The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Adaptive Safety Nets and Economic Inclusion Project (P175363) WESTERN AND CENTRAL AFRICA | Cameroon | Social Protection & Jobs Global Practice | IBRD/IDA | Investment Project Financing | FY 2022 | Seq No: 1 | ARCHIVED on 23-Jun-2022 | ISR51788 | Implementing Agencies: Ministry of Economy, Planning, and Regional Development (MINEPAT), The Republic of Cameroon Key Dates Key Project Dates Bank Approval Date: 09-Mar-2022 Effectiveness Date: -- Planned Mid Term Review Date: 03-Feb-2025 Actual Mid-Term Review Date: Original Closing Date: 30-Mar-2028 Revised Closing Date: 30-Mar-2028 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to: (i) expand the coverage and shock-responsive capacity of the safety nets system for poor households, and (ii) increase access to income-generation and entrepreneurship support opportunities for youth in urban areas. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Adaptive Safety Nets:(Cost $70.00 M) Youth Economic Inclusion and Entrepreneurship:(Cost $68.50 M) Shock-Responsive Digital Delivery Systems:(Cost $5.00 M) Project Management and Coordination Support:(Cost $16.50 M) Contingent Emergency Response Component (CERC) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial Implementation Status and Key Decisions The project was approved on March 9, 2022, and is currently subject to internal government procedures required to declare it effective. The World Bank and the government teams are working to prepare to launch key activities as soon as the project is effective, including an update of the Project Implementation Manual and recruitment of additional personnel to strengthen the project implementation unit. This is the first ISR ahead of the first implementation support mission tentatively scheduled for November 2022. 6/23/2022 Page 1 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial -- Substantial Macroeconomic Moderate -- Moderate Sector Strategies and Policies Substantial -- Substantial Technical Design of Project or Program Substantial -- Substantial Institutional Capacity for Implementation and Substantial -- Substantial Sustainability Fiduciary Substantial -- Substantial Environment and Social Substantial -- Substantial Stakeholders Substantial -- Substantial Other -- -- -- Overall Substantial -- Substantial Results PDO Indicators by Objectives / Outcomes Expand the coverage and shock-responsive capacity of the safety nets system for poor households IN01151511 ►Households benefitting from safety nets services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 The sum of: (i) number of households that have received regular cash transfers, (ii) number of households Comments: who have received emergency cash transfers, and (iii) number of households in which one member participating in public works. IN01151513 of which recipient is a female household member (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 103,900.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151515 6/23/2022 Page 2 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) of which recipient is a displaced household member (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 30,100.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151517 ►Social registry developed and implemented (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 A social registry is developed and implemented when it has a single registration form, a unique identifier Comments: system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries. IN01151519 ►Digital payments system developed and implemented (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 A digital payment system is considered developed and implemented when beneficiaries are provided with Comments: the option of receiving transfers from the project through digital payment provider(s). Increase access to income-generation and entrepreneurship support opportunities for youth IN01151512 ►Urban youth benefitting from IGA support services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 65,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: The number of youth who have received IGA support services under sub-component 2.1 IN01151514 of which women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 32,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151516 of which displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 6/23/2022 Page 3 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Value 0.00 -- 0.00 23,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151518 ►Urban youth benefitting from entrepreneurship support services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,000.00 Date 31-Mar-2022 -- 06-Jun-2022 30-Jun-2027 Comments: The number of youth who have received entrepreneurship support under sub-component 2.2 IN01151520 of which women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 600.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151521 of which displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 400.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151522 ►Jobs created by the firms receiving support from the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 6,000.00 Date 31-Mar-2022 -- 06-Jun-2022 30-Mar-2028 Comments: Number of jobs created by the firm, including of the entrepreneur running the firm IN01151523 of which women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,800.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151524 of which displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,200.00 6/23/2022 Page 4 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Intermediate Results Indicators by Components Component 1. Sub-component 1.1. Regular Cash Transfers IN01151532 ►Households benefitting from regular cash transfers (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 53,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Count of households receiving regular cash transfer through the project IN01151534 of which recipient is a Female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 42,400.00 Date 30-Jun-2022 -- 06-Jun-2022 30-Jun-2027 IN01151546 of which recipient is Displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 10,600.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151549 ►Beneficiaries receiving cash transfers on time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of recipients receiving transfer on time as per PIM guidelines. "On time" means within the Comments: same calendar month of the expected bi-monthly payment. IN01151553 ►Beneficiaries participating in IGA accompanying measures and completing the activity (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 6/23/2022 Page 5 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) This indicator intends to capture participation (minimum 80% attendance) to accompanying measures Comments: offered in their location. IN01151558 ►Beneficiaries participating in human capital accompanying measures and completing the activity (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 This indicator intends to capture participation (minimum 80% attendance) to accompanying measures Comments: offered in their location. IN01151563 ►Beneficiaries participating in GBV accompanying measures and completing the activity (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 This indicator intends to capture participation (minimum 80% attendance) to accompanying measures Comments: offered in their location. Component 1. Sub-component 1.2. Emergency Cash Transfers IN01151531 ►Households benefitting from emergency cash transfers (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 42,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Count of households receiving emergency cash transfer. IN01151533 Of which recipient is a woman (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 34,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151545 of which recipient is displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 8,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151551 ►Beneficiaries receiving cash transfers on time (Percentage, Custom) 6/23/2022 Page 6 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of beneficiaries receiving transfer on time as per PIM guidelines. On time means within the Comments: same calendar month of the expected bi-monthly payment. Component 1. Sub-component 1.3. Labor-Intensive Public Works Program IN01151530 ►Public works beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 55,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Count of individuals participating in public works (PW) through the project IN01151535 of which Female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 27,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151544 of which Displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 11,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151550 ►Person days of temporary employment created (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3,300,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Sum of days worked by each PW participant. IN01151554 Of which female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,650,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 6/23/2022 Page 7 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) IN01151559 ►Beneficiaries receiving payment on time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of beneficiaries receiving transfer on time as per PIM guidelines. On time means within the Comments: same calendar month of the expected payment. IN01151562 ►Microprojects chosen through meaningful consultations with targeted communities (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of microprojects that were selected based on a participatory project with community Comments: representatives and local leaders and that reflect community priorities as reflected in the local development plans. IN01151565 ►Microprojects contributing to climate change mitigation and adaptation (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 45.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of microprojects under LIPW that support prevention or management of climate-induced Comments: droughts, floods and landslides IN01151568 ►Microprojects providing on-site childcare services (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2 per commune Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 This indicator will report the number of on-site childcare services associated to PW microprojects in each Comments: commune. Component 2. Sub-Component 2.1. Economic Inclusion of Youth IN01151529 ►Beneficiaries who received IGA support (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 65,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 6/23/2022 Page 8 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Comments: Count of youth participating in at least one IGA support activity IN01151539 Of which Female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 32,500.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151541 of which Displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 23,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151547 ►Beneficiaries who completed the life and business skills training (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 85.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Participation is defined as having attended at least 80% of sessions IN01151552 ►Beneficiaries who received the productive grant (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 98.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Percentage of intended beneficiaries able to access full amount of the productive grant IN01151557 Among women beneficiaries (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 98.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151561 ►Beneficiaries running an IGA (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 70.00 -- 70.00 90.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 6/23/2022 Page 9 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Percentage of beneficiaries who reported initiating or expanding an IGA following participation in the Comments: project IN01151564 Among women beneficiaries (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 50.00 -- 50.00 90.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151567 ►Women running IGAs in non-traditional sectors (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 5.00 -- 5.00 25.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of women beneficiaries operating an IGA in a non-traditional or male-dominated sector (e.g., Comments: mechanics, carpentry, foundry) IN01151571 ►Beneficiaries with active IGAs at least 6 months after the end of the program (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of beneficiaries with IGAs generating more revenues than needed to cover costs in the Comments: previous month. IN01151573 Among women beneficiaries (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Component 2. Sub-component 2.2. Business Plan Competition IN01151526 ►Youths (18 to 35) receiving a training (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Number of pre-selected applicants receiving support to develop their business plans IN01151540 of which Females (Number, Custom Breakdown) 6/23/2022 Page 10 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 900.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151542 of which Displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 600.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151548 ►Applications received (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 6,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Number of applications received for the two BPC selection rounds IN01151555 of which females (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,800.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151556 of which displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,200.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151560 ►Grants disbursed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Number of final BPC grant beneficiaries supported post selection (24 months) IN01151566 of which females (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 6/23/2022 Page 11 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Value 0.00 -- 0.00 600.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151569 of which displaced (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 400.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 IN01151570 ►Winners of BPC selected competitively (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Number of youth receiving a grant based on a competitive selection process IN01151572 ►New firms supported under the Business Plan Competition (BPC) that are still operating 24 months after receiving assistance (financial and non-financial) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 90.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 This will count the share of firms that received the BPC grant that is still operational after 24 month from Comments: receiving the grant in each round. IN01151574 ►New firms established through BPC (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,000.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: This is the number of informal SMEs formalized IN01151575 Of which female owned (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 300.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Component 3. Sub-component 3.1. Unified Social Registry 6/23/2022 Page 12 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) IN01151528 ►Communal social centers equipped to manage the National Social Registry (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 -- 10.00 60.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Share of communal social centers equipped with hardware, software and personel to manage activities of Comments: the National Social Registry at each commune. IN01151537 ►MINAS staff trained to develop, implement and maintain the National Social Registry (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 255.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Number of MINAS staff trained to develop, implement and maintain the National Social Registry. IN01151538 ►National Social Registry MIS operational (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 30-Jun-2022 -- 06-Jun-2022 30-Jun-2027 MIS designed and implemented as described in PIM. An effective and operational MIS system is capable of generating lists and report in an effective and transparent manner. Processes can be streamlined and Comments: automated. It is expected that the system will be scaled up and fully automated and functional for the National Social Registry. Component 3. Sub-component 3.2. Digital Payment System IN01151525 ►Beneficiaries receiving payments digitally (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 30-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Percentage of beneficiaries of any of the components who received the payment digitally. Numerator: sum Comments: of beneficiaries of each component receiving digital payment. Denominator: sum of beneficiaries of all components Component 4. Project Management and Coordination Support IN01151527 ►Maximum program management expenses as share of total program expenses (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/23/2022 Page 13 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Value 0.00 -- 0.00 15.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Maximum program management expenses as share of total program expenses. IN01151536 ►Grievances registered and addressed within the project’s GRM timeframe (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 97.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 Comments: Percentage of claims resolved in line with PIM IN01151543 ►Beneficiary satisfied with the program (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 31-Mar-2022 -- 06-Jun-2022 31-Mar-2028 The share of respondents who scored above average (i.e., mostly agree or strongly agree) to a Comments: satisfaction index. The results will be disaggregated by sub-component. Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed Not P175363 IDA-70480 USD 160.00 160.00 0.00 0.00 156.20 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Not P175363 IDA-70480 09-Mar-2022 -- -- 30-Mar-2028 30-Mar-2028 Effective Cumulative Disbursements 6/23/2022 Page 14 of 15 The World Bank Implementation Status & Results Report Adaptive Safety Nets and Economic Inclusion Project (P175363) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/23/2022 Page 15 of 15