E4462 ZAMBEZI RIVER AUTHORITY TERMS OF REFERENCE (TOR) CONSULTANCY SERVICES TO CARRY OUT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED BATOKA GORGE HYDRO-ELECTRIC SCHEME ON THE ZAMBEZI RIVER The Zambezi River Authority Page 1 of 25 April 2013 Contents ....................................................................................................... 3 .................................... 3 5 ....................................... 5 4.1 Phase I: Inception........................................................................................................ 5 4.1.1 Compilation and Initial Review of Previous Documents and Data ............... 5 4.1.2 Site Visits............................................................................................................. 6 4.1.3 Coordination With Parallel Studies ................................................................. 6 4.1.4 Inception Workshop .......................................................................................... 6 4.2.1 Policy, Legal, and Institutional Framework. ................................................... 7 4.2.2 Project Description ............................................................................................ 9 4.2.3 Baseline Conditions ............................................................................................ 9 4.2.4 Environmental and Social Impacts ................................................................ 10 4.2.5 Environmental Flow Maintenance ................................................................. 12 4.2.6 Cumulative Impacts ......................................................................................... 12 4.2.7 Analysis of alternatives .................................................................................... 12 4.2.8 Public Consultation .......................................................................................... 13 4.3 Phase III: Risk Management and Mitigation ......................................................... 13 4.3.1 Environmental and Social Risk Management and Mitigation..................... 13 4.3.6 Presentation and Reporting ............................................................................ 19 5.0 REQUIRED EXPERTISE OF KEY PERSONNEL .............................................. 20 ..................................................................................................... 21 ........... 22 7.1 Documentation .......................................................................................................... 22 7.2 Equipment and Tools ................................................................................................ 22 7.3 Office Space and Facilities ....................................................................................... 23 7.4 General Assistance .................................................................................................... 23 ............................................................ 23 .............................................................................................................. 23 The Zambezi River Authority Page 2 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT The Zambezi River Authority (ZRA) has been mandated by the Governments of Zambia and Zimbabwe to develop the Batoka Gorge Hydro-Electric Scheme, and therefore intends to carry out the feasibility study through an outsourced Engineering Consultancy Services Contract for the project. The ZRA is a statutory body jointly owned by the Governments of Zambia and Zimbabwe. The ZRA came into being on October 01, 1989 as a result of parallel legislation tabled before the parliaments of the Republics of Zambia and Zimbabwe. This followed the reconstitution of its predecessor, the Central African Power Corporation (CAPCO). The generating assets were subsequently handed over to the two national power utilities, the Zambia Electricity Supply Corporation (Zesco) and the Zimbabwe Power Corporation (ZPC). These two utilities now account for about 90% of ZRAs revenue. The ZRA has responsibility of the operation and maintenance of Kariba Dam Complex, investigation and development of new dam sites on the Zambezi River and analysing and disseminating hydrological and environmental information pertaining to the Zambezi River and Lake Kariba. The ZRA is governed by a Council of Ministers consisting of four members from the two Contracting States. The common Ministries in the council are those responsible for Energy and Finance. In terms of the Zambezi River Authority Acts, the Council of Ministers gives direction, through the ZRA Board of Directors, to the Authority to ensure the most efficient use of the Zambezi River and any other infrastructure developed on it. The Council may also prescribe anything which in its opinion is necessary or convenient for the better exercise of the functions of the Authority. The ZRA has four main strategic functions, which are outlined in the schedule to the Zambezi River Authority Acts Nos. 17 and 19 of 1987 of Zambia and Zimbabwe, respectively. These are: 1. In consultation with the national electricity undertakings investigate the desirability of constructing new dams on the Zambezi River and make recommendations thereon to the Council; 2. Subject to the approval of the Council, construct, operate, monitor and maintain any other dams on the Zambezi River; 3. Make such recommendations to the Council as will ensure the effective and efficient use of waters and other resources of the Zambezi River; and, 4. Submit development plans and programmes to the Council for approval. The proposed Batoka Gorge Hydro-electric Scheme (HES) is located on the Zambezi River approximately 54 km downstream of the world famous Victoria Falls. The project site is located across the boundary between Zambia and Zimbabwe at Grid Reference 055-178 (scale 1:50 000). The Batoka Gorge HES was conceived in 1972 out of a study instituted by the predecessor of Zambezi River Authority (Central African Power Corporation - CAPCO). The aim of the study was to identify possible power sources which the inter-governmental institution could develop to meet the power demands of Zambia and Zimbabwe. In 1981 an update of this study was done, where the dam site was moved 12 km upstream. In 1992-93 a feasibility study was commissioned by the ZRA. This study confirmed the Batoka Gorge as the least cost alternative in respect to average specific energy generation cost for development on the Zambezi River. Its recommended scheme included a 181 m high RCC Gravity The Zambezi River Authority Page 3 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT Arch dam, radial gated crest type spillway, two underground power stations on each side of the river with four Francis 200 MW turbines installed in each, giving a total capacity of 1600 MW for the scheme. The scheme is designed as a run-of-the river scheme with an estimated average energy generation of 8700 GWh/year. The reservoir is fully located within the Batoka gorge and has a relatively small surface area of 26 Km2. The preliminary design of the dam, tunnels and power houses were based on more than 200 drill holes and 8 exploratory adits. The documentation (photos, description, interpretation) of these geotechnical investigations exist although the core samples are no longer available. Environmental impact assessments were conducted in 1993 and 1998, which concluded that identified impacts could be mitigated. The notable impacts resulting from inundation are loss of natural habitat in the gorge and loss of opportunity for white-water rafting downstream of Victoria Falls. Impacts related to associated construction of access roads, transmission lines and work camps were also noted, although not detailed During initial project planning it was envisioned that each side would include an equal number community development structures. These were identified as including the following: Housing Units:  Low Density 50  Medium Density 100  High Density 600 Health Clinics 2 Primary Schools 2 Shops 2 Post Office 1 Sports/ Recreation Centers 2 Administration Offices 1 This community development would provide permanent townships for a permanent workforce of an estimated 1,500 people, including employees of the ZRA, the power utilities, and other government agencies. The Advanced Infrastructure identified with development of the Batoka HES include upgrading of existing roads and construction of new roads to each bank from the main roads linking Livingstone to Lusaka (Zambia) and Victoria Falls to Bulawayo (Zimbabwe). The works identified in Zambia include rehabilitation of 9 km of road and the construction of 22 km of new road. The works identified in Zimbabwe include rehabilitation and upgrading of 40 km of road and the construction of 14 km of new road. Along with construction of new townships and access roads, there will be a need to construct transmission lines to deliver power to each country’s respective power grid. Studies on Transmission System Development were conducted in 2004 and in 2010. Options considered have estimated a range of 60-1060 km of transmission lines for Zambia, and nearly 850 km of transmission lines for Zimbabwe. The Zambezi River Authority Page 4 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT The objective of the Environmental and Social Consultancy Services is to evaluate the design for the Batoka Gorge HES and develop the required Environmental and Social Impact Assessments to be used in sourcing financing for implementation/ development of the project. The proposed Batoka Gorge HES Environmental and Social Impact Assessment will conduct a review and update of the previous screening and preparatory studies for Batoka Gorge HES and hydropower development on the Zambezi River between Victoria Falls and Lake Kariba. The services will include an assessment of any transmission lines required to evacuate the power to both countries and other associated infrastructure. The Consultancy Services will then produce an updated Environmental Impact and Social Impact Assessment (ESIA) for the Batoka Gorge HES, along with Environmental Management Plans (EMPs) and Resettlement Action Plans (RAP), as needed, for each infrastructure investment of the project. The ESIA should inform the Governments of Zambia and Zimbabwe, the ZRA, national power utilities, interested and affected parties and other stakeholders about potential environmental and social impacts associated with development of the Batoka Gorge HES. This will include those potential impacts at the dam site and surrounding areas, the reservoir inundation area, any upstream and or downstream impacts, as well as those from associated infrastructure, such as transmission lines, and operations infrastructure. The ESIA should be prepared based on information gathered from stakeholders, relevant government agencies, and active participation and consultation with all persons directly impacted by the works associated with development of the Batoka Gorge HES. The procedure of data acquisition, analysis and interpretation conducted must be transparent and according to accepted international standards and practice. All services will adhere to national legislative requirements and international best practice, such as the World Bank safeguard policies, such that they will allow for mobilization of the required resources for the development of the scheme within the shortest possible time. An updated detailed feasibility assessment will be carried out via a separate contract, although it is a requirement that the two studies be closely coordinated and prepared in parallel. The consulting services will be conducted in three phases:  Inception  Updated Environmental and Social Assessment  Risk Management and Mitigation 4.1 Phase I: Inception 4.1.1 Compilation and Initial Review of Previous Documents and Data As a first step in the execution of the Consultancy Services, the Consultant shall hold consultations with the ZRA and shall acquaint themselves with the Zambezi River Basin and environmental requirements in Zambia and Zimbabwe along with any regional or international obligations. The Zambezi River Authority Page 5 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT The Consultant shall collect and review previous documents related to environmental and social aspects of the Zambezi River Basin, and especially the proposed Batoka Gorge HES. The documents should include, but not be limited, to  1981 CAPCO Study  1993 Batoka Gorge Hydro Electric Scheme, Feasibility Study  1997 Further Batoka EIA Studies  2007 IWRM Strategy for Zambezi River Basin  Transmission Studies  2010 Multi-Sectoral Investment Opportunity Analysis During the inception phase, the Consultant shall compile all available environmental and social baseline data, including maps, aerial surveys and related reports of the project area. etc., relevant for the Batoka Gorge HES. 4.1.2 Site Visits The Consultant shall conduct initial site visits at the potential dam sites, power house sites, transmission routes, and upstream and downstream reaches to familiarize themselves with the environmental and social characteristics. 4.1.3 Coordination With Parallel Studies The Consultant shall inform themselves on the progress and results so far from the parallel Feasibility Study. The Consultant will propose a study plan which will be harmonised with a similar plan issued by the Engineering Consultants. The objective will be that of achieving a “shared design plan� between the two Consultants. The plan should feature the main interface subjects (e.g. dam/intake siting, reservoir elevation and resettlement, managed river flows, etc.) along the study process and propose a proactive coordination plan to work out trade-offs and agreed design solution balancing engineering, social, economic and environmental aspects. 4.1.4 Inception Workshop The Consultant shall prepare an Inception Report with their findings during the inception phase and report this at an Inception Workshop chaired by ZRA. The Inception Report shall include what data and information have been collected, the results of the initial review and site visits, the proposed study plan for coordination with the Engineering Consultants, the proposed plan for field investigations, and any deviances in the proposed detailed methodology compared to the what was specified in the contract. Based on the feedback from the Client and other stakeholders the Consultant shall update the final methodology and time plan for the study. 4.2 Phase II: Environmental and Social Impact Assessment The Consultant shall carry out an independent environmental and social impact assessment for the proposed Batoka Gorge hydro-electric scheme on the Zambezi River. The ESIA shall be presented following the description of the scope work contained herein. The ESIA shall include an Executive Summary that concisely discusses significant findings, recommended actions and associated costs for the preparation, construction and recurrent operational costs. Each section of the scope of work described herein should include a description of the methodology used to collect, compile and analyze all data and information. The ESIA will further include a set of annexes that shall include, but not necessarily be limited to the following: (i) List of those involved in preparation of the report (individuals and organizations). (ii) References, including both published and unpublished written material. The Zambezi River Authority Page 6 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT (iii) Record of interagency and consultation meetings, including consultations for obtaining the informed views of the affected people and local nongovernmental organizations (NGOs). (iv) Tables presenting the relevant data referred to or summarized in the main text, including species lists. (v) List of associated and supporting reports (e.g. Engineering Reports, Resettlement Action Plan etc.). 4.2.1 Policy, Legal, and Institutional Framework. The Consultant will review and describe the policy, legal, and administrative framework within which the ESIA is to be carried out. This will include a description of the pertinent regulations, protocols and standards pertaining to the project and their implication on the project and will cover those in Zambia and Zimbabwe, as well as at international and regional level. An overview of the implementation arrangements, including the roles and responsibilities of all relevant agencies, will be detailed. Relevant international environmental and social agreements to which both countries are party to will be identified and any obligations with implications for the project identified and described. The environmental and social requirements of potential financiers should be reviewed and described in terms of potential obligations. Reference should be made, but not limited to, the following:  Zambezi River Authority Act  Zambia Water Resources Management Act  Zimbabwe Water Act  Zambian Environmental Management Agency  Zimbabwean Environmental Management Agency  SADC Revised Protocol on Shared Water Courses  Agreement on the Establishment of the Zambezi Watercourse Commission  RAMSAR Convention on Wetlands of International Importance  World Bank Safeguard Policies (see summary below)  IFC Equator Principles  World Bank Group Environmental, Health and Safety Guidelines IFC Performance Standards World Bank Safeguard Operational Policies Triggered Environmental Assessment (OP/BP 4.01) Yes Natural Habitats (OP/BP 4.04) Yes Pest Management (OP 4.09) No Indigenous Peoples (OP/BP 4.10) No Physical Cultural Resources (OP/BP 4.11) Yes Involuntary Resettlement (OP/BP 4.12) Yes Forests (OP/BP 4.36) No Safety of Dams (OP/BP 4.37) Yes Projects on International Waterways (OP/BP 7.50) Yes Projects in Disputed Areas (OP/BP 7.60) No The Zambezi River Authority Page 7 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT Environmental Assessment (OP and BP 4.01) The World Bank’s environmental assessment operational policy establishes the fact that some level of environmental assessment is required for all Bank financed development projects. According to OP 4.01 the Bank classifies proposed projects into one of three categories, depending on the type, location, sensitivity, and scale of the project and the nature and magnitude of its potential environmental impacts. The Zambezi River Basin Development Project has been classified as Category A. A proposed project is classified as Category A if it is likely to have significant adverse environmental impacts that are sensitive, diverse, or unprecedented. For a Category A project, the Recipient is responsible for preparing a report, such as an ESIA. Bank policy also requires that an environmental assessment is initiated as early as possible in project processing and is integrated closely with the economic, financial, institutional, social, and technical analyses of a project. The commissioning of an environmental assessment is the responsibility of the Recipient and the Bank reviews the findings and recommendations of the EA to determine whether they provide an adequate basis the project. Natural Habitats (OP & BP 4.04) The Bank supports the protection, maintenance, and rehabilitation of natural habitats and their functions in its economic and sector work, project financing, and policy dialogue and expects borrowers to apply, a precautionary approach to natural resource management. In the context of current project implementation and development the following elements of Bank policy will apply: i) promotion and support to natural habitat conservation and improved land use and the rehabilitation of degraded natural habitats; ii) the Bank does not support projects that involve significant conversion or degradation of critical natural habitats.1 ; and, iii) wherever feasible, Bank- financed projects are sited on lands already converted (excluding any lands that in the Bank's opinion were converted in anticipation of the project). The Bank does not support projects involving the significant conversion of natural habitats unless there are no feasible alternatives for the project and its siting and comprehensive analysis demonstrates that overall benefits from the project substantially outweigh the environmental costs. If the environmental assessment indicates that a project would significantly convert or degrade natural habitats, the project includes mitigation measures acceptable to the Bank. Such mitigation measures include, as appropriate, minimizing habitat loss (e.g., strategic habitat retention and post-development restoration) and establishing and maintaining an ecologically similar protected area. Physical Cultural Resources (OP & BP 4.11) This policy addresses physical cultural resources, which are defined as movable or immovable objects, sites, structures, groups of structures, and natural features and landscapes that have archaeological, paleontological, historical, architectural, religious, aesthetic, or other cultural significance. Physical cultural resources may be located in urban or rural settings, and may be above or below ground, or under water. Their cultural interest may be at the local, provincial or national level, or within the international community The Bank assists countries to avoid or mitigate adverse impacts on physical cultural resources from development projects that it finances. The impacts on physical cultural resources resulting from project activities, including mitigating measures, may not contravene either the borrower’s national legislation, or its obligations under relevant international environmental treaties and agreements. Involuntary Resettlement (OP & BP 4.12) This policy applies to all land acquisition and any changes in access to resources due to a project and/or subproject. The policy applies whether or not affected persons must move to another location. The Bank’s policy requires a Resettlement Action 1 Significant conversion is the elimination or severe diminution of the integrity of a critical or other natural habitat caused by a major, long-term change in land or water use. The Zambezi River Authority Page 8 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT Plan (RAP) for any subproject that involuntarily displaces people from land or productive resources, and the displacement results in:  relocation, the loss of shelter, the loss of assets or access to assets important to production;  the loss of income sources or means of livelihood; or  the loss of access to locations that provide higher incomes or lower expenditures to businesses or persons. Safety of Dams (0P& BP 4.37) Dam safety is a matter of significant importance in many countries in the world today because of the presence of a large number of dams, existing, under construction or planned. The safe operation of dams has significant social, economic, and environmental relevance. When the World Bank finances new dams, OP 4.37 requires that experienced and competent professionals design and supervise construction, and that the borrower adopts and implements dam safety measures through the project cycle. The policy also applies to existing dams where they influence the performance of a project. In this case, a dam safety assessment should be carried out and necessary additional dam safety measures implemented. OP 4.37 recommends, where appropriate, that Bank staff discuss with the borrowers any measures necessary to strengthen the institutional, legislative, and regulatory frameworks for dam safety programs in those countries. OP 4.37 is triggered by this project and will be addressed according to Bank policies and guidelines, including preparation of Dam Safety Studies. International Waterways (OP &BP 7.50) This policy applies to any river or body of surface water that flows through, two or more states, whether Bank members or not. This policy applies to irrigation systems, dams and flood control measures. If such a project is proposed, the Bank requires the beneficiary state to formally notify the other co-riparians of the proposed project and its Project Details. OP 7.50 is triggered by this project and riparian notification will be issued to all nine co- riparians. 4.2.2 Project Description The Consultant will:  Describe the major activities to be undertaken during construction, operation and decommissioning of the works related to the proposed project and its geographic, ecological, social, and temporal context, including any off site investments that may be required (e.g., transmission lines, access roads, water supply, housing, and raw material and product storage facilities). This will include a justification of the suitability of the proposed site for the proposed project.  Indicate the need for any resettlement plan (see also Section 4.3.3 below), including a map or maps showing the project site and the project's area of influence.  Outline any alternatives under consideration; the alternatives should include but not be limited to sighting, design and technology selection. Site-specific maps of the project area (Scale 1:50,000 or larger) should be provided, showing the proposed project site, all environmental and social characteristics of relevance to the project and its assessment. 4.2.3 Baseline Conditions The Consultants will review and assess the dimensions of the study area and describe relevant physical, biological, chemical, socio-economic and cultural conditions, including any changes anticipated before the project commences. The baseline conditions should also take into account current and proposed development activities within the project area but not directly connected to the project. The Zambezi River Authority Page 9 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT Baseline data should include, but not limited to, the following: a) Physical environment: geology, topography, soils, climate and meteorology, surface and ground water hydrology, river flows, baseline water and air quality and sedimentation, and physical cultural resources; b) Biological environment: flora, fauna, rare, endangered or endemic species, IUCN Red List Species, Important Bird Areas, etc., including amphibians and reptiles, birds, fish, large and small mammals (i.e. bats), plants, economic plants and medicinal plants, sensitive habitats, significant natural sites, etc.; species of commercial importance, and species with potential to become nuisances, vectors or dangerous; c) Socio-cultural environment including population, migration pattern, land use, planned development activities, community structure, employment, distribution of income, goods and services, recreation/tourism, public health, prevalence and distribution of waterborne diseases and cultural properties. d) Data should be relevant to decisions about project location, design, operation, or mitigatory measures. The section will include a description of the methodology used to collect information and data and indicating the accuracy, reliability, and sources of the data. 4.2.4 Environmental and Social Impacts The Consultant will predict and assess the potential positive and negative impacts associated with the Batoka Gorge HES. This will include direct and indirect impacts, short and long-term duration; along with any potential cumulative impacts. This will be done in quantitative terms to the extent possible in line with the methodology agreed during the inception phase and should include economic and financial analysis of alternatives as appropriate. The Consultant will identify and estimate the extent and quality of available data, key data gaps, and uncertainties associated with predictions, and specifies topics that do not require further attention. Mitigation measures and any residual negative impacts that cannot be mitigated will be identified and taken forth through appropriate Environmental Management Plans and Resettlement Action Plans during the third phase. Opportunities for environmental and social enhancement will be identified. The ESIA will also inform the project developer on locations where the Involuntary Resettlement Policy would be triggered (based on internationally accepted best practice, such as the World Bank Safeguard Policy 4.12: Involuntary Resettlement) which would necessitate the preparation of a Resettlement Action Plan (RAP). Environmental and social impacts (direct and indirect, short and long-term and cumulative) associated with the project at and around the site focussing on both positive and negative impacts as well as bio-physical, chemical, social, economic and cultural components of the environment associated with the construction, operation and decommissioning of the project. The environmental baseline assessment should include, but not be limited to, the following: i) backwater effects for a variety of dam heights and reservoir levels and identify any associated environmental and social impacts; ii) hydrological regimes of the river and reservoirs, upstream and downstream of the proposed dam (including potential gas super-saturation below the spillway); The Zambezi River Authority Page 10 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT iii) water quality regimes of the river and reservoirs, upstream and downstream of the proposed dam (including potential gas super-saturation below the spillway, eutrophication and reservoir stratification); iv) environmental and social impacts of potential alteration of river flow regimes (natural run-of-river, regulated flows, peaking power, etc.); v) aquatic wildlife, including fish, fisheries resources, benthos, and other aquatic life, particularly endemic, rare or endangered species, those of conservation concern or economic importance, with focus on special issues such as natural fish migrations, existing or planned fisheries development, invasive aquatic plant or fish species, etc.;; vi) terrestrial wildlife and biodiversity, with special focus on particularly endemic, rare or endangered species, or those species for which the Batoka Gorge area may be of regional or global significance, including the birds Taita Falcon Falco fasciinucha and Rock Pratincole Glareola nuchalis, along with any potential invasive species; vii) protected areas, existing or proposed, or other sites of conservation or special management interest (including river rapids, sandbars, bird nesting cliffs, and riverine woodlands); viii) erosion (river banks, construction sites, etc.), river bed morphology, and siltation, in the reservoir area above and below the dam; ix) the need and/or opportunities for conservation offsets, including of free-flowing river rapids elsewhere that would remain undammed; x) the need for an Integrated Catchment Management Plan (ICMP) and, if appropriate, prepare as part of the ESIA; xi) nature based tourism and recreation, both existing and potential, with a special focus on whitewater rafting, boating, sightseeing, wildlife viewing, etc.; and, xii) need for, cost of and opportunities to develop bird-friendly pole-line configurations on the associated power lines, to minimize bird collisions and electrocutions xiii) physical cultural resources archaeological survey and change find procedure in all contracts xiv) potential greenhouse gas emissions from the reservoir; xv) Public health and safety, particularly in relation to waterborne diseases, with regard to dam construction and operation. The socio-economic baseline assessment should provide sufficient detail in the socio-economic analysis so that it may serve as the socio-economic baseline for the resettlement action plan. It should include, but not be limited to, the following: i) detailed socio-economic assessment, including a description of the population/demographics of the area of impact, and livelihood and income strategies; ii) description of land types and land uses in all areas to be impacted by the project; iii) description of important cultural, historical, archaeological sites in the area of impact; iv) description of the primary social services in the area of impact, including quality of services delivery – especially water, sanitation and waste management, health services, and schools; v) gender and livelihoods assessment; vi) maps delineating different areas of impact, both upstream and downstream, identifying zones of land use, and the different livelihoods that these land uses support; vii) description of the community structures: official leadership structures and other institutions that are important to the community; viii) description of the main NGOs active in the area and their activities; The Zambezi River Authority Page 11 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT ix) identification of all resettlement requirements; and, x) public health and safety, particularly in relation to waterborne diseases, with regard to dam construction and operation. The Consultant shall review the baseline assessment above against the future possible changes in inflow because of upstream land use changes, water abstractions as well as climate change, and make recommendations on possible mitigation and adaptation measures. The future possible changes in inflow will be calculated as part of the assessment of the hydrological risks related to the project by the Engineering Consultants undertaking the parallel Feasibility Study. The Engineering approach will include estimating future possible changes in inflow because of upstream land use changes or water abstractions as well as climate change. Future changes due to climate change will be assessed by the Engineering Consultants using information from the Intergovernmental Panel on Climate Change (IPCC) available Global Circulation Model (GCM) scenarios for Southern Africa, as well as other studies as available. The information on uncertainty in inflow series and extreme floods shall be presented as scenarios corresponding to low, most probable, and high. 4.2.5 Environmental Flow Maintenance The Consultant will review the location, design criteria and proposed operating procedures for the Batoka Gorge HES to assess any impacts associated with potential changes to the natural flow regime. The Consultant shall define the environmental and social boundary conditions downstream of the Batoka Gorge HES, and any associated changes that may result from its construction in the release regime downstream of the Kariba Dam, and recommend the required water releases during construction, reservoir filling and operation and maintenance. The Consultant shall identify the need for any special design features to be included in the dam structure for the release of environmental flows during construction, reservoir filling and operation and maintenance. 4.2.6 Cumulative Impacts The Consultant will specifically review and assess the existing information and data available to determine any potential cumulative impacts that result from incremental changes caused by other past, present or reasonably foreseeable actions together with the project. These may not be a direct result of the project and can often be manifest away from the project, or as a result of a complex pathway. These are sometimes referred to as second or third level impacts. This review and assessment should be based on the most likely future scenario derived from projections contained in adopted plans and planning documents, such as the Southern African Power Pool, the IWRM Strategy for the Zambezi River basin, and the Multi-Sector Investment Opportunity Analysis. Provisions will be limited to projects where there is a high probability the action will proceed or where there may be some uncertainty about the project but it is reasonably foreseeable to proceed. 4.2.7 Analysis of alternatives The Consultants should describe potential alternatives examined in the course of developing the project and identify any alternative investments that would achieve the same objectives. The ESIA will systematically compare feasible alternatives to the proposed project site, technology, design, and operation--including the "without project" situation--in terms of their potential environmental and social impacts. The comparison will include the feasibility of mitigating these impacts; their capital and recurrent costs; their suitability under local conditions; and their institutional, training, and monitoring requirements. For each alternative, the ESIA should quantify the environmental and social impacts to the extent possible, and attach economic values where feasible. This comparison will contribute to the decision framework for reconfirming selection of the Batoka Gorge HES. Among the specific alternatives that should be evaluated include: (i) alternative hydropower projects to the Batoka Gorge HES; The Zambezi River Authority Page 12 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT (ii) alternative dam sites within the Batoka Gorge; (iii) alternative dam heights, reservoir operating levels and project configurations in order to mitigate or minimizing any potential environmental and social impacts, those on whitewater rafting or development of future hydro-electric schemes within the Batoka Gorge; (iv) alternative spillway designs (if downstream water quality is at risk, such as from gas super-saturation); (v) alternative water flow regimes (run-of-river, river regulation, or peaking); (vi) alternative alignments for the access roads and power transmission lines (if they would cross environmentally or socially sensitive areas); and (vii) analysis of potential greenhouse gas emissions from the reservoir and comparison with other technologies to produce the same amount of electricity; (viii) alternative power generation technologies that could produce the same amount of electricity and compare their environmental and social impacts. If the recommended alternative is not least-cost from an environmental and or social perspective, then the ESIA report should demonstrate that the overall benefits from the chosen project alternative substantially outweigh the environmental costs. 4.2.8 Public Consultation The Consultants will be required to undertake public consultation to ensure that all interested and affected stakeholders are involved in the ESIA process and their views incorporated into the ESIA report. Evidence of consultation should be provided in the report. Consultations throughout the ESIA will be based on a consultation programme agreed with the ZRA during the inception phase. Specifically, the Consultant will propose an effective, comprehensive public consultation strategy which should include its objective, list of stakeholders to be consulted, methods for reaching these stakeholders, the scheduling of consultation activities, and how the consultation efforts will be analyzed. The Consultants will maintain a record of interagency and consultation meetings, including consultations for obtaining the informed views of the affected people and local non-governmental organizations (NGOs). The record will specify any means other than consultations (e.g., surveys) that were used to obtain the views of affected groups and local NGOs. Minutes should be kept for all consultation meetings with project affected persons and included in an annex of the ESIA. All relevant materials will be provided to affected groups in a timely manner prior to consultation and in a form and language that is understandable and accessible to the groups being consulted. 4.3 Phase III: Risk Management and Mitigation 4.3.1 Environmental and Social Risk Management and Mitigation Development of hydro-electric projects involves various risks at different stages viz., planning, design and construction, and operation and maintenance. The Environmental and Social Impact Assessment Phase will provide an analysis of potential risks associated with development of the Batoka Gorge HES. Based on this assessment, this phase will identify options and define recommended measures to be taken to eliminate, reduce, mitigate or manage associated risks and develop any opportunities for environmental and social enhancement. 4.3.2 Environmental Management Plan The Consultant will prepare a separate Construction Environmental Management Plan and an Operation and Maintenance Environmental Management Plan. These will consist of the set of The Zambezi River Authority Page 13 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT mitigation, monitoring, and institutional measures to be taken during implementation and operation of the Batoka Gorge HES to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels. These should reduce residual adverse impacts to levels that are compatible with the standards imbedded in the applicable World Bank Safeguard Policies. The plan will include the actions needed to implement these measures and any other potential measures to enhance positive impacts, including training and capacity building. The Consultant will propose an Environmental Management Plan which should be in tabular form and should specify the predicted impacts, mitigation measures/enhancement measures and schedule of these measures. This should include specific provisions to be included in all Contract documents outlining the necessary chance find procedures in relation to physical cultural resources. The Consultant should estimate the costs of implementing this plan, including all capital, recurrent operating and training costs. The Environmental Management Plan must identify the information needed to guide management decisions, including recommendations on the source of funding for all recurrent costs associated with mitigation and monitoring measures. It should clearly indicate responsibilities for lead agencies, stakeholders and any training needs that should be undertaken to ensure its proper implementation; The Consultant shall prepare a draft bill of quantities for all monitoring, mitigation and impact management measures required under the EMP. These will be used for inclusion in tender documents for all works. This should include Environmental Rules for Contractors to follow, in order to minimize adverse construction-related environmental and social impacts, along with clear penalties for non-compliance. The EMP will include an Environmental Monitoring Plan by which all mitigation measures recommended in the Environmental Management Plan will be monitored. This should include: (i) performance monitoring of how well project construction and operation - including the implementation of key mitigation measures - are carried out from an environmental and social (including health and safety) perspective; and, (ii) outcome monitoring of key selected environmental and social indicators (such as for reservoir and river water quality, indicator species of conservation or special management interest, livelihood restoration for any project-affected persons, etc.). The EMP should specify the activities of the project, key monitoring parameters, the frequency and duration of monitoring, resources required, skilled personnel needs, authorities responsible for monitoring and means of verification. The EMP will provide an overview of the implementation arrangements, roles, and responsibilities of all relevant agencies in implementation and monitoring compliance with the ESIA and the EMP. This should include a review of the authority and capability of institutions at different levels (e.g. local, district, provincial/regional, and national), and their capacity to manage and monitor implementation. The analysis may extend to new laws and regulations, new agencies or agency functions, inter-sectoral arrangements, management procedures and training, staffing, operation and maintenance training, budgeting, and financial support. The EMP shall specifically outline the responsibilities of the Contractors in the preparation and implementation of a Contractors EMP (CEMP) and the development of Environmental and Social Method Statements. This will include Risk Assessments for each activity and the recruitment of qualified personnel specifically for this purpose. These requirements will be included as part of the Tender Documents. The EMP shall similarly outline the responsibilities of the Supervising Engineer. This will include, but not necessarily be limited to, monitoring and enforcing implementation of the CEMP through The Zambezi River Authority Page 14 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT suitably qualified personnel recruited. These provisions will be included as part of the Tender Documents. For institutions responsible for implementation of the overall project and subsequent plans, the EMP will identify any training and capacity building programs that will need to be provided and determine what, if any, technical assistance may be needed. The Consultant shall identify and outline any environmental and social dimensions associated with the Emergency Preparedness Plan. This Framework EPP is being prepared in parallel by the Engineering Consultants undertaking the Feasibility Study. The Engineering Consultants will carry out a one-dimensional dam-break analysis and assess the downstream impact of such failure. The results of the dam-break analysis will be used to prepare inundation maps and the framework of an Emergency Preparedness Plan. The Environmental and Social Consultant will review the output of this analysis and the proposed EPP and identify any environmental and social dimensions and any associated measures that may be required. The Consultant shall provide an outline for a Decommissioning Plan to identify any potential environmental and or social issues that would be associated with the full or partial removal of the dam and its associated facilities, or from any significant changes to the operations thereof. 4.3.3 Resettlement Action Plan The Consultant will prepare a Resettlement Action Plan for the Batoka Gorge HES, including all associated infrastructure, based on the socio-economic baseline assessment. The RAP will identify all persons directly and indirectly impacted by the project works. This will include residents, communities, and users of the land and water resources. The RAPs will include the number of people to be displaced, an inventory of all property and structures to be affected or lost due to the project and indicate the alternative places for relocating displaced people to ensure that people are not worse-off as a consequence of the project. The basic format for presentation of the RAP will be based on the following: Executive Summary Concise presentation of significant findings, recommended actions and associated costs for the preparation, construction and recurrent operation and maintenance. Description of the project General description of the project and identification of the project area. Potential impacts Identification of: (a) the project component or activities that give rise to resettlement; (b) the zone of impact of such component or activities; (c) the alternatives considered to avoid or minimize resettlement; and (d) the mechanisms established to minimize resettlement, to the extent possible, during project implementation. Objectives The main objectives of the resettlement program. Socioeconomic studies The Zambezi River Authority Page 15 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT The findings of socio-economic studies conducted under Phase 2 of the ESIA Consultants Services, including: (a) the results of the socio-economic baseline survey carried out in Phase 2 covering: (i) current occupants of the affected area to establish a basis for the design of the resettlement program and to exclude subsequent inflows of people from eligibility for compensation and resettlement assistance; (ii) standard characteristics of displaced households, including a description of production systems, labor, and household organization; and baseline information on livelihoods (including, as relevant, production levels and income derived from both formal and informal economic activities) and standards of living (including health status) of the displaced population; (iii) the magnitude of the expected loss—total or partial—of assets, and the extent of displacement, physical or economic; (iv) information on vulnerable groups or persons for whom special provisions may have to be made; and, (v) provisions to update information on the displaced people's livelihoods and standards of living at regular intervals so that the latest information is available at the time of their displacement. (b) Other studies as may be required describing the following: (i) land tenure and transfer systems, including an inventory of common property natural resources from which people derive their livelihoods and sustenance, non title- based usufruct systems (including fishing, grazing, or use of forest areas) governed by local recognized land allocation mechanisms, and any issues raised by different tenure systems in the project area; (ii) the patterns of social interaction in the affected communities, including social networks and social support systems, and how they will be affected by the project; (iii) public infrastructure and social services that will be affected; and (iv) social and cultural characteristics of displaced communities, including a description of formal and informal institutions (e.g., community organizations, ritual groups, NGOs) that may be relevant to the consultation strategy and to designing and implementing the resettlement activities. Legal framework. The findings of an analysis of the legal framework, covering (a) the scope of the power of eminent domain and the nature of compensation associated with it, in terms of both the valuation methodology and the timing of payment; (b) the applicable legal and administrative procedures, including a description of the remedies available to displaced persons in the judicial process and the normal time frame for such procedures, and any available alternative dispute resolution mechanisms that may be relevant to resettlement under the project; (c) relevant law (including customary and traditional law) governing land tenure, valuation of assets and losses, compensation, and natural resource usage rights; customary personal law related to displacement; and environmental laws and social welfare legislation; (d) laws and regulations relating to the agencies responsible for implementing resettlement activities; (e) gaps, if any, between local laws covering eminent domain and resettlement and the Bank's resettlement policy, and the mechanisms to bridge such gaps; and (f) any legal steps necessary to ensure the effective implementation of resettlement activities under the project, including, as appropriate, a process for recognizing claims to legal rights to land—including claims that derive from customary law and traditional usage. The Zambezi River Authority Page 16 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT Institutional Framework The findings of an analysis of the institutional framework covering (a) the identification of agencies responsible for resettlement activities and NGOs that may have a role in project implementation; (b) an assessment of the institutional capacity of such agencies and NGOs; and (c) any steps that are proposed to enhance the institutional capacity of agencies and NGOs responsible for resettlement implementation. Eligibility. Definition of displaced persons and criteria for determining their eligibility for compensation and other resettlement assistance, including relevant cut-off dates. Valuation of and compensation for losses. The methodology to be used in valuing losses to determine their replacement cost; and a description of the proposed types and levels of compensation under local law and such supplementary measures as are necessary to achieve replacement cost for lost assets. Resettlement measures. A description of the packages of compensation and other resettlement measures that will assist each category of eligible displaced persons to achieve the objectives of the RAP. In addition to being technically and economically feasible, the resettlement packages should be compatible with the cultural preferences of the displaced persons, and prepared in consultation with them. Site selection, site preparation, and relocation. Alternative relocation sites considered and explanation of those selected, covering (a) institutional and technical arrangements for identifying and preparing relocation sites, whether rural or urban, for which a combination of productive potential, locational advantages, and other factors is at least comparable to the advantages of the old sites, with an estimate of the time needed to acquire and transfer land and ancillary resources; (b) any measures necessary to prevent land speculation or influx of ineligible persons at the selected sites; (c) procedures for physical relocation under the project, including time tables for site preparation and transfer; and (d) legal arrangements for regularizing tenure and transferring titles to resettlers. Housing, infrastructure, and social services. Plans to provide (or to finance resettlers' provision of) housing, infrastructure (e.g., water supply, feeder roads), and social services (e.g., schools, health services); plans to ensure comparable services to host populations; any necessary site development, engineering, and architectural designs for these facilities. Environmental protection and management. A description of the boundaries of the relocation area; and an assessment of the environmental impacts of the proposed resettlement and measures to mitigate and manage these impacts (coordinated as appropriate with the environmental assessment of the main investment requiring the resettlement). Community participation. Involvement of resettlers and host communities, including (a) a description of the strategy for consultation with and participation of resettlers and hosts in the design and implementation of the resettlement activities; The Zambezi River Authority Page 17 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT (b) a summary of the views expressed and how these views were taken into account in preparing the resettlement plan; (c) a review of the resettlement alternatives presented and the choices made by displaced persons regarding options available to them, including choices related to forms of compensation and resettlement assistance, to relocating as individuals, families or as parts of preexisting communities or kinship groups, to sustaining existing patterns of group organization, and to retaining access to cultural property (e.g. places of worship, pilgrimage centers, cemeteries); and (d) institutionalized arrangements by which displaced people can communicate their concerns to project authorities throughout planning and implementation, and measures to ensure that such vulnerable groups as indigenous people, ethnic minorities, the landless, and women are adequately represented. Integration with host populations. Measures to mitigate the impact of resettlement on any host communities, including (a) consultations with host communities and local governments; (b) arrangements for prompt tendering of any payment due the hosts for land or other assets provided to resettlers; (c) arrangements for addressing any conflict that may arise between resettlers and host communities; and (d) any measures necessary to augment services (e.g., education, water, health, and production services) in host communities to make them at least comparable to services available to resettlers. Grievance procedures. Affordable and accessible procedures for third-party settlement of disputes arising from resettlement; such grievance mechanisms should take into account the availability of judicial recourse and community and traditional dispute settlement mechanisms. Organizational responsibilities. The organizational framework for implementing resettlement, including identification of agencies responsible for delivery of resettlement measures and provision of services; arrangements to ensure appropriate coordination between agencies and jurisdictions involved in implementation; and any measures (including technical assistance) needed to strengthen the implementing agencies' capacity to design and carry out resettlement activities; provisions for the transfer to local authorities or resettlers themselves of responsibility for managing facilities and services provided under the project and for transferring other such responsibilities from the resettlement implementing agencies, when appropriate. Implementation schedule. An implementation schedule covering all resettlement activities from preparation through implementation, including target dates for the achievement of expected benefits to resettlers and hosts and terminating the various forms of assistance. The schedule should indicate how the resettlement activities are linked to the implementation of the overall project. Costs and budget. Tables showing itemized cost estimates for all resettlement activities, including allowances for inflation, population growth, and other contingencies; timetables for expenditures; sources of funds; and arrangements for timely flow of funds, and funding for resettlement, if any, in areas outside the jurisdiction of the implementing agencies. The Zambezi River Authority Page 18 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT The Consultant shall prepare a draft bill of quantities for all monitoring, mitigation and impact management measures required under the RAP. These will be used for inclusion in tender documents for all works. Monitoring and evaluation. Arrangements for monitoring of resettlement activities by the implementing agency, supplemented by independent monitors as considered appropriate by the Bank, to ensure complete and objective information; performance monitoring indicators to measure inputs, outputs, and outcomes for resettlement activities; involvement of the displaced persons in the monitoring process; evaluation of the impact of resettlement for a reasonable period after all resettlement and related development activities have been completed; using the results of resettlement monitoring to guide subsequent implementation. 4.3.4 Work Plan The Consultant shall estimate a realistic work plan for implementation of the EMP and the RAP for the Batoka Gorge HES. The work plan shall include estimation of needed labor and equipment. The work plan shall further take into account the construction schedule developed under the Feasibility Study. 4.3.5 Costing The Consultant shall prepare a cost estimate for the Batoka Gorge HES with break-down in local and foreign currency. The cost estimate shall be prepared on the basis of prevailing market prices. The reference price level and exchange rate(s) should be provided. For all construction and equipment associated with implementation of the EMP and the RAP, prices should be based on collected information from potential suppliers. An estimate for administration, legal costs, land acquisition, resettlement, compensation, social, and environmental measures outlined in the EMP and the RAP shall be included along, with the basis for their estimate. The Consultant shall determine the criteria for estimating physical contingencies for the various project components and the price escalation during implementation shall be provided. The Consultant shall further estimate any annual operating and maintenance costs associated with the measures required under the EMP and RAP for the Batoka Gorge HES. 4.3.6 Presentation and Reporting The Consultant shall present the Environmental and Social Impact Assessment, the EMP and the RAP as separate volumes. The draft ESIA Report will be presented to the Client and stakeholders at a workshop prior to finalization of the EMPs and the RAPs. This will ensure all potential impacts are properly identified for inclusion in the EMP and RAPs. Based on feedback from the workshop the Consultant shall finalize the ESIA Report, which will be used as input for the subsequent EMP and RAP. The draft EMP and the draft RAP will be presented to the Client and stakeholders at a workshop prior to finalization. Based on feedback from the workshop the Consultant shall finalize the EMP and RAP. All consultations will be properly managed and documented through the Public Consultation Strategy and minutes of all meetings. This shall be included as part of the final report. The Zambezi River Authority Page 19 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT 5.0 REQUIRED EXPERTISE OF KEY PERSONNEL The Consultant shall ensure a team of international experts with extensive experience from similar environmental and social assessments of large dam, or related infrastructure, projects. The project management and key personnel must have experience from projects in Africa and the team should be supported by local expertise as far as possible. To adequately address the core issues of the study, the Consultant’s key personnel should be composed of at least the following: 1) Team Leader – Environmental Impact Assessment Expert A professional with at least a Masters Degree in Environmental Management and at least 15 years of experience in the assessment of the environmental impact of large dam, or related, projects. In demonstrating the professional experience, the Team Leader shall prove to have been involved in at least 5 (five) projects of a similar nature based in international contracts. In addition, the Team Leader shall be a person with good oral and written communication skills and shall demonstrate a high level of organizational skills. 2) Water Resources Expert A Water Resources Expert with at least a Masters Degree in Water Resources Management or its equivalent and at least 10 years relevant experience in water management planning. The Water Resources Expert shall be a key member of the consultancy team and play a key role in the planning and implementation of the overall assessment and as such is expected to prove to have been involved in at least 5 (five) projects of a similar nature based in international contracts. 3) Aquatic Ecologist Aquatic Ecologist with at least a Masters Degree and at least 10 years relevant experience in impact assessment associated, fisheries, aquatic ecology or related field and mitigation plan preparation. Expertise in identifying species of conservation or management interest in the project area will be an advantage. The Ecologist shall be a key member of the consultancy team and play a key role in the planning and undertaking of the environmental assessment for the project and as such is expected to prove to have been involved in at least 3 (three) projects of a similar nature based in international contracts. 4) Terrestrial Ecologist Terrestrial Ecologist with at least a Masters Degree in Ecology, or equivalent discipline, and at least 10 years relevant experience in ecological management or related field and mitigation plan preparation. Expertise in identifying plant or animal species of conservation or management interest in the project area will be an advantage. The Ecologist shall be a key member of the consultancy team and play a key role in the planning and undertaking of the environmental assessment for the project and as such is expected to prove to have been involved in at least 3 (three) projects of a similar nature based in international contracts. 5) Sociologist A professional sociologist with at least a Masters degree in Social Sciences or equivalent and at least 10 years relevant experience in social impact assessment and mitigation plan preparation. The Sociologist shall be a key member of the consultancy team and play a key role in the planning and undertaking of the social assessment for the project and as such is expected to prove to have been involved in at least 3 (three) projects of a similar nature based in international contracts. The Zambezi River Authority Page 20 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT 6) Public Consultation Facilitator. A qualified specialist with not less than ten (10) years of cumulative experience developing and implementing public awareness and consultation strategies. The Public Consultation Facilitator will be responsible for planning and implementing a transparent public consultation strategy targeting affected communities and will have specific experience working as a public participation specialist on at least two (2) dam projects of similar nature and complexity, of which at least one must be from sub-Saharan Africa. 7) Civil Engineer A professional engineer with at least 15 years of experience in the reconnaissance, siting, general layout design and output optimization of hydropower plants/schemes. The Engineer shall be a key member of the consultancy team and shall play a key role in informing the planning and execution of the feasibility study and as such is expected to prove to have been involved in at least 3 (three) projects of a similar nature based in international contracts. 8) Additional Expertise Additional expertise that shall have smaller but essential inputs may include, but may not be limited to:  Anthropologist  Livelihood Specialist  Agricultural Economist  Public Health Specialist  Geologist / Geomorphologist  Ornithologist  Hydrologist  Legal Specialist  Surveyor/s  Economist The Client considers of utmost importance the timely elaboration and submission of pertinent reports and briefings during the course of the work of very high importance. Therefore, apart from submitting the reports, the Consultant shall be expected to hold bi-monthly updates/briefings/video conferences with the ZRA on works in progress and problems encountered. The Consultant shall prepare and submit reports of the consultancy to the Client in one [1] electronic copy, preferably in MS Word, on CD ROM and hard copies as specified in the Table below. The reports and briefing shall be written and held in English. The draft and the final reports shall be submitted as hard copies and in electronic form to the ZRA as specified. After incorporating the necessary modifications to the drafts the edited technical reports shall be submitted to the ZRA no later than three weeks after approval of the draft report. 2) Bi-monthly progress reports The Consultant shall prepare bimonthly progress reports, which shall discuss activities undertaken during the period and progress against the program, issues and constraints that could affect the The Zambezi River Authority Page 21 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT delivery of services and outputs and a program of work to be undertaken during the next period. The Bi-monthly Progress Reports shall be kept as brief as possible and shall be limited to highlighting progress, key issues and constraints encountered during the reporting period. The Consultant will also submit quarterly progress reports on the work to the ZRA, detailing work progress, constraints and solutions whilst carrying out the assessment. These will be due on the 15 th of the subsequent month at the end of each quarter and ten [10] copies will be submitted to the Client. Should there be comments from the Client, these will be discussed at a consultative meeting within two weeks after submission of the report. The Client is engaging an independent Panel of Experts to assist in the review and oversight of the Consultant. Summary of the Expected Deliverables Report Report Description No. Due date No. hard (No. of weeks from copies commencement date) 1 Draft Inception Report 15 4.0 2 Final Inception Report 20 8.0 3 Draft Environmental & Social Impact Assessment 15 32.0 Report 4 Final Draft Environmental & Social Impact 15 40.0 Assessment Report 5 Final Environmental & Social Impact Assessment 20 60.0 Report 6 Draft Resettlement Action Plan 15 40.0 7 Draft Environmental Management Plan 15 40.0 (Construction and Operation) 8 Draft bills of quantities for monitoring, mitigation 10 40.0 and impact management for inclusion in tender documents for all works 9 Final Environmental Management Plan 15 56.0 (Construction and Operation) 10 Final Resettlement Action Plan 15 56.0 11 Final bills of quantities for monitoring, mitigation 10 56.0 and impact management for inclusion in tender documents for all works 7.1 Documentation The ZRA shall provide documents, where available, such as previous power development master plans, feasibility studies reports, environmental assessments, operational data for the existing power generation, transmission and distribution systems, etc., that may be required for the performance of the services. 7.2 Equipment and Tools All equipment and tools needed to undertake the study shall be provided by the Consultant. The Zambezi River Authority Page 22 of 25 April 2013 BATOKA GORGE HYDROELECTRIC SCHEME ToR for ENVIRONMENT & SOCIAL ASSESSMENT 7.3 Office Space and Facilities The Consultant shall provide own office facilities, for the execution of the services. The ZRA shall render all possible assistance to the Consultant in the timely acquisition and securing of such office space required for the execution of the Services. 7.4 General Assistance The ZRA shall provide assistance in obtaining working permits, residence visas, exit, re-entry and exit visas for the Consultant’s staff, other licensing documents, etc. ZRA shall also provide assistance in facilitating and expediting customs procedures in connection with importation of equipment and materials necessary for the Consultant’s services and for the personal use of the Consultant’s staff. It is preferred that the consultancy services shall be undertaken and completed within a period of fourteen (14) calendar months, i.e. sixty (60) weeks. In the Consultant’s proposal it shou ld be taken into account how any additional investigations can be accommodated. It is envisaged that the Consultancy Services Contract will be a lump-sum Contract, modeled on the World Bank’s guidelines for the selection and employment of Consultants. The Zambezi River Authority Page 23 of 25 April 2013