PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Western and Central Africa : WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development PLAN General Information Country: Western and Central Africa Bank’s Approval Date of the Original Procurement Plan: 2018-02-28 Revised Plan Date(s): (comma delineated, leave blank if 2022-05-08 none) Project ID: P113266 GPN Date: Project Name: WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Loan / Credit No: IDA / D2440, IDA / H7700 WEST AFRICAN POWER POOL Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOF-REF-24 / Design, Suppl Technical Assistance and Int Open - Internationa Single Stage - One E 7,509,480.1 2018-12-2 y and Installation of SVC, SPS IDA / H7700 A priori Appel d'offres 5,700,000.00 Signé 2018-02-26 2018-05-11 2018-03-14 2018-07-06 2018-04-25 2018-05-25 2018-10-19 2018-06-29 2018-12-19 egration of WAPP Network l nvelope 5 6 and PMUs- Re-tendering BJ-WAPP-194527-CW-RFB / A Supply Alternatives Studies Single Stage - One E 2021-03-3 ccess Roads and Rivers Cross IDA / D2440 and Project Preparation Sup A posteriori Appel d'offres Open - National 690,000.00 991,700.00 Signé 2020-09-30 2021-02-15 2020-10-05 2021-03-08 2020-11-06 2021-03-22 2020-11-16 2021-04-02 2020-12-14 2021-05-06 nvelope 0 ing- Liberia - in the framewor port k of FS studies GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF-REF-26 / Acquisition of Technical Assistance and Int Open - Internationa Single Stage - One E En cours d'ex IDA / H7700 A posteriori Demande de prix 100,000.00 0.00 2018-01-20 2018-03-17 2018-06-17 video conférence equipemen egration of WAPP Network l nvelope écution ts MOF-REF-28 / Equipment for functioning of the North Core Supply Alternatives Studies Open - Internationa Single Stage - One E En attente d' PIU (vehicles, office equipme IDA / D2440 and Project Preparation Sup A posteriori Demande de prix 300,000.00 0.00 2018-06-06 2018-08-01 2018-11-01 l nvelope exécution nt, consumables etc- multipl port e contracts under 100.000 $) BJ-WAPP-97000-GO-RFQ / Ac Technical Assistance and Int Open - Internationa Single Stage - One E En cours d'ex quisition of IT, Office equipm IDA / H7700 A posteriori Demande de prix 200,000.00 0.00 2019-03-20 2019-05-15 2019-11-11 egration of WAPP Network l nvelope écution ent and Office supplies (mul tiple contracts) BJ-WAPP-173726-GO-RFQ / N Technical Assistance and Int Single Stage - One E En attente d' C-Supply Printers and photoc IDA / H7700 A posteriori Demande de prix Open - National 40,000.00 0.00 2020-05-26 2020-07-21 2020-09-21 egration of WAPP Network nvelope exécution opiers - North Core Abuja Offi ce BJ-WAPP-173728-GO-RFQ / N Technical Assistance and Int Single Stage - One E En attente d' C- Field equipment for ESIA s IDA / H7700 A posteriori Demande de prix Open - National 16,000.00 0.00 2020-05-26 2020-07-21 2020-08-21 egration of WAPP Network nvelope exécution afeguard department- North Core Project BJ-WAPP-173733-GO-RFQ / N C- Supply of computer hardw Technical Assistance and Int Open - Internationa Single Stage - One E En attente d' IDA / H7700 A posteriori Demande de prix 168,330.00 0.00 2020-05-26 2020-07-21 2020-10-21 are and equipment for North egration of WAPP Network l nvelope exécution Core-Abuja and local Offices NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF-REF-25 / Tuning of Pow er System Stabilizers (PSS), F Technical Assistance and Int Open - Internationa Single Stage - One E IDA / H7700 A priori Appel d'offres 2,600,000.00 4,014,239.34 Signé 2018-04-15 2018-11-04 2018-04-20 2018-12-30 2018-06-01 2019-02-18 2018-07-01 2019-05-13 2018-08-05 2019-08-26 2019-02-01 ield Testing and Synchroniza egration of WAPP Network l nvelope tion of the WAPP network. BJ-WAPP-48674-NC-DIR / Acq Technical Assistance and Int Passation de marc uisition of Integrated fiduciar IDA / H7700 A posteriori Direct 75,000.00 0.00 Annulé 2017-12-01 2018-02-19 2017-12-06 2017-12-01 2018-03-23 2018-06-25 egration of WAPP Network hé de gré à gré y management software BJ-WAPP-106480-NC-DIR / Ac Technical Assistance and Int Passation de marc En attente d' quisition of TOMPRO ( integra IDA / H7700 A posteriori Direct 75,000.00 0.00 2019-03-17 2019-03-22 2019-04-26 2019-10-23 egration of WAPP Network hé de gré à gré exécution ted fiduciary management so ftware) BJ-WAPP-124404-NC-DIR / N Institutional Framework and Passation de marc En cours d'ex C- Acquisition of TOMPRO-ext IDA / D2440 A posteriori Direct 170,000.00 0.00 2019-07-31 2019-08-01 2019-08-05 2019-09-09 2020-03-07 Project Oversight hé de gré à gré écution ended version BJ-WAPP-173811-NC-DIR / TE Power Interconnection betw STS at Delta IV power plant ( Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 54,795.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-11-30 Nigeria)-- Contract with GE IN hé de gré à gré exécution erra Leone and Guinea TERNATIONAL OPERATIONS NIGERIA LTD- OEM BJ-WAPP-173812-NC-DIR / TE Power Interconnection betw Passation de marc En attente d' STS at GEREGU power plant ( IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 41,465.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-09-30 hé de gré à gré exécution Nigeria)- contract with SIEME erra Leone and Guinea NS LTD- OEM BJ-WAPP-173813-NC-DIR / TE Power Interconnection betw STS at KAINJI power plant (Ni Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 63,000.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-09-30 geria)-contract with GE Rene hé de gré à gré exécution erra Leone and Guinea wable Energy Hydro France - OEM N.1 BJ-WAPP-173816-NC-DIR / TE STS at AFAM VI power plant ( Power Interconnection betw Passation de marc En attente d' Nigeria)- contract with Gener IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 32,000.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-09-30 hé de gré à gré exécution al Electric International Oper erra Leone and Guinea ations (NIG) Limited (“GEION ”) - OEM BJ-WAPP-173817-NC-DIR / Te Power Interconnection betw sts N.2 for VRA AKOSOMBO p Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 64,700.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-09-30 ower plant (Ghana)- contract hé de gré à gré exécution erra Leone and Guinea with GE Oil and Gas Limited - OEM N.2 Page 1 BJ-WAPP-173818-NC-DIR / Te Power Interconnection betw sts at VRA AKOSOMBO powe Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 36,600.00 0.00 2020-06-01 2020-06-06 2020-07-11 2020-09-30 r plant (Ghana) - contract wit hé de gré à gré exécution erra Leone and Guinea h ANDRITZ HYDRO - OEM N.2 BJ-WAPP-190195-NC-DIR / TE Power Interconnection betw STS at MANANTALI power pla Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 68,600.00 0.00 2020-08-31 2020-09-05 2020-10-10 2020-12-30 nt (Mali)- Cf. contract with Ge hé de gré à gré exécution erra Leone and Guinea neral Electric International f or tuning of PSS BJ-WAPP-194528-NC-RFB / G Supply Alternatives Studies Single Stage - One E eotech Investigation- Liberia- IDA / D2440 and Project Preparation Sup A posteriori Appel d'offres Limited 650,000.00 0.00 Annulé 2020-09-30 2021-06-14 2020-10-05 2021-06-11 2020-11-06 2021-08-09 2020-11-25 2021-09-10 2020-12-30 2021-03-31 nvelope in the framework of FS studie port s BJ-WAPP-173815-NC-DIR / TE STS N.2 at KAINJI power plan Power Interconnection betw Passation de marc En attente d' t (Nigeria)-contract with Pow IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 126,000.00 0.00 2020-06-01 2021-02-28 2021-04-04 2021-06-24 hé de gré à gré exécution er China Huadong Engineerin erra Leone and Guinea g Company Limited - OEM N. 2 BJ-WAPP-216681-NC-DIR / Te Power Interconnection betw sts at TAPCO & TIPCO Power Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 86,615.00 0.00 2021-02-15 2021-02-20 2021-03-27 2021-06-16 Plants(VRA) in Ghana- OEM G hé de gré à gré exécution erra Leone and Guinea eneral Electric Power service s (Ghana) BJ-WAPP-216687-NC-DIR / Te Power Interconnection betw sts at EGBIN 1 Power Plant ( Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 81,092.00 0.00 2021-02-15 2021-02-20 2021-03-27 2021-06-16 Nigeria)- OEM Emerson Auto hé de gré à gré exécution erra Leone and Guinea matic Solutions (UAE) BJ-WAPP-216688-NC-DIR / Te Power Interconnection betw sts at EGBIN 2-(Nigeria)- OEM Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 65,422.00 0.00 2021-02-15 2021-02-20 2021-03-27 2021-06-16 Mitsubishi Hitachi Power Syst hé de gré à gré exécution erra Leone and Guinea ems (UK-Europe) BJ-WAPP-216689-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' sts at JEBBA Power Plant (Ni IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 18,000.00 0.00 2021-02-15 2021-02-20 2021-03-27 2021-06-16 hé de gré à gré exécution geria)-OEM ANDRITZ erra Leone and Guinea BJ-WAPP-239136-NC-DIR / As Power Interconnection betw Passation de marc En attente d' ogli (Ghana) Power Plant Test IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 91,500.00 0.00 2021-06-17 2021-06-22 2021-07-27 2021-10-16 hé de gré à gré exécution ing erra Leone and Guinea BJ-WAPP-241047-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' sts N.1at TAABO power plant IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 35,245.00 0.00 2021-07-15 2021-07-20 2021-08-24 2021-11-13 hé de gré à gré exécution ( Cote d'Ivoire) -OEM SAR Co erra Leone and Guinea nsulting BJ-WAPP-241048-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' sts N.2 at TAABO Power Plant IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 84,587.00 0.00 2021-07-16 2021-07-21 2021-08-25 2021-11-14 hé de gré à gré exécution (Cote d'Ivoire)-OEM GE Rene erra Leone and Guinea wable Energy BJ-WAPP-254958-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' st at BUI Power Plant (Ghana) IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 14,000.00 0.00 2021-09-30 2021-10-05 2021-11-09 2022-01-29 hé de gré à gré exécution - OEM Sinohydro Corporation erra Leone and Guinea Ltd BJ-WAPP-254961-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' st at KTPS (Kpone Thermal P IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 117,497.00 0.00 2021-09-30 2021-10-05 2021-11-09 2022-01-29 hé de gré à gré exécution ower Plant)-Ghana-OEM ABB erra Leone and Guinea BJ-WAPP-264040-NC-RFB / N ew Bid- Geotechnical Investig Supply Alternatives Studies Single Stage - One E ations in the framework of th IDA / D2440 and Project Preparation Sup A posteriori Appel d'offres Limited 1,300,000.00 1,398,671.00 Signé 2021-11-23 2021-11-22 2021-11-28 2021-11-22 2021-12-17 2021-12-13 2022-01-10 2021-12-20 2022-02-01 2022-03-02 2022-07-01 nvelope e Feasibility Study for a new port major Hydro Project on Saint- Paul River, Liberia BJ-WAPP-268124-NC-DIR / Te Power Interconnection betw sts at Bel Air and Kahone Po Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 77,000.00 0.00 2021-12-20 2021-12-25 2022-01-29 2022-04-20 wer Plants in Senegal-OEM W hé de gré à gré exécution erra Leone and Guinea ARSTILA West Africa BJ-WAPP-292792-NC-DIR / N Power Interconnection betw ew- Test at BUI Power Plant ( Passation de marc En attente d' IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 38,049.00 0.00 2022-05-03 2022-05-08 2022-06-12 2022-09-01 Ghana)/2nd round of test 2- hé de gré à gré exécution erra Leone and Guinea OEM Guangzhou Kinte Indust rial BJ-WAPP-292794-NC-DIR / Te Power Interconnection betw Passation de marc En attente d' st at CIPREL ( Cote d’Ivoire) - IDA / H7700 een Cote d'Ivoire, Liberia, Si A posteriori Direct 86,980.00 0.00 2022-05-16 2022-05-21 2022-06-25 2022-09-14 hé de gré à gré exécution OEM GE ( 1st and 2nd round erra Leone and Guinea of test) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF-REF-12 / Feasibility Stu Supply Alternatives Studies Sélection fondée s Open - Internationa dy of the priority project sele IDA / D2440 and Project Preparation Sup A priori ur la qualité et le 4,100,000.00 0.00 Annulé 2018-11-30 2018-12-21 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2020-06-10 l cted-St Paul River Proj.- Liber port coût ia- AF 2MOF-REF-13 / ESIA Studies Supply Alternatives Studies Sélection fondée s Open - Internationa for the Priority Project-St Paul IDA / D2440 and Project Preparation Sup A priori ur la qualité et le 3,300,000.00 0.00 Annulé 2018-11-30 2018-12-21 2019-02-03 2019-03-03 2019-04-02 2019-05-07 2019-06-11 2020-06-10 l River Proj.- Liberia- AF port coût MOF-REF-14 / Strategic Advi Supply Alternatives Studies Sélection fondée s Open - Internationa sor to support Project's devel IDA / D2440 and Project Preparation Sup A posteriori ur la qualité et le 800,000.00 852,650.00 Signé 2018-09-01 2020-02-09 2018-09-22 2020-03-12 2018-11-05 2020-05-29 2018-12-03 2020-07-20 2019-01-02 2020-07-27 2019-02-06 2020-09-01 2019-03-13 2021-01-26 2020-03-12 l opment -St Paul River Proj.- L port coût iberia- AF BJ-WAPP-58133-CS-CQS / Ev Sélection fondée s Technical Assistance and Int Open - Internationa aluation Electricity sub-secto IDA / H7700 A posteriori ur les qualification 200,000.00 221,774.00 Signé 2018-06-01 2018-12-01 2018-06-22 2018-12-06 2018-08-05 2019-04-29 2018-09-04 2019-07-09 2018-10-09 2019-07-29 2019-04-07 egration of WAPP Network l r skills in west Africa s des consultants BJ-WAPP-48547-CS-CQS / No Sélection fondée s Technical Assistance and Int Open - Internationa rth Core Project: Selection Ag IDA / H7700 A posteriori ur les qualification 300,000.00 0.00 Annulé 2018-02-12 2018-02-14 2018-02-20 2018-02-28 2018-03-19 2018-09-19 egration of WAPP Network l ency for recruitment of IMU k s des consultants ey staff MOF-REF-6 / Financial Audit Supply Alternatives Studies Sélection au moin Open - Internationa ITAP/ WAPP for 2018 - 2019- IDA / H7700 and Project Preparation Sup A posteriori 29,440.00 30,078.00 Signé 2018-07-30 2019-02-27 2018-08-20 2019-01-15 2018-10-03 2019-04-24 2018-10-31 2019-05-22 2018-11-30 2019-05-24 2019-01-04 2019-06-03 2019-02-08 2019-06-05 2021-11-29 dre coût l 2020 period port Page 2 MOF-REF-7 / Support to the Supply Alternatives Studies Sélection fondée s preparation of the PPAs base Open - Internationa En attente d'exéc IDA / D2440 and Project Preparation Sup A posteriori ur la qualité et le 350,000.00 0.00 2018-08-15 2018-09-05 2018-10-19 2018-11-16 2018-12-16 2019-01-20 2019-02-24 2020-02-24 d on the opportunities create l ution port coût d by the development of the CLSG- AF MOF-REF-8 / Organization of Supply Alternatives Studies Sélection fondée s Open - Internationa En attente d'exéc a sub-regional workshop on C IDA / D2440 and Project Preparation Sup A posteriori ur les qualification 100,000.00 0.00 2018-08-30 2018-09-20 2018-11-03 2018-12-03 2019-01-07 2019-07-06 l ution LSG market opportunities- AF port s des consultants MOF-REF-20 / Consultant for Sélection fondée s Technical Assistance and Int Open - Internationa preparation of Certification p IDA / H7700 A posteriori ur les qualification 200,000.00 0.00 Annulé 2018-03-30 2018-04-20 2018-06-03 2018-07-03 2018-08-07 2019-02-03 egration of WAPP Network l rogram for Operators s des consultants MOF-REF-9 / Preparation of t Supply Alternatives Studies Sélection fondée s Open - Internationa En attente d'exéc he technical annexes to sign IDA / D2440 and Project Preparation Sup A posteriori ur la qualité et le 500,000.00 0.00 2018-05-15 2018-06-05 2018-07-19 2018-08-16 2018-09-15 2018-10-20 2018-11-24 2019-11-24 l ution ed PPAs and TSA through the port coût CLSG line - AF MOF-REF-11 / Optimization S Supply Alternatives Studies Sélection fondée s Open - Internationa tudy to define a priority inve IDA / D2440 and Project Preparation Sup A posteriori ur la qualité et le 550,000.00 355,331.58 Signé 2018-08-20 2019-02-27 2018-09-10 2018-08-24 2018-10-24 2018-10-25 2018-11-21 2018-12-10 2018-12-21 2018-12-18 2019-01-25 2019-01-18 2019-03-01 2019-02-14 2020-02-29 l stment project - St Paul River port coût Proj.- Liberia- AF BJ-WAPP-81801-CS-QCBS / T Supply Alternatives Studies Sélection fondée s echnical Assistance to Focal Open - Internationa IDA / D2440 and Project Preparation Sup A priori ur la qualité et le 799,500.00 1,090,480.11 Signé 2018-10-15 2018-11-05 2018-10-17 2018-12-19 2018-12-11 2019-01-16 2019-02-05 2019-02-15 2019-02-05 2019-03-22 2019-08-02 2019-04-26 2019-08-23 2020-04-25 Point (Phase 2)-St Paul River l port coût Project- Liberia- AF BJ-WAPP-111608-CS-QCBS / Supply Alternatives Studies Sélection fondée s Open - Internationa En attente d'exéc ESIA Ghana -Burkina-Mali Int IDA / H7700 and Project Preparation Sup A priori ur la qualité et le 1,300,000.00 0.00 2019-04-26 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-11-04 l ution erconnection Project port coût BJ-WAPP-127634-CS-CQS / L Supply Alternatives Studies Sélection fondée s Open - Internationa En cours d'exécut EGAL EXPERT IN REGIONAL P IDA / H7700 and Project Preparation Sup A posteriori ur les qualification 275,000.00 0.00 2019-08-30 2019-09-25 2019-09-20 2019-11-03 2019-12-03 2020-01-07 2020-07-05 l ion OWER POOLS ( firm) port s des consultants BJ-WAPP-130085-CS-QCBS / Supply Alternatives Studies Sélection fondée s Feasibility & ESIA studies of t Open - Internationa IDA / D2440 and Project Preparation Sup A priori ur la qualité et le 7,400,000.00 4,170,989.74 Signé 2019-09-15 2019-10-05 2019-10-06 2019-10-23 2019-11-19 2019-12-21 2019-12-17 2020-03-02 2020-01-16 2020-05-23 2020-02-20 2020-05-28 2020-03-26 2020-06-05 2021-03-26 he priority project Selected-S l port coût t Paul River Projects - Liberia BJ-WAPP-134263-CS-CQS / L Supply Alternatives Studies Sélection fondée s Open - Internationa En cours d'exécut egal Expert Regional Power P IDA / H7700 and Project Preparation Sup A posteriori ur les qualification 150,000.00 0.00 2019-09-30 2019-09-25 2019-10-21 2019-12-04 2020-01-03 2020-02-07 2020-08-05 l ion ool (firm)- AT to Energy Buye port s des consultants rs BJ-WAPP-198430-CS-QCBS / Supply Alternatives Studies Sélection fondée s GBM- New-Etudes de faisabili Open - Internationa En cours d'exécut IDA / D2440 and Project Preparation Sup A priori ur la qualité et le 3,477,000.00 0.00 2020-10-15 2021-01-15 2020-11-05 2021-01-27 2020-12-19 2021-08-05 2021-01-16 2021-11-29 2021-02-15 2022-01-10 2021-03-22 2021-04-26 2022-04-26 té et EIES-Projet d'Interconne l ion port coût ction Ghana-Burkina-Mali BJ-WAPP-279141-CS-LCS / A Supply Alternatives Studies Sélection au moin Open - Internationa En cours d'exécut UDIT EXTERNE FINANCIER DU IDA / H7700 and Project Preparation Sup A posteriori 30,000.00 0.00 2022-02-21 2022-02-18 2022-03-04 2022-02-24 2022-03-27 2022-03-17 2022-04-10 2022-04-19 2022-04-17 2022-04-25 2022-04-29 2022-04-27 2022-05-08 2023-06-02 dre coût l ion PROJET ITAP Exercices 2021 port et 2022 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF-REF-22 / Technical Coor Technical Assistance and Int IDA / H7700 A priori Individuel Open 345,000.00 0.00 Annulé 2018-01-08 2019-02-28 2018-02-26 2018-03-19 2018-04-23 2019-04-23 dinator for WAPP ( Resident) egration of WAPP Network MOF-REF-23 / Power pool Ad Technical Assistance and Int En cours d'exécut IDA / H7700 A priori Individuel Open 648,000.00 0.00 2018-03-30 2018-05-17 2018-05-18 2019-04-30 2018-06-08 2019-06-30 2018-07-13 2019-01-09 viser ( Phase 2) - CIC egration of WAPP Network ion MOF-REF-16 / Focal Team PD Supply Alternatives Studies Sélection de cons En cours d'exécut U counterpart Expert-St Paul IDA / D2440 and Project Preparation Sup A priori ultants par entent Direct 354,000.00 0.00 2018-02-13 2019-02-28 2018-02-16 2018-02-28 2020-02-28 ion River Proj.- Liberia- AF port e directe BJ-WAPP-58084-CS-INDV / N Supply Alternatives Studies En cours d'exécut orth Core Project- Implementi IDA / H7700 and Project Preparation Sup A priori Individuel Open 232,500.00 0.00 2018-04-10 2018-06-13 2018-05-17 2018-06-07 2019-02-28 2018-07-12 2019-01-08 ion ng Management Unit (IMU) di port rector BJ-WAPP-59065-CS-INDV / C Technical Assistance and Int En cours d'exécut ertification program for Oper IDA / H7700 A posteriori Individuel Open 200,000.00 0.00 2018-04-13 2018-05-28 2018-06-01 2018-12-20 2018-06-22 2018-07-27 2019-01-23 egration of WAPP Network ion ators ( Individual Consultant) BJ-WAPP-61508-CS-CDS / Re Supply Alternatives Studies Sélection de cons view of Environmental and S IDA / H7700 and Project Preparation Sup A posteriori ultants par entent Direct 40,500.00 40,435.00 Achevé 2018-05-02 2018-05-07 2018-05-07 2018-05-21 2018-12-18 2018-05-31 2018-05-25 ocial Impact Assessment (ESI port e directe A) Reports for North Core Pro ject MOF-REF-19 / Electricity sub- Technical Assistance and Int IDA / H7700 A posteriori Individuel Open 100,000.00 0.00 Annulé 2018-01-05 2018-03-02 2018-03-23 2018-04-27 2018-07-24 sector skill study for West Afr egration of WAPP Network ica BJ-WAPP-58896-CS-INDV / N. Supply Alternatives Studies Core-Monitoring &Evaluation IDA / H7700 and Project Preparation Sup A priori Individuel Open 185,100.00 0.00 Annulé 2018-05-28 2019-02-28 2018-07-04 2018-07-25 2018-08-29 2019-02-25 Specialist port BJ-WAPP-64381-CS-INDV / N. Supply Alternatives Studies IDA / H7700 A priori Individuel Open 187,500.00 0.00 Annulé 2018-05-29 2019-02-28 2018-07-05 2018-07-26 2018-08-30 2019-02-26 Core- Environmental Speciali and Project Preparation Sup st port BJ-WAPP-64383-CS-INDV / N. Supply Alternatives Studies IDA / H7700 A priori Individuel Open 187,500.00 0.00 Annulé 2018-05-28 2019-02-28 2018-07-04 2018-07-25 2018-08-29 2019-02-25 Core- Social Safeguards and Project Preparation Sup port BJ-WAPP-64384-CS-INDV / N. Supply Alternatives Studies IDA / H7700 A priori Individuel Open 187,500.00 0.00 Annulé 2018-05-28 2019-02-28 2018-07-04 2018-07-25 2018-08-29 2019-02-25 Core- Sr Financial Specialist and Project Preparation Sup port BJ-WAPP-64385-CS-INDV / N. Supply Alternatives Studies IDA / H7700 A priori Individuel Open 187,500.00 0.00 Annulé 2018-05-28 2019-02-28 2018-07-04 2018-07-25 2018-08-29 2019-02-25 Core-Sr Electrical Engineerin and Project Preparation Sup g port BJ-WAPP-64386-CS-INDV / N. Supply Alternatives Studies En cours d'exécut IDA / H7700 A priori Individuel Open 187,500.00 0.00 2018-05-28 2019-02-28 2018-07-04 2018-07-25 2018-08-29 2019-02-25 Core- Sr Procurement Special and Project Preparation Sup ion ist port BJ-WAPP-64388-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / D2440 A posteriori Individuel Open 102,000.00 0.00 2018-05-28 2018-09-25 2018-07-16 2018-08-06 2018-09-10 2019-09-10 nel- Environmental Specialist and Project Preparation Sup ion port Page 3 MOF-REF-18 / Two specialist Supply Alternatives Studies s members of Panel Experts IDA / D2440 and Project Preparation Sup A posteriori Individuel Open 204,000.00 0.00 Annulé 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2019-06-13 (Social specialist and Enviro port nmental specialist )- WAPP pr ojects- AF BJ-WAPP-64390-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / D2440 A posteriori Individuel Open 102,000.00 0.00 2018-05-28 2018-09-25 2018-07-16 2018-08-06 2018-09-10 2019-09-10 nel-Social Specialist and Project Preparation Sup ion port MOF-REF-17 / Panel of 6 exp Supply Alternatives Studies erts (different specialities)- IDA / H7700 and Project Preparation Sup A posteriori Individuel Open 400,000.00 0.00 Annulé 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2019-06-13 WAPP projects- PP port BJ-WAPP-64416-CS-INDV / fin Technical Assistance and Int alization of the pricing model IDA / H7700 A posteriori Individuel Open 148,500.00 0.00 Annulé 2018-03-30 2018-05-18 2018-06-08 2018-07-13 2019-01-09 egration of WAPP Network for regional power transmissi on BJ-WAPP-64392-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 139,000.00 0.00 2018-05-29 2018-09-25 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel-Dam Specialist and Project Preparation Sup ion port BJ-WAPP-64395-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 78,000.00 0.00 2018-05-28 2018-09-25 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel- Geologist and Project Preparation Sup ion port BJ-WAPP-64396-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 30,000.00 0.00 2018-05-29 2018-09-25 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel- Hydrologiist and Project Preparation Sup ion port BJ-WAPP-64397-CS-INDV / Pa Supply Alternatives Studies IDA / H7700 A posteriori Individuel Open 30,000.00 0.00 Annulé 2018-05-29 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel- Hydraulic Engineer Speci and Project Preparation Sup alist port BJ-WAPP-64398-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 60,000.00 0.00 2018-05-29 2018-09-25 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel- Health and Safety Specia and Project Preparation Sup ion list port BJ-WAPP-64399-CS-INDV / Pa Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 63,000.00 0.00 2018-05-29 2018-09-25 2018-09-24 2018-10-15 2018-11-19 2019-11-19 nel- Electro-mechanical speci and Project Preparation Sup ion alist port BJ-WAPP-88925-CS-CDS / Te Sélection de cons Technical Assistance and Int En attente d'exéc chnical Assistance fo Focal T IDA / D2440 A posteriori ultants par entent Direct 150,000.00 0.00 2018-12-07 2018-12-17 2019-02-20 2019-08-19 egration of WAPP Network ution eam -Liberia- Phase 1-B e directe BJ-WAPP-96229-CS-INDV / Se Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 145,000.00 0.00 2019-01-24 2019-01-24 2019-03-14 2019-04-04 2019-05-09 2019-11-05 nior Accountant Officer ( Nort and Project Preparation Sup ion h Core ) port BJ-WAPP-106481-CS-CDS / Pr Sélection de cons Technical Assistance and Int En attente d'exéc icing model for regional pow IDA / H7700 A posteriori ultants par entent Direct 148,500.00 0.00 2019-03-31 2019-04-10 2019-05-28 2019-11-24 egration of WAPP Network ution er transmission e directe BJ-WAPP-124405-CS-CDS / N Sélection de cons orth Core- Recruitment of Blu Institutional Framework and En cours d'exécut IDA / D2440 A posteriori ultants par entent Direct 123,000.00 0.00 2019-07-31 2019-08-28 2019-08-10 2019-10-14 2020-04-11 eprint Consult Co Ltd- for no Project Oversight ion e directe key staff selection BJ-WAPP-127670-CS-INDV / T Supply Alternatives Studies IDA / H7700 A posteriori Individuel Open 130,000.00 0.00 Annulé 2019-08-25 2019-08-28 2019-10-13 2019-09-13 2019-11-03 2019-09-17 2019-12-08 2020-06-05 echnical Expert Regional Pow and Project Preparation Sup er Pools port BJ-WAPP-127672-CS-INDV / F Supply Alternatives Studies En cours d'exécut IDA / H7700 A posteriori Individuel Open 150,000.00 0.00 2019-08-25 2019-09-24 2019-10-13 2019-11-03 2019-12-08 2020-06-05 INANCIAL EXPERT IN ENERGY and Project Preparation Sup ion TRADE port BJ-WAPP-134265-CS-INDV / F Supply Alternatives Studies En cours d'exécut inancial Expert in Energy Tra IDA / H7700 and Project Preparation Sup A posteriori Individuel Open 150,000.00 0.00 2019-09-30 2019-09-24 2019-11-18 2019-12-09 2020-01-13 2020-07-11 ion ding- TA to buyers port BJ-WAPP-134262-CS-CDS / N Sélection de cons Institutional Framework and En cours d'exécut ew- Technical Coordinator for IDA / H7700 A posteriori ultants par entent Direct 165,000.00 0.00 2019-09-26 2019-10-01 2019-10-06 2019-07-19 2019-12-10 2020-06-07 Project Oversight ion WAPP-resident e directe BJ-WAPP-145246-CS-INDV / Technical Assistance and Int En cours d'exécut Consultant to conduct team IDA / H7700 A posteriori Individuel Limited 82,500.00 0.00 2019-11-14 2019-12-12 2019-11-19 2019-12-10 2020-01-14 2020-07-12 egration of WAPP Network ion building workshop for WAPP Secretariat BJ-WAPP-173802-CS-CDS / S Sélection de cons Technical Assistance and Int upport to Technical Working IDA / H7700 A posteriori ultants par entent Direct 170,000.00 202,606.00 Signé 2020-05-21 2020-06-03 2020-05-31 2020-07-21 2020-06-30 2020-09-20 2020-12-15 egration of WAPP Network groups-new contract e directe BJ-WAPP-189376-CS-INDV / T Technical Assistance and Int ransaction adviser- North Cor IDA / H7700 A posteriori Individuel Limited 150,000.00 0.00 Annulé 2020-08-21 2020-08-19 2020-08-26 2020-09-02 2020-10-14 2021-04-12 egration of WAPP Network e transactions BJ-WAPP-191482-CS-INDV / Technical Assistance and Int En cours d'exécut IDA / D2440 A posteriori Individuel Open 150,000.00 0.00 2020-09-03 2020-09-02 2020-09-26 2020-10-06 2020-10-21 2021-04-19 New- Transaction Adviser- No egration of WAPP Network ion rth Core BJ-WAPP-194526-CS-CDS / L Sélection de cons egal Technical Assistance for Technical Assistance and Int IDA / D2440 A posteriori ultants par entent Direct 750,000.00 0.00 Annulé 2020-09-29 2020-10-09 2020-10-09 2020-11-08 2021-04-25 Regional Energy Trade for No egration of WAPP Network e directe rth Core Project- MILBANK BJ-WAPP-227087-CS-CDS / N Sélection de cons ew- Legal technical assistanc Technical Assistance and Int En cours d'exécut IDA / D2440 A posteriori ultants par entent Direct 295,000.00 0.00 2021-04-04 2021-04-01 2021-04-09 2021-04-18 2021-07-30 e to North Core Project- Regi egration of WAPP Network ion e directe onal Energy Transactions- Cli ve Ransome BJ-WAPP-229325-CS-INDV / Recruitment of a local lawyer Technical Assistance and Int IDA / H7700 A posteriori Individuel Limited 75,000.00 50,500.00 Signé 2021-04-18 2021-04-20 2021-04-23 2021-04-20 2021-04-28 2021-05-23 2021-05-13 2021-05-31 2021-07-12 in Nigeria for assisting North egration of WAPP Network Core Project for regional ener gy trade transactions Page 4