Summarized Procurement Plan I. GENERAL Project information: Borrower: CCARDESA Project Name: Agricultural Productivity Program for Southern Africa Project ID No: P164486 Grant No.: Project Implementing Agency: CCARDESA Bank’s approval Date of the Procurement Plan: February 13, 2019 Date of General Procurement Notice: Period covered by this procurement plan: February 13, 2019 to September 2020 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Thresholds for Procurement Methods and Prior Review Goods, Works and Non- Consulting Services Procurement Approaches and Methods (US$ Prior millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 15 ≥7 < 0.2 ≤ 0.2 Goods, IT, and non- ≥6 ≥1 < 0.1 ≤ 0.1 consulting services 2. Reference to (if any) Project Operational/Procurement Manual: The Procurement Plan also forms part of the Project Implementation Manual approved on May 2019. 1 3. Procurement Packages with Methods and Time Schedule Procurement of Goods & Non-consulting Services Summary 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB NIL NIL NIL NIL NIL (Works) Summary of the NCB NIL NIL NIL NIL NIL (Works) Summary of the ICB NIL NIL No NIL No major goods (Goods) Summary of the NCB NIL NIL NIL NIL NIL (Goods) Summary of the RfQ 0.03 6 No Post Request for (Goods & Non- Quotations Consulting Services) Summary of the DC 0.2million 2 No Post (Non-consulting services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines: Selection and Employment of Consultants: Thresholds for Consultants Selection Methods and Prior Review Thresholds for Consultants Selection Methods and Prior Review for Consulting Services Category Prior Short List of National Consultants (US$ million) 2 Review Consulting Engineering and (US$ Services Construction Supervision millions) Consultants (Firms) ≥4 ≤ 0.3 ≤ 0.3 Individual Consultants ≥ 0.5 NA. NA. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines: Selection and Employment of Consultants. 3. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. 4. Any Other Special Selection Arrangements: N/A 5. Consultancy Assignments with Selection Methods and Time Procurement of Consulting Services Summary 1 2 3 4 5 6 Ref. No. Description of Estimated Package Review Comments Assignment Cost s by Bank (Prior / US$ million Post) Summary of NIL NIL NIL NIL contracts through CQS 3 Summary of 0.2 million 26 Post Individual Consultants (mostly contracts through peer reviewers) IC 4 PROCUREMENT Eastern and Southern Africa : Agricultural Productivity Program for Southern Africa - Angola & Lesotho PLAN General Information Country: Eastern and Southern Africa 2020-08-27 Bank’s Approval Date of the Original Procurement Plan: 2022-07-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164486 GPN Date: Project Name: Agricultural Productivity Program for Southern Africa - Angola & Lesotho Loan / Credit No: IBRD / 89170 Agronomic Research Institute Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AO-IIA-188294-CW-RFP / PIU Strengthening the Institution Implementa Solicitação de Cot Single Stage - One E Other (with field f 2021-08-3 renovation and office refurbis IBRD / 89170 al and Enabling Environment Posterior Limited 200,000.00 0.00 ção Pendent 2021-01-06 2021-03-03 ações nvelope or explanation) 0 hment of three premises in C for Technology Adoption e hianga RS GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-188196-GO-RFQ / Offi Technology Generation and Solicitação de Cot Single Stage - One E ce supplies for R&D projects IBRD / 89170 Posterior Limited 30,000.00 0.00 Cancelado 2020-10-11 2020-12-06 2021-06-04 Dissemination ações nvelope and PIU office AO-IIA-193891-GO-RFQ / Pur Strengthening the Institution chase ot three vehicles stati Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 120,000.00 174,219.91 Concluído 2020-11-08 2021-02-19 2021-01-03 2021-03-31 2021-07-02 2021-10-29 on wagon 13 seats for Experi ações nvelope for Technology Adoption mental Fields of Luso, Ceilun ga and Zaire AO-IIA-193765-GO-RFB / Pur Strengthening the Institution Solicitação de Ofe Single Stage - One E chase of tractors and implem IBRD / 89170 al and Enabling Environment Posterior Open - National 400,000.00 0.00 Cancelado 2021-01-10 2021-01-15 2021-02-26 2021-03-28 2021-05-02 2021-10-29 rtas nvelope ents for Malanje and Huambo for Technology Adoption (Chianga) AO-IIA-187401-GO-RFQ / Pur Technology Generation and Solicitação de Ofe Single Stage - One E Implementaç IBRD / 89170 Posterior Open - National 120,000.00 0.00 2021-01-18 2021-01-23 2021-03-06 2021-04-05 2021-05-10 2021-11-06 chase of IT equipments for R Dissemination rtas nvelope ão Pendente &D Projects AO-IIA-188275-GO-RFQ / Thr Strengthening the Institution Solicitação de Cot Single Stage - One E ee sets video conference equ IBRD / 89170 al and Enabling Environment Posterior Limited 30,000.00 0.00 Cancelado 2020-11-08 2021-01-03 2021-07-02 ações nvelope ipment for Technology Adoption AO-IIA-221338-GO-RFQ / Veh Project management, monit Solicitação de Cot Single Stage - One E icles to Support the monitori IBRD / 89170 oring and evaluation, and re Posterior Limited 200,000.00 281,067.85 Concluído 2021-03-09 2021-06-11 2021-05-04 2021-09-30 2021-10-31 2022-02-25 ações nvelope ng Missions gional coordination Strengthening the Institution AO-IIA-187417-GO-RFB / Pur Solicitação de Ofe Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Open - National 880,000.00 0.00 Cancelado 2020-09-21 2020-09-26 2020-11-07 2020-12-07 2021-01-11 2021-07-10 chase of vehicles rtas nvelope for Technology Adoption Strengthening the Institution AO-IIA-188183-GO-RFQ / Pur Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 15,000.00 0.00 Cancelado 2021-05-09 2021-07-04 2021-12-31 chase of 10 motorbikes ações nvelope for Technology Adoption Strengthening the Institution APPSA/G-013 / Procurement IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 25,000.00 81,865.99 Assinado 2022-01-10 2022-01-26 2022-01-15 2022-01-31 2022-02-19 2022-02-17 2022-08-18 of Motorbikes for Technology Adoption Strengthening the Institution APPSA/G-014 / Procurement IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 500,000.00 535,515.88 Assinado 2022-01-10 2021-12-10 2022-01-15 2022-02-07 2022-02-19 2022-03-14 2022-08-18 Tractors and Implements for Technology Adoption APPSA/G-015 / Procurement Strengthening the Institution of Vehicles for PIU, IIA Resear IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 750,000.00 804,217.70 Assinado 2022-01-11 2022-01-05 2022-01-16 2022-02-07 2022-02-20 2022-03-04 2022-08-19 ch Programmes and Stations for Technology Adoption Project management, monit APPSA/G-016 / License Softw IBRD / 89170 oring and evaluation, and re Posterior Aquisição Direta Direct 30,000.00 16,459.31 Assinado 2022-01-16 2022-01-26 2022-01-21 2022-01-26 2022-02-25 2022-01-31 2022-08-24 are Accounting TOMPRO gional coordination AO-IIA-188898-GO-RFQ / Aut Em fase de I Technology Generation and Solicitação de Cot Single Stage - One E omatic Weather Stations for IBRD / 89170 Posterior Limited 97,000.00 0.00 mplementaç 2021-01-17 2021-03-14 2021-09-10 Dissemination ações nvelope Research and Field Stations ão AO-IIA-193893-GO-RFQ / Pur Strengthening the Institution Solicitação de Ofe Single Stage - One E Implementaç chase of two sprinkler irrigati IBRD / 89170 al and Enabling Environment Posterior Open - National 260,000.00 0.00 2022-07-25 2022-07-30 2022-09-10 2022-10-10 2022-11-14 2023-05-13 rtas nvelope ão Pendente on schemes and two drip irri for Technology Adoption gation schemes AO-IIA-187641-GO-RFB / Pro Technology Generation and Solicitação de Ofe Single Stage - One E Implementaç IBRD / 89170 Posterior Open - National 400,000.00 0.00 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 2023-04-18 curement of Office Furniture Dissemination rtas nvelope ão Pendente APPSA/G-017 / IT Equipment Strengthening the Institution Em fase de I Solicitação de Ofe Single Stage - One E for UIP and Subprojects Supp IBRD / 89170 al and Enabling Environment Posterior Open - National 300,000.00 0.00 mplementaç 2022-05-31 2022-05-26 2022-06-05 2022-05-27 2022-07-17 2022-07-08 2022-08-16 2022-09-20 2023-03-19 rtas nvelope ort for Technology Adoption ão Strengthening the Institution APPSA/G-018 / Procurement Solicitação de Ofe Single Stage - One E Implementaç IBRD / 89170 al and Enabling Environment Posterior Open - National 250,000.00 0.00 2022-05-31 2022-06-05 2022-07-17 2022-08-16 2022-09-20 2023-03-19 of Tractors and Implements I rtas nvelope ão Pendente for Technology Adoption APPSA/G-019 / Procurement Strengthening the Institution Solicitação de Ofe Single Stage - One E Implementaç of Freezers for Conservation IBRD / 89170 al and Enabling Environment Posterior Open - National 200,000.00 0.00 2022-05-31 2022-06-05 2022-07-17 2022-08-16 2022-09-20 2023-03-19 rtas nvelope ão Pendente of Genetic Agricultural Materi for Technology Adoption al AO-IIA-188210-GO-RFQ / Lab oratory supplies (essencial e Technology Generation and Solicitação de Cot Single Stage - One E IBRD / 89170 Posterior Limited 70,000.00 0.00 Cancelado 2021-01-15 2021-03-12 2021-09-08 quipment, reagens and other Dissemination ações nvelope lab consumables) APPSA/G-020 / Procurement Technology Generation and Solicitação de Ofe Single Stage - One E Implementaç of Reagents, Equipment and IBRD / 89170 Posterior Open - National 250,000.00 0.00 2022-06-26 2022-07-01 2022-08-12 2022-09-11 2022-10-16 2023-04-14 Dissemination rtas nvelope ão Pendente other Laboratorial Consumab les Page 1 APPSA/G-021 / Procurement Strengthening the Institution Em fase de I Solicitação de Ofe Single Stage - One E of 6 Vehicles to Intensify the IBRD / 89170 al and Enabling Environment Posterior Open - National 500,000.00 0.00 mplementaç 2022-06-26 2022-07-18 2022-07-01 2022-08-12 2022-09-11 2022-10-16 2023-04-14 rtas nvelope Activities of the Research Su for Technology Adoption ão b-projects Fields APPSA/G-022 / Procurement Strengthening the Institution Em fase de I Solicitação de Cot Single Stage - One E of 15 Motorbikes and Access IBRD / 89170 al and Enabling Environment Posterior Open - National 150,000.00 0.00 mplementaç 2022-07-19 2022-06-23 2022-09-13 2023-03-12 ações nvelope ories for Technology Adoption ão Strengthening the Institution APPSA/G-025 / Procurement Solicitação de Cot Single Stage - One E Implementaç IBRD / 89170 al and Enabling Environment Posterior Limited 80,000.00 0.00 2022-08-01 2022-09-26 2023-03-25 1 Vehicle for Supporting UIP ações nvelope ão Pendente for Technology Adoption NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual APPSA/S-001 / Repair Servic Strengthening the Institution Em fase de I e and Supply of Parts for IIA IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 300,000.00 0.00 mplementaç 2022-05-26 2022-05-27 2022-05-31 2022-07-05 2023-01-01 Vehicles Within the scope of for Technology Adoption ão APPSA APPSA/S-003 / Website Desi Strengthening the Institution Solicitação de Cot Single Stage - One E Implementaç gn, Development and Manag IBRD / 89170 al and Enabling Environment Posterior Open - National 85,000.00 0.00 2022-06-05 2022-07-31 2023-01-27 ações nvelope ão Pendente ement Services for the IIA an for Technology Adoption d APPSA APPSA/S-002 / Repair Servic Strengthening the Institution Solicitação de Ofe Single Stage - One E Implementaç es and Supply of Parts of Tra IBRD / 89170 al and Enabling Environment Posterior Open - National 300,000.00 0.00 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 2023-04-18 rtas nvelope ão Pendente ctors for Experimental Agricu for Technology Adoption ltural Stations CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-259173-CS-QCBS / Pr Strengthening the Institution Seleção Baseada oject Design and Supervision Open - Internationa Em fase de Imple IBRD / 89170 al and Enabling Environment Posterior na Qualidade e Cu 540,000.00 0.00 2021-10-29 2022-01-21 2021-11-19 2022-04-18 2022-01-02 2022-06-13 2022-01-30 2022-03-01 2022-04-05 2022-05-10 2023-05-10 of the Supervision of the Cas l mentação for Technology Adoption sto sava Regional Leadership Ce nter AO-IIA-267731-CS-QCBS / As Project management, monit Seleção Baseada Em fase de Imple sessment the Agriculture Res IBRD / 89170 oring and evaluation, and re Posterior na Qualidade e Cu Open - National 180,000.00 99,929.00 2021-12-19 2022-01-10 2022-01-09 2022-01-20 2022-02-22 2022-04-14 2022-03-22 2022-05-30 2022-04-21 2022-06-03 2022-05-26 2022-06-06 2022-06-30 2023-06-30 mentação earch Baseline gional coordination sto Project management, monit APPSA/C-028 / External Audi Seleção Baseada Open - Internationa Em fase de Imple IBRD / 89170 oring and evaluation, and re Posterior 200,000.00 0.00 2022-01-13 2022-02-02 2022-02-03 2022-03-04 2022-03-19 2022-07-15 2022-04-16 2022-05-16 2022-06-20 2022-07-25 2023-01-21 t no Menor Custo l mentação gional coordination AO-IIA-188277-CS-INDV / Ra pid rual survey for assement of conditions to stregthen the Seleção Baseada Technology Generation and Implementação P the basic seed and vegetativ IBRD / 89170 Posterior nas Qualificações Limited 60,000.00 0.00 2022-09-01 2022-09-15 2022-10-15 2022-11-19 2023-05-18 Dissemination endente e propagation materials fram dos Consultores ework under coordination of Chianga Research Station in the Central Plateau of Angola APPSA/C-023 / Consultancy f or the Development of Enviro Strengthening the Institution Seleção Baseada nmental Impact Studies for t IBRD / 89170 al and Enabling Environment Posterior nas Qualificações Open - National 100,000.00 0.00 Em Análise 2022-06-20 2022-06-16 2022-07-11 2022-08-04 2022-09-03 2022-10-08 2023-04-06 he Construction Work of the for Technology Adoption dos Consultores Cassava Regional Leadership Center - Malanje INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-187655-CS-INDV / Re Project management, monit cruitment of Procurement Sp IBRD / 89170 oring and evaluation, and re Prévia Individual Open 84,000.00 0.00 Cancelado 2020-09-01 2021-01-15 2020-10-20 2021-07-16 2020-11-10 2020-12-15 2021-06-13 ecialist gional coordination AO-IIA-187660-CS-INDV / Re Project management, monit Em fase de Imple cruitment of safeguards spec IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 84,205.35 2020-09-01 2020-10-09 2020-10-20 2021-07-01 2020-11-10 2021-07-09 2020-12-15 2021-06-13 mentação ialist gional coordination AO-IIA-187659-CS-INDV / Re Project management, monit cruitment of communication IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 86,205.35 Assinado 2020-09-01 2021-02-12 2020-10-20 2021-09-30 2020-11-10 2021-10-01 2020-12-15 2021-10-15 2021-06-13 and information specialst gional coordination AO-IIA-187657-CS-INDV / Re Project management, monit cruitment of monitoring and IBRD / 89170 oring and evaluation, and re Posterior Individual Open 84,000.00 111,873.80 Assinado 2020-09-01 2020-10-09 2020-10-20 2021-04-28 2020-11-10 2021-05-24 2020-12-15 2021-06-07 2021-06-13 evaluation specialist gional coordination AO-IIA-187647-CS-INDV / Re Project management, monit cruitment of the project coor IBRD / 89170 oring and evaluation, and re Posterior Individual Open 96,000.00 0.00 Cancelado 2020-09-01 2020-09-17 2020-10-20 2020-11-10 2020-12-15 2021-06-13 dinator gional coordination Project management, monit AO-IIA-221339-CS-INDV / So IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,500.00 97,039.57 Assinado 2021-03-10 2021-09-21 2021-04-28 2021-11-08 2021-05-19 2021-11-09 2021-06-23 2021-11-10 2021-12-20 cial Safeguards Specialist gional coordination Project management, monit AO-IIA-187662-CS-INDV / Re IBRD / 89170 oring and evaluation, and re Posterior Individual Open 36,000.00 0.00 Cancelado 2020-09-01 2020-10-09 2020-10-20 2020-11-10 2020-12-15 2021-06-13 cruitment of an accountant gional coordination AO-IIA-187652-CS-INDV / Re Project management, monit cruitment of financial manag IBRD / 89170 oring and evaluation, and re Posterior Individual Open 84,000.00 0.00 Cancelado 2020-09-01 2020-10-09 2020-10-20 2020-11-10 2020-12-15 2021-06-13 er gional coordination AO-IIA-239079-CS-INDV / Fin Project management, monit ancial Management Specialis IBRD / 89170 oring and evaluation, and re Posterior Individual Open 140,000.00 150,376.47 Assinado 2021-07-22 2021-07-27 2021-09-09 2021-09-27 2021-09-30 2021-09-29 2021-11-04 2021-09-29 2022-05-03 t gional coordination Page 2 Project management, monit AO-IIA-239084-CS-INDV / Ac IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 64,954.01 Assinado 2021-07-22 2021-07-27 2021-09-09 2021-10-14 2021-09-30 2021-10-20 2021-11-04 2021-10-25 2022-05-03 countant gional coordination Project management, monit AO-IIA-252339-CS-INDV / IT IBRD / 89170 oring and evaluation, and re Posterior Individual Open 45,000.00 33,285.56 Assinado 2021-09-13 2021-10-05 2021-11-01 2022-02-08 2021-11-22 2022-03-24 2021-12-27 2022-04-26 2022-06-25 Specialist gional coordination Project management, monit AO-IIA-252343-CS-INDV / Infr IBRD / 89170 oring and evaluation, and re Posterior Individual Limited 74,000.00 34,485.56 Assinado 2021-09-13 2021-10-21 2021-09-18 2022-01-14 2021-10-09 2022-03-24 2021-11-13 2022-04-26 2022-05-12 astructure Specialist gional coordination AO-IIA-252344-CS-INDV / En Project management, monit vironmental Safeguards Spec IBRD / 89170 oring and evaluation, and re Posterior Individual Open 74,000.00 98,039.57 Assinado 2021-09-13 2021-09-29 2021-11-01 2021-07-01 2021-11-22 2021-10-19 2021-12-27 2021-10-20 2022-06-25 ialist gional coordination AO-IIA-244838-CS-INDV / Fin Project management, monit ancial Management Consulta IBRD / 89170 oring and evaluation, and re Posterior Individual Direct 60,000.00 0.00 Cancelado 2021-07-23 2021-07-22 2021-08-02 2021-08-03 2021-08-23 2021-09-27 2022-03-26 nt gional coordination AO-IIA-252345-CS-INDV / Co nsultancy for Water Resource Strengthening the Institution Em fase de Imple s Assessment, Irrigation Cap IBRD / 89170 al and Enabling Environment Posterior Individual Limited 60,000.00 0.00 2021-09-27 2021-10-05 2021-10-02 2022-03-24 2021-10-23 2021-11-27 2022-05-26 mentação acity Review and Water Man for Technology Adoption agement Systems Proposals Project management, monit AO-IIA-254446-CS-INDV / Pro IBRD / 89170 oring and evaluation, and re Prévia Individual Open 176,000.00 156,793.58 Assinado 2021-09-23 2021-10-12 2021-11-11 2021-12-02 2021-12-02 2021-12-08 2022-01-06 2021-12-08 2022-07-05 curement Specialist gional coordination AO-IIA-218571-CS-INDV / Stu Strengthening the Institution dies on small scale irrigation IBRD / 89170 al and Enabling Environment Posterior Individual Open 30,000.00 0.00 Cancelado 2022-03-14 2022-05-02 2022-05-23 2022-06-27 2022-12-24 schemes in Central Plateau o for Technology Adoption f Angola AO-IIA-188476-CS-INDV / Re Strengthening the Institution cruitment of a consultant for IBRD / 89170 al and Enabling Environment Posterior Individual Limited 20,000.00 0.00 Cancelado 2020-11-02 2020-11-06 2020-11-27 2021-01-01 2021-06-30 budget preparation and supe for Technology Adoption rvision of rehabilitation works in Chianga RS Project management, monit AO-IIA-221336-CS-INDV / Pro IBRD / 89170 oring and evaluation, and re Posterior Individual Open 100,000.00 0.00 Cancelado 2022-03-31 2022-05-19 2022-06-09 2022-07-14 2023-01-10 ject Manager gional coordination Project management, monit Em fase de Imple APPSA/C-027 / Internal Audit IBRD / 89170 oring and evaluation, and re Posterior Individual Open 70,000.00 0.00 2022-01-12 2022-04-19 2022-03-02 2022-03-23 2022-04-27 2022-10-24 mentação gional coordination Project management, monit APPSA/C-029 / Procurement Em fase de Imple IBRD / 89170 oring and evaluation, and re Prévia Individual Open 72,000.00 0.00 2022-01-14 2022-02-24 2022-03-04 2022-03-25 2022-04-29 2022-10-26 Assistant mentação gional coordination Project management, monit APPSA/C-030 / Financial Assi Em fase de Imple IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 0.00 2022-01-14 2022-02-02 2022-03-04 2022-03-25 2022-04-29 2022-10-26 stant mentação gional coordination AO-IIA-193690-CS-INDV / Ass Strengthening the Institution essment the agriculture rese IBRD / 89170 al and Enabling Environment Posterior Individual Open 50,000.00 0.00 Cancelado 2020-11-03 2021-07-12 2020-12-22 2021-01-12 2021-02-16 2021-08-15 ardh baseline for Technology Adoption Project management, monit AO-IIA-221337-CS-INDV / Ca Implementação P IBRD / 89170 oring and evaluation, and re Posterior Individual Open 80,000.00 0.00 2022-05-31 2022-07-19 2022-08-09 2022-09-13 2023-03-12 ssava Consultant Specialist endente gional coordination AO-IIA-188286-CS-INDV / Ass Strengthening the Institution Implementação P ess and design the IIA resear IBRD / 89170 al and Enabling Environment Posterior Individual Open 45,000.00 0.00 2022-06-30 2022-08-18 2022-09-08 2022-10-13 2023-04-11 endente ch network investment for Technology Adoption AO-IIA-188291-CS-INDV / Stu Strengthening the Institution Implementação P dies on cassava value chain i IBRD / 89170 al and Enabling Environment Posterior Individual Open 30,000.00 0.00 2022-07-19 2022-09-06 2022-09-27 2022-11-01 2023-04-30 endente n Angola for Technology Adoption APPSA/C-032 / Consultant fo Project management, monit Em fase de Imple r Supporting the Installation, IBRD / 89170 oring and evaluation, and re Posterior Individual Open 80,000.00 0.00 2022-05-13 2022-05-16 2022-07-01 2022-07-22 2022-08-26 2023-02-22 mentação Operation and, Management gional coordination of DHIS2 Project management, monit APPSA/C-022 / Monitoring an Em fase de Imple IBRD / 89170 oring and evaluation, and re Posterior Individual Open 120,000.00 0.00 2022-06-13 2022-06-03 2022-08-01 2022-08-22 2022-09-26 2023-03-25 d Evaluation Specialist mentação gional coordination Page 3