RP1411v1 RUSUMO FALLS HYDROELECTRIC PROJECT – DAM & POWERPLANT COMPONENT R E S E T T L E M E N T A C T I O N P L AN ( R A P ) VOLUME 1 : MAIN REPORT FINAL REPORT ARTELIA EAU & ENVIRONNEMENT ECHIROLLES NILE BASIN INITIATIVE (NBI) / NILE EQUATORIAL 6, Rue de Lorraine LAKES SUBSIDIARY ACTION PROGRAM (NELSAP) 38130 Echirolles, France 4th Floor, Kigali City Tower, Boulevard du Commerce, Kigali, Tel.: +33 (0)4 76 33 40 00 Rwanda Fax: +33 (0)4 76 33 43 32 DATE: MARCH 2013 REF: 1770050 Coteba & Sogreah, same team, enhanced expertise RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) EXECUTIVE SUMMARY PREAMBLE This document presents the Resettlement Action Plan (RAP) for the Rusumo Falls Hydro-electric Power Development Project (= the Project). The Project will affect communities in Rwanda and Tanzania in the vicinity of the Project site, the Kagera river immediately upstream of the Rusumo Falls, on the border between the two countries. The RAP has been established in order to ensure that any economic or physical displacement resulting from the Project, whether permanent or temporary, is undertaken in a socially responsible manner and according to good international practice. Through the RAP, the Project will apply the relevant national legislations of Rwanda and Tanzania as well as the relevant World Bank and AfDB Policies:  WB OP 4.12 “Involuntary Resettlement� (December 2001, revised February 2011);  AfDB (2003): Involuntary Resettlement Policy STRUCTURE OF THE RAP The RAP has been developed as one consolidated document, covering the affected communities in both countries, Rwanda and Tanzania. Some of the relevant topics need to be dealt with under consideration of the respective country specific aspects, as the legal framework information or the socio-ecomic baseline information. For these cases, specific sub-sections have been prepared. Overview: Contents of the RAP Chapter No Topic 0 Executive Summary 1 Introduction 2 Project Description 3 International Policies and Requirements 3 Legal and Institutional Context 4 Project Impacts on Affected Communities 5 Socio-Economic Baseline of Affected Communities 6 Valuation and Compensation 7 Grievance Mechanism 8 Consultations 9 Budget and Costs 10 Implementation Arrangements 11 Monitoring and Evaluation / 1770050 / MARCH 2013 FINAL REPORT a|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) THE PROJECT The Nile Basin Initiative (NBI) is a partnership of the riparian states of the Nile. The NBI seeks to develop the river basin resources in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security. Within the framework of the NBI, the Governments of Burundi, Rwanda and Tanzania have received financial support from various donors for preparation of the proposed Regional Rusumo Falls Hydroelectric Project (RRFHP), prepared through the Nile Equatorial Lakes Subsidiary Action Program (NELSAP). RRFHP is a key project that is part of an overall Kagera Basin Integrated Development Framework, which is part of the Nile Basin Initiative. The proposed project is a joint development undertaking by the Governments of Burundi, Rwanda and Tanzania. The agreed project preparation management arrangements consist, at the regional level, of a Council of Ministers in charge of electricity in the three countries; a Project Implementation Committee (PIC) consisting of the Managing Director/Director General of the Electricity Utility, Director General/ Commissioner/Director of Energy in each country; and a Project Manager at the NELSAP Coordination Unit (NELSAP-CU). NBI/NELSAP will also have fiduciary responsibility and oversee donor grants to the project. In March 2006 in Kigali, the Ministers of Energy of the three countries signed a Joint Project Development Agreement, reconfirming their commitment to jointly develop the Project. The feasibility and design studies as well as the Environmental and Social Impacts Assessments and Resettlement Action Plans conducted by the Consulting Firm SNC Lavalin since 2007, were interrupted several times as the scope of the studies were modified, due to the findings related to magnitude of the environmental and social impacts, especially those associated with the involuntary resettlement of local communities in the three countries. Thus, since 2007, the Feasibility and Design studies as well as the ESIA&RAP studies have shifted from the Full Development Scheme (FDS) to the Intermediate Development Scheme (IDS) and finally to the Run of the River Scheme (RoR). Following the recommendation of the Project Implementation Committee in March 2012, the RoR option was retained as the best option. The dam reservoir and power plant is planned to be situated at the Rusumo Falls where the Kagera River forms the boundary between Tanzania and Rwanda, and about 2 kilometres downstream of the river's confluence with the Ruvubu River. In general, the project civil works will consist of the following:  Dam about 15 meters high creating hydraulic head of about 32 meters at maximum water level estimated at 1,320 masl;  Fixed crest overflow weir (four openings of 15 m each) ;  A 4 x4 sluice gate for minimum flow releases ;  A 13 m wide gated pass (that may be installed to make back water profiles similar to natural conditions in flood period);  Transmission lines connecting the hydroelectric power plant of Rusumo Falls to the national grids of Rwanda, Burundi, and Tanzania, and the related project area development: 220 kV transmission lines: Rusumo Falls – Gitega (Burundi), 161 / 1770050 / MARCH 2013 FINAL REPORT b|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) km; Rusumo Falls – Birembo/Kigali (Rwanda), 109 km; and Rusumo Falls – Nyakanazi (Tanzania), 98 km, and  Substations in Muyinga, and Gitega, for Burundi; Birembo and Kigali/Bugesera for Rwanda; and Nyakanazi for Tanzania. Current estimates show that the Rusumo Project will create up to about 1,000 temporary jobs during the construction period. About 10% of the workforce is expected to be Third Country Nationals. The overall duration of the construction period is estimated to be about 4 years. There will be in total 2,400,000 person-hours divided into two main contracts: the civil works contract and the electrical and mechanical works contract. Source: SLII, 2012 Project Situation Map – Country Scale / 1770050 / MARCH 2013 FINAL REPORT c|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Source: SLII, 2012 Project Situation Map – Regional Scale LEGAL AND POLICY BACKGROUND The RAP has been prepared in compliance with the requirements of the relevant national legislation of the Republic of Rwanda and the United Republic of Tanzania. Articles 29 and 30 of the 2003 Constitution of the Republic of Rwanda establish the fundamental principles of right to and protection of private property. In addition to the overarching principles stated in the Constitution, key legislation applicable to land management and expropriation in Rwanda includes:  Organic Law N° 08/2005 of 14/07/2005 determining the use and management of land in Rwanda;  Law N° 18/2007 of 19/04/2007 relating to expropriation in the public interest;  Law N°17/2010 of 12/05/2010 establishing and organizing the real property valuation profession in Rwanda / 1770050 / MARCH 2013 FINAL REPORT d|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) In Tanzania, it is a constitutional right that if private property is either acquired or nationalized, the individual affected must be fully, fairly and promptly provided with compensation. The procedures for valuation are set out in the  Land Act No.4, and  Village Land Act No.5 of 1999. The World Bank Group is the potential lender for the project. This document has therefore been prepared in accordance with WB requirements as stated in OP 4.12 “Involuntary Resettlement�. SUMMARY OF PROJECT IMPACTS Compared to the previous Project designs, the RoR is resulting in a significant reduction of impacts, concerning the types as well as the magnitude and extent. Construction Impacts Impacts on land resulting from construction are limited to the dam site. Affected land will be residential land, land used for business and small areas of agricultural land. Land take will result in the permanent change of land use and the termination of the present use of the land. Land take due to construction will affect a total of 223 households, in Rusumo East and Nyakwisi villages in Rwanda and in Rusumo village, Tanzania. / 1770050 / MARCH 2013 FINAL REPORT e|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Overview on Project Impacts and affected households: Construction Description of Project Impacts Number of affected Households Construction; Impacts on Land (Dam Site) Land loss due to construction of dam Rwanda Tanzania Total Residential structures, associated with agricultural land plots 8 8 Agricultural land 10 10 Subtotal 18 Land loss due to establishment of concrete bashing and rock crushing and contractors work area, future residential area for operation staff Residential structures, associated with agricultural land plots 33 33 Residential structures 21 21 Subtotal 54 Land loss due to establishment of concrete bashing and rock crushing area Business structures 13 13 Brick making businesses 26 26 Arable marshland 2 2 fish hatching ponds (1 cooperative) 6 6 Subtotal 47 Land loss due to establishment of construction contractor’s area Business structures: owners 17 17 Business structures (business tenants in affected structures as per row 36 36 above) residential structures (as annex of affected business structure as per 3 3 row above) Subtotal 56 Land loss due to establishment of borrow areas (borrow area 2) Sand digging and brick making businesses (including 1 cooperative 34 34 with 21 members) Subtotal 34 Temporary loss of access to resources due to construction activities Loss of access to the river due to construction of dam structure: fishing 14 14 business downstream of dam site 14 Total 223 / 1770050 / MARCH 2013 FINAL REPORT f|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Impacts from Project Operation The project will function as a Run-of-River scheme and will not create a water storage reservoir upstream from the dam. However, there will be a 40 cm increase in the average water level at the dam compared to the natural situation to maintain the water level needed for operation (1,320 m asl). As a result, areas of seasonally flooded marshland up to 5 km on both sides of the Kagera river, upstream the dam, will become permanently flooded. In Rwanda, the arable marshland of 6 villages will be affected: Rusumo East, Rusumo West, Nyakwisi, Nshungeruzi, Nyakabungo and Ruhuha. In Tanzania, two sub-villages of the village Nyakiziba will be affected: Kabuye and Kyenda. Impacts from Project operation will be limited to marshland and no private agricultural land will be affected by permanent flooding. Summary: Project Impacts and Project Affected People Description Area (hectares) No. of Households Rwanda Tanzania Total Rwanda Tanzania Total 1. Land Acquisition in Dam Site  Agricultural Land 14.34 15.75 45 45  Natural Vegetation 1.84 26.97  Residential Structures 1.03 0.88 3 29 32  Business Units 87 59 146 Sub-Total 17.21 43.58 60.79 90 133 223 2. Affected Marshland (flooded)  Arable Marshland 107.6 79.6 187.2 351 90 441 Sub-Total 107.6 79.6 187.2 351 90 441 TOTAL 124.81 123.18 247.99 441 223 664 / 1770050 / MARCH 2013 FINAL REPORT g|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Overview on Project Affected Area / 1770050 / MARCH 2013 FINAL REPORT h|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) RESETTLEMENT AND COMPENSATION Overall Approach The RAP aims to ensure that all affected parties are compensated and assisted in restoring their livelihoods. Overall objectives of the RAP are:  Avoid or at least minimize involuntary resettlement  Mitigate adverse social and economic impacts from land acquisition by: (i) providing compensation for loss of assets at replacement cost; and (ii) ensuring that resettlement activities are implemented with appropriate disclosure of information, consultation, and the informed participation of those affected, and  Improve or at least restore the livelihoods and standards of living of affected people.  Provide additional targeted assistance (e.g., credit facilities, training, or job opportunities) and opportunities to improve or at least restore their income- earning capacity, production levels, and standards of living to economically displaced persons whose livelihoods or income levels are adversely affected;  Provide transitional support to affected people, as necessary, based on a reasonable estimate of the time required to restore their income earning capacity, production levels, and standards of living. Principles for Compensation and Resettlement The key principles of this RAP are the following  Compensation and resettlement of project affected people will be carried out in compliance with Rwandan and Tanzanian legislation and WB OP 4.12;  Where Rwandan and Tanzanian legislation is less favourable to PAPs than WB OP 4.12 requirements or does not apply at all, these latter shall apply;  All physically and economically displaced people will be offered an option between either a full resettlement package, including the provision of replacement residential land and a house, or cash compensation; The option for land-for-land exchange will be given priority and will be explored before cash compensation;  Where farmers are economically displaced, they will be offered a resettlement option including the provision of agricultural land of potential equivalent to that of the land they have lost; the land for land option will be offered as primary option before cash compensation;  The Project will provide for measures to support sustainable use of cash compensation (money management training) and for mechanisms within the overall monitoring framework to follow up the use of cash compensation;  The Project will assist PAP in restoring their affected livelihoods and will provide transitional assistance in order to restore livelihoods to at least their previous level / 1770050 / MARCH 2013 FINAL REPORT i|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  The Project aims to turn PAP to Project beneficiaries; targeted livelihood restoration programs will be implemented as part of this RAP in order to achieve this goal  The RAP implementation and –outcomes will be monitored and evaluated as part of a transparent process  PAP (and host communities) were, are and will be informed, consulted and involved in decisions making during the course of RAP development, implementation and evaluation  In addition to the RAP, A Local Area Development Plan (LADP) will be designed and implemented, aiming to support the overall sustainable social and economic development of the wider Project area; the LADP will complement the mitigation measures proposed in the ESMP and the livelihood restoration measures of this RAP. General Approach for Compensation and Resettlement Loss of residential structure and residential land Option 1  Cash compensation at replacement value for loss of residential house;  Cash compensation for loss of residential land at replacement value;  Cash compensation at replacement value for loss of other structures;  Cash compensation at replacement value for permanent crops in home garden  Plus: all necessary transaction costs  Money management training Option 2  Allocation of residential plot an agreed resettlement site, with secure tenure;  Reconstruction of a resettlement house of at least the same quality as the affected house;  and cash compensation at replacement value of any specific features that would not be included in the resettlement house, and  Resettlement assistance. Note: According to the results of the field surveys in November and December 2012 and in January 2013, project affected people entirely prefer cash compensation over the land for land or the house for house approach. There was not a single exception to the cash preference. / 1770050 / MARCH 2013 FINAL REPORT j|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of business structure Immovable business structure  Compensation at full replacement value for immovable assets (including commercial land associated to the structure);  Plus: all necessary transaction costs;  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training  If business cannot be re-established: livelihood restoration program (see section 7.6) Movable business structure (e.g.kiosk)  Moving allowance (covering moving costs/transaction costs)  Transition allowance to cover the period until the business is fully operational again after moving (typically 3 month income, with a maximum of 1 year income)  Money management training  If business cannot be re-established: livelihood restoration program (see section 7.6) Loss of Income due to Loss of Employment  Compensation for lost income for employees of displaced business is the responsibility of the business owner (salaries of employees are part of the compensation amount for lost income); PIU will facilitate respective arrangements between owners and employees, based on the results of field work Dec 2012 – Jan 2013 and on the results of the exit survey;  In the case that a displaced business does not reopen elsewhere, former employees are entitled to participate in the livelihood restoration program (see section 7.6); Loss of Other Immovable Structures  Compensation at full replacement value;  Plus: all necessary transaction costs; / 1770050 / MARCH 2013 FINAL REPORT k|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of Agricultural Land  Compensation at full replacement value or allocation of a land plot in an acceptable distance to residence of at least equivalent productivity;  Compensation for loss of perennial crops and trees and full replacement value  Compensation for loss of seasonal crops at market value  Compensation for developments on land at full replacement value  Plus: all necessary transaction costs;  Participation in livelihood restoration program (see section 7.6)  Participation in money management training Note: only small areas of private agricultural land will be affected during construction; this land is entirely located in Rusumo, Tanzania; affected people stated their preference for cash compensation; according to a rapid land availability survey, agricultural land close (less than 5 km) to Rusumo is available for purchase Loss of Access to Agricultural Land (Sharecropper, Tenant) In case there is a formal contract/agreement with share cropper or tenant  Allocation of compensation for permanent crops (full replacement value) according to the formal contract (between owner and sharecropper/tenant)  Compensation for annual crops at market value (only if annual crops could not be harvested prior to date of loss) according to the formal contract (between owner and sharecropper/tenant)  Compensation at full replacement value for improvements on land to the documented owner of the improvement  Participation in livelihood restoration program (see section 7.6)  Participation in money management training In case there is no formal contract/agreement with share cropper or tenant  PIU will seek to facilitate agreement between with owner on allocation of compensation for permanent crops (full replacement value) according to the informal arrangements (between owner and sharecropper/tenant)  Compensation for annual crops at market value  (only if annual crops could not be harvested prior to date of loss) according to the informal arrangements (between owner and sharecropper/tenant)  Compensation at full replacement value for improvements on land to the documented owner of the improvement  Participation in livelihood restoration program (see section 7.6)  Participation in money management training Loss of Permanent Crops  Compensation at full replacement value of the lost crop  Participation in money management training / 1770050 / MARCH 2013 FINAL REPORT l|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of Production from Marshland  Compensation for loss of income from marshland production at market value of crop (most important crop on affected marshland plot for the 3 years prior to cut-off date)  Compensation for labor costs to develop the marshland;  Compensation for developments on land at full replacement value  Participation in livelihood restoration program (see section 7.6)  Participation in money management training Note: Marshland is under government ownership. Hence, the loss of marshland will not be compensated for the land as such, but under consideration of the loss of production/income from marshland. Note: In order to provide for livelihood restoration, compensation will be paid for a period equivalent to 3 years of income from marshland production. For affected households who entirely depend on marshland, compensation will be paid for a period equivalent to 5 years of income from marshland production. Final calculation of compensation: The rationale for final calculation of compensation rates is based on factual information that marshland cultivation is only possible every second year, due to flooding of marshland every other year. Hence, income from marshland only occurs every second year. Consequently, a 3 - year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 1.5. A 5 - year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 2.5. Reference information on marshland cultivation was obtained from local resettlement committees, from district agronomists and from affected people; the information was confirmed during the consultative workshop in Kigali on 4 Feb 2013. / 1770050 / MARCH 2013 FINAL REPORT m|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of Access to Resources Brick Making – and Sand Digging Businesses on Marshland  Assistance in finding a new business site  Restoration allowance (costs for moving and re-establishment of business site plus all transaction costs)  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training  In case the business cannot be restored: participation in livelihood restoration program (see section 7.6) Fish Hatching Ponds on Marshland  Assistance in finding a new business site  Restoration allowance (costs for moving and re-establishment of business site plus all transaction costs)  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training  In case the business cannot be restored: participation livelihood restoration program (see section 7.6)  In case that the displaced business cannot be restored : participation in livelihood restoration program (see section 7.6) Note: some of the affected businesses are organized as co-operatives (see entitlement matrix below) / 1770050 / MARCH 2013 FINAL REPORT n|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of Access to Resources during Construction Access to the Kagera river for fishing  Assistance in finding alternative fishing sites upstream during construction period  Re-establishment of access to original fishing sites immediately after construction (2 month period after completion of construction)  severance allowance equivalent to a 2-month income from fishing) Note: Vulnerable people, in addition to entitlements as listed above, are entitled to special assistance as needed to participate effectively in the resettlement process Note: actual land market assessments will be done prior to determination of final replacement rates for residential land, commercial land and agricultural land. Note: entitlements are presented separately for each category of affected household/entity; some households may qualify for entitlements in more than one category (for example, a household that is physically and economically displaced may qualify for the entitlements for both these categories. e.g. households losing their residential structure and losing agricultural land); Note: Prior to the start of the compensation payment process, compensation agreements with affected people will be set up and signed . This will be done through an exit survey, to be carried out by the official valuers of the land offices of the districts of Kirehe and Ngara. The exit survey is to confirm the results of the surveys for validation of losses carried out November 2012 to January 2013 (see section 7.3) through the performance of the respective legal procedure. The resettlement committees and PIU officers will participate in the exit survey Livelihood Restoration Program Affected households are entitled to participate in and to benefit from the targeted set of livelihood restoration programs, which were developed for this RAP:  Financial training for the sustainable use of cash compensation (including training on the maintenance of a bank account, on small household investments, saving strategy and financial planning on the household level);  Agricultural extension training for intensification of production;  Livestock keeping extension training, and  Business skills training: facilitation of access to alternative income generating activities. Priority Access to Construction Employment Affected households will be provided with priority consideration for construction employment. Local Area Development Plan Affected households will be entitled to priority assistance through the LADP. / 1770050 / MARCH 2013 FINAL REPORT o|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Cut-off Date The cut-off date for this RAP was communicated to the affected communities during the field work in November 2012 – January 2013. The cut-off dates are the respective dates of self-validation meetings in the affected communities in November 2012, December 2012 and January 2013. The cut-off dates were signed by the affected people, by the village heads and resettlement committees (see section 7.3.2). / 1770050 / MARCH 2013 FINAL REPORT p|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) GRIEVANCE MANAGEMENT In practice, in similar compensation and resettlement activities, grievances arise from misunderstandings of the Project policy, or result from conflicts between neighbours, which can usually be solved through adequate mediation using customary rules or local administration at the lowest level. Most grievances can be settled with additional explanation efforts and some mediation using customary dispute settlement mechanisms. The Project provides a simple and accessible, extra-judicial mechanism for managing grievances and disputes based on explanation and mediation by third parties. Each of the affected persons will be able to trigger this mechanism, while still being able to resort to the judicial system. Procedures within the grievance management process are explained in detail in the full report below. Grievance management will provide two tiers of amicable review and settlement, with the first one on the village level. The second level will integrate a mediation committee in case the grievance cannot be solved on the first level. Finally, there will be the option for each complainant to resort to court (third level), in case there is no solution within the Project’s grievance mechanism. VULNERABLE PEOPLE Vulnerable groups/people are defined as individuals, groups, households, or communities who by virtue of gender, locality, age, physical or mental disability, economic disadvantage, or social and cultural status who may require additional support or assistance and will need help adjusting to changes introduced by the Project. Assistance will take the following forms, depending on vulnerable people’s requests and needs:  Assistance in the compensation payment procedure;  Assistance in the post payment period to secure the compensation money;  Assistance in moving: providing vehicle, driver and facilitation at the moving stage, providing ambulance services for disabled or infirm persons during moving, and  Health care if required at critical periods: moving and transition period. In the context of the Project, vulnerable people include:  Households whose heads are children;  Households whose heads are female, particularly widowed or repudiated and divorced women having to take care of their children, and who live with limited resources;  Landless people having to work on others’ land;  Households who have no or very limited resources, including those who are marginalized due to their social status.  Disabled persons, whether mentally or physically; / 1770050 / MARCH 2013 FINAL REPORT q|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Refugees, internally displaced people;  People with serious medical conditions, particularly people living with HIV, AIDS and other chronic illnesses;  Elderly people, particularly when they live alone. Under the provisions of the RAP, vulnerable households will provided with targeted assistance. CONSULTATIONS The overall goal of consultation and stakeholder engagement is to establish an on- going, accessible and constructive dialogue with potentially affected parties and other interested organizations and individuals, so that their views and concerns can be taken into account in decisions about the Project in accordance with international good practice. The consultation and stakeholder engagement activities of the RAP are entirely interwoven with the Project’s Stakeholder Public Consultation and Disclosure Plan (PCDP). The PCDP is attached to the RAP as an alone standing document. In line with the relevant international requirements, consultation with and participation of affected communities and individuals are key elements of the RAP development and implementation process. One essential aspect of this approach is the establishment of a robust process to redress the grievances of affected people (see above). Consultation with the affected population and with officials of local government, civil society and other representatives of the affected population is essential in order to achieve an in-depth understanding of types and extents of Project impacts as well as of required measures for mitigation and enhancement (= livelihood restoration measures). Between 2007 and 2008, a total of 270 individual and group interviews with stakeholders were conducted in eleven survey areas. Similar individual and group interviews were subsequently conducted with 75 selected stakeholders in Tanzania (Nyamiaga, Kasharazi, Rusuzo and Nyakiziba in the Ngara District). These interviews were conducted with the following stakeholder groups:  Administrators and local elected representatives;  Representatives of agricultural extension services or of social education and health care services;  Representatives of trade associations (farmers, fishermen, small traders etc);  Representatives of local civil society associations (women, youth, etc.). These interviews aimed to identify: (i) the status and recent developments in local economic conditions (agriculture, fishing, trade, crafts, industry, tourism, etc.); (ii) status and recent developments in infrastructures and services; (iii) project`s key stakeholders and representatives and on-going programs and local priorities. In 2011, a comprehensive government stakeholder consultation process was developed in order to obtain authorizations for Consultants to conduct field work, as well as to engage as soon as possible with government authorities in obtaining their / 1770050 / MARCH 2013 FINAL REPORT r|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) views, advice and participation in defining the socio-economic and environmental impacts of the project and the most adequate mitigation measures to apply. This was also a particularly important step in terms of gaining a better understanding of resettlement impacts and planning possible synergies with rural development projects to find available land and propose restoration strategies. During November and December 2012 and in January 2013, consultations with communities in Rwanda and Tanzania along the Kagera river, amongst them the affected communities, were performed. Consultations were conducted after preparatory meetings with authorities of Kigarama sector in Rwanda and the district of Ngara in Tanzania. Sector authorities in Rwanda and Ngara district authorities in Tanzania facilitated the performance of the field program. Affected local communities were visited in order to validate the affected assets (= marshland plots) in a participatory manner. Village leaders, resettlement committees and affected households participated in the self-validation process. Self- validation was aiming to obtain information on marshland use on the individual/household level. In the context of the consultations, communities were provided with updated information about the Project in the frame of community meetings. An overview on the consultation activities in the context of the Project so far is provided in the full text below. Consultation activities in the frame of this RAP have a focus on:  Consultation in the context of the RAP approach to compensation: o self -validation of affected land by local communities o consultation with resettlement committees on compensation approach  Consultation of local communities/focus groups on marshland use and marshland user and on how to best compensate the loss of marshland;  Consultation of local communities on needs and aspirations with regard to the design of livelihood restoration measures;  Consultation in the context of RAP disclosure;  Routine consultation of local resettlement committees in the context of the RAP monitoring program;  Public consultation on the context of the RAP monitoring program;  Continuous information of the affected population and other project stakeholders about Project progress and upcoming relevant activities: o One important information campaign in the context of the Project’s overall consultation program is the information of Ex-PAPs (people who were considered as affected due to previous project designs, but are not affected by the RoR) about the actual status of Project design and the respective impact on their status as project affected people; this campaign has been implemented as part of the PCDP  Continuous update of stakeholder list of the RAP. / 1770050 / MARCH 2013 FINAL REPORT s|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) MONITORING AND EVALUATION Monitoring, evaluation and auditing are key components of the RAP and are an integral part of the Project Owner’s responsibilities. These components have the following general objectives. Monitoring Monitoring looks at progress of resettlement and compensation and at specific situations of economic or social difficulties arising from the implementation of the compensation and resettlement process. Auditing Auditing looks at compliance and completion of the resettlement process. Evaluation Evaluation looks at outcomes, through an assessment of the short- mid- and long term impacts of the compensation and resettlement process on affected households, their incomes and standards of living, the environment, housing etc. The following monitoring and evaluation approach will be used, whereby different levels of monitoring and evaluation are used:  Internal progress (Input/Output) monitoring: measures whether inputs are delivered on schedule and as defined in the RAP, and their direct measurable results, for instance: o Amounts of compensation paid in a given month o Completion of cash payments and follow up of self-resettlement of affected people, prior to any construction activity o Completion of physical relocation prior to any construction activity o People completing livelihood restoration training courses Monitoring will also seek to document and investigate specific conflict or hardship situations arising from the implementation of the RAP. Monitoring keeps track of RAP implementation efficiency and indicates whether changes have to be made to make the program work more efficiently. Progress monitoring is done internally by the Project at a frequency determined by the RAP for every indicator (in general every three months)  Outcome evaluation: Defines the extent to which the project is achieving or likely to achieve the objectives of the RAP. Re-establishment of businesses and earning acceptable returns over a reasonable period is an example of outcome. Outcome evaluation, combined with output monitoring results, will indicate whether the program is genuinely working and should continue to be implemented as planned, or whether some fundamental changes need to be made. Outcome evaluation looks beyond numerical compliance to the longer term impacts of program inputs and outputs, do determine what works and what does not work, and what needs to be changed. Outcome evaluation will be done by an independent entity. / 1770050 / MARCH 2013 FINAL REPORT t|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Outcome evaluation often uses proxy indicators (indirect indicators): for example, many people are reluctant to talk about their actual income. Proxy indicators can be used to help determine whether affected people are re-establishing or improving their livelihoods and standard of living. Indirect indicators may include status of nutrition, school attendance, or the purchase of “luxury� items such as motorbikes, sat TVs. Outcome evaluation reports will be publicly disclosed.  Audit of compliance and completion: Defines whether the RAP and applicable requirements have been complied with, and if the implementation can be deemed complete (external audit). IMPLEMENTATION ARRANGEMENTS The RAP, the ESMP and the LADP will be implemented within one overall organizational set up, by multi-disciplinary teams on different levels. The implementation of the Project will require the participation of several key players, including, but not limited to, - the Project Owner and the Project Implementing Unit - the Governments of Rwanda and Tanzania - the relevant local and regional authorities of each national government - as well as – during construction - the Owner’s Engineer and the Construction Contractor (for details see ESMP). Project Owner – SPVPC As required by the Tripartite Agreement between Burundi, Rwanda and Tanzania; the role of the Project Owner is delegated to a Special Purpose Vehicle Project Company (SPVPC). The Project Owner (SPVPC) is responsible for overseeing and monitoring overall project implementation and for ensuring compliance with the environmental and social requirements of government authorities and funding agencies. Project Implementing Unit NELSAP will serve as project implementing unit (PIU) for the RAP, ESMP and LADP, with a team dedicated to carrying out the respective activities, and coordinating with the two governments. The PIU will operate on site, in interaction with the project affected people and direct cooperation with the district authorities. PIU will operate under and report to the SPVCP management. The PIU as regional implementation unit will operate from Kigali (PIU headquarters) as well as directly at the Project site, with a local Project office. The key implementation processes of the RAP require continuous presence in the project area and continuous communication with district authorities (Task Forces), resettlement committees and affected people. / 1770050 / MARCH 2013 FINAL REPORT u|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) A project office at the Project site (location yet to be determined, in the Rusumo villages) will maximise efficiency and accessibility of the PIU staff. The present NELSAP team, already operating on the RAP, PCDP and ESMP preparation will be reinforced by additional staff. To properly deliver its mandate, the PIU must be fully established and operational as soon as the decision to go ahead with the Rusumo project has been made. This is in order to timely initiate and manage those key RAP implementation activities, which will have to be performed prior to the start of construction (i.e. the compensation process for people affected by construction). With regard to the implementation of the RAP and the PCDP, the PIU has the following responsibilities Communication and Coordination  Overall coordination with national governments and with authorities and funding agencies with regard to the Project’s social and environmental issues  Implementation of the PCDP and establishment of good and operational relations to affected communities  Communication and cooperation with local resettlement committees as key actors with implementation processes (i.e. compensation process, monitoring, identification of vulnerable people) Management of RAP Implementation  Ensure and monitor overall social and environmental due diligence within RAP, ESMP and LADP implementation (national requirements, lenders requirements)  RAP Key Implementation Processes  Compensation process  Grievance Mechanism  Monitoring  Manage staff recruitment processes and contracting processes of external service providers  Design of overall training plan for implementation staff, oversee implementation of plan Management of ESMP and LADP implementation  PIU will also be responsible for ESMP – and LADP implementation. For further details, see ESIA and LADP. Change Management  Communicate necessary changes of approach, particularly where substantial and material changes to the RAP (ESMP, LADP, PCDP) might be envisioned / 1770050 / MARCH 2013 FINAL REPORT v|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) or necessary (i.e. as consequence of monitoring results) to SPVPC manager and PIC (see below) for final decision making Capacity building  Facilitate and guide capacity building for authorities on different levels with regard to due diligence of Project management and due consideration of environmental and social safeguards District Task Forces The District Task Forces act as implementing bodies for RAP related activities on the district level, in Kagera District in Rwanda and in Ngara District in Tanzania. They operate as direct partners to the PIU. District executive administration staff shall contribute with their expertise, their capacity and competence to the implementation of the RAP, corresponding to the different technical areas they represent (i.e. agriculture, social assistance, land bureau). Resettlement Committees The resettlement committees are partners on the local level for RAP implementation, especially for - Compensation process - Involvement into the grievance mechanism on the village level - Involvement into monitoring procedures, especially in monitoring of marshland dynamics, of progress of livelihood restoration measures and of compensation disbursement - Identification of vulnerable people on the household level, information of PIU on special concerns of vulnerable people in their community, organise meetings and with and visits of vulnerable people / 1770050 / MARCH 2013 FINAL REPORT w|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) General Overview on Implementation Arrangements Overview on Implementation Arrangements – District Level / 1770050 / MARCH 2013 FINAL REPORT x|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Budget Overview on Budget for RAP and LADP Implementation Item Total Costs USD Project Preparation and Construction Period Year 0, Year 1- Year4 (= 5 years) Project Implementation Unit for RAP Implementation y0 and y1-y4 1,220,200 Compensation, construction impacts Due in Year 0 2,236,645 Livelihood restoration PAP affected by Due Year 0 – Year 2/Year construction impacts, including assistance 3 to vulnerable people 711,612 External Monitoring and external for RAP Implementation y0 Coordination and y1-y4 555,000 Sub-Total, Preparation period and for RAP Implementation y0 4,723,457 construction period and y1-y4 Project Operation (Year 5 – Year 9) (= 5 years) Compensation, operation impacts Due in year 4 1,155,700 Livelihood restoration PAP affected by Due Year 3 – Year 6 operation impacts 1,180,476 External Monitoring and external for RAP Implementation Coordination year 5 – year 9 310,000 Sub-Total, Operation Period for RAP Implementation year 5 – year 9 2,646,176 Grand Total, RAP Implementation 7,369,633 Summary Budget, LADP 15,000,000 Total, RAP and LADP Implementation 22,369,633 / 1770050 / MARCH 2013 FINAL REPORT y|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) CONTENTS EXECUTIVE SUMMARY ............................................................................................................ A 1. INTRODUCTION ................................................................................................................. 1 1.1 Structure of the RAP ....................................................................................................... 1 2. THE PROJECT .................................................................................................................. 2 2.1 General........................................................................................................................... 2 2.2 Project Location .............................................................................................................. 2 2.3 Project Features ............................................................................................................. 3 2.4 Construction Period ........................................................................................................ 3 2.4.1 Construction Areas .................................................................................... 3 2.4.2 Construction Methods ................................................................................ 4 2.4.3 Construction Workforce.............................................................................. 4 3. INTERNATIONAL POLICIES AND REQUIREMENTS ................................................................. 5 3.1 World Bank ..................................................................................................................... 5 3.1.1 OP 4.12 Involuntary Resettlement ............................................................. 5 3.1.2 OP 4.10 Indigenous People ....................................................................... 6 3.2 African Development Bank ............................................................................................. 7 4. LEGAL AND INSTITUTIONAL FRAMEWORK .......................................................................... 9 4.1 Rwanda .......................................................................................................................... 9 4.1.1 The Constitution ......................................................................................... 9 4.1.2 Relevant Legislation................................................................................... 9 4.1.3 Institutional Context ................................................................................. 12 4.1.4 Gap Analysis Rwanda .............................................................................. 15 4.2 Tanzania........................................................................................................................17 4.2.1 The Constitution ....................................................................................... 17 4.2.2 Relevant Legislation................................................................................. 17 4.2.3 Institutional Context ................................................................................. 20 4.2.4 Gap Analysis Tanzania ............................................................................ 23 5. PROJECT IMPACTS ON AFFECTED COMMUNITIES ..............................................................25 5.1 General Information .......................................................................................................25 5.2 Affected Communities: overview ....................................................................................26 5.3 Land Impacts from Construction ....................................................................................26 5.3.1 Overview .................................................................................................. 26 5.4 Construction impacts and project affected people ..........................................................29 5.5 Impacts from Project operation ......................................................................................32 / 1770050 / MARCH 2013 FINAL REPORT i|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5.5.1 General .................................................................................................... 32 5.5.2 Land Affected by Operations .................................................................... 33 5.5.3 Project Affected People – Project Operation ............................................ 36 5.6 Summary: affected people from Project operation .........................................................39 5.7 Summary of Project impacts and affected people ..........................................................39 6. SOCIOECONOMIC BASELINE OF AFFECTED COMMUNITIES ..................................................40 6.1 General Background ......................................................................................................40 6.2 Administrative Subdivisions ...........................................................................................41 6.2.1 Overview on Administrative Units-Rwanda............................................... 41 6.2.2 Overview on Administrative Units - Tanzania ........................................... 41 6.3 Demographic Characteristics .........................................................................................42 6.4 Agriculture and Land Tenure .........................................................................................44 6.4.1 Rwanda: Agriculture and Animal Husbandry in the Project Area ............. 44 6.4.2 Rwanda: Land Tenure in the Project Area ............................................... 44 6.4.3 Tanzania: Agriculture and Animal Husbandry in the Project Area ............ 48 6.4.4 Tanzania: Land Tenure in the Project Area .............................................. 50 6.5 Marshland Cultivation in the Project Area ......................................................................51 6.6 Livelihoods ....................................................................................................................59 6.7 Poverty and Vulnerability ...............................................................................................61 6.7.1 Situation in Rwanda ................................................................................. 61 6.7.2 Situation in Tanzania ............................................................................... 63 6.7.3 Vulnerable Groups ................................................................................... 64 6.8 Infrastructure .................................................................................................................66 6.8.1 Health ...................................................................................................... 66 6.8.2 Education ................................................................................................. 67 6.8.3 Markets .................................................................................................... 67 6.8.4 Summary ................................................................................................. 68 6.9 Housing and Other Assets .............................................................................................69 6.9.1 Rwanda ................................................................................................... 69 6.9.2 Tanzania .................................................................................................. 69 7. VALUATION AND COMPENSATION .....................................................................................71 7.1 Compensation and Resettlement Strategy.....................................................................71 7.1.1 Overall Approach and Key principles ....................................................... 71 7.2 Livelihood Restoration ...................................................................................................73 7.3 Eligibility ........................................................................................................................73 7.3.1 Census and Asset Assessment................................................................ 73 7.3.2 Cut-off Date ............................................................................................. 74 7.3.3 Speculative Structures ............................................................................. 75 7.3.4 Eligibility ................................................................................................... 76 7.4 Overview of Entitlements ...............................................................................................77 / 1770050 / MARCH 2013 FINAL REPORT ii | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.1 General Approach .................................................................................... 77 7.4.2 Loss of Residential Structure /Residential Land ....................................... 78 7.4.3 Loss of Business Structure ...................................................................... 79 7.4.4 Loss of Income Due to Loss of Employment ............................................ 79 7.4.5 Loss of Other Structures .......................................................................... 80 7.4.6 Loss of Agricultural Land.......................................................................... 80 7.4.7 Loss of Access to Agricultural Land ......................................................... 81 7.4.8 Loss of Permanent Crops ........................................................................ 81 7.4.9 Loss of Marshland for Cultivation ............................................................. 82 7.4.10 Loss of business sites in marshland ......................................................... 83 7.4.11 Temporary Loss of Access to Resources (Severance) ............................. 84 7.5 Determination of Compensation Rates ..........................................................................89 7.5.1 Residential Structures .............................................................................. 89 7.5.2 Residential Land, Rusumo East and Rusumo Villages ............................. 90 7.5.3 Business Structures ................................................................................. 92 7.5.4 Agricultural Land ...................................................................................... 92 7.5.5 Permanent Crops ..................................................................................... 92 7.5.6 Annual Crops ........................................................................................... 94 7.5.7 Determination of Compensation for Loss of Production from Marshland ................................................................................................ 96 7.5.8 Compensation Rates vs Income of PAP from Marshland Crops............... 98 7.5.9 Compensation Rates Update ................................................................. 105 7.5.10 Compensation Process .......................................................................... 105 7.6 Livelihood Restoration Program ...................................................................................109 7.6.1 General .................................................................................................. 109 7.6.2 Preparation and Implementation through Districts .................................. 109 7.6.3 Baseline Influencing Factors .................................................................. 110 7.6.4 Gender Aspects ..................................................................................... 111 7.6.5 Eligibility ................................................................................................. 111 7.6.6 Agricultural Enhancement – Outline ....................................................... 111 7.6.7 Improved Livestock Keeping-Outline ...................................................... 113 7.6.8 Diversification of Livelihood, Small business development - Outline ...... 113 7.6.9 Financial Training for Sustainable Use of Cash Compensation .............. 114 7.6.10 Micro-Credit Program ............................................................................. 115 7.7 Assistance to Vulnerable People .................................................................................115 7.7.1 General .................................................................................................. 115 7.7.2 Individual Support for Vulnerable People ............................................... 116 7.7.3 Envisaged Types of Assistance ............................................................. 116 7.7.4 Local Area Development Plan (LADP) ................................................... 117 7.7.5 Flood Risk Mitigation Plan...................................................................... 117 7.7.6 Overview: Preparation and Implementation of Livelihood Restoration Measures and LADP .............................................................................. 119 / 1770050 / MARCH 2013 FINAL REPORT iii | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 8. GRIEVANCE MECHANISM ...............................................................................................121 8.1 Anticipated Types of Grievances .................................................................................121 8.2 Management Mechanism ............................................................................................121 8.2.1 General Principles and Key Aspects ...................................................... 121 8.2.2 Grievance Registration and Monitoring .................................................. 122 8.2.3 Three Levels of Grievance Management .............................................. 123 9. CONSULTATIONS ...........................................................................................................127 9.1 General Information .....................................................................................................127 9.2 Overview on Consultations for the FDS and IDS prior to the year 2011 .......................127 9.3 Consultations Concerning the IDS During the Period FEbruary 2011- April 2012 ........128 9.4 Consultations for Preparation of the RAP ....................................................................130 9.4.1 Overview ................................................................................................ 130 9.4.2 Consultation Activities ............................................................................ 131 9.5 Regional consultative workshop ..................................................................................136 9.6 Consultations in the Context of RAP Disclosure ..........................................................137 9.7 Consultations in the Context of Compensation Agreements ........................................137 9.8 Consultation during RAP Implementation ....................................................................137 9.9 Public Consultation and Disclosure Plan (PCDP) .....................................................138 9.10 Project Stakeholders ...........................................................................................141 10. IMPLEMENTATION ARRANGEMENTS ................................................................................143 10.1 introduction .........................................................................................................143 10.2 Roles and Responsibilities ..................................................................................143 10.2.1 High Level Councils and Committees..................................................... 143 10.2.2 Project Owner - SPVPC ......................................................................... 144 10.3 NELSAP: Project Implementing unit (PIU) ..........................................................144 10.4 other parties involved in RAP implementation .....................................................152 10.4.1 Project Implementation Committee (PIC) ............................................... 152 10.4.2 Technical Advisory Committee (TAC) .................................................... 152 10.4.3 District Task Forces ............................................................................... 152 10.4.4 Financial Institutions on the District Level .............................................. 153 10.4.5 Resettlement Committees ...................................................................... 154 10.5 Implementation SChedule ...................................................................................156 11. MONITORING AND EVALUATION ......................................................................................160 11.1 Overview.............................................................................................................160 11.2 Objectives of Monitoring .....................................................................................160 11.3 M&E Approach....................................................................................................161 11.4 Internal Monitoring ..............................................................................................162 11.5 Outcome Evaluation............................................................................................163 11.6 Compliance - and completion audit .....................................................................164 / 1770050 / MARCH 2013 FINAL REPORT iv | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 11.7 Responsibilities ...................................................................................................164 12. BUDGET ........................................................................................................................166 APPENDICES Appendix 1 Consultation material used during November and December 2012 Appendix 2 Results of consultations in November and December 2012 Appendix 3 Marshland users in villages affected by operation Appendix 4 Compensation rates for annual and perennial crops Appendix 5 Calculation approach for compensation rates for residential structures Appendix 6 Budget Tables Appendix 7 Documentation (minutes of meetings, field reports) Appendix 8 References ANNEXES Annex 1 Public Consultation and Disclosure Plan (PCDP) Annex 2 Local Area Development Plan (LADP) Annex 3 Endorsement Documentation Annex 4 Signatures of cut-off date / 1770050 / MARCH 2013 FINAL REPORT v|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) TABLES Table 1 Contents of the RAP...................................................................................... 1 Table 2 Areas Needed for Construction ..................................................................... 3 Table 3 Gap Analysis - Rwanda ................................................................................15 Table 4 Gap Analysis - Tanzania ..............................................................................24 Table 5 Affected Villages in Rwanda .........................................................................26 Table 6 Affected Villages* Tanzania ..........................................................................26 Table 7 Changes in Land Use from Dam Construction Activities ...............................27 Table 8 Overview on Project Impacts due to Construction .......................................29 Table 9 Project Construction: Overview on Affected Households ..............................30 Table 10 Rwanda: Affected marshland as per village self-validation ...........................33 Table 11 Tanzania: Affected marshland as per village self-validation..........................33 Table 12 Affected marshland users - Rwanda .............................................................37 Table 13 Affected marshland users – Tanzania .........................................................38 Table 14 Summary: project impacts and project affected households .........................39 Table 15 Overview: Project Impacts and Project Affected Households, Construction and Operation ..........................................................................39 Table 16 Characteristics of Household Land Holdings in Kirehe District .....................45 Table 17 Female headed households: marshland cultivation along the Kagera river up to 15 km upstream the dam site, Rwanda ........................................47 Table 18 Female headed households: marshland cultivation along the Kagera river up to 15 km upstream the dam site, Tanzania ......................................49 Table 19 Marshland Use along the Kagera River, Rwanda (villages up to 15 km u/s the dam site) ...........................................................................................53 Table 20 Marshland Use in villages along the Kagera river up to 15 km upstream the dam site, Tanzania .................................................................................55 Table 21 Livelihoods in the Project Area .....................................................................59 Table 22 Definition of Poverty Status ..........................................................................62 Table 23 Poverty Levels in the Project Area ................................................................63 Table 24 – Access to Services and Means of Transport in the Project Aea .........................68 Table 25 – Entitlement Matrix ..............................................................................................85 Table 26 – Compensation Rates for Residential Houses, Rwanda ......................................90 Table 27 Compensation Rates for Residential Houses, Tanzania ...............................90 / 1770050 / MARCH 2013 FINAL REPORT vi | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 28 Compensation Rates for Residential and Commercial Land in Rusumo East, Rwanda ...............................................................................................91 Table 29 Compensation Rates for Residential and Commercial Land in Rusumo, Tanzania ......................................................................................................91 Table 30 Compensation Rates – Agricultural Land .....................................................92 Table 31 Information Sources – Market Price of Annual Crops ...................................94 Table 32 Compensation Rates Annual Crops* - Tanzania .........................................95 Table 33 Compensation Rates Annual Crops* - Rwanda ............................................96 Table 34 Reference figures for harmonization as per market price research ..............96 Table 35 Sample calculation of labour costs for average plot sizes .............................97 Table 36 Overview on average plot sizes on marshland .............................................99 Table 37 Rwanda: Annual Compensation Amounts: average-size marshland plots – all marshland users .................................................................................101 Table 38 Rwanda: Annual Compensation Amounts: average-size marshland plots of marshland dependents ...........................................................................102 Table 39 Tanzania: Annual Compensation Amounts: average-size marshland plots – all users ..........................................................................................103 Table 40 Tanzania: Annual Compensation Amounts: average-size marshland plots of marshland dependents...................................................................104 Table 41 Overview: Vulnerable People .....................................................................115 Table 42 Priority area for flood risk mitigation - Rwanda ...........................................118 Table 43 Priority area for flood risk mitigation - Tanzania ..........................................119 Table 44 Stakeholder Consultation Process with Respect to the IDS ........................129 Table 45 Consultations in affected communities .......................................................130 Table 46 Interviews on the District- and Cell-Level ....................................................134 Table 47 Consultations with Ex-PAPs: Village Meetings ...........................................136 Table 48 Consultations prior to RAP Implementation as per PCDP ...........................139 Table 49 Project Stakeholders, Tanzania ..................................................................141 Table 50 Project Stakeholder, Rwanda .....................................................................142 Table 51 PIU Set-Up and Tasks for RAP Implementation .........................................147 Table 52 Selection of Indicators for Internal Monitoring .............................................162 Table 53 Overview on Budget for RAP Implementation .............................................166 / 1770050 / MARCH 2013 FINAL REPORT vii | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) ACRONYMS AfDB African Development Bank BCR Benefit Cost Ratio CDC Community Development Committees D.A. Drainage area DEM Digital Elevation Model EIA Environmental Impact Assessment ESIA Environmental and Social Impact Assessment FDS Full Development Scheme FSL Full Supply Level GIS Geographical Information System GPS Global Positioning System Ha Hectares HEC Hydrologic Engineering Centers – US Corps of Engineers IC Installed Capacity IDF Inflow Design Flood IDS Intermediate Development Scheme IGEBU Geographic Institute of Burundi LIDAR Light Detection and Ranging MOL Minimum Operating Level MPLD Local Development Master Plan NBD Nile Basin Discourse NBI Nile Basin Initiative NEL Nile Equatorial Lakes NELSAP Nile Equatorial Lakes Subsidiary Action Program NELSAP-CU NELSAP Coordination Unit NGO Non-Governemental Organization NPV Net Present Value OP 4.12 World Bank Operational Policy Involuntary Resettlement PAP Project Affected People PCDP Public Commutation and Disclosure Plan PIC Project Implementing Committee Q Discharge (flow) / 1770050 / MARCH 2013 FINAL REPORT viii | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) RAP Resettlement Action Plan RFP Regional Rusumo Falls Hydroelectric Project ROR Run-of-river Scheme RSSP Rural Sector Support Project SI International System of Units ("Système International d'Unités’’) SLII SNC-Lavalin International Inc. SPV Special Purpose Vehicle (company manage the RFP) Sta. Station, established by metric chainage along centerline alignment from a zero reference STn Station TAC Technical Advisory Committee TIU Tanzania Implementation Unit UTM Universal Transverse Mercator (coordinate) WB World Bank WGS 84 World Geodetic System 1984 / 1770050 / MARCH 2013 FINAL REPORT ix | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Glossary of Terms Some key terms found in this document are defined below. Compensation Payment in cash or in kind for loss of an asset or a resource that is acquired or affected by the project. Affected person Person or enterprise affected by Project impacts, i.e. experiencing either physical or economic displacement. Economic displacement Loss of assets (including land) or access to assets that leads to loss of income sources or means of livelihood as a result of project-related land acquisition or restriction of access to natural resources. People or enterprises may be economically displaced with or without experiencing physical displacement. Involuntary resettlement Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that leads to loss of income sources or means of livelihood) as a result of project-related land acquisition or restriction of access to natural resources. Resettlement is considered involuntary when affected individuals or communities do not have the right to refuse land acquisition that results in displacement. This occurs in cases of: (i) lawful expropriation or restrictions on land use based on eminent domain; and (ii) negotiated settlements in which the buyer can resort to expropriation or impose legal restrictions on land use if negotiations with the seller fail. Land acquisition Land acquisition includes both outright purchases of property and purchases of access rights, such as rights-of way. Physical displacement Loss of dwelling or shelter as a result of project-related land acquisition which requires the affected person(s) to move to another location. Project A project to build and operate a dam and hydro power generation facilities at Rusumo Falls on the border between Rwanda and Tanzania. The Project does not include transmission facilities from the main Rusumo switchyard to the grids of the respective three countries Project Affected All members of a household, whether related or not, operating as single Household economic unit, affected by the Project Relocation Change of place of residence Replacement Value Market value of the asset plus transaction costs (e.g. taxes, stamp duties, legal and notarization fees, registration fees, travel costs and any other such costs such as may be incurred as a result of the transaction or transfer of property). In applying this method of valuation, depreciation of structures and assets should not be taken into account. / 1770050 / MARCH 2013 FINAL REPORT x|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Vulnerable groups Vulnerable or “at-risk� groups includes people who, by virtue of gender, ethnicity, age, physical or mental disability, economic disadvantage or social status may be more adversely affected by displacement than others and who may be limited in their ability to claim or take advantage of resettlement assistance and related development benefits. Vulnerable groups in the context of displacement also include people living below the poverty line, the landless, the elderly, women- and children-headed households, ethnic minorities, natural resource dependent communities or other displaced persons who may not be protected through national land compensation or land titling legislation. / 1770050 / MARCH 2013 FINAL REPORT xi | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) UNITS ¢ U.S. Cent bbl Standard oil barrel of 42 U.S. gallons (159 l) GWh Gigawatt hour GWh/yr Gigawatt hour per year h Hour 2 ha Hectare (10,000 m ) kg Kilogram 3 kg/m Kilogram per cubic meter 2 km Square kilometer kV Kilovolt kWh Kilowatt hour m Meter M$ Million dollars m.a.s.l. Meters above sea level 3 m /s Cubic meter per second MVA Megavolt ampere MW Megawatt MWh Megawatt hour t Ton (1,000 kg) USD U.S. Dollar / 1770050 / MARCH 2013 FINAL REPORT xii | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 1. INTRODUCTION This document presents the Resettlement Action Plan (RAP) for the Rusumo Falls Hydro-electric Power Development Project (= the Project). The Project will affect communities in Rwanda and Tanzania in the vicinity of the Project site, the Kagera River immediately upstream of the Rusumo Falls, on the border between the two countries. The RAP has been established in order to ensure that any economic or physical displacement resulting from the Project, whether permanent or temporary, is undertaken in a socially responsible manner and according to good international practice. Through the RAP, the Project will apply the respective relevant national legislations of Rwanda and Tanzania as well as the relevant World Bank and AfDB policies.  WB OP 4.12 “Involuntary Resettlement� (December 2001, revised February 2011)  AfDB (2003): Involuntary Resettlement Policy 1.1 STRUCTURE OF THE RAP The RAP has been developed as one consolidated document, covering the affected communities in both countries, Rwanda and Tanzania. However, some of the relevant topics need to dealt with under consideration of the respective country specific aspects. One example is the legal and institutional context, presented in chapter 3 (see Table 1 below). In these cases, country specific sub-sections have been prepared. Table 1 – Contents of the RAP Chapter No Main Heading 0 Executive Summary 1 Introduction 2 Project Description 3 International Policies and Requirements 4 Legal and Institutional Context 5 Project Impacts on Affected Communities 6 Socio-Economic Baseline of Affected Communities 7 Valuation and Compensation 8 Grievance Mechanism 9 Consultations 10 Budget and Costs 11 Implementation Arrangements 12 Monitoring and Evaluation / 1770050 / MARCH 2013 FINAL REPORT 1|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 2. THE PROJECT 2.1 GENERAL The Nile Basin Initiative (NBI) is a partnership of the riparian states of the Nile. The NBI seeks to develop the river basin resources in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security. Within the framework of the NBI, the Governments of Burundi, Rwanda and Tanzania have received financial support from various donors for preparation of the proposed Regional Rusumo Falls Hydroelectric Project (RRFHP), prepared through the Nile Equatorial Lakes Subsidiary Action Program (NELSAP). RRFHP is a key project that is part of an overall Kagera Basin Integrated Development Framework, which is part of the Nile Basin Initiative. The proposed project is a joint development undertaking by the Governments of Burundi, Rwanda and Tanzania. The agreed project preparation management arrangements consist, at the regional level, of a Council of Ministers in charge of electricity in the three countries; a Project Implementation Committee (PIC) consisting of the Managing Director/Director General of the Electricity Utility, Director General/ Commissioner/Director of Energy in each country; and a Project Manager at the NELSAP Coordination Unit (NELSAP-CU). NBI/NELSAP will also have fiduciary responsibility and oversee donor grants to the project. In March 2006 in Kigali, the Ministers of Energy of the three countries signed a Joint Project Development Agreement, reconfirming their commitment to jointly develop the Project. The feasibility and design studies as well as the Environmental and Social Impacts Assessments and Resettlement Action Plans conducted by the Consulting Firm SNC Lavalin since 2007, were interrupted several times as the scope of the studies were modified, due to the findings related to magnitude of the environmental and social impacts, especially those associated with the involuntary resettlement of local communities in the three countries. Thus, since 2007, the Feasibility and Design studies as well as the ESIA&RAP studies have shifted from the Full Development Scheme (FDS) to the Intermediate Development Scheme (IDS) and finally to the Run of the River Scheme (RoR). Following the recommendation of the Project Implementation Committee in March 2012, the RoR option was retained as the best option. 2.2 PROJECT LOCATION The dam reservoir and powerplant is planned to be situated at the Rusumo Falls where the Kagera River forms the boundary between Tanzania and Rwanda, and about 2 kilometres downstream of the river's confluence with the Ruvubu River. The reservoir is expected to extend up the Kagera River. / 1770050 / MARCH 2013 FINAL REPORT 2|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 2.3 PROJECT FEATURES In general, the project civil works will consist of the following:  Dam about 15 meters high creating hydraulic head of about 32 meters at maximum water level estimated at 1,320 masl;  Fixed crest overflow weir (four openings of 15 m each)  A 4 x4 sluice gate for minimum flow releases, and  A 13 m wide gated pass (that may be installed to make back water profiles similar to natural conditions in flood period). 2.4 CONSTRUCTION PERIOD 2.4.1 Construction Areas The construction area will affect land in Rwanda and Tanzania. The substation and the diversion tunnel will be built on the Rwandan Site, the power generation facilities will be located in Tanzania. The following table summarizes land area required for the construction site; Table 2 - Areas Needed for Construction Description Area (ha) Status Country 1 Sub-station 2.5 Permanent Rwanda 2 Operators accommodation 1.3 Permanent Rwanda 3 Diversion channel and dam 3.0 Permanent Rwanda construction area 4 Deposit area (soil, rock) 3.0 Permanent Rwanda 5 Construction camp 1.9 Temporary Rwanda 6 Borrow area 1 & 2 and quarry 7 Temporary Rwanda TOTAL RWANDA 18.7 7 Power Station and all facilities (tunnel, 28.0 Permanent Tanzania surge, tail race canal, spoil deposit) 8 Administration and operators city 4.4 Permanent Tanzania 9 Dam and water intake construction 3.0 Permanent Tanzania area 10 Spoil disposal area (rock, soil)-to be 3.0 Permanent Tanzania reused for vegetation control 11 Concrete basting and rock crushing 0.5 Temporary Tanzania 12 Construction workers camp 4.4 Temporary Tanzania TOTAL TANZANIA 43.3 TOTAL 62.0 In Rwanda, from the 18.7 ha land needed for construction, 8.9 ha will be needed temporary and 9.8 ha will be permanently acquired. In Tanzania, from the 43.3 ha land needed for construction, 4.9 ha will be needed temporary and 38.4 ha will be permanently acquired. / 1770050 / MARCH 2013 FINAL REPORT 3|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 2.4.2 Construction Methods The construction of the Project does not involve unusual or special construction methods. It deals mainly with rock excavation, back filling or disposal of excess materials, crushing and screening various types of aggregates, formwork placing and dismantling, reinforced steel placing, supplying and placing concrete, structural steel erection, architectural works and finishing. For the electrical and mechanical works, it mainly consists in fabrication, supply and installation of standard equipment (Kaplan turbines, 30 MW generators, 70 MVA transformers, 220 kV equipment, LV equipment, etc.). 2.4.3 Construction Workforce Current estimates show that the Rusumo Project will create up to about 1,000 temporary jobs during the construction period. About 10% of the workforce is expected to be Third Country Nationals. The overall duration of the construction period is estimated to be about 4 years. There will be in total 2,400,000 person-hours divided into two main contracts: the civil works contract and the electrical and mechanical works contract. / 1770050 / MARCH 2013 FINAL REPORT 4|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 3. INTERNATIONAL POLICIES AND REQUIREMENTS This document has been prepared in accordance with WB requirements as stated in OP 4.12 “Involuntary Resettlement�. Furthermore, the policy and respective requirements of the African Development Bank are considered (AfDB (2003): Involuntary Resettlement Policy). The overall policy approach and concept is guided by the following basic principles for social development:  People who are physically or economically displaced by the Project should not be worse off after the Project than before the Project, and  The number of people whose livelihoods are improved as a result of the Project should be maximised. 3.1 WORLD BANK 3.1.1 OP 4.12 Involuntary Resettlement The World Bank recognizes that involuntary resettlement may cause severe long-term economic, social and environmental damage unless appropriate measures are carefully planned and implemented. The main objective of OP 4.12 is therefore to avoid involuntary resettlement when possible, by exploring all viable options before any action is taken to resettle people. In cases where involuntary resettlement cannot be avoided, the policy aims to minimize and mitigate its adverse social and economic impacts by providing sufficient investment resources to enable affected parties to share in project benefits. The policy promotes the participation of displaced people in resettlement planning and implementation. The policy requires that displaced persons be assisted in their efforts to improve or at least restore their incomes and standards of living to pre-displacement levels or to levels prevailing prior to the beginning of project implementation, whichever is higher. More specifically, OP 4.12 requires that the following measures be taken in the event of involuntary resettlement:  A Resettlement Action Plan (RAP) should be prepared;  Prompt and effective compensation at full replacement cost should be provided for losses of assets attributable directly to the project;  Affected people (including residents of “host communities�) should be consulted and fully informed of their rights under the resettlement process;  Affected people (including residents of “host communities�) should be allowed to express their preferences regarding housing, infrastructure and services and agricultural land provided as compensation;  Physically displaced people should be provided with assistance such as a moving allowance during the relocation process; / 1770050 / MARCH 2013 FINAL REPORT 5|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Economically displaced people (including residents of “host communities�) should be provided with development assistance in addition to compensation measures, such as credit facilities, training and job opportunities;  Vulnerable persons among the displaced people (such as the handicapped, the elderly, women, widows, children, members of disadvantaged minority groups, etc.) should be provided with specific social assistance;  Ensuring that the relocation of affected people (and subsequent start-up of project construction) does not occur until all necessary measures for compensation and resettlement are fully in place. In terms of eligibility to resettlement benefits, OP4.12 makes a distinction between three categories of Project Affected People (PAP): a. Those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country); b. Those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets--provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan (see Annex A, para. 7(f)); and c. Those who have no recognizable legal right or claim to the land they are occupying. According to OP 4.12, persons covered under para. (a) and (b) are provided compensation for the land they lose, and other assistance. Persons covered under para. (c) are provided resettlement assistance in lieu of compensation for the land they occupy, and other assistance, as necessary, to achieve the objectives set out in the policy, if they occupy the project area prior to the cut-off date. OP 4.12 also mentions that where affected peoples’ livelihoods are land based, land for land solutions should always be preferred to cash compensation. 3.1.2 OP 4.10 Indigenous People OP 4.10 is not deemed applicable in the context of the Rusumo Falls project. This is based on findings from social surveys in the context of the ESIA for the IDS (SNII, 2011), which found no presence of indigenous people as defined in OP4.10. / 1770050 / MARCH 2013 FINAL REPORT 6|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 3.2 AFRICAN DEVELOPMENT BANK The AfDB Involuntary Resettlement Policy (2003) refers to involuntary displacement of people caused by Bank funded operations in the public and private sector. It applies when a project results in relocation due to loss of shelter of project affected people, when assets are lost due to the project or livelihoods are affected. Key objectives of the policy are:  to avoid involuntary resettlement where feasible, or minimize resettlement impacts where population displacement is unavoidable, exploring all viable project designs. Particular attention must be given to socio-cultural considerations, such as cultural or religious significance of land, the vulnerability of the affected population, or the availability of in-kind replacement for assets, especially when they have important intangible implications;  To ensure that displaced people receive resettlement assistance, preferably under the project, so that their standards of living, income earning capacity, and production levels are improved; The primary goal of the involuntary resettlement policy is to ensure that displaced people are treated equitably, and that they can share the benefits of the project that involves their displacement. The lending agency has the primary responsibility for planning, implementing and monitoring resettlement issues. The client will be required to prepare a full resettlement plan (FRP) for any project that involves a significant number of people (200 or more persons) who would need to be displaced with a loss of assets, or access to assets, or reduction in their livelihood. The resettlement plan should be prepared and based on a development approach that addresses issues of the livelihood and living standards of the displaced person as well as compensation for loss of assets, using a participatory approach for all stages of project design and implementation. Compensation at the full replacement cost for loss of lands and other assets should be paid prior to project implementation with the view to improve the former living standards, income earning capacity and production levels of the affected people. The needs of disadvantaged groups must be at the centre of the development approach. Particular attention should be given to disadvantaged groups, especially those below the poverty line. Provisions should also be made for counselling and dispute settlement. Project planners should work to ensure that affected communities give their demonstrable acceptance to the resettlement plan and the development program, and that any necessary displacement is done in context of negotiated settlements with affected communities. / 1770050 / MARCH 2013 FINAL REPORT 7|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The resettlement plan will be made accessible to the displaced population and relevant NGOs and CSOs in a form, manner and language that are comprehensible to them. During the implementation of the resettlement plan, the borrower is responsible for the monitoring and evaluation of all activities outlined in the plan. / 1770050 / MARCH 2013 FINAL REPORT 8|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 4. LEGAL AND INSTITUTIONAL FRAMEWORK 4.1 RWANDA 4.1.1 The Constitution Articles 29 and 30 of the 2003 Constitution of the Republic of Rwanda establish the fundamental principles of right to and protection of private property. Article 29 Every person has a right to private property, whether personal or owned in association with others. Private property, whether individually or collectively owned, is inviolable. The right to property may not be interfered with except in public interest, in circumstances and procedures determined by law and subject to fair and prior compensation. Article 30 Private ownership of land and other rights related to land are granted by the State. The law specifies the modalities of acquisition, transfer and use of land. 4.1.2 Relevant Legislation In addition to the overarching principles stated in the Constitution, key legislation applicable to land management and expropriation in Rwanda includes:  Organic Law N° 08/2005 of 14/07/2005 determining the use and management of land in Rwanda;  Law N° 18/2007 of 19/04/2007 relating to expropriation in the public interest;  Law N°17/2010 of 12/05/2010 establishing and organising the real property valuation profession in Rwanda. The Organic Land Law Key principles In 2005, a new Organic Land Law was enacted by Parliament. This new law defines land ownership, the rights and duties of land owners, and rules applicable to land transactions and registration. It was complemented by Presidential Order No 54/01/ dated October 12, 2006 establishing the structure, responsibilities, operation and composition of Land Commissions and by Ministerial Order No. 001/2006 dated October 26, 2006 establishing the structure of Land Registers and the responsibilities and operation of the District Land Registrar’s office. The Organic Land Law establishes certain key principles in respect of land ownership and management, including most prominently the following:  The State has supreme power to manage all national land in the public interest aimed at sustainable economic development and social welfare (Article 3); / 1770050 / MARCH 2013 FINAL REPORT 9|P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  The State guarantees the right to own and use land (Article 3);  Any legal person can exert rights over land. Any discrimination either based on sex or origin in matters relating to ownership or possession of rights over the land is prohibited. The wife and the husband have equal rights over the land (Article 4);  Any legal person that owns land either through custom, or who acquired it from competent authorities or who purchased it, is allowed to own it on long term lease (Article 5);  The law protects equally rights over land acquired from custom and rights derived from written law. Owners of land acquired from custom include all persons who inherited the land from their parents (Article 7), and  Lastly, the law establishes land commissions, amongst others at District level (Article 8). Land categorization Organic Land Law provides for a categorization of land:  According to categories of land use, and  According to categories of land ownership. Land use categories include urban land and rural land (Article 9). Urban land is defined as “confined within the legal boundaries of towns and municipalities�, as well as other land that may defined as urban by presidential order, for instance in suburbs and collective settlements of towns and municipalities. Any other land is rural land. Land ownership is divided into individually owned lands and State lands (whether urban or rural). Article 11 provides that individual land is comprised of land acquired through custom, written law, acquisition from competent authorities, purchase, gift, exchange and sharing. State lands are further categorized into two sub-categories: public domain and private State owned land (Articles 12 and 13). State land for public domain comprises land reserved for public use, for use by organs of state services or for environmental protection. Private State owned land consists of all other state owned land not considered to be part of public domain. Land tenure The Organic Land Law also provides for two types of formal land tenure:  full ownership (or freehold)  long term leasehold. Lands previously considered as State land are in the process of being allocated to private persons, in practice those who use such land. For example in Kirehe District, this process is almost complete, with all landowners registered and a full cadaster established. This process uses the decentralized District Land Bureau, Sector Land Committees and Cell Land Committees in conformance with the provisions of Ministerial Order N° 001/2006 of 26/09/2006 determining the structure of Land Registers, the responsibilities and the functioning of the District Land Bureau. / 1770050 / MARCH 2013 FINAL REPORT 10 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Swamp land Swamp land is specifically addressed in Article 29 of the Organic Land Law, which states the following: “Swamp Land belongs to the State. It shall not definitively be allocated to individuals and no person can use the reason that he or she has spent a long time with it to justify the definitive take over of the land. In order for the swamp land to be efficiently managed and exploited, the order of the Minister having Environment in his or her attributions shall determine a list of swamps and their boundaries. Such a list shall clearly indicate the structure of the swamps, their use, how they can be organized so that they can be beneficial to Rwandan nationals on a sustainable basis. The Minister having Environment in his or her attributions shall institute an order certifying the modalities of how swampland shall be managed, organized and exploited.� In the Project area, marshland is often subdivided in allotments, which tend to have a more or less permanent character. From a tenure standpoint, usage right is recognized (as an usufruct right), but individual informal users have no prospect of registration or ownership. Where irrigated schemes are developed, the local cooperative which handles the scheme will generally obtain a leasehold right from the District authorities or the relevant Land Commission. Role of Land Commissions The Land Commissions established at the national and district levels (Art. 8) are to monitor the effective use of land (Articles 52 and 73), consider the implementation of land division and reorganization (Art. 22) and inform the Minister in charge of vacant lands whether such can be exploited (Art. 15). Law on Land Expropriation (Law No. 18/2007 dated 19/04/2007) The 2007 Law on Land Expropriation establishes provisions on expropriation, including the following:  Compensation: Compensation equivalent to the value of a piece of land and operations carried out thereon shall be paid to the expropriated person and shall be calculated according to current market rates (Article 2);  Available funds: Any project at any level, considering expropriation for public utility purposes, must set aside funds in its budget for the assessment of compensation for expropriation and the payment of fair compensation (Article 4);  Consultative meeting: When the competent Land Commission establishes the actual public interest of the project, it requires in writing the district authorities concerned to convene a consultative meeting with the people living where the piece of land is located. This has to take place not less than thirty (30) days after receiving the request for expropriation (Article 12);  Expropriation procedure’s period: The expropriation procedure may not exceed a period of four months from the date the decision to expropriate was taken by the bodies mentioned in Article 10 of the Expropriation Law (Article 16).  Resettlement: Through mutual arrangement, both parties can determine the mode of payment. Article 23 (2) of the Expropriation Law provides that through an / 1770050 / MARCH 2013 FINAL REPORT 11 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) agreement between the person to expropriate and the one to be expropriated, just compensation may either be monetary, alternative land or a building equivalent as long as either option equates to fair and just monetary compensation. In case the determination of ‘just’ compensation exceeds in value the alternative land given to the expropriated person, the difference will be paid to the expropriated person. Law N°17/2010 of 12/05/2010 (valuation) The Law on Valuation is mostly addressing issues related to certification and organization of the valuators’ profession. However, it also includes a number of useful definitions (market value) and methodological elements to arrive at fair compensation. Market value is defined as “the estimated amount for which a property should exchange on the date of valuation�. Valuation methodologies are addressed in Articles 27 to 31 of the Valuation Law. Specifically, the following methods are described:  Comparable prices methods: the valuator is to compare prices by referring to the prices recently assigned to a real property that is similar or comparable to the real property subject to valuation;  Comparison of land values countrywide: where comparable prices are not available for land in a particular area, the valuator may use comparable prices of similarly classified land from other areas of the country, with variations depending on the quality and location of the land;  Replacement cost method: Where sufficient comparable prices are not available to determine the value of improved land, the replacement cost approach shall be used to determine the value of improvements to land by taking real property as a reference. Lastly (Article 31), the Valuation Law recommends that several methods be used concurrently and that all premises to valuation be clearly explained in the valuation report. 4.1.3 Institutional Context Responsibility for ensuring that all aspects of resettlement and compensation planning and implementation are taken into consideration falls to project proponents or project implementation bodies. The main institutions and departments involved in land management, compensation and resettlement are briefly described below:  The Ministry of Natural Resources (MINIRENA3): This Ministry is responsible, amongst others, for land management throughout the Rwanda territory, through the implementation and enforcement of the Organic Land Law and the Land Use Master Plan. As a result of the decentralization policy, the responsibility for implementing these laws is now also devolved to decentralized land registry offices, district commissions and committees. Where needed, the Ministry works directly with implementing bodies or project proponents to develop resettlement lands; / 1770050 / MARCH 2013 FINAL REPORT 12 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Land Valuation Offices: Following the promulgation of the Land Valuation Law in 2007, independent Land Valuation Offices were given the responsibility for providing “fair and just� valuations of land and affected assets in the event of expropriation. To date, such offices are not in place in the Project affected Districts of Kirehe and Ngoma;  District level authorities: District authorities concerned by resettlement activities are those normally responsible for allocating resettlement funds and for overseeing, coordinating and facilitating the implementation of resettlement activities across local governments in the sectors and units placed under their jurisdiction. As part of the implementation of the new land legislation, district land registry offices overseen by the District Authority have been given the responsibility of ensuring that resettlement activities are in line with current national and district land use plans.  District Development Committees: These Committees oversee and monitor all activities at district level. They are represented by members of each of the key ministries and bodies at district level, including the District Land Registry Office. They are responsible for developing a district development strategy and for ensuring that all activities, including resettlement and compensation activities are consistent with this strategy.  District Land Commissions: As part of the implementation of the new land legislation, district land commissions have been assigned the responsibility to act as consultative institutions to monitor and assess the work of district land offices. The committees are also responsible for setting up sector and unit level land committees.  District Land Registry Offices: The process for establishing these offices is currently underway. These offices will be responsible for the following:  setting up and guiding resettlement and compensation committees at sector/unit levels;  establishing standards for unit rates applied to affected assets and compensation rates, tailored to local conditions where necessary;  assessing the validity of the land tenure rights of project-affected people and eventually providing land use permits for relocated activities;  ensuring that effective grievance mechanisms are in place;  coordinating and supervising the implementation of resettlement activities carried out by resettlement and compensation committees with a view to ensuring compliance with national/district guidelines.  Resettlement and Compensation Committees: In line with the national decentralization policy, the responsibility for developing and implementing resettlement and compensation activities lies with these resettlement and compensation committees to be established at the sector/unit levels by the District Land Registry Offices. These committees would be responsible for planning, coordinating and monitoring resettlement and compensation activities as well carrying out public consultations with project-affected parties. / 1770050 / MARCH 2013 FINAL REPORT 13 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Sector/Unit Land Committees: These committees would also be established to monitor the role of the District Land Registry Offices in their relevant sectors/units, through the provision of field information relating to land use, land tenure and land expropriation permits and land use changes. They would also be responsible for coordinating individual land registrations and for ensuring that appropriate compensation payments have been made for expropriated land. Such committees are a traditional legal institution implemented only when there is a conflict over land ownership.  Other institutions: The following institutions may have a role to play in some aspects of the resettlement process: the Ministry of Agriculture (MINAGRI) the Ministry of Finance and Economic Planning (MINECOFIN), the Ministry of Local Government, Community Development and Social Affairs (MINALOC), the Ministry of Infrastructure (MININFRA) and the Ministry of Commerce, Industry, Investment Promotion, Tourism and Cooperatives (MINICOM). / 1770050 / MARCH 2013 FINAL REPORT 14 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 4.1.4 Gap Analysis Rwanda The following table identifies gaps in Rwandan legislation against the World Bank’s OP 4.12. Table 3 – Gap Analysis - Rwanda Recommendations to address World Bank OP 4.12 Rwanda Legislation gaps Involuntary resettlement should be Rwanda has no involuntary Ensure that resettlement issues are avoided wherever possible, or resettlement policy per se. RAPs fully recognized and dealt with at the minimized, exploring all alternatives. are prepared when required by project planning and design stages funding agencies. Expropriation law in order to avoid or minimize does not stipulate that displacement displacement. This is particularly should be avoided wherever important in a context of land possible. scarcity. Resettlement programs should be There is no requirement in Ensure that resettlement plans are sustainable, include meaningful legislation that resettlement integrated into long term regional consultation with affected parties, programs should provide development plans (as well as the and provide benefits to the affected sustainable benefits to affected Land Use Master Plan in Rwanda). parties. parties (although this is inferred in the Land Use Master Plan). Displaced persons as well as “host There is no stipulation that Ensure that levels of compensation, communities� should be assisted in displaced persons have livelihoods assistance and benefits are in line improving their livelihoods, or at improved or at least restored to with international standards. least in restoring them to their former levels (though this previous levels. corresponds to a key objective of the National Poverty Reduction Strategy). Displaced persons that are eligible Displaced persons that are eligible Ensure that all affected land users to assistance include those affected to assistance are limited to titled and receive appropriate assistance and by loss of shelter, those affected by customary landholders rather than benefits, including unauthorized loss of land and those affected by to all land users. occupants (“squatters�), laborers the loss of access to resources that and persons affected by the loss of support their livelihoods. access to resources that support their livelihoods. Eligibility criteria: Criteria are Expropriation law defines eligibility Ensure that all users of affected defined as follows: a) those who as both formal (legal) and informal lands (including unauthorized have formal rights to land, including (customary) owners of lands to be occupants or users, laborers or legally recognized customary or expropriated. However, it does not persons affected by the loss of traditional rights; b) those who do recognize the eligibility of all access to resources) are included not have formal rights to the land occupants or users of the land. as affected parties in the census but have a claim to such land or Eligibility of affected parties is survey. Implement cut-off assets that can be recognized determined on the basis of a socio- procedures based upon the date of through a process identified in the economic census. There is no the census survey. resettlement plan; c) those who provision for a cut-off date for have no recognizable right or claim eligibility. to the land they are occupying or the assets they are using. Eligibility of affected parties is determined on the basis of a census. The cut-off date for eligibility is based upon the date of the census. / 1770050 / MARCH 2013 FINAL REPORT 15 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 3 – Gap Analysis - Rwanda World Bank OP 4.12 Rwanda Legislation Recommendations to address gaps Consultation: Displaced persons There is no provision for affected Implement resettlement consultation should be informed of their rights persons to participate in procedures in conformance with and meaningfully consulted and resettlement planning and international standards. Displaced should have opportunities to implementation. Expropriation law persons are informed of their rights participate in planning and provides for displaced persons and consulted during RAP implementing resettlement being informed of the process preparation and implementation programs, including the selection of underway and for negotiations if appropriate relocation sites and necessary between the expropriated compensation and/or assistance and the expropriating party. packages. Grievance mechanisms: Appropriate Ministerial order No. 001/2006 and Ensure that informal and easily and accessible grievance Article 53 of the Organic Land Law accessible grievance mechanisms mechanisms must be established. both outline grievance mechanisms are in place and that affected parties in relation to physical and economic benefit from efficient processes for displacement which meet OP 4.12 addressing grievances. requirements. Compensation and relocation: There is no requirement under Preference to be given to land- Preference should be given to land- Rwandan law to place preference based compensation and relocation based compensation and relocation on non-cash based compensation. options for displaced persons whose options for displaced persons whose There is no requirement that livelihoods areland-based. Affected livelihoods are land-based. affected parties be fully parties to be fully compensated and Displaced persons to be provided compensated and relocated prior to relocated PRIOR TO project with at least equivalent housing, project implementation. There is no implementation. housing sites and/or agricultural requirement that cash compensation Cash compensation to be provided land PRIOR TO project be provided at full, non-depreciated, at full, non-depreciated, implementation and to be assisted replacement cost for losses of replacement cost for losses of during and after relocation. For cash assets attributable to the project. assets attributable to the project. compensation, displaced persons to The valuation process will be be provided with compensation at performed through the district land full, not depreciated, replacement offices, with official valuers; the final cost for losses of assets attributable determination of compensation rates to the project. will be done according to the approach of the RAP; actual land and property market assessments will be done prior to determination of final replacement rates Vulnerable persons: Special There is no requirement under Special assistance to be provided to assistance must be provided to Rwandan law to provide special vulnerable persons as per vulnerable persons in the assistance to vulnerable persons in provisions of the RAP, with the resettlement process. These may the expropriation process assistance of Kirehe district and include the handicapped, the resettlement committees elderly, women, widows, children, members of disadvantaged minority groups or indigenous peoples, etc. Monitoring and evaluation: There is no requirement under Independent monitoring and Adequate monitoring and evaluation Rwandan law to undertake evaluation of resettlement activities of resettlement activities and monitoring and evaluation of the and outcomes to be undertaken on outcomes must be undertaken. This outcomes of the expropriation the basis of performance indicators should be based on performance process (though this corresponds to and over a reasonable length of indicators and must be carried out a key objective of the National time (at least 5 years). In the event over a reasonable length of time Poverty Reduction Strategy). where the livelihoods of affected (typically at least 5 years). In the Monitoring is limited to ensuring that parties have not improved or at least event where the livelihoods of displaced persons have been been restored to their former levels, affected parties have not improved compensated as required under the measures to be taken to address or at least been restored to their law. identified deficiencies. Trust fund to former levels, measures must be be set up to finance such measures. taken to address identified deficiencies. / 1770050 / MARCH 2013 FINAL REPORT 16 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 4.2 TANZANIA 4.2.1 The Constitution There is no specific law or legal provision on resettlement in Tanzania. It is a constitutional right in Tanzania that if one's property is either acquired or nationalized, the individual affected must be fully, fairly and promptly provided with compensation. The procedures for valuation are set out in the Land Act No.4 and Village Land Act No.5 of 1999. 4.2.2 Relevant Legislation The Village Land Act (No. 5 of 1999) The Village Land Act (No. 5 of 1999) came into effect on May 1, 2001. It affirms that all land in Tanzania is public land and vested in the President as trustee on behalf of all citizens. The Act states that an interest in land has value and requires this value to be taken into consideration in any transaction affecting that interest. The Act distinguishes two categories of land  General/public land, on which socio-economic activities are permitted; and  Reserved/restricted lands for national parks, protected areas, and forest/wildlife reserves. Tanzania underwent a massive ‘villagisation’ process in the 1970s that was designed to provide ‘rural economic and social communities’ where people would live and work together for the good of all (Nyerere 1968:348). The Village Land Act recognizes land allocated during the villagisation process at any time between the first day of January 1970 and the thirty-first day of December 1977 as a valid allocation subject to rights and obligations in the party to whom the allocation was made. Village communities are therefore allowed to hold and manage land, although they do not formally own it. Holdings of individuals can be in two categories:  By leasehold right of occupancy for varying periods;  By customary lands. Management of village land is the responsibility of the Village Council as a trustee on behalf of the villagers and other residents of the land, who are beneficiaries of the land. The occupiers of the land do not have title deeds as the village administration is said to have records of each granted right of occupancy and/or customary rights; this tenure is therefore rarely disputed. The Village Land Act contains a gender clause declared to be law which affirms that the right of every women to acquire, hold, use, and deal with land shall, to the same extent and subject to the same restriction be treated as the right of any man. / 1770050 / MARCH 2013 FINAL REPORT 17 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The Land Act No 4 of 1999 The Land Act No 4 of 1999 came into effect on 1 May 2001. The Land Act categorizes Land into three main groupings:  General Land ;  Village Land ;  Reserved Land. The government can assign general or reserved land through a granted right of occupancy of derivative of rights. A right of occupancy is granted by the President in surveyed general or reserved land and is required to be registered under the Land Registration Ordinance Cap-334 to be valid and subject to the provision of that Law and the Land Act. Occupancy can be for periods not exceeding 99 years. Such land is also liable, subject to the prompt payment of compensation, to compulsory acquisition by the state for Public Purposes. Land Act No 4 The Land Act places value on land and thus introduces consideration for land as well as improvements, and the obligation to pay fair and reasonable compensation (through) proper valuation and Government determined compensation rates) for land acquired by the government or public bodies and institutions. The Land Policy, related to the Land Act, required that the value in land is taken into consideration in any transaction affecting that interest. It provides for the payment of full, fair, and prompt compensation to any person whose right of occupancy or recognized long-standing occupation or customary use of land is revoked or otherwise interfered with to their detriment by the State or is acquired under the Land Acquisition Act. According to the Act, assessment for compensation for land acquired in the manner provided for in the Act should be based on market value of the real property. It also provides for additional compensation, which includes:  Disturbance allowance;  Transport;  Loss of profits;  Accommodation allowance;  Cost of acquiring or getting the subject land;  Any other loss or capital expenditure incurred in the development of the subject land. Land Acquisition The Land Act 1999 validated the clause in the Land Acquisition Act, 1967 which states that ‘All Land in Tanzania is public land vested in the President as trustee on behalf of all citizens.’ The Act grants power to the president to acquire lands for public purposes. / 1770050 / MARCH 2013 FINAL REPORT 18 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Assessment of Compensation The Act (which) imposes upon corporations conditions under which land may be acquired which includes requirements to provide security for the payment for, acquisition of the land and dictates the terms under which the public shall be entitled to use and derive benefit from the work and to deal with the corporation in connection therewith. As in the Land Act (1999), this regulation sets market value as the basis for assessment of the value of any land, but includes compensation for unexhausted improvements on the land. It requires the market value to be arrived at through one of three possible methods:  By use of comparative method evidenced by recent actual sales of similar properties  By use of income approach, or  By replacement cost method where the property is of special nature and not saleable Assessments and payment of compensation are to be prepared by a qualified valuation expert and verified by the Chief Valuation Officer of the government or his/her representative. Compensation for loss of interest in land includes:  The value of unexhausted improvements ;  Disturbance allowance;  Transport allowance;  Accommodation allowance;  Loss of profits. The regulations detail how each of these aspects are to be calculated. Transport, accommodation and loss of profit allowances are not payable for unoccupied land at the date of loss of interest in land. Interest payment is required where compensation payment is not prompt i.e. if not paid within six months of acquisition or revocation of the land. Land Compensation Claims Regulations The Land Compensation Claims Regulations, 2001 under the Land Act no. 4 of 1999 applies to applications or claims for compensation against the government, local government authorities or any other public body or institution. The regulations allow holders of granted rights of occupancy in village land or holders of customary right of occupancy whose land is acquired under section 60 of the Land Act to claim compensation. The Land (Assessment of Value for Compensation) Regulations of 2001 (see above) provides the guidelines for claimants. Of note is the fact that the Land Compensation Claims Regulations includes interest in grazing land as compensable. Compensation should be verified by the commissioner or authorized officer, and rejected or paid within no more than thirty days from the date that the claim for / 1770050 / MARCH 2013 FINAL REPORT 19 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) compensation and the compensation schedule is received. It is required to be in monetary form or a combination of any of:  A plot of land of comparable quality, extent and productive potential to the land lost;  A building or buildings of comparable quality extent and use comparable to the building (s) lost;  Plants and seedlings ;  Regular supplies of grain and other basic food stuffs for a specified time. Compensation under Section 156 of the Act applies to non-government corporate bodies, organizations, associations or groups of persons in whose favor a public right of way is created. In effect, this regulation makes provision for compensation on land and assets acquired both by the State and by private parties, including mining companies. It also presents opportunity for compensation in kind, including replacements land of equal quality and productive potential, preferred by International Standards for compensation for displaced persons whose livelihoods are land based. The Grave Removal Act (1969) A grave and any dead body buried therein to be removed from the land and reinterred elsewhere if the land is required for a public purpose. The law required that a notice is served to the interested parties or to the members of a particular religion which may be controlling the cemetery. The law allows the interested party-(ies) to object in writing to the intention, and to themselves undertake the removal, as long as they are deemed to have lawful authority to do so. The law allows for compensation for the removal act, limited to reasonable expenses incurred in the removal, transportation, reinstatement, or re-interment of the grace or dead body and any placatory or expiatory rites or other ceremony accompanying such removal and reinterment. It also imposes penalty that includes payment of a fine or imprisonment for anyone who willfully hinders or obstructs those authorized to remove a grave or dead body. 4.2.3 Institutional Context The following ministries would have responsibilities in the resettlement context:  Ministry of Energy and Minerals: responsible for gas, oil, and mineral extraction and electrification;  Ministry of Natural Resources and Tourism: responsible for national parks, forestry, and fisheries;  Ministry of Lands, Housing and Human Settlements Development: responsible for land surveys and registration, town planning, regional physical planning and housing policy. The Commissioner of Lands, appointed by the President, is the principal administrative and professional officer and advisor to the government on all matters connected with the administration of land. Land Allocation Committee are established by the Minister and advise the Commissioner in determining applications for rights of occupancy; / 1770050 / MARCH 2013 FINAL REPORT 20 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Ministry of Agriculture, Food Security and Cooperatives: responsible for agriculture and land use planning, extension services and cooperatives, savings and credit societies;  Ministry of Infrastructure Development: is responsible of the construction industry, transport, electrical and mechanical services. Its Authorities cover airports, civil aviation, ports, and public works such as roads, bridges and ferries. Relevant agencies include the Architects and Quantity Surveyors Registration Board, Engineers Registration Board, National Board for Materials Management, National Construction Council, Tanzania National Roads Agency and the Tanzania Building Agency;  Ministry of Finance and Economic Affairs: manages government revenue, expenditure and fiancé, and the Ministry provides government with advice on the financial and economic affairs in support of the Government’s economic and social objectives. It works closely with officials in other ministries, agencies and departments to ensure that the Government’s overarching poverty reductions strategy is implemented and objectives attained. The Ministry also actively engages in public consultations with the view that an open and accessible budget planning process is important for effective and responsible decision making. Ministry of State in the Prime Ministers’ office responsible for Regional Administration and Local Government is responsible for creating conditions for local government authorities to deliver quality services and effectively manage the interface between it and other Ministries as well as development partners, regional secretariats and local government authorities;  Ministry of Home Affairs: core function is to maintain law and order and to protect life and property. Its departments include the Police Force, Prisons Service, Immigration Force, Fire Rescue Force, Refugees Service, Community Service and a Complaints Division;  Ministry of Health and Social Welfare: is responsible for health, hospital services, and welfare programs;  Ministry of Community Development - Gender and Children: is responsible for community development programs related to women and children;  Ministry of Water and Irrigation: Is responsible for ensuring that water resources are managed in an integrated manner and that water is adequately supplied with acceptable quality to meet the requirements of different sectors;  Ministry of Education and Vocational Training: responsible for management of schools and teachers from pre-primary through teachers’ colleges and technical and vocational training programs and colleges/institutes, and  Ministry for Labour, Employment and Youth Development: responsible for trade unions, human resource development programs, vocational training and youth development. The primary purpose of local government, according to article 146(1) of the Constitution is “to transfer authority to the people� by participating and involving people in the planning and implementation of development programs within their respective areas and throughout the country. In the sub-article, the enforcement of law and public safety is stated as one of the functions of the local authorities. The / 1770050 / MARCH 2013 FINAL REPORT 21 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) articles further states that “local government shall be entitled and competent to participate and to involve the people in planning and implementation of development� Local Government Level Local Government Authorities are classified into two categories: urban authorities, responsible for the administration and development of urban areas, and rural authorities. All Local Government Authorities are responsible for administration of law and order, and economic and development planning in their respective areas of jurisdiction. Several laws were enacted in 1982 and 1983 to establish and give legal power to the local authorities. Local government administration politically involves the election of and control by councillors (madiwani) in and of districts, municipalities and townships. At the level of social and economic management, the affairs of the council concerned are handled by technical personnel appointed by the President, ministers or functionaries responsible for local government. Regional Level Act No. 15 of 1984 s.9 provides for “a Regional Commissioner (RC) for each region who subject to sub-article (3), shall be a leader in the Government of the United Republic.� Regional Commissioners in Mainland Tanzania are appointed by the President with the advice of the Prime Minster, under whose office the Regional and Local Government portfolio is placed. Regional administration forms part of the central government and represents it from the level of the region down to the villages. District Level The situation in the Regional government is replicated at the level of the district (wilaya). Here, the District Commissioner (DC) is the officer in charge of the administrative area. A District Administrative Secretary (DAS) assists him/her. The DC is the representative of the central government. He/she is the local governor of the district and reports to the RC, who in turn reports to the president. The DC is responsible for preserving peace and security in the district so that citizens can go about their social and economic activities in a secure environment. He/She acts as the Justice of the Peace of the district and in this regard, has to work very closely with the officer in charge of the police in the district and other officers responsible for security. The DC is also a political and social mobilize in their jurisdiction and is responsible for mobilizing people to contribute financially or physically towards projects or other relevant causes. The Chief Executive Officer of a District Council is known as a District Executive Director (DED) The DED overseas the functioning of a variety of services provides by Government Ministries and Departments at the regional level i.e. District Officers for land, agriculture, livestock, forestry, education, community development, roads, health, planning, water, and energy, etc. The DED also oversees implementation of any projects that are not directly implemented by the central government. Local Level At Ward and Village levels, Central Government remains the principle operating authority through appointed officers and the power of the purse. / 1770050 / MARCH 2013 FINAL REPORT 22 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) In the resettlement context, Ward Executive Officers (WEOs), Village Executive Officers (VEOs) and Village Chairpersons have key functions. The WEOs and VEOS are appointed positions, and the Village Chairs are elected by the Village Council. Hamlet chairperson are responsible for sections of villages and operate under village chairpersons. The structure of the Village Administration is characterized by Village Assemblies and Councils, Village Executive Officers and Chairpersons, all of which are extensions of central government operating authority’s at local levels. The Village Assembly of all adults 18 years and older conduct meetings at least once a quarter. The Assembly elects a Village Council with management responsibility. The Council meets at least once a month. The Council ideally draws up an implements land use plans, land use regulations, and a development program. The basic administrative unit of the Local Government is the Kitongoji (Hamlet). Key Kitongoji responsibilities are provision of planning and voluntary serves for development projects; security; birth; and death registration, and dealing with topical issues such as HIV/AIDS. The Kitongoji Chairperson represents the Hamlet in Village government. 4.2.4 Gap Analysis Tanzania The following table identifies gaps in Tanzanian legislation against the requirements of WB, OP 4.12. / 1770050 / MARCH 2013 FINAL REPORT 23 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 4 – Gap Analysis - Tanzania Resettlement National WB Policy Gap Strategy & Responsibility Topic Legislative Requirements Timing of Prompt payment Compensation to be Standard Affected parties to be fully Compensation within 6 months paid prior to project Operating compensated prior to project Payment after land has implementation, before Procedure implementation been acquired the impact occurs (SUST006) has (PIU, districts to manage guided the compensation process in line with compensation WB requirements) process, and details the valuation and payment schedule process, which typically (assuming there are no disputes, and govern’t valuers and village officials are available) can process payments promptly. Calculation of Mining Act (1998) Cash compensation Recent land cost Preference to be given to land- Compensation requires ‘fair and should be sufficient to study has been based compensation and relocation reasonable replace the lost land completed, and options for displaced persons whose compensation for and other assets at full indicates that livelihoods are land-based. Affected crops, trees, replacement cost replacement land parties to be fully compensated and buildings, stock or costs have risen. relocated PRIOR TO project works ‘ Crop rates for 2010 implementation. Land Act (1999) released in Cash compensation to be provided says that comp. January. at full, non-depreciated, replacement for land should be Compensation cost for losses of assets attributable based on market rates for other to the project value of the real assets (i.e. The valuation process will be property. It also structures) are performed through the district land provides for calculated by a offices, with official valuers; the final additional Registered Valuer, determination of compensation rates compensation, and are by law, to will be done according to the inclu: reflect current approach of the RAP; actual land Disturbance market value. and property market assessments allowance, will be done prior to determination of transport final replacement rates allowance, loss of profits, accommod. allowance, cost of acquiring or getting land, and any other loss or capital expenditure incurred Livelihoods & Provide additional Not required by Final design and implementation of Resettlement targeted assistance national legislation livelihood restoration programs by Assistance (e.g. credit facilities, Ngara district; RAP will provide training, or job budget for livelihood restoration opportunities) and opportunities to improve or restore income earning capacity, production levels and standards of living to displaced persons whose livelihoods or income levels are adversely affected. / 1770050 / MARCH 2013 FINAL REPORT 24 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5. PROJECT IMPACTS ON AFFECTED COMMUNITIES 5.1 GENERAL INFORMATION Compared to the previous Project designs, the RoR is resulting in a significant reduction concerning the types as well as the magnitude and extent of impacts. The dam will function as a Run-of-River scheme and it will not create a water storage reservoir upstream from the dam. However, because there will be an 40 centimetre increase in the average water level at the dam compared to the natural situation to maintain the water level at 1,320 metres above sea level (asl), areas of seasonally flooded marshland will become permanently flooded. Under natural conditions, at the end of the wet season (May) the marshland is flooded and the water is at its highest level. Then during the period May – October, (dry season) the water slowly recedes and reaches its lowest level in October. For an average year the water recedes to the main river bed and the marshes are dry. Agricultural cultivation is then possible. The physical presence of the dam and the maintaining of the water level at 1,320 metres (asl) will cause the marshlands near the dam and about 5 kilometres upstream the Kagera valley to remain flooded. According to modelling results, for the areas further upstream, permanent flooding of arable marshland is not expected. Impacts in general can be distinguished into  Impacts from Project construction, and  Impacts from Project operation. The RAP is covering the project impacts resulting from land acquisition during construction and from the permanent flooding of presently seasonally flooded marshland areas from Project operation. Other socio-economic impacts, i.e. impacts from construction activities such as noise, vibrations, construction traffic, presence of a large number of workforce, population influx, are covered by the ESMP. Note: This chapter provides a description of the structures and operating modes based on the feasibility study for the IDS carried out by SLII in 2011/12. The structures and activities for the RoR scheme will be much the same as for IDS, and environmental and social impacts for the RoR scheme can be accurately predicted from the design of the structures for the IDS. The / 1770050 / MARCH 2013 FINAL REPORT 25 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) ESIA study has confirmed that there will be no need to revise the design of the facilities due to the findings of the study. 5.2 AFFECTED COMMUNITIES: OVERVIEW The Project will affect households in local communities upstream of the dam structure, up to a distance of about 5 km on both sides of the Kagera river. The Table below provides an overview on affected villages in Rwanda and in Tanzania*. All affected villages in Rwanda are located in Kirehe district, All affected villages in Tanzania are located in Ngara district. Table 5 – Affected Villages in Rwanda Village Cell Sector Total population (Census 2012) Rusumo East Kiyanzi Nyamungari 204 Rusumo West Nyankurazo Kigarama 163 Nyakwisi Nyankurazo Kigarama 89 Nshungerezi 118 Nyakabungo 124 Ruhuha 148 * Figures and other information on villages from SNII RAP Tanzania,, Phase III; Table 6 – Affected Villages* Tanzania Village Sub-Village Division Ward Total population of Nyakiziba village Nyakiziba Kabuye 2,309 Kyenda *Figures and other information on villages from SNII RAP Tanzania,, Phase III; 5.3 LAND IMPACTS FROM CONSTRUCTION 5.3.1 Overview The impact on land during construction is limited to the dam site. Affected land will be residential land, land used for business and small areas of agricultural land. Land take will result in the permanent change of land use and the termination of the present use of the land. / 1770050 / MARCH 2013 FINAL REPORT 26 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 7 Changes in Land Use from Dam Construction Activities Natural Agricultural Residential Description Total vegetation land areas Borrow Area No 1 2.06 2.06 Borrow Area No 2 4.89 4.89 Operation Base Camp sub-station 1.26 1.26 Sub-station Area 1.79 1.79 Construction Base camp (Rwanda) 1.02 1.02 Construction Area 1.84 0.62 1.03 3.50 Spoil Deposit Area 2.70 2.70 TOTAL RWANDA 1.84 14.34 1.03 17.21 Power plant Building 21.51 6.69 28.19 Operation Base Camp (power and 2.73 1.71 4.44 dam) Construction Workers Permanent 1.84 0.05 1.89 Camp Construction Workers Temporary 0.22 3.72 0.42 4.36 Camp Water Intake 2.51 1.79 0.41 4.70 TOTAL TANZANIA 26.97 15.75 0.88 43.58 TOTAL for the Project (ha) 28.81 30.09 1.91 60.80 The map on the page below presents the spatial setting of areas required for construction with the indication of losses. / 1770050 / MARCH 2013 FINAL REPORT 27 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 1 Components of Project during Construction and losses resulting from impacts on land / 1770050 / MARCH 2013 FINAL REPORT 28 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5.4 CONSTRUCTION IMPACTS AND PROJECT AFFECTED PEOPLE Project affected households were identified during field surveys between November 2012 and January 2013. In total, 90 households will be affected in Rwanda and 133 households will be affected in Tanzania. The following tables (Table 8 and Table 9) provide an overview on the types of project impacts and the corresponding numbers of affected households. Table 8 Overview on Project Impacts due to Construction Description of Project Impacts Number of affected Households Construction; Impacts on Land (Dam Site) Land loss due to construction of dam Rwanda Tanzania Total Residential structures, associated with 8 8 agricultural land plots Agricultural land 10 10 Subtotal 18 Land loss due to establishment of concrete bashing and rock crushing and contractors work area, future residential area for operation staff Residential structures, associated with 33 33 agricultural land plots Residential structures 21 21 Subtotal 54 Land loss due to establishment of concrete bashing and rock crushing area Business structures 13 13 Brick making businesses 26 26 Arable marshland 2 2 fish hatching ponds (1 cooperative) 6 6 Subtotal 47 Land loss due to establishment of construction contractor’s area Business structures: owners 17 17 Business structures (business tenants in 36 36 affected structures as per row above) residential structures (as annex of affected 3 3 business structure as per row above) Subtotal 56 Land loss due to establishment of borrow areas (borrow area 2) Sand digging and brick making businesses 34 34 Subtotal 34 Temporary loss of access to resources due to construction activities Loss of access to the river due to construction of dam structure: fishing business 14 14 downstream of dam site 14 Total 223 / 1770050 / MARCH 2013 FINAL REPORT 29 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 9 Project Construction: Overview on Affected Households Construction Period - Overview on affected households Rwanda Tanzania Households affected by loss of agricultural land and loss of residency 41 Households affected by loss of residency: owners 21 Households affected by loss of agricultural land 10 Households affected by loss of arable marshland 2 Households affected by loss of business: commercial structures 17 13 Households affected by loss of residential structures (as annexes to affected 3 business structures) Households affected by loss of business premises as part of affected business 36 structures (tenants) Households affected by loss of business: brick making/sand digging structures 34 26 Households affected by loss of business: fish hatching pond 6 Households affected by temporary loss of access to resources: fishers 14 Total 90 133 Loss of Residence 21 households (Tanzania) will be affected by a loss of their residence and 3 households will be affected by loss of a residential premise they are renting. Types of affected residences were documented during the field surveys from Nov 2012 to Jan 2013 (see lists of affected residences in Annex 4). Loss of agricultural land 10 households in Tanzania will be affected by the loss of agricultural land. This land is intermediate land (private land). Areas of affected agricultural land and the overall cultivation pattern were documented during the field surveys from Nov 2012 to Jan 2013 (see documentation of affected residences in Annex 4). Loss of residence plus loss of agricultural land 41 households in Tanzania will be affected by the loss of residential structures plus the loss of the associated agricultural land (private land). Types of affected residences and areas of affected land were documented during the field surveys from Nov 2012 to Jan 2013 (see documentation of affected residences in Annex 4). / 1770050 / MARCH 2013 FINAL REPORT 30 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Loss of arable marshland 2 households in Tanzania will be affected by loss of arable marshland plots. Affected plots and cultivation patterns were documented during the field surveys from Nov 2012 to Jan 2013 Loss of business 17 commercial structures are affected and Rwanda and 13 in Tanzania. 36 businesses in Rwanda will lose their rented business premises in affected commercial buildings. 34 brick making businesses in Rwanda and 26 brick making businesses in Tanzania will lose their fabrication sites in the marshland. A fishing cooperative with 6 members in Tanzania will lose the area of their fish hatching ponds. Affected businesses are of different types  Permanent built business structures ;  Kiosks of small traders ;  Rented premises in business structures ;  Brick making businesses in marshland, and  Fish hatching businesses in marshland. Affected businesses were described and documented during the field surveys from Nov 2012 to Jan 2013 (see documentation of affected assets Annex 4), comprising names of owners and cooperative members and names of tenants of business premises. Loss of access to resources 14 fishers, who practice fishing as a seasonal economic activity, will temporary lose the access to their present fishing sites/mooring locations of their boats. Names of affected fishers were documented during the field surveys from Nov 2012 to Jan 2013 (see documentation of affected assets Annex 4). Note: all impacts on marshland of Rusumo village, Tanzania, are considered under construction impacts; no HHs in Rusumo village in addition to those HH affected by construction, will be affected by operation / 1770050 / MARCH 2013 FINAL REPORT 31 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5.5 IMPACTS FROM PROJECT OPERATION 5.5.1 General The project will function as a Run-of-River scheme and it will not create a water storage reservoir upstream from the dam. However, there will be a 40 cm increase in the average water level at the dam compared to the natural situation to maintain the water level needed for operation (1,320 m asl). As a result, areas of seasonally flooded marshland up to 5 km on both sides of the Kagera river, upstream the dam, will become permanently flooded (see Figure 2 below). Figure 2 Project Operation: Permanently flooded marshland areas up to 5 km from Dam site / 1770050 / MARCH 2013 FINAL REPORT 32 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5.5.2 Land Affected by Operations Arable Marshland In the area extending upstream from the dam site, impacts from Project operation will be limited to marshland and no private agricultural land will be affected by permanent flooding (see ESIA, chapter 6). The hydrological changes will have effects on flooding conditions of the marshlands on both sides of the Kagera river and will hereby affect the narrow strip of arable marshland, stretching inland of the papyrus marshlands. The strip of flooded arable marshland as per interpretation of maps with modelling results will extend up to 5 km upstream of the dam site. Arable marshland will be flooded up to the areas of Ruhuha village in Rwanda and Kabuye sub-village in Tanzania (see Figure 3 below). A total of 107.6 ha of arable marshland will be affected in Rwanda, see Table below. Table 10 Rwanda: Affected marshland as per village self-validation Total area cultivated by Village Marshland cultivated (ha) marshland users (ha) Rusumo East 8.56 5.06 Nyakwisi 99.29 37.33 West Rusumo 42.68 16.24 Nshungeruzi 65.77 26.52 Nyakabungo 22.71 4.33 Ruhuha 100.54 18.1 Total 339.55 107.58 *self-validation Nov 2012 The affected marshland encompasses about 31% of the total land available to marshland users in the affected communities. A total of 79.6 ha of arable marshland will be affected in Tanzania, see Table below. Table 11 Tanzania: Affected marshland as per village self-validation Total area cultivated by Marshland Cultivated Village Sub-Village marshland users (ha) (ha) Nyakiziba Kabuye 37.75 18.25 Nyakiziba Kyenda 258.46 61.37 Total 296.21 79.62 *self-validation Nov 2012 The affected marshland encompasses about 26% of the total land cultivated by marshland users in the affected communities. / 1770050 / MARCH 2013 FINAL REPORT 33 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 3 Overview with area of Ruhuha and Kabuye villages / 1770050 / MARCH 2013 FINAL REPORT 34 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 4 Cut out with example for marshland, affected by operation / 1770050 / MARCH 2013 FINAL REPORT 35 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 5.5.3 Project Affected People – Project Operation Households cultivating arable marshland Households affected by the permanent flooding of arable marshland plots will permanently lose the agricultural production from their marshland plots. In Rwanda, households cultivating arable marshland in the following villages are considered as affected  Rusumo East  Nyakwisi  West Rusumo  Nshungeruzi  Nyakabungo  Ruhuha In Tanzania, households cultivating arable marshland in the following villages are considered as affected  Rusumo  Nyakiziba Village, sub villages Kyenda and Kabuye Validation of arable marshland in the affected villages was undertaken in November 2012, through a self-validation by marshland users, with confirmation from village heads and resettlement committees. Information from self-validation comprises  Names and contact details of affected households  Size of marshland plots/household  Size of total land cultivated/household  Most important crop cultivated on marshland plot over past 3 years prior to cut-off date (see chapter on baseline conditions/marshland cultivation above) Each affected household signed the cut – off date (date of self-validation in village). For documentation of self-validation, see Annex 3. Amongst the affected households, a total number of 4 households are entirely depending on marshland cultivation, with no land uphill (private land). They make up about 4.35% of the marshland users. / 1770050 / MARCH 2013 FINAL REPORT 36 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 12 Affected marshland users - Rwanda HH entirely depending on HH using marshland for agriculture – average HH using marshland marshland sizes of land of different types/HH Average Average size for Total size of Average Average users Village No. of %of marshland % of total total land size of size of entirely HH* No. %of total HH No. users HH (marshland private marshland depending plus land (ha) (ha) on private, ha) marshland (ha) Rusumo East 204 12 5.9 5 41.7 2.5 0.71 0.5 0.42 0.37 Nyakwisi 89 84 94.4 14 16.7 15.7 1.18 0.89 0.44 0.28 West Rusumo 163 48 29.4 11 22.9 6.7 0.89 0.49 0.71 0.33 Nshungeruzi 118 57 48.3 5 8.8 4.2 1.13 0.75 0.47 0.25 Nyakabungo 124 28 22.6 3 10.7 2.4 0.39 0.73 0.15 0.08 Ruhuha 148 122 82.4 5 4.1 3.4 0.82 0.7 0.15 0.28 Total 846 351 41.5 43 12.3 5.1 0.9 0.7 0.4 0.3 *Source: SLII , other figures : village self validation, Nov 2012 / 1770050 / MARCH 2013 FINAL REPORT 37 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 13 Affected marshland users – Tanzania HH using HH using marshland for agriculture – average HH entirely depending on marshland marshland sizes of land of different types/HH Average size Average Total No. for users Village Sub- %of size of total Average Average entirely of HH* % of total land size of size of Village No. %of total HH No. marshland HH (marshland private land marshland depending on users plus private) (ha) (ha) marshland (ha) (ha) Nyakiziba Kabuye n.a. 24 1 4.2 1.57 0.84 0.76 0.5 Nyakiziba Kyenda n.a. 66 3 4.5 3.91 3.12 0.92 1.66 Total 90 4 4.35 2.74 1.98 0.84 1.08 *Source: SLII , other figures : village self validation, Nov 2012 / 1770050 / MARCH 2013 FINAL REPORT 38 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) In the six affected villages in Rwanda, a total number of 351 households will be affected. Amongst the affected households, a total number of 43 households are entirely depending on marshland cultivation, with no land uphill (private land). They make up 12.3% of the marshland users. Marshland users make up between 5.9% (Rusumo East) and 82.4% (Ruhuha) of the total population of affected villages. In the two affected sub-villages in Tanzania, a total number of 90 households will be affected. 5.6 SUMMARY: AFFECTED PEOPLE FROM PROJECT OPERATION The table below summarizes project impacts from operation and project affected households. Table 14 Summary: project impacts and project affected households Project Impact from Operation No of Affected Households Rwanda Tanzania Permanent flooding: Loss of arable marshland 351 90 Total 441 Source: village self-validation, Nov 2012, hydraulic modelling results 5.7 SUMMARY OF PROJECT IMPACTS AND AFFECTED PEOPLE Table 15 Overview: Project Impacts and Project Affected Households, Construction and Operation Description Area (hectares) No. of Households Rwanda Tanzania Total Rwanda Tanzania Total 3. Land Acquisition in Dam Site 14.34 15.75 45 45  Agricultural Land 1.84 26.97  Natural Vegetation 1.03 0.88 3 29 32  Residential Structures 87 59 146  Business Units Sub-Total 17.21 43.58 60.79 90 133 223 4. Affected Marshland (flooded) 107.6 79.6 187.2 351 90 441  Arable Marshland Sub-Total 107.6 79.6 187.2 351 90 441 TOTAL 124.81 123.18 247.99 441 223 664 / 1770050 / MARCH 2013 FINAL REPORT 39 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6. SOCIOECONOMIC BASELINE OF AFFECTED COMMUNITIES 6.1 GENERAL BACKGROUND The area affected by the Project is located towards the South-East of the Rwandan capital of Kigali, within the District of Kirehe (capital: Kirehe) of the Eastern Province (capital: Rwamagana). The morphology of the landscape is characterized by gentle hillsides gradually converging into marshlands. The villages are usually established on the hilltops, often with scattered houses on the slopes. All available land is intensively used by agriculture, extending over the hillsides to the edge of the marshlands. A transitional zone (“the intermediate zone�) between marshlands and hillside lands is usually observed in much of the study area. The intermediate zone can be occasionally flooded in the rainy or high water season. The existence and extension of this zone depends on the slope of the hillside lands bordering the marshland. It is a critically important area for agriculture as the soil is better drained than in marshlands and the issues that impede agriculture on hillsides do not exist (erosion, poor fertility). The extension of agricultural cultivation to the seasonally flooded marshlands was often a response to food and fodder shortages in the dry seasons or to drought periods as the population levels increased. Successive government policies have had a direct influence on wetland agricultural use. The use of marshland has therefore been influenced more by political and socio-economic factors than by individual farmers. The Rwandan Government currently sees marshland as providing an important opportunity for improving food security and income through the production of rice. In the Rwandan context, ‘marshland’ is defined as all lowland and comprises the entire valley bottom, which includes both areas that are permanently under some water and areas that are inundated on a temporary basis only. Marshland is colonized by a specific type of natural vegetation such as Cyperus papyrus and Echinochloa pyramidalis, associated with other species. In Tanzania, due to the availability of hillside land, the cultivation of marshland is not such a frequent phenomenon. East Rusumo in Rwanda and Rusumo in Tanzania are border villages and the closest ones to the construction site. Separated by the Kagera River, the two villages share a similar lifestyle, even including a common language. However, trade is not significant enough to generate opportunities in trade-related services. These villages are similar to other villages along the Kagera River, all relying on subsistence agriculture economy. Yet Rusumo on the Rwandan side and Rusumo on the Tanzanian side differ from other communities of the study area in their relation to this project, since they are located in the immediate area of the construction site. Baseline information was mostly gathered from District development plans and household surveys. Household surveys included Rusumo (Kirehe, Rwanda), Rusumo and Mitako (Ngara, Tanzania). / 1770050 / MARCH 2013 FINAL REPORT 40 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.2 ADMINISTRATIVE SUBDIVISIONS 6.2.1 Overview on Administrative Units-Rwanda District District is an autonomous administrative structure with a legal status and financial autonomy. The District Council elaborates the District policy, approves the District budget, mobilizes the population for development, and controls the activities of the Executive Committee of the District. Sector Sector is the next level of the democratic local government, and it includes, several Cells. Cells development plans are coordinated by the Sector Development Committees, who have been elected by members of the Cell Community Development Committees (CDCs). Members of the Sector CDCs elect their representative in the District CDC. Cell Cell is the grass-roots local government organization, administered by a freely elected Executive Committee. Each Cell elects a Cell CDC responsible for planning social and economic development activities. Cells are usually comprised of 100 to 200 households. Umidugudu Villages in the project area have been created and settled relatively recently following a villagisation program (Umidugudu) launched by the government in 1996. The overall objective of this program was to overcome the traditional disperse settlement pattern and to enhance the development of coherent settlements in order to be able to provide easier access to social infrastructure. Today, Umudugudu represent grassroots administrative unit under the cell, comprising at least 50 households. Affected Villages – Administrative Units The affected area in Rwanda is entirely located in Kirehe District. Except Rusumuo East, which belongs to Nyamungari Sector, all the other affected villages are part of Kigarama Sector. 6.2.2 Overview on Administrative Units - Tanzania Tanzania has 26 regions or administrative divisions. The levels below the regions are  Districts ;  Divisions ;  Wards ;  Villages. / 1770050 / MARCH 2013 FINAL REPORT 41 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Rural areas in Tanzania have a two-tier system for local government with local government councils operating at both the district and the village levels. In addition, the Tanzanian local government system has administrative committees at both the ward, street (mtaa) and sub-village levels. Local government authorities have a broad spectrum of responsibilities, including primary education, primary health care, rural water supply, local government roads. In addition to these local government structures, Tanzania also has a network of decentralized Regional Administrations, which include secretariats at the regional level and staff at the district and divisional levels. The Regional Secretariats have oversight over matters like local budgets, and monitoring responsibilities with regards to local government authorities. Affected Villages-Administrative Units The Kagera region of Tanzania is comprised of six districts. Rusumo Village is part of Ngara District, which is itself divided into 4 divisions, 17 wards, and 72 villages. Ngara is further divided into 359 sub-villages. Rusumo village belongs to Kiyanzi Division and to Rusumo Ward. 6.3 DEMOGRAPHIC CHARACTERISTICS Demographic Rwanda Tanzania Aspect Population Kirehe District is one of the most densely populated The Kagera Region has a population of over 2 million Density districts in Rwanda, with 320 people/km2. and a population density of 71 people/km2, much lower than the Kirehe District in Rwanda. Population Over the past ten years, average population growth The Ngara district, which contains the impacted area, Growth was 2.3%/year, which is slightly below the national had a population of 334,409, and an annual average of 2.7%. population growth rate of 5.3%. Ngara’s population constitutes approximately 16% of the Kagera region’s population. Age Structure The age structure is that of a young population, The age pyramid structure is that a roughly equal characterized by high fertility and high mortality. A number of males and females and is typical of a decline in the age groups 20-24 and 25-29 for both young population age structure characterized by high sexes is due to the circumstances of the mid- fertility and mortality. nineties. Gender Ratio In general, male population figures are lower that of The Ngara Poverty Survey (2006) indicates that female population. The ratio of male per 100 approximately 4 out of 5 households of the district females was already low in 1991 (95.1 males for are headed by males. every 100 women in rural Rwanda), but dropped 2011 survey data also indicated that 75% of the consistently after the genocide. The ratio is households in the survey area were headed by men, particularly low among the population subgroup and only 25% by women. aged over than 20-24 years, what can be attributed to higher male mortality during the genocide. Single-parent households are frequent in the wider Project Affected Area, whereby 20% of the households in the Project Affected Area are headed by women. Household Size The average household size for Kirehe District is According to the Ngara Poverty Survey (2006), the 4.3 individuals per household. The age of most of mean household size is 5.1 individuals. SNII’s the heads of households is between 18 and 55 household survey indicated that most households years. have 5 or more members. Only 9% of the households had only one member. 2011 household survey (SNII)indicated that the average age of male heads of households is 41years and the average age of female heads of households is 40 years. According to the Ngara Poverty Survey, most heads of households fall within the 50-59 age / 1770050 / MARCH 2013 FINAL REPORT 42 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Demographic Rwanda Tanzania Aspect group and the 60 and above group. Education 2011 household survey results (SNII) suggest that 2011 household survey results (SNII) suggests a low Levels and the literacy rate of the heads of household in the education level of males in the study area . 14% of Access to project area is generally low: 33% of the male males in the sampled households seem to have Education heads of households indicated not to have any started but not completed primary education, but formal education, while 44% had not finished 61% have and 17% are currently attending primary primary school and 4% had not finished secondary school. Only 5% have completed secondary school. Out of the surveyed woman headed schooling. Although 1% have graduated from households, 26% had not finished primary school university and 1% have completed some form of and 61% did not have any formal education. vocational-technical training. , In general, the highest According to the survey results, 52% of the heads education level completed by males is primary of households are illiterate and only 48% of schooling. children (both sexes) aged 5 years or older are enrolled in primary school. Generally, the highest education level completed by both heads and other members of households is primary school. Access to secondary education is impeded by long distances between most villages from secondary schools (usually from 3 to 7 km). Access to primary education is easier, with primary schools relatively close to residential areas (max 2 km). Migration A noticeable characteristic of the villages in the The majority of the individuals from the surveyed Project Affected Area is that only 41% the affected households in Ngara district were originating from the households same district; only 4% had migrated from other had been living in their actual village for more than districts within Tanzania, and 3% were from other 10 years. After 1994, large numbers of returning countries in East Africa. families, especially from Tanzania and Uganda, There is a refugee population in Ngara district, settled in the Kirehe District. mainly from Burundi, and according to the 2002 census, 30% of Ngara’s population was comprised of refugees (SNII RAP Tanzania, p. 32). / 1770050 / MARCH 2013 FINAL REPORT 43 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.4 AGRICULTURE AND LAND TENURE 6.4.1 Rwanda: Agriculture and Animal Husbandry in the Project Area General The prevailing farming system in the Project area is a livestock based mixed farming system based on family labour on small plots, using traditional tools (hoe and machetes). Agricultural production is essentially by smallholder farmers who cultivate on average 1 ha of land with simple farm implements and very low inputs use, growing traditional food crops primarily for self-consumption and secondarily for marketing, and keep small numbers of livestock. Production is characterized by an intensive organic system and involves the combination of food, fodder and tree crops. Food crops account for 92% of the cultivated area and 95% of affected household source their food primarily from their own cultivation. High value crops such as tea and coffee are grown by only a small number of farmers. Bananas and beans are the main crops on hillside plots. Banana is the key staple as in other areas of Rwanda. In the Project area, bananas are typically grown around homesteads and on the foot of slopes in the “intermediate zone�. In addition to banana, a large variety of crops is cultivated on hillsides (beans, maize, sweet potatoes, sorghum, and cassava). Intercropping is widespread, allowing for minimization of risks and for a flexible mix of subsistence and commercial production. Such systems also allow households to synchronize household labor requirements, access food for household consumption, and generate small income with sales throughout the year. 6.4.2 Rwanda: Land Tenure in the Project Area General In the Project area, land tenure can be formal, customary and informal. Formal tenure corresponds to land that was allocated by the State. There is no standard size for formally allocated plots. Since many of the returning families resettled after 1994 were livestock keepers, plot sizes were allocated according to herd size. Other formal tenure holders hold land for agricultural use. More recently, there has been a large effort to sanction customary occupation by a formal, registered title and corresponding cadastral mapping. This process is now completed in the Kirehe District and all customary land owners have now been turned into formal holders under a lease hold regime. District authorities have also awarded lease hold titles to cooperatives, particularly to a number of cooperatives operating irrigated schemes in the marshland for rice cultivation. In this case, cooperatives are the entities that hold the title, while cooperative members are registered at the cooperative level but do not hold title as such. Leasehold tenure involves a contract and a grant of an estate in land for a specific period of time; plots of land are leased out to the public by the government. In / 1770050 / MARCH 2013 FINAL REPORT 44 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) freehold tenure, the interest in land goes on in perpetuity; the advantage of this type of tenure lies in the fact that it encourages investment, due to security of the holding. Informal holders include two categories: people encroaching informally on individual land belonging to others, and people using state-owned land without formal permission to do so. This situation appears to be of marginal significance in the Project area, where an overwhelming majority of the land is held either formally under a registered leasehold title. The Table below shows information on land ownership, plot sizes, and their spatial distribution in Kirehe District. Most of the plots are located on the hillside and intermediate zone areas which have historically been obtained as a result of distribution by the government following the Imidugudu process in the late 1990s. Few local farmers have bought additional land but some farmers came from outside the region and bought land for settlement. Table 16 – Characteristics of Household Land Holdings in Kirehe District Land Issue Description Situation in Kirehe District Total Land Size/Household Average (ha) 1,1 No. Plots/Household Average No 3 Ownership Owners % 93 Tenants % 7 Tenure Type Inherited 11 Allocated by State 21 Purchased 61 Rented 7 Source: SNII, Household Survey (2011); SNII Land Tenure Focus Groups (2011) Some people, such as younger couples and women, lease land because they cannot afford to purchase land. It is important to notice that 11% of the surveyed households did not own any land for cultivation at all, including many youth who cannot obtain any land partly because the law abolished land subdivision into plots of less than one hectare. Members of these households typically work for others as casual laborers, or they rent land for cultivation from those with larger landholding. These households often have no livestock at all. They are bound to be food insecure during certain periods of the year. Average Size of Household Land Holdings Land distribution and tenure in the Project affected area have been constrained in the last decade by a combination of local demographic dynamics, historical context, legal framework, market situation and institutional capacities. The land holding sizes are on average of 1,0 ha of arable land per household. The density of the rural population has increased significantly in the last couple of decades; and as a result the average size of household agricultural land holdings decreased by 32 % between 1990 and 2012 in the Kirehe district (SNII, 2012: RAP Rwanda, p. 46). Plots in marshlands are usually of small dimension, with an average of 0.05 ha. / 1770050 / MARCH 2013 FINAL REPORT 45 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Marshland Tenure While much agricultural land is held by individuals in leasehold, the exception is marshland, which according to the Organic Land Law (see section 4.1.2 above) is vested in the State and administered by District authorities. The agricultural use of marshland has significantly increased in the last decades, as result of demographic pressure and gradual deterioration of hillside lands. Apart from use by cooperatives (see para below), most if not all marshland cultivation is essentially informal and tolerated by authorities in spite of an environmental prohibition to harvest wetlands and to keep a buffer zone of 20 to 50 meters from the riverbank or the lake shore. Informally held and traditionally farmed marshland is managed either by individuals or by families, and each farmer chooses which crops to plant. In the Project area it was observed that, during cultivation and sowing periods, when labor demand is high, informal groups are formed within which farmers help each other. Cooperatives Using Marshland To cultivate marshlands, farmers should in theory obtain a specific authorization from District authorities. According to information from field surveys (SNII 2012), this appears to be the case for cooperatives, which usually apply for a long term leasehold title. 15 agricultural cooperatives have been observed in Kirehe district, mainly cultivating vegetables for sale in local markets. Cooperatives have to agree on a planting, regime, weeding and harvesting schedule and on the application of agricultural inputs such as fertilizers and pesticides. A cooperative is aiming to facilitate access to specific services that meet a common need of the members. Advantages for farmers from joining a cooperative are:  Access to markets;  Managing irrigation systems and securing access to land, and  Obtaining technical support from government or private service providers. Gender Aspects of Marshland Use For Kirehe District, it has been observed that female heads of households generally cultivate more plots in the marshland and less on hillside as compared to men (SNII: 2012, RAP, Rwanda, p. 47). However, for the marshland areas visited during the field work for the RAP in November 2012, this observation could not be confirmed. In the visited villages, young couples with no or limited access to hillside land due to inheritance practises, were the most frequent group of marshland users. The table below presents the situation in the villages along the Kagera river in Rwanda, that were visited during consultation and self-validation in Nov 2012. The Project affected villages are shaded in blue. The share of female headed households who cultivate marshland in the affected villages ranges between 18% and 36%. / 1770050 / MARCH 2013 FINAL REPORT 46 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 17 Female headed households: marshland cultivation along the Kagera river up to 15 km upstream the dam site, Rwanda No. female No HH headed HH total no. HH entirely female entirely Village cultivating % of total depending % of total headed HH depending marshland on on marshland marshland Rusumo East 12 4 33 5 2 40 Nyakwisi 84 30 36 14 5 36 West Rusumo 48 12 25 11 3 27 Nshungeruzi 57 10 18 5 1 20 Nyakabungo 28 6 21 3 0 0 Ruhuha 122 42 34 5 2 40 Marembo 104 38 37 3 0 0 Nyagahanga 31 10 32 1 0 0 Nyakigera 51 13 25 2 1 50 Kaguriro 82 20 24 2 1 50 Bweranka II 41 13 32 4 4 100 Kimeshu 94 18 19 5 0 0 Nyarutojo 76 22 29 8 4 50 Gahindu 89 25 28 10 4 40 Gasenyi 77 21 27 15 3 20 Gatari 95 24 25 5 2 40 Ryamukaza 71 19 27 8 1 13 Kabuga 98 25 26 14 7 50 Kabimba I 43 20 47 5 3 60 Nyamirambo I 147 41 28 27 9 33 Nyamirambo II 284 66 23 44 20 45 Source: village self-validation Nov 2012 In the villages along the Kagera river in Rwanda (up to 15 km upstream of the dam site), on average 28% of marshland users are female headed households. From those households entirely depending on marshland, an average of 21% is female headed. More than a quarter of marshland using households are female headed, but the average portion of female headed households who are entirely depending on marshland is lower than the average share of female headed households in the total of marshland using households. Marshland Utilization In the last decade, land scarcity on hillsides has led to broader resorting to wetland cultivation. Marshlands play a crucial role in the provision of household food security and income, they are used for additional food production during the dry seasons, usually on small to very small plots using traditional farming methods. Maize and / 1770050 / MARCH 2013 FINAL REPORT 47 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) sorghum are cropped in rotation with legumes or root tubers (Irish potato, sweet potato, yam and cocoyam). In general, marshlands are utilized in three different ways:  vegetables and other crops, such as sweet potato and beans, grown on raised on mounds to avoid submersion of the root system;  for small-scale rice cultivation, single or double cropped according to water availability;  for larger-scale rice cultivation within gravity schemes, including cultivation of other crops after the harvest of the rice The dry season from June to August is dedicated to marshland cultivation. Households are usually engaged in agriculture activities in the three zones concurrently (hill, intermediate and marshland). However, 19% of affected households engage only in marshland cultivation, essentially because they hold no land in other zones. Starting from 2000, the Government of Rwanda has been developing marshlands in Kirehe District for cultivation of rice, with large gravity schemes. Animal Husbandry The Government has been promoting stronger agriculture-livestock integration to improve both farmers' livelihood and soil fertility management. A program called “Gir'inka project� (“one poor family – one cow�) was implemented throughout Rwanda. This program aims at enabling every poor household to own and manage an improved dairy cow which would help the family to improve their livelihood through increased milk and meat production and to improve soil fertility of their land for their crops using the available manure. The program is based on a zero-grazing policy (the cow should be kept in a stable and fed with fodder gathered either from cultivation or in the bush or marshland and crop stubble). 71% of surveyed households (SNII household survey 2011) in the project area own livestock, higher than the national average of 60%. Since 2006, there has been a noticeable increase in the proportion of households owning livestock. 43% now own goats, 35% poultry, 15% pigs and 7% cows. Kirehe is the lead district in Rwanda for goats and sheep possession (about 30% of the total goat population in Rwanda). 6.4.3 Tanzania: Agriculture and Animal Husbandry in the Project Area General The SNII Household Survey (2011) highlighted that the main crops cultivated in the Project area are yam, plantain banana, cassava, sugarcane, sweet potato, Irish potato, sorghum, and coffee. Rain fed agriculture depends on short vuli rains from October to December, and long masika rains from March to May. The vuli rains provide a minor cropping season with planting in usually November and harvesting in late January/February. The masika / 1770050 / MARCH 2013 FINAL REPORT 48 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) rains provide the main cropping season with planting in late February/March and harvesting in July/August. Utilization of Marshland Different from the situation in the Project area in Rwanda, there is no shortage of land in Ngara District in Tanzania. Hence, there is no intensive marshland use (see more information on marshland use in sections below). Gender Aspects of Marshland Use Table 18 Female headed households: marshland cultivation along the Kagera river up to 15 km upstream the dam site, Tanzania total no. no. HH no. Female total no. female entirely headed HH Village marshland headed HH % of total depending depending Sub-Village users on on on marshland marshland marshland Ntobeye Burambira 64 0 0 0 Ntobeye Kumurenge 47 1 5 11 0 Ntobeye Mukatokatoke 70 5 7 0 0 Ntobeye Mukirarama 42 8 19 0 0 Ntobeye Rwintuku 29 8 28 4 1 Nyakiziba Kabuye 24 8 33 1 0 Nyakiziba Kagali 143 10 7 1 0 Nyakiziba Kyenda 66 3 5 3 0 Nyakiziba Ruhembe 122 6 5 17 0 *source: self-validation in affected villages (No 2012) In the villages along the Kagera river in Tanzania (up to 15 km upstream), on average 13% of marshland users are female headed households. From those households entirely depending on marshland, less than 1% of the total households is female headed. The share of female headed households in the total of marshland users is lower than in Rwanda. Only 1 female headed household in the affected area is entirely depending on marshland (affected sub-villages shaded in blue in the table above). These results, compared to the figures from Rwanda, reflect the overall land scarcity in Rwanda. Animal Husbandry 51% of the livestock owned by households in the area consists of goats, followed by cows at 21% and fowl at 20%. Pigs are owned by only a few households. According to the Ngara Poverty Survey, 85% of households did not own any cattle, and only 2% of households owned more than 10 heads of cattle. Households in remote villages and poor households were less likely to own cattle. Conversely, large households (seven or more members) were more likely to own between 2 and 10 / 1770050 / MARCH 2013 FINAL REPORT 49 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) heads of cattle at 21% compared to households with only one or two members at 14%. Agricultural Infrastructure Under the District Agriculture Sector Investment Project (DASIP) being executed by the Ngara District Council, efforts are underway to rehabilitate Ngara district’s agricultural infrastructure. For instance, in 2009-2010, eight cattle dips were rehabilitated and one dip was constructed. In several villages within the district, large numbers of cattle are brought in for dipping at regularly scheduled intervals each month. Another example is that more feeder roads have been constructed in villages, and existing roads in villages have been rehabilitated, making the trip between the villages and the main market easier. Vehicles can also now pass on these roads to carry products from the community. Two market sheds were also constructed in Keza and Mugoma, which can accommodate 85 people and 100 people, respectively. The DASIP commenced in 2006/2007, and is expected to conclude in 2011-2012. The social benefit of this project includes improved food security, human nutrition and income, which will contribute to the reduction of poverty. 6.4.4 Tanzania: Land Tenure in the Project Area Average Size of Household Land Holdings According to the Ngara Poverty Survey, around 37% of all households own less than 2 acres of land (including 4% of landless households). However, 41% own between 2 and 4 acres, and 23% own 4 or more acres. The Ngara survey states that landless households tend to be more common in accessible villages, while the reverse holds true in remote villages; there, households owning large portions of land are more common. As well, larger households tend to own larger pieces of land than households with fewer members. Finally, male-headed households tend to have larger holdings of land than female-headed households. Land Tenure – General All land in Tanzania is state property, but customary rights are respected under new land laws, with the responsibility of land allocation of district administrations and villages. The Land Act (1999) confirmed land tenures that were introduced under colonial rule, such as customary tenure, which applies to village land and other forms of land like urban land and peri-urban areas. Village councils administer village land, they have to ensure that village land administration is maintained with effective participation of villagers and that gender balance in land administration and ownership is secured. It is the Ministry of Land that is responsible for overseeing implementation of the National Land policy and the Village Land Act, with Local Government playing a role in implementation of the Village Land Act. A number of initiatives have been taken to formalize land tenure in Tanzania, including the Commission for the Legal Empowerment of the Poor, and the Strategic Plan for the Implementation of the Land Laws. / 1770050 / MARCH 2013 FINAL REPORT 50 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.5 MARSHLAND CULTIVATION IN THE PROJECT AREA Information on marshland use up to 15 km upstream the dam site on both sides of the Kagera river use was obtained during village consultations in November 2012. Village consultations were conducted in 21 villages in Rwanda and 9 sub-villages in Tanzania. Marshland cultivation is described with reference to the results of village consultations. The six affected villages in Rwanda and the 2 affected sub-villages in Tanzania were part of the consultations. The description of marshland use in this baseline section, however, is not limited to marshland use in the affected villages, but refers to a broader context (= 21 villages and 9 sub-villages) in order to establish a representative description, based on  interviews with resettlement committees (see questionnaire in Appendix 1)  community meetings in the context of self-validation of affected marshlands (see records of meetings in Appendix 2)  on the spot interviews with affected people (in Dec 2012)  interviews with district authorities (Kirehe and Ngara districts) (Dec 2012) In Rwanda, farmers in the Project area had been allocated land from the government under the ‘Land sharing policy’ as confirmed by the agronomist of Kigarama sector. Hence, the majority of households own one hectare of uphill land (private land). In the villages up to 15 km upstream from the dam site in Rwanda, almost all young people have very small plots of hillside land which they received from their parents as an inheritance once they got married. As a consequence of this inheritance practise, the original one hectare plots owned by parent households, is being reduced according to the separation of plots. People who own small plots of uphill land aim to supplement their production through development and cultivation of marshland. According to information from residents, marshland is cultivated on the principal of “whoever initially cultivates a plot in a marshland owns it�. The plot sizes are determined by the capacity of the household to allocate labour for cultivation. Specific information was obtained on the reliability of income from marshland from - resettlement committees - affected people - agronomists of Kirehe district According to information from sources as indicated above, every other year marshland cultivation is not possible due to flooding of the arable marshland strip. Hence, production from marshland is not a reliable source of income. This was confirmed by several on the spot interviews with marshland users in the affected area in Dec 2012. Interviewees even indicated longer periods (several years) when marshland cultivation was not possible over the past decade. / 1770050 / MARCH 2013 FINAL REPORT 51 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) According to interviews with resettlement committees, about three quarters of marshland users sell their marshland products on the market. The range of income from market sale of marshland production in a good year was indicated to be between 200,000 RWF and 3,000,000 RWF respectively (resettlement committees during self-validation). Whilst a range between 200,000 RWF up to 300,000 RWF, with 500,000 RWF in exceptional years was confirmed during interviews in the affected area in Dec 2012, the amount of 3,000,000 is considered significantly exaggerated and not realistic. Participants of the Consultative workshop in Kigali on 4 Feb 2013 considered the 200,000 to 300,000 RWF range as realistic. Tanzanian resettlement committee members indicated the marshland income in RWF, too, because farmers use to sell their marshland produce in Rusumo East, Rwanda. It is noted that the income indicated for sale of production from marshland, significantly exceeds the total annual income of households in the project area as obtained by SNII (2011/2012). Main coping strategies for the loss of marshland income in wet years are  borrow cash (less than a quarter to a quarter of households)  purchase of additional food at the market (less than a quarter to a quarter of households) For less than a quarter of the marshland users, loss of income from marshland is not indicated as a serious problem. From all resettlement committees it was indicated that at present there are still remaining marshland areas in their villages which would be available for cultivation. However, it was pointed out, that development of marshland needs considerable input of labour. As per information from on the spot interviews with marshland users in Kimeshu village (Dec 2012), marshland cultivation in the area is constantly decreasing since 2004, due to increased flooding of arable marshlands. Only on two villages in the area, the average size of total land of marshland users exceeds 1 ha, in Nyakwisi and Nshungeruzi. The average size of private land of marshland users is 0.64 ha. The average size of marshland plots is 0.24 ha. The average size of plots of people entirely depending on marshland, is 0.21 ha, smaller than the average marshland plots. Households entirely depending on marshland, are characterised by  dependency on a non-reliable source of livelihood (flooding of arable marshland every other year)  cultivation of extremely small plots, resulting in amounts of annual income likely to be below the average indicated by the resettlement committees. In the villages visited for self-validation in Tanzania, users generally had more land available for cultivation from both categories of land, private land and marshland. / 1770050 / MARCH 2013 FINAL REPORT 52 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 19 Marshland Use along the Kagera River, Rwanda (villages up to 15 km u/s the dam site) HH using marshland for agriculture – average sizes of land of different HH using marshland HH entirely depending on marshland types/HH Total No. of Average size of Average size Average size Average size Village total land of private land of marshland for users HH* No.* %of total HH No. %of marshland users % of total HH (marshland (ha) (ha) entirely plus private) depending on (ha) marshland (ha) Rusumo East 204 12 (15) 7.4 5 33 16.2 0.71 0.5 0.42 0.37 Nyakwisi 89 84 (92) >100 14 15.2 15.7 1.18 0.89 0.44 0.28 West Rusumo 163 48(64) 39.3 11 17.2 6.7 0.89 0.49 0.71 0.33 Nshungeruzi 118 57 48.3 5 8.8 4.2 1.13 0.75 0.47 0.25 Nyakabungo 124 28 22.6 3 10.7 2.4 0.39 0.73 0.15 0.08 Ruhuha 148 122 (134) 90.5 5 3.7 3.4 0.82 0.7 0.15 0.28 Marembo 93 104 >100 3 0.33 3.2 0.85 0.62 0.23 0.18 Nyagahanga 185 31 16.7 1 3.2 0.5 0.92 0.78 0.17 0.05 Nyakigera 94 51(59) 62.8 2 3.4 2.2 0.34 0.26 0.07 0.27 Kaguriro 131 82 (87) 66.4 2 2.2 1.5 0.82 0.72 0.1 0.31 Bweranka II 100 41(43) 43 4 9.3 4 0.59 0.65 0.09 0.03 Kimeshu 118 94(95) 80.5 5 5.3 4.2 0.83 0.67 0.15 0.09 Nyarutojo 101 76 75.2 8 10.5 7.9 0.77 0.65 0.19 0.3 Gahindu 121 89 73.6 10 11.2 8.3 0.65 0.62 0.09 0.07 Gasenyi 120 77 (79) 65.8 15 19 12.5 0.72 0.78 0.09 0.05 Gatari 147 95(97) 66 5 5.1 3.4 0.71 0.63 0.12 0.25 Ryamukaza 66 71 >100 8 11.3 12.2 0.81 0.77 0.13 0.04 Kabuga 123 98 (101) 82.1 14 14.3 11.4 0.68 0.5 0.26 0.21 Kabimba I 124 43 (55) 44.4 5 9.1 4 0.94 0.73 0.3 0.4 Nyamirambo I 134 147(151) >100 27 18.4 20.1 0.72 0.45 0.35 0.23 Nyamirambo II 177 284 (287) >100 44 15.5 24.9 0.9 0.6 0.39 0.36 *the figures indicated in parenthesis are referring to the total number of marshland users, including users who were absent during self-validation / 1770050 / MARCH 2013 FINAL REPORT 53 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 *indication in ha, source: village self-validation Nov 2012 Figure 5 Average size of marshland plots* in villages up to 15 km upstream the Kagera river, Rwanda Nyamirambo II Kabimba I Ryamukaza Gasenyi Nyarutojo Bweranka II Nyakigera Marembo Nyakabungo West Rusumo Rusumo East 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 *indication in ha, source: village self-validation Nov 2012 Figure 6 Average size of plots* of users entirely depending on marshland, in villages up to 15 km upstream the Kagera river, Rwanda / 1770050 / MARCH 2013 FINAL REPORT 54 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 20 Marshland Use in villages along the Kagera river up to 15 km upstream the dam site, Tanzania HH using marshland for agriculture – average sizes of HH using marshland HH entirely depending on marshland land of different types/HH Average Average size for Total No. of size of total Average Average users Village Sub-Village HH* %of marshland % of total land size of size of entirely No.* %of total HH No. users HH (marshland private land marshland depending plus private) (ha) (ha) on (ha) marshland (ha) Ntobeye Burambira 64 0 0 0 1.46 0.74 0.72 Ntobeye Kumurenge 47 1 2.1 1.67 0.81 0.86 Mukatokatok Ntobeye 70 0 0 0 3.22 2.5 0.72 e Ntobeye Mukirarama 42 0 0 0 2.29 1.26 1.03 Ntobeye Rwintuku 29 4 13.8 1.47 0.91 0.69 0.49 Nyakiziba Kabuye 24 1 4.2 1.57 0.84 0.76 0.5 Nyakiziba Kagali 143 1 0.7 2.36 1.71 0.65 0.35 Nyakiziba Kyenda 66 3 4.5 3.91 3.12 0.92 1.66 Nyakiziba Ruhembe 122 17 13.93 1.71 0.95 0.88 0.73 Ntobeye 1,111 252 22.7 5 2.0 0.5 2.02 1.24 0.8 Nyakiziba 2,309 355 15.4 22 6.2 1.0 2.38 1.65 0.8 3,420 607 17.7 27 4.4 0.8 2.2 1.45 0.8 0.8 Source: village self-validation Nov 2012 / 1770050 / MARCH 2013 FINAL REPORT 55 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) In all villages visited for consultation in Tanzania, the average size of total land of marshland users exceeds 1 ha. This corresponds to the land scarcity in Rwanda and the availability of land for agriculture in Tanzania. The average size of private land of marshland users is 1.42 ha. The average size of marshland plots is 0.8 ha. The average size of plots of people entirely depending on marshland, is 0.74 ha, smaller than the average marshland plots. Despite the larger areas of marshland under cultivation per household in Tanzania, resettlement committees indicated a range of income from marshland which corresponds to the income from smaller plots in Rwanda. It was not possible to get additional information on this issue up to present. 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 Figure 7 Average size* of total land holdings, Tanzania *indication in ha, source: village self-validation Nov 2012 / 1770050 / MARCH 2013 FINAL REPORT 56 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Most important crops on marshland Marshland in the visited villages is exclusively cultivated with annual crops. Resettlement committees were asked for the four most important crops in their village. source: village self-validation Nov 2012, 21 villages Figure 8 Most important marshland crops, Rwanda In 8 villages, tomato, soja and maize are the most important crop respectively. Beans, irish potato and cabbage are most important in 1 village respectively. 6 5 most important crop in village 4 number of villages 3 2 1 0 beans irish potato tomato onion eggplant crop source: village self-validation Nov 2012, 9 sub.villages Figure 9 Most important marshland crops, Tanzania / 1770050 / MARCH 2013 FINAL REPORT 57 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) In 5 of the 9 villages, beans were indicated as the most important crop, in 2 villages irish potato is the most important crop. Tomato and onion are most important in 1 village respectively. Different from Rwanda, soja, sweet potato and maize are not amongst the most important crops. Tomato is much less important than in Rwanda. Figure 10 Tomato cultivation, Nyakwisi marshlands, Rwanda / 1770050 / MARCH 2013 FINAL REPORT 58 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.6 LIVELIHOODS The Table below presents an overview on livelihoods in the Project area. Table 21 – Livelihoods in the Project Area Livelihood Rwanda Tanzania Aspect Agriculture Agriculture is the main activity Agriculture is the main activity for both male and for both male and female head female head of households, with 76% of male of households, with 95% of male adults and 89% of female adults engaging in adults and 92% of female adults smallholder farming engaging in some form of According to the Ngara Poverty Survey, agriculture smallholder farming. is the main livelihood for both male and female heads of households; approximately 4 out of 5 households are dedicated to agriculture. Livestock 4% of the male and 3% of the 19% of the male and 5% of the female heads of female heads of households households engage in livestock breeding engage in livestock breeding Casual 1% of the male heads of Labor households engage in casual labour, with two peaks corresponding with the agricultural season Other Almost one third of the heads of 19% of individuals are engaged in occupations Economic households engages in such as in mining, manufacturing, energy, Activities secondary occupations to construction, and private/public service. provide income during the lean The Ngara poverty survey states that in the case of season before the harvest. those self-employed in non-agricultural activities, Activities such as pastoral work the predominant economic activity is the provision or commercial activities are of services. pertained during the year. For the Tanzanian part of the Project are, all the Handcraft activities (including petty traders identified in the SNII survey (2011) brewing local beer) for female were located in Nyakahanga subvillage within heads of households and fishing Rusumo village. Petty trading as economic activity and artisanal work for male was indicated by 5% of both, the male and the heads of households are the female heads of households (SNII survey, 2011) only activities undertaken as A small portion of the female demographic (3%) income replacement for also makes handicrafts for a living. agricultural work Fishing as economic activity was indicated by 2% of the male heads of household Source: SNII 2012: RAP Rwanda and RAP Tanzania, Section 5 Most of the livelihood activities in order to provide additional income rely on marshland resources, such as:  Fish stocks in marshland  Clay for brick-production or other handcraft products  Reed for artisanal handcraft production Fishing activities are mainly practiced in marshlands. Fishing as a primary activity is performed by a tiny minority of rural dwellers in the Project area. Small-scale fish hatching is currently practiced near East Rusumo village and in two cooperatives in Kigarama sector. However, most of the households in the District practice some fishing during low agricultural seasons as a supplement to their livelihood. According to the Village Level Survey (SNII,2011), 78% of the fish harvested is sold and 28% is consumed by producers. This indicates that the primary goal of fish production is to earn income. / 1770050 / MARCH 2013 FINAL REPORT 59 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) A considerable number of brick making businesses are using the marshlands of Rusumo East village and Nyakwisi village in Rwanda and of Rusumo, Tanzania, as fabrication sites, 55 in Rwanda and 26 in Tanzania. These businesses are either run by cooperatives or by private owners, with the support of casual workers. According to the flooding dynamics of marshland brickmaking is a seasonal activity. Figure 11 Brick maker, Nyakwisi village marshlands Figure 12 brick making site, Nyakwisi, Rwanda / 1770050 / MARCH 2013 FINAL REPORT 60 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Field survey results (SNII, 2012) conform brick making as a seasonal activity intended to complement livelihoods during low agricultural season and an economic opportunity for landless households. They supply materials to local markets or to rural small business people in East Rusumo. All facilities for brick making are located on marshland and not on privately owned intermediate zones. The brick kilns are the only permanent structure, while other structures, such as shields and workstations, are temporary and rebuilt each season. 6.7 POVERTY AND VULNERABILITY 6.7.1 Situation in Rwanda Monetary Income Note: According to interviews with resettlement committees, about three quarters of marshland users sell their marshland products on the market. The range of income from market sale of marshland production in a good year was indicated to be between 200,000 RWF and 3,000,000 RWF respectively (resettlement committees during self- validation). Whilst a range between 200,000 RWF up to 300,000 RWF, with 500,000 RWF in exceptional years was confirmed during interviews in the affected area in Dec 2012, the amount of 3,000,000 is considered significantly exaggerated and not realistic. Participants of the Consultative workshop in Kigali on 4 Feb 2013 considered the 200,000 to 300,000 RWF range as realistic. Tanzanian resettlement committee members indicated the marshland income in RWF, too, because farmers use to sell their marshland produce in Rusumo East, Rwanda. Secondary data gathered from the Comprehensive Food Security and Vulnerability Analysis (CFSVA, 2006) show that for households that derive more than 75% of their income from agriculture, the average yearly cash income is around RWF 60,000 (USD 100) As more than 97% of the affected households in the study area rely on agriculture to sustain their livelihood, they would belong in this category. Annual income is slowly higher (RWF 70,000) for the remaining 3% of households who have supplemental earnings from trade, daily labour (cash and in kind) and agriculture activities (CFSVA, 2006). Food expenditure represents more than 71% of total expenditure. Maize, beans and peas alone accounts for more than 31% of total expenditures. Education and health expenditures represent respectively 14% and 11% of the total expenditure. The largest percentage of non-food items is soap (2%) and fuel (1%). In terms of mode of payment, 98% of the expenditures are made in cash and 2% through barter (SNII, 2012). Poverty Poverty is widespread in the Project area. Based on the 2012 national survey, some 43% of households live below the poverty threshold and 20 % below the extreme poverty line, which means they could not afford the basic food consumption basket even without spending anything on non-food items. / 1770050 / MARCH 2013 FINAL REPORT 61 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 22 – Definition of Poverty Status Indicator Group 1 Group 2 Group 3 Wealthier Household Average Household Poorer Household Cow ownership >2 1 or sharing none Land size (ha) >1 0,4-0,9 >0,4 Hire/Sale of Labor Hire labor Sell labor against cash Exchange labor for income crops Household Assets Bicycle, motorcycle, Shared with other Poor housing cellphone households Non agricultural income Most of the year seasonally Agricultural labor for (>50%) others Production orientation Surplus for market Grains and bananas for Only food for and/or commercial subsistence, beans subsistence crops for sale (e.g. and vegetables for sale coffee, tea, rice) Source: SNII, 2012: RAP Rwanda, p. 58, based on results of social survey 2011/2012 Based on these categories, 51% of surveyed households fall into the average category while 43% are poor and 6% in the “wealthy� category. The distribution is different if only female head of households are considered. Here, 77% are poor and 23% are average. There is also widespread food insecurity as a large majority of farmers in Kirehe District report facing occasional periods of food shortages. The largest group of rural poor is made up of households who have less than 0,4 ha of land (including the landless) and whose agricultural production does not cover the food needs of the family during the lean season. Within this category, the following specific groups can be distinguished:  Female heads of household, who have no autonomous economic activity;  Young landless people, who have little chance of obtaining land because of the prohibition to subdivide land into small pieces;  Households with chronically ill members. Virtually all affected marshland users who are entirely depending on marshland, cultivate plots smaller than 0.4 ha (see Table 12 Affected marshland users - Rwanda). Coping Strategies In addition to on-farm work, the poor part of the population goes for work in nearby mines, towns and across the border in Tanzania. Also, poorer households that lack the land and agricultural resources to produce and sell high value crops, opt to produce food crops selling a portion of their harvest to finance essential non-food items or preferred food items. Poorer households also do not source all of their food from their own production alone. They also receive beans, cassava and maize as in-kind payment for working on better-off household’s farms. / 1770050 / MARCH 2013 FINAL REPORT 62 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.7.2 Situation in Tanzania Note: According to interviews with resettlement committees, about three quarters of marshland users sell their marshland products on the market. The range of income from market sale of marshland production in a good year was indicated to be between 200,000 RWF and 3,000,000 RWF respectively (resettlement committees during self- validation). Whilst a range between 200,000 RWF up to 300,000 RWF, with 500,000 RWF in exceptional years was confirmed during interviews in the affected area in Dec 2012, the amount of 3,000,000 is considered significantly exaggerated and not realistic. Participants of the Consultative workshop in Kigali on 4 Feb 2013 considered the 200,000 to 300,000 RWF range as realistic. Tanzanian resettlement committee members indicated the marshland income in RWF, too, because farmers use to sell their marshland produce in Rusumo East, Rwanda. The economy of Ngara is heavily dependent on small-scale farming. Accordingly the estimated average income of rural households is very low and is estimated at TShs 165,000 – 170,000 (equivalent to less than USD 110.00) per annum compared to the district average income of TShs 750,000 (equivalent to USD 475.00, SNII, 2012, RAP Tanzania). Poverty In Tanzania, poverty tends to be a rural phenomenon. In rural areas, incomes tend to be lower and poverty more widespread and intense than in urban centers. The poor tend to be concentrated in the subsistence agriculture sector. Tanzania faces severe income poverty, with the country having one of the world’s lowest per capita national incomes. During the 1990s, there was virtually no economic growth in Tanzania, coupled with an increase in the number of people who fell below the national basic needs poverty line. In the same vein, hunger, malnutrition, and lack of food security are all serious problems in Tanzania, with many children under the age of 5 being malnourished and underweight. Declining soil nutrient quality and very low rates of mechanization have left agricultural productivity at a stagnant level. Since the majority of Tanzania’s small-scale farmers rely on rain, annual agricultural output is highly variable and thus periodically leads to food shortages in parts of the country. Table 23 – Poverty Levels in the Project Area Administrative Population Surface (km2) Density1 Poverty Levels2 Divisions Tanzania 45,039,573 947,300 48 Kagera Region 2,033,888 29,241 70 29% Ngara District 334,939 3,744 89 58% Rwanda 10,227,212 26,340 388 Eastern Province 2,141,174 9, 226 50% Kirehe District 292,215 1,119 261 Sources: National Census (Tanzania 2002), MINALOC (Rwanda, 2006-2009), World Bank. Note (1) Total population per square kilometers. Note (2) Percentage of households living under the poverty line. / 1770050 / MARCH 2013 FINAL REPORT 63 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.7.3 Vulnerable Groups People who by virtue of gender, ethnicity, age, physical or mental disability, economic disadvantage, or social status may be more adversely affected by the project/ by displacement than others and who may be limited in their ability to claim or take advantage of resettlement assistance and related development benefits. Vulnerability is considered with regard to the Project context. Identification of Vulnerable Groups in the Project Area Vulnerable groups were identified based on - Consultations by SNII (2011/2012), aiming at the identification of vulnerable people - Reference to the KWAMP Project Design Report (with a focus on Kirehe district), 2008 - Interviews with district officials in Kirehe district and Ngara district - Interviews during the consultation period December 2012 Note: Individual support measures for vulnerable people will be identified early in RAP implementation (start of year0). The respective consultations will be undertaken under the lead of PIU, through local resettlement committees. Female headed households 20 % of heads of household are women, and of these, 68 % are widows; another 26 % are divorced or living apart. Other than land related issues, female-headed households face additional constraints, such as difficulties to engage in certain farming operations because of lack of physical strength and inadequate representation of their interests in community structures and farmers’ organizations. They are likely to be among the poorest households (SNII 2011/2012). For information on female headed households, see information above (gender aspects on marshland use). Female headed households with small land holdings (less than 0.2 ha) are considered as especially vulnerable by the KWAMP Project Design Report. The social officer of Kirehe district also indicated female headed households as vulnerable. This information was confirmed during the Consultative Workshop in Kigali on 4 Feb 2013. Amongst the affected marshland users in Rwanda, there are 104 female headed households, 13 of them entirely depending on marshland. These 13 households are considered as especially vulnerable to the loss of marshland plots. Female headed households amongst the households affected by construction yet have to be identified. For Tanzania, there is only a limited number of female headed households depending on marshland (3). Furthermore, availability of land is not a problem in Tanzania. / 1770050 / MARCH 2013 FINAL REPORT 64 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Household heading orphans Household heading orphans are considered as vulnerable. They usually have no access to education, due to family obligations. Hence, their capacity to benefit from training measures, is considered to be limited as is their capacity to develop alternative livelihoods. The vulnerability of household heading orphans was confirmed by the social officer of Kirehe district and is also stated in the KWAMP report. According to the results of the village self-validation in the project affected area, no orphans heading households were documented as affected. However, during RAP implementation, special attention will be given to the identification of orphan headed households. Orphans heading households can be expected to be amongst affected people in Rwanda. Households with limited access to land, landless households 9% of all households in the Project area do not own land for cultivation, including many young people who have failed to obtain any land partly because the law prohibits land subdivision into plots of less than one hectare. Young people relying on small marshland plots are making up a large group within the affected marshland users in Rwanda. They entirely rely on marshland or they only have very small hillside plots. They would be vulnerable in the project context, due to the loss of marshland and hereby the loss of their main livelihood asset. The vulnerability of young households with limited access to land was confirmed by the social officer of Kirehe district. This category of vulnerable people is an issue for Rwanda. In Tanzania, there is no limited availability of land for young households. HIV- and AIDS affected households HIV- and AIDS affected households are an important subset of households with chronically ill members, who can face moderate to severe labour constraints, fall sick often and face high medical bills, are under threat to lose household assets and access to factors of production, and are often stigmatized in their community. Almost 11% of the affected households in the Project area fall into this category, with a “hot spot� in the area of the Rusumo villages, where HIV-and AIDS incidence in the households is 28%. Vulnerability of HIV/AIDS affected households in the Rusumo area was highlighted during the Consultative Workshop in Kigali on 4 Feb 2013. The KWAMP report as well as district officers in Ngara- and Kirehe districts indicate people with HIV- and AIDS as especially vulnerable. In the project context, HIV-and AIDS affected households are expected to have a limited capacity to fully benefit from livelihood restoration programs, unless they are provided with special assistance. Elderly, Disabled or infirm Persons Elderly, infirm or ill people might have limited access to project related information, unless they are considered with specific measures. / 1770050 / MARCH 2013 FINAL REPORT 65 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Women and children Women and children might be at risk of being dispossessed of their immovable and productive assets as a result of the compensation process that may solely benefit the male household head. From the representatives of Ngara district, it was indicated that especially in polygamous settings, partners would be at risk not to have access to the compensation money of the household. Polygamous settings occur in Tanzania. 6.8 INFRASTRUCTURE Two main asphalted roads cross the Project area. The first road goes eastward from Kigali and then turns southward from Kayonza, continues near Kibungo, before crossing the Akagera and the Rwanda -Tanzania border at the Rusumo Falls Bridge. The road then proceeds to the South-East of Tanzania towards the town of Nyakahura. The second road, which is being rehabilitated, also starts in Kigali and follows a north-south axis through Nyabarongo and then the Bugesera district near the town of Kirundo in Burundi. There is also an extensive and well distributed network of dirt tracks that link all public services and most villages. Many tracks, however, are poorly maintained. In addition, the transportation of goods and people by water is well developed, particularly on Lake Rweru between certain Burundian and Rwandan villages. 6.8.1 Health With a life expectancy of about 45 years, the population’s overall health in the Project area is very poor. The most common diseases are malaria, respiratory infections, diarrhoeal diseases, AIDS and diseases caused by malnutrition and nutrition deficiency. Rwanda In Rwanda, access to the nearest health center is 7 km on average, which is a long distance for the rural population considering the poor condition of the roads and the lack of transport. About 75% of childbirths occur at home, and the infant mortality rate in the district is 126 per 1000 live births. Tanzania According to the Ngara Poverty Survey, households in remote areas have lower access to medical services (28%) than households in villages that are more accessible (59%). Both show similar ratings for use and satisfaction, but households in remote villages report higher need rates (31%) than households in accessible villages (27%). While Tanzania has made progress towards reducing infant and children mortality, and child malnutrition, maternal mortality is still an issue as well as the percentage of births attended by trained personnel. Positive contributing factors have included strengthened immunization and micronutrient supplementation, improved diagnosis and treatment of malaria among children, improved diagnosis and treatment of malaria and HIV/AIDS among pregnant women, and improved availability of drugs. Factors limiting progress in the health sector include continued shortages of / 1770050 / MARCH 2013 FINAL REPORT 66 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) qualified health workers, inadequate infrastructure, shortages of drugs and other medical supplies, and poor transport. 6.8.2 Education The project area is characterised by insufficient teaching premises and personnel and above normal student-per-teacher ratios. Secondary and vocational education is very weak. Rwanda Access to primary school in affected communities is in line with national standards. Primary school can be found in a range of maximum 2 km from the residence village. Classes are usually overpopulated, with as many as 80 pupils per class and a teacher/student ratio of 1 to 74. Secondary schooling is less distributed and at further distance, from 5 to 10 km from the affected villages. Tanzania With regards to schools, the Ngara Poverty Survey states that almost two-thirds of primary school age children live within 30 minutes of a primary school. Primary school access is obviously significantly higher in accessible clusters than in remote clusters. Significantly more children aged 7 to 13 living in non-poor households lived within 30 minutes of the nearest primary school, when compared to children living in poor households. Interestingly, primary school access tended to be higher among children from female-headed households (70%) than that of children from male-headed households (57%). In terms of satisfaction, more than three quarters of all primary school pupils were satisfied with their schools. A higher share of pupils living in poor households reported satisfaction than those living in non-poor households; however, there was no marked difference in satisfaction rates between pupils living in remote and accessible areas. 6.8.3 Markets Rwanda Domestic markets for crops are generally underdeveloped. Marketing chains are informal and often fragmented, with produce changing hands several times as it moves from farm gate to the final consumer. Farmers sell produce to rural assemblers at the farm gate or to rural traders located in local markets, who then transport it to urban wholesalers. In turn the latter supply urban retailers, who break loads down into small lots for resale in market stalls or small neighbourhood shops. Marketing margins for domestically produced food crops are high compared with those of other countries in Africa, reflecting both a certain lack of competition among intermediaries and high transport costs. During consultations in affected villages (Dec 2012), participants in on the spot group discussions raised the issue of lack of access to markets for affected communities, due to - Distance to markets and lack of means of transport / 1770050 / MARCH 2013 FINAL REPORT 67 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) - Overall bad maintenance and quality of rural roads - Lack of storage facilities - Overall lack of capacity to get organized for group based marketing of products Tanzania In order to support trade and business transactions at the village level, each village in the Tanzanian part of the Project area has a central market square. On one day each week, a market day is held where agricultural product and other commodities are traded. These market days occur on rotation such that on every day of the week, there is an open market somewhere in the neighbourhood. During consultations in affected villages (Dec 2012), participants in on the spot group discussions raised the issue of lack of access to markets for affected communities, due to - Distance to markets and lack of means of transport - Overall bad maintenance and quality of rural roads - Lack of storage facilities - Overall lack of capacity to get organized for group based marketing of products 6.8.4 Summary Table 24 – Access to Services and Means of Transport in the Project Aea No. Bicycles Distance to Distance to Distance to Country District Electricity Line Secondary per Household Hospital (km) (km) School (km) Rwanda KIREHE 0.2 15.6 21 4.8 Tanzania NGARA 0.1 13 13 15 / 1770050 / MARCH 2013 FINAL REPORT 68 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 6.9 HOUSING AND OTHER ASSETS 6.9.1 Rwanda The vast majority of houses observed in the affected area are made from local material, including locally extracted earth or clay for walls without cement or plastering and local timber for the structure. Most roofs, however, are covered in corrugated iron sheets. None of the residential structures has modern features such as an inside bathroom or toilet, or running water. Concrete floors are absent compared with clay floors which are found in 99% of the surveyed households. More than half the population use non- potable water from water springs, rivers, lakes or ponds. A small proportion of the population has access to public water taps. The most common toilet facilities are traditional pit latrines (70%) and open pits (22%). Source of fuel for cooking is nearly exclusively charcoal (97% of households) and source of lighting is most frequently kerosene, oil or gas lamp (74%) or firewood (21 %). In East Rusumo, where many shops, restaurant and offices are located, 20% of households use charcoal and electricity while firewood still is the main source of energy for 80 % of the residents in the village. Information and communication equipment are still limited. Those households who own a radio are almost a quarter of the total number of households in the Project Affected Area. Cellular phone is pretty common with one head of households out of three owns at least a mobile phone. 6.9.2 Tanzania According to the Ngara Poverty Survey, households in remote villages are more likely to use thatch as a roof building material than households in accessible villages, which would tend to use iron sheets. Poor households are also more likely to use thatch, and non-poor more likely to use iron sheets. As well, smaller households tend to use thatch, and bigger households more likely to use iron sheets. Those self-employed in agriculture are also most likely to use thatch for their roofs. Female-headed households use iron sheets more often than male-headed households. With regards to building materials for the rest of the house, 95% of houses are built with mud or mud bricks. Burnt bricks take second place. Households in remot villages have a higher share of mud and mud bricks than households in villages that are more accessible. Likewise, poor households use mud or mud bricks more often than non- poor households. With regards to the floor, households in accessible villages have more houses with concrete floors than households in remote villages. Poor households have a higher share of houses with mud or dirt floors than non-poor households, which have a higher share of houses with concrete flooring than poor households. Overall, 59% of households have a safe source of water (such as treated pipes, boreholes, hand pumps, and protected wells), wheras 30% get it from an unprotected well. 70% of households in accessible villages have a safe source of drinking water, whereas the share of households in remote villages in merely 37%. With regards to unprotected wells, the numbers are 25% of households in accessible villages, and 41% of households in remote villages. Poverty status seems to be a key indicator. / 1770050 / MARCH 2013 FINAL REPORT 69 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 67% of non-poor households use safe sources of water, compared to 35% of poor households. As well, 54% of poor households get their drinking water from unprotected well, compared with only 23% of non-poor households. With regards to toilets, only 27% of households have safe sanitation, whereas up to 69% use a covered pit latrine. / 1770050 / MARCH 2013 FINAL REPORT 70 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7. VALUATION AND COMPENSATION 7.1 COMPENSATION AND RESETTLEMENT STRATEGY 7.1.1 Overall Approach and Key principles Overall Approach The RAP aims to ensure that all affected parties are compensated and assisted in restoring their livelihoods. Overall objectives of the RAP are:  Avoid or at least minimize involuntary resettlement;  Mitigate adverse social and economic impacts from land acquisition by: (i) providing compensation for loss of assets at replacement cost; and (ii) ensuring that resettlement activities are implemented with appropriate disclosure of information, consultation, and the informed participation of those affected;  Improve or at least restore the livelihoods and standards of living of affected people;  Provide additional targeted assistance (e.g., credit facilities, training, or job opportunities) and opportunities to improve or at least restore their income- earning capacity, production levels, and standards of living to displaced persons whose livelihoods or income levels are adversely affected, and  Provide transitional support to displaced persons, as necessary, based on a reasonable estimate of the time required to restore their income earning capacity, production levels, and standards of living. Principles for Compensation and Resettlement The key principles of this RAP are the following  Compensation and resettlement of project affected people will be carried out in compliance with Rwandan and Tanzanian legislation, WB OP 4.12 and AfDB Involuntary Resettlement Policy;  Where Rwandan and Tanzanian legislation is less favourable to PAPs than WB OP 4.12 and/or AfDB requirements or does not apply at all, these latter shall apply;  All physically and economically displaced people will be offered an option between either a full resettlement package, including the provision of replacement residential land and a house, or cash compensation;  Experience has shown that cash compensation, although very sought after by many household heads, could be detrimental in the medium term, to other household members, particularly the females and the children; the Project will provide for measures to support sustainable use of cash compensation and for / 1770050 / MARCH 2013 FINAL REPORT 71 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) mechanisms within the overall monitoring framework to follow up the use of cash compensation;  Where farmers are economically displaced, they will be offered a resettlement option including the provision of agricultural land of potential equivalent to that of the land they have lost;  The Project will assist PAP in restoring their affected livelihoods and will provide transitional assistance as necessary as long as livelihoods are not restored to their previous level;  The Project aims to turn PAP to Project beneficiaries; targeted livelihood restoration programs will be implemented as part of this RAP in order to achieve this goal;  The RAP implementation and –outcomes will be monitored and evaluated as part of a transparent process;  PAP and host communities will be informed, consulted and involved in decision making during the course of RAP development, implementation and evaluation;  A grievance mechanism will be accessible to all affected people at all times during preparation, implementation and monitoring of the RAP; this mechanism will include the possibility to resort to court resolution;  In addition to the RAP, A Local Area Development Plan (LADP) will be designed and implemented, aiming to support the overall sustainable social and economic development of the wider Project area; the LADP will complement the mitigation measures proposed in the ESMP and the livelihood restoration measures of this RAP, and  Removal of assets, displacement or restriction of access will not occur before necessary measures for compensation are agreed and in accordance with Rwandan and Tanzanian Law and in conformance with International Requirements. Measures will include all kinds of compensation and of other assistance prior to, during or after displacement/physical relocation. In this RAP, these key principles apply to all people and businesses affected by involuntary land take and loss of other assets resulting in:  Relocation or loss of shelter;  Loss of assets or access to assets, and  Loss of income sources or means of livelihood, whether or not the affected persons must move to another location. Note: The Project has presented the two options “resettlement option� and “cash compensation� to affected households with the respective entitlements. All PAP expressed a strong preference for cash compensation. This overwhelming preference is due to the specific setting of the project site with the Rusumo East, Rusumo West and Rusumo villages. These villages are economic hubs in a rural environment and offer respective opportunities for the establishment of alternative or additional sources of income, with strong perspectives for restoration of livelihoods and overall improvement of living standards. Hence, affected people entirely prefer to stay directly at the Project site, establish new residences and benefit from the local / 1770050 / MARCH 2013 FINAL REPORT 72 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) economic dynamics. Affected businesses want to stay at the project site and benefit from the dynamics for the re-establishment of their affected businesses or for the development of new businesses. Households at the Project site affected by loss of agricultural land due to construction (only occurs in Tanzania) also prefer cash compensation. This is due to the fact that livelihoods in the Rusumo villages are not mainly land based but more business oriented. Hence, affected households rather would intensify their business activities with the support of the compensation money than to relocate to a rural environment with less options for diverse economic activities. Affected households in the Rusumo villages are experienced to manage cash money. However, money management training will be offered to all households who receive cash compensation. Affected marshland users who will also receive cash compensation, are not used to manage relatively large amounts of cash. Money management training through the districts will have a focus on this group of affected people. 7.2 LIVELIHOOD RESTORATION The RAP is entirely designed to meet the provisions of Rwandan and Tanzanian Law as well as the requirements of International Standards, namely WB OP 4.12., in the context of the Project’s anticipated impacts. In this respect, livelihood restoration measures provide a wide range of support measures to affected populations in addition to compensation (see measures in 7.6 below). The livelihood restoration measures aim to ensure that no PAP suffers hardship due to the Project as set out in the International Requirements. Therefore, the overall purpose is to achieve the restoration of affected livelihoods at least to the level prior to the Project or even the improvement of affected livelihoods and the special consideration of affected vulnerable groups. The livelihood restoration measures have been developed under consideration of the results of consultations of PAP and of other stakeholders performed 2011/2012 (SNII) and in November/ December 2012. For more information on the livelihood restoration measures see section 7.6 below. 7.3 ELIGIBILITY 7.3.1 Census and Asset Assessment SNII Census for Phase III RAPs In order to capture all households affected by the IDS, SNII conducted a census in the format of a questionnaire based socio-economic household survey in 2011/2012. The census questionnaires in general comprised two parts, with a third part addressing businesses  Part A: socio-economic household information, inventory of affected assets  Part B: results of topographic survey of affected plots – area of plots and crops grown on plots – (GPS-based) / 1770050 / MARCH 2013 FINAL REPORT 73 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Part C: assessment of affected cooperatives and businesses Heads of households were interviewed on the overall situation of their household, their affected assets were assessed; their land under cultivation as well as the respective crops were recorded. Businesses were surveyed focused on the inventory of expected losses and the establishment of revenue losses due to the Project. About 2,100 households were covered with the 2011/2012 census in Rwanda and Tanzania respectively. In November and December 2012 and in January 2013, additional field work was carried out in order to cover information gaps in the census database. For more information on the field work for RAP preparation, see section 9.4 below. Field work in potentially affected villages along the Kagera River in Rwanda and Tanzania was carried out in order to  Establish arable marshland use at household level using a self-validation approach  Establish for each village a list of households and area of land used through consultations with the cell and village leaders, and  Conduct village meetings and ask individual households to validate the obtained marshland use information and sign acknowledgement of the new cut-off date. Consultations of households in the Rusumo (Tanzania) and Rusumo East (Rwanda) villages which will be affected by dam construction activities were undertaken in December 2012 and in January 2013, aiming to:  Meet affected households in order to document the assets that would be lost, and  Confirm preferred options for compensation (land for land - or cash compensation) and acknowledge the cut-off date. Note: For this RAP, the approach of a village self-validation was adopted, due to a requirement of the WB social safeguard specialist. This requirement was one of the outcomes of a meeting in October 2012 with the WB and NELSAP in order to discuss the most efficient strategy to finalize the RAP within the given very limited time frame. Results from previous census activities had been proven as not correct at the time of the meeting in October. In order to exactly determine affected households and respective losses within the very short time period available, the self-validation was deemed the appropriate approach. 7.3.2 Cut-off Date The cut-off date is the respective date of the community self-validation meeting or consultation meeting with affected households (November and December 2012, January 2013). No structure or field established in the Project area after the cut-off date shall be eligible for compensation. This has been explained during the field work period to all interested parties: / 1770050 / MARCH 2013 FINAL REPORT 74 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Project affected people, who were taking notice of the information by individual signature;  Resettlement committees;  Village leaders, and  Cell authorities. It was also explained that cut-off dates which were set during previous design phases of the Project are no longer valid. This information was also communicated to ex- PAPs (see section 9 below). Cut of dates as dates of signatures by PAP Rusumo Village, Tanz ania 22.12. 2012: owners of residential structures, business structures and land 23.12. 2012: brick-making businesses, fish-pond cooperative 13.1. 2013: fishermen cooperative Nyakwisi, Rwanda: 27.12. 2012: brick making businesses Rusumo East, Rwanda: 23.12. 2012 and 27.12. 2012: business structures, residential structures Kyenda sub-village and Kabuye sub-village, Tanzania 20.11. 2012: marshland users Nshungeruzi, Nyakabungo, Nyakwisi, Rusumo, Rwanda: 14.11. 2012: marshland users Ruhuha, Rwanda: 10.11. 2012: marshland users Note: The cut – off date related to the RoR scheme was communicated in about 30 villages in Rwanda along the Kagera river and in 9 sub-villages in Tanzania. This was prior to the availability of the final results of hydraulic monitoring. Based on the final modelling results, from the 30 villages consulted in Rwanda, only 6 villages are affected (see section 5.5.3). In Tanzania, from the 9 sub-villages consulted, only 2 sub-villages are affected. The marshland users in the remaining villages will be informed and consulted as ex-PAPs in the frame of the PCDP. Consultations will start during the disclosure period of the RAP. 7.3.3 Speculative Structures Opportunistic structures established for the sole purpose of compensation pose a specific eligibility problem, which will be addressed through the following methods to ascertain the validity of the claim: / 1770050 / MARCH 2013 FINAL REPORT 75 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Visual inspection of the structure to determine whether it is really a residential- or business structure or not;  Consultation with the local resettlement committee whether the contested structure indeed was established prior to the cut -off date. 7.3.4 Eligibility Assets, including structures and fields, that were surveyed in the project affected area at the cut-off-date are eligible for compensation, if these assets, structures and fields are determined as project affected by the mapping of the hydraulic modelling results (see section 5 above). People residing or holding affected assets in the project affected area at the cut-off date are eligible for compensation. The types of impacts identified as eligible for compensation are:  Loss of crops;  Loss of land and loss of improvements on land  Loss of structures;  Loss of access (to resources);  Loss of business ;  Loss of employment / 1770050 / MARCH 2013 FINAL REPORT 76 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4 OVERVIEW OF ENTITLEMENTS Note: Entitlements were approved by local resettlement committees in February 2013 (see Annex 3). 7.4.1 General Approach  Entitlements for compensation will refer to the affected household as a joint entity rather than to the head of household considered as an individual.  In a bi-parental family, both spouses will be considered as entitled to cash compensation and both are intended to be beneficiaries of livelihood restoration measures ; respective procedures, i.e. exit survey with the signature of compensation agreements, will be performed in the presence of and with the signatures of both spouses; bank transfers will be made to accounts held by both spouses.  Where the household is headed by a single person, entitlements will be in the name of this individual only. In case the head of household is a child (under 14 years),the household head would be entitled to a special support program in order obtain the capacity to manage compensation money. Where possible, an adult relative would be asked to act as trustee.  The cash compensation process will be subject to monitoring (see 11.4 below) in order to track if the entire affected household will benefit from compensation and that compensation money is used in a meaningful manner.  Cash compensation disbursement will be complemented by money management training (to both spouses in a bi-parental family) as part of the livelihood restoration program (see chapter 7.5.10 below). For provisions for polygamous partnership settings see section 7.7 (vulnerable people) below. The following paragraphs provide an overview on the different types of losses and the respective entitlements. / 1770050 / MARCH 2013 FINAL REPORT 77 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.2 Loss of Residential Structure /Residential Land Loss of residential structure and residential land Option 1  Cash compensation at replacement value for loss of residential house;  Cash compensation for loss of residential land at replacement value;  Cash compensation at replacement value for loss of other structures;  Cash compensation at replacement value for permanent crops in home garden  Plus: all necessary transaction costs  Money management training Option 2  Allocation of residential plot an agreed resettlement site, with secure tenure;  Reconstruction of a resettlement house of at least the same quality as the affected house;  and cash compensation at replacement value of any specific features that would not be included in the resettlement house, and  Resettlement assistance. Note: According to the results of the field surveys in November and December 2012 and in January 2013, project affected people entirely prefer cash compensation over the land for land or the house for house approach. There was not a single exception to the cash preference. Note: Salvaging of materials is permitted and will not be taken into account for calculation of compensation. Note: An actual land market assessment will be done prior to determination of final replacement rates. / 1770050 / MARCH 2013 FINAL REPORT 78 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.3 Loss of Business Structure Loss of business structure Immovable business structure  Compensation at full replacement value for immovable assets (including commercial land associated to the structure);  Plus: all necessary transaction costs;  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training  If business cannot be re-established: livelihood restoration program (see section 7.6) Movable business structure (e.g.kiosk)  Moving allowance (covering moving costs/transaction costs)  Transition allowance to cover the period until the business is fully operational again after moving (typically 3 month income, with a maximum of 1 year income)  Money management training  If business cannot be re-established: livelihood restoration program (see section 7.6) Note: Salvaging of materials is permitted and will not be taken into account for calculation of compensation. Note: An actual land market assessment will be done prior to determination of final replacement rates. 7.4.4 Loss of Income Due to Loss of Employment Loss of Income due to Loss of Employment  Compensation for lost income for employee of displaced business is the responsibility of the business owner (salaries of employees are part of the compensation amount for lost income); PIU will facilitate respective arrangements between owners and employees, based on the results of field work Dec 2012 – Jan 2013 and on the results of the exit survey;  In the case that a displaced business does not reopen elsewhere, former employees are entitled to participate in the livelihood restoration program (see section 7.6); Note: employment at businesses is not the most frequent setting in the affected area; in Tanzania, most of the businesses are run by the owner; in Rwanda, the affected business premises in Rusumo East are rented out to business tenants, who run their own business / 1770050 / MARCH 2013 FINAL REPORT 79 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.5 Loss of Other Structures Loss of Other Immovable Structures  Compensation at full replacement value;  Plus: all necessary transaction costs; Note: Salvaging of materials is permitted and will not be taken into account for calculation of compensation. 7.4.6 Loss of Agricultural Land Loss of Agricultural Land  Compensation at full replacement value or allocation of a land plot in an acceptable distance to residence of at least equivalent productivity;  Compensation for loss of perennial crops and trees and full replacement value  Compensation for loss of seasonal crops at market value  Compensation for developments on land at full replacement value  Plus: all necessary transaction costs;  Participation in livelihood restoration program (see section 7.6)  Participation in money management training Note: only small areas of private agricultural land will be affected during construction; this land is entirely located in Rusumo, Tanzania. Affected people stated their preference for cash compensation; according to a rapid land availability survey (Dec 2012), agricultural land close to Rusumo (less than 5 km) is available for purchase. Note: An actual land market assessment will be done prior to determination of final replacement rates. / 1770050 / MARCH 2013 FINAL REPORT 80 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.7 Loss of Access to Agricultural Land Loss of Access to Agricultural Land (Sharecropper, Tenant) In case there is a formal contract/agreement with share cropper or tenant  Allocation of compensation for permanent crops (full replacement value) according to the formal contract (between owner and sharecropper/tenant)  Compensation for annual crops at market value (only if annual crops could not be harvested prior to date of loss) according to the formal contract (between owner and sharecropper/tenant)  Compensation at full replacement value for improvements on land to the documented owner of the improvement  Participation in livelihood restoration program (see section 7.6)  Participation in money management training In case there is no formal contract/agreement with share cropper or tenant  PIU will seek to facilitate agreement between with owner on allocation of compensation for permanent crops (full replacement value) according to the informal arrangements (between owner and sharecropper/tenant)  Compensation for annual crops at market value  (only if annual crops could not be harvested prior to date of loss) according to the informal arrangements (between owner and sharecropper/tenant)  Compensation at full replacement value for improvements on land to the documented owner of the improvement  Participation in livelihood restoration program (see section 7.6)  Participation in money management training 7.4.8 Loss of Permanent Crops Loss of Permanent Crops  Compensation at full replacement value of the lost crop  Participation in money management training / 1770050 / MARCH 2013 FINAL REPORT 81 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.9 Loss of Marshland for Cultivation Loss of Production from Marshland  Compensation for loss of income from marshland production at market value of crop (most important crop on affected marshland plot for the 3 years prior to cut-off date)  Compensation for labor costs to develop the marshland;  Compensation for developments on land at full replacement value  Participation in livelihood restoration program (see section 7.6)  Participation in money management training Note: Marshland is under government ownership. Hence, the loss of marshland will not be compensated for the land as such, but under consideration of the loss of production/income from marshland. Note: In order to provide for livelihood restoration, compensation will be paid for a period equivalent to 3 years of income from marshland production. For affected households who entirely depend on marshland, compensation will be paid for a period equivalent to 5 years of income from marshland production. Final calculation of compensation: The rationale for final calculation of compensation rates is based on factual information that marshland cultivation is only possible every second year, due to flooding of marshland every other year. Hence, income from marshland only occurs every second year. Consequently, a 3 year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 1.5. A 5 year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 2.5. Reference information on income from marshland cultivation was obtained from resettlement committees during the village self-validation exercise, from district agronomists and from affected people; the information was confirmed during the consultative workshop in Kigali on 4 Feb 2013. / 1770050 / MARCH 2013 FINAL REPORT 82 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.10 Loss of business sites in marshland Loss of Access to Resources Brick Making – and Sand Digging Businesses on Marshland  Assistance in finding a new business site  Restoration allowance (costs for moving and re-establishment of business site plus all transaction costs)  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training In case the business cannot be restored: participation in livelihood restoration program (see section 7.6) Fish Hatching Ponds on Marshland  Assistance in finding a new business site  Restoration allowance (costs for moving and re-establishment of business site plus all transaction costs)  Compensation for loss of income for the period of time required to re- establish the business and restore associated income - typically three month income, with a maximum of one year income.  Money management training In case the business cannot be restored: participation in livelihood restoration program (see section 7.6)  In case that the displaced business cannot be restored : participation in livelihood restoration program (see section 7.6) Note: some of the affected businesses are organized as co-operatives (see entitlement matrix below) / 1770050 / MARCH 2013 FINAL REPORT 83 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.4.11 Temporary Loss of Access to Resources (Severance) Loss of Access to Resources during Construction Access to the Kagera river for fishing  Assistance in finding alternative fishing sites upstream during construction period  Re-establishment of access to original fishing sites immediately after construction (2 month period after completion of construction)  severance allowance equivalent to a 2-month income from fishing) / 1770050 / MARCH 2013 FINAL REPORT 84 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 25 – Entitlement Matrix Entitlement Affected Asset/Type # PAP Compensation Livelihood Restoration and of Loss Training Option 1: Cash Compensation Money management training Compensation at replacement value for loss of residential house ; In case PAP is affected by loss of Compensation for loss of associated residential plot at replacement value; agricultural land/arable marshland: Compensation at replacement value for loss of other structures associated to livelihood restoration affected structure ; Compensation at replacement value for permanent crops in home garden; Plus: all necessary transaction costs Option2: Resettlement Residential Structure Allocation of residential plot at agreed resettlement site, with secure tenure ; 1 Owner Reconstruction of a resettlement house of at least the same quality as the affected house ; and cash compensation at replacement value of any specific features that would not be included in the resettlement house ; Resettlement assistance : moving allowance, payment of any transaction costs Note: according to results of consultations in Nov/Dec 2012 and January 2013 there will be no resettlement program under the Project, since all PAP opted for cash compensation and self - resettlement / 1770050 / MARCH 2013 FINAL REPORT 85 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Entitlement Affected Asset/Type # PAP Compensation Livelihood Restoration and of Loss Training Moving allowance (all costs related to moving plus all transaction costs) Tenancy in affected Transition allowance to cover time needed to restore place of residency usually In case PAP is affected by loss of residential building three months tenancy rate, with a maximum of six months rate) agricultural land/arable marshland: livelihood restoration program (see Residential use section 7.6) 2 Tenancy in affected Moving allowance (all costs related to moving plus all transaction costs) In case PAP is affected by loss of Tenant residential building agricultural land/arable marshland: Transition allowance to cover time needed to restore place of residency/business Residential use and usually three months tenancy rate, with a maximum of six months rate) livelihood restoration commercial use Compensation for loss of income for the period of time required to re-establish In case business cannot be re- the business – typically three month income, with a maximum of one year established: livelihood restoration income program (see section 7.6) Money management training Compensation at full replacement value for immovable assets (including commercial plot associated to the structure); Money management training Permanent Business Structure Plus: all necessary transaction costs; If business cannot be re-established: 3 Compensation for loss of income for the period of time required to re-establish livelihood restoration program (see the business – typically three month income, with a maximum of one year section 7.6) income Moving allowance (costs for moving and re-establishment of business plus all transaction costs) Money management training Owner (private 4 owner, Movable Business Compensation for loss of income for the period of time required to re-establish If business cannot be re-established: cooperative as Structure the business – typically three month income, with a maximum of one year livelihood restoration program (see owner) income section 7.6 Assistance in finding a new business site (in case cooperative is affected: Restoration allowance (costs for moving and complete re-establishment of participation of all members Business Site on registered at cut-off date) business site plus all transaction costs) marshland Compensation for loss of income for the period of time required to re-establish Money management training 5 Brick making, sand the business – typically three month income, with a maximum of one year In case business cannot be re- digging, fish hatching income established: livelihood restoration ponds program (see section 7.6 / 1770050 / MARCH 2013 FINAL REPORT 86 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Entitlement Affected Asset/Type # PAP Compensation Livelihood Restoration and of Loss Training Compensation for land at full replacement value Assistance in finding new land for purchase 6 Compensation for permanent crops at full replacement value Money management training Agricultural land Compensation for annual crops at market value livelihood restoration program (see Owner (hillside land, (only if annual crops could not be harvested prior to date of loss) section 7.6 intermediate land) Compensation at full replacement value for improvements on the land Plus: all necessary transaction costs In case there is a formal contract/agreement with share cropper or tenant Allocation of compensation for permanent crops (full replacement value) according to the formal contract (between owner and sharecropper/tenant) Compensation for annual crops at market value Money management training (only if annual crops could not be harvested prior to date of loss) according to livelihood restoration program (see the formal contract (between owner and sharecropper/tenant) section 7.6 Compensation at full replacement value for improvements on land to the document owner of the improvement Agricultural Land Share cropper In case there is no formal contract/agreement with share cropper or tenant (hillside land, or tenant PIU will seek to facilitate agreement between with owner on allocation of intermediate land) compensation for permanent crops (full replacement value) according to the 7 informal arrangements (between owner and sharecropper/tenant) Compensation for annual crops at market value Money management training (only if annual crops could not be harvested prior to date of loss) according to livelihood restoration program (see the informal arrangements (between owner and sharecropper/tenant) section 7.6 Compensation at full replacement value for improvements on land to the document owner of the improvement / 1770050 / MARCH 2013 FINAL REPORT 87 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Entitlement Affected Asset/Type # PAP Compensation Livelihood Restoration and of Loss Training For marshland users who have uphill land 8 Compensation for loss of income from marshland production at market value of affected crops (= most important crop for three years prior to cut-off date); Money management training Compensation will be paid at factor 1.5 livelihood restoration program (see Compensation for labor costs to develop the marshland section 7.6 User Marshland, used for Compensation for developments on the land at full replacement value agriculture or pasture For marshland users who have no uphill land Compensation for loss of income from marshland production at market value of affected crops (= most important crop for three years prior to cut-off date); Money management training Compensation will be paid at factor 2.5 livelihood restoration program (see Compensation for labor costs to develop the marshland section 7.6 Compensation for developments on the land at full replacement value Compensation at full replacement value 9 Other immovable Owner structure Compensation for loss of income for employee of displaced business is part of the If employment cannot be re- 10 Loss of income due compensation for loss of income for business owner (see above) established to loss of In case there is no contractual arrangement between employer and employee, PIU will seek Employee livelihood restoration program (see employment at to facilitate agreement between business owner an employee on allocation of compensation section 7.6 affected businesses to employees Temporary loss of Assistance in finding alternative fishing sites during construction period 11 access to fishing Re-establishment of original fishing sites immediately after construction (2 PAP active in sites months) fishing Severance allowance (equivalent to a 2 month income from fishing) Note: Vulnerable people, in addition to entitlements as listed above, are entitled to special assistance as needed to participate effectively in the resettlement process Note: actual land market assessments will be done prior to determination of final replacement rates for residential land, commercial land and agricultural land. Note: entitlements are presented separately for each category of affected household/entity; some households may qualify for entitlements in more than one category (for example, a household that is physically and economically displaced may qualify for the entitlements for both these categories. e.g. households losing their residential structure and losing agricultural land); / 1770050 / MARCH 2013 FINAL REPORT 88 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.5 DETERMINATION OF COMPENSATION RATES Note: Compensation rates were approved by local resettlement committees. 7.5.1 Residential Structures Approach Loss of residential structures will affect households in the Rusumo East and Rusumo villages close to the Project site. Rates for the replacement value of residential structures were established with the support of local enterprises for construction, during 2011/2012 field work of SNII for the Phase III RAPs. However, the rates presented in Table 14 below refer to generalized types of houses. They indicate different levels of housing which will be reflected by different compensation rates in order to meet the respective replacement values. The compensation rates for residential structures were consulted with the resettlement committees in Rusumo East and Rusumo village. The committees signed off the compensation approach. Some of the committee members considered the rates for residential structures as too low. Each affected structure will be individually validated during the exit survey, by an official valuer on behalf of the district land bureaus (Ngara District, Kirehe District), under consideration of the compensation approach and the respective rates of the RAP (see compensation process, below). Note: according to consultations with Ngara – and Kirehe district officials, there are no official compensation rates for land, residential structures or businesses on the district levels. Officers stated that determination of compensation depends on the respective property to be expropriated and is done on a case by case basis. Compensation is based on market value, not on replacement value. Compensation rates from other projects (e.g. the One Stop Border Post) could not be obtained during RAP preparation. Actual assessments will be performed prior to the determination of final replacement rates. Compensation will comprise all necessary transaction costs related to the purchase of land and residential sites. Appendix 5 presents the reference figures for the rates indicated in the tables below. / 1770050 / MARCH 2013 FINAL REPORT 89 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 26 – Compensation Rates for Residential Houses, Rwanda Type of house Replacement value (RWF) Replacement value (USD) Traditional, improved, small 3,090,000 5,100 2 room house, 40m2 in surface, raw clay bricks with cement finish, corrugated iron roof Improved, small 6,479,000 10,700 2 room house, 40m2 in surface, baked clay bricks with cement finish, concrete pillars, corrugated iron roof 3-4 room house, 70m2 in 9,709,000 16,000 surface, cement bricks with cement finish, concrete pillars, corrugated iron roof Source: SNII, RAP Phase III, Rwanda Table 27 Compensation Rates for Residential Houses, Tanzania Type of house Replacement value (TZS) Replacement value (USD) Improved, small 2,767,840 8,020 2 room house, 40m2 in surface, baked clay bricks with cement finish, corrugated iron roof Source: SNII, RAP Phase III, Tanzania 7.5.2 Residential Land, Rusumo East and Rusumo Villages Loss of residential land connected to the loss of residential structures will affect households in the Rusumo East and Rusumo villages close to the Project site. Costs for the purchase of land in and around Rusumo East are determined by overall land scarcity in Rwanda and by the function of Rusumo East as economic hub. Furthermore, the implementation of large projects (i.e. the construction of the One Stop Border Post) with land acquisition and the forthcoming implementation of additional projects (RoR, road, railway) contribute to the increase of purchase costs/to land speculation. In 2011/2012, village heads were consulted on costs for residential land in Rusumo East (SNII, RAP Phase III), resulting in the determination of 800 RWF/m2 of residential land as compensation rate for the Phase III RAP (= 8,000,000 RWF/ and 13,000 USD/ha). In November 2012, a rapid land availability appraisal was conducted in Rusumo East and it’s vicinity. For example, for plots along the Rusumo-Kyanzi-Rwanteru road, interviewees during the rapid appraisal indicated prizes of about 7.5 – 8.00 USD/m2 (= 4,500 – 5,000 RWF). This is by six times higher than the prizes determined for the RAP Phase III. The table below indicates the higher rates as per rapid appraisal Nov 2012. In order to meet replacement value for residential land, a land market update will be performed prior to the exit survey, at the start of RAP implementation (see below under Compensation Process). / 1770050 / MARCH 2013 FINAL REPORT 90 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 28 – Compensation Rates for Residential and Commercial Land in Rusumo East, Rwanda Compensation/ha RWF USD 50,000,000 83,921 Compensation/m2 RWF USD 5,000 8.3 For Rusumo village, Tanzania, the overall setting is similar – an economic hub, characterized by ongoing and expected major construction projects and rising prizes for land in and around the village. In 2011/2012, village heads were consulted on costs for residential land in Rusumo village (SNII, RAP Phase III), resulting in the determination of 1,145 TZS/m2 of residential land as compensation rate for the Phase III RAP (= 11,145.000 TZS/ = 7,000 USD/ha). Interviews in the frame of the rapid appraisal for land availability indicated a current market price of 2,000,000 – 3, 000,000 TZS /ha for land in the area of Kahaza, close to Rusumo. For example, for plots along the Rusumo-Kyanzi-Rwanteru road, interviewees during the rapid appraisal indicated prizes of about 7.5 – 8.00 USD/m2 (= 4,500 – 5,000 RWF). This is by six times higher than the prizes determined for the RAP Phase III. The table below indicates the higher rates as per consultations in 2011/2012. In order to meet replacement value for residential land, a land market update will be performed prior to the exit survey, at the start of RAP implementation (see below under Compensation Process). The update of land prizes prior to the start of the compensation process is necessary, because civil works are not expected to commence immediately after Project approval (see implementation schedule Figure 20). Furthermore, the Rusumo villages are a highly dynamic environment with regard to the land market, as they are functioning as economic hubs in the wider area and because different large Projects are currently implemented or going to be implemented (i.e. One Stop Border Post). Hence, land prizes are rising constantly. Table 29 – Compensation Rates for Residential and Commercial Land in Rusumo, Tanzania Compensation/ha TZS USD 11,145,000 7,000 Compensation/m2 TZS USD 1145 0.7 Source: SNII, RAP Phase III, Tanzania / 1770050 / MARCH 2013 FINAL REPORT 91 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.5.3 Business Structures Business structures will be validated on case by case base during the exit survey. Replacement costs then will be calculated based on actual cost of construction/re- establishment of a structure of at least equal quality as the affected structure. 7.5.4 Agricultural Land Rates for agricultural hillside land were established through consultation of local agronomists and other key staff within district authorities, village heads and village residents in the Project area (Rwanda and Tanzania), during 2011/2012 consultations (SNII, RAP Phase III). In addition to compensation, all transaction costs will be paid to the affected household. Table 30 Compensation Rates – Agricultural Land Rwanda Tanzania Compensation Rate, RWF/ha USD/ha TZS/ha USD/ha Hillside land 3,000,000 5,000 4,000,000 2,500 Note: According to the findings of the field survey at the Project site (Rusumo East and Rusumo West in Rwanda) no household in Rwanda will be affected by loss of agricultural land. Loss of agricultural land due to construction will only occur in Rusumo, Tanzania (see Table 8). According to a rapid land availability appraisal in Rusumo, Tanzania, agricultural land is available for purchase in the vicinity of Rusumo (Kahaza area). Affected people will be assisted by the district land offices in finding alternative agricultural land to purchase from their compensation money. 7.5.5 Permanent Crops The calculation of the full replacement value requires consideration not only of the product of the crop, but also the cost of re-establishing the crop (seedlings, soil preparation, fertilizers, others), as well as the lost income during the period needed to re-establish the crop up to the degree of maturity of the lost crop. Compensation rates were calculated in compliance with the full replacement value principle, based on the following:  V: Average market value of the produce;  D: Average period of time required to re-establish the tree to a mature production level, in years;  CP: Cost of planting (seedling, soil preparation, initial fertilization);  CL: Cost of the labor required to maintain the crop during the period of time needed to re-establish it to its previous production level. / 1770050 / MARCH 2013 FINAL REPORT 92 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The compensation amount C is determined by application of the following formula: C = V x D + CP + CL The parameters in the compensation formula have been obtained as follows: / 1770050 / MARCH 2013 FINAL REPORT 93 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Parameter Information Sources V product of the  FAO statistics market value of the fruit by the yield  National Statistics  survey of regional markets  direct interviews with affected farmers  confirmation by local agronomists Note: figures from national and international statistics were obtained for the past three years to the cut-off date (2009-2012) as far as available; the highest figure was taken for calculation of compensation rates D Average period of  secondary sources of information, publications time required to re- establish the tree to a mature production level, in years CP cost of initial  local agronomists planting and cost of CL labor  affected farmers For more information on compensation rates , see Appendix 4. 7.5.6 Annual Crops Compensation of annual crops is according to the market value of the crop. Market values were established under consideration of the following sources: Table 31 Information Sources – Market Price of Annual Crops Level of Details Information International Level FAO Statistics (http://faostat.fao.org/site/703/DesktopDefault.aspx?PageID=703#ancor) Producer prices 2009 and 2010 for Rwanda Figures for Tanzania are not available National level National agricultural statistics Rwanda: Ministry of Agriculture and Animal Resources, Annual Reports http://www.minagri.gov.rw/ Tanzania: Ministry of Agriculture and Food Security http://www.tanzania.go.tz/agriculture.htm Regional level Consultation with national agronomists (2011/2012) District level Market research in Kirehe and Ngara Districts (2011/2012) Local level Information from resettlement committees of affected villages (2012) = yields of 4 most important crops/ha in a good year Market prices were obtained for the past three years prior to the cut-off date (if available). / 1770050 / MARCH 2013 FINAL REPORT 94 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) As reference for the calculation for compensation, the respective highest reference prices were taken into account (see list below). The formula for the loss of seasonal crops is C=VxA To calculate the compensation for losses of production from annual crops, the market value (V) is multiplied with the area of the affected plot or the affected part of the plot (A). For affected plots with mixed crops, the most important crop is considered. For affected plots, the most important crop for the last three years prior to the cut-off date is considered. Note: In some cases, research of market prizes delivered quite different results for the same crops for Tanzania and Rwanda. For the RAP, compensation rates were matched with regard to their USD value, with the respective higher values obtained from price research taken into account. This is due to the spatial proximity of the respective affected areas (marshland areas along the Kagera river) and the resulting similar conditions for production. Furthermore, during the interviews with the resettlement committees of the affected villages in Tanzania, interviewees indicated that local farmers use to market their products in Rusumo East, Rwanda. Table 32 Compensation Rates Annual Crops* - Tanzania Reference Price Reference Yield Compensation Compensation Type of Crop for Compensation for Compensation Rate/ha (TZS) Rate/ha (USD) (TZS/t) (t/ha) Tomato 695,881.87 9.00 6,262,936.80 3,946.40 Soya 888,720.00 2.00 1,777,440.00 1,120.00 Irish Potatoes 435,631.50 12.00 5,227,578.00 3,294.00 Sweet Potatoes 522,652.00 9.00 4,703,868.00 2,964.00 Beans 871,263.00 5.00 4,356,315.00 2,745.00 Maize 726,052.50 4.00 2,904,210.00 1,830.00 Onions 3,047,040.00 12.00 36,564,480.00 23,040.00 Yam 1,258,491.00 7.00 8,809,437.00 5,551.00 *most important marshland crops as per self-validation of affected villages, 2012 / 1770050 / MARCH 2013 FINAL REPORT 95 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 33 Compensation Rates Annual Crops* - Rwanda Reference Price Reference Yield Compensation Compensation Type of Crop for Compensation for Compensation Rate/ha (RWF) Rate/ha (USD) (RWF/t) (t/ha) Tomato 268,389.88 9 2,415,508.92 3,964.40 Soya 341,208.00 2 682,416.00 1,120.00 Irish Potatoes 167,252.85 12 2,007,034.20 3,294.00 Sweet Potatoes 200,662.80 9 1,805,965.20 2,964.00 Beans 334,505.70 5 1,672,528.50 2,745.00 Maize 278,754.75 4 1,115,019.00 1,830.00 Onions 1,169,856.00 12 14,038,272.00 23,040.00 Yam 483,174.90 7 3,382,224.30 5,551.00 *most important marshland crops as per self-validation of affected villages, 2012 Table 34 Reference figures for harmonization as per market price research Rwanda Tanzania Type of Crop USD/ha USD/ha Tomato 3,946.40 3,776.00 Soya 1,120.00 170.12 Irish Potatoes 2,718.00 3,294.00 Sweet Potatoes 2,880.00 2,964.00 Beans 1,600.00 2,745.00 Maize 1,280.00 1,830.00 Onions 23,040.00 12,444.00 Yam n.a 5.551.00 Cabbage n.a n.a 7.5.7 Determination of Compensation for Loss of Production from Marshland Step 1: Market price of lost crops Marshland is government owned land. Hence, the loss of marshland will not be compensated for loss of land as such, but with reference to the loss of production from marshland. Loss of marshland will be compensated via the loss of crops produced from this marshland and via the labour put into the development of the land. According to the self- validation of the affected villages and the interviews with the resettlement committees, marshland plots are without exception cultivated with annual crops. The loss of annual crops will be compensated at the market value of the lost crop (see paragraphs above). / 1770050 / MARCH 2013 FINAL REPORT 96 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Step 2: Labour costs for development of marshland In addition, the labour input for the preparation of marshland for cultivation is considered for the calculation for compensation. Labour costs for marshland clearing are calculated under consideration of:  Labour needed for clearing of marshland: 1 day/0.01 ha = 100 days/ha  Costs for labour: UDS 5/day Information on marshland clearing costs were obtained during 2011/2012 consultations in the Project area. Table 35 Sample calculation of labour costs for average plot sizes Rwanda Tanzania labour costs labour costs Plot sizes size (ha) (USD) size (ha) (USD) All users Average Plot 0.24 120 0.65 325 S Average Max. Plot 0.71 355 1.03 515 t Average Min. Plot 0.07 35 0.8 400 e depending on marshland users p Average Plot 0.21 105 0.74 370 Averag Max. Plot 0.4 200 1.66 830 3 Average Min. Plot 0.03 15 0.35 175 : Final Calculation of Compensation In order to provide for livelihood restoration, compensation will be paid for a period equivalent to 3 years of income from marshland production. For affected households who entirely depend on marshland, compensation will be paid for a period equivalent to 5 years of income from marshland production. This approach for final calculation of compensation rates is based on information that marshland cultivation is only possible every second year, due to flooding of marshland every other year. Hence, income from marshland only occurs every second year. Consequently, a 3 year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 1.5. A 5 year period of income from marshland is compensated by cash compensation at market value for lost crop with the factor 2.5. Reference information on income from marshland cultivation was obtained from  resettlement committees during the village self-validation exercise  district agronomists  affected marshland users  information and overall approach were confirmed during the consultative workshop in Kigali on 4 Feb 2013. Note: District officials in Rwanda during consultations in December 2012 stated that in the context of land scarcity in Rwanda, it would not be possible to allocate / 1770050 / MARCH 2013 FINAL REPORT 97 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) alternative land of at least similar quality (land for land compensation) to affected marshland users in appropriate distance to their place of residence (acceptable walking distance/about 5 km). This was confirmed during the Consultative Workshop in Kigali on 3 Feb 2013. For affected marshland users in Tanzania, it would be difficult to allocate alternative marshlands within acceptable distance. However, there is no general land scarcity in the affected area in Tanzania like it is in Rwanda. Calculation The formula for the calculation of compensation for affected marshland users who have uphill land is C= (V/ha x A (ha)) x 1.5 + (L/ha x A (ha)) The formula for the calculation of compensation for affected marshland users who have no uphill land is C= (V/ha x A (ha)) x 2.5 + (L/ha x A (ha)) C = Compensation V/ha = crop market value per ha L/ha = labour cost per ha A = affected area (in ha) 7.5.8 Compensation Rates vs Income of PAP from Marshland Crops Compensation rates as per international requirements need to fully replace the loss they are referring to. Affected people must be able to restore their livelihoods and to re-establish living standards they had prior to the impact. In this context, the loss of marshland is a special issue with regard to compensation. Affected marshland users will permanently lose access to marshland plots and hence, will permanently lose income from these plots. Marshland is under government ownership and therefore marshland users will not be compensated for the marshland as such. For the full restoration of livelihoods and living standards, cash compensation for the loss of crops for only one season is not considered sufficient as explained above. Affected people would need to bridge a longer period of time until they will have restored their livelihoods/living standards. For the RAP approach to address this issue, see paragraph above “Step 3: Final Calculation of Compensation�. In addition, / 1770050 / MARCH 2013 FINAL REPORT 98 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) the livelihood restoration programs will support the restoration process and aim to provide capacity to establish alternative sources of income. During consultations in villages in the Project area to up 10-15 km along the Kagera river upstream the Project site (including affected villages) in Nov 2012 and from interviews with the local resettlement committees, average amounts of income from marshland were obtained. Income from marshland in a good year was indicated to range between 200,000 RWF and 3,000,000 RWF per year per household (330 USD- 500 USD), see also discussion of incomes in baseline chapter above. The following paragraphs present compensation amounts for typical crops on marshland and for average marshland plot sizes. This is in order to assess if estimated compensation rates as per entitlements above would meet the income amounts people get from marshland at present. The table below presents average plot sizes in villages in the project area, up to 15 km upstream the project site, as obtained during the self-validation field visit in Nov 2012. Table 36 Overview on average plot sizes on marshland Marshland Plots Rwanda Marshland Plots Tanzania Average = Average of 21 villages Average = Average of 9 sub- villages Average max = highest figure of 21 village averages Average max = highest figure of 9 sub-village averages Average min : lowest figure of 21 village averages Average min : lowest figure of 9 sub- village averages All marshland users Average Average Max (ha) Average Min (ha) Average (ha) Average Max (ha) Average Min (ha) (ha) 0.24 0.71 0.07 0.8 1.03 0.65 Users entirely depending on marshland (no private land) Average Average Max (ha) Average Min (ha) Average (ha) Average Max (ha) Average Min (ha) (ha) 0.21 0.4 0.03 0.74 1.66 0.35 Source: village self-validation Nov 2012 For all types of plots, average sizes in Tanzania are higher, what is not surprising in the context of land scarcity in Rwanda. Marshland plots are normally very small, only in exceptional cases exceeding 1 ha. Average sizes of marshland plots for users who entirely depend on marshland in Rwanda are extremely small indicating that from these plots, despite the high productivity of marshland only small incomes can be generated. Marshland users with small plots and no other agricultural land uphill are considered especially vulnerable to the loss of marshland, as they would entirely depend on the successful establishment of alternative livelihoods after the loss. The following tables present examples for annual compensation amounts (factor 1.5 to the rates will be applied to PAP who have hillside land, factor 2.5 will be applied to PAP who entirely depend on marshland). Calculations are for average plot sizes as derived from the village self - validation exercise in Rwanda (21 villages) and Tanzania (9 sub-villages). The red cells in the tables below highlight those situations, where annual compensation amounts would not meet the minimum of incomes from marshland of affected people. / 1770050 / MARCH 2013 FINAL REPORT 99 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Logically, people who cultivate small plots would not meet the minimum of the average incomes drawn from marshland cultivation (200,000 RWF/year). In addition to the plot size, the cultivated crop determines the compensation amount. In addition, the tables indicate that  only in Rwanda there are setting where minimum income amounts would not be met by compensation (due to small plots)  tomato as one of the most important crops in Rwanda would be compensated with rates achieving cash amounts which exceed by far average incomes (except for the very small plots)  Soja as one of the most important crops in Rwanda would not be compensated with rates that would meet average annual income amounts  Beans as one of the most important crops in Tanzania, according to relatively high market prizes and to relatively large plots, would be compensated by amounts which significantly exceed the indicated average annual income / 1770050 / MARCH 2013 FINAL REPORT 100 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 37 Rwanda: Annual Compensation Amounts: average-size marshland plots – all marshland users Compensation Compensation Compensation Compensation Compensation Compensation (RWF/year): max. (USD/year): max. (RWF/year): min. (USD/year): min. Type of Crop (RWF/year): average (USD/year): average average marshland average marshland average marshland average marshland marshland plot marshland plot plot plot plot plot Tomato 579,722.1 951.5 1,715,011.3 2,814.7 169,085.6 277.5 Soja 163,779.8 268.8 484,515.4 795.2 47,769.1 78.4 Irish Potatoes 481,688.2 790.6 1,424,994.3 2,338.7 140,492.4 230.6 Sweet Potatoes 433,431.6 711.4 1,282,235.3 2,104.4 126,417.6 207.5 Beans 401,406.8 658.8 1,187,495.2 1,949.0 117,077.0 192.2 Maize 267,604.6 439.2 791,663.5 1,299.3 78,051.3 128.1 Onions 3,369,185.3 5,529.6 9,967,173.1 16,358.4 982,679.0 1,612.8 Yam 811,733.8 1,332.2 2,401,379.3 3,941.2 236,755.7 388.6 / 1770050 / MARCH 2013 FINAL REPORT 101 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 38 Rwanda: Annual Compensation Amounts: average-size marshland plots of marshland dependents Compensation Compensation Compensation Compensation Compensation Compensation (RWF/year): max. (USD/year): max. (RWF/year): min. (USD/year): min. Type of Crop (RWF/year): average (USD/year): average average marshland average marshland average marshland average marshland marshland plot marshland plot plot plot plot plot Tomato 507,256.9 832.5 966,203.6 1,585.8 72,465.3 118.9 Soya 143,307.4 235.2 272,966.4 448.0 20,472.5 33.6 Irish Potatoes 421,477.2 691.7 802,813.7 1,317.6 60,211.0 98.8 Sweet Potatoes 379,252.7 622.4 722,386.1 1,185.6 54,179.0 88.9 Beans 351,231.0 576.5 669,011.4 1,098.0 50,175.9 82.4 Maize 234,154.0 384.3 446,007.6 732.0 33,450.6 54.9 Onions 2,948,037.1 4,838.4 5,615,308.8 9,216.0 421,148.2 691.2 Yam 710,267.1 1,165.7 1,352,889.7 2,220.4 101,466.7 166.5 / 1770050 / MARCH 2013 FINAL REPORT 102 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 39 Tanzania: Annual Compensation Amounts: average-size marshland plots – all users Compensation Compensation Compensation Compensation Compensation Compensation (TZS/year): max. (USD/year): max. (TZS/year): min. (USD/year): min. Type of Crop (TZS/year): average (USD/year): average average marshland average marshland average marshland average marshland marshland plot marshland plot plot plot plot plot Tomato 5,010,349.44 3,157.12 6,450,824.90 4,064.79 6,262,936.80 2,565.16 Soya 1,421,952.00 896.00 1,830,763.20 1,153.60 1,777,440.00 728.00 Irish Potatoes 4,182,062.40 2,635.20 5,384,405.34 3,392.82 5,227,578.00 2,141.10 Sweet Potatoes 3,763,094.40 2,371.20 4,844,984.04 3,052.92 4,703,868.00 1,926.60 Beans 3,485,052.00 2,196.00 4,487,004.45 2,827.35 4,356,315.00 1,784.25 Maize 2,323,368.00 1,464.00 2,991,336.30 1,884.90 2,904,210.00 1,189.50 Onions 29,251,584.00 18,432.00 37,661,414.40 23,731.20 36,564,480.00 14,976.00 Yam 7,047,549.60 4,440.80 9,073,720.11 5,717.53 8,809,437.00 3,608.15 / 1770050 / MARCH 2013 FINAL REPORT 103 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 40 Tanzania: Annual Compensation Amounts: average-size marshland plots of marshland dependents Compensation Compensation Compensation Compensation Compensation Compensation Type of Crop (TZS/year): average (USD/year): average (TZS/year): max. (USD/year): max. (TZS/year): min. (USD/year): min. marshland plot marshland plot marshland plot marshland plot marshland plot marshland plot Tomato* 4,634,573.23 2,920.34 10,396,475.09 6,551.02 2,192,027.88 1,381.24 Soya* 1,315,305.60 828.80 2,950,550.40 1,859.20 622,104.00 392.00 Irish Potatoes 3,868,407.72 2,437.56 8,677,779.48 5,468.04 1,829,652.30 1,152.90 Sweet Potatoes 3,480,862.32 2,193.36 7,808,420.88 4,920.24 1,646,353.80 1,037.40 Beans 3,223,673.10 2,031.30 7,231,482.90 4,556.70 1,524,710.25 960.75 Maize 2,149,115.40 1,354.20 4,820,988.60 3,037.80 1,016,473.50 640.50 Onions 27,057,715.20 17,049.60 60,697,036.80 38,246.40 12,797,568.00 8,064.00 Yam 6,518,983.38 4,107.74 14,623,665.42 9,214.66 3,083,302.95 1,942.85 / 1770050 / MARCH 2013 FINAL REPORT 104 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.5.9 Compensation Rates Update An update of the current land market prizes contained in this RAP will be done prior to the determination of final replacement rates. This is due to the fact that civil works for the Project are not expected to commence immediately after Project approval. Market prizes for crops will be updated prior to the final determination of compensation rates. 7.5.10 Compensation Process General The compensation process with be performed under the project policy and according to the entitlements as presented above. The overall process will be embedded in the formal procedures for expropriation and valuation in Rwanda and Tanzania and executed through the district land offices, with official valuers. Compensation must be paid before the impact occurs:  For impacts from construction: compensation has to be paid and the entire compensation process for all affected people has to be completed by the start of Year 1 (= start of construction)  For impacts from operation: compensation has to be paid and the entire compensation process for all affected people has to be completed by the start of Year 5 (= start of operation) Exit Survey and Agreement Prior to the start of the compensation payment process, compensation agreements with affected people will be set up and signed . This will be done through an exit survey, to be carried out by the official valuers of the land offices of the districts of Kirehe and Ngara. The exit survey is to confirm the results of the surveys for validation of losses carried out November 2012 to January 2013 (see section 7.3) through the performance of the respective legal procedure. The resettlement committees and PIU officers will participate in the exit survey. Agreement of the respective affected household to the exit survey documentation and the resulting determination of compensation will be officially documented in the compensation agreement. Compensation agreements shall be signed off by both spouses of affected households. For households where partners are not officially married or for polygamous partnerships, the project will request the head of household to sign the agreement together with all partners, so that all partners can document their entitlement to compensation. Exit survey results will be entered into the PIU compensation database. / 1770050 / MARCH 2013 FINAL REPORT 105 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Issue of Cash Compensation As stated above, compensation has to be paid timely in advance to the impact. The disbursement of cash compensation will be managed by SACCO in Rwanda and NMB in Tanzania as local financial institutes. Payments will be to bank accounts of affected households. PIU and the respective bank (SACCO, NMB) will assist people who do not have an account with the establishment of a bank account, any costs for opening an account will be paid by the project. Accounts should be in the names of both spouses. Consultation results show that there is awareness of potential misuse of compensation money. Monitoring There will be monitoring from the very start of the compensation process (see section 11.4). Monitoring of the compensation process will be contracted to an external entity. During the process, weekly progress reports will be delivered to PIU management. Any delays in payments which could influence the overall project schedule will be forwarded immediately to SPV. A special focus in monitoring will be on the people affected by loss of their residence. They will be tracked individually in order to follow up the process of finding a new residential site and to establish a new house timely before the affected building has to be left. Construction will not start until all people affected by loss of residential –or business structure will have properly moved out of their premises. Grievances For grievances and complaints in the context of compensation, affected people can make use of the Project’s grievance mechanism. Grievances which stay unresolved will be reported to PIU management and SPV order to facilitate a timely solution. Note: Marshland users who were absent at the time of the village self- validation, will be contacted as soon as the Project is approved and surveyed according to the self- validation exercise. They will be integrated into the exit survey. Due to the fact that the final layout of the construction area pattern is not yet available, there might be changes in size and location of areas required for construction. In case a change in construction area layout will affect different areas/households, these will be surveyed according to the self-validation exercise and then be integrated into the exit survey. / 1770050 / MARCH 2013 FINAL REPORT 106 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 13 Overview: Compensation Process for Construction Impacts Figure 14 Overview: Compensation Process for Operation Impacts / 1770050 / MARCH 2013 FINAL REPORT 107 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 15 Compensation Process for Construction Impacts (Year 0, prior to commencements of civil works) 1 2 3 4 5 6 7 8 9 10 11 12 Activity Q1 Q2 Q3 Q4 Set-Up of PIU: tender, contract staff as per section 10 of RAP Final design of civil works Compensation Process Contracts for compensation disbursement with SACCO/NMB Exit surveys/compensation agreement for HH affected by construction, extension of survey period corresponding to availability of final construction area pattern ░ ░ ░ ░ Disbursement of compensation Livelihood Restoration Final arrangements for livelihood restoration measures: small business management, small business support; PIU livelihood restoration officer ▓ ▓ (business expert), district officers, SACCO and NMB representatives; consultation of affected businesses Training of Trainers for Money Management Training: ▓ SACCO for district officers in Rwanda and Tanzania Final arrangements for livelihood restoration measures: agricultural enhancement measures/livestock enhancement: PIU livelihood restoration officer; agronomists of districts; other ▓ ▓ district officers (social, community development), consultation of affected people (PAP losing agricultural land due to construction) Advisory service to affected people for enrollment in livelihood restoration Enrollment HH affected by construction in livelihood restoration: small business and agricultural enhancement Start of Livelihood Restoration: Small business support/small business development Start of Livelihood Restoration: agricultural enhancement and livestock Implementation of Money Management Training for affected people: district officers Preparation Process for LADP measures (priority on affected communities and ex-PAPs): PIU and districts Grievance Process Training of Resettlement Commmittees for the management of grievanances on local level Maintenance of Grievance Management Process as per section 7 Note: the table above refers to the preparation period, prior to the commencement of civil works. Civil works will only start in year 1 (after year 0, the preparation period). / 1770050 / MARCH 2013 FINAL REPORT 108 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.6 LIVELIHOOD RESTORATION PROGRAM 7.6.1 General The livelihood restoration programs of the RAP aim to enable project affected people to fully restore their livelihoods and improve living standards - through capacity building for more profitable and sustainable use of livelihood assets - through capacity building for the establishment of alternative sources of livelihood. Livelihood restoration programs contain subsidies (in the amount of 500 USD) to be used against investments related to the respective program. Livelihood restoration programs are supplemented by micro-credit schemes in order to support sustainability of restored livelihoods on the long term and to provide for improvement of living standards. Livelihood restoration programs target the following areas  Agricultural enhancement,  Improved livestock keeping  Provision of access to income generating activities: small business development;  A micro-credit program available for affected households is connected to the livelihood restoration programs In addition, all affected households will have access to a financial training program to enhance the sustainable use of cash compensation. 7.6.2 Preparation and Implementation through Districts Kirehe district and Ngara district confirmed their preparedness to take the lead in preparation and implementation of livelihood restoration programs in the context of consultation visits in February 2013. Livelihood restoration programs will be implemented through technical staff of Kirehe and Ngara Districts with the support of capable NGOs. The final details with regard to allocation of tasks to individual officers will be set immediately after project approval, at the start of year0, through cooperation of PIU (livelihood restoration officers) and the two districts. Affected peoples enrolment period for the livelihood support programs will be of three years duration. District executives recommended the consideration of frameworks and formats of existing projects and interventions within the design of livelihood restoration programs, e.g. the Kirehe Community- based Watershed Management Project (KWAMP) or the “one poor family-one cow� project in Rwanda, in order to benefit from successful project designs and from lessons learned. / 1770050 / MARCH 2013 FINAL REPORT 109 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Small business development measures will be implemented with the support of the district cooperatives officer (Kirehe), the district community development officer (Ngara), livelihood restoration officers of PIU, cooperatives in the project area (through SACCO). In general, the Project will enhance that affected people join existing cooperatives or that, with the support of the districts and of SACCO/NMB, cooperatives will be established. Cooperatives are considered as appropriate framework for the delivery of measures under the livelihood restoration programs and for the sustainable development of the livelihoods of participants/members. KWAMP is providing a continuous support to strengthen cooperatives in Kirehe District in terms of training in accounting, business plan, project management and leadership. Respective training will be made accessible for PAP within the livelihood restoration program. Livelihood activities under the RAP are covered by the RAP budget. In order to achieve a maximum of synergies, the design of livelihood restoration programs considers the measures under the LADP (also to be implemented through the districts) and vice versa. 7.6.3 Baseline Influencing Factors Livelihood restoration programs are tailored to existing baseline conditions and consider the project impacts on the livelihoods of affected people. For the construction area, baseline conditions are characterized by the function of the villages at the Rusumo Falls as economic hubs in an entirely rural area. A large number of different, mainly small businesses, markets for agricultural products from the wider area and a high concentration of brick making businesses in the marshlands form a dynamic business environment. Affected livelihoods are mainly based on business activities. Consequently, capacity building for small business development is a focus of livelihood restoration measures for people affected by construction. Important aspects are the strengthening and diversification of existing skills (for the restoration of affected businesses), but also training for business development as alternative livelihood (e.g. for brick businesses that will not be able to restore their business). For impacts from operation, affected people are smallholder farmers, depending on agriculture as main source of livelihood. Those PAP who have agricultural land apart from arable marshland (that will be lost), livelihood restoration has a focus on the enhancement of agriculture to achieve higher productivity and practise sustainable use of agricultural land so that incomes from agricultural land would increase and perspectives for long term income security from agriculture would be enhanced. Agricultural enhancement has a focus on those households who will maintain sufficient areas of agricultural land to serve as sustainable livelihood asset. This will be a limited number of households in the affected villages in Rwanda, but virtually all affected households in Tanzania. However, for a large number of the affected households in Rwanda, remaining agricultural land is of very limited size. Especially the young generation of farmers hold very small areas of land, due to inheritance practices and to overall land scarcity / 1770050 / MARCH 2013 FINAL REPORT 110 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) (in Rwanda). Those affected households, who entirely depend on marshland, will even lose all the land they currently use. This applies for 43 households in Rwanda and 4 households in Tanzania. As a consequence, respective livelihood restoration measures will rather focus on the development of skills for alternative livelihoods, other than agriculture (i.e. small business development component of the livelihood restoration programs). 7.6.4 Gender Aspects In general, both spouses of affected households (or all partners for non-marriage or polygamous partnerships) are entitled to participate in livelihood restoration programs. Women will be specifically targeted through gender sensitive engagement and training methods, and through specific activities in both, the agricultural field and income-generating activities. Program training activities will consider specific needs of women, e.g. with regard to training hours (in the context of the every-day working schedule of women). 7.6.5 Eligibility Entitlements to livelihood restoration are presented in Table 25 – Entitlement Matrix. Households are entitled to livelihood restoration in case of - Loss of arable marshland - Loss of business, in case business cannot be re-established - Loss of agricultural land (only occurs in Rusumo, Tanzania, due to construction), or access to agricultural land - Loss of employment, in case employment cannot be re-established Prior to the start of the programs, affected households will have access to advisory services in order to facilitate their choice for livelihood restoration. These services will be provided by district officers and by SACCO and NMB. 7.6.6 Agricultural Enhancement – Outline Agricultural enhancement measures will be delivered under the framework of existing programs - KWAMP (Rwanda) - Crop Intensification Program in Rwanda (CIP) - Farmers Field Schools Program The KWAMP aims to promote poor smallholders in Kirehe district to overcome their food insecurity and low agricultural incomes, to combat land degradation and to / 1770050 / MARCH 2013 FINAL REPORT 111 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) restore soil fertility. The immediate objectives of the KWAMP have a focus on the development of sustainable profitable small scale commercial agriculture, through - An increased level of marketed production of crops and livestock products, leading to increases in incomes derived from gains in productivity, farming efficiency and cash returns to effort; - The operation and maintenance of affordable irrigation facilities made available to a large proportion of the active poor and landless farmers in the District, reducing dependence on increasingly erratic rains and permitting a shift to higher value crops in response to market demand; and - A steady improvement in the natural resource base in selected watersheds to enable production in the future, reversing the present negative trends of soil erosion and nutrient depletion coupled with failure to put available water to productive use. Agricultural enhancement within livelihood restoration builds upon achievements of the KWAMP, such as - Support to crop intensification - Support to livestock intensification - Soil protection and water conservation - A concept to operationalize value chain development Source: MINAGRI website http://www.minagri.gov.rw/index.php?option=com_content&view=category&layout=blo g&id=208&Itemid=314&lang=en The main components of the Crop Intensification Program (CIP) are - Land use consolidation (growing one crop in the same area by different farmers) - Improved seed and fertilizers use - Proximity extension service by proximity service providers (through sector agronomists) - Agricultural product marketing - Change in farmer’s attitude , - Promote Agro inputs dealer’s network - Stimulate reliable, private-sector input and output markets: through fertilizer electronic auctions Source: MINAGRI website http://www.minagri.gov.rw/index.php?option=com_content&view=category&layout=blo g&id=177&Itemid=38&lang=en The CIP is linked to KWAMP measures in Kirehe district. Within the framework of existing programs, the livelihood restoration program has a focus on the following aspects  Extension services on improved agricultural techniques, including improved crop varieties, fertilization, small scale irrigation, erosion protection; / 1770050 / MARCH 2013 FINAL REPORT 112 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Subsidies (in the amount of 500 USD per household) against the purchase of agricultural equipment;  Provision of fertilizers and improved seeds;  Enhance of establishment of cooperatives and capacity building for existing cooperatives; support of membership of PAP in cooperatives Crop production will be supported by community-based extension services (with farmer field schools and the provision of improved planting materials. The Farmer Field School approach will be used as learning framework that facilitates the transfer of innovation in agriculture. The teaching objectives of the FFS are to facilitate sound understanding by targeting farmers through exchange with technicians. The FFS approach explicitly involves women in the training of facilitators and producers. 7.6.7 Improved Livestock Keeping-Outline This livelihood restoration package builds on the success of the “one poor family – one cow� project implemented by the Government of Rwanda and the corresponding component of KWAMP.  Each beneficiary household has to build a shed adequate for receiving one or two cattle;  Once this commitment is met, the beneficiary household receives one heifer (costs about 500 USD/heifer);  Beneficiaries are further supported in the following ways: o Veterinary services (immunization and periodic health checks on the animals) and community based animal health interventions o Support in growing and harvesting fodder crops; o Training in integrated crop/livestock systems o Animal nutrition training and support. Heifers will be sourced from local breeds. 7.6.8 Diversification of Livelihood, Small business development - Outline This livelihood restoration program has a focus on the promotion of rural entrepreneurial activities and economic activities not requiring land. This package includes the following:  Different options for capacity building (e.g. commercial activities, agribusinesses such as bee-keeping, processing of farm products, e.g. banana beer)  Technical and managerial training for this activity;  Subsidies (in the amount of 500 USD per household) against the purchase of equipment related to this activity; / 1770050 / MARCH 2013 FINAL REPORT 113 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Training and further technical assistance will be delivered by experienced organizations with a permanent presence in the project affected area, i.e. SACCO and NMB. In this program, too, women will be targeted as a specific group of interest, with specific engagement methodologies and specific activities and business areas. 7.6.9 Financial Training for Sustainable Use of Cash Compensation Experience has shown that cash compensation, although very sought after by many household heads, could be detrimental in the medium term, to other household members, particularly the females and the children; the Project provides for measures to support sustainable use of cash compensation and for mechanisms within the overall monitoring framework to follow up the use of cash compensation. Financial training will be offered to each affected household who receives cash compensation and will focus on:  Assistance for opening and management of a bank account ;  Financial planning for the household ;  Planning of investments related to the household’s participation in livelihood restoration programs;  Saving strategy ;  Management of existing debts ; Households will be required to enroll on this training when they sign off the compensation agreement. Both spouses/all partners shall participate in the training. Training will start in advance to the disbursement of compensation and be continued for a period of 1 year. The management of cash compensation will be integrated into the overall monitoring program. Training will be provided by district officers, as per commitment of Ngara- and Kirehe districts from February 2013. Officers from both districts will be trained by SACCO (“Training of Trainers�) immediately by the start of year 0. For Ngara district, the following officers will participate in the ToT and act as trainers for affected households - Community development officer - Cooperative officer - Trade officer - Land officer - Agriculture officer For Kirehe district, the following officers will participate in the ToT and act as trainers for affected households / 1770050 / MARCH 2013 FINAL REPORT 114 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) - Land officer for urbanization and resettlement - Agriculture officer - Officer in charge of cooperatives - Officer for social affairs - Proximity business officer 7.6.10 Micro-Credit Program Micro-Credit schemes for affected people will be made available through SACCO and NMB in order to foster sustainability of livelihood restoration and improvement of living standard. Micro-credits will be available for all PAP who participate in livelihood restoration measures. The respective information and related procedures will be part of the money management training. Furthermore, SAACO and NMB will provide personal advisory services on micro-credits. 7.7 ASSISTANCE TO VULNERABLE PEOPLE 7.7.1 General For identification of vulnerable groups see section 6.7.3 above. Based on the identification of vulnerable households for the RAP, the individual support measures will be developed early in RAP implementation (start of year0), in order to ensure that individual needs in the context of displacement are fully considered. Consultations will be undertaken under the lead of PIU, through local resettlement committees. Table 41 Overview: Vulnerable People Group of vulnerable people Identification as per section 6.7.3 Female headed households with small land holdings Rwanda: 104 affected marshland users, 13 households entirely depending on marshland Tanzania: 3 women headed households using affected marshland Household heading orphans no household heading orphans amongst affected marshland users Households with limited access to land, landless Rwanda: affected marshland users in the 6 affected households villages HIV/AIDS affected households Geographical focus at Rusumo villages Elderly and disabled people All groups of affected people Women in polygamous settings During the village self-validation in the affected sub- villages in Tanzania, no household with polygamous setting was identified. / 1770050 / MARCH 2013 FINAL REPORT 115 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 7.7.2 Individual Support for Vulnerable People The Project through the Project Implementation Units (PRU) will assist vulnerable people insofar as they are affected by the displacement and resettlement process. Vulnerable individuals in affected households will be consulted by local resettlement committees in affected communities; based on the identification of vulnerable people in the RAP (see above); resettlement committees will receive a training on o the concept of vulnerability and the issues to be considered in the Project context o how to conduct household visits o how to assess individual needs for assistance Based on the consultation of vulnerable individuals, appropriate types of assistance will be developed by PIU, in cooperation with the resettlement committees and the social officers of the districts. 7.7.3 Envisaged Types of Assistance  In depth explanation of exit survey process, assistance to negotiate compensation agreement, sign/co-sign compensation agreement, provide in-depth understanding of rights (e.g. for female spouses or for partners in polygamous settings)  Compensation process (opening bank account, easy to understand money management training, in – depth explanation of rights), special focus on women, on elderly and on orphans heading households; Assistance in the post payment period to secure the compensation money  Participation livelihood restoration (facilitation of participation for women, for orphans heading households), special provisions for HIV/AIDS affected persons; special consideration of elderly  Counseling in matters such as family issues, health, money management, and livelihood restoration;  Health care if required at critical periods: transition period; The following process will be implemented:  in depth information of the resettlement committees about the Project policy with regard to vulnerable people;  consultation of vulnerable people amongst the affected households through the resettlement committees;  Identification of assistance measures on a case-by-case basis, with the following process: o Review of each case by PIU community liaison officer, together with a resettlement committee member, including a visit at home and a detailed interview / 1770050 / MARCH 2013 FINAL REPORT 116 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) o Discussion of the assistance measures required between the PIU officer, the resettlement committee member and the vulnerable person o Report to the resettlement committee on required measures o Review and decision by the committee o Implementation of assistance measures o Monitoring The RAP contains a specific budget for assistance measures for vulnerable people. 7.7.4 Local Area Development Plan (LADP) Whilst the livelihood support programs address the individual household level, broader community development measures are addressed in the context of the LADP. A summary of the LADP is attached as Annex 2 to the RAP. The Local Area Development Plan (LADP) aims to support local economies by providing infrastructure in order to enhance different income generating activities. Infrastructure development will focus on markets, roads, rural electrification and water supply. Furthermore, the development of sustainable agricultural practises will support land based economic activities. The LADP will target communities in the Project area of influence, in Rwanda, Tanzania and Burundi. Affected communities will be considered with priority in the LADP. By the start of RAP implementation, the final design of the LADP will be developed in cooperation with the target districts and with other relevant stakeholders in the three countries. The LADP will be developed under consideration of three focal strategies which are in line with the current country strategies for the development of rural areas: - Rural infrastructure development - Agricultural intensification and extension - Income generation including small business training and support Within the broader geographical target areas for the implementation of the LADP, special consideration will be given to - Communities along the Kagera river up to 15 km upstream of the Project site, in Rwanda and Tanzania (see section 7.7.5 below) - Communities with ex-PAPs (see section 9) 7.7.5 Flood Risk Mitigation Plan The development of a flood risk mitigation plan will specifically target communities that may experience some seasonal flooding of their arable marshlands, upstream of the dam site, with a priority area up to 15 km upstream the Project site. / 1770050 / MARCH 2013 FINAL REPORT 117 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The flood risk mitigation plan will be developed alongside existing watershed/catchment programs that have direct effects on controlling sedimentation and improving flood control. Priority consideration in flood risk mitigation Priority consideration will be given to about 1,734 households in Rwanda, who cultivate arable marshland along the Kagera river in 21 villages between Rusumo East at the dam site and Kabuga about 15 km upstream from the Project site. The total area of arable marshland in these villages is about 401 ha (as per village self- validation in Nov 2012). Table 42 Priority area for flood risk mitigation - Rwanda Village Arable Marshland (ha) Rusumo East 5.06 Nyakwisi 37.33 West Rusumo 16.24 Nshungeruzi 26.52 Nyakabungo 4.33 Ruhuha 18.1 Nyagahanga 5.3 Nyakigera 3.91 Kaguriro 8.65 Bweranka II 5.32 Kimeshu 14.54 Nyarutojo 14.69 Gahindu 8,45 Gasenyi 11.16 Gatari 19.94 Ryamukaza 9.31 Kabuga 25.06 Kabimba I 12.9 Nyamirambo I 51.49 Nyamirambo II 111.47 Total 401.32 *source: village self validation in Nov 2012 Priority consideration will be given to about 607 households in Rwanda, who cultivate arable marshland along the Kagera river in 9 sub-villages up to 15 km upstream from the Project site. The total area of arable marshland in these villages is about 484 ha (as per village self-validation in Nov 2012). / 1770050 / MARCH 2013 FINAL REPORT 118 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 43 Priority area for flood risk mitigation - Tanzania Village Sub-Village Marshland Cultivated (ha) Nyakiziba Kabuye 18.25 Nyakiziba Kyenda 61.37 Ntobeye Burambira 46.37 Ntobeye Kumurenge 40.56 Ntobeye Mukatokatoke 51.22 Ntobeye Mukirarama 43.45 Ntobeye Rwintuku 20.05 Nyakiziba Kagali 93.8 Nyakiziba Ruhembe 108.48 Total 483.55 *source: village self validation in Nov 2012 Flood risk mitigation will also give priority consideration to about 80 households in the direct vicinity of the dam site in Rwanda and Tanzania respectively (in total 160 households), that may experience some reduced production levels from their agricultural land due to seasonal flooding. All households with priority consideration under the flood risk mitigation plan will also be given priority consideration under measures of the LADP. 7.7.6 Overview: Preparation and Implementation of Livelihood Restoration Measures and LADP The timely preparation of the final designs of livelihood restoration programs and of the LADP measures is of key importance in order to support livelihood restoration for PAP effectively and in order to enhance Project benefits for the population in the affected – and the wider Project area (target areas of LADP). The table below provides an overview on tasks and responsibilities related to the preparation of the livelihood restoration programs and the LADP for year 0, the year of Project preparation. For further information, i.e. for construction phase activities and activities by start of operation, see section 10.5 below. Note: Households will be provided with advisory services by PIU, the districts and SACCO in order to facilitate enrollment in livelihood restoration programs. Based on the current status of information, for households affected by construction it is assumed that affected businesses will enroll to business training measures. Due to the fact that virtually all affected households in the Rusumo villages are involved in business activities, it is assumed that a part of the households who will lose agricultural land, will also prefer business training over agricultural enhancement (agricultural enhancement training will only be efficient once alternative land has been purchased/allocated). / 1770050 / MARCH 2013 FINAL REPORT 119 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 16 Livelihood Restoration and LADP: Overview on Preparation/Implementation during pre-construction phase 1 2 3 4 5 6 7 8 9 10 11 12 Activity Q1 Q2 Q3 Q4 Installation of PIU at project site; Establishment of working groups for livelihood restoration preparation with districts; joint kick off meeting with PIU, executives of districts and relevant ▓ district officers, with SACCO and NMB Final Arrangements of livelihood restoration measures: small business management, small business support; PIU livelihood restoration officer (business expert), district officers, SACCO and ▓ ▓ NMB representatives; consultation of affected businesses Training of Trainers for Money Management Training: SACCO for district officers in Rwanda and Tanzania ▓ Final Arrangements of livelihood restoration measures: agricultural enhancement measures/livestock enhancement: PIU livelihood restoration officer; agronomists of districts; other district officers (social, community development), ▓ ▓ consultation of affected people (PAP losing agricultural land due to construction) Advisory service to affected people for enrollment in livelihood restoration Enrollment HH affected by construction in livelihood restoration: small business and agricultural enhancement Start of Livelihood Restoration: Small business support/small business development Start of Livelihood Restoration: agricultural enhancement and livestock Implementation of Money Management Training for affected people: district officers Compensation Process: Exit Survey and Agreements Compensation Process: Cash compensation disbursement Preparation Process for LADP measures (priority on affected communities and ex-PAPs): PIU and districts ♦ Start of Construction: start of year 1, see table below / 1770050 / MARCH 2013 FINAL REPORT 120 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 8. GRIEVANCE MECHANISM The Grievance Mechanism provides affected parties with a mechanism to express any issues and problems that they may have with the compensation and resettlement process for the Project in a way which is free of cost and without retribution. Affected parties will also have ultimate recourse to the courts in accordance with the provisions of Rwandan and Tanzanian law. 8.1 ANTICIPATED TYPES OF GRIEVANCES In the context of the Project, grievances could arise from: (list is illustrative only)  Misidentification of owner/occupier of eligible property and assets;  Errors in asset assessments;  Disputes over plot limits, either between the affected person and the Project, or between two neighbors;  Complaints about entitlement policy of the project;  Disagreement of asset valuation;  Disagreement on entitlement and ownership;  Disputed ownership of businesses (for example if the owner and the operator are different persons);  Disagreement of time and manner of compensation. 8.2 MANAGEMENT MECHANISM 8.2.1 General Principles and Key Aspects The Project will put in place an extra-judicial mechanism for the management of grievances and disputes, based on explanation and on mediation by third parties. Each of the affected persons will be able to trigger this mechanism, while still being able to resort to the judicial system. The mechanism will be based on the following principles:  Each affected person will have easy access to deliver grievances and complaints;  Grievances can be submitted orally (and will be recorded) or in written form ;  Any grievance will be registered, acknowledged receipt of, and tracked until it is closed;  The grievance management arrangement will include two tiers of extra-judicial, amicable review and settlement, with the first one internal to the PIU in cooperation with the local resettlement committee (village level), and the second one with involvement of external parties; / 1770050 / MARCH 2013 FINAL REPORT 121 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  The third tier of the mechanism is the judicial system, for those grievances that cannot be resolved; the overall objective is to avoid resorting to Justice for as many grievances as possible. Key aspects of the grievance mechanism are:  The public and especially PAPs need to be informed about the grievance mechanism and how they can make use of this process. The public will be informed via RAP disclosure process and through community meetings conducted by the PIU in cooperation with the local resettlement committees:  Grievances will be recorded by using a Grievance Form (in local language, also available in English). Grievance Forms are available for recording complaints and will contain details regarding the grievance as well as the name and address of the applicant, application date, type of application and the name of the persons receiving the grievance. The forms will be logged in a register where they will be tracked through to a suitable resolution.  The PIU will maintain a digital grievance database, containing the logs and records of all grievances received, with an indication of the respective status of a grievance (i.e. resolved, not resolved, pending. . .)  Resolution options will be developed through unilateral proposal, bilateral discussion and/or third party mediation. If a complaint is not legitimate the case will be closed without agreement with the complainant. Any response will be communicated clearly either orally or in writing, and a grievance case will only be closed when an agreement with the complainant is reached.  Affected people will be offered access to third party legal advice, through a qualified lawyer; this lawyer will be available at the PIU on site office on a regular base; legal advice will be at no costs; information on the possibility of access to legal advice will be communicated to the affected people; 8.2.2 Grievance Registration and Monitoring The grievance mechanism shall be accessible to all affected parties, including vulnerable people. Hence, it is of key importance that grievances can be submitted on the village level. Grievance registration will be possible:  at the village level, registration through the resettlement committees;  at the PIU Community Liaison Office, to be established at the Project site, either in Rusumo East or in Rusumo village;  at NELSAP offices in Kigali. Grievance registration will be possible as of the commencement of compensation and resettlement activities. For each grievance, a grievance file will be opened, containing:  grievance form (recording complaints, details regarding the grievance, name and address of the applicant, application date, type of application and the name of the persons receiving the grievance); / 1770050 / MARCH 2013 FINAL REPORT 122 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  receipt with acknowledgement of registration, to be handed back to the complainant;  grievance monitoring sheet (actions taken, corrective measures);  closure sheet, copy of which will be handed to the complainant after he/she has agreed to the resolution and signed off. Grievances will be registered within 7 days of receipt and a response will be provided to the aggrieved party in 30 days or less. Closure of a grievance does not automatically mean that the complainant is satisfied with the action taken (i.e. in cases where a complaint is not justified). Closure means that the complainant agrees that action has been taken by the PIU to address the grievance without being necessarily satisfied with the outcome. 8.2.3 Three Levels of Grievance Management First Level: Village level in Cooperation with PIU In practice, in similar compensation and resettlement activities, grievances arise from misunderstandings of the Project policy, or result from conflicts between neighbours, which can usually be solved through adequate mediation using customary rules or local administration at the lowest level. Furthermore, grievances are expected to arise in the context of construction activities. For this reason, the cooperation with the construction contractor’s grievance management – and community liaison staff is of key importance (see ESMP). Grievances related to construction should be resolved through cooperation of PIU grievance management and the construction contractors staff in charge for grievances. During construction, weekly reports should be issued to senior management (PIU, SPV) that highlight grievances with potential to affected the construction schedule. These reports should include grievances where resolution is pending for long periods. Aggrieved people will have the opportunity to submit their grievances at the village level. This setting provides maximum accessibility to the grievance mechanism for all affected people and the possibility to resolve grievances in a practical and direct manner. Local resettlement committees/village leaders as members of the resettlement committees will record grievances in oral or written form. It is expected that a large part of grievances can be resolved directly through explanation and information to the claimant. Resettlement committees/village leaders will obtain training from the PIU in order to address issues which can be resolved by explanation (i.e. explanation of resettlement policy, compensation strategy or entitlement determination, construction related regulations). The Project Implementation Unit (PIU) takes note of the grievances filed with the village chiefs during meeting routines and regular visits of all affected villages with consultations. Furthermore, regular meetings will be performed with key staff of the construction contractor. All grievances will be registered within PIU and entered in the electronic database. / 1770050 / MARCH 2013 FINAL REPORT 123 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Grievances, which were not resolved on the village level, will be reviewed. PIU grievance officers will perform the reviews, typically with the following steps:  Review of existing relevant documentation on the individual case (household issues, potential plot disputes, initial measurements and counts, etc…); construction related disturbance-or other issue  Review of disputed properties, disputed boundaries, or property characteristics in the field, as applicable, and hearing of interested parties (the complainant(s) and third parties (resettlement committee members);  Agreement on proposed resolution within the grievance management team and the local resettlement committee/village leader; representative of construction contractor  Response to complainant. For these cases, the grievance management team will cooperate with representatives of the local resettlement committees and with representatives of the construction contractor and will meet directly with the complainant in order to provide in depth explanations and if necessary, combine the explanation with a field visit to the disputed area/ the location related to a construction related grievance. The PIU grievance management team will:  Maintain, check and file the registered grievances and log all grievances in a central database of grievances at PIU level;  Ensure that grievances are acknowledged receipt of in the agreed timeframe (7 days);  Collect files of grievances submitted at local levels on a regular basis (twice a month) to make sure that all grievances are dealt with in a timely manner; check that receipts for grievance registration were issued by the local levels (resettlement committees, cell and ward administrations)  Make sure that local authorities and Village Resettlement Committees are duly consulted when reviewing the grievance; construction contractors representatives will be consulted when applicable  Make sure that closure letters proposing a resolution to the complainant are timely sent to the complainant and acknowledged receipt of;  Ensure that all steps of grievance management are properly documented. Second Level: Mediation Committee The second tier aims at processing grievances that the first tier is unable to resolve, and coming up with solutions, which if agreed will be binding to both the implementing agency and the complainant(s). The objective is to avoid resorting to Justice and try to reach amicable settlements wherever possible. No grievance will be considered by the second tier unless it has already been reviewed by the first tier and the resolution proposed by the PIU was not acceptable to the complainant. / 1770050 / MARCH 2013 FINAL REPORT 124 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The second tier of grievance management shall be based on a Mediation Committee established at District level, which will include:  One representative of the District Administration;  One representative of the Project Implementation Unit (PIU), acting as an observer; one representative of the construction contractor, acting as an observer  Three representatives of the affected people, amongst them at least one woman, chosen i.e. from community based organizations, elders, customary authorities. The Mediation Committee will meet as needed, depending on the inflow of registered complaints and disputes. Minutes of meetings, including proposed resolution arrangements, records of decisions, agreements reached, will be prepared. Third Level: Resort to Justice In case this mechanism will not allow an amicable agreement to be reached, the complainant or the defendant can resort to Justice (and could at any time). The figure below provides an overview on the grievance management mechanism. / 1770050 / MARCH 2013 FINAL REPORT 125 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Record of grievance at village level- receipt to complainant Resolution at village level 1 Level– Village & PIU on site office NO YES Village leader to forward file to PIU: review and proposal of Documentation of resolution, file resolution agreed with resettlement committee of case to PIU for registration, closure agreement between PIU and complainant PIU proposes resolution of grievance to complainant st YES Complainant NO Grievance closure agreement between PIU satisfied with Escalate Grievance to and complainant proposed Mediation Committee resolution Mediation Committee reviews level – MEDIATION COMMITTEE grievance and seeks resolution Proposed resolution from Mediation Committee Complainant nd Grievance closure agreement satisfied with 2 between PIU and complainant, YES proposed witnessed by Mediation resolution Committee 3rd level– Court Resort Complainant resort to NO Justice / 1770050 / MARCH 2013 FINAL REPORT 126 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 9. CONSULTATIONS 9.1 GENERAL INFORMATION The overall goal of consultation and stakeholder engagement is to establish an on- going, accessible and constructive dialogue with potentially affected parties and other interested organizations and individuals, so that their views and concerns can be taken into account in decisions about the Project in accordance with international good practice. The consultation and stakeholder engagement activities of the RAP are entirely interwoven with the Project’s Stakeholder Public Consultation and Disclosure Plan (PCDP), which is provided in a separate document. In line with the relevant international requirements, consultation with and participation of affected communities and individuals are key elements of the RAP development and -implementation process. One essential aspect of this approach is the establishment of a robust process to redress the grievances of affected people (see above). Consultation with the affected population and with officials of local government, civil society and other representatives of the affected population is essential in order to achieve an in-depth understanding of types and extents of Project impacts as well as of required measures for mitigation and enhancement (= livelihood restoration measures). The design of this RAP partially draws upon consultation activities which were performed during the development of the RAP for the IDS by SNII. 9.2 OVERVIEW ON CONSULTATIONS FOR THE FDS AND IDS PRIOR TO THE YEAR 2011 Between 2007 and 2008, a total of 270 individual and groupinterviews with stakeholders were conducted in eleven survey areas (source: SNII, RAP& LADP, Phase I, II and III): Burundi  Gatare(Busoni district)  Nyagisozi(Busoni district)  Ruzo (Giternayi (distruct) Rwanda  Rweru cell (Bugesera district),  Jarama(Ngomadistruct)  Kigarama(Kirehe District)  Nyamungari (Kirehe District) / 1770050 / MARCH 2013 FINAL REPORT 127 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Tanzania  Nyamiaga (Ngara District)  Kasharazi (Ngara District)  Rusuzo (Ngara District)  Nyakiziba (Ngara District) Similar individual and group interviews were subsequently conducted with 75 selectedstakeholders in Tanzania (Nyamiaga, Kasharazi, Rusuzo and Nyakiziba in the Ngara District).These interviews were conducted with the following stakeholder groups:  Administrators and local elected representatives;  Representatives of agricultural extension services or of social education and health careservices;  Representatives of trade associations (farmers, fishermen, small traders etc);  Representatives of local civil society associations (women, youth, etc.). These interviews aimed to identify: (i) the status and recent developments in local economicconditions (agriculture, fishing, trade, crafts, industry, tourism, etc.); (ii) status and recentdevelopments in infrastructures and services; (iii) project`s key stakeholders and representativesand on-going programs and local priorities. 9.3 CONSULTATIONS CONCERNING THE IDS DURING THE PERIOD FEBRUARY 2011- APRIL 2012 In 2011, a comprehensive government stakeholder consultation process was developed in order to obtain authorizations for Consultants to conduct field work, as well as to engage as soon as possible with government authorities in obtaining their views, advice and participation in defining the socio-economic and environmental impacts of the project and the most adequate mitigation measures to apply. This was also a particularly important step in terms of gaining a better understanding of resettlement impacts and planning possible synergies with rural development projects to find available land and propose restoration strategies. The consultation process is summarized in the following Table. / 1770050 / MARCH 2013 FINAL REPORT 128 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 44 – Stakeholder Consultation Process with Respect to the IDS Consultation Process and Objectives Date Level Participants 1) Introduce consultants to district authorities and February 2011 District Governors testing with authorities the field program Level: Mayors & Vice-Mayors First introduction to the Rusumo Falls Project Kirehe, Executive Secretaries with Maps showing the flooded area Ngoma, Economic Planners Introduction of Consultants to District officials Bugesera Social Affair Officers, c. Testing the questionnaires and obtain (Rwanda) Security Officers comments from officers 2) Introducing the project to government May 2011 National Ministries of interior or Local stakeholders and assess the adequate Level Governance, Institutional, regulatory and administrative Ministry of infrastructure or framework for resettlement and local Energy development planning Ministry of Agriculture, National resettlement process confirmed Livestock Key issues to address identified Ministry of Environment, Discussion on a monitoring and Water and Natural consultative scheme for the Rusumo Falls Resources Project Ministry of Social Affairs or Community Development 3) Introducing the Field Program and Agree on June 2011 District Level Same participants as above Consultation Mechanism National and Presenting the field program and requirements (participation and authorizations) from governments Agreement on the formation of a national and district/province taskforces for ensuring government officials directly participate in the Project, especially in designing the resettlement action plan and the local area development plan 4) Community consultations in 263 potentially June to Communityl Village leaders and most affected PAPs (at 1,325 masl.) to inform about August evel members of the community the Project, collect their views and present the upcoming Census process 5) Calling for national and district taskforces to August 2011 National and Members of taskforces present community District Level consultation outcomes and village surveys’ results and collect their views prior to PIC meeting September 12th 6) Consultation of 9,000 PAPs with participatory July 2011 to PAP-level Head of households, the wife and individual questions at the end of each February 2012 and at times the children survey to know their views and expectations 7) Setting up of Resettlement Committees July 2011 to Village-level Village leaders and chosen February 2012 representatives 8) Workshop with district officials to September Kirehe, Members of District elaborate the Local Development Plan 2011 Ngoma taskforces e.g. village-level, cell-level and sector level measures to maximize benefits on communities 9) Focus Group on Land Tenure, Vulnerable December Kirehe, Identified groups and Groups 2011, January Ngoma associations 2012 10) Agree on the entitlement matrix, resettlement February 2012 National and Relevant members of sites and the institutional arrangements with land District Level taskforces and agriculture authorities / 1770050 / MARCH 2013 FINAL REPORT 129 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Consultation Process and Objectives Date Level Participants 11) Send to taskforces preliminary local February 2012 National and Relevant members of Development Program for comments District Level taskforces 12) Include comments of all consultations to April 2012 District Level Members of taskforces and finally disclose the draft RAP, draft LADP and National and decisional instances draft ESIA through a formal consultation process 13) Once agreed with governments, present to April 2012 Local level Members of taskforces and communities at the cell administrative building to decisional instances obtain a level of approval 9.4 CONSULTATIONS FOR PREPARATION OF THE RAP 9.4.1 Overview The overall program for public consultation and participation is established in the PCDP for the Project (see below). During November and December 2012 and in January 2013, consultations with affected communities in Rwanda and Tanzania as well as with communities in the wider project area upstream the Kagera river (up to 20 km upstream the dam site) were performed. Consultations were conducted after preparatory meetings with authorities of the two affected sectors (Kigarama and Musaza) in Rwanda and the district of Ngara in Tanzania. Sector authorities in Rwanda and Ngara district authorities in Tanzania facilitated the performance of the field program. Table 45 – Consultations in affected communities Consultation of villages in Rwanda and Tanzania in the area up to 20 km upstream the Kagera river, including affected communities Nov 3 – Nov 28, 2012 Locations Rwanda: 30 villages along the Kagera river, upstream of the future dam site Tanzania: 9 villages along the Kagera river, upstream of the future dam site Objectives - provide updated information on the Project - raise awareness that the number of PAPs is significantly reduced by the RoR design and that there are people who were previously considered as affected and now are not affected any more (= Ex- PAPs) - conduct a self-validation of affected marshland plots - to obtain information on marshland use - to communicate cut-off dates, to obtain acknowledgement and signatures from affected people and from resettlement committees - to obtain endorsement from the resettlement committees on the compensation approach Consultations - village leaders and resettlement committees - affected people - Ex- PAPs (people considered as affected by previous Project designs and not any more affected by the RoR) Note In Rwanda, 2,585 marshland users were identified and registered. In Tanzania, 607 marshland users were identified and registered. However, according to the hydraulic modelling results, not all villages which were considered in the consultations will be affected by the Project. Details on the number of PAP according to the modelling results are presented in chapter 5.5 above. / 1770050 / MARCH 2013 FINAL REPORT 130 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Consultations in the future construction area, in Nyakwisi village, in Rusumo East village in Rwanda and in Rusumo village in Tanzania Nov 8 – Nov 16 � Dec 14 – Dec 16 � Dec 21, Dec 22, Dec 27 2012 � Jan 11 – Jan 13, 2013 Locations Rwanda: Nyakwisi village, Rusumo East village Tanzania: Rusumo village (Mitako, Migombani) Objectives - provide updated information on the Project - conduct a self-validation of affected assets (land, residential structures, business structures) - communicate cut-off dates, obtain acknowledgement and signatures from affected people and from resettlement committees - obtain endorsement from the resettlement committees on the compensation approach - obtain information on preferences of PAP, affected by the loss of their residential assets, if they would prefer the participation in a resettlement program of the Project or rather opt for cash compensation and then conduct self- resettlement. Consultations - village leaders and resettlement committees - project affected people Additional visits for on the spot interviews and group discussions in affected villages Interviews on the District and Cell level Dec 9 – Dec 12, 2012 Locations Rwanda: Kimeshu village, Nyakwisi village, Nyarutojo village; Kagera District, Kigarama sector, Ngara District Tanzania: Rusumo village, Ntobeye village Consultations - village leaders, village executive officers - district officers, cell officers - project affected people Objectives - obtain additional formation on marshland use (i.e. operation of brick making businesses) - obtain views, proposals and ideas on the design of livelihood restoration measures and LADP measures - obtain information on administrative procedures related to expropriation - obtain information on experiences with ongoing projects in the area (One Stop Border Post) 9.4.2 Consultation Activities Self-Validation of Affected Assets Affected local communities were visited in order to validate the affected assets (= marshland plots) in a participatory manner. Village leaders, resettlement committees and affected households participated in the self-validation process. Self- validation was aiming to obtain information on marshland use on the individual/household level. The validation was conducted in two steps (i) Village leaders were asked to provide information on marshland users in their villages and on the respective marshland areas, which are under cultivation by the individual users; furthermore, information on the total area of land cultivated by the affected households, was obtained; all marshland users of the past three years were identified for each of the affected villages (ii) Affected people were invited to community meetings; in the course of the meetings the household heads confirmed/updated the information provided by the leaders on their marshland plots and added information on the most important crops they had cultivated over the past three years; Village leaders also provided up to date demographic information on their villages (population figures). / 1770050 / MARCH 2013 FINAL REPORT 131 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Self-validation visits were also carried out in the Rusumo East and Rusumo villages in order to validate assets which will be affected due to the construction of the Project. The participants of the self-validation meetings confirmed the acknowledgement of the cut-off date with their signature. Furthermore, residents in Rusumo village and Rusumo East village, who will be affected by loss of residential structures, were asked if they wished to participate in a resettlement program implemented by the Project, with the respective entitlements (see above) or if they would prefer cash compensation for their lost assets and then manage the relocation on their own. Without any exception, all affected people in Rwanda and Tanzania opted for the cash compensation and self - resettlement. Affected people confirmed their preference with their signature. The signatures of affected people and resettlement committees are compiled in Annex 3. Information of PAPs In the context of the consultations, communities were provided with updated information about the Project in the frame of community meetings. Participants were invited to ask questions and received direct response.  Participants entirely appreciated the new Project design and the significant reduction of land take by the RoR Scheme. All PAPs in the villages upstream the future dam site expressed gratitude on hearing that they will not be affected by physical displacement with the RoR scheme.  PAPs in Tanzania expressed doubt on the compensation process being able to meet the benefits associated with marshland use.  The most frequent questions from people affected by the RoR scheme were related to the amount of compensation they would receive for the loss of production from marshland and when this compensation would be disbursed. People were concerned about if and how they would be able to gain access to alternative land, once their marshland plots would be not available for cultivation any more.  People in the villages of Kabuga and Ryamukaza asked to know whether they will be considered for jobs when the dam construction exercise starts.  People also wished to know whether they will have access to electricity which will be produced on Rusumo falls. Consultations on the RAP Compensation Approach Simultaneously to the self-validation program, local authorities (for the 30 villages in Rwanda and the 9 villages in Tanzania) and local resettlement committees (for the Rusumo villages) were consulted on the compensation approach in order to obtain their endorsement:  Compensation for loss of income from marshland / 1770050 / MARCH 2013 FINAL REPORT 132 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Compensation for loss of residential structure  Compensation for loss of business structure  Compensation for loss of intermediate land The consulted local authorities and resettlement committees endorsed the compensation approach and confirmed their agreement with their signatures. The cut-off dates was also acknowledged. Key Informant Interviews Structured interviews were conducted with the local resettlement committees to better understand issues of marshland use and to gain an understanding of what would be important to consider for livelihood restoration. The results of the interviews are compiled in Appendix 2. The respective information was integrated into the main RAP text, especially into the identification of livelihood restoration measures and into the baseline information about marshland use of affected communities. Main issues addressed in the interviews were  Most important crops on marshland and related yields  Use of production from marshland (household consumption, market sale)  Range of income from market sale of marshland production  Seasonal flooding of marshland  Coping strategies for loss of income due to seasonal flooding  Dependency of residents on marshland production  Assistance measures and compensation Additional interviews with affected people Some of the affected communities in Rwanda and Tanzania were visited again. On the spot interviews of affected people and on the spot group discussions, complemented by community walks, confirmed information obtained during the field work in November 2012 and provided some additional information, mainly on the use of marshland, on preferences for livelihood restoration programs and on aspirations with regard to the Local Area Development Plan (LADP, provided in a separate document). The results of the field work are considered in the chapters on livelihood restoration and in the baseline sections above. Main issues addressed in the interviews were  Frequency of marshland use in the villages  Income from sale of marshland production  Businesses depending on marshland / 1770050 / MARCH 2013 FINAL REPORT 133 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Challenges of marshland use (i.e. flooding)  Preferences for livelihood restoration measures and for measures in the frame of the LADP Interviews on the District Level Information gathering interviews were conducted on the district- and cell- levels in Rwanda and on the district level in Tanzania. Table 46: Interviews on the District- and Cell-Level District/Cell-Unit Topics addressed Kagera District: Land Office (Land Officer);  Information about land register and the Secretary of District Land Commission registrations process  Information about expropriation process and related valuation procedures  Procedures in cooperation with the land bureau in the Project context Kagera District: cooperatives business promotion officer  Support of cooperatives by district (capacity building)  Livelihood restoration measures and LADP measures related to agricultural business Kigarama Sector: agronomist and social development  Marshland use issues officer (together with local leaders)  Needs of affected people with regard to livelihood restoration measures and LADP measures  Proposals for measures  Sector activities to address poverty  Agricultural cooperatives: mode of operation, members and activities Ngara District: District Executive Director  Needs with regard to livelihood restoration measures and LADP measures  Expropriation procedures Consultations of District Task Forces On December 18th and 20th, the drafts of the RAP and the ESIA were presented to the District Task Forces in Rwanda (Kirehe District) and Tanzania (Ngara District) in order to obtain views and comments. For the RAP, comments and concerns were focussing on : Project Impacts  Extent of flooding of arable marshland due to project construction and – operation  Project impacts on fishing Compensation Issues  Mechanisms to discourage speculation with regard to eligibility for compensation  Compensation for intermediate land  Compensation disbursement in a complex household setting (polygamy in Tanzania) Cooperation for RAP Implementation / 1770050 / MARCH 2013 FINAL REPORT 134 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  Exchange of information between the two district task forces, implementation of meeting routines  Involvement of local leaders in grievance management Management of Expectations of - and Consultations with EX-PAPs Ex- Project Affected People (Ex-PAPs) are people, who were considered as affected by previous designs of the Project, i.e. the Intermediate Development Scheme, but who will not be affected any more with regard to the RoR Scheme. The RoR is resulting in a considerably reduced number of affected people and in a significant reduction of the severity of impacts (i.e. reduction of physical displacement under the RoR). The consultation of Ex-PAPs is a very important part of the overall consultation plan of the Project in order to  Provide up to date information on affected areas and the corresponding affected people under the RoR  Manage expectations of Ex-PAPs with regard to compensation (they will not be entitled any more to compensation)  Avoid rumours and unrest amongst the population in the Project area (PAPs and Ex-PAPs) with regard to their status as PAP or ex-PAP respectively  Provide a realistic reference base for individual short- and mid- term planning for households of PAP and ex-PAP (information that cut-off dates which were communicated in the context of previous design phases of the Project are no longer valid)  Proactively reduce the number of grievances (resulting from insufficient information) The district administrations of Ngoma in Rwanda and Giteranyi in Burundi were informed about the changes in Project design, i.e from IDS to the RoR Scheme. Corresponding information was provided to previously affected people (Ex-PAPs) in these districts. It was communicated that no social and environmental Project impacts are expected for the two districts (Giteranyi and Ngoma). The same message was communicated to previously affected communities which are located upstream the actually affected area along the Kagera river in the districts of Kirehe and Ngara, where the status of residents also changed from PAP to ex-PAP as a consequence of the new Project design. Ex-PAPs were informed, that the cut-off dates which were communicated in the context of previous Project design phases, are no longer valid (for cut-off dates for the RoR, see section 7.3.2). A key point within the consultation program with ex-PAPs was to communicate information about measures under the Local Area Development Plan (LADP). The LADP will target communities in the entire project area, with a focus on ex-PAPs in order to enhance sustainable development and overall improvement of living conditions in the respective communities. Consultation with ex-PAPs will continue during the implementation of the RAP, as outlined in the PCDP (separate document, Annex 1 to the RAP). / 1770050 / MARCH 2013 FINAL REPORT 135 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) The table below provides an overview on consultations conducted with Ex-PAPs. Table 47 – Consultations with Ex-PAPs: Village Meetings Key Aspects of Consultations with ex-PAPs  Information on change of Project design from IDS to RoR and respective reduction of Project impacts  Information on the resulting change of status from PAP to ex-PAP  Manage expectations under the RoR scheme  Information on project benefits with a focus on measures under the Local Area Development Plan  Provide communication materials with comprehensive Project information  Enhance supportive attitude to the Project from local communities Audience Consulted Key issues noted as feedback Ex-PAPs Local Communities in  Extremely happy that the project will not affect local Giteranyi district marshlands, 12-14 Dec 2012  Enquired if they will get electricity from the project  Enquired if they will get improved roads, schools or clinics EX-PAPs Local Communities in  Happy that the project will have no impacts on their Ngoma district marshlands, 17 Dec 2012  Enquired if they will get electricity from the project  Enquired if they will get improved roads, schools or clinics Ex-PAPs Local Communities in  Happy that the project will not affect their arable marshlands, Ntobeye  Some not pleased since they were anticipating cash 19 Dec 2012 compensation,  Enquired if they will get electricity from the project  Enquired if they will get improved roads, schools or clinics 9.5 REGIONAL CONSULTATIVE WORKSHOP A consultative workshop in order to discuss the RAP, the ESIA and the LADP was held in Kigali on 4 February 2013, with a field trip to the Project site on 4 February. The workshop program contained summarizing presentations of the ESIA, the RAP and of main aspects of the PCDP, LADP and the ESIA/RAP for the transmission lines. For the RAP, the discussion focused on implementation arrangements with strong statements from the districts on their preparedness to take a lead role in key implementation processes of the RAP (livelihood restoration, financial training of PAP). Another focal point was the overwhelming preference for cash compensation over a resettlement program from people affected by loss of residence (see chapter 5.4 above). The background of this attitude is the specific situation of the villages at the Project site (Rusumo, Rusumo East, Rusumo West) as an economic hub area within an entirely rural environment. Affected people prefer to stay in this area, to purchase new residences with their cash compensation and to benefit from the economic opportunities and dynamics at the Project site rather than to be resettled to different, remote areas. Participants appreciated that all PAP who will receive cash compensation will be entitled to money management training. The districts stated their commitment to support the implementation of the respective training program through their staff. The minutes of the workshop are attached in Appendix 7 to the RAP. / 1770050 / MARCH 2013 FINAL REPORT 136 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 9.6 CONSULTATIONS IN THE CONTEXT OF RAP DISCLOSURE The Executive Summaries of ESIA and RAP will be disclosed in the regional and national newspapers to allow the public and stakeholders to consult the documents for final feedback. Publications will be in English, Swahili and French. Hard copies of the ESIA and RAP will be placed in public areas (Public Libraries, District offices, Ministries of Energy, Environmental Management offices) to allow for public consultation. The disclosure process of the RAP will be accompanied by the consultation of affected communities in order to obtain their views and concerns on the overall approach and program of the RAP. A disclosure program, comprising:  Public information events for presentation and explanation of the RAP, and  Focus group discussions in order to obtain views and concerns will be implemented in each of the affected communities Consultation events during disclosure will be held on site in the affected villages and be made accessible for all affected people, including vulnerable groups. The disclosure process will be explained and the RAP executive summary will be presented and explained. Hard copies will be available for the PAP. During the consultation events, concerns will be recorded and questions will be answered. PAP will be informed on the availability of the full versions of the RAP at the district offices. Kirehe district in Rwanda and Ngara district in Tanzania as well as the local resettlement committees of the affected communities will support the performance of the disclosure consultation program. 9.7 CONSULTATIONS IN THE CONTEXT OF COMPENSATION AGREEMENTS After disclosure and approval of the RAP, affected communities will be consulted again to assess their level of satisfaction and agreement with the proposed compensation scheme. According to the documented preferences of PAP affected by physical displacement, there will be no resettlement program in the Project context, as all PAP prefer cash compensation and self - resettlement. Therefore, this RAP does not include provisions for consultations with host communities at resettlement sites. 9.8 CONSULTATION DURING RAP IMPLEMENTATION During RAP implementation, the Project Implementation Unit will be responsible for the planning and performance of regular consultation with affected communities, covering the different groups of PAP, including vulnerable people. Community Liaison Officers (to be assigned immediately by the start of RAP implementation, at the start of year 0) will be the staff who will operate the consultation program for the project / 1770050 / MARCH 2013 FINAL REPORT 137 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) affected communities during the implementation phase Key elements of consultation during RAP implementation are:  Routine consultation of local resettlement committees in the context of the RAP monitoring program;  Public consultation events in the context of the RAP monitoring program;  Special consideration of vulnerable people, organize the identification of and the individual participatory needs assessment with vulnerable persons (see chapter 7.7 above);  Continuous information of the affected population and other project stakeholders about Project progress and upcoming relevant activities;  Continuous update of stakeholder list of the RAP;  Provide accessibility for affected people, establish capacity/availability for quick response to consultation needs expressed by PAP (i.e. constructions related concerns). From the start of RAP implementation, PIU will operate a field office at the project site. The operation of the project office will be communicated broadly to affected people, including office hours of key staff. The location of the office will be signposted. The field office will be established at a site which will be accessible without any disturbance from construction activities, access will not be severed by construction activities at any time. 9.9 PUBLIC CONSULTATION AND DISCLOSURE PLAN (PCDP) The RAP is supplemented by a stand-alone Public Consultation and Disclosure Plan (PCDP). The PCDP is attached to the RAP as Annex 1. The PCDP provides the framework for information and consultation of Project stakeholders with a focus on project affected people during RAP implementation. It contains provisions for consultation of ex-PAPs. Furthermore, the PCDP presents procedures and requirements for the disclosure process. The table below provides an overview on forthcoming consultations as indicated in the PCDP. / 1770050 / MARCH 2013 FINAL REPORT 138 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 48 Consultations prior to RAP Implementation as per PCDP # Date of Target Audience Nature/ Type of Objective of the consultation Participants Consultation for Consultation Consultation 1 March, 2013 TAC and PIC Two-day Discuss the Share Holders' Agreements (SHA), the Ministries of Energy, Minerals, Workshop Implementation Agreement (IA) and the Special Purpose Vehicle Environment, Agriculture, Natural (SPV) of the Regional Rusumo Project. Resources, National Environmental Management Councils, Utility Agencies, Country Investment Agencies, among others 2 March 2013 African Office meeting Discuss Communication strategy under T-line AfDB Senior Officials Development Bank (AfDB) 3 March 2013 Utility Agencies Office meetings,  What they wish to be included in the Communication strategy Utility Agency Senior Officials (EWASA-Rwanda, emails and letters  Provide communication materials including Project Fact sheet REGIDESO-Burundi & FAQs for inputs & improvements TENESCO-  Any other concerns to address under the RoR Tanzania) 4 March 2013 Environmental Office meeting,  Informing them of the release of the ESIA and RAP Reports Environmental Agency Senior Agencies emails and letters and seeking their feedback Officials (REMA-Rwanda,  What they wish to be included in the Communication strategy NEMEC-Tanzania  Provide communication materials including Project Fact sheet Min- Envt-Burundi & FAQs for inputs & improvements  Any other concerns to address under the RoR 5 March 2013 Country Office meeting,  Informing them of the release of the ESIA and RAP Reports Investment Agency Senior Officials Investment emails and letters and seeking their feedback Agencies  What they wish to be included in the Communication strategy (RDB-Rwanda  Provide communication materials including Project Fact sheet NEMEC - Tanzania & FAQs Min-Envt-Burundi  Any other concerns to address under the RoR 6 March 2013 NGOs and CSO Office meeting,  Informing them of the release of the ESIA and RAP Reports NGOs + CSO Representatives (Nile Basin emails and letters and seeking their feedback Senior Officials Discourse Forum-  Inform them of change from IDS to RoR scheme Witness NGO)  Create first rapport with them  Establish their role in mobilizing communities to support the project  Provide communication materials including Project Fact sheet & FAQs / 1770050 / MARCH 2013 FINAL REPORT 139 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) # Date of Target Audience Nature/ Type of Objective of the consultation Participants Consultation for Consultation Consultation 7 March 2013 Media and General Workshop, emails Informing them of the release of the ESIA and RAP Reports and All stakeholders Public and letters seeking their feedback 8 March 2013 Development Development Disclosure Workshop All stakeholders Partners Partner’s (WB, AfDB, KfW, Workshop EIB, Netherlands) 9 March/April Project Affected Village meetings PIU will visit the PAPs again to provide project updates. Issues of All project affected persons (PAPs) 2013 Persons (PAPs) compensation will be resolved before construction 10 March/April Previously Project Village meetings PIU will revisit the Ex-PAPs in all project areas to inform them of All Ex-PAPs 2013 Affected Persons changes in project design and to inform them that they are no (Ex-PAPs) longer going to be affected by the project. The purpose is to manage expectations. 11 March/April Business Office meeting, Consultations will continue with Tourism Business Owners All business operators 2013 Operators emails and letters especially at the Project site to explain mitigation measures and compensation plans in place (where applicable) to protect their businesses. Also to receive their concerns and feedback on ESIA and RAP. 12 March/April Vulnerable Groups Village meetings Vulnerable groups' interests are represented through the Vulnerable groups 2013 Sector/District Grievance Mechanism Committees. Input on how their interests have been considered will be considered when meeting the district or local communities. 13 March/April Tourists/Visitors District offices and The interests of tourists are being addressed through consultation Tourism Associations, district 2013 offices with Tourism Business Association and at districts who will be kept authorities, etc updated of the project updates. / 1770050 / MARCH 2013 FINAL REPORT 140 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 9.10 PROJECT STAKEHOLDERS Project stakeholders are listed in the following tables. Table 49 – Project Stakeholders, Tanzania Relation to Project Stakeholder Level and Type Composition Function in Project Regional; Ministries of Energy and Minerals Decisional body of the Project at Project Implementation regional level; Government officials Committee (PIC) Part of NELSAP/NBI Nile Equatorial Lakes Regional; Ministries of Energy and Minerals, Advisory body for the Project at Technical Advisory Government Officials Water and Environment regional level; Committee (NELTAC) Part of NELSAP/NBI National; Ministry of Energy and Minerals Advisory body for the Project in GovernmentOfficials Ministry of Agriculture Tanzania Ministry of Community Development Planning and Coordinating Agencies Rusumo Falls Tanzania Ministry of Land for the RAP, LADP and ESMP in Taskforce Tanzania NEMC Decision-maker in Tanzania Ministry of Finance District; District Commissionner (DC) Advisory body for the Project in GovernmentOfficials District Executive Director (DED) Ngara District Land Officer Planning and Implementing Agencies RusumoFalls District for the RAP, LADP and ESMP District Agronomist Taskforces District Environment Officer Decision-maker at District-level District Planning Officer Decision-maker and advisors at Ward-level Ward Leaders Village- and Village Leader Advisory body for the Project at Subvillagelevel Subvillage leaders village-level Rusumo Falls 4 Affected Households Planning and Implementing Agencies Resettlement 3 representatives of vulnerable for the RAP, LADP and ESMP in Committees Ngara groups Decision-maker at Village level Representatives of vulnerable groups Regional and National RegionalNGOs Reviewing social and environmental Non-government National NGOs acceptability of the Project Tanzanian Nile Basin Organizations (NGOs) Take part in some community Discourse Forum measures to be implemented Joint Action Forum Local; CODISO, Concern, Jetropha, etc. Ensure synergy between Projects (JAF) NGOs or Donors Identify mitigation measures if Non-Government conflicting projects Organization (NGOs.) Local; Rural population in project area of RAP and LADP provide mechanism Official representatives influence and measures to ensure that project Affected communities of PAP ; affected people become project and affected beneficiaries households, including All project affected vulnerable people people Regular consultation of affected people, special assistance for vulnerable groups / 1770050 / MARCH 2013 FINAL REPORT 141 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 50- Project Stakeholder, Rwanda Stakeholders Level and Type Composition Interest in the Project Regional; Ministry of Energy Decisional body of the Project at Project Implementation regional level; Government officials Committee (PIC) Part of NELSAP/NBI Nile Equatorial Lakes Regional; Ministries of Energy Water and Advisory body for the Project at Technical Advisory Government Officials Environment regional level; Committee (NELTAC) Part of NELSAP/NBI National; Ministry of Infrastructure (MINIFRA) Advisory body for the Project in GovernmentOfficials Ministry of Local Governance Rwanda (MINALOC) Planning and Coordinating Rusumo Falls Rwanda Agencies for the RAP, LADP and Ministry of Agriculture (MINAGRI) Taskforce ESMP in Rwanda Ministry of Natural Resources (MIRINELA) Decision-maker in Rwanda Ministry of Finance (MINECOFIN) District; Vice Mayor Advisory body for the Project in Government Officials Permanent Secretary Kagera District Land Officer Planning and Implementing Rusumo Falls District Agencies for the RAP, LADP and District Agronomist Taskforces ESMP District Social Affair Officer Decision-maker at District-level Affected Sector Leaders Sector Agronomists Cell- and Village level CellExecutiveSecretary Advisory body for the Project at Village Leader village-level Village Council Planning and Implementing Rusumo Falls Agencies for the RAP, LADP and Resettlement 4 AffectedHouseholds ESMP in Ngara Committees 3 representatives of vulnerable groups Decision-maker at Village level Representatives of vulnerable groups Regional and National RegionalNGOs Reviewing social and Non-government National NGOs environmental acceptability of the Nile Basin Discourse Organizations (NGOs) Project Forum Take part in some community measures to be implemented Joint Action Forum Local; KWAMP. SNV, JICA, BTC Ensure synergy between Projects (JAF) NGOs or Donors Identify mitigation measures if Non-Government conflictual projects Organization (NGOs.) Local; Rural population in project area of RAP and LADP provide Official influence mechanism and measures to Affected communities representatives of ensure that project affected and affected PAP people become project households, including All project affected beneficiaries vulnerable people people Regular consultation of affected people, special assistance for vulnerable groups / 1770050 / MARCH 2013 FINAL REPORT 142 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 10. IMPLEMENTATION ARRANGEMENTS 10.1 INTRODUCTION A complex Project such as the Rusumo Falls Run of River Scheme with the requirements of associated environmental and social management plans, the RAP and the LADP requires an adequate implementation set up, with agreed roles and responsibilities. The RAP, the ESMP and the LADP will be implemented within one overall organizational set up, by multi-disciplinary teams (see below) on different levels. High level committees, representing different ministries of the two governments, will provide overall guidance as decision makers during the implementation phase. District authorities will act as advisory bodies and partners for implementation. The intended implementation arrangements with a range of key actors on different levels, representing different entities, require the development of an overall communication plan for Project implementation (see below), in order to facilitate efficient performance. The sections below present the implementation arrangements with a focus on the RAP. The respective requirements for the ESMP implementation are described in detail in the RoR ESIA, chapter 7. 10.2 ROLES AND RESPONSIBILITIES The implementation of the Project will require the participation of several key players, including, but not limited to, - the Project Owner and the Project Implementing Unit - the Governments of Rwanda, Tanzania and Burundi (through high level councils) - the relevant local and regional authorities of each national government - as well as – during construction - the Owner’s Engineer and the Construction Contractor (for details see ESMP). 10.2.1 High Level Councils and Committees High level committees oversee and guide the process of Project implementation. Council of Ministers The councils is composed of the ministers of the three countries who are in charge for electricity/energy provision. / 1770050 / MARCH 2013 FINAL REPORT 143 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Project Implementation Committee (PIC) The PIC is composed of the Managing Directors of the National Electricity Utilities, the DG/Commissioner/Director of Energy from each of the three countries Technical Advisory Committee (TAC) The Technical Advisory Committee currently consists of two experts, one from Rwanda and one from Tanzania. 10.2.2 Project Owner - SPVPC As required by the Tripartite Agreement between Burundi, Rwanda and Tanzania; the role of the Project Owner is delegated to a Special Purpose Vehicle Project Company (SPVPC). The SPVPC shall be responsible for all aspects of project management, including those associated with its environmental and social issues. The Project owner is the entity making commitments with authorities in Rwanda, Tanzania and Burundi as well as with funding agencies in relation to the implementation of the RAP, the Environmental and Social Management Plan and the LADP (for ESMP, see ESIA for the RoR Scheme, chapter 7). The Project Owner (SPVPC) is responsible for overseeing and monitoring overall project implementation and for ensuring compliance with the environmental and social requirements of government authorities and funding agencies. 10.3 NELSAP: PROJECT IMPLEMENTING UNIT (PIU) NELSAP will serve as project implementing unit (PIU) for the RAP, ESMP and LADP, with a team dedicated to carrying out the respective activities, and coordinating with the two governments. The PIU will operate on site, in interaction with the project affected people and direct cooperation with the district authorities. PIU will report to the SPVCP. The PIU as regional implementation unit will operate from Kigali (PIU headquarters) as well as directly at the Project site, with a local Project office (see section 9.8). The key implementation processes of the RAP require continuous presence in the project area and continuous communication with district authorities (mainly via Task Forces, see below), resettlement committees and affected people. A project office at the Project site (location yet to be determined, in the Rusumo villages) will maximise efficiency and accessibility of the PIU staff. The present NELSAP team, already operating on the RAP, PCDP and ESMP preparation will be reinforced by additional staff (see Table 51 below). To properly deliver its mandate, the PIU must be fully established and operational as soon as the decision to go ahead with the Rusumo project has been made. This is in order to timely initiate and manage those key RAP implementation activities, which will have to be performed prior to the start of construction (i.e. the compensation process for people affected by construction). / 1770050 / MARCH 2013 FINAL REPORT 144 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) With regard to the implementation of the RAP and the PCDP, the PIU has the following responsibilities Communication and Coordination  Overall coordination with national governments and with authorities and funding agencies with regard to the Project’s social and environmental issues  Implementation of the PCDP and establishment of good and operational relations to affected communities  Communication and cooperation with district administrations (Ngara and Kirehe districts) as key actors with implementation of livelihood restoration programs  Communication and cooperation with district administrations of the target area of the LADP as key actors with implementation of LADP measures  Communication and cooperation with local resettlement committees as key actors with implementation processes (i.e. compensation process, monitoring, identification of vulnerable people)  Communication and cooperation with the institutions involved in the compensation process and into training measures for affected people: SACCO (Rwanda) and National Microfinance Bank (NMB Bank) Ngara Branch (Tanzania) Management of RAP Implementation  Ensure and monitor overall social and environmental due diligence within RAP, ESMP and LADP implementation (national requirements, lenders requirements)  RAP Key Implementation Processes  Oversee and coordinate compensation process (see chapter 7.5.10)  Operate Grievance Mechanism (see chapter 0)  Operate Monitoring (see chapter 11)  Manage staff recruitment processes and contracting processes of external service providers  Design of overall training plan for RAP implementation staff, oversee and coordinate implementation of plan Management of ESMP and LADP implementation  PIU will also be responsible for ESMP – and LADP implementation. For further details, see ESIA for the RoR, chapter 7 and LADP as separate document (Annex 2). / 1770050 / MARCH 2013 FINAL REPORT 145 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Change Management  Communicate necessary changes of approach, particularly where substantial and material changes to the RAP (ESMP, LADP, PCDP) might be envisioned or necessary (i.e. as consequence of monitoring results) to SPVPC and PIC (see below) for final decision making Capacity building  Facilitate and guide capacity building for authorities on different levels with regard to due diligence of Project management and due consideration of environmental and social safeguards Existing PIU Staff Positions and Additional Staff Requirements The table below presents a summary of staff positions and corresponding tasks for the PIU with regard to RAP implementation. PIU will also manage ESMP and LADP - implementation. For respective staff positions and tasks see ESIA for the RoR (chapter 7, ESMP). From the proposed staff positions, the following positions are already established with staff operating for the RAP and LADP (preparation phase) as well as PCDP- and ESIA - preparation.  Lead Safeguard Specialist  Communication Officer  Environment Management Officer  Social Development- and Resettlement Officer Several support staff is also already in operation. The additional positions indicated in the table below shall be assigned through a tender procedure to qualified candidates in order to set up the full capacity for RAP (ESMP, LADP) implementation. At the end of the construction phase, the PIU team will be gradually reduced as the need for intervention decreases and works will have been completed by its staff. However, some key processes of RAP implementation will extend into the operation phase (i.e. monitoring), hence respective staff will perform until the completion of the RAP (after the compliance – and completion audit (external) and the acceptance of the RAP completion report (containing the independent outcome evaluation) by governments and lenders. In the long run, two community liaison officers and one monitoring expert for long term livelihood tracking will be in charge on a permanent base for project operation. / 1770050 / MARCH 2013 FINAL REPORT 146 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Table 51 PIU Set-Up and Tasks for RAP Implementation Lead Safeguard Specialist (1) TASKS* ■ report to SPVPC manager ■ recruit PIU staff, and terminate him/her if warranted; in agreement with SPVPV management ■ set up and implement of staff training plan ■ overlook and supervise RAP implementation, with a focus on key processes: compensation process, grievance management process, monitoring process ■ establish and follow up detailed short term implementation plan (monthly planning of activities); submitRAP Implementation Reports ■ liaise with all team members of the PIU, hold regular team meetings ■ operate communication routines with relevant administrations and authorities ■ meet regularly with District Task Forces and Resettlement Committees ■ act as observer in grievance mediation committee ■ Propose, if necessary , corrective actions as consequence of monitoring results to SPVPC ■ Implement decisions upon major corrective actions which might become necessary during RAP implementation ■ overlook and supervise ESMP and LADP implementation SKILLS* Seniorspecialist with experience in of the Rusumo Falls region. ■ relevant education record ■ senior project management skills (including quality management) ■ advanced communication- and coordination skills ■ advanced expertise in social and environmental safeguards, familiarity with application of relevant guidelines ■ familiarity with the Project and with all social and environmental plans related to the Project ■ advanced reporting skills Social Development and Resettlement Officer (1) TASKS* ■ Ensure that RAP implementation proceeds in line with social safeguards requirements of lenders and governments of Rwanda and Tanzania ■ oversee social issues in ESMP implementation (details see ESMP) ■ supervise LADP implementation (details see LADP) ■ meet regularly with District Task Forces and Resettlement Committees ■ Initiate and supervise final design process for livelihood restoration measures ■ Supervise implementation of livelihood restoration measures ■ Coordinate exit survey prior to compensation disbursement with final technical valuation of losses ■ provide guidance for social monitoring staff, follow up of monitoring activities ■ coordinate community liaison officers, direct tasks and receive reports, liaise and cooperate with PCDP coordinator ■ Deputy to PIU Manager SKILLS* Senior social and/or development specialist with experience in resettlement and land acquisition issues, preferably in of the Rusumo Falls region. ■ relevant education record ■ senior specialist with experience in resettlement and land acquisition issues ■ advanced communication- and coordination skills ■ expertise in social safeguards, familiarity with application of relevant guidelines ■ experienced in social field work, methodology and design ■ familiarity with the project region and with the respective socio-cultural specifics, especially related to poverty issues, to gender issues and to vulnerable groups ■ expertise in social monitoring ■ familiarity with the Project and with all social and environmental plans related to the Project ■ advanced reporting skills Environment Management Officer TASKS and SKILLS see ESMP / 1770050 / MARCH 2013 FINAL REPORT 147 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Communication Officer (1) TASKS* ■ oversee and supervise implementation of PCDP ■ develop actions of PCDP according to lessons learned within communication with PAPs ■ liaise with community liaison staff, provide guidance in cooperation with social safeguards expert ■ maintain contact to district authorities, resettlement committees and other representatives of PAP as well as to other stakeholders of the Project (see stakeholder engagement activities within ESMP) ■ maintain relations to the public ■ communication with media, project related publications and development of communication material SKILLS* Senior specialist with experience in communication process management, public relations, facilitation ■ relevant education record ■ senior specialist with advanced expertise in designing and performing communication processes with different target groups, public relations experience ■ advanced coordination- and facilitation skills ■ familiarity with the project region and with the respective socio-cultural specifics ■ familiarity with relevant safeguard policies ■ familiarity with the Project and with social/environmental plans related to the Project Livelihood Restoration and Community Liaison Officer (4) TASKS* ■ operate under direct guidance of social safeguards expert and of PCDP coordinator ■ maintain contact to and cooperation with affected communities ■ technical management of livelihood restoration programs, in cooperation with the district authorities ■ be accessible to liaise with affected population per request, especially for vulnerable groups. ■ assist affected people in issues related to the Project (answer questions about the process, delivery of grievances, information about consultation activities etc.) ■ participate as observer on a case by case base in the exit surveys with final technical valuation of losses (under guidance of social safeguards expert) ■ operation of consultation process with affected people (PCDP implementation), guided by PCDP coordinator ■ identification of vulnerable people in cooperation with resettlement committees ■ on the spot and ad-hoc consultation and information of affected people ■ liaise with monitoring staff, involvement in monitoring process ■ liaise with grievance management staff SKILLS* ■ technical skills required for the final design and implementation coordination of livelihood restoration programs: at least 1 agriculturalist, at least one expert for small – and micro businesses, at least one expert for agri-business; ■ familiarity with government programs which would serve as conceptual frameworks for the RAP livelihood restoration measures ■ very good communication skills and cultural sensitivity ■ experience in livelihood restoration programs and in field work on the grass root level with rural population ■ ability to work in a team and in an interdisciplinary manner ■ ability to work proactively ■ familiarity with the project area and with the respective socio-cultural specifics ■ knowledge of local languages (depending on the area of operation) Note At least 50% of livelihood restoration and community liaison team should be female Livelihood restoration and community liaison officers are permanently operating from Project office on site / 1770050 / MARCH 2013 FINAL REPORT 148 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Grievance Management Officer (1) TASKS* ■ supervise operation of grievance mechanism and regional coordination ■ guide grievance management officers and establish detailed design of documents and procedures, in cooperation wi th social safeguards specialist ■ train resettlement committees on their tasks within local grievance management ■ maintain relations to resettlement committees and organize regular visits and consultation meetings in affected communities ■ take over complex and disputed cases of grievances in order to avoid forwarding to mediation committee ■ train grievance management officers and introduce them into their tasks ■ report to social safeguards specialist and to PIU manager ■ liaise with monitoring coordinator, contribute to monitoring ■ follow up the registration of grievances and filing of grievances into the database SKILLS* Experienced project manager with strong organizational, analytical - and communication skills. ■ familiarity with the Project and with social/environmental plans related to the Project, familiarity with the Project’s grievance mechanism ■ experience with similar tasks in similar settings ■ familiarity with the legal aspects of the grievance process and familiarity with related administrative processes (i.e. pro cesses related to expropriation) ■ ability to work in a demanding set up, mediation skills, sensitivity towards socio -cultural specifics of the Project area ■ ability to organize a complex mechanism Grievance Management Assistant (2) TASKS* ■ collection of registered grievances from resettlement committees ■ reception, registration, processing of grievances according to the Project’s mechanism ■ participation in resolution of grievances on the first level through information and explanation ■ proposals for grievance resolution ■ on site verification of complaints and consultation of complainants ■ contributions to monitoring SKILLS* ■ very good communication skills and cultural sensitivity ■ experience in social field work on the grass root level and in communication with the rural population of the affected area ■ ability to work in a team and in an interdisciplinary manner ■ ability to work proactively ■ familiarity with the project area and with the respective socio-cultural specifics ■ knowledge of local languages (depending on the area of operation) ■ willingness to familiarize with relevant RAP implementation processes in order to provide information to claimants ■ knowledge of local languages (depending on the area of operation) Note At least 50% of grievance management team should be female Grievance management officers are permanently operating from Project office on site / 1770050 / MARCH 2013 FINAL REPORT 149 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Project Database Manager (2) TASKS* ■ develop Project database, provide advise with respective professional software ■ get familiar with RAP processes and other relevant processes, consider processed in data base design ■ cooperate with PIU staff in order to appropriately design the database ■ design processes in order to file data from PIU staff into the data base ■ report to PIU senior management ■ provide data as required from PIU team Database will at least contain - Socio-economic baseline data - Grievance database - Monitoring database - Compensation database - Environmental data - Project report – and documentation database SKILLS* Senior IT expert with advanced skills in database management ■ in depth familiarity with relevant software and technical settings ■ experience with the design and management of complex database systems ■ team working skills Monitoring Officer (1) TASKS* ■ regional coordination of monitoring ■ implementation of internal monitoring programme of the RAP according to the provisions in section 11.4 ■ detailed design of procedures and monitoring forms under supervision of social safeguards specialist ■ documentation of monitoring results and alert on any required corrective action as outcome of monitoring ■ guide monitoring assistants and community liaison officers for monitoring procedures ■ cooperate with local resettlement committees and district task forces ■ forward results to database management ■ deliver monitoring reports according to schedule SKILLS* Senior expert in social monitoring, desirably in similar projects ■ advanced expertise in designing and performing monitoring procedures, analyzing results ■ familiarity with relevant social safeguard policies and their application ■ familiarity with social field work in rural environments ■ good reporting skills Monitoring Assistant (2) TASKS* ■ perform tasks within the monitoring program under guidance of monitoring officer ■ cooperate with community liaison officers and with resettlement committees within monitoring SKILLS* ■ good communication skills and cultural sensitivity ■ experience in social field work on the grass root level ■ familiarity with the project area and with the respective socio-cultural specifics ■ knowledge of local languages (depending on the area of operation) Note At least 50% of monitoring assistants should be female Monitoring assistant are permanently operating from Project office on site / 1770050 / MARCH 2013 FINAL REPORT 150 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Support Staff Supporting staff will be hired according to demand (to be determined)  Secretary  Accountant  Office assistant  Driver  Other support staff *Tasks and skills are presented as tentative lists, final description to be determined by the start of implementation phase The figure below presents an overview on the PIU set up as described in the table above. Figure 17 – PIU Overview Chart / 1770050 / MARCH 2013 FINAL REPORT 151 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 10.4 OTHER PARTIES INVOLVED IN RAP IMPLEMENTATION 10.4.1 Project Implementation Committee (PIC) The PIC as high level regional committee will oversee and guide overall RAP implementation. The PIC will facilitate regional communication and exchange on government level. With the SPV, the PIC is the high level decision making body for the overall implementation process of the RAP. The PIC will establish an appropriate meeting routine for the period of RAP implementation. 10.4.2 Technical Advisory Committee (TAC) The TAC is a high level regional technical advisory committee, with members from relevant government ministries of the three countries. The TAC will act on request (e.g. request the PIC or request by PIU via SPV). 10.4.3 District Task Forces The District Task Forces act as implementing bodies for RAP related activities on the district level, in Kagera District in Rwanda and in Ngara District in Tanzania. They operate as direct partners to the PIU and will take the lead role with regard to the implementation of livelihood restoration programs (see section 7.6). Kirehe district and Ngara district both confirmed their commitment to actively participate in RAP implementation in February 2013. District executive administration staff shall contribute with their expertise, their capacity and competence to the implementation of the RAP, corresponding to the different technical areas they represent (i.e. agriculture, social assistance, land bureau). District Task Forces will establish appropriate meeting routines with the PIU. Continuous mutual information will be a key aspect of cooperation. With the objective of overall capacity building, PIU will provide in-depth information about relevant social and environmental safeguards for the RAP. Practical aspects of application of the respective guidelines will be explained. Sub-processes of RAP implementation such as the official valuation of affected assets, will be carried out by district officials (land bureaus) according to the relevant legal and administrative framework. The District Land Officer is member of the Task Force. District Sector Leaders in Rwanda and Ward Leaders in Tanzania as representatives of the affected population will provide for updated information and for the consideration of area specific aspects within RAP implementation. Rwanda District Task Force, Kirehe District:  Vice Mayor  Permanent Secretary / 1770050 / MARCH 2013 FINAL REPORT 152 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  District Land Officer  District Legal Officer  District Cooperatives Officer  District Agronomist  District Social Affair Officer  Affected Sector Leaders  Sector Agronomists Tanzania District Task Force, Ngara District:  District Commissioner  District Executive Director  District Community Development Officer  District Land Officer  District Legal Officer  District Agronomist  District Gender Officer  District Environment Officer  District Planning Officer  Ward Leaders 10.4.4 Financial Institutions on the District Level The disbursement of cash compensation will be operated by district branches of financial institutions with expertise in rural environments (including micro-finance): SACCO in Rwanda and National Microfinance Bank (NMB) in Tanzania (as agreed by Ngara district and Kirehe district and by SACCO and NMB in Feb 2013). SACCO and NMB will be contracted by NELSAP/PIU for the disbursement of compensation to affected households. PIU will provide the respective information for compensation disbursement (PIU compensation database). PIU and representatives of the district Task Forces will oversee the compensation disbursement process. Monitoring of the process will be performed by an external party (to be contracted), see section 11.4. SACCO and NMB will also train district staff so that they can perform money management training for affected people who receive cash compensation (see section 7.6.9). Furthermore, the micro-credit schemes which are associated with the livelihood restoration programs will be operated by SACCO and NMB (see section 7.6). / 1770050 / MARCH 2013 FINAL REPORT 153 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 10.4.5 Resettlement Committees The resettlement committees are partners on the village level for RAP implementation, especially for:  Compensation process: witness of exit survey with technical asset valuation by official valuers and final compensation agreements with households (see section 7.5 above);  Involvement into the grievance mechanism on the village level (see section 8 above)  Involvement into monitoring procedures, especially in monitoring of marshland dynamics (see section 7.4 above), of progress of livelihood restoration measures and of compensation disbursement  Identification of vulnerable people on the household level, information of PIU on special concerns of vulnerable people in their community, organize meetings and with and visits of vulnerable people PIU field staff shall regularly meet and consult with local resettlement committees on site in the affected villages. Composition of Resettlement Committees, Tanzania  Village Leader  Subvillage leaders  4 Affected Households  3 representatives of vulnerable groups Composition of Resettlement Committees, Rwanda  Cell Executive Secretary  Village Leader  Village Council  4 Affected Households  3 representatives of vulnerable groups / 1770050 / MARCH 2013 FINAL REPORT 154 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 18- Implementation Chart for the RAP / 1770050 / MARCH 2013 FINAL REPORT 155 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Figure 19 – Implementation Set Up on the District Level 10.5 IMPLEMENTATION SCHEDULE The project is divided into three phases. Phase 1 - Preconstruction period (Y0): establishment of PIU and start of RAP implementation (i.e. compensation for assets affected by construction, start of livelihood restoration measures for affected people); Phase 2 – Construction period (Y1– Y4): continuation of RAP implementation (i.e. compensation for loss of marshland resulting from project operation, start of livelihood restoration measures for affected marshland users); Phase 3 – Commissioning and start of Project operation (Y5): continuation of RAP implementation; After Phase 3 - Y5–Y8 : completion of RAP implementation. / 1770050 / MARCH 2013 FINAL REPORT 156 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 1 2 3 4 5 6 7 8 9 10 11 12 Activity Q1 Q2 Q3 Q4 Set-Up of PIU: tender, contract staff as per section 10 of RAP Final design of civil works Compensation Process Contracts for compensation disbursement with SACCO/NMB Exit surveys/compensation agreement for HH affected by construction, extension of survey period corresponding to availability of final construction area pattern ░ ░ ░ ░ Disbursement of compensation Monitoring Baseline survey (20%PAP startified sample) as reference base for outcome evaluation, determination of outcome indicators for monitoring Tender/contract for outcome evaluation Tender/contract for monitoring of compensation disbursement Internal monitoring as per section 11 Outcome monitoring as per section 11 Monitoring compensation disbursement Tracking of PAP who lose their residence for establishment of new residence before they have to leave their affected residence Livelihood Restoration Final arrangements for livelihood restoration measures: small business management, small business support; PIU livelihood restoration officer ▓ ▓ (business expert), district officers, SACCO and NMB representatives; consultation of affected businesses Training of Trainers for Money Management Training: ▓ SACCO for district officers in Rwanda and Tanzania Final arrangements for livelihood restoration measures: agricultural enhancement measures/livestock enhancement: PIU livelihood restoration officer; agronomists of districts; other ▓ ▓ district officers (social, community development), consultation of affected people (PAP losing agricultural land due to construction) Advisory service to affected people for enrollment in livelihood restoration Enrollment HH affected by construction in livelihood restoration: small business and agricultural enhancement Start of Livelihood Restoration: Small business support/small business development Start of Livelihood Restoration: agricultural enhancement and livestock Implementation of Money Management Training for affected people: district officers Preparation Process for LADP measures (priority on affected communities and ex-PAPs): PIU and districts Consultation Consultation of Vulnerable People on household level on support needed; implementation of support measures as per consultation results; consultation of PAP as per RAP and PCDP Grievance Process Training of Resettlement Commmittees for the management of grievanances on local level Maintenance of Grievance Management Process as per section 7 Figure 20 Implementation Schedule for Year 0 / 1770050 / MARCH 2013 FINAL REPORT 157 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Activity Year 1 Year 2 Year 3 Year 4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 PIU operation as per RAP Civil contractor mobilization Start of Civil Works, construction, Project commissioning at end of year 4 Compensation Process Survey of PAP who were absent during village self-validation (PAP affected by operation) Exit surveys/compensation agreement for HH affected by operation, integrating PAP who were absent during village self- validation Disbursement of compensation Monitoring Internal monitoring as per section 11 Outcome monitoring/evaluation as per section 11 ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ Monitoring compensation disbursement Livelihood Restoration Advisory service to affected people for enrollment in livelihood restoration Enrollment HH affected by operation for livelihood restoration measures Start and Operation of Livelihood Restoration Programs Money Management Training for affected people: district officers Implementation of LADP Consultation Consultation of Vulnerable People on support needed; implementation of support measures as per consultation results Consultation of PAP as per RAP and PCDP Grievance Process Maintenance of Grievance Management Process as per section 7 Figure 21 Implementation Schedule – Construction Period / 1770050 / MARCH 2013 FINAL REPORT 158 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Activity Year 5 Year 6 Year7 Year 8 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 PIU operation as per RAP Project commissioning, operation Monitoring Internal monitoring as per section 11 Outcome monitoring/evaluation as per section 11 ♦ ♦ ♦ ♦ ♦ ♦ compliance/completion audit ♦ Livelihood Restoration Livelihood Restoration Programs Money Management Training for affected people: district officers Implementation of LADP Consultation consultation of PAP as per RAP and PCDP vulnerable people - implementation of support measures as per consultation results Grievance Process Maintenance of Grievance Management Process as per section 7, available for target population of LADP Figure 22 Implementation Schedule - Operation / 1770050 / MARCH 2013 FINAL REPORT 159 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 11. MONITORING AND EVALUATION 11.1 OVERVIEW The monitoring is to assess the overall success of the RAP and the effectiveness of the various processes and measures. Monitoring activities will comprise three main components:  Internal monitoring  External monitoring (by external experts);  RAP completion audit (by one or more international experts) The internal monitoring process will run as part of day to day PIU activities by the PIU teams. External monitoring is intended to provide an independent, third party, objective assessment of the on-going RAP implementation to ensure that the Project is meeting international standards for compensation and resettlement. The monitoring & evaluation team in collaboration with representatives of affected people will select final outcome indicators by the start of Year 0. A stratified sample of about 20% of affected people will be used consistently for outcome measurement. The stratification process will ensure that all sub-groups are adequately represented in the sample. The team will finalize the baseline against which indicators will be measured for the sample households prior to affected households’ loss of assets (by month 6 of Year 0). Indicators will include both quantitative (such as income for livelihood restoration, size and quality for standard of living), as well as proxy indicators for livelihood restoration. The completion audit will verify full, comprehensive and transparent implementation of the RAP according to international policies. Each of the key aspects of the M&E Mechanism is described below. 11.2 OBJECTIVES OF MONITORING The overall objectives of monitoring in the RAP context are to verify the following points:  Actions and commitments described in the RAP are implemented fully and on time;  Project affected persons understand their rights;  Eligible project affected persons (PAPs) receive their full compensation entitlements and livelihood restoration measures within the agreed time;  Physically displaced HH restore and improve living standards to at least previous levels / 1770050 / MARCH 2013 FINAL REPORT 160 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP)  RAP compensation and livelihood restoration measures are effective with regard to the enhancement or at least the restoration of livelihoods of PAPs;  Complaints and grievances expressed/submitted by PAPs are followed up and resolved and that, where necessary, corrective actions are implemented;  If necessary, changes in RAP procedures are made to improve delivery of compensation/assistance to PAPs; needs for changes would be noted largely by the monitoring and evaluation results and through consultation of PAP The overall responsibility of monitoring is with NELSAP. The monitoring will be performed by internal (PIU) staff who will receive training with regard to monitoring techniques and recording of monitoring results. External experts will be hired for external monitoring (evaluation) where applicable. 11.3 M&E APPROACH The following monitoring and evaluation approach will be used, whereby different levels of monitoring and evaluation are used  Internal progress (Input/Output) monitoring: measures whether inputs are delivered on schedule and as defined in the RAP, and their direct measurable results, for instance o Amounts of compensation paid in a given month (see below) o People completing livelihood restoration training courses o Lost places of residence re-established o Businesses re-established Monitoring will also seek to document and investigate specific conflict or hardship situations arising from the implementation of the RAP. Monitoring keeps track of RAP implementation efficiency and indicates whether changes have to be made to make the program work more efficiently. Progress monitoring is done internally by the Project at a frequency determined by the RAP for every indicator. For this RAP, participatory elements are integrated in the monitoring process, e.g. interviews and focus group discussions. Note: Monitoring of compensation disbursement will be outsourced to an external independent entity.  Outcome evaluation:  Outcome evaluation assesses whether standard of living and livelihood restoration measures are achieving the goals of restoring/improving standard of living of physically displaced households and/or restoring/improving livelihood conditions of economically displaced households. Outcome evaluation defines the extent to which the project is achieving or likely to achieve the objectives of the RAP. Re-establishment of businesses and earning acceptable returns over a reasonable period is an example of outcome. Outcome evaluation, combined with output monitoring results, will indicate whether the program is genuinely working and should continue to be implemented as planned, / 1770050 / MARCH 2013 FINAL REPORT 161 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) or whether some fundamental changes need to be made. Outcome evaluation looks beyond numerical compliance to the longer term impacts of program inputs and outputs, do determine what works and what does not work, and what needs to be changed. Outcome evaluation will be done by an independent entity during RAP implementation. Outcome evaluation often uses proxy indicators (indirect indicators): for example, many people are reluctant to talk about their actual income. Proxy indicators can be used to help determine whether affected people are re-establishing or improving their livelihoods and standard of living. Indirect indicators may include school attendance, or the purchase of “luxury� items such as motorbikes, sat TVs. Outcome evaluation reports will be publicly disclosed.  Audit of compliance and completion: Defines whether the RAP and applicable requirements have been complied with, and if the implementation can be deemed complete. 11.4 INTERNAL MONITORING Internal monitoring will verify progress and analyse relevant issues at regular intervals (e.g. quarterly) in order to provide information for necessary updates of the RAP process. Table 52 – Selection of Indicators for Internal Monitoring Monitoring Monitoring Activity and specific monitoring parameters* Aspect Frequency Performance Progress in technical validation of affected land and assets and signature of Monthly against schedule compensation agreements: % complete Payment of compensation and delivery of livelihood restoration measures % complete Land plots used temporarily during construction, number: - % of total land used for construction Plots used during construction: % re-instated and handed back to owners Grievance process: no. of grievances received/responded/resolved Consultation activities: records of meetings, discussions, interviews, etc. Summary of monitoring activities, to be integrated into the RAP Implementation Status Reports Overall Was compensation paid to land owners and land users? Monthly restoration of % of total payments/livelihood measures completed, in progress, not started, in livelihoods and appeal. income Was compensation in general in line with agreed rates and in – time? % of total payments made at agreed rates % within agreed time frame. How is the response of affected people to the livelihood programs? % enrolment of affected households Where livelihood restoration measures delivered for all groups of affected people? % of total livelihood restoration measures in progress, not started. Was financial training delivered to all groups of affected people? % of affected households in financial training completed, in progress, not started, appeal Did affected businesses receive entitlements? % of total completed, in progress, not started, in appeal. / 1770050 / MARCH 2013 FINAL REPORT 162 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) Monitoring Monitoring Activity and specific monitoring parameters* Aspect Frequency Did affected workers/employees receive entitlements? % of total completed, in progress, not started. Have vulnerable people been identified on the household level? % of household situations reviewed Have special needs of vulnerable groups been identified and addressed? % of vulnerable people addressed with targeted measures Have physically displaced people managed to re-establish a new place of residence? 3 monthly % of displaced people established new place of residence Have affected businesses been restored? % of restored businesses 6 monthly What changes have occurred in the costs for living/expenditures of PAPs? Once a year Factual description How have changes of income changed overall household economy of PAPs? Factual description Number. of skilled and non- skilled PAPs engaged in construction workforce (or otherwise employed as part of Project)? Total no. of PAPs who applied for jobs, % employed part-time/full-time, % undergoing job training Are livelihood restoration measures proving effective? Summary professional opinion Are any additional support measures required? Professional opinion based on all results to date Level of PAP How do PAPs perceive the extent to which their overall livelihood has been restored? Continuously satisfaction Results of routine interviews with PAPs Have PAPs experienced any hardship as result of the Project? Results of routine interviews with PAPs Consultation and Do PAPs understand the process of land acquisition/ compensation/ livelihood Grievances restoration measures? Results of routine interviews with PAPs Do PAPS understand avenues for expressing grievances? Results of routine interviews with PAPs What types of grievances have been issued and how have these been resolved? Summary of input from Grievance Procedure and routine interviews with PAPs: factual information. 11.5 OUTCOME EVALUATION Outcome evaluation will be done during RAP implementation by a qualified and experience external evaluator. Outcome evaluation (with data collection and analysis) will be done with 6-month intervals from the beginning of RAP implementation onwards. One of the key purposes of outcome evaluation is the identification of need for changes (e.g. for the implementation mechanisms) or additional actions within livelihood restoration. With 6-month intervals, need for changes can be identified timely and changes can be implemented as quickly as possible. Simple-socio-economic parameters will be established and monitored Compliance and Completion Audit The purpose of the compliance/completion audit is to determine whether the Project has met its commitments and can be released from further responsibility. Hence, the independent compliance and completion audit will focus on the assessment of / 1770050 / MARCH 2013 FINAL REPORT 163 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) compliance with the commitments of this RAP, the relevant Rwandan and Tanzanian legislation and the WB Policies. The audit will be performed by an independent entity (to be determined). Evaluation reports will be made public. 11.6 COMPLIANCE - AND COMPLETION AUDIT The compliance and completion audit will be performed about one year after completion of RAP implementation, including the completion of the livelihood restoration programs. The compliance reviews will concentrate on  Overall compliance with applicable legislation, international requirements and commitments of this RAP  Compliance with the eligibility criteria described in this RAP  Actual delivery of entitlements as described in this RAP  Compliance with implementation mechanisms described in this RAP The completion audit will assess all activities needed to achieve compliance were implemented and whether compensation (and resettlement) can be deemed complete. A key objective of this RAP is that compensation and livelihood restoration measures should lead to sustainable restoration or enhancement of affected people’s quality of life and income levels. At the time when affected people’s quality of life and livelihoods can be demonstrated to have been restored, the RAP process can be deemed as completed. 11.7 RESPONSIBILITIES  Internal monitoring will be a responsibility of the PIU team. In cooperation with the monitoring officers, the community liaison- with the grievance management officers will be in charge of gathering and processing relevant data. Interim monthly reports will be established according to monitoring activities.  Monitoring results will be entered into a digital database by PIU database management experts.  PIU officers will also prepare the annual monitoring report to be delivered to SPV/PIC  Monitoring of the compensation disbursement process will be outsourced to an independent external entity. During the disbursement periods, PIU will receive weekly monitoring reports. Monitoring will include the individual tracking of people affected by loss of residence. They will be tracked in order to follow up the process of establishment of a new residency before the affected building has to be left.  For outcome monitoring and evaluation external consultants will be hired, who will conduct six-monthly monitoring missions during RAP implementation. The scope / 1770050 / MARCH 2013 FINAL REPORT 164 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) of work of this consultant will include the two countries to address transnational consistency issues and to allow for comparisons.  The compliance/completion audit will be contracted to a qualified an experienced consultant. / 1770050 / MARCH 2013 FINAL REPORT 165 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) 12. BUDGET The following table provides an overview on the budget for RAP implementation. More detailed tables related to the different items are compiled in Appendix 6. Table 53 Overview on Budget for RAP Implementation Item Total Costs USD Project Preparation and Construction Period Year 0, Year 1- Year4 (= 5 years) Project Implementation Unit for RAP Implementation y0 and y1-y4 1,220,200 Compensation, construction impacts Due in Year 0 2,236,645 Livelihood restoration PAP affected by Due Year 0 – Year 2/Year 3 construction impacts, including assistance to vulnerable people 711,612 External Monitoring and external Coordination for RAP Implementation y0 and y1-y4 555,000 Sub-Total, Preparation period and for RAP Implementation y0 and y1-y4 4,723,457 construction period Project Operation (Year 5 – Year 9) (= 5 years) Compensation, operation impacts Due in year 4 1,155,700 Livelihood restoration PAP affected by Due Year 3 – Year 6 operation impacts 1,180,476 External Monitoring and external for RAP Implementation year 5 – year 9 Coordination 310,000 Sub-Total, Operation Period for RAP Implementation year 5 – year 9 2,646,176 Grand Total, RAP Implementation 7,369,633 Summary Budget, LADP 15,000,000 Total, RAP and LADP Implementation 22,369,633 / 1770050 / MARCH 2013 FINAL REPORT 166 | P a g e RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT RESETTLEMENT ACTION PLAN (RAP) For the budget, the best estimates available at this time were considered. A strong PIU team will be in place to monitor and manage RAP implementation adaptively both during construction and operation by responding to any issues that may arise. Correspondingly, actual budget allocations to individual activities may change, or new activities may be added as necessary. / 1770050 / MARCH 2013 FINAL REPORT 167 | P a g e