E4506 V6 REV Environmental Management Plan of Kunming WuHua Municipal Solid Waste Incineration Power Plant Kunming WuHua Municipal Solid Waste Incineration Power Plant July 2014 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Abbreviations APC air pollution control Bank World Bank BAT best available techniques BEP best environmental practices CFB circulating fluidized bed DongJiao DongJiao MSW Power Plant EA environmental assessment EHS Guidelines World Bank Group Environmental, Health and Safety Guidelines EPB environmental protection bureau EMP environmental management plan FECO Foreign Economic Cooperation Office, Ministry of Environmental Protection KongGang KongGang MSW Power Plant MEP Ministry of Environmental Protection, PRC MSW municipal solid wastes NIP National Implementation Plan POPs persistent organic pollutants Stockholm SC Convention UMB urban management bureau WuHua WuHua MSW Power Plant XiShan XiShan MSW Power Plant ii Content Abbreviations ............................................................................................................... ii 1 Introduction ........................................................................................................... 4 1.1 Project background .................................................................................... 4 1.2 Project profile ........................................................................................... 5 1.2.1 Project location ................................................................................... 5 1.2.2 Project owner ..................................................................................... 5 1.2.3 Technical Considerations for BAT/BEP application ................................... 5 1.3 Environmental law and Regulatory Framework.............................................. 6 1.3.1 Domestic environmental protection laws, regulations & policies ............... 6 1.3.2 World Bank safeguards policies............................................................. 8 1.3.4 Stockholm Convention BAT/BEP ............................................................ 9 1.3.5 Domestic technical documents ........................................................... 10 1.4 Relevant pollutant emission standards ....................................................... 10 1.4.1 Domestic standards ............................... Error! Bookmark not defined. 1.5 Environmentally sensitive receptors ........................................................... 14 2 Mitigation Measures .............................................................................................. 15 2.1 Construction period ................................................................................. 15 2.2 Operational period ................................................................................... 18 3 Responsibilities of Environmental Management ........................................................ 22 3.1 Management organization and responsibilities assignment ........................... 22 3.2 Environmental management ..................................................................... 23 4 Monitoring plan for environmental protection .......................................................... 24 4.1 Environmental monitoring plan ................................................................. 24 4.1.1 Environmental monitoring during construction period ........................... 24 4.1.2 Environmental monitoring during operation period ............................... 24 4.1.3 Standardize sampling location ............................................................ 25 4.1.4 Monitoring on accident emergency and tracking monitoring .................. 26 4.1.5 Plant monitoring staff ........................................................................ 26 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 4.2 Environmental Monitoring Enhancement .................................................... 26 4.2.1 Operational and environmental performance monitoring ....................... 26 4.2.2 Improved monitoring of MSW incinerators during operation................... 26 5 Risk Control and Emergency Management............................................................... 28 5.1 Major risk factors ..................................................................................... 28 5.2 Environmental risk accidents ..................................................................... 30 5.2.1 Fire and explosion ............................................................................. 30 5.2.2 Environmental risk monitoring and preventive measures ....................... 30 5.2.3 Monitoring method ............................................................................ 30 5.2.4 Preventive measures ......................................................................... 31 5.3 Accident response plan ............................................................................ 31 5.3.1 Early warning procedure .................................................................... 31 5.3.2 Emergency plan initiation procedure ................................................... 32 5.3.3 Organization & responsibilities ............................................................ 32 5.3.4 Reporting and notification .................................................................. 35 5.4 Emergency responses and salvage measures.............................................. 35 5.4.1 Responding procedure ....................................................................... 35 5.4.2 Emergency measures ........................................................................ 36 5.4.3 Emergency monitoring ....................................................................... 37 5.4.4 Termination of emergency.................................................................. 37 6 Environmental Training Plan................................................................................... 38 6.1 Goal and content of training ..................................................................... 38 6.2 Regular training plan................................................................................ 38 6.2.1 Emergency drill and training ............................................................... 39 6.2.2 Special trainings on environmental laws and regulation as well as related environmental knowledge ............................................................................... 39 6.2.3 Environmental risk identification ......................................................... 39 6.2.4 Budget for training expenditure .......................................................... 39 6.3 Enhanced training for incinerator managers and operators ........................... 40 7 Environmental Reporting ....................................................................................... 41 7.1 Reporting................................................................................................ 41 ii Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 7.2 Record filing ........................................................................................... 41 8 Public Engagement Plan ........................................................................................ 43 8.1 Information Disclosure and Public Participation Strategy .............................. 43 8.1.1 Information Disclosure and Public Participation Program ....................... 43 8.2 Grievance Redress Mechanism .................................................................. 47 8.3 Other Public Engagement Programs .......................................................... 48 9 Legal Implication of Environmental Management Plan .............................................. 49 10 EMP Budget................................................................................................... 51 iii Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 1 Introduction 1.1 Project background The National Implementation Plan of the People’s Republic of China for the Stockholm Convention on Persistent Organic Pollutants (POPs) lists the municipal solid waste (MSW) disposal sector as one the country’s six priority industries for POPs reduction. In order to help China implement its responsibility under the Convention, achieve reduction of dioxin emissions from MSW incineration, the Ministry of Environmental Protection (MEP) and the World Bank work together to promote best available techniques (BAT) and best environmental practices (BEP) in accordance with the Stockholm Convention (SC). Four existing MSW incinerators in Kunming City were identified as candidates for the demonstration of BAT and BEP. With grant financing from the Global Environmental Facility (GEF) complemented with own resources, selected MSW incinerators would improve operations and install necessary equipment to demonstrate operations that are in line with SC BAT and BEP. With the support of the Foreign Economic Cooperation Office (FECO) of MEP, each of the four incinerators prepared an environmental audit report. Based on the findings and recommendations of the environmental audit, a standalone EMP was also prepared for each incinerator. During project preparation, a social assessment and public consultations were carried out and integrated with the environmental assessment process. The project implementation, by design, will consist two phases. In the first phase an intensive operating and environmental performance audit at the four candidate incinerators will be carried out in the first year of project implementation. Based on the audit, an operational improvement program will be designed for each incinerator. Incinerators that commit to implementing these programs and fulfill financial eligibility conditions would be supported during the remainder of the project, including through grand funding for necessary upgrades of equipment relevant for dioxin emission reduction. The project will aim at achieving the operational improvements at least three of the four incinerators in Kunming. During the project appraisal, Ministry of Environmental Protection (MEP) issued Standard for Pollution Control on the MSW Incineration (GB18485-2014), which is an amendment to existing GB18485-2001. The new national standard has considerably tightened air emission limits of MSW incineration to the level of EU and US standards that are referenced by WBG EHS Guidelines. According to this new national standard, by Jan 1st, 2016, all existing MSW incinerators in China, including the four candidate MSW incinerators in Kunming, must meet the new standard. This Environment Management Plan (EMP) has incorporated applicable domestic requirements, Stockholm Convention Best Available Techniques and Best Environmental Practices (BAT/BEP), and World Bank Group Environmental, Health and Safety Guidelines (WBG EHS Guidelines). The EMP is expected to remain valid upon completion of the said intensive operating and environmental performance audit to be carried out in the first year 4 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant of project implementation. The EMP will be updated and costed once the operational and performance audit during the first year of project implementation is completed and that the EMP will be part of the Operational Improvement Program for each incinerator. 1.2 Project profile 1.2.1 Project location Kunming Wuhua Municipal Solid Waste Incineration Power Plant (Wuhua Incinerator hereafter) is located in Wuhua district in northwestern Kunming city (see Figure 1-1). Figure 1-1 Location of 4 candidate incinerators – Wuhua – northwestern Kunming 1.2.2 Project owner The Wuhua Incinerator will be responsible for implementation of the EMP. The Wuhua Incinerator was built in December 2007, and entered into official operation in July 2008 after obtaining environmental acceptance issued by Yunnan Provincial Environmental Protection Department. 1.2.3 Findings and Recommendations of Environmental Audit According to an expert evaluation made during project preparation, the Wuhua facility comprises three combustion trains each of 400 TPD (440 maximum) for total of 1,200 TPD. One of the three trains is held in reserve. The facility utilizes circulating fluidized bed (CFB) technology and has been in operation since 2008. Electricity is generated using two turbine generators with a total generating capacity of 24 megawatts. Municipal solid waste, pre-processed at the transfer stations by “fermentation” for water removal is delivered to the plant, hand-picked to remove oversize and large stones and bricks, stored in their pit 5 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant and, over a period of time, additional water is drained off. Waste is fed to the furnace using a screw feeder. If combustion temperatures fall below 850°C, coal is used as an auxiliary fuel. Oxygen is measured in the boiler following the recirculating cyclone and ranges between 4 and 7 %. After leaving the economizer, acidic flue gases are treated using dry Ca(OH)2 (slaked lime). Activated carbon with a B.E.T. of 1400 is added for dioxin and mercury control with achievement of mercury compliance indicated as the driving factor in setting the carbon feed rate. Particulate collection is now effected using a bag house with fiberglass (Line #1) and PPS (Lines #2 and #3) bags but these will be replaced with Teflon bags technology (without Teflon membranes) at the next bag replacement. Dioxin monitoring have been carried out 12 times since the incinerator was built and ranged 0.057-0.89 ng TEQ/m3 in stack emissions. 3 of the 12 results exceeded 0.1 ng TEQ/m3. Overall, the environmental audit and technical evaluation of the Wuhua plant concluded that the incineration plant is well-designed and well maintained, has fundamental control systems, qualified staff in place. It has also established a sound environmental management system. These conditions allow the incinerator for readily adaption of an operating and environmental performance enhancement program. The main issues include: 1) the operation is seriously affected by high humidity, low heat-value and abnormal size garbage due to poor at-source segregation, which compromise good combustion and/or result in frequent fire-pressing and restart in furnaces. 2) The incinerator’s instrumentation and automatic control system may not be adequate to address these challenges. Overall the unsteady operations cause considerable likelihood of uncertain emissions; 2) environmental monitoring seems to be inadequate due to technical and capacity constraints. The online monitoring equipment does not function properly at all times. Some monitoring results seem unreliable; 3) incinerator operators’ knowledge of process control, comprehensive application of BAT/BEP and environmental compliance need to be further enhanced. Accordingly the following suggestions on operational improvement are suggested, including:  Enhance pretreatment to help reduce down-time of incinerators;  Investments in monitoring equipment for plant performance and environmental performance, and a certain level of integration of environmental performance monitoring and process control; and  Enhance flue gas treatment system, such as installing lime and activated carbon injection metering device, bag breakage tester, replacing bag materials to PTFE coated filter.  Capacity building for operator skills. 1.3 Environmental law and Regulatory Framework 1.3.1 Domestic environmental protection laws, regulations & policies Ever since the year of 1979 when the Environmental Protection Law of the People's Republic of China (Trail) was issued, multiple environmental protection laws and 6 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant regulations have ensued, including the Water Pollution Prevention and Control Law of the People’s Republic of China, the Atmospheric Pollution Prevention Law of the People’s Republic of China and the Marine Environment Protection Law of the People's Republic of China, etc. An environmental protection legislation system has taking shape by integrating the components of comprehensive laws, pollution control laws, and resource and eco-protection laws, etc. Currently an environmental law system has been derived from the Environmental Protection Law of the People’s Republic of China on basis of the Constitution of the People’s Republic of China. The legislation efforts on environmental protection have provided power thrusts to the development of environmental protection in China. The environmental protection laws and regulation concerning this project include: (1) Environmental Protection Law of the People’s Republic of China issued on December 26, 1989; (2) Noise Pollution Prevention Law of the People’s Republic of China revised on October 29, 1996; (3) Atmospheric Pollution Prevention Law of the People’s Republic of China revised on April 29, 2000; (4) Solid Waste Pollution Prevention Law of the People’s Republic of China revised on December 29, 2004; (5) Water Pollution Prevention Law of the People’s Republic of China effective on June 1 2008; (6) Cleaner Production Promotion Law of the People’s Republic of China effective on July 1, 2012; (7) National Hazardous Waste Inventory issued by Instruction No.1 of the Ministry of Environmental Protection and the National Development and Reform Commission, taking effect on August 1, 2008; (8) Renewable Energy Law of the People's Republic of China (February 28, 2005); (9) Circular Economy Promotion Law of the People’s Republic of China (August 29, 2008); (10) CZ [2000] No.120 Technical Policy on Urban Domestic Waste Disposal and Pollution Prevention jointly issued by the Ministry of Construction, the Ministry of Science and Technology and the State Environmental Protection Administration; (11) HF (2008) No.82 Circular on Improving the Environmental Impact Assessing Management for Biomass Power Generation Projects issued on September 4, 2008; (12) The Technical Guidance on Domestic Waste Disposal jointly issued by the Ministry of Housing and Urban-Rural Construction, the National Development and Reform Commission and the Ministry of Environmental Protection on April 22, 2010; (13) HF [2010] No. 123 Guidance on Strengthening Dioxin Pollution Prevention; 7 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 1.3.2 World Bank safeguards policies Table 1-2 Compliance with the Bank’s safeguard policies Safeguard Policies Applicability Compliance OP/BP 4.01 Yes Category A project, full assessment, and environmental audit Environmental report and environmental management plan prepared. Public assessment participation and information disclosure carried out. OP/BP 4.04 Natural No The Project does not involve any natural habitats habitat OP 4.09 Pest No The project would incur neither purchase of any pesticide nor management additional pesticide application. No action is required according to the Policy. OP 4.37 Dam safety No There are no dams in the project area. OP4.11 Physical No Not any cultural heritage or other physical cultural resource has cultural resources been found. This project will not result in material changes or deterioration of OP/BP4.36 Forest No important forest areas or relevant natural habitats as defined in such policies. OP/BP 4.12 Involuntary No This project will out activities in existing waste Incineration resettlement Power Plant, so no land acquisition and resettlement are involved. OD 4.20 Indigenous No There’re no indigenous residents living in the project area or no Peoples indigenous residents will be affected by the project. OP 7.50 International No There are no international waterways in the project area. Waterways OP/BP 7.60 Disputed No There’re no international waterways in the project area. area 1.3.3 World Bank Group Environmental Health and Safety Guidelines The World Bank Group Guidelines applicable to this project include the applicable guidelines of General Guidelines and sub-guidelines related to municipal solid waste incineration. The EHS Guidelines contain the performance levels and measures that are generally considered to be achievable in new facilities by existing technology at reasonable costs. Application of the EHS Guidelines to existing facilities may involve the establishment of site-specific targets, with an appropriate timetable for achieving them. The applicability of the EHS Guidelines should be tailored to the hazards and risks established for each project on the basis of the results of an environmental assessment in which site-specific variables, such as host country context, assimilative capacity of the environment, and other project factors, are taken into account. The applicability of specific technical recommendations should be based on the professional opinion of qualified and experienced persons. When host country regulations differ from the levels and measures presented in the EHS Guidelines, projects are expected to achieve whichever is more stringent. If less stringent levels or measures than those provided in these EHS Guidelines are appropriate, in view of specific project circumstances, a full and detailed justification for any proposed alternatives is needed as part of the site-specific environmental assessment. This justification should demonstrate that the choice for any alternate performance levels is protective of human health and the environment. The Environment, Health and Safety Guidelines for Waste Management Facilities includes 8 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant measures and performance levels relevant to MSW incineration, including management of air emissions, ash and other residuals, water effluents, noise, occupational health and safety, etc. These measures have been incorporated into the project EMP. The Waste Management Facilities guidelines also make reference to emissions standards for MSW incinerators from European and the United States for this sector. 1.3.4 Stockholm Convention BAT/BEP The key relevant articles in Stockholm Convention and the BAT/BEP Guidelines on POPs are as the followings (1) Best Environmental Practices  Reducing the overall mass of wastes that have to be disposed of by any means serves to reduce both the releases and residues from incinerators. Diversion of biodegradables to composting and initiatives to reduce the amount of packaging materials entering the waste stream can significantly affect waste volumes. Responsibility for waste minimization lies only to a minor extent with the operator of a waste incineration plant. However, coordination and harmonization of relevant activities on different organizational levels (e.g. operator, local, regional or national level) is of major importance for protection of the environment as a whole.  Kerbside or centralized sorting and collection of recyclable materials (for example, aluminum and other metals, glass, paper, recyclable plastics, and construction and demolition waste) also reduces waste volume, saves valuable resources and removes some non-combustibles. Responsibility for these activities must be coordinated between relevant levels.  Operators must be able to accurately predict the heating value and other attributes of the waste being combusted in order to ensure that the design parameters of the incinerator are being met. This can be done using the results from a feed monitoring programme of key contaminants and parameters where sampling and analysis frequencies and rigour would increase as feed variability increases.  To achieve optimal prevention of formation, and capture, of chemicals listed in Annex C, proper care and control of both burn and exhaust parameters are necessary. In continuous feed units, the timing of waste introduction, control of burn conditions and post-burn management are important considerations  These events are normally characterized by poor combustion, and consequently create the conditions for formation of chemicals listed in Annex C. For smaller, modular incinerators operating in batch mode, start-up and shutdown may be daily occurrences. Preheating the incinerator and initial co-firing with a clean fossil fuel will allow efficient combustion temperatures to be reached more quickly. Wherever possible, however, continuous operation should be the practice of choice. Independent of the operation mode waste should be fed into the combustion system only when the required temperature (e.g. above 850℃) is reached. Upsets can be minimized through periodic inspection and preventive maintenance. Incinerator operators should not feed the waste during filter bypass (“dump stack”) operations or 9 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant during severe combustion upsets.  Routine inspections by the operator and periodic inspections by the relevant authority of the furnace and air pollution control devices should be conducted to ensure system integrity and the proper performance of the incinerator and its components.  High-efficiency combustion is facilitated by establishing a monitoring regime of key operating parameters, such as carbon monoxide (CO), volumetric flow rate, temperature and oxygen content.  Carbon monoxide, oxygen in the flue gas, particulate matter, hydrogen chloride (HCl), sulphur dioxide (SO2), nitrogen oxides (NOx), hydrogen fluoride (HF), airflows and temperatures, pressure drops, and pH in the flue gas should all be routinely monitored.  Bottom and fly ash from the incinerator must be handled, transported and disposed of in an environmentally sound manner.  Regular training of personnel is essential for good operation of waste incinerators. Creating and maintaining public goodwill towards a waste incineration project is critical to the success of the venture. (2) Best Available Techniques  Environmental concerning location is the most important for a new MSW incinerator.  Proper management of time, temperature and turbulence (the “3 Ts”), as well as oxygen (airflow), by means of incinerator design and operation will help to ensure the above conditions. The type and order of treatment processes applied to the flue gases once they leave the incineration chamber is important, both for optimal operation of the devices and for the overall cost-effectiveness of the installation. Best available techniques involve applying the most suitable combination of flue gas cleaning systems, including the dust (particulate matter) removal techniques, acid gas removal techniques, fuel gas polishing techniques, NOx removal techniques, etc. 1.3.5 Domestic technical documents (1) Approval on Kunming Municipal Solid Waste Incineration Power Plant by Yunnan Development and Reform Commission, foreign YFGWZ [2006] No. 835, Annex 1; (2) Administrative decision approved by Yunnan environmental protection department, YHXZ [2006] No. 51, Annex 3; (3) Acceptance opinion of three simultaneous actions by Yunnan Environment Protection Department, YHY [2010] No. 2, annex. 1.4 Relevant pollutant emission standards (1) Air Emission standards GB18485-2001 Standard for Pollution Control on Municipal Solid Waste Incineration is existing national standard for MSW incineration. In May 2014, MEP issued amendment to this standard, i.e. Standard for Pollution Control on the MSW Incineration (GB18485-2014). 10 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant The new national standard has considerably tightened air emission limits of MSW incineration to the level of EU and US standards that are referenced by WBG EHS Guidelines. According to this new national standard, by Jan 1st, 2016, Wuhua incineration plant must meet the new national standard. Table 1-1 shows Chinese national standards, EU and US standards for air emissions of MSW incinerators TSP in-organization emission sticks to Table 2 of Comprehensive Emission Standard of Atmospheric Pollutants (GB16297-1996). (2) Boundary standards for non-point emission of odor pollutants The concentration of the odor pollutants emitted by the Project is governed by the secondary expansion and transformation standards in GB14554-93 Emission Standard for Odor Pollutants. (3) Wastewater discharge standard There is no externally emitted sewage from the Company. (4) Standards on Noise Emission & Control The boundary noise is governed by the 3rd-grade standards in GB12348-2008 Emission Standard for Industrial companies Noise at Boundary. 11 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 1-1 Chinese national standards, EU and US standards for air emissions of MSW incinerators Parameter National National EHS Guidelines Standard, Stanard, (expanded) GB18485-2001 GB18485-2014 Ref. Pollutants Time mg/m3 mg/m3 EU USA USA converted mg/m3 (mg/m3) 1 Total Suspended Particulates 1-hr average 80 30 30 20 24-hr average 20 10 n/a 20 2 Carbon Monoxide (CO) 1-hr average 150 100 50-150ppmv 62.5-187.5 24-hr average 80 50-150 3 Nitrogen Oxides (NOx) 1-hr average 400 300 400 n/a n/a 24-hr average 250 200-400 150ppmv Not Convertible 4 Sulfur Dioxides (SO2) 1-hr average 260 100 200 30ppmv or 80% 85.7 or 80% reduction, 24-hr average 80 50 reduction, whichever is less whichever is less strigent strigent 5 Hydrochloric Acid (HCl) 1-hr average 75 60 60 25ppm or 95% 40.7 or 95% reduction, reduction, 24-hr average 50 10 whichever is less whichever is less strigent strigent 6 Mercury (Hg) Test Average 0.2 0.05 0.05-0.1 0.05 mg/dscm 0.05 or 80% or 80% reduction, reduction, whichever is less whichever is less strigent strigent 7 Lead (Pb) Test Average 1.6 See below Ref. 11 See below 0.14 0.14 12 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Ref. 10 8 Cadmium (Cd) Test Average 0.1 See below Ref. 9 0.05-0.1 0.01 0.01 (0.5-8 hr average) 9 Tl+Cd Test Average n/a 0.1 10 Total Metals / n/a n/a 0.5-1 n/a n/a (0.5-8 hr average) 11 Sb+As+Pb+Cr+Co+Cu+Mn+ Test Average n/a 1.0 n/a n/a n/a Ni+V 12 HF / n/a n/a 1 n/a n/a 13 Dioxins (incl. furans) / 1 ng TEQ/m3; 0.1 ngTEQ/m3 0.1 ngTEQ/m3 13 0.2 0.1 ng TEQ/m3 for Test average (6-8 hr (ng/m3)(total ng TEQ/m3 new incinerators built average) mass) after 2008 Note Effective for existing To be effective for 7%o oxygen, mg/m3=ppmv*co MSW incinerator until existing MSW dscm: milligrams mpound molecular December 31, 2015 incinerator on Jan per dry standard weight/22.4 st 1 , 2016 cubic meter 13 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 1.5 Environmentally sensitive receptors To the south of the incinerator there are two environmental sensitive targets. One is Puji Community, the other is Dayangtian village; both are about 1km away from the incinerator. See Table 1-4 and Figure 1-2. Table 1-4 Environmentally Sensitive Targets in the Plant Vicinity S/N Name Position Distance Properties Scale Remarks (m) 1 Dayangtian Southwest 1000 Rural 500 Category 2 function Village of the area households zone of ambient air plant 2 Puji District Southeast 1000 Rural 500 Category 2 function of the area households zone of ambient air plant Figure 1-2 Wuhua incinerator and nearby village/community 14 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 2 Mitigation Measures 2.1 Construction period The implementation of operational improvement program is not anticipated to include major civil works. In Wuhua incineration plant, limited works associated with reparation and installation of equipment may take place. Mitigation measures to such construction activities are included in Table 2-1. 15 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 2-1 Mitigation measures during the construction period Activities Influences Measures Implemented Supervised by Monitored by by Construction  Domestic Sewage  Sanitary sewage to be flowed into the existing sewage basin of Company & Company & Monitoring period from Construction plant, the sewage will be cleaned regularly and delivered to sewage Contractor Environmental Station Personnel disposal plant. Protection Agency  Muddy water for  The construction site should be surrounded by a fence no less than construction, etc 2m in height. Fences and masonry walls should be set up for construction  Fugitive Dust in works using the dust-raising materials like cement, lime powder and Construction and gravel, with covering cloth being deployed to suppress the dust. The piles Exhausted Gas from excavated earth and construction wastes that stays for over 48 hours Construction Equipment should be furnished with dust-proof provisions like covering or water  Certain noise sprinkling. The major dust source should be sprinkled with water for dust pollution may be suppression. The ground of the construction site should be sprinkled with generated by water before cleaning the site. construction equipment  The construction site should be completed with the vehicle cleaning in operation. facilities and the necessary drainage and slurry settlement devices. All transportation vehicles must be cleaned off the mud and flushed before exiting the construction site.  Vehicles transporting materials, slag and wastes into the construction site should preferably be completed with the enclosed hopper to prevent spillage. Road, along the material transportation route and coming or leaving the storage yard, shall be timely sprayed with water. The plant has procured one water spraying vehicle for daily road cleaning.  The low-noise equipment and techniques should be used if possible, with each piece of equipment properly placed.  The construction plan should be properly prepared. It is required for nighttime construction to register the construction plan in the local authority of public utilities.  Strengthen the maintenance of the construction equipment. Strengthen the construction management to conduct the construction works in a civilized manner.  The route and timing of vehicles entering and leaving the 16 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant construction site should be properly arranged. Strengthen the management of construction vehicles, require the drivers to drive in a civilized manner without horns, and shunt the route away from communities. For construction vehicles that have to take the route through communities, a proper route plan should be prepared, and negotiations and communications should be maintained with local residents to avoid any noise disturbance to the local population during the construction period. 17 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 2.2 Operational period The mitigation measures during operational period include provisions of SC BAT/BEP Guidelines and WBG EHS Guidelines for MSW incineration, and identified improvement measures for Wuhua incineration plant. These mitigation measures will be complemented by the operational improvement program developed after the first-year operating and environmental performance audit. See Table 2-2. 18 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 2-2 Mitigation measures during the operation period mitigation measures note1 Implemented Supervise Monitored by d by by pre-treatment  Presorting out the chlorine plastics and metals and especially the copper through the law, EHS, incinerator EPB monitoring pretreatment of garbage to control the generation of HCl, CuO, CuCl2 and Dioxin precursors. BAT/BEP station  Presorting out non-combustible wastes such as construction waste.  Increase homogeneity of wastes through presorting, shredding, and mixing  Keep garbage in bunker for at least 3-5 days to drain off leachate and increase heat value to 5,024KJ/kg minimum. Air emissions Ensure best combustion conditions through proper management of time, temperature and turbulence law, EHS, incinerator EPB monitoring (the “3 Ts”), as well as oxygen (airflow). BAT/BEP station  Residence time above 850°C >2s  Optimize and control combustion conditions by the control of air (oxygen) supply, distribution and temperature, including gas and oxidant mixing; the control of combustion temperature level and distribution; and the control of raw gas residence time;  Minimize the uncontrolled ingress of air into the combustion chamber via waste loading or other routes Avoid re-formation of dioxins after combustion chamber law, EHS, incinerator EPB monitoring  Rapid quenching of the flue gas after leaving all combustion chambers and before entering any BAT/BEP station particulate matter air pollution control device to avoid re-generation of dioxins;  Flue gas 850 ℃ ~ 950 ℃ under high-power traction followed by induced draft fan super heater, evaporator convection tubes, economizer, air pre heater, a sharp decline in the temperature of the flue gas in the 1s to about 300 ℃. Minimize furnace down-time and unsteady operation law, EHS, incinerator EPB monitoring BAT/BEP station  Implement maintenance and other procedures to minimize planned and unplanned shutdowns;  The waste charging system should be interlocked with the temperature monitoring and control system to prevent waste additions if the operating temperature falls below the required limits; Use flue gas treatment system for control of dioxins, acid gases, particulate matter, and other air law, EHS, incinerator EPB monitoring BAT/BEP station pollutants;  Minimize formation of dioxins and furans by ensuring that particulate control systems do not operate in the 200 to 400 degrees Celsius temperature range; identifying and controlling 1 Law: domestic law, regulation, approved documents, etc. 19 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant incoming waste composition; using primary (combustion-related) controls; using designs and operation conditions that limit the formation of dioxins, furans, and their precursors; and using flue gas controls;  Using semi-dry purification tower + activated carbon injection + bag filter  Optimize lime powder and activated carbon injections to increase the mixing uniformity of lime powder/activated carbon with flue gas  Automatic metering unit is provided for the activated carbon.  Using PTFE coated bag filters and bag breakage detection devices. Enhance instrumentation, control and environmental monitoring in order to maintain optimal and law, EHS, incinerator EPB monitoring flexible combustion conditions according to design parameters and emission levels. BAT/BEP station  Investments in monitoring equipment for plant performance and environmental performance,  Integration of environmental performance monitoring and process control; e.g. build CO into control loop;  Maintain and validate existing online monitoring devices regularly to ensure monitoring reliability. Odor control law, EHS, incinerator EPB monitoring  Fully enclosed design for each process point prone to produce odor. BAT/BEP station  Maintain micro-negative pressure environment at garbage storage pit.  Odor is collected and combusted in the incinerator and various types of pollutants provided by the combustion and its auxiliary facility can satisfy corresponding standard limits of emission. waste water Leachate is injected into furnace to burn. Domestic wastewater is transported to Kunming wastewater law incinerator EPB monitoring treatment plant for final disposal. Cooling water and other wastewater are treated and reused onsite. station Fly ash and Bottom ash and residuals should be managed based on their classification as hazardous or law, EHS, incinerator EPB monitoring other solid non-hazardous materials. Hazardous ash should be managed and disposed of as hazardous waste. BAT/BEP station wastes Non-hazardous ash may be disposed of in an MSW landfill or considered for recycling in construction materials.  Bottom slug is non-hazardous and recycled as construction materials  Fly ash is hazardous that needs safe treatment (see below) Manage bottom ash separately from fly ash and other flue gas treatment residues to avoid law, EHS, incinerator EPB monitoring contamination of the bottom ash for its potential recovery; BAT/BEP station Separate remaining ferrous and non- ferrous metals from bottom ash as far as practicably and law, EHS, incinerator EPB monitoring economically viable, for their recovery; BAT/BEP station Treat bottom ash on or off-site (e.g., by screening and crushing) to the extent that is required to meet law, EHS, incinerator EPB monitoring the specifications set for its use or at the receiving treatment or disposal site; BAT/BEP station Leaching toxicity of fly ash and fly ash solidified body, dioxins and water content should be in line with law, EHS, incinerator EPB monitoring 6.3 of Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2008). Then BAT/BEP station it can be sent for landfill. 20 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant noise Noise reduction measures law, EHS, incinerator EPB monitoring  Low-noise equipment in terms of type selection, BAT/BEP station  Sound insulation of plant building,  provision of damping pad and  installation of silencer Environmental Environmental monitoring program includes monitoring  Inspection monitoring by local EPBs  Environmental quality monitoring  Online monitoring: online monitoring of pollutant are connected to environmental protection bureau  Additional dioxins monitoring supported by the project  Online monitoring of operating parameters and emission data supported by the project.  See Chapter 4 for details Public  See Chapter 8 for details engagement others The health protection zone between the boundary of the incinerator and environmentally sensitive law incinerator EPB monitoring target is set at 800m. station law incinerator EPB monitoring Total pollutant index: dust 89.6 t/a, SO2 359.1t/a, COD77t/a,NH3-N 5.4t/a station 21 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 3 Responsibilities of Environmental Management FECO of MEP, as the national GEF project execution unit, takes overall responsibility for project implementation, including environmental safeguards. Yunnan Provincial Environmental Protection Department, as local PIU, will supervise Wuhua incineration plant in implementing the project. The incineration plant’s environmental management responsibility in implementing the project and operating the incineration plant is summarized in below. 3.1 Management organization and responsibilities assignment The company has set up an organization for environmental protection management, where general manager responsibility system is adopted; one full-time staff for environmental protection is employed, who takes charge of the company’s environmental protection and environmental protection coordination with other organizations and fulfills environmental management and supervision, consisting of the following responsibilities: (1) To implement environmental regulations and standards; (2) To set up environmental management system and often conduct inspection and supervision; (3) To compile environmental protection plans for the project and organize the implementation; (4) To lead and organize the implementation of project’s environmental inspection, and establish monitoring files; (5) To well cover environmental education and technological training and improve the quality of staffs; (6) To build up rules and regulations on project-related pollutant emissions and the operation of environmentally protective facilities; (7) To take charge of daily environmental management and support the department of environmental protection management to coordinate with other social sectors on environmental protection; (8) To formulate the emergency response plans for sudden accidents and participate in the emergency treatment for sudden accidents; (9) To regularly inspect and supervise the implementation of environmentally protective laws and regulations and timely contact related department to implement environmentally protective measures in all aspects to ensure the normal implementation of the measures. Responsibilities for Environmental Monitoring (1) To formulated annual plans on environmental monitoring and implementation plans as well as build up regulations and carry out the regulations; (2) To complete the monitoring assignments regulated in the environmental monitoring plan related to project on schedule and compile reports according to related regulations and take charge of submitting reports; 22 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant (3) To actively participate in the investigation and treatment of accidents when sudden pollution accidents related to project occur; (4) To take charge of the maintenance and inspection of monitoring devices to ensure normal monitoring; (5) To organize and supervise the implementation of environmental monitoring plans; 3.2 Environmental management The environmental management of the company mainly includes: (1) Management of rubbish towards the factory It shall enhance the management of rubbish towards to the factory, including formulating regulations on the traveling of garbage trucks in the factory, operating instruction on how to prevent foul smell and percolate leakage, especially the management on the garbage towards to factory during peak hours and high-temperature seasons; (2) It shall, according to incineration technology and equipment requirements, formulate operation instruction on jobs related to pollutant emission and strictly implement the specification on technological operation. (3) It shall formulate operation instruction on on-line monitoring on smoke to ensure the normal operation of on-line monitoring device. (4) It shall formulate operation instruction on jobs covering the maintenance of pollutant emission equipment. (5) It shall formulate monitoring plan for pollutant emissions and organize the implementation of monitoring. (6) It shall formulate operation instruction on fly ash, temporarily storage of slag in the factory, and the control of secondary pollution during transportation. (7) It shall, according to national control regulations on dangerous chemical management, clearly specify the building structure of storehouse, safe distance, emergency facilities, notes for fire controlling, etc. (8) It shall, according to regulations on managing the transportation of dangerous goods, formulate regulations on transportation management, explicit transportation routes and time, make related records, and build up management machine account. (9) It shall enhance the company’s resources and energy management, further reduce the energy consumption, and improve cleaner production to minimize the affect left by the project on the environment. (10) It shall follow the national and local policies, orders, and regulations on environmental protection, regularly train the staffs for environmental protection, strengthen the safety and environmental protection sense of the staffs, and intensify their responsibility sense of pollution control. (11) The constructing organization shall, according to the requirements of industrial 23 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant authority, meet the requirements of the third-party independent supervisory organization for monitoring the whole of the manufacturing process. 4 Monitoring plan for environmental protection Environmental monitoring refers to that, during the construction period and operation period of the GEF project, the monitoring organization shall collect and test environmental samples, deal with data, compile related reports, and proactively respond to environmental problems related to the project. The formulation and implementation of environmental monitoring plan is the basis of environmental management. It provides environmental statistics and environmental quantitative evaluation with scientific basis to ensure the implementation of pollution controls and timely find the problems in environmental protection measures and correct and improve. 4.1 Environmental monitoring plan 4.1.1 Environmental monitoring during construction period Local environmental monitoring station will be engaged to implement environmental monitoring during construction period and the monitoring plan can be seen in Table 4-1. Table 4-1 Monitoring Plan during Construction Period Monitoring location Monitoring items Monitoring frequency One spot in each of Equivalent Continuous Once for three months, once Sound the four sides of the A-weighted Sound Pressure lasting one day, 4 periods in plant Level total 4.1.2 Environmental monitoring during operation period The environmental monitoring programs during operational period follow domestic regulatory requirements; including the following 1) Per Chinese regulation, regular inspection monitoring are carried out by environmental monitoring station that is under local environmental protection bureau; 2) Continuous Emission Monitoring System (CEMS), 3) Dioxins monitoring which is to be conducted by licensed monitoring institute since Yunnan province is yet to have a dioxin monitoring lab; and 4) Ambient environmental quality monitoring. In addition, the GEF project will support additional monitoring during project implementation (see section 4.2). Environmental monitoring plan during operation period can be seen in Table 4-2. 24 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 5-2 Environmental Monitoring Plan during Operation Period Monitoring Monitoring Monitoring Monitoring Monitoring items category content location frequency Continuous fume flow rate, oxygen content, SO2, online NOx, TSP, CO, Temperature Automatic Chimney, Air pollution monitoring 32.5m from the source Regular bottom Fume flow rate, oxygen content, SO2, inspection NOx, TSP, HCl, CO, Temperature, monitoring, Pollution Heavy metals (Hg, Cd, Pb) quarterly source Air Pollution Behind the bag monitoring Dioxins Once a year source house Slag Output, disposal volume Quarterly Solid wastes Output, disposition volume, leaching Fly Ash toxicity Twice a Plant boundary NH3, H2S, and odor concentration year Sensitive area under the Ambient air dominant wind quality SO2,NO2,PM10,NH3,H2S,HCl,Pb, direction Annual Cd,Hg, dioxin (Dayangtian Environment Village, Puji quality community). monitoring Outside pH, Sulfate, total hardness, NH3-N, incineration NO3-N, NO2-N, volatile phenol, Twice a Groundwater workshop, permanganate index, fluoride, As, Hg, year outside Cd, hexavalent chromium, Fe, Mn garbage pit 1m away from Acoustic Equivalent Continuous A-weighted Twice a the plant environment Sound Pressure Level year boundary 4.1.3 Standardize sampling location The waste water of Wuhua incineration plant is not discharged hence no online monitoring for wastewater is needed. Sampling location for online monitoring of air emission is at the 32.5m from bottom of the 80-m stack of the incinerator following “Technical Specification on Continuous Monitoring System of Flue Gas Emission from Stationary Pollution Source” released by Ministry of Environmental Protection; stationary pollution source CEMS shall be installed at a representative location that allows reliable continuous monitoring of the flue gas emission from stationary pollution sources. Data sampling and controlling shall be implemented according to HJ/T212-2005 “Standards on the Data Transmission of Online Automatic Monitoring System of Pollution Source”. The location for manual sampling and the methods of monitoring and sampling should comply with GB/T16157-1996 “Methods for Measuring Particulate Matters and Sampling Gaseous Pollutants from Stationary Pollution Sources”; the sampling platform and hole size shall be normalized; the monitoring holes shall set up at the entrance and exit of 25 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant controlling devices and the aperture shall be over 80 mm. 4.1.4 Monitoring on accident emergency and tracking monitoring Emergency plan for the project-related accidents includes emergency monitoring procedure; once accidents occur during the operation of the project, emergency monitoring procedure shall be launched immediately and the movement of pollutants shall be tracked until the effect of the accidents is fundamentally moved. 4.1.5 Plant monitoring staff There are three water quality testing personnel working for water workshop in Wuhua Incinerator. Lab facilities include equipped with electronic balance and ultraviolet spectrophotometer, responsible for the company's waste water detection. To ensure the accuracy of monitoring data, the monitoring shall be strictly implemented according to monitoring standards. 4.2 Environmental Monitoring Enhancement The GEF project will support monitoring enhancement in addition to the environmental monitoring programs required by domestic regulatory requirements. The monitoring enhancement includes operating and environmental monitoring in the first year of project implementation, and improved monitoring of MSW incinerators during operation. 4.2.1 Operational and environmental performance monitoring The project would fund consultants to evaluate the collected data together with Kunming UMB and EPB, and to determine weaknesses and areas for improvements in the incinerators’ operations. Jointly with the companies, UMB and EPB, the consultants would develop customized operational improvement programs. The program would define baselines, targets and milestones for the improvement of operating procedures in the facility. As part of the effort, operational and environmental performance monitoring would be carried out during the first 9-12 months of Project implementation to fill the information gap on operating conditions at the four Kunming incinerators. Kunming UMB and Kunming EPB would collect in a systematic manner periodic information on operating parameters, including notably combustion temperature, residual oxygen, carbon monoxide, flue gas flow rate; emission of HCl, SO2, NOx, mercury and other heavy metals, and total suspended particulates; incoming waste characteristics; and combustion residuals, including bottom and fly ash. The monitoring of these data would be carried out through continuous emission monitoring (CEM) and/or stack sampling and waste characterization. Two stack tests for dioxin emissions per plant would also be carried out during this period. 4.2.2 Improved monitoring of MSW incinerators during operation The Project would support environmental monitoring for operation, including (i) enabling continuous access by regulators to incinerator operating and emission data; and (ii) additional stack emission testing for dioxin. 26 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant i. Enabling Continuous Access by Regulators to Incinerator Operating and Emission Data The Project would support investments in monitoring equipment at the incinerator needed to enable the monitoring of the above parameters (i.e. operating and emission parameters, including notably combustion temperature, residual oxygen, carbon monoxide, flue gas flow rate; emission of HCl, SO2, NOx, mercury and other heavy metals, and total suspended particulates; incoming waste characteristics; and combustion residuals, including bottom and fly ash. ) and IT systems to transmit real time and continuously data from MSW incinerators to the environmental protection bureaus (EPBs) and urban management bureaus (UMBs) in Kunming. Kunming UMB’s existing state-of-the-art Digital Urban Management Platform would be used to publicize real-time operating performance and (non-dioxin) emission data. Dioxin Stack Testing following Standards In Kunming, the Project would fund one more stack test annually at each selected demonstration incinerator in addition to the one test per year that facilities are required to carry out by domestic regulatory requirement, in order to gauge the impact of improved operations and investments on dioxin emissions. The baseline tests would be carried out during the initial period of operational and environmental performance audt. All tests, regardless of funding source, would be carried out by the same facility, following a set of sampling procedures. Kunming UMB and EPB will jointly ensure that normal operating conditions prevail at the time of sampling. 27 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 5 Risk Control and Emergency Management 5.1 Major risk factors Analyses on the identification of hazardous materials and the production procedures of the Company suggest the existence of toxic gases like the hydrochloric acid, sulfureted hydrogen and methane during the production procedure, and the incineration process may create certain amount of dioxin with considerable environmental impact. Hydrochloric acid and sodium hydroxide are provided with acid-base storage tank with a capacity of 10t, among which the minimum daily storage of hydrochloric acid is 1t, daily storage of sodium hydroxide is 1t. In addition, furnace is ignited by and combusted by light diesel oil. The plant is installed with 1 12t underground steel oil tank for light diesel oil, and its daily storage capacity for light diesel oil is about 5t. The risk factor analysis is shown in Table 5-1. 28 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 5-1 Risk Factor Analysis for Proposed Works 3 Tenses 3 Situations Danger Place/Equipment Source & Nature of Management S/N Section Pattern Source Position/Activity Risk Past Present Future Normal Abnormal Emergency Approach Grading Storage Tank for Fly Transportation Potential Risk of Ash from Incinerated 1 Management Leakage & Fly Ash √ √ Solid A Domestic Wastes (A Dept. Pollution 300m3 Ash Tank) Potential Risk of Leakage, Personal Alkali Tank Injury and √ √ Liquid A (Storage capacity 10T) Environmental Chemical Pollution Strengthen 2 Water Potential Risk of the Acid Tank Leakage, Personal supervision, ( Storage capacity Injury and √ √ Liquid A take 10T) Environmental preventive Pollution measures Potential Risk of and deploy General Affairs Leakage, Personal more 3 Domestic Sewage Dept. Poisoning and √ √ Liquid A emergency Collecting Tank Environmental facilities Pollution Boiler Room Potential risk of fire 4 (Excessive dioxin and Boiler and secondary gas √ √ Gas A smoke, etc.) pollution Potential Risk of Leakage, Personal Leachate Collecting 5 Fuel Poisoning and √ √ Liquid A Tank Environmental Pollution Note: The ordinary environmental risk sources are rated as Grade B, and the critical ones are rated as Grade A. 29 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 5.2 Environmental risk accidents 5.2.1 Fire and explosion (1) Environmental accidents due to boil or pipe explosions The boiler as a steam-generating devise is one of the major equipment in the plant. Subjected to the high-temperature flame and smokes that contain large volume of dusts and highly corrosive gases, the heating surface of the boiler is always under the high temperature and pressure load of the heated media (i.e. water) from inside, and the impact and corrosion of the high-temperature smoke from outside; any leakage, explosion or fire happened on the boiler may result in severe personal injury and equipment damage. The boiler and pipe explosion can be easily triggered by the overpressure, component flaw or severe shortage of water in the boiler due to the equipment malfunction, automatic device failure, mal-operation or poor management, posing great threat to the security and environmental safety of the boiler operators, plant staff and the surrounding environment. (2) Environmental Accidents due to the Fire and Explosion of the Fuel System and the Diesel Tanks The fuel for garbage incinerator is 0 # light diesel oil, an underground steel oil tank for light diesel oil is set up in the factory with a capacity of 12t.Diesel is a combustible material, which is highly inflammable when contacted with oxidants, or exposed to high temperature, open fire or static sparks. (3) Waste storage fire The domestic wastes in storage are prone to generate methane and similar gases, which, without being expelled timely, may cause fire or explosion when reaching the explosion limits and exposed to the ignition source. 5.2.2 Environmental risk monitoring and preventive measures Necessary safety and environment monitoring facilities should be set up company-wide for contingency, making sure these facilities work in emergency cases and send the alarming signals timely. 5.2.3 Monitoring method (1) The company shall set up special organizations and assign personnel take in charge of safety and environment works, establish daily patrol inspection systems, and inspect records and corrective actions .The revealed potential risks should be corrected immediately for production safety. (2) It shall strengthen the management, it shall define responsibilities for each relevant body such as production, storage and transportation, waste disposal and other procedures, and establish corresponding management system to make each work of the company conduct in accordance with regulations and all the operations are under control. 30 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 5.2.4 Preventive measures (1) Establishment and Completion of Rules and Regulations: Including the monitoring of critical risk sources, safety operation procedures of major equipment, positional operation guidance, watch system, routine inspections, approval for special operations and various performance-based rewards and punishments. (2) It shall assess the safety and environmental risk on regular basis; establish all kinds of safety and environmental management files for major risk source, and do a good job of report and registration to the local security and environmental protection departments. (3) Act by the rules to prevent any breaching activities. Strengthen the trainings and examinations for employees, requiring all employees to receive the specific training courses, and to pass the tests on such courses before taking position. Special operation undertakers are required to hold the qualification certificates. Process parameters should be controlled and recorded as per the requirements of each individual position. (4) Safety and environmental protection facilities are complete and valid. The pressure vessels, fire equipment and safety equipment shall be well-equipped and their functions shall be guaranteed through the regular inspection. (5) The lighting-proof facilities should be checked each year to make sure they are intact and functioning. (6) Strengthen the management of special operations. Operation licenses should be acquired for temporary line operations, fire-involved works, high-altitude works and operations entering the tanks, with necessary safety provisions being deployed. The operators should receive the corresponding safety training courses, and be specified with supervisors in operation. (7) It shall try to prevent the occurrences of natural disaster. The company shall do well in dealing with all kinds of natural events based on the weather report. That disaster preparedness includes flood and typhoon prevention. The procedure of production suspension should be prepared for extreme weather conditions, and inspections on tanks, outdoor production facilities and environmental protection facilities should be strengthened, with all revealed problems being corrected immediately. 5.3 Accident response plan 5.3.1 Early warning procedure The early warning of emergent environmental pollution accidents should be graded according to the severity, emergent level and potential extensiveness of the accidents, establishing the warning system with the progressive grades at company level, workshop level and team level, represented by the color of orange, yellow and blue respectively. The warning can be upgraded, downrated or cancelled as per the progression of situations and the feedback of the countermeasures being taking against the warning cases. To those emergency cases beyond the emergency response at the company level, the government’s grading on early warning of emergent environmental incidents should be adopted. 31 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Measures to be taken in early warning situations: Grade I: Equipment malfunction or microleakage with no threat to the production, which can be handled by checking the equipment or replacing the pipes. The operators should follow the uniformed command of the team to solve the problem immediately. Grade II: Part of the auxiliary facilities in the plant is affected, and the risk of fire emerges in the workshop. Emergency response procedures should be initiated to evacuate the personnel from the warning zone, and the emergency response team should be gathered up in such zone, following the command of the directorate to take responses. Grade III: The grade III alarm should be sounded in case of leakage in the plant beyond the alarming level, ordinary fire or explosion. In such case, the emergency directorate of the Company should alarm the surrounding entities with phone, and report the situation to the government of the Economic Development Zone, requesting and providing guidance for the neighboring entities to initiate their emergency responses. Meanwhile, the plant should initiate the emergency procedure to evacuate its personnel to the specified safety zones, allowing for the Company’s emergency salvage operations, conducting the rescue missions, buying time for the efforts to reduce the accidental loss. 5.3.2 Emergency plan initiation procedure (1) The first witness of the accident should report the situation to the production supervisor of the Company immediately, and take necessary measures to stop the situation from escalating. The accidents of grade II (or above) should be reported immediately to the government of the zone (town), the local environmental protection agency, the local safety production supervision administration and the local police, etc. (2) The production supervisor should make emergency arrangements as per the nature and pollution intensity of the accident immediately after receiving the accident report. (3) Upon the breakup of the accident, the section where the accident occurs should immediately investigate the cause to such accident, and to make sure the situation is under control; otherwise the situation should be reported to its superior-level office immediately. The production technical department should join in the accident section and other relevant sections to make the decision of partial of total suspension of production as necessary. (4) After the situation is under control, preventive measures should be prepared immediately, salvage teams should be organized, and salvage plans should be prepared to resume the production as soon as possible. (5) The salvage works should be completed by the accident section independently as much as possible, with corresponding measures being discussed and determined, salvage teams being organized, and salvage plans being prepared, in order to resume the production as soon as possible. 5.3.3 Organization & responsibilities The Company has established its Emergency Response Directorate for Emergent Environmental Pollution Incidents (or the Directorate in short), headed by President of the Company, viced by Vice President of the Company, along with a group of assistance 32 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant director positions manned by leaders of all departments. The Emergency Directorate is formed by officials of the Company, the Operation Management Dept., the Safety Supervision Dept., the Technical Support Dept., the General Affairs Dept. and the Financial Dept. Manager of the General Affairs Dept. is appointed as director of the directorate office, and heads of other departs as assistant directors of the office. The field executive mechanism of the Directorate is formed by its Environmental Protection Team, the Production Control Team, the Fire Control Team, the General Team, the Salvage Team and the Communication and Press Team. The Directorate operates und the command of: (1) General Director  Execute the guidelines, policies and regulations of the state and the local authorities and the superior offices on environmental safety, and organize the preparation of emergency plans for emergent environmental incident;  Build the emergency rescue team for emergent environmental incidents;  Keep surveillance on the progression of the accidents, appoint the field commanders, and support the work of the emergency response team;  Determine whether it is necessary to call for external supports or salvages, according to the incident profile and the possible development of the situation. Accept the instructions and mobilizations from the superior emergency commanding authorities, and provide assistance for the handling of the incidents;  Approve the initiation and termination of the emergency plan;  Prepare the internal accident report and the report to the government, and provide assistance for the efforts of environmental recovery, accident investigation and the summary of experiences and lessons by relevant authorities;  Review and update the emergency plans from each level of the Company;  Organize the external review of the plans. (2) Executive Office of the Directorate  Prepare the emergency and preventive facilities, equipments (like the leak-stopping tools, emergency lagoons, protective equipment, rescue apparatus and emergency transports, etc.) and emergency supplies, particularly for the storage of chemicals capable of processing, dissolving and absorbing the pollutants.  Provide the organized training courses on emergent accident salvage, and rehearse the emergency plan. Provide publications on the nature of major chemicals used by the plant and the knowledge on emergency rescue to the neighboring companies and villages.  Report the emergent environmental incidents and the possible scale of influence;  Conduct inspections and supervisions to make sure the preventive measures against 33 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant emergent environmental incidents and emergency salvage preparations are properly made. Supervise and assist the relevant sections to eliminate the leakage and spillage toxic and hazardous substances.  Determine the grade of the incident, and notify the grading to General Director. Organize the execution of the Company’s emergency plan, contact and mobilize the emergency teams, and coordinate their works in site. Approve and execute the provisional emergency plans, and determine whether to seek external help in emergency cases. (3) Emergent Incident Response Team  Environmental Protection Team Conduct the periodical inspections on critical environmental risk sources, and on the construction and operation of emergency facilities. Show up in the place of incident timely to organize investigations determining the nature and magnitude of the hazard, with the reports submitted to the office immediately. Prepare the pollutant disposal plans, determine the scale of pollution, carry out assessments on the influence of the incident, and prepare and organize the implementation of the recovery plans. Provide assistances for the environment monitoring practices undertaken by the superior authorities.  Production Control Team Organize the cutoff and transportation of materials in the incident site, and coordinate the operation of production facilities and the supply and utilization of fire-control water and steam. Coordinate the sewage emission procedure of other equipment and auxiliary devices. Organize the salvage team to conduct the system blocking and diversion works. Coordinate the operations of material recovery and sewage processing and storage. Organize the resumption of the production afterwards.  Fire control team Responsibilities: Rescue and evacuate the wounded and trapped personnel from the incident site. Organize the execution of the fire-control, gas protection and salvage plans in the site. Supply and distribute the protective equipment to the emergency response personnel in site. Perform the decontamination of the pollutants in site, with the water supply for fire control and decontamination being properly utilized.  General Team Establish the provisional medical center in the nearby safety zone, where the wounded are attended, and critical ones are transferred to hospital for further treatments. Arrange the vehicles, and determine the destination hospitals for rescue missions. Make casualty statistics. Execute the rescue plan according to the natures of the injury and toxicity. Evacuate the personnel and guard the incident site. Secure the traffic for rescue missions. Organize the evacuation of personnel in the potentially influenced areas, and protect the security of the evacuated area. Protect the security the incident site and the surrounding areas. Allocate the internal and external emergency supplies to secure the supply. Organize the 34 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant delivery of such supplies, and detail vehicles for the transportation of pollution prevention supplies. Coordinate and allocate the household supplies and personnel transportation. Make sure the site communication is well functioning. Perform the recording, videotaping and photographing of the incident site. Draft the notes and circulars published by the Directorate. Provide consolations for the employees and the neighboring residents, and contact the local authorities as per the instructions of the Directorate, if necessary, for evacuation and pacification.  Salvage Team Confirm the cutoff of the disconnecting valve. Maintain and control the electrical equipment. Control and cut off the combustion sources. Shut off the external gate of the sewage processing system. Provide the existing supporting equipment and documents and those available nearby for the salvage efforts.  Communication and Press Team Receive the visitors from press, government agencies and other authorities. Handle the publication of the incident information. 5.3.4 Reporting and notification In case of accidents, the National Response Plan for Emergent Environmental Incidents, the Practice of Notification for Emergent Environmental Incidents by Environmental Protection Administrations (Trail) and other governmental regulations should be followed to report the incident to the Directorate immediately, and to notify the incident to the superior authority and the local government at the same time, maintaining a 24h contact with the authorities to facilitate the corresponding salvage efforts. 5.4 Emergency responses and salvage measures 5.4.1 Responding procedure In case of incidents escalating beyond the risk control of the company level (Grade I), the Communication and Press Team should immediately call for external supports, allowing for the district authority to take responses, taking uniform command to initiate the emergency plan at the district level. The company-level responses (Grade II) is commanded by the Emergency Directorate of the Company, headed by President of the Company, viced by Vice President of the Company, along with a group of assistance director positions manned by leaders of all departments. In case of the absence of the President and the Vice President, the head of the General Affairs Department should act as the commanding officer temporarily to take whole control of the rescue works (making instructions on emergency actions, supply allocation and emergency evacuation).All functional departments should initiate their emergency plans by their responsibilities. 35 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant The departmental-level responses (Grade III) should be under the command of the production director, who should gather the team and shift leaders to form up the workshop emergency response group, commanded by the production director to organize and guide the emergency response in the workshop. In case of incident escalating beyond the control of the workshop, the commander should report the situation to the Directorate of the Company, and upgrade the response to the company level (Grade I). The position (team)-level responses (Grade IV) should be under the command of the shift leader, who should gather his/her staff to form up the workshop emergency response group, commanded by the shift leader to organize and guide the emergency response. If the team technical force can not solve the development trend of events, the shift supervisor reports to the company safety production emergency rescue command leading team, response grade is escalated and immediately enters the workshop level response (Grade III response) program. 5.4.2 Emergency measures The field response team should be equipped with professional protective gears fitful for the specific situations, along with other safety measures. The incident site emergency access procedure should be strictly followed. The Directorate in site is responsible for the protection of the local residents, including:  Notifying the residents to take necessary protective measures according to the nature of the incident;  Instructing the responsible department to organize the evacuation of the residents to safety, and determining the means of evacuation according to the weather and geographical conditions and the population density;  Set up the emergency shelter outside the safety boundary of the incident site; The entity and individual responsible for the emergent environmental pollution incident and the supervising administration of such incidents should, upon the detection of the incident, report the incident to the Environmental Protection Agency of the government in 1 hour, and organize the field investigation immediately. It is allowable to bypass the reporting chain in urgent cases. (1) Field Response Measures for Emergent Environmental Incidents The responsible entity in the emergency environmental incidents should take immediate actions to control or cutoff the source of pollution, taking all possible measures to control the situation, in order to prevent the secondary pollution and the derivative incidents. The field rescue team should be organized immediately if necessary to reduce the casualty and property loss. Meanwhile, it should be determined that whether the incident is severe enough to be reported to the superior office; the Grade I incidents must be reported to the executive office of the direct government, the district environmental protection administration and relevant experts, with necessary assistances being provided for the environmental monitoring station to gather up the environmental information, in order to further 36 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant strengthen the existing responsive measures. Requests for support should be sent to the emergency response offices of the neighboring companies, if necessary, when taking the above measures. The superior government (or emergency response commission) and the superior administration should be notified of the incident according to the regulations on information disclosure. Individuals in the contaminated area should be evacuated to safety, and irrelevant individuals should be barred from the area. The emergency response personnel should be equipped with self-contained breathing apparatus and chemical protection suits. No direct contact with the leaked substance. Conduct the leakage-stopping working safely. The flushing water used to dilute the pollutant should be drained to the sewage system. The pollutant absorbed by earth and gravel should be neutralized by large volume of water before being drained into the sewage system. In case of severe leakage, the pollutant should be gathered with a cofferdam, and then collected, transferred and recycled, or should it be subject to nuisanceless treatment before been discarded. 5.4.3 Emergency monitoring In emergent environmental incidents, the Company should contact the Environmental Protection Agency of Wuhua District, allowing the latter to conduct the monitoring on the incident site and the external atmosphere and water systems through its environmental monitoring station in the same district. 5.4.4 Termination of emergency The emergency for those situations that meet the following requirement is qualified to be terminated: (1)The scene of incident has been under control, and the conditions for the incident to occur are removed; (2) The leakage or release of pollution source has been limited within a stipulated scope; (3) The hazard caused by the incident has been thoroughly removed and can not cause any new incident; (4) It is not necessary to continue to adopt professional emergency disposals at the incident site; (5) Necessary measures have been taken for protecting the public from any secondary danger. 37 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 6 Environmental Training Plan The Wuhua incineration plant has environmental capacity building plan in place. In addition, supported by the GEF project, training will be provided to the incinerator operators to improve their management and technical skills. 6.1 Goal and content of training To ensure the effective implementation of the plan for environment protection management, related staffs shall have relatively rich environmental knowledge and high skills in environmental protection. Therefore, the personnel who participate in the project management and construction shall accept related environmental training so as to guarantee the effective implementation of environmental protection measures.  Environmental regulations: The related governors to environmental protection management shall learn domestic environmental legal system and its constitutions, related World Bank environmental policies, the legal liabilities regulated by environmental laws, “Regulations on the Administration of Environmental Protection Management for Construction Project”, local environmental protection regulations and rules, and the plan and schedule for local national economy and social development to help administrative staffs learn laws and act by laws.  Environmental monitoring: The related governors to environmental protection management shall learn the methods for environmental monitoring, regulations and methods for sampling water quality, air, living beings, etc., the analyzing methods, standards, and data reorganization for environmental parameters, and the requirements for analysis techniques.  The treatment and reaction capacity for environmental accidents: The related governors to environmental protection management shall learn the occurrence mechanism of accident potential, corresponding preventive measures and methods, and emergency treatment methods after the occurrence of the accident.  Public participation and public contact: The related governors to environmental protection management shall learn the types and methods, basic methods, and importance of public participations, and basic methods and procedures related to public participation.  Pollution control and management during construction period: The contractor of the construction work shall learn the constructive procedure of the project and the links that will produce pollutions, the pollution controlling methods during construction period, and management and monitoring measures. 6.2 Regular training plan The Wuhua Incinerator has regular training plan, as described in this section. The GEF project will support enhanced training for incinerator manager snd operators, which is described in section 6.3. The Wuhua Incinerator offers the staffs three-level training, namely, group-level training, 38 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant department-level training, and company-training, formulates corresponding annual training plan, as well as examines and evaluates the results of the training so as to improve the staffs’ capacity of emergency treatment and environmental pretreatment. 6.2.1 Emergency drill and training (1) A drill that consists of environmental incidents is organized every year to imitate the organization and command of emergency measures. (2) A special drill is organized every year: A drill where the members of special groups of the company respectively carry out special operations included in emergency rescue tasks. (3) At the beginning of each year, the annual, quarterly, and monthly emergency training plans will be formulated. 6.2.2 Special trainings on environmental laws and regulation as well as related environmental knowledge (1) In terms of knowledge related to the raw and auxiliary materials the company deals with, security features of chemicals, fire equipment, the usage of tools for emergency rescues, the basis knowledge of rescuing people on the spot, related environmental laws and regulations, etc., every year, the company delivers a written publicity, an oral publicity, and corresponding lectures to improve the staffs’ environmental preparedness and capacity of emergency treatment. (2) Special training shall be conducted on the new laws, regulations, national standards, industrial standards and technical standards on environmental protection to ensure that the existing staffs have some acquaintance with the relevant existing regulations for the purpose of promoting their legal awareness. 6.2.3 Environmental risk identification (1) The staffs shall be organized to be familiar with the features, sources of danger and points of risks of the relevant environmentally protective facilities and equipment and the relevant preventive measures. (2) New contractors and staffs of the factory shall be treated with three-level education to ensure that each employee be familiar with the sources of danger and points of risks of the environment and the relevant environment system of the company. (3) Risk analysis, analysis evaluation and the corresponding preventive measures against pollution sources of the company shall be quarterly made to effectively promote the staffs’ awareness of sources of environmental risks and dangers and to avoid the environmental pollution accidents. 6.2.4 Budget for training expenditure Training shall be planned once each quarter. Budget for each training shall be about RMB 30,000 and that for training each year shall be RMB 120,000. 39 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 6.3 Enhanced training for incinerator managers and operators The GEF project would fund consultant services to design training materials and train approximately 250 MSW incinerator managers and operators in BAT and BEP. The program would be implemented in three phases: (i) training of eight trainers, (ii) training of approximately 30 managers and operators from incinerators in Kunming, and (iii) training of approximately 200 managers and operators from across China. Based on the experience with the pilot program, consultants would prepare recommendations for the institution of a training and certification requirement for MSW incinerator operators. Detailed training proram and materials will be developed during project implementation. 40 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 7 Environmental Reporting 7.1 Reporting During construction period of the project, organizations of environmental management shall regularly (once each quarter according to the monitoring plan) authorize the local environmental monitoring center to conduct the environmental monitoring and to report to the engineering management office and the local environmental protection department. The contents of the report at this stage shall cover the construction progress, main construction contents and methods, remarks on environmental impacts incurred and implementation of mitigation measures of environmental impacts. During operation period of the project, the company shall conduct environmental monitoring according to the operation situation of the project and timely submit the monitoring report to the local environmental protection department. Contents of monitoring reports: (1) Monitoring time, frequency, point position, monitoring items, methods and quality control program; (2) Monitoring data and statistical analysis; (3) Description of operation conditions of the facilities during monitoring period; (4) Remarks on abnormal working conditions. To sum up, construction unit of the project shall conduct the monitoring and plan the filing as per construction period and operation period and shall submit one semi-annual monitoring report to the environmental protection department and the World Bank. 7.2 Record filing For the effective operation of environmental management system, organizations of environmental management shall establish a perfect environmental protection record system and keep the records in the following aspects: (1) Requirements of laws and regulations; (2) Project approval; (3) Environmental factors and relevant environmental impacts; (4) Training for management and construction personnel; (5) Inspection, verification and maintenance construction and management activities; (6) Record on environmental quality monitoring data; (7) Conformity analysis of environmental quality; (8) Effectiveness of the corrective and preventive measures in case of disconformities; 41 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant (9) Information of the parties concerned of the project; (10) Examination and verification; (11) Review. Besides, the necessary control shall be conducted on the above-mentioned records including identification, collection, cataloguing, filing, keeping, management, maintenance, inquiring, storage life, disposition and others of the records. 42 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 8 Public Engagement Plan The GEF project will support a comprehensive public engagement program that consists of public disclosure of emission data and public awareness raising aspects. Such program include :a) organizing residents to visit nearby MSW INCINERATION plants; b) installing display panels at plant gates to disclose online monitoring information; c) disclosing online monitoring data of the MSW INCINERATION plants to the public; d) conducting publicity events annually; e) strengthening the online monitoring system for incineration gases; andf) developing an information disclosure and public participation plan. Of particular important is the disclosure of incinerator operating and emission data. Key emission and plant data would be disclosed on a website that the general public can access at will. Thus, a concerned citizen could observe real time SO2, CO, NOx and other emissions (monitored real time by CEMs); several key process variables such as the furnace temperature, and activated carbon feed rate; and periodic postings of annual stack test results for dioxins, heavy metals and the like. 8.1 Information Disclosure and Public Participation Strategy To ensure that residents have a good source of information on MSW incineration pollutants (especially incineration gases), ensure their equal participation in emission reduction, improve their awareness of public participation, environmental action teams will be established at the community level. Trials will be conducted within 3km around the MSW INCINERATION plants, and then the practice will be extended gradually. 8.1.1 Information Disclosure and Public Participation Program The information and Public Participation disclosure strategy is established on the basis of improving existing modes of information disclosure and the public needs for information disclosure. The estimated cost of information interface establishment is CNY 120,000, and the publicity and interactive activities is CNY 374,400. The monitoring index and cost estimate will be implemented by PMO. Public participate expert will be engaged by PMO to in charge of the information and public participation details. The payment of public participate expert is CNY 30,000 man-month, and the total cost is 20 man-month X 30,000= CNY 600,000. 43 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 8-1 Information and Public Participation Disclosure Strategy Content Targeting people Channel Time and frequency Implement institution Monitoring index Estimated cost (CNY) Number of posters on Information interface the community bulletin establishment: Residents around Community bulletin Details and target of During the preparing PMO board CNY120,000 MSW INCINERATION board GEF project stage of GEF project The village committee The publicity Publicity and plants Website of EPD announcement on the interactive activities: website of EPD CNY 374,400 Number of incineration data posters on the Residents around Community bulletin community bulletin Disclose the operating MSW INCINERATION Community bulletin board: Once per PMO board per month and online monitoring plants, especially board month Information center of The publicity of data (see table 5-19 vulnerable group Website of EPD Website of EPD :Once EPD monitoring data on the for details of online which include the LED panels per day The village committee website of EPD per day monitoring data) aged, women, children LED panels: Instant The publicity of online and disabled. monitoring data on the LED panels. Dioxin monitoring data and knowledge of Community bulletin PMO dioxin on the Disclose the Residents around Dioxin monitoring board Information center of community bulletin monitoring reports of MSW INCINERATION reports: 1 or 2 times Website of EPD EPD board dioxin plants per year The publicity of dioxin data on the website of EPD Popularize the Brochure PMO knowledge of waste Residents around Reach to 80% Community bulletin Information center of incineration and MSW INCINERATION awareness rate of board EPD health. The plants, especially incineration, health Website of EPD Irregularly UMB knowledge publicity vulnerable group and dioxin knowledge Media MSW INCINERATION should be taken in an which include the in the residents around Events organized by plants easy way to aged, women, children MSW INCINERATION MSW INCINERATION Public participation understand, such as and disabled. plants plants expert chart, comic, etc. Activities on Residents around Brochure Once per half year PMO Waste sorting and 44 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant popularizing the MSW INCINERATION Community bulletin Information center of incineration knowledge knowledge of waste plants, especially board EPD on the community sorting and vulnerable group Website of EPD UMB bulletin board around incineration which include the Media MSW INCINERATION the MSW aged, women, children Events organized by plants INCINERATION plants and disabled. MSW INCINERATION Public participation Column of waste Insure 30% women of plants expert sorting and participation incineration knowledge on the website of EPD Reach to 80% awareness rate of waste sorting and incineration knowledge in the residents around MSW INCINERATION plants Frequency of residents Interaction of MSW visit to the MSW Residents around INCINERATION plants Residents visit to the PMO INCINERATION plants MSW INCINERATION and the residents MSW INCINERATION MSW INCINERATION Frequency of FDGs plants, especially around the MSW plants plants between residents and vulnerable group 1 or 2 times per year INCINERATION FDGs between Village committee the MSW which include the plants, insure 30% residents and the MSW Public participation INCINERATION plants aged, women, children women participation INCINERATION plants expert The proportion of and disabled. in the activities. women participation in the activities. 45 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant Table 8-2 Online monitoring data of MSW INCINERATION plants Wuhua MSW INCINERATION Xishan MSW INCINERATION DongJiao INCINERATION plant Konggang MSW INCINERATION plant plant plant Dust Dust Dust Dust Flu gas velocity Flu gas velocity Flu gas velocity Flu gas velocity SO2 Flu gas pressure SO2 Flu gas pressure NOx SO2 NOx SO2 O2 NOx O2 NOx CO O2 CO CO Flu gas temperature CO Standard state flow HF Standard state flow HF Flu gas temperature Flu gas temperature Standard state flow Standard state flow Details of information disclosure: During project implementation, the enterprises should put information on record timely, and disclose it to the public on the website of the provincial environmental protection department. Enterprises should maintain continuous information monitoring, ensure the effectiveness of information, and make it available timely upon request. The following information should be put on record timely: 1)Monitoring results of SO2, CO, NOX and other incineration gases; 2) Monitoring results of wastewater, noise and MSW emissions; 3) Monitoring results of dioxin emissions issued by an authoritative third party; 4) Incinerator operating conditions, e.g., temperature;; 5) Technical upgrading of MSW incineration of the MSW INCINERATION plants; and 6) Publicity materials and photos of information disclosure. 46 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 8.2 Grievance Redress Mechanism If any MSW INCINERATION plant pollutes the environment or affects the physical health of any nearby resident during operation, a resident may file an appeal through the following procedure: Stage 1: The resident reports to the community committee in writing or orally, which should negotiate with the MSW INCINERATION plant and give a reply within two weeks. Stage 2: If the resident is dissatisfied with the disposition of Stage 1, he/she may file a written or oral appeal with the district environmental protection bureau, which should make a disposition within two weeks. Stage 3: If the resident is dissatisfied with the disposition of Stage 2, he/she may file a written or oral appeal with the municipal environmental protection bureau, which should make a disposition within two weeks. Stage 4: If the resident is still dissatisfied with the disposition of Stage 3, he/she may file an appeal with a local court in accordance with the Civil Procedure Law of the People’s Republic of China and be subject to court judgment. Currently, the municipal and district environmental protection bureaus have director-general mailboxes and environmental appeal hotlines. Residents may also file an appeal through Kunming Digital Urban Administration or online directly. Table8-3 Grievance Redress Contact of GEF Project Unit Contact Tel. PMO Office 0871-64166316 UMB Office 0871-63190771 Wuhua MSW Office 0871-68307396 INCINERATION plant DongJiao MSW Office 0871-67396512 INCINERATION plant Xishan MSW Office 0871-68599896 INCINERATION plant Konggang MSW Office 0871-68017385 INCINERATION plant 47 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant This procedure should be included in the GEF project publicity during every stages of the project, and the residents will be informed via bulletin board and brochure. Monitor the effect of grievance redress will be included in the process of M&E. 8.3 Other Public Engagement Programs The project should establish linkage mechanism with mass media and valuing the role of new media, to this end, the project will a)disclose project information completely and objectively online; b) introduce technical information of the MSW INCINERATION plants to media a t the operation stage; and c) explaining major negative events and reports openly and transparently, and proposing corresponding solutions for public . MSW incineration plants, EPB and UMB will work toeger the carry out the program to make sure during project implementation the project information, incinerator operating conditions and major events relevant to the incinerators are accessible through internet and/or public media. 48 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 9 Legal Implication of Environmental Management Plan Environmental management plan shall have the corresponding legal force in view of environmental standards, clean production, total quantity control, relevant project documents and agreements. (1) Environment standards shall be the regulations on various works related to environment in accordance with the environmental protection law and the relevant policies to protect the population health, prevent environmental pollution, prompt the virtuous circle of ecology, utilize the resources reasonably and promote the economic development. Since the companies are difficult to avoid the pollutant emission during production, to prevent that the companies transfer the internal costs to the external environment and to balance the emission rights among the companies, the governments on behalf of public interests shall control the emissions of pollutants and thus the standards for emission of pollutants emerge. This represents the external index of characteristics of pollution sources on environmental effect. It requires that the technical measures against continuous emission and reduction of pollutants at the sources of pollution shall be made and the technical compulsory measures with legal binding force shall be implemented against the behaviors of pollutant emission. (2) Clean production refers to continuously apply the comprehensively preventive environmental protection strategies to the production and products so as to reduce the human and environmental risks. In connotation, clean production substantially means a production mode of taking the wholly preventive environmental strategies against the production process and the products to reduce or eliminate their possible danger on human and environment and meanwhile to fully meet the human demands and maximizing the social and ecumenical benefits. Law of the People’s Republic of China on Promoting Clean Production was issued and publicized on June 29, 2002 In the ninth session of the standing committee of the National People's Congress of the People’s Republic of China and has been executed since January 01, 2003. (3) Total quantity control of pollutant emission (shorted as total control) means to control under the scope of some amount the total quantity of pollutants at some control area (such as administrative region, river basin, environmental functional area, etc.) which is taken as a complete system so as to meet the environmental quality requirements at the area. Total control shall include the contents in the following three aspects: total amount, area and time of pollutant emission. Total control system means a legal system that the national environmental management authorities decide the total amount of pollutant emission at the area according to the surveyed regional environmental capacity and individually distribute to the companies in the area their own mode of total amount limit of pollutant emission according to the reduction plan of total amount of emission. (4)Details of the environment management plan is a part constituting the tender document and the construction contract signed between the project owner and project contractor. (5)This project is executed by the World Bank, complying with the environment management plan is specified as one clause in the project agreement and grant agreement between the World Bank and the Chinese government, the environment management plan 49 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant shall come into legal effect therefore. Therefore, the project construction unit shall strictly implement environmental pollution prevention measures, environment risk elimination measures, accident emergency plan, environment supervision plan, regular environment report of environmental impact, environment information discussion plan, environment protection record plan, and environment protection supervision plan to maintain the legal effect of environment management plan. 50 Environmental Management Plan of Kunming WuHua MSW Incineration Power Plant 10 EMP Budget The project by nature is an environmental protection project and will be supported by GEF grant USD12 million and counterpart funding from national, provincial, municipal level and participating incinerators. Total budget is about USD 60 million. 51