PROCUREMENT PLAN I. General 1. Project Information Country: Bangladesh Borrower: People's Republic of Bangladesh Project Name: Private Investment and Digital Entrepreneurship Project (PRIDE) P Number: P170688 Loan Credit No.: 6676-BD 2. Bank’s Approval Date of the Procurement Plan: May 26, 2020 3. Period Covered by this procurement plan: 18 months 4. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 5. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. 6. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. II. Goods, Works, and Non-Consulting Services: Thresholds for Method of Procurement for procurement of goods, works and non-consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods Open International > US Dollars 2 million Open National > USD 100,000 and up to USD 2 million Request for Quotations Up to USD 50,000 Procurement of Works: Method of Procurement Thresholds for Methods Open International > US Dollars 10 million Open National > USD 100,000 and up to USD 10 million Request for Quotations Up to USD 100,000 III. Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: Procurement Prior Review Thresholds (US$ millions) Type of High risk Substantial Moderate Low risk procurement risk risk Works (including turnkey, supply & installation of plant and equipment, 5 20 and PPP) 10 15 Goods, information technology and non-consulting 2 4 6 services 1.5 Consultants: firms 0.5 1 2 4 Consultants: individuals 0.2 0.3 0.4 0.5 Leased Assets Not Applicable Procurement of Second Hand Goods: Not Applicable Other Relevant Procurement Information. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. Even for Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. PROCUREMENT Bangladesh : Bangladesh Private Investment & Digital Entrepreneurship Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2020-10-05 2022-04-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170688 GPN Date: 2020-09-07 Project Name: Bangladesh Private Investment & Digital Entrepreneurship Project Loan / Credit No: IDA / 66760 B Executing Agency(ies): angladesh Economic Zones Authority WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned WD1-BSMSN- BEZA / Road 1. Creating an enabling Pending Single Stage - One 24,260,355.0 2023-11- and Storm Water Network for IDA / 66760 environment for private Prior Request for Bids Open - International 0.00 Implementat 2021-01-02 2021-01-07 2021-02-18 2021-04-19 2021-05-24 Envelope 0 22 Mirsarai-2A EZ investment and sustainability ion 1. Creating an enabling Pending WD3-BSMSN- BEZA / Access Single Stage - One 30,532,544.3 2024-01- IDA / 66760 environment for private Prior Request for Bids Open - International 0.00 Implementat 2021-03-01 2021-03-06 2021-04-17 2021-06-16 2021-07-21 Road for Mirsarai-2A & 2B EZ Envelope 8 07 investment and sustainability ion 1. Creating an enabling Under WD12-BSMSN-BEZA / Central Public Private 24,142,011.0 2023-09- IDA / 66760 environment for private Prior Open - International 0.00 Implementat 2021-01-01 2021-03-09 2021-01-06 2021-03-17 2021-08-19 2021-09-23 Effluent Treatment Plant Partnership 0 23 investment and sustainability ion Request for Bids - WD2-BSMSN- BEZA / Road 1. Creating an enabling Under Single Stage - One Works (without 24,852,071.0 2024-04- and Storm Water Network for IDA / 66760 environment for private Prior Request for Bids Open - International 0.00 Implementat 2021-06-20 2021-06-25 2021-08-06 2021-09-05 2021-10-10 Envelope prequalification) 0 09 Mirsarai-2B EZ investment and sustainability ion SPD GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD1-BSMSN-BEZA / 1. Creating an enabling Pending Single Stage - One Procurement of Furniture and IDA / 66760 environment for private Post Request for Bids Open - National 492,307.00 0.00 Implementati 2021-01-01 2021-01-06 2021-02-03 2021-03-05 2021-04-09 2021-05-09 Envelope Fixtures investment and sustainability on GD2- BSMSN -BEZA / 1. Creating an enabling Pending Single Stage - One Procurement of Office IDA / 66760 environment for private Post Request for Bids Open - National 39,053.00 0.00 Implementati 2021-01-01 2021-01-06 2021-02-17 2021-03-19 2021-04-23 2021-05-23 Envelope Equipment investment and sustainability on GD3- BSMSN-BEZA / 1. Creating an enabling Pending Single Stage - One Procurement of Multimedia IDA / 66760 environment for private Post Request for Bids Open - National 41,420.00 0.00 Implementati 2021-02-01 2021-02-06 2021-03-06 2021-04-05 2021-05-10 2021-06-09 Envelope Projectors investment and sustainability on GD4- BSMSN -BEZA / Procurement of Computer and 1. Creating an enabling Under Accessories (Desktop-60, Single Stage - One IDA / 66760 environment for private Post Request for Bids Open - National 295,857.00 0.00 Implementati 2021-02-01 2022-03-06 2021-02-06 2022-03-21 2021-02-27 2021-03-29 2021-05-03 2021-06-02 Laptop-35, Tab-10, Printer- Envelope investment and sustainability on 60, Photocopier-10, and Scanner-15) GD10- BSMSN -BEZA / 1. Creating an enabling Pending Single Stage - One Procurement of Camera & IDA / 66760 environment for private Post Request for Bids Open - National 5,917.00 0.00 Implementati 2021-02-01 2021-02-06 2021-03-06 2021-04-05 2021-05-10 2021-06-09 Envelope Accessories investment and sustainability on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PS1-BSMSN-BEZA / Manpower (Special Service-1) Outsourcing (Lot- 1. Creating an enabling Under Single Stage - One 1),Manpower (Special Service- IDA / 66760 environment for private Post Request for Bids Open - National 1,781,183.00 0.00 Implementati 2020-10-03 2021-11-21 2020-10-08 2021-12-02 2020-11-05 2022-01-24 2020-12-05 2021-01-09 2025-12-31 Envelope 2 & 3) Outsourcing (Lot-2), investment and sustainability on Manpower (Category 1-5) Outsourcing (Lot-3) 1. Creating an enabling Under PS-2-BSMSN-BEZA / Rent of Single Stage - One IDA / 66760 environment for private Prior Request for Bids Open - National 2,020,828.40 0.00 Implementati 2021-11-22 2022-01-10 2021-11-27 2022-01-19 2022-01-08 2022-01-23 2022-02-07 2022-04-03 2022-03-14 2024-03-13 vehicles Envelope investment and sustainability on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PMC15-BSMSN-BEZA / 1. Creating an enabling Quality And Cost- Under Selection of Design and IDA / 66760 environment for private Prior Open - International 8,875,739.00 0.00 2021-01-01 2021-04-06 2021-02-12 2021-08-15 2021-03-28 2022-03-18 2021-04-25 2021-05-25 2021-06-29 2021-08-03 2025-12-31 Based Selection Implementation Supervision Consultant investment and sustainability PMC3-BSMSN-BEZA / 1. Creating an enabling Quality And Cost- Pending Selection of Regulatory reform IDA / 66760 environment for private Post Open - International 804,733.00 0.00 2021-01-01 2021-01-22 2021-03-07 2021-04-04 2021-05-04 2021-06-08 2021-07-13 2025-12-31 Based Selection Implementation and advisory services investment and sustainability PMC8-BSMSN-BEZA / 1. Creating an enabling Selection of Desalination Quality And Cost- Pending IDA / 66760 environment for private Prior Open - International 1,183,431.00 0.00 2021-01-15 2021-02-12 2021-03-28 2021-04-25 2021-05-25 2021-06-29 2021-08-03 2023-05-31 Feasibility & Transaction Based Selection Implementation investment and sustainability Advisor PMC9-BSMSN-BEZA / Solar 1. Creating an enabling Quality And Cost- Pending Power Generation Feasibility IDA / 66760 environment for private Post Open - International 1,017,751.48 0.00 2021-05-15 2021-06-05 2021-07-19 2021-08-16 2021-09-15 2021-10-20 2021-11-24 2022-05-31 Based Selection Implementation and Transaction Advisor investment and sustainability Page 1 PMC17-BSMSN-BEZA / Training need assessment for 1. Creating an enabling Quality And Cost- Pending skills workforce of EZs and IDA / 66760 environment for private Post Open - International 2,248,520.00 0.00 2021-07-15 2021-08-12 2021-09-25 2021-10-23 2021-11-22 2021-12-27 2022-01-31 2025-12-31 Based Selection Implementation Skill & Social Development investment and sustainability Program at BSMSN PMC7-BSMSN-BEZA / IMD for 1. Creating an enabling Quality And Cost- Pending Green Zone Feasibility and IDA / 66760 environment for private Prior Open - International 1,479,289.00 0.00 2020-12-15 2021-01-12 2021-02-25 2021-03-25 2021-04-24 2021-05-29 2021-07-03 2023-06-30 Based Selection Implementation Transaction Advisor investment and sustainability PMC10-BSMSN-BEZA / Solid Waste Management, steam 1. Creating an enabling (waste heat) and Quality And Cost- Pending IDA / 66760 environment for private Post Open - International 946,745.00 0.00 2021-05-15 2021-06-12 2021-07-26 2021-08-23 2021-09-22 2021-10-27 2021-12-01 2023-05-31 Biogas/pyrolisis (inlcuding Based Selection Implementation investment and sustainability waste sorting)) Feasability and Transaction Advisor PMC-1-BSMSN-BEZA / Selection of Consulting Firm 1. Creating an enabling Quality And Cost- Under for study of National Master IDA / 66760 environment for private Prior Open - International 1,840,575.00 0.00 2022-01-11 2022-01-12 2022-02-01 2022-01-13 2022-03-17 2022-02-17 2022-04-14 2021-02-25 2022-05-14 2022-06-18 2022-07-23 2023-07-23 Based Selection Implementation Plan for Bangladesh Economic investment and sustainability Zones Authority PMC-16-BSMSN-BEZA (LOT- 1. Creating an enabling 2) / Environmental & Social Quality And Cost- IDA / 66760 environment for private Post Open - National 236,686.00 0.00 Canceled 2020-12-01 2022-01-06 2020-12-22 2021-02-04 2021-03-04 2021-04-03 2021-05-08 2021-06-12 2022-09-05 Consultancy Services (Lot-2), Based Selection investment and sustainability RESA PMC16-BSMSN-BEZA / 1. Creating an enabling Selection of Environmental & Quality And Cost- IDA / 66760 environment for private Prior Open - International 1,834,319.00 0.00 Canceled 2021-07-15 2021-03-07 2021-08-12 2021-07-27 2021-09-25 2021-10-23 2021-11-22 2021-12-27 2022-01-31 2025-09-30 Social Consultancy Services Based Selection investment and sustainability (Lot1) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IC-9 BSMSN-BEZA / Selection 1. Creating an enabling Individual of Jr. Procurement Consultant IDA / 66760 environment for private Prior Consultant Open 617,751.00 506,157.79 Signed 2020-09-15 2021-03-08 2020-10-20 2021-12-28 2020-10-25 2022-01-13 2020-11-08 2022-02-06 2025-12-13 (3 nos.) investment and sustainability Selection IC-1 BSMSN-BEZA / Selection 1. Creating an enabling Individual Pending of Component Coordinator IDA / 66760 environment for private Prior Consultant Open 355,030.00 0.00 2020-11-01 2020-11-30 2020-12-21 2021-01-25 2025-12-31 Implementation (for Comp. 1 & Comp. 3) investment and sustainability Selection IC-8 BSMSN-BEZA / Selection 1. Creating an enabling Individual Under of Procurement Consultant (2 IDA / 66760 environment for private Prior Consultant Open 686,390.00 243,171.13 2020-11-01 2021-05-10 2020-12-02 2021-12-27 2020-12-23 2022-03-10 2021-01-27 2025-12-31 Implementation nos.) investment and sustainability Selection IC-10 BSMSN-BEZA / 1. Creating an enabling Individual Pending Selection of Contract IDA / 66760 environment for private Post Consultant Open 343,195.00 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2025-12-31 Implementation Management Specialist investment and sustainability Selection IC-14 BSMSN-BEZA / 1. Creating an enabling Individual Selection of Monitoring & IDA / 66760 environment for private Prior Consultant Open 284,023.00 49,503.57 Signed 2021-02-02 2021-04-27 2021-03-23 2021-11-16 2021-04-13 2021-11-18 2021-05-18 2021-12-01 2025-12-31 Evaluation Consultant investment and sustainability Selection 1. Creating an enabling Individual IC-15 BSMSN-BEZA / IDA / 66760 environment for private Prior Consultant Open 284,023.00 49,503.57 Signed 2021-02-03 2021-03-31 2021-03-24 2021-10-31 2021-04-14 2021-11-18 2021-05-19 2021-12-01 2025-12-31 Selection of Social Consultant investment and sustainability Selection IC-17 BSMSN-BEZA / 1. Creating an enabling Individual Selection of Environmental IDA / 66760 environment for private Post Consultant Open 284,023.00 94,742.22 Signed 2021-02-04 2021-07-09 2021-03-25 2021-10-19 2021-04-15 2021-10-25 2021-05-20 2021-11-16 2025-12-31 Consultant investment and sustainability Selection IC-19 BSMSN-BEZA / 1. Creating an enabling Individual Under Selection of Occupational IDA / 66760 environment for private Post Consultant Open 260,355.00 0.00 2021-02-05 2021-12-30 2021-03-26 2021-04-16 2021-05-21 2025-12-31 Implementation Health and Safety Consultant investment and sustainability Selection IC-22 BSMSN-BEZA / 1. Creating an enabling Individual Under Selection of Administrative IDA / 66760 environment for private Post Consultant Open 213,017.00 0.00 2021-02-06 2021-12-29 2021-03-27 2021-04-17 2021-05-22 2025-12-31 Implementation Support Consultant investment and sustainability Selection IC-23 BSMSN-BEZA / 1. Creating an enabling Individual Selection of Junior IDA / 66760 environment for private Post Consultant Open 154,437.00 31,073.01 Signed 2020-12-01 2021-03-04 2021-01-10 2021-06-24 2021-01-31 2021-10-14 2021-03-07 2021-11-23 2025-12-31 Architectural Consultant (for investment and sustainability Selection Comp. 2) (1 no.) 1. Creating an enabling Individual IC-6 BSMSN-BEZA / Selection IDA / 66760 environment for private Post Consultant Open 343,195.00 128,059.66 Signed 2020-12-01 2021-05-23 2021-01-19 2021-10-19 2021-02-09 2021-10-28 2021-03-16 2021-11-08 2025-12-31 of Legal Consultant (1 no.) investment and sustainability Selection IC-12 BSMSN-BEZA / 1. Creating an enabling Individual Selection of Financial IDA / 66760 environment for private Prior Consultant Open 558,579.00 221,438.62 Signed 2020-12-01 2021-04-15 2021-01-19 2022-01-19 2021-02-09 2022-02-08 2021-03-16 2022-03-09 2025-12-31 Management Specialist (2 investment and sustainability Selection nos.) IC-5 BSMSN-BEZA / Selection 1. Creating an enabling Individual Pending of PPP Consultants (local) IDA / 66760 environment for private Prior Consultant Open 569,940.00 0.00 2020-11-15 2021-01-03 2021-01-24 2021-02-28 2025-12-31 Implementation (2nos.) investment and sustainability Selection PMC11 A-BSMSN-BEZA / 1. Creating an enabling Under CETP Transcation Advisory IDA / 66760 environment for private Post Direct Selection Direct 214,950.00 0.00 2021-04-05 2021-05-27 2021-04-15 2021-07-27 2021-05-27 2022-05-27 Implementation Service investment and sustainability IC-7 BSMSN-BEZA / Selection 1. Creating an enabling Individual Under of Investment Promotion IDA / 66760 environment for private Post Consultant Open 325,444.00 0.00 2021-05-23 2021-06-14 2021-07-11 2021-08-01 2021-09-05 2025-12-31 Implementation Consultant (1 no.) investment and sustainability Selection IC-21 BSMSN-BEZA / 1. Creating an enabling Individual Under Selection of IT Consultant (1 IDA / 66760 environment for private Post Consultant Open 227,811.00 0.00 2021-06-20 2021-06-24 2021-08-08 2021-08-29 2021-10-03 2025-12-31 Implementation no.) investment and sustainability Selection Page 2 IC-4 BSMSN-BEZA / Selection 1. Creating an enabling Individual Under of PPP Senior Adviser (local) (1 IDA / 66760 environment for private Prior Consultant Open 488,166.00 0.00 2021-10-25 2022-01-10 2021-12-13 2022-01-03 2022-02-07 2025-12-31 Implementation no.) investment and sustainability Selection IC-3 BSMSN-BEZA / Selection 1. Creating an enabling Individual Pending of PPP Senior Advisors IDA / 66760 environment for private Prior Consultant Open 751,598.00 0.00 2021-10-30 2021-12-18 2022-01-08 2022-02-12 2024-07-31 Implementation (international) (3 nos.) investment and sustainability Selection IC-7-R-BSMSN-BEZA / 1. Creating an enabling Individual Selection of Investment IDA / 66760 environment for private Prior Consultant Open 325,444.00 0.00 Under Review 2021-10-23 2021-12-07 2021-12-11 2022-01-01 2022-02-05 2025-12-31 Promotion Consultant (1 no.) investment and sustainability Selection IC-18 BSMSN-BEZA / 1. Creating an enabling Individual Under Selection of Environmental IDA / 66760 environment for private Post Consultant Open 295,858.00 0.00 2021-11-14 2021-12-29 2022-01-02 2022-01-23 2022-02-27 2025-12-31 Implementation Counselors (5 nos.) investment and sustainability Selection IC-16 BSMSN-BEZA / 1. Creating an enabling Individual Under Selection of Social Counselors IDA / 66760 environment for private Prior Consultant Open 887,574.00 0.00 2021-11-28 2022-01-19 2022-01-16 2022-02-06 2022-03-13 2025-12-31 Implementation (15 nos.) investment and sustainability Selection IC-20-BSMSN-BEZA / 1. Creating an enabling Individual Selection of Skills Under IDA / 66760 environment for private Post Consultant Open 247,337.00 0.00 2021-12-30 2022-01-12 2022-02-17 2022-03-10 2022-04-14 2025-12-31 Development Consultant (1 Implementation investment and sustainability Selection No.) Page 3