PROCUREMENT PLAN (Textual Part) Project information: Bangladesh, Project Preparation Advance (PPA) for Livestock Development-based Dairy Revolution and Meat Productions (DRMP), PPA No. IDA V104-BD Project Implementation agency: Department of Livestock Date of the Procurement Plan: October 2017 Period covered by this Procurement Plan: October 2017 - August 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and the Public Procurement Rules 2008, as amended in August 2009) , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions : a) e-GP system of the country for national competitive bidding (NCB) shall be followed using Standard/Model Procurement documents satisfactory to the Bank; b) Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; c) Bids should be submitted and opened in public in one location immediately after the deadline for submission; d) Lottery in award of contracts shall not be allowed; e) Bidders’ qualification/experience requirement shall be mandatory; f) Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable/ Other Relevant Procurement Information. Procurement Responsibility: Department of Livestock (DLS) is the implementing agency (IA) who will be responsible for all procurements Procurement Threshold Bank-financed all contracts at or above the thresholds set out in the below table 1 are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) High Substant Modera Low Type of procurement risk ial risk te risk risk Works (including turnkey, supply & installation of plant and equipment, 5 10 15 20 and PPP) Goods, information technology and 1.5 2 4 6 non-consulting services Consultants: firms 0.5 1 2 4 Consultants: individuals 0.2 0.3 0.4 0.5 Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract, including all taxes and duties payable under the contract. PROCUREMENT Bangladesh : Livestock and Dairy Development Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2018-05-26 2022-02-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161246 GPN Date: 2019-04-22 Project Name: Livestock and Dairy Development Project Loan / Credit No: IDA / V1040, IDA / 63300 D Executing Agency(ies): epartment of Livestock Services for DRMP WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DLS/DRMP/PPA/W-01 / Civil Construction of office Project Management Single Stage - One 2018-12- IDA / V1040 Post Request for Bids Open - National 131,916.00 107,296.86 Signed 2018-09-05 2018-08-12 2018-09-08 2018-09-19 2018-09-09 2018-09-24 2018-09-09 2018-10-02 2018-09-23 building: vertical extension of Monitoring and Evaluation Envelope 31 Nutrition Building, DLS DLS/LDDP/WD-88A / Repair and renovation of auditorium Market Linkages and Value Single Stage - One 2020-05- (+/- 350 Sq M) at Officers IDA / 63300 Post Request for Bids Open - National 109,157.00 148,080.77 Signed 2019-05-07 2019-08-18 2019-05-15 2019-06-10 2019-09-23 2019-06-24 2019-09-30 2019-08-01 2019-10-02 Chain Development Envelope 01 Training Institute (OTI) Savar, Dhaka DLS/LDDP/WD-90 / Construction of Existing DLS Building no-02 6th and 7th Project Management Single Stage - One 2020-07- IDA / 63300 Post Request for Bids Open - National 805,000.00 787,630.60 Signed 2019-04-25 2019-04-23 2019-04-30 2019-05-13 2019-05-23 2019-05-27 2019-05-30 2019-07-11 2019-06-03 floor including substation, lift, Monitoring and Evaluation Envelope 11 furniture, decoration etc for PMU DLS/LDDP/WD-108 / Improving Risk Management Single Stage - One 2020-05- Renovation and Repairing IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 273,048.00 231,093.97 Signed 2019-05-07 2019-08-25 2019-05-15 2019-06-10 2019-09-23 2019-06-24 2019-10-15 2019-08-01 2019-11-03 Envelope 01 works at Rajshahi Dairy Farm Livestock Production Systems DLS/LDDP/WD-109 / Improving Risk Management Single Stage - One 2020-02- Renovation and Repairing IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 106,795.00 92,669.51 Signed 2019-05-07 2019-08-25 2019-05-15 2019-06-10 2019-09-15 2019-06-24 2019-10-15 2019-08-01 2019-10-30 Envelope 01 works at Bogura Dairy Farm Livestock Production Systems DLS/LDDP/WD-110 / Improving Risk Management Single Stage - One 2020-02- Renovation and Repairing IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 109,217.00 93,148.19 Signed 2019-05-07 2019-12-16 2019-05-15 2019-06-10 2019-10-13 2019-06-24 2020-10-22 2019-08-01 2019-11-03 Envelope 01 works at Barishal Dairy Farm Livestock Production Systems DLS/LDDP/WD-111 / Improving Risk Management Single Stage - One 2020-02- Renovation and Repairing IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 109,217.00 101,531.58 Signed 2019-05-07 2019-08-07 2019-05-21 2019-06-10 2019-08-29 2019-06-24 2019-10-21 2019-08-01 2019-11-03 Envelope 01 works at Sylhet Dairy Farm Livestock Production Systems DLS/LDDP/WD-112 / Improving Risk Management Single Stage - One 2020-02- Renovation and Repairing IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 109,627.00 86,578.92 Signed 2019-05-07 2019-09-18 2019-05-15 2019-06-10 2019-10-10 2019-06-24 2019-11-19 2019-08-01 2019-12-12 Envelope 01 works at Faridpur Dairy Farm Livestock Production Systems DLS/LDDP/WD-113 / Improving Risk Management Renovation and Repairing Single Stage - One 2020-02- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 117,819.00 95,932.45 Signed 2019-05-07 2019-08-07 2019-05-15 2019-06-10 2019-08-29 2019-06-24 2019-10-03 2019-08-01 2019-10-30 works at Chattogram Dairy Envelope 01 Livestock Production Systems Farm DLS/LDDP/WD-23 / Construction of Vertical Expansion of 26 (twenty Six) Existing Upazila Livestock Development Centers (ULDC) Market Linkages and Value Single Stage - One 2020-08- IDA / 63300 Post Request for Bids Open - National 728,000.00 664,894.90 Signed 2019-05-07 2019-05-05 2019-05-15 2019-06-10 2019-06-10 2019-06-24 2019-06-25 2019-08-01 2019-07-16 for Training and service Chain Development Envelope 01 Facilities Panchagor-03 nos, Thakurgaon-02 nos, Dinajpur- 10 nos, Lalmonirhat-05 nos, Nilphamari-06 nos DLS/LDDP/WD-24 / Construction of Vertical Extension of 26 (twenty six) existing Upazila Livestock Development Centers (ULDC) Market Linkages and Value Single Stage - One 2020-08- IDA / 63300 Post Request for Bids Open - National 728,000.00 707,395.77 Signed 2019-05-26 2019-10-10 2019-06-03 2019-06-30 2019-10-27 2019-07-14 2019-11-06 2019-08-21 2019-11-28 for Training and Service Chain Development Envelope 21 Facilities Kurigram=07 nos, Gaibandha= 03 nos, Rangpur=04 nos, Bogra=08 nos and Natore=04 nos DLS/LDDP/WD-25 / Construction of Vertical Extension of 26 (twenty six) existing Upazila Livestock Development Centers (ULDC) Market Linkages and Value Single Stage - One 2020-09- IDA / 63300 Post Request for Bids Open - National 728,000.00 705,326.16 Signed 2019-06-13 2019-10-10 2019-06-23 2019-07-18 2019-10-28 2019-08-01 2019-11-12 2019-09-09 2019-11-28 for Training and Service Chain Development Envelope 09 Facilities Rajshahi=06, Nawgaon=07 nos, Pabna=06 nos, Sirajgonj=05 nos and Joypurhat=02 nos DLS/LDDP/WD-26 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Dhaka=04 nos, Market Linkages and Value Single Stage - One 2020-09- IDA / 63300 Post Request for Bids Open - National 728,000.00 698,192.98 Signed 2019-06-27 2019-07-28 2019-07-07 2019-08-01 2019-08-27 2019-08-14 2019-09-09 2019-09-19 2019-09-22 Manikgonj=04 nos, Chain Development Envelope 19 Narrayongonj=02 nos, Gazipur=02 nos, Munshigonj=03 nos, Narshingdi=03 nos, Shariatpur=04 nos and Madaripur=04 nos Page 1 DLS/LDDP/WD-27 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training Market Linkages and Value Single Stage - One 2020-11- and Service Facilities IDA / 63300 Post Request for Bids Open - National 728,000.00 711,651.18 Signed 2019-08-27 2019-07-28 2019-09-04 2019-09-30 2019-08-27 2019-10-14 2019-09-05 2019-11-11 2019-09-22 Chain Development Envelope 11 Faridpur=06 nos, Kishorgonj=07 nos, Khulna=06 nos, Satkhira=05 nos and Feni=02 nos DLS/LDDP/WD-28 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Rajbari=02 nos, Market Linkages and Value Single Stage - One 2020-12- Chottogram=05, Kustia=02 IDA / 63300 Post Request for Bids Open - National 728,000.00 704,886.04 Signed 2019-09-30 2019-08-04 2019-10-07 2019-10-28 2019-09-04 2019-11-11 2019-09-23 2019-12-17 2019-10-07 Chain Development Envelope 17 nos, Meherpur=01, Chuadanga=02 nos, Jhenaidah=04 nos, Magura=03, Narail=02, Jessore=03 and B. Baria=02 nos DLS/LDDP/WD-29 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Market Linkages and Value Single Stage - One 2020-12- IDA / 63300 Post Request for Bids Open - National 728,000.00 700,592.74 Signed 2019-10-14 2019-10-20 2019-10-21 2019-11-11 2019-11-19 2019-11-25 2019-11-26 2019-12-23 2019-12-12 Barishal=04, Barguna=02, Chain Development Envelope 23 Patuakhali=03, Jhalkhati=02, bhola=03, Pirojpur=03, Bagerhat=04, Lakhipur=03 and Noakhali=02 nos DLS/LDDP/WD-30 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Market Linkages and Value Single Stage - One 2021-01- IDA / 63300 Post Request for Bids Open - National 728,000.00 691,352.25 Signed 2019-11-12 2019-10-10 2019-11-19 2019-12-10 2019-10-29 2019-12-25 2019-11-18 2020-01-22 2019-12-02 Sylhet=04, Moulbai Bazar=04, Chain Development Envelope 22 Sunamgonj=02, Hobogonj=03, Cumilla=05, Chadpur=04 and Coxes Bazar=04 WD-83 / Construction of Pending District level Hygienic Market Linkages and Value Single Stage - One 2022-07- IDA / 63300 Post Request for Bids Open - National 3,174,987.95 0.00 Implementat 2021-07-01 2021-07-08 2021-08-07 2021-09-06 2021-10-18 Slaughter House with Chain Development Envelope 15 ion necessary Drainage System. WD-102 / Construction of one Storied Training Center Improving Risk Management Pending Single Stage - One 2022-03- and Cattle Shed at Rajshahi (5 IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 926,783.13 0.00 Implementat 2021-06-03 2021-06-10 2021-07-10 2021-08-09 2021-09-20 Envelope 19 nos each 868 Sqm) + Vetting Livestock Production Systems ion for shed and Training centers. WD-84 / Construction of Pending District level Hygienic Market Linkages and Value Single Stage - One 2022-05- IDA / 63300 Post Request for Bids Open - National 3,174,987.95 0.00 Implementat 2021-08-01 2021-08-08 2021-09-07 2021-10-07 2021-11-05 Slaughter House with Chain Development Envelope 04 ion necessary Drainage System WD-104 / Construction of one storied Training Center, Improving Risk Management Pending Single Stage - One 2022-02- Cattle Shed at Barishal, IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 306,710.84 0.00 Implementat 2021-05-10 2021-05-17 2021-06-16 2021-07-16 2021-08-20 Envelope 16 Prefabricated MS steel Section Livestock Production Systems ion Column (185+76 sqm) DLS/LDDP/WD-40 / Earth filling, Boundary wall Construction at Tangail and Improving Risk Management Pending Jamalpur DAI premises, Repair Single Stage - One 2021-10- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 115,747.00 0.00 Implementat 2021-01-20 2021-01-27 2021-02-22 2021-03-08 2021-04-15 of Tangail and Jamalpur AI Envelope 16 Livestock Production Systems ion Offices and quarter and Vetting Charge for Architectural Drawings LDDP/W-31 / Construction of Vertical Extension of 30 (thirty) existing ULDC for Training and Service Facilities Market Linkages and Value Single Stage - One 2022-01- at Chapainababgonj (3 nos), IDA / 63300 Post Request for Bids Open - National 840,000.00 822,174.97 Signed 2020-09-20 2019-10-10 2020-09-27 2020-10-27 2019-10-31 2020-11-26 2019-10-31 2021-01-07 2019-11-28 Chain Development Envelope 07 Mymensingh (6 nos), Netrokona (7 nos), Jamalpur (1 no), Sherpur (4 nos), Tangail (6 nos) and Gopalgonj (3 nos). DLS/LDDP/WD-31 / Construction of Vertical Extension of 30 (thirty) existing ULDC for Training and Service Facilities Market Linkages and Value Single Stage - One 2020-10- IDA / 63300 Prior Request for Bids Open - National 840,000.00 0.00 Canceled 2019-08-13 2019-08-21 2019-09-16 2019-09-30 2019-10-28 Chapainababgonj=03, Chain Development Envelope 28 Mymensingh=06, Netrokona=07, Jamalpur=01, Sherpur=04, Tangail=06 and Gopalgonj=03 nos WD-86 / Construction of Request for Bids - Modern Semi Automatic Pending Market Linkages and Value Single Stage - One Works (without 10,000,000.0 2020-08- Slaughter House with IDA / 63300 Prior Request for Bids Open - International 0.00 Implementat 2020-03-01 2020-03-15 2020-04-05 2020-04-26 2020-05-31 Chain Development Envelope prequalification) 0 16 Drainage system at Khulna ion SPD City Corporation WD-18/DLS/LDDP/2020-21 / Installation of Tube well for Dairy and Beef Cattle - National support to Safe water Systems Procurement Pending Single Stage - One 2022-08- for animals in Coastal Area/ IDA / 63300 Productivity Improvement Post Request for Bids Open - National Document - 1 45,000.00 0.00 Implementat 2021-11-01 2021-11-08 2021-12-08 2021-12-22 2022-02-02 Envelope 01 District/ Region- Khulna, Envelope process ion Bagerhat, Satkhira, Jessore (Non Bank-SPD) with locally developed water purification system (12 nos) Page 2 WD-19/LDDP/DLS/2020-21 / Installation of Tube well for National Dairy and Beef Cattle - Procurement Pending support to Safe water Systems Single Stage - One 2022-07- IDA / 63300 Productivity Improvement Post Request for Bids Open - National Document - 1 30,000.00 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-10 2022-01-21 for animals in Coastal Area/ Envelope 20 Envelope process ion District / Region- Barishal, (Non Bank-SPD) Bhola, Patuakhali & Perojpur (08 nos) WD-20/DLS/LDDP/2020-21 / Construction of Waste Disposal pit at Barishal FDIL, National Jassore FDIL, Manikgonj FDIL, Improving Risk Management Procurement Pending LRI Dhaka and Khulna DVH Single Stage - One 2022-07- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 123,433.70 0.00 Implementat 2021-10-04 2021-10-11 2021-11-10 2021-11-24 2022-01-05 premises, Gazipur DVH with Envelope 04 Livestock Production Systems Envelope process ion Necessary Civil works for (Non Bank-SPD) installation of Machinery for FDIL Jassore, Khulna-DVO and Barishal FDIL (05 nos) WD-21/DLS/LDDP/2020-21 / Construction of Waste Disposal Pit at Feni FDIL, National Chattogram FDIL, LRI Cumilla, Improving Risk Management Procurement Pending and Narshingdi DVH Premises Single Stage - One 2022-07- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 47,530.12 0.00 Implementat 2021-10-05 2021-10-12 2021-11-11 2021-11-25 2022-01-06 with Necessary Civil works for Envelope 05 Livestock Production Systems Envelope process ion installation of Machineries for (Non Bank-SPD) FDIL-Chattagream, Feni and Sylhet FDIL Laboratory (05 nos) WD-22/DLS/LDDP/2020-21 / Construction of Waste Disposal pit at Gaibandha Sirajgonj FDIL, Joypurhat FDIL, National Necessary Civil works for Improving Risk Management Procurement Pending Single Stage - One 2022-07- installation of Machineries for IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 90,903.61 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-28 Envelope 27 FDIL-Joypurhat, Gaibandha, Livestock Production Systems Envelope process ion Sirajgonj, Lalmonirhat-DVO, (Non Bank-SPD) Dinajpur-DVO,Rajshahi-DVO and Rangpur-DVO laboratory (05 nos) National WD-32 / Construction of Improving Risk Management Procurement Pending District AI Center at Noakhali Single Stage - One 2022-03- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 282,975.90 0.00 Implementat 2021-10-03 2021-10-10 2021-11-09 2021-11-30 2022-01-04 with Three Storied Envelope 22 Livestock Production Systems Envelope process ion Foundation. (Non Bank-SPD) WD-33 / Construction of National District AI Centre at Pabna Improving Risk Management Procurement Pending Single Stage - One 2022-03- with Three Storied Foundation IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 274,987.95 0.00 Implementat 2021-09-06 2021-09-13 2021-10-13 2021-11-03 2021-12-15 Envelope 02 & Drain, Repairing of Road, Livestock Production Systems Envelope process ion Shed, Floors etc. (Non Bank-SPD) National WD-34 / Construction of Improving Risk Management Procurement Pending Single Stage - One 2022-04- District AI center at Rangpur IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 268,048.19 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-28 Envelope 15 with 3 storied Foundation. Livestock Production Systems Envelope process ion (Non Bank-SPD) National WD-35 / Construction of Improving Risk Management Procurement Pending District AI center at Single Stage - One 2022-04- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 273,481.93 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 Thakurgaon with 3 storied Envelope 08 Livestock Production Systems Envelope process ion Foundation. (Non Bank-SPD) WD-36 / Construction of National District AI Center at Barishal Improving Risk Management Procurement Pending Single Stage - One 2022-04- with Three Storied Foundation IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 257,469.88 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 Envelope 08 & Drain, Repairing of Road, Livestock Production Systems Envelope process ion Shed, Floors etc. (Non Bank-SPD) WD-37 / Construction of National District AI Center at Sylhet Improving Risk Management Procurement Pending Single Stage - One 2022-04- with Three Storied IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 270,060.24 0.00 Implementat 2021-10-27 2021-11-03 2021-12-03 2021-12-24 2022-02-04 Envelope 22 Foundation and Training Livestock Production Systems Envelope process ion Center at Sylhet Dairy Farm. (Non Bank-SPD) National WD-38 / Construction of Improving Risk Management Procurement Pending District AI Center at Faridpur Single Stage - One 2022-04- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 285,048.19 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 with Three Storied Foundation Envelope 08 Livestock Production Systems Envelope process ion & Drain. (Non Bank-SPD) WD-41 / Construction of National District AI Center at Improving Risk Management Procurement Pending Single Stage - One 2022-04- Chattogram with Three IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 232,602.41 0.00 Implementat 2021-10-20 2021-10-27 2021-11-26 2021-12-17 2022-01-21 Envelope 08 Storied Foundation & Drain, Livestock Production Systems Envelope process ion Repairing of Road, Shed, (Non Bank-SPD) Floors etc. WD-43/DLS/LDDP/2020-21 National / Construction of Hygienic Procurement Pending Animal Slaughter House/ Wet Market Linkages and Value Single Stage - One 2022-07- IDA / 63300 Post Request for Bids Open - National Document - 1 1,290,012.05 0.00 Implementat 2021-10-14 2021-10-21 2021-11-20 2021-12-17 2022-01-21 Market at Upazila level with Chain Development Envelope 14 Envelope process ion natural Drainage System (05 (Non Bank-SPD) nos) WD-44/DLS/LDDP/2020-21 National / Construction of Hygienic Procurement Pending Animal Slaughter House/ Wet Market Linkages and Value Single Stage - One 2021-10- IDA / 63300 Post Request for Bids Open - National Document - 1 1,290,012.05 0.00 Implementat 2020-08-06 2020-08-13 2020-09-03 2020-09-17 2020-10-29 Market at Upazila level with Chain Development Envelope 24 Envelope process ion natural Drainage System (05 (Non Bank-SPD) nos) WD-45/DLS/LDDP/2020-21 National / Construction of Hygienic Procurement Pending Animal Slaughter House/wet Market Linkages and Value Single Stage - One 2022-07- IDA / 63300 Post Request for Bids Open - National Document - 1 1,290,012.05 0.00 Implementat 2021-10-05 2021-10-12 2021-11-11 2021-11-25 2022-01-06 market at Upazila level with Chain Development Envelope 05 Envelope process ion natural Drainage system (05 (Non Bank-SPD) nos) WD-81 / Construction of National District level Hygienic Procurement Pending Market Linkages and Value Single Stage - One 2022-07- Slaughter House with IDA / 63300 Post Request for Bids Open - National Document - 1 3,174,987.95 0.00 Implementat 2021-10-20 2021-10-30 2021-11-29 2021-12-20 2022-01-24 Chain Development Envelope 23 necessary Drainage System Envelope process ion (05 nos) (Non Bank-SPD) Page 3 National WD-82 / Construction of Procurement Pending District level Hygienic Market Linkages and Value Single Stage - One 2022-07- IDA / 63300 Post Request for Bids Open - National Document - 1 3,174,987.95 0.00 Implementat 2021-10-03 2021-10-10 2021-11-09 2021-11-30 2022-01-04 Slaughter House with Chain Development Envelope 03 Envelope process ion necessary Drainage System (Non Bank-SPD) WD-85 / Construction of Request for Bids - Modern Semi Automatic Pending Market Linkages and Value Single Stage - One Works (without 10,000,000.0 2020-08- Slaughter House with IDA / 63300 Prior Request for Bids Open - International 0.00 Implementat 2020-03-01 2020-03-15 2020-04-05 2020-04-26 2020-05-31 Chain Development Envelope prequalification) 0 16 Drainage system at ion SPD Chattagram City Corporation. WD-87 / Construction of Request for Bids - Modern Semi Automatic Pending Market Linkages and Value Single Stage - One Works (without 10,000,000.0 2022-11- Slaughter House with IDA / 63300 Prior Request for Bids Open - International 0.00 Implementat 2021-12-20 2022-01-03 2022-02-17 2022-04-03 2022-05-31 Chain Development Envelope prequalification) 0 27 Drainage system at Rajshahi ion SPD City Corporation. WD-88 (1) / Construction of National Seven Storied Dormitory Procurement Pending Market Linkages and Value Single Stage - One 2022-09- Building, Main Gate, Boundary IDA / 63300 Post Request for Bids Open - National Document - 1 968,674.70 0.00 Implementat 2021-12-01 2021-12-08 2022-01-07 2022-01-28 2022-03-11 Chain Development Envelope 07 Wall and Entry Road from Envelope process ion Dhaka Aricha Highway. (Non Bank-SPD) WD-101 / Construction of Bio Gas Plant, with distribution line, Mechanical National System for drying the slurry, Procurement Pending Market Linkages and Value Single Stage - One 2022-06- Liquid extractor, shed for IDA / 63300 Post Request for Bids Open - National Document - 1 843,373.49 0.00 Implementat 2021-12-15 2021-12-22 2022-01-21 2022-02-11 2022-03-18 Chain Development Envelope 16 dryers Manure Plant Manure Envelope process ion Plant- 20 ton at Savar CCDBF (Non Bank-SPD) including remodeling and activation of existing 4 nos National WD-103 / Construction of Improving Risk Management Procurement Pending Single Stage - One 2022-08- Training center at Bogura IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 111,746.99 0.00 Implementat 2021-11-17 2021-11-24 2021-12-24 2022-01-14 2022-02-18 Envelope 17 Dairy Farm. Livestock Production Systems Envelope process ion (Non Bank-SPD) National WD-105 / Construction of Improving Risk Management Procurement Pending One Storied Training Center Single Stage - One 2022-07- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 164,662.65 0.00 Implementat 2021-10-25 2021-11-01 2021-12-01 2021-12-22 2022-01-26 (185 Sqm) and Godown at Envelope 25 Livestock Production Systems Envelope process ion Sylhet Dairy Farm. (Non Bank-SPD) National WD-106 / Construction of Improving Risk Management Procurement Pending one Storied Training Center Single Stage - One 2022-08- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 355,180.72 0.00 Implementat 2021-11-10 2021-11-17 2021-12-17 2022-01-07 2022-02-11 (185 Sqm), Cattle Shed (2 nos Envelope 10 Livestock Production Systems Envelope process ion each 576.50 Sqm) at (Non Bank-SPD) Faridpur. National WD-107 / Construction of Improving Risk Management Procurement Pending Training Center,Boundary Wall Single Stage - One 2022-08- IDA / 63300 and Climate Resilience of Post Request for Bids Open - National Document - 1 215,819.28 0.00 Implementat 2021-11-30 2021-12-07 2022-01-06 2022-01-27 2022-03-03 and Mini Deep Tube Well at Envelope 30 Livestock Production Systems Envelope process ion Chattogram. (Non Bank-SPD) LDDP/W-17 / Construction National works (Sqm) for establishment Procurement Pending Market Linkages and Value Single Stage - One 2022-06- of demonstration Farm for IDA / 63300 Post Request for Bids Open - National Document - 1 159,763.31 0.00 Implementat 2021-10-05 2021-10-10 2021-11-09 2021-12-09 2022-01-20 Chain Development Envelope 19 innovative private Farmers. Envelope process ion Barisal division (Non Bank-SPD) National LDDP/W-115 / Repair & Procurement Pending Project Management Single Stage - One 2022-07- Renovation of CDIL, FDIL & IDA / 63300 Post Request for Bids Open - National Document - 1 333,251.63 0.00 Implementat 2021-10-03 2021-10-08 2021-11-07 2021-12-07 2022-01-18 Monitoring and Evaluation Envelope 17 Nutrition Lab. Envelope process ion (Non Bank-SPD) LDDP/W-8 / Construction of National Small climate resilient housing Procurement Pending for -5 cows Farms & Market Linkages and Value Single Stage - One 2022-07- IDA / 63300 Post Request for Bids Open - National Document - 1 123,538.46 0.00 Implementat 2021-10-20 2021-10-25 2021-11-24 2021-12-24 2022-02-04 Medium Climate Resilient Chain Development Envelope 04 Envelope process ion housing for 10 Cows Farms (Non Bank-SPD) Khulna division LDDP/W-15 / Construction National works for establishment of Procurement Pending Market Linkages and Value Single Stage - One 2022-07- demonstration Farm for IDA / 63300 Post Request for Bids Open - National Document - 1 319,526.62 0.00 Implementat 2021-10-20 2021-10-25 2021-11-24 2021-12-24 2022-02-04 Chain Development Envelope 04 innovative private Farmers. Envelope process ion Khulna division (Non Bank-SPD) LDDP/W-5 / Construction of National Small climate resilient housing Procurement Pending for -5 cows Farms & Market Linkages and Value Single Stage - One 2022-05- IDA / 63300 Post Request for Bids Open - National Document - 1 103,053.25 0.00 Implementat 2021-09-23 2021-09-28 2021-10-28 2021-11-27 2022-01-08 Medium Climate Resilient Chain Development Envelope 08 Envelope process ion housing for 10 Cows Farms (Non Bank-SPD) Barisal division LDDP/W-116A / Construction National of Cow Shed-2 nos., Heifer Procurement Pending Shed-2 nos. & Manure Market Linkages and Value Single Stage - One 2023-02- IDA / 63300 Post Request for Bids Open - National Document - 1 89,411.76 0.00 Implementat 2022-02-15 2022-02-22 2022-03-22 2022-04-21 2022-06-02 processor/ pit-2nos. at Chain Development Envelope 27 Envelope process ion Faridpur and Barishal Dairy (Non Bank-SPD) farm LDDP/W-117 / Construction National of Cow Shed-2nos., Heifer Procurement Pending Shed-2 nos. & Manure Market Linkages and Value Single Stage - One 2023-03- IDA / 63300 Post Request for Bids Open - National Document - 1 89,411.76 0.00 Implementat 2022-02-20 2022-02-27 2022-03-27 2022-04-26 2022-06-07 processor/ pit-2nos. at Chain Development Envelope 04 Envelope process ion Rajshahi and Bogura Dairy (Non Bank-SPD) farm National LDDP/W-118 / Construction Procurement Pending of Cow Shed, Heifer Shed & Market Linkages and Value Single Stage - One 2023-03- IDA / 63300 Post Request for Bids Open - National Document - 1 44,705.88 0.00 Implementat 2022-02-23 2022-03-02 2022-03-30 2022-04-29 2022-06-10 Manure processor/ pit at Chain Development Envelope 07 Envelope process ion Sylhet Dairy farm (Non Bank-SPD) LDDP/W-119 / Construction National of Cow Shed, Heifer Shed & Procurement Pending Market Linkages and Value Single Stage - One 2023-03- Manure processor/ pit at IDA / 63300 Post Request for Bids Open - National Document - 1 44,705.88 0.00 Implementat 2022-02-27 2022-03-06 2022-04-03 2022-05-03 2022-06-14 Chain Development Envelope 11 Central Cattle Breeding and Envelope process ion Dairy farm, Savar, Dhaka (Non Bank-SPD) National LDDP/W-116 / Construction Procurement of a) Cow Shed, b) Heifer Shed Single Stage - One 2022-06- IDA / 63300 Productivity Improvement Post Request for Bids Open - National Document - 1 269,822.48 0.00 Canceled 2021-09-15 2021-09-20 2021-10-20 2021-11-19 2021-12-31 & Manure processor/ pit for Envelope 29 Envelope process 06 nos Govt. Dairy Farm. (Non Bank-SPD) Page 4 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/G-06 / 16 sets of Desktop Computers/ Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 34,579.12 28,014.20 Signed 2018-04-03 2018-04-01 2018-04-08 2018-06-27 2018-05-20 2018-04-16 2018-06-19 2018-05-15 2018-07-24 2018-05-28 2019-01-20 Laptop Computers, Printers, Monitoring and Evaluation Envelope UPS and accessories DLS/DRMP/PPA/G-07 / 1 no. Digital Camera, 5 nos. Digital Photocopiers, 2 nos. Fax Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 23,565.58 12,745.56 Signed 2018-04-19 2018-04-01 2018-04-24 2018-06-27 2018-06-05 2018-04-16 2018-07-05 2018-05-17 2018-08-09 2018-06-12 2019-02-05 Machine , 2 nos. Scanner, and Monitoring and Evaluation Envelope 2 nos. Digital Multimedia Projector with Screens DLS/DRMP/PPA/G-08 / 4 nos. split type 2 ton capacity Air Conditioners, 1 no. Water Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 11,526.15 0.00 Canceled 2018-04-09 2018-04-14 2018-06-27 2018-05-26 2018-04-16 2018-06-25 2018-05-09 2018-07-30 2019-01-26 Heater, 2 nos. Microwave Monitoring and Evaluation Envelope Oven, 2 nos. Water Purifier, Electronic Appliances DLS/DRMP/PPA/G-12 / Office Furniture, Fixture, File Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 12,806.72 8,785.69 Signed 2018-04-23 2018-05-08 2018-04-28 2018-06-27 2018-06-09 2018-05-24 2018-07-09 2018-05-29 2018-08-13 2018-06-07 2019-02-09 Cabinet, helves, Closet, Monitoring and Evaluation Envelope Almirah DLS/DRMP/PPA/G-01 / Project Management Request for Single Stage - One Procurement of Office IDA / V1040 Post Limited 3,842.61 3,515.98 Signed 2018-04-03 2018-04-16 2018-05-29 2018-04-25 2018-11-25 Monitoring and Evaluation Quotations Envelope Supplies, and Consumables DLS/DRMP/PPA/G-03 / Procurement of Biding Project Management Request for Single Stage - One IDA / V1040 Post Limited 3,842.61 3,538.46 Signed 2018-04-16 2018-05-08 2018-06-11 2018-05-17 2018-12-08 Machine, Shredder, Vacuum Monitoring and Evaluation Quotations Envelope Cleaner, Water Dispenser, etc. DLS/DRMP/PPA/G-08A / Split Project Management Request for Single Stage - One type air conditioner 3 nos. for IDA / V1040 Post Limited 5,763.00 5,336.11 Signed 2018-06-15 2018-06-13 2018-08-10 2018-06-18 2019-02-06 Monitoring and Evaluation Quotations Envelope immediate requirement DLS/DRMP/PPA/G-08B / 1 no. Water Heater, 2 nos. Pending Microwave Oven, 2 nos. Water Project Management Request for Single Stage - One IDA / V1040 Post Limited 5,763.15 0.00 Implementati 2018-06-19 2018-08-14 2019-02-10 Purifier, Electronic Appliances Monitoring and Evaluation Quotations Envelope on and 1 no. split type 2 ton capacity Air Conditioner DLS/DRMP/PPA/G-09 / Office Refurbishing for the Project Management Request for Single Stage - One IDA / V1040 Post Limited 3,842.61 3,422.28 Signed 2018-04-06 2018-03-18 2018-06-01 2018-03-28 2018-11-28 offices of the Project Director Monitoring and Evaluation Quotations Envelope and Deputy Project Director DLS/DRMP/PPA/G-10 / Repair & reconstruction of civil works, sanitary & water Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 19,209.68 16,093.48 Signed 2018-05-24 2018-04-08 2018-05-29 2018-06-27 2018-07-10 2018-04-23 2018-08-09 2018-05-10 2018-09-13 2018-06-06 2019-03-12 supply line, electrical & thai Monitoring and Evaluation Envelope glass fitting -Office Refurbishing DLS/DRMP/PPA/G-13 / Project Management Request for Single Stage - One Computer Accessories and IDA / V1040 Post Limited 5,520.00 5,092.86 Signed 2018-09-10 2018-10-08 2018-09-23 2018-10-18 2018-10-08 Monitoring and Evaluation Quotations Envelope software. MS office & etc. DLS/DRMP/PPA/G-14 / Split Project Management Request for Single Stage - One IDA / V1040 Post Limited 6,404.00 5,872.30 Signed 2018-09-11 2018-10-07 2018-09-23 2018-10-18 2018-10-08 type Air-Conditioner -3 nos. Monitoring and Evaluation Quotations Envelope DLS/DRMP/PPA/G-15 / Project Management Request for Single Stage - One IDA / V1040 Post Limited 4,265.00 3,891.28 Signed 2018-09-07 2018-10-07 2018-09-18 2018-10-18 2018-10-02 Procurement of 3 nos. laptop Monitoring and Evaluation Quotations Envelope DLS/DRMP/PPA/G-16 / Water Heater, Microwave Oven, Project Management Request for Single Stage - One IDA / V1040 Post Limited 5,123.00 4,707.86 Signed 2018-09-11 2018-10-07 2018-09-25 2018-10-18 2018-10-10 Freezer, Water Purifier, Monitoring and Evaluation Quotations Envelope Electronic Appliances, etc. DLS/DRMP/PPA/G-17 / Phone set (land ph 02 nos, Project Management Request for Single Stage - One IDA / V1040 Post Limited 2,945.00 2,535.23 Signed 2018-09-06 2018-08-29 2018-09-17 2018-09-10 2018-10-04 Cell phone 2 nos, Tab 2 Nos, Monitoring and Evaluation Quotations Envelope LED Pocket/Mini Projector-01) DLS/LDDP/GD-78A / Pending Project Management Request for Single Stage - One Furniture for Project IDA / 63300 Post Limited 2,410.00 0.00 Implementati 2019-04-23 2019-05-21 2019-05-28 Monitoring and Evaluation Quotations Envelope Management Unit (PMU) on DLS/LDDP/GD-102 / A) Intercom for Project Pending Project Management Request for Single Stage - One Management unit (50 user), B) IDA / 63300 Post Limited 8,434.00 0.00 Implementati 2019-04-23 2019-05-21 2019-06-11 Monitoring and Evaluation Quotations Envelope Surveillance System (Camera- on minimum 10 nos) GD-45 / Equipment for Improving Risk Management Single Stage - One improvement of Food Safety IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 250,000.00 244,428.67 Signed 2019-08-19 2019-12-23 2019-08-28 2019-09-11 2020-01-09 2019-09-18 2020-02-10 2019-10-23 2020-02-11 2020-01-08 Envelope lab. (BLRI) Livestock Production Systems GD-56 / Drug for Dairy cattle Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 216,867.47 375,945.27 Signed 2019-08-19 2020-02-20 2019-08-28 2019-09-11 2020-04-27 2019-09-18 2020-05-31 2019-10-23 2020-07-01 2020-01-08 deworming program Envelope Pending GD-57 / Drug for Beef cattle Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 216,867.47 0.00 Implementati 2019-08-19 2019-08-28 2019-09-11 2019-09-18 2019-10-23 2020-01-08 deworming program. Envelope on GD-63 / Consumable item Improving Risk Management Single Stage - One for mini diagnostic lab. and IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 366,024.10 337,676.75 Signed 2019-08-19 2020-02-24 2019-08-28 2019-09-11 2020-04-27 2019-09-18 2020-07-16 2019-10-23 2020-08-17 2020-01-08 Envelope FDIL & CDIL Livestock Production Systems GD-74 / Procurement of Pending Project Management Single Stage - One Computer and associated IDA / 63300 Post Request for Bids Open - National 120,481.93 0.00 Implementati 2019-08-19 2019-08-29 2019-09-12 2019-09-19 2019-10-24 2020-01-09 Monitoring and Evaluation Envelope equipment's on Page 5 GD-76 / Procurement of Project Management Request for Single Stage - One IDA / 63300 Post Limited 4,939.76 4,808.66 Signed 2019-10-15 2020-06-17 2019-11-04 2020-06-25 2019-11-24 Photocopier Monitoring and Evaluation Quotations Envelope GD-87 / Procurement of Bi- Project Management Single Stage - One IDA / 63300 Post Request for Bids Open - National 759,036.14 413,768.68 Signed 2019-09-01 2019-12-22 2019-09-15 2020-08-31 2019-10-06 2020-01-08 2019-10-27 2020-01-21 2019-12-01 2020-01-23 2020-02-16 Cycle for LSP Monitoring and Evaluation Envelope GD-88 / Procurement of Tab Project Management Single Stage - One IDA / 63300 Post Request for Bids Open - National 1,113,253.01 1,063,831.81 Signed 2019-10-01 2020-02-09 2019-10-15 2019-11-05 2020-02-26 2019-11-26 2020-03-16 2019-12-31 2020-04-20 2020-03-17 for LSP Monitoring and Evaluation Envelope GD-89 / Procurement of Kit Project Management Single Stage - One IDA / 63300 Post Request for Bids Open - National 354,216.87 282,534.34 Signed 2019-10-01 2020-02-09 2019-10-15 2019-11-05 2020-02-27 2019-11-26 2020-05-20 2019-12-31 2020-06-02 2020-03-17 Box for LSP Monitoring and Evaluation Envelope GD-66 (2) / Consumable Improving Risk Management Single Stage - One items such as emergency IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 397,241.38 488,941.21 Signed 2019-09-22 2020-04-28 2019-09-27 2019-11-08 2020-05-28 2019-12-08 2020-09-06 2020-01-12 2021-07-26 2023-12-31 Envelope drug, antiseptic etc 180 UNIT Livestock Production Systems GD 66 / Procurement of Improving Risk Management Single Stage - One Mobile Veterinary Clinic with IDA / 63300 and Climate Resilience of Prior Request for Bids Open - International 11,934,216.87 4,716,000.00 Signed 2020-02-09 2020-03-30 2020-03-05 2020-05-14 2020-04-16 2020-07-15 2020-05-16 2020-12-07 2020-06-27 2021-05-31 2021-06-22 Envelope Registration Livestock Production Systems GD-66 / Procurement of Improving Risk Management Single Stage - One Mobile Veterinary Clinic with IDA / 63300 and Climate Resilience of Prior Request for Bids Open - National 11,934,216.87 0.00 Canceled 2019-08-19 2019-09-09 2019-09-23 2019-09-30 2019-11-04 2020-01-20 Envelope Registration Livestock Production Systems DLS/LDDP/EAP/ER/G-15 / Supply of 300-400L Capacity Single Stage - One IDA / 63300 Unallocated funds Post Request for Bids Open - National 265,000.00 235,611.16 Signed 2020-06-07 2020-09-02 2020-06-12 2020-07-24 2020-10-04 2020-08-23 2020-10-04 2020-09-27 2020-12-28 2021-03-26 Deep Freezer to store Envelope Vaccines and Medicines DLS/LDDP/EAP/ER/G-14 / Supply of 600 nos Milk Cream Single Stage - One IDA / 63300 Unallocated funds Post Request for Bids Open - National 300,000.00 128,294.69 Signed 2020-06-07 2020-09-02 2020-06-12 2020-07-24 2020-10-04 2020-08-23 2020-10-04 2020-09-27 2021-01-24 2021-03-26 Separator Machine (50- Envelope 100lph) DLS/LDDP/EAP/ER/G-11 / Supply of 61 Nos MVC Single Stage - One IDA / 63300 Unallocated funds Prior Request for Bids Open - International 3,965,000.00 1,611,604.23 Signed 2020-06-30 2020-07-08 2020-07-07 2020-07-14 2020-08-18 2020-09-03 2020-09-17 2020-12-01 2020-10-22 2021-03-08 2021-10-22 (Double Cabin Pick with Envelope Canopy and Customization) Improving Risk Management GD-40 / Consumables item Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 202,409.64 0.00 Canceled 2019-09-01 2019-09-15 2019-10-06 2019-10-20 2019-11-03 2019-12-01 for research Laboratories Envelope Livestock Production Systems DLS/LDDP/2020-21/GD-46 / Improving Risk Management Consumables for selected Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 37,951.81 36,907.86 Signed 2020-08-16 2020-10-20 2020-08-23 2020-09-06 2020-11-08 2020-09-20 2020-11-08 2020-11-01 2021-03-01 2020-12-31 network of food safety Envelope Livestock Production Systems laboratories DLS/LDDP/2020-21/GD-76 Project Management Request for Single Stage - One (1) / Photocopying and IDA / 63300 Post Open - National 17,686.75 0.00 Canceled 2020-09-20 2020-10-05 2020-10-15 Monitoring and Evaluation Quotations Envelope Printing Equipment LDDP/G-75 / Procurement of Project Management Desktop Computers and IDA / 63300 Post Request for Bids 120,481.93 0.00 Canceled 2021-05-10 2021-05-17 2021-06-16 2021-07-31 2021-09-11 2021-12-10 Monitoring and Evaluation Associated Equipment. Improving Risk Management LDDP/G-43 / Procurement of Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 19,277.11 18,807.86 Signed 2020-12-24 2021-03-25 2020-12-31 2021-01-30 2021-04-04 2021-03-01 2021-04-04 2021-04-12 2021-04-05 2021-07-11 Books & Journals Envelope Livestock Production Systems LDDP/G-62 / Procurement of Improving Risk Management Under Equipment Set for Mini- Single Stage - One IDA / 63300 and Climate Resilience of Prior Request for Bids Open - International 4,481,927.71 0.00 Implementati 2021-01-03 2021-08-26 2021-01-17 2021-09-02 2021-03-03 2021-04-17 2021-07-14 2022-01-10 Diagnostic Labs at Upazila Envelope Livestock Production Systems on level (465 Upazila) LDDP/G-78 / Procurement of Laptop Computers for Improving Risk Management Capacity Building Support of Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 95,000.00 57,702.54 Signed 2020-10-29 2021-02-22 2020-11-05 2020-12-05 2021-03-11 2021-01-04 2021-03-11 2021-02-15 2021-06-10 2021-05-16 DLS (Risk-Based Inspection: Envelope Livestock Production Systems Assessment, Monitoring, Communication) LDDP/G-67 / Procurement of Improving Risk Management Single Stage - One Mobile Veterinary Clinic (119 IDA / 63300 and Climate Resilience of Prior Request for Bids Open - International 7,889,843.37 2,745,597.70 Signed 2020-10-25 2020-10-19 2020-11-08 2021-01-18 2020-12-23 2021-03-08 2021-02-06 2021-06-15 2021-04-20 2021-08-26 2021-10-17 Envelope Nos) Livestock Production Systems DLS/LDDP/2020-21/GD-40 & 41 / Procurement of Consumable Items for Improving Risk Management Research Laboratories under Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 404,819.28 394,815.26 Signed 2020-10-15 2020-11-29 2020-10-22 2020-11-21 2020-12-22 2020-12-21 2020-12-22 2021-02-01 2021-03-01 2021-05-02 Department of Livestock Envelope Livestock Production Systems Services (DLS)(Different Chemicals, Re-Agents and others) GD-51 / Procurement of Syringe, Cool Box etc for FMD, Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 266,915.67 248,355.76 Signed 2020-11-01 2020-12-30 2020-11-08 2020-11-29 2021-01-31 2020-12-20 2021-01-31 2021-01-24 2021-06-22 2021-04-24 PPR & ND Vaccination Envelope Program. Pending GD-79 / Printing of Materials Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 120,481.93 0.00 Implementati 2020-12-20 2020-12-27 2021-01-17 2021-02-07 2021-03-14 2021-05-13 for different programs. Chain Development Envelope on GD-66 (2)/DLS/LDDP/2020- Improving Risk Management Single Stage - One 21 / Equipment’s for Mobile IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 459,337.35 0.00 Canceled 2020-10-31 2020-11-07 2020-11-28 2020-12-12 2021-01-16 2021-04-16 Envelope Veterinary Clinic (61 nos) Livestock Production Systems DLS/LDDP/2020-21/GD-68 / Procurement of Consumables Improving Risk Management Under Single Stage - One Items for 180 nos Mobile IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 188,144.58 0.00 Implementati 2020-10-15 2020-10-20 2020-10-22 2020-11-12 2020-11-15 2020-12-03 2021-01-14 2021-04-14 Envelope Veterinary Clinic (Injection, Livestock Production Systems on Ointment, Liquid Vitamin etc.) GD-80 / Procurement of Improving Risk Management Pending Single Stage - One Goods for Farmers on Food IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 120,481.93 0.00 Implementati 2019-09-01 2019-09-15 2019-10-06 2019-10-27 2019-12-01 2020-02-16 Envelope Safety. Livestock Production Systems on Page 6 GD-44 / Procurement of Improving Risk Management Single Stage - One Computer Hardware & IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 96,385.54 94,133.23 Signed 2020-11-18 2021-03-18 2020-11-25 2020-12-25 2021-04-07 2021-01-24 2021-04-07 2021-03-07 2021-06-10 2021-06-05 Envelope software for Laboratories Livestock Production Systems LDDP/G-76(1) / Procurement Project Management Single Stage - One of Photocopy Machine and IDA / 63300 Post Request for Bids Open - National 17,686.75 0.00 Canceled 2020-11-15 2020-11-22 2020-12-13 2021-01-03 2021-02-07 2021-04-08 Monitoring and Evaluation Envelope Printing Equipment DLS/LDDP/EAP/ER/G-10 / Supply of Antiseptic Request for Single Stage - One IDA / 63300 Unallocated funds Post Limited 12,000.00 0.00 Canceled 2020-06-09 2020-08-04 2021-01-31 Disinfectant and Bleaching Quotations Envelope Powder LDDP/EAP/ER/G-10 / Procurement of Antiseptic Single Stage - One IDA / 63300 Unallocated funds Post Request for Bids Open - National 12,000.00 11,710.69 Signed 2020-11-10 2020-10-07 2020-11-17 2020-12-08 2020-10-25 2020-12-29 2020-10-25 2021-02-02 2020-12-22 2021-04-03 Disinfectant and Bleaching Envelope Powder GD-48 / Procurement of FMD IDA / 63300 Productivity Improvement Post Direct Selection Direct 296,385.54 290,096.16 Signed 2020-11-15 2020-09-30 2020-11-29 2020-12-03 2021-01-17 2021-01-27 2022-01-12 Vaccine. Project Management Request for Single Stage - One GD-43 / Books & Journal IDA / 63300 Post Limited 6,024.10 0.00 Canceled 2019-10-15 2019-11-01 2019-11-21 Monitoring and Evaluation Quotations Envelope LDDP/G-78(1) / Procurement of Furniture for Capacity Improving Risk Management Building Support of DLS (Risk- Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 25,860.00 21,090.74 Signed 2020-11-01 2021-02-22 2020-11-08 2020-12-08 2021-03-11 2021-01-07 2021-05-23 2021-02-18 2021-06-17 2021-05-19 Based Inspection: Envelope Livestock Production Systems Assessment, Monitoring, Communication). LDDP/EAP/ER/G-12 / Procurement of 400 nos Milk Single Stage - One IDA / 63300 Unallocated funds Post Request for Bids Open - National 920,000.00 482,377.58 Signed 2020-12-20 2020-10-04 2020-12-27 2021-01-26 2020-11-03 2021-02-25 2020-11-03 2021-04-08 2021-02-24 2021-10-05 Cream Separator Machine Envelope (350-500lph Capacity) LDDP/EAP/ER/G-13 / Procurement of 500 nos Milk Single Stage - One IDA / 63300 Unallocated funds Post Request for Bids Open - National 750,000.00 195,703.26 Signed 2021-01-21 2020-10-04 2021-01-28 2021-02-27 2020-11-03 2021-03-29 2020-11-03 2021-05-10 2021-02-24 2021-11-06 Cream Separator Machine Envelope (150-200lph Capacity) LDDP/EAP/G-9 / Single Stage - One Procurement of Surgical Musk IDA / 63300 Unallocated funds Post Request for Bids Open - National 21,000.00 15,343.54 Signed 2020-11-22 2020-10-07 2020-11-29 2020-12-29 2020-10-25 2021-01-28 2020-10-25 2021-03-11 2021-01-17 2021-05-10 Envelope and Hand Gloves DLS/LDDP/EAP/ER/G-9 / Request for Single Stage - One Supply of Surgical Musk and IDA / 63300 Unallocated funds Post Limited 21,000.00 0.00 Canceled 2020-06-09 2020-08-04 2021-01-31 Quotations Envelope Hand Gloves DLS/LDDP/EAP/ER/G-13 / Supply of 500 nos Milk Cream Single Stage - One IDA / 63300 Unallocated funds Prior Request for Bids Open - National 750,000.00 0.00 Canceled 2020-06-14 2020-06-19 2020-07-31 2020-08-30 2020-10-04 2021-04-02 Separator Machine (150- Envelope 200lph capacity) DLS/LDDP/EAP/ER/G-12 / Supply of 400 nos Milk Cream Single Stage - One IDA / 63300 Unallocated funds Prior Request for Bids Open - National 920,000.00 0.00 Canceled 2020-06-21 2020-06-26 2020-08-07 2020-09-06 2020-10-11 2021-04-09 Separator Machine (350- Envelope 500lph capacity) LDDP/G-47 / Printing of Single Stage - One Leaflets, Vaccine Card and IDA / 63300 Productivity Improvement Post Request for Bids Open - National 470,600.00 345,525.34 Signed 2021-01-03 2021-03-28 2021-01-10 2021-02-09 2021-05-05 2021-03-26 2021-05-05 2021-05-16 2021-08-03 2021-08-14 Envelope Training Modules. LDDP/G-22 / Procurement of Pending Single Stage - One Farm Animals (Goat and IDA / 63300 Productivity Improvement Post Request for Bids Open - National 117,647.00 0.00 Implementati 2021-02-10 2021-02-17 2021-03-19 2021-05-03 2021-06-14 2021-09-12 Envelope Sheep) for Govt. Farms. on LDDP/G-111 / Printing of Basic Training Module for Request for Single Stage - One IDA / 63300 Productivity Improvement Post Open - National 19,927.71 19,260.55 Signed 2020-10-30 2021-01-01 2021-01-24 2021-02-15 Livestock Service Provider Quotations Envelope (LSP) GD-66 (1) / Procurement of Equipment for 241 nos Mobile Improving Risk Management Pending Veterinary Clinic (Small Single Stage - One IDA / 63300 and Climate Resilience of Prior Request for Bids Open - National 1,814,759.04 0.00 Implementati 2019-10-31 2019-11-21 2019-12-05 2019-12-12 2020-01-16 2020-04-02 Refrigerator, Digital Envelope Livestock Production Systems on Ultrasound Machine, Surgical Kits etc.) LDDP/G-16(III) / Procurement Pending of Feed (For cow & calves) and Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 77,088.75 0.00 Implementati 2021-09-02 2021-09-07 2021-10-07 2021-11-06 2021-12-18 2022-03-18 related Utility for 06 nos of Envelope on Govt. breeding center LDDP/G-27 / Procurement of Pending Feed for Complementary Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 294,674.55 0.00 Implementati 2021-09-27 2021-10-04 2021-11-03 2021-12-18 2022-01-29 2022-05-29 feeding practices during Envelope on pregnancy and calf rearing Pending LDDP/G-42 / Procurement of Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 198,816.56 0.00 Implementati 2021-09-28 2021-10-05 2021-11-04 2021-12-19 2022-01-30 2022-04-30 Consumables for Laboratories Envelope on Pending LDDP/G-48(I) / Procurement IDA / 63300 Productivity Improvement Post Direct Selection Direct 291,124.26 0.00 Implementati 2021-11-29 2021-12-09 2022-02-19 2022-06-19 of FMD Vaccine on LDDP/G-104 / Procurement Pending Single Stage - One of Animal Feeds (Goat and IDA / 63300 Productivity Improvement Post Request for Bids Open - National 47,060.00 0.00 Implementati 2021-12-15 2021-12-22 2022-01-12 2022-02-02 2022-03-16 2022-06-14 Envelope Sheep) for Govt. Farms on LDDP/G-39 / Procurement of Laboratory Equipment for Improving Risk Management Under Single Stage - One Improvement of Existing IDA / 63300 and Climate Resilience of Prior Request for Bids Open - International 2,409,638.55 0.00 Implementati 2021-10-05 2021-10-17 2021-10-19 2021-12-22 2021-12-03 2022-01-05 2022-01-17 2022-04-15 2022-10-12 Envelope Laboratory of Department of Livestock Production Systems on Livestock Services (DLS) Page 7 DLS/LDDP/2020-21/GD-64 / Procurement of Consumables Pending for Mini-Diagnostic Labs (465 Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 366,024.10 0.00 Implementati 2021-09-30 2021-10-07 2021-10-28 2021-11-11 2021-12-23 2022-03-23 nos), FDIL (9 nos) & DVH (61 Envelope on nos) (Autoclave Machine, Precision Balance etc.) LDDP/G-75(1) / Procurement Pending of Desktop Computers, Project Management Single Stage - One IDA / 63300 Post Request for Bids Open - National 134,917.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-06 2021-10-10 2021-11-23 2022-03-23 Printers, Scanners and Monitoring and Evaluation Envelope on Photocopiers etc. LDDP/G-103 / Procurement Pending of Utensils for Farms (Dairy Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 447,000.00 0.00 Implementati 2021-09-30 2021-10-07 2021-11-06 2021-12-06 2022-01-17 2022-04-17 Cattle, Beef Cattle, Goat and Envelope on Sheep) LDDP/G-113 / Procurement Pending of Breeding Animals (Heifer Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 647,058.00 0.00 Implementati 2021-02-01 2021-02-08 2021-03-10 2021-04-24 2021-06-07 2021-10-05 and Bulls) for Govt. Breeding Envelope on Centers. LDDP/G-60 / Procurement of Machines for Dairy Cattle Early Pregnancy Diagnosis Tool (USG) (30 set), Equipment (35 Improving Risk Management Single Stage - One set) for Expansion/ Upgrade IDA / 63300 and Climate Resilience of Prior Request for Bids Open - National 1,891,566.27 0.00 Canceled 2021-01-03 2021-01-17 2021-02-16 2021-04-02 2021-05-14 2021-08-12 Envelope of DLS Capacity for Veterinary Livestock Production Systems Supervision and Services Delivery including FDIL and DVH. LDDP/G-60A / Procurement of Machines for Dairy Cattle Early Pregnancy Diagnosis Tool (USG) (30 set), Under Single Stage - One Equipment (35 set) for IDA / 63300 Productivity Improvement Prior Request for Bids Open - International 1,891,566.27 0.00 Implementati 2021-09-30 2021-10-07 2021-11-18 2022-01-02 2022-03-03 2022-06-01 Envelope Expansion/ Upgrade of DLS on Capacity for Veterinary Supervision and Services Delivery including FDIL and DVH. LDDP/G-66(1) / Procurement of Equipment for 241 nos Under Mobile Veterinary Clinic (Small Single Stage - One IDA / 63300 Productivity Improvement Prior Request for Bids Open - International 1,814,759.04 0.00 Implementati 2021-09-15 2021-10-10 2021-09-22 2021-10-17 2021-11-03 2021-12-07 2021-12-18 2022-02-14 2022-06-14 Refrigerator, Digital Envelope on Ultrasound Machine, Surgical Kits etc.) WD-39 / Construction of Improving Risk Management Pending District AI Center at Single Stage - One IDA / 63300 and Climate Resilience of Post Request for Bids Open - National 239,554.22 0.00 Implementati 2021-09-23 2021-09-30 2021-10-30 2021-11-20 2021-12-25 2022-03-12 Mymensingh with Three Envelope Livestock Production Systems on Storied Foundation. LDDP/G-94 / Procurement of Pending Single Stage - One Equipment for existing Feed IDA / 63300 Productivity Improvement Post Request for Bids Open - National 206,272.18 0.00 Implementati 2021-10-20 2021-10-25 2021-11-24 2021-12-24 2022-01-28 2022-04-28 Envelope Analysis Lab. at district Level on LDDP/G-70 / Procurement of Pending Consumables- emergency Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 360,520.71 0.00 Implementati 2021-09-20 2021-09-25 2021-10-25 2021-11-24 2022-01-05 2022-04-05 drugs, antiseptic & Envelope on disinfectant for MVC LDDP/G-105 / Procurement of Poultry DOC (Broiler, Pending Single Stage - One Sonali, Turkey, Guinea fowl, IDA / 63300 Productivity Improvement Post Request for Bids Open - National 828,402.36 0.00 Implementati 2021-10-05 2021-10-10 2021-11-09 2021-12-09 2021-12-25 2022-03-25 Envelope Quail Local chicken) under on Investment support LDDP/G-115 / Supply of Pending Request for Single Stage - One Wooden Calendar with Paper IDA / 63300 Productivity Improvement Post Open - National 5,917.00 0.00 Implementati 2021-09-20 2021-11-15 2022-01-14 Quotations Envelope Box. on LDDP/G-98 / Procurement of Pending Hygienic Cleaning Tools, Cans Single Stage - One IDA / 63300 Productivity Improvement Prior Request for Bids Open - International 4,402,366.86 0.00 Implementati 2021-09-30 2021-10-05 2021-11-16 2021-12-16 2022-02-12 2022-07-12 and Pails for Farm Level Envelope on Collection. LDDP/G-67(I) / Procurement Pending Single Stage - One of equipment for Mobile IDA / 63300 Productivity Improvement Post Request for Bids Open - National 880,177.51 0.00 Implementati 2021-09-22 2021-09-27 2021-10-27 2021-11-26 2022-01-07 2022-05-07 Envelope Veterinary Clinic on LDDP/G-16(I) / Procurement Pending of Heifer for Breed Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 426,035.50 0.00 Implementati 2021-10-14 2021-10-21 2021-11-20 2022-01-04 2022-02-15 2022-06-15 improvement program of Envelope on Govt. 06 nos breeding center LDDP/G-16(II) / Procurement of Machineries & equipment’s Pending Single Stage - One (Roughage Shredder, Feed IDA / 63300 Productivity Improvement Post Request for Bids Open - National 296,213.02 0.00 Implementati 2021-09-15 2021-09-22 2021-10-22 2021-12-06 2022-01-17 2022-05-17 Envelope mixer & Tractor) for 06 nos of on Govt. breeding center LDDP/G-52 / Procurement of Pending Single Stage - One Syringe, Needle, Cool box, IDA / 63300 Productivity Improvement Post Request for Bids Open - National 262,177.51 0.00 Implementati 2021-09-09 2021-09-16 2021-10-16 2021-11-30 2022-01-11 2022-05-11 Envelope etc. for FMD vaccination on program LDDP/G-106 / Procurement of Feed and Medicine-Vaccine Pending for Broiler-200 and Sonali, Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 354,117.65 0.00 Implementati 2022-02-01 2022-02-06 2022-03-06 2022-04-05 2022-05-17 2022-09-14 Turkey, Guinea fowl & Quail- Envelope on 200 under Investment support to the Farmer LDDP/G-107 / Procurement of equipment (hand feed trolly, bucket, milk can, milk Pending Single Stage - One measuring pot etc.) for IDA / 63300 Productivity Improvement Post Request for Bids Open - National 43,941.17 0.00 Implementati 2022-02-06 2022-02-13 2022-03-13 2022-04-12 2022-05-24 2022-08-22 Envelope demonstration Farms for on innovative private Farmers at Khulna & Barisal division Page 8 LDDP/G-108 / Procurement of vitamin-mineral premix, Pending anthelmintics, disinfectant Single Stage - One IDA / 63300 Productivity Improvement Post Request for Bids Open - National 10,058.82 0.00 Implementati 2022-02-13 2022-02-20 2022-03-20 2022-04-19 2022-05-31 2022-08-29 etc. for demonstration Farms Envelope on for innovative private Farmers at Khulna & Barisal division NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/NC-03A / Pending Study tour in India for Project Management IDA / V1040 Post Direct Selection Direct 32,017.81 0.00 Implementati 2018-06-10 2018-06-15 2018-07-20 2019-01-16 Insurance, co-operative and Monitoring and Evaluation on Dairy Hub model in India DLS/DRMP/PPA/NC-01C / Pending Project Management Request for Single Stage - One Workshop, Conference, IDA / V1040 Post Limited 6,300.00 0.00 Implementati 2018-09-04 2018-10-30 2019-04-28 Monitoring and Evaluation Quotations Envelope Meeting, FGD on DLS/DRMP/PPA/NC-01 / Workshop, Conference, Meeting, FGD: In some cases Project Management Request for Single Stage - One Direct Procurement and in IDA / V1040 Post Limited 6,300.00 5,917.16 Signed 2018-06-25 2018-03-12 2018-08-20 2018-03-19 2019-02-16 Monitoring and Evaluation Quotations Envelope some cases Request for Quotation, as and when required basis. DLS/LDDP/S-72 / Vehicle Rent for PMU (12 Months, Pending Effective from January, 2019). Project Management IDA / 63300 Post Direct Selection Direct 11,566.00 0.00 Implementati 2019-04-18 2019-04-22 2019-05-09 2019-12-31 The Agreement signing date Monitoring and Evaluation on between 2 parties is 19/12/2018 DLS/LDDP/EAP/ER/NCS-6 / Preparation of Docu Drama on Request for Single Stage - One importance of Farm Hygiene IDA / 63300 Unallocated funds Post Limited 7,500.00 7,488.65 Signed 2020-06-09 2020-10-08 2020-08-04 2020-10-19 2021-01-31 Quotations Envelope and Workers Health Safety during Covid-19 lock down DLS/LDDP/EAP/ER/NCS-4 / Preparation of TVC Dialogue on importance of Request for Single Stage - One IDA / 63300 Unallocated funds Post Limited 6,000.00 5,971.56 Signed 2020-06-09 2020-05-20 2020-08-04 2020-05-27 2021-01-31 consumption of Animal Quotations Envelope Protein during corona situation DLS/LDDP/EAP/ER/NCS-3 / Preparation of TVC Dialogue Request for Single Stage - One on Continuation of Farming IDA / 63300 Unallocated funds Post Limited 6,000.00 2,985.78 Signed 2020-06-09 2020-05-17 2020-08-04 2020-05-20 2021-01-31 Quotations Envelope Business to contribute country Food Security DLS/LDDP/EAP/ER/NCS-2 / Preparartion of TVC Request for Single Stage - One Monologue on Consumption IDA / 63300 Unallocated funds Post Limited 4,500.00 2,891.37 Signed 2020-06-09 2020-07-15 2020-08-04 2020-07-21 2021-01-31 Quotations Envelope of Milk, Meat and Eggs to fight against Corona DLS/LDDP/EAP/ER/NCS-1 / Preparation of TVC Request for Single Stage - One IDA / 63300 Unallocated funds Post Limited 4,500.00 2,891.37 Signed 2020-06-09 2020-07-15 2020-08-04 2020-07-21 2021-01-31 Monologue on immediate Quotations Envelope response to Corona DLS/LDDP/EAP/ER/NCS-7 / Preparation of Documentary Request for Single Stage - One IDA / 63300 Unallocated funds Post Limited 8,500.00 8,078.31 Signed 2020-12-08 2020-10-20 2021-02-03 2020-11-01 2021-04-04 on Development of LDDP and Quotations Envelope EAP for Livestock Sector DLS/LDDP/EAP/ER/NCS-8 / Preparation of Documentary Request for Single Stage - One on Contribution of CERC-EAP IDA / 63300 Unallocated funds Post Limited 8,500.00 8,137.27 Signed 2021-01-04 2021-03-28 2021-02-23 2021-04-08 2021-04-24 Quotations Envelope for Business Continuation and Supply Chain Restoration DLS/LDDP/EAP/ER/NCS-5 / Preparation of Docu Drama on Request for Single Stage - One IDA / 63300 Unallocated funds Post Limited 7,500.00 7,429.68 Signed 2020-12-15 2020-10-20 2021-02-03 2020-11-01 2021-04-04 importance of feeding silage Quotations Envelope to Farm Animal DLS/DRMP/PPA/ NC-03 / Foreign Study tour on Food safety value chain practices in Project Management IDA / V1040 Post Direct Selection Direct 64,036.00 0.00 Canceled 2018-09-17 2018-09-22 2018-10-05 2018-11-19 USA/Canada/Europe for DG, Monitoring and Evaluation DLS, Secretary, MOFL including govt. team SD-80/DLS/LDDP/2020-21 / Project Management IDA / 63300 Post Direct Selection Direct 54,000.00 0.00 Canceled 2020-08-16 2020-08-21 2020-09-28 2021-03-27 Office Security and Cleaning Monitoring and Evaluation LDDP/NC-80 / Procurement Pending Project Management Single Stage - One of Office Security and IDA / 63300 Post Request for Bids Open - National 54,000.00 0.00 Implementati 2021-01-05 2021-01-12 2021-02-02 2021-02-23 2021-03-30 2024-03-29 Monitoring and Evaluation Envelope Cleaning Services on LDDP/NCS-83 / Non Consulting Service for Pending Project Management Request for Single Stage - One organizing Journalist IDA / 63300 Post Limited 47,000.00 0.00 Implementati 2022-02-15 2022-04-05 2022-07-04 Monitoring and Evaluation Quotations Envelope Fellowship Program in on Livestock Sector CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 9 DLS/LDDP/S-67 / Agro- Business Planning, Technology and Marketing Quality And Cost- Advice and Implementation IDA / 63300 Productivity Improvement Prior Open - International 6,000,000.00 5,661,065.34 Signed 2019-07-25 2020-01-29 2019-08-15 2020-02-03 2019-09-28 2020-11-24 2019-10-26 2021-02-14 2019-11-25 2021-06-02 2019-12-30 2021-08-02 2020-02-03 2021-11-23 2021-02-02 Based Selection Support Livestock and Dairy Development Project (LDDP) LDDP/S-39 / Consulting Services for Design and Project Management Quality And Cost- Supervision of Civil, Electrical IDA / 63300 Prior Open - International 3,750,000.00 2,621,583.73 Signed 2019-07-21 2019-08-08 2019-08-11 2019-08-09 2019-09-15 2020-03-08 2019-10-06 2020-06-03 2019-11-05 2020-08-05 2019-12-10 2020-12-10 2020-01-14 2021-05-15 2021-01-13 Monitoring and Evaluation Based Selection & Mechanical works and other procurement DLS/LDDP/S-39 / Engineering Consulting Firm Selection for site survey, Project Management Quality And Cost- IDA / 63300 Prior Open - International 3,750,000.00 0.00 Canceled 2019-04-18 2019-04-22 2019-05-12 2019-05-16 2019-05-20 2019-05-27 2019-06-17 2023-12-31 Drawing, Design and Monitoring and Evaluation Based Selection Supervision of construction works S-7 / The PMU will hire Environmental and Social Project Management Quality And Cost- IDA / 63300 Post Open - National 361,445.78 115,355.10 Signed 2020-03-22 2020-03-22 2020-04-12 2020-05-26 2020-11-15 2020-06-23 2020-12-31 2020-07-23 2021-05-04 2020-08-27 2021-05-24 2020-10-01 2021-06-13 2023-12-31 Impact Assessment (ESIA) firm Monitoring and Evaluation Based Selection for 06 (six) Months SD-65 FAO / Participatory Mapping of Farmers Group, Project Management UN Agencies Baseline Studies, National Risk IDA / 63300 Post Direct 438,614.46 428,200.00 Signed 2020-07-30 2020-12-06 2021-07-30 Monitoring and Evaluation (Direct) Analysis and Management Strategy Development SD-74 UNIDO / Gap analysis of existing legislation, drafting legal amendments, development of baseline data Project Management UN Agencies IDA / 63300 Prior Direct 1,272,445.78 1,242,353.00 Signed 2020-07-08 2021-07-13 2023-06-23 of food safety, establishment Monitoring and Evaluation (Direct) of animal origin food inspection program and quality assurance scheme SD-75 UNIDO / AMR Surveillance, risk mitigation Project Management UN Agencies IDA / 63300 Prior Direct 567,530.12 554,118.00 Signed 2020-07-08 2021-03-11 2022-06-28 and monitoring of microbial, Monitoring and Evaluation (Direct) chemical & residual hazards SD-76 FAO / Farmers/Producers Group Project Management UN Agencies IDA / 63300 Prior Direct 1,875,000.00 1,830,800.00 Signed 2020-07-30 2021-07-08 2023-07-15 Formation and Mobilization Monitoring and Evaluation (Direct) for Farm Development SD-77 FAO / Development of FFS Curricula, Livestock Extension Manual, Animal Breeding & AI Policy; Livestock Project Management UN Agencies Extension Policy, Vaccination IDA / 63300 Prior Direct 751,277.11 733,600.00 Signed 2020-07-30 2021-01-31 2021-07-30 Monitoring and Evaluation (Direct) Strategy, Hatchery Act & Rules, Sustainability Model for small & medium dairy and poultry Farming, etc LDDP/S-40 / Consulting Services (Firm) for Website Project Management Quality And Cost- Pending IDA / 63300 Post Open - National 120,482.00 0.00 2021-01-03 2021-01-24 2021-03-24 2021-04-23 2021-06-07 2021-07-05 2021-08-09 2022-08-09 Development and Operations Monitoring and Evaluation Based Selection Implementation for PMU DLS/LDDP/S-41 / Developed Project Management Project Management Quality And Cost- IDA / 63300 Post Open - National 100,000.00 0.00 Canceled 2019-06-30 2019-07-14 2019-08-04 2019-08-18 2019-08-25 2019-09-22 2019-10-06 2020-10-05 Information System (PMIS) and Monitoring and Evaluation Based Selection Accounting Software SD-6(3)/LDDP/DLS/2020-21 / Consulting Service (Firm) for Improving Risk Management Quality And Cost- Pending Feasibility Study on Total Mix IDA / 63300 and Climate Resilience of Post Open - National 150,000.00 0.00 2021-02-14 2021-02-28 2021-04-28 2021-05-28 2021-07-12 2021-08-09 2021-09-20 2022-03-19 Based Selection Implementation Ration/ Densified Total Mixed Livestock Production Systems Ration SD-73 / Consulting Services (Firm) for Computerized Project Management and Project Management Quality And Cost- Under Information System (CPMIS) to IDA / 63300 Post Open - National 100,000.00 0.00 2019-09-01 2019-07-10 2019-09-15 2019-10-13 2019-10-20 2019-10-27 2019-11-10 2019-12-01 2023-12-31 Monitoring and Evaluation Based Selection Implementation Design and Develop Computerized Data Entry and Reporting System Software DLS/DRMP/PPA/S-17 / Consulting Services (Firm) for Designing and Costing of Project Management Quality And Cost- Pending Integrated Livestock Manure IDA / V1040 Post Open - National 6,403.00 0.00 2018-09-16 2018-09-19 2018-09-26 2018-09-30 2018-10-05 2018-10-14 2018-10-30 2018-12-04 Monitoring and Evaluation Based Selection Implementation Management Plant for Central Cattle Breeding & Dairy Firm - CCDF LDDP/S-84 / Consultancy Services for Assessment of Least Cost IDA / 63300 Productivity Improvement Post Open - National 6,804.73 0.00 Canceled 2021-10-05 2021-11-10 2021-10-26 2021-12-09 2022-01-06 2022-02-05 2022-03-12 2022-04-16 2022-10-13 Impact of deworming Selection awareness campaign program LDDP/S-87 / Consultancy Services for Periodic Project Management Quality And Cost- Pending Beneficiary Assessment and IDA / 63300 Prior Open - International 982,248.52 0.00 2021-12-28 2022-01-18 2022-03-03 2022-03-31 2022-04-30 2022-06-04 2022-07-09 2023-07-09 Monitoring and Evaluation Based Selection Implementation Process Monitoring under LDDP LDDP/S-3 / Consultancy Services for Institutional Project Management Quality And Cost- Pending IDA / 63300 Post Open - National 196,449.70 0.00 2021-11-01 2021-11-22 2022-01-21 2022-02-20 2022-03-22 2022-04-26 2022-05-31 2023-05-31 Capacity- Human Resources Monitoring and Evaluation Based Selection Implementation Development Plan LDDP/S-85 / Consultancy Services for Assessment of Impact of Progressive Market Linkages and Value Least Cost IDA / 63300 Post Open - National 6,331.36 0.00 Canceled 2021-10-20 2021-11-10 2021-11-10 2021-12-24 2022-01-21 2022-02-20 2022-03-27 2022-05-01 2022-10-28 Management of Mastitis, Chain Development Selection Reproductive and Metabolic Diseases Page 10 LDDP/S-6 / Consulting Services on Feasibility Study on Bangladesh Dairy Improving Risk Management Quality And Cost- Pending Development Board, IDA / 63300 and Climate Resilience of Prior Open - International 600,000.00 0.00 2021-11-30 2021-12-21 2022-02-03 2022-03-03 2022-04-02 2022-05-07 2022-06-11 2023-06-11 Based Selection Implementation Bangladesh Dairy Research Livestock Production Systems Institute, Bangladesh Poultry Research Institute. SD-6 (1)/DLS/LDDP/2020-21 / Consulting Service (Firm) for Improving Risk Management Quality And Cost- Feasibility Study on IDA / 63300 and Climate Resilience of Post Open - National 150,000.00 0.00 Canceled 2021-12-01 2021-12-22 2022-02-04 2022-03-06 2022-03-20 2022-04-10 2022-05-15 2022-11-11 Based Selection Bangladesh Dairy Research Livestock Production Systems Institute LDDP/S-88 / Consultancy Consultant Project Management Under Services for Risk Based Audit IDA / 63300 Post Qualification Limited 42,000.00 0.00 2021-11-10 2021-09-23 2021-11-24 2021-12-24 2022-01-14 2022-04-14 Monitoring and Evaluation Implementation for CERC-EAP and LDDP. Selection LDDP/S-68 / Consulting Services for (a) Design/develop/pilot an electronic and online-based cattle traceability system; (b) Improving Risk Management Quality And Cost- Develop Livestock Risk IDA / 63300 and Climate Resilience of Prior Open - International 2,636,470.00 0.00 Canceled 2022-03-15 2022-04-05 2022-06-10 2022-07-25 2022-08-24 2022-09-28 2022-11-26 2023-11-26 Based Selection Mitigations Products Livestock Production Systems (Insurances) and services and (c) Conduct to support the development of a National Livestock Insura LDDP/S-85A / Consultancy Services for Assessment of Consultant Impact of Progressive Project Management Pending IDA / 63300 Post Qualification Limited 6,331.36 0.00 2022-02-15 2022-03-17 2022-04-16 2022-05-21 2022-11-17 Management of Mastitis, Monitoring and Evaluation Implementation Selection Reproductive and Metabolic Diseases LDDP/S-84A / Consultancy Consultant Services for Assessment of Project Management Pending IDA / 63300 Post Qualification Limited 6,804.73 0.00 2022-02-22 2022-03-24 2022-04-23 2022-05-28 2022-11-24 Impact of deworming Monitoring and Evaluation Implementation Selection awareness campaign program LDDP/S-83 / Consultancy Services (Firm) for Journalist Project Management Least Cost IDA / 63300 Post Open - National 47,337.27 0.00 Canceled 2021-10-20 2021-11-10 2021-12-24 2022-01-21 2022-02-20 2022-03-27 2022-05-01 2022-10-28 Fellowship Program on Monitoring and Evaluation Selection Activities of Livestock Sector LDDP/S-68A / Consulting Services for Establishment of Quality And Cost- Pending Pre-Conditions for IDA / 63300 Productivity Improvement Prior Open - International 2,636,470.00 0.00 2022-03-10 2022-03-31 2022-05-14 2022-06-28 2022-07-28 2022-09-01 2022-10-06 2024-10-05 Based Selection Implementation Bangladesh Integrated Network for Livestock Information (BINLI) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/LDDP/SD-22 / PMU will Individual Project Management Under hire engineering Expert (01 IDA / 63300 Post Consultant Open 202,409.00 0.00 2019-04-23 2019-05-21 2019-07-03 2019-07-05 2019-08-09 2023-01-20 Monitoring and Evaluation Implementation Person) for 42 month Selection DLS/LDDP/S-36A / PMU will Individual Project Management hired Procurement Specialist IDA / 63300 Prior Consultant Open 202,409.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 Monitoring and Evaluation (1 nos) for 48 month Selection DLS/LDDP/S-36B / PMU will Individual Project Management hire 01 procurement specialist IDA / 63300 Prior Consultant Open 202,409.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 Monitoring and Evaluation for 48 MM Selection DLS/LDDP/S-38A / PMU will Individual hired Financial Management Project Management IDA / 63300 Post Consultant Open 180,723.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 Specialist (1 nos) for 50 Monitoring and Evaluation Selection month DLS/LDDP/S-38B / PMU will Individual hired Financial Management Project Management IDA / 63300 Post Consultant Open 180,723.00 0.00 Canceled 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 Specialist (1 nos) for 50 Monitoring and Evaluation Selection month SD-15 / PMU will hired Junior Individual Project Management Under Monitoring Specialist 01 (One) IDA / 63300 Post Consultant Open 151,807.23 0.00 2019-09-15 2019-10-29 2019-10-13 2019-10-20 2019-11-24 2023-12-31 Monitoring and Evaluation Implementation for 36 Months Selection SD-24 / Project Management Individual Project Management Expert: PMU will hired expert IDA / 63300 Prior Consultant Open 231,325.30 0.00 Canceled 2019-10-13 2019-11-13 2019-12-01 2019-12-22 2020-01-26 2023-12-31 Monitoring and Evaluation for 48 MM Selection SD-27 / Junior Agribusiness Individual Project Management Specialist: PMU will hired IDA / 63300 Post Consultant Open 86,746.99 89,627.94 Signed 2019-10-20 2019-10-29 2019-12-08 2020-06-03 2019-12-29 2020-06-03 2020-02-02 2020-07-01 2023-12-31 Monitoring and Evaluation expert for 24 MM Selection SD-34 / Environment and Individual Social Safeguard Specialist: Project Management IDA / 63300 Prior Consultant Open 231,325.30 192,251.93 Signed 2019-11-03 2019-11-27 2019-12-22 2020-07-05 2020-01-12 2020-07-29 2020-02-16 2020-08-09 2023-12-31 PMU will hired expert for 48 Monitoring and Evaluation Selection MM SD-35 / Senior Procurement Individual Project Management Specialist: PMU will hired IDA / 63300 Prior Consultant Open 231,325.30 196,072.91 Signed 2019-09-22 2020-02-24 2019-11-10 2020-07-05 2019-12-01 2020-07-29 2020-01-05 2020-09-01 2023-12-31 Monitoring and Evaluation expert for 48 MM Selection SD-37 / Senior Financial Individual Management Specialist (SFMS): Project Management IDA / 63300 Prior Consultant Open 289,156.63 0.00 Canceled 2019-09-22 2019-11-27 2019-11-10 2020-07-05 2019-12-01 2020-01-05 2023-12-31 PMU will hired expert for 60 Monitoring and Evaluation Selection MM Page 11 SD-12 / PMU will hired 01 Individual Position of Senior Monitoring Project Management Under IDA / 63300 Post Consultant Open 231,325.30 0.00 2019-10-20 2020-01-30 2019-12-08 2019-12-29 2020-02-02 2020-07-31 $ Evaluation Specialist (48 Monitoring and Evaluation Implementation Selection Month) SD-30 / Food Safety and Individual Project Management Under Quality Control Expert: PMU IDA / 63300 Post Consultant Open 202,409.64 0.00 2019-11-03 2020-01-30 2019-12-22 2020-01-12 2020-02-16 2023-12-31 Monitoring and Evaluation Implementation will hired expert for 42 MM Selection SD-20 / PMU will hired Individual Project Management Animal Health Expert 01 (One) IDA / 63300 Post Consultant Open 202,409.64 176,522.65 Signed 2019-10-24 2020-01-30 2019-11-21 2020-07-20 2019-11-28 2020-07-23 2020-01-02 2020-08-09 2024-02-21 Monitoring and Evaluation for 42 Months Selection SD-17 / PMU will hire Individual Project Management Under Training & Extension Expert IDA / 63300 Post Consultant Open 231,325.30 0.00 2019-10-20 2020-01-30 2019-11-17 2019-11-24 2019-12-29 2024-01-28 Monitoring and Evaluation Implementation 01 (One) for 48th months Selection SD-14 / PMU will hired 01 Individual Project Management Position of ICT Expert (48 IDA / 63300 Post Consultant Open 231,325.30 172,327.14 Signed 2019-10-24 2020-01-30 2019-12-12 2020-11-05 2020-01-02 2020-11-05 2020-02-06 2020-12-01 2020-08-04 Monitoring and Evaluation Month) Selection SD-18 / National Dairy Individual Project Management Expert: PMU will hired Expert IDA / 63300 Post Consultant Open 231,325.30 176,460.22 Signed 2019-10-24 2020-02-02 2019-12-12 2020-06-07 2020-01-02 2020-07-20 2020-02-06 2020-08-10 2020-08-04 Monitoring and Evaluation for 48 MM Selection LDDP_SD-24 / Project Individual Project Management Under Management Expert: PMU will IDA / 63300 Post Consultant Open 231,325.30 0.00 2020-01-20 2019-11-19 2020-03-09 2020-03-30 2020-05-04 2020-09-01 Monitoring and Evaluation Implementation hired expert for 48 MM Selection S-29 / International Individual Project Management Under Slaughter/Meat Processing IDA / 63300 Post Consultant Open 173,493.98 0.00 2020-02-16 2020-01-30 2020-04-27 2020-08-09 2020-05-11 2020-06-15 2023-12-31 Monitoring and Evaluation Implementation Expert 12 person-months Selection SD-21 / PMU will hire Animal Individual Project Management Reproductive Health Expert 42 IDA / 63300 Post Consultant Open 202,409.64 152,113.70 Signed 2020-02-16 2020-01-30 2020-03-22 2021-03-22 2020-04-05 2021-03-22 2020-05-10 2021-04-01 2023-12-31 Monitoring and Evaluation person/months Selection SD-23 / Ruminant Nutrition Individual Project Management Under expert: PMU will hired expert IDA / 63300 Post Consultant Open 202,409.64 0.00 2020-02-16 2020-01-30 2020-03-23 2020-04-13 2020-05-18 2024-04-22 Monitoring and Evaluation Implementation for 42 MM Selection SD-25 / PMU will hired Individual Climate Smart Livestock Project Management Under IDA / 63300 Post Consultant Open 202,409.64 0.00 2020-02-16 2020-01-30 2020-03-22 2020-04-05 2020-05-10 2023-12-31 Husbandry Expert (National) Monitoring and Evaluation Implementation Selection for 42 person/months DLS/LDDP/EAP/ER/S-01 / Selection of Short-term Individual Under International Consultant to IDA / 63300 Unallocated funds Post Consultant Limited 15,000.00 0.00 2020-05-31 2020-07-13 2020-06-05 2020-06-26 2020-07-31 2020-10-31 Implementation prepare EAP Implementation Selection Field Manual LDDP/S-33 / Consulting Individual Services (Individual) of Project Management Pending IDA / 63300 Post Consultant Open 115,662.65 0.00 2021-01-14 2021-03-29 2021-04-26 2021-06-07 2023-05-28 Communication and Public Monitoring and Evaluation Implementation Selection Relation Expert. SD-26 / Consultancy Services Individual Project Management Pending (Individual) of Senior Agri- IDA / 63300 Prior Consultant Open 231,325.30 0.00 2019-10-20 2020-01-18 2020-02-17 2020-04-17 2024-03-15 Monitoring and Evaluation Implementation Business Specialist Selection Individual DLS/DRMP/PPA/S-08 / Project Management IDA / V1040 Post Consultant Limited 14,727.85 0.00 Canceled 2018-06-03 2018-06-08 2018-06-29 2018-08-03 2019-01-30 Gender Specialist Monitoring and Evaluation Selection DLS/DRMP/PPA/S-03 / Individual Project Management Project Management IDA / V1040 Post Consultant Open 44,183.56 0.00 Canceled 2018-04-25 2018-06-13 2018-07-04 2018-08-08 2019-02-04 Monitoring and Evaluation Consultant (Team Leader) Selection Individual DLS/DRMP/PPA/S-15 / Cattle Project Management IDA / V1040 Post Consultant Limited 22,091.78 0.00 Canceled 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2018-12-07 Insurance Specialist Monitoring and Evaluation Selection DLS/DRMP/PPA/S-12 / Individual Project Management Market Development and IDA / V1040 Post Consultant Limited 29,455.71 0.00 Canceled 2018-05-08 2018-05-13 2018-06-03 2018-07-08 2019-01-04 Monitoring and Evaluation Value Chain Specialist Selection DLS/DRMP/PPA/S-07 / Individual Project Management Monitoring & Evaluation IDA / V1040 Post Consultant Limited 22,091.78 0.00 Canceled 2018-04-26 2018-05-01 2018-05-22 2018-06-26 2018-12-23 Monitoring and Evaluation Specialist Selection SD-64 / PMU will hired Consulting services for Individual Project Management preparing vaccination card, IDA / 63300 Post Consultant Open 6,506.02 0.00 Canceled 2019-09-15 2019-10-13 2019-10-20 2019-11-24 2023-12-31 Monitoring and Evaluation training manual, and leaflets Selection etc SD-38 (B) / Consulting Individual Services (Individual) of Junior Project Management IDA / 63300 Post Consultant Open 180,722.89 151,188.18 Signed 2019-09-22 2019-10-10 2019-11-10 2019-12-15 2019-12-01 2019-12-19 2020-01-05 2020-01-16 2023-12-31 Financial Management Monitoring and Evaluation Selection Specialist. SD-32 / Consulting Services Individual Project Management Under (Individual) of Social and IDA / 63300 Post Consultant Open 86,746.99 0.00 2020-02-20 2020-02-20 2020-05-05 2020-05-26 2020-06-30 2021-12-22 Monitoring and Evaluation Implementation Gender Specialist. Selection SD-38 (A) / Consulting Individual Services (Individual) of Junior Project Management IDA / 63300 Post Consultant Open 180,722.89 151,188.18 Signed 2019-09-22 2019-10-10 2019-11-20 2019-12-15 2019-12-11 2021-02-11 2020-01-15 2019-12-19 2024-01-10 Financial Management Monitoring and Evaluation Selection Specialist SD-31 / Consulting Services Individual Project Management Pending (Individual) of AMR IDA / 63300 Post Consultant Open 173,493.98 0.00 2020-02-20 2020-05-11 2020-06-01 2020-07-06 2024-02-01 Monitoring and Evaluation Implementation Surveillance Expert. Selection SD-13 / Consulting Services Individual Project Management Pending (Individual) of Knowledge IDA / 63300 Post Consultant Open 202,409.64 0.00 2020-02-20 2020-05-04 2020-05-25 2020-06-29 2024-01-25 Monitoring and Evaluation Implementation Management Specialist. Selection Page 12 DLS/DRMP/PPA/S-16 / Individual Project Management Pending Consulting Services IDA / V1040 Post Consultant Limited 36,819.64 0.00 2018-06-28 2018-07-03 2018-07-24 2018-08-28 2019-02-24 Monitoring and Evaluation Implementation (Individual) of Engineer. Selection SD-28 / Consulting Services Individual Project Management Pending (Individual) of International IDA / 63300 Post Consultant Open 173,493.98 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2023-12-31 Monitoring and Evaluation Implementation Dairy Processing Expert. Selection SD-19 / Consulting Services Individual Project Management Pending (Individual) of Poultry IDA / 63300 Post Consultant Open 202,409.64 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2023-12-31 Monitoring and Evaluation Implementation Nutrition Expert. Selection DLS/DRMP/PPA/S-05 / Consulting Services Individual Project Management Pending (Individual) of Development IDA / V1040 Post Consultant Limited 22,091.78 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 Monitoring and Evaluation Implementation Project Proposal (DPP) Selection Preparation Specialist SD-36 (A) / Consulting Individual Project Management Services (Individual) of Junior IDA / 63300 Post Consultant Open 202,409.64 161,896.36 Signed 2019-09-22 2020-03-01 2019-11-10 2020-06-04 2019-12-01 2020-06-04 2020-01-05 2020-08-10 2023-12-31 Monitoring and Evaluation Procurement Specialist Selection SD-36 (B) / Consulting Individual Project Management Services (Individual) of Junior IDA / 63300 Post Consultant Open 202,409.64 161,896.36 Signed 2019-09-22 2019-10-01 2019-11-10 2019-12-15 2019-12-01 2019-12-26 2020-01-05 2020-02-10 2023-12-31 Monitoring and Evaluation Procurement Specialist. Selection SD-73 UNIDO / Consulting Improving Risk Management Services for Establishment of IDA / 63300 and Climate Resilience of Prior Direct Selection Direct 2,700,000.00 0.00 Canceled 2022-02-10 2022-02-20 2022-04-26 2022-10-23 Pre-Conditions for Livestock Livestock Production Systems Insurance in Bangladesh LDDP/S-81 / Consultancy Services for Exhibition/ Pending Demonstration of milk & milk IDA / 63300 Productivity Improvement Prior Direct Selection Direct 12,581,065.08 0.00 2022-02-01 2022-02-21 2022-04-27 2023-04-22 Implementation product in school children (01 Primary School/Upazila) LDDP/S-37A / Senior Individual Project Management Financial Management IDA / 63300 Post Consultant Open 113,000.00 0.00 Canceled 2021-11-01 2021-12-20 2022-01-10 2022-02-14 2023-12-31 Monitoring and Evaluation Specialist (National) Selection Individual LDDP/S-22A / Engineering Project Management Under IDA / 63300 Post Consultant Open 113,000.00 0.00 2021-11-01 2021-10-17 2021-12-20 2021-12-25 2022-01-15 2023-11-28 Expert (National) Monitoring and Evaluation Implementation Selection LDDP/S-86 / Consultancy Project Management Services for Evaluation of IDA / 63300 Post Direct Selection Direct 130,000.00 128,445.69 Signed 2021-09-14 2021-10-17 2021-09-24 2021-10-27 2021-11-28 2021-12-13 2022-05-27 Monitoring and Evaluation CERC-EAP LDDP/S-37 / Senior Financial Individual Project Management Pending Management Specialist IDA / 63300 Post Consultant Limited 127,000.00 0.00 2021-11-21 2021-11-26 2021-12-17 2022-01-30 2024-01-20 Monitoring and Evaluation Implementation (National) Selection Page 13