Procurement Plan 1. For each contract to be financed by the Loan, the different procurement methods or consultant selection methods, the need for pre-qualification, estimated costs, prior review requirements, and time frame are agreed between the Borrower and the Bank in the Procurement Plan (Annex 6). The procurement plan, which covers the entire project, and its updates or modifications, shall be subject to the Bank’s prior review and no objection before implementation. The Procurement Plan and its updates will be published in the Bank’s external website. Thresholds for Procurement Methods 2. The same procurement thresholds for SPAP will apply and this is reflected in the procurement plan (see Annex 6). 3. Goods: Goods and equipment estimated to cost US$300,000 or more will be procured through International Competitive Bidding (ICB). Goods estimated to cost less than $300,000 and more than $100,000 will be procured through National Competitive Bidding (NCB). Readily available off-the-shelf goods estimated to cost less than US$100,000 each may be procured through Shopping (SH) on the basis of at least three written quotations obtained from qualified suppliers. 4. Works: Works estimated to cost US$4,000,000 and more will be procured through ICB. Works estimated to cost less than US$4,000,000 and more than US$100,000 will be procured through NCB. Contracts estimated to cost less than US$100,000 each may be procured through Shopping (SH) procedures on the basis of at least three written quotations obtained from qualified contractors. 5. Consultant Services: Consultancy services to be provided by consulting firms estimated to cost US$300,000 or more will be procured through Quality and Cost Based Selection (QCBS) method. Consultancy services to be provided by consulting firms estimated to cost less than US$300,000 may be procured through Consultants’ Qualifications (CQ) method. For assignments estimated to cost less than US$ 100,000, the shortlist may comprise only of national firms according to the paragraph 2.7 of the Consultant Guidelines. However, if foreign firms express interest, they shall be considered. Individual Consultants will be selected in accordance with Section V of the Consultant Guidelines. Prior Review Thresholds 6. Prior Review thresholds are proposed as follows: - All ICB and first two NCB contracts each for Goods and Works; - All DC contracts; - All contracts with consulting firms estimated to cost US$100,000 or more and all Single Source Selection contracts; - All contracts with individual consultants estimated to cost US$50,000 or more and all Single Source Selection contracts. PROCUREMENT Armenia : Armenia Social Protection Administration II Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2016-09-15 2021-11-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146318 GPN Date: Project Name: Armenia Social Protection Administration II Project Loan / Credit No: IDA / 53980 Ministry of Labor and Social Affairs Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SPAP II W-1-1-1/1-G / Under Roll-Out of Integrated Social Single Stage - One 2018-03- Refurbishment of Shengavit IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementat 2016-11-15 2016-11-09 2016-11-20 2016-12-18 2017-02-01 2017-03-15 Protection Service Delivery Envelope 15 ISPC ion 1-1-1-1-A / Refubrishment Roll-Out of Integrated Social Single Stage - One 2017-08- IDA / 53980 Prior Request for Bids Open - National 480,092.00 428,441.00 Signed 2016-04-20 2016-04-27 2016-05-25 2016-08-16 2016-11-13 2016-09-07 2016-09-07 of Vanadzor ISPC Protection Service Delivery Envelope 07 SPAP II 1-1-1-1-F / Roll-Out of Integrated Social Single Stage - One 2018-05- Refurbishment of Hrazdan IDA / 53980 Post Request for Bids Open - National 0.00 455,029.26 Signed 2016-11-17 2016-11-17 2016-11-22 2016-12-20 2016-12-16 2017-03-20 2017-03-27 2017-04-24 2017-04-28 Protection Service Delivery Envelope 13 ISPC SPAP II 1-1-1-1-H / Roll-Out of Integrated Social Single Stage - One 2018-02- Akhooryan ISPC IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Canceled 2017-01-10 2017-05-30 2017-01-15 2017-02-12 2017-07-10 2017-05-13 2017-10-30 2017-06-17 Protection Service Delivery Envelope 12 refurbushment Pending SPAP II 1-1-1/1-I / Roll-Out of Integrated Social Single Stage - One 2018-11- IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementat 2017-06-01 2017-06-06 2017-07-04 2017-10-02 2017-11-06 Refubrishment of Tashir ISPC Protection Service Delivery Envelope 06 ion SPAP II 1-1-1-1-H-R / Pending Roll-Out of Integrated Social Single Stage - One 2018-12- Refubrishment of Akhuryan IDA / 53980 Post Request for Bids Open - National 229,279.00 0.00 Implementat 2018-02-09 2018-02-11 2018-03-13 2018-05-10 Protection Service Delivery Envelope 27 ISPC ion SPAP II W 1-1-1/1-C / Pending Roll-Out of Integrated Social Single Stage - One 2018-12- Construction of Stepanavan IDA / 53980 Post Request for Bids Open - National 994,968.00 0.00 Implementat 2018-07-27 2018-07-27 2018-07-27 2018-07-27 2018-07-27 Protection Service Delivery Envelope 30 ISPC ion SPAP II W 1-1-1/1-J / Roll-Out of Integrated Social Single Stage - One 2018-12- Refubrishment of Caxkahovit IDA / 53980 Post Request for Bids Open - National 211,358.00 151,561.51 Completed 2018-08-06 2018-09-27 2018-08-08 2018-09-05 2018-10-31 2018-10-05 2018-12-10 2018-11-02 2019-01-14 Protection Service Delivery Envelope 30 ISPC SPAP II W 1-1-1/1-K / Roll-Out of Integrated Social Single Stage - One 2020-03- Refubrishment of Meghri IDA / 53980 Post Request for Bids Open - National 197,402.00 0.00 Canceled 2018-12-10 2018-12-15 2019-01-12 2019-02-06 2019-02-11 2019-04-30 2019-03-25 Protection Service Delivery Envelope 24 CSSTC SPAP II W 1-1-1/1-C-1 / Roll-Out of Integrated Social Single Stage - One 2020-11- Construction of Stepanavan IDA / 53980 Post Request for Bids Open - National 606,127.00 596,841.06 Signed 2019-01-24 2019-02-01 2019-01-29 2019-02-26 2019-03-03 2019-03-28 2019-06-25 2019-05-09 2019-08-02 Protection Service Delivery Envelope 30 CSSTC SPAP II W 1-1-1/1-L / Roll-Out of Integrated Social Single Stage - One 2019-12- Refubrishment of Sevan IDA / 53980 Post Request for Bids Open - National 170,405.00 134,631.81 Signed 2019-01-30 2019-07-19 2019-02-04 2019-08-29 2019-03-04 2019-08-26 2019-04-03 2019-09-25 2019-05-15 2019-10-23 Protection Service Delivery Envelope 26 CSSTC SPAP II W 1-1-1/1-M / Reconstruction and Roll-Out of Integrated Social Single Stage - One 2020-04- IDA / 53980 Post Request for Bids Open - National 198,116.00 131,076.91 Signed 2019-01-30 2019-07-19 2019-02-04 2019-08-29 2019-03-04 2019-08-26 2019-04-03 2019-09-26 2019-05-15 2019-10-16 refubrishment of Aparan Protection Service Delivery Envelope 29 CSSTC SPAP II W 1-1-1/1-N / Roll-Out of Integrated Social Single Stage - One 2019-12- Refubrishment of Martuni IDA / 53980 Post Request for Bids Open - National 198,335.00 156,043.90 Signed 2019-01-31 2019-07-30 2019-02-05 2019-08-29 2019-03-05 2019-08-27 2019-04-04 2019-09-26 2019-05-16 2019-10-17 Protection Service Delivery Envelope 27 CSSTC SPAP II W 1-1-1/1-O / Roll-Out of Integrated Social Single Stage - One 2019-12- Refubrishment of Goris IDA / 53980 Post Request for Bids Open - National 218,191.00 178,429.87 Signed 2019-01-31 2019-07-19 2019-02-05 2019-08-29 2019-03-05 2019-08-29 2019-04-04 2019-09-25 2019-05-16 2019-11-01 Protection Service Delivery Envelope 12 CSSTC SPAP II W 1-1-1/1-K-R / Roll-Out of Integrated Social Single Stage - One 2020-11- Refurbishment of Meghri IDA / 53980 Post Request for Bids Open - National 197,402.00 192,165.46 Signed 2019-07-29 2019-08-06 2019-08-03 2019-09-05 2019-08-31 2019-09-03 2019-09-30 2019-09-26 2019-11-04 2019-10-16 Protection Service Delivery Envelope 30 CSSTC SPAP II W 1.1.1/1.P / Roll-Out of Integrated Social Single Stage - One 2020-11- Refurbishment of Dilijan IDA / 53980 Post Request for Bids Open - National 197,254.00 148,302.67 Signed 2019-08-19 2019-10-25 2019-08-24 2019-09-21 2019-11-26 2019-10-21 2020-01-22 2019-12-02 2020-02-11 Protection Service Delivery Envelope 16 CSSTC SPAP II W 1.1.1/1.R / Roll-Out of Integrated Social Single Stage - One 2020-06- Refurbishment of Kapan IDA / 53980 Post Request for Bids Open - National 286,301.00 0.00 Canceled 2019-08-20 2019-10-24 2019-08-25 2019-09-22 2019-11-25 2019-10-22 2020-01-23 2019-12-03 Protection Service Delivery Envelope 30 CSSTC SPAP II W 1.1.1/1.S / Reconstruction and Roll-Out of Integrated Social Single Stage - One 2020-11- IDA / 53980 Post Request for Bids Open - National 806,145.00 721,997.55 Signed 2019-08-21 2019-10-24 2019-08-26 2019-09-23 2019-11-29 2019-10-23 2020-01-20 2019-12-04 2020-02-06 Refurbishment of Gyumri Protection Service Delivery Envelope 30 CSSTC SPAP II W 1.1.1/1.T / Under Roll-Out of Integrated Social Single Stage - One 2020-11- Reconstruction of Alaverdi IDA / 53980 Post Request for Bids Open - National 643,564.00 0.00 Implementat 2019-08-20 2019-10-24 2019-08-25 2019-09-22 2019-11-21 2019-10-22 2019-12-03 Protection Service Delivery Envelope 30 CSSTC ion SPAP II W 1-1-1/1-U / Roll-Out of Integrated Social Single Stage - One 2020-11- Refurbishment of Ijevan IDA / 53980 Post Request for Bids Open - National 510,580.00 414,981.02 Signed 2019-10-24 2019-10-29 2019-10-29 2019-11-26 2019-11-28 2019-12-26 2020-01-24 2020-02-06 2020-02-05 Protection Service Delivery Envelope 30 CSSTC SPAP II W 1-1-1/1-V / Roll-Out of Integrated Social Single Stage - One 2020-11- IDA / 53980 Post Request for Bids Open - National 395,017.00 309,207.60 Signed 2019-10-25 2019-10-25 2019-10-30 2019-11-27 2019-11-26 2019-12-27 2020-01-20 2020-01-31 2020-02-11 Refurbishment of Gavar Protection Service Delivery Envelope 30 CSSTC SPAP II W 1.1.1/1.R-1 / Roll-Out of Integrated Social Single Stage - One 2020-11- Refurbishment of Kapan IDA / 53980 Post Request for Bids Open - National 286,301.00 0.00 Canceled 2020-03-02 2020-03-02 2020-03-07 2020-03-04 2020-04-04 2020-05-04 2020-06-15 Protection Service Delivery Envelope 30 CSSTC Page 1 SPAP II W 1.1.1/1.Q / Roll-Out of Integrated Social Single Stage - One 2020-11- IDA / 53980 Post Request for Bids Open - National 570,506.00 0.00 Canceled 2019-08-16 2019-08-21 2019-08-23 2019-09-22 2019-11-03 Refurbishment of Artik CSSTC Protection Service Delivery Envelope 30 Under SPAP II W 1.1.1/1.W / Roll-Out of Integrated Social Single Stage - One 2021-01- IDA / 53980 Post Request for Bids Open - National 144,058.00 0.00 Implementat 2020-04-07 2020-04-10 2020-05-05 2020-05-07 2020-06-06 2020-07-11 Refurbishment of Berd CSSTC Protection Service Delivery Envelope 07 ion SPAP II W 1.1.1/1.X / Roll-Out of Integrated Social Single Stage - One 2021-11- Construction and IDA / 53980 Post Request for Bids Open - National 136,693.00 125,232.14 Signed 2020-04-08 2020-04-10 2020-04-13 2020-05-11 2020-05-12 2020-06-10 2020-06-25 2020-07-15 2020-07-20 Protection Service Delivery Envelope 07 refurbishmen of Jermuk CSSTC SPAP II W 1.1.1/1.R-2 / Roll-Out of Integrated Social Single Stage - One 2021-02- Refurbishment of Kapan IDA / 53980 Post Request for Bids Open - National 286,301.00 232,925.79 Signed 2020-04-19 2020-04-17 2020-04-21 2020-05-19 2020-05-15 2020-06-18 2020-07-10 2020-07-23 2020-08-03 Protection Service Delivery Envelope 18 CSSTC SPAP II W-1.1.1/1.Y / Roll-Out of Integrated Social Single Stage - One 2022-01- Refurbishment of IDA / 53980 Post Request for Bids Open - National 164,865.00 143,599.35 Signed 2020-06-08 2020-06-16 2020-06-13 2020-07-11 2020-07-15 2020-08-10 2020-08-20 2020-09-14 2020-10-07 Protection Service Delivery Envelope 07 Yeghegnadzor CSSTC SPAP II W1.1.1/1.Q-R-1 / Roll-Out of Integrated Social Single Stage - One 2022-06- IDA / 53980 Post Request for Bids Open - National 365,260.00 338,801.50 Signed 2020-06-23 2020-07-07 2020-06-28 2020-07-26 2020-08-05 2020-09-09 2020-10-16 2020-10-14 2020-11-12 Reconstruction of Artik CSSTC Protection Service Delivery Envelope 06 SPAP II W1.1.1/1.Z / Reconstruction and Roll-Out of Integrated Social Single Stage - One 2021-11- IDA / 53980 Post Request for Bids Open - National 485,845.00 0.00 Canceled 2020-08-25 2020-09-23 2020-08-30 2020-09-27 2020-10-23 2020-11-11 2020-12-09 2020-11-18 Refurbishment of Abovyan Protection Service Delivery Envelope 17 CSSTC SPAP II W1.1.1/1.Z-R / Reconstruction and Roll-Out of Integrated Social Single Stage - One 2022-06- IDA / 53980 Post Request for Bids Open - National 485,845.00 372,683.91 Signed 2021-03-10 2021-03-15 2021-03-11 2021-04-08 2021-04-12 2021-05-08 2021-07-12 2021-06-19 2021-06-23 Refurbishment of Abovyan Protection Service Delivery Envelope 18 CSSTC SPAP II W 1.1.1/1-1-A / Roll-Out of Integrated Social Single Stage - One 2022-06- Refurbishment of Ashtarak IDA / 53980 Post Request for Bids Open - National 382,453.00 316,637.52 Signed 2021-03-17 2021-03-31 2021-03-24 2021-04-02 2021-04-14 2021-04-21 2021-05-14 2021-06-10 2021-06-25 2021-06-29 Protection Service Delivery Envelope 25 CSSTC SPAP II W 1.1.1/1-1-B / Under Roll-Out of Integrated Social Single Stage - One 2022-07- Refurbishment of Sisian IDA / 53980 Post Request for Bids Open - National 375,905.00 0.00 Implementat 2021-03-17 2021-06-04 2021-03-22 2021-04-02 2021-04-12 2021-06-25 2021-05-12 2021-06-23 Protection Service Delivery Envelope 23 CSSTC ion SPAP II W 1.1.1/1-1-C / Roll-Out of Integrated Social Single Stage - One 2022-09- IDA / 53980 Post Request for Bids Open - National 842,865.00 823,452.51 Signed 2021-03-17 2021-04-14 2021-03-22 2021-04-12 2021-05-05 2021-05-12 2021-06-10 2021-06-23 2021-06-29 Construction of Spitak CSSTC Protection Service Delivery Envelope 01 SPAP II W 1.1.1/1-1-D / Roll-Out of Integrated Social Request for Single Stage - One 2021-08- Refurbishment of the IDA / 53980 Post Open - National 8,332.00 0.00 Canceled 2021-04-18 2021-06-13 Protection Service Delivery Quotations Envelope 12 reception of the MLSA of RA SPAP II W 1.1.1/1-1-D-R / Request for Under Refurbishment of the Roll-Out of Integrated Social Request for Single Stage - One 2021-10- IDA / 53980 Post Open - National Quotations (Non 8,330.00 0.00 Implementat 2021-08-04 2021-09-22 reception of the MLSA of RA Protection Service Delivery Quotations Envelope 22 Bank-SPD) ion (rebid) SPAP II W1.1.1/1.Q-R / Roll-Out of Integrated Social Single Stage - One 2020-11- IDA / 53980 Post Request for Bids Open - National 365,260.00 0.00 Canceled 2020-03-18 2020-03-18 2020-03-23 2020-04-20 2020-04-16 2020-05-20 2019-10-16 2020-06-23 Reconstruction of Artik CSSTC Protection Service Delivery Envelope 30 SPAP II W 1.1.1/1-1-F / Reconstruction and Under Roll-Out of Integrated Social Single Stage - One Other (with field 2022-10- Refurbishment of IDA / 53980 Post Request for Bids Open - National 429,000.00 0.00 Implementat 2021-10-29 2021-11-08 2021-11-03 2021-11-24 2021-12-22 2022-01-17 Protection Service Delivery Envelope for explanation) 24 Vagharshapat USS territorial ion center SPAP II W 1.1.1/1-1-E / Under Roll-Out of Integrated Social Single Stage - One Other (with field 2022-10- Refurbishment of Vayq USS IDA / 53980 Post Request for Bids Open - National 326,000.00 0.00 Implementat 2021-10-29 2021-11-08 2021-11-01 2021-11-22 2021-12-20 2022-01-15 Protection Service Delivery Envelope for explanation) 22 territorial center ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Contract 2.5.1 / Equipment Roll-Out of Integrated Social Request for IDA / 53980 Prior Open - International 0.00 39,315.07 Signed 2015-07-06 for PIU and PCU Protection Service Delivery Quotations SPAPII-G-2.1-4.1, Lot 2 / Equipment for MLSA, SSSS, Roll-Out of Integrated Social Single Stage - One IDA / 53980 Prior Request for Bids Open - International 107,350.00 41,205.30 Signed 2016-02-29 2016-04-21 Nork CJSC, NILRS, SEA and Protection Service Delivery Envelope MCPO, Lot 2 SPAP II G-2.1-4.1, Lot 1 / Equipment for MLSA, SSSS, Roll-Out of Integrated Social Single Stage - One IDA / 53980 Prior Request for Bids Open - International 531,000.00 407,283.24 Signed 2016-03-01 2016-04-12 Nork CJSC, NILSR, SEA and Protection Service Delivery Envelope MCPO, Lot 1 SPAPII-G-2.1-4.1, Lot 4 / Equipment for MLSA, SSSS, Roll-Out of Integrated Social Single Stage - One IDA / 53980 Prior Request for Bids Open - International 84,000.00 67,502.01 Signed 2016-02-29 2016-04-21 Nork CJSC, NILRS, SEA and Protection Service Delivery Envelope MCPO, Lot 4 SPAP II 2-3-2 / Upgrading electronic pension Modernization of the Pension Single Stage - One information system software IDA / 53980 Prior Request for Bids Open - National 0.00 0.00 Canceled 2016-11-22 2017-01-23 2016-11-27 2016-12-25 2017-02-20 2017-01-24 2017-06-20 2017-02-28 2018-02-28 System Envelope with interfaces with other databases SPAP II 2-1-3 / Upgrade and Development of information Pending subsystem of complex social Roll-Out of Integrated Social Single Stage - One IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementati 2017-04-10 2017-04-15 2017-05-13 2017-08-11 2017-09-15 2018-10-31 services provision (Upgrade Protection Service Delivery Envelope on and development of ISPCs' MIS) SPAP II 2-3-3 / Development Pending of the new risk-based control Modernization of the Pension Single Stage - One IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementati 2017-08-07 2017-08-12 2017-09-09 2017-12-08 2018-01-12 2018-08-07 and supervision information System Envelope on system software Page 2 SPAP II 2-4-3 / Development Strengthen MLSI Analytical and introduction of internal Single Stage - One IDA / 53980 Capacity and Monitoring and Post Request for Bids Open - National 0.00 0.00 Canceled 2017-01-10 2017-05-30 2017-01-15 2017-02-12 2017-07-19 2017-05-13 2017-11-03 2017-06-17 2018-06-10 portal for MLSI management Envelope Evaluation Systems system SPAP II 2-4-4 / Development and introduction of electronic Strengthen MLSI Analytical Pending Single Stage - One system of monitoring and IDA / 53980 Capacity and Monitoring and Post Request for Bids Open - National 0.00 0.00 Implementati 2017-08-15 2017-08-20 2017-09-17 2017-12-16 2018-01-20 2018-10-15 Envelope evaluation of efficiency of Evaluation Systems on social SPAP II 2-1-2/1 / Pending Procurement of furniture for Roll-Out of Integrated Social Single Stage - One IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementati 2017-06-05 2017-06-10 2017-07-08 2017-10-06 2017-11-10 2018-01-09 Talin, Vanadzor, Amasia, Protection Service Delivery Envelope on Malatia-Sebastia SPAP II G-2-1-4-1/3AR / Air Modernization of the Pension Request for Single Stage - One Conditioners for MLSA, SSSS, IDA / 53980 Post Limited 0.00 0.00 Canceled 2017-07-15 2017-07-14 2017-09-03 2018-03-02 System Quotations Envelope NILSR SPAP II G-2-3-2R / Upgrading electronic pension Modernization of the Pension Single Stage - One information system software IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Canceled 2017-07-20 2017-07-25 2017-08-22 2017-09-21 2017-10-26 2018-04-24 System Envelope with interfaces with other databases SPAP II G-2-1-1/2 / Procurement of technical Roll-Out of Integrated Social Request for Single Stage - One (household) means for Talin, IDA / 53980 Post Limited 0.00 0.00 Canceled 2017-12-20 2018-02-03 2018-03-20 Protection Service Delivery Quotations Envelope Vanadzor, Amasia, Talin, Malatia-Sebastia SPAP II G-2-1-2/2 / Pending Procurement of furniture for Roll-Out of Integrated Social Single Stage - One IDA / 53980 Post Request for Bids Open - National 0.00 0.00 Implementati 2017-12-20 2017-12-24 2018-01-21 2018-03-27 2018-04-24 2018-06-23 SEA, AMSE and Malatia- Protection Service Delivery Envelope on Sebastia SPAP II G-2-1-1/1 / Pending Procurement of printers and Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 0.00 0.00 Implementati 2017-12-20 2018-01-26 2018-03-12 scanners for State Social Protection Service Delivery Quotations Envelope on Security Service (SSSS) SPAP II G-2-1-1/3 / Pending Roll-Out of Integrated Social Request for Single Stage - One Procurement of computer IDA / 53980 Post Open - National 186,000.00 0.00 Implementati 2018-02-25 2018-06-14 2018-08-13 Protection Service Delivery Quotations Envelope equipments for AMSE TCs on SPAP II 2-4-3-R / Strengthen MLSI Analytical Pending Development and introduction Single Stage - One IDA / 53980 Capacity and Monitoring and Post Request for Bids Open - National 240,000.00 0.00 Implementati 2018-02-12 2018-02-17 2018-03-19 2018-05-16 2018-12-27 of internal portal for MLSI Envelope Evaluation Systems on management system SPAP II G-2-1-1/5 / Procurement of household appliances means for Talin, Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 69,600.00 0.00 Canceled 2018-04-15 2018-05-21 2018-06-03 2018-08-02 Vanadzor, Amasia, Malatia- Protection Service Delivery Quotations Envelope Sebastia, Hrazdan, Shengavit, Tashir, Akhuryan CSSTCs SPAP II G-2-1-1/6 / Procurement of Computer Under Equipment for Vanadzor, Roll-Out of Integrated Social Single Stage - One IDA / 53980 Post Request for Bids Open - National 118,800.00 0.00 Implementati 2018-04-30 2018-04-27 2018-05-05 2018-06-02 2018-06-11 2018-07-02 2018-07-30 2018-09-28 Talin, Amasia, Malatia- Protection Service Delivery Envelope on Sebastia,Shengavit, Hrazdan, Tashir and Akhuryan CSSTC- s SPAP II G-2-1-2/3 / Pending Procurement of furniture and Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 63,036.00 0.00 Implementati 2018-07-14 2018-09-01 2018-10-31 other means for Hrazdan and Protection Service Delivery Quotations Envelope on Tashir CSSTC-s SPAP II-G-2-1-4-1-3/AR-II / Pending Procurement of Air Modernization of the Pension Request for Single Stage - One IDA / 53980 Post Open - National 60,000.00 0.00 Implementati 2018-09-15 2018-10-28 2018-12-27 Conditioners for MLSA and System Quotations Envelope on SSSS SPAP II G-2-1-1/5-R / Procurement of household Pending appliances means for Talin, Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 69,600.00 0.00 Implementati 2018-09-15 2018-10-28 2018-12-27 Vanadzor, Amasia, Malatia- Protection Service Delivery Quotations Envelope on Sebastia, Hrazdan, Shengavit, Tashir, Akhuryan CSSTCs SPAP II G-2-1-2/4 / Pending Procurement of furniture and Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 67,414.00 0.00 Implementati 2018-11-03 2018-12-29 2019-02-27 other means for Shengavit Protection Service Delivery Quotations Envelope on and Akhuryan CSSTC-s SPAP II G-2-1-2/5 / Pending Roll-Out of Integrated Social Request for Single Stage - One Procurement of furniture for IDA / 53980 Post Limited 49,530.00 0.00 Implementati 2018-11-12 2019-01-07 2019-03-08 Protection Service Delivery Quotations Envelope MLSA on SPAP II G-2-1-1/4 / Procurement of Tablets and Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 73,200.00 0.00 Canceled 2019-03-30 2019-05-18 2019-07-17 Docking Stations for the Protection Service Delivery Quotations Envelope CSSTC-s SPAP II G-2-1-1/7 / Roll-Out of Integrated Social Single Stage - One Procurement of Computer IDA / 53980 Post Request for Bids Open - National 601,200.00 0.00 Canceled 2018-12-10 2018-12-15 2019-01-12 2019-02-09 2019-03-23 2019-05-22 Protection Service Delivery Envelope Equipment for SSSS and SEA SPAP II G-2-1-2/6 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Limited 30,753.00 0.00 Canceled 2019-07-28 2019-08-01 2019-09-01 2019-10-31 of furniture for Tsaghkahovit Protection Service Delivery Quotations Envelope CSSTC SPAP II 2-2-3 / Procurement of furniture for the "State Support the Implementation Request for Single Stage - One Employment Service" Agency IDA / 53980 of the New Employment Post Open - National 0.00 0.00 Canceled 2017-08-12 2017-10-30 2018-04-02 Quotations Envelope and "Professional Orientation Strategy by the Government Methodical Center" POMC Page 3 SPAP II 2-2-2 / Support the Implementation Modernization of "Gorts" Single Stage - One IDA / 53980 of the New Employment Post Request for Bids Open - National 0.00 0.00 Canceled 2017-05-15 2017-05-20 2017-06-17 2017-09-15 2017-10-20 2018-10-15 information system of Envelope Strategy by the Government employment sector SPAP II 2-2-4 / Development and introduction of Support the Implementation information system for Request for Single Stage - One IDA / 53980 of the New Employment Post Open - National 0.00 0.00 Canceled 2017-06-16 2017-09-03 2018-09-03 assuring methodical Quotations Envelope Strategy by the Government assistance to professional orientation SPAP II 2-2-5 / Drafting and introduction of online consultancy and distance- Support the Implementation Request for Single Stage - One training programs IDA / 53980 of the New Employment Post Open - National 0.00 0.00 Canceled 2017-10-15 2018-01-02 2018-10-31 Quotations Envelope implemented via the web page Strategy by the Government of "Professional Orientation Methodical Center" POMC SPAP II 2-2-6 / Development Support the Implementation and installation of software Request for Single Stage - One IDA / 53980 of the New Employment Post Open - National 0.00 0.00 Canceled 2017-05-06 2017-07-24 2018-05-01 for testing of professional Quotations Envelope Strategy by the Government orientation SPAP II G-2-1-1/8 / Roll-Out of Integrated Social Single Stage - One Procurement of Computer IDA / 53980 Post Request for Bids Open - National 441,600.00 307,705.07 Signed 2019-09-27 2019-10-24 2019-10-02 2019-10-30 2019-11-21 2019-11-29 2019-12-16 2020-01-10 2020-02-17 2020-03-10 Protection Service Delivery Envelope Equipment for SEA SPAP II G-2-1-1/9 / Procurement of Electronic Under Roll-Out of Integrated Social Request for Single Stage - One Queuing Terminals and Video IDA / 53980 Post Open - National 66,000.00 0.00 Implementati 2019-12-03 2019-12-18 2019-12-08 2020-02-14 2019-12-22 2020-01-21 2020-02-18 2020-05-18 Protection Service Delivery Quotations Envelope Surveillance and Related on Equipment for the CSSTC-s SPAP II G-2-1-2/6-R / Under Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 29,450.00 0.00 Implementati 2019-12-25 2020-02-14 2020-02-22 2020-05-22 of furniture for Tsaghkahovit Protection Service Delivery Quotations Envelope on CSSTC SPAP II G-2-1-2/7 / Under Roll-Out of Integrated Social Request for Single Stage - One Procurement and installation IDA / 53980 Post Open - National 31,873.00 0.00 Implementati 2020-03-09 2020-05-13 2020-07-12 Protection Service Delivery Quotations Envelope of furniture for Sevan CSSTC on SPAP II G-2-1-1/10 / Roll-Out of Integrated Social Single Stage - One Procurement of Computer IDA / 53980 Post Request for Bids Open - National 448,800.00 40,082.62 Signed 2020-03-25 2020-03-26 2020-03-30 2020-04-27 2020-04-27 2020-05-27 2020-08-25 2020-06-24 2020-10-05 2020-09-22 Protection Service Delivery Envelope Equipment for SATA/D SPAP II G-2-1-2/8 / "Procurement of additional furniture items for Shengavit, Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 29,139.00 20,302.41 Signed 2020-05-05 2020-06-22 2020-07-01 2020-08-21 Malatia-Sebastia, Talin, Protection Service Delivery Quotations Envelope Vanadzor, Tashir, Akhuryan, Hrazdan CSSTC-s and MSEA" SPAP II G-2-1-2/9 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 82,350.00 59,021.52 Completed 2020-05-18 2020-07-22 2020-08-10 2020-09-20 2020-10-09 of furniture for Martuni and Protection Service Delivery Quotations Envelope Meghri CSSTCs SPAP II G-2-1-2/10 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 43,913.00 37,710.26 Signed 2020-07-15 2020-09-01 2020-10-05 2020-10-31 of furniture for Dilijan Protection Service Delivery Quotations Envelope andAparan CSSTCs SPAP II G-2-1-1/11 / Procurement of appliances means for Tsaghkahovit, Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 37,800.00 32,417.39 Signed 2020-08-25 2020-10-22 2020-11-25 2020-12-21 Stepanavan, Meghri, Sevan, Protection Service Delivery Quotations Envelope Martuni, Goris, Aparan, Gavar, Dilijan and Ijevan CSSTCs SPAP II G-2-1-2/11 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 57,517.00 0.00 Canceled 2020-10-26 2020-11-28 2021-02-26 of furniture for Gavar and Protection Service Delivery Quotations Envelope Goris CSSTCs SPAP II G-2-1-2/13 / Procurement of furnishing Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 11,271.00 12,010.25 Signed 2021-02-21 2021-03-04 2021-04-04 2021-05-10 2021-06-03 means for Gavar and Goris Protection Service Delivery Quotations Envelope CSSTCs SPAP II G-2-1-2/12 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 46,175.00 48,726.85 Signed 2021-02-20 2021-03-04 2021-04-03 2021-05-10 2021-06-02 of furniture for Gavar and Protection Service Delivery Quotations Envelope Goris CSSTCs SPAP II 2-1-1/12 / Procurement of computer Roll-Out of Integrated Social Single Stage - One and computer related IDA / 53980 Post Request for Bids Open - National 583,200.00 551,247.73 Signed 2021-04-12 2021-03-03 2021-04-17 2021-05-08 2021-05-17 2021-06-07 2021-06-07 2021-07-19 2021-07-12 2021-10-17 Protection Service Delivery Envelope equipments for SATA/D and SSS SPAP II G-2-1-2/14 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One of furniture for Ijevan, Jermuk, IDA / 53980 Post Open - National 73,405.00 78,703.34 Signed 2021-04-18 2021-06-09 2021-07-01 2021-08-08 Protection Service Delivery Quotations Envelope Kapan, Stepanavan United Social services /USSs/ SPAP II G-2-1-2/15 / Procurement and installation of furnishing means for Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 18,920.00 19,326.09 Signed 2021-04-20 2021-06-11 2021-07-01 2021-08-10 Ijevan, Jermuk, Kapan, Protection Service Delivery Quotations Envelope Stepanavan United Social services /USSs/ SPAP II G-2-1-1/13 / Procurement of Electronic Under Roll-Out of Integrated Social Single Stage - One Queuing Terminals and Video IDA / 53980 Post Request for Bids Open - National 100,800.00 0.00 Implementati 2021-06-15 2021-06-25 2021-06-21 2021-07-12 2021-07-19 2021-08-02 2021-09-03 2021-12-02 Protection Service Delivery Envelope Surveillance and Related on Equipment for the USSTC-s Page 4 SPAP II G-2-1-2/16 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One of furniture for United Social IDA / 53980 Post Open - National 36,500.00 0.00 Canceled 2021-07-28 2021-09-04 2021-11-03 Protection Service Delivery Quotations Envelope services of Alaverdi and Berd teritorial centers /USSs/ SPAP II G-2-1-2/17 / Procurement and installation of furnishing means for Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 10,700.00 0.00 Canceled 2021-07-28 2021-09-24 2021-09-04 2021-11-03 United Social services of Protection Service Delivery Quotations Envelope Alaverdi and Berd teritorial centers /USSs/ SPAP II G-2-1-2/19 / Procurement and installation of interior decoration and Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 5,245.00 0.00 Canceled 2021-11-03 2021-12-18 2022-02-16 accommodation articles for Protection Service Delivery Quotations Envelope Yeghegnadzor United Social service /USS/ SPAP II G-2-1-2/18 / Procurement and installation Roll-Out of Integrated Social Request for Single Stage - One IDA / 53980 Post Open - National 18,300.00 0.00 Canceled 2021-11-03 2021-12-18 2022-02-16 of furniture for Protection Service Delivery Quotations Envelope Yeghegnadzor United Social service /USS/ SPAP II G-2-1-1/20 / Procurement and installation of furniture and interior Pending Roll-Out of Integrated Social Single Stage - One decoration and IDA / 53980 Post Request for Bids Open - National 70,750.00 0.00 Implementati 2021-11-29 2021-12-04 2021-12-25 2022-01-24 2022-02-28 2022-04-29 Protection Service Delivery Envelope accommodation articles for on Alaverdi, Berd and Yeghegnadzor USSTCs. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SPAP II- C- 3.4.1 / Implementation of Monitoring, Development and Consultant Introduction of Descriptions Roll-Out of Integrated Social IDA / 53980 Prior Qualification Open - International 0.00 171,705.86 Signed 2016-01-06 2016-01-15 of Efficiency Evaluation and Protection Service Delivery Selection Monitoring Indicators of the Social Services Implemented Through the MoLSA 3-4-3 / Assessment of needs Strengthen MLSI Analytical Consultant of the primary beneficiaries of IDA / 53980 Capacity and Monitoring and Prior Qualification Open - National 204,000.00 202,414.06 Signed 2016-02-24 2016-03-16 2016-07-19 2016-09-22 2016-11-13 2016-09-26 2016-09-26 2018-08-10 programs piloted in the SP Evaluation Systems Selection system SPAP II 3-2-2 / Fulfillment of public awareness activities on Support the Implementation Consultant Pending reforms and programs IDA / 53980 of the New Employment Post Qualification Open - National 0.00 0.00 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-05-20 Implementation implemented in the sector of Strategy by the Government Selection labor and employment SPAP II 3-1-2-B/1 / Implementation of technical Support the Implementation Consultant Pending supervision of refurbishment IDA / 53980 of the New Employment Post Qualification Open - National 0.00 0.00 2016-12-29 2017-01-12 2017-02-09 2017-02-16 2017-03-23 2018-12-31 Implementation of Shengavit, and Malatia- Strategy by the Government Selection Sebastia ISPCs, SEA, and AMSE SPAP II 3-1-7 / Development of methodical manuals and other training materials Consultant assuring the provision of Roll-Out of Integrated Social Pending IDA / 53980 Post Qualification Open - National 0.00 0.00 2017-07-10 2017-07-31 2017-09-13 2017-10-13 2017-11-17 2018-05-16 integrated social protection Protection Service Delivery Implementation Selection delivery services, delivery and follow up support of distance- training system SPAP II 3-2-1 / Preparing of films about professions and cartoon animations for the Support the Implementation Consultant Pending professional orientation of IDA / 53980 of the New Employment Post Qualification Open - National 0.00 0.00 2017-11-06 2017-11-27 2018-01-10 2018-02-09 2018-03-16 2018-10-31 Implementation primary school-aged children Strategy by the Government Selection and people with mental disabilities SPAP II-C-3-1-8 / Preparation of Interior Designs, Specifications and Cost Estimates of Necessary Consultant Roll-Out of Integrated Social Pending Goods for Furnishing the IDA / 53980 Post Qualification Open - National 77,424.20 0.00 2018-01-30 2018-02-20 2018-04-05 2018-05-05 2018-05-26 2019-04-11 Protection Service Delivery Implementation CSSTC-s renovated and built Selection under SPAP II and follow on supervision of goods to be supplied. /23 Centers/ SPAP II-C-3-1-1I / Preparation of design-cost estimate documents for Consultant Roll-Out of Integrated Social Pending refurbishment of Kentron and IDA / 53980 Post Qualification Open - National 75,518.60 0.00 2018-01-25 2018-02-15 2018-03-31 2018-04-30 2018-05-21 2018-10-28 Protection Service Delivery Implementation Erebuni CSSTCs and Selection implementation of author's supervision SPAP II-C-3-1-1J / Preparation of design-cost Consultant estimate documents for Roll-Out of Integrated Social Pending IDA / 53980 Post Qualification Open - National 18,852.00 0.00 2018-03-15 2018-03-29 2018-05-12 2018-06-11 2018-07-02 2018-12-29 refurbishment of Artik CSSTC Protection Service Delivery Implementation Selection and implementation of author's supervision Page 5 SPAP II-C-3-1-1K / Preparation of design-cost estimate documents for Consultant Roll-Out of Integrated Social Pending refurbishment of Dilijan, IDA / 53980 Post Qualification Open - National 52,736.40 0.00 2018-04-09 2018-04-23 2018-06-06 2018-06-20 2018-07-11 2018-12-30 Protection Service Delivery Implementation Ijevan and Berd ISPCs and Selection implementation of author's supervision SPAP II-C-3-1-1L / Preparation of design-cost estimate documents for Consultant Roll-Out of Integrated Social Pending refurbishment of Gyumri and IDA / 53980 Post Qualification Open - National 32,790.00 0.00 2018-04-10 2018-04-24 2018-06-07 2018-06-21 2018-07-12 2018-12-30 Protection Service Delivery Implementation Spitak ISPCs and Selection implementation of author's supervision SPAP II-C-3-1-1M / Preparation of design-cost Consultant estimate documents for Roll-Out of Integrated Social Pending IDA / 53980 Post Qualification Open - National 39,696.00 0.00 2018-04-10 2018-04-24 2018-06-07 2018-06-21 2018-07-12 2018-12-30 refurbishment of Ashtarak Protection Service Delivery Implementation Selection and Vagharshapat implementation of author's supervision SPAP II-C-3-1-1N / Preparation of design-cost estimate documents for Consultant Roll-Out of Integrated Social Pending refurbishment of Arabkir, Nor IDA / 53980 Post Qualification Open - National 72,885.60 0.00 2018-04-10 2018-04-24 2018-06-07 2018-06-21 2018-07-12 2018-12-30 Protection Service Delivery Implementation Norq, Qanaqer-Zeytun Selection CSSTCs and implementation of author's supervision SPAP II C 3-1-2-E / Implementation of technical Consultant supervision of Roll-Out of Integrated Social IDA / 53980 Post Qualification Open - National 9,317.00 4,838.12 Signed 2018-07-30 2020-04-15 2018-08-13 2018-09-26 2020-06-17 2018-10-03 2020-07-22 2018-10-17 2020-07-21 2018-12-30 construction/rehabilitation Protection Service Delivery Selection works of Yeghegbadzor, Vayq and Jermouk CSSTCs /ISPCs/ SPAP II C-3-1-2-F / Implementation of technical Consultant supervision of Roll-Out of Integrated Social Under IDA / 53980 Post Qualification Open - National 11,387.00 0.00 2018-07-30 2018-07-13 2018-08-13 2018-09-26 2019-10-25 2018-10-03 2018-10-17 2018-12-30 construction/rehabilitation Protection Service Delivery Implementation Selection works of Ashtarak, Aparan and Abovyan CSSTCs /ISPCs/ SPAP II C-3-1-2-G / Implementation of technical supervision of Consultant Roll-Out of Integrated Social Pending construction/rehabilitation IDA / 53980 Post Qualification Open - National 10,973.00 0.00 2018-07-30 2018-08-13 2018-09-26 2018-10-03 2018-10-17 2018-12-30 Protection Service Delivery Implementation works of Nor-Norq, Erebuni Selection and Qanaqer-Zeytun CSSTCs /ISPCs/ SPAP II C-3-1-2-H / Implementation of technical Consultant supervision of Roll-Out of Integrated Social Pending IDA / 53980 Post Qualification Open - National 16,563.00 0.00 2018-07-30 2018-08-13 2018-09-26 2018-10-03 2018-10-17 2018-12-30 construction/rehabilitation Protection Service Delivery Implementation Selection works of Kentron, Arabkir and Vagharshapat CSSTCs /ISPCs/ SPAP II C-3-1-2-I / Implementation of technical Consultant supervision of Roll-Out of Integrated Social Under IDA / 53980 Post Qualification Open - National 16,563.00 0.00 2018-07-30 2019-11-04 2018-08-13 2018-09-26 2018-10-03 2018-10-17 2018-12-30 construction/rehabilitation Protection Service Delivery Implementation Selection works of Gyumri, Artik and Spitak CSSTCs /ISPCs/ SPAP II C-3-1-2-J / Implementation of technical Consultant supervision of Roll-Out of Integrated Social IDA / 53980 Post Qualification Open - National 11,387.00 10,561.74 Signed 2018-07-30 2019-01-16 2018-08-13 2018-09-26 2019-03-27 2018-10-03 2019-06-12 2018-10-17 2019-07-25 2018-12-30 construction/rehabilitation Protection Service Delivery Selection works of Goris, Kapan and Meghri CSSTCs /ISPCs/ SPAP II C-3-1-2-K / Implementation of technical Consultant supervision of Roll-Out of Integrated Social IDA / 53980 Post Qualification Open - National 12,836.00 10,445.56 Signed 2018-07-30 2019-01-17 2018-08-13 2018-09-26 2019-10-25 2018-10-03 2019-11-29 2018-10-17 2019-11-29 2018-12-30 construction/rehabilitation Protection Service Delivery Selection works of Gavar, Martuni and Sevan CSSTCs /ISPCs/ SPAP II-C-2-2-7 / “Development and Support the Implementation Consultant Introduction of an Information IDA / 53980 of the New Employment Post Qualification Open - National 299,000.00 0.00 Canceled 2019-09-05 2019-10-10 2019-09-19 2019-12-02 2019-11-02 2019-12-02 2019-12-17 2020-11-14 System supporting the Strategy by the Government Selection Development of the RoA Employment Sector” SPAP II C-3-1-2-L / Implementation of technical Consultant supervision of Roll-Out of Integrated Social Under IDA / 53980 Post Qualification Open - National 13,359.00 0.00 2019-08-26 2019-11-04 2019-09-09 2019-10-23 2019-11-06 2019-11-27 2020-11-30 construction/rehabilitation Protection Service Delivery Implementation Selection works of Dilijan, Ijevan and Berd CSSTCs /ISPCs/ SPAP II-C-3-1-1-Q / Preparation of design-cost estimate documents and implementation of follow-on Consultant Roll-Out of Integrated Social Under supervision for the IDA / 53980 Post Qualification Open - National 48,606.00 0.00 2020-10-21 2020-11-04 2020-11-04 2020-12-02 2020-12-16 2020-12-23 2022-10-31 Protection Service Delivery Implementation establishment of Integrated Selection (Complex) Social Services Central Office, Kentron and Erebuni CSSTCs SPAP II-C-3.5.1/1 / Project Least Cost Audit /for the years 2020, IDA / 53980 Project Management Post Open - National 11,200.00 8,553.22 Signed 2021-03-09 2021-03-12 2021-03-16 2021-04-06 2021-03-31 2021-04-13 2021-04-09 2021-04-20 2021-04-09 2021-05-11 2021-04-30 2021-05-19 2021-06-03 2022-10-31 Selection 2021, 2022/ INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 Individual Roll-Out of Integrated Social SPAP II-C-3.5.7-b / Engineer IDA / 53980 Prior Consultant Open 0.00 146,365.35 Signed 2015-04-09 2015-04-11 Protection Service Delivery Selection Individual Roll-Out of Integrated Social SPAP II-C-3.5.7-c / Engineer IDA / 53980 Prior Consultant Open 0.00 73,173.93 Signed 2015-04-09 2015-04-11 Protection Service Delivery Selection CONTRACT SPAP II-C-3.5.3r Individual Roll-Out of Integrated Social / Social Protection Project IDA / 53980 Prior Consultant Open 0.00 113,768.81 Signed 2015-06-15 2015-06-15 Protection Service Delivery Implementation Specialist Selection Individual SPAPII-C-3.5.11 / Roll-Out of Integrated Social IDA / 53980 Prior Consultant Open 0.00 79,765.11 Signed 2015-07-28 2015-08-17 Information Systems Specialist Protection Service Delivery Selection SPAP-C-3.5.2 / Project Roll-Out of Integrated Social IDA / 53980 Prior Direct Selection Direct 96,000.00 37,748.69 Signed 2015-03-02 Coordinator Protection Service Delivery SPAP II-C-3.5.6 / Technical Individual Roll-Out of Integrated Social Support and Communication IDA / 53980 Prior Consultant Open 0.00 72,273.39 Signed 2015-04-06 2015-04-10 Protection Service Delivery Technologies (TSCT) Specialist Selection SPAP II-C-3.5.4 / Specialist Individual Roll-Out of Integrated Social on Project Monitoring and IDA / 53980 Prior Consultant Open 0.00 133,874.84 Signed 2015-04-08 2015-04-10 Protection Service Delivery Evaluation Selection Individual Roll-Out of Integrated Social SPAP II-C-3.5.7-a / Engineer IDA / 53980 Prior Consultant Open 0.00 109,863.34 Signed 2015-04-09 2015-04-11 Protection Service Delivery Selection Individual 3-5-13 / Social Safeguards Under IDA / 53980 Project Management Post Consultant Open 0.00 0.00 2016-10-25 2016-10-25 2016-12-13 2017-01-03 2017-02-07 2017-08-06 Specialist Implementation Selection SPAP II C 3-5-2A / IDA / 53980 Project Management Prior Direct Selection Direct 17,920,971.00 89,889.00 Completed 2017-09-25 2017-09-30 2017-10-14 2017-10-06 2018-12-09 2019-06-21 Coordinator for PCU SPAP II-C-3-5-5/A / Individual Engineer - Environmental IDA / 53980 Project Management Post Consultant Open 0.00 49,180.63 Signed 2017-12-21 2017-12-20 2018-02-08 2018-02-26 2018-03-01 2018-02-26 2018-03-22 2018-03-01 2018-09-18 Specialist Selection Individual SPAP II-C-3-5-7-D / IDA / 53980 Project Management Prior Consultant Open 16,666.00 47,458.54 Completed 2018-03-20 2018-03-22 2018-05-13 2018-04-17 2018-05-18 2018-08-07 2018-05-20 2018-06-13 2018-12-26 2019-09-19 Engineer Selection Individual SPAP II C-3-5-14 / PCU IDA / 53980 Project Management Post Consultant Open 2,025.00 14,158.44 Terminated 2018-05-20 2018-12-17 2018-06-22 2018-07-03 2018-07-13 2018-07-06 2018-08-02 2018-07-20 2018-12-30 Technical Assistant Selection SPAP II-C-3-1-1P / Making Amendments in Design-Cost Estimate Documents for Refurbishment Works of Roll-Out of Integrated Social Under Tashir Complex Social IDA / 53980 Post Direct Selection Direct 4,950.00 0.00 2018-06-11 2018-06-06 2018-06-16 2018-06-30 2018-12-30 Protection Service Delivery Implementation Services Territorial Center (CSSTC) in Lori Marz and Implementing Follow-on Supervision Individual SPAP II C-3-5-9 / Assistant Under IDA / 53980 Project Management Post Consultant Open 43,767.00 0.00 2018-11-05 2014-11-07 2018-11-05 2015-02-02 2018-11-05 2015-02-25 2018-11-05 2018-11-30 to Project Coordinator Implementation Selection SPAP II-C-3-5-15 / Software, Individual Telecommunication IDA / 53980 Project Management Post Consultant Open 33,100.00 29,620.09 Signed 2019-01-24 2019-01-16 2019-03-14 2019-02-27 2019-03-28 2019-04-15 2019-04-09 2019-05-02 2020-11-30 Technologies and Technical Selection Support Specialist SPAP II C 3-5-2/B / Project IDA / 53980 Project Management Prior Direct Selection Direct 40,800.00 100,005.34 Completed 2019-07-15 2019-07-16 2019-07-15 2019-07-22 2019-07-20 2019-07-25 2020-11-30 2020-10-30 coordinator Individual SPAP II-C-3-5-7-E / IDA / 53980 Project Management Post Consultant Open 20,415.00 9,737.98 Signed 2019-10-17 2019-10-17 2019-12-05 2019-11-29 2019-12-12 2019-11-29 2019-12-26 2019-12-02 2020-06-25 Engineer Selection Individual SPAP II-C-3-5-7-F / IDA / 53980 Project Management Post Consultant Open 20,415.00 52,693.02 Signed 2019-10-17 2019-10-17 2019-12-05 2019-11-29 2019-12-12 2019-11-29 2019-12-26 2019-12-02 2020-06-25 Engineer Selection Individual SPAP II-C-3-5-16 / Financial IDA / 53980 Project Management Prior Consultant Open 21,000.00 59,741.50 Signed 2019-10-25 2019-10-28 2019-12-13 2019-12-03 2019-12-20 2019-12-04 2020-01-01 2019-12-06 2020-06-29 management specialist Selection SPAP II C 3-5-17 / IDA / 53980 Project Management Prior Direct Selection Direct 19,221.00 58,006.00 Signed 2019-12-24 2020-01-08 2019-12-26 2020-01-09 2020-01-18 2020-01-16 2020-11-30 Procurement Specialist SPAP II-C-3.5.1 / Project Under IDA / 53980 Project Management Post Direct Selection Direct 40,500.00 0.00 2020-03-23 2020-03-24 2020-03-24 2020-03-24 2020-11-29 Audit Implementation Individual SPAP II-C-3-5-7-G / IDA / 53980 Project Management Post Consultant Open 43,188.00 19,151.22 Signed 2020-07-13 2020-07-09 2020-08-24 2020-07-31 2020-08-24 2020-07-31 2020-09-16 2020-08-06 2022-10-30 Engineer Selection Individual SPAP II C-3-5-14-A / PCU IDA / 53980 Project Management Post Consultant Open 11,123.00 8,779.40 Signed 2020-10-20 2020-10-30 2020-12-08 2021-03-19 2020-12-29 2021-03-31 2021-01-12 2021-04-01 2022-11-01 Technical Assistant Selection Individual SPAP II C 3-5-2/C / Project IDA / 53980 Project Management Post Consultant Limited 62,750.00 59,929.96 Signed 2020-11-06 2020-11-04 2020-11-07 2020-11-11 2020-11-09 2020-11-19 2020-11-12 2020-11-20 2022-10-31 coordinator Selection Page 7