C Additional Financing for IDP Revision Date: 20 Living Standards and August 2018 Livelihoods Project PIU Director: Sabir Ahmadov TTL: Robert Wrobel Credit : USD 66.7 mln Proc. Specialist: Emma Mammadkhanova Operations Officer: Nijat Veliyev PAS: Sandro Nozadze Program Assistant: Vusala Asadova Contracts,Am Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Plan / Actual Reception Short endments Execution Category IDP Living Standards and Estimated Cost Contr. Prior / No Objection Company name Type- Days Note Selection of Listing/RFP Invitation for Proposal Technical Final Contract (Amount, Livelihoods Project Name Procurement Ref. # / Actual (USD) Type LS Post Ad of EOI No Objection No Objection to Sign Start Completion which is awarded # Method Expression submssion RFP Submission Evaluation Evaluation Signature Date and of Assignment / Contract incl VAT / TB Review Contract a contract of Interest to the Bank reason should be indicated Hiring the services of individual consultants for A about 300 contracts for IC-1 250,000.00 IC TB Post technical supervision over contracts implementation p A- Micro-projects A P 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/080 352.49 A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Farzali Vali P 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/081 352.49 Nariman A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qahraman p 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/082 352.49 A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qadim p 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/083 352.49 A 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Hasan p 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/084 352.49 A 352.49 IC Post 2/9/2017 2/9/2017 60 4/10/2017 Qadim p 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/085 352.49 A 352.49 IC Post 2/3/2017 2/3/2017 60 4/3/2017 Tariyel Davud p 352.49 IC Post 3/14/2017 3/14/2017 60 5/15/2017 Huseynov Niyazi Local Technical Supervisor SFDI/8627-AZ/088 352.49 A 352.49 IC Post 3/14/2017 3/14/2017 60 5/15/2017 Bahadur p 352.49 IC Post 7/14/2017 7/14/2017 60 9/14/2017 Sadighov Local Technical Supervisor SFDI/8627-AZ/164 352.49 A 352.49 IC Post 7/14/2017 7/14/2017 60 9/14/2017 Soltanagha Taghi p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/165 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Tariyel Davud p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Nabiyev Nasib Local Technical Supervisor SFDI/8627-AZ/166 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Qadim p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/167 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Hasan p 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Mammadov Local Technical Supervisor SFDI/8627-AZ/168 352.49 A 352.49 IC Post 7/18/2017 7/18/2017 60 9/18/2017 Xaqani Shuriya p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Pashayev Qivami Local Technical Supervisor SFDI/8627-AZ/171 528.73 A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Hasan p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/172 528.73 Nariman A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Qahraman p 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Aslanov Asgar Local Technical Supervisor SFDI/8627-AZ/173 528.73 A 528.73 IC Post 7/20/2017 7/20/2017 90 10/20/2017 Musa p 528.73 IC Post 7/24/2017 7/24/2017 90 10/24/2017 Hashimov Local Technical Supervisor SFDI/8627-AZ/174 528.73 Nariman A 528.73 IC Post 7/24/2017 7/24/2017 90 10/24/2017 Qahraman p 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Verdiyev Chingiz Local Technical Supervisor SFDI/8627-AZ/181 528.73 A 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Seyyaf p 528.73 IC Post 8/2/2017 8/2/2017 90 11/2/2017 Asadov Vaqif Local Technical Supervisor SFDI/8627-AZ/182 528.73 Boran Plan vs./ Actual Type-Category Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Not Proc. Prior / Post Submission No Evaluation & No Objection Contract Contarct Name of Assignment/Contract Procurement Ref. # Invitation Bid Opening Start e # Method Review to the Bank Objection Recomm. + PSC Award Siganture 9/12/2018 0:00 3 4 9 10 11 12 13 14 15 16 17 18 19 A- Micro-projects 1 Prior P A NCB/SH 3/3/2017 7 3/10/2017 7 3/17/2017 14 3/31/2017 7 4/7/2017 5 4/12/2017 5 4/17/2017 3 4/20/2017 3 4/23/2017 Summary of the micro-projects (small-value rehabilitation works,such as potable / Post Review Prior A water,roads,electricity,etc. ) NCB/SH / Post Review P A 11/28/2015 14 12/12/2015 2 12/14/2015 1 12/15/2015 1 12/16/2015 1 12/17/2015 Installation of heating system in the school and landscaping of schoolyard ,Sumgayit, Kimyachilar SFDI/8627-AZ/001 SH Post A settlement, S.Vurgun street 3, Jabrayil school #6, “Khudafarinâ€? community, SFDI/8096-AZ/726 A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 P A 11/23/2015 14 12/7/2015 2 12/9/2015 1 12/10/2015 1 12/11/2015 1 12/12/2015 SFDI/8627-AZ/002 SH Post A Construction of additional classrooms for the school, Goranboy, Kohna Meshali village, Kalbajar school A 2/18/2016 14 3/2/2016 2 3/4/2016 1 3/5/2016 1 3/6/2016 9 3/15/2016 #100, “Zaylikâ€? community SFDI/8096-AZ/698,Lot 1 P A 12/5/2015 14 12/19/2015 2 12/21/2015 1 12/22/2015 1 12/23/2015 1 12/24/2015 Rehabilitation and equipment supply, Sumgayit city, Jorat settlment, Zangilan region, school #11, SFDI/8627-AZ/004 SH Post A A 14 1 5/17/2016 1 5/18/2016 15 6/2/2016 1 5/3/2016 "Zangilan-11" community, SFDI/8096-AZ/792 5/2/2016 5/16/2016 P A 11/29/2015 14 12/13/2015 2 12/15/2015 1 12/16/2015 1 12/17/2015 1 12/18/2015 SFDI/8627-AZ/006 SH Post A Rehabilitation of local roads,Zardab, farms in the territory of Bayimli settlement,â€?Bayimliâ€? A 11/3/2015 14 11/17/2015 1 11/18/2015 1 11/19/2015 5 11/24/2015 1 11/25/2015 community,SFDI/8096-AZ/657 P A 11/24/2015 14 12/8/2015 2 12/10/2015 1 12/11/2015 1 12/12/2015 1 12/13/2015 SFDI/8627-AZ/007 SH Post A Rehabilitation, construction of additional classrooms and equipment supply of school Goranboy, Iravanli A 2/18/2016 14 3/2/2016 2 3/4/2016 1 3/5/2016 23 3/29/2016 1 3/30/2016 village, Kalbajar Vocational School, “Zakaâ€? community SFDI/8096-AZ/698,Lot 2 P A 12/1/2015 14 12/15/2015 2 12/17/2015 1 12/18/2015 1 12/19/2015 1 12/20/2015 Rehabilitation and equipment supply, Baku city, Yasamal district, Sharifzadeh str., 4, # 2 dormitory of SFDI/8627-AZ/008 SH Post A A 19,04,2016 14 03,05,2016 2 5/5/2016 1 5/6/2016 33 6/8/2016 1 6/9/2016 ASEU, Aghdam region, school #88 , "Birlik" community, SFDI/8096-AZ/774,Lot 2 P A 11/29/2015 14 12/13/2015 2 12/15/2015 1 12/16/2015 1 12/17/2015 1 12/18/2015 SFDI/8627-AZ/011 SH Post A A 11/30/2015 14 12/14/2015 1 12/15/2015 12/15/2015 2 12/17/2015 1 12/18/2015 Rehabilitation of local roads,Barda, Mollali village, “Mollaliâ€? community,SFDI/8096-AZ/694 P A 12/3/2015 14 12/17/2015 2 12/19/2015 1 12/20/2015 1 12/21/2015 1 12/22/2015 SFDI/8627-AZ/012 SH Post A Rehabilitation of internall roads, Tartar region, Husaynli village, SFDI/8096-AZ/724, Lot 1 A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 4 3/15/2016 1 3/16/2016 P A 12/21/2015 14 1/5/2016 2 1/7/2016 1 1/8/2016 1 1/9/2016 1 1/10/2016 Rehabilitation of internall roads, Imishli, Orujlu village, "Yeddi evler",SFDI/8096-AZ/784, Lot 2 SFDI/8627-AZ/013 SH Post A A 4/21/2016 14 5/5/2016 1 5/6/2016 5/6/2016 27 6/2/2016 1 6/3/2016 P A 11/19/2015 14 12/3/2015 2 12/5/2015 1 12/6/2015 1 12/7/2015 1 12/8/2015 Cleaning of canal Fuzuli, Shukurbayli village, “Shukurbayliâ€? community,SFDI/8096-AZ/702 SFDI/8627-AZ/015 SH Post A A 2/18/2016 14 3/3/2016 1 3/4/2016 1 3/5/2016 13 3/18/2016 1 3/19/2016 P A 11/29/2015 14 12/13/2015 2 12/15/2015 1 12/16/2015 1 12/17/2015 1 12/18/2015 Rehabilitation and equipment supply of kindergarten,Yevlakh, Vidadi street 1, kindergarten #3, SFDI/8627-AZ/016 SH Post A A 2/19/2016 14 3/3/2016 1 3/4/2016 1 3/5/2016 12 3/18/2016 1 3/19/2016 “Chichakâ€? community SFDI/8096-AZ/712 P A 11/20/2015 14 12/4/2015 2 12/6/2015 1 12/7/2015 1 12/8/2015 1 12/9/2015 Boring of sub-artesian well Goranboy, Hamanli village, “Lachinâ€? community,SFDI/8096-AZ/745 SFDI/8627-AZ/019 NCB Post A A 2/12/2016 30 3/9/2016 6 3/15/2016 1 3/16/2016 35 4/20/2016 1 4/21/2016 P A 12/5/2015 14 12/19/2015 2 12/21/2015 1 12/22/2015 1 12/23/2015 1 12/24/2015 Rehabilitation of water pipeline, Barda region, Æ?liyanlı village,SFDI/8096-AZ/775 SFDI/8627-AZ/020 SH Post A A 4/20/2016 14 5/4/2016 1 5/5/2016 1 5/6/2016 27 6/2/2016 1 6/3/2016 P A 11/28/2015 14 12/12/2015 2 12/14/2015 1 12/15/2015 1 12/16/2015 1 12/17/2015 Rehabilitation of kindergarten ,Beylagan, Tazakand village, “Tazakandâ€? community, SFDI/8096- SFDI/8627-AZ/023 SH Post A AZ/699 A 2/18/2016 14 3/2/2015 1 3/3/2016 1 3/4/2016 11 3/15/2016 1 3/16/2016 P Rehabilitation and equipment supply of Lachin region school # 3,Baku city, Sabunchu settlement, A 11/30/2015 14 12/14/2015 2 12/16/2015 1 12/17/2015 1 12/18/2015 1 12/19/2015 secondary school # 68,SFDI/8096-AZ/760 SFDI/8627-AZ/024 SH Post A A 14 4 4/11/2016 1 4/12/2016 2 4/14/2016 1 4/15/2016 3/15/2016 4/7/2016 P A 12/21/2015 14 1/5/2016 2 1/7/2016 1 1/8/2016 1 1/9/2016 1 1/10/2016 Rehabilitation of internall roads,"Aghjabedi", Aran village, "Aran-2" community,SFDI/8096-AZ/785 SFDI/8627-AZ/026 SH Post A A 4/22/2016 14 5/6/2016 4 5/10/2015 1 5/10/2016 13 6/2/2016 1 6/3/2016 P A 11/23/2015 14 12/7/2015 2 12/9/2015 1 12/10/2015 1 12/11/2015 1 12/12/2015 Rehabilitation and equipment supply of school, Goygol, Chaykand village, Chaykand village, “Tahsilâ€? SFDI/8627-AZ/027 NCB Post A community, SFDI/8096-AZ/749 A 2/18/2016 30 3/18/2016 11 3/29/2016 1 3/30/2016 5 4/5/2016 1 4/6/2016 P A 12/3/2015 14 12/17/2015 2 12/19/2015 1 12/20/2015 1 12/21/2015 1 12/22/2015 SFDI/8627-AZ/028 SH Post A Rehabilitation of internall roads, Barda region, Birinji Gazakhlar village, SFDI/8096-AZ/713 A 2/19/2016 14 3/3/2016 4 3/7/2016 1 3/8/2016 10 3/18/2016 1 3/19/2016 P A 11/24/2015 14 12/8/2015 2 12/10/2015 1 12/11/2015 1 12/12/2015 1 12/13/2015 SFDI/8627-AZ/030 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 17 3/28/2016 1 3/29/2016 Rehabilitation and equipment supply of school building Baku, Yasamal district, Sharifzadeh street 1, music school of Aybasanli village of Fizuli, "Aybasanlı" community,SFDI/8096-AZ/716 P A 11/28/2015 14 12/12/2015 2 12/14/2015 1 12/15/2015 1 12/16/2015 1 12/17/2015 SFDI/8627-AZ/031 SH Post A Rehabilitation of local roads,Aghdam, Orta Garvand village, “Najilarâ€? community, SFDI/8096-AZ/691 A 11/26/2015 14 12/10/2015 1 12/11/2015 1 12/12/2015 6 12/18/2015 1 12/19/2015 P A 11/16/2015 14 11/30/2015 2 12/2/2015 1 12/3/2015 1 12/4/2015 1 12/5/2015 Construction of power supply system,Barda, Mammadli village, “Mammadliâ€? community, SFDI/8096- SFDI/8627-AZ/032 NCB Post A AZ/650 A 10/29/2015 30 11/26/2015 4 11/30/2015 1 12/1/2015 14 12/15/2015 1 12/16/2015 P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 Rehabilitation of internall roads, Shamkir region, Chinarli settlement, SFDI/8096-AZ/757 SFDI/8627-AZ/033 SH Post A A 3/15/2016 14 4/7/2016 1 4/8/2016 1 4/9/2016 3 4/12/2016 1 4/13/2016 P A 12/1/2015 14 12/15/2015 2 12/17/2015 1 12/18/2015 1 12/19/2015 1 12/20/2015 Repair of school mounting of additional classrooms, Yevlax, QoyunbinÉ™si kÉ™ndi, KÉ™lbÉ™cÉ™r,42 saylı tam SFDI/8627-AZ/034 SH Post A A 3/16/2016 14 4/8/2016 3 4/11/2016 1 4/12/2016 4/12/2016 1 13,04,2016 orta, "Javid" community,SFDI/8096-AZ/761 P A 12/1/2015 14 12/15/2015 2 12/17/2015 1 12/18/2015 1 12/19/2015 1 12/20/2015 Rehabilitation and equipment supply of Garabulag village school, Garabulag village,Goygol SFDI/8627-AZ/035 SH Post A A 3/15/2016 14 4/7/2016 4 4/11/2016 1 4/12/2016 1 4/13/2016 1 4/14/2016 region,SFDI/8096-AZ/759 P A 11/15/2015 14 11/29/2015 2 12/1/2015 1 12/2/2015 1 12/3/2015 1 12/4/2015 Construction of power supply system,Samukh region, Bozdagh residential area, “Bozdaghâ€? community, SFDI/8627-AZ/036 NCB Post A SFDI/8096-AZ/647 A 10/28/2015 14 11/25/2015 2 11/27/2015 1 11/28/2015 13 12/11/2015 1 12/12/2015 P A 11/21/2015 14 12/5/2015 2 12/7/2015 1 12/8/2015 1 12/9/2015 1 12/10/2015 Construction of drainage channel Aghjabadi, Takhtakorpu area, “Raufâ€? community,SFDI/8096-AZ/748 SFDI/8627-AZ/038 NCB Post A A 2/18/2016 30 3/18/2016 23 4/1/2016 1 4/2/2016 6 4/8/2016 1 4/9/2016 P A SH 11/29/2015 14 12/13/2015 2 12/15/2015 1 12/16/2015 1 12/17/2015 1 12/18/2015 Rehabilitation and equipment supply of Fuzuli region school # 48, Baku city, Binagadi district, SFDI/8627-AZ/039 Post A Darnagul settlement, K.Rahimov street 70,SFDI/8096-AZ/758, Lot 1 A 3/15/2016 14 4/7/2016 1 4/8/2016 1 4/9/2016 5 4/14/2016 1 4/15/2016 P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015 Reconstruction of thr additional classrooms and provision with eqipment of Lachin region, high school SFDI/8627-AZ/040 Post A A NCB 2/20/2016 38 3/28/2016 8 4/5/2016 1 1/6/2016 15 4/21/2016 1 4/22/2016 # 46 located in "Hovsan sudchuluk state farm", Bina settlement, Khazar district, Baku city SFDI/8096- AZ/750 P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015 SFDI/8627-AZ/041 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Rehabilitation, construction of additional classrooms and equipment supply of Aghdam region, Kichikli village school located in Kichikli village, Aghdam region, SFDI/8096-AZ/725 P A 11/25/2015 14 12/9/2015 2 12/11/2015 1 12/12/2015 1 12/13/2015 1 12/14/2015 Rehabilitation and equipment supply of school Baku, Khatai district, support building of Marine SFDI/8627-AZ/043 SH Post A School, Fizuli region school #46, “Argunashâ€? community, SFDI/8096-AZ/693 A 11/27/2015 14 12/11/2015 3 12/14/2015 1 12/15/2015 6 12/21/2015 1 12/22/2015 P A 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015 SFDI/8627-AZ/044 SH Post A A 14 1 4/8/2016 1 4/9/2016 5 4/14/2016 1 4/15/2016 Rehabilitation and equipment supply of school Baku, Neapol area ,43, # 2 Baku Vocational Liseum, of Lachin region school #20, “Turanâ€? community, SFDI/8096-AZ/758,Lot 2 3/15/2016 4/7/2016 P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 SFDI/8627-AZ/046 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Rehabilitation of internall roads, Goygol region, Mollajalilli village, SFDI/8096-AZ/715 P A 11/22/2015 14 12/6/2015 2 12/8/2015 1 12/9/2015 1 12/10/2015 1 12/11/2015 Rehabilitation of drinking water supply system Ismayilli, Kalband village, “Kalbandâ€? community, SFDI/8627-AZ/047 NCB Post A SFDI/8096-AZ/747 A 2/18/2016 30 3/18/2016 12 3/30/2016 1 3/31/2016 15 4/15/2016 1 4/15/2016 P A 12/6/2015 14 12/20/2015 2 12/22/2015 1 12/23/2015 1 12/24/2015 1 12/25/2015 Rehabilitation of internall roads, Yevlax, "Kolani" community, Kolani village,SFDI/8096-AZ/794 SFDI/8627-AZ/048 SH Post A A 5/18/2016 14 6/1/2016 1 6/2/2016 1 6/3/2016 18 6/21/2016 1 6/22/2016 P Rehabilitation, construction of additional classrooms and equipment supply of Sumgayıt city A SH Post 12/2/2015 14 12/16/2015 2 12/18/2015 1 12/19/2015 1 12/20/2015 1 12/21/2015 H.Z.Taghiyev settlement, Lachın region, Jijimli village school, "Qayghı" community SFDI/8627-AZ/055 A A SH Post 14 1 4/14/2016 1 4/15/2016 10 4/25/2016 1 4/26/2016 SFDI/8096-AZ/773 3/31/2016 4/13/2016 P A 12/3/2015 14 12/17/2015 2 12/19/2015 1 12/20/2015 1 12/21/2015 1 12/22/2015 SFDI/8627-AZ/056 SH Post A A 4/21/2016 14 5/5/2016 11 5/6/2016 1 5/7/2016 27 6/3/2016 1 6/4/2016 Rehabilitation of internall roads, Oghuz region, Karimli village, Karimli community, SFDI/8096- AZ/784,Lot 1 P A 12/4/2015 14 12/18/2015 2 12/20/2015 1 12/21/2015 1 12/22/2015 1 12/23/2015 SFDI/8627-AZ/062 SH Post A A 2/18/2016 14 3/2/2016 1 3/3/2016 1 3/4/2016 11 3/15/2016 1 3/16/2016 Rehabilitation of internall roads, Goygol region, Jumshudlu village, SFDI/8096-AZ/700 P A 11/23/2015 14 12/7/2015 2 12/9/2015 1 12/10/2015 1 12/11/2015 1 12/12/2015 Rehabilitation of school, construction of additional classrooms and supply with equipment Dashkasan, SFDI/8627-AZ/063 SH Post Gushchu village, Kalbajar region school #71, “Hopuzluâ€? community, SFDI/8096-AZ/714 Rehabilitation of school, construction of additional classrooms and supply with equipment Dashkasan, SFDI/8627-AZ/063 SH Post A A 2/22/2016 14 3/7/2016 3 3/10/2016 1 3/11/2016 7 3/18/2016 1 3/19/2016 Gushchu village, Kalbajar region school #71, “Hopuzluâ€? community, SFDI/8096-AZ/714 P A 11/27/2015 14 12/11/2015 2 12/13/2015 1 12/14/2015 1 12/15/2015 1 12/16/2015 SFDI/8627-AZ/064 SH Post A A 2/12/2016 28 3/9/2016 5 3/14/2016 32 4/11/2016 3 4/15/2016 1 4/16/2016 Rehabilitation of local roads Imishli, Hajirustamli village, "Mughangöl" community,SFDI/8096-AZ/746 P A 12/5/2015 14 12/19/2015 2 12/21/2015 1 12/22/2015 1 12/23/2015 1 12/24/2015 Construction of dyke, Goranboy region, area of Ashaghi Aghjakand village,SFDI/8096-AZ/786 SFDI/8627-AZ/065 SH Post A A 14 4 5/10/2016 1 5/11/2016 23 6/3/2016 1 6/4/2016 4/22/2016 5/6/2016 P A P A Prior P Approximately 60 contracts for implementation of micro-projects will be signed NCB/SH / Post Review 3/7/2017 7 3/14/2017 7 3/21/2017 14 4/4/2017 7 4/10/2017 5 4/15/2017 5 4/20/2017 3 4/23/2017 3 4/26/2017 A during the first 18 months after project effectiveness Prior NCB/SH / Post Review P A SH Post 12/14/2016 14 12/28/2016 2 12/30/2016 1 1/1/2017 3 1/4/2017 11 1/15/2017 Rehabilitation and equipment supply of Zangilan region school # 8, Baku city, Narimanov region, SFDI/8627-AZ/070 A Hidayatzadeh street # 166 A SH Post 2/3/2017 14 2/17/2017 10 2/27/2017 1 2/28/2017 14 3/14/2017 1 3/15/2017 P A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 Rehabilitation and equipment supply of Zangilan region # 24 school, Baku city,Nizami region,# 5 State SFDI/8627-AZ/071 A chemistry-biology tendentiously school A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017 P Rehabilitation of kindergarten and provision with module type classrooms, Goygol region, Balchili A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 SFDI/8627-AZ/072 A village A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017 P A SH Post 12/7/2016 14 12/21/2016 5 12/26/2016 1 12/27/2016 3 12/30/2016 11 1/10/2017 GÉ™ncÉ™ ÅŸÉ™hÉ™ri, Gülüstan qÉ™sÉ™bÉ™si, Qocalar evinin É™trafı, "ÅžiÅŸqaya" icması Daxili yolların bÉ™rpası SFDI/8627-AZ/073 A A SH Post 1/10/2017 15 1/25/2017 2 1/27/2017 1 1/28/2017 12 2/9/2017 1 2/10/2017 P A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 Rehabilitation of internall roads, Goranboy region, Goran settlement, "Goran" community SFDI/8627-AZ/074 A A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 7 2/3/2017 1 2/4/2017 P A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 Rehabilitation of internall roads, Gazakh region, Khanliglar village SFDI/8627-AZ/075 A A SH Post 1/6/2017 18 1/24/2017 2 1/26/2017 1 1/27/2017 13 2/9/2017 1 2/10/2017 P Rehabilitation of internall roads, Aghdam region, Uchoghlan municipality,"Baharli and Ballar" A SH Post 12/12/2016 14 12/26/2016 15 1/10/2017 1 1/11/2017 5 1/16/2017 1 1/17/2017 SFDI/8627-AZ/076 A community A SH Post 1/10/2017 15 1/25/2017 2 1/27/2017 1 1/28/2017 6 2/3/2017 1 2/4/2017 P A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 Rehabilitation and equipment supply of school Yevlakh, new settlement, Kalbajar school #30, “Amilâ€? CW-100 A community,SFDI/8627-AZ/206 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 6 9/29/2017 1 9/30/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, Meyvali A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 CW-101 A village, Kalbajar school #86, “Malakâ€? community, SFDI/8627-AZ/159, Lot 1 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 6 8/2/2017 1 8/3/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, territory A SH Post 8/5/2017 14 8/19/2017 2 8/21/2017 1 8/22/2017 6 8/28/2017 1 8/29/2017 CW-102 A of cotton gin plant, Kalbajar school #85, “Gochdashâ€?, SFDI/8627-AZ/156 A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 11 7/20/2017 1 7/21/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Yevlakh, Aran A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 CW-103 A settlement, Aghdam school #101, “Goytapaâ€? community, SFDI/8627-AZ/159, Lot 2 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 6 8/2/2017 1 8/3/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Mingachevir, A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 CW-104 A Shafa garden suburb, Kalbajar school #114, “Soyugbulagâ€? community, SFDI/8627-AZ/188 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017 P Rehabilitation of school, construction of additional classrooms and equipment supply Mingachevir, A SH Post 8/10/2017 14 8/24/2017 2 8/26/2017 1 8/27/2017 6 9/2/2017 1 9/3/2017 territory of AzDRES, settlement #3, Aghdam school #128, “Shahbulagâ€? community, CW-105 A A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 8 7/20/2017 1 7/21/2017 SFDI/8627-AZ/157, Lot 1 P A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 Rehabilitation of school, construction of additional classrooms and equipment supply Mingachevir, CW-106 A Gunashli residential area, Aghdam school #139 “Gunashliiâ€? community, SFDI/8627-AZ/157, Lot 2 A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 8 7/20/2017 1 7/21/2017 P Construction and equipment supply of additional classrooms Goranboy, New settlement, Kalbajar A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-107 A school #33, “Baharâ€? community, SFDI/8627-AZ/160 A SH Post 7/11/2017 14 7/25/2017 1 7/26/2017 1 7/27/2017 7 8/4/2017 1 8/5/2017 P Construction and equipment supply of additional classrooms Ganja, Gizildaya settlement, Kalbajar A SH Post 8/15/2017 14 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-108 A school #122, “Mammadoghluâ€? community, SFDI/8627-AZ/158 A SH Post 6/22/2017 19 7/11/2017 1 7/12/2017 1 7/13/2017 7 7/20/2017 1 7/21/2017 P A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 Construction and equipment supply of additional classrooms Shamkir, dormitory of the Vocational CW-109 A Lyceum, Kalbajar school #74, “Aykhanâ€? community, SFDI/8627-AZ/189 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017 P Rehabilitation of school, construction of heating system and equipment supply of school Baku, Khazar A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 CW-110 A district, Bina settlement, Kalbajar school #37, “Ojagâ€? community, SFDI/8627-AZ/207 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 10 10/3/2017 1 10/4/2017 P A SH Post 8/20/2017 14 9/3/2017 2 9/5/2017 1 9/6/2017 6 9/12/2017 1 9/13/2017 Rehabilitation of school, construction of heating system and equipment supply of school Baku, Sabail CW-111 A district, Badamdar settlement, Lachin secondary school, “Samaâ€? community A SH Post P A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Rehabilitation of school, construction of heating system and equipment supply of school Absheron district, “Nubarâ€? settlement, Atyali residential area, Khanlig village school #3 of Gubadly, “Khanlig-3â€? CW-112 A A SH Post 7/31/2017 14 8/14/2017 1 8/15/2017 8/16/2017 6 8/22/2017 1 8/23/2017 community, SFDI/8627-AZ/177, Lot 1 P Rehabilitation of school, construction of heating system and equipment supply of school Absheron A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 district, Masazir settlement, Gazyan village school of Gubadly, “Gazyanâ€? community, SFDI/8627- CW-113 Rehabilitation of school, construction of heating system and equipment supply of school Absheron district, Masazir settlement, Gazyan village school of Gubadly, “Gazyanâ€? community, SFDI/8627- CW-113 A A SH Post 7/31/2017 14 8/14/2017 1 8/15/2017 8/16/2017 6 8/22/2017 1 8/23/2017 AZ/177, Lot 2 P Rehabilitation of school, construction of heating system and equipment supply of school Sumgayit, A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Yashildara residential area, Khidirli village school of Gubadly, “Tahsilâ€? community, SFDI/8627- CW-114 A A SH Post 8/1/2017 14 8/15/2017 1 8/16/2017 8/16/2017 6 8/22/2017 1 8/23/2017 AZ/178, Lot 1 P Rehabilitation of school, construction of heating system and equipment supply of school Sumgayit, A SH Post 8/25/2017 14 9/8/2017 2 9/10/2017 1 9/11/2017 6 9/17/2017 1 9/18/2017 Inshaatchilar settlement, yard of the school #9, Lachin school #12, “Lachinâ€? community, SFDI/8627- CW-115 A A SH Post 8/1/2017 14 8/15/2017 1 8/16/2017 1 8/17/2017 4 8/21/2017 1 8/22/2017 AZ/178, Lot 2 P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Construction and equipment supply of the additional classrooms Barda, Guloghlular village, Kalbajar CW-116 A school #45, “Ashiglarâ€? community, SFDI/8627-AZ/208 A SH Post 8/30/2017 14 9/15/2017 7 9/22/2017 1 9/23/2017 6 9/29/2017 1 9/30/2017 P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Rehabilitation of school, construction of heating system and equipment supply of school Barda, Shatirli CW-117 A village, Kalbajar school #43, “Chinarlarâ€? community, SFDI/8627-AZ/190, Lot 1 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017 P Construction and equipment supply of the additional classrooms Barda, Jayirli village, Kalbajar school A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 CW-118 A #104, “Jayirliâ€? community, SFDI/8627-AZ/190, Lot 2 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 2 8/25/2017 1 8/26/2017 P A SH Post 8/30/2017 14 9/13/2017 2 9/15/2017 1 9/16/2017 6 9/22/2017 1 9/23/2017 Rehabilitation and equipment supply of the hospital Aghdam, Khindiristan, CW-119 A “Sarichobanâ€? community, SFDI/8627-AZ/214 A SH Post 9/8/2017 14 9/22/2017 3 9/25/2017 1 9/26/2017 9 10/5/2017 1 10/6/2017 P A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 Repair of inner roads Sumgayıt city, “Khazarâ€? gardens residential area, “Khazarâ€? community, CW-121 A SFDI/8627-AZ/179 A SH Post 8/2/2017 14 8/16/2017 5 8/21/2017 1 8/22/2017 2 8/24/2017 1 8/25/2017 P Repair of inner roads Fizuli district, Ashagi Yaglivand village, “Ashagi Yaglivandâ€? community, A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 CW-122 A SFDI/8627-AZ/152, Lot 1 A SH Post 6/19/2017 17 7/6/2017 1 7/7/2017 1 10 7/18/2017 1 7/19/2017 P Rehabilitation of inner roads Fizuli district, Shukurbayli rural area, “Seyid Akhmadliâ€? community, A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 CW-123 A SFDI/8627-AZ/152, Lot 2 A SH Post 6/19/2017 17 7/6/2017 1 7/7/2017 1 7/8/2017 10 7/18/2017 1 7/19/2017 P A SH Post 9/5/2017 14 9/19/2017 2 9/21/2017 1 9/22/2017 6 9/28/2017 1 9/29/2017 Rehabilitation of power supply system Aghjabedi district, Aran village, “On uch obaâ€? community, CW-124 A SFDI/8627-AZ/161 A SH Post 7/13/2017 14 7/27/2017 1 7/28/2017 1 7/29/2017 4 8/2/2017 1 8/3/2017 P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Rehabilitation of power supply system Aghjabedi district, Tazakand village, “Tazakandâ€? community, CW-125 A SFDI/8627-AZ/191 A SH Post 8/4/2017 14 8/18/2017 4 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017 P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Repair of inner roads Beylagan district, Harami plain, “Haramiâ€? community,SFDI/8627-AZ/153 CW-126 A A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 9 7/18/2017 1 7/19/2017 P A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 Repair of inner roads Barda district, Turkman village, “Turkmanâ€? community, SFDI/8627- CW-127 A AZ/162 A SH Post 7/12/2017 14 7/26/2017 1 7/27/2017 1 7/28/2017 5 8/2/2017 1 8/3/2017 P Rehabilitation of access and inner roads Yevlakh district, Havarli village, “Havarliâ€? A SH Post 9/10/2017 14 9/24/2017 2 9/26/2017 1 9/27/2017 6 10/3/2017 1 10/4/2017 CW-128 A community,SFDI/8627-AZ/155 A SH Post 6/21/2017 19 7/10/2017 1 7/11/2017 1 7/12/2017 6 7/18/2017 1 7/19/2017 P A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 Rehabilitation of access and inner roads Yevlakh district, Tobacco plant area, “İshıqlı yollarâ€? CW-129 A community, SFDI/8627-AZ/192 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 3 8/25/2017 1 8/26/2017 P Rehabilitation of irrigation system Goranboy district, Boru settlement (Khojalilar), “Yeni boruâ€? A NCB Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 CW-130 A community, SFDI/8627-AZ/237 A NCB Post 12/20/2017 30 1/22/2018 P A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 Rehabilitation of irrigation water supply Goranboy district, Meshali settlement, “New Meshaliâ€? CW-131 A community, SFDI/8627-AZ/215 A SH Post 9/8/2017 14 9/22/2017 3 9/25/2017 1 9/26/2017 8 10/4/2017 1 10/5/2017 P Rehabilitation of inner roads Goranboy district, Ashagi aghjakend, Yuxari aghjakend and Meshali A SH Post 9/15/2017 14 9/29/2017 2 10/1/2017 1 10/2/2017 6 10/8/2017 1 10/9/2017 CW-132 A settlements, “Ashagi aghjakendâ€? community, SFDI/8627-AZ/193 A SH Post 8/7/2017 14 8/21/2017 1 8/22/2017 1 8/23/2017 8 8/31/2017 1 9/1/2017 P Rehabilitation of access and inner roads Agdash district, Kukal village, “Kukalâ€? community, A SH Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-133 A SFDI/8627-AZ/163 A SH Post 7/12/2017 14 7/26/2017 1 7/27/2017 1 7/28/2017 5 8/2/2017 1 8/3/2017 P Rehabilitation of access and inner roads Agdash district, Yenikend village, “Yenikendâ€? A SH Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-134 A community,SFDI/8627-AZ/154 A SH Post 6/20/2017 17 7/7/2017 1 7/8/2017 1 7/9/2017 5 7/14/2017 1 7/14/2017 P Rehabilitation of inner roads Goygol district, New residential area, “Kochkunlarâ€? A NCB Post 9/20/2017 14 10/4/2017 2 10/6/2017 1 10/7/2017 6 10/13/2017 1 10/14/2017 CW-135 A community,SFDI/8627-AZ/238 A NCB Post 12/20/2017 30 1/22/2018 P Folding tents for public ceremonies in Baku, Darnagul settlement S. Bahlulzadeh-31 for "Dastak" A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-136 A community, SFDI/8627-AZ/136, Lot 1 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 30 6/29/2017 6/29/2017 P Folding tents for public ceremonies in Baku, Masazir settlement,Absheron district, "Chalbayir" A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-137 A community, SFDI/8627-AZ/136, Lot 2 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 14 6/14/2017 6/14/2017 P Folding tents for public ceremonies in Hajiqabul region, Yeni IDPs settlement, "Araz" community A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-138 A SFDI/8627-AZ/136, Lot 3 A SH Post 5/12/2017 14 5/26/2017 5 5/30/2017 1 5/31/2017 30 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Saatli region, Alisoltanli villiage, "Alisoltanli" community, A SH Post 9/25/2017 14 10/9/2017 2 10/11/2017 1 10/12/2017 6 10/18/2017 1 10/19/2017 CW-139 A SFDI/8627-AZ/137, Lot 1 A SH Post 5/15/2017 15 5/30/2017 1 5/31/2017 1 6/1/2017 29 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Barda region, Alachadirli villiage and Concrete plant area A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-140 A ,"Aghdere" community, SFDI/8627-AZ/137, Lot 2 A SH Post 5/15/2017 15 5/30/2017 1 5/31/2017 1 6/1/2017 29 6/30/2017 1 7/1/2017 P Folding tents for public ceremonies in Goranboy region, Goranli villiage, "Merhemet" community, A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-141 A SFDI/8627-AZ/138, Lot 1 A SH Post 5/16/2017 15 5/31/2017 2 6/1/2017 1 6/1/2017 28 6/29/2017 1 6/30/2017 P Folding tents for public ceremonies in Zaqatala region, Ashaghi tala IDPs settlement, "Shimshek" A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-142 A community, SFDI/8627-AZ/138, Lot 2 A SH Post 5/16/2017 15 5/31/2017 1 6/1/2017 6/1/2017 33 7/3/2017 1 7/4/2017 P Folding tents for public ceremonies in Balaken region, IDPs settlement, "Balaken" community, A SH Post 9/30/2017 14 10/14/2017 2 10/16/2017 1 10/17/2017 6 10/23/2017 1 10/24/2017 CW-143 A SFDI/8627-AZ/139, Lot 1 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 31 7/3/2017 7/4/2017 P Folding tents for public ceremonies in Goygol region, Keremli village, "Keremli" community, A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 CW-144 A SFDI/8627-AZ/139, Lot 2 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 12 6/14/2017 6/14/2017 P Folding tents for public ceremonies in Yevlakh region, Rustemli village, "Rustemli" community, A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 CW-145 A SFDI/8627-AZ/139, Lot 3 A SH Post 5/17/2017 15 6/1/2017 1 6/2/2017 6/2/2017 12 6/14/2017 6/14/2017 P A SH Post 10/5/2017 14 10/19/2017 2 10/21/2017 1 10/22/2017 6 10/28/2017 1 10/29/2017 Purchase of vehicles ,SFDI/8627-AZ/148 CW-146 A A SH Post 5/8/2017 14 5/22/2017 1 5/23/2017 1 5/24/2017 8 6/2/2017 1 6/3/2017 P Repair of access and local roads, Agdam district, Soltanbud forest, Soltanbud community, SFDI/8627- A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 CW-147 A AZ/263, Lot 1 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of local roads, Fuzuli district, Arayatlı village, "Arayatlı" community, A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 CW-148 A SFDI/8627-AZ/240 A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 8 12/28/2017 1 12/29/2017 P A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 Repair of local roads Terter region, Khoruzlu village, "Khoruzlu" community, SFDI/8627-AZ/241 CW-149 A A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 6 12/26/2017 1 12/27/2017 P A SH Post 2/2/2018 14 2/16/2018 2 2/18/2018 1 2/19/2018 6 2/25/2018 1 2/26/2018 Repair of local roads Beylagan district, Imamverdili and Vetaga villages, Vetaga community,SFDI/8627- CW-150 A AZ/242 A SH Post 12/4/2017 14 12/18/2017 1 12/19/2017 1 12/20/2017 8 12/28/2017 1 12/29/2017 P Repair of local roads Beylagan district, Tazakand village, " Tazakand " community, SFDI/8627- A NCB Post 2/20/2018 30 3/22/2018 2 3/24/2018 1 3/25/2018 6 3/31/2018 1 4/1/2018 CW-151 A AZ/262 A NCB Post P Repair of local roads Barda district, “Ikinji Nazırlı village, " Ikinji Nazırli" community, SFDI/8627- A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-152 A AZ/263,Lot 2 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of access and local roads Dashkesan district, Zeylik village, "Gulluduzu" community, SFDI/8627- A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-153 A AZ/264,Lot 1 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of access and local roads Dashkesan district, Gushchu village, (beshbarmak farm area) A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-154 A "Yelniche" community, SFDI/8627-AZ/264,Lot 2 A SH Post 2/19/2018 14 3/5/2018 1 3/6/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Garakechdi Aghbulag hamlets, A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-155 A “Garakechdi Aghbulagâ€? community, SFDI/8627-AZ/243,Lot 1 A SH Post 12/5/2017 14 12/19/2017 1 12/20/2017 1 12/21/2017 5 12/26/2017 1 12/27/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Sheylanlı, Ardashavi, Finga A SH Post 2/7/2018 14 2/21/2018 2 2/23/2018 1 2/24/2018 6 3/2/2018 1 3/3/2018 CW-156 A and Mishni hamlets, “Fingaâ€? community, SFDI/8627-AZ/244,Lot 1 A SH Post 12/6/2017 14 12/20/2017 1 12/21/2017 1 12/22/2017 4 12/26/2017 1 12/27/2017 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Aghbulag 1 hamlet, “Aghbulagâ€? A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-157 A community,SFDI/8627-AZ/265,Lot 1 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Ardashavi hamlet, “Ardashavi -2â€? A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-158 A community,SFDI/8627-AZ/243,Lot 2 A SH Post 12/5/2017 14 12/19/2017 1 12/20/2017 1 12/21/2017 5 12/26/2017 1 12/27/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Vagazin (Garagach-Cattle A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-159 A rookery) hamlets, “Vagazinâ€? community,SFDI/8627-AZ/244,Lot 2 A SH Post 12/6/2017 14 12/20/2017 1 12/21/2017 1 12/22/2017 5 12/27/2017 1 12/28/2017 P Repair of access and local roads Aghcabedi district, " Takhta korpu" area, Garıgıshlag-Gilishli hamlets, A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-160 A “Garıgıshlag - Gilishliâ€? community, SFDI/8627-AZ/265,Lot 2 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of local roads Aghcabedi district, " Takhta korpu" area, Hacilar village, Hacilar hamlets, A SH Post 2/12/2018 14 2/26/2018 2 2/28/2018 1 3/1/2018 6 3/7/2018 1 3/8/2018 CW-161 A "Hacilar" community, SFDI/8627-AZ/265,Lot 3 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P Repair of access and local roads Ismailli district, Ismayilli village, Niyaz community, SFDI/8627- A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 CW-162 A AZ/266 A SH Post 2/20/2018 14 3/6/2018 1 3/7/2018 P A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 Repair and equipment supply of the school Baku city, Yasamal district, Sharifzadeh street 131a, CW-163 A Dormitory of Communication College, Secondary school # 47 of Fuzuli district "Lalatapa" community A SH Post P A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 Construction and equipment supply of 3 additional module-type classrooms Baku city Khazar district, CW-164 A Gala settlement, Malibey village secondary school of Lachin district, “Malibeyâ€? community A SH Post P Repair of school, construction and equipment supply of 2 additional module-type classrooms Aghdam A SH Post 2/17/2018 14 3/3/2018 2 3/5/2018 1 3/6/2018 6 3/12/2018 1 3/13/2018 district, Guzanli settlement "3rd stone houses" Secondary school # 148 of Aghdam district, "3rd stone CW-165 A A SH Post houses" community P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Construction and equipment supply of 4 additional module-type classrooms Tartar district, Zolgoran CW-166 A village, Zolgoran village secondary school, “Zolgoranâ€? community A SH Post P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair of school, construction and equipment supply of 3 additional module-type classrooms Tartar CW-167 A district, SU-15 settlement, school # 147 of Aghdam district, “SU-15â€? community A SH Post P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair of school, construction and equipment supply of 3 additional module-type classrooms Barda CW-168 A district, Mirzajafarli settlement, school # 105 of Kalbajar district, "Mirzajafarli" community A SH Post P A SH Post 2/19/2018 14 3/5/2018 2 3/7/2018 1 3/8/2018 6 3/14/2018 1 3/15/2018 Repair and equipment supply of the hospital Ganja city, Gulustan settlement, "Vatan" community CW-169 A A SH Post P A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 Construction and equipment supply of additional module-type rooms for kindergarden Goygol CW-170 A district, Goychakand village, "Goychakand" community A SH Post P Rehabilitation of inner roads Sumgayit city, "Yashildara" New residential area, "Khidirli-3" A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 CW-171 A community A SH Post P Rehabilitation of potable water supply line Khizi district, Khalanj-Findigan village, "Khizi Mountains" A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 CW-172 A community A SH Post P A SH Post 2/20/2018 14 3/6/2018 2 3/8/2018 1 3/9/2018 6 3/15/2018 1 3/16/2018 Repair of power supply line Tartar district, Mamirli village, "Mamirli" community CW-173 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Repair of power supply line Tartar district, Poladli village, Poladli community CW-174 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line Agdam district, Ballar village, "Ballar" community CW-175 A A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line Oguz district, Jalud-1 settlement, "Jalud-1" community CW-176 A A SH Post P Rehabilitation of potable water supply line Oguz district, Boyuk soyudlu village, " Boyuk soyudlu " A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 CW-177 A community A SH Post P A SH Post 2/22/2018 14 3/8/2018 2 3/10/2018 1 3/11/2018 6 3/17/2018 1 3/18/2018 Rehabilitation of potable water supply line Shamkir district, Narimanli village, “Narimanliâ€? community CW-178 A A SH Post P A P A P A P A P A 2 B- Infrastructure projects Prior P B NCB / Post Review 3/20/2017 7 3/27/2017 7 4/3/2017 30 5/3/2017 7 5/10/2017 5 5/15/2017 5 5/20/2017 3 5/23/2017 3 5/26/2017 Summary of NCB (Works) packages for Infrastructure projects in IDP settlements Prior A NCB / Post Review P B 11/8/2015 30 12/8/2015 7 12/15/2015 5 12/20/2015 5 12/25/2015 3 12/28/2015 3 12/31/2015 Rehabilitation of dormitory Dormitory of Special housing maintenance union #2 in the Z.Khalilov street SFDI/8627-AZ/003 NCB Post A 14, Yasamal district, Baku,SFDI/8096-AZ/533 B 7/28/2015 30 8/24/2015 4 8/28/2015 18 9/15/2015 1 9/16/2015 P B 11/10/2015 30 12/10/2015 7 12/17/2015 5 12/22/2015 5 12/27/2015 3 12/30/2015 3 1/4/2016 Rehabilitation of dormitory Dormitory of Baku Vocational School #3 in F.Gasimzadeh street 36, Nasimi SFDI/8627-AZ/005 NCB Post A district, Baku,SFDI/8096-AZ/561,Lot 1 B 21.08.2015 30 17.09.2015 4 9/21/2015 15 10/6/2015 1 10/7/2015 P B 10/20/2015 30 11/20/2015 7 11/27/2015 5 12/2/2015 5 12/7/2015 3 12/10/2015 3 12/13/2015 Sumgayit, 15th residential quarter, 20th January street 42B, dormitory #5,SFDI/8096-AZ/427,Lot 1 SFDI/8627-AZ/009 NCB Post A B 4/1/2015 30 5/1/2015 4 5/5/2015 22 6/1/2015 11 6/12/2015 1 6/13/2015 P B 11/12/2015 30 12/12/2015 7 12/19/2015 5 12/24/2015 5 12/29/2015 3 1/1/2016 3 1/5/2016 Rehabilitation of dormitory Dormitory #7 in the N.Narimanov street 7/14, 14th residential quarter, SFDI/8627-AZ/010 NCB Post A Sumgayit,SFDI/8096-AZ/593 B 9/16/2015 30 10/13/2015 3 10/16/2015 5 10/21/2015 1 10/22/2015 P B 10/28/2015 30 11/28/2015 7 12/5/2015 5 12/10/2015 5 12/15/2015 3 12/18/2015 3 12/21/2015 Baku, Binagadi district, "Mughan" rest home,SFDI/8096-AZ/504,Lot 1 SFDI/8627-AZ/014 NCB Post A B 5/25/2015 28 7/23/2015 5 7/28/2015 24 9/22/2015 1 9/23/2015 P B 11/14/2015 30 12/14/2015 7 12/21/2015 5 12/26/2015 5 1/1/2016 3 1/4/2016 3 1/7/2016 Rehabilitation of dormitory Dormitory #20 in the Natavan street, 26th residential quarter, Sumgayit SFDI/8627-AZ/017 NCB Post A SFDI/8096-AZ/617 B 9/22/2015 28 10/20/2015 2 10/22/2015 13 11/5/2015 1 11/6/2015 P Rehabilitation of dormitory Dormitory #6, Special State Security Service in the Gachag Nabi street 3, B 11/12/2015 30 12/12/2015 7 12/19/2015 5 12/24/2015 5 12/29/2015 3 1/1/2016 3 1/5/2016 SFDI/8627-AZ/018 NCB Post A Khatai district, Baku ,SFDI/8096-AZ/561,Lot 2 B 21.08.2015 30 17.09.2015 4 9/21/2015 36 10/27/2015 1 10/28/2015 P B 10/28/2015 30 11/28/2015 7 12/5/2015 5 12/10/2015 5 12/15/2015 3 12/18/2015 3 12/21/2015 Sumqayıt, 42st residential quarter, dormitory #14,SFDI/8096-AZ/462, Lot 1 SFDI/8627-AZ/021 NCB Post A B 5/5/2015 30 6/4/2015 4 6/8/2015 7 6/15/2015 8 6/23/2015 1 6/24/2015 P Rehabilitation of dormitory Dormitory #3 in the Gahramanov street 1a, residential quarter 15, Sumgayit B 11/18/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 SFDI/8627-AZ/022 NCB Post A SFDI/8096-AZ/651 B 10/29/2015 28 11/26/2015 4 11/30/2015 7 12/7/2015 1 12/8/2015 P B Provision and mounting with fire-control units Rehabilitated Collective Centers, SFDI/8096-AZ/808 SFDI/8627-AZ/025 SH Post A B 6/29/2016 14 7/13/2016 1 7/14/2016 7/14/2016 1 7/15/2016 4 7/19/2016 1 7/20/2016 P B 10/22/2015 30 11/22/2015 7 11/29/2015 5 12/4/2015 5 12/9/2015 3 12/12/2015 3 12/15/2015 Sumgayıt, 15th residential quarter, 20th January street 42A, dormitory #19,FDI/8096-AZ/436 SFDI/8627-AZ/029 NCB Post A B 4/3/2015 31 5/4/2015 3 5/7/2015 24 6/1/2015 8 6/9/2015 1 6/10/2015 P Rehabilitation of dormitory Dormitory #2 in the Gahramanov street 1, residential quarter 15, Sumgayit B 11/18/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 SFDI/8627-AZ/037 NCB Post A SFDI/8096-AZ/627,Lot 2 B 10/11/2015 30 11/12/2015 4 11/16/2015 11 11/27/2015 1 11/28/2015 P B 11/10/2015 30 12/10/2015 7 12/17/2015 5 12/22/2015 5 12/27/2015 3 12/30/2015 3 1/4/2016 Rehabilitation of dormitory Dormitory #3, SMP-518 in the S.Bahlulzadeh street, Haji Zeynalabdin SFDI/8627-AZ/042 NCB Post A taghiyev settlement, Sumgayit,SFDI/8096-AZ/609 B 9/18/2015 30 10/19/2015 2 10/21/2015 9 10/30/2015 1 10/31/2015 P B 10/22/2015 30 11/22/2015 7 11/29/2015 5 12/4/2015 5 12/9/2015 3 12/12/2015 3 12/15/2015 Sumgayit, 18th residential quarter, H.Aliyev avenue 32, dormitory #2, SFDI/8096-AZ/551 SFDI/8627-AZ/045 NCB Post Sumgayit, 18th residential quarter, H.Aliyev avenue 32, dormitory #2, SFDI/8096-AZ/551 SFDI/8627-AZ/045 NCB Post A B 8/4/2015 27 8/31/2015 7 9/7/2015 10 9/17/2015 1 9/18/2015 P Baku, Nizami district, Nakhchivanski street 100, dormitory #14 of Baku Vocational B 10/12/2015 30 11/12/2015 7 11/19/2015 5 11/24/2015 5 11/29/2015 3 12/2/2015 3 12/5/2015 SFDI/8627-AZ/049 NCB Post A Lyceum,SFDI/8096-AZ/511 B 6/30/2015 30 7/27/2015 4 7/31/2015 32 9/2/2015 7 9/9/2015 1 9/10/2015 P B 11/20/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 Rehabilitation of dormitory Dormitory #5 in the Gahramanov street 5a, Sumgayit, SFDI/8096- SFDI/8627AZ/050 NCB Post A AZ/652,Lot 1 B 10/30/2015 28 11/27/2015 4 12/1/2015 16 12/17/2015 1 12/18/2015 P B 11/14/2015 30 12/14/2015 7 12/21/2015 5 12/26/2015 5 1/1/2016 3 1/4/2016 3 1/7/2016 Rehabilitation of dormitory Dormitory #11, 42nd residential quarter, Sumgayit, SFDI/8096-AZ/590 SFDI/8627-AZ/051 NCB Post A B 9/5/2015 30 10/5/2015 10 10/15/2015 48 12/3/2015 1 12/4/2015 P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/7/2016 3 1/10/2016 3 1/13/2016 Rehabilitation of dormitory Dormitory #1 in the Gahramanov street 5, 15th residential quarter, Sumgayit SFDI/8627-AZ/052 NCB Post A SFDI/8096-AZ/627,Lot 1 B 10/11/2015 30 11/12/2015 1 11/13/2015 24 12/7/2015 1 12/8/2015 P B 9/15/2015 30 10/15/2015 7 10/22/2015 5 10/27/2015 5 11/1/2015 3 11/4/2015 3 11/7/2015 Repair works in 16 Collective Centers with expired defects liability period, SFDI/8096-AZ/809 SFDI/8627-AZ/053 NCB Post A B 7/1/2016 30 8/1/2016 3 8/1/2016 3 8/5/2016 10 8/15/2016 1 8/16/2016 P B 11/20/2015 30 12/18/2015 7 12/25/2015 5 12/30/2015 5 1/6/2016 3 1/9/2016 3 1/12/2016 Rehabilitation of dormitory Dormitory #4 in the Gahramanov street 3, 15th residential quarter, Sumgayit SFDI/8096-AZ/054 NCB Post A SFDI/8096-AZ/652,Lot 2 B 10/30/2015 28 11/27/2015 5 12/2/2015 19 12/21/2015 1 12/22/2015 P B 11/2/2015 30 12/2/2015 7 12/9/2015 5 12/14/2015 5 12/19/2015 3 12/22/2015 3 12/25/2015 Rehabilitation of dormitory Dormitory #2 of “Azerbaijan Caspian Shippingâ€? CJSC, Khatai district, 823 SFDI/8096-AZ/057 NCB Post A passage, 3, Baku, SFDI/8096-AZ/534, Lot 2 B 7/29/2015 30 8/25/2015 2 8/27/2015 18 9/15/2015 1 9/16/2015 P B 10/30/2015 30 11/30/2015 7 12/7/2015 5 12/12/2015 5 12/17/2015 3 12/20/2015 3 12/23/2015 Baku, Binagadi district, 8 microdistrict, H. Huseynov street,19, dormitory of Baku Humanitarian SFDI/8627-AZ/058 NCB Post A College, SFDI/8096-AZ/546,Lot 2 B 8/1/2015 30 8/28/2015 3 9/1/2015 22 9/23/2015 1 9/24/2015 P B 11/8/2015 30 12/8/2015 7 12/15/2015 5 12/20/2015 5 12/25/2015 3 12/28/2015 3 12/31/2015 Rehabilitation of dormitory Dormitory of Absheron Vocational Lyceu, in the A.Isazadeh street 1, Bina SFDI/8627-AZ/059 NCB Post A settlement, Khazar district, Baku,SFDI/8096-AZ/562 B 21.08.2015 30 17.09.2015 5 9/22/2015 35 10/27/2015 1 10/28/2015 P Rehabilitation of dormitory Dormitory of Zardab Vocational Lyceum in the Samad Vurghun street 1, B 11/5/2015 30 12/5/2015 7 12/12/2015 5 12/17/2015 5 12/22/2015 3 12/25/2015 3 12/28/2015 SFDI/8627-AZ/060 NCB Post A Zardab town,SFDI/8096-AZ/608 B 9/17/2015 28 10/15/2015 4 10/19/2015 31 11/19/2015 1 11/20/2015 P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/7/2016 3 1/10/2016 3 1/13/2016 Rehabilitation of dormitory Dormitory owned by special housing maintenance union #2 in the A.M. SFDI/8627-AZ/061 NCB Post A Juma street 26, Narimanov district, Baku, SFDI/8096-AZ/626 B 10/13/2015 30 11/10/2015 2 11/12/2015 7 11/19/2015 1 11/20/2015 P B 11/16/2015 30 12/16/2015 7 12/23/2015 5 12/28/2015 7 1/4/2016 3 1/7/2016 3 1/10/2016 NCB Post A B 10/13/2015 30 11/12/2015 2 11/14/2015 7 11/21/2015 1 11/28/2015 Prior B NCB / Post Review 3/25/2017 7 4/1/2017 7 4/8/2017 30 5/8/2017 7 5/15/2017 5 5/20/2017 5 5/25/2017 3 5/28/2017 3 5/31/2017 Approximately 30 NCB (Works) contracts will be signed during the first 18 months after project effectiveness Prior NCB / Post Review P Rehabilitation of local roads and roadside channels, Bilasuvar, Settlement #1, “Bilasuvar-1â€? community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 CW-089 NCB Post A SFDI/8627-AZ/186 B 8/3/2017 28 8/31/2017 19 9/19/2017 13 10/2/2017 3 10/5/2017 1 10/6/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #2, “Bilasuvar-2â€? community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 SFDI/8627-AZ/187 CW-090 NCB Post A B 8/4/2017 30 9/5/2017 15 9/20/2017 19 10/9/2017 14 10/23/2017 1 10/24/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #3, “Bilasuvar -3â€? community, B 7/20/2017 30 8/19/2017 7 8/26/2017 5 8/31/2017 7 9/7/2017 3 9/10/2017 3 9/13/2017 CW-091 NCB Post A SFDI/8627-AZ/194 B 8/10/2017 31 9/11/2017 9 9/20/2017 21 10/10/2017 6 10/16/2017 1 10/17/2017 P B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #4, “Bilasuvar-4â€? community, CW-092 NCB Post A SFDI/8627-AZ/195 B 8/11/2017 30 9/12/2017 9 9/21/2017 18 10/9/2017 18 10/27/2017 1 10/28/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #5, “Bilasuvar-5â€? community, B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 CW-093 NCB Post A SFDI/8627-AZ/196 B 8/15/2017 30 9/14/2017 7 9/21/2017 18 10/9/2017 16 10/25/2017 1 10/26/2017 P Rehabilitation of local roads and roadside channels Bilasuvar, Settlement #6, “Bilasuvar-6â€? community, B 7/25/2017 30 8/24/2017 7 8/31/2017 5 9/5/2017 7 9/12/2017 3 9/15/2017 3 9/18/2017 CW-094 NCB Post A SFDI/8627-AZ/176 B 7/27/2017 30 8/28/2017 22 9/19/2017 21 10/10/2017 35 11/15/2017 1 11/16/2017 P Rehabilitation of the water supply system Aghdam, Guzanly settlement, “Guzanliâ€? community, SFDI/8627- B 7/30/2017 14 8/13/2017 2 8/15/2017 1 8/16/2017 6 8/22/2017 1 8/23/2017 CW-095 SH Post A AZ/213 B 9/11/2017 14 9/25/2017 2 9/27/2017 1 9/28/2017 5 10/3/2017 1 10/4/2017 P Rehabilitation of the water supply system Aghdam, Banovshalar settlements, “Banovshalarâ€? community, B 7/30/2017 30 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-096 NCB Post A SFDI/8627-AZ/212 B 9/7/2017 29 10/6/2017 25 11/1/2017 43 12/14/2017 14 12/28/2017 1 12/29/2017 P Rehabilitation of the water supply system Aghdam, Baharli settlement, “Baharliâ€? community, SFDI/8627- B 7/30/2017 30 8/29/2017 2 8/31/2017 1 9/1/2017 6 9/7/2017 1 9/8/2017 CW-097 NCB Post A AZ/219 B 9/19/2017 30 10/19/2017 13 11/1/2017 29 11/30/2017 5 12/5/2017 1 12/6/2017 P Rehabilitation of the water supply system Aghdam, “Dortyol-1 settlement, “Dortyol-1â€? community, SFDI/8627- B 8/5/2017 30 9/4/2017 7 9/11/2017 5 9/16/2017 7 9/23/2017 3 9/26/2017 3 9/29/2017 CW-098 NCB Post A AZ/239 B 12/20/2017 30 1/22/2018 P Rehabilitation of drainage system Mingachever, “Yeni Hayatâ€? settlement, “Yeni Hayatâ€? community, SFDI/8627- B 8/5/2017 30 9/4/2017 7 9/11/2017 5 9/16/2017 7 9/23/2017 3 9/26/2017 3 9/29/2017 CW-099 SH Post A AZ/175 B 8/11/2017 14 8/25/2017 4 8/29/2017 1 8/30/2017 10 9/8/2017 1 9/9/2017 P A P NCB Prior 4/7/2017 7 4/14/2017 7 4/21/2017 30 5/21/2017 7 5/28/2017 5 6/2/2017 5 6/7/2017 3 6/10/2017 3 10/13/2017 Maintenance&Operation Contract for Completed Collective Centers B A NCB Prior P CW-179 NCB Post 5/21/2018 30 6/21/2018 10 7/2/2018 10 7/12/2018 5 7/17/2018 1 7/18/2018 Maintenance of Collective Centers (CCs) where repair and rehabilitation works were completed B A P A P A Total Works and Goods Component A Days Execution Amendmen Payment Physical Contracts' ts to Company name which is Completion Variation progress Amendment vendor awarded a contract Order % s % 20 60 6/23/2017 60 2/17/2016 fully "Aghoghlan-I" LLC 60 5/19/2016 100% completed 60 2/12/2016 15.05.2016 fully "Art Proje" LLC 60 Extension period 100% completed 15.06.2016 60 2/24/2016 fully 60 8/3/2016 100% completed "Aypara Ä°nshaat" LLC 60 2/18/2016 25.01.2016 fully 60 Extension period 100% "Azertikinti" LLC 28.03.2016 completed 60 2/13/2016 29.05.2016 fully 60 Extension 100% "Azertikinti-M" LLC period completed 60 2/20/2016 08.08.2016 fully 60 Extension period 100% completed "Azertikinti-M" MMC 08.09.2016 60 2/18/2016 fully "Azertamirgeotekh"LLC 60 2/18/2016 100% completed 60 2/22/2016 fully 60 5/16/2016 100% "Azertamirgeotex" LLC 60 3/10/2016 fully 60 8/2/2016 100% completed "Azertamirgeotex" LLC 60 2/8/2016 19.05.2016 fully 60 Extension period 100% "Elnur LTD" LLC 02.06.2016 completed 60 2/18/2016 19.05.2016 fully 60 Extension 100% "Elnur LTD" LLC period completed 60 2/9/2016 20.07.2016 fully Extension 90 100% "HTM Holding" LLC period completed 22.08.2016 60 2/24/2016 03.08.2016 Extension fully 60 100% completed "HTM Holdinq" MMC period 02.09.2016 60 2/17/2016 fully 60 5/16/2016 100% "Ilkin -IM" LLC completed 60 2/19/2016 fully 60 6/14/2016 100% "Ilkin -IM" LLC completed 60 3/10/2016 fully 60 7/28/2016 100% "Ilkin -IM" LLC completed 60 2/12/2016 fully 90 7/6/2016 100% "Ish Inshaat" LLC completed 60 2/22/2016 fully 60 5/16/2016 100% "Ishigli Daghi" LLC completed 60 2/13/2016 29.05.2016 fully Extension 60 100% "K.E. Inshaat" LLC period completed 28.07.2016 60 2/17/2016 fully 60 2/19/2016 100% "Kanan-N"LLC completed 60 2/5/2016 fully 90 1/28/2016 100% "Kirs" Firm completed 60 2/23/2016 fully 60 6/9/2016 100% "Kirs" Firm completed 60 2/20/2016 fully 60 6/11/2016 100% "Kirs" Firm completed 60 2/20/2016 fully 60 6/17/2016 100% "Kurud Tikinti" LLC completed 60 2/4/2016 12.03.2016 Extension fully 90 period 100% "M.Nazimoghlu" LLC 11.04.2016 completed 60 2/10/2016 fully 60 6/3/2016 100% "Merkuri-Inshaat" LLC completed 60 2/18/2016 fully 60 6/10/2016 100% "Narmin-IM"LLC completed 60 2/21/2016 22.07.2016 Extension 90 100% 5% "NN Group" LLC period 23.09.2016 60 2/21/2016 19.05.2016 fully Extension 60 100% "Perlit" LLC period completed 16.06.2016 60 2/14/2016 22.02.2016 fully Extension 60 100% "Piramida-F.R."LLC period completed 18.05.2016 60 2/21/2016 15.06.2016 fully Extension 60 100% "Piramida-F.R" LLC period completed 14.07.2016 60 2/23/2016 fully 60 5/17/2016 100% "Q.E. Narmin" LLC completed 60 2/11/2016 fully 90 7/15/2016 100% "Q.E. Narmin" LLC completed 60 2/25/2016 fully 60 8/22/2016 100% "Q.E. NÉ™rmin" LLC completed 60 2/21/2016 fully 60 6/25/2016 100% "Yusana LTD" LLC completed 60 2/22/2016 04.08.2016 fully Extension 60 100% "Yusana LTD" LLC period completed 29.07.2016 60 2/23/2016 fully 60 5/13/2016 100% "Lanel" LLC completed 60 2/12/2016 fully 60 5/18/2016 100% "Lanel" LLC completed 60 2/16/2016 fully 60 6/16/2016 100% "Lanel" LLC completed 60 2/24/2016 fully 60 8/2/2016 100% "TH Sabirabad TTSh" completed 60 6/26/2017 60 3/16/2017 Extension 60 5/14/2017 100% 95% period "Kirs" firm 15.06.2017 60 3/11/2017 Extension 60 4/11/2017 100% 95% period "UNL LTD" LLC 10.05.2017 60 3/11/2017 60 4/11/2017 100% 95% "MTM-S" LLC 60 3/11/2017 60 4/11/2017 100% 95% "Lanel" LLC 60 3/18/2017 60 4/5/2017 100% 95% "Ilkin-IM" LLC 60 3/18/2017 60 4/11/2017 100% 95% "Azad Banna" LLC 60 3/18/2017 60 4/5/2017 100% 95% "Ilkin-IM" LLC 60 10/28/2017 Extension 60 11/29/2017 100% period "Aghoghlan-I " LLC 29.12.2017 60 10/28/2017 90 10/14/2017 100% 51% "Dashqala"Small Enterprise 60 10/28/2017 90 10/18/2017 100% 51% "Elnur LTD" LLC 60 11/2/2017 90 10/27/2017 100% "TH Sabirabad TTSh" 60 11/2/2017 90 10/30/2017 100% "QÉ™razÉ™n" LLC 60 11/2/2017 "Kainat Tajhizat Tikinti" 90 10/5/2017 100% 20% LLC 60 11/7/2017 Extension 22.10.2017 90 11536.92 100% 20% period "Azertikinti-M" LLC 22.11.2017 60 11/7/2017 90 10/31/2017 100% 51% "Art Proje" LLC 60 11/7/2017 90 10/18/2017 100% 20% "M. Nazimoghlu" LLC 60 11/12/2017 Extension 22.11.2017 90 81% 8% period "Azertikinti-M" LLC 29.12.2017 60 11/12/2017 90 12/4/2017 51% "Kurud Tikinti" LLC 60 11/12/2017 60 11/17/2017 Extension 22.11.2017 90 7361.11 81% 20% period "Lanel" LLC 22.12.2017 60 11/17/2017 90 11/22/2017 11798.42 81% 20% "Kainat Tajhizat Tikinti" LLC 60 11/17/2017 90 11/22/2017 13702.43 81% 20% "Kral Tamir Tikinti" LLC 60 11/17/2017 Extension 22.11.2017 90 81% 20% period "Teymur" LLC 21.12.2017 60 11/22/2017 Extension 90 12/29/2017 81% period "Zinnur" LLC 05.02.2018 60 11/22/2017 Extension 30.11.2017 90 81% period "HTM Holding" LLC 05.01.2018 60 11/22/2017 90 11/7/2017 100% "Aghoghlan-I" LLC 60 11/22/2017 Extension 90 1/4/2018 51% period "Fige" LLC 05.03.2018 60 11/28/2017 Extension 25.10.2017 60 100% period "Kurud Tikinti" LLC 07.11.2017 60 11/28/2017 60 9/11/2017 100% 51% "Ruslan-P" LLC 60 11/28/2017 60 9/8/2017 100% 51% "Ilkin-IM" LLC 60 11/28/2017 Extension 03.11.2017 90 81% 20% period "Q. E. Narmin" LLC 04.01.2018 60 12/3/2017 Extension 25.11.2017 "Dashqala" Small 90 81% period 27.12.2017 Enterprise 60 12/3/2017 60 9/11/2017 100% "Ishigli Daghi" LLC 60 12/3/2017 Extension 02.10.2017 "TH Sabirabad 60 100% 51% period 02.11.2017 Tamir-Tikinti Sahesi" 60 12/3/2017 60 9/18/2017 100% 51% "MTM-S" LLC 60 12/8/2017 Extension 25.10.2017 60 8331.24 100% period "MTM-S" LLC 24.11.2017 60 12/8/2017 60 12/8/2017 Extension "TH Sabirabad 90 1/4/2018 81% period 05.02.2018 Tamir-Tikinti Sahesi" 60 12/8/2017 60 10/31/2017 100% "Qarazan" LLC 60 12/13/2017 60 10/22/2017 100% 51% "Azad Banna" LLC 60 12/13/2017 60 9/14/2017 100% 51% "Ish Ishaat" LLC 60 12/13/2017 30 11/18/2017 30 7/28/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 7/14/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 8/1/2017 100% "Ilkin-IM"LLC 30 11/18/2017 30 8/1/2017 100% "Kurud Tikinti" LLC 30 11/23/2017 30 7/25/2017 100% "Kurud Tikinti" LLC 30 11/23/2017 30 7/24/2017 100% "Shusha XTQ" LLC 30 11/23/2017 30 8/3/2017 "Shusha XTQ" LLC 30 11/23/2017 30 8/3/2017 "Perlit" LLC 30 11/28/2017 30 7/14/2017 "Perlit" LLC 30 11/28/2017 30 7/13/2017 100% "Perlit" LLC 60 12/28/2017 60 7/2/2017 100% 100% "Auto Azerbaycan" LLC 60 4/27/2018 60 4/27/2018 60 2/27/2018 51% "Qarazan"LLC 60 4/27/2018 60 2/25/2018 20% "MTM-S" LLC 60 4/27/2018 60 2/27/2018 14% "Elgun-Inshaat-2008"LLC 60 5/31/2018 60 5/2/2018 60 5/2/2018 60 5/2/2018 60 5/2/2018 60 2/25/2018 21% "Inshaatchi-Q" LLC 60 5/2/2018 60 2/25/2018 22% "Aghoghlan-I" LLC 60 5/7/2018 60 5/7/2018 60 2/25/2018 20% "Kanan-N" LLC 60 5/7/2018 60 2/26/2018 20% "Yusana LTD" LLC 60 5/7/2018 60 5/7/2018 60 5/12/2018 60 5/12/2018 60 5/12/2018 60 5/12/2018 60 5/14/2018 60 5/14/2018 60 5/14/2018 60 5/14/2018 60 5/15/2018 60 5/15/2018 60 5/15/2018 60 5/15/2018 60 5/17/2018 60 5/17/2018 60 5/17/2018 60 5/17/2018 60 5/17/2018 120 10/26/2017 120 5/31/2015 fully "Art Proje" LLC 120 1/15/2016 100% completed 120 6/4/2016 fully "Azertikinti-M" LLC 120 2/6/2016 100% completed 120 5/13/2016 12.10.2015 fully Extension "AzerSanaye Inshaat" LLC 120 100% period completed 14.02.2016 120 6/5/2016 22.02.2016 fully "Azertamirgeotekh"LLC 120 Extension period 100% 28.03.2016 completed 120 5/21/2016 23.01.2016 fully Extension "Bak Inshaat"LLC 120 100% period completed 28.03.2016 120 6/7/2016 fully "Fullcom" LLC 120 3/4/2016 100% completed 120 6/5/2016 fully "HTM Holding" LLC 120 2/19/2016 100% 120 5/21/2016 fully "Ilkin-IM" LLC 120 10/23/2015 100% completed 120 6/12/2016 fully "Ilkin-IM"LLC 120 4/7/2016 100% "Ilkin-IM"LLC 30 8/19/2016 100% 100% 120 5/15/2016 fully "K.E. Inshaat" LLC 120 10/10/2015 100% completed 120 6/12/2016 fully "Merkuri-Inshaat" LLC 120 3/28/2016 100% 120 6/4/2016 fully "Piramida.F.R" LLC 120 2/28/2016 100% completed 120 5/15/2016 "Q.E. Narmin" LLC fully "Q.E. Narmin" LLC 120 1/17/2016 100% completed 120 4/28/2016 fully Qartal Tikinti Firm 120 1/11/2016 100% completed 120 6/12/2016 fully Qartal Tikinti Firm 120 4/17/2016 100% completed 120 6/7/2016 fully "Rabita Tamir Tikinti" LLC 120 4/4/2016 100% completed 120 6/13/2016 fully "Rabita Tamir Tikinti"LLC 120 4/7/2016 100% completed 3 monthes 2/7/2016 "T.T.Sh. Inshaat" LLC 90 11/16/2016 100% 100% 120 6/12/2016 fully "Khimekspress-2000"Firm 120 4/21/2016 100% completed 120 5/25/2016 fully "Lanel" LLC 120 1/15/2016 100% completed 120 5/23/2016 23.01.2016 fully Extension "Lanel" LLC 120 100% period completed 23.02.2016 120 5/31/2015 fully "Lanel"LLC 120 2/29/2016 100% completed 120 5/28/2016 fully "Lanel" LLC 120 3/18/2016 100% completed 120 6/13/2016 fully "Lanel"LLC 120 3/19/2016 100% completed 120 5/9/2016 fully "Lanel"LLC 120 3/27/2016 100% completed 120 10/26/2017 120 1/11/2018 "Farid Firm. R"LLC 120 2/3/2018 51% 120 1/11/2018 "Olimp Muhendis 120 2/21/2018 51% Xidmetleri" LLC 120 1/11/2018 120 2/14/2018 31% "Azertikinti" LLC 120 1/16/2018 "Catena 120 2/25/2018 51% Construction" LLC 120 1/16/2018 120 2/23/2018 31% "Azeri Servis LTD" LLC 120 1/16/2018 120 3/16/2018 31% "Ilkin IM" LLC 60 10/22/2017 90 1/4/2018 81% "Araz-Ä°nÅŸaatchi" LLC 60 11/7/2017 90 3/29/2018 82% "Merkuri-Inshaat" LLC 60 11/7/2017 90 3/6/2018 81% "Azersutajhizattikinti" JSC 120 1/27/2018 120 1/27/2018 90 12/8/2017 100% "Merkuri-Inshaat" LLC 90 1/13/2018 12 7/18/2019 monthes Days Execution Plan vs./ Actual Type-Category Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Months Additional Financing for IDP Living Standards and Review by Technical No Objection Selection/Proc Adverti-sement Contract Livelihoods Project Name of Procurement Ref. # Bank Prior TORs No Objection Submission Evaluation No Objection Interviews to Sign Start Completion Contract award ure Method Invitation Signature Assignment/Contract / Post +Shortlist Contract 1 9/12/2018 0:00 3 4 5 9 10 11 12 13 14 15 16 17 19 20 21 22 TRAINING AND IOC P PMT training OC-1 D 48 A P Office operation & maintenance OC-2 D 48 A P Communication OC-3 D 48 A P Fuel OC-4 D 48 A P Bank expenses OC-5 D 48 A P Utilities OC-6 D 48 A P Purchase of vehicles OC-7 D 48 A P Insurance for vehicles OC-8 D 48 A P Vehicle operating costs OC-9 D 48 A P A P A D- STAFF P 48 IC Prior Deputy Director OC-10 D A P 48 IC Prior Technical Coordinator/Chief Engineer OC-11 D A P 48 IC Prior Office Manager OC-12 D A P 48 IC Prior Chief Accountant OC-13 D A P Manager for the Supervision of the Implementation of 48 IC Prior OC-14 D A Micro-projects P Manager for the Supervision of the Implementation of 48 IC Prior OC-15 D A Micro-projects P Manager for Housing Renovation and Social and 48 IC Prior OC-16 D A Economic Infrastructure for IDP Settlements P 48 IC Prior Senior Livelihoods Manager OC-17 D A P 48 IC Prior Senior Community Mobilization Manager OC-18 D A P 48 IC Prior Appraisal Manager OC-19 D A P 48 IC Prior Procurement Manager OC-20 D A P 48 IC Post Deputy Procurement Manager OC-21 D A P 48 IC Post Procurement Manager Assistant OC-22 D A P 48 IC Post Procurement Manager Assistant OC-23 D A P 48 IC Post Procurement Manager Assistant OC-24 D A P 48 IC Post Appraisal Manager Assistant for Micro-projects OC-25 D A P 48 IC Post Appraisal Manager Assistant for Micro-projects OC-26 D A P 48 IC Post Appraisal Manager Assistant for infrastructure support OC-27 D A P 48 IC Post Appraisal Manager Assistant for infrastructure support OC-28 D A P 48 IC Post Office Manager Assistant OC-29 D A P 48 IC Post Manager Assistant for Infrastructure support OC-30 D A P Regional Technical Supervisor for the Implementation 48 IC Post OC-31 D A of Infrastructure support P Regional Technical Supervisor for the Implementation 48 IC Post OC-32 D A of Infrastructure support P Regional Technical Supervisor for the Implementation 48 IC Post OC-33 D A of Infrastructure support P Regional Technical Supervisor for the Implementation 48 IC Post OC-34 D A of Infrastructure support P 48 IC Post Accounting Specialist OC-35 D A P 48 IC Post Accounting Specialist OC-36 D A P 48 IC Post Accountant/Chief Accountant Assistant OC-37 D A P 48 IC Post Management Information System Manager OC-38 D A P 48 IC Post Management Information System Manager Assistant OC-39 D A P 48 IC Post Community Mobilization Specialist OC-40 D A P 48 IC Post Regional Community Mobilization Consultant OC-41 D A P 48 IC Post Regional Community Mobilization Consultant OC-42 D A P 48 IC Post Regional Community Mobilization Consultant OC-43 D A P 48 IC Post Regional Community Mobilization Consultant OC-44 D A P 48 IC IC Senior Community Mobilization Manager Assistant OC-45 D A P 48 IC Post Senior Community Mobilization Manager Assistant OC-46 D A P 48 IC Post Senior Livelihood Manager Assistant OC-47 D A P 48 IC Post Senior Livelihood Manager Assistant OC-48 D A P 48 IC Post Social and Environmental Protection Specialist OC-49 D A P 48 IC Post Monitoring and Evaluation Specialist OC-50 D A P Manager Assistant for Supervision on Micro-projects 48 IC Post OC-51 D A Implementation P Manager Assistant for Supervision on Micro-projects 48 IC Post OC-52 D A Implementation P 48 IC Post Manager Assistant for housing maintenance OC-53 D A P Deputy Senior Livelihood Manager 48 IC Post OC-54 D A P 48 IC Post Deputy Appraisal Manager OC-55 D A P Deputy Senior Community Mobilization manager/ 48 IC Post OC-56 D A Promotion manager P Regional Technical Supervisor for the Implementation 48 IC Post OC-57 D A of Micro-projects P Regional Technical Supervisor for the Implementation 48 IC Post OC-58 D A of Micro-projects P Regional Technical Supervisor for the Implementation 48 IC Post OC-59 A of Micro-projects P 48 IC Post Housing Maintenance Coordinator OC-60 A P 48 IC Post Housing Maintenance Coordinator OC-61 A P 48 IC Post Housing Maintenance Coordinator OC-62 A P 48 IC Post Translator OC-63 A P 48 IC Post Translator OC-64 A P 48 IC Post Secretary OC-65 A P 48 IC Post Mechanic OC-66 A P 48 IC Post Driver OC-67 A P 48 IC Post Driver OC-68 A P 48 IC Post Driver OC-69 A P 48 IC Post Driver OC-70 A P 48 IC Post Driver OC-71 A P 48 IC Post Economist Specialist OC-72 A P 48 IC Post Housekeeper OC-73 A P 48 IC Post Cleaner OC-74 A P 48 IC Post Cleaner OC-75 A P 48 IC Post Gardener OC-76 A P 48 IC Post Guard OC-77 A P 48 IC Post Guard OC-78 A P A P A P A P A P A P A Total for Other Cost - PLANNED Red Text Rows: = Actuals Total for Other Cost - ACTUALS Yellow Columns: Cell turns red if Planned Date has passed. Cell turns white again if cell for Actual Date is filled in. Total for Component A Works and goods Note: Every line item represents only one lot. Consultant service Total Total for Component A - ACTUALS Works and goods Consultant service Total Loan Agrmt IBRD (USD) Total for Component B Works and goods Total IBRD Financing Per Category Actual signed/used Usage in USD Current state Consultant service Goods, Works, Cons. Part 1 Total Incr. Operating Costs and PMT training Total for Component B - ACTUALS Works and goods Front-end fee Consultant service Unallocated Total TOTAL AMOUNT Total for Component C Works and goods Consultant service Total Total for Component C - ACTUALS Works and goods Consultant service Total Total for Component D Works and goods Consultant service Total Total for Component D - ACTUALS Works and goods Consultant service Total GRAND TOTAL - PLAN GRAND TOTAL - ACTUALS Total Loan #REF! Front-end fee Non-allocated/Contingencies C Revision Date: Additional Financing for IDP Living 12 September 2018 Standards and Livelihoods Project PIU Director: Sabir Ahmadov TTL: Robert Wrobel Proc. Specialist: Emma Mammadkhanova Operations Officer: Nijat Veliyev Days Execution Type-Category Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Plan / Actual Contr. Short Prior / Reception of No Objection Procurement Ref. Not Selection Type Listing/RFP Invitation for Proposal Technical No Final Contract Name of Assignment / Contract Post Ad of EOI Expression No Objection to Sign Start Completion # e # Method LS / submssion RFP Submission Evaluation Objection Evaluation Signature Review of Interest Contract TB to the Bank 9/12/2018 0:00 3 4 5 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A- Micro-projects 1 Hiring the services of consultants for the design of micro-projects (approximately 15 Prior / packages consisting of 14-15 micro- CS-1 A CQS LS Post 11/20/2016 14 12/4/2016 7 12/11/2016 3 12/14/2016 1 12/15/2016 14 12/29/2016 3 1/1/2017 5 1/6/2017 2 1/8/2017 5 1/13/2017 1 1/14/2017 1 1/15/2017 150 6/14/2017 projects; average size amount of each Review package is about USD 60 000) P A CQS LS Post 2/8/2017 14 2/22/2017 4 2/26/2017 1 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/086 A projects (CMP 008-017) -(schools) A CQS LS Post 3/29/2017 9 4/6/2017 1 4/7/2017 4/7/2017 3 4/10/2017 9 4/19/2017 1 4/20/2017 1 4/21/2017 120 8/20/2017 P A CQS LS Post 2/10/2017 14 2/24/2017 4 2/28/2017 1 3/1/2017 7 3/8/2017 3 3/11/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/087 A projects (CMP 018-027) -(schools) A CQS LS Post 3/31/2017 10 4/10/2017 1 4/11/2017 4/11/2017 3 4/14/2017 6 4/20/2017 1 4/21/2017 1 4/22/2017 120 8/21/2017 P A CQS LS Post 2/13/2017 14 2/27/2017 4 3/3/2017 1 3/4/2017 7 3/11/2017 3 3/14/2017 3 3/14/2017 1 3/15/2017 120 7/13/2017 Consulting services for preparation design/tender documentation of the micro- SFDI/8627-AZ/120 A projects projects (CMP 028-042) -(roads) A CQS LS Post 4/4/2017 10 4/13/2017 1 4/14/2017 4/14/2017 8 4/22/2017 2 4/24/2017 2 4/26/2017 1 4/27/2017 120 8/28/2017 P Consulting services for preparation A CQS LS Post 7/24/2017 14 8/7/2017 4 8/11/2017 1 8/12/2017 7 8/19/2017 3 8/22/2017 2 8/24/2017 1 8/25/2017 120 12/23/2017 design/tender documentation of the micro- SFDI/8627-AZ/169 A projects projects (CMP 053-060) -(roads) A CQS LS Post 8/18/2017 14 8/31/2017 5 9/5/2017 1 9/6/2017 12 9/18/2017 1 9/19/2017 10 9/29/2017 1 9/30/2017 120 1/29/2018 P Consulting services for preparation A CQS LS Post 7/26/2017 14 8/9/2017 4 8/13/2017 1 8/14/2017 7 8/21/2017 3 8/24/2017 2 8/26/2017 1 8/27/2017 120 12/25/2017 design/tender documentation of the micro- SFDI/8627-AZ/170 A projects projects (CMP 061-068) -(roads) A CQS LS Post 8/22/2017 14 9/6/2017 1 9/7/2017 1 9/8/2017 11 9/19/2017 1 9/20/2017 9 9/29/2017 1 9/30/2017 120 1/29/2018 P A CQS LS Post 9/15/2017 14 9/29/2017 4 10/3/2017 1 10/3/2017 7 10/10/2017 3 10/13/2017 2 10/13/2017 1 10/14/2017 120 2/11/2018 Consulting services for preparation SFDI/8627- design/tender documentation of the micro- A AZ/222 A CQS LS Post 10/3/2017 14 10/17/2017 1 10/18/2017 1 10/19/2017 14 11/3/2017 3 11/6/2017 4 11/10/2017 1 11/11/2017 120 4/10/2018 projects projects (CMP 069-077) P A CQS LS Post 9/15/2017 14 9/29/2017 4 10/3/2017 1 10/3/2017 7 10/10/2017 3 10/13/2017 2 10/13/2017 1 10/14/2017 120 2/11/2018 Consulting services for preparation SFDI/8627- design/tender documentation of the micro- A AZ/224 A CQS LS Post 10/4/2017 14 10/18/2017 1 10/19/2017 1 10/20/2017 14 11/6/2017 1 11/7/2017 9 11/16/2017 1 11/17/2017 120 4/16/2018 projects projects (CMP 078-085) (roads) P Consulting services for preparation design A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 SFDI/8627- documentation of the micro-projects and AZ/247 infrastructure projects (power supply) A A CQS TB Post 2/20/2018 14 3/5/2018 P Consulting services for preparation design A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (water supply, A AZ/256 A CQS TB Post 2/21/2018 14 3/6/2018 drainage networkconstruction of artesian wells system) P Consulting services for preparation design A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- A infrastructure projects (social facilities AZ/257 A CQS TB Post 2/20/2018 14 3/5/2018 (schools, gardens, hospitals etc.) P Consulting services for preparation design A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (social facilities AZ/258 A (schools, gardens, hospitals etc.) A CQS TB Post 2/21/2018 14 3/6/2018 P Consulting services for preparation design A CQS TB Post 2/14/2018 14 2/28/2018 7 3/7/2018 3 3/10/2018 1 3/11/2018 14 3/25/2018 3 3/28/2018 5 4/2/2018 2 4/4/2018 5 4/9/2018 1 4/10/2018 1 4/11/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/259 A roads) A CQS TB Post 2/20/2018 14 3/5/2018 P Consulting services for preparation design A CQS TB Post 2/16/2018 14 3/2/2018 7 3/9/2018 3 3/12/2018 1 3/13/2018 14 3/27/2018 3 3/30/2018 5 4/4/2018 2 4/6/2018 5 4/11/2018 1 4/12/2018 1 4/13/2018 33 4/2/2020 documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/260 roads) Consulting services for preparation design documentation of the micro-projects and SFDI/8627- infrastructure projects (access and local AZ/260 A roads) A CQS TB Post 2/21/2018 14 3/6/2018 2 B - Infrastructure projects Hiring the services of consultants for the design of IP (approximately 9 packages Prior / consisting of 9-10 infrastructure projects; CS-2 B CQS LS Post 2/3/2017 14 2/17/2017 7 2/24/2017 3 2/27/2017 1 2/28/2017 14 3/14/2017 3 3/17/2017 5 3/22/2017 2 3/24/2017 5 3/26/2017 1 3/27/2017 1 3/28/2017 150 8/25/2017 average size amount of each package is Review about USD 90 000) Consulting services for preparation P B CQS LS Post 2/6/2017 14 2/20/2017 4 2/24/2017 3 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 90 6/13/2017 design/tender documentation of the infrastructure projects (CIP 001-006) - SFDI/8627-AZ/077 A (roads) B CQS LS Post 2/4/2017 14 2/17/2017 6 2/23/2017 1 2/24/2017 6 3/2/2017 5 3/7/2017 2 3/9/2017 1 3/10/2017 90 6/8/2017 Consulting services for preparation P B CQS LS Post 2/6/2017 14 2/20/2017 4 2/24/2017 3 2/27/2017 7 3/6/2017 3 3/9/2017 3 3/14/2017 1 3/15/2017 90 6/13/2017 design/tender documentation of the infrastructure projects (CIP 007-011)- SFDI/8627-AZ/078 A (water supply) B CQS LS Post 3/17/2017 14 4/3/2017 2 4/5/2017 4/5/2017 9 4/14/2017 3 4/17/2017 1 4/18/2017 1 4/19/2017 90 7/18/2017 P A P A P A p Hiring the services of consultant for QCBS TB Post 7/10/2017 14 7/24/2017 7 8/1/2017 7 8/8/2017 2 8/10/2017 20 8/30/2017 10 9/11/2017 6 9/18/2017 10 9/28/2017 5 10/3/2017 7 10/10/2017 1 10/11/2017 43 months 10/11/2020 Monitoring, evaluation and impact CS-3 C A assesment QCBS TB Post p IC LS Post 2/10/2017 14 2/24/2017 7 3/3/2017 3 3/6/2017 1 3/7/2017 43 months 3/7/2020 Impact Evaluation Field Coordinator CS-10 A IC LS Post 2/28/2017 14 3/9/2017 p CS-10 IC TB Post 3/1/2017 14 3/14/2017 3 3/17/2017 10 3/27/2017 1 3/28/2017 43 months 3/28/2020 Impact Evaluation Field Coordinator SFDI/8627- (readvertisement) A AZ/151 IC TB Post 5/17/2017 14 6/1/2017 8 6/9/2017 6/9/2017 2 6/12/2017 1 6/13/2017 43 months 12/30/2020 P CS-4 LCS LS Post 7/25/2017 30 8/25/2017 10 9/11/2017 25 9/25/2017 10 10/5/2017 10 10/16/2017 9 10/25/2017 1 10/26/2017 36 months 10/25/2020 Hiring the services of an Audit firm SFDI/8627- C A AZ/146 LCS LS Post 1/8/2018 14 1/22/2018 46 4-Apr-18 P Hiring the services of an Audit firm Post SFDI/8627- (Amendment under Contract # SFDI/8096- C AZ/147 A AZ/090) Post P A P SFDI/8627- SSS LS Post Hiring the services of Individual AZ/180 C Livelihood Consultant A CS-11 SSS LS Post 1-Oct-17 1-Oct-17 39 months 30-Dec-20 P SFDI/8627- CQS LS Post 12/15/2017 14 12/29/2017 5 1/11/2018 10 1/21/2018 10 1/31/2018 2 2/2/2018 10 2/20/2018 1 2/21/2018 35 months 12/30/2020 Hiring the services of Institutional capacity AZ/221 C building of micro-finance team A CS-12 1/9/2018 14 1/22/2018 23 2/14/2018 P CQS TB Post 12/12/2017 14 12/26/2016 4 12/30/2016 10 1/10/2017 8 1/18/2017 5 1/23/2017 1 1/24/2017 45 months 9/24/2020 CS-5 Hiring the services of consultant for SFDI/8627- C Community Mobilization A AZ/069 CQS TB Post 1/19/2017 14 2/8/2017 16 2/24/2017 10 3/6/2017 8 3/14/2017 2 3/16/2017 27 4/12/2017 1 4/13/2017 45 months 12/13/2020 P Technical services on software for CQS TB Post 10/14/2017 14 10/28/2017 7 11/4/2017 7 11/11/2017 1 11/12/2017 30 12/12/2017 10 12/22/2017 10 1/1/2018 10 1/11/2018 5 1/16/2018 3 1/19/2018 1 1/20/2018 38 months 12/20/2020 CS-9 SFDI/8627- A Financial Management System AZ/149 CQS TB Post 10/13/2017 14 10/26/2017 1 10/26/2017 10/26/2017 4 10/30/2017 1 10/31/2017 11/8/2018 11/8/2018 38 months 12/8/2020 3 C - Livelihood Support P Hiring the services of Implementing Partner CS-6 SSS TB Prior 4/3/2017 14 4/17/2017 7 4/24/2017 7 5/1/2017 1 5/2/2017 30 6/1/2017 10 6/11/2017 10 6/21/2017 10 7/1/2017 5 7/6/2017 3 7/9/2017 1 7/10/2017 36 months 9/11/2020 for Component C,Livelihoods,Sub- SFDI/8627- C Component:Youth Support AZ/067 A SSS TB Prior 3/27/2017 13 4/10/2017 1 4/11/2017 36 months 4/10/2020 P SSS TB Prior 4/3/2017 14 4/17/2017 7 4/24/2017 7 5/1/2017 1 5/2/2017 30 6/1/2017 10 6/11/2017 10 6/21/2017 10 7/1/2017 5 7/6/2017 3 7/9/2017 1 7/10/2017 45 months 12/11/2020 Hiring the services of Implementing Partner CS-7 for Component C,Livelihoods,Sub- SFDI/8627- C A Component:Income Generating Activites AZ/068 SSS TB Prior 3/27/2017 13 4/10/2017 1 4/11/2017 45 months 12/10/2020 p QCBS TB Prior 4/10/2017 14 4/24/2017 7 5/1/2017 7 5/8/2017 1 5/9/2017 30 6/8/2017 10 6/18/2017 10 6/28/2017 10 7/8/2017 5 7/13/2017 3 7/16/2017 1 7/16/2017 45 months 9/16/2020 Hiring the services of Implementing Partner CS-8 for Component C,Livelihoods, Ä°ntergrated SFDI/8627- C A Economic Support Pilot AZ/066 QCBS TB Prior 1/14/2017 30 2/14/2017 30 3/15/2017 7/5/2017 7 6/12/2017 30 7/12/2017 48 8/30/2017 23 9/22/2017 30 10/23/2017 24 11/13/2017 2 11/15/2017 1 11/16/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/263 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/264 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/265 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/266 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/267 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/268 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/269 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/270 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/271 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/272 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/273 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/274 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/275 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/276 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/277 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/278 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/279 Grand Contract SFDI/IGP/279 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/280 A TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 p TB Prior 11/30/2017 11/30/2017 41 months 12/30/2020 Grand Contract SFDI/IGP/281 Contracts' Company name which is Amendments awarded a contract "Inshaatchi -Tamir" LLC "RAARCHITECH ltd" LLC "AM.M Line" LLC "AY Consulting" LLC "Billur" Layiha-Ä°stehsalat Firm "AM.M Line" LLC "RAARCHÄ°TECT Ltd" MMC "Billur" Layiha-Ä°stehsalat Extension Firm period 10.07.2017 "AY Consulting" LLC Amin Ahmad Charkazov Moore Stephens Azerbaijan Limited Peter Reid "Support to Socio-Economic Development Public Union (Azerbaijan,leading organization) and "Progress" Social Development Public Union (Azerbaijan)" "Akbis" LLC Ganja Regional Economic Advisory Center Social Union (Azerbaijan) and "Tamas" Regional Develpoment Public Union (Azerbaijan) Azerbaijan Community Development Research,Training and Resource Center (Azerbaijan) and ASR Consulting and Research Group LLC (Azerbaijan) and Regional Gender Center NGO (Azerbaijan) and "Social Progress" Public Union (Azerbaijan) Joint Venture “Social Progressâ€? Public Union (SPPU) with “Women of the XXI Centuryâ€? Public Union and “Support for Economic Development of Regionsâ€? Public Union “TEK CHÄ°NAR-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “QARAQOYUNLU-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “EVOGHLU-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “MESHELÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “VUQARLI 2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “QARAGOL-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “SADÆ?GUL 2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “DASHBULAQ-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “DEMÄ°RCHÄ°LER-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “ZERTÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “TEK PALID-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “SEYDÄ°MLÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “ELEKCHÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “NEMÄ°RLÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “ELÄ°-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “YAQUT-1968 KENDLÄ° FERMER TESERRUFATIâ€? LLC “EMÄ°RALLAR-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “EMÄ°RALLAR-2017 KENDLÄ° FERMER TESERRUFATIâ€? LLC “YAQUB 2014â€? LLC “ZEYNEB 2009â€? LLC C IDP Living Standards and Revision Date: Livelihoods Project 12 September 2018 Credit : USD 66.70 mln Deepal Fernando Emma Mammadkhanova Officer: Yagut Program Assistant: Operations Ertenlice Nijat Veliyev Contracts,Amen Days Execution Type-Category Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval dments Plan / Actual Short Contr. Prior / Reception of (Amount, Date Estimated Cost / Listing/RFP Invitation Proposal Technical No Objection to Contract Company name which is Name of Assignment / Contract Procurement Ref. # Note # Type LS Post Ad of EOI Expression of No Objection No Objection Final Evaluation Start Completion and reason Actual (USD) submssion to for RFP Submission Evaluation Sign Contract Signature awarded a contract / TB Review Interest should be the Bank indicated in the Comments) 1 9/12/2018 0:00 3 4 5 6 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Micro-finance agreements P TB Prior 5/28/2017 14 6/11/2017 20 6/1/2017 5 6/6/2017 6 6/12/2017 2 6/14/2017 5 6/19/2017 20 6/9/2017 20 6/29/2017 9 7/8/2017 7/10/2017 7/10/2017 7/10/2020 Loan Agreement MF-1 A