PROCUREMENT PLAN (Textual Part) Project information: [country]Congo Democratic Republic, EMERGENCY EQUITY AND SYSTEM STRENGTHENING IN EDUCATION PROJECT [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Congo, Democratic Republic of : DR Congo Emergency Equity and System Strengthening in Education PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2020-08-11 2021-09-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172341 GPN Date: Project Name: DR Congo Emergency Equity and System Strengthening in Education Loan / Credit No: IDA / 66920 Permanent Secretariat for Support and Coordination of the Education Sector Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-214168-CW-RFQ / Travaux d'aménagement des Component 3: Strengthening Request for Single Stage - One 2021-04- bureaux pour l'Equipe de IDA / 66920 Post Limited 52,613.00 Signed 2021-01-22 2021-01-05 2021-03-10 2021-02-18 Systems for Results Quotations Envelope 24 Coordination du Projet (ECP) du Projet PERSE GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-209748-GO-RFQ Component 3: Strengthening Request for Single Stage - One / Fourniture des supports de IDA / 66920 Post Limited 69,950.00 Signed 2020-12-15 2020-12-04 2021-01-28 2021-01-20 2021-02-27 Systems for Results Quotations Envelope communication pour le PERSE ZR-SPACE-209751-GO-RFQ / Fourniture et installation des Component 3: Strengthening Request for Single Stage - One IDA / 66920 Post Limited 45,800.00 Signed 2020-12-15 2020-12-04 2021-01-10 2021-01-20 2021-02-09 équipements vidéo conférence Systems for Results Quotations Envelope pour l'UCP PERSE ZR-SPACE-209756-GO-RFQ / Acquisition de deux Component 3: Strengthening Request for Single Stage - One IDA / 66920 Post Limited 94,450.00 Signed 2020-12-15 2020-12-15 2021-01-05 2021-03-23 2021-02-04 véhicules utilitaires pour l'UCP Systems for Results Quotations Envelope PERSE ZR-SPACE-229255-GO-RFQ / ACQUISITION MOBILIER DE Component 3: Strengthening Request for Single Stage - One BUREAU POUR L'EQUIPE DE IDA / 66920 Post Limited 94,415.00 Signed 2021-04-19 2021-04-15 2021-06-14 2021-05-10 2021-12-11 Systems for Results Quotations Envelope COORDINATION (ECP) DU PROJET PERSE A KINSHASA ZR-SPACE-229266-GO-RFQ / ACQUISITION EQUIPEMENTS Component 3: Strengthening Request for Single Stage - One INFORMATIQUES POUR IDA / 66920 Post Limited 94,060.00 Signed 2021-04-19 2021-04-15 2021-06-14 2021-05-10 2021-12-11 Systems for Results Quotations Envelope L'EQUIPE DE COORDINATION DU PROJET PERSE A KINSHASA ZR-SPACE-237602-GO-RFQ / ACQUISITION DES FOURNITURES DE BUREAU ET CONSOMMABLES Pending Component 3: Strengthening Request for Single Stage - One INFORMATIQUES POUR IDA / 66920 Post Limited 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 Systems for Results Quotations Envelope L'EQUIPE DE COORDINATION on DU PROJET (ECP) PERSE POUR 3 MOIS ( JUILLET -AOUT- SEPTEMBRE 2021) ZR-SPACE-248721-GO-RFP / Pending Component 3: Strengthening Request for Single Stage - One Impression du code de bonne IDA / 66920 Post Limited 0.00 Implementati 2021-09-19 2021-11-07 2022-02-05 Systems for Results Quotations Envelope conduite (Acte d'engagement) on ZR-SPACE-252528-GO-RFB / Pending ACQUISITION DE 11 Component 3: Strengthening Single Stage - One IDA / 66920 Post Request for Bids Open - National 0.00 Implementati 2021-09-08 2021-09-13 2021-10-25 2021-11-24 2021-12-29 2022-06-27 VEHICULES DE TERRAIN POUR Systems for Results Envelope on LE PROJET PERSE NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-227692-NC-DIR / Acquisition du logiciel Pending Component 3: Strengthening TOMPRO pour la gestion IDA / 66920 Post Direct Selection Direct 0.00 Implementati 2021-09-14 2021-09-19 2021-10-24 2021-11-23 Systems for Results comptable du projet PERSE : on TOMATE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-187618-CS-CQS / Consultant Sélection de la firme pour la Component 3: Strengthening Pending IDA / 66920 Post Qualification Open - National 0.00 2021-02-09 2021-03-02 2021-04-15 2021-05-15 2021-06-19 2023-06-09 revue du Plan de Travail Systems for Results Implementation Selection Annuel (PTA) ZR-SPACE-191896-CS-CQS / Sélection du Cabinet pour le Consultant Component 3: Strengthening recrutement du personnel clé IDA / 66920 Post Qualification Open - National 96,825.08 Signed 2020-09-15 2020-09-28 2020-10-06 2020-11-03 2020-11-02 2020-11-10 2020-12-09 2020-12-01 2021-01-13 2021-01-30 Systems for Results de l'équipe de gestion du Selection projet Page 1 ZR-SPACE-198450-CS-CQS / Sélection du Cabinet Firme Consultant Component 3: Strengthening l'Audit externe du Programme IDA / 66920 Post Qualification Limited 106,350.00 Signed 2020-10-08 2020-10-06 2020-10-22 2020-11-02 2020-10-29 2020-11-12 2020-11-19 2020-11-18 2020-12-19 Systems for Results des Dépenses Eligibles (EEP)au Selection 30 novembre 2020 ZR-SPACE-187535-CS-UN / Sélection de l'Agence des Nations Unies pour la mise en Component 3: Strengthening UN Agencies IDA / 66920 Prior Direct 15,000,000.00 Signed 2020-11-03 2021-01-11 2020-11-10 œuvre du programme pilote " Systems for Results (Direct) écoles sécurisées et inclusives" : UNFPA ZR-SPACE-221809-CS-QCBS / Cabinet d'Assistance Technique pour appuyer la Component 3: Strengthening Quality And Cost- Under IDA / 66920 Post Open - International 0.00 2021-03-05 2021-03-23 2021-03-19 2021-06-25 2021-04-16 2021-05-14 2021-05-28 2021-06-25 2021-07-30 2022-07-30 mise en oeuvre de l'ILD 5 et Systems for Results Based Selection Implementation les activités de la Composante 3.2 liées au MGP et l'EC ZR-SPACE-223392-CS-QCBS / Sélection du Cabinet d'assistance technique chargé Component 3: Strengthening Quality And Cost- Under d'appuyer les activités liées IDA / 66920 Post Open - International 0.00 2021-03-10 2021-03-23 2021-03-31 2021-06-25 2021-04-28 2021-05-26 2021-06-25 2021-07-30 2021-09-03 2022-09-03 Systems for Results Based Selection Implementation aux ILD 2,3,6 et 7 et de renforcer les Directions responsables de ces ILD ZR-SPACE-221808-CS-QCBS / Sélection du Cabinet / ONG d'Assistance technique pour Consultant appuyer les activités suivantes Component 3: Strengthening Under IDA / 66920 Post Qualification Open - International 0.00 2021-03-22 2021-03-29 2021-04-12 2021-04-08 2021-05-26 2021-06-09 2021-07-14 2022-01-10 de la Composante 3.1: Systems for Results Implementation Selection renforcer le SIGE et entreprendre une revue fonctionnelle de la DIGE. ZR-SPACE-226130-CS-QBS / Sélection du Cabinet / ONG d'Assistance technique pour Component 3: Strengthening Quality Based Under IDA / 66920 Post Open - International 0.00 2021-04-01 2021-04-01 2021-04-22 2021-04-07 2021-06-05 2021-07-03 2021-08-02 2021-09-01 2021-10-06 2022-10-06 les activités de Systems for Results Selection Implementation Communication ( y compris vis-à-vis du MGP) ZR-SPACE-241434-CS-QCBS / Sélection d'un Cabinet pour la formation, sensibilisation et Component 3: Strengthening Quality And Cost- Under suivi sur les Violences Basées IDA / 66920 Post Open - International 0.00 2021-06-29 2021-08-05 2021-07-20 2021-08-09 2021-08-17 2021-09-14 2021-09-15 2021-10-13 2021-11-17 2023-11-07 Systems for Results Based Selection Implementation sur le Genre (VBG) au niveau des Points Focaux MGP/ PERSE ZR-SPACE-187608-CS-QCBS / Sélection des firmes pour la réalisation des reformes du Component 3: Strengthening Quality And Cost- IDA / 66920 Prior Open - International 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2023-03-02 système d'enseignement Systems for Results Based Selection primaire et l'amélioration de la gouvernance ZR-SPACE-241554-CS-QCBS / Sélection du Consultant Firme chargé (i) de la Vérification des indicateurs Component 3: Strengthening Quality And Cost- Under Liés au Décaissements, (ii) de IDA / 66920 Post Open - National 0.00 2021-06-29 2021-08-02 2021-07-20 2021-08-09 2021-08-04 2021-09-01 2021-09-15 2021-10-13 2021-11-10 2022-11-10 Systems for Results Based Selection Implementation l'audit des Dépenses Eligibles au Programme (DEP) et (iii) de l'audit financier des comptes du projet ZR-SPACE-187612-CS-QCBS / Sélection de la firme pour la vérification des Indicateurs Component 3: Strengthening Quality And Cost- Liés aux Décaissements ( ILD) IDA / 66920 Prior Open - International 0.00 Canceled 2020-09-10 2020-10-01 2020-11-14 2020-12-12 2021-01-11 2021-02-15 2021-03-22 2024-03-21 Systems for Results Based Selection et de l'Audit externe du Programme des Dépenses Eligibles (EEP) et du SECOPE ZR-SPACE-221810-CS-QCBS / Un Cabinet d'Assistance Component 3: Strengthening Quality And Cost- Technique pour le suivi par IDA / 66920 Post Open - International 0.00 Canceled 2021-03-05 2021-04-01 2021-03-19 2021-04-08 2021-04-16 2021-05-14 2021-05-28 2021-06-25 2021-07-23 2022-07-23 Systems for Results Based Selection des tiers des autres assistances techniques ZR-SPACE-246958-CS-CQS / Consultant ASSISTANCE TECHNIQUE POUR Component 3: Strengthening Pending IDA / 66920 Post Qualification Open - National 0.00 2021-08-12 2021-08-26 2021-10-09 2021-10-23 2021-11-27 2022-05-26 L'EVALUATION SOCIALE DU Systems for Results Implementation Selection PROJET PERSE INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-187600-CS-INDV Individual / Sélection des consultants ( Component 3: Strengthening Under IDA / 66920 Post Consultant Open 0.00 2020-09-07 2020-09-28 2020-10-26 2020-11-16 2020-12-21 2022-12-11 2) chargés du suivi de Systems for Results Implementation Selection l'engagement citoyen ZR-SPACE-187601-CS-INDV / Sélection des consultants nationaux ( 10) au niveau Individual Component 3: Strengthening Under provincial pour la supervision, IDA / 66920 Post Consultant Open 0.00 2020-09-15 2020-09-17 2020-11-03 2020-11-24 2020-12-29 2022-12-19 Systems for Results Implementation le soutien et le suivi des Selection reformes du projet : plusieurs petits marchés ZR-SPACE-187573-CS-INDV / Sélection du spécialiste Individual responsable pour appuyer le Component 3: Strengthening Under IDA / 66920 Post Consultant Open 0.00 2020-09-10 2020-09-28 2020-10-29 2020-11-19 2020-12-24 2022-12-14 renforcement des réseaux Systems for Results Implementation Selection d'écoles et Bureaux gestionnaires Page 2 ZR-SPACE-187592-CS-INDV Individual / Sélection du Spécialiste Component 3: Strengthening Under IDA / 66920 Post Consultant Open 0.00 2020-09-14 2020-09-28 2020-11-02 2020-11-23 2020-12-28 2022-12-18 chargé du suivi-évaluation du Systems for Results Implementation Selection projet ZR-SPACE-187590-CS-INDV Individual Component 3: Strengthening Pending / Sélection du Spécialiste en IDA / 66920 Post Consultant Open 0.00 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2022-12-19 Systems for Results Implementation sauvegardes sociales Selection ZR-SPACE-187548-CS-INDV Individual Component 3: Strengthening Under / Sélection du Coordonnateur IDA / 66920 Post Consultant Open 0.00 2020-09-14 2020-09-17 2020-11-02 2020-11-16 2020-12-14 2022-12-04 Systems for Results Implementation adjoint du projet PERSE Selection ZR-SPACE-187555-CS-INDV / Sélection d'un Consultant Individual Component 3: Strengthening Under international pour appuyer les IDA / 66920 Post Consultant Open 0.00 2020-09-10 2020-09-28 2020-10-29 2020-11-12 2020-12-17 2021-02-27 Systems for Results Implementation systèmes d'information et de Selection paiement des salaires ZR-SPACE-187561-CS-INDV Individual / Sélection du spécialiste Component 3: Strengthening Pending IDA / 66920 Post Consultant Open 0.00 2020-09-13 2020-11-01 2020-11-22 2020-12-27 2022-12-17 responsable pour le Systems for Results Implementation Selection recrutement basé sur le mérite ZR-SPACE-187576-CS-INDV Individual / Sélection d'un Consultant Component 3: Strengthening Pending IDA / 66920 Post Consultant Open 0.00 2020-09-17 2020-11-05 2020-11-19 2020-12-24 2022-12-14 international pour la gestion Systems for Results Implementation Selection financière du projet ZR-SPACE-187579-CS-INDV Individual / Sélection du Consultant Component 3: Strengthening Pending IDA / 66920 Post Consultant Open 0.00 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2022-12-19 national spécialiste en gestion Systems for Results Implementation Selection financière du projet ZR-SPACE-187580-CS-INDV Individual Component 3: Strengthening Under / Sélection du Spécialiste en IDA / 66920 Post Consultant Open 0.00 2020-09-10 2021-01-26 2020-10-29 2020-11-12 2020-12-17 2022-12-07 Systems for Results Implementation Passation des marchés Selection ZR-SPACE-187582-CS-INDV Individual / Sélection du Spécialiste Component 3: Strengthening Pending IDA / 66920 Post Consultant Open 0.00 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2022-12-19 chargé des sauvegardes Systems for Results Implementation Selection environnementales ZR-SPACE-187575-CS-INDV / Sélection du spécialiste Individual Component 3: Strengthening Pending responsable pour appuyer la IDA / 66920 Post Consultant Open 0.00 2020-09-14 2020-11-02 2020-11-23 2020-12-28 2022-12-18 Systems for Results Implementation gestion des finances Selection publiques ZR-SPACE-187620-CS-CDS / Sélection du Coordonnateur Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 7,500.00 Signed 2020-09-10 2020-10-16 2020-09-20 2021-01-03 2020-11-01 2021-01-05 2022-10-22 du Projet : Prof Valère Systems for Results MUNSYA ZR-SPACE-209760-CS-CDS / Sélection chargée de Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 7,500.00 Signed 2020-12-14 2021-02-10 2020-12-18 2020-12-30 2020-12-29 2021-01-05 2021-06-27 Passation des Marchés : Fleur Systems for Results SHWEKA ZR-SPACE-216049-CS-CDS / Sélection du Consultant Component 3: Strengthening Spécialiste en Communication IDA / 66920 Post Direct Selection Direct 27,000.00 Signed 2021-01-26 2021-02-10 2021-02-05 2020-12-30 2021-02-26 2021-01-05 2021-08-25 Systems for Results de l'ECP PERSE: Mme BIBICHE MODJAKA ZR-SPACE-216061-CS-CDS / Sélection du Spécialiste en Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 36,000.00 Signed 2021-01-26 2021-02-10 2021-02-05 2020-12-30 2021-03-05 2021-01-05 2021-09-01 VBG : Jeanine Gabrielle Systems for Results NGUNGU ZR-SPACE-221812-CS-CDS / Sélection du Consultant Principal ( avec son équipe de 4 experts) pour la conduite Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 93,500.00 Signed 2021-03-08 2021-03-10 2021-03-18 2021-03-15 2021-04-08 2021-03-29 2021-07-07 des opérations de Systems for Results géolocalisation des écoles primaires dans le cadre du PERSE : Roger VIBILA ZR-SPACE-221817-CS-INDV Individual / Assistant ponctuel Component 3: Strengthening IDA / 66920 Post Consultant Direct 0.00 Under Review 2021-02-25 2021-02-26 2021-03-07 2021-03-12 2021-03-22 2021-06-20 logisticien : ARLY MANGELELE Systems for Results Selection BOKOMBE ZR-SPACE-223393-CS-INDV / Consultant Architecte chargé de mener les études Individual Component 3: Strengthening Under pour la réhabilitation des IDA / 66920 Post Consultant Limited 0.00 2021-03-10 2021-01-20 2021-03-15 2021-04-05 2021-05-03 2021-08-01 Systems for Results Implementation bureaux du SPACE qui Selection serviront des bureaux définitifs pour le projet PERSE ZR-SPACE-223394-CS-INDV Individual Component 3: Strengthening Under / Sélection du Comptable IDA / 66920 Post Consultant Open 0.00 2021-03-10 2021-03-23 2021-04-28 2021-05-19 2021-06-23 2021-12-20 Systems for Results Implementation pour le projet PERSE Selection ZR-SPACE-221823-CS-CDS / Recrutement du Prestataire Component 3: Strengthening pour le Développement de IDA / 66920 Post Direct Selection Direct 830,726.00 Signed 2021-03-21 2021-03-03 2021-03-31 2021-03-25 2021-04-29 2021-07-07 2021-10-26 Systems for Results l'application ALLO ECOLE : INFOSET ZR-SPACE-231137-CS-INDV / RENOUVELLEMENT Individual CONTRAT CHARGEE DE Component 3: Strengthening Pending IDA / 66920 Post Consultant Direct 0.00 2021-04-22 2021-05-02 2021-05-23 2021-06-27 2022-06-27 PASSATION DES MARCHES Systems for Results Implementation Selection MADAME FLEUR SHWEKA (12 MOIS) Page 3 ZR-SPACE-234473-CS-INDV / Sélection du Consultant chargé de l'élaboration du Individual Plan de Gestion Component 3: Strengthening Under IDA / 66920 Post Consultant Limited 0.00 2021-06-30 2021-08-05 2021-07-05 2021-07-19 2021-08-09 2021-10-08 Environnemental et Social Systems for Results Implementation Selection Générique (PGES) pour le projet PERSE ( Le volet Social étant prépondérant dans le cadre de ce marché) ZR-SPACE-241555-CS-INDV / Renouvellement du Contrat Individual Component 3: Strengthening Pending de la Chargée de logistique- IDA / 66920 Post Consultant Direct 0.00 2021-06-27 2021-07-07 2021-07-14 2021-07-28 2022-07-28 Systems for Results Implementation ARLLY MANGELELE ( pour 12 Selection mois) ZR-SPACE-187591-CS-INDV Individual / Sélection du Spécialiste dans Component 3: Strengthening IDA / 66920 Post Consultant Open 0.00 Canceled 2020-09-09 2020-10-28 2020-11-18 2020-12-23 2022-12-13 la gestion des Violences Systems for Results Selection Basées sur le Genre ( VBG) ZR-SPACE-248688-CS-INDV Individual / Sélection spécialiste en Component 3: Strengthening Pending IDA / 66920 Post Consultant Open 0.00 2021-08-17 2021-10-05 2021-10-26 2021-11-30 2022-11-30 planification et vérification du Systems for Results Implementation Selection projet PERSE ZR-SPACE-248700-CS-INDV Individual Component 3: Strengthening Pending / Sélection Expert en IDA / 66920 Post Consultant Open 0.00 2021-08-17 2021-10-05 2021-10-26 2021-11-30 2022-05-29 Systems for Results Implementation communication Projet PERSE Selection ZR-SPACE-249050-CS-INDV / Sélection d'un Spécialiste Individual Component 3: Strengthening Pending des Systèmes d’information IDA / 66920 Post Consultant Limited 0.00 2021-09-14 2021-09-19 2021-10-03 2021-10-24 2022-10-24 Systems for Results Implementation de gestion de l’éducation et Selection du paiement (SIGEP) ZR-SPACE-241557-CS-CDS / Sélection du Prestataire Tiers chargé du suivi des activités Component 3: Strengthening Pending de renforcement des capacités IDA / 66920 Post Direct Selection Direct 0.00 2021-09-14 2021-09-24 2021-11-12 2022-11-12 Systems for Results Implementation dans le cadre de la mise en oeuvre du projet PERSE : ONG CORDAID ZR-SPACE-231135-CS-INDV / RENOUVELLEMENT Individual CONTRAT SPECIALISTE EN Component 3: Strengthening Pending IDA / 66920 Post Consultant Direct 0.00 2021-06-30 2021-07-10 2021-07-31 2021-09-04 2023-08-25 VIOLENCES BASEES SUR LE Systems for Results Implementation Selection GENRE : MADAME JEANINE NGUNGU KWATE (12 MOIS) Page 4