UDIN: -19068385AAAABD3916 Auditor's Report on Program Financial Statements for the Financial Year 2017-18 To The Managing Director Bihar State Educational Infrastructure Development Corporation, Patna Report on the Audit of the Program Financial Statements Opinion We have audited the accompanying Program Financial Statements of "Enhancing Teacher Effectiveness in Bihar Operation" financed by the International Development Association in accordance with the Financing Agreement and Implementing Entity Agreement both dated 10.01.2019 IDA Credit no. 5578 IN and implemented by Bihar State Educational Infrastructure Development Corporation. These financial statements comprise of the sources and uses of the program fund for the period under audit, and notes to the financial statemnents, including a summary of significant accounting policies (collectively referred to as the "Program financial statements"~ - PFS). In our opinion the accompanying PFS give a true and fair view of the cash receipts and disbursements for the year ended on March 31, 2018 and the expenditure of the Program for the year ended on March 3 I st 2018 and its cash flows for the year then ended in accordance with the Financing Agreement and Implementing Entity Agreement stated as above. Basis of Opinion We conducted our audit in accordance with the Standards on Auditing (SAs) issued by Institute of Chartered Accountants of India (ICAI). Our responsibilities under those standards are further described in the Auditor"s Responsibilities for the Audit of the Financial Statements section of our report. We are independent of the implementing agency in accordance with the Code of Ethics issued by the ICAI and the ethical requirements stated in our letter of appointment no 256 dated 10.01.2019 for undertaking this assignment, that are relevant to our audit of the financial statements, and we have fulfilled our other ethical responsibilities in accordance with these requirements and-ICAI's Code of Ethics. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion. 6 www.guptasachdevacom Registered Office: +91 78700 99007 +91 612 2973080 connect. patna@guptasachdeva in 103, 1st Floor, Jagat Trade Centre, +91 75649 00708 +91 612 2973081 Fraser Road, Patna - 800 001 +91 75649 00710 +91 612 2973083 facebookcom/guptasachdeva Management's Responsibility for the Program Financial Statements The Program Management & Board of Directors of BSEIDC are responsible with respect to the preparation of these program financial statements in accordance with the Program Financing Agreement and Implementing Entity Agreement, accounting principles generally accepted in India, including the applicable Accounting Standards. This responsibility also includes maintenance of adequate accounting records for safeguarding the assets of the Fund and for preventing and detecting frauds and other irregularities; selection and application of appropriate accounting policies; making judgments that are reasonable and prudent; and design, implementation and maintenance of adequate internal financial controls, that were operating effectively for ensuring the accuracy and completeness of the accounting records, relevant to the preparation and presentation of the program financial statements that give a true and fair view and are free from material misstatement, whether due to fraud or error. Auditor's Responsibility for the Audit of the Financial Statements Our responsibility is to express an opinion on these program financial statements based on our audit. We have taken into account the provisions of the Program Financing Agreement and Implementing Entity Agreement, the accounting and auditing standards and matters which are required to be included in the audit report. We conducted our audit in accordance with the Standards on Auditing issued by the Institute of Chartered Accountants of India. Those Standards require that we comply with ethical requirements and plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and the disclosures in the program financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the program financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal financial control relevant to the Management's preparation of the program financial statements that give a true and fair view in order to design audit procedures that are appropriate in the circumstances. An audit also includes evaluating the appropriateness of the accounting policies used and the reasonableness of the accounting estimates made by the management, as well as evaluating the overall presentation of the program financial statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion on the program financial statements. Report on Other Legal and Regulatory Requirements Further to our opinion on the Program Financial Statements we report that in our opinion and to the best of our information and according to the explanations given to us, we believe that program expenditure during the period of audit has been correctly reported in the Program Financial Statement. Further we also certify that: a. Program funds were utilized for the purpose for which they were intended. b. Program expenditure was exclusively financed through the program funds and no other sources of funds have been received for incurring those expenditures. c. Proper books of accounts have been maintained and Program Financial Statement are in agreement with the books of account. d. Program financial statement has been prepared on cash basis in accordance with the accounting policies disclosed in the audited annual financial statements of BSEIDC and applicable to the preparation of the Program financial statement. e. Interim Financial Reports (IFR) submitted by the Project management can be relied upon to support applications for withdrawal of the Loan, and adequate supporting documentation has been maintained to support these claims; f. The accounting and internal control systems underlying the program and oversight over the Program funds except for the possible effects reported in management letter from auditor, were adequate and maintained throughout the audit period, and g. Procurements made by BSIEDC under the program had been undertaken in accordance with agreed procedures. Other Matter We have not audited the financial statements/information of Financial Statement of BSEIDC for the year ended 3 1 March 2018 which has been audited by another auditor and whose reports have been furnished to us. For Gupta Sachdeva & Co. (Chartered Accountants) (Firm Reg. No.:.006706N) Gourav Gunjan (Partner) (M. No.: 068385) Date: 20.08.2019 Place: Patna BIHAR STATE EDUCATIONAL INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED CIN: U80301BR2010SGC015859 Annex 2: INDICATIVE FORMAT FOR PROGRAM FINANCIAL STATEMENTS Enhancing Teacher Effectiveness in Bihar Operation Credit No .5578 IN World Bank: Programme Fund Statement of Sources and Uses of Funds Year: 01.04.2017 to 31.03.2018 S.No. Particulars Note No. Firgures as at the Firgures as at the end of the current end of the previous reporting period reporting period A Sources of Funds 31.03.2018 31.03.2017 (i) Funds received from Government 1 2,50,46,52,846.00 2,37,18,54,111.00 of Bihar (net) (ii) Long term liabilities 2 (iii) Current liabilities 3 44,36,32,184.00 37,75,84,082.94 Total Rs. 2,94,82,85,030.00 2,74,94,38,193.94 B Uses of Funds (i) Long term advances 4 ... (ii) Current assets: (a) Short term advance 5 93,72,844.00 1,02,70,99000 (b) Cash & Cash Equivalents 6 2,93,89,12,186.00 2,73,91,67,203,94 Tot s. 2,94,82,85,030.00 2,74,94,38,193.94 For GUPTA SACHDEVA & CO Senior count Managing Chartered Accounta officer Director FRN - 0067 Patna GO RAV GUNJAN Date :06.05.19 Partner 0 MRN -068385 EV BIHAR STATE EDUCATIONAL INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED CIN: U80301BR2010SGC015859 Annex 2: INDICATIVE FORMAT FOR PROGRAM FINANCIAL STATEMENTS Enhancing Teacher Effectiveness in Bihar Operation Credit No: 5578 IN World Bank : Programme Fund Statement of Sources and Uses of Funds Year: 01.04.2017 to 31.03.2018 Notes Forming Part of the Statement of Sources and Uses of Funds Particulars Firgures as at the Firgures as at the end of the current end of the previous reporting period reporting period 31.03.2018 31.03.2017 Note 1: Funds received from Government of Bihar (net) Funds received from Government of Bihar (i) Opg.Balance 2,37,18,54,111.00 2,16,59,45,287.00 (ii) Receipt during the year 1,67,24,23,800.00 1,94,50,20,000.00 Add: Bank interest 4,41,42,636.00 5,21,47,763.00 Less Program expenditure: (a) Civil Works 1,58,37,67,701.00 1,79,12,58,939.00 (b) ICT (c) Others (Please specify) Total Rs. 2,50,46,52,846.00 2,37,18,54,111.00 Note 2: Long Term Liabilities (a) Trade payables(goods, works & services etc.) (b) Others(retention money, security deposits etc.) Total Rs. Note 3 : Current Liabilities (a) Trade payables(goods, works & services etc.) (b) Others(retention money, 44,36,32,184.00 37,75,84,082.94 security deposits etc.) Total Rs. 44,36,32,184.00 37,75,84,082.94 Note 4 : Long Term Advances Civil Works (mobilization/ secured advance etc.) Others Total Rs. Note 5 : Short Term Advances Civil Works (mobilization/ secured advance etc.) 93,72,844.00 1,02,70,990.00 Others Total Rs. 93,72,844.00 1,02,70,990.00 . . .. .. Note 6 Cash and Cash Equivalents Cash - in - hand Balance with Bank/s 59,73,91,866.00 1,26,91,72,544.94 Bank Deposits PLA 2,34,15,20,32000 1,46,99,94,65900 Total Rs. 2,93,89,12,186.00 2,73,91,67,203,94 Senior ccouns Managing For GUPTA SACHDEVA & CO officer Director Chartered Accoutan ts FRN - 006f6N( GOURAV GUNJAN Patna Partner Date: 06.05.2019 MRN -068385 PA7, Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 DIET Expenses 2017-18 Expenses upto 2017-18 SL No. Name of DIET Amount (in INR) Amount ( in INR) 1 Araria (SI. No. 06) 10,984.00 1 1,23,76,227.00 2 Banka 1,81,75,94300 8,02,95,642,00 3 Begusarai (SI. No. 05) 43,58,388.00 9,46,28,214.07 4 Darbhanga 2,79,03,072.00 2,79,03,072,00 5 Dumraon, Buxar (SI, No. 02) 42,03,016.00 2,59,50,27300 6 E. Champaran (SI, No, 16) 8,75,500,00 10,65,95,936.00 7 Janui (Gr. No. 28) 6,33.81,960.00 6,33,81,960.00 8 Katihar (SI. No. 14) 10,10,71,977.00 9 Kisangai, (SI. No. 4) 33,58,887.00 8,23,20,357.03 10 Kliagaria (SI. No. 01) 87,72,077.00 11,60,26,979.00 11 Lakhisarai (SL No. 1) 2,85,14,061.00 9,23,46,817.00 12 Madhepura (SI. No. 11) 1,37,03,011.00 6,75,14,447.00 13 Madhubani (SI. No. 08) 12,23,95,974.00 14 Mohania (SI. No. 03) 2,38,86,199.00 4,76,35,790.00 15 Munger, Purbasarai (S1. No 9) 4,56,73,878.00 8,15,09,041.00 16 Nawada(SI. No. 08) 1,17,16,077.00 9,85,60,702.00 17 Noorsarai (SI. No. 15) 1,31,04,995.00 6,22,31,000.00 18 Samastipur (SIL No. 10) 68,53,487.00 5,09,73,253.00 19 Sheikhpura (SI. No. 6) 5,50,46,269.00 9,88,00,452.00 20 Srinagar, Purnia (SI.No.02) 10,82,71,827.00 21 Siwan (SIL No. 12) I 1,37,93,665.00 22 Sheohar (SI. No. 4) 4,04,53,564.00 10 14,89,474.00 23 Saran (SI. No. 09) 31,05,294.00 6,84,48,223.00 24 Tarar, Aurangabad 3,28,83,057.00 8,89,24.947.00 25 Thawe(SI, No.07) 36,00,263.00 7,27,38,803.00 26 Vikram (SI. No.04) I 1,33,54,73 1.00 27 W. Champaran (SI. No. 3) 2,53,37,787.00 10,5 1,41,572,00 TOTAL DIET 43,49,17,769.00 2,30,46,81,355.10 Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 CTE Expenses 2017-18 Expenses upto 2017-18 SL.No. Name of CTE AmoUnt ( in INR) Amount ( in INR) 1 Barh 97,59,872.00 97,59,872.00 2 Bhagalpur 2,51,34,141 .00 9,84,21,868.00 3 Chhapra, Saran 1,43,19,522.00 1,43,19,522.00 4 Dumraon, Buxar 1,34,59,274.00 1,34,59,274.00 5 Forbesganj, Araria 6,65,91,323,00 6,65,91,323.00 6 Gaya 1,76,42,047.00 5,16,03,063.98 7 Haweli, Kharagpur 98,75,611.00 98,75,611.00 8 Purnia 5,22,05,196.00 5,22,05,196.00 9 Saharsa 2,83,76,412.00 2,83,76,412.00 10 Samastipur 4,43,39,855.00 6,31,21,447.00 11 Tarar 2,02,85,199.00 2,02,85,199.00 121 'furkee 93,57,946.00 8,83.90,964.02 TOTAL 31,13,46,398.00 51,64,09,752.00 Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 BITE Expenses 2017-18 Expenses upto 2017-18 SLNo. Name of BITE Amount (in iNR) Amount ( in INR) 1 Dariyapur 2,19,13,604.00 9,07,68,933.00 Katihar 2,73,85,855.00 7,32,67,253.00 3 Madhopatti 10,31,00,978.37 4 West Champaran 2,03,11,788.00 9,00,70,685.02 6,96,11,247.00 35,72,07,849.39 Bihar State Educational Infrastructure Development Corporation Ltd, Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 SCERT Expenses 2017-18 Expenses upto 2017-18 SL.No. Name of SCERT Amount ( in INR) Amount (in INR) 1 SCERT 1,34,46,564.00 1,34,46,564.00 134,46,564.00 1,34,46,56400 Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 BRC Expenses 2017-18 Expenses upto 2017-18 SL.No. Name of BRC Amount ( in INR) Anount ( in INR) i BRC (SI. No.I) Ekma, Saran 33,54,209.00 33,54,209.00 2 BR (SI No, 6) Dariyapur. Saran 23,71,560.00 35,94,187.00 3 BRC (SI, No. 7) Garkha, Saran 9,31,364.00 9,31,364.00 4 BRC (SI. No. 9) Keoti, Darbhanga 57,78,284.00 57,78,284.00 5 BRC (SI No. 10) Kusheshwarsthan 23,83,398.00 38,53,164.00 6 BRC (SI. No. 10) Samastipur 15,89,242.00 15,89,242.00 7 BRC (SI. No. 12) Bairiya, W. Champaran 27,21,536.00 27,21,536.00 8 BRC (SI. No. 13) Baheri, Darbhanga 16.83,387.00 16,83,387.00 9 BRC (SI. No. 16) Jhaniharpur, Madhubani 45,72,271,00 45,72,271.00 10 BRG (Sl, No. 17) Thakurganj, Kisanganj 25,09,343.00 25,09,343.00 11 BRC (SI. No. 18) Khutauna, Madhubani 36,01,573.00 73,45,655.00 12 BRG (SL. No. 19) Khajauli, Madhubani 37,97,257.00 37,97,257.00 13 BRC (SI. No. 22 )Warisaliganj, Nawada 17,41,941.00 17,41,941.00 14 BRC (SI. No. 22) Harlakhi, Madhubani 27,33,828.00 27,33,828.00 15 BRC (SI. No, 23 ) Babubarlhi, Madhubani 51,44,743.00 72,83,151.00 16 BRC (SI. No. 23 ) Narhat, Nawada 26,30,432.00 26,30,432.00 17 BRC (SI. No. 24) Rosera, Samastipur 45,21,895.00 62,57,662.00 18 BRC (SI. No. 27) Hasanpur, Darbhanga 29,46,218.00 29,46,218.00 19 BRG (SI. No. 28) Mohanpur, Samiastipur 34,15,883.00 34,15,883.00 20 BRC (SI. No. 29) Patori, Samastipur 49,03,484.00 63,61,371.00 21 BRC (SI. No. 30) Shivajinagar 53,05,575.00 53,05,575.00 22 BRC (Sl. No. 3 1) Sangrampur, E. Champarai 36,85,273.00 48,50,248.00 23 BRC (Sl. No. 33) Chakia, E. Champaran 48,78,970.00 48,78,970.00 24 BRC (SI. No. 33) Kalyanpur, E. Champaran 22,69,881.00 22,69,881.00 25 BRC (S. No, 34) Raxual, E. Champaran 48,18,990.00 48,18,990.00 26 BRC (SI. No. 34) Sugauli, E. Champaran 33,88,601.00 33,88,601.00 27 BRC (SI. No. 35) Madhuban 52,05,990.00 67,45,687.00 28 BRG (SL No. 35) Dhaka 19,71,135.00 19,71,135.00 29 BRC (SI. No. 36) Patahi, E. Champaran 68,25,447.00 68,25,447.00 30 BRG (SI. No. 38) Adapur, E. Champaran 31,56,235.00 31,56,235.00 31 BRG (SI. No. 38) Hasanpura, Siwan 22,92,217.00 22,92,217.00 32 BRC (SI. No. 41) Pirpaiti, Bha,alpur 22,59,310.00 22,59,310.00 33 BRC (SI. No. 42) Narkatiyaganj, W. Champa 47,12,276.00 47,12,276.00 34 BRC (SI. No. 43) Sikta, W. Champaran 32,55,336.00 32,55,336.00 35 BRC (SI. No. 45) Lauriya, W. Champaran 47,81,810.00 47,81,810.00 36 BRC (SI. No. 47) Majhaulia, W. Champaran 58,08,338.00 58,08,338.00 37 BRC (SI. No. 48) Darauli, Siwan 19,44,114.00 19,44,114.00 38 BRC (SI. No. 50) Mairwa, Siwan 37,41,693.00 37,41,693.00 39 BRG (SL No. 51) Basantpur, Siwan 48,50,402.00 48,50,402.00 40 BRC (SI. No. 52) Maharajgani, Siwan 19,47,118.00 19,47,118.00 Pagé1f 4 < Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Canipus Saidpur, Patna- 800004 BRC Expenses 2017-18 Expenses upto 2017-18 SL.No. Name of BRC Amount ( in INR) Amount ( in INR ) 41 BRC (SI. No. 53) Bhagwanpur, Siwan 36,86,061.00 36,86,061.00 42 BRC (SI. No. 56) Sidhwalia, Gopalgan 29,00,355.00 29,00,355.00 43 BRC (SI. No. 57) Bhory, Gopalganj 22,10,372.00 22,10,37200 44 BRC (SI. No. 58) Bijaipur, Gopalganj 32,06,904.00 32,06,904.00 45 BRC (SI. No. 6 9) Ramgadh, Kajmur 16,75,284.00 16,75,284.00 46 BRC (SI. No. 62) Chainpur, Kaimur 35,07,571.00 35,07,571.00 47 BRC (SI. No. 63) Bhagwanpur, Kaimur 30,30,567.00 30,30,56700 48 BRC (SI, No. 67) Dinara, Rohtas 64,40,033,00 64,40,033.00 49 BRC (SI. No. 68) Karapgar, Roihtas 45,26,019.00 45,26,019.00 50 BRC (SI. No. 69) Kochas, Rohtas 24,73,405.00 24,73,405.00 51 BRC (SI. No. 70) Tilautu, Rohtas 52,53,766.00 70,88,140.00 52 BRC (SI. No. 72) Dawat, Rohtas 52,95,326.00 52,95,326.00 53 BRC (SI. No. 73) Mansahi, katiar 56,18,167.00 56,18,167.00 54 BRC (SI. No. 75) Pranpur, katihar 48,95,85200 48,95,852.00 55 BRC (SI. No. 76) Kadwa, katihar 43,47,706,00 43,47,706.00 56 BRC (SI. No. 77) Barsoi, Katihar 36,96,303.00 36,96,303.00 57 BRC (SI. No. 82) Bhiargama, Araria 53,09,062.00 53,09,062.00 58 BRC (SI. No. 84) Purnea East 33,05,448.00 49,072572.00 59 BRC (SI. No. 85) Baisi, Purnea 64,38,543.00 64,38,543.00 60 BRC (SI. No. 86) Amour, Purnea 65,07,285.00 65,07,285.00 61 BRC (SI. No, 87) Dhadaha 52,45,432.00 52,45,432.00 62 BRC (SI. No. 88) Banbankhi, Purnea 57,99,085.00 57,99,085.00 63 BRC (SI. No. 89) T'aragachi 28,57,348.00 46,12,144.00 64 BRC (SI. No. 92) Katoria, Banka 24,79,406.00 37,98,723.00 65 BRC (SI. No. 93) Rajour, Banka 30,76,876.00 30,76,876.00 66 BRC (SI. No. 94) Barahat, Banka 60,70,002.00 60,70,002.00 67 BRC (SI, No. 95) Belhar, Banka 38,73,147.00 38,73,147.00 68 BRC (SI. No. 100) Sikandara, Jamui 38,46,865.00 38,46,865.00 69 BRC (SI. No. 101) Asiarganj, Munger 49,77,288.00 60,37,330.00 70 BRC (SI. No. 104) Shahkund, Bhagalpur 49,41,904.00 49,41,904.00 71 BRC (SI. No. 105) Puraii, Madhepura 49,54,121.00 49,54,121.00 72 BRC (SI. No. 106) Gwalpada, Madhiepura 18,8,894.00 18,86,894.00 73 BRC (SI. No. 107) Kuparkand, Madhepura 155,56,568.00 15,54,568.00 74 BRC (SL, No7 108) Gailarhi, Madhiepura 46,82,935.00 46,82,935.00 75 BRC (SL.No. 109) Saurbazar, Sahiarsa__ 19,93,171.00 19,93,171.00 76 BRC (SL. No. I 10) Navhiatta, saharsa 45,09,627.00 45,09,627.00 77 BRC (SL. No. 1 13) Simri, Bakhifyarpur 19,22,824.00 19,22,824.00 78 BRC (SI. No, 114) Supaul 55,56,768.00 55,56,768.00 79 BRC (SI. No. I15) Pipra, Supaul 21,92,971 .00 21,92,971.00 80 BRC (SI. No. 116) Pratapganj, Supaul 49,68,130.00 66,66,307,00 Page 2 of 4 Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 BRC Expenses 2017-18 Expenses upto 2017-18 SLNo. Name of BRC Amount ( in INR) Amount (in INR) 81 BRC (SI. No.1 18) Raghopur, Supaul 39,85,044.00 39,85,044.00 82 BRC (SIL No. 119) Atari, Gaya 21,22,048.00 21,22,048.00 83 BRC (SI No.120)Neemchak, Gaya 44,58,289.00 44,58,289.00 84 BRC (SI. No.12^)Waiirganj, Gaya 16,67,515.00 16,67,515.00 85 BRC (SI. No. 122)M ohanpur, Gaya 11,06,819.00 11,06,819.00 86 BRC (SI. No. 1 23)namganj, Gaya 9,02,516.00 9,02,516.00 87 BRC (SI.No. 124) Amas gaya 51,25,818.00 51,25,818.00 88 BRC (S1.No. 126) Jehanabad 41,72,747.00 41,72,747.00 89 BRC (SI.No. 127) Kako, Jehanabad 8.19,683.00 8,19,683.00 90 BRC (SI.No. 129) Arwal 11,01,709.00 11,01,709.00 91 BRC (SI.No, 130) Karpi, Arwal 29,47,367.00 29,47,367.00 92 BRC (SI.No. 131) Obra, Aurangabad 46,34,056.00 46,34,056.00 93 BRC (SI.No. 132) Dev, Aurangabad 47,00,494.00 47,00,494.00 94 BRC (SI. No. 133) Madanpur 9,11,729.00 19,40,173.00 95 BRC (SI. No. 134) Kutumba 30,28,454.00 40,08,265,00 96 BRC (SI. No. 135) Riga, Sitamarhi 25,13,1 14.00 25,13,114.00 97 BRC (SL No. 137) Pupri, Sitamarhi 34,56,179.00 34,56,179.00 98 BRC (SI. No. 139) Runnisaidpur, Sitamarhi 64,35,257.00 64,35,257.00 99 BRC (SI. No. 140) Suppi, Sitamarhi 37,74,265.00 37,74,265.00 100 BRC (SI. No. 141) Pakribarawan, Nawada 37,33,284.00 58,26,947.00 101 BRC (SI. No. 143) Akbarpur, Nawada 48,01,263.00 56,52,662.00 102 BRC (SI. No. 145) Chandi, Nalanda 36,36,827.00 36,36,827.00 103 BRC (SI. No. 146) Austhaban, Nalanda 47,47,415.00 47,47,415.00 104 BRC (SI. No. 147) Rahui 45,79,330.00 45,79,330.00 105 BRC (SI. No. 148) Ekangarsarai, Nalanda 35,66,870.00 44,57,918.00 106 BRC (SI. No. 149) Silaw, Nalanda 36,04,757.00 36,04,757.00 107 BRC (SI. No. 150) Katrisarai, Nalanda 54,46,373.00 54,46,373.00 108 BRC (SI. No. 152) Motipur, Muzaffarpur 20,64,452.00 20,64,452.00 109 BRC (SI. No. 154) Aurai, Muzaffarpur 11,79,202.00 11,79,202.00 110 BRC (SI. No. 155) Bandra, Muzaffarpur 37,39,763.00 52,14,989.00 111 BRC (SI. No. 156) Minapur, Muzaffarpur 32,59,953.00 32,59,953.00 112 BRC (SI. No. 158) Jagdishpur, Bhojpur 27,82,689.00 42,32,955.00 113 BRC (SI. No. 159) Charpokhri, Bhojpur 9,86,147.00 9,86,147.00 114 BRC (SI. No. 160) Udwantnagar, Bhojpur 34,56,645.00 34,56,645.00 115 BRC (SI. No. 161) Garhani, Bhojpur 31,99,191.00 47,99,883.00 116 BRC (SI. No. 162) Koilwar, Bhojpur 19,36,274.00 19,36,274.00 117 BRC (SI. No. 165) Naubatpur 28,37,758,00 50,23,291.00 118 BRC (SI. No. 168) Mithihani, Begusarai 32,57,690.00 51,75,794,00 119 BRC (SI. No. 169) Bhagwanpur, Begusarai 39,06,828.00 39,06,828,00 120 BRC (SI. No. 173) Chautham, Khagaria 15,01,871,.00 Page 3 of 4 Bihar State Educational Infrastructure Development Corporation Ltd. Rastra Bhasha Parisad Campus Saidpur, Patna- 800004 BRC Expenses 2017-18 Expenses upto 2017-18 SL.No. Name of BRC Amount ( in INR) Amount ( in INR ) 121 BRC (SI No. 174) Gogari, Khagaria 66,67,601.00 66,67,601.00 122 BRC (SI No. 176) Parbatta, Khagaria 65,15,378.00 65,15,378.00 123 BRC (SI. No, 178) Desari. Vaishali 58,44,888.00 58,44,888.00 124 BRC (SL No. 179) Bidupur 31,41,143 00 44,68,916.00 125 BRC (SI No. 180) Jandaha, Vaishali 50,96,327.00 50,96,327.00 126 BRC (SI. No. 181) Mahua 43,03,423,00 55,64,775.00 127 BRC (SI. No. 182) Garoul, Vaishali 57,33,347,00 57,33,347.00 128 BRC (SI. No, 183) Chewada, Sheikhpura 67,73,006.00 67,73,006.00 Total BRC 47,23,06,748.00 51,31,07,098.00 Page 4 of 4