Plan Belgrano WSS Development Project (P125151) PROCUREMENT Argentina : Plan Belgrano Water Supply and Sanitation Services Development Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2017-07-17 2022-03-10 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P125151 GPN Date: Project Name: Plan Belgrano Water Supply and Sanitation Services Development Project Loan / Credit No: / , IBRD / 80320, IBRD / 87310 Ministry of Home Affairs, Public Works and Housing Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-NGII-24-O-LPI / Planta de Tratamiento de Líquidos Component 1: Water Supply Solicitud de 64,600,000.0 64,464,034. 2016-01- Cloacales del Área / Previa Open - International Firmado 2013-09-17 2013-10-04 2013-11-18 2013-12-09 2014-01-02 2014-04-29 and Sanitation Infrastructure ofertas 0 61 02 Metropolitana Gran Resistencia. AR-NGII-25-O-LPI / Sistema de Colección en Impulsión Component 1: Water Supply Solicitud de 76,030,000.0 83,392,069. 2015-12- Cloacal del Área / Previa Open - International Firmado 2013-07-24 2013-08-22 2013-10-08 2013-10-31 2013-12-06 2013-12-23 and Sanitation Infrastructure ofertas 0 36 06 Metropolitana, Gran Resistencia. LPI N 02/13 / Obra:Planta de Tratamiento de Líquidos Cloacales del Área Component 1: Water Supply Solicitud de Single Stage - One 78,300,000.0 78,300,000. IBRD / 80320 Previa Open - International En ejecución 2014-04-09 Metropolitana Gran and Sanitation Infrastructure ofertas Envelope 0 00 Resistencia, Provincia de Chaco AR-MININTERIOR-31232-CW- RFB / Obra Abastecimiento de Agua Potable a las Localidades de Wichí, El Component 1: Water Supply Solicitud de Single Stage - One 17,610,714.4 2018-11- IBRD / 80320 Previa Open - International 0.00 Cancelado 2017-10-05 2017-10-05 2017-11-22 2017-12-14 2018-04-12 2019-01-31 2018-05-17 Sauzal, Misión Nueva and Sanitation Infrastructure ofertas Envelope 9 13 Pompeya y Fuerte Esperanza, Etapa II, Provincia de Chaco.Las obras proyectadas comprenden. AR-MININTERIOR-44442-CW- RFB / Remediación de Lagunas de sedimentación en Component 1: Water Supply Solicitud de Single Stage - One 21,494,148.0 2018-12- IBRD / 80320 Previa Open - International 0.00 Cancelado 2018-02-23 2018-03-05 2018-04-16 2018-05-16 2018-06-20 el área Metropolitana de Gran and Sanitation Infrastructure ofertas Envelope 0 17 Resistencia, Provincia de Chaco AR-MININTERIOR-49928-CW- RFB / OBRA: ACUEDUCTO PRESIDENCIA ROCA - PAMPA DEL INDIO Y OTRAS CINCO Component 1: Water Supply Solicitud de Single Stage - One 29,298,210.0 2018-12- IBRD / 87310 Previa Open - International 0.00 Cancelado 2018-02-20 2018-03-07 2018-04-18 2018-05-18 2018-06-22 LOCALIDADES - 2DA ETAPA - and Sanitation Infrastructure ofertas Envelope 0 19 REDES DE DISTRIBUCIÓN DE AGUA POTABLE, PROVINCIA DEL CHACO AR-MININTERIOR-31232-CW- RFB-2 / Obra Abastecimiento de Agua Potable - Localidades Component 1: Water Supply Solicitud de Single Stage - One 24,501,815.2 2023-06- de Wichí, El Sauzal, Misión IBRD / 80320 Previa Open - International 0.00 Cancelado 2020-12-23 2020-12-28 2021-02-14 2021-05-15 2021-06-12 and Sanitation Infrastructure ofertas Envelope 7 02 Nueva Pompeya y Fuerte Esperanza, Etapa II, Provincia de Chaco AR-MININTERIOR-214622- CW-RFB / Obra Abastecimiento de Agua Component 1: Water Supply Solicitud de Single Stage - One 22,649,474.1 26,604,645. 2023-05- Potable - Localidades de IBRD / 80320 Previa Open - National Firmado 2021-01-21 2021-01-28 2021-01-26 2021-01-29 2021-03-09 2021-03-05 2021-04-08 2021-05-11 2021-05-13 2021-07-06 and Sanitation Infrastructure ofertas Envelope 9 77 03 Wichí, El Sauzal, Misión Nueva Pompeya y Fuerte Esperanza, Etapa II, Provincia de Chaco GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-8-B-CP / Compras Component 1: Water Supply Solicitud de varias de equipamiento / Previa Limited - National 45,000.00 0.00 Cancelado 2016-11-09 2016-12-09 2017-01-31 and Sanitation Infrastructure cotizaciones mobiliario de oficina AR-NGII-29-B-CP / Component 1: Water Supply Solicitud de Adquisición de artículos de / Posterior Limited - National 21,100.00 0.00 Cancelado 2016-11-04 2016-11-24 2016-12-20 and Sanitation Infrastructure cotizaciones Librería para la UEP. AR-NGII-51-B-CP / Component 1: Water Supply Solicitud de Adquisición de equipos / Posterior Limited - National 38,000.00 0.00 Cancelado 2016-09-30 2016-11-28 2017-01-27 and Sanitation Infrastructure cotizaciones informáticos AR-NGII-9-B-CP / Component 1: Water Supply Solicitud de Equipamiento Informático / Previa Limited - National 25,000.00 0.00 Cancelado 2016-11-09 2016-12-20 2017-02-15 and Sanitation Infrastructure cotizaciones (Soft y Hardware) AR-NGII-46-B-LPI / Adquisición, provisión e Component 2: Institutional Solicitud de Single Stage - One instalación de IBRD / 80320 and Operational Development Previa Open - International 7,103,449.00 0.00 En ejecución 2018-05-11 2018-05-16 2018-06-27 2018-07-27 2018-08-31 2019-02-27 ofertas Envelope micromedidores y medidores and Technical Assistance de agua potable.- AR-MININTERIOR-83924-GO- Component 2: Institutional RFQ / Adquisición de Solicitud de Single Stage - One IBRD / 80320 and Operational Development Posterior Limited 60,000.00 0.00 En ejecución 2018-10-28 2018-10-19 2018-11-13 2019-01-12 Mobiliario para oficina cotizaciones Envelope and Technical Assistance DiGePPSE Page 1 AR-MININTERIOR-83927-GO- Component 2: Institutional RFQ / Adquisición de Solicitud de Single Stage - One IBRD / 80320 and Operational Development Posterior Limited 82,500.00 36,080.46 Firmado 2018-10-31 2018-12-05 2018-11-30 2019-06-10 2019-01-29 equipamiento informático cotizaciones Envelope and Technical Assistance para oficina DiGePPSE AR-MININTERIOR-87716-GO- Component 2: Institutional RFB / Adquisición de Solicitud de Single Stage - One IBRD / 80320 and Operational Development Previa Open - International 851,671.20 520,552.62 Firmado 2019-05-13 2019-05-31 2019-06-02 2019-08-05 2019-07-17 2019-08-08 2019-09-15 2020-08-21 2019-11-14 2020-11-19 2020-01-13 Equipamiento fijo para ofertas Envelope and Technical Assistance Laboratorios - I AR-MININTERIOR-112642- Component 2: Institutional GO-RFB / Adquisición de Solicitud de Single Stage - One IBRD / 80320 and Operational Development Previa Open - International 6,141,000.00 568,128.95 Firmado 2019-05-15 2019-09-02 2019-06-04 2019-11-27 2019-07-19 2019-11-28 2019-09-17 2021-03-23 2019-11-16 2021-06-29 2020-01-15 Equipamiento Fijo para los ofertas Envelope and Technical Assistance Laboratorios- II AR-MININTERIOR-44109-GO- RFB / Adquisición de Component 2: Institutional Medidores de Agua Potable, Solicitud de Single Stage - One IBRD / 80320 and Operational Development Previa Open - International 9,000,000.00 0.00 Cancelado 2018-02-05 2018-02-10 2018-03-24 2018-04-23 2018-05-28 2019-01-23 Kit de Micro Medición y de ofertas Envelope and Technical Assistance Cajas Unificadas, con instalación. AR-MININTERIOR-169205- GO-RFB / Adquisición de Draga para la Obra: Component 2: Institutional Abastecimiento de Agua Solicitud de Single Stage - One IBRD / 80320 and Operational Development Previa Open - International 2,355,340.41 1,029,011.52 Firmado 2020-07-20 2020-10-21 2020-09-01 2021-01-26 2020-10-16 2021-02-10 2021-01-14 2021-05-10 2021-03-05 2021-09-17 2021-05-04 Potable en las Localidades de ofertas Envelope and Technical Assistance Wichi, El Sauzal, Misión Nueva Pompeya y Fuerte Esperanza - Etapa I, Chaco AR-MININTERIOR-225272- Component 2: Institutional GO-RFQ / Adquisición de Solicitud de Single Stage - One IBRD / 80320 and Operational Development Posterior Limited 95,000.00 97,051.29 Firmado 2021-03-31 2021-03-17 2021-04-30 2021-05-28 2021-06-29 Equipamiento y Accesorios de cotizaciones Envelope and Technical Assistance Informática NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-28-S-CP / Servicio Component 1: Water Supply Solicitud de de limpieza para la oficina de / Posterior Limited - National 43,000.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 and Sanitation Infrastructure cotizaciones la UEP. AR-NGII-11-S-CP / Servicio Component 1: Water Supply Solicitud de / Posterior Limited - National 12,198.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 externo de archivo and Sanitation Infrastructure cotizaciones AR-NGII-30-S-CP / Servicio Técnico y alquiler de Component 1: Water Supply Solicitud de / Posterior Limited - National 16,300.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 fotocopiadora para la oficina and Sanitation Infrastructure cotizaciones de la UEP. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-27-CF-SBCC / Inspección para la Obra: Planta de Tratamiento de Component 1: Water Supply Selección basada / Previa Open - International 3,211,248.00 2,724,833.47 Firmado 2013-10-04 2013-12-12 2013-12-26 2014-01-13 2014-07-10 2017-02-13 Líquidos Cloacales del Área and Sanitation Infrastructure en calidad y costo Metropolitana Gran Resistencia. AR-NGII-26-CF-SBCC / Inspección para la Obra: Sistema de Colección en Component 1: Water Supply Selección basada / Previa Open - International 3,500,000.00 3,153,776.19 Firmado 2013-11-22 2014-01-26 2014-03-15 2014-04-15 2014-03-26 2017-05-15 Impulsión Cloacal del Área and Sanitation Infrastructure en calidad y costo Metropolitana, Gran Resistencia. AR-NGII-33-CF-SBMC / Contratación de los Trabajos Component 1: Water Supply Selección basada / Previa Open - National 10,680.00 19,294.34 Firmado 2013-11-19 2014-03-18 2014-04-25 2014-05-09 2014-12-10 2015-06-30 de Auditoría Externa, Ejercicio and Sanitation Infrastructure en el menor costo 2014. Selección basada AR-NGII-53-CF-SCC / Component 1: Water Supply / Posterior en calificaciones Open - International 21,321,321.00 0.00 Cancelado 354635465 and Sanitation Infrastructure de consultores AR-MININTERIOR-60998-CS- QCBS / CONTRATACIÓN PARA LA ELABORACIÓN DE UN PLAN DIRECTOR DE AGUA Y SANEAMIENTO PARA EL AREA Component 3: Project Selección basada IBRD / 80320 Posterior Open - International 500,000.00 105,683.40 Firmado 2018-04-26 2016-06-01 2018-05-17 2018-06-30 2016-10-12 2018-07-28 2016-11-10 2018-08-27 2017-01-23 2018-10-01 2017-03-14 2018-11-05 2017-05-12 2019-11-05 METROPOLITANA DE PUERTO Management and Supervision en calidad y costo IGUAZU - PROVINCIA DE MISIONES - Pedido de Propuestas UEP 8032 - 10/2016 - NGII-41-SBCC-CF- AR-MININTERIOR-60999-CS- QCBS / CONTRATACIÓN PARA LA ELABORACIÓN DE PROYECTO EJECUTIVO DEL Component 3: Project Selección basada SISTEMA CLOACAL EN SAN IBRD / 80320 Posterior Open - International 750,000.00 0.00 En ejecución 2018-04-26 2016-05-19 2018-05-17 2018-06-30 2016-10-07 2018-07-28 2016-11-14 2018-08-27 2017-01-30 2018-10-01 2017-03-17 2018-11-05 2019-11-05 Management and Supervision en calidad y costo VICENTE - PROVINCIA DE MISIONES - Pedido de Propuestas UEP 8032 - 11/2016 - NGII-42-SBCC-CF- Page 2 AR-MININTERIOR-61000-CS- QCBS / CONTRATACIÓN PARA LA REVISIÓN, COMPLETAMIENTO Y ACTUALIZACIÓN DE PROYECTO SISTEMA CLOACAL Component 3: Project Selección basada IBRD / 80320 Posterior Open - International 700,000.00 61,705.06 Firmado 2018-04-26 2016-06-07 2018-05-17 2018-06-30 2016-09-29 2018-07-28 2016-11-03 2018-08-27 2017-01-16 2018-10-01 2017-03-03 2018-11-05 2017-09-20 2019-11-05 L.N.ALEM - SISTEMA CLOACAL Management and Supervision en calidad y costo DE ARISTOBULO DEL VALLE - PROVINCIA DE MISIONES - Pedido de Propuestas UEP 8032 - 12/2016 - NGII-43- SBCC-CF- AR-MININTERIOR-31240-CS- QCBS / CONTRATACIÓN DE TRABAJOS PARA LA INSPECCIÓN DE LA OBRA: ABASTECIMIENTO DE AGUA Component 1: Water Supply Selección basada POTABLE PARA LAS IBRD / 80320 Previa Open - International 880,535.70 0.00 Cancelado 2017-10-11 2017-10-20 2017-12-04 2018-01-01 2018-01-31 2018-03-07 2018-04-11 2019-04-11 and Sanitation Infrastructure en calidad y costo LOCALIDADES DE WICHÍ, EL SAUZAL, MISIÓN NUEVA POMPEYA Y FUERTE ESPERANZA - ETAPA II - PROVINCIA DE CHACO AR-MININTERIOR-43779-CS- LCS / Servicio de Auditoría Component 3: Project Selección basada Ejecución Externa del Préstamo BIRF IBRD / 80320 Posterior Open - National 80,714.00 0.00 2018-01-12 2018-01-12 2018-01-16 2018-02-20 2018-02-26 2018-03-01 2018-03-05 2020-08-31 Management and Supervision en el menor costo pendiente 8032-AR y su financiamiento adicional BIRF 8731-AR AR-MININTERIOR-113147-CS- QCBS / Monitoreo Proactivo Component 3: Project Selección basada de los PGRs de Prestadores de IBRD / 80320 Posterior Open - National 185,848.00 0.00 En ejecución 2019-05-08 2019-02-15 2019-05-29 2019-07-12 2019-08-09 2019-09-08 2019-10-13 2019-11-17 2021-11-06 Management and Supervision en calidad y costo Agua Potable y Saneamiento AR-MININTERIOR-98095-CS- QCBS / CONTRATACIÓN DE TRABAJOS PARA LA INSPECCIÓN DE LA OBRA: ABASTECIMIENTO DE AGUA Component 1: Water Supply Selección basada POTABLE PARA LAS IBRD / 80320 Posterior Open - International 955,000.00 0.00 Cancelado 2019-02-04 2019-02-09 2019-03-16 2019-04-13 2019-05-13 2019-06-17 2019-07-22 2020-07-21 and Sanitation Infrastructure en calidad y costo LOCALIDADES DE WICHÍ, EL SAUZAL, MISIÓN NUEVA POMPEYA Y FUERTE ESPERANZA - ETAPA II - PROVINCIA DE CHACO AR-MININTERIOR-31242-CS- QCBS / CONTRATACIÓN DE LOS TRABAJOS DE INSPECCIÓN DE LA OBRA REMEDIACIÓN DE Component 1: Water Supply Selección basada IBRD / 80320 Previa Open - International 1,234,378.21 0.00 Cancelado 2017-10-11 2017-10-20 2017-12-03 2017-12-31 2018-01-30 2018-03-06 2018-04-10 2019-04-10 LAGUNAS DE SEDIMENTACIÓN and Sanitation Infrastructure en calidad y costo EN EL ÁREA METROPOLITANA DE GRAN RESISTENCIA, PROVINCIA DE CHACO AR-NGII-50-CI-CD / Contratación para la Component 1: Water Supply elaboración del manual / Posterior Adquisición directa National 7,000.00 0.00 Cancelado 2016-09-20 2017-02-20 and Sanitation Infrastructure operativo, en el marco del nuevo financiamiento BIRF. AR-NGII-54-CI-CD / Contratación de servicios de consultoria para llevar a cabo Component 1: Water Supply / Posterior Adquisición directa National 2,300.00 0.00 Cancelado 2017-04-03 2017-04-28 las tareas de traducción and Sanitation Infrastructure pública del nuevo Préstamo BIRF. AR-NGII-49-CI-CD / Contratación para la Component 1: Water Supply actualización de estudios / Posterior Adquisición directa National 3,500.00 0.00 Cancelado 2016-09-30 2016-10-31 and Sanitation Infrastructure sociales en el marco del nuevo financiamiento BIRF. AR-NGII-53-CI-CD / CONSULTORÍA PARA LA EVALUACIÓN DE PROPUESTAS Component 1: Water Supply TÉCNICAS Y DE PRECIO PARA / Posterior Adquisición directa National 2,500.00 0.00 Cancelado 2017-04-03 2017-07-03 and Sanitation Infrastructure LA ELABORACIÓN DE PROYECTOS EJECUTIVOS DE LAS OBRAS DEL PROYECTO. AR-MININTERIOR-49932-CS- QCBS / Contratación del Servicio de Inspección de la Obra: ACUEDUCTO PRESIDENCIA ROCA - PAMPA Component 1: Water Supply Selección basada IBRD / 87310 Previa Open - International 1,171,928.00 0.00 Cancelado 2018-02-28 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-08-05 2018-09-09 2019-09-09 DEL INDIO Y OTRAS CINCO and Sanitation Infrastructure en calidad y costo LOCALIDADES - 2DA ETAPA - REDES DE DISTRIBUCIÓN DE AGUA POTABLE, PROVINCIA DEL CHACO. AR-MININTERIOR-31240-CS- QCBS-2 / Contratación de Trabajos de Inspección de Obra Abastecimiento de Agua Component 1: Water Supply Selección basada IBRD / 80320 Posterior Open - International 880,535.70 625,142.55 Firmado 2020-05-04 2019-03-13 2020-05-13 2020-06-27 2021-05-21 2020-07-25 2021-06-22 2020-08-24 2021-08-18 2020-09-21 2021-06-22 2020-10-21 2021-10-16 2022-10-11 Potable - Localidades de and Sanitation Infrastructure en calidad y costo Wichí, El Sauzal, Misión Nueva Pompeya y Fuerte Esperanza, Etapa II, Prov. de Chaco INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 AR-MININTERIOR-44105-CS- CDS / Consultoria para la elaboración de los Planes de Component 3: Project Selección directa Gestión y Resultados de los IBRD / 80320 Posterior Direct 45,000.00 45,000.00 Firmado 2018-04-26 2018-08-02 2018-05-03 2018-08-17 2018-05-20 2018-12-18 2019-01-30 Management and Supervision de consultores prestadores de agua y saneamiento de la región norte de la Argentina AR-MININTERIOR-87039-CS- CDS / Consultoría externa Component 3: Project Selección directa IBRD / 80320 Posterior Direct 34,122.00 0.00 Cancelado 2018-11-23 2018-12-05 2019-01-29 2019-05-29 para la elaboración de PGR´s: Management and Supervision de consultores Tucumán y Misiones AR-NGII-7-CI-3CV / Plantel Component 2: Institutional Profesional, Técnico y IBRD / 80320 and Operational Development Posterior Individual Limited 569,038.00 1,062,585.17 Firmado 2018-12-21 2018-12-21 2016-01-11 2019-01-02 2016-12-30 2020-03-31 Administrativo de DiGePPSE y and Technical Assistance DNAPyS AR-MININTERIOR-168842-CS- Component 2: Institutional INDV / Plantel Profesional, IBRD / 80320 and Operational Development Posterior Individual Limited 45,000.00 77,603.80 Firmado 2020-04-15 2020-04-01 2020-04-16 2020-03-27 2020-04-17 2020-04-22 2020-04-19 2020-04-23 2020-11-04 Técnico y Administrativo and Technical Assistance DIGEPPSE AR-MININTERIOR-121657-CS- CDS / Programa de Component 2: Institutional Selección directa Capacitación en Regulación de IBRD / 80320 and Operational Development Posterior Direct 108,000.00 0.00 Cancelado 2019-08-15 2019-09-04 2019-10-09 2020-06-05 de consultores Servicios Públicos de Agua y and Technical Assistance Saneamiento AR-MININTERIOR-100961-CS- CDS / Programa de Component 2: Institutional Selección directa Capacitación en Proyecto de IBRD / 80320 and Operational Development Posterior Direct 130,000.00 0.00 Cancelado 2019-05-20 2019-06-09 2019-07-14 2020-03-10 de consultores Instalaciones de Ingeniería and Technical Assistance Sanitaria AR-MININTERIOR-44115-CS- INDV / Contratación de servicios para el relevamiento de necesidades y definición de Component 3: Project IBRD / 80320 Posterior Individual Direct 119,000.00 0.00 Cancelado 2018-01-31 2018-02-10 2018-03-03 2018-04-07 2018-09-04 Especificaciones Técnicas para Management and Supervision Macromedición de Prestadores Principales de Agua Potable y Saneamiento. AR-MININTERIOR-181526-CS- Component 3: Project Ejecución INDV / Analista Económico IBRD / 80320 Posterior Individual Limited 6,225.00 0.00 2020-06-23 2020-06-28 2020-06-29 2020-07-09 2021-01-05 Management and Supervision pendiente Financiero AR-MININTERIOR-201097-CS- INDV / Especialista Senior - Servicio de consultoría para asesoramiento técnico en la Component 3: Project compra de equipamiento para IBRD / 80320 Posterior Individual Direct 30,000.00 0.00 En ejecución 2020-10-23 2018-02-06 2020-10-27 2020-11-01 2020-11-16 2021-07-14 Management and Supervision los laboratorios de empresas prestadoras de agua y desagües cloacales de la Región Norte Argentino AR-MININTERIOR-213879-CS- INDV / Analista en Component 3: Project IBRD / 80320 Posterior Individual Limited 5,000.00 35,103.24 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 adquisiciones y Management and Supervision Contrataciones AR-MININTERIOR-213900-CS- Component 3: Project INDV / Asistente de Mesa de IBRD / 80320 Posterior Individual Limited 3,000.00 27,456.83 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 Management and Supervision Entradas AR-MININTERIOR-213902-CS- INDV / Especialista en Component 3: Project IBRD / 80320 Posterior Individual Limited 5,500.00 18,468.19 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-20 2021-01-18 2021-01-26 2021-04-30 Adquisiciones y Management and Supervision Contrataciones AR-MININTERIOR-213903-CS- Component 3: Project INDV / Analista en Encuadre IBRD / 80320 Posterior Individual Limited 4,500.00 37,120.29 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 Management and Supervision Normativo AR-MININTERIOR-221948-CS- INDV / Especialista en Soporte Component 3: Project IBRD / 80320 Posterior Individual Limited 12,000.00 16,862.17 Firmado 2021-02-26 2021-03-04 2021-02-27 2021-03-02 2021-02-28 2021-03-09 2021-03-02 2021-03-09 2021-12-31 del Sistema de Gestión de Management and Supervision Obras AR-MININTERIOR-221951-CS- Component 3: Project INDV / Staff Operativo de IBRD / 80320 Posterior Individual Limited 12,000.00 35,233.84 Firmado 2021-02-26 2021-03-04 2021-02-27 2021-03-02 2021-02-28 2021-03-09 2021-03-02 2021-03-09 2021-12-31 Management and Supervision Apoyo de Gestión de Procesos AR-MININTERIOR-226063-CS- Component 3: Project INDV / Asistente de Mesa de IBRD / 80320 Posterior Individual Limited 5,094.00 22,187.09 Firmado 2021-03-23 2021-04-08 2021-03-24 2021-03-31 2021-03-25 2021-04-14 2021-04-01 2021-04-14 2021-12-31 Management and Supervision Entradas AR-MININTERIOR-226064-CS- INDV / Especialista en Component 3: Project IBRD / 80320 Posterior Individual Limited 11,823.00 41,350.84 Firmado 2021-03-23 2021-04-08 2021-03-24 2021-03-31 2021-03-25 2021-04-15 2021-04-01 2021-04-15 2021-12-31 Adquisiciones y Management and Supervision Contrataciones AR-MININTERIOR-226065-CS- Component 3: Project INDV / Asistente de Encuadre IBRD / 80320 Posterior Individual Limited 7,905.00 30,461.29 Firmado 2021-03-23 2021-04-08 2021-03-26 2021-04-13 2021-03-27 2021-04-14 2021-04-01 2021-04-14 2021-12-31 Management and Supervision Normativo AR-MININTERIOR-226068-CS- INDV / Asistente para la Component 3: Project Dirección de Gestión de IBRD / 80320 Posterior Individual Limited 7,373.00 25,930.49 Firmado 2021-03-23 2021-04-08 2021-03-26 2021-03-31 2021-03-27 2021-04-14 2021-04-01 2021-04-14 2021-12-31 Management and Supervision Proyectos Sectoriales y Especiales AR-MININTERIOR-236848-CS- INDV / Especialista Senior en Component 3: Project IBRD / 80320 Posterior Individual Limited 11,000.00 10,282.62 Firmado 2021-05-27 2021-05-27 2021-05-28 2021-06-16 2021-05-29 2021-06-17 2021-06-01 2021-06-17 2021-12-31 el Desarrollo de Metodologías Management and Supervision para Laboratorios de Ensayo Page 4 AR-MININTERIOR-239911-CS- INDV / Especialista para el Component 3: Project IBRD / 80320 Posterior Individual Limited 7,819.00 33,614.60 Firmado 2021-06-16 2021-06-16 2021-06-17 2021-06-27 2021-06-18 2021-06-30 2021-06-20 2021-06-30 2022-04-20 Sector de Monitoreo de Management and Supervision Contratos. AR-MININTERIOR-245117-CS- Component 3: Project INDV / ANALISTA ECONÓMICO IBRD / 80320 Posterior Individual Limited 5,531.00 24,788.14 Firmado 2021-07-22 2021-07-22 2021-07-27 2021-07-26 2021-07-28 2021-07-30 2021-08-01 2021-07-30 2022-01-28 Management and Supervision FINANCIERO AR-MININTERIOR-249429-CS- Component 3: Project INDV / Analista Sector IBRD / 80320 Posterior Individual Limited 4,723.60 4,625.59 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-24 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 Management and Supervision Ambiental AR-MININTERIOR-249430-CS- Component 3: Project INDV / Analista Sector IBRD / 80320 Posterior Individual Limited 4,302.20 23,480.25 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-24 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 Management and Supervision Ambiental AR-MININTERIOR-249432-CS- Component 3: Project INDV / Analista Sector IBRD / 80320 Posterior Individual Limited 4,302.20 11,039.43 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-01 2021-09-01 2021-09-07 2021-12-31 Management and Supervision Relaciones Institucionales AR-MININTERIOR-249433-CS- Component 3: Project INDV / Especialista Sector IBRD / 80320 Posterior Individual Limited 6,274.60 31,637.67 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-06 2021-09-01 2021-09-06 2021-12-31 Management and Supervision Relaciones Institucionales AR-MININTERIOR-249435-CS- INDV / Analista Sector de Component 3: Project IBRD / 80320 Posterior Individual Limited 4,723.60 25,780.70 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 Gestión de Consultores Management and Supervision Individuales AR-MININTERIOR-252617-CS- INDV / Analista para el Sector Component 3: Project IBRD / 80320 Posterior Individual Limited 3,000.00 17,337.90 Firmado 2021-09-08 2021-09-08 2021-09-09 2021-09-29 2021-09-10 2021-10-01 2021-09-15 2021-10-05 2021-12-31 de Auditoría y Mejora de Management and Supervision Procesos AR-MININTERIOR-255923-CS- Component 3: Project IBRD / 80320 Posterior Individual Limited 3,800.00 22,689.58 Firmado 2021-10-01 2021-09-10 2021-10-02 2021-09-29 2021-10-03 2021-10-06 2021-10-04 2021-10-06 2021-12-31 INDV / Analista Técnico Management and Supervision AR-MININTERIOR-271701-CS- Component 3: Project INDV / Especialista para el IBRD / 80320 Posterior Individual Limited 18,916.00 491.40 Firmado 2022-01-03 2022-01-26 2022-01-04 2022-01-04 2022-01-05 2022-01-25 2022-01-07 2022-01-25 2022-12-31 Management and Supervision sector de Presupuesto AR-MININTERIOR-271702-CS- Component 3: Project INDV / Analista para el sector IBRD / 80320 Posterior Individual Limited 17,400.00 16,930.64 Firmado 2022-01-03 2022-01-24 2022-01-04 2022-01-25 2022-01-05 2022-01-25 2022-01-07 2022-01-25 2022-12-31 Management and Supervision Liquidaciones AR-MININTERIOR-275647-CS- INDV / Consultor Experto en Component 3: Project Desarrollo de Gestión - IBRD / 80320 Posterior Individual Limited 6,603.00 6,502.04 Firmado 2022-01-28 2022-01-27 2022-01-29 2022-01-31 2022-01-30 2022-02-11 2022-02-01 2022-02-11 2022-12-02 Management and Supervision Plataforma de Gestión de Obras (SGO) AR-MININTERIOR-275648-CS- Component 3: Project INDV / Consultor Experto en IBRD / 80320 Posterior Individual Limited 6,603.00 6,502.04 Firmado 2022-01-28 2022-01-27 2022-01-29 2022-02-01 2022-01-30 2022-02-07 2022-02-01 2022-02-10 2022-12-31 Management and Supervision Gestión de Proyectos AR-MININTERIOR-283438-CS- Component 3: Project Ejecución INDV / Asesor Integral en IBRD / 80320 Posterior Individual Limited 13,737.00 0.00 2022-03-10 2022-03-11 2022-03-12 2022-03-15 2023-01-13 Management and Supervision pendiente Comercio Exterior AR-MININTERIOR-283440-CS- INDV / Especialista en Soporte Component 3: Project Ejecución IBRD / 80320 Posterior Individual Limited 10,127.00 0.00 2022-03-10 2022-03-11 2022-03-12 2022-03-21 2023-01-19 del Sistema de Gestión de Management and Supervision pendiente Obras Page 5