PROCUREMENT PLAN (Textual Part) Project information: Uzbekistan ETMMD (P171683) Project Implementation agency: PIU under NES Date of the Procurement Plan: January 11, 2021 Period covered by this Procurement Plan: from Jan 11,2021 to June 30, 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the PPL dated April, 2018, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Uzbekistan : Electricity Sector Transformation and Resilient Transmission PLAN General Information Country: Uzbekistan 2021-08-18 Bank’s Approval Date of the Original Procurement Plan: 2022-07-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171683 GPN Date: Project Name: Electricity Sector Transformation and Resilient Transmission Loan / Credit No: TF / B3778, TF / B4241, IDA / 69430 Uzbekistan National Power Grid Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RFB/KOLTS/2021 / Lot 1.RFB/ KOLTS/2021-1:Constuction of Substation 500 kV "Koltsevay COMPONENT 2: Power grid s Open - Internationa Single Stage - One E a"; Lot 2. RFB/KOLTS/2021-2: IDA / 69430 trengthening and renewable Prior Request for Bids 0.00 Canceled 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 2022-08-20 l nvelope Construction of Transmission energy integration lines 220; Lot 3. RFB/KOLTS/2 021-3: Construction of Trans mission lines 500; RFB/KOLTS/2021-1 / Lot 1: R FB/KOLTS/2021-1/1: Construc COMPONENT 2: Power grid s tion of transmission lines 220 Open - Internationa Single Stage - One E Under Imple IDA / 69430 trengthening and renewable Prior Request for Bids 0.00 2022-03-16 2022-07-15 2022-03-21 2022-07-20 2022-05-02 2022-06-01 2022-07-06 2023-01-02 kV, L=213 km l nvelope mentation energy integration Lot 2: RFB/KOLTS/2021-1/2: Construction of transmission lines 500 kV, L=72 km RFB/KOLTS/2021-2 / Constru COMPONENT 2: Power grid s Open - Internationa Single Stage - One E Pending Impl ction of new 500 kV substatio IDA / 69430 trengthening and renewable Prior Request for Bids 0.00 2022-04-10 2022-04-15 2022-05-27 2022-06-26 2022-07-31 2023-01-27 l nvelope ementation n ‘Koltsevaya’ energy integration RFB/SCADA/2021-1 / Lot 1: S COMPONENT 1: Digitalizatio Open - Internationa Single Stage - One E Pending Impl CADA/EMS/RTU and Telecom IDA / 69430 n of the electricity transmiss Prior Request for Bids 0.00 2022-08-08 2022-08-18 2022-11-16 2023-02-14 2023-03-30 2027-12-31 l nvelope ementation munications ion sector RFB/SCADA/2021-2 / Lot 2: F COMPONENT 1: Digitalizatio Open - Internationa Single Stage - One E Pending Impl IDA / 69430 Prior Request for Bids 0.00 2022-08-01 2022-08-16 2022-11-14 2023-02-12 2023-03-28 2026-12-31 iber Optic Cables n of the electricity transmiss l nvelope ementation ion sector CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ETMMD/CS/CQ-01 / Consultin g Services for preparation of COMPONENT 1: Digitalizatio Quality And Cost- Open - Internationa Pending Impleme Feasibility Study and Procure TF / B3778 n of the electricity transmiss Post 0.00 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-05-14 2021-06-18 2021-07-23 2022-07-23 Based Selection l ntation ment Documents for SCADA/ ion sector EMS/RTU and Telecommunic ations ETMMD/CS-02 / Consultantin g service to prepare the Proj ect Procurement Strategy for COMPONENT 2: Power grid s Fixed Budget Sele Pending Impleme Development and Procureme TF / B4241 trengthening and renewable Post Open - National 0.00 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-05-14 2021-06-18 2021-07-23 2022-07-23 ction ntation nt Plan for Electricity Transmi energy integration ssion System Modernization and Market Development Pro ject ESTART/CS-3/2/1 / Project Im plementation Support and Te COMPONENT 3: NEGU institu chnical Supervision for Const Quality And Cost- Open - Internationa Under Implement IDA / 69430 tional development and proj Post 0.00 2022-05-10 2022-05-26 2022-05-31 2022-07-14 2022-08-11 2022-09-10 2022-10-15 2022-11-19 2023-11-19 ruction of new 500 kV substa Based Selection l ation ect implementation support tion ‘Koltsevaya’ and Constru ction of transmission lines 50 0KV and 220 KV INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ESTART/CS/2021-01 / Constr COMPONENT 2: Power grid s uction of new 500 kV substat Individual Consult Under Implement TF / B4241 trengthening and renewable Post Open 0.00 2021-08-19 2021-08-02 2021-10-07 2021-08-25 2021-10-28 2021-08-25 2021-12-02 2022-05-31 ion ‘Koltsevaya’ with overhea ant Selection ation energy integration d lines 500KV and 220 KV ESTART/2021/CS-02 / FINAN CIAL AUDIT OF THE ECAPDEV GRANT NO. TF0B 4241 FOR T COMPONENT 1: Digitalizatio HE PERIOD FROM GRANT EFF TF / B4241 n of the electricity transmiss Post Direct Selection Direct 0.00 Canceled 2021-08-25 2021-08-24 2021-09-04 2021-11-08 2022-05-07 ECTIVENESS (INCEPTION) TO ion sector GRANT CLOSURE (31 AUGUS T 2021, INCLUDING DISBURS EMENT DEADLINE PERIOD OC TOBER 30, 2021) Page 1