PROCUREMENT PLAN (Textual Part) Project information: Supporting Egypt Education Reform (P157809) Project Implementation agency: Ministry of Education and Technical Education Date of the Procurement Plan: 16 August 2018 Period covered by this Procurement Plan: First 18 months • Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable PROCUREMENT Egypt, Arab Republic of : Supporting Egypt Education Reform Project PLAN General Information Country: Egypt, Arab Republic of 2018-11-08 Bank’s Approval Date of the Original Procurement Plan: 2022-06-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157809 GPN Date: Project Name: Supporting Egypt Education Reform Project Loan / Credit No: IBRD / 88520 MINISTRY OF EDUCATION AND TECHNICAL EDUCATION Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOETE -110999-GO-RFQ Component 5: Project Manag Request for Quota Single Stage - One E / PCU Office equipment and f IBRD / 88520 ement, Communication, and Post Limited 36,576.00 Completed 2019-04-22 2019-06-05 2019-06-17 2019-08-25 2019-12-14 2019-09-08 tions nvelope urniture Monitoring and Evaluation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOETE -83470-CS-CQS / Component 5: Project Manag Consultant Qualifi Independent Verification Age IBRD / 88520 ement, Communication, and Post Limited 52,966.31 Signed 2018-10-30 2019-03-31 2018-11-13 2019-03-31 2018-11-28 2019-04-15 2018-12-19 2019-05-09 2019-12-14 cation Selection ncy Monitoring and Evaluation EG-MOETE -110745-CS-QCB S / Data collection for Diagno Component 1: Improved Earl Consultant Qualifi IBRD / 88520 Post Limited 437,215.94 Signed 2019-05-10 2019-10-28 2019-05-24 2019-08-06 2019-06-23 2019-11-28 2019-07-28 2019-12-26 2020-01-24 stic study of teaching practic y Childhood Education cation Selection es in KG classrooms EG-MOETE -110749-CS-QCB S / Technical support for the Component 5: Project Manag PCU's M&E function, includin Consultant Qualifi IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2019-07-14 2019-07-28 2019-08-27 2019-10-01 2020-03-29 g and not limited to developi cation Selection Monitoring and Evaluation ng an M&E system, timely da ta collection and analysis, an d reporting Component 5: Project Manag EG-MOETE -110995-CS-CQS Consultant Qualifi IBRD / 88520 ement, Communication, and Post Limited 653,615.44 Signed 2019-06-02 2020-03-25 2019-06-16 2020-06-21 2019-07-16 2020-06-30 2019-08-20 2020-08-20 2020-02-16 / External Auditor cation Selection Monitoring and Evaluation EG-MOETE -111146-CS-QBS Component 5: Project Manag Quality And Cost- / Supporting the implementat IBRD / 88520 ement, Communication, and Post Open - National 0.00 Canceled 2019-08-10 2019-08-31 2019-10-14 2019-11-11 2019-12-11 2020-01-15 2020-02-19 2021-02-18 Based Selection ion of communication strateg Monitoring and Evaluation y. EG-MOETE -166172-CS-CQS Component 5: Project Manag Consultant Qualifi / Consulting Services for “Ind IBRD / 88520 ement, Communication, and Post Open - National 0.00 Canceled 2020-03-31 2020-03-31 2020-04-30 2020-06-01 2020-06-16 2020-07-01 2023-06-01 cation Selection ependent verification Agent ( Monitoring and Evaluation IVA)” EG-MOETE -214348-CS-CQS Component 5: Project Manag Consultant Qualifi / Consulting Services for Inde IBRD / 88520 ement, Communication, and Post Limited 125,282.07 Signed 2021-01-21 2021-06-03 2021-02-04 2020-04-15 2021-02-19 2021-06-27 2021-03-15 2021-07-01 2022-03-15 cation Selection pendent verification Agent (I Monitoring and Evaluation VA) EG-MOETE -246539-CS-CQS / Technical Assistance to sup Component 5: Project Manag Consultant Qualifi port the Data Collection unde IBRD / 88520 ement, Communication, and Post Limited 245,392.94 Signed 2021-08-08 2021-08-05 2021-08-31 2021-08-16 2021-09-09 2021-12-08 2021-10-03 2021-12-15 2023-08-31 cation Selection r Ongoing Sector Reforms ED Monitoring and Evaluation U 2.0 (multi-round pulse surv eys ) EG-MOETE -256458-CS-CQS Component 5: Project Manag / Technical Assistance to sup Consultant Qualifi IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2021-10-10 2021-10-12 2021-10-20 2021-10-29 2021-11-18 2022-06-30 port establishing MOETE’s Ed cation Selection Monitoring and Evaluation ucation Technology Entity EG-MOETE -301109-CS-CQS Component 5: Project Manag / Technical Assistance to sup Consultant Qualifi Pending Impleme IBRD / 88520 ement, Communication, and Post Limited 0.00 2022-06-24 2022-06-27 2022-07-17 2022-07-24 2023-01-23 port Developing the MOETE S cation Selection ntation Monitoring and Evaluation trategic Communication Plan INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 5: Project Manag EG-MOETE -83469-CS-INDV / Individual Consult IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2019-04-01 2019-04-06 2019-04-11 2019-04-21 2020-04-15 Financial officer ant Selection Monitoring and Evaluation Component 5: Project Manag EG-MOETE -83458-CS-INDV / Individual Consult IBRD / 88520 ement, Communication, and Post Limited 2,832.56 Terminated 2018-11-19 2019-04-16 2018-11-24 2018-12-13 2018-11-29 2018-12-20 2018-12-09 2018-12-29 2019-12-04 PCU Director ant Selection Monitoring and Evaluation Component 5: Project Manag EG-MOETE -83474-CS-INDV / Individual Consult IBRD / 88520 ement, Communication, and Post Limited 1,594.15 Completed 2018-10-28 2019-04-09 2018-11-02 2019-02-06 2018-11-07 2019-01-15 2018-11-17 2019-02-09 2019-11-12 2020-02-24 Procurement officer ant Selection Monitoring and Evaluation Page 1 Component 5: Project Manag EG-MOETE -83467-CS-INDV / Individual Consult IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2018-10-23 2018-10-28 2018-11-02 2018-12-07 2019-12-02 accountant ant Selection Monitoring and Evaluation EG-MOETE -111152-CS-CDS Component 5: Project Manag / Financial firm as an interim IBRD / 88520 ement, Communication, and Post Direct Selection Direct 3,324.77 Signed 2019-04-30 2019-07-11 2019-05-10 2019-06-02 2019-07-14 2019-08-01 2020-01-10 arrangement until the FM Off Monitoring and Evaluation icer is recruited Component 5: Project Manag EG-MOETE -115008-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Limited 1,633.02 Terminated 2019-05-15 2019-05-16 2019-05-17 2019-05-16 2019-05-19 2019-05-20 2019-06-01 2019-05-28 2020-06-03 / Administration Specialist ant Selection Monitoring and Evaluation Component 5: Project Manag EG-MOETE -135234-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Limited 1,121.67 Terminated 2019-09-30 2019-09-01 2019-10-02 2019-09-24 2019-10-04 2019-09-24 2019-10-17 2019-09-25 2020-10-19 / Administrative officer ant Selection Monitoring and Evaluation EG-MOETE -154526-CS-INDV / Branding and developing th Component 5: Project Manag Individual Consult emes of all products and mat IBRD / 88520 ement, Communication, and Post Open 1,650.00 Completed 2020-01-20 2020-01-21 2020-01-21 2020-01-21 2020-01-21 2020-01-21 2020-01-21 2020-01-26 2020-02-20 2020-03-15 ant Selection erials for the regional confere Monitoring and Evaluation nce: “Accelerating Learning i n MENA'' EG-MOETE -162528-CS-INDV Component 5: Project Manag Individual Consult / Procurment and Operation IBRD / 88520 ement, Communication, and Post Limited 24,106.47 Terminated 2020-03-03 2020-01-24 2020-03-03 2020-01-26 2020-03-03 2020-01-27 2020-03-03 2020-02-09 2021-02-08 ant Selection Officer Monitoring and Evaluation EG-MOETE -166965-CS-CDS Component 5: Project Manag / Procurment and Operation IBRD / 88520 ement, Communication, and Post Direct Selection Direct 2,597.14 Signed 2020-03-30 2020-02-24 2020-03-30 2020-01-20 2020-03-30 2020-02-09 2021-03-25 Officer Monitoring and Evaluation EG-MOETE -154510-CS-INDV / Communication support ser Component 5: Project Manag Individual Consult vices for the preparation of t IBRD / 88520 ement, Communication, and Post Open 0.00 Canceled 2020-01-23 2020-01-21 2020-01-24 2020-01-21 2020-01-24 2020-01-26 2020-02-25 ant Selection he regional conference: “Acc Monitoring and Evaluation elerating Learning in MENA''. EG-MOETE -211209-CS-CQS / Grade 4 national assessme Component 5: Project Manag Individual Consult nt: Technical Assistance to s IBRD / 88520 ement, Communication, and Post Open 0.00 Canceled 2020-12-22 2020-12-22 2021-01-17 2020-12-22 2021-01-24 2021-02-07 2021-06-30 ant Selection upport the Review of Nationa Monitoring and Evaluation l Assessment Framework Dev elopment EG-MOETE -211603-CS-INDV Component 5: Project Manag Individual Consult Under Implement / Grade 4 national assessme IBRD / 88520 ement, Communication, and Post Limited 0.00 2021-01-05 2021-01-05 2021-01-10 2021-01-31 2021-03-01 2022-06-01 ant Selection ation nt results: Data analysis and Monitoring and Evaluation reporting Component 5: Project Manag EG-MOETE -213100-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Limited 2,101.91 Terminated 2021-01-10 2021-01-10 2021-01-15 2021-01-11 2021-01-20 2021-02-28 2021-02-01 2021-03-01 2022-02-01 / PCU director ant Selection Monitoring and Evaluation EG-MOETE -216348-CS-CDS Component 5: Project Manag / Continuation of the external IBRD / 88520 ement, Communication, and Post Direct Selection Direct 30,561.76 Signed 2021-02-01 2021-01-21 2021-02-11 2021-01-18 2021-02-21 2021-02-21 2023-03-01 audit service Monitoring and Evaluation EG-MOETE -222337-CS-INDV / Grade 4 national assessme Component 5: Project Manag Individual Consult nt: Technical Assistance to s IBRD / 88520 ement, Communication, and Post Limited 12,500.00 Signed 2021-03-04 2021-03-02 2021-03-11 2021-03-02 2021-03-15 2021-03-08 2021-03-25 2021-03-15 2021-07-25 ant Selection upport the Review of Nationa Monitoring and Evaluation l Assessment Framework Dev elopment Component 5: Project Manag EG-MOETE -224677-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Direct 15,272.03 Signed 2021-03-16 2021-03-21 2021-03-26 2021-03-25 2021-03-30 2021-03-25 2021-04-15 2021-04-01 2022-04-15 / Technical Liaison Officer ant Selection Monitoring and Evaluation EG-MOETE -83464-CS-INDV / Component 5: Project Manag Individual Consult Monitoring and Evaluation st IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2018-10-23 2018-10-28 2018-11-02 2018-11-12 2019-11-07 ant Selection aff Monitoring and Evaluation EG-MOETE -226157-CS-INDV Component 5: Project Manag Individual Consult / Monitor and Evaluation Offi IBRD / 88520 ement, Communication, and Post Direct 20,621.51 Terminated 2021-03-24 2021-03-24 2021-03-25 2021-03-11 2021-03-28 2021-03-28 2021-04-01 2021-05-01 2022-03-31 ant Selection cer Monitoring and Evaluation Component 5: Project Manag EG-MOETE -227526-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Limited 20,673.15 Terminated 2021-04-01 2021-04-04 2021-04-03 2021-03-29 2021-04-04 2021-04-04 2021-04-07 2021-04-12 2022-04-07 / Unit Coordinator ant Selection Monitoring and Evaluation Component 5: Project Manag EG-MOETE -253719-CS-CDS IBRD / 88520 ement, Communication, and Post Direct Selection Direct 2,557.02 Signed 2021-09-16 2021-09-01 2021-09-16 2021-09-01 2021-09-16 2021-09-01 2022-08-31 / PCU Director Monitoring and Evaluation Component 5: Project Manag EG-MOETE -253736-CS-CDS IBRD / 88520 ement, Communication, and Post Direct Selection Direct 488.85 Terminated 2021-09-16 2021-12-27 2021-09-26 2022-01-10 2021-09-30 2022-01-15 2022-09-30 / Procurement Officer Monitoring and Evaluation Component 5: Project Manag EG-MOETE -254855-CS-INDV IBRD / 88520 ement, Communication, and Post Direct Selection Direct 23,019.85 Signed 2021-09-23 2021-09-26 2021-09-29 2021-09-27 2021-10-03 2021-10-03 2022-10-03 / Administration Specialist Monitoring and Evaluation EG-MOETE -261194-CS-INDV Component 5: Project Manag Individual Consult / Monitoring and Evaluation IBRD / 88520 ement, Communication, and Post Limited 23,034.50 Signed 2021-11-04 2021-11-02 2021-11-05 2021-11-08 2021-11-08 2021-11-11 2021-11-14 2021-12-01 2022-11-13 ant Selection Officer Monitoring and Evaluation Component 5: Project Manag EG-MOETE -227527-CS-INDV Individual Consult IBRD / 88520 ement, Communication, and Post Limited 0.00 Canceled 2021-04-01 2021-04-01 2021-04-04 2021-04-05 2021-04-10 2022-04-10 / Financial Officer ant Selection Monitoring and Evaluation Component 5: Project Manag EG-MOETE -271019-CS-CDS IBRD / 88520 ement, Communication, and Post Direct Selection Direct 7,697.90 Signed 2021-12-26 2022-01-05 2021-12-27 2022-01-10 2022-01-01 2022-01-15 2022-12-31 / Financial Officer Monitoring and Evaluation EG-MOETE -280044-CS-CDS Component 5: Project Manag / Technical Assistance to sup IBRD / 88520 ement, Communication, and Post Direct Selection 30,467.57 Signed 2022-03-07 2022-03-08 2022-03-20 2022-03-10 2022-04-17 2022-04-01 2022-10-14 port establishing MOETE’s Ed Monitoring and Evaluation ucation Technology Entity Component 5: Project Manag EG-MOETE -293015-CS-CDS IBRD / 88520 ement, Communication, and Post Direct Selection Direct 24,457.42 Signed 2022-04-29 2022-04-29 2022-04-30 2022-04-29 2022-05-15 2022-05-15 2023-05-15 / Procurement Officer Monitoring and Evaluation Page 2 EG-MOETE -301112-CS-CDS Component 5: Project Manag / Technical Assistance to sup Pending Impleme IBRD / 88520 ement, Communication, and Post Direct Selection Direct 0.00 2022-06-24 2022-06-26 2022-07-07 2025-01-31 port High Frequency Pulse Su ntation Monitoring and Evaluation rveys under Ongoing Educati on Reforms Page 3