EC Quito Metro Line One (P144489) Ecuador, IBRD/IDA, FY: 2014, Team Leader(s): Arturo Ardila Gomez, Alejandro Hoyos Guerrero , Lending Instrument: Investment Project Financing • PROCUREMENT Ecuador : Quito Metro Line One PLAN General Information Country: Ecuador 2017-08-08 Bank’s Approval Date of the Original Procurement Plan: 2022-06-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144489 GPN Date: Project Name: Quito Metro Line One Loan / Credit No: IBRD / 82850, IBRD / 88890 Quito Metro Private Enterprise Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-EPM METRO QUITO-1670 6-CS-QCBS / Incorporación d 5: Technical Studies to Supp Selección basada e la perspectiva de género e IBRD / 82850 Posterior Open - National 178,000.00 0.00 En ejecución 2017-08-11 2017-08-09 2017-08-29 2017-08-22 2017-09-12 2017-12-18 2017-10-03 2018-01-12 2017-10-10 2018-01-21 2017-10-20 2017-10-30 2018-10-30 ort Project Implementation en calidad y costo n el sistema Integrado de Tra nsporte Público del Distrito M etropolitano de Quito EC-EPM METRO QUITO-4703 9-CS-QCBS / Desarrollo e Imp lementación del Plan de Cap 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 82850 Previa 500,000.00 0.00 Cancelado 2018-03-05 2018-03-26 2018-05-09 2018-06-06 2018-07-06 2018-08-10 2018-09-14 2019-09-14 acitación y formación de pers ort Project Implementation en calidad y costo l onal para el período de trans ción y operación Metro de Qu ito EC-EPM METRO QUITO-4731 9-CS-QCBS / Consultoría para 5: Technical Studies to Supp Selección basada Open - Internationa la actualización del Estudio IBRD / 82850 Posterior 300,000.00 235,211.74 Firmado 2018-07-02 2018-09-18 2018-07-23 2020-02-04 2018-09-05 2020-09-03 2018-10-03 2020-10-12 2018-11-02 2020-11-27 2018-12-07 2020-12-17 2019-01-11 2021-07-01 2019-07-10 ort Project Implementation en calidad y costo l de Impacto Ambiental para la operación de la PLMQ EC-EPM METRO QUITO-4703 6-CS-QCBS / Estudio para el 5: Technical Studies to Supp Selección basada Open - Internationa Modelo de desarrollo, manejo IBRD / 82850 Posterior 345,000.00 0.00 Cancelado 2018-03-04 2018-03-25 2018-05-08 2018-06-05 2018-07-05 2018-08-09 2018-09-13 2019-05-11 ort Project Implementation en calidad y costo l y adminsitración de ingresos no tarifarios de Metro de Quit o EC-EPM METRO QUITO-1670 5: Technical Studies to Supp Selección basada Open - Internationa 5-CS-QCBS / Elaboración del IBRD / 82850 Previa 1,300,000.00 0.00 Cancelado 2018-02-01 2018-02-22 2018-04-07 2018-05-05 2018-06-04 2018-07-09 2018-08-13 2019-08-13 ort Project Implementation en calidad y costo l nuevo Plan Maestro Integral de Movilidad EC-EPM METRO QUITO-4703 5: Technical Studies to Supp Selección basada Open - Internationa 8-CS-QCBS / Desarrollo de la IBRD / 82850 Posterior 300,000.00 0.00 En ejecución 2018-05-21 2018-06-11 2018-07-25 2018-08-22 2018-09-21 2018-10-26 2018-11-30 2019-05-29 ort Project Implementation en calidad y costo l estrategia para el fomento d e Cultura Metro EC-EPM METRO QUITO-1670 0-CS-QCBS / Estudio de desar 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 82850 Previa 550,000.00 0.00 En ejecución 2018-07-25 2018-08-24 2018-09-27 2018-09-21 2020-04-06 2018-10-19 2020-10-30 2018-11-02 2018-11-15 2018-11-25 2019-11-25 rollo urbano relacionado con ort Project Implementation en calidad y costo l el Sistema de Transporte Púb lico Metro de Quito EC-EPM METRO QUITO-1670 8-CS-QCBS / Implementación de mecanismos de prevenció n, atención y denuncia de la 5: Technical Studies to Supp Selección basada IBRD / 82850 Posterior Open - National 100,000.00 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-10 2018-10-01 2018-10-08 2018-10-18 2018-10-28 2019-04-26 violencia y el acoso sexual h ort Project Implementation en calidad y costo acia las mujeres y niñas en el Sistema Integrado de Transp orte Público del distrito Metro politano de Quito EC-EPM METRO QUITO-1670 5: Technical Studies to Supp Selección basada Open - Internationa 1-CS-QCBS / Estudio de Inter IBRD / 88890 Posterior 250,000.00 0.00 Cancelado 2019-05-03 2019-05-24 2019-07-07 2019-08-04 2019-09-03 2019-10-08 2019-11-12 2020-05-10 ort Project Implementation en calidad y costo l modalidad y fomento del tra nsporte público EC-EPM METRO QUITO-4704 0-CS-QCBS / Consultoría para 5: Technical Studies to Supp Selección basada Open - Internationa el estudio de monitoreo de p IBRD / 82850 Previa 500,000.00 0.00 Cancelado 2019-01-10 2019-01-31 2019-03-16 2019-04-13 2019-05-13 2019-06-17 2019-07-22 2020-01-07 ort Project Implementation en calidad y costo l arámetros ambientales adici onales solicitados por los mul tilaterales en el PAC EC-EPM METRO QUITO-1126 84-CS-QCBS / Plan maestro d e Movilidad. Según lo acorda 5: Technical Studies to Supp Selección basada Open - Internationa do en la misión de seguimien IBRD / 88890 Previa 1,300,000.00 1,218,778.00 Firmado 2019-08-05 2019-11-14 2019-08-26 2019-11-18 2019-10-09 2020-11-17 2019-11-06 2021-01-22 2019-12-06 2021-06-07 2020-01-10 2021-09-14 2020-02-14 2022-02-07 2020-12-10 ort Project Implementation en calidad y costo l to de Abril de 2019, se retom a este estudio con el mismo presupuesto planificado ante riormente. Page 1 EC-EPM METRO QUITO-4731 6-CS-QCBS / Estudio de reme diación de pasivos ambiental 5: Technical Studies to Supp Selección basada es y sociales en escombrera IBRD / 82850 Posterior Open - National 150,000.00 0.00 Cancelado 2018-06-04 2018-06-25 2018-08-08 2018-09-05 2018-10-05 2018-11-09 2018-12-14 2019-06-02 ort Project Implementation en calidad y costo Oyacoto, generados por verti do de materiales de desalojo de la Primera Línea del Metro de Quito EC-EPM METRO QUITO-4703 7-CS-QCBS / Estudio el desar 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 82850 Posterior 195,000.00 0.00 Cancelado 2019-03-29 2019-04-12 2019-05-10 2019-05-24 2019-06-07 2019-07-05 2019-08-02 2019-10-31 rollo del sistema de control e ort Project Implementation en calidad y costo l inventario de bienes de la PL MQ EC-EPM METRO QUITO-1669 9-CS-QCBS / Estudio sobre m odelo de negocio de Metro d e Quito y estructuración de l 5: Technical Studies to Supp Selección basada Open - Internationa a Empresa Metro de Quito. In IBRD / 82850 Previa 2,500,000.00 0.00 Cancelado 2017-09-22 2017-10-13 2017-11-10 2017-12-08 2017-12-22 2018-01-08 2018-01-18 2019-01-18 ort Project Implementation en calidad y costo l cluye estudio para ingresos n o tarifarios y desarrollo e Imp lementación del Plan de Cap acitación y formación para el personal de Metro durante la transición EC-EPM METRO QUITO-1428 77-CS-QCBS / Estudio que pe rmita estructurar y conforma 5: Technical Studies to Supp Selección basada Open - Internationa r la Entidad Administradora d IBRD / 88890 Posterior 340,000.00 0.00 En ejecución 2019-11-08 2020-03-31 2019-11-29 2020-04-10 2020-01-12 2020-11-17 2020-02-09 2020-12-16 2020-03-10 2021-02-12 2020-04-14 2020-05-19 2020-09-16 ort Project Implementation en calidad y costo l el Sistema Integrado de Tran sporte Público del Distrito Me tropolitano de Quito - Autorid ad Única de Transporte EC-EPM METRO QUITO-1428 81-CS-QCBS / Asesoría técnic a especializada para la elabo ración de los pliegos para la 5: Technical Studies to Supp Selección basada Open - Internationa Ejecución pendien IBRD / 88890 Posterior 350,000.00 0.00 2019-11-08 2019-11-29 2020-01-12 2020-02-09 2020-03-10 2020-04-14 2020-05-19 2021-05-19 contratación de la implement ort Project Implementation en calidad y costo l te ación, operación y mantenim iento del SIR, SAE, SIU y sag para el Sistema Integrado de Transporte Público de Pasaje ros del DMQ. EC-EPM METRO QUITO-1428 85-CS-QCBS / Estudio que pe 5: Technical Studies to Supp Selección basada Open - Internationa rmita definir el modelo de ge IBRD / 88890 Posterior 250,000.00 0.00 Cancelado 2019-12-02 2019-12-23 2020-02-05 2020-03-04 2020-04-03 2020-05-08 2020-06-12 2021-06-12 ort Project Implementation en calidad y costo l stión del Sistema Integrado d e Transporte Público del DM Q. EC-EPM METRO QUITO-1449 56-CS-QCBS / Estudio para la 5: Technical Studies to Supp Selección basada Open - Internationa Determinación de los Ingreso IBRD / 82850 Posterior 500,000.00 0.00 En ejecución 2019-11-15 2020-11-13 2019-12-06 2020-10-27 2020-01-19 2020-02-16 2020-03-17 2020-04-21 2020-05-26 2021-05-26 ort Project Implementation en calidad y costo l s No Tarifarios en la Primera Linea del Metro de Quito (PL MQ) EC-EPM METRO QUITO-1079 68-CS-QCBS / Implementació 5: Technical Studies to Supp Selección basada Open - Internationa n de acciones de Cultura Met IBRD / 88890 Posterior 500,000.00 0.00 Cancelado 2019-08-30 2019-09-20 2019-11-03 2019-12-01 2019-12-31 2020-02-04 2020-03-10 2021-03-10 ort Project Implementation en calidad y costo l ro en seguimiento al Desarr ollo de la estrategia para el f omento de la misma EC-EPM METRO QUITO-1670 9-CS-QCBS / Declaratoria anu al de desechos peligrosos 20 18. Este estudio corresponde 5: Technical Studies to Supp Selección basada IBRD / 82850 Posterior Open - National 30,000.00 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-10 2018-09-24 2018-10-04 2018-10-21 2018-11-04 2019-01-03 al período mencionado y es p ort Project Implementation en calidad y costo arte del cumplimento de la n ormativa ambiental local, qu e se realiza anualmente. Es d istinta a la de 2017. EC-EPM METRO QUITO-1462 Selección basada 47-CS-CQS / Estructuración l 5: Technical Studies to Supp Open - Internationa IBRD / 88890 Posterior en calificaciones d 180,000.00 0.00 Cancelado 2019-11-21 2020-02-14 2019-12-12 2020-01-25 2020-02-24 2020-03-30 2020-09-26 egal para la operación y man ort Project Implementation l e consultores tenimiento de la Primera Line a del Metro de Quito EC-EPM METRO QUITO-1428 88-CS-INDV / Actualización al modelo de integración tarifar ia (Fase II). Determinación de 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 300,000.00 0.00 En ejecución 2020-10-19 2020-10-20 2020-11-09 2020-12-23 2021-01-20 2021-02-19 2021-03-26 2021-04-30 2022-04-30 la fórmula de distribución de ort Project Implementation en calidad y costo l ingresos a distintos operador es del sistema integrado de t ransporte público de pasajer os del DMQ. EC-EPM METRO QUITO-1449 58-CS-QCBS / Estudio de eval uación integral y propuesta d 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 82850 Posterior 927,670.00 0.00 En ejecución 2020-11-06 2020-12-03 2020-11-27 2020-12-26 2021-01-23 2021-02-22 2021-03-29 2021-05-03 2022-05-03 e reestructuración institucion ort Project Implementation en calidad y costo l al de la Empresa Pública Met ropolitana de Transporte de Pasajeros de Quito EC-EPM METRO QUITO-2035 38-CS-QCBS / Estructuración 5: Technical Studies to Supp Selección basada Open - Internationa técnica de la operación y el IBRD / 82850 Previa 2,122,600.00 1,304,829.36 Firmado 2020-11-06 2020-11-10 2020-11-27 2020-11-12 2021-01-10 2021-01-27 2021-02-07 2021-03-22 2021-03-09 2021-04-26 2021-04-13 2021-10-11 2021-05-18 2021-12-14 2022-05-18 ort Project Implementation en calidad y costo l mantenimineto de la Primera Línea del Metro de Quito EC-EPM METRO QUITO-2089 64-CS-QCBS / Definición de l a estrategia de comunicación a operadores y usuarios sobr 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 85,000.00 0.00 En ejecución 2020-12-14 2020-12-24 2020-12-29 2021-02-19 2021-01-27 2021-02-24 2021-03-26 2021-04-30 2021-06-04 2021-10-02 e la implementación del Siste ort Project Implementation en calidad y costo l ma integrado de Transporte y la Tarifa Integrada de Trans porte del Distrito Metropolita no de Quito EC-EPM METRO QUITO-2173 76-CS-QCBS / Actualización a l modelo de integración tarifa ria (Fase II). Determinación d 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 250,000.00 0.00 En ejecución 2021-02-05 2021-02-10 2021-02-26 2021-03-19 2021-04-11 2022-02-23 2021-05-09 2022-03-30 2021-06-08 2022-04-12 2021-07-13 2021-08-17 2022-08-17 e la fórmula de distribución d ort Project Implementation en calidad y costo l e ingresos a distintos operad ores del Sistema Integrado d e Transporte Público de pasaj eros del DMQ EC-EPM METRO QUITO-2306 63-CS-QCBS / Consultoría par a establecer las causas de as 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 1,000,000.00 0.00 En ejecución 2021-04-23 2021-04-21 2021-05-14 2021-05-13 2021-06-27 2022-02-10 2021-07-25 2022-03-18 2021-08-24 2022-04-04 2021-09-28 2022-04-21 2021-11-02 2022-11-02 entamientos y daños a las ed ort Project Implementation en calidad y costo l ificaciones en las Etapas 1 y 4 de la ciudadela Solanda y p ropuestas de solución Page 2 EC-EPM METRO QUITO-2306 5: Technical Studies to Supp Selección basada Open - Internationa 68-CS-QCBS / Plan parcial de IBRD / 88890 Posterior 500,000.00 0.00 En ejecución 2021-05-21 2021-11-12 2021-06-11 2021-12-20 2021-07-25 2021-08-22 2021-09-21 2021-10-26 2021-11-30 2022-11-30 ort Project Implementation en calidad y costo l renovación urbana en Soland a EC-EPM METRO QUITO-2322 76-CS-QCBS / Encuestas satis 5: Technical Studies to Supp Selección basada Open - Internationa Ejecución pendien IBRD / 88890 Posterior 20,000.00 0.00 2021-08-02 2021-08-23 2021-10-06 2021-11-03 2021-12-03 2022-01-07 2022-02-11 2023-02-11 facción de usuarios de la Pri ort Project Implementation en calidad y costo l te mera Línea del Metro de Quit o EC-EPM METRO QUITO-1923 20-CS-QCBS / SERVICIOS DE CONSULTORÍA PARA ESTABL ECER LA METODOLOGÍA DE S 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 180,000.00 0.00 Cancelado 2020-09-11 2020-10-13 2020-10-02 2020-10-14 2020-11-15 2020-11-24 2020-12-13 2021-01-12 2021-02-16 2021-03-23 2022-03-23 ELECCIÓN DEL PROVEEDOR ort Project Implementation en calidad y costo l DE LOS SERVICIOS DE OPERA CIÓN, MANTENIMIENTO Y TR ANSFERENCIA TECNOLÓGICA DE LA PRIMERA LÍNEA DEL M ETRO DE QUITO EC-EPM METRO QUITO-2823 16-CS-QCBS / Apoyo técnico para la creación e implement 5: Technical Studies to Supp Selección basada Open - Internationa IBRD / 88890 Posterior 300,000.00 0.00 En ejecución 2022-03-07 2022-03-09 2022-03-28 2022-03-24 2022-05-11 2022-06-08 2022-07-08 2022-08-12 2022-09-16 2023-09-16 ación del fondo metropolitan ort Project Implementation en calidad y costo l o de movilidad como parte d el proceso de restructuración de rutas INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-EPM METRO QUITO-1670 5: Technical Studies to Supp Selección directa 3-CS-CDS / Contratación de u IBRD / 82850 Posterior Direct 30,000.00 25,000.00 Finalizado 2017-08-11 2017-08-07 2017-08-13 2017-11-01 2017-09-15 2017-11-10 2017-10-30 2018-01-31 ort Project Implementation de consultores n consultor para asesoría en Contrato Fidic EC-EPM METRO QUITO-4766 5-CS-INDV / Declaratoria anu al de desechos peligrosos 20 18. Este estudio corresponde 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Limited 30,000.00 30,000.00 Finalizado 2018-09-14 2018-11-30 2018-09-19 2019-02-20 2018-10-10 2019-02-28 2018-11-14 2019-03-13 2019-02-22 2019-04-26 al período mencionado y es p ort Project Implementation arte del cumplimento de la n ormativa ambiental local, qu e se realiza anualmente. Es d istinta a la de 2017. EC-EPM METRO QUITO-1654 7-CS-CDS / Actualización del 5: Technical Studies to Supp Selección directa Ejecución pendien IBRD / 82850 Posterior Direct 200,000.00 0.00 2017-05-30 2017-06-01 2018-04-30 2018-10-27 modelo de demanda para la ort Project Implementation de consultores te Primera Línea del Metro de Q uito del DMQ EC-EPM METRO QUITO-5662 6-CS-INDV / Declaratoria anu al de desechos peligrosos 20 17. Este estudio corresponde 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Limited 30,000.00 0.00 Cancelado 2018-02-05 2018-05-10 2018-05-31 2018-07-05 2018-08-04 al período mencionado y es p ort Project Implementation arte del cumplimento de la n ormativa ambiental local, qu e se realiza anualmente. Es d istinta a la de 2018. EC-EPM METRO QUITO-4731 8-CS-CDS / Actualización de l a puesta en valor de los halla zgos arqueológicos en la Plaz 5: Technical Studies to Supp Selección directa IBRD / 82850 Posterior Direct 50,000.00 0.00 Cancelado 2018-04-30 2018-05-10 2018-07-14 2018-07-20 a San Francisco. Esta consult ort Project Implementation de consultores oría es un seguimiento del pr imer estudio realizado al res pecto. Sería realizado por la misma firma: KATZAM EC-EPM METRO QUITO-4732 0-CS-INDV / Asesoría técnica para la implementación del C omponente V en el área de G 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Limited 34,000.00 0.00 Cancelado 2018-05-02 2018-05-07 2018-05-28 2018-07-02 2018-08-31 estión Ambiental, que respon ort Project Implementation de a la necesidad de la imple mentación inmediata de med idas solicitadas por los organi smos multilaterales EC-EPM METRO QUITO-1347 76-CS-CDS / Diseño de ingeni ería básica y definición de pr 5: Technical Studies to Supp Selección directa esupuesto básico de la const IBRD / 82850 Previa Direct 1,100,000.00 1,451,563.50 Firmado 2019-09-17 2019-11-18 2019-09-27 2020-01-24 2019-12-01 2020-12-01 2020-05-29 ort Project Implementation de consultores rucción de la extensión de la Primera Línea del Metro de Q uito (Tramo El Labrador - La Ofelia) EC-EPM METRO QUITO-1079 55-CS-INDV / Asesoría técnic a para la implementación del Componente V en el área de 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Direct 34,000.00 34,000.00 Finalizado 2019-09-30 2019-04-16 2019-10-08 2019-05-28 2019-10-09 2019-06-05 2019-10-18 2019-09-09 2020-08-13 2020-07-05 Gestión Ambiental, que resp ort Project Implementation onde a la necesidad de la im plementación inmediata de medidas solicitadas por los o rganismos multilaterales EC-EPM METRO QUITO-1428 57-CS-INDV / Consultoría indi vidual para la asistir a la Dire 5: Technical Studies to Supp cción Metropolitana de Polític IBRD / 88890 Posterior Individual Open 21,000.00 0.00 Cancelado 2019-11-08 2019-12-27 2020-01-17 2020-02-21 2020-08-19 ort Project Implementation as y Pleaneamiento de Movili dad de la Secretaría de Movil idad en la reestructuración d e rutas de transporte público EC-EPM METRO QUITO-1428 63-CS-INDV / Consultoría indi vidual para asistir a la Direcci 5: Technical Studies to Supp ón Metropolitana de Políticas IBRD / 88890 Posterior Individual Open 70,000.00 0.00 En ejecución 2019-11-08 2020-02-14 2019-12-27 2020-01-17 2020-02-21 2020-08-19 ort Project Implementation y Pleaneamiento de la Movili dad de la Secretaría de Movil idad en las negociaciones de la reestructuración de rutas. EC-EPM METRO QUITO-1428 65-CS-INDV / Consultoría indi vidual para asistir a la Direcci ón Metropolitana de Políticas 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Open 32,000.00 30,000.00 Firmado 2019-11-08 2020-02-14 2019-12-27 2021-02-04 2020-01-17 2021-02-20 2020-02-21 2021-04-21 2020-08-19 y Planeamiento de la Movilid ort Project Implementation ad de la Secretaría de Movili dad en los sistemas de infor mación geográficos orientad as al transporte público. Page 3 EC-EPM METRO QUITO-1428 68-CS-INDV / Consultoría indi vidual para apoyo técnico a l a implementación del compo 5: Technical Studies to Supp nente AT en la Dirección Met IBRD / 88890 Posterior Individual Open 21,000.00 0.00 Cancelado 2019-11-08 2020-02-14 2019-12-27 2020-04-06 2020-01-17 2020-02-21 2020-08-19 ort Project Implementation ropolitana de Políticas y Plan eamiento de la Movilidad de l a Secretaría de Movilidad. Es pecialista en transporte urba no (modelador) EC-EPM METRO QUITO-1349 41-CS-CDS / Asesoría para la 5: Technical Studies to Supp Selección directa IBRD / 82850 Posterior Direct 200,000.00 200,000.00 Firmado 2019-11-15 2020-02-06 2019-11-20 2020-03-03 2020-01-24 2020-05-08 2020-07-22 Selección del Operador de la ort Project Implementation de consultores Primera Línea del Metro de Q uito EC-EPM METRO QUITO-1597 47-CS-CDS / Consultoría indiv idual para la asesoría Técnic 5: Technical Studies to Supp Selección directa IBRD / 88890 Posterior Direct 35,000.00 0.00 En ejecución 2020-02-14 2020-02-14 2020-02-24 2020-04-06 2020-04-29 2020-10-26 a para la definición del Plan d ort Project Implementation de consultores e Reestructuración de la Red de Rutas de Transporte Públi co del DMQ EC-EPM METRO QUITO-2021 37-CS-INDV / Consultoría indi vidual para el apoyo en los pr ocesos, análisis y evaluación 5: Technical Studies to Supp de la viabilidad financiera del IBRD / 88890 Posterior Individual Direct 7,000.00 7,000.00 Firmado 2020-11-04 2020-11-11 2020-11-14 2020-12-15 2020-12-05 2020-12-21 2021-01-09 2020-12-30 2021-07-08 ort Project Implementation Proyecto que permita la tom a de decisiones y definición s obre el proceso de contrataci ón e implementación del Sist ema Inteligente de Transport e EC-EPM METRO QUITO-2021 41-CS-INDV / Asesoría técnic a para el apoyo en la implem 5: Technical Studies to Supp entación de consultorías cont IBRD / 88890 Posterior Individual Direct 50,000.00 0.00 Cancelado 2020-11-04 2021-03-18 2020-11-14 2020-12-05 2021-01-09 2021-07-08 ort Project Implementation ratadas y a contratar para la implementación del sistema i ntegrado de transporte públi co del MDMQ EC-EPM METRO QUITO-2021 39-CS-INDV / Asistencia técni ca para la implementación d 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Direct 28,000.00 0.00 Cancelado 2020-11-06 2020-11-16 2020-12-07 2021-01-11 2021-07-10 e los Sistemas Inteligentes d ort Project Implementation e Transporte en la Empresa P ública Metropolitna de Trans porte de Pasajeros Quito EC-EPM METRO QUITO-2113 98-CS-CDS / ELABORACIÓN D E ESTUDIOS PREVIOS, DEFINI CIÓN DE MODELO Y TECNOL OGÍA DE MEDIO DE PAGO, ES 5: Technical Studies to Supp Selección directa IBRD / 88890 Posterior Direct 28,000.00 0.00 En ejecución 2020-12-22 2021-01-17 2021-01-01 2021-03-11 2021-03-07 2021-09-03 TUDIO TÉCNICO Y TÉRMINOS ort Project Implementation de consultores DE REFERENCIA PARA LA CO NTRATACIÓN, IMPLEMENTACI ÓN Y PUESTA EN MARCHA DE L SISTEMA INTEGRADO DE R ECAUDO, PARA LA EPMTPQ EC-EPM METRO QUITO-2271 36-CS-INDV / Asistir a la Dire cción Metropolitana de Polític as y Planeamiento de la Movi 5: Technical Studies to Supp lidad de la Secretaría de Mov IBRD / 88890 Posterior Individual Limited 12,000.00 0.00 En ejecución 2021-04-05 2021-04-13 2021-04-10 2021-05-01 2021-06-05 2021-12-02 ort Project Implementation ilidad en las negociaciones c on operadores en la impleme ntación del Plan de Reestruct uración de Rutas de Transpor te Público del DMQ (Fase1) EC-EPM METRO QUITO-2271 37-CS-INDV / Asesoría técnic a en la revisión y recepción d e los productos del Estudio q 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Limited 14,000.00 14,000.00 Firmado 2021-04-05 2021-04-13 2021-04-10 2022-03-03 2021-05-01 2022-04-05 2021-06-05 2022-05-16 2021-12-02 ue permita Estructurar y Con ort Project Implementation formar la Entidad Administra dora del SIT Público del DMQ (Autoridad Única de Transpor te) dentro del ámbito financi ero EC-EPM METRO QUITO-2274 72-CS-INDV / Asesoría técnic a en el ámbito legal para la r evisión y recepción de los pr 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Limited 14,000.00 0.00 En ejecución 2021-04-12 2021-04-13 2021-04-17 2021-09-23 2021-05-08 2021-06-12 2021-12-09 oductos del estudio para la e ort Project Implementation structuración y conformación de la entidad administradora del SIT del DMQ (Autoridad Ú nica de Transporte) EC-EPM METRO QUITO-2274 76-CS-INDV / asesoría técnic a en el ámbito de planificació n de transporte público para 5: Technical Studies to Supp Ejecución pendien IBRD / 88890 Posterior Individual Limited 14,000.00 0.00 2021-04-12 2021-04-17 2021-05-08 2021-06-12 2021-12-09 la revisión y recepción del es ort Project Implementation te tudio para la estructuración y conformación de la entidad a dministradora del SIT del DM Q (autoridad Única de Transp orte) EC-EPM METRO QUITO-2274 82-CS-INDV / Asesoría técnic a en planificación de tranport 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Limited 36,000.00 0.00 En ejecución 2021-04-19 2021-04-13 2021-04-24 2021-05-15 2021-06-19 2021-12-16 e pública para la revisión y re ort Project Implementation cepción delos productos del Plan Maestro de movilidad 20 20 - 2040 EC-EPM METRO QUITO-2317 75-CS-INDV / Consultor indivi dual Análisis Técnico y Admi 5: Technical Studies to Supp nistrativo especializado para IBRD / 88890 Posterior Individual Open 40,250.00 0.00 Cancelado 2021-05-07 2021-05-06 2021-06-25 2021-07-16 2021-08-20 2022-02-16 ort Project Implementation el mantenimiento de Material Rodante, Vehículos auxiliares y equipos de taller de la Prim era Línea del Metro de Quito EC-EPM METRO QUITO-2317 76-CS-INDV / Consultor exper 5: Technical Studies to Supp IBRD / 88890 Posterior Individual Open 50,000.00 0.00 Cancelado 2021-05-21 2021-07-09 2021-07-30 2021-09-03 2022-03-02 to en legislación y normativa ort Project Implementation de Seguros y Reclamos Page 4 EC-EPM METRO QUITO-2317 77-CS-INDV / Consultor indivi dual Análisis Técnico y Admi 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Open 40,250.00 0.00 Cancelado 2021-05-07 2021-05-06 2021-06-25 2021-07-16 2021-08-20 2022-02-16 nistrativo especializado para ort Project Implementation el mantenimiento del Sistem a de Energía de la Primera Lí nea del Metro de Quito EC-EPM METRO QUITO-2317 78-CS-INDV / Consultor indivi dual Análisis Técnico y Admi nistrativo especializado para 5: Technical Studies to Supp el mantenimiento de los siste IBRD / 82850 Posterior Individual Open 55,250.00 0.00 Cancelado 2021-05-24 2021-05-06 2021-07-12 2021-08-02 2021-09-06 2022-03-05 ort Project Implementation mas Electromecánicos (Prote cción Contra Incendios, Venti lación Escaleras Mecánicas y Ascensores) de la Primera Lín ea del Metro de Quito EC-EPM METRO QUITO-2317 79-CS-INDV / Consultor indivi dual Análisis Técnico y Admi 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Open 40,250.00 0.00 Cancelado 2021-05-17 2021-05-06 2021-07-05 2021-07-26 2021-08-30 2022-02-26 nistrativo especializado para ort Project Implementation el mantenimiento del sistem a de Señalización de la Prime ra Línea del Metro de Quito EC-EPM METRO QUITO-2317 80-CS-INDV / Consultor indivi dual Análisis Técnico y Admi 5: Technical Studies to Supp nistrativo especializado para IBRD / 82850 Posterior Individual Open 40,250.00 0.00 Cancelado 2021-05-21 2021-05-06 2021-07-09 2021-07-30 2021-09-03 2022-03-02 ort Project Implementation el mantenimiento del sistem a de Telecomunicaciones de l a Primera Línea del Metro de Quito EC-EPM METRO QUITO-2317 81-CS-INDV / Consultor indivi dual Especializado Análisis T 5: Technical Studies to Supp écnico - Administrativo para l IBRD / 88890 Posterior Individual Open 48,000.00 0.00 En ejecución 2021-05-14 2021-05-06 2021-07-02 2021-07-23 2021-08-27 2022-02-23 ort Project Implementation a etapa preparatoria de infor mación para el mantenimient o de las obras civiles Infraest ructura y Superestructura de la PLMQ EC-EPM METRO QUITO-2322 75-CS-INDV / Asesoría técnic a para el apoyo en la implem 5: Technical Studies to Supp Ejecución pendien entación de consultorías cont IBRD / 88890 Posterior Individual Limited 24,800.00 0.00 2021-05-03 2021-05-08 2021-05-29 2021-07-03 2021-12-30 ort Project Implementation te ratadas y a contratar para la implementación del sistema i ntegrado de transporte públi co EC-EPM METRO QUITO-2508 26-CS-INDV / Asesoría técnic a de dos especialistas para el 5: Technical Studies to Supp apoyo en la implementación IBRD / 82850 Posterior Individual Limited 9,920.00 0.00 Cancelado 2021-08-31 2021-09-08 2021-09-05 2021-09-26 2021-10-31 2021-12-31 ort Project Implementation de consultorías contratadas y a contratar para la implemen tación del sistema integrado de transporte público. EC-EPM METRO QUITO-2674 10-CS-INDV / Apoyo administ 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Limited 27,280.00 0.00 En ejecución 2021-12-13 2021-12-13 2021-12-18 2022-01-17 2022-01-08 2022-02-12 2022-08-11 rativo de coordinación de act ort Project Implementation ividades con las secretarías d el MDMQ EC-EPM METRO QUITO-2674 13-CS-INDV / Asesoría técnic 5: Technical Studies to Supp a de coordinación para activi IBRD / 82850 Posterior Individual Limited 27,280.00 20,909.09 Firmado 2021-12-13 2021-12-13 2021-12-18 2022-01-17 2022-01-08 2022-02-02 2022-02-12 2022-02-07 2022-08-11 ort Project Implementation dades a ser contratadas por l as secretarías del MDMQ EC-EPM METRO QUITO-2708 46-CS-CDS / Asesoría externa para la gestión de relaciones 5: Technical Studies to Supp Selección directa estratégicas interinstituciona IBRD / 82850 Posterior Direct 50,000.00 50,000.00 Firmado 2021-12-23 2021-12-28 2022-01-02 2022-01-28 2022-03-08 2022-02-11 2022-09-04 ort Project Implementation de consultores les y corporativas en el marc o del modelo de gestión para la operación del Metro de Qui to EC-EPM METRO QUITO-2708 48-CS-CDS / Asesoría de alto 5: Technical Studies to Supp Selección directa nivel a la Gerncia de Opracio IBRD / 82850 Posterior Direct 70,000.00 70,000.00 Firmado 2021-12-23 2021-12-28 2022-01-02 2022-01-28 2022-03-08 2022-04-20 2022-09-04 ort Project Implementation de consultores nes de la EPMMQ durante el proceso de contratación de l a operación de la PLMQ EC-EPM METRO QUITO-2823 18-CS-INDV / Asesoría técnic a para mecanismos de obenc 5: Technical Studies to Supp ión de fondos vinculados a la IBRD / 88890 Posterior Individual Direct 34,000.00 34,000.00 Firmado 2022-03-03 2022-03-10 2022-03-13 2022-03-29 2022-04-03 2022-04-06 2022-05-08 2022-06-08 2022-11-04 ort Project Implementation reducción de emisiones de c arbono en la Primera línea de l Metro de Quito y Salvaguar das Ambientales y Sociales EC-EPM METRO QUITO-2823 23-CS-CDS / Elaboración del diseño de la exposición perm 5: Technical Studies to Supp Selección directa IBRD / 88890 Posterior Direct 40,200.00 0.00 En ejecución 2022-03-25 2022-03-23 2022-04-04 2022-06-08 2022-12-05 anente Quito Patrimonio de l ort Project Implementation de consultores a Humanidad, Historia de la Ciudad en la Estación del Met ro San Francisco EC-EPM METRO QUITO-2869 29-CS-INDV / Asesoría estrat 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Direct 70,000.00 0.00 En ejecución 2022-04-01 2022-04-05 2022-04-11 2022-05-02 2022-06-06 2022-12-03 égica de alto nivel a la EPMM ort Project Implementation Q para el proceso puesta en marcha de la PLMQ EC-EPM METRO QUITO-2869 33-CS-INDV / Asesoría para la 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Direct 40,000.00 0.00 En ejecución 2022-05-09 2022-05-13 2022-05-19 2022-06-09 2022-07-14 2023-01-10 inspección estudio y diagnóst ort Project Implementation ico de edificaciones en Solan da EC-EPM METRO QUITO-2936 41-CS-INDV / Asesoría y asist encia técnica para realizar lo 5: Technical Studies to Supp s estudios para la implement IBRD / 82850 Posterior Individual Limited 45,000.00 0.00 En ejecución 2022-05-11 2022-05-13 2022-05-16 2022-06-06 2022-07-11 2023-01-07 ort Project Implementation ación de la explotación de se rvicios digitales y de telecom unicaciones dentro de la Pri mera Línea del Metro de Quit o Page 5 EC-EPM METRO QUITO-2937 82-CS-INDV / Apoyo técnico a la implementación del compo 5: Technical Studies to Supp IBRD / 82850 Posterior Individual Limited 18,923.52 0.00 En ejecución 2022-05-13 2022-05-13 2022-05-18 2022-06-08 2022-07-13 2023-01-09 nente AT en la Dirección Met ort Project Implementation ropolitana de Políticas y Plan eamiento de la Movilidad. Es pecialista en transporte urba no EC-EPM METRO QUITO-3008 00-CS-INDV / Asesoría Técnic a para efectuar el levantamie nto de los espacios disponebl 5: Technical Studies to Supp Ejecución pendien es y óptimos en las estacione IBRD / 82850 Posterior Individual Limited 38,500.00 0.00 2022-06-27 2022-07-02 2022-07-23 2022-08-27 2023-02-23 ort Project Implementation te s y trenes del Metro de Quito y determinar el modelo de n egocio idóneo para rentabiliz ar dichos espacios relativos a actividades publicitarias físic os y/ Page 6