Organismo de Ejecución: Municipalidad de Manta Proyecto: P143996 Mejora de los Servicios Públicos de Manta CONVENIO DE PRESTAMO BIRF - 82890 Expresado en dólares (USD) 100 millones Plan actualizado al (Fecha) 26 de September de 2016 PROCUREMENT Ecuador : EC Manta Public Services Improvement Project PLAN General Information Country: Ecuador Bank’s Approval Date of the Original Procurement Plan: 2017-07-14 2020-08-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143996 GPN Date: Project Name: EC Manta Public Services Improvement Project Loan / Credit No: IBRD / 82890 Executing Agency(ies): Municipality of Manta WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned OB 001-GADM-UGP / Pavimentacion de vias de la Parroquia Manta con Component 1: Investments Solicitud de Single Stage - One estructura completa de IBRD / 82890 in Water Supply and Previa Open - National 2,277,887.00 1,905,046.03 Firmado 2015-04-20 2015-05-14 ofertas Envelope paviemnto flexible y de Sewerage pavimento rigido (Primer Grupo). LPN OB 005-GADM-UGP- Component 1: Investments Solicitud de Single Stage - One 2016 / Regeneracion Urbana IBRD / 82890 in Water Supply and Previa Open - National 0.00 4,448,658.39 Firmado 2016-05-11 2016-05-12 ofertas Envelope de Avenida Barbasquillo Sewerage OB-016-EMERG / REPARACIONES EMERGENTES PARA EL Component 1: Investments Adquisición RESTABLECIMIENTO DEL IBRD / 82890 in Water Supply and Previa Direct 370,722.05 370,722.05 Firmado 2016-07-18 directa SERVICIO DE AGUA Sewerage POTABLE DE LA CIUDAD DE MANTA OB-001-LPN / Component 1: Investments Pavimentación de calles en Solicitud de Single Stage - One Ejecución IBRD / 82890 in Water Supply and Previa Open - National 2,318,526.18 0.00 2014-11-19 2014-12-19 2015-01-18 2015-02-02 2015-08-24 2016-01-21 parroquias Manta y Eloy ofertas Envelope pendiente Sewerage Alfaro OB-002-LPI / Construcción Component 1: Investments de sistemas de agua potable Solicitud de Open - Single Stage - One Ejecución IBRD / 82890 in Water Supply and Previa 25,527,999.50 0.00 2017-02-19 2017-03-22 2017-05-21 2017-06-05 2017-07-25 2018-05-21 y alcantarillado en la ofertas International Envelope pendiente Sewerage parroquia de Manta (Grupo1) OB-003-LPI / Regeneración Component 1: Investments urbana de Avenida 4 de Solicitud de Open - Single Stage - One IBRD / 82890 in Water Supply and Previa 30,878,380.92 0.00 En ejecución 2016-09-29 2016-10-28 2016-12-28 2017-01-12 2017-03-03 2018-02-26 Noviembre y Avenida 113 ofertas International Envelope Sewerage (Par vial) OB-005-LPN / Regeneración urbana de Avenida Component 1: Investments Solicitud de Single Stage - One Ejecución Barbasquillo (desde Escuela IBRD / 82890 in Water Supply and Previa Open - National 5,689,576.07 0.00 2015-12-13 2016-01-11 2016-02-10 2016-02-25 2016-07-08 2016-12-05 ofertas Envelope pendiente de Pesca hasta entrada Sewerage edificio La Jolla) OB-006-LPN / Construcción Component 1: Investments Solicitud de Single Stage - One Ejecución de colector Los Geranios - IBRD / 82890 in Water Supply and Previa Open - National 627,200.00 0.00 2015-10-02 2015-12-24 2016-01-22 2016-02-08 2016-08-01 2016-12-29 ofertas Envelope pendiente Rio Burro Sewerage OB-007-LPN / Construcción Component 1: Investments Solicitud de Single Stage - One de tanques reservorios de IBRD / 82890 in Water Supply and Posterior Open - National 3,006,250.13 2,454,403.93 Finalizado 2016-03-30 2016-04-11 2016-04-29 2016-05-30 2016-07-18 2016-06-29 2016-08-22 2016-08-02 2016-10-24 2016-12-30 ofertas Envelope agua de 2,500 m3 Sewerage Page 1 OB-009-LPN / Construcción del edificio de laboratorio y Component 3: Institutional Solicitud de Single Stage - One adquisición e instalación de IBRD / 82890 Posterior Open - National 471,179.67 660,805.12 Finalizado 2017-09-13 2018-03-07 2017-09-28 2017-10-31 2018-05-02 2017-11-30 2018-06-29 2018-01-04 2018-07-26 2018-07-03 Strengthening ofertas Envelope generador electrico (Proyecto Laboratorio EPAM) OB-011-LPN / Construcción de sistemas de agua potable, Component 1: Investments Solicitud de Single Stage - One alcantarillado y regeneración IBRD / 82890 in Water Supply and Posterior Open - National 3,298,025.43 2,829,709.02 Finalizado 2016-01-08 2016-01-27 2016-02-08 2016-03-09 2016-02-29 2016-03-23 2016-04-25 2016-05-12 2016-05-16 2016-09-09 ofertas Envelope urbana de la calle 13 en la Sewerage parroquia de Manta OB-012-LPN / Construcción de sistemas de agua potable, Component 1: Investments Solicitud de Single Stage - One alcantarillado y regeneración IBRD / 82890 in Water Supply and Posterior Open - National 3,578,466.71 3,392,842.42 Finalizado 2016-03-07 2016-04-25 2016-04-06 2016-05-06 2016-05-20 2016-05-20 2016-07-15 2016-05-26 2016-12-12 ofertas Envelope urbana de Avenida 24 en la Sewerage parroquia de Manta OB-013-LPN / Construcción de sistemas de agua potable, Component 1: Investments alcantarillado y regeneración Solicitud de Single Stage - One IBRD / 82890 in Water Supply and Posterior Open - National 5,710,641.60 4,298,787.14 Finalizado 2016-03-07 2016-04-13 2016-04-06 2016-05-06 2016-08-08 2016-05-21 2016-11-11 2016-07-11 2016-12-12 2016-12-08 urbana de la Avenida Flavio ofertas Envelope Sewerage Reyes en la parroquia de Manta OB-014-LPN / Construcción de Vías, Aceras y Component 1: Investments Solicitud de Single Stage - One Escalinatas en las IBRD / 82890 in Water Supply and Posterior Open - National 660,000.00 632,719.14 Finalizado 2016-01-16 2016-02-15 2016-02-15 2016-03-21 2016-03-18 2016-04-05 2016-04-06 2016-05-25 2016-06-03 2016-10-22 ofertas Envelope Parroquias Eloy Alfaro, Sewerage Tarqui y San Mateo OB-010-CP / Remodelación Component 4: Project Solicitud de Single Stage - One IBRD / 82890 Posterior Open - National 8,960.00 5,385.00 Finalizado 2015-04-12 2015-06-21 2015-07-25 2015-07-11 de oficinas Management cotizaciones Envelope OB-016-EMERG / Reparación de fugas Component 5: Emergency Adquisición IBRD / 82890 Posterior Direct 364,000.00 370,722.05 Finalizado 2016-06-20 2016-05-05 2016-07-20 2016-08-09 2016-07-29 2016-11-07 emergentes y sectorización Component directa "Zona Cero" GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 008-2015 / Adquisicion de muebles de oficina (mesas Component 1: Investments Adquisición auxiliares) y pago de servicio IBRD / 82890 in Water Supply and Previa Direct 290.00 290.00 En ejecución directa de instalacion central Sewerage telefonica 24-JAF-UGP-GAD / Component 1: Investments Adquisición Adquisicion de Licencias IBRD / 82890 in Water Supply and Previa Direct 11,653.60 11,653.60 En ejecución directa Informaticas Sewerage BI-003-EMERG / Repotenciación y Rehabilitación de las Component 5: Emergency Solicitud de Open - Single Stage - One Ejecución Estaciones de Bombeo, IBRD / 82890 Previa 6,780,480.00 0.00 2016-11-01 2016-12-01 2017-01-15 2017-01-30 2017-03-21 2018-01-15 Component ofertas International Envelope pendiente Planta de Tratamiento de Agua (El Ceibal, Caza Lagarto y Río de Oro) Page 2 BI-009 / Adquisición de Component 3: Institutional Solicitud de Single Stage - One insumos de laboratorio, IBRD / 82890 Posterior Open - National 23,050.00 0.00 Cancelado 2017-07-05 2017-08-04 2017-09-03 2017-09-18 2017-11-17 2017-12-17 Strengthening ofertas Envelope (Proyecto Laboratorio EPAM) BI-010 / Adquisición de equipos de seguridad y señaletica, y equipamiento Component 3: Institutional Solicitud de Single Stage - One de consultorio medico de IBRD / 82890 Posterior Open - National 38,574.00 0.00 Cancelado 2017-01-20 2017-02-19 2017-03-21 2017-04-05 2017-05-25 2017-06-24 Strengthening ofertas Envelope salud ocupacional y medicina preventiva (Proyecto Laboratorio EPAM) BI-011 / Adquisición de equipos informáticos para Component 3: Institutional Solicitud de Single Stage - One IBRD / 82890 Posterior Open - National 8,837.00 0.00 En ejecución 2017-10-08 2017-10-23 2017-11-22 laboratorio (Proyecto Strengthening cotizaciones Envelope Laboratorio EPAM) BI-012 / Adquisición de Component 3: Institutional Solicitud de Single Stage - One mobiliario para laboratorio IBRD / 82890 Posterior Open - National 20,000.00 22,747.65 En ejecución 2017-10-08 2017-10-23 2019-04-11 2017-11-22 2019-04-20 Strengthening cotizaciones Envelope (Proyecto Laboratorio EPAM) BI-013 / Equipamiento de Component 4: Project Solicitud de Single Stage - One Ejecución oficinas y Adquisición de IBRD / 82890 Posterior Limited 35,840.00 0.00 2015-03-27 2015-04-10 2015-04-25 Management cotizaciones Envelope pendiente licencias del software BI-014 / Adquisición de Component 3: Institutional Solicitud de Single Stage - One laboratorio móvil (vehículo), IBRD / 82890 Posterior Open - National 24,562.00 15,963.00 En ejecución 2017-02-14 2017-02-28 2019-04-23 2017-03-30 2019-04-23 Strengthening cotizaciones Envelope (Proyecto Laboratorio EPAM) BI-015 / Adquisición de un (1) vehículo hidrosuccionador Component 3: Institutional Solicitud de Open - Single Stage - Two IBRD / 82890 Previa 553,580.00 0.00 Cancelado 2017-04-12 2017-11-10 2018-01-05 2018-03-20 2018-04-24 2018-10-21 para la Empresa Pública Strengthening ofertas International Envelope Aguas de Manta (EPAM) BI-008 / Adquisición de equipos para laboratorio para el control de la calidad Component 3: Institutional Solicitud de Open - Single Stage - One IBRD / 82890 Previa 496,422.00 496,421.79 Firmado 2017-03-21 2018-01-03 2017-09-28 2018-01-17 2017-11-20 2017-11-20 2017-12-05 2018-03-05 2018-01-09 2018-04-05 2018-07-08 de aguas. (Proyecto Strengthening ofertas International Envelope Laboratorio Empresa Pública Aguas de Manta-EPAM) BI 009 A / Adquisición de Component 3: Institutional Solicitud de Single Stage - One insumos de laboratorio IBRD / 82890 Posterior Open - National 23,050.00 23,397.00 En ejecución 2018-05-12 2018-06-29 2019-04-23 2018-07-29 2019-05-06 Strengthening cotizaciones Envelope (Proyecto Laboratorio EPAM) BI 010 A / Adquisición de equipos de seguridad y señalética, y equipamiento Component 3: Institutional Solicitud de Single Stage - One de consultorio médico de IBRD / 82890 Posterior Open - National 38,574.00 24,149.17 En ejecución 2018-06-09 2018-07-27 2019-04-18 2018-10-25 2019-04-23 Strengthening cotizaciones Envelope salud ocupacional y medicina preventiva (Proyecto Laboratorio EPAM) BI-016-EMERG / ADQUISICIÓN DE BIENES Component 5: Emergency Adquisición Ejecución IBRD / 82890 Posterior Direct 200,000.00 0.00 2020-07-24 2020-07-27 2020-07-30 2020-08-01 E INSUMOS PARA Component directa pendiente EMERGENCIA COVID-19 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 SNC-001 / Levantamiento Component 3: Institutional Solicitud de Single Stage - One de información Catastral IBRD / 82890 Posterior Open - National 392,000.00 375,461.27 Finalizado 2016-07-08 2017-02-09 2016-08-08 2016-09-06 2017-03-13 2016-09-21 2017-05-10 2016-11-10 2017-06-30 2017-05-09 2018-01-15 Strengthening ofertas Envelope Comercial de la EPAM SNC-002 / LEVANTAMIENTO DE Component 4: Project Solicitud de Single Stage - One INFORMACION PARA LA IBRD / 82890 Posterior Limited 6,000.00 6,000.00 En ejecución 2020-03-10 2020-03-05 2020-03-23 2020-03-13 2020-04-12 2020-03-28 Management cotizaciones Envelope DEFINICIÓN DEL ÍNDICE DE CAMINABILIDAD CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCC/001 / Fiscalizacion de la Pavimentacion de vias de la Parroquia Manta con Component 1: Investments Selección basada Open - estructura completa de IBRD / 82890 in Water Supply and Previa en calificaciones 100,000.00 99,998.36 Firmado 2015-06-25 2015-06-02 International pavimento flexible y de Sewerage de consultores pavimento rigido (Primer Grupo). FC-001 / Fiscalización (Supervisión de obras) para la construcción de Sistemas de agua potable y Component 1: Investments Selección basada Open - Ejecución alcantarillado en la IBRD / 82890 in Water Supply and Previa 819,451.16 0.00 2017-02-01 2017-02-22 2017-04-07 2017-05-05 2017-06-04 2017-07-09 2017-08-13 2018-08-13 en calidad y costo International pendiente Parroquia Manta y Sewerage Repotenciación de las Estaciones de Bombeo (Bloque 2) FC-002 / Fiscalización para la construcción de obras de Component 1: Investments alcantarillado, agua potable Selección basada Open - Ejecución IBRD / 82890 in Water Supply and Previa 302,400.00 0.00 2015-12-08 2015-12-29 2016-02-11 2016-03-10 2016-04-09 2016-05-14 2016-06-18 2017-06-18 y regeneración urbana en la en calidad y costo International pendiente Sewerage avenida Barbasquillo y Calle 13 de la parroquia Manta FC-004 / Fiscalización de la Component 1: Investments Construcción de tanques Selección basada IBRD / 82890 in Water Supply and Posterior Open - National 176,889.93 0.00 Bajo Revision 2016-01-31 2016-03-01 2016-02-15 2016-03-25 2016-04-14 2016-04-29 2016-05-18 2016-08-02 2016-12-30 reservorios de agua de 2,500 en calidad y costo Sewerage m3 FC-006 / Fiscalización para la Construcción de sistemas Component 1: Investments de agua potable, Selección basada IBRD / 82890 in Water Supply and Posterior Open - National 148,447.04 0.00 En ejecución 2016-01-25 2016-03-11 2016-02-09 2016-03-07 2016-04-08 2016-04-22 2016-05-12 2016-07-15 2016-12-12 alcantarillado y regeneración en calidad y costo Sewerage urbana de Avenida 24 en la parroquia de Manta FC-007 / Fiscalización de la Construcción de sistemas de Component 1: Investments agua potable, alcantarillado Selección basada IBRD / 82890 in Water Supply and Posterior Open - National 233,714.58 0.00 Bajo Revision 2016-01-25 2016-07-01 2016-02-09 2016-03-07 2016-04-08 2016-04-22 2016-05-12 2016-07-11 2016-12-08 y regeneración urbana de la en calidad y costo Sewerage Avenida Flavio Reyes en la parroquia de Manta FC-008 / Consultoría para la elaboración del Plan de Component 3: Institutional Selección basada Open - Movilidad para le Gobierno IBRD / 82890 Previa 1,120,000.00 649,501.44 Finalizado 2015-10-26 2017-12-19 2015-11-16 2018-01-03 2015-12-30 2018-05-16 2016-01-27 2016-02-26 2018-09-07 2016-04-01 2018-10-30 2016-05-06 2018-12-18 2017-05-06 2019-07-22 Strengthening en calidad y costo International Autónomo Descentralizado Municipal del cantón Manta Page 4 FC-009 / Fiscalización (Supervisión de Obras) para la Rehabilitación y Component 1: Investments Selección basada Open - Ejecución Adecuación de vías urbanas IBRD / 82890 in Water Supply and Previa 2,072,394.66 0.00 2016-09-12 2016-10-03 2016-11-16 2016-12-14 2017-01-13 2017-02-17 2017-03-24 2018-03-24 en calidad y costo International pendiente de la Avenida 4 de Sewerage Noviembre y Avenida 113 (Par Vial) FC-010 / Consultoría para Component 3: Institutional Selección basada Ejecución acreditación del laboratorio - IBRD / 82890 Posterior Open - National 149,912.00 0.00 2017-04-19 2017-05-04 2017-05-31 2017-07-03 2017-07-17 2017-08-07 2017-10-08 2018-06-05 Strengthening en calidad y costo pendiente EPAM FC-012 / Sistema Informatico para la Gestión de los Recursos (Presupuesto, Financiero Costos, Compras Component 3: Institutional Selección basada Open - Ejecución IBRD / 82890 Previa 973,560.00 0.00 2016-07-08 2016-07-22 2016-08-19 2016-09-20 2016-10-05 2016-10-24 2016-12-28 2017-10-24 Públicas, Inventarios, Strengthening en calidad y costo International pendiente Operaciones, Mantenimiento, Recursos Humanos) de la EPAM FC-022 / Fiscalización para la Construcción de Vías, Component 1: Investments Selección basada Aceras y Escalinatas en las IBRD / 82890 in Water Supply and Posterior Open - National 193,633.17 0.00 Bajo Revision 2016-01-16 2016-03-28 2016-02-01 2016-02-26 2016-03-30 2016-04-04 2016-04-25 2016-05-25 2016-10-22 en calidad y costo Parroquias Eloy Alfaro, Sewerage Tarqui y San Mateo FC-003 / Fiscalización de la Component 1: Investments Selección basada Construcción de colector Los IBRD / 82890 in Water Supply and Posterior en calificaciones Open - National 100,800.00 0.00 Bajo Revision 2015-11-08 2015-08-14 2015-11-23 2015-12-21 2016-03-22 2016-04-12 2016-09-09 Geranios - Rio Burro Sewerage de consultores FC-014 / Fiscalización de Component 1: Investments Selección basada Pavimentación de calles en IBRD / 82890 in Water Supply and Posterior en calificaciones Open - National 115,926.31 0.00 Bajo Revision 2015-03-04 2015-04-10 2015-03-24 2015-04-24 2015-08-03 2015-08-24 2016-01-21 parroquias Manta y Eloy Sewerage de consultores Alfaro FC-019 / Auditoría Component 4: Project Selección basada Open - IBRD / 82890 Posterior 115,000.00 0.00 Bajo Revision 2016-10-25 2016-10-26 2016-11-09 2016-12-06 2017-01-06 2017-01-23 2017-02-10 2017-04-17 2018-10-31 Financiera Management en el menor costo International FC-020A / AUDITORÍA FINANCIERA DE LOS ESTADOS FINANCIEROS DE PROPÓSITO ESPECIAL Component 4: Project Selección basada IBRD / 82890 Posterior Open - National 20,000.00 0.00 Bajo Revision 2020-01-20 2020-02-17 2020-02-10 2020-03-25 2020-04-22 2020-05-22 2020-06-26 2020-07-31 2021-01-27 DEL PROYECTO Management en el menor costo MEJORAMIENTO DE LOS SERVICIOS PÚBLICOS DEL CANTÓN MANTA INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual No. FC-028-EMERG / Component 1: Investments ASISTENCIA TECNICA Y Selección directa IBRD / 82890 in Water Supply and Previa Direct 480,224.01 480,224.01 Firmado 2016-07-19 CONSULTORIA de consultores Sewerage EMERGENTE EN MANTA FC-028-EMERG / Consultoría de Asistencia Component 5: Emergency Selección directa técnica y comercial para la IBRD / 82890 Previa Direct 471,520.00 0.00 En ejecución 2016-06-20 2016-08-12 2016-11-21 2017-01-20 Component de consultores reactivación de los servicios de la EPAM CI-001 / Consultoría Component 4: Project Selección directa Ejecución individual para Gestión de IBRD / 82890 Previa Direct 36,400.00 0.00 2015-07-31 2015-08-28 2015-10-01 2016-06-30 Management de consultores pendiente contratos del Proyecto Page 5 CI-002 / Consultoría para Component 4: Project Selección directa Ejecución IBRD / 82890 Previa Direct 36,400.00 0.00 2015-07-31 2015-08-28 2015-10-01 2016-06-30 apoyo técnico al Proyecto Management de consultores pendiente CI-003 / Diseño de Component 4: Project Selección directa Soterramiento PAR VIAL IBRD / 82890 Posterior Direct 44,800.00 0.00 Bajo Revision 2016-08-01 2016-10-17 2016-08-29 2016-09-20 2016-10-20 Management de consultores (Iluminación) CI-004 / Consultoría en Component 4: Project Selección directa Ejecución IBRD / 82890 Previa Direct 30,240.00 0.00 2015-08-07 2015-09-04 2015-10-01 2016-06-30 Medio Ambiente Management de consultores pendiente CI-005 / Consultoría en Component 4: Project Selección directa Ejecución IBRD / 82890 Previa Direct 30,240.00 0.00 2015-08-07 2015-09-04 2015-10-01 2016-06-30 Aspectos Sociales Management de consultores pendiente CI-007 / Consultoría de Component 4: Project Selección directa Ejecución apoyo en el seguimiento de IBRD / 82890 Previa Direct 26,208.00 0.00 2015-07-31 2015-08-28 2015-10-01 2016-06-30 Management de consultores pendiente los procesos de adquisiciones CI-008 / Consultoría Jurídica del Proceso de Component 3: Institutional Selección directa Colaboración Público-Privado IBRD / 82890 Posterior Direct 46,816.00 0.00 Bajo Revision 2016-04-13 2016-10-12 2016-05-10 2016-06-01 2016-07-16 Strengthening de consultores para la Empresa Pública Aguas de Manta (EPAM) CI-009 / Consultoría para estudios de Ingeniería de Component 3: Institutional Selección directa detalle de construcción del IBRD / 82890 Posterior Direct 29,143.91 0.00 Bajo Revision 2016-08-05 2016-09-28 2016-09-01 2016-09-23 2016-11-07 Strengthening de consultores edificio de laboratorio - EPAM CI-010 / Consultoría en Component 4: Project Selección directa Ejecución IBRD / 82890 Posterior Direct 95,000.00 0.00 2016-05-13 2016-06-09 2016-09-01 2018-05-02 Medio Ambiente Management de consultores pendiente CI-011 / Consultoría Component 4: Project Selección directa Ejecución individual para Gestión de IBRD / 82890 Posterior Direct 95,000.00 0.00 2016-05-13 2016-06-09 2016-07-01 2018-03-01 Management de consultores pendiente contratos del Proyecto CI-012 / Consultoría para Component 4: Project Selección directa Ejecución IBRD / 82890 Posterior Direct 95,000.00 0.00 2016-05-13 2016-06-09 2016-07-01 2018-03-01 apoyo técnico al Proyecto Management de consultores pendiente CI-013 / Consultoría de Component 4: Project Selección directa Ejecución apoyo en el seguimiento de IBRD / 82890 Posterior Direct 95,000.00 0.00 2016-05-13 2016-06-09 2016-07-01 2018-03-01 Management de consultores pendiente los procesos de adquisiciones CI-017 / Consultoría en Component 4: Project Selección directa Ejecución IBRD / 82890 Posterior Direct 95,000.00 0.00 2016-05-13 2016-06-09 2016-07-01 2018-03-01 Aspectos Sociales Management de consultores pendiente CI-018 / Consultoría de Asesoramiento en apoyo del proceso de asociación Público- Component 3: Institutional IBRD / 82890 Posterior Individual Open 32,340.00 0.00 Bajo Revision 2016-04-11 2016-11-23 2016-05-09 2016-05-23 2016-05-31 2016-07-15 Privada para la Empresa Strengthening Pública de Aguas de Manta (EPAM) CI-019 / Consultoría de Diseño de modelación y Component 4: Project IBRD / 82890 Posterior Individual Open 19,040.00 0.00 Bajo Revision 2016-05-20 2017-03-01 2016-06-16 2016-07-01 2016-07-11 2016-11-08 animación 3D de Proyectos Management de Regeneración CI-023 / EVALUACIÓN DE LOS AVANCES DE LA Component 3: Institutional IBRD / 82890 Posterior Individual Limited 24,080.00 21,500.00 Firmado 2018-11-12 2019-05-13 2018-11-17 2018-12-03 2018-12-08 2019-02-18 2019-01-12 2019-06-10 2019-07-11 ALIANZA ESTRATÉGICA Strengthening EPAM - VEOLIA Page 6 CI-024 / EVALUACIÓN DE INDICADORES Y COMPONENTES DEL CONVENIO DE CRÉDITO Component 4: Project PARA EL CIERRE DE IBRD / 82890 Posterior Individual Limited 43,000.00 0.00 Cancelado 2019-03-29 2020-02-17 2019-04-03 2020-02-27 2019-04-08 2019-04-15 2019-06-14 Management PROYECTO DE MEJORAMIENTO DE SERVICIOS PÚBLICOS DEL CANTÓN MANTA CI-025 / SERVICIOS DE CONSULTORÍA DE MEDIO AMBIENTE DEL Component 4: Project PROYECTO DE IBRD / 82890 Posterior Individual Limited 15,900.00 0.00 Bajo Revision 2019-06-20 2019-05-23 2019-06-25 2019-06-30 2019-07-04 2019-12-31 Management MEJORAMIENTO DE SERVICIOS PÚBLICOS DE MANTA CI-022 / Fiscalización de la Construcción del edificio del Component 3: Institutional Selección directa laboratorio y adecuación de IBRD / 82890 Posterior Direct 25,760.00 0.00 Cancelado 2017-07-14 2017-08-10 2017-09-01 2017-11-30 Strengthening de consultores los laboratorios existentes - EPAM CI-026 / EVALUACIÓN DE INDICADORES Y COMPONENTES DEL CONVENIO DE CRÉDITO Component 4: Project Ejecución PARA EL CIERRE DE IBRD / 82890 Posterior Individual Limited 25,000.00 0.00 2020-08-12 2020-08-14 2020-09-04 2020-09-22 2020-12-21 Management pendiente PROYECTO DE MEJORAMIENTO DE SERVICIOS PÚBLICOS DEL CANTÓN MANTA Page 7