SUMMARY O F PROCUREMENT PLAN Project Preparation Advancement (PPA) Project information: Harmonizing and Improving Statistics in West Africa Project -P169265 Project Implementation agency: Liberia Institute of Statistics and Geo- Information Services (LISGIS) Date of the Procurement Plan: February 3, 2020 Period covered by this Procurement Plan: 3rd February to 31st July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016), revised in November 2017, and August 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Regional Project for Statistics Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market 1 Works C ≥ 5,000,000 Approach and Direct international advertising and the use of the Bank’s SPDs (or other Contracting documents agreed with the Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Bank). Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RfQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and the C ≥ 500,000 Approach and Direct use of the Bank’s SPDs (or other Goods, IT and Contracting documents agreed with the 2 non-consulting Bank). services Open Competition 100,000 < C < 500,000 National Market None Approach C ≤ 100,000 RfQ None All contracts at or above USD 100,000 are subject to for international advertising and the C < 100,000 Consulting Services use of the Bank’s SPDs (or other National documents agreed with the shortlist for Bank). 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and the C ≤ 200,000 Construction use of the Bank’s SPDs (or other Supervision documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, This line activity is not subject to Workshops, Based on approved Procurement Review However, 5 Study Tours All Values Annual Work Plan & each of the activities will be Budgets (AWPB) by TTL cleared with the TTL prior to its implementation. (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will be need for prequalification in the procurement arrangements under this Regional Project *These thresholds are for the purposes of the initial procurement plan for the PPA and for first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post-reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The LISGIS Project Management Team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works There are no works under the Project Preparation Advance Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procurement Prequ Nation Revie Expecte Expecte Comment No. (Description) Cost Method alifica al w d bid d s US$ tion Prefer by opening Contrac (yes/n ence Bank date t o) (yes/n (Prior Signatu o) / Post) re Date 1 Procurement of 4 12,100 laptops, 3 No. all- in-1 printers, Limited, RFQ No No Post 28 Feb 4 Mar office desks, a 20 20 projector, metal filing cabinet, and stationery and supplies for project management Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimate Selection Review Expecte Expected Expected Comments No. Assignment d Method/ by Bank d date Contract Completi Cost in Arrangem (Prior / of Signatur on US$ ent Post) proposal e Date submissi Date on 1. Recruitment of a Consultant to draft and validate 10,000 INDV Post 16 Mar 10 Apr 23 Apr ToR to be curricula of the 20 20 20 submitted to IDA Statistics degree & for Review and No CEST Program at Objection. the UL 2. Recruitment of a ToR, performance Financial evaluation, draft Management contract and Officer for Project DS Prior 10 Feb 21 Feb 31 Aug minutes of Management 20 20 20 contract negotiation to be submitted to IDA for Review and No 15,600 Objection. 3. ToR, performance evaluation, draft Recruitment of a contract and Procurement DS Prior 10 Feb 21 Feb 31 Aug minutes of Specialist for 20 20 20 contract Project 18,000 negotiation to be Management submitted to IDA for Review and No Objection. Training and Workshop (Training & Workshop activities are subject to TTL clearance). Estimat Estimated Expected Ref. Training, workshop and ed Cost Duration Training/workshop No. study tours in (Days) Date (US$) Conduct of validation 54,000 workshop and TOT for the GP Feb. 20 to March 1. on the design of 13 2020 questionnaires and enumeration training manual Workshop for cartographic 150,000 Feb. 24 to March 2. field staff training 16 2020 Workshop for enumeration 113,900 3. mapping training April 15, 2020 Study Tours to regional 32,000 countries for first-hand experience on regional March to April 4. harmonization of data 2020 collection, management and communication Workshops on current 50,000 administrative data across 5. April to July 2020 MACs and LISGIS regional offices Workshop to strengthen and 35,000 6. develop institutional capacity April to July 2020 of NSO Workshops for steering 40,000 7. committee on Administrative April to July 2020 Data Workshop for Project 10,000 Steering/Technical 8. Committees for annual work February 2020 plan preparation, review and validation GENERAL NOTES 1. Training and capacity building: Training workshops (including training material and support), conference attendance and study tours, will be carried out based on approved annual training and allied activities plan by the TTL. The beneficiaries, after the training, will be requested to submit a brief report indicating what skills have been acquired and how these skills will contribute to enhance their performance and contribute to the attainment of the Project’s development objective. 2. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) communication technology (including, without limitation, internet and telephone; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance; (iv) maintenance of equipment; (v) photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Western and Central Africa : Harmonizing and Improving Statistics in West Africa PLAN General Information Country: Western and Central Africa Bank’s Approval Date of the Original Procurement Plan: 2020-03-06 Revised Plan Date(s): (comma delineated, leave blank if 2022-06-28 none) Project ID: P169265 GPN Date: 2021-05-19 Project Name: Harmonizing and Improving Statistics in West Africa Loan / Credit No: IDA / V3090, IDA / V3080, IDA / 65740, IDA / 65760, IDA / 65730, IDA / D5830, IDA / D5820, IDA / 65770, IDA / 65750, IDA / D5840, IDA / D5880, IDA / 65780, IDA / D5850 Liberia Institute of Statistics & Geo-Information Services Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-LISGIS-222566-CW-RFQ / Regional component: Harmo Refurbish 3 classrooms & a c nization, Data Collection, Qu Request for Quota Request for Quota Single Stage - One E 2021-07-3 omputer laboratory for Statis IDA / 65730 ality Improvement, Dissemin Post Limited tions (Non Bank-S 50,000.00 49,875.00 Signed 2021-04-07 2021-10-26 2021-05-05 2021-12-07 tions nvelope 0 tics Degree Program at the U ation and Use of Core Social PD) L and Economic Statistics LR-LISGIS-222743-CW-RFQ / Country-Specific Component Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-01-3 Refurbish 7 LISGIS Regional IDA / 65760 : Improving and modernizing Post Limited tions (Non Bank-S 70,000.00 0.00 2022-09-22 2022-10-26 tions nvelope lementation 1 Officer physical and statistical infra PD) structure LR-LISGIS-222740-CW-RFQ / Country-Specific Component Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-01-0 Refurbish 8 LISGIS Regional IDA / 65760 : Improving and modernizing Post Limited tions (Non Bank-S 80,000.00 0.00 2022-08-25 2022-09-28 tions nvelope lementation 3 Offices physical and statistical infra PD) structure Regional component: Harmo LR-LISGIS-282952-CW-RFQ / nization, Data Collection, Qu Request for Quota Installation & commissioning Request for Quota Single Stage - One E Pending Imp 2023-02-1 IDA / D5840 ality Improvement, Dissemin Post Limited tions (Non Bank-S 61,000.00 0.00 2022-06-25 2022-08-20 of LAN (IPS and BSc.) at the tions nvelope lementation 6 ation and Use of Core Social PD) UL and Economic Statistics Regional component: Harmo LR-LISGIS-222567-CW-RFQ / nization, Data Collection, Qu Installation of LAN in Statistic Request for Quota 2021-09-2 IDA / D5840 ality Improvement, Dissemin Post 21,000.00 0.00 Canceled 2021-07-24 2021-08-25 s Laboratory (CEST and Bach tions 5 ation and Use of Core Social elor in Statistics) at the UL and Economic Statistics LR-LISGIS-233727-CW-RFQ / Project Management and Mo Request for Quota Single Stage - One E Other (with field f 2021-08-1 Refurbish 4 offices for PMT ( IDA / 65760 Post Limited 10,000.00 0.00 Canceled 2021-06-02 2021-07-02 nitoring and Evaluation tions nvelope or explanation) 8 M&E, FMO, Coordinator, and PS) LR-LISGIS-233655-CW-RFQ / Country-Specific Component Request for Quota Single Stage - One E 2021-11-3 Refurbish 4 offices at LISGIS IDA / 65740 : Improving and modernizing Post Limited 100,000.00 0.00 Canceled 2021-08-19 2021-09-17 tions nvelope 0 Headquarters including ware physical and statistical infra house structure Regional component: Harmo LR-LISGIS-222569-CW-RFQ / nization, Data Collection, Qu Request for Quota Request for Quota Single Stage - One E 2021-07-2 Refurbish IPS (CEST) Capitol IDA / 65730 ality Improvement, Dissemin Post Limited tions (Non Bank-S 25,000.00 0.00 Canceled 2021-04-27 2021-05-27 tions nvelope 7 Hill Building ation and Use of Core Social PD) and Economic Statistics LR-LISGIS-283618-CW-RFB / Country-Specific Component Request for Bids - Clearing of site and refurbish : Improving and modernizing Single Stage - One E Small Works SPD Pending Imp 2023-05-0 IDA / 65740 Post Request for Bids Open - National 375,000.00 0.00 2022-07-21 2022-07-26 2022-09-06 2022-10-06 2022-11-10 ment of LISGIS new Offices lo physical and statistical infra nvelope (1 envelope proce lementation 9 cated in Congo Town structure ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LISGIS/HISWAP/RFQ/GO-01/P PA / Procurement of stationer Project Management and Mo Request for Quota Single Stage - One E IDA / V3080 Post Limited 12,100.00 18,756.00 Completed 2020-03-04 2020-03-25 2020-04-29 2020-04-24 2020-10-26 2020-06-19 y and office equipment for Pr nitoring and Evaluation tions nvelope oject Management LR-LISGIS-164876-GO-RFQ / Project Management and Mo Request for Quota Single Stage - One E Procurement of 2 No. Double IDA / V3090 Post Limited 74,000.00 73,000.00 Completed 2020-04-04 2020-03-26 2020-04-26 2020-04-24 2020-05-19 2020-06-01 nitoring and Evaluation tions nvelope Cabin Pickup Trucks for PMT Regional component: Harmo LR-LISGIS-213264-GO-UN / P nization, Data Collection, Qu rocurement of 27 Toyota Lan UN Agencies (Dire IDA / 65740 ality Improvement, Dissemin Prior Direct 1,215,000.00 1,192,297.62 Signed 2021-01-12 2021-02-01 2021-01-22 2021-02-08 2021-01-26 2021-02-19 2021-04-30 d Cruisers for the conduct of ct) ation and Use of Core Social Censuses and Surveys and Economic Statistics LR-LISGIS-213267-GO-RFQ / Procurement of two Toyota H Project Management and Mo IDA / 65760 Prior Direct Selection Direct 113,000.00 113,000.00 Signed 2021-02-04 2021-02-14 2021-02-09 2021-02-18 2021-02-10 2021-02-19 2021-02-26 ilux Pickups and one Toyota nitoring and Evaluation Fortuner (SUV) for Project Ma nagement LR-LISGIS-222548-GO-RFQ / Procure 7 printers for Census Regional component: Harmo PIU, 115 backpacks for NAAS, nization, Data Collection, Qu Request for Quota Single Stage - One E 15 laptops, USB, 100 HD Dat IDA / 65740 ality Improvement, Dissemin Post Limited 60,100.00 59,990.00 Completed 2021-03-29 2021-04-12 2021-04-27 2021-05-28 2021-05-21 2021-06-07 tions nvelope a -Entry, 200ctn A4 paper, 1 ation and Use of Core Social ctn hand sanitizer, 50 cartrid and Economic Statistics ges, 100 themometers, 1 ctn nose mask for Administrative Data LR-LISGIS-222555-GO-RFQ / Regional component: Harmo Procure 75 scales, 100 tablet nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl s, and 60 sets of rain gears a IDA / 65730 ality Improvement, Dissemin Post Limited 22,150.00 0.00 2021-04-05 2021-05-04 2021-05-28 tions nvelope ementation nd assorted stationery for m ation and Use of Core Social onthly CPI Data Collection and Economic Statistics LR-LISGIS-222551-GO-RFQ / Regional component: Harmo Procure assorted stationery a nization, Data Collection, Qu Request for Quota Single Stage - One E nd supplies for CENSUS, CES IDA / D5820 ality Improvement, Dissemin Post Limited 9,000.00 8,883.20 Completed 2021-03-26 2021-05-17 2021-04-21 2021-06-21 2021-05-05 2021-07-09 tions nvelope T and Statistics Degree Progr ation and Use of Core Social am and Economic Statistics Page 1 LR-LISGIS-222745-GO-RFB / Country-Specific Component Procure 15 laptops, 15 deskt : Improving and modernizing Single Stage - One E IDA / 65750 Post Request for Bids Open - National 180,000.00 169,995.00 Signed 2021-07-08 2021-08-24 2021-07-12 2021-12-28 2021-08-12 2021-10-05 2021-08-25 2021-11-05 2021-09-14 2021-12-10 2021-10-15 ops, 15 hard drives, 30 fans, physical and statistical infra nvelope 30 chairs, and 30 desks for LI structure SGIS County Offices LR-LISGIS-233729-GO-RFQ / Procure 2 laptops, 2 sets of d esktop computers with UPS, 2 printers, assorted printer c Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / D5820 Post Limited 34,500.00 0.00 2021-05-28 2021-06-25 2021-07-30 artridges (2 sets each for 5 p nitoring and Evaluation tions nvelope ementation rinters), 1 mini refrigerator, 2 air conditioners, 1 digital ca mera, 1 TV, 1 scanner, 3 filin g cabinets, 1 projector, 3 HD D, etc. LR-LISGIS-233732-GO-RFQ / Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / 65760 Post Limited 6,000.00 0.00 2021-05-20 2021-06-15 2021-06-30 Procure stationery for PMT nitoring and Evaluation tions nvelope ementation LR-LISGIS-260046-GO-RFQ / Project Management and Mo Request for Quota Single Stage - One E IDA / 65770 Post Limited 40,500.00 43,500.00 Completed 2021-11-11 2021-11-10 2021-12-10 2021-12-08 2021-12-31 2021-12-08 Procurement of an SUV for PF nitoring and Evaluation tions nvelope MU LR-LISGIS-260047-GO-RFQ / Regional component: Harmo Procure two All-in-One Deskt nization, Data Collection, Qu Request for Quota Single Stage - One E op computer with UPS, one l IDA / V3080 ality Improvement, Dissemin Post Limited 9,500.00 10,685.00 Completed 2022-01-07 2022-01-06 2022-02-07 2022-02-03 2022-02-25 2022-02-03 tions nvelope aptop computer, and an exte ation and Use of Core Social rnal hard drive for Census Ma and Economic Statistics nagement Team Regional component: Harmo LR-LISGIS-278032-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Procurement of rain gear for IDA / 65750 ality Improvement, Dissemin Post Limited 5,000.00 5,000.00 Completed 2022-03-21 2022-02-02 2022-05-16 2022-03-03 2022-11-12 2022-03-11 tions nvelope CPI ation and Use of Core Social and Economic Statistics Regional component: Harmo LR-LISGIS-278102-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Procurement of laptops for C IDA / 65760 ality Improvement, Dissemin Post Limited 6,000.00 5,400.00 Completed 2022-03-21 2022-02-02 2022-05-16 2022-03-17 2022-11-12 2022-04-22 tions nvelope PI ation and Use of Core Social and Economic Statistics LR-LISGIS-282804-GO-RFQ / Country-Specific Component Request for Quota Single Stage - One E Pending Impl Procure 1 No. 250KVA gener IDA / 65770 : Improving and modernizing Post Limited 60,000.00 0.00 2022-07-02 2022-08-27 2023-02-23 tions nvelope ementation ator for LISGIS physical and statistical infra structure LR-LISGIS-222759-GO-RFB / Supply and installation of 10 Country-Specific Component 0a/c, 30 laptops, 25 desktops : Improving and modernizing Single Stage - One E Pending Impl , 200ctn sheets, 10 printers, IDA / 65740 Post Request for Bids Open - National 300,500.00 0.00 2022-08-23 2022-08-28 2022-09-27 2022-10-10 2022-11-01 2023-04-30 physical and statistical infra nvelope ementation 100 chairs, 20 filing cabinets, structure and assorted stationery & su pplies for LISGIS Offices (Phy sical and Statistical Infrastruc ture) LR-LISGIS-282805-GO-RFQ / Country-Specific Component Request for Quota Single Stage - One E Pending Impl Procure 2 No. 32 seater staff IDA / 65770 : Improving and modernizing Post Limited 100,000.00 0.00 2022-05-28 2022-07-23 2023-01-19 tions nvelope ementation buses for LISGIS physical and statistical infra structure LR-LISGIS-222750-GO-RFQ / Country-Specific Component Request for Quota Single Stage - One E Pending Impl Procure stationery & supplies IDA / 65730 : Improving and modernizing Post Limited 55,350.00 0.00 2022-06-30 2022-08-02 2022-08-25 tions nvelope ementation for LISGIS County Offices physical and statistical infra structure LR-LISGIS-282806-GO-RFQ / Country-Specific Component Request for Quota Single Stage - One E Pending Impl Procure antivirus (160 users) IDA / 65750 : Improving and modernizing Post Limited 5,600.00 0.00 2022-07-25 2022-09-19 2023-03-18 tions nvelope ementation for LISGIS physical and statistical infra structure LR-LISGIS-282807-GO-RFQ / Country-Specific Component Procure additional meriki equ : Improving and modernizing Request for Quota Single Stage - One E Pending Impl IDA / D5820 Post Limited 100,000.00 0.00 2022-06-27 2022-08-22 2023-02-18 ipment & licenses to manage physical and statistical infra tions nvelope ementation LISGIS Cloud network structure LR-LISGIS-282808-GO-RFQ / Country-Specific Component Request for Quota Single Stage - One E Pending Impl Procure solar plant to upgrad IDA / D5840 : Improving and modernizing Post Limited 100,000.00 0.00 2022-07-26 2022-09-20 2023-03-19 tions nvelope ementation e existing battery bank at LIS physical and statistical infra GIS structure Regional component: Harmo LR-LISGIS-282809-GO-RFQ / nization, Data Collection, Qu Procure stationery and suppli Request for Quota Single Stage - One E Pending Impl IDA / D5880 ality Improvement, Dissemin Post Limited 4,000.00 0.00 2022-05-30 2022-07-25 2023-01-21 ers for IPS and BSc. in Statisti tions nvelope ementation ation and Use of Core Social cs at the UL and Economic Statistics Regional component: Harmo LR-LISGIS-222732-GO-RFQ / nization, Data Collection, Qu Procure furniture (desks and Request for Quota Single Stage - One E Pending Impl IDA / 65760 ality Improvement, Dissemin Post Limited 6,250.00 0.00 2022-06-25 2022-08-14 2022-10-21 chairs) for 30 CEST students tions nvelope ementation ation and Use of Core Social and 15 faculty and Economic Statistics Regional component: Harmo LR-LISGIS-233623-GO-RFQ / nization, Data Collection, Qu Procure 1 projector, 2 camer Request for Quota Single Stage - One E Pending Impl IDA / 65740 ality Improvement, Dissemin Post Limited 4,500.00 0.00 2022-10-01 2022-11-02 2022-11-23 as and 2 No. 65" TV for IPS ( tions nvelope ementation ation and Use of Core Social CEST) and Economic Statistics LR-LISGIS-222571-GO-RFQ / Regional component: Harmo Procure computers (31 deskt nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl ops & 6 laptops), 45 calculat IDA / D5820 ality Improvement, Dissemin Post Limited 57,075.00 0.00 2022-07-21 2022-08-19 2022-09-13 tions nvelope ementation ors, printers (4 regular & 1 m ation and Use of Core Social ultipurpose) for IPS (CEST) and Economic Statistics LR-LISGIS-223124-GO-RFB / Procure 76 desktops, 5 lapto Regional component: Harmo ps, 300 chairs, 4 white board nization, Data Collection, Qu Single Stage - One E Under Imple s, 4 projectors, 5 air conditio IDA / 65770 ality Improvement, Dissemin Post Request for Bids Open - National 280,000.00 247,143.00 2022-03-15 2022-02-23 2022-03-21 2022-05-11 2022-05-03 2022-03-29 2022-05-17 2022-04-28 2022-06-07 2022-07-08 nvelope mentation ners, 2 printers, 1 desk, 2 ext ation and Use of Core Social ernal hard drive, 1 smart TV, and Economic Statistics 1 audio system set, 76 tables , statistical softwares Regional component: Harmo LR-LISGIS-282972-GO-RFQ / nization, Data Collection, Qu Procure integrative statistical Request for Quota Single Stage - One E Pending Impl IDA / 65750 ality Improvement, Dissemin Post Limited 15,000.00 0.00 2022-07-24 2022-09-18 2023-03-17 data watch board for data dis tions nvelope ementation ation and Use of Core Social semination and Economic Statistics LR-LISGIS-282980-GO-RFQ / Regional component: Harmo Procure 4 external harddrive nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl s, 1 projector & 85 tablets/s IDA / 65750 ality Improvement, Dissemin Post Limited 16,000.00 0.00 2022-07-26 2022-09-20 2023-03-19 tions nvelope ementation mart phones, 4 office chairs, ation and Use of Core Social 3 executive desks & 3 cabine and Economic Statistics ts for NEC 2022 Page 2 Regional component: Harmo LR-LISGIS-282981-GO-RFQ / nization, Data Collection, Qu Procure 90 sets of rain gear Request for Quota Single Stage - One E Pending Impl IDA / 65780 ality Improvement, Dissemin Post Limited 7,800.00 0.00 2022-07-24 2022-09-18 2023-03-17 & 90 backpacks for NEC 202 tions nvelope ementation ation and Use of Core Social 2 and Economic Statistics LR-LISGIS-222729-GO-RFB / Regional component: Harmo Procure 8 laptops, 6 desktop nization, Data Collection, Qu Single Stage - One E s, 5 printers, 1TV, 2 printers, IDA / 65780 ality Improvement, Dissemin Post Request for Bids Open - National 122,000.00 0.00 Canceled 2021-04-16 2021-04-19 2021-05-20 2021-05-31 2021-06-29 2021-07-26 nvelope 2 cameras, and 4 air conditio ation and Use of Core Social ners for UL Statistics Degree and Economic Statistics Program Regional component: Harmo LR-LISGIS-222734-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Procure a 12 kva generator f IDA / D5820 ality Improvement, Dissemin Post Limited 5,000.00 0.00 Canceled 2021-05-13 2021-06-15 2021-06-30 tions nvelope or CEST Program ation and Use of Core Social and Economic Statistics LR-LISGIS-222545-GO-RFQ / Printing of 400 jackets, 200 c opies of Pilot Census Report, Regional component: Harmo 4000 questionnaires -NAAS, nization, Data Collection, Qu Request for Quota Single Stage - One E 150 copies NAAS Reports, 20 IDA / 65770 ality Improvement, Dissemin Post Limited 100,150.00 0.00 Canceled 2021-03-29 2021-04-23 2021-05-21 tions nvelope 0 copies Administrative Data ation and Use of Core Social Report, 200 copies of data sh and Economic Statistics aring handbook, 200 copies Administrative data report, & 200 Meta Data Hand book LR-LISGIS-233642-GO-RFB / Country-Specific Component Open - Internationa Single Stage - One E Pending Impl Supply and installation of ICT IDA / 65740 : Improving and modernizing Post Request for Bids 300,000.00 0.00 2021-09-24 2021-09-29 2021-11-10 2021-12-10 2022-01-14 2022-07-13 l nvelope ementation infrastructure for LISGIS physical and statistical infra structure Regional component: Harmo LR-LISGIS-291061-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl Procure 90 backpacks for NE IDA / 65750 ality Improvement, Dissemin Post Limited 2,250.00 0.00 2022-06-26 2022-08-21 2023-02-17 tions nvelope ementation C data collection ation and Use of Core Social and Economic Statistics Regional component: Harmo LR-LISGIS-291063-GO-RFQ / nization, Data Collection, Qu Procure 4 external hard drive Request for Quota Single Stage - One E Pending Impl IDA / D5880 ality Improvement, Dissemin Post Limited 17,100.00 0.00 2022-07-18 2022-09-12 2023-03-11 , 1 projector and 85 tablets f tions nvelope ementation ation and Use of Core Social or NEC data collection and Economic Statistics Regional component: Harmo LR-LISGIS-291064-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl Procure 30 tablets/smart pho IDA / 65740 ality Improvement, Dissemin Post Limited 6,000.00 0.00 2022-07-18 2022-09-12 2023-03-11 tions nvelope ementation nes for CPI data collection ation and Use of Core Social and Economic Statistics LR-LISGIS-282983-GO-RFQ / Regional component: Harmo Procure 10 desktops, 1 lapto nization, Data Collection, Qu p, 4 external HDD, 4 printers, Request for Quota Single Stage - One E Pending Impl IDA / 65750 ality Improvement, Dissemin Post Limited 15,190.00 0.00 2022-06-26 2022-08-21 2023-02-17 weighing scales (types 1, 2, tions nvelope ementation ation and Use of Core Social & 3) touch lights, print cartri and Economic Statistics dges, and A4 paper for Pilot HIES Survey LR-LISGIS-283393-GO-RFQ / Procure 1 SUV for Director G Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / D5820 Post Limited 60,000.00 0.00 2022-06-05 2022-07-31 2023-01-27 eneral of LISGIS for Project C nitoring and Evaluation tions nvelope ementation oordination and Monitoring LR-LISGIS-282970-GO-RFQ / Regional component: Harmo Procure 50 statistical textboo nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl ks for teaching and research IDA / D5820 ality Improvement, Dissemin Post Limited 25,000.00 0.00 2022-06-19 2022-08-14 2023-02-10 tions nvelope ementation by instructors and students ( ation and Use of Core Social BSc.) and Economic Statistics LR-LISGIS-282976-GO-RFQ / Regional component: Harmo Procure 1 all-in-one desktop nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl computer, 1projector, 4 lapto IDA / 65750 ality Improvement, Dissemin Post Limited 35,000.00 0.00 2022-07-24 2022-09-18 2023-03-17 tions nvelope ementation ps, 30 power banks, 30 table ation and Use of Core Social ts, 100 back gabs for agricult and Economic Statistics ure survey (Crop Cut) LR-LISGIS-293555-GO-RFB / Country-Specific Component Pending Impl Supply and installation of 5k IDA / D5820 : Improving and modernizing Post Request for Bids 225,000.00 0.00 2022-08-23 2022-08-26 2022-09-29 2022-10-06 2022-10-31 2023-04-28 ementation w solar plant for LISGIS Coun physical and statistical infra ty Offices structure LR-LISGIS-293092-GO-RFQ / Regional component: Harmo Procure 60 weighing scales (t nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl ypes 1, 2 & 3), 16 laptops, 20 IDA / 65770 ality Improvement, Dissemin Post Limited 50,000.00 0.00 2022-06-28 2022-08-19 2023-02-15 tions nvelope ementation memory sticks, printer cartri ation and Use of Core Social dges, 4 cabinets, 14 external and Economic Statistics HDD for HIES Main survey LR-LISGIS-293094-GO-RFQ / Procure 16 pcs of 2.5kva gen Regional component: Harmo erators, 28 pcs of power exte nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl nsion cords, 100 touch lights, IDA / D5840 ality Improvement, Dissemin Post Limited 25,000.00 0.00 2022-06-14 2022-08-09 2023-02-05 tions nvelope ementation 1300 pks of batteries, 150 su ation and Use of Core Social its of rain gears, 30 pcs of sh and Economic Statistics ovels and cutlasses for main HIES survey LR-LISGIS-293095-GO-RFQ / Country-Specific Component Procure 16 portable generato : Improving and modernizing Request for Quota Single Stage - One E Pending Impl rs, 28 pcs of power extension IDA / D5820 Post Limited 25,000.00 0.00 2022-07-23 2022-09-17 2023-03-16 physical and statistical infra tions nvelope ementation cords, 1300 touch lights, 150 structure suits of rain gears for main HI ES Survey LR-LISGIS-293216-GO-RFQ / Project Management and Mo Request for Quota Single Stage - One E Pending Impl Procure laptops, print cartrid IDA / 65770 Post Limited 15,000.00 0.00 2022-05-31 2022-07-26 2023-01-22 nitoring and Evaluation tions nvelope ementation ges, A4 papers for Project Ma nagement Regional component: Harmo LR-LISGIS-291053-GO-RFB / nization, Data Collection, Qu Single Stage - One E Pending Impl Printing of manuals - training IDA / D5820 ality Improvement, Dissemin Post Request for Bids Open - National 380,000.00 0.00 2022-07-19 2022-07-24 2022-08-26 2022-09-10 2022-10-15 2023-04-13 nvelope ementation and supervisors for CENSUS ation and Use of Core Social and Economic Statistics LR-LISGIS-291056-GO-RFQ / Regional component: Harmo Procure 42 extension cords, nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl 15 projectors, 378 rolls of wir IDA / D5840 ality Improvement, Dissemin Post Limited 83,400.00 0.00 2022-07-19 2022-09-13 2023-03-12 tions nvelope ementation e, 20 stabalizers, and 15 gen ation and Use of Core Social erators for Census field activi and Economic Statistics ties Page 3 Regional component: Harmo LR-LISGIS-291057-GO-RFQ / nization, Data Collection, Qu Request for Quota Single Stage - One E Pending Impl Procure 16500 name tag for IDA / 65750 ality Improvement, Dissemin Post Limited 16,500.00 0.00 2022-07-20 2022-09-14 2023-03-13 tions nvelope ementation Census field enumerators ation and Use of Core Social and Economic Statistics LR-LISGIS-291059-GO-RFQ / Regional component: Harmo Procure 400ctns of batteries, nization, Data Collection, Qu 500pks of pens, 1500ctns of Request for Quota Single Stage - One E Pending Impl IDA / 65740 ality Improvement, Dissemin Post Limited 49,500.00 0.00 2022-07-17 2022-09-11 2023-03-10 chalk, 1500 ctns of markers, tions nvelope ementation ation and Use of Core Social 300 pcs of staplers and pins, and Economic Statistics note pads, pencils, etc. for C ensus LR-LISGIS-301821-GO-DIR / Regional component: Harmo Procure 17,400 Rain gears, 1 nization, Data Collection, Qu Pending Impl 7,400 backpacks, 17,400 ves IDA / 65780 ality Improvement, Dissemin Post Direct Selection Direct 473,845.62 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 ementation ts, and 17,400 flashlights for ation and Use of Core Social Census and Economic Statistics NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-LISGIS-167168-NC-RFQ / Hire a Vehicle Rental Compa Regional component: Harmo ny to provide 15 Vehicles for nization, Data Collection, Qu Request for Quota Single Stage - One E the deployment of 30 teams IDA / V3090 ality Improvement, Dissemin Post Limited 112,500.00 0.00 Canceled 2020-08-26 2020-09-16 2021-03-15 tions nvelope of mappers in the 15 countie ation and Use of Core Social s for the cartographic phase and Economic Statistics of the National Population a nd Housing Census LR-LISGIS-184898-NC-RFQ / Hire a Vehicle Rental Compa Regional component: Harmo ny to provide 15 Vehicles for nization, Data Collection, Qu Request for Quota Single Stage - One E the deployment of 30 teams IDA / V3090 ality Improvement, Dissemin Post Limited 112,500.00 0.00 Canceled 2020-08-26 2020-09-09 2020-12-31 tions nvelope of mappers in the 15 countie ation and Use of Core Social s for the cartographic phase and Economic Statistics of the National Population a nd Housing Census LR-LISGIS-167165-NC-RFQ / Hire a Vehicle Rental Compa Regional component: Harmo ny to provide 21 Vehicles for nization, Data Collection, Qu Request for Quota Single Stage - One E the deployment of 30 teams IDA / V3090 ality Improvement, Dissemin Post Limited 157,500.00 150,650.00 Completed 2020-09-17 2020-10-05 2020-09-29 2020-11-17 2020-10-31 2021-05-05 tions nvelope of mappers in the 15 countie ation and Use of Core Social s for the cartographic phase and Economic Statistics of the National Population a nd Housing Census LR-LISGIS-167167-NC-RFQ / Hire a Vehicle Rental Compa Regional component: Harmo ny to provide 27 Vehicles for nization, Data Collection, Qu Request for Quota Single Stage - One E the deployment of 30 teams IDA / V3090 ality Improvement, Dissemin Post Limited 162,000.00 189,405.00 Completed 2021-04-21 2021-03-29 2021-05-19 2021-04-30 2021-06-21 2021-06-15 tions nvelope of mappers in the 15 countie ation and Use of Core Social s for the cartographic phase and Economic Statistics of the National Population a nd Housing Census LR-LISGIS-223077-NC-RFQ / Regional component: Harmo Hire vehicle rental company t nization, Data Collection, Qu Request for Quota Single Stage - One E o provide 7 vehicles for renta IDA / D5830 ality Improvement, Dissemin Post Limited 90,000.00 89,850.00 Signed 2021-04-30 2021-04-12 2021-05-31 2021-05-19 2021-07-30 tions nvelope l services for 60 days of NAA ation and Use of Core Social S data collection and 30 days and Economic Statistics of monitoring LR-LISGIS-223050-NC-RFQ / Regional component: Harmo Recruit a vehicle rental comp nization, Data Collection, Qu any to provide 30 vehicles fo Request for Quota Single Stage - One E Pending Impl IDA / 65760 ality Improvement, Dissemin Post Limited 75,000.00 0.00 2021-07-18 2021-09-12 2022-03-11 r 10 days for the conduct of P tions nvelope ementation ation and Use of Core Social ilot Census of the National Po and Economic Statistics pulation and Housing Census Regional component: Harmo LR-LISGIS-223054-NC-RFQ / nization, Data Collection, Qu Hire Vehicle Rental Company Request for Quota Single Stage - One E IDA / 65730 ality Improvement, Dissemin Post Limited 2,000.00 0.00 Canceled 2021-04-23 2021-05-24 2021-05-31 to provide 4 vehicles for rent tions nvelope ation and Use of Core Social al services for Pilot of NAAS and Economic Statistics LR-LISGIS-164854-NC-RFQ / Hire a Vehicle Rental Compa Regional component: Harmo ny to provide 27 Vehicles for nization, Data Collection, Qu Request for Quota Single Stage - One E the deployment of 30 teams IDA / V3090 ality Improvement, Dissemin Post Limited 162,000.00 0.00 Canceled 2021-04-05 2021-05-03 2021-06-03 tions nvelope of mappers in the 15 countie ation and Use of Core Social s for the cartographic phase and Economic Statistics of the National Population an d Housing Census 2021 Regional component: Harmo LR-LISGIS-191194-NC-DIR / P nization, Data Collection, Qu ayment of internet subscripti IDA / D5880 ality Improvement, Dissemin Post Direct Selection Direct 32,220.00 0.00 Canceled 2020-09-25 2020-09-30 2020-11-04 2021-05-03 on for GIS planning to suppor ation and Use of Core Social t NPHC Mapping and Economic Statistics CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Regional component: Harmo LR-LISGIS-223174-CS-CQS / nization, Data Collection, Qu Consultant Qualifi Consultant to develop and ho IDA / 65740 ality Improvement, Dissemin Post Open - National 9,000.00 0.00 Canceled 2021-05-11 2021-06-01 2021-06-23 2021-07-23 2021-08-12 2022-02-08 cation Selection st IPS (CEST) Website ation and Use of Core Social and Economic Statistics LR-LISGIS-223117-CS-CQS / Regional component: Harmo Consultant (ICT) to conduct a nization, Data Collection, Qu Consultant Qualifi ssessment for establishment IDA / 65780 ality Improvement, Dissemin Post Open - National 11,000.00 0.00 Canceled 2021-06-10 2021-07-01 2021-07-23 2021-08-24 2021-09-14 2021-12-03 cation Selection of statistics lab at the IPS on ation and Use of Core Social Capitol Hill and Statistics Deg and Economic Statistics ree Program at Fendell LR-LISGIS-283377-CS-CQS / Regional component: Harmo Recruit a consultant (firm) to nization, Data Collection, Qu Consultant Qualifi Pending Impleme conduct assessment for setu IDA / D5820 ality Improvement, Dissemin Post Open - National 13,000.00 0.00 2022-06-22 2022-07-13 2022-08-26 2022-09-25 2022-10-30 2023-04-28 cation Selection ntation p of statistical labs at UL (CE ation and Use of Core Social ST & BSc. Programs) and Economic Statistics Page 4 LR-LISGIS-233639-CS-CQS / Country-Specific Component Recruit a Consultant to cond : Improving and modernizing Consultant Qualifi Open - Internationa Pending Impleme uct ICT infrastructure needs IDA / 65760 Post 30,000.00 0.00 2022-08-23 2022-09-07 2022-10-21 2022-11-20 2022-12-25 2023-06-23 physical and statistical infra cation Selection l ntation assessment for LISGIS and su structure pport the development of a T OR for same LR-LISGIS-283387-CS-QBS / Recruit a consultant to suppl Country-Specific Component y, configure, commission and : Improving and modernizing Quality Based Sel Pending Impleme IDA / 65740 Post Open - National 103,300.00 0.00 2022-09-23 2022-10-14 2022-11-27 2022-12-25 2023-01-24 2023-02-23 2023-03-30 2024-03-29 test an integrated system for physical and statistical infra ection ntation LISGIS Finance, Human Reso structure urce, Logistics and Procurem ent Departments INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-LISGIS-158146-CS-CDS / Project Management and Mo Recruitment of a Finance Offi IDA / V3090 Prior Direct Selection Direct 15,600.00 0.00 Canceled 2020-04-10 2020-04-21 2020-04-14 2020-02-17 2020-04-17 2020-10-14 nitoring and Evaluation cer for Project Management LR-LISGIS-167161-CS-CDS / Project Management and Mo IDA / V3090 Prior Direct Selection Direct 18,000.00 18,000.00 Signed 2020-04-10 2020-04-09 2020-04-20 2020-02-17 2020-06-24 2020-03-03 2020-12-21 Recruitment of Procurement nitoring and Evaluation Specialist LISGIS/HISWAP/CS/ICS/02/PP A / Recruit a consultant to dr Project Management and Mo Individual Consult aft curricula for the Statistics IDA / V3090 Post Open 10,000.00 10,000.00 Signed 2020-04-09 2020-05-27 2020-05-28 2020-06-04 2020-06-18 2020-07-23 2020-06-09 2021-01-19 nitoring and Evaluation ant Selection Degree and Certificate - CES T - Programmes at the UL LR-LISGIS-167262-CS-CDS / Project Management and Mo Recruitment of a Procuremen IDA / V3090 Prior Direct Selection Direct 18,000.00 18,000.00 Signed 2020-02-18 2020-06-15 2020-02-28 2020-02-23 2020-05-03 2020-03-03 2020-10-30 nitoring and Evaluation t Specialist for Project Manag ement LR-LISGIS-167263-CS-CDS / Project Management and Mo Recruitment of a Financial M IDA / V3090 Prior Direct Selection Direct 15,600.00 15,600.00 Signed 2020-02-18 2020-06-18 2020-02-28 2020-06-25 2020-05-03 2020-03-03 2020-10-30 nitoring and Evaluation anagement Officer for Project Management LR-LISGIS-167346-CS-INDV / Recruitment of a consultant t Project Management and Mo Individual Consult IDA / V3090 Post Limited 15,000.00 26,666.00 Signed 2020-09-14 2020-09-29 2020-09-20 2021-01-20 2020-10-16 2021-02-01 2020-10-23 2021-02-02 2020-12-31 2021-03-31 o conduct a capacity building nitoring and Evaluation ant Selection needs assessment for LISGIS and UL Regional component: Harmo LR-LISGIS-223131-CS-INDV / nization, Data Collection, Qu Individual Consult Pending Impleme Consultant (IT Analyst) for St IDA / D5820 ality Improvement, Dissemin Post Open 12,000.00 0.00 2021-04-15 2021-05-19 2021-05-31 2021-06-18 2021-12-15 ant Selection ntation atistics Lab at Fendell ation and Use of Core Social and Economic Statistics LR-LISGIS-223176-CS-INDV / Country-Specific Component Consultant Senior ICT Adviso : Improving and modernizing Individual Consult r/Quality Assurance Specialis IDA / 65760 Post Open 20,000.00 0.00 Canceled 2021-04-20 2021-03-16 2021-06-08 2021-06-02 2021-06-29 2021-08-13 2021-07-23 2022-01-19 physical and statistical infra ant Selection t to develop ICT Policy and e structure nsure quality compliance in I CT LR-LISGIS-223180-CS-INDV / Project Management and Mo Individual Consult Consultant (M&E Officer) for IDA / 65770 Post Open 18,000.00 0.00 Canceled 2021-04-12 2021-03-12 2021-05-17 2021-08-12 2021-06-07 2021-10-20 2021-06-29 2022-06-30 nitoring and Evaluation ant Selection Project Management Team LR-LISGIS-271331-CS-INDV / Project Management and Mo Individual Consult Under Implement IDA / 65750 Post Limited 18,000.00 0.00 2022-01-18 2022-01-07 2022-01-23 2022-01-26 2022-02-13 2022-03-20 2022-09-16 Recruit an M&E Consultant fo nitoring and Evaluation ant Selection ation r PMT LR-LISGIS-271332-CS-INDV / Project Management and Mo Individual Consult Under Implement Recruit a Project Manger for t IDA / 65730 Post Limited 38,400.00 0.00 2022-01-24 2022-01-07 2022-01-29 2022-02-19 2022-03-26 2022-09-22 nitoring and Evaluation ant Selection ation he HISWA Project LR-LISGIS-271330-CS-INDV / Country-Specific Component Recruit Senior ICT Advisor/Qu : Improving and modernizing Individual Consult Under Implement IDA / 65770 Post Limited 90,000.00 0.00 2022-01-17 2022-01-07 2022-02-08 2022-05-06 2022-02-11 2022-03-18 2022-09-14 ality Assurance Consultant to physical and statistical infra ant Selection ation support the ICT Unit structure Regional component: Harmo LR-LISGIS-282954-CS-INDV / nization, Data Collection, Qu Consultant to conduct assess Individual Consult IDA / 65740 ality Improvement, Dissemin Post Limited 10,000.00 0.00 Under Review 2022-06-21 2022-06-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 ment to setup computer lab ant Selection ation and Use of Core Social at the UL (BSc.) and Economic Statistics Regional component: Harmo LR-LISGIS-282960-CS-INDV / nization, Data Collection, Qu Recruit a Lecturer (Statistical Individual Consult Pending Impleme IDA / D5850 ality Improvement, Dissemin Post Limited 4,000.00 0.00 2022-06-22 2022-06-27 2022-07-18 2022-08-22 2023-02-18 Organization and Official Stat ant Selection ntation ation and Use of Core Social istics) at the UL BSc. and Economic Statistics Regional component: Harmo LR-LISGIS-223132-CS-INDV / nization, Data Collection, Qu Individual Consult Pending Impleme Consultant (Data Analyst) for IDA / D5820 ality Improvement, Dissemin Post Open 13,200.00 0.00 2022-06-22 2022-07-26 2022-08-07 2022-08-25 2023-02-21 ant Selection ntation Statistics Lab at Fendell ation and Use of Core Social and Economic Statistics Regional component: Harmo LR-LISGIS-283365-CS-INDV / nization, Data Collection, Qu Recruit HIES Resident Adviso Individual Consult Under Implement IDA / 65770 ality Improvement, Dissemin Post Open 25,500.00 0.00 2022-05-25 2022-03-20 2022-07-13 2022-08-03 2022-09-07 2023-03-06 r for Preparation and Plannin ant Selection ation ation and Use of Core Social g of HIES and Economic Statistics Regional component: Harmo LR-LISGIS-283367-CS-INDV / nization, Data Collection, Qu Individual Consult Pending Impleme Recruit a Sampling Consultan IDA / 65770 ality Improvement, Dissemin Post Open 12,000.00 0.00 2022-06-14 2022-08-02 2022-08-23 2022-09-27 2023-03-26 ant Selection ntation t for HIES ation and Use of Core Social and Economic Statistics Regional component: Harmo LR-LISGIS-283368-CS-INDV / nization, Data Collection, Qu Individual Consult Recruit a Consultant - Local - IDA / 65770 ality Improvement, Dissemin Post Open 15,000.00 0.00 Under Review 2022-05-18 2022-03-22 2022-07-06 2022-07-27 2022-08-31 2023-02-27 ant Selection (CSPro/Programmer) for HIES ation and Use of Core Social and Economic Statistics Page 5 Regional component: Harmo LR-LISGIS-223106-CS-INDV / nization, Data Collection, Qu Recruit a Consultant to cond Individual Consult Pending Impleme IDA / 65780 ality Improvement, Dissemin Post Limited 6,000.00 0.00 2022-09-20 2022-10-05 2022-10-26 2022-11-11 2023-05-10 uct training on Open Data Pla ant Selection ntation ation and Use of Core Social tform at LISGIS and Economic Statistics LR-LISGIS-283370-CS-INDV / Regional component: Harmo Recruit a Consultant to devel nization, Data Collection, Qu Individual Consult Pending Impleme op communication sharing p IDA / 65770 ality Improvement, Dissemin Post Open 15,000.00 0.00 2022-08-17 2022-10-05 2022-10-26 2022-11-30 2023-05-29 ant Selection ntation olicy & dissemination plan fo ation and Use of Core Social r LISGIS and Economic Statistics Regional component: Harmo LR-LISGIS-283371-CS-INDV / nization, Data Collection, Qu Recruit a consultant to rebuil Individual Consult Pending Impleme IDA / 65770 ality Improvement, Dissemin Post Open 15,000.00 0.00 2022-09-20 2022-11-08 2022-11-29 2023-01-03 2023-07-02 d LISGIS data info for data di ant Selection ntation ation and Use of Core Social ssemination and Economic Statistics Regional component: Harmo LR-LISGIS-283374-CS-INDV / nization, Data Collection, Qu Recruit a consultant to devel Individual Consult Under Implement IDA / 65770 ality Improvement, Dissemin Post Open 10,000.00 0.00 2022-06-21 2022-04-12 2022-08-09 2022-08-30 2022-10-04 2023-04-02 op capacity building strategy ant Selection ation ation and Use of Core Social and roadmap for LISGIS and Economic Statistics Regional component: Harmo LR-LISGIS-283375-CS-INDV / nization, Data Collection, Qu Individual Consult Pending Impleme Recruit a Legal Consultant fo IDA / 65770 ality Improvement, Dissemin Post Open 12,000.00 0.00 2022-06-20 2022-08-08 2022-08-29 2022-10-03 2023-04-01 ant Selection ntation r LISGIS (Retainership) ation and Use of Core Social and Economic Statistics LR-LISGIS-283382-CS-INDV / Country-Specific Component Recruit a consultant to suppo : Improving and modernizing Individual Consult Pending Impleme rt processing of geo-data & b IDA / 65750 Post Open 9,000.00 0.00 2022-09-21 2022-11-09 2022-11-30 2023-01-04 2023-07-03 physical and statistical infra ant Selection ntation uilding of geo-spartial dashb structure oard for LISGIS on the open d ata portal Regional component: Harmo LR-LISGIS-223087-CS-CDS / nization, Data Collection, Qu Consultant to develop Grieva IDA / 65730 ality Improvement, Dissemin Post Direct Selection Direct 5,000.00 0.00 Canceled 2021-04-09 2021-04-23 2021-05-07 2021-06-30 nce Redress Mechanism Man ation and Use of Core Social ual for Census 2021 and Economic Statistics Regional component: Harmo LR-LISGIS-223108-CS-INDV / nization, Data Collection, Qu Consultant to develop data t Individual Consult Pending Impleme IDA / 65730 ality Improvement, Dissemin Post Limited 6,000.00 0.00 2022-08-26 2022-08-31 2022-09-21 2022-10-10 2022-12-09 emplate for Administrative D ant Selection ntation ation and Use of Core Social ata and Economic Statistics Regional component: Harmo LR-LISGIS-223101-CS-INDV / nization, Data Collection, Qu Consultant (DBA) to develop Individual Consult IDA / 65730 ality Improvement, Dissemin Post Open 7,500.00 0.00 Canceled 2021-04-30 2021-05-31 2021-06-04 2021-06-21 2021-08-31 database for Administrative ant Selection ation and Use of Core Social Data and Economic Statistics Regional component: Harmo LR-LISGIS-223110-CS-INDV / nization, Data Collection, Qu Consultant to update and co Individual Consult IDA / D5840 ality Improvement, Dissemin Post Open 12,000.00 0.00 Canceled 2021-04-20 2021-05-17 2021-05-31 2021-06-18 2021-08-31 mplete LISGIS HR manual an ant Selection ation and Use of Core Social d Handbook and Economic Statistics Regional component: Harmo LR-LISGIS-223109-CS-INDV / nization, Data Collection, Qu Consultant to develop comm Individual Consult IDA / D5830 ality Improvement, Dissemin Post Open 45,000.00 0.00 Canceled 2021-09-16 2021-10-12 2021-10-27 2021-11-15 2021-12-31 unication & Dissemination St ant Selection ation and Use of Core Social rategy & Plan for LISGIS and Economic Statistics Regional component: Harmo LR-LISGIS-291069-CS-INDV / nization, Data Collection, Qu Individual Consult Pending Impleme Recruit a National Resident A IDA / 65740 ality Improvement, Dissemin Post Limited 25,500.00 0.00 2022-06-23 2022-06-28 2022-07-19 2022-08-23 2023-02-19 ant Selection ntation dvisor for HIES ation and Use of Core Social and Economic Statistics Regional component: Harmo LR-LISGIS-291072-CS-INDV / nization, Data Collection, Qu Recruit a consultant to deplo Individual Consult Under Implement IDA / D5820 ality Improvement, Dissemin Post Limited 15,000.00 0.00 2022-07-20 2022-06-01 2022-07-25 2022-08-15 2022-09-19 2023-03-18 y CAPI and train staff for CPI ant Selection ation ation and Use of Core Social data collection and Economic Statistics Regional component: Harmo LR-LISGIS-223093-CS-INDV / nization, Data Collection, Qu Recruit a Consultant to plan Individual Consult Pending Impleme IDA / D5850 ality Improvement, Dissemin Post Open 10,000.00 0.00 2022-08-23 2022-09-28 2022-10-19 2022-11-23 2023-05-22 Liberia's Non Registered Trad ant Selection ntation ation and Use of Core Social e Survey and Economic Statistics LR-LISGIS-223134-CS-INDV / Regional component: Harmo Lecturer for Agriculture Statis nization, Data Collection, Qu Individual Consult tics and Statistical Organizati IDA / D5850 ality Improvement, Dissemin Post Open 12,000.00 0.00 Canceled 2021-04-28 2021-05-26 2021-06-15 2021-07-09 2022-01-05 ant Selection on and Official Statistics for S ation and Use of Core Social tatistics Degree Program at t and Economic Statistics he UL Page 6