Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: September 24, 2013] 2. Date of General Procurement Notice: July 12, 2013 3. Period covered by this procurement plan: The procurement period of project covered from year September 2013 to May 2018. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,500,000 All 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 500,000 All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Summary of the Procurement Packages planned during the first 18 months after project effectiveness [See Procurement Plan] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule [See Procurement Plan] PROCUREMENT Iraq : Transport Corridors Project PLAN General Information Country: Iraq Bank’s Approval Date of the Original Procurement Plan: 2017-09-11 2021-11-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P131550 GPN Date: Project Name: Transport Corridors Project Loan / Credit No: IBRD / 83220 Ministry of Municipalities and Public Works - Roads & Bridges Directorate Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TCP.W.A1.EW.1.R8 / Transport Corridors Single Stage - One 95,800,237. Rehabilitation of Expressway IBRD / 83220 Prior Request for Bids Open - International Signed 2015-11-22 2015-12-10 Improvements Envelope 07 No 1 R8 TCP.W.A1.EW.1.R7 / Transport Corridors Single Stage - One 105,953,61 Rehabilitation of Expressway IBRD / 83220 Prior Request for Bids Open - International Signed 2015-11-04 2015-12-07 Improvements Envelope 0.99 No.1 R7 TCP.W.A1.EW.1.R8B / Rehabilitation of Expressway Transport Corridors Single Stage - One 2020-05- No.1Section R8B IBRD / 83220 Prior Request for Bids Open - International 0.00 Canceled 2019-07-18 2019-09-10 2019-07-23 2019-11-11 2019-09-03 2019-10-03 2019-11-07 Improvements Envelope 05 from Basra Junction – Safwan (Remaining works) TCP.W.A1.EW.1.R8B /R / Rehabilitation of Expressway Transport Corridors Single Stage - One 37,157,475. 2020-09- IBRD / 83220 Prior Request for Bids Open - International Signed 2019-12-03 2019-12-12 2019-12-08 2019-12-17 2020-01-19 2020-02-02 2020-02-18 2020-03-16 2020-03-24 2020-04-30 No.1 R8/B Basra Junction – Improvements Envelope 00 20 Safwan (Remaining works) TCP.W.A1.EW.1.R9A / The complete works involve rehabilitation of the sub- Transport Corridors Single Stage - One 2022-03- section R9A of the Expressway IBRD / 83220 Prior Request for Bids Open - International 0.00 Canceled 2020-06-30 2020-07-30 2020-09-10 2020-10-10 2020-12-20 Improvements Envelope 15 No. 1 which is the main road axis in Iraq. The total length of this section is about 63 km Request for Bids - Works TCP.W.A1.EW.1.R9A/R / (without Rehabilitation of part of the prequalificati Under section R9A from the Transport Corridors Single Stage - One 2023-02- IBRD / 83220 Prior Request for Bids Open - International on) SPD - 0.00 Implementat 2021-06-11 2021-08-17 2021-07-11 2021-08-25 2021-08-22 2021-11-01 2021-09-21 2021-12-01 Expressway No. 1 from St. ( Improvements Envelope 24 Applying ion 0+970) Baghdad- West to St. ( contractor 40+00) disqualificiati on Request for Bids - Works TCP.W.A1.EW.1.A3 / (without Construction on a pilot basis prequalificati Pending of a fiber optic cable network Transport Corridors Single Stage - One 2024-02- IBRD / 83220 Prior Request for Bids Open - International on) SPD - 0.00 Implementat 2021-08-18 2021-09-17 2021-10-29 2021-11-28 2022-02-07 along section R8B (Rumaila - Improvements Envelope 07 Applying ion Safwan) of Expressway (1) for contractor 17 KM. disqualificiati on GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TCP/G/SH/01 / Supply of Air Project Implementation and Request for Single Stage - One Conditioner for - New PMT IBRD / 83220 Post Limited 6,329.00 Signed 2016-04-04 2016-03-30 2016-05-30 2016-04-10 2016-11-26 Monitoring Quotations Envelope offices Pending TCP/G/SH/02 / Supply of Lap Project Implementation and Request for Single Stage - One IBRD / 83220 Post Limited 0.00 Implementati 2016-09-30 2016-11-25 2017-05-24 top and printer for PMT TCP Monitoring Quotations Envelope on TCP/G/SH/03 / Supply of Lap Project Implementation and Request for Single Stage - One IBRD / 83220 Post Limited 2,990.00 Signed 2018-09-29 2019-03-06 2018-11-24 2020-05-05 2019-05-23 top and printer for pmt Monitoring Quotations Envelope TCP/G/SH/04 / Supply of wooden Deskwith drawers (20 pieces) ,Metallic cupboard with gloss doers with safety Project Implementation and Request for Single Stage - One IBRD / 83220 Post Limited 2,760.00 Signed 2019-08-24 2019-08-26 2019-10-19 2019-09-02 2020-04-16 lock (3 pieces) , Metallic Monitoring Quotations Envelope cupboard with safety lock (3 pieces), Metal curtains (35 L.M) TCP.G.SH.06 / Supply of Pending Laptops for PMT ,archive Project Implementation and Request for Single Stage - One IBRD / 83220 Post Limited 0.00 Implementati 2020-02-15 2020-04-11 2020-05-11 system and external hard Monitoring Quotations Envelope on drives Pending TCP.G.SH.07 / Vehicle for Transport Corridors Request for Single Stage - One IBRD / 83220 Post Limited 0.00 Implementati 2020-11-28 2021-01-12 2021-01-12 pavement condition survey Improvements Quotations Envelope on TCP.G.SH.08 / Furniture for Pending Transport Corridors Request for Single Stage - One HDM4,GIS contract IBRD / 83220 Post Limited 0.00 Implementati 2021-01-10 2021-02-07 2021-02-07 Improvements Quotations Envelope management committees on TCP.G.SH.09 / Purchase of Pending printers for PMT and RBD Transport Corridors Request for Single Stage - One IBRD / 83220 Post Limited 0.00 Implementati 2021-04-20 2021-04-29 2021-04-29 Departments supporting the Improvements Quotations Envelope on TCP PMT TCP.G.SH.10 / Supply of Pending Transport Corridors Request for Single Stage - One Laptop for one of PMT IBRD / 83220 Post Limited 0.00 Implementati 2021-07-23 2021-08-15 2021-08-29 Improvements Quotations Envelope member on Page 1 TCP.G.SH.11 / Purchase of Pending Transport Corridors Request for Single Stage - One Furniture for PMT and LED IBRD / 83220 Post Limited 0.00 Implementati 2021-09-20 2021-10-26 2021-11-09 Improvements Quotations Envelope screen on TCP.G.SH.12 / Furniture for Pending new GIS room ( following up Transport Corridors Request for Single Stage - One IBRD / 83220 Post Limited 0.00 Implementati 2021-12-05 2022-01-10 2022-01-24 the GIS contract Improvements Quotations Envelope on requirements). NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TCP.NON-CON.DS.01 / TCP- Transport Corridors AF Geotechnical and Pavement IBRD / 83220 Post Direct Selection Direct 39,000.00 Signed 2021-04-28 2021-04-26 2021-05-03 2021-05-04 2021-05-17 2021-06-06 2021-06-16 Improvements Testing for PR06A TCP.NON-CON.DS.02 / Pending Additional works for the TCP- Transport Corridors IBRD / 83220 Post Direct Selection Direct 0.00 Implementati 2021-11-28 2021-12-03 2021-12-17 2022-01-16 AF Geotechnical and Pavement Improvements on Testing for PR06A CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TCP.CON.QCBS.C1(a) / Tech Transport Corridors Quality And Cost- IBRD / 83220 Prior Open - International 465,046.00 Signed 2015-06-15 2015-08-24 2015-10-19 2015-11-30 2016-01-11 2016-11-07 2016-02-22 2016-11-08 2017-03-02 Audit Improvements Based Selection TCP.CON.LCS.C1 (b) / Transport Corridors Quality And Cost- IBRD / 83220 Prior Open - International 214,592.00 Completed 2016-04-14 2016-04-18 2021-06-30 External Audit Improvements Based Selection TCP.CON.QCBS.R7&R8 / Technical Assistance for construction supervision of Transport Corridors Quality And Cost- Expressway NO.1 section R7: IBRD / 83220 Prior Open - International 8,063,012.49 Signed 2013-09-18 2015-05-11 2015-07-05 2015-08-16 2015-09-27 2016-03-03 2015-10-21 2016-03-03 2016-03-08 Improvements Based Selection Nasiria-Rumaila & R8 A: section Rumaila-Basra , R8 B:Rumaila-Safwan TCP/CON/QCBS/B1/I/01/B / Preparation of ESIA for Safwan- Institutional Strengthening Quality And Cost- Umm Qasr and Safwan and IBRD / 83220 and Capacity Building in the Post Open - International 0.00 Canceled 2017-07-04 2018-08-06 2017-12-24 2018-05-10 2018-08-02 2018-06-07 2018-07-07 2019-02-10 2018-08-11 2018-09-15 2019-09-15 Based Selection Safwan - Border Crossing Road Sector Road Rehabilitation Project TCP/CON/QCBS/B1/I/01/A / Preparation of Economic Analysis , Detailed Institutional Strengthening Engineering Design & Bidding Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2017-06-01 2018-06-27 2017-06-22 2017-08-05 2018-09-21 2017-09-02 2018-11-07 2017-10-02 2019-02-21 2017-11-06 2019-06-06 2017-12-11 2018-12-11 Document for Safwan- Umm Based Selection Road Sector Qasr and Safwan – Border Crossing Road Rehabilitation Project TCP/CON/QCBS/B1/G / Technical Assistance in Analysis and inmprovement Institutional Strengthening Quality And Cost- /Develoment of Technical IBRD / 83220 and Capacity Building in the Prior Open - International 964,335.50 Signed 2017-05-08 2018-08-30 2018-01-15 2018-05-28 2018-09-26 2018-06-25 2019-01-09 2018-07-25 2019-06-01 2018-08-29 2019-07-30 2018-10-03 2019-08-29 2019-10-03 Based Selection Manual /Specification for road Road Sector Miantaenance and Superpave implemantation study TCP/CON/QCBS/B1/D / Technical Assistance in development of ICT including Institutional Strengthening citizens'roadway reporting Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 825,689.19 Signed 2018-05-20 2018-08-30 2018-06-10 2019-06-18 2018-07-24 2020-02-25 2018-08-21 2020-02-10 2018-09-20 2020-03-18 2018-10-25 2020-06-01 2018-11-29 2020-06-29 2019-11-29 system,estiblishment of call Based Selection Road Sector center(s),surveilance system , and axel -load limit enforcement for RBD TCP/CON/QCBS/B1/C / Institutional Strengthening Awareness raising on routine Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2018-04-11 2018-05-02 2018-06-15 2018-07-13 2018-08-12 2018-09-16 2018-10-21 2019-10-21 maintenance and improving Based Selection Road Sector capacity for RBD TCP/CON/QCBS/B1/B / Institutional Strengthening Technical assistance in Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2018-04-11 2018-05-02 2018-06-15 2018-07-13 2018-08-12 2018-09-16 2018-10-21 2019-10-21 enhancement of the road Based Selection Road Sector sector governance for RBD TCP/CON/QCBS/B1/I/ 02 / Technical Assistance for the Institutional Strengthening Quality And Cost- upgrade of the existing GIS IBRD / 83220 and Capacity Building in the Prior Open - International 1,295,327.39 Signed 2018-11-21 2019-01-09 2018-12-12 2019-01-25 2020-05-12 2019-02-22 2020-05-01 2019-03-24 2020-05-18 2019-04-28 2020-05-19 2019-06-02 2020-06-23 2020-06-01 Based Selection & the road asset management Road Sector HDM-IV system TCP/CON/QCBS/B1/I/02 / Institutional Strengthening Quality And Cost- upgrade of the existing IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2018-01-02 2018-01-23 2019-02-19 2018-03-08 2018-04-05 2018-05-05 2018-06-09 2018-07-14 2019-07-14 Based Selection database and GIS at RBD Road Sector TCP/CON/QCBS/B1/B/C / Technical assistance in Institutional Strengthening Enhancement of the road Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2018-11-26 2019-01-30 2018-12-17 2019-01-30 2019-02-27 2019-03-29 2019-05-03 2019-06-07 2020-06-06 sector governance And Based Selection Road Sector Raising awareness on routine maintenance TCP/CON/QCBS/B4/A / Institutional Strengthening Quality And Cost- Training of local contractors IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2018-11-19 2019-02-20 2018-12-10 2019-01-23 2019-02-20 2019-03-22 2019-04-26 2019-05-31 2020-05-30 Based Selection and consultants for RBD Road Sector Page 2 TCP/CON/QCBS/R8B / Technical Assistance of Transport Corridors Quality And Cost- Construction Supervision for IBRD / 83220 Prior Open - International 13,500.00 Signed 2019-01-28 2019-02-20 2019-02-18 2019-04-24 2019-04-03 2019-09-02 2019-05-01 2019-10-22 2019-05-31 2019-12-30 2019-07-05 2020-03-05 2019-08-09 2020-03-31 2020-08-08 Improvements Based Selection Expressway No.1 R8B Project (Remaining Works) TCP.CON.DS.B1(I)-03 / IDENTIFYING AND ASSESSMENT OF FINANCING Institutional Strengthening Quality And Cost- AND MAINTENANCE OPTIONS IBRD / 83220 and Capacity Building in the Post Open - International 0.00 Canceled 2019-07-18 2019-07-17 2019-08-08 2019-09-02 2019-09-21 2019-10-19 2019-11-18 2019-12-23 2020-01-27 2021-01-26 Based Selection FOR ROAD TRADE AND Road Sector DEVELOPMENT CORRIDORS “TOLLING ROAD STUDY” TCP.CON.QCBS.B1(I)-03 / IDENTIFYING AND ASSESSMENT OF FINANCING Institutional Strengthening Quality And Cost- AND MAINTENANCE OPTIONS IBRD / 83220 and Capacity Building in the Prior Open - International 470,661.88 Completed 2019-10-27 2019-10-30 2019-11-17 2019-12-31 2020-09-08 2020-01-28 2020-01-09 2020-02-27 2020-09-14 2020-04-02 2020-09-18 2020-05-07 2020-09-29 2021-05-07 2021-02-19 Based Selection FOR ROAD TRADE AND Road Sector DEVELOPMENT CORRIDORS “TOLLING ROAD STUDY” TCP/CON/QCBS/B1(A) / Institutional Strengthening Technical assistance in RBD Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 0.00 Canceled 2019-11-14 2019-12-05 2020-01-18 2020-02-15 2020-03-16 2020-04-20 2020-05-25 2021-05-25 organizational structure and Based Selection Road Sector capacity improvement TCP/CON/QCBS/B4(A) / Training of staff of Road and Institutional Strengthening Bridges (RBD) and State owned Quality And Cost- IBRD / 83220 and Capacity Building in the Prior Open - International 674,265.00 Completed 2019-12-02 2020-01-07 2019-12-23 2020-01-20 2020-02-05 2020-04-25 2020-03-04 2020-06-28 2020-04-03 2020-09-23 2020-05-08 2020-11-24 2020-06-12 2020-12-02 2021-06-12 2021-07-31 Construction Companies / Based Selection Road Sector Enterprises SOEs in the Road Sector TCP.CON.QCBS.B1(I)-04 / Road Safety Investment Transport Corridors Quality And Cost- IBRD / 83220 Prior Open - International 662,590.00 Signed 2020-01-24 2020-02-11 2020-02-14 2020-03-10 2020-03-29 2020-06-15 2020-04-26 2020-08-18 2020-05-26 2020-09-29 2020-06-30 2021-02-08 2020-08-04 2021-05-02 2021-05-06 Strategy and Safety System Improvements Based Selection Projects TCP.CON.QCBS.R9A / supervision consultant to of the rehabilitation of Expressway No.1 sec R9A which starts in Abou Ghraib Transport Corridors Quality And Cost- Under city near Baghdad.The total IBRD / 83220 Prior Open - International 0.00 2020-05-31 2020-05-18 2020-06-21 2020-07-13 2020-08-04 2020-11-05 2020-09-01 2021-01-05 2020-10-01 2021-08-01 2020-11-05 2020-12-20 2022-03-15 Improvements Based Selection Implementation length is about 63 km.to implement the project according to specification, within cost and according to time schedule TCP.CON.QCBS.B1(I)-05 / Technical assistance for the development and Transport Corridors Quality And Cost- implementation of Bridge IBRD / 83220 Prior Open - International 0.00 Canceled 2020-11-23 2021-01-18 2020-12-14 2021-02-17 2021-01-27 2021-07-27 2021-02-24 2021-03-26 2021-04-30 2021-06-04 2022-06-04 Improvements Based Selection Inventory and Inspection System (BIIS) for Baghdad 13 Bridges over Tigris River TCP.CON.QCBS.A5 / Engineering supervision for Transport Corridors Quality And Cost- Under IBRD / 83220 Post Open - International 0.00 2021-01-28 2021-03-06 2021-02-11 2021-03-11 2021-03-25 2021-04-24 2021-05-22 2021-06-29 2023-04-20 installation of fiber optics Improvements Based Selection Implementation network for Expressway 1 TCP.CON.QCBS.B1(I)-06 / Preparation of Economic Analysis, Detailed Engineering Transport Corridors Quality And Cost- Under IBRD / 83220 Prior Open - International 0.00 2021-05-14 2021-08-24 2021-06-04 2021-08-03 2021-08-31 2021-09-30 2021-11-04 2021-12-09 2022-07-21 Design for Package 1 Roads: Improvements Based Selection Implementation Kut – Ammara Road and Ammara Basra Road TCP.CON.QCBS.B1(I)-06A / Preparation of (ESIA) and(RAP) Transport Corridors Quality And Cost- IBRD / 83220 Post Open - International 0.00 Canceled 2021-06-10 2021-07-01 2021-08-30 2021-09-27 2021-10-27 2021-12-01 2022-01-05 2022-07-27 Studies for Hwy 6-Kut- Improvements Based Selection Amarah-Basra Road TCP.CON.CQS.B1.I.01 / Consultant Structural Evaluation for Five Transport Corridors IBRD / 83220 Post Qualification Open - International 0.00 Canceled 2021-08-20 2021-08-12 2021-09-10 2021-10-24 2021-11-23 2021-12-28 2022-04-07 Bridges Located on Improvements Selection Expressway No. 1 TCP.CON.QCBS.B1(I)-05/R / Technical assistance for Transport Corridors Quality And Cost- Under IBRD / 83220 Prior Open - International 0.00 2021-10-27 2021-11-01 2021-11-17 2021-11-09 2021-12-31 2022-01-28 2022-02-27 2022-04-03 2022-05-08 2022-09-05 Inspection of Baghdad 13 Improvements Based Selection Implementation Bridges over Tigris River INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual TCP.CON.IC.C1(c) / Contract Transport Corridors IBRD / 83220 Prior Consultant Open 580,975.00 Signed 2016-04-11 2016-05-31 Management Specialist Improvements Selection TCP.CON.IC.C1 (c).01-04 / Transport Corridors IBRD / 83220 Prior Direct Selection Direct 12,000.00 Signed 2015-09-29 Translation Services Improvements Individual TCP.CON.IC.C.01 / Transport Corridors IBRD / 83220 Prior Consultant Open 99,615.00 Signed 2015-07-30 2015-08-11 Procurement Expert Improvements Selection Individual TCP/CON/IC/C1/C/01/02 / Project Implementation and Under IBRD / 83220 Post Consultant Open 0.00 2015-02-26 2016-09-28 2015-04-16 2015-05-07 2015-06-11 2015-12-08 Environmental Specialist Monitoring Implementation Selection TCP/CON/IC/C1/C/01/06 / Dispute Board for Individual Project Implementation and Under Rehabilitation of Expressway IBRD / 83220 Post Consultant Direct 0.00 2016-10-24 2018-09-15 2016-11-03 2016-11-24 2016-12-29 2017-06-27 Monitoring Implementation No.1 section R7 (Nasiria- Selection Rumaila) Page 3 TCP/CON/IC/C1/C/01/07 / Dispute Board for Individual Project Implementation and Under Rehabilitation Of Expressway IBRD / 83220 Post Consultant Direct 0.00 2016-10-24 2016-09-15 2016-11-03 2016-11-24 2017-05-16 2020-01-15 Monitoring Implementation Section R8 (Rumaila – Basra & Selection Safwan) TCP/CON/IC/C1/C/01/08 / Dispute Board for Individual Project Implementation and Under Rehabilitation of Expressway IBRD / 83220 Post Consultant Direct 0.00 2016-08-18 2016-09-15 2016-08-28 2016-09-18 2016-10-23 2017-04-21 Monitoring Implementation No.1 section R7 (Nasiria- Selection Rumaila) TCP/CON/IC/C1/C/01/09 / Dispute Board for Individual Project Implementation and Under Rehabilitation Of Expressway IBRD / 83220 Post Consultant Direct 0.00 2016-08-18 2016-09-15 2016-08-28 2016-09-18 2016-10-23 2017-04-21 Monitoring Implementation Section R8 (Rumaila – Basra & Selection Safwan) TCP/CON/IC/C1/C/01/10 / Dispute Board for Individual Project Implementation and Under Rehabilitation of Expressway IBRD / 83220 Post Consultant Direct 0.00 2017-03-07 2016-09-15 2017-03-17 2017-04-07 2017-05-12 2017-11-08 Monitoring Implementation No.1 section R7 (Nasiria- Selection Rumaila) TCP/CON/IC/C1/C/01/11 / Dispute Board for Individual Project Implementation and Under Rehabilitation Of Expressway IBRD / 83220 Post Consultant Direct 0.00 2017-03-07 2016-09-15 2017-03-17 2017-04-07 2017-05-12 2017-11-08 Monitoring Implementation Section R8 (Rumaila – Basra & Selection Safwan) TCP/CON/IC/C1/C/01/12 / Root Cause Analysis and Individual Occupational Health and Project Implementation and IBRD / 83220 Post Consultant Open 0.00 Canceled 2018-11-19 2019-01-07 2019-01-28 2019-03-04 2019-08-31 Safety(OHS) Audit for Iraq Monitoring Selection Transport Corridors Project (TCP Segment R7 and R8) TCP/CON/IC/C1/C/ 01-12 / Root Cause Analysis and Occupational Health and Project Implementation and IBRD / 83220 Post Direct Selection Direct 22,000.00 Signed 2018-12-16 2018-12-26 2019-03-01 2018-12-31 2019-08-28 Safety(OHS) Audit for Iraq Monitoring Transport Corridors Project (TCP Segment R7 and R8) TCP/CON/IC/C1/C/01/13 / Road Safety Audit of traffic management plan Project Implementation and IBRD / 83220 Post Direct Selection Direct 20,000.00 Signed 2018-12-16 2018-12-26 2019-03-01 2018-12-31 2019-08-28 for Iraq Transport Corridors Monitoring project (TCP segment R7 and R8) TCP/CON/DS/B1/I/03 / Identifying and assessment of Project Implementation and financing and maintenance IBRD / 83220 Post Direct Selection Direct 0.00 Canceled 2019-02-26 2019-03-08 2019-05-12 2019-11-08 Monitoring options for road trade and development corridors TCP-CON-IC-C1-C -01-16 / Dispute Board for Individual Project Implementation and Rehabilitation of Expressway IBRD / 83220 Post Consultant Direct 13,600.00 Signed 2020-01-12 2020-02-06 2020-01-17 2020-02-01 2020-02-07 2020-02-01 2020-03-13 2020-02-09 2021-05-12 Monitoring No.1 section R7 (Nasiria- Selection Rumaila) TCP-CON-IC-C1-C -01-17 / Dispute Board for Individual Project Implementation and Rehabilitation Of Expressway IBRD / 83220 Post Consultant Direct 13,600.00 Signed 2020-01-12 2020-02-01 2020-01-17 2020-02-01 2020-02-07 2020-03-13 2020-02-09 2021-04-04 Monitoring Section R8 (Rumaila – Basra & Selection Safwan) TCP.CON.IC.C1(C ).01-18 / Individual Project Implementation and Pavement Expert/ Prof. IBRD / 83220 Post Consultant Direct 45,600.00 Signed 2020-01-30 2020-02-09 2020-02-09 2020-02-01 2020-02-12 2020-02-01 2020-02-15 2020-02-09 2021-02-09 Monitoring Hamed Hamdou Selection TCP.CON.DC.BI(E AND H,F)- 01 / PPP Training and Institutional Strengthening Certification (CP3P IBRD / 83220 and Capacity Building in the Post Direct Selection Direct 34,760.00 Signed 2020-03-01 2020-01-23 2020-03-02 2020-03-03 2020-03-25 2020-02-06 2020-04-29 Foundation)/BeirutTCP.CON.D Road Sector C.B1(e and h,f)-01 TCP.CON.IC.C1(C ).01-19 / Update the ESIA, ESMP and ARAP/RAP in accordance with the WB safeguards policies for Individual the Expressway No.1–sections Project Implementation and IBRD / 83220 Post Consultant Direct 14,000.00 Signed 2020-04-23 2020-05-19 2020-05-03 2020-06-09 2020-05-24 2020-06-28 2020-07-05 2020-07-06 2020-10-03 R9A (63km) and R9B (61km) Monitoring Selection Abu Ghraib city in Baghdad at Sta. 0+000 and the City of Hit in the Governate of Al Anbar at Sta. 123+000 (123 km) TCP/CON/IC/C1/C/01/15 / Individual Project Implementation and Environmental and Social IBRD / 83220 Post Consultant Direct 0.00 Canceled 2019-03-03 2019-07-17 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Monitoring Specialist Selection TCP.CON.IC.C1(C ).01-20 / Occupational Health and Individual Transport Corridors Safety Expert for TCP projects IBRD / 83220 Post Consultant Limited 72,000.00 Signed 2020-09-20 2020-09-19 2020-09-25 2020-10-19 2020-10-16 2020-11-03 2020-11-20 2020-11-11 2021-05-19 Improvements Sections R8B (Remaining Selection works), R9A R4 ,R5 and R6. TCP.CON.IC.C1(C ).01-21 / Transportation economist Expert to update the feasibility study report Individual Transport Corridors prepared by the Consolidated IBRD / 83220 Post Consultant Limited 22,000.00 Signed 2020-09-20 2020-09-14 2020-09-25 2020-12-16 2020-10-05 2020-12-25 2020-10-17 2020-12-30 2021-02-14 Improvements Consultants (CC) 2013 for the Selection Expressway No.1 – specifically to Sections R9A and R9B TCP.CON.IC.C1(C).01-22 / Individual ESMP audit for TCP projects Transport Corridors IBRD / 83220 Post Consultant Direct 5,500.00 Signed 2020-09-30 2020-10-18 2020-10-19 2020-12-09 2020-10-24 2020-12-22 2020-11-03 2021-01-21 2022-02-26 Expressway No. 1- Sections Improvements Selection R4, R5 and R6 Page 4 TCP.CON.IC.C1(C).01-24 / Individual Transport Corridors TCP-AF / Senior Highway IBRD / 83220 Post Consultant Direct 0.00 Canceled 2020-10-18 2020-10-18 2020-10-25 2020-11-04 2020-11-16 2021-02-08 Improvements Engineer Selection TCP.CON.IC.C1(C).01-25 / Individual Transport Corridors TCP-AF /Senior Structural/ IBRD / 83220 Post Consultant Direct 0.00 Canceled 2020-10-19 2020-10-18 2020-10-26 2020-11-05 2020-11-17 2021-02-09 Improvements Bridge Engineer Selection Individual TCP.CON.IC.C1(C).01-26 / Transport Corridors IBRD / 83220 Post Consultant Direct 17,000.00 Signed 2020-10-25 2020-10-14 2020-11-01 2020-11-25 2020-11-15 2020-12-04 2020-12-04 2020-12-13 2021-01-29 Road Maintenance Expert Improvements Selection TCP.CON.IC.C1(C).01-23 / Individual Transport Corridors TCP - AF / Environmental and IBRD / 83220 Post Consultant Direct 0.00 Canceled 2020-10-22 2020-10-15 2020-10-25 2020-10-30 2020-11-11 2021-01-20 Improvements Social Expert Selection TCP.CON.IC.C1(C).01-27 / Preparation of the ESIAs and RAPs for the below projects within the TCP-AF priority Individual Transport Corridors no.1 IBRD / 83220 Post Consultant Direct 0.00 Canceled 2020-11-08 2020-11-11 2020-11-11 2020-11-14 2020-11-19 2020-12-30 Improvements - PR03B: The Rustumiya Selection Bridge project. - PR03A: Kut-Baghdad Road section (Hwy 6). TCP.CON.IC.C1(C).01-28 / Detailed Engineering Design, Individual Transport Corridors Tender Document Preparation IBRD / 83220 Post Consultant Limited 0.00 Canceled 2020-11-24 2020-12-09 2020-11-29 2020-12-13 2020-12-23 2021-04-14 Improvements For the widening and Selection rehabilitation of Kut-Baghdad TCP.CON.IC.C1(C).01-29 / Detailed Engineering Design, Individual Transport Corridors Tender Document Preparation IBRD / 83220 Post Consultant 95,000.00 Signed 2020-11-26 2020-12-09 2020-12-01 2021-01-06 2020-12-15 2021-04-02 2020-12-25 2021-04-15 2021-04-16 Improvements For Dualization of the Fajr Selection intersection - Al Bader road TCP.CON.IC.C1(C).01-31 / Individual Transport Corridors Traffic Data Collection and IBRD / 83220 Post Consultant Direct 27,000.00 Signed 2020-11-24 2021-01-19 2020-12-04 2021-03-30 2020-12-09 2021-04-26 2020-12-19 2021-05-05 2021-01-23 Improvements Analysis Selection TCP.CON.IC.C1(C).01-30 / Individual Detailed Engineering Design, Transport Corridors IBRD / 83220 Post Consultant Limited 0.00 Canceled 2020-11-25 2020-12-09 2020-11-30 2020-12-07 2020-12-19 2021-03-13 Tender Document Preparation Improvements Selection For PR03B- Rustumiya Bridge TCP.CON.DS.B1.I.06 / Geotechnical and Pavement Transport Corridors Testing along PR03A, PR03B IBRD / 83220 Post Direct Selection Direct 0.00 Canceled 2020-12-20 2021-04-11 2020-12-30 2021-01-11 2021-03-22 Improvements &PR06A road corridors subprojects Individual TCP.CON.IC.C1(C).01-32 / Transport Corridors IBRD / 83220 Post Consultant Limited 20,000.00 Signed 2020-12-31 2020-12-26 2021-01-14 2021-04-01 2021-01-19 2021-04-23 2021-02-14 2021-05-05 2021-06-20 TCP-AF Road Safety Auditor Improvements Selection TCP.CON.IC.C1(C).01-33 / AF- Individual Transport Corridors TCP Transport Economist IBRD / 83220 Post Consultant Limited 22,000.00 Signed 2020-12-31 2021-01-19 2021-01-14 2021-04-05 2021-01-19 2021-01-29 2021-05-09 2021-06-18 Improvements Expert Selection TCP.CON.IC.C1(C).01-34 / Individual Transport Corridors Under Dispute Board Sole Member IBRD / 83220 Post Consultant Limited 0.00 2021-01-27 2021-01-22 2021-02-10 2021-02-15 2021-02-25 2023-02-15 Improvements Implementation for R8B remaining works Selection TCP.CON.IC.C1(C).01-35 / Individual Environmental and Social Transport Corridors IBRD / 83220 Post Consultant Direct 42,455.00 Signed 2021-04-14 2021-04-15 2021-04-24 2021-05-10 2021-05-01 2021-06-10 2021-05-11 2021-06-13 2021-08-10 Expert for R9A and Al -Fajer Improvements Selection Al-Beder. TCP.CON.DS.C1 (B) / External Transport Corridors IBRD / 83220 Post Direct Selection Direct 0.00 Canceled 2021-05-08 2021-05-20 2021-06-30 2023-06-30 financial audit contract Improvements TCP.CON.IC.C1(C).01-36 / Individual Transport Corridors Under Baghdad 13 Bridges Road IBRD / 83220 Post Consultant Limited 0.00 2021-05-11 2021-05-05 2021-05-25 2021-05-30 2021-06-25 2021-09-03 Improvements Implementation Safety Auditor Selection TCP.CON.IC.C1(C).01-37 / 13 Individual Bridges package no.1 - Transport Corridors IBRD / 83220 Post Consultant Limited 0.00 Under Review 2021-06-03 2021-06-25 2021-06-24 2021-07-01 2021-07-09 2021-11-26 Environmental and Social Improvements Selection Specialist TCP.CON.IC.C1(C).01-38 / Road Safety Investment Individual Transport Corridors Under Strategy and Safety System IBRD / 83220 Post Consultant Limited 0.00 2021-07-22 2021-06-30 2021-07-27 2021-08-17 2021-09-21 2022-03-20 Improvements Implementation Projects- Roads Safety Auditor Selection RSA. TCP.CON.DS.C1(B)/R / Transport Corridors Under External financial audit IBRD / 83220 Post Direct Selection Direct 0.00 2021-07-27 2021-06-28 2021-08-08 2021-09-18 2024-01-01 Improvements Implementation contract- Iraq Branch Page 5