PROCUREMENT PLAN (Textual Part) Project information: Bangladesh, Project Preparation Advance (PPA) for Livestock Development-based Dairy Revolution and Meat Productions (DRMP), PPA No. IDA V104-BD Project Implementation agency: Department of Livestock Date of the Procurement Plan: October 2017 Period covered by this Procurement Plan: October 2017 - August 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and the Public Procurement Rules 2008, as amended in August 2009) , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions : a) e-GP system of the country for national competitive bidding (NCB) shall be followed using Standard/Model Procurement documents satisfactory to the Bank; b) Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; c) Bids should be submitted and opened in public in one location immediately after the deadline for submission; d) Lottery in award of contracts shall not be allowed; e) Bidders’ qualification/experience requirement shall be mandatory; f) Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable/ Other Relevant Procurement Information. Procurement Responsibility: Department of Livestock (DLS) is the implementing agency (IA) who will be responsible for all procurements Procurement Threshold Bank-financed all contracts at or above the thresholds set out in the below table 1 are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) High Substant Modera Low Type of procurement risk ial risk te risk risk Works (including turnkey, supply & installation of plant and equipment, 5 10 15 20 and PPP) Goods, information technology and 1.5 2 4 6 non-consulting services Consultants: firms 0.5 1 2 4 Consultants: individuals 0.2 0.3 0.4 0.5 Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract, including all taxes and duties payable under the contract. PROCUREMENT Bangladesh : Livestock and Dairy Development Project PLAN General Information Country: Bangladesh 2018-05-26 Bank’s Approval Date of the Original Procurement Plan: 2022-07-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161246 GPN Date: 2019-04-22 Project Name: Livestock and Dairy Development Project Loan / Credit No: IDA / V1040, IDA / 63300 Department of Livestock Services for DRMP Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DLS/DRMP/PPA/W-01 / Civil C Project Management Monitor Single Stage - One E 2018-12-3 onstruction of office building: IDA / V1040 Post Request for Bids Open - National 131,916.00 107,296.86 Signed 2018-09-05 2018-08-12 2018-09-08 2018-09-19 2018-09-09 2018-09-24 2018-09-09 2018-10-02 2018-09-23 ing and Evaluation nvelope 1 vertical extension of Nutritio n Building, DLS DLS/LDDP/WD-88A / Repair and renovation of auditorium Market Linkages and Value Single Stage - One E 2020-05-0 IDA / 63300 Post Request for Bids Open - National 109,157.00 148,080.77 Signed 2019-05-07 2019-08-18 2019-05-15 2019-06-10 2019-09-23 2019-06-24 2019-09-30 2019-08-01 2019-10-02 (+/- 350 Sq M) at Officers Tra Chain Development nvelope 1 ining Institute (OTI) Savar, D haka DLS/LDDP/WD-90 / Construct ion of Existing DLS Building n Project Management Monitor Single Stage - One E 2020-07-1 IDA / 63300 Post Request for Bids Open - National 805,000.00 787,630.60 Signed 2019-04-25 2019-04-23 2019-04-30 2019-05-13 2019-05-23 2019-05-27 2019-05-30 2019-07-11 2019-06-03 o-02 6th and 7th floor includi ing and Evaluation nvelope 1 ng substation, lift, furniture, decoration etc for PMU DLS/LDDP/WD-108 / Renovat Improving Risk Management Single Stage - One E 2020-05-0 ion and Repairing works at R IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 273,048.00 231,093.97 Signed 2019-05-07 2019-08-25 2019-05-15 2019-06-10 2019-09-23 2019-06-24 2019-10-15 2019-08-01 2019-11-03 nvelope 1 ajshahi Dairy Farm estock Production Systems DLS/LDDP/WD-109 / Renovat Improving Risk Management Single Stage - One E 2020-02-0 ion and Repairing works at B IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 106,795.00 92,669.51 Signed 2019-05-07 2019-08-25 2019-05-15 2019-06-10 2019-09-15 2019-06-24 2019-10-15 2019-08-01 2019-10-30 nvelope 1 ogura Dairy Farm estock Production Systems DLS/LDDP/WD-110 / Renovat Improving Risk Management Single Stage - One E 2020-02-0 ion and Repairing works at B IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 109,217.00 93,148.19 Signed 2019-05-07 2019-12-16 2019-05-15 2019-06-10 2019-10-13 2019-06-24 2020-10-22 2019-08-01 2019-11-03 nvelope 1 arishal Dairy Farm estock Production Systems DLS/LDDP/WD-111 / Renovat Improving Risk Management Single Stage - One E 2020-02-0 ion and Repairing works at S IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 109,217.00 101,531.58 Signed 2019-05-07 2019-08-07 2019-05-21 2019-06-10 2019-08-29 2019-06-24 2019-10-21 2019-08-01 2019-11-03 nvelope 1 ylhet Dairy Farm estock Production Systems DLS/LDDP/WD-112 / Renovat Improving Risk Management Single Stage - One E 2020-02-0 ion and Repairing works at F IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 109,627.00 86,578.92 Signed 2019-05-07 2019-09-18 2019-05-15 2019-06-10 2019-10-10 2019-06-24 2019-11-19 2019-08-01 2019-12-12 nvelope 1 aridpur Dairy Farm estock Production Systems DLS/LDDP/WD-113 / Renovat Improving Risk Management Single Stage - One E 2020-02-0 ion and Repairing works at C IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 117,819.00 95,932.45 Signed 2019-05-07 2019-08-07 2019-05-15 2019-06-10 2019-08-29 2019-06-24 2019-10-03 2019-08-01 2019-10-30 nvelope 1 hattogram Dairy Farm estock Production Systems DLS/LDDP/WD-23 / Construct ion of Vertical Expansion of 2 6 (twenty Six) Existing Upazil a Livestock Development Ce Market Linkages and Value Single Stage - One E 2020-08-0 IDA / 63300 Post Request for Bids Open - National 728,000.00 664,894.90 Signed 2019-05-07 2019-05-05 2019-05-15 2019-06-10 2019-06-10 2019-06-24 2019-06-25 2019-08-01 2019-07-16 nters (ULDC) for Training and Chain Development nvelope 1 service Facilities Panchagor- 03 nos, Thakurgaon-02 nos, Dinajpur-10 nos, Lalmonirhat -05 nos, Nilphamari-06 nos DLS/LDDP/WD-24 / Construct ion of Vertical Extension of 2 6 (twenty six) existing Upazil a Livestock Development Ce Market Linkages and Value Single Stage - One E 2020-08-2 IDA / 63300 Post Request for Bids Open - National 728,000.00 707,395.77 Signed 2019-05-26 2019-10-10 2019-06-03 2019-06-30 2019-10-27 2019-07-14 2019-11-06 2019-08-21 2019-11-28 nters (ULDC) for Training and Chain Development nvelope 1 Service Facilities Kurigram=0 7 nos, Gaibandha= 03 nos, R angpur=04 nos, Bogra=08 n os and Natore=04 nos DLS/LDDP/WD-25 / Construct ion of Vertical Extension of 2 6 (twenty six) existing Upazil a Livestock Development Ce Market Linkages and Value Single Stage - One E 2020-09-0 IDA / 63300 Post Request for Bids Open - National 728,000.00 705,326.16 Signed 2019-06-13 2019-10-10 2019-06-23 2019-07-18 2019-10-28 2019-08-01 2019-11-12 2019-09-09 2019-11-28 nters (ULDC) for Training and Chain Development nvelope 9 Service Facilities Rajshahi=0 6, Nawgaon=07 nos, Pabna= 06 nos, Sirajgonj=05 nos and Joypurhat=02 nos DLS/LDDP/WD-26 / Construct ion of Vertical Extension of 2 6 (twenty six) existing ULDC for Training and Service Facil Market Linkages and Value Single Stage - One E 2020-09-1 ities Dhaka=04 nos, Manikgo IDA / 63300 Post Request for Bids Open - National 728,000.00 698,192.98 Signed 2019-06-27 2019-07-28 2019-07-07 2019-08-01 2019-08-27 2019-08-14 2019-09-09 2019-09-19 2019-09-22 Chain Development nvelope 9 nj=04 nos, Narrayongonj=02 nos, Gazipur=02 nos, Munshi gonj=03 nos, Narshingdi=03 nos, Shariatpur=04 nos and Madaripur=04 nos DLS/LDDP/WD-27 / Construct ion of Vertical Extension of 2 6 (twenty six) existing ULDC Market Linkages and Value Single Stage - One E 2020-11-1 IDA / 63300 Post Request for Bids Open - National 728,000.00 711,651.18 Signed 2019-08-27 2019-07-28 2019-09-04 2019-09-30 2019-08-27 2019-10-14 2019-09-05 2019-11-11 2019-09-22 for Training and Service Facil Chain Development nvelope 1 ities Faridpur=06 nos, Kishor gonj=07 nos, Khulna=06 nos , Satkhira=05 nos and Feni= 02 nos DLS/LDDP/WD-28 / Construct ion of Vertical Extension of 2 6 (twenty six) existing ULDC for Training and Service Facil Market Linkages and Value Single Stage - One E 2020-12-1 ities Rajbari=02 nos, Chottog IDA / 63300 Post Request for Bids Open - National 728,000.00 704,886.04 Signed 2019-09-30 2019-08-04 2019-10-07 2019-10-28 2019-09-04 2019-11-11 2019-09-23 2019-12-17 2019-10-07 Chain Development nvelope 7 ram=05, Kustia=02 nos, Meh erpur=01, Chuadanga=02 no s, Jhenaidah=04 nos, Magura =03, Narail=02, Jessore=03 and B. Baria=02 nos Page 1 DLS/LDDP/WD-29 / Construct ion of Vertical Extension of 2 6 (twenty six) existing ULDC for Training and Service Facil Market Linkages and Value Single Stage - One E 2020-12-2 IDA / 63300 Post Request for Bids Open - National 728,000.00 700,592.74 Signed 2019-10-14 2019-10-20 2019-10-21 2019-11-11 2019-11-19 2019-11-25 2019-11-26 2019-12-23 2019-12-12 ities Barishal=04, Barguna= Chain Development nvelope 3 02, Patuakhali=03, Jhalkhati =02, bhola=03, Pirojpur=03, Bagerhat=04, Lakhipur=03 a nd Noakhali=02 nos DLS/LDDP/WD-30 / Construct ion of Vertical Extension of 2 6 (twenty six) existing ULDC Market Linkages and Value Single Stage - One E 2021-01-2 for Training and Service Facil IDA / 63300 Post Request for Bids Open - National 728,000.00 691,352.25 Signed 2019-11-12 2019-10-10 2019-11-19 2019-12-10 2019-10-29 2019-12-25 2019-11-18 2020-01-22 2019-12-02 Chain Development nvelope 2 ities Sylhet=04, Moulbai Baz ar=04, Sunamgonj=02, Hobo gonj=03, Cumilla=05, Chadp ur=04 and Coxes Bazar=04 WD-83 / Construction of Dis Market Linkages and Value Single Stage - One E Pending Imp 2022-07-1 trict level Hygienic Slaughter IDA / 63300 Post Request for Bids Open - National 3,174,987.95 0.00 2021-07-01 2021-07-08 2021-08-07 2021-09-06 2021-10-18 Chain Development nvelope lementation 5 House with necessary Draina ge System. WD-102 / Construction of on e Storied Training Center and Improving Risk Management Single Stage - One E Pending Imp 2022-03-1 Cattle Shed at Rajshahi (5 no IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 926,783.13 0.00 2021-06-03 2021-06-10 2021-07-10 2021-08-09 2021-09-20 nvelope lementation 9 s each 868 Sqm) + Vetting fo estock Production Systems r shed and Training centers. WD-84 / Construction of Dis Market Linkages and Value Single Stage - One E Pending Imp 2022-05-0 trict level Hygienic Slaughter IDA / 63300 Post Request for Bids Open - National 3,174,987.95 0.00 2021-08-01 2021-08-08 2021-09-07 2021-10-07 2021-11-05 Chain Development nvelope lementation 4 House with necessary Draina ge System WD-104 / Construction of on Improving Risk Management e storied Training Center, Cat Single Stage - One E Pending Imp 2022-02-1 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 306,710.84 0.00 2021-05-10 2021-05-17 2021-06-16 2021-07-16 2021-08-20 tle Shed at Barishal, Prefabr nvelope lementation 6 estock Production Systems icated MS steel Section Colu mn (185+76 sqm) DLS/LDDP/WD-40 / Earth filli ng, Boundary wall Constructi Improving Risk Management on at Tangail and Jamalpur D Single Stage - One E 2021-10-1 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 115,747.00 111,660.39 Signed 2021-01-20 2021-06-22 2021-01-27 2021-02-22 2021-07-19 2021-03-08 2021-08-18 2021-04-15 2021-10-11 AI premises, Repair of Tangai nvelope 6 estock Production Systems l and Jamalpur AI Offices and quarter and Vetting Charge f or Architectural Drawings LDDP/W-31 / Construction of Vertical Extension of 30 (thirt y) existing ULDC for Training and Service Facilities at Chap Market Linkages and Value Single Stage - One E 2022-01-0 IDA / 63300 Post Request for Bids Open - National 840,000.00 822,174.97 Signed 2020-09-20 2019-10-10 2020-09-27 2020-10-27 2019-10-31 2020-11-26 2019-10-31 2021-01-07 2019-11-28 ainababgonj (3 nos), Mymens Chain Development nvelope 7 ingh (6 nos), Netrokona (7 no s), Jamalpur (1 no), Sherpur ( 4 nos), Tangail (6 nos) and G opalgonj (3 nos). DLS/LDDP/WD-31 / Construct ion of Vertical Extension of 3 0 (thirty) existing ULDC for Tr Market Linkages and Value Single Stage - One E 2020-10-2 aining and Service Facilities IDA / 63300 Prior Request for Bids Open - National 840,000.00 0.00 Canceled 2019-08-13 2019-08-21 2019-09-16 2019-09-30 2019-10-28 Chain Development nvelope 8 Chapainababgonj=03, Myme nsingh=06, Netrokona=07, J amalpur=01, Sherpur=04, Ta ngail=06 and Gopalgonj=03 nos WD-86 / Construction of Mod Request for Bids - ern Semi Automatic Slaughte Market Linkages and Value Open - Internationa Single Stage - One E Works (without pr 10,000,000.0 Pending Imp 2020-08-1 IDA / 63300 Prior Request for Bids 0.00 2020-03-01 2020-03-15 2020-04-05 2020-04-26 2020-05-31 r House with Drainage syste Chain Development l nvelope equalification) SP 0 lementation 6 m at Khulna City Corporation D WD-18/DLS/LDDP/2020-21 / I nstallation of Tube well for D National Procure airy and Beef Cattle - support ment Document - to Safe water Systems for ani Single Stage - One E Pending Imp 2022-08-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1 Envelope proce 45,000.00 0.00 2021-11-01 2021-11-08 2021-12-08 2021-12-22 2022-02-02 mals in Coastal Area/ District nvelope lementation 1 ss (Non Bank-SPD / Region- Khulna, Bagerhat, S ) atkhira, Jessore with locally d eveloped water purification s ystem (12 nos) WD-19/LDDP/DLS/2020-21 / I National Procure nstallation of Tube well for D ment Document - airy and Beef Cattle - support Single Stage - One E 2022-07-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1 Envelope proce 30,000.00 22,632.22 Signed 2021-10-20 2021-11-01 2021-10-27 2021-11-26 2021-12-23 2021-12-10 2021-12-15 2022-01-21 2022-01-19 to Safe water Systems for ani nvelope 0 ss (Non Bank-SPD mals in Coastal Area/ District ) / Region- Barishal, Bhola, Pat uakhali & Perojpur (08 nos) WD-20/DLS/LDDP/2020-21 / Construction of Waste Dispos National Procure al pit at Barishal FDIL, Jassor Improving Risk Management ment Document - e FDIL, Manikgonj FDIL, LRI D Single Stage - One E 2022-07-0 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 123,433.70 379,594.29 Signed 2021-10-04 2021-11-01 2021-10-11 2021-11-10 2021-11-23 2021-11-24 2021-12-14 2022-01-05 2022-01-19 haka and Khulna DVH premi nvelope 4 estock Production Systems ss (Non Bank-SPD ses, Gazipur DVH with Nec ) essary Civil works for installa tion of Machinery for FDIL Ja ssore, Khulna-DVO and Baris hal FDIL (05 nos) WD-21/DLS/LDDP/2020-21 / Construction of Waste Dispos National Procure al Pit at Feni FDIL, Chattogra Improving Risk Management ment Document - m FDIL, LRI Cumilla, and Nars Single Stage - One E 2022-07-0 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 47,530.12 8,507.95 Signed 2021-10-05 2021-11-01 2021-10-12 2021-11-11 2021-11-23 2021-11-25 2021-12-14 2022-01-06 2022-01-19 hingdi DVH Premises with Ne nvelope 5 estock Production Systems ss (Non Bank-SPD cessary Civil works for install ) ation of Machineries for FDIL- Chattagream, Feni and Sylhe t FDIL Laboratory (05 nos) WD-22/DLS/LDDP/2020-21 / Construction of Waste Dispos al pit at Gaibandha Sirajgonj National Procure FDIL, Joypurhat FDIL, Necess Improving Risk Management ment Document - Single Stage - One E 2022-07-2 ary Civil works for installation IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 90,903.61 8,273.98 Signed 2021-10-20 2021-11-01 2021-10-27 2021-11-26 2021-11-23 2021-12-17 2021-12-14 2022-01-28 2022-01-19 nvelope 7 of Machineries for FDIL-Joypu estock Production Systems ss (Non Bank-SPD rhat, Gaibandha, Sirajgonj, L ) almonirhat-DVO, Dinajpur-DV O,Rajshahi-DVO and Rangpur -DVO laboratory (05 nos) National Procure WD-32 / Construction of Dist Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-03-2 rict AI Center at Noakhali wit IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 282,975.90 0.00 2021-10-03 2021-10-10 2021-11-09 2021-11-30 2022-01-04 nvelope lementation 2 h Three Storied Foundation. estock Production Systems ss (Non Bank-SPD ) National Procure WD-33 / Construction of Dis Improving Risk Management ment Document - trict AI Centre at Pabna with Single Stage - One E Pending Imp 2022-03-0 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 274,987.95 0.00 2021-09-06 2021-09-13 2021-10-13 2021-11-03 2021-12-15 Three Storied Foundation & nvelope lementation 2 estock Production Systems ss (Non Bank-SPD Drain, Repairing of Road, She ) d, Floors etc. Page 2 National Procure WD-34 / Construction of Dis Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-04-1 trict AI center at Rangpur wi IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 268,048.19 0.00 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-28 nvelope lementation 5 th 3 storied Foundation. estock Production Systems ss (Non Bank-SPD ) National Procure WD-35 / Construction of Dist Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-04-0 rict AI center at Thakurgaon IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 273,481.93 0.00 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 nvelope lementation 8 with 3 storied Foundation. estock Production Systems ss (Non Bank-SPD ) National Procure WD-36 / Construction of Dis Improving Risk Management ment Document - trict AI Center at Barishal w Single Stage - One E Pending Imp 2022-04-0 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 257,469.88 0.00 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 ith Three Storied Foundation nvelope lementation 8 estock Production Systems ss (Non Bank-SPD & Drain, Repairing of Road, ) Shed, Floors etc. National Procure WD-37 / Construction of Dis Improving Risk Management ment Document - trict AI Center at Sylhet with Single Stage - One E Pending Imp 2022-04-2 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 270,060.24 0.00 2021-10-27 2021-11-03 2021-12-03 2021-12-24 2022-02-04 Three Storied Foundation a nvelope lementation 2 estock Production Systems ss (Non Bank-SPD nd Training Center at Sylhet ) Dairy Farm. National Procure WD-38 / Construction of Dist Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-04-0 rict AI Center at Faridpur wi IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 285,048.19 0.00 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 nvelope lementation 8 th Three Storied Foundation estock Production Systems ss (Non Bank-SPD & Drain. ) National Procure WD-41 / Construction of Dist Improving Risk Management ment Document - rict AI Center at Chattogram Single Stage - One E Pending Imp 2022-04-0 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 232,602.41 0.00 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 with Three Storied Foundatio nvelope lementation 8 estock Production Systems ss (Non Bank-SPD n & Drain, Repairing of Road, ) Shed, Floors etc. WD-43/DLS/LDDP/2020-21 / National Procure Construction of Hygienic Ani ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-07-1 mal Slaughter House/ Wet M IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 1,290,012.05 0.00 2021-10-14 2021-10-21 2021-11-20 2021-12-17 2022-01-21 Chain Development nvelope lementation 4 arket at Upazila level with n ss (Non Bank-SPD atural Drainage System (05 n ) os) WD-44/DLS/LDDP/2020-21 / National Procure Construction of Hygienic Ani ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2021-10-2 mal Slaughter House/ Wet M IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 1,290,012.05 0.00 2020-08-06 2020-08-13 2020-09-03 2020-09-17 2020-10-29 Chain Development nvelope lementation 4 arket at Upazila level with na ss (Non Bank-SPD tural Drainage System (05 no ) s) WD-45/DLS/LDDP/2020-21 / National Procure Construction of Hygienic Ani ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-07-0 mal Slaughter House/wet ma IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 1,290,012.05 0.00 2021-10-05 2021-10-12 2021-11-11 2021-11-25 2022-01-06 Chain Development nvelope lementation 5 rket at Upazila level with na ss (Non Bank-SPD tural Drainage system (05 no ) s) National Procure WD-81 / Construction of Dis ment Document - trict level Hygienic Slaughter Market Linkages and Value Single Stage - One E Pending Imp 2022-07-2 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 3,174,987.95 0.00 2021-10-20 2021-10-30 2021-11-29 2021-12-20 2022-01-24 House with necessary Draina Chain Development nvelope lementation 3 ss (Non Bank-SPD ge System (05 nos) ) National Procure WD-82 / Construction of Dis ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-07-0 trict level Hygienic Slaughter IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 3,174,987.95 0.00 2021-10-03 2021-10-10 2021-11-09 2021-11-30 2022-01-04 Chain Development nvelope lementation 3 House with necessary Draina ss (Non Bank-SPD ge System ) WD-85 / Construction of Mod Request for Bids - ern Semi Automatic Slaughte Market Linkages and Value Open - Internationa Single Stage - One E Works (without pr 10,000,000.0 Pending Imp 2020-08-1 IDA / 63300 Prior Request for Bids 0.00 2020-03-01 2020-03-15 2020-04-05 2020-04-26 2020-05-31 r House with Drainage syste Chain Development l nvelope equalification) SP 0 lementation 6 m at Chattagram City Corpo D ration. WD-87 / Construction of Mod Request for Bids - ern Semi Automatic Slaughte Market Linkages and Value Open - Internationa Single Stage - One E Works (without pr 10,000,000.0 Pending Imp 2022-11-2 IDA / 63300 Prior Request for Bids 0.00 2021-12-20 2022-01-03 2022-02-17 2022-04-03 2022-05-31 r House with Drainage syste Chain Development l nvelope equalification) SP 0 lementation 7 m at Rajshahi City Corporati D on. National Procure WD-88 (1) / Construction of ment Document - Seven Storied Dormitory Buil Market Linkages and Value Single Stage - One E Pending Imp 2022-09-0 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 968,674.70 0.00 2021-12-01 2021-12-08 2022-01-07 2022-01-28 2022-03-11 ding, Main Gate, Boundary W Chain Development nvelope lementation 7 ss (Non Bank-SPD all and Entry Road from Dhak ) a Aricha Highway. WD-101 / Construction of Bio Gas Plant, with distribution li National Procure ne, Mechanical System for dr ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-06-1 ying the slurry, Liquid extract IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 843,373.49 0.00 2021-12-15 2021-12-22 2022-01-21 2022-02-11 2022-03-18 Chain Development nvelope lementation 6 or, shed for dryers Manure Pl ss (Non Bank-SPD ant Manure Plant- 20 ton at S ) avar CCDBF including remod eling and activation of existi ng 4 nos National Procure WD-103 / Construction of Tr Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-08-1 aining center at Bogura Dairy IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 111,746.99 0.00 2021-11-17 2021-11-24 2021-12-24 2022-01-14 2022-02-18 nvelope lementation 7 Farm. estock Production Systems ss (Non Bank-SPD ) National Procure WD-105 / Construction of On Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-07-2 e Storied Training Center (18 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 164,662.65 0.00 2021-10-25 2021-11-01 2021-12-01 2021-12-22 2022-01-26 nvelope lementation 5 5 Sqm) and Godown at Sylh estock Production Systems ss (Non Bank-SPD et Dairy Farm. ) National Procure WD-106 / Construction of on Improving Risk Management ment Document - e Storied Training Center (18 Single Stage - One E Pending Imp 2022-08-1 IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 355,180.72 0.00 2021-11-10 2021-11-17 2021-12-17 2022-01-07 2022-02-11 5 Sqm), Cattle Shed (2 nos e nvelope lementation 0 estock Production Systems ss (Non Bank-SPD ach 576.50 Sqm) at Faridpur ) . National Procure WD-107 / Construction of Tr Improving Risk Management ment Document - Single Stage - One E Pending Imp 2022-08-3 aining Center,Boundary Wall IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 1 Envelope proce 215,819.28 0.00 2021-11-30 2021-12-07 2022-01-06 2022-01-27 2022-03-03 nvelope lementation 0 and Mini Deep Tube Well at estock Production Systems ss (Non Bank-SPD Chattogram. ) National Procure LDDP/W-17 / Construction w ment Document - orks (Sqm) for establishment Market Linkages and Value Single Stage - One E Under Imple 2022-06-1 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 159,763.31 95,285.65 2021-10-05 2022-03-21 2021-10-10 2021-11-09 2022-04-13 2021-12-09 2022-04-28 2022-01-20 of demonstration Farm for in Chain Development nvelope mentation 9 ss (Non Bank-SPD novative private Farmers. Ba ) risal division National Procure LDDP/W-115 / Repair & Reno Project Management Monitor Single Stage - One E ment Document - 2022-07-1 vation of CDIL, FDIL & Nutriti IDA / 63300 Post Request for Bids Open - National 333,251.63 255,537.74 Signed 2021-10-03 2021-11-03 2021-10-08 2021-11-07 2020-11-28 2021-12-07 2022-01-12 2022-01-18 2022-02-01 ing and Evaluation nvelope 1 Envelope proce 7 on Lab. ss (Non Bank-SPD ) LDDP/W-8 / Construction of National Procure Small climate resilient housin ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-07-0 g for -5 cows Farms & Medi IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 123,538.46 0.00 2021-10-20 2021-10-25 2021-11-24 2021-12-24 2022-02-04 Chain Development nvelope lementation 4 um Climate Resilient housin ss (Non Bank-SPD g for 10 Cows Farms Khuln ) a division Page 3 National Procure LDDP/W-15 / Construction w ment Document - orks for establishment of de Market Linkages and Value Single Stage - One E Under Imple 2022-07-0 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 319,526.62 186,449.43 2021-10-20 2022-03-21 2021-10-25 2021-11-24 2022-04-13 2021-12-24 2022-04-27 2022-02-04 monstration Farm for innova Chain Development nvelope mentation 4 ss (Non Bank-SPD tive private Farmers. Khulna ) division LDDP/W-5 / Construction of National Procure Small climate resilient housin ment Document - Market Linkages and Value Single Stage - One E Pending Imp 2022-05-0 g for -5 cows Farms & Medi IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 103,053.25 0.00 2021-09-23 2021-09-28 2021-10-28 2021-11-27 2022-01-08 Chain Development nvelope lementation 8 um Climate Resilient housin ss (Non Bank-SPD g for 10 Cows Farms Barisa ) l division National Procure LDDP/W-116A / Construction ment Document - of Cow Shed-2 nos., Heifer S Market Linkages and Value Single Stage - One E 2023-02-2 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 89,411.76 63,475.26 Signed 2022-02-15 2022-03-15 2022-02-22 2022-03-22 2022-04-05 2022-04-21 2022-04-28 2022-06-02 2022-06-08 hed-2 nos. & Manure process Chain Development nvelope 7 ss (Non Bank-SPD or/ pit-2nos. at Faridpur and ) Barishal Dairy farm National Procure LDDP/W-117 / Construction ment Document - of Cow Shed-2nos., Heifer Sh Market Linkages and Value Single Stage - One E 2023-03-0 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 89,411.76 66,848.08 Signed 2022-02-20 2022-03-15 2022-02-27 2022-03-27 2022-04-05 2022-04-26 2022-04-28 2022-06-07 2022-06-01 ed-2 nos. & Manure processo Chain Development nvelope 4 ss (Non Bank-SPD r/ pit-2nos. at Rajshahi and B ) ogura Dairy farm National Procure LDDP/W-118 / Construction ment Document - Market Linkages and Value Single Stage - One E 2023-03-0 of Cow Shed, Heifer Shed & IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 44,705.88 35,800.17 Signed 2022-02-23 2021-11-01 2022-03-02 2022-03-30 2021-11-23 2022-04-29 2021-12-14 2022-06-10 2022-01-19 Chain Development nvelope 7 Manure processor/ pit at Sylh ss (Non Bank-SPD et Dairy farm ) National Procure LDDP/W-119 / Construction ment Document - of Cow Shed, Heifer Shed & Market Linkages and Value Single Stage - One E 2023-03-1 IDA / 63300 Post Request for Bids Open - National 1 Envelope proce 44,705.88 32,291.20 Signed 2022-02-27 2022-03-16 2022-03-06 2022-04-03 2022-04-06 2022-05-03 2022-04-28 2022-06-14 2022-06-08 Manure processor/ pit at Cen Chain Development nvelope 1 ss (Non Bank-SPD tral Cattle Breeding and Dair ) y farm, Savar, Dhaka National Procure LDDP/W-116 / Construction ment Document - of a) Cow Shed, b) Heifer She Single Stage - One E 2022-06-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1 Envelope proce 269,822.48 0.00 Canceled 2021-09-15 2021-09-20 2021-10-20 2021-11-19 2021-12-31 d & Manure processor/ pit fo nvelope 9 ss (Non Bank-SPD r 06 nos Govt. Dairy Farm. ) LDDP/W-1 / Construction of Single Stage - One E Other (with field f Pending Imp 2023-07-2 Small and Medium Climate re IDA / 63300 Productivity Improvement Post Request for Bids Open - National 103,989.47 0.00 2022-10-13 2022-10-18 2022-11-17 2022-12-17 2023-01-28 nvelope or explanation) lementation 7 silient housing for Farms at D haka Division LDDP/W-2 / Construction of Small and Medium Climate re Single Stage - One E Other (with field f Pending Imp 2023-06-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 91,663.15 0.00 2022-09-06 2022-09-11 2022-10-11 2022-11-10 2022-12-22 silient housing for Farms at C nvelope or explanation) lementation 0 hittagong Division LDDP/W-3 / Construction of Single Stage - One E Other (with field f Pending Imp 2023-07-1 Small and Medium Climate re IDA / 63300 Productivity Improvement Post Request for Bids Open - National 91,663.15 0.00 2022-10-03 2022-10-08 2022-11-07 2022-12-07 2023-01-18 nvelope or explanation) lementation 7 silient housing for Farms at S ylhet Division LDDP/W-4 / Construction of Single Stage - One E Other (with field f Pending Imp 2023-07-0 Small and Medium Climate re IDA / 63300 Productivity Improvement Post Request for Bids Open - National 91,663.15 0.00 2022-09-22 2022-09-27 2022-10-27 2022-11-26 2023-01-07 nvelope or explanation) lementation 6 silient housing for Farms at M ymenshing LDDP/W-6 / Construction of Single Stage - One E Other (with field f Pending Imp 2023-07-3 Small and Medium Climate re IDA / 63300 Productivity Improvement Post Request for Bids Open - National 91,663.15 0.00 2022-10-17 2022-10-22 2022-11-21 2022-12-21 2023-02-01 nvelope or explanation) lementation 1 silient housing for Farms at R ajshahi LDDP/W-7 / Construction of Single Stage - One E Other (with field f Pending Imp 2023-08-1 Small and Medium Climate re IDA / 63300 Productivity Improvement Post Request for Bids Open - National 91,663.15 0.00 2022-10-23 2022-10-28 2022-10-31 2022-11-30 2023-02-19 nvelope or explanation) lementation 8 silient housing for Farms at R angpur LDDP/W-9 / Construction wor ks for establishment of demo Single Stage - One E Other (with field f Pending Imp 2023-07-3 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 198,947.36 0.00 2022-10-17 2022-10-22 2022-11-21 2022-12-21 2023-02-01 nstration Farm for innovative nvelope or explanation) lementation 1 private Farmers at Dhaka div ision LDDP/W-10 / Construction w orks for establishment of de Single Stage - One E Other (with field f Pending Imp 2023-07-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 149,210.52 0.00 2022-10-13 2022-10-18 2022-11-17 2022-12-17 2023-01-28 monstration Farm for innovat nvelope or explanation) lementation 7 ive private Farmers at Chatto gram division LDDP/W-11 / Construction w orks for establishment of de Single Stage - One E Other (with field f Pending Imp 2023-08-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 99,473.68 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 monstration Farm for innovat nvelope or explanation) lementation 3 ive private Farmers at Sylhet Division LDDP/W-12 / Construction w orks for establishment of de Single Stage - One E Other (with field f Pending Imp 2023-07-3 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 149,210.52 0.00 2022-10-17 2022-10-22 2022-11-21 2022-12-21 2023-02-01 monstration Farm for innovat nvelope or explanation) lementation 1 ive private Farmers at Myme nshing division LDDP/W-13 / Construction w orks for establishment of de Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 198,947.36 0.00 2022-11-09 2022-11-14 2022-12-14 2023-01-13 2023-02-24 monstration Farm for innovat nvelope or explanation) lementation 3 ive private Farmers at Rajsha hi Division LDDP/W-14 / Construction w orks for establishment of de Single Stage - One E Other (with field f Pending Imp 2023-08-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 248,684.21 0.00 2022-10-18 2022-10-23 2022-11-22 2022-12-22 2023-02-02 monstration Farm for innovat nvelope or explanation) lementation 1 ive private Farmers at For Ra ngpur LDDP/W-46 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-11 2022-10-16 2022-11-15 2022-12-15 2023-01-19 nvelope or explanation) lementation 8 ughter slab/wet market at Up azila level LDDP/W-47 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-0 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-21 2022-09-26 2022-10-26 2022-11-25 2023-01-06 nvelope or explanation) lementation 5 ughter slab/wet market at Up azila level LDDP/W-48 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-28 2022-10-03 2022-11-02 2022-12-02 2023-01-13 nvelope or explanation) lementation 2 ughter slab/wet market at Up azila level LDDP/W-49 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-06-2 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-13 2022-09-18 2022-10-18 2022-11-17 2022-12-22 nvelope or explanation) lementation 0 ughter slab/wet market at Up azila level LDDP/W-50 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-02 2022-10-07 2022-11-06 2022-12-06 2023-01-17 nvelope or explanation) lementation 6 ughter slab/wet market at Up azila level Page 4 LDDP/W-51 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-3 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-16 2022-10-21 2022-11-20 2022-12-20 2023-01-31 nvelope or explanation) lementation 0 ughter slab/wet market at Up azila level LDDP/W-52 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-08-0 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-18 2022-10-23 2022-11-22 2022-12-22 2023-02-02 nvelope or explanation) lementation 1 ughter slab/wet market at Up azila level LDDP/W-53 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-05 2022-10-10 2022-11-09 2022-12-09 2023-01-20 nvelope or explanation) lementation 9 ughter slab/wet market at Up azila level LDDP/W-54 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-04 2022-10-09 2022-11-08 2022-12-08 2023-01-19 nvelope or explanation) lementation 8 ughter slab/wet market at Up azila level LDDP/W-55 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-27 2022-10-02 2022-11-01 2022-12-01 2023-01-12 nvelope or explanation) lementation 1 ughter slab/wet market at Up azila level LDDP/W-56 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-2 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-10 2022-10-15 2022-11-14 2022-12-14 2023-01-25 nvelope or explanation) lementation 4 ughter slab/wet market at Up azila level LDDP/W-57 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-2 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-12 2022-10-17 2022-11-16 2022-12-16 2023-01-27 nvelope or explanation) lementation 6 ughter slab/wet market at Up azila level LDDP/W-58 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-2 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-10 2022-10-15 2022-11-14 2022-12-14 2023-01-25 nvelope or explanation) lementation 4 ughter slab/wet market at Up azila level LDDP/W-59 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-29 2022-10-04 2022-11-03 2022-12-03 2023-01-14 nvelope or explanation) lementation 3 ughter slab/wet market at Up azila level LDDP/W-60 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-07-0 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-09-20 2022-09-25 2022-10-25 2022-11-24 2023-01-05 nvelope or explanation) lementation 4 ughter slab/wet market at Up azila level LDDP/W-61 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-08-1 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-10-30 2022-11-04 2022-12-04 2023-01-03 2023-02-14 nvelope or explanation) lementation 3 ughter slab/wet market at Up azila level LDDP/W-62 / Construction/R Single Stage - One E Other (with field f Pending Imp 2023-09-0 econstruction of Hygienic Sla IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,127,063.15 0.00 2022-11-22 2022-11-27 2022-12-27 2023-01-26 2023-03-09 nvelope or explanation) lementation 5 ughter slab/wet market at Up azila level LDDP/W-81 / Construction of District level Hygienic Slaugh Single Stage - One E Other (with field f Pending Imp 2023-08-3 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-17 2022-11-22 2022-12-22 2023-01-21 2023-03-04 ter house with necessary Dra nvelope or explanation) lementation 1 inage system at Sylhet Munic ipality LDDP/W-82 / Construction of District level Hygienic Slaugh Single Stage - One E Other (with field f Pending Imp 2023-09-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-20 2022-11-25 2022-12-25 2023-01-24 2023-03-07 ter house with necessary Dra nvelope or explanation) lementation 3 inage system at Munshigonj Municipality LDDP/W-83 / Construction of District level Hygienic Slaugh Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-15 2022-11-20 2022-12-20 2023-01-19 2023-03-02 ter house with necessary Dra nvelope or explanation) lementation 9 inage system at Kustia Munic ipality LDDP/W-84 / Construction of District level Hygienic Slaugh Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-15 2022-11-20 2022-12-20 2023-01-19 2023-03-02 ter house with necessary Dra nvelope or explanation) lementation 9 inage system at Cumilla Muni cipality LDDP/W-120 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-13 2022-11-18 2022-12-18 2023-01-17 2023-02-28 ghter house with necessary nvelope or explanation) lementation 7 Drainage system at Dinajpur Municipality LDDP/W-121 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-10 2022-11-15 2022-12-15 2023-01-14 2023-02-25 ghter house with necessary nvelope or explanation) lementation 4 Drainage system at Rangpur Municipality LDDP/W-122 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-06 2022-11-11 2022-12-11 2023-01-10 2023-02-21 ghter house with necessary nvelope or explanation) lementation 0 Drainage system at Lalmonir hat Municipality LDDP/W-123 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-1 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-11-01 2022-11-06 2022-12-06 2023-01-05 2023-02-16 ghter house with necessary nvelope or explanation) lementation 5 Drainage system at Bogura Municipality LDDP/W-124 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-10-25 2022-10-30 2022-11-29 2022-12-29 2023-02-09 ghter house with necessary nvelope or explanation) lementation 8 Drainage system at Chapai N awabganj Municipality LDDP/W-125 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-08-0 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 ghter house with necessary nvelope or explanation) lementation 3 Drainage system at Noakhali Municipality LDDP/W-126 / Construction of District level Hygienic Slau Single Stage - One E Other (with field f Pending Imp 2023-06-2 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 554,778.94 0.00 2022-09-15 2022-09-20 2022-10-20 2022-11-19 2022-12-31 ghter house with necessary nvelope or explanation) lementation 9 Drainage system at Rajbari M unicipality GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 DLS/DRMP/PPA/G-06 / 16 set Project Management Monitor Single Stage - One E s of Desktop Computers/ Lap IDA / V1040 Post Request for Bids Open - National 34,579.12 28,014.20 Signed 2018-04-03 2018-04-01 2018-04-08 2018-06-27 2018-05-20 2018-04-16 2018-06-19 2018-05-15 2018-07-24 2018-05-28 2019-01-20 ing and Evaluation nvelope top Computers, Printers, UPS and accessories DLS/DRMP/PPA/G-07 / 1 no. Digital Camera, 5 nos. Digital Project Management Monitor Single Stage - One E Photocopiers, 2 nos. Fax Mac IDA / V1040 Post Request for Bids Open - National 23,565.58 12,745.56 Signed 2018-04-19 2018-04-01 2018-04-24 2018-06-27 2018-06-05 2018-04-16 2018-07-05 2018-05-17 2018-08-09 2018-06-12 2019-02-05 ing and Evaluation nvelope hine , 2 nos. Scanner, and 2 nos. Digital Multimedia Proje ctor with Screens DLS/DRMP/PPA/G-08 / 4 nos. split type 2 ton capacity Air C Project Management Monitor Single Stage - One E onditioners, 1 no. Water Heat IDA / V1040 Post Request for Bids Open - National 11,526.15 0.00 Canceled 2018-04-09 2018-04-14 2018-06-27 2018-05-26 2018-04-16 2018-06-25 2018-05-09 2018-07-30 2019-01-26 ing and Evaluation nvelope er, 2 nos. Microwave Oven, 2 nos. Water Purifier, Electroni c Appliances DLS/DRMP/PPA/G-12 / Office Project Management Monitor Single Stage - One E Furniture, Fixture, File Cabin IDA / V1040 Post Request for Bids Open - National 12,806.72 8,785.69 Signed 2018-04-23 2018-05-08 2018-04-28 2018-06-27 2018-06-09 2018-05-24 2018-07-09 2018-05-29 2018-08-13 2018-06-07 2019-02-09 ing and Evaluation nvelope et, helves, Closet, Almirah DLS/DRMP/PPA/G-01 / Procur Project Management Monitor Request for Quota Single Stage - One E ement of Office Supplies, and IDA / V1040 Post Limited 3,842.61 3,515.98 Signed 2018-04-03 2018-04-16 2018-05-29 2018-04-25 2018-11-25 ing and Evaluation tions nvelope Consumables DLS/DRMP/PPA/G-03 / Procur ement of Biding Machine, Shr Project Management Monitor Request for Quota Single Stage - One E IDA / V1040 Post Limited 3,842.61 3,538.46 Signed 2018-04-16 2018-05-08 2018-06-11 2018-05-17 2018-12-08 edder, Vacuum Cleaner, Wat ing and Evaluation tions nvelope er Dispenser, etc. DLS/DRMP/PPA/G-08A / Split Project Management Monitor Request for Quota Single Stage - One E type air conditioner 3 nos. for IDA / V1040 Post Limited 5,763.00 5,336.11 Signed 2018-06-15 2018-06-13 2018-08-10 2018-06-18 2019-02-06 ing and Evaluation tions nvelope immediate requirement DLS/DRMP/PPA/G-08B / 1 no. Water Heater, 2 nos. Microwa Project Management Monitor Request for Quota Single Stage - One E Pending Impl ve Oven, 2 nos. Water Purifie IDA / V1040 Post Limited 5,763.15 0.00 2018-06-19 2018-08-14 2019-02-10 ing and Evaluation tions nvelope ementation r, Electronic Appliances and 1 no. split type 2 ton capacit y Air Conditioner DLS/DRMP/PPA/G-09 / Office Refurbishing for the offices of Project Management Monitor Request for Quota Single Stage - One E IDA / V1040 Post Limited 3,842.61 3,422.28 Signed 2018-04-06 2018-03-18 2018-06-01 2018-03-28 2018-11-28 the Project Director and Dep ing and Evaluation tions nvelope uty Project Director DLS/DRMP/PPA/G-10 / Repair & reconstruction of civil work Project Management Monitor Single Stage - One E IDA / V1040 Post Request for Bids Open - National 19,209.68 16,093.48 Signed 2018-05-24 2018-04-08 2018-05-29 2018-06-27 2018-07-10 2018-04-23 2018-08-09 2018-05-10 2018-09-13 2018-06-06 2019-03-12 s, sanitary & water supply lin ing and Evaluation nvelope e, electrical & thai glass fittin g -Office Refurbishing DLS/DRMP/PPA/G-13 / Comp Project Management Monitor Request for Quota Single Stage - One E uter Accessories and softwar IDA / V1040 Post Limited 5,520.00 5,092.86 Signed 2018-09-10 2018-10-08 2018-09-23 2018-10-18 2018-10-08 ing and Evaluation tions nvelope e. MS office & etc. DLS/DRMP/PPA/G-14 / Split t Project Management Monitor Request for Quota Single Stage - One E IDA / V1040 Post Limited 6,404.00 5,872.30 Signed 2018-09-11 2018-10-07 2018-09-23 2018-10-18 2018-10-08 ype Air-Conditioner -3 nos. ing and Evaluation tions nvelope DLS/DRMP/PPA/G-15 / Procur Project Management Monitor Request for Quota Single Stage - One E IDA / V1040 Post Limited 4,265.00 3,891.28 Signed 2018-09-07 2018-10-07 2018-09-18 2018-10-18 2018-10-02 ement of 3 nos. laptop ing and Evaluation tions nvelope DLS/DRMP/PPA/G-16 / Water Project Management Monitor Request for Quota Single Stage - One E Heater, Microwave Oven, Fre IDA / V1040 Post Limited 5,123.00 4,707.86 Signed 2018-09-11 2018-10-07 2018-09-25 2018-10-18 2018-10-10 ing and Evaluation tions nvelope ezer, Water Purifier, Electroni c Appliances, etc. DLS/DRMP/PPA/G-17 / Phone set (land ph 02 nos, Cell pho Project Management Monitor Request for Quota Single Stage - One E IDA / V1040 Post Limited 2,945.00 2,535.23 Signed 2018-09-06 2018-08-29 2018-09-17 2018-09-10 2018-10-04 ne 2 nos, Tab 2 Nos, LED Poc ing and Evaluation tions nvelope ket/Mini Projector-01) DLS/LDDP/GD-78A / Furnitur Project Management Monitor Request for Quota Single Stage - One E Pending Impl IDA / 63300 Post Limited 2,410.00 0.00 2019-04-23 2019-05-21 2019-05-28 e for Project Management Un ing and Evaluation tions nvelope ementation it (PMU) DLS/LDDP/GD-102 / A) Interc om for Project Management Project Management Monitor Request for Quota Single Stage - One E Pending Impl IDA / 63300 Post Limited 8,434.00 0.00 2019-04-23 2019-05-21 2019-06-11 unit (50 user), B) Surveillanc ing and Evaluation tions nvelope ementation e System (Camera-minimum 10 nos) GD-45 / Equipment for impro Improving Risk Management Single Stage - One E vement of Food Safety lab. ( IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 250,000.00 244,428.67 Signed 2019-08-19 2019-12-23 2019-08-28 2019-09-11 2020-01-09 2019-09-18 2020-02-10 2019-10-23 2020-02-11 2020-01-08 nvelope BLRI) estock Production Systems GD-56 / Drug for Dairy cattle Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 216,867.47 375,945.27 Signed 2019-08-19 2020-02-20 2019-08-28 2019-09-11 2020-04-27 2019-09-18 2020-05-31 2019-10-23 2020-07-01 2020-01-08 deworming program nvelope GD-57 / Drug for Beef cattle Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 216,867.47 115,036.09 Signed 2019-08-19 2021-06-23 2019-08-28 2019-09-11 2021-08-17 2019-09-18 2021-09-20 2019-10-23 2021-10-10 2020-01-08 deworming program. nvelope GD-63 / Consumable item fo Improving Risk Management Single Stage - One E r mini diagnostic lab. and FDI IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 366,024.10 337,676.75 Signed 2019-08-19 2020-02-24 2019-08-28 2019-09-11 2020-04-27 2019-09-18 2020-07-16 2019-10-23 2020-08-17 2020-01-08 nvelope L & CDIL estock Production Systems GD-74 / Procurement of Com Project Management Monitor Single Stage - One E Pending Impl IDA / 63300 Post Request for Bids Open - National 120,481.93 0.00 2019-08-19 2019-08-29 2019-09-12 2019-09-19 2019-10-24 2020-01-09 puter and associated equipm ing and Evaluation nvelope ementation ent's GD-76 / Procurement of Phot Project Management Monitor Request for Quota Single Stage - One E IDA / 63300 Post Limited 4,939.76 4,808.66 Signed 2019-10-15 2020-06-17 2019-11-04 2020-06-25 2019-11-24 ocopier ing and Evaluation tions nvelope GD-87 / Procurement of Bi-C Project Management Monitor Single Stage - One E IDA / 63300 Post Request for Bids Open - National 759,036.14 413,768.68 Signed 2019-09-01 2019-12-22 2019-09-15 2020-08-31 2019-10-06 2020-01-08 2019-10-27 2020-01-21 2019-12-01 2020-01-23 2020-02-16 ycle for LSP ing and Evaluation nvelope GD-88 / Procurement of Tab Project Management Monitor Single Stage - One E IDA / 63300 Post Request for Bids Open - National 1,113,253.01 1,063,831.81 Signed 2019-10-01 2020-02-09 2019-10-15 2019-11-05 2020-02-26 2019-11-26 2020-03-16 2019-12-31 2020-04-20 2020-03-17 for LSP ing and Evaluation nvelope GD-89 / Procurement of Kit B Project Management Monitor Single Stage - One E IDA / 63300 Post Request for Bids Open - National 354,216.87 282,534.34 Signed 2019-10-01 2020-02-09 2019-10-15 2019-11-05 2020-02-27 2019-11-26 2020-05-20 2019-12-31 2020-06-02 2020-03-17 ox for LSP ing and Evaluation nvelope GD-66 (2) / Consumable ite Improving Risk Management Single Stage - One E ms such as emergency drug, IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 397,241.38 488,941.21 Signed 2019-09-22 2020-04-28 2019-09-27 2019-11-08 2020-05-28 2019-12-08 2020-09-06 2020-01-12 2021-07-26 2023-12-31 nvelope antiseptic etc 180 UNIT estock Production Systems Page 6 GD 66 / Procurement of Mobi Improving Risk Management Open - Internationa Single Stage - One E le Veterinary Clinic with Regi IDA / 63300 and Climate Resilience of Liv Prior Request for Bids 11,934,216.87 4,716,000.00 Signed 2020-02-09 2020-03-30 2020-03-05 2020-05-14 2020-04-16 2020-07-15 2020-05-16 2020-12-07 2020-06-27 2021-05-31 2021-06-22 l nvelope stration estock Production Systems GD-66 / Procurement of Mob Improving Risk Management Single Stage - One E ile Veterinary Clinic with Regi IDA / 63300 and Climate Resilience of Liv Prior Request for Bids Open - National 11,934,216.87 0.00 Canceled 2019-08-19 2019-09-09 2019-09-23 2019-09-30 2019-11-04 2020-01-20 nvelope stration estock Production Systems DLS/LDDP/EAP/ER/G-15 / Sup Single Stage - One E ply of 300-400L Capacity Dee IDA / 63300 Unallocated funds Post Request for Bids Open - National 265,000.00 235,611.16 Signed 2020-06-07 2020-09-02 2020-06-12 2020-07-24 2020-10-04 2020-08-23 2020-10-04 2020-09-27 2020-12-28 2021-03-26 nvelope p Freezer to store Vaccines a nd Medicines DLS/LDDP/EAP/ER/G-14 / Sup Single Stage - One E ply of 600 nos Milk Cream Se IDA / 63300 Unallocated funds Post Request for Bids Open - National 300,000.00 128,294.69 Signed 2020-06-07 2020-09-02 2020-06-12 2020-07-24 2020-10-04 2020-08-23 2020-10-04 2020-09-27 2021-01-24 2021-03-26 nvelope parator Machine (50-100lph) DLS/LDDP/EAP/ER/G-11 / Sup Open - Internationa Single Stage - One E ply of 61 Nos MVC (Double C IDA / 63300 Unallocated funds Prior Request for Bids 3,965,000.00 1,611,604.23 Signed 2020-06-30 2020-07-08 2020-07-07 2020-07-14 2020-08-18 2020-09-03 2020-09-17 2020-12-01 2020-10-22 2021-03-08 2021-10-22 l nvelope abin Pick with Canopy and C ustomization) Improving Risk Management GD-40 / Consumables item f Single Stage - One E IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 202,409.64 0.00 Canceled 2019-09-01 2019-09-15 2019-10-06 2019-10-20 2019-11-03 2019-12-01 or research Laboratories nvelope estock Production Systems DLS/LDDP/2020-21/GD-46 / Improving Risk Management Single Stage - One E Consumables for selected ne IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 37,951.81 36,907.86 Signed 2020-08-16 2020-10-20 2020-08-23 2020-09-06 2020-11-08 2020-09-20 2020-11-08 2020-11-01 2021-03-01 2020-12-31 nvelope twork of food safety laborato estock Production Systems ries DLS/LDDP/2020-21/GD-76 (1 Project Management Monitor Request for Quota Single Stage - One E ) / Photocopying and Printing IDA / 63300 Post Open - National 17,686.75 0.00 Canceled 2020-09-20 2020-10-05 2020-10-15 ing and Evaluation tions nvelope Equipment LDDP/G-75 / Procurement of Project Management Monitor Desktop Computers and Asso IDA / 63300 Post Request for Bids 120,481.93 0.00 Canceled 2021-05-10 2021-05-17 2021-06-16 2021-07-31 2021-09-11 2021-12-10 ing and Evaluation ciated Equipment. Improving Risk Management LDDP/G-43 / Procurement of Single Stage - One E IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 19,277.11 18,807.86 Signed 2020-12-24 2021-03-25 2020-12-31 2021-01-30 2021-04-04 2021-03-01 2021-04-04 2021-04-12 2021-04-05 2021-07-11 Books & Journals nvelope estock Production Systems LDDP/G-62 / Procurement of Improving Risk Management Open - Internationa Single Stage - One E Under Imple Equipment Set for Mini-Diagn IDA / 63300 and Climate Resilience of Liv Prior Request for Bids 4,481,927.71 0.00 2021-01-03 2021-08-26 2021-01-17 2021-09-02 2021-03-03 2021-04-17 2021-07-14 2022-01-10 l nvelope mentation ostic Labs at Upazila level (4 estock Production Systems 65 Upazila) LDDP/G-78 / Procurement of Laptop Computers for Capaci Improving Risk Management Single Stage - One E ty Building Support of DLS (Ri IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 95,000.00 57,702.54 Signed 2020-10-29 2021-02-22 2020-11-05 2020-12-05 2021-03-11 2021-01-04 2021-03-11 2021-02-15 2021-06-10 2021-05-16 nvelope sk-Based Inspection: Assess estock Production Systems ment, Monitoring, Communic ation) LDDP/G-67 / Procurement of Improving Risk Management Open - Internationa Single Stage - One E Mobile Veterinary Clinic (119 IDA / 63300 and Climate Resilience of Liv Prior Request for Bids 7,889,843.37 2,745,597.70 Signed 2020-10-25 2020-10-19 2020-11-08 2021-01-18 2020-12-23 2021-03-08 2021-02-06 2021-06-15 2021-04-20 2021-08-26 2021-10-17 l nvelope Nos) estock Production Systems DLS/LDDP/2020-21/GD-40 & 41 / Procurement of Consum Improving Risk Management able Items for Research Labo Single Stage - One E IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 404,819.28 394,815.26 Signed 2020-10-15 2020-11-29 2020-10-22 2020-11-21 2020-12-22 2020-12-21 2020-12-22 2021-02-01 2021-03-01 2021-05-02 ratories under Department of nvelope estock Production Systems Livestock Services (DLS)(Diff erent Chemicals, Re-Agents a nd others) GD-51 / Procurement of Syri Single Stage - One E nge, Cool Box etc for FMD, PP IDA / 63300 Productivity Improvement Post Request for Bids Open - National 266,915.67 248,355.76 Signed 2020-11-01 2020-12-30 2020-11-08 2020-11-29 2021-01-31 2020-12-20 2021-01-31 2021-01-24 2021-06-22 2021-04-24 nvelope R & ND Vaccination Program. GD-79 / Printing of Materials Market Linkages and Value Single Stage - One E Pending Impl IDA / 63300 Post Request for Bids Open - National 120,481.93 0.00 2020-12-20 2020-12-27 2021-01-17 2021-02-07 2021-03-14 2021-05-13 for different programs. Chain Development nvelope ementation GD-66 (2)/DLS/LDDP/2020-2 Improving Risk Management Single Stage - One E 1 / Equipment’s for Mobile Ve IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 459,337.35 0.00 Canceled 2020-10-31 2020-11-07 2020-11-28 2020-12-12 2021-01-16 2021-04-16 nvelope terinary Clinic (61 nos) estock Production Systems DLS/LDDP/2020-21/GD-68 / Procurement of Consumables Improving Risk Management Single Stage - One E Under Imple Items for 180 nos Mobile Vet IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 188,144.58 0.00 2020-10-15 2020-10-20 2020-10-22 2020-11-12 2020-11-15 2020-12-03 2021-01-14 2021-04-14 nvelope mentation erinary Clinic (Injection, Oint estock Production Systems ment, Liquid Vitamin etc.) GD-80 / Procurement of Goo Improving Risk Management Single Stage - One E Pending Impl ds for Farmers on Food Safet IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 120,481.93 0.00 2019-09-01 2019-09-15 2019-10-06 2019-10-27 2019-12-01 2020-02-16 nvelope ementation y. estock Production Systems GD-44 / Procurement of Com Improving Risk Management Single Stage - One E puter Hardware & software f IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 96,385.54 94,133.23 Signed 2020-11-18 2021-03-18 2020-11-25 2020-12-25 2021-04-07 2021-01-24 2021-04-07 2021-03-07 2021-06-10 2021-06-05 nvelope or Laboratories estock Production Systems LDDP/G-76(1) / Procurement Project Management Monitor Single Stage - One E of Photocopy Machine and Pri IDA / 63300 Post Request for Bids Open - National 17,686.75 0.00 Canceled 2020-11-15 2020-11-22 2020-12-13 2021-01-03 2021-02-07 2021-04-08 ing and Evaluation nvelope nting Equipment DLS/LDDP/EAP/ER/G-10 / Sup Request for Quota Single Stage - One E ply of Antiseptic Disinfectant IDA / 63300 Unallocated funds Post Limited 12,000.00 0.00 Canceled 2020-06-09 2020-08-04 2021-01-31 tions nvelope and Bleaching Powder LDDP/EAP/ER/G-10 / Procure Single Stage - One E ment of Antiseptic Disinfecta IDA / 63300 Unallocated funds Post Request for Bids Open - National 12,000.00 11,710.69 Signed 2020-11-10 2020-10-07 2020-11-17 2020-12-08 2020-10-25 2020-12-29 2020-10-25 2021-02-02 2020-12-22 2021-04-03 nvelope nt and Bleaching Powder GD-48 / Procurement of FMD IDA / 63300 Productivity Improvement Post Direct Selection Direct 296,385.54 290,096.16 Signed 2020-11-15 2020-09-30 2020-11-29 2020-12-03 2021-01-17 2021-01-27 2022-01-12 Vaccine. Project Management Monitor Request for Quota Single Stage - One E GD-43 / Books & Journal IDA / 63300 Post Limited 6,024.10 0.00 Canceled 2019-10-15 2019-11-01 2019-11-21 ing and Evaluation tions nvelope LDDP/G-78(1) / Procurement of Furniture for Capacity Buil Improving Risk Management Single Stage - One E ding Support of DLS (Risk-Ba IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 25,860.00 21,090.74 Signed 2020-11-01 2021-02-22 2020-11-08 2020-12-08 2021-03-11 2021-01-07 2021-05-23 2021-02-18 2021-06-17 2021-05-19 nvelope sed Inspection: Assessment, estock Production Systems Monitoring, Communication). Page 7 LDDP/EAP/ER/G-12 / Procure Single Stage - One E ment of 400 nos Milk Cream IDA / 63300 Unallocated funds Post Request for Bids Open - National 920,000.00 482,377.58 Signed 2020-12-20 2020-10-04 2020-12-27 2021-01-26 2020-11-03 2021-02-25 2020-11-03 2021-04-08 2021-02-24 2021-10-05 nvelope Separator Machine (350-500l ph Capacity) LDDP/EAP/ER/G-13 / Procure Single Stage - One E ment of 500 nos Milk Cream IDA / 63300 Unallocated funds Post Request for Bids Open - National 750,000.00 195,703.26 Signed 2021-01-21 2020-10-04 2021-01-28 2021-02-27 2020-11-03 2021-03-29 2020-11-03 2021-05-10 2021-02-24 2021-11-06 nvelope Separator Machine (150-200l ph Capacity) LDDP/EAP/G-9 / Procurement Single Stage - One E IDA / 63300 Unallocated funds Post Request for Bids Open - National 21,000.00 15,343.54 Signed 2020-11-22 2020-10-07 2020-11-29 2020-12-29 2020-10-25 2021-01-28 2020-10-25 2021-03-11 2021-01-17 2021-05-10 of Surgical Musk and Hand Gl nvelope oves DLS/LDDP/EAP/ER/G-9 / Supp Request for Quota Single Stage - One E IDA / 63300 Unallocated funds Post Limited 21,000.00 0.00 Canceled 2020-06-09 2020-08-04 2021-01-31 ly of Surgical Musk and Hand tions nvelope Gloves DLS/LDDP/EAP/ER/G-13 / Sup Single Stage - One E ply of 500 nos Milk Cream Se IDA / 63300 Unallocated funds Prior Request for Bids Open - National 750,000.00 0.00 Canceled 2020-06-14 2020-06-19 2020-07-31 2020-08-30 2020-10-04 2021-04-02 nvelope parator Machine (150-200lph capacity) DLS/LDDP/EAP/ER/G-12 / Sup Single Stage - One E ply of 400 nos Milk Cream Se IDA / 63300 Unallocated funds Prior Request for Bids Open - National 920,000.00 0.00 Canceled 2020-06-21 2020-06-26 2020-08-07 2020-09-06 2020-10-11 2021-04-09 nvelope parator Machine (350-500lph capacity) LDDP/G-47 / Printing of Leafl Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 470,600.00 345,525.34 Signed 2021-01-03 2021-03-28 2021-01-10 2021-02-09 2021-05-05 2021-03-26 2021-05-05 2021-05-16 2021-08-03 2021-08-14 ets, Vaccine Card and Trainin nvelope g Modules. LDDP/G-22 / Procurement of Single Stage - One E Pending Impl Farm Animals (Goat and She IDA / 63300 Productivity Improvement Post Request for Bids Open - National 117,647.00 0.00 2021-02-10 2021-02-17 2021-03-19 2021-05-03 2021-06-14 2021-09-12 nvelope ementation ep) for Govt. Farms. LDDP/G-111 / Printing of Bas Request for Quota Single Stage - One E ic Training Module for Livesto IDA / 63300 Productivity Improvement Post Open - National 19,927.71 19,260.55 Signed 2020-10-30 2021-01-01 2021-01-24 2021-02-15 tions nvelope ck Service Provider (LSP) GD-66 (1) / Procurement of Equipment for 241 nos Mobil Improving Risk Management Single Stage - One E Pending Impl e Veterinary Clinic (Small Ref IDA / 63300 and Climate Resilience of Liv Prior Request for Bids Open - National 1,814,759.04 0.00 2019-10-31 2019-11-21 2019-12-05 2019-12-12 2020-01-16 2020-04-02 nvelope ementation rigerator, Digital Ultrasound estock Production Systems Machine, Surgical Kits etc.) LDDP/G-16(III) / Procurement of Feed (For cow & calves) an Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 77,088.75 0.00 2021-09-02 2021-09-07 2021-10-07 2021-11-06 2021-12-18 2022-03-18 d related Utility for 06 nos of nvelope ementation Govt. breeding center LDDP/G-27 / Procurement of Feed for Complementary fee Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 294,674.55 263,709.65 Signed 2021-09-27 2022-03-23 2021-10-04 2021-11-03 2022-04-24 2021-12-18 2022-06-02 2022-01-29 2022-06-16 2022-05-29 ding practices during pregna nvelope ncy and calf rearing LDDP/G-42 / Procurement of Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 198,816.56 0.00 2021-09-28 2021-10-05 2021-11-04 2021-12-19 2022-01-30 2022-04-30 Consumables for Laboratorie nvelope ementation s LDDP/G-48(I) / Procurement Pending Impl IDA / 63300 Productivity Improvement Post Direct Selection Direct 291,124.26 0.00 2021-11-29 2021-12-09 2022-02-19 2022-06-19 of FMD Vaccine ementation LDDP/G-104 / Procurement o Single Stage - One E f Animal Feeds (Goat and Sh IDA / 63300 Productivity Improvement Post Request for Bids Open - National 47,060.00 71,107.84 Signed 2021-12-15 2021-12-29 2021-12-22 2022-01-12 2022-01-23 2022-02-02 2022-03-06 2022-03-16 2022-04-03 2022-06-14 nvelope eep) for Govt. Farms LDDP/G-39 / Procurement of Improving Risk Management Laboratory Equipment for Im Open - Internationa Single Stage - One E Under Imple IDA / 63300 and Climate Resilience of Liv Prior Request for Bids 2,409,638.55 0.00 2021-10-05 2021-10-17 2021-10-19 2021-12-22 2021-12-03 2022-01-05 2022-01-17 2022-07-07 2022-04-15 2022-10-12 provement of Existing Labora l nvelope mentation estock Production Systems tory of Department of Livesto ck Services (DLS) DLS/LDDP/2020-21/GD-64 / Procurement of Consumables Single Stage - One E for Mini-Diagnostic Labs (465 IDA / 63300 Productivity Improvement Post Request for Bids Open - National 366,024.10 350,203.62 Signed 2021-09-30 2021-12-23 2021-10-07 2021-10-28 2022-01-16 2021-11-11 2022-02-13 2021-12-23 2022-03-13 2022-03-23 nvelope nos), FDIL (9 nos) & DVH (61 nos) (Autoclave Machine, Pre cision Balance etc.) LDDP/G-75(1) / Procurement Project Management Monitor Single Stage - One E of Desktop Computers, Printe IDA / 63300 Post Request for Bids Open - National 134,917.00 132,643.62 Signed 2021-09-01 2021-10-07 2021-09-06 2021-10-06 2021-11-04 2021-10-10 2022-01-17 2021-11-23 2022-01-30 2022-03-23 ing and Evaluation nvelope rs, Scanners and Photocopier s etc. LDDP/G-103 / Procurement o Single Stage - One E Pending Impl f Utensils for Farms (Dairy Ca IDA / 63300 Productivity Improvement Post Request for Bids Open - National 447,000.00 0.00 2021-09-30 2021-10-07 2021-11-06 2021-12-06 2022-01-17 2022-04-17 nvelope ementation ttle, Beef Cattle, Goat and Sh eep) LDDP/G-113 / Procurement o Single Stage - One E f Breeding Animals (Heifer an IDA / 63300 Productivity Improvement Post Request for Bids Open - National 647,058.00 639,083.19 Signed 2021-02-01 2021-10-11 2021-02-08 2021-03-10 2021-11-15 2021-04-24 2022-01-03 2021-06-07 2022-01-19 2021-10-05 nvelope d Bulls) for Govt. Breeding C enters. LDDP/G-60 / Procurement of Machines for Dairy Cattle Ear ly Pregnancy Diagnosis Tool ( Improving Risk Management Single Stage - One E USG) (30 set), Equipment (35 IDA / 63300 and Climate Resilience of Liv Prior Request for Bids Open - National 1,891,566.27 0.00 Canceled 2021-01-03 2021-01-17 2021-02-16 2021-04-02 2021-05-14 2021-08-12 nvelope set) for Expansion/ Upgrade estock Production Systems of DLS Capacity for Veterinar y Supervision and Services D elivery including FDIL and DV H. LDDP/G-60A / Procurement o f Machines for Dairy Cattle E arly Pregnancy Diagnosis Too Open - Internationa Single Stage - One E l (USG) (30 set), Equipment ( IDA / 63300 Productivity Improvement Prior Request for Bids 1,891,566.27 1,600,628.79 Signed 2021-09-30 2022-04-24 2021-10-07 2022-04-27 2021-11-18 2021-12-15 2022-01-02 2022-04-28 2022-03-03 2022-05-31 2022-06-01 l nvelope 35 set) for Expansion/ Upgra de of DLS Capacity for Veteri nary Supervision and Service s Delivery including FDIL and DVH. LDDP/G-66(1) / Procurement of Equipment for 241 nos Mo Open - Internationa Single Stage - One E bile Veterinary Clinic (Small IDA / 63300 Productivity Improvement Prior Request for Bids 1,814,759.04 1,041,372.25 Signed 2021-09-15 2021-10-10 2021-09-22 2021-10-17 2021-11-03 2021-12-07 2021-12-18 2022-04-21 2022-02-14 2022-05-24 2022-06-14 l nvelope Refrigerator, Digital Ultrasou nd Machine, Surgical Kits etc. ) WD-39 / Construction of Dis Improving Risk Management Single Stage - One E Pending Impl trict AI Center at Mymensin IDA / 63300 and Climate Resilience of Liv Post Request for Bids Open - National 239,554.22 0.00 2021-09-23 2021-09-30 2021-10-30 2021-11-20 2021-12-25 2022-03-12 nvelope ementation gh with Three Storied Found estock Production Systems ation. LDDP/G-94 / Procurement of Single Stage - One E Equipment for existing Feed IDA / 63300 Productivity Improvement Post Request for Bids Open - National 206,272.18 195,151.64 Signed 2021-10-20 2021-12-30 2021-10-25 2021-11-24 2022-01-24 2021-12-24 2022-02-13 2022-01-28 2022-03-03 2022-04-28 nvelope Analysis Lab. at district Level Page 8 LDDP/G-70 / Procurement of Single Stage - One E Pending Impl Consumables- emergency dr IDA / 63300 Productivity Improvement Post Request for Bids Open - National 360,520.71 0.00 2021-09-20 2021-09-25 2021-10-25 2021-11-24 2022-01-05 2022-04-05 nvelope ementation ugs, antiseptic & disinfectant for MVC LDDP/G-105 / Procurement o f Poultry DOC (Broiler, Sonali Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 828,402.36 0.00 2021-10-05 2021-10-10 2021-11-09 2021-12-09 2021-12-25 2022-03-25 , Turkey, Guinea fowl, Quail L nvelope ementation ocal chicken) under Investme nt support LDDP/G-115 / Supply of Woo Request for Quota Single Stage - One E IDA / 63300 Productivity Improvement Post Open - National 5,917.00 5,285.37 Signed 2021-09-20 2021-11-15 2021-10-07 2022-01-14 den Calendar with Paper Box. tions nvelope LDDP/G-98 / Procurement of Open - Internationa Single Stage - One E Under Imple Hygienic Cleaning Tools, Can IDA / 63300 Productivity Improvement Prior Request for Bids 4,402,366.86 0.00 2021-09-30 2022-06-29 2021-10-05 2022-07-06 2021-11-16 2021-12-16 2022-02-12 2022-07-12 l nvelope mentation s and Pails for Farm Level Col lection. LDDP/G-67(I) / Procurement Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 880,177.51 695,110.98 Signed 2021-09-22 2021-11-17 2021-09-27 2021-10-27 2021-12-06 2021-11-26 2022-03-02 2022-01-07 2022-03-22 2022-05-07 of equipment for Mobile Vete nvelope rinary Clinic LDDP/G-16(I) / Procurement Single Stage - One E of Heifer for Breed improvem IDA / 63300 Productivity Improvement Post Request for Bids Open - National 426,035.50 412,038.11 Signed 2021-10-14 2021-11-17 2021-10-21 2021-11-20 2021-12-15 2022-01-04 2022-01-03 2022-02-15 2022-01-19 2022-06-15 nvelope ent program of Govt. 06 nos breeding center LDDP/G-16(II) / Procurement of Machineries & equipment’ Single Stage - One E IDA / 63300 Productivity Improvement Post Request for Bids Open - National 296,213.02 269,463.16 Signed 2021-09-15 2021-10-07 2021-09-22 2021-10-22 2021-10-31 2021-12-06 2022-01-03 2022-01-17 2022-01-24 2022-05-17 s (Roughage Shredder, Feed nvelope mixer & Tractor) for 06 nos o f Govt. breeding center LDDP/G-52 / Procurement of Single Stage - One E Syringe, Needle, Cool box, et IDA / 63300 Productivity Improvement Post Request for Bids Open - National 262,177.51 220,053.76 Signed 2021-09-09 2021-10-07 2021-09-16 2021-10-16 2021-10-31 2021-11-30 2021-11-29 2022-01-11 2021-12-12 2022-05-11 nvelope c. for FMD vaccination progra m LDDP/G-106 / Procurement o f Feed and Medicine-Vaccine Single Stage - One E Pending Impl for Broiler-200 and Sonali, Tu IDA / 63300 Productivity Improvement Post Request for Bids Open - National 354,117.65 0.00 2022-02-01 2022-02-06 2022-03-06 2022-04-05 2022-05-17 2022-09-14 nvelope ementation rkey, Guinea fowl & Quail-20 0 under Investment support t o the Farmer LDDP/G-107 / Procurement o f equipment (hand feed trolly , bucket, milk can, milk meas Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 43,941.17 0.00 2022-02-06 2022-02-13 2022-03-13 2022-04-12 2022-05-24 2022-08-22 uring pot etc.) for demonstra nvelope ementation tion Farms for innovative priv ate Farmers at Khulna & Bari sal division LDDP/G-108 / Procurement o f vitamin-mineral premix, ant Single Stage - One E Pending Impl helmintics, disinfectant etc. f IDA / 63300 Productivity Improvement Post Request for Bids Open - National 10,058.82 0.00 2022-02-13 2022-02-20 2022-03-20 2022-04-19 2022-05-31 2022-08-29 nvelope ementation or demonstration Farms for i nnovative private Farmers at Khulna & Barisal division LDDP/G-66 (II) / Procurement of Equipment for 241 nos. Mo Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 721,000.00 0.00 2022-06-15 2022-06-20 2022-07-20 2022-08-19 2022-09-30 2023-01-28 bile Veterinary Clinic (Small nvelope ementation Refrigerator, Surgical Kits etc .) LDDP/G-28 & 29 / Procureme nt of Feed for Complementar Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 524,210.52 0.00 2022-11-15 2022-11-20 2022-12-20 2023-01-19 2023-03-02 2023-08-29 y feeding practices during pr nvelope ementation egnancy and calf rearing LDDP/G-31 & 32 / Procureme nt of Equipment for manure management: Solid and Liqui d Separator/Gas Generator/H Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 555,789.47 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 2023-08-03 2S separator support to exist nvelope ementation ing Biodigesters (24 unit), Tr actor and other goods for Dai ry Cattle - Support to market- oriented feed and fodder pro duction (8 unit) LDDP/G-53 / Procurement of Single Stage - One E Pending Impl Syringe, Needle, Cool box, et IDA / 63300 Productivity Improvement Post Request for Bids Open - National 233,200.00 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 2023-08-03 nvelope ementation c. for FMD vaccination progra m LDDP/G-55 / Printing of Leafl ets for (i) progressive manag ement of Mastitis, Reproducti ve and Metabolic Diseases; (i Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 89,473.68 0.00 2022-12-13 2022-12-18 2023-01-17 2023-02-16 2023-03-30 2023-09-26 i) dairy and beef cattle (Rumi nvelope ementation nants) parasites control prog ram; (iii) poultry farm assess ment and intervention to imp rove prevention against com mon dis LDDP/G-59 / Procurement of Single Stage - One E Pending Impl Drug for dairy and beef cattl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 189,473.68 0.00 2022-12-20 2022-12-25 2023-01-24 2023-02-23 2023-04-06 2023-10-03 nvelope ementation e deworming programme LDDP/G-61 / Procurement of Machine for Dairy Cattle Earl y Pregnancy Diagnosis Tool ( Open - Internationa Single Stage - One E Pending Impl USG) (30 set), Equipment (35 IDA / 63300 Productivity Improvement Prior Request for Bids 1,652,631.57 0.00 2022-10-02 2022-10-07 2022-11-18 2022-12-18 2023-01-29 2023-07-28 l nvelope ementation set) for expansion/upgrade of DLS capacity for veterinary s upervision and services deliv ery including FDIL and DVH LDDP/G-62A / Procurement o Single Stage - One E Pending Impl f Equipment set for mini-diag IDA / 63300 Productivity Improvement Post Request for Bids Open - National 1,263,157.89 0.00 2022-09-01 2022-09-06 2022-10-18 2022-11-17 2022-12-29 2023-06-27 nvelope ementation nostic labs at Upazila level LDDP/G-80 & 81 / Procureme nt of Goods for farmers on Fo Single Stage - One E Pending Impl od Safety, Quality Assurance IDA / 63300 Productivity Improvement Prior Request for Bids Open - National 3,745,605.26 0.00 2022-11-22 2022-11-27 2022-12-27 2023-01-26 2023-03-09 2023-09-05 nvelope ementation and Public Health- Training a nd demonstration of different food safety modalities LDDP/G-99 / Procurement of Open - Internationa Single Stage - One E Pending Impl Hygienic Cleaning Tools, Can IDA / 63300 Productivity Improvement Prior Request for Bids 3,947,368.42 0.00 2023-01-30 2023-02-04 2023-03-18 2023-04-17 2023-05-29 2023-11-25 l nvelope ementation s and Pails for Farm Level Col lection LDDP/G-109 / Printing of curr iculum and syllabus for FFS, Single Stage - One E Pending Impl FFS operational manual, FFS IDA / 63300 Productivity Improvement Prior Request for Bids Open - National 2,368,157.89 0.00 2023-01-30 2023-02-04 2023-03-18 2023-04-17 2023-05-22 2023-11-18 nvelope ementation Books, Livestock Extension M anual and Different Food Saf ety Modules Page 9 LDDP/G-110 / Procurement o f equipment (hand feed trolly , bucket, milk can, milk meas Single Stage - One E Pending Impl uring pot etc.) for demonstra IDA / 63300 Productivity Improvement Post Request for Bids Open - National 137,600.00 0.00 2022-10-18 2022-10-23 2022-11-22 2022-12-22 2023-02-02 2023-08-01 nvelope ementation tion Farm for innovative priv ate Farmers at Rangpur, Rajs hahi, Dhaka, Chottogram, Syl het & Mymensingh division LDDP/G-117 / Procurement o f vitamin-mineral premix, ant helmintics, disinfectant and e Single Stage - One E Pending Impl tc. for demonstration Farm fo IDA / 63300 Productivity Improvement Post Request for Bids Open - National 31,494.73 0.00 2022-09-13 2022-09-18 2022-10-18 2022-11-17 2022-12-29 2023-06-27 nvelope ementation r innovative private Farmers at Rangpur, Rajshahi, Dhaka, Chottogram, Sylhet & Mymen singh division LDDP/G-112 / Procurement o f Poultry DOC [Broiler, Sonali, Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 81,052.63 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 2023-08-03 Quail and Local chicken] und nvelope ementation er Investment support LDDP/G-116 / Procurement o f Utensils for Farms (Dairy Ca Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 494,736.84 0.00 2022-10-20 2022-10-25 2022-11-24 2022-12-24 2023-02-04 2023-08-03 ttle, Beef Cattle, Goat and Sh nvelope ementation eep) under Investment suppo rt LDDP/G-114 / Procurement o f Feed and Medicine-Vaccine Single Stage - One E Pending Impl IDA / 63300 Productivity Improvement Post Request for Bids Open - National 316,842.10 0.00 2022-10-24 2022-10-29 2022-11-28 2022-12-28 2023-02-08 2023-08-07 for Broiler, Sonali and Quail u nvelope ementation nder Investment support NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/NC-03A / Stu Project Management Monitor Pending Impl dy tour in India for Insurance, IDA / V1040 Post Direct Selection Direct 32,017.81 0.00 2018-06-10 2018-06-15 2018-07-20 2019-01-16 ing and Evaluation ementation co-operative and Dairy Hub model in India DLS/DRMP/PPA/NC-01C / Wor Project Management Monitor Request for Quota Single Stage - One E Pending Impl IDA / V1040 Post Limited 6,300.00 0.00 2018-09-04 2018-10-30 2019-04-28 kshop, Conference, Meeting, ing and Evaluation tions nvelope ementation FGD DLS/DRMP/PPA/NC-01 / Work shop, Conference, Meeting, F Project Management Monitor Request for Quota Single Stage - One E GD: In some cases Direct Pro IDA / V1040 Post Limited 6,300.00 5,917.16 Signed 2018-06-25 2018-03-12 2018-08-20 2018-03-19 2019-02-16 ing and Evaluation tions nvelope curement and in some cases Request for Quotation, as an d when required basis. DLS/LDDP/S-72 / Vehicle Ren t for PMU (12 Months, Effecti Project Management Monitor Pending Impl ve from January, 2019). The IDA / 63300 Post Direct Selection Direct 11,566.00 0.00 2019-04-18 2019-04-22 2019-05-09 2019-12-31 ing and Evaluation ementation Agreement signing date betw een 2 parties is 19/12/2018 DLS/LDDP/EAP/ER/NCS-6 / Pr eparation of Docu Drama on i Request for Quota Single Stage - One E mportance of Farm Hygiene IDA / 63300 Unallocated funds Post Limited 7,500.00 7,488.65 Signed 2020-06-09 2020-10-08 2020-08-04 2020-10-19 2021-01-31 tions nvelope and Workers Health Safety d uring Covid-19 lock down DLS/LDDP/EAP/ER/NCS-4 / Pr eparation of TVC Dialogue on Request for Quota Single Stage - One E IDA / 63300 Unallocated funds Post Limited 6,000.00 5,971.56 Signed 2020-06-09 2020-05-20 2020-08-04 2020-05-27 2021-01-31 importance of consumption o tions nvelope f Animal Protein during coron a situation DLS/LDDP/EAP/ER/NCS-3 / Pr eparation of TVC Dialogue on Request for Quota Single Stage - One E IDA / 63300 Unallocated funds Post Limited 6,000.00 2,985.78 Signed 2020-06-09 2020-05-17 2020-08-04 2020-05-20 2021-01-31 Continuation of Farming Bus tions nvelope iness to contribute country F ood Security DLS/LDDP/EAP/ER/NCS-2 / Pr eparartion of TVC Monologue Request for Quota Single Stage - One E IDA / 63300 Unallocated funds Post Limited 4,500.00 2,891.37 Signed 2020-06-09 2020-07-15 2020-08-04 2020-07-21 2021-01-31 on Consumption of Milk, Mea tions nvelope t and Eggs to fight against C orona DLS/LDDP/EAP/ER/NCS-1 / Pr Request for Quota Single Stage - One E eparation of TVC Monologue IDA / 63300 Unallocated funds Post Limited 4,500.00 2,891.37 Signed 2020-06-09 2020-07-15 2020-08-04 2020-07-21 2021-01-31 tions nvelope on immediate response to Co rona DLS/LDDP/EAP/ER/NCS-7 / Pr eparation of Documentary on Request for Quota Single Stage - One E IDA / 63300 Unallocated funds Post Limited 8,500.00 8,078.31 Signed 2020-12-08 2020-10-20 2021-02-03 2020-11-01 2021-04-04 Development of LDDP and EA tions nvelope P for Livestock Sector DLS/LDDP/EAP/ER/NCS-8 / Pr eparation of Documentary on Request for Quota Single Stage - One E Contribution of CERC-EAP for IDA / 63300 Unallocated funds Post Limited 8,500.00 8,137.27 Signed 2021-01-04 2021-03-28 2021-02-23 2021-04-08 2021-04-24 tions nvelope Business Continuation and S upply Chain Restoration DLS/LDDP/EAP/ER/NCS-5 / Pr Request for Quota Single Stage - One E eparation of Docu Drama on i IDA / 63300 Unallocated funds Post Limited 7,500.00 7,429.68 Signed 2020-12-15 2020-10-20 2021-02-03 2020-11-01 2021-04-04 tions nvelope mportance of feeding silage t o Farm Animal DLS/DRMP/PPA/ NC-03 / Fore ign Study tour on Food safety Project Management Monitor value chain practices in USA/ IDA / V1040 Post Direct Selection Direct 64,036.00 0.00 Canceled 2018-09-17 2018-09-22 2018-10-05 2018-11-19 ing and Evaluation Canada/Europe for DG, DLS, Secretary, MOFL including go vt. team SD-80/DLS/LDDP/2020-21 / Project Management Monitor IDA / 63300 Post Direct Selection Direct 54,000.00 0.00 Canceled 2020-08-16 2020-08-21 2020-09-28 2021-03-27 Office Security and Cleaning ing and Evaluation LDDP/NC-80 / Procurement o Project Management Monitor Single Stage - One E Pending Impl IDA / 63300 Post Request for Bids Open - National 54,000.00 0.00 2021-01-05 2021-01-12 2021-02-02 2021-02-23 2021-03-30 2024-03-29 f Office Security and Cleanin ing and Evaluation nvelope ementation g Services LDDP/NCS-83 / Non Consulti Project Management Monitor Request for Quota Single Stage - One E ng Service for organizing Jour IDA / 63300 Post Limited 47,000.00 45,960.38 Signed 2022-02-15 2022-02-17 2022-04-05 2022-02-28 2022-07-04 ing and Evaluation tions nvelope nalist Fellowship Program in Livestock Sector Page 10 LDDP/NCS-89 / Non-Consulti ng Services for documentary preparation on (i) Mobile Vet Market Linkages and Value Request for Quota Single Stage - One E IDA / 63300 Post Open - National 28,236.00 49,089.50 Signed 2022-06-15 2022-08-15 2022-06-15 2022-11-13 erinary Clinic (MVC), (ii) Prod Chain Development tions nvelope ucer Group (PG) formation an d (iii) Livestock Farmers Field School. LDDP/NCS-90 / Non-Consulti Market Linkages and Value Request for Quota Single Stage - One E ng Services for documentary IDA / 63300 Post Open - National 9,412.00 6,070.21 Signed 2022-06-06 2022-08-18 2022-05-26 2022-10-17 Chain Development tions nvelope preparation on Livestock Exh ibition 2022 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/LDDP/S-67 / Agro-Busin ess Planning, Technology an d Marketing Advice and Impl Quality And Cost- Open - Internationa IDA / 63300 Productivity Improvement Prior 6,000,000.00 5,661,065.34 Signed 2019-07-25 2020-01-29 2019-08-15 2020-02-03 2019-09-28 2020-11-24 2019-10-26 2021-02-14 2019-11-25 2021-06-02 2019-12-30 2021-08-02 2020-02-03 2021-11-23 2021-02-02 ementation Support Based Selection l Livestock and Dairy Develop ment Project (LDDP) LDDP/S-39 / Consulting Servi ces for Design and Supervisi Project Management Monitor Quality And Cost- Open - Internationa IDA / 63300 Prior 3,750,000.00 2,621,583.73 Signed 2019-07-21 2019-08-08 2019-08-11 2019-08-09 2019-09-15 2020-03-08 2019-10-06 2020-06-03 2019-11-05 2020-08-05 2019-12-10 2020-12-10 2020-01-14 2021-05-15 2021-01-13 on of Civil, Electrical & Mech ing and Evaluation Based Selection l anical works and other procu rement DLS/LDDP/S-39 / Engineerin g Consulting Firm Selection f Project Management Monitor Quality And Cost- Open - Internationa IDA / 63300 Prior 3,750,000.00 0.00 Canceled 2019-04-18 2019-04-22 2019-05-12 2019-05-16 2019-05-20 2019-05-27 2019-06-17 2023-12-31 or site survey, Drawing, Desi ing and Evaluation Based Selection l gn and Supervision of constr uction works S-7 / The PMU will hire Envir Project Management Monitor Quality And Cost- onmental and Social Impact IDA / 63300 Post Open - National 361,445.78 115,355.10 Signed 2020-03-22 2020-03-22 2020-04-12 2020-05-26 2020-11-15 2020-06-23 2020-12-31 2020-07-23 2021-05-04 2020-08-27 2021-05-24 2020-10-01 2021-06-13 2023-12-31 ing and Evaluation Based Selection Assessment (ESIA) firm for 0 6 (six) Months SD-65 FAO / Participatory M apping of Farmers Group, Ba Project Management Monitor UN Agencies (Dire IDA / 63300 Post Direct 438,614.46 428,200.00 Signed 2020-07-30 2020-12-06 2021-07-30 seline Studies, National Risk ing and Evaluation ct) Analysis and Management St rategy Development SD-74 UNIDO / Gap analysis of existing legislation, draftin g legal amendments, develo Project Management Monitor UN Agencies (Dire pment of baseline data of foo IDA / 63300 Prior Direct 1,272,445.78 1,242,353.00 Signed 2020-07-08 2021-07-13 2023-06-23 ing and Evaluation ct) d safety, establishment of an imal origin food inspection pr ogram and quality assurance scheme SD-75 UNIDO / AMR Surveilla nce, risk mitigation and moni Project Management Monitor UN Agencies (Dire IDA / 63300 Prior Direct 567,530.12 554,118.00 Signed 2020-07-08 2021-03-11 2022-06-28 toring of microbial, chemical ing and Evaluation ct) & residual hazards SD-76 FAO / Farmers/Produ Project Management Monitor UN Agencies (Dire cers Group Formation and M IDA / 63300 Prior Direct 1,875,000.00 1,830,800.00 Signed 2020-07-30 2021-07-08 2023-07-15 ing and Evaluation ct) obilization for Farm Develop ment SD-77 FAO / Development of FFS Curricula, Livestock Exte nsion Manual, Animal Breedi ng & AI Policy; Livestock Exte Project Management Monitor UN Agencies (Dire IDA / 63300 Prior Direct 751,277.11 733,600.00 Signed 2020-07-30 2021-01-31 2021-07-30 nsion Policy, Vaccination Stra ing and Evaluation ct) tegy, Hatchery Act & Rules, S ustainability Model for small & medium dairy and poultry Farming, etc LDDP/S-40 / Consulting Servi Project Management Monitor Quality And Cost- Pending Impleme ces (Firm) for Website Devel IDA / 63300 Post Open - National 120,482.00 0.00 2021-01-03 2021-01-24 2021-03-24 2021-04-23 2021-06-07 2021-07-05 2021-08-09 2022-08-09 ing and Evaluation Based Selection ntation opment and Operations for P MU DLS/LDDP/S-41 / Developed Project Management Monitor Quality And Cost- Project Management Informa IDA / 63300 Post Open - National 100,000.00 0.00 Canceled 2019-06-30 2019-07-14 2019-08-04 2019-08-18 2019-08-25 2019-09-22 2019-10-06 2020-10-05 ing and Evaluation Based Selection tion System (PMIS) and Acco unting Software SD-6(3)/LDDP/DLS/2020-21 / Improving Risk Management Consulting Service (Firm) for Quality And Cost- Pending Impleme IDA / 63300 and Climate Resilience of Liv Post Open - National 150,000.00 0.00 2021-02-14 2021-02-28 2021-04-28 2021-05-28 2021-07-12 2021-08-09 2021-09-20 2022-03-19 Feasibility Study on Total Mix Based Selection ntation estock Production Systems Ration/ Densified Total Mixed Ration SD-73 / Consulting Services (Firm) for Computerized Proj ect Management and Informa Project Management Monitor Quality And Cost- Under Implement IDA / 63300 Post Open - National 100,000.00 0.00 2019-09-01 2019-07-10 2019-09-15 2019-10-13 2019-10-20 2019-10-27 2019-11-10 2019-12-01 2023-12-31 tion System (CPMIS) to Desig ing and Evaluation Based Selection ation n and Develop Computerized Data Entry and Reporting Sys tem Software DLS/DRMP/PPA/S-17 / Consul ting Services (Firm) for Desig Project Management Monitor Quality And Cost- Pending Impleme ning and Costing of Integrate IDA / V1040 Post Open - National 6,403.00 0.00 2018-09-16 2018-09-19 2018-09-26 2018-09-30 2018-10-05 2018-10-14 2018-10-30 2018-12-04 ing and Evaluation Based Selection ntation d Livestock Manure Manage ment Plant for Central Cattle Breeding & Dairy Firm - CCD F LDDP/S-84 / Consultancy Ser vices for Assessment of Impa Least Cost Selecti IDA / 63300 Productivity Improvement Post Open - National 6,804.73 0.00 Canceled 2021-10-05 2021-11-10 2021-10-26 2021-12-09 2022-01-06 2022-02-05 2022-03-12 2022-04-16 2022-10-13 ct of deworming awareness c on ampaign program LDDP/S-87 / Consultancy Ser vices for Periodic Beneficiary Project Management Monitor Quality And Cost- Open - Internationa Pending Impleme IDA / 63300 Prior 982,248.52 0.00 2021-12-28 2022-01-18 2022-03-03 2022-03-31 2022-04-30 2022-06-04 2022-07-09 2023-07-09 Assessment and Process Mon ing and Evaluation Based Selection l ntation itoring under LDDP LDDP/S-3 / Consultancy Serv Project Management Monitor Quality And Cost- Pending Impleme ices for Institutional Capacity IDA / 63300 Post Open - National 196,449.70 0.00 2021-11-01 2021-11-22 2022-01-21 2022-02-20 2022-03-22 2022-04-26 2022-05-31 2023-05-31 ing and Evaluation Based Selection ntation - Human Resources Develop ment Plan Page 11 LDDP/S-85 / Consultancy Ser vices for Assessment of Impa Market Linkages and Value Least Cost Selecti IDA / 63300 Post Open - National 6,331.36 0.00 Canceled 2021-10-20 2021-11-10 2021-11-10 2021-12-24 2022-01-21 2022-02-20 2022-03-27 2022-05-01 2022-10-28 ct of Progressive Managemen Chain Development on t of Mastitis, Reproductive an d Metabolic Diseases LDDP/S-6 / Consulting Servic es on Feasibility Study on Ba Improving Risk Management Quality And Cost- Open - Internationa Pending Impleme ngladesh Dairy Development IDA / 63300 and Climate Resilience of Liv Prior 600,000.00 0.00 2021-11-30 2021-12-21 2022-02-03 2022-03-03 2022-04-02 2022-05-07 2022-06-11 2023-06-11 Based Selection l ntation Board, Bangladesh Dairy Re estock Production Systems search Institute, Bangladesh Poultry Research Institute. SD-6 (1)/DLS/LDDP/2020-21 Improving Risk Management / Consulting Service (Firm) fo Quality And Cost- IDA / 63300 and Climate Resilience of Liv Post Open - National 150,000.00 0.00 Canceled 2021-12-01 2021-12-22 2022-02-04 2022-03-06 2022-03-20 2022-04-10 2022-05-15 2022-11-11 r Feasibility Study on Bangla Based Selection estock Production Systems desh Dairy Research Institute LDDP/S-88 / Consultancy Ser Project Management Monitor Consultant Qualifi vices for Risk Based Audit for IDA / 63300 Post Limited 42,000.00 37,495.78 Signed 2021-11-10 2021-09-23 2021-11-24 2022-01-23 2021-12-24 2022-03-07 2022-01-14 2022-03-22 2022-04-14 ing and Evaluation cation Selection CERC-EAP and LDDP. LDDP/S-68 / Consulting Servi ces for (a) Design/develop/pil ot an electronic and online-b Improving Risk Management ased cattle traceability syste Quality And Cost- Open - Internationa IDA / 63300 and Climate Resilience of Liv Prior 2,636,470.00 0.00 Canceled 2022-03-15 2022-04-05 2022-06-10 2022-07-25 2022-08-24 2022-09-28 2022-11-26 2023-11-26 m; (b) Develop Livestock Ris Based Selection l estock Production Systems k Mitigations Products (Insur ances) and services and (c) C onduct to support the develo pment of a National Livestoc k Insura LDDP/S-85A / Consultancy S ervices for Assessment of Im Project Management Monitor Consultant Qualifi Pending Impleme pact of Progressive Managem IDA / 63300 Post Limited 6,331.36 0.00 2022-02-15 2022-03-17 2022-04-16 2022-05-21 2022-11-17 ing and Evaluation cation Selection ntation ent of Mastitis, Reproductive and Metabolic Diseases LDDP/S-84A / Consultancy S ervices for Assessment of Im Project Management Monitor Consultant Qualifi Pending Impleme IDA / 63300 Post Limited 6,804.73 0.00 2022-02-22 2022-03-24 2022-04-23 2022-05-28 2022-11-24 pact of deworming awarenes ing and Evaluation cation Selection ntation s campaign program LDDP/S-83 / Consultancy Ser vices (Firm) for Journalist Fell Project Management Monitor Least Cost Selecti IDA / 63300 Post Open - National 47,337.27 0.00 Canceled 2021-10-20 2021-11-10 2021-12-24 2022-01-21 2022-02-20 2022-03-27 2022-05-01 2022-10-28 owship Program on Activities ing and Evaluation on of Livestock Sector LDDP/S-68A / Consulting Ser vices for Establishment of Pr Quality And Cost- Open - Internationa Under Implement IDA / 63300 Productivity Improvement Prior 2,636,470.00 0.00 2022-03-10 2022-02-24 2022-03-31 2022-03-14 2022-05-14 2022-06-28 2022-07-28 2022-09-01 2022-10-06 2024-10-05 e-Conditions for Bangladesh I Based Selection l ation ntegrated Network for Livest ock Information (BINLI) LDDP/S-11 / Consultancy Ser vices for Assessment of impa Market Linkages and Value Quality And Cost- Pending Impleme ct of Vaccination, Poultry far IDA / 63300 Post Open - National 54,210.52 0.00 2023-01-10 2023-01-31 2023-03-16 2023-04-13 2023-05-13 2023-06-17 2023-07-22 2024-07-21 Chain Development Based Selection ntation m management intervention s and Parasite control progra m LDDP/S-60 / Consultancy Ser vices for Awareness Building, Quality And Cost- Pending Impleme IDA / 63300 Productivity Improvement Post Open - National 78,947.36 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-29 2023-08-03 2024-08-02 Campaign on disease inform Based Selection ntation ation and reporting/traceabili ty system INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/LDDP/SD-22 / PMU will h Project Management Monitor Individual Consult Under Implement ire engineering Expert (01 Pe IDA / 63300 Post Open 202,409.00 0.00 2019-04-23 2019-05-21 2019-07-03 2019-07-05 2019-08-09 2023-01-20 ing and Evaluation ant Selection ation rson) for 42 month DLS/LDDP/S-36A / PMU will h Project Management Monitor Individual Consult ired Procurement Specialist ( IDA / 63300 Prior Open 202,409.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 ing and Evaluation ant Selection 1 nos) for 48 month DLS/LDDP/S-36B / PMU will h Project Management Monitor Individual Consult IDA / 63300 Prior Open 202,409.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 ire 01 procurement specialist ing and Evaluation ant Selection for 48 MM DLS/LDDP/S-38A / PMU will h Project Management Monitor Individual Consult ired Financial Management S IDA / 63300 Post Open 180,723.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 ing and Evaluation ant Selection pecialist (1 nos) for 50 month DLS/LDDP/S-38B / PMU will h Project Management Monitor Individual Consult ired Financial Management S IDA / 63300 Post Open 180,723.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 ing and Evaluation ant Selection pecialist (1 nos) for 50 month SD-15 / PMU will hired Junior Project Management Monitor Individual Consult Monitoring Specialist 01 (One IDA / 63300 Post Open 151,807.23 102,058.53 Signed 2019-09-15 2019-10-29 2019-10-13 2020-03-02 2019-10-20 2020-03-01 2019-11-24 2020-03-09 2023-12-31 ing and Evaluation ant Selection ) for 36 Months SD-24 / Project Management Project Management Monitor Individual Consult IDA / 63300 Prior Open 231,325.30 0.00 Canceled 2019-10-13 2019-11-13 2019-12-01 2019-12-22 2020-01-26 2023-12-31 Expert: PMU will hired expert ing and Evaluation ant Selection for 48 MM SD-27 / Junior Agribusiness S Project Management Monitor Individual Consult IDA / 63300 Post Open 86,746.99 89,627.94 Signed 2019-10-20 2019-10-29 2019-12-08 2020-06-03 2019-12-29 2020-06-03 2020-02-02 2020-07-01 2023-12-31 pecialist: PMU will hired expe ing and Evaluation ant Selection rt for 24 MM SD-34 / Environment and So Project Management Monitor Individual Consult cial Safeguard Specialist: PM IDA / 63300 Prior Open 231,325.30 192,251.93 Signed 2019-11-03 2019-11-27 2019-12-22 2020-07-05 2020-01-12 2020-07-29 2020-02-16 2020-08-09 2023-12-31 ing and Evaluation ant Selection U will hired expert for 48 MM SD-35 / Senior Procurement Project Management Monitor Individual Consult Specialist: PMU will hired exp IDA / 63300 Prior Open 231,325.30 196,072.91 Signed 2019-09-22 2020-02-24 2019-11-10 2020-07-05 2019-12-01 2020-07-29 2020-01-05 2020-09-01 2023-12-31 ing and Evaluation ant Selection ert for 48 MM SD-37 / Senior Financial Man Project Management Monitor Individual Consult agement Specialist (SFMS): P IDA / 63300 Prior Open 289,156.63 0.00 Canceled 2019-09-22 2019-11-27 2019-11-10 2020-07-05 2019-12-01 2020-01-05 2023-12-31 ing and Evaluation ant Selection MU will hired expert for 60 M M Page 12 SD-12 / PMU will hired 01 Po Project Management Monitor Individual Consult Under Implement sition of Senior Monitoring $ IDA / 63300 Post Open 231,325.30 0.00 2019-10-20 2020-01-30 2019-12-08 2019-12-29 2020-02-02 2020-07-31 ing and Evaluation ant Selection ation Evaluation Specialist (48 Mon th) SD-30 / Food Safety and Qua Project Management Monitor Individual Consult Under Implement lity Control Expert: PMU will h IDA / 63300 Post Open 202,409.64 0.00 2019-11-03 2020-01-30 2019-12-22 2020-01-12 2020-02-16 2023-12-31 ing and Evaluation ant Selection ation ired expert for 42 MM SD-20 / PMU will hired Anim Project Management Monitor Individual Consult IDA / 63300 Post Open 202,409.64 176,522.65 Signed 2019-10-24 2020-01-30 2019-11-21 2020-07-20 2019-11-28 2020-07-23 2020-01-02 2020-08-09 2024-02-21 al Health Expert 01 (One) for ing and Evaluation ant Selection 42 Months SD-17 / PMU will hire Trainin Project Management Monitor Individual Consult Under Implement g & Extension Expert 01 (On IDA / 63300 Post Open 231,325.30 0.00 2019-10-20 2020-01-30 2019-11-17 2019-11-24 2019-12-29 2024-01-28 ing and Evaluation ant Selection ation e) for 48th months SD-14 / PMU will hired 01 Po Project Management Monitor Individual Consult IDA / 63300 Post Open 231,325.30 172,327.14 Signed 2019-10-24 2020-01-30 2019-12-12 2020-11-05 2020-01-02 2020-11-05 2020-02-06 2020-12-01 2020-08-04 sition of ICT Expert (48 Mont ing and Evaluation ant Selection h) SD-18 / National Dairy Exper Project Management Monitor Individual Consult IDA / 63300 Post Open 231,325.30 176,460.22 Signed 2019-10-24 2020-02-02 2019-12-12 2020-06-07 2020-01-02 2020-07-20 2020-02-06 2020-08-10 2020-08-04 t: PMU will hired Expert for 4 ing and Evaluation ant Selection 8 MM LDDP_SD-24 / Project Manag Project Management Monitor Individual Consult Under Implement ement Expert: PMU will hired IDA / 63300 Post Open 231,325.30 0.00 2020-01-20 2019-11-19 2020-03-09 2020-03-30 2020-05-04 2020-09-01 ing and Evaluation ant Selection ation expert for 48 MM S-29 / International Slaughte Project Management Monitor Individual Consult Under Implement r/Meat Processing Expert 12 IDA / 63300 Post Open 173,493.98 0.00 2020-02-16 2020-01-30 2020-04-27 2020-08-09 2020-05-11 2020-06-15 2023-12-31 ing and Evaluation ant Selection ation person-months SD-21 / PMU will hire Animal Project Management Monitor Individual Consult Reproductive Health Expert 4 IDA / 63300 Post Open 202,409.64 152,113.70 Signed 2020-02-16 2020-01-30 2020-03-22 2021-03-22 2020-04-05 2021-03-22 2020-05-10 2021-04-01 2023-12-31 ing and Evaluation ant Selection 2 person/months SD-23 / Ruminant Nutrition e Project Management Monitor Individual Consult Under Implement IDA / 63300 Post Open 202,409.64 0.00 2020-02-16 2020-01-30 2020-03-23 2020-04-13 2020-05-18 2024-04-22 xpert: PMU will hired expert f ing and Evaluation ant Selection ation or 42 MM SD-25 / PMU will hired Clima Project Management Monitor Individual Consult Under Implement te Smart Livestock Husbandr IDA / 63300 Post Open 202,409.64 0.00 2020-02-16 2020-01-30 2020-03-22 2020-04-05 2020-05-10 2023-12-31 ing and Evaluation ant Selection ation y Expert (National) for 42 per son/months DLS/LDDP/EAP/ER/S-01 / Sel ection of Short-term Internati Individual Consult Under Implement IDA / 63300 Unallocated funds Post Limited 15,000.00 0.00 2020-05-31 2020-07-13 2020-06-05 2020-06-26 2020-07-31 2020-10-31 onal Consultant to prepare E ant Selection ation AP Implementation Field Man ual LDDP/S-33 / Consulting Servi Project Management Monitor Individual Consult Under Implement ces (Individual) of Communic IDA / 63300 Post Open 115,662.65 0.00 2021-01-14 2020-11-05 2021-03-29 2021-04-26 2021-06-07 2023-05-28 ing and Evaluation ant Selection ation ation and Public Relation Exp ert. SD-26 / Consultancy Service Project Management Monitor Individual Consult Pending Impleme s (Individual) of Senior Agri-B IDA / 63300 Prior Open 231,325.30 0.00 2019-10-20 2020-01-18 2020-02-17 2020-04-17 2024-03-15 ing and Evaluation ant Selection ntation usiness Specialist DLS/DRMP/PPA/S-08 / Gende Project Management Monitor Individual Consult IDA / V1040 Post Limited 14,727.85 0.00 Canceled 2018-06-03 2018-06-08 2018-06-29 2018-08-03 2019-01-30 r Specialist ing and Evaluation ant Selection DLS/DRMP/PPA/S-03 / Project Project Management Monitor Individual Consult IDA / V1040 Post Open 44,183.56 0.00 Canceled 2018-04-25 2018-06-13 2018-07-04 2018-08-08 2019-02-04 Management Consultant (Tea ing and Evaluation ant Selection m Leader) DLS/DRMP/PPA/S-15 / Cattle Project Management Monitor Individual Consult IDA / V1040 Post Limited 22,091.78 0.00 Canceled 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2018-12-07 Insurance Specialist ing and Evaluation ant Selection DLS/DRMP/PPA/S-12 / Market Project Management Monitor Individual Consult Development and Value Chai IDA / V1040 Post Limited 29,455.71 0.00 Canceled 2018-05-08 2018-05-13 2018-06-03 2018-07-08 2019-01-04 ing and Evaluation ant Selection n Specialist DLS/DRMP/PPA/S-07 / Monito Project Management Monitor Individual Consult IDA / V1040 Post Limited 22,091.78 0.00 Canceled 2018-04-26 2018-05-01 2018-05-22 2018-06-26 2018-12-23 ring & Evaluation Specialist ing and Evaluation ant Selection SD-64 / PMU will hired Consu lting services for preparing v Project Management Monitor Individual Consult IDA / 63300 Post Open 6,506.02 0.00 Canceled 2019-09-15 2019-10-13 2019-10-20 2019-11-24 2023-12-31 accination card, training man ing and Evaluation ant Selection ual, and leaflets etc SD-38 (B) / Consulting Servic Project Management Monitor Individual Consult es (Individual) of Junior Finan IDA / 63300 Post Open 180,722.89 151,188.18 Signed 2019-09-22 2019-10-10 2019-11-10 2019-12-15 2019-12-01 2019-12-19 2020-01-05 2020-01-16 2023-12-31 ing and Evaluation ant Selection cial Management Specialist. SD-32 / Consulting Services Project Management Monitor Individual Consult Under Implement (Individual) of Social and Gen IDA / 63300 Post Open 86,746.99 0.00 2020-02-20 2020-02-20 2020-05-05 2020-05-26 2020-06-30 2021-12-22 ing and Evaluation ant Selection ation der Specialist. SD-38 (A) / Consulting Servic Project Management Monitor Individual Consult es (Individual) of Junior Finan IDA / 63300 Post Open 180,722.89 151,188.18 Signed 2019-09-22 2019-10-10 2019-11-20 2019-12-15 2019-12-11 2021-02-11 2020-01-15 2019-12-19 2024-01-10 ing and Evaluation ant Selection cial Management Specialist SD-31 / Consulting Services Project Management Monitor Individual Consult Pending Impleme IDA / 63300 Post Open 173,493.98 0.00 2020-02-20 2020-05-11 2020-06-01 2020-07-06 2024-02-01 (Individual) of AMR Surveillan ing and Evaluation ant Selection ntation ce Expert. SD-13 / Consulting Services Project Management Monitor Individual Consult Pending Impleme (Individual) of Knowledge Ma IDA / 63300 Post Open 202,409.64 0.00 2020-02-20 2020-05-04 2020-05-25 2020-06-29 2024-01-25 ing and Evaluation ant Selection ntation nagement Specialist. DLS/DRMP/PPA/S-16 / Consul Project Management Monitor Individual Consult Pending Impleme IDA / V1040 Post Limited 36,819.64 0.00 2018-06-28 2018-07-03 2018-07-24 2018-08-28 2019-02-24 ting Services (Individual) of E ing and Evaluation ant Selection ntation ngineer. SD-28 / Consulting Services Project Management Monitor Individual Consult Pending Impleme (Individual) of International D IDA / 63300 Post Open 173,493.98 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2023-12-31 ing and Evaluation ant Selection ntation airy Processing Expert. SD-19 / Consulting Services Project Management Monitor Individual Consult Pending Impleme IDA / 63300 Post Open 202,409.64 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2023-12-31 (Individual) of Poultry Nutritio ing and Evaluation ant Selection ntation n Expert. DLS/DRMP/PPA/S-05 / Consul ting Services (Individual) of D Project Management Monitor Individual Consult Pending Impleme IDA / V1040 Post Limited 22,091.78 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 evelopment Project Proposal ing and Evaluation ant Selection ntation (DPP) Preparation Specialist Page 13 SD-36 (A) / Consulting Servic Project Management Monitor Individual Consult es (Individual) of Junior Procu IDA / 63300 Post Open 202,409.64 161,896.36 Signed 2019-09-22 2020-03-01 2019-11-10 2020-06-04 2019-12-01 2020-06-04 2020-01-05 2020-08-10 2023-12-31 ing and Evaluation ant Selection rement Specialist SD-36 (B) / Consulting Servic Project Management Monitor Individual Consult es (Individual) of Junior Procu IDA / 63300 Post Open 202,409.64 161,896.36 Signed 2019-09-22 2019-10-01 2019-11-10 2019-12-15 2019-12-01 2019-12-26 2020-01-05 2020-02-10 2023-12-31 ing and Evaluation ant Selection rement Specialist. SD-73 UNIDO / Consulting Se Improving Risk Management rvices for Establishment of Pr IDA / 63300 and Climate Resilience of Liv Prior Direct Selection Direct 2,700,000.00 0.00 Canceled 2022-02-10 2022-02-20 2022-04-26 2022-10-23 e-Conditions for Livestock Ins estock Production Systems urance in Bangladesh LDDP/S-81 / Consultancy Ser vices for Exhibition/ Demonst Pending Impleme IDA / 63300 Productivity Improvement Prior Direct Selection Direct 12,581,065.08 0.00 2022-02-01 2022-02-21 2022-04-27 2023-04-22 ration of milk & milk product ntation in school children (01 Primar y School/Upazila) LDDP/S-37A / Senior Financi Project Management Monitor Individual Consult IDA / 63300 Post Open 113,000.00 0.00 Canceled 2021-11-01 2021-12-20 2022-01-10 2022-02-14 2023-12-31 al Management Specialist (N ing and Evaluation ant Selection ational) LDDP/S-22A / Engineering Ex Project Management Monitor Individual Consult IDA / 63300 Post Open 113,000.00 130,593.99 Signed 2021-11-01 2021-10-17 2021-12-20 2022-01-23 2021-12-25 2022-02-14 2022-01-15 2022-02-15 2023-11-28 pert (National) ing and Evaluation ant Selection LDDP/S-86 / Consultancy Ser Project Management Monitor IDA / 63300 Post Direct Selection Direct 130,000.00 128,445.69 Signed 2021-09-14 2021-10-17 2021-09-24 2021-10-27 2021-11-28 2021-12-13 2022-05-27 vices for Evaluation of CERC- ing and Evaluation EAP LDDP/S-37 / Senior Financial Project Management Monitor Individual Consult Pending Impleme IDA / 63300 Post Limited 127,000.00 0.00 2021-11-21 2021-11-26 2021-12-17 2022-01-30 2024-01-20 Management Specialist (Nati ing and Evaluation ant Selection ntation onal) LDDP/S-22B / Selection of En Project Management Monitor Individual Consult Pending Impleme IDA / 63300 Post Open 197,647.00 0.00 2022-07-20 2022-09-09 2022-09-19 2022-10-24 2025-04-11 gineering Expert (Individual) ing and Evaluation ant Selection ntation LDDP/S-37B / Selection of Se Project Management Monitor Individual Consult Pending Impleme nior Financial Management S IDA / 63300 Post Open 141,177.00 0.00 2022-07-14 2022-09-10 2022-09-24 2022-10-29 2025-06-30 ing and Evaluation ant Selection ntation pecialist (Individual) LDDP/S-38(C) / Selection of J Project Management Monitor Individual Consult Pending Impleme unior Financial Management IDA / 63300 Post Open 127,058.00 0.00 2022-07-05 2022-08-28 2022-09-11 2022-10-16 2025-09-30 ing and Evaluation ant Selection ntation Specialist (Individual) Page 14