(P159843) Metropolitan Buenos Aires Urban Transformation Project PROCUREMENT PLAN Country: Argentina Region: LATIN AMERICA AND CARIBBEAN Approval Date: 27-Feb-2017 General Procurement Notice published on: 24-Feb-2017 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Argentina : Metropolitan Buenos Aires Urban Transformation Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 2021-12-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159843 GPN Date: 2017-02-24 Project Name: Metropolitan Buenos Aires Urban Transformation Project Loan / Credit No: IBRD / 87060 M Executing Agency(ies): ultilateral Credit Organizations Financing Unit WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-UFOMC-10275-CW-RFB / Urban and social integration Solicitud de Single Stage - One 24,000,000.0 23,261,984. 2018-09- Completamiento de red fina IBRD / 87060 Previa Open - National Firmado 2017-04-06 2017-05-16 2017-04-11 2017-06-01 2017-06-21 2017-07-01 2017-09-11 2017-08-05 2017-10-26 of Barrio 31 in CABA ofertas Envelope 0 97 29 (Barrio 31) AR-UFOMC-13527-CW-RFB / Urban and social integration Solicitud de Single Stage - One 103,000,000. 82,830,721. 2019-04- Construcción de Vivienda IBRD / 87060 Previa Open - International Firmado 2017-06-26 2017-07-20 2017-08-01 2017-08-02 2017-09-15 2017-09-19 2017-10-27 2017-12-07 2017-12-26 2017-12-29 of Barrio 31 in CABA ofertas Envelope 00 25 01 Nueva YPF AR-UFOMC-10277-CW-RFB / Readecuación de Urban and social integration Solicitud de Single Stage - One 12,685,729.0 13,505,497. 2019-04- IBRD / 87060 Posterior Open - National Firmado 2017-10-27 2018-08-01 2017-11-01 2017-12-13 2017-11-13 2018-01-12 2017-11-29 2018-02-16 2017-12-29 infraestructura existente of Barrio 31 in CABA ofertas Envelope 0 09 12 (Barrio 31) AR-UFOMC-28520-CW-RFB / Urban and social integration Solicitud de Single Stage - One 5,176,729.3 2019-02- Infraestructura de Media IBRD / 87060 Posterior Open - National 3,214,930.13 Firmado 2017-09-18 2017-09-22 2017-10-11 2017-10-27 2017-11-10 2017-12-26 2017-12-29 2018-01-17 2018-02-05 of Barrio 31 in CABA ofertas Envelope 1 03 Tensión AR-UFOMC-32028-CW-RFB / Urbanización nueva YPF en el Urban and social integration Solicitud de Single Stage - One 14,628,934.7 14,190,743. 2018-08- Barrio 31 Carlos Mujica, IBRD / 87060 Posterior Open - National Firmado 2017-10-31 2017-11-03 2017-12-06 2017-12-20 2018-01-05 2018-01-25 2018-02-09 2018-02-20 of Barrio 31 in CABA ofertas Envelope 0 76 08 Retiro, Ciudad Autónoma de Buenos Aires AR-UFOMC-90019-CW-RFB / Obra de demolición y Desarme para la creación del Urban and social integration Solicitud de Single Stage - One 2,329,743.7 2019-10- IBRD / 87060 Posterior Open - National 7,629,179.00 Firmado 2018-12-21 2019-02-21 2018-12-26 2019-02-06 2019-03-29 2019-03-08 2019-04-29 2019-04-12 2019-06-18 Espacio Urbano en el Sector of Barrio 31 in CABA ofertas Envelope 5 09 Bajo Autopista - Barrio 31 y 31 bis- Retiro. AR-UFOMC-93035-CW-RFB / Construcción de Viviendas Urban and social integration Solicitud de Single Stage - One 2019-10- Nuevas YPF, Infraestructura y IBRD / 87060 Posterior Open - National 8,128,654.55 0.00 En ejecución 2019-01-03 2019-02-19 2019-01-08 2019-02-19 2019-05-02 2019-03-21 2019-04-25 of Barrio 31 in CABA ofertas Envelope 22 Espacio Publico, Barrio 31 - Retiro AR-UFOMC-114369-CW-RFB Urban and social integration Solicitud de Single Stage - One 1,822,764.0 2020-02- / Apertura de Calles y Nueva IBRD / 87060 Posterior Open - National 4,243,364.64 Firmado 2019-05-17 2019-06-07 2019-05-22 2019-06-21 2019-09-10 2019-07-21 2019-10-30 2019-08-25 2019-12-23 of Barrio 31 in CABA ofertas Envelope 6 21 Calle 14 AR-UFOMC-182850-CW-RFB / Construcción y Urban and social integration Solicitud de Single Stage - One 2,753,721.8 2022-04- Equipamiento de Espacio IBRD / 87060 Posterior Open - National 4,300,000.00 Firmado 2020-10-09 2020-10-02 2020-10-15 2020-11-23 2020-12-22 2020-12-23 2021-03-17 2021-01-27 2021-04-15 of Barrio 31 in CABA ofertas Envelope 7 22 Urbano en Sector Bajo Autopista AR-UFOMC-198055-CW-RFQ Urban and social integration Solicitud de Single Stage - One 2021-06- / Remodelación CeSAC 47 en IBRD / 87060 Posterior Open - National 350,000.00 329,591.53 Firmado 2020-11-26 2021-01-21 2021-05-13 of Barrio 31 in CABA cotizaciones Envelope 20 galpón 31 AR-UFOMC-73116-CW-RFB / Infraestructura de Baja Tensión en el Marco de la Urban and social integration Solicitud de Single Stage - One 16,033,334.0 2019-08- Integración Social y Urbana de IBRD / 87060 Previa Open - National 0.00 Cancelado 2018-10-31 2019-02-08 2018-11-05 2018-12-17 2019-03-29 2019-01-16 2019-06-04 2019-02-20 of Barrio 31 in CABA ofertas Envelope 0 19 la Villa 31 en la Ciudad Autónoma de Buenos Aires (CABA) AR-UFOMC-206531-CW-DIR / CONSTRUCCIÓN DE RED AEREA BAJA TENSION BARRIO 31 ETAPA I –MANZANAS 11, Urban and social integration Ejecución 2021-05- IBRD / 87060 Posterior Adquisición directa Direct 704,230.00 0.00 2020-11-25 2020-12-05 2021-01-19 16 Y 12 DEL SECTOR GÜEMES of Barrio 31 in CABA pendiente 19 Y UNA FRACCIÓN DE LAS MANZANAS 22 Y 23 DEL SECTOR YPF National AR-UFOMC-257202-CW-RFB Procurement / CONSTRUCCION DE GALPON Urban and social integration Solicitud de Single Stage - One Ejecución 2022-08- IBRD / 87060 Posterior Open - National Document - 1 616,000.00 0.00 2021-10-14 2021-10-19 2021-11-23 2021-12-23 2022-01-27 COMUNITARIO EN BAJO of Barrio 31 in CABA ofertas Envelope pendiente 15 Envelope process AUTOPISTA (Non Bank-SPD) AR-UFOMC-257207-CW-RFB National / “CONSTRUCCION VIVIENDAS Procurement NUEVAS e INFRAESTRUCTURA Urban and social integration Solicitud de Single Stage - One 10,180,207.0 2023-06- IBRD / 87060 Posterior Open - National Document - 1 0.00 En ejecución 2021-10-28 2021-11-22 2021-11-02 2021-12-15 2021-12-07 2022-01-06 2022-02-10 Y ESPACIO PÚBLICO of Barrio 31 in CABA ofertas Envelope 0 05 Envelope process URBANIZACIÓN NUEVA YPF – (Non Bank-SPD) ETAPA 3 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-134079-GO-RFQ / Adquisición de bienes para Project Management and Solicitud de Single Stage - One el fortalecimiento del IBRD / 87060 Posterior Limited 92,000.00 55,954.99 Finalizado 2019-10-06 2019-10-17 2019-12-01 2019-12-02 2020-05-29 2019-12-17 Monitoring – CABA cotizaciones Envelope Programa de Formalización del Barrio 31 Page 1 AR-UFOMC-145648-GO-DIR / Adquisición de 195 cortinas Urban and social integration para las nuevas Viviendas IBRD / 87060 Posterior Adquisición directa Direct 8,921.00 9,110.69 Finalizado 2019-11-18 2019-11-11 2019-11-23 2019-11-19 2019-12-28 2019-12-09 2020-06-25 2020-01-30 of Barrio 31 in CABA sector Cristo Obrero, Barrio Padre Carlos Mugica AR-UFOMC-156114-GO-RFQ / Adquisición de mini proyector, proyector, tablets, totem de autogestión, scanner, smart TV 50" RCA, Project Management and Solicitud de Single Stage - One IBRD / 87060 Posterior Limited 16,000.00 0.00 Cancelado 2020-02-14 2020-04-10 2020-05-10 auriculares bluetooth, Monitoring – CABA cotizaciones Envelope parlantes, láser, pantalla y trípode para proyector, PC ALL IN ONE, Medidor de distancia Láser y pinza amperimétrica AR-UFOMC-198060-GO-RFB Urban and social integration Solicitud de Single Stage - One Ejecución / Adquisición de Mobiliario y IBRD / 87060 Posterior Open - National 200,000.00 0.00 2020-12-10 2020-12-15 2021-01-26 2021-02-25 2021-04-01 2021-09-28 of Barrio 31 in CABA ofertas Envelope pendiente equipamiento para Co taller AR-UFOMC-264534-GO-RFB / ADQUISICIÓN DE TERMOTANQUES ELÉCTRICOS Urban and social integration Solicitud de Single Stage - One Ejecución PARA LAS VIVIENDAS DEL IBRD / 87060 Posterior Open - National 750,800.00 0.00 2021-11-30 2021-12-05 2021-12-20 2022-01-09 2022-01-31 2022-02-15 of Barrio 31 in CABA ofertas Envelope pendiente SECTOR DE YPF DEL BARRIO 31 Y SERVICIOS CONEXOS DE CONEXION Y COLOCACIÓN NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-97097-NC-RFB / Contratación de Servicio de Mudanza para la Relocalización de Unidades Urban and social integration Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 1,210,000.00 646,106.90 Rescindido 2019-01-28 2019-03-19 2019-02-02 2019-03-16 2019-04-22 2019-04-15 2019-05-07 2019-05-20 2019-06-28 2019-11-16 Funcionales (Hogares y of Barrio 31 in CABA ofertas Envelope Comercios) en el marco del Plan de Urbanización Barrio 31 - Retiro AR-UFOMC-118087-NC-RFB / Servicio especializado de control integral de plagas en el Barrio Padre Carlos Mugica Project Management and Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 100,000.00 197,613.78 Firmado 2019-07-18 2019-06-26 2019-07-23 2019-09-03 2019-09-18 2019-10-03 2019-09-23 2019-11-07 2019-10-31 2020-05-05 y Saldías, en el marco del plan Monitoring – CABA ofertas Envelope de urbanización integral Retiro-Puerto de la Secretaría de Integración Social y Urbana AR-UFOMC-128140-NC-RFB / Servicio de logística externa Project Management and Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 750,000.00 1,252,411.38 Firmado 2019-08-30 2019-08-28 2019-09-04 2019-10-16 2019-10-21 2019-11-15 2019-11-14 2019-12-20 2019-12-30 2020-06-17 de recolección de residuos Monitoring – PBA ofertas Envelope áridos AR-UFOMC-170987-NC-RFQ / Servicio de Mudanzas de Urban and social integration Solicitud de Single Stage - One unidades funcionales (hogares IBRD / 87060 Posterior Open - National 100,000.00 64,971.25 Firmado 2020-05-05 2020-06-30 2020-07-17 2020-12-27 of Barrio 31 in CABA cotizaciones Envelope y comercios) del sector Bajo Autopista AR-UFOMC-147685-NC-RFB / Servicio de mantenimiento, desobstrucción y limpieza de Urban and social integration Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 920,000.00 0.00 Cancelado 2020-01-04 2021-01-03 redes cloacales y pluviales en of Barrio 31 in CABA ofertas Envelope el Barrio Padre Carlos Mugica y Saldías AR-UFOMC-218123-NC-RFQ / Encuentro para la Strenghtening institutional Solicitud de Single Stage - One Ejecución construcción de regiones IBRD / 87060 capacities for metropolitan Posterior Open - National 25,000.00 0.00 2021-02-24 2021-04-21 2021-04-26 cotizaciones Envelope pendiente metropolitanas a escala urban management humana AR-UFOMC-232856-NC-RFB / Nuevo Servicio Especializado Urban and social integration Solicitud de Single Stage - One de Control Integral de Plagas IBRD / 87060 Posterior Open - National 150,000.00 0.00 En ejecución 2021-05-14 2021-07-28 2021-05-19 2021-06-30 2021-07-30 2021-09-03 2022-09-03 of Barrio 31 in CABA ofertas Envelope en el Barrio Padre Carlos Mugica AR-UFOMC-232869-NC-RFB / Nuevo Servicio de logística Urban and social integration Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 1,000,000.00 0.00 En ejecución 2021-05-14 2021-07-22 2021-05-19 2021-09-24 2021-06-30 2021-07-30 2021-09-03 2022-09-03 externa de recolección de of Barrio 31 in CABA ofertas Envelope residuos áridos CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-47028-CS-QCBS / Desarrollo e implementación Strenghtening institutional Selección basada de un sistema de información IBRD / 87060 capacities for metropolitan Posterior Open - International 500,000.00 0.00 Cancelado 2018-02-09 2018-03-02 2018-04-15 2018-05-13 2018-06-12 2018-07-17 2018-08-21 2019-08-21 en calidad y costo del área metropolitana de urban management buenos aires AR-UFOMC-78401-CS-QCBS / Servicio de Consultoria destinado a la contratación de Recursos Humanos para la Urban and social integration Selección basada IBRD / 87060 Posterior Open - International 1,024,532.00 1,232,818.20 Firmado 2018-09-18 2018-10-01 2018-10-04 2019-01-31 2018-11-17 2018-12-11 2018-12-15 2019-01-07 2019-01-14 2019-01-18 2019-02-18 2019-01-29 2019-03-25 2019-05-10 2020-03-24 conformación de la Gerencia of Barrio 31 in CABA en calidad y costo Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro Page 2 AR-UFOMC-90015-CS-CQS / "Fortalecimiento de la Strenghtening institutional Selección basada coordinación de políticas IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 67,017.30 24,420.89 En ejecución 2018-12-07 2019-06-10 2018-12-28 2019-02-10 2020-10-21 2019-03-12 2020-01-30 2019-04-16 2019-10-13 públicas en el Área urban management de consultores Metropolitana Buenos Aires" AR-UFOMC-92033-CS-CQS / Strenghtening institutional Selección basada Diseño de App Nativa IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 50,491.00 56,085.02 Finalizado 2018-12-18 2019-01-03 2019-01-08 2019-02-21 2019-03-11 2019-03-23 2019-05-07 2019-04-27 2019-05-24 2019-10-04 2019-07-23 Responsive BA INTEGRACIÓN urban management de consultores para el Barrio 31 AR-UFOMC-93031-CS-CQS / Strenghtening institutional Selección basada Generación de información IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 30,521.37 15,306.52 Finalizado 2019-01-02 2018-11-05 2019-01-23 2019-03-08 2019-03-28 2019-04-07 2019-09-05 2019-05-12 2019-09-11 2019-11-08 2019-12-11 relevante para el desarrollo de urban management de consultores AMBA Data AR-UFOMC-78400-CS-QCBS / Servicio de Consultoría destinado a la Gestión, Diseño e Implementación de los Urban and social integration Selección basada IBRD / 87060 Posterior Open - National 256,410.00 0.00 Cancelado 2018-09-17 2018-10-01 2018-09-18 2018-11-01 2018-11-29 2018-12-29 2019-02-02 2019-03-09 2020-03-08 procesos de la Gerencia of Barrio 31 in CABA en calidad y costo Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro AR-UFOMC-78400-CS-QCBS- 2 / Servicio de Consultoría destinado a la Gestión, Diseño Selección basada e Implementación de los Urban and social integration IBRD / 87060 Posterior en calificaciones Limited 256,410.00 367,067.53 Finalizado 2019-01-07 2018-09-27 2019-01-14 2019-01-08 2019-02-13 2019-02-22 2019-03-20 2019-03-27 2020-03-19 2020-03-31 procesos de la Gerencia of Barrio 31 in CABA de consultores Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro AR-UFOMC-92035-CS-CQS / Consultoría para la recolección de información y Selección basada análisis de encuesta de Project Management and IBRD / 87060 Posterior en calificaciones Open - National 44,210.00 88,205.15 Finalizado 2018-12-20 2018-12-21 2019-01-10 2019-02-23 2019-03-20 2019-03-25 2019-05-16 2019-04-29 2019-09-30 2019-10-26 2020-01-02 opinión pública y estudio de Monitoring – CABA de consultores satisfacción del Proyecto de Integración Social y Urbana del Barrio 31 AR-UFOMC-96264-CS-CQS / Evaluación Económica y Social Selección basada Project Management and del Proyecto de Integración IBRD / 87060 Posterior en calificaciones Open - National 20,304.37 24,442.93 Firmado 2019-02-04 2019-01-31 2019-02-25 2019-04-10 2019-05-06 2019-05-10 2019-08-02 2019-06-14 2019-11-15 2019-12-11 Monitoring – CABA Social y Urbana del Barrio de consultores Padre Carlos Mugica AR-UFOMC-97122-CS-CQS / Fortalecimiento de Strenghtening institutional Selección basada Ejecución Capacidades Institucionales IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 63,380.00 0.00 2019-01-31 2019-02-21 2019-04-06 2019-05-06 2019-06-10 2019-12-07 pendiente para la Gestión Urbana urban management de consultores Metropolitana AR-UFOMC-105967-CS-CQS / Formulación de una Strenghtening institutional Selección basada estrategia de Gestión IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 61,822.00 37,417.81 Finalizado 2019-03-13 2019-03-06 2019-04-03 2019-05-17 2019-04-26 2019-06-16 2019-11-20 2019-07-21 2019-11-22 2020-01-17 2020-03-22 Comunitaria de urban management de consultores Regularización de Servicios Públicos en el Barrio 31 AR-UFOMC-113329-CS- QCBS / Consultoría para el desarrollo e implementación del sistema CRM Salesforce y Project Management and Selección basada IBRD / 87060 Posterior Open - International 691,906.00 614,372.32 Firmado 2019-05-03 2019-05-02 2019-05-24 2019-07-07 2019-07-23 2019-08-04 2019-08-30 2019-09-03 2019-12-05 2019-10-08 2020-01-03 2019-11-12 2020-03-05 2020-11-11 plataforma Intranet en el Monitoring – CABA en calidad y costo marco del Proyecto de la Secretaría de Integración Social y Urbana AR-UFOMC-97125-CS-QCBS / Auditoria Externa Contable y Financiera del Proyecto de Project Management and Selección basada IBRD / 87060 Posterior Open - National 50,000.00 0.00 En ejecución 2019-02-08 2019-03-18 2019-03-01 2019-04-14 2019-05-12 2019-06-11 2019-05-15 2019-07-16 2019-08-20 2020-02-16 Transformación Urbana del Monitoring – CABA en el menor costo Área Metropolitana de Buenos Aires. AR-UFOMC-99141-CS-CQS / Evaluación de Impacto del Programa de Reasentamiento y Mejoramiento de Viviendas Project Management and Selección basada IBRD / 87060 Posterior Open - National 354,214.00 392,617.69 Firmado 2019-05-08 2019-02-05 2019-05-29 2019-07-12 2019-05-15 2019-08-09 2019-06-26 2019-09-08 2019-09-05 2019-10-08 2019-09-18 2019-11-12 2019-11-29 2020-11-11 del Proyecto de Integración Monitoring – CABA en calidad Social y Urbana del Barrio Padre Carlos Mugica para el sector Bajo Autopista AR-UFOMC-99141-CS-QCBS / Evaluación de Impacto del Programa de Reasentamiento y Mejoramiento de Viviendas Project Management and Selección basada IBRD / 87060 Posterior Open - National 354,214.00 0.00 Cancelado 2019-02-05 2019-02-05 2019-02-26 2019-02-27 2019-04-11 2019-05-09 2019-06-08 2019-07-13 2019-08-17 2020-08-16 del Proyecto de Integración Monitoring – CABA en calidad y costo Social y Urbana del Barrio Padre Mugica para el sector Bajo Autopista AR-UFOMC-122846-CS-CQS / Consultoría para el diseño Selección basada del modelo teórico para la Project Management and IBRD / 87060 Posterior en calificaciones Open - National 87,471.00 0.00 Cancelado 2019-09-01 2019-07-08 2019-10-03 2019-11-16 2019-09-18 2019-12-16 2020-01-20 2020-07-18 implementación y Monitoring – CABA de consultores replicabilidad del Proyecto de Integración Social y Urbana AR-UFOMC-124190-CS-CQS / Asesoramiento y evaluación Project Management and Selección basada para el fortalecimiento del eje IBRD / 87060 Posterior Open - National 173,363.00 113,735.55 Firmado 2019-09-08 2019-08-01 2019-09-29 2019-11-12 2019-11-08 2019-12-10 2019-12-11 2020-01-09 2019-12-26 2020-02-13 2020-01-14 2020-03-19 2020-11-09 2021-03-19 Monitoring – CABA en calidad y costo de desarrollo económico del Barrio Padre Carlos Mugica AR-UFOMC-170973-CS-CQS Strenghtening institutional Selección basada / Desarrollo e Implementación IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 77,000.00 50,431.52 En ejecución 2020-04-30 2020-04-23 2020-05-21 2020-07-04 2020-10-09 2020-08-03 2020-11-05 2020-09-07 2021-07-04 de mejoras en la interfaz y urban management de consultores usabilidad del sitio AMBA Data Page 3 AR-UFOMC-125031-NC-RFP / Contratación de firma consultora para prestar el servicio de implementación de Project Management and Selección basada los programas que conforman IBRD / 87060 Posterior Open - International 1,000,000.00 0.00 Cancelado 2019-08-01 2019-08-15 2019-08-22 2019-09-04 2019-10-05 2019-10-28 2019-11-02 2019-12-02 2020-01-06 2020-02-10 2021-08-03 Monitoring – CABA en calidad y costo el Plan de Formalización del Barrio Padre Carlos Mugica”, en el marco del Plan Maestro de Integración Retiro – Puerto AR-UFOMC-188783-CS-CQS / Asesoría Técnica Especializada en Gestión de Proyectos y Seguridad, Selección basada Higiene y Medio Ambiente Project Management and IBRD / 87060 Posterior en calificaciones Limited 129,200.00 136,725.31 Firmado 2020-08-25 2020-08-14 2020-09-08 2020-09-24 2020-09-28 2020-10-26 2020-10-08 2020-11-04 2021-04-06 para la Subsecretaría de Monitoring – CABA de consultores Infraestructura, Vivienda y Coordinación Gubernamental de la Secretaría de Integración Social y Urbana AR-UFOMC-201630-CS-CQS / Evaluación del impacto de la Strenghtening institutional Selección basada carga fiscal consolidada para IBRD / 87060 capacities for metropolitan Posterior en calificaciones Limited 105,000.00 0.00 En ejecución 2020-10-26 2020-10-08 2020-11-09 2020-12-09 2020-12-24 2021-06-22 la toma de decisiones urban management de consultores comerciales (doing business) y de inversiones en la Región AR-UFOMC-201631-CS-CQS Strenghtening institutional Selección basada / Planes Sectoriales de IBRD / 87060 capacities for metropolitan Posterior en calificaciones Limited 130,000.00 0.00 En ejecución 2020-10-26 2020-10-08 2020-11-09 2020-12-09 2020-12-15 2021-01-11 reactivación económica post urban management de consultores COVID-19 AR-UFOMC-206566-CS-CQS / Servicio integral de Selección basada desarrollo de identidad y Project Management and IBRD / 87060 Posterior en calificaciones Open - National 40,000.00 0.00 En ejecución 2020-11-25 2021-03-01 2020-12-10 2021-01-03 2021-01-10 2021-01-27 2021-05-27 estrategia reposicionamiento Monitoring – CABA de consultores de imagen del Barrio Padre Carlos Múgica AR-UFOMC-149935-CS-CQS / Desarrollo de lineamientos generales para una estrategia Selección basada Project Management and coordinada de visión urbana IBRD / 87060 Posterior en calificaciones Open - National 31,100.00 0.00 Cancelado 2020-01-02 2020-01-16 2020-02-21 2020-03-06 2020-04-04 2020-10-01 Monitoring – CABA entre la Ciudad Autónoma de de consultores Buenos Aires y el Municipio de Lanús. AR-UFOMC-148005-CS-LCS / Servicio integral de dictado de talleres para el desarrollo e Project Management and Selección basada IBRD / 87060 Posterior Open - National 48,000.00 0.00 Cancelado 2019-12-03 2020-01-27 2019-12-24 2020-01-31 2020-02-06 2020-03-05 2020-04-04 2020-05-09 2020-06-13 2020-12-10 inclusión económica de los Monitoring – CABA en el menor costo vecinos y las vecinas del Barrio Padre Carlos Mugica AR-UFOMC-206568-CS-CQS / Servicio integral de formación, talleres y capacitaciones para la Selección basada incorporación de actividades Project Management and Ejecución IBRD / 87060 Posterior en calificaciones Open - National 21,000.00 0.00 2021-02-09 2021-03-02 2021-04-15 2021-05-15 2021-06-19 2021-12-16 de promoción como un nuevo Monitoring – CABA pendiente de consultores factor de integración socioeconómica de las vecinas y los vecinos del Barrio Padre Carlos Múgica AR-UFOMC-211462-CS-CQS / Diseño e implementación de Banco de Proyectos AMBA Strenghtening institutional Selección basada asociados a la Oferta de IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 120,000.00 0.00 En ejecución 2021-02-10 2020-12-21 2021-03-03 2021-04-16 2021-05-16 2021-06-20 2021-12-17 Financiamiento de urban management de consultores Organismos Internacionales de Crédito AR-UFOMC-225014-CS-CQS / Mercado de Trabajo en el Strenghtening institutional Selección basada AMBA: Estudio de la oferta IBRD / 87060 capacities for metropolitan Posterior en calificaciones Limited 100,000.00 0.00 En ejecución 2021-03-16 2021-04-20 2021-03-30 2021-04-29 2021-06-03 2021-10-31 laboral y el impacto de la urban management de consultores Pandemia AR-UFOMC-218122-CS-CQS Strenghtening institutional Selección basada / Alianza Metropolitana de IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 105,000.00 0.00 En ejecución 2021-02-18 2021-03-24 2021-03-11 2021-04-24 2021-05-24 2021-06-28 2022-04-24 Datos Abiertos urban management de consultores AR-UFOMC-218120-CS-CQS / DISEÑO DE METODOLOGÍA Strenghtening institutional PARA PROMOVER EL Selección basada IBRD / 87060 capacities for metropolitan Posterior Open - National 90,400.00 0.00 En ejecución 2021-04-06 2021-05-21 2021-04-27 2021-06-10 2021-07-08 2021-08-07 2021-09-11 2021-10-16 2022-04-14 DESARROLLO URBANO A en calidad y costo urban management ESCALA HUMANA EN LA REGIÓN DEL AMBA AR-UFOMC-121658-CS-CQS / Estudio cualitativo de tipo etnográfico en el marco de la Project Management and Selección basada Estrategia de Evaluación y IBRD / 87060 Posterior Open - National 114,740.00 0.00 Cancelado 2019-09-06 2019-07-02 2019-09-27 2019-11-10 2019-12-08 2020-01-07 2020-02-11 2020-03-17 2020-09-13 Monitoring – CABA en el menor costo Monitoreo Integral del Proyecto de Integración Social y Urbana AR-UFOMC-270353-CS- Strenghtening institutional QCBS / Lineamientos para la Selección basada Ejecución IBRD / 87060 capacities for metropolitan Posterior Open - National 540,360.00 0.00 2021-12-22 2022-01-12 2022-02-08 2022-03-08 2022-03-28 2022-05-02 2022-05-30 2023-05-30 formulación de un Plan de en calidad y costo pendiente urban management Acción Climática en el AMBA AR-UFOMC-270354-CS- Strenghtening institutional QCBS / MEJORA DE LA Selección basada Ejecución IBRD / 87060 capacities for metropolitan Posterior Open - National 475,400.00 0.00 2021-12-21 2021-12-23 2022-01-21 2022-02-18 2022-03-05 2022-04-09 2022-05-14 2023-05-14 COMPETITIVIDAD en calidad y costo pendiente urban management TERRITORIAL DEL AMBA AR-UFOMC-270355-CS- QCBS / Apoyo a la institucionalidad Strenghtening institutional metropolitana: diseño Selección basada Ejecución IBRD / 87060 capacities for metropolitan Posterior Open - National 240,000.00 0.00 2021-12-21 2022-01-11 2022-02-09 2022-03-09 2022-03-24 2022-04-28 2022-06-02 2023-06-02 funcional y bases para la en calidad y costo pendiente urban management puesta en marcha del Instituto Metropolitano del AMBA (IMAmba) Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-42945-CS-INDV / servicio de un profesional dedicado a la evaluación y Project Management and IBRD / 87060 Posterior Individual Limited 16,500.00 16,500.00 Finalizado 2018-01-08 2018-02-01 2018-01-08 2018-03-21 2018-01-08 2018-08-15 2018-01-15 2018-08-16 2018-07-14 2019-02-16 monitoreo durante de 6 Monitoring – CABA meses, con 4 productos entregables AR-UFOMC-23943-CS-INDV / Consultoría Proyecto Plusvalía: contratación de dos Strenghtening institutional consultores internacionales IBRD / 87060 capacities for metropolitan Posterior Individual Direct 36,500.00 0.00 Cancelado 2017-08-08 2017-08-15 2017-08-18 2017-09-08 2017-10-13 2018-04-11 para la evaluación y propuesta urban management de mejoras del Proyecto de Ley de Plusvalías. AR-UFOMC-24874-CS-CDS / Consultoría Proyecto Plusvalía: Strenghtening institutional contratación de una firma Selección directa IBRD / 87060 capacities for metropolitan Posterior Direct 18,350.00 0.00 Cancelado 2017-08-08 2017-08-15 2017-08-18 2017-10-22 2018-04-20 para la evaluación y propuesta de consultores urban management de mejoras del Proyecto de Ley de Plusvalías. AR-UFOMC-83913-CS-INDV / Selección de Consultores de apoyo a la Gestión para el Project Management and IBRD / 87060 Posterior Individual Open 7,162.32 5,144.68 Finalizado 2018-11-01 2018-09-12 2018-11-11 2018-11-26 2018-11-15 2018-11-26 2018-11-18 2018-11-27 2019-06-06 2019-09-30 Proyecto de Transformación Monitoring – CABA Urbana del Área Metropolitana de Buenos Aires. AR-UFOMC-83922-CS-INDV / Coordinador para la Strenghtening institutional experiencia piloto de IBRD / 87060 capacities for metropolitan Posterior Individual Open 7,297.30 3,362.39 Finalizado 2018-11-01 2018-11-09 2018-11-19 2018-11-01 2018-11-29 2018-11-07 2018-12-23 2019-01-30 2019-06-21 2019-07-31 articulación de la normativa urban management urbana en el AMBA AR-UFOMC-85481-CS-INDV / Consultarías Individuales - Contrataciones de los Responsables del Diseño y Project Management and Seguimiento de la Gestión IBRD / 87060 Posterior Individual Open 25,918.68 5,641.34 Finalizado 2018-11-02 2018-11-01 2018-11-12 2018-11-01 2018-11-16 2018-11-29 2018-11-19 2019-03-06 2019-11-19 2020-03-06 Monitoring – CABA Comunitaria y Participativa en los componentes del Plan Integral de Urbanización e Integración en el Barrio 31. AR-UFOMC-85494-CS-INDV / Consultor experto en Strenghtening institutional planificación urbana IBRD / 87060 capacities for metropolitan Posterior Individual Open 8,108.11 3,735.99 Finalizado 2018-11-01 2019-11-09 2018-11-19 2018-10-17 2018-11-29 2018-12-27 2018-12-23 2018-12-27 2019-06-21 2019-06-27 validación para la experiencia urban management piloto de articulación de la normativa urbana en el AMBA AR-UFOMC-85495-CS-INDV / Consultor experto en Strenghtening institutional planificación urbana para la IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,864.86 2,241.59 Finalizado 2018-11-01 2018-11-09 2018-11-19 2018-10-10 2018-11-29 2018-12-21 2018-12-23 2019-01-16 2019-06-21 2019-07-16 experiencia piloto de urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85500-CS-INDV / Consultor experto en Strenghtening institutional asuntos legales y jurídicos IBRD / 87060 capacities for metropolitan Posterior Individual Open 5,675.68 2,615.19 Finalizado 2018-11-02 2018-11-09 2018-11-20 2018-10-10 2018-11-30 2018-11-23 2018-12-24 2018-11-29 2019-06-22 2019-05-29 para la experiencia piloto de urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85501-CS-INDV / Consultor experto en Strenghtening institutional economía urbana para la IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,864.86 2,241.59 Finalizado 2018-11-01 2018-11-09 2018-11-19 2018-11-23 2018-11-29 2019-03-12 2018-12-23 2019-02-18 2019-06-21 2019-08-31 experiencia piloto de urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85503-CS-INDV / Asistente en manejo de información territorial y Strenghtening institutional técnicas proyectuales para la IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,378.38 2,017.43 Finalizado 2018-11-02 2018-09-14 2018-11-20 2019-11-23 2018-11-30 2019-04-23 2018-12-24 2019-03-06 2019-06-22 2019-08-31 experiencia piloto de urban management articulación de la normativa urbana en el AMBA AR-UFOMC-85506-CS-INDV Strenghtening institutional / Asistente para la Gestión del IBRD / 87060 capacities for metropolitan Posterior Individual Open 2,702.70 1,248.65 Finalizado 2018-11-01 2018-10-29 2018-11-19 2018-10-18 2018-11-29 2019-05-20 2018-12-23 2019-05-13 2019-04-22 2019-08-13 Proyecto AMBA Data urban management AR-UFOMC-97114-CS-INDV Strenghtening institutional / Contratación de un IBRD / 87060 capacities for metropolitan Posterior Individual Open 13,026.00 9,614.61 Finalizado 2019-02-01 2019-01-21 2019-03-22 2019-02-21 2019-04-12 2019-04-26 2019-05-17 2019-04-26 2019-11-13 2020-02-06 especialista lider de Proyecto urban management de AMBA DATA. AR-UFOMC-97117-CS-INDV Strenghtening institutional / Contratación de un IBRD / 87060 capacities for metropolitan Posterior Individual Open 8,527.00 5,868.66 Finalizado 2019-02-01 2019-01-21 2019-03-22 2019-02-21 2019-04-12 2019-04-12 2019-05-17 2019-04-15 2019-05-27 2020-02-06 consultor Desarrollador Web urban management para AMBA DATA AR-UFOMC-117911-CS- INDV / Especialista en Energía Project Management and y Eficiencia Energética para el IBRD / 87060 Posterior Individual Limited 34,600.00 19,375.31 Finalizado 2019-06-03 2019-06-03 2019-06-13 2019-07-10 2019-07-13 2019-08-23 2019-09-21 2019-08-28 2020-04-18 2020-03-28 Monitoring – CABA proyecto de integración social y urbana del Barrio 31 AR-UFOMC-117914-CS- Project Management and INDV / Especialista en Marcos IBRD / 87060 Posterior Individual Limited 37,745.00 41,139.48 Firmado 2019-06-03 2019-06-03 2019-06-13 2019-07-04 2019-07-13 2019-07-26 2019-09-21 2019-08-01 2020-04-18 Monitoring – CABA Regulatorios Page 5 AR-UFOMC-123775-CS- INDV / Experto en Gestión de Acceso y Sostenibilidad de Project Management and usuarios de bajos recursos en IBRD / 87060 Posterior Individual Open 9,300.00 21,568.19 Firmado 2019-08-20 2019-07-22 2019-10-08 2019-08-05 2019-10-29 2019-09-12 2019-12-03 2019-09-13 2020-05-31 Monitoring – CABA las redes de Aguas y Energía para el Plan de Inclusión en Servicios Públicos Básicos AR-UFOMC-126298-CS-CDS / Servicio consultoría para llevar adelante la supervisión de la obra denominada Urban and social integration Selección directa “Construcción de Viviendas IBRD / 87060 Posterior Direct 444,000.00 249,618.24 Firmado 2019-08-30 2019-07-31 2019-09-09 2019-08-13 2019-11-13 2019-10-28 2020-05-11 of Barrio 31 in CABA de consultores Nuevas YPF – Etapa III”, Licitación Pública Nacional, Referencia STEP Nº AR- UFOMC-93035-CW-RFB. AR-UFOMC-130081-CS- INDV / Especialista en Project Management and IBRD / 87060 Posterior Individual Open 8,200.00 8,183.58 Finalizado 2019-09-08 2019-10-23 2019-10-27 2019-09-18 2019-11-17 2019-10-16 2019-12-22 2019-10-17 2020-06-19 2020-04-30 Desarrollo Comercial y Monitoring – PBA Económico AR-UFOMC-139188-CS-CDS / Servicio de Soporte para la Gestión Territorial de los Recursos Humanos que Project Management and Selección directa IBRD / 87060 Posterior Direct 551,977.00 212,084.43 Firmado 2019-10-11 2019-10-22 2019-10-21 2019-11-11 2019-12-25 2019-12-05 2020-06-22 participan en la Monitoring – CABA de consultores Implementación del Plan de Formalización en el Barrio Padre Carlos Mugica AR-UFOMC-144410-CS- INDV / Asesor Técnico para la Urban and social integration IBRD / 87060 Posterior Individual Open 13,585.00 33,947.67 Firmado 2019-11-10 2019-10-29 2019-12-29 2019-11-15 2020-01-19 2019-12-19 2020-02-23 2019-12-23 2020-08-21 obra “Creación del Espacio of Barrio 31 in CABA Urbano Bajo Autopista” AR-UFOMC-145633-CS-CDS / Servicio Profesional de Asistencia Técnica para las tareas de Inspección referidas Urban and social integration Selección directa IBRD / 87060 Posterior Direct 241,506.00 370,184.74 Finalizado 2019-11-18 2019-11-14 2019-11-28 2019-11-27 2020-02-01 2019-12-10 2020-07-30 2020-10-31 a las Obras de Sectores de of Barrio 31 in CABA de consultores Completamiento (SC) y Renovación de Infraestructura (RI) AR-UFOMC-145696-CS-CDS / Servicio Profesional de Supervisión Integral de Obras de Construcción de Edificios Urban and social integration Selección directa de Vivienda Multifamiliares IBRD / 87060 Posterior Direct 859,000.00 1,293,779.93 Finalizado 2019-11-17 2019-08-15 2019-11-27 2019-11-27 2020-01-31 2019-12-10 2020-07-29 2020-11-26 of Barrio 31 in CABA de consultores con Infraestructuras y Espacios Públicos en el denominado “Sector EX YPF” del Barrio 31 AR-UFOMC-180995-CS- INDV / Especialista en Project Management and IBRD / 87060 Posterior Individual 8,200.00 0.00 Cancelado 2020-07-16 2020-07-31 2020-07-31 2020-08-05 2021-02-01 aspectos fiduciarios y Monitoring – CABA contrataciones AR-UFOMC-184055-CS- Strenghtening institutional INDV / Especialista Senior en IBRD / 87060 capacities for metropolitan Posterior Individual Open 9,700.00 9,004.50 Firmado 2020-07-15 2020-06-11 2020-07-20 2020-09-01 2020-07-20 2020-10-13 2020-07-25 2020-10-16 2021-01-21 Procesos y Calidad urban management AR-UFOMC-184057-CS- Strenghtening institutional INDV / Especialista en IBRD / 87060 capacities for metropolitan Posterior Individual Open 9,700.00 9,004.50 Firmado 2020-07-16 2020-06-11 2020-07-21 2020-09-01 2020-07-21 2020-10-08 2020-07-26 2020-10-14 2021-01-22 Desarrollo Económico urban management Territorial AR-UFOMC-180996-CS- Strenghtening institutional INDV / Coordinador Técnico IBRD / 87060 capacities for metropolitan Posterior Individual Open 11,000.00 9,754.88 Firmado 2020-07-16 2020-06-11 2020-07-21 2020-08-06 2020-07-21 2020-09-08 2020-07-26 2020-09-10 2021-01-22 para la ejecución de la Parte 2 urban management (componente 3) AR-UFOMC-189360-CS- Strenghtening institutional INDV / Especialista en IBRD / 87060 capacities for metropolitan Posterior Individual Open 8,200.00 6,753.38 Finalizado 2020-08-18 2020-06-11 2020-08-31 2020-09-02 2020-09-21 2020-10-19 2020-10-26 2020-10-21 2021-04-24 2021-04-21 aspectos fiduciarios y urban management contrataciones AR-UFOMC-201632-CS- INDV / Contratacion de 3 Especialistas para el Diseño Strenghtening institutional de un Programa para la IBRD / 87060 capacities for metropolitan Posterior Individual Limited 20,000.00 0.00 En ejecución 2020-10-26 2020-10-08 2020-11-10 2020-11-10 2020-12-02 2021-03-02 Reactivación urban management Económica y Cultural en Barrios del AMBA AR-UFOMC-218124-CS- Strenghtening institutional INDV / Especialista en IBRD / 87060 capacities for metropolitan Posterior Individual Limited 7,800.00 0.00 En ejecución 2021-02-23 2021-02-17 2021-02-28 2021-03-21 2021-04-25 2021-10-22 Comunicación y Difusión urban management AR-UFOMC-225027-CS- INDV / Consultor Facilitador Project Management and IBRD / 87060 Posterior Individual Limited 7,500.00 0.00 En ejecución 2021-03-18 2021-03-01 2021-03-23 2021-04-13 2021-05-18 2021-11-14 para la articulación con Monitoring – CABA Municipios AR-UFOMC-232839-CS- INDV / Especialista en Strenghtening institutional Aspectos Fiduciarios y IBRD / 87060 capacities for metropolitan Posterior Individual Limited 16,000.00 0.00 En ejecución 2021-05-12 2021-05-17 2021-05-17 2021-06-07 2021-07-12 2022-07-12 Contrataciones - Parte 2 - urban management Componente 3 AR-UFOMC-233066-CS- INDV / Consultor individual para asesoría y supervisión de la gestión de Higiene, Urban and social integration IBRD / 87060 Posterior Individual Limited 24,000.00 0.00 En ejecución 2021-05-12 2021-06-25 2021-05-17 2021-06-07 2021-07-12 2022-07-12 Seguridad y Ambiente, para of Barrio 31 in CABA los proyectos de la Dirección General de Obras, Proyectos y Diseño Urbano. Page 6 AR-UFOMC-238902-CS-CDS / Continuidad de la Consultoría para el desarrollo e implementación del sistema Project Management and Selección directa IBRD / 87060 Posterior Direct 448,000.00 0.00 En ejecución 2021-06-11 2021-06-11 2021-07-01 2021-09-04 2021-12-23 CRM Salesforce y plataforma Monitoring – CABA de consultores Intranet en el marco del Proyecto de la Secretaría de Integración Social y Urbana AR-UFOMC-244641-CS- Strenghtening institutional INDV / Especialista en Cambio IBRD / 87060 capacities for metropolitan Posterior Individual Limited 16,300.00 0.00 En ejecución 2021-07-23 2021-07-23 2021-07-28 2021-08-18 2021-09-22 2022-09-22 Climático para el Componente urban management 3 - Senior AR-UFOMC-244643-CS- Strenghtening institutional INDV / Especialista en Cambio IBRD / 87060 capacities for metropolitan Posterior Individual Limited 13,000.00 0.00 En ejecución 2021-07-22 2021-07-23 2021-07-27 2021-08-17 2021-09-21 2022-09-21 Climático para el Componente urban management 3 - Junior AR-UFOMC-244644-CS- Strenghtening institutional INDV / Especialista en Visión IBRD / 87060 capacities for metropolitan Posterior Individual Limited 16,300.00 0.00 En ejecución 2021-07-23 2021-07-23 2021-07-28 2021-08-18 2021-09-22 2022-09-22 Urbana para el Componente 3 urban management - Senior- AR-UFOMC-244645-CS- Strenghtening institutional INDV / Especialista en Visión IBRD / 87060 capacities for metropolitan Posterior Individual Limited 13,000.00 0.00 En ejecución 2021-07-23 2021-07-23 2021-07-28 2021-08-18 2021-09-22 2022-09-22 Urbana para el Componente 3 urban management - Junior Page 7