Revised as of 5/12/2019 PROCUREMENT PLAN Revie w by Packa Description of No. of Procurement/sel Bank ge contract Packa ection method (PRIO No. packages ges R/ Post) 1 2 3 6 7 Component 1 - Improving the effectiveness of the trade promotion and quality system of the country Component 2 - Promoting Investment & Export Subcomponent 2.1 Support Services Provided by the Investment, Export Promotion and Industrial Development Agency 2.1.1 GOODS Procurement of IT 2.1.1.1 1 SH Post Equipment for ANIF CONSULTING 2.1.2 SERVICES Deployment of strong 2.1.2.1 1 CQS Prior communication and PR campaign 2.1.2.2 IFRS Audit of ANIF 1 CQS Post OPERATING 2.1.3 multi SOE N/A EXPENSES Sub-Component 2.2. Innovation Financing Exporter Development 2.2.1 Grants and per OM Innovatiion Matching Grants 2.2.1.1 Grants for SMEs multi Innovatiion 2.2.1.2 Matching Grants Innovatiion 2.2.1.2 Matching Grants multi N/A /1 Financing 2.2.1.2 Operating expenses SOE /2 Innovation Equity 2.2.2 Fund Sub-Component 2.3. PPPs to Promote Research, Skills and Cluster Development Establishment of 2.3.1 Engineering City (EC) 2.3.1. WORKS 1 Land 2.3.1. Improvement 1 NCB Post 1/1 Works Engineering Accelerator 2.3.1. Building/Co- 1 NCB Post 1/2 working Space Construction 2.3.1. GOODS 2 Procurement of Machines and 2.3.1. PCB 1 ICB Prior 2/1 Manufacturing for EC Laboratories Procurement of 2.3.1. Advance ICB Prior 2/2 Engineering Labs including 5G, RF Procurement of Control and 2.3.1. Measurement ICB Prior 2/3 Systems for EC Laboratories Furniture for 2.3.1. Engineering 1 NCB Post 2/4 Accelerator Building 2.3.1. CONSULTING 3 SERVICES Master Plan, 2.3.1. Detailed Designs CQS Post 3/1 for the Engineering City Engineering analysis and site inspections, engineering designs and budgets of Engineering Business Accelerator Building /co- 2.3.1. working Space 1 CQS Post 3/2 (including Interior and furniture design) and design of information, communication, anti-fire alarm and security system networks and Follow-on Supervision Engineering City Infrustructure 2.3.1. Development Plan 1 CQS Post 3/3 and Follow Supervisiuon Project Manager 2.3.1. for Land 1 IC Post 3/4 Improvement Works Project Manager 2.3.1. for Engineering 1 IC Post 3/5 Accelerator Construction Land 2.3.1. Improvement 1 CQS Post 3/6 Works Technical Supervision Engineering Accelerator 2.3.1. Building 1 CQS Post 3/7 Construction Technical Supervision 2.3.1. OPERATING multi SOE N/A 4 EXPENSES Establishment of 2.3.2 Cyber Security TBD Incubator Establishment of Advanced 2.3.3 TBD Industrial Research Labs Establishment of National 2.3.4 TBD Supercomputing Center of Armenia Advancing Engineering Education in Gyumri Building 2.3.5 collaborative TBD Framework with Private Sector on High-tech Development Component 3 - Modernizing the national quality infrastructure Subcomponent 3.1. Refurbishment of National Industrial Metrology (NIM) building 3.1.1 WORKS Refurbishment of 3.1.1. NIM building and 1 NCB Post 1 laboratories 3.1.2 GOODS Procurement of Equipment for Mass and Related 3.1.2. Quantities 1 ICB Post 1 Measurements and Thermal Measurements Laboratories Procurement of Computers and 3.1.2. laptops forNIM 1 SH Post 2 building and laboratories Procurement of 3.1.2. Furniture for NIM 1 SH Post 3 building and laboratories CONSULTING 3.1.3 SERVICES Design for refurbishment of 3.1.3. NIM building and 1 CQS Post 1 laboratories and follow-on supervision NIM 3.1.3. Refurbishment 1 IC Post 2 Project Manager Technical 3.1.3. Supervision of 1 CQS Post 3 NIM Refurbishment Technical 3.1.3. Consultant for 1 IC Post 4 NIM International Accreditation, implementation 3.1.3. of the quality 1 CQS Prior 5 system for metrological laboratories Sub-component 3.2: Refurbishment of NAB offices and capacity building of NAB staff CONSULTANT'S 3.2.1 SERVICES Resident Advisor (with international 3.2.1. work experience) 1 IC Prior 1 to implement NAB quality control system Development of electronic accreditation process (e- 3.2.1. accreditation), 1 CQS Post 2 conformity assessment process automation (on- line) system Translator 3.2.1. (Translation of 1 IC Post 3 standards) Component 4: Project Management, Monitoring and Evaluation 4.1.1 Operating Costs 4.1.1. PID of MoF/PMU SOE N/A 1 4.1.1. EIF SOE N/A 2 CONSULTANT'S SERVICES 4.1.2 Project Manager 1 IC Prior 4.1.2/ Project Manager 1 IC Prior 1 4.1.3 Translator 1 IC Post 4.1.3/ Translator IC Post 1 4.1.4 IT expert 1 IC Post 4.1.4/ IT expert 1 SSS Prior 1 4.1.5 Engineer 1 IC Post 4.1.5/ Engineer 1 IC Post 1 Procurement 4.1.6 1 SSS Prior Specialist 4.1.7 Project Accountant 1 SSS Prior Financial 4.1.8 Management 1 SSS Prior Specialist 4.1.9 Project Audit 1 LCS Post Environment and 4.1.10 Social Safeguards 1 IC Post Consultant Project Monitoring 4.1.11 and Evaluation 1 IC Post Consultant 4.1.12 Project Assistant 1 IC Post GRAND TOTAL PROCUREMENT Armenia : Trade Promotion and Quality Infrastructure PLAN General Information Country: Armenia 2019-12-17 Bank’s Approval Date of the Original Procurement Plan: 2022-06-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146994 GPN Date: Project Name: Trade Promotion and Quality Infrastructure Loan / Credit No: IBRD / 83900 RoA Prime Minister's Office Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - TPQI-W-3.1.1.1 / Renovation Component 3: Modernizing t Single Stage - One E Works (without pr 2022-04-0 of the Premises of the Industr IBRD / 83900 he National Quality Infrastru Post Request for Bids Open - National 534,000.00 512,234.92 Signed 2021-05-21 2021-06-03 2021-05-26 2021-06-10 2021-06-23 2021-07-02 2021-08-22 2021-09-01 2021-10-03 2021-10-26 nvelope equalification) SP 1 ial Metrology Center of the N cture D BSM TPQI-W-2.3.1.1/1 / Engineeri Component 2: Promoting Inv Single Stage - One E Other (with field f 2,499,747.3 2022-08-1 ng City (EC) Land Improveme IBRD / 83900 Post Request for Bids Open - National 2,211,600.00 Signed 2021-08-09 2021-08-16 2021-08-11 2021-08-18 2021-09-08 2021-09-13 2021-11-07 2021-12-27 2021-12-19 2022-02-04 estment and Exports nvelope or explanation) 7 9 nt and Infrastructures Constr uction GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TPQI-G-2.3.1.2/1 / Procurem Component 2: Promoting Inv Open - Internationa Single Stage - One E ent of Machines and PCB Ma IBRD / 83900 Prior Request for Bids 1,500,000.00 1,551,948.85 Completed 2020-03-23 2020-03-24 2020-03-25 2020-03-31 2020-03-27 2020-05-05 2020-05-12 2020-12-31 2021-03-31 estment and Exports l nvelope nufacturing for Engineering C ity Laboratories TPQI-G-3.1.2.1-1 / Procurem Component 3: Modernizing t ent of Equipment for Mass an Open - Internationa Single Stage - One E IBRD / 83900 he National Quality Infrastru Post Request for Bids 725,000.00 431,109.05 Completed 2020-05-25 2020-06-10 2020-06-01 2020-06-11 2020-07-13 2020-07-24 2020-10-11 2020-10-05 2020-11-22 2020-11-12 2021-05-21 2021-04-28 d Related Quantities Measure l nvelope cture ments Laboratory TPQI-G-2.3.4.1/1 / Supply of New Components for Superc Component 2: Promoting Inv IBRD / 83900 Post Direct Selection Direct 1,135,000.00 975,796.91 Signed 2020-06-22 2020-07-13 2020-06-27 2020-08-30 2020-08-31 2021-07-26 2021-04-30 omputing System Upgrade a estment and Exports nd Perform Installation, Testi ng and Training TPQI-G-3.1.2.2 / Procuremen Component 3: Modernizing t Request for Quota IBRD / 83900 Post 37,800.00 0.00 Canceled 2021-02-03 2021-02-04 2021-03-17 2021-05-16 t of Laptops for MoE and NBS he National Quality Infrastru tions M cture TPQI-G-2.3.2.1/2 / Procurem Component 2: Promoting Inv Request for Quota Single Stage - One E ent of Furniture for CS Incuba IBRD / 83900 Post Open - National 8,160.00 0.00 Canceled 2021-02-06 2021-02-04 2021-03-20 2021-05-19 estment and Exports tions nvelope tor Education Labs TPQI-G-3.1.2.2/R / Procurem Component 3: Modernizing t Request for Quota Single Stage - One E IBRD / 83900 Post Open - National 37,800.00 35,511.89 Completed 2021-03-26 2021-04-09 2021-05-16 2021-05-31 2021-08-14 2021-10-18 ent of Laptops for MoE and N he National Quality Infrastru tions nvelope BSM cture TPQI-G-2.3.2.1/1 / Procurem ent of Computer Equipment f Component 2: Promoting Inv Request for Quota Single Stage - One E IBRD / 83900 Post Open - National 38,400.00 46,868.75 Completed 2021-06-02 2021-06-03 2021-07-30 2021-07-30 2021-10-28 2022-03-07 or Educational Labs of Cyber estment and Exports tions nvelope Security Incubator TPQI-G-3.1.2.1/3 / Procurem Component 3: Modernizing t Open - Internationa Single Stage - One E ent of Equipment for Petroleu IBRD / 83900 he National Quality Infrastru Post Request for Bids 365,950.00 0.00 Canceled 2021-10-12 2021-10-14 2021-10-15 2021-10-14 2021-11-26 2021-11-25 2022-01-25 2022-02-10 2022-03-08 2022-09-04 l nvelope m Testing Laboratory cture TPQI-G-2.3.2.1/3 / Procurem ent of Hardware for IBM Lab Component 2: Promoting Inv Single Stage - One E IBRD / 83900 Post Request for Bids Open - National 342,240.00 0.00 Canceled 2022-03-21 2022-03-22 2022-03-22 2022-03-28 2022-04-19 2022-04-20 2022-06-18 2022-07-30 2022-11-27 within the PPP "Cyber Securit estment and Exports nvelope y Incubator and R&D Lab Est ablishment" TPQI-G-2.3.2.1/3-R / Procure ment of Hardware for IBM La Component 2: Promoting Inv Single Stage - One E Pending Impl IBRD / 83900 Post Request for Bids Open - National 426,600.00 0.00 2022-06-22 2022-06-27 2022-07-25 2022-09-23 2022-11-04 2023-03-04 b within the PPP “Cyber Secu estment and Exports nvelope ementation rity Incubator and R&D Lab E stablishment.” NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TPQIP C-4.1.9(a) / Review an Component 1: Improving the d Validation of Eligible Expen Least Cost Selecti Open - Internationa IBRD / 83900 Effectiveness of the Trade pr Prior 0.00 94,531.26 Signed 2015-06-17 2015-06-18 ditures under Part A of the TP on l omotion and Quality system QIP for year ended Decembe r 31, 2014 TPQI-C-2.1.2.1 / Deployment Component 2: Promoting Inv Consultant Qualifi Open - Internationa of Strong Communication an IBRD / 83900 Prior 480,000.00 628,293.60 Under Review 2019-12-23 2019-12-24 2020-01-13 2019-12-26 2020-02-26 2020-03-06 2020-03-27 2020-08-15 2020-04-20 2020-09-28 2021-04-20 estment and Exports cation Selection l d PR Campaign TPQI-C-3.1.3.1 / Design of Re construction of Building for t Component 3: Modernizing t Consultant Qualifi he Industrial Metrology Cente IBRD / 83900 he National Quality Infrastru Post Open - National 48,000.00 13,781.78 Signed 2019-12-24 2019-12-25 2020-01-15 2020-01-31 2020-02-28 2020-07-16 2020-03-29 2020-08-25 2020-04-15 2020-09-15 2021-12-26 cation Selection r of “National Institute of Met cture rology” CJSC and Implementa tion of Author's Supervision Page 1 TPQI-C-2.2.1.1-2 / Evaluation of the sub-projects (business applications) presented withi Component 2: Promoting Inv Consultant Qualifi IBRD / 83900 Post Open - National 36,000.00 34,612.80 Completed 2020-02-05 2020-02-14 2020-02-26 2020-03-05 2020-03-19 2020-06-02 2020-04-09 2020-06-18 2020-04-15 2020-07-07 2020-05-15 2020-08-11 n the framework of call for pr estment and Exports cation Selection oposals of Exporter Develop ment Grants (EDG) within TP QIP TPQI-C-3.2.1.2 / Developmen Component 3: Modernizing t Consultant Qualifi t of electronic accreditation p IBRD / 83900 he National Quality Infrastru Post Open - National 100,800.00 100,903.62 Completed 2020-02-17 2020-02-13 2020-03-09 2020-03-10 2020-04-22 2020-05-26 2020-05-22 2020-06-19 2020-06-01 2020-06-22 2021-07-16 2022-03-04 cation Selection rocess (e-accreditation) auto cture mation system TPQI-C-3.1.3.3 / Technical su Component 3: Modernizing t pervision over renovation wo Consultant Qualifi IBRD / 83900 he National Quality Infrastru Post Open - National 8,040.00 8,825.78 Signed 2021-06-04 2021-06-16 2021-06-18 2021-08-18 2021-08-18 2021-09-18 2021-09-17 2021-10-18 2021-10-06 2021-11-01 2022-04-04 rks quality of the premises of cation Selection cture the Industrial Metrology Cent er of NBSM TPQI-C-2.3.1.3/6 / Technical Component 2: Promoting Inv Consultant Qualifi Supervision of EC Land Impro IBRD / 83900 Post Open - National 22,116.00 21,036.46 Signed 2021-08-13 2021-08-18 2021-08-27 2021-08-31 2021-10-16 2021-11-15 2021-11-15 2021-12-27 2021-12-19 2022-02-14 2022-08-19 estment and Exports cation Selection vement and Infrastructures C onstruction TPQI-C-2.3.5.3/1 / Design of the 25 Achemyan and 2/1 an d Achemyan buildings’ recon Component 2: Promoting Inv Consultant Qualifi struction and yard area impr IBRD / 83900 Post Open - National 70,080.00 0.00 Under Review 2022-06-23 2022-06-20 2022-07-07 2022-08-20 2022-09-03 2022-09-20 2024-05-27 estment and Exports cation Selection ovement works in Gyumri for new building of NPUA GB und er the "Advanced High-Tech Education at NPUA GB" PPP p rogram. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TPQI-C-3.1.8. / International Component 1: Improving the Individual Consult Resident Advisor for National IBRD / 83900 Effectiveness of the Trade pr Prior Open 0.00 108,480.00 Canceled 2016-03-17 ant Selection Institute of Metrology omotion and Quality system Component 1: Improving the CONTRACT TPQI-C - 4.1.2 / P Individual Consult IBRD / 83900 Effectiveness of the Trade pr Prior Open 0.00 27,176.85 Signed 2016-02-17 2016-02-17 MU Project Manager ant Selection omotion and Quality system TPQI-C 2.3.7/1 / Ensure the t ransparent selection of good Component 1: Improving the Individual Consult Under Implement quality PPP initiatives, includi IBRD / 83900 Effectiveness of the Trade pr Post Open 0.00 42,000.00 2016-10-19 ant Selection ation ng the evaluation of Concept omotion and Quality system Papers and Full proposals TPQI-C 2.3.7/4 / Ensure the t ransparent selection of good Component 1: Improving the Individual Consult Under Implement quality PPP initiatives, includi IBRD / 83900 Effectiveness of the Trade pr Post Open 0.00 33,600.00 2016-10-19 ant Selection ation ng the evaluation of Concept omotion and Quality system Papers and Full proposals TPQI-C-3.2.9. / International Component 1: Improving the Individual Consult Resident Advisor for National IBRD / 83900 Effectiveness of the Trade pr Prior Open 0.00 107,280.00 Canceled 2016-04-06 ant Selection Accreditation Body omotion and Quality system TPQI-C 2.3.7/2 / Ensure the t ransparent selection of good Component 1: Improving the Individual Consult Under Implement quality PPP initiatives, includi IBRD / 83900 Effectiveness of the Trade pr Post Open 0.00 26,880.00 2016-10-19 ant Selection ation ng the evaluation of Concept omotion and Quality system Papers and Full proposals. TPQI-C 2.3.7/3 / Ensure the t ransparent selection of good Component 1: Improving the Individual Consult Under Implement quality PPP initiatives, includi IBRD / 83900 Effectiveness of the Trade pr Post Open 0.00 48,000.00 2016-10-19 ant Selection ation ng the evaluation of Concept omotion and Quality system Papers and Full proposals. TPQI-C-4.1.11 / Project Monit Component 4: Project Manag Individual Consult IBRD / 83900 Post Open 40,500.00 32,205.21 Signed 2019-12-24 2019-12-25 2020-02-10 2020-04-22 2020-02-12 2020-04-25 2020-03-01 2020-05-04 2022-06-30 oring and Evaluation Speciali ement and Monitoring and E ant Selection st valuation TPQI-C-4.1.12 / Project Assis Component 4: Project Manag Individual Consult IBRD / 83900 Post Open 24,300.00 19,323.12 Signed 2019-12-24 2019-12-25 2020-02-10 2020-04-22 2020-02-12 2020-04-25 2020-03-01 2020-05-04 2022-06-30 tant ement and Monitoring and E ant Selection valuation TPQI-C-4.1.4-1 / IT Expert of Component 4: Project Manag IBRD / 83900 Prior Direct Selection Direct 40,500.00 73,193.66 Signed 2020-01-08 2020-01-09 2020-01-10 2020-01-15 2020-01-15 2020-02-26 2022-06-30 PMU ement and Monitoring and E valuation TPQI-C-4.1.6 / Procurement Component 4: Project Manag IBRD / 83900 Prior Direct Selection Direct 60,750.00 109,820.03 Signed 2020-01-08 2020-01-09 2020-01-10 2020-01-10 2020-01-15 2020-02-26 2022-06-30 Specialist ement and Monitoring and E valuation TPQI-C-4.1.7 / Project Accou Component 4: Project Manag IBRD / 83900 Prior Direct Selection Direct 60,750.00 109,684.44 Signed 2020-01-08 2020-01-09 2020-01-10 2020-01-15 2020-01-15 2020-02-26 2022-06-30 ntant ement and Monitoring and E valuation TPQI-C-4.1.8 / Financial Man Component 4: Project Manag IBRD / 83900 Prior Direct Selection Direct 40,500.00 37,670.38 Completed 2020-01-08 2020-01-09 2020-01-10 2020-01-15 2020-01-15 2020-02-26 2022-06-30 2022-05-31 agement Specialist ement and Monitoring and E valuation TPQI-C-4.1.3-1 / Translator o Component 4: Project Manag Individual Consult IBRD / 83900 Post Open 22,950.00 0.00 Canceled 2020-02-05 2020-02-01 2020-03-23 2020-03-26 2020-04-01 2022-05-31 f PMU ement and Monitoring and E ant Selection valuation TPQI-C-4.1.5-1 / Engineer of Component 4: Project Manag Individual Consult IBRD / 83900 Post Open 35,100.00 32,205.21 Signed 2020-02-05 2020-02-01 2020-03-23 2020-04-22 2020-03-26 2020-04-25 2020-04-01 2020-05-04 2022-05-31 PMU ement and Monitoring and E ant Selection valuation TPQI-C-4.1.2/1 / Project Man Component 4: Project Manag Individual Consult IBRD / 83900 Prior Open 121,500.00 110,747.32 Terminated 2020-06-07 2020-06-07 2020-06-07 2020-06-11 2020-06-07 2019-08-15 2022-05-31 ager ement and Monitoring and E ant Selection valuation TPQI-C-2.3.1.3/4 / Project Ma nger for Land Improvement a Component 2: Promoting Inv Individual Consult IBRD / 83900 Post Open 12,150.00 0.00 Canceled 2020-06-29 2020-06-18 2020-08-25 2020-08-30 2020-09-01 2021-06-30 nd Infrastructures Constructi estment and Exports ant Selection on of the Engineering City TPQI-C-2.3.1.3/5 / Project Ma Component 2: Promoting Inv Individual Consult nager for Construction of EC IBRD / 83900 Post Open 17,550.00 0.00 Canceled 2020-06-29 2020-06-18 2020-08-25 2020-08-30 2020-09-01 2021-12-30 estment and Exports ant Selection Engineering Business Acceler ator Bulding TPQI-C-3.1.3.2 / Project Man Component 3: Modernizing t Individual Consult ager for renovation of the pr IBRD / 83900 he National Quality Infrastru Post Open 9,450.00 9,408.46 Signed 2021-05-29 2021-06-16 2021-07-29 2021-10-25 2021-08-19 2021-10-25 2021-10-01 2021-11-01 2022-04-29 ant Selection emises of Industrial Metrolog cture y Center of NBSM Page 2 TPQI-C-4.1.2/2 / Project Man Component 4: Project Manag Individual Consult IBRD / 83900 Post Limited 40,500.00 41,289.13 Signed 2021-07-28 2021-07-29 2021-08-02 2021-07-29 2021-08-04 2021-07-31 2021-08-06 2021-08-02 2022-05-31 ager ement and Monitoring and E ant Selection valuation TPQI-C-2.3.1.3/8 / Project Ma Component 2: Promoting Inv Individual Consult nager for EC Land Improvem IBRD / 83900 Post Open 12,150.00 11,577.26 Signed 2021-11-25 2021-12-02 2021-12-17 2022-01-10 2021-12-19 2022-01-12 2022-01-03 2022-02-14 2022-10-10 estment and Exports ant Selection ent and Infrastructures Const ruction TPQI-C-4.1.2/NVF / Legal Cou Component 4: Project Manag Individual Consult IBRD / 83900 Post Limited 19,460.00 0.00 Canceled 2021-12-28 2021-12-29 2022-01-18 2022-01-23 2022-02-01 2022-05-22 nsel on National Venture Cap ement and Monitoring and E ant Selection ital Fund valuation TPQI-C-3.1.3.4 / Expert for In Component 3: Modernizing t Individual Consult Under Implement ternational Accreditation of C IBRD / 83900 he National Quality Infrastru Post Open 54,430.00 0.00 2022-04-29 2022-04-28 2022-06-20 2022-06-25 2022-07-11 2022-11-28 ant Selection ation alibration Labs of the NBSM cture TPQI-C-4.1.8./1 / Financial M Component 4: Project Manag Individual Consult Under Implement IBRD / 83900 Post Open 33,120.00 0.00 2022-05-16 2022-05-17 2022-06-13 2022-06-16 2022-07-01 2024-06-30 anagement Specialist of the ement and Monitoring and E ant Selection ation TPQI PMU valuation Page 3