Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: March 2017] 2. Date of General Procurement Notice: Sep 28, 2015 3. Period covered by this procurement plan: The procurement period of project covered from year March 2017 till April 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 2. Prequalification. Bidders for works activities shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank loan Project issued by The Council For Development and Reconstruction. 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) Review P-Q Expected Contract Proc. by Bank Ref. No. (Yes/No Bid Opening (Description) Method (Prior/Pos ) Date t) Expansion of sewage collection to QC1W1 ICB/NCB No Prior March 2017 connect to the Zahlé WWTP Expansion of sewage network to September QC1W2 ICB/NCB No Prior connect to the Anjar WWTP 2018 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 million 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule Expected Review by Selection Proposals Ref. No. Description of Assignment Bank Method Submission (Prior/Post) Date Post Supervision of sewage collection to QC1C1 QCBS (Prior of March 2017 connect to the Zahlé WWTP TOR) Post Design of sewage network to connect to QC1C2 SSS (Prior of March 2017 the Anjar WWTP TOR) Post Supervision of sewage network to December QC1C3 QCBS (Prior of connect to the Anjar WWTP 2018 TOR) Post Design and supervision of sewage September QC1C4 QCBS (Prior of network to connect to the Aitanit WWTP 2017 TOR) SSS QC2C1 Promote the use of GAP, including IPM Prior March 2017 (FAO) Post Technical studies and training in solid September QC3C1 QCBS (Prior of waste management - MoE 2017 TOR) Post QC3C2 Water expert- LRA IC (Prior of TOR) Post QC3C3 Communication expert - LRA IC (Prior of TOR) Post QC3C6 Capacity building and training BWE (Prior of TOR) Post QC3C8 Capacity building and training of MoEW (Prior of TOR) PMU and training (part-time procurement; Prior of QC3C11 part-time environmental/social; part time IC TORs FM) Post QC3C12 Audit report LCS (Prior of February 2016 TOR) PROCUREMENT Lebanon : Lake Qaraoun Pollution Prevention Project PLAN General Information Country: Lebanon 2017-03-27 Bank’s Approval Date of the Original Procurement Plan: 2022-06-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147854 GPN Date: Project Name: Lake Qaraoun Pollution Prevention Project Loan / Credit No: IBRD / 86370 Council for Development and Reconstruction Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1W1 / Expansion of sewa Component 1: Improvement Open - Internationa Single Stage - One E 10,539,562. 2020-03-1 ge collection to connect to th IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids Signed 2017-03-27 2017-03-31 2017-03-29 2017-06-02 2017-06-02 2017-08-01 2017-10-04 2017-09-15 2017-10-13 l nvelope 49 5 e Zahlé WWTP on QC1W2 / Expansion of sewa Component 1: Improvement Open - Internationa Single Stage - One E 6,905,853.1 Under Imple 2022-12-1 IBRD / 86370 Prior Request for Bids 2018-08-30 2020-12-01 2018-09-29 2021-01-08 2018-12-28 2021-02-18 2019-03-28 2021-08-19 2019-06-11 ge network to connect to the of Municipal Sewage Collecti l nvelope 3 mentation 0 Anjar WWTP on QC1W3 / Expansion of sewa Component 1: Improvement Single Stage - One E 2,522,112.6 2020-12-1 ge network to connect to the IBRD / 86370 of Municipal Sewage Collecti Post Request for Bids Open - National Signed 2018-04-16 2018-05-10 2018-05-16 2018-05-31 2018-06-30 2018-07-31 2018-09-28 2019-05-30 2018-12-12 2019-12-09 nvelope 2 1 Aitanit WWTP on QC1W2A / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E 2023-06-1 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 Canceled 2021-06-03 2021-06-10 2021-09-09 2021-11-04 2021-12-16 l nvelope 5 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 1 QC1W2B / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E Under Imple 2023-06-2 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 2021-06-10 2021-09-28 2021-06-17 2021-10-27 2021-09-16 2021-12-10 2021-11-11 2022-05-20 2021-12-30 l nvelope mentation 9 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 1 QC1W2C / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E Under Imple 2024-03-1 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 2022-01-24 2022-04-10 2022-02-28 2022-04-21 2022-05-09 2022-06-06 2022-07-04 2022-09-12 l nvelope mentation 1 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3. Solid Waste M QC3G1 / Purchase of water anagement, Water Quality M Under Imple IBRD / 86370 Post Direct Selection Direct 0.00 2018-07-18 2019-05-27 2018-07-23 2018-10-06 2019-04-04 monitoring stations onitoring, Capacity Building mentation and Project Management NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1NC1 / Operation and Mai Component 1: Improvement Pending Impl ntenance of Zahlé Wastewat IBRD / 86370 of Municipal Sewage Collecti Prior Direct Selection Direct 0.00 2022-06-17 2022-06-24 2022-08-05 2022-08-31 ementation er Treatment Plant on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C1 / Supervision of sewa Component 1: Improvement Quality And Cost- Open - Internationa ge collection to connect to th IBRD / 86370 of Municipal Sewage Collecti Post 378,622.27 Signed 2016-10-28 2016-10-28 2016-12-08 2017-05-02 2017-07-31 2017-07-01 2017-09-14 2017-07-31 2017-11-13 2017-09-09 2018-01-03 2017-11-23 2018-03-26 2021-05-24 Based Selection l e Zahlé WWTP on Component 2. Promotion of QC2C1 / Promote the use of UN Agencies (Dire IBRD / 86370 Good Agricultural Practices ( Prior Direct 1,500,000.00 Signed 2017-06-08 2017-06-09 2021-06-08 GAP, including IPM ct) Including Integrated Pest Ma nagement) QC1C3 / Supervision of sewa Component 1: Improvement Quality And Cost- Open - Internationa IBRD / 86370 Prior 366,200.00 Signed 2018-08-30 2019-11-06 2018-09-29 2020-01-15 2019-01-27 2020-11-11 2019-02-26 2021-02-12 2019-03-28 2021-04-08 2019-05-27 2021-10-19 2019-08-10 2021-11-15 2023-02-08 ge network to connect to the of Municipal Sewage Collecti Based Selection l Anjar WWTP on Component 3. Solid Waste M QC3C1A / Studies for Closur anagement, Water Quality M Quality And Cost- e and Rehabilitation of Bar El IBRD / 86370 Post Open - National 67,237.25 Signed 2018-08-02 2019-06-06 2018-08-02 2018-08-02 2019-12-16 2019-05-03 2020-02-03 2019-05-31 2020-06-17 2019-07-12 2020-07-22 2019-08-30 2020-11-09 2020-06-30 onitoring, Capacity Building Based Selection ias Dumpsite and Project Management QC3C1B / Studies for the Ass Component 3. Solid Waste M essment of Odor Impact from anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 72,944.54 Signed 2018-08-02 2018-08-02 2018-08-02 2019-06-10 2018-08-02 2019-12-16 2019-05-31 2020-02-19 2019-06-28 2020-06-17 2019-08-09 2020-07-29 2019-09-27 2021-04-09 2020-05-29 Solid Waste Management Fac onitoring, Capacity Building Based Selection l ilities and Landfills and Project Management Component 3. Solid Waste M QC3C2 / LRA Water Governa anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 0.00 Canceled 2018-08-02 2018-06-30 2018-08-02 2019-05-03 2018-08-02 2019-10-11 2019-04-15 2020-02-18 2019-05-13 2019-06-24 2019-08-12 2021-02-15 nce Study onitoring, Capacity Building Based Selection l and Project Management Component 3. Solid Waste M QC3C12 / Website for Litani anagement, Water Quality M Quality And Cost- River (20 weeks) + 1-year M IBRD / 86370 Post Open - National 63,314.50 Signed 2018-08-30 2018-09-05 2018-08-30 2018-08-30 2019-01-17 2019-03-07 2019-03-07 2019-04-04 2019-03-28 2019-05-16 2019-06-11 2019-07-04 2019-10-17 2022-07-04 onitoring, Capacity Building Based Selection aintenance + 3-year Hosting and Project Management QC1C4B / Supervision of sew Component 1: Improvement Quality And Cost- age network to connect to th IBRD / 86370 of Municipal Sewage Collecti Post Open - National 62,344.00 Signed 2018-04-16 2019-04-16 2018-12-28 2019-04-18 2019-05-02 2019-05-16 2019-05-24 2019-06-13 2019-07-17 2019-07-04 2019-11-27 2019-08-01 2020-03-02 2020-07-31 Based Selection e Aitanit WWTP on Page 1 QC3C1C / Strategic Environ Component 3. Solid Waste M mental and Social Assessme anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 104,925.00 Signed 2019-09-19 2019-07-04 2019-10-31 2020-04-23 2019-12-26 2020-12-11 2020-02-20 2021-02-16 2020-03-19 2021-03-11 2020-04-23 2021-04-22 2020-06-01 2021-11-19 2021-03-31 nt Study for the National Inte onitoring, Capacity Building Based Selection l grated Solid Waste Strategy and Project Management Component 3. Solid Waste M QC3C7B / Upgrading IT Syst anagement, Water Quality M Quality And Cost- Under Implement IBRD / 86370 Post Open - National 0.00 2020-06-16 2020-09-29 2020-07-14 2021-11-01 2020-08-11 2020-09-08 2020-09-29 2020-10-20 2020-12-01 2021-05-31 em - BWE onitoring, Capacity Building Based Selection ation and Project Management Component 3. Solid Waste M QC3C6D / Sustainability Stu anagement, Water Quality M Quality And Cost- Open - Internationa Under Implement dy of Wastewater Services in IBRD / 86370 Post 0.00 2021-12-19 2021-12-29 2022-02-13 2022-03-01 2022-03-27 2022-04-24 2022-05-22 2022-06-26 2022-08-07 2023-02-06 onitoring, Capacity Building Based Selection l ation Aitanit, Zahle and Anjar. and Project Management INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C2 / Design of sewage n Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 392,500.00 Signed 2017-03-22 2017-03-22 2017-06-30 2017-06-29 2017-09-03 2017-10-09 2018-07-04 etwork to connect to the Anja of Municipal Sewage Collecti r WWTP on Component 3. Solid Waste M QC3C5A / Administration Offi anagement, Water Quality M Individual Consult IBRD / 86370 Prior Direct 253,304.25 Signed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 cer– BWE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M anagement, Water Quality M Individual Consult QC3C5B / Assistant– BWE IBRD / 86370 Post Direct 37,479.72 Completed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 2019-06-30 onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C9 / Solid waste expert - anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 132,000.00 Signed 2016-11-14 2016-11-14 2017-03-23 2017-03-23 2017-03-23 2017-03-23 2017-06-06 2017-06-06 2018-05-04 MOE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C10 / Project manageme anagement, Water Quality M Individual Consult IBRD / 86370 Prior Open 277,860.00 Signed 2015-08-06 2015-08-06 2015-11-25 2015-11-25 2015-11-25 2015-11-25 2017-07-06 2016-11-01 2018-06-04 nt– CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C4 / Wastewater engine anagement, Water Quality M Individual Consult Under Implement IBRD / 86370 Post Open 38,500.00 2016-12-28 2016-12-28 2017-06-30 2017-06-09 2017-07-15 2017-09-03 2018-08-02 er - BWE onitoring, Capacity Building ant Selection ation and Project Management Component 3. Solid Waste M QC3C7 / Financial officer - B anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 0.00 Canceled 2016-12-28 2017-06-08 2017-07-08 2017-08-12 2018-07-11 WE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C7A / Financial Officer - anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 167,200.00 Signed 2017-08-02 2017-08-02 2017-11-13 2017-11-13 2017-11-23 2017-11-23 2018-02-06 2018-02-01 2019-01-05 BWE onitoring, Capacity Building ant Selection and Project Management QC1C5 / ESMP/LAP Anjar and Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 66,383.00 Signed 2017-04-21 2017-04-21 2017-06-05 2017-05-01 2017-09-07 2017-09-29 2018-05-05 Aitanit of Municipal Sewage Collecti on Component 3. Solid Waste M QC3C11A / Financial Officer - anagement, Water Quality M Individual Consult IBRD / 86370 Prior Direct 201,153.59 Signed 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-11-03 2017-11-15 2018-10-02 CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C11B / Procurement Offi anagement, Water Quality M Individual Consult IBRD / 86370 Prior Open 153,054.00 Signed 2017-12-14 2017-12-14 2018-03-14 2018-04-30 2018-04-04 2018-07-02 2018-06-18 2018-07-02 2019-05-19 cer onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C1 / Lower Litani Enviro anagement, Water Quality M nment and Investment Plan - IBRD / 86370 Post Direct Selection Direct 196,000.00 Completed 2017-05-04 2017-05-04 2017-09-05 2017-09-05 2018-01-19 2018-02-12 2019-01-14 2019-03-15 onitoring, Capacity Building MoE and Project Management QC1C4A / Design of sewage Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 17,560.00 Completed 2018-05-10 2018-05-10 2018-04-12 2018-11-07 2018-11-07 2018-12-07 2018-12-06 network to connect to the Ait of Municipal Sewage Collecti anit WWTP on Component 3. Solid Waste M QC3C6B / Individual Consult anagement, Water Quality M Individual Consult Under Implement ant Wastewater Sector - MOE IBRD / 86370 Post Open 0.00 2018-06-10 2019-04-10 2019-06-07 2020-02-20 2019-06-28 2019-08-16 2020-07-15 onitoring, Capacity Building ant Selection ation W and Project Management Component 3. Solid Waste M QC3C11C / Environmental a anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 111,840.00 Signed 2018-06-10 2018-05-22 2018-10-11 2018-08-16 2018-10-25 2018-12-26 2018-12-26 2018-12-26 2019-09-30 nd Social Officer - CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C11D / Project Engineer anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 109,120.00 Signed 2018-11-30 2018-11-30 2019-06-07 2019-09-17 2019-06-28 2019-09-19 2019-08-16 2019-11-26 2020-07-15 - CDR onitoring, Capacity Building ant Selection and Project Management QC1C4 / Supervision of sewa Component 1: Improvement ge network to connect to the IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 Canceled 2018-04-16 2018-05-06 2018-08-19 2020-12-11 Aitanit WWTP on QC3C13 / Consultancy Servi Component 3. Solid Waste M ces for the Preparation of a F anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 104,294.80 Signed 2019-01-08 2020-01-24 2019-10-01 2020-01-22 2019-12-31 2020-08-25 2020-05-30 easibility Study for Sustainab onitoring, Capacity Building le Sludge Management in the and Project Management Bekaa Region Component 3. Solid Waste M QC3C6A / Focal Point - MoE anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 136,400.00 Signed 2019-07-17 2019-07-30 2019-07-30 2019-07-25 2019-10-01 2020-03-02 2020-08-31 W onitoring, Capacity Building and Project Management Component 3. Solid Waste M QC3C11E / Rockwise PMIS S anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 30,746.25 Signed 2020-01-01 2020-01-17 2020-01-21 2020-01-21 2020-03-10 2020-03-10 2020-12-31 oftware Maintenance - CDR onitoring, Capacity Building and Project Management Page 2 QC3C6C / Updating the Strat Component 3. Solid Waste M egic Environmental and Soci anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 99,973.00 Signed 2020-12-10 2021-01-28 2020-12-24 2021-03-17 2021-03-04 2021-09-23 2021-12-03 al Assessment (SESA) of the onitoring, Capacity Building Updated National Water Sect and Project Management or Strategy - MoEW Component 3. Solid Waste M QC3C11F / Environmental an anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 28,600.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-07-08 2021-02-18 2021-09-03 2021-04-01 2021-09-03 2022-02-28 d Social Officer - CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C9A / Solid Waste Exper anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 42,900.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-03-01 2021-02-18 2021-03-11 2021-04-01 2021-05-17 2022-02-28 t - MoE onitoring, Capacity Building ant Selection and Project Management QC1C1A / Design of Remaini Component 1: Improvement ng Works related to Expansio Under Implement IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 2022-01-24 2022-02-07 2022-02-14 2022-04-25 2022-06-20 n of Sewage Network to Conn ation on ect to Zahlé Wastewater Tre atment Plant Project Component 3. Solid Waste M QC3C9A' / Solid Waste Exper anagement, Water Quality M Individual Consult Under Implement IBRD / 86370 Post Open 0.00 2022-02-24 2022-03-30 2022-04-21 2022-05-05 2022-06-16 2023-05-15 t - MoE onitoring, Capacity Building ant Selection ation and Project Management QC1C6 / Supervision of Zahl Component 1: Improvement é Wastewater Treatment Pla Pending Impleme IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 2022-05-26 2022-06-02 2022-07-21 2022-08-31 nt Operation and Maintenanc ntation on e, and Temporary Sludge Dis posal Facility Component 3. Solid Waste M QC3C11G / Environmental a anagement, Water Quality M Individual Consult Pending Impleme IBRD / 86370 Post Open 0.00 2022-06-30 2022-08-25 2022-09-08 2022-10-01 2023-08-31 nd Social Consultant - CDR onitoring, Capacity Building ant Selection ntation and Project Management Page 3