International Bank for Reconstruction and Development MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of August 31, 1981) SecM81-758 FROM: The Deputy Secretary September 11, 1981 CONTENTS Section Pages I. - Eastern Africa 1 - 14 II. - Western Africa 15 - 29 III. - East Asia and Pacific 30 - 38 IV. - South Asia 39 - 47 V. - Europe, Middle East and North Africa 48 - 60 VI. - Latin America and Caribbean 61 - 75 VII. - New Projects 76 - 78 Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ I. EASTERN AFRICA BOTSWANA (BOTSWANA About (R) Power I (Coal) - Construction of Appraisal mission in the field. POWER 40.0 90 MW Pithead power station at (Cofinancing being sought.) CORPORATION) (Bank) Morupule, and transmission lines. Project cost estimated at $325 million, with foreign exchange component of about $260 million. Ministry of 17.0 (R) Education III - Construction, furnish- Negotiations scheduled Education (Bank) ing of primary school classrooms; for late September. textbooks; construction of new primary teacher training college. Total project cost about $30.0 million. (WATER UTILITIES About (R) Water Supply III - Surface or Project identification CORPORATION) 7.0 groundwater development to meet under way. (Bank) Gaberone's future water supply requirements. Total project cost to be determined. BURUNDI Ministry of 19.3 Kirimiro Rural Development - Inte- Approved by the Agriculture (IDA) grated rural development (food, crops, Executive Directors and Livestock coffee, rural services) in about on June 16. 6 communes in the Kirimiro region; extension services to increase pro- duction of cash crops and foodcrops; provision of agricultural inputs; improvement of marketing and social infrastructure. Total project cost estimated at $21.4 million. 1/ If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. - If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. 3/ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. 4/ This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. Distribution: Executive Directors and Alternates President Senior Vice Presidents President's Council Vice Presidents, IFC Directors and Department Heads, Bank id IFOP: -2- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BURUNDI (Cont-d) Ministry of 16.0 (R) Integrated Rural Development II/Ngozi Board presentation tentatively Agriculture (IDA) III - Continuation of coffee improve- scheduled for October. (Co- ment program and development of financing arrangements with foodcrops in context of an integrated IFAD and Kuwait Fund agreed.) rural development of the Ngozi-Muyinga An advance of $500,000 from the region. Total project cost estimated IDA Project Preparation Facility at $28.9 million. has been approved for the establishment of the project implementation agency, including technical assistance for extension services. Ministry 25.0 Highway III - Construction of first Approved by the Executive Directors of Public (IDA) section of Ngozi-Kobero road (about on April 21. IDA Project Preparation Works and 39 km) and continuation of road main- Facility advance of $1,000,000 Equipment tenance. Total project cost for first approved to complete preparation section estimated at $32.1 million. of project. '(Co-financing agreed with Belgium, France, Japan, UNDP and ACCD.) Ministry of About (R) Local Construction Industry - Negotiations tentatively Energy and 5.0 Promotion of local construction scheduled for October. Mines (IDA) industry. Total project cost to An advance of $300,000 from be determined. the IDA Project Preparation Facility has been approved for the establishment and start up of operations of the project unit, including the recruitment of consultants. Ministry of To be (R) Water Supply II - Rehabilitation Project preparation underway. Rural deter- of 48 rural aqueducts. Total project IDA Project Preparation Facility Development mined cost to be determined. advance of $470,000 approved (IDA) to complete preparation. Regie de produc- About Rwegura Hydroelectric Power - Con- Appraisal report being prepared. tion et distri- 28.0 struction of a hydroelectric plant. (Co-financing with Germany bution d'eau et (IDA) Total project cost estimated at agreed.) d'electricite $50.0 million. (REGIDESO) Ministry of To be (R) Education III - Expansion of basic Project to be identified. National deter- education. Total project cost to Education mined be determined. (IDA) Ministry of About (R) Technical Assistance - Improving Project under preparation. Planning 6.0 efficiency of public sector enter- Appraisal mission scheduled (IDA) prises and project preparation for April 1982. capabilities. Total project cost to be determined. Banque About DFC II (Artisan Centers) - Second Project under preparation. Nationale de 8.0 line of credit to BNDE. Total Appraisal mission scheduled Developpement (IDA) project cost to be determined. for October. Economique (BNDE) Ministry To be (R) Agriculture Muyinga - Pilot Project under preparation. of Agriculture deter- settlement scheme and development mined of coffee and foodcrop production (IDA) in the Muyinga province. Total project cost to be determined. COMOROS Ministry of About (R) Education - Primary education curric- Appraisal report being reviewed. Education 5.8 ulum improvement including provision Negotiations:tentatively scheduled (IDA) of textbooks; training of teachers, for mid-October. -IDA Project Prepara- health personnel and agricultural tion Facility advance of $205,000 staff. Project based on UNESCO approved to finance project prepara- study. Total project cost estimated tion activities. at $6.5 million. See page 1 for footnotes. -3- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ COMOROS (Cont-d) Ministry of About (R) Highways II - Continuation for 3 years Negotiations substantially Equipment and 6.3 of road maintenance and improvement completed. (Co-financing with Envir2nment (IDA) program started under first highway AfDB agreed.) project. Total project cost estimated at $13.5 million. Ministry of About DFC I - Line of credit for financing Project under preparation. Production 2.0 of industry, agroindustry and small- and Industry (IDA) scale industry. DJIBOUTI Ministry of About (R) Technical Assistance - Technical Appraisal report tentatively Finance and 3.0 assistance in planning, and project expected by end September. Economy (IDA) preparation and evaluation. (Project to be co-financed with UNDP; Bank is executing agency for UNDP-financed part of project.) Ministry of About (R) Road Maintenance - Strengthening of Project being prepared. Public Works 6.0 the road maintenance capability (Co-financing being explored (IDA) of Ministry of Public Works. with the Arab Fund.) Ministry of About (R) Urban Sites - Services and Housing Project under preparation. Public Works/ 8.0 Development - Urban facilities, An IDA Project Preparation District of (IDA) support for small scale industry, Facility advance of $500,000 Djibouti and artisanal enterprise, training. has been approved to finance primarily consultants services. ETHIOPIA Addis Ababa To be Addis Ababa Water Supply II - Further Project preparation Water & Sewer- deter- expansion of the water supply system underway. age Authority mined of Addis Ababa. (AAWSA) (IDA) Ministry of To be Livestock Development and Marketing - Preparation report to be Agriculture deter- A sector credit for further livestock revised on completion of mined development. Government-s comprehensive (IDA) review of livestock sector. Ministry of To be Urban Development I - Upgrading of Appraisal report under Public Works deter- existing settlements in Addis Ababa review. & Housing mined with basic services and house improve- (IDA) ment loans and development of new sites for self-help housing construction. Ethiopian To be Power III - Electric transmission and Preparation work Electric Light deter- possibly hydroelectric generation underway by EELPA, and Power mined facilities, to be assisted by Authority (IDA) Consultants. (EELPA) AIDB To be DFC IV - Provision of credit and tech- Appraisal report under deter- nical assistance to small-scale enter- preparation. mined prises, and assistance to the agri- (IDA) cultural and industrial sector, through the Agricultural and Industrial Devel- opment Bank for medium- to large-scale enterprises. Ethiopian To be Roads VIII - Second phase of Preparation underway in Transport deter- 1978/82 Road Sector Program. course of supervision of Construction mined Roads VII. (IDA) Ministry of To be Coffee Processing II and Marketing - Appraisal report under Coffee and Tea deter- Second phase of the ongoing coffee preparation. Development mined processing project. (IDA) See page 1 for footnotes. -4- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ETHIOPIA (Cont-d) Ethiopia To be Sugar - Establishment of new sugar Project preparation underway. Sugar deter- production complex at Finchaa, (Co-financing is being Corporation mined including infrastructure. sought.) (IDA) Ministry To be Agricultural Minimum Package Project Preparation work of deter- III - Support for expansion and underway. Agriculture mined intensification of integrated agri- (IDA) cultural services, including con- struction of rural roads, seed multiplication programs; provision of training facilities. KENYA Ministries of 25.0 Industry I - Soda Ash Project. Expan- Project preparation underway. Commerce and (Bank) sion of soda ash production and Industry/Kenya improved railway and port facilities. Port Authority Ministry of 40.0 (R) Population II - Support for family Appraisal report under preparation. Health (IDA) planning and rural integrated health (Co-financing being arranged.) programs. Estimated total project cost $70.0 million. Ministry of 25.0 Agricultural Credit IV - Institutional Approved by the Executive Agriculture (Bank) strengthening in areas of planning, Directors on May 19. and Agricul- 10.0 credit management and training; and tural Finance (IDA) line of credit to Agricultural Corporation Finance Corporation. Estimated total project cost $50.0 million. Ministry of Up to (R) Cotton Processing and Marketing - Negotiations tentatively Agriculture 30.0 Marketing, storage and processing scheduled for October. (IDA) of cotton. Total cost estimated at $45.1 million, of which $35.0 million in foreign exchange. Ministries of 35.0 Industry II - Leather Production Project being reassessed. Commerce and (Bank) Project. Processing of hides and Industry production of leather goods. Ministry of 20.0 (R) Urban Transport - Improvement of Further project processing Urban Develop- (Bank) public transport and pedestrian delayed pending the resolution ment and Housing 15.0 facilities, road maintenance, and of counterpart financing (IDA) strengthening of transport manage- issues. ment in Nairobi and Mombasa. Total project cost estimated at $48.3 million. Ministry of 24.0 (R) Urban (Small Towns) - Extension Project preparation underway. Urban Develop- (Bank) of urban development programs ment and Housing 15.0 to smaller towns. (IDA) (INDUSTRIAL 45.0 Fifth line of credit to IDB. Project under preparation. DEVELOPMENT (Bank) BANK) Ministry 35.0 (R) Forestry III - Maintenance and Appraisal report being of Environ- (Bank) rehabilitation of existing planta- prepared. (Co-financing ment and 16.0 tions, new industrial plantations, being explored.) Natural (IDA) fuelwood plantations, development Resources of sawmilling industry, and various studies. Total project cost esti- mated at $79 million. See page 1 for footnotes. 5 Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ KENYA (Cont'd) Ministry 4.0 (R) Petroleum Exploration Promotion: Appraisal report under preparation. of Energy (IDA) Would provide technical assistance in petroleum exploration and for legal consultants. Total project An IDA Project Preparation Facility cost estimated at $5.3 million. advance of $300,000 has been approved to finance geological/geophysical review of existing exploration data, and legal studies. A second advance of $700,000 will be requested to complete the work. Ministry of 50.0 (R) Grain Marketing and Storage. Project preparation delayed due to Agriculture (IDA) Components to be identified. ongoing discussions on grain pricing and marketing policy. (TANA RIVER 60.0 (R) Power IV (Kiambere): Civil work Project preparation underway. DEVELOPMENT (Bank) including powerhouse with two 70 (Co-financing being explored.) COMPANY) MW units and associated mechanical and electrical equipment. Total project cost estimated at about $300 million. Ministry Up to (R) Second Structural Adjustment Appraisal report being prepared. of Finance/ 130.0 Credit. Support for program Ministry of (Bank/ of economic measures agreed with Economics, IDA) the Government. Planning & Develop- ment Ministry 15.0 Cotton Production - Components Preparation dependent of Agri- (IDA) still to be identified. on progress of Cotton culture Processing/Marketing Project. Ministry 5.0 (R) Agriculture Technical Assistance: Appraisal mission tentatively of Agriculture (IDA) Technical assistance to the scheduled for October. agricultural sector to support structural adjustment program. Kenya Post and 50.0 (R) Telecommunications II: Telecommuni- Preappraisal mission in the Telecommunica- (Bank) cations Development. Total project field. tions Corporation cost estimated at $129.5 million. LESOTHO Ministries of About Highways IV - Continuation.of road Project identification Works, and 12.0 maintenance and rehabilitation underway. (Co-financing Transport and (IDA) begun under Third Road Project. expected to be needed.) Communications Possible assistance for construction of Oxbow-Mokhotlong road. Lesotho About (R) DFC III - Third line of Credit to Project to be defined. National 5.0 Lesotho National Development Corpora- Development (IDA) tion. Corporation Ministry of About Health/Nutrition - Components to be Project under identification. Health and 12.0 identified. Social Welfare (IDA) MADAGASCAR Ministries of About Fokonolona I (Rural Development) - Project under preparation by Rural Develop- 12.0 Medium and long-term credit to small Government, with assistance ment; Finance (IDA) farmers and artisans; rural develop- from RMEA. and Planning ment fund to finance village-level infrastructure, such as irrigation systems, feeder roads, collective storage facilities, and village water supply systems; training; and estab- lishment of central.project manage- ment unit. See page 1 for footnotes. -6- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ MADAGASCAR (Cont'd) Ministry 20.0 Forestry II - Follow-up on Forestry I; Approved by the Executive of Rural (IDA) planting of 18,000 ha over a 3-year Directors on June 16. (Co-financing Development period. Total cost is $30.2 million. agreed with BADEA and UNDP.) Ministry of About (R) Urban I - Upgrading of low income Consultants' study is nearing Finance and 20.0 neighborhoods in Antananarivo and completion; Bank is executing Plan, Industrial (IDA) Toamasina; employment and income agency for UNDP-financed study. Bank and Munici- generation; serviced sites for new pality of housing in Antananarivo; municipal Antananarivo assistance. Ministry of About (R) Second Village Livestock and Rural Appraisal report being reviewed. Rural Develop- 15.0 Development - Extension of veteri- (Co-financing with IFAD under ment (IDA) nary services to the whole Mahajunga discussion.) Faritany, including development of social and road infrastructure; pilot component of integrated mixed farming and cattle fattening. Total project cost estimated at $25.8 million. Ministries of About (R) Lac Alsotra II - Intensification Appraisal mission in the field. Rural Develop- 25.0 of cultivation in Lac Alaotra area ment; Finance (IDA) (mainly rice). Includes seed and Planning production, marketing, irrigation maintenance, extension, and assistance to SOMALAC. Ministry About (R) Middlewest Mixed Farming - Integrated Project being prepared. of Rural 20.0 mixed farming development. (Co-financing likely to be Development (IDA) required.) Ministry About Highways VI - Highway maintenance. Project being identified. of Public 25.0 (Co-financing likely to be Works (IDA) required.) Office Militaire About (R) Petroleum II - Further development Project being prepared. National pour 20.0 of the petroleum sector, including lee Industries (IDA) financing of a feasibility study Strategiques for heavy oil exploitation in (OMNIS) Tsimiroro. Total project cost to be determined. Ministry of About (R) Agricultural Institutions: Tech- Appraisal report being prepared. Rural 5.0 nical Assistance - Parastatal reform, Development (IDA) management studies, planning assistance, and research. Ministry About Petits Perimetres - Strengthening Project preparation of Rural 15.0 of national systems for operation underway. Development (IDA) and maintenance of efficient irrigation network and rehabilita- tion of selected networks. Bankin' NY About DFC II - Second line of credit to Project preparation underway. Indostria 15.0 Bankin' NY Indostria (BNI). (National (IDA) Industrial Development Bank (BNI)) Ministry of About Cotton - Smallholder cotton Project under preparation. Rural 10.0 development and ginnery Development (IDA) modernization. MALAWI Department of About (R) Water Supply II - Expansion of Project under preparation. Lands, Valuation 26.0 water supply facilities for City and Water; (Bank/ of Lilongwe. Office of IDA) the President and Cabinet See page 1 for footnotes. -7- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ MALAWI (Cont'd) Ministry of 7.3 (R) National Rural Development Program Negotiations substantially Agriculture (IDA) III - Third consolidation stage of completed. and Natural the Karonga/Chitipa Project. Resources (INVESTMENT About (R) DFC II - Assistance to the Investment Project preparation underway. AND DEVELOPMENT 5.0 and Development Bank of Malawi. BANK OF MALAWI (Bank) (INDEBANK)) Ministry of About Health - Components to be identified. Project preparation Health 14.0 underway. (IDA) Ministry About Structural Adjustment Loan II. To be defined following of 60.0 utilization of first loan and Finance (IDA) outcome of program. Ministry of About (R) National Rural Development Program Project preparation Agriculture 30.0 IV - Expansion of NRDP concept into underway. and Natural (IDA) new developing areas - Dedza Hills Resources and Lilongwe East. Ministry About Education V - Components to be Project identification of Education 30.0 identified. underway. (IDA) Ministry of About Highways V - Highway maintenance, Project preparation underway. Works and 46.0 including workshop equipment Supplies (Bank) and staff training; road construction. MAURITIUS Ministry About Road Maintenance and Rehabilitation - Project under preparation. of Public 10.0 Total project cost estimated at $15.4 (Cofinancing being explored.) Works (Bank) million. Ministry of To be (R) Education III - Post-primary tech- Project identification Education deter- nical schools and vocational underway. and Cultural mined education. Affairs (Bank) Central About (R) Water Supply - Rehabilitation Project preparation under- Water 15.0 and expansion of water supply way. (Co-financing: Kuwait Authority (Bank) systems. Total project cost still Fund agreed in principle; undetermined. being explored with CCCE.) Development To be (R) DBM VI - Sixth Line of Credit to Timing of operation will depend Bank of deter- Development Bank of Mauritius. on rate of commitment of DBM's Mauritius mined resources, including those under (DBM) (Bank) the Fifth Line of Credit. Irrigation To be (N) Northern Plains Irrigation - Project being prepared. Authority deter- Irrigation infrastructure for (Co-financing with AfDB agreed.) mined about 2,500 ha; provision of (Bank) agricultural services and inputs for about 1,200 small farmers growing sugar cane and foodcrops. RWANDA Ministry of About (R) Education II - Project to focus on Appraisal report being prepared. Education 10.0 quality improvement of occupationally- (IDA) oriented secondary education. Total project cost estimated at $11.8 million. Banque About Local Construction Industry - Assis- Project to be identified. Rwandaise de 10.0 tance in the promotion of the local Developpement (IDA) construction industry through technical assistance and credits for equipment. Total project cost undetermined. See page 1 for footnotes. -8- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable - ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ RWANDA (Cont'd) Ministry of About (R) Highways V - Construction of the Appraisal reporting being prepared. Public Works 18.0 Butare-Ntendezi road (123 km); (Co-financing with EEC agreed.) and Equipment (IDA) technical assistance preinvestment study. Total project cost estimated at $64.0 million. IDA Project Preparation Facility advance of $250,000 to help finance consultants services and updating of feasibility study. Ministry of About Water Supply - Rehabilitation, Project being prepared. Public Works 10.0 improvement and extension of rural and Equipment (IDA) aqueducts in the Gisenyi and IDA Project Preparation Ruhengeri Prefectures; construction Facility advance of $500,000 of sanitation facilities for Kigali; approved to finance consultants' and renovation and extension of water services during one year of supply systems in a few secondary preparation as well as the urban centers. Total project cost necessary local support staff to be estimated. and equipment. Banque 10.0 BRD III - Third line of Credit Project to be identified. Rwandaise de (IDA) to the Development Bank of Rwanda Developpement to finance industrial development. (BRD) Total project cost to be estimated. Ministry of About (R) Bugesera (Phase II) - Possible com- Post-appraisal mission scheduled Agriculture 15.0 ponents to include mixed crop and for end October. (IDA) livestock farming. Total project cost to be determined pending post- appraisal. Ministry of About (R) Technical Assistance - Provision Negotiations tentatively scheduled Planning 5.0 of technical assistance to for October. (Co-financing with UNDP (IDA) Ministry of Planning. Total agreed.) project cost to be determined. SEYCHELLES Ministry of About (R) Ports/Land Reclamation - Reclamation Project being prepared. Preappraisal Planning 6.0 of land, improvement of fishing and mission scheduled for mid-September. (Bank) commercial ports, and development of Bank Project Preparation Facility industrial site. Total project cost advance of $300,000 approved to estimated at $25.0 million. complete project preparation. (Co- financing being explored with Kuwait Fund, OPEC Fund, BADEA and AfDB.) SOMALIA Somali To be DFC II - Assistance to the Somali Project identification Development deter- Development Bank. underway. Bank mined (IDA) Government To be Roads IV - Strengthening of the Appraisal report being prepared. of Somalia deter- Algoi-Baidoa road; pilot road main- mined tenance program; training of Somali (IDA) engineers abroad. Mogadishu To be Mogadishu Water Supply - Extension Negotiations tentatively scheduled Water deter- of Mogadishu water supply facilities. for October. (Co-financing is being Authority mined sought.) (MWA) (IDA) Procurement: Retroactive financing of up to $100,000 will be recommended to cover the initial cost of consulting services for water resource investigations. See page 1 for footnotes. -9- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ SOMALIA (Cont'd) Government To be Fisheries - Support for small Project identification of Somalia deter- fisheries development, including underway. mined financing of infrastructure and (IDA) processing facilities; financial and technical assistance to artisans and fishermen. SUDAN Government To be Urban Water Supply - Expansion of Preparation underway by of Sudan deter- Water Scheme in Khartoum. Government and consultants. mined (IDA) Agricultural 18.0 Agriculture Services Project - Credit Negotiations substantially completed. Bank of Sudan (IDA) for small farmers and possibly agri- IDA Project Preparation Facility cultural machinery through Agricultural advance of $600,000 approved to Bank of Sudan. finance consultancy services, provision of vehicles, equipment and seed material. Ministry of To be Gezira Rehabilitation - Trials, studies Project preparation underway. Irrigation deter- and possibly some investments aimed and Gezira mined at improving Gezira production. Board (IDA) Government To be (R) Port Development II - Extension Appraisal report under of Sudan deter- of facilities at Port Sudan. review. IDA Project mined Preparation Facility advance (IDA) of $250,000 approved to finance consulting services for prepara- tion of tender documents. Government To be Sugar Rehabilitation - Credit Project identification of Sudan deter- would provide assistance for underway. mined rehabilitation of sugar industry (IDA) and would support policy changes in the subsector generally. Government To be Highways III - Construction of Project preparation of' Sudan deter- national and/or secondary/feeder underway. mined roads; improvement and maintenance (IDA) of secondary roads; technical assistance to the Southern Region Ministry of Communications, Transport and Roads (SRMCT9). Government To be (R) Petroleum - Petroleum development Appraisal mission scheduled for of Sudan deter- and distribution. October. IDA Project Prepara- mined tion Facility advance of (IDA) $100,000 approved to finance con- sultancy services for distribution study. Government 13.0 (R) Savanah Development Consolidation - Board presentation scheduled for I of Sudan (IDA) A pilot operation which would, over October. (Cofinancing with Saudi 3 years, provide 3 development Fund and ODA agreed.) centers, 4 settlement areas, 400 ha. of flood irrigation, a range program, veterinary services, and rehabilita- tion of water resources facilities. Government To be Railways V - Track rehabilitation, Project preparation under- ,of Sudan deter- signalling, locomotives and rolling way. mined stock. Maintenance facilities, (IDA) training and communication. See page 1 for footnotes. - 10 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ SUDAN (Cont'd) Government To be Program Credit - Industrial Program identification of Sudan deter- Rehabilitation. underway. mined (IDA) SWAZILAND Ministry of About (R) Low Veldt Development - Irrigation Project identification Agriculture 11.0 for crop production and, potentially, underway. (Bank) for ranch development. (NATIONAL About (R) DFC II - Line of credit for medium- Awaiting utilization of INDUSTRIAL 7.0 scale industrial enterprises. funds in first loan. DEVELOPMENT (Bank) CORPORATION) Ministry for About Urban I - To be identified. . Project identification Water, Power 12.0 underway. and Communi- (Bank) cations (SWAZILAND 10.0 (R) Power III - Construction of hydro- Loan signing scheduled for ELECTRICITY (Bank) generating facilities, provision of September. (Co-financing with BOARD) transmission and distribution facil- AfDB, CDC, EIB, and KfW.) ities, and ecological and tariff studies. Total project cost esti- mated at $62.0 million with foreign exchange component of $44.0 million. Ministry of About (R) Roads IV - Upgrading Ngwavuma River - Project content being discussed Works, Power 15.0 Luvumisa road; road regravelling with Government. and Communi- (Bank) and resealing; technical assistance cations to strengthen road maintenance, and feeder road study. TANZANIA Office of Prime 14.0 (R) Rural Development IV (Mara) - Inte- Board presentation scheduled Minister . (IDA) grated rural development in Mara . for December. IDA Project Region. Total project cost esti- Preparation Facility advance of mated at $17.5 million with $228,000 approved to finance foreign exchange component of improvements to existing infra- $13.4 million. structure and services in Mara region. Ministry of. 17.0 Water Supply II - Urban Water Supply Negotiations postponed due to delay Water, Energy (IDA) for Iringa and Moshi. Total project in establishment of the National Urban and Minerals cost estimated at $22.8 million, with Water Supply Authority. IDA Project foreign exchange component of about Preparation Facility advance of $17.0 million. $700,000 approved to finance engineering consultant costs to prepare preliminary and detailed design for the expansion of the water system in two towns (Iringa and Moshi). Ministry of 21.0 (R) Harbours I - Improvements to Dar-es- Appraisal mission scheduled for Communications (IDA) Salaam Port. Total project cost November. (Co-financing possibilities and Transport estimated at $75.0 million, with being explored.) foreign exchange component of about $50.0 million. See page 1 for footnotes. - 11 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and,Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ TANZANIA (Cont'd) (NATIONAL BANK 10.0 (R) Small Scale Industries Project - Post-appraisal mission in the OF COMMERCE (IDA) To provide a line of credit to field. (NBC)) NBC for onlending*to small-scale industry and to assist in the development of institutional IDA Project Preparation Facility capabilities. advance of $500,000 approved to finance consultant costs to prepare detailed projections, help NBC in organizing and establishing a special department, help Ministry of Industry to review overall development plans, and assist the Bank of Tanzania to set up a credit guarantee fund and to finance training. Ministry of 27.0 Telecommunications I - A three- Approved by the Executive Directors Communications (IDA) year program of expansion and on July 21. and Transport rehabilitation of telecommunica- tion facilities. Total project cost estimated at $47.0 million, with a foreign exchange component of $27.0 million. (TANGANYIKA 10.0 TDFL II - Second line of credit Negotiations postponed, pending DEVELOPMENT (IDA) to TDFL. Government-s review of invest- FINANCE CO., ment priorities. LTD.) (TDFL) Ministry of 15.0 (R) Dar-es-Salaam Sewerage - Rehabili- Appraisal report being prepared. Land, Housing, (IDA) tation of Dar-es-Salaam sewerage IDA Project Preparation Facility and Urban system. Total project cost esti- advance of $1.0 million approved to Development mated at $27.2 million, with a finance consultants for completion of foreign exchange component of preparatory work, feasibility $11.2 million. studies and detailed design. (TANZANIA 15.0 (R) TIB V - Fifth line of credit to TIB. Appraisal mission in the field. INVESTMENT (IDA) BANK) (TIB) (TANZANIA 13.0 Petroleum II - Specific description and Appraisal mission tentatively PETROLEUM (IDA) total project costs will depend upon scheduled for September. DEVELOPMENT outcome of drilling of two wells at (Co-financing being explored with CORPORATION) Songo-Songo field area. This project European Investment Bank and OPEC will be the second phase of Songo- Special Fund.) Songo Petroleum Exploration Project. Total project cost estimated at $17.0 million. Ministry 15.0 (R) Urban III - Squatter area upgrading, This project is no longer in the of Land, (IDA) surveyed plots infrastructure current lending program. Reporting Housing construction loans, assistance will be discontinued. and Urban to small business in Morogoro Development and technical assistance. Ministry 10.0 Forestry II - Second phase of the Appraisal report being prepared. of Natural (IDA) Sao Hill Forestry Project. Total Resources project cost estimated at $15.0 and million, with foreign exchange Tourism component of about $9.0 million. Shell 5.0 Shell Energy " First phase of Appraisal report being prepared. Tanzania (Bank) the on-shore program to be carried out by Shell (Tanzania) in about 72,575 sq. km. over 11 years. Total project cost estimated at $20.0 million. See page 1 for footnotes. - 12 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ TANZANIA (Cont'd) Ministry 10.0 -Technical Assistance III - Assis- Appraisal report being prepared. of Finaiice (IDA) tance to Government in implementing the Export Rehabilitation Program and in pieparingsmore wide-ranging economic adjustment measures. Ministry 20.0 Education VIII - Secondary education. Project being identified. of Education (IDA) Tanzania 20.0 (N) Power IV - Rehabilitation-of existing Appraisal mission scheduled Electric (IDA) diesel units and construction of a 75 for November. (Co-financing Supply Co. MW hydrostation on the existing Mtera possibilities being explored.) Limited dam with the necessary tunnel, trans- - (TANESCO) mission line and substations; Total project cost estimated at $295.7 million.- UGANDA Ministry 55.0 (R) Reconstruction Credit II. Combined identification/appraisal of Finance (IDA) mission in the field. Ministry of 35.0 (R) Roads III - Rehabilitation of trunk Project preparation underway. Works (IDA) road; re-equipping of maintenance- unit, technical assistance; some - upgrading, and construction of vital links under consideration. Total project cost estimated at $51.0 million. Ministry of 25.0 (R) DFC I - Credit for the rehabilitation Appraisal mission in the field. Industry (IDA) of industry. Ministry of -3.4 (R) Phosphate Engineering - Feasibility Combined President's/Appraisal Industry (IDA) and engineering studies preparation; report under preparation. audits of existing facilities; and a survey of possible additional deposits. Total project cost estimated at $3.8 million., Ministry of 40.0 Education III - Rehabilitation of the Project preparation underway. Education (IDA) school system and reconstruction of-' school infrastructure. Ministry of 30.0 (N) Export Crops Promotion - Program The reassessment of the Agri- Agriculture (IDA) credit type operation to help culture (Coffee) Project ascer- restore production- of export crops. tained that other donors are providing adequate assistanced to the Coffee Sector and identified the need for a broader based assistance to other export crops. Project preparation underway. ZAIRE Department 26.0 (R) Onatra Modernization - River trans- Board presentation scheduled of Trans- (IDA) port equipment, shipyard equipment; for October 6. (Co-financing -portation - railroad equipment; training. Total has been agreed with KfW-Germany, (ONATRA) project cost estimated at $84.0 ADB, and BADEA.) million. GECAMINES 50.0 (R) Gecamines II - Rehabilitation, main- Appraisal mission tentatively (IDA) tenance and expansion of existing scheduled for October. mining facilities. Societe 12.0 (R) Shaba Power System - Rehabilita- Negotiations scheduled for October. Nationale .(IDA) tion of power plants in Shaba. Total (Co-financing agreed with Belgium.) d-Electricite project cost estimated at. (SNEL) $32.0 million. IDA Project Preparation Facility advance of $500,000 will finance consultant services for work planning, document preparation, and bid evaluation. See page 1 for footnotes. - 13 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ZAIRE (Cont'd) Regie de pro- 15.0 (R) Water Supply II - Distribution to Negotiations scheduled for October. duction et (IDA) several cities. Total project distribution cost estimated at $26.3 million. d-eau et d'electricite (REGIDESO) Department of 40.0 (R) Highways V - Continuation of Highway Appraisal report being prepared. Transportation (IDA) Maintenance Program. Total project cost estimated at $180.2 million. Department 40.0 (R) Ports I (ONATRA) - Expansion of Preappraisal mission scheduled of Trans- (IDA) Matadi Kinshasa Ports; total for September/October. IDA Project portation project cost estimated at Preparation Facility advance (ONATRA) $120.0 million. of $1.0 million will finance consultancy services to begin preparation of design and tender documents, bid evaluation, and contract negotiation. Department About (R) Cotton II - Rehabilitation including Negotiations tentatively scheduled of 11.3 road rehabilitation; extension for October. Agriculture (IDA) services, spare parts, farm tools and social infrastructure. Total project cost estimated at $39.3 million. Department About (R) NE Zaire Ituri II - Improvement of Appraisal mission tentatively of Agriculture 10.0 productivity of farmers- livestock scheduled for October. (IDA) and agricultural holdings through provision of inputs and extension services. Total project cost estimated at $15.0 million. SOFIDE About (R) DFC VI - Sixth DFC credit to SOFIDE. Appraisal mission in the field. 10.0 Total project cost to be determined. (IDA) Department About Agricultural Technical Assistance - Appraisal report being prepared. of Agriculture 5.0 Technical assistance to strengthen (IDA) Ministry of Agriculture and Rural Development. Total project cost estimated at $5.8 million. ZAMBIA Ministry of About (R) Rural Water Supply - Provision and Appraisal report under prepara- Agriculture 15.0 extension of water supply in six tion. and Water .(IDA) rural districts and institution Development building. Total project cost estimated at $28.3 million. Ministry of 25.0 (R) Education V - Assistance for expansion Appraisal report under prepara- Education (Bank) and improvement of basic education; tion. (Co-financing with ADF and Culture maintenance program. Total project being explored.) cost estimated at $116.6 million. Ministry of 11.0 (R) Eastern Province Agricultural Awaiting authorization from Agriculture (Bank) Development - Expansion of agri- Government agencies for signing and Water cultural production in the Eastern loan. Development Province through strengthening extension and marketing services and providing farm inputs on credit. Total project cost estimated at $29.0 million. See page 1 for footnotes. -14- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ZAMBIA (Cont'd) Ministry of 19.0 (R) Southern Province Agricultural Negotiations scheduled for Agriculture (IDA) Development III - Expansion of agri- mid-September. and Water cultural production in the Southern Development Province through strengthening extension and marketing services, and providing farm inputs on credit. Total project cost estimated at $25.2 million. Ministry of About Forestry III - Expansion of the long- Project preparation underway. Lands and 15.0 term planting and maintenance program Natural (IDA) for industrial plantations. Resources Ministry of About (R) Fisheries - Improvement of fish Project preparation underway. Lands and 7.0 production systems and marketing Natural (IDA) channels. Resources Ministry of About (R) Copper - Rehabilitation of copper Appraisal mission scheduled for Mines 60.0 mining and processing facilities. end-September. (Co-financing (Bank) being explored.) Ministry of 7.5 (R) Dairy - Introduction of improved Negotiations scheduled for mid- Agriculture (IDA) production techniques and services September. and Water to increase milk production. Total Development project cost estimated at $11.7 million. Development 18.0 (R) DFC III - Financial Assistance to Appraisal mission in the field. Bank of (Bank) Development Bank of Zambia. Zambia ZIMBABWE Ministry of About Agriculture - Small farm credit: Project preparation underway. Agriculture 40.0 Credit to farmers in the higher (Bank/ potential areas. IDA) Ministry of About- Power I - To be identified. Appraisal scheduled for November. Industry 80.0 and Energy (Bank) Ministry About Highways I - Construction and Project identification underway. of Roads 30.0 improvement of state roads, and Road - (Bank/ feeder roads and training. Traffic IDA) Ministry About Intensive Rural Development Area Project preparation underway. of 10.0 Project I - Rural development project Agriculture (IDA) in former tribal trust lands. Ministry of About Program Loan - Provide foreign Appraisal tentatively scheduled Finance 45.0 exchange for underutilized for October. (Bank) capacity in manufacturing sector. Ministry of About DFC I. To be determined. Project identification underway. Industry 30.0 and Energy (Bank) Local About Urban I - To be determined. Project identification underway. Government 20.0 and Housing (Bank/ IDA) See page 1 for footnotes. - 15 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ II. WESTERN AFRICA BENIN Ministere de 14.0 Education II -.Construction and equip- Appraisal report being prepared. 1'Enseignement (IDA) ment of three teacher training IDA Project Preparation Facility Moyen General, colleges, construction of facilities advance of $400,000 approved Technique et and provision of technical assistance to prepare architectural studies Professionel for production and distribution of and bidding documents. (Co- teaching materials, and technical financing will be required.) assistance for project implementation. Total cost estimated at $24.8 million. Ministere de l' 5.0 Technical assistance for development Appraisal underway. An Industrie, des (IDA) of appropriate policies for petroleum advance of $500,000 under the Mines et de 1' exploration, assessment of enhance- IDA Project Preparation Facility Energie ment methods proposed for exploitation has been approved to finance of Seme oilfield, training and insti- consultants to (a) review geophysical tution building. and geological data, prepare a work program for oil exploration outside the Seme field and to formulate an exploration strategy; (b) prepare a training program for Beninese nationals. Ministere de 5.0 Cotonou Priority Works and Credit approved by the Executive l'Industrie, (IDA) Engineering Assistance Credit. Directors on June 25. des Mines et de Extension of water distribution 1Energie system, drainage and studies. Total cost estimated at $6.3 million. Governments 3.8 (R) Engineering design and preparation Negotiations completed. An of Benin (IDA) of tender documents for the regional advance of $400,000 each for and Togo Nangbeto hydroelectric project. Benin and Togo under the IDA Total cost $5.0 million, of which Project Preparation Facility has $4.7 million in foreign exchange. been approved to finance project preparation. (Co-financing has been arranged with FAC.) Procurement: Retroactive financing of $1.12 million to cover consulting services being proposed. CAMEROON Banque 15.0 Assistance to artisans and small-scale Approved by the Executive Camerounaise (Bank) enterprises, financing of medium-scale Directors on November 18. de Developpe- industrial projects and technical ment (BCD) assistance. Ministere 40.0 Urban Development Sites and Services Appraisal report being prepared. de 1-Urbanisme (IDA) in Yaounde and Douala; squatter set- (Co-financing considered with et de l' Habitat tlements upgrading in Douala. Switzerland.) (and possibly - others, to be determined) To be 32.0 Wood Processing Industries. Total Project preparation underway. determined (Bank) cost about $37.0 million plus $10.0 million for infrastructure. Ministere de 14.0 (R) Construction of Cameroonian portion Project processing in abeyance I'Equipement (IDA) of road between Moundou (Chad) and due to political situation in Guidjiba (Cameroon). Total cost Chad. Further reporting will $90.0 million (tentative). be discontinued. See page 1 for footnotes. - 16 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ CAMEROON (Cont-d) Ministere de 100.0 Roads V - Construction of one section Appraisal report being reviewed. l'Equipement (Bank) of a paved road between Donala and (Co-financing considered with Yaounde; preparation of transport plan. Abu Dhabi Fund, AfDB, BADEA, Total cost of overall. program esti- Canada, FED, France, Islamic mated at $390.0 million. Total cost Bank, Kuwait Fund, and of Bank-financed section estimated Netherlands.) at $272 million of which foreign exchange component $211 million. Ministere de 18.0 Forestry project - Pulpwood planta- Appraisal report being prepared. 1'Agriculture (Bank) tion to supply the Cellucaih pulp- (CDC has indicated desire to through Fonds -mill of Edea; pole and utility co-finance Edea plantation National Forestier timber plantations to supply the component.) et Piscicole - . Northern Province; fuel, and pole (FNFP) plantation for the Maga area. Total project cost estimated at $37.1 million. Ministere des 20.0 (R) Ports III - Extension of general Appraisal report being prepared. Transports, and (Bank) cargo facilities, with provision Pre-qualification of contractors Office National for banana handling and floating for civil works underway. du Port craft. Ministere de 10.0 Technical Cooperation II - To Approved by the Executive l'Economie et (IDA) increase absorptive capacity Directors on June 23. du Plan through cooperation in develop- ment planning, policies/programs for agriculture, energy, industry, social development,' and external debt management. Ministere des 7.5- (R) Technical Assistance - To - Negotiations substantially Postes et Tele- (Bank) - establish a commercially- completed. communications oriented postal and telecommunication I corporation; improve technical. training; and prepare .an investment program, including telecommunications projects for external financing. To be 50.0 Tree Crops - Bring to maturity Appraisal report being prepared. dter- (Bank) 9,000 ha. of rubber and 6,800 ha. mined of oil palms. Preparation of all the above areas for exploitation. Provision of additional processing facilities for CAMDEV's-rubber estates. Replanting of about 3,700 ha. of rubber and up to 700 ha. of oil palm on CAMDEV's estates. Provision for small-holders. Total project cost about $157.0 million. Ministere.de 40.0 Education IV - Qualitative improve- Preparation underway. 3'Education (Bank) ment of primary and secondary tech- nationale nical education through teacher training, curriculum development, textbook production, rehabilitation of workshops and laboratories, and establishing an equipment maintenance unit. Strengthening of educational planning and administration; improv- ing organizational and upgrading capacity of the General Inspectorate of the State. Total project cost about $60 million. CAPE VERDE Ministry of 5.0 Inter-island Shipping - Purchase of IDA Project Preparation Transport (IDA) replacements and additions to inter- Facility advance of island fleet, technical assistance $100,000 approved, to for nautical training school, con- finance the first stage sulting services and transport survey. of project preparation. See page 1 for footnotes. - 17 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ CAPE VERDE (Cont'd) Ministry 7.0 Port of Praia - Rehabilitation of the Appraisal awaiting preparation of (IDA) port, technical assistance. of bidding documents. IDA Transport Project Preparation Facility advance of $100,000 approved to finance consultant's services. (Co-financing by Portugal for engineering and construction. Additional co-financing will be required.) CENTRAL AFRICAN REPUBLIC Ministere de 18.0 (R) Highways IV - Road rehabilitation Appraisal report being prepared. 1'Equipement (IDA) program. Total project cost IDA Project Preparation estimated at $54.5 million, of Facility advance of $490,000 which $41.4 million in foreign approved. (Co-financiers' exchange. meeting planned for early October.) Ministere 15.0 Cotton Areas Integrated Rural Preparation underway. de l'Agriculture (IDA) Development - Rehabilitating and et de improving the production of cotton 1'Elevage and food crops; strengthening SOCADA, the proposed executing agency. Total project cost about $60.0 million. CHAD Ministers du 6.6 Power-Construction of a new power Genie Civil, (IDA) plant in N'Djamena and extension des Mines et de of distribution system. The power la Geologie/ plant will use residual fuel from STEE (Societe a refinery which is part of a pro- Tchadienne de posed development project. Total l'Energie et de cost estimated at $25.0 million. 1'Electricite) To be 2.0 Urban: Squatter settlement upgrading determined (IDA) and sites and services in NDjamena; assistance to small-scale enterprises in the informal sector; assistance to sanitation and maintenance services of the municipality of N'Djamena; technical assistance. Ministere 3.0 Construction of feeder roads. des Travaux (IDA) Publics, ) Project processing in des Mines ) abeyance due to political et de la ) situation. Further Geologie ) reporting will be discontinued. Ministere des 14.0 Construction of Chadian portion Travaux Publics (IDA) of road between Moundou (Chad) and Guidjiba (Cameroon). Total cost $90 million (tentative.) Ministere 9.0 Sategui-Deressia II - Flood irri- ) de l'Agri- (IDA) gation work, improved rice culture cultivation, technical assistance. Ministere de 14.4 Petroleum Development Project - Con- 1'Economie (IDA) struction of two oil wells, surface separation and storage facilities, a pipeline, refinery and associated engineering and technical assistance. Total cost about $61 million. See page 1 for footnotes. - 18 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ CONGO, PEOPLE-S REPUBLIC OF THE Ministere des 9.0 Third Highway Project - Road Main- Appraisal report being prepared. Travaux Publics (IDA) tenance including procurement of Report on preparatory studies, et de la equipment and spare parts, workshop by consultants under IDA Project Construction improvements, and technical assistance. Preparation Facility advance Total cost estimated at $16.0 of $125,000, has been completed. million, of which $12.0 million in foreign exchange. To be 6.0 (R) Forestry - Logging and processing Preappraisal mission in the determined (IDA) unit in the northern provinces near field. Feasibility study carried Ouesso, and technical assistance for out by consultants and financed sector institutions and policies. under IDA Project Preparation Facility advance of $250,000. Agence Trans- 17.0 (R) Rehabilitation and expansion of Board presentation scheduled for congolaise des (IDA) river transport services; equipment October 6. Communications and technical assistance to improve (ATC) waterways, services and administration. EQUATORIAL GUINEA Ministerio de 7.0 Technical assistance in the petro- Preparation underway. Industrias, (IDA) leum sector. Minas y Energia THE GAMBIA Ministry of 8.0 Agricultural Development Project - Appraisal delayed, pending reorganiza- Agriculture (IDA) Second phase of ongoing Rural Develop- tion of the credit system and and Natural ment Project (Credit 644) would strengthening of management under the Resources include: support for traditional First Rural Development Project. IDA farmers, including extension, input Project Preparation Facility advance of supply and marketing services on a $300,000 approved to finance detailed country-wide basis, the national architectural and engineering designs a seed multiplication scheme and preparation of tender documents for the research into irrigated and upland buildings. (Possible co-financiers: food crops, and possibly for live- ODA, IFAD, and USAID.) stock marketing and rehabilitation of small irrigation schemes. Ports Authority 5.5 (R) Second Banjul Port Project - Rehabil- Appraisal report being prepared. (IDA) itation of Banjul Port facilities; IDA Project Preparation construction of new berth, floating Facility advance of $300,000 craft and spare parts for existing approved to finance the com- cargo handling equipment, technical pletion of the feasibility assistance, and emergency rehabili- study and the preparation of tation works. engineering design and tender documents. Prequalification of contractors for civil works completed on August 20. (Possible co-financing with ADB, and Germany.) Ministry of 1.5 Energy - Technical assistance for Board presentation will be Economic (IDA) geophysical studies; planning; determined when the political Planning and assistance to power sector, and situation has been clarified. Industrial assistance for planning in the Development forestry sector. GHANA To be 20.0 Assistance to small-scale Identification/preparation determined (IDA) enterprises. underway. Ministry 15.0 Urban development including sites Project preparation financed by of Works (IDA) and services and upgrading in Accra an IDA Project Preparation & Housing, and selected cities as well as assis- Facility advance of $175,000 or a new tance to small business in project underway. agency areas. Total original cost estimated at $43.9 million, of which about $10.0 million was the foreign exchange component. Cost figures will be revised at reappraisal. See page 1 for footnotes. 19 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ GHANA (Cont-d) To be 30.0 (R) Cocoa III - Replanting and rehabil- Pre-feasibility studies expected determined (IDA) itation of existing cocoa areas; to be completed by end-October. technical assistance for training and institution building. Ghana Water 10.0 (R) Water Supply Technical Assistance Negotiations underway. and Sewerage (IDA) and Rehabilitation - Managerial, Corporation financial, operational assistance to (GWSC) Ghana Water and Sewerage Corporation - and rehabilitation of the water supply facilities in the Accra-Tema area; project preparation assistance. Total cost about $13.0 million, of which $10.0 million in foreign exchange. To be 30.0 Rehabilitation of wood industry, Project preparation completed. determined (IDA) forestry operations, forestry and Decision to appraise awaiting forest industries development Government policy decisions. planning study, strengthening of (Co-financing will be required.) institution. Ghana Highway 42.0 (R) Fourth Highway - Rehabilitation of Project preparation underway. Authority (IDA) bridges and main roads, extension of An advance of $1.0 million the road maintenance program, and from the IDA Project Pre- technical assistance. Total cost paration Facility has been estimated at $200 million, of approved to finance the which $110.0 million in foreign feasibility study. (Co- exchange. financing will be required.) To be 7.0 Petroleum Pre-development - Technical Project preparation, financed by determined (IDA) assistance, studies and surveys IDA Project Preparation Facility needed for petroleum exploration, advance of $340,000, underway. strengthening petroleum institutions and energy planning assistance. To be 7.0 Public Administration Technical President's Report being prepared. determined (IDA) Assistance to strengthen the Office Project preparation financed by of the Head of Civil Service; moni- an IDA Project Preparation toring and supervision of parastatals; Facility advance of $155,000. and retraining and redeployment of (Commonwealth Fund and UNDP staff. Total cost about $11.3 million have expressed interest in co- of which $8.9 million in foreign financing.) exchange. Ghana Oil Palm 15.0 (R) Oil Palm II - Consolidation and Appraisal report being prepared. Corporation (IDA) completion of activities undertaken (GOPC) under ongoing Oil Palm I project through continued provision of tech- nical assistance, management support, training and developmental operating costs. Extension of existing small outgrower planting program. Total cost about $37.9 million of which about $10.0 million in foreign exchange. Electric 20.0 (R) Fourth Power Distribution - Rehabili- Appraisal report being prepared. Corporation (IDA) tation of ECG-s distribution network, (Co-financing may be required.) of Ghana system maintenance, technical assis- (ECG) tance and training. Total project cost estimated at $26.0 million, of which $20.6 million in foreign exchange. To be To be (R) Export Rehabilitation Credit. Spare Project appraisal underway. deter- deter- parts and foreign input requirements of mined mined cocoa, forestry, gold mining sectors, (IDA) as well as commercial trucking fleet and technical assistance. See page 1 for footnotes. - 20 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ GUINEA Ministere 50.0 (R) Nimba Iron ore mining and beneficia- Feasibility studies being des Mines (Bank) tion with evacuation via existing reviewed. Technical sponsor et Geologie facilities in Liberia. identified. Ministry of 17.0 Industrial Rehabilitation - Appraisal report being prepared. Industry (IDA) Rehabilitation of selected public IDA Project Preparation and Credit sector industrial enterprises, Facility advance of $290,000 National promotion of privately-owned small- approved. (Co-financing with and medium-scale enterprises, OPEC Fund, CIDA and EEC identified.) technical assistance for industrial planning and to project institutions. Ministry of 10.0 Port of Conakry - Rehabilitation German-financed feasibility study Transport (IDA) of port facilities, provision of nearing completion. The Government cargo handling equipment, technical has agreed, in principle to assistance to improve port adminis- establish an autonomous port authority. tration and operations. Total cost Appraisal mission tentatively scheduled about $20.0 million. for November. (Co-financing of project by Federal Republic of Germany and AfDB anticipated.) Ministry 10.0 (R) Education II - Construction of Preparation underway. Appraisal of Higher (IDA) facilities and provision of equip- mission tentatively scheduled for Education, ment, technical assistance and early 1982. (Possible co-financing Ministry fellowships for 3 existing with AfDB.) of Pre- industrial vocational schools; 2 University primary teacher training colleges Education and the pedagogical institute; curriculum development and textbook production for primary education; strengthening of educational and manpower planning; equipment, technical assistance and fellowships for project implementation. Total cost estimated at $28.5 million. Ministry 15.0 Highways III - Rehabilitation and Feasibility study of Conakry-Mamou of Public (IDA) strengthening of Conakry-Mamou Road. Road being finalized. Other Works Periodic resealing and regravelling components being prepared. of trunk roads. Assistance to road transport and domestic construction industries. Study of a transport plan. Technical assistance to Ministry of Public Works. Total cost about $95.0 million. GUINEA-BISSAU Ministry of .14.0 Rehabilitation of Bissau Port; Appraisal mission deferred to Transport (IDA) technical assistance for port December to allow time for management and operations. May completion of soil borings include reconstruction of some required under feasibility study. riverine ports. Consultants, under IDA Project Preparation Facility advance of $800,000, to complete studies. (Co-financing with Kuwait Fund and BADEA envisaged.) IVORY COAST Regie 49.0 (R) Railways II - Realignment Petionara- Railway investment plan being Abidjan- (Bank) Tafire; track renewal in Ivory Coast discussed with Government and Niger and Upper Volta locomotive main- borrower. Appraisal processing (RAN) tenance facilities; railway equip- depends on co-donors' meeting ment, consulting services and scheduled for September. (Co- training. Total cost about $91.0 financing with CCCE and CIDA million. envisaged.) Ministere 51.0 (R) Urban Development II - Development Approved by the Executive des Travaux (Bank) of transport infrastructure and Directors on August 25. Publics et management in Abidjan; basic infra- des Transports structure in secondary cities and assistance to urban agencies. See page 1 for footnotes. - 21 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lander 2/ Project 3/ Procurement 4/ IVORY COAST (Cont'd) PETROCI 35.0 Petroleum development. Appraisal report being prepared. (Patrols de (Bank) la Cote d'Ivoire) Ministers des 40.0 (R) Improvement of water supply and Appraisal report being reviewed. Travaux Publics (Bank) sanitation in Abidjan and other et des urban centers. Transports Ministere de 15.0 (R) Centre-West Rural Development - Appraisal report being prepared. 1'Agriculture, (Bank) Strengthening regional development (Co-financing with CCCE SATMACI agency; development of smallholder envisaged.) crops; co-operatives; applied research; staff retraining. Total cost $55.1 million. Government of 50.0 Soubre Hydroelectric Project. Con- Appraisal mission tentatively Ivory Coast (Bank) struction of dam on Sassandra River; scheduled for November. and Energie powerhouse, civil works, equipment, Second co-donor's meeting Electrique de resettlement and engineering. 328 MW scheduled for October. (Co- la Cote d'Ivoire capacity to meet growing demands in financing will be required.) Ivory Coast. Total cost in 1980 prices estimated at $540.0 million. LIBERIA Ministry of 6.0 (R) Education IV - Ministry of Education Project preparation underway Education, (Bank) institutional development; develop- financed by an IDA Project National Youth 4.0 ment and purchase of textbooks; in- Preparation Facility advance and Sports (IDA) service teacher training; primary of $500,000. Appraisal scheduled Commission, school development; establishment for first quarter of 1982. (Co- and University of commercial training center; financing will be required.) of Liberia university staff development. Total cost estimated at $24.0 million, of which $14.0 million in foreign exchange. To be 15.0 (R) Rural Development I - Technical and Project scope being reviewed. determined (Bank) financial support for rural develop- ment institutions, development of smallholder production, and rural infrastructures in three south- eastern counties. Ministry 15.0 (R) Highways V - Road maintenance; Project preparation.in progress. of Public (Bank) technical assistance and fellowships Draft report on road maintenance Works to Ministry of Public Works. study completed by Government, assisted by Consultants. (Co- financing will be needed.) Monrovia 10.0 (R) Urban development including Negotiations. substantially completed. City (IDA) upgrading, assistance in land and Consultants' services, equipment Corporation ownership registry and institu- and training being financed by tional development. Total cost an advance of $450,000 under estimated at $13.3 million, including Bank Project Preparation foreign exchange costs of $6.7 mil- Facility. lion. Ministry of 15.0 (R) Agricultural Development (LOFA) II - Appraisal report being prepared. Agriculture (Bank) Expansion of existing project (Co-financing will be required.) activities in LOFA county and into new areas of the county. It will strengthen agricultural services and develop swamp rice, upland rice, cocoa and coffee, and provide feeder roads and wells. Total cost estimated at $33.0 million of which $14.0 million in foreign exchange. See page 1 for footnotes. -22- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ LIBERIA (Cont-d) Ministry of 18.0 (R) National Iron Ore Company (NIOC) - Negotiations underway. Prepara- Lands and (Bank) Rehabilitation of mining equipment, tion financed by Bank Project Mines, and construction of ore surge facility; Preparation Facility advance of National improvements in concentrator; repair $1.Omillion. (ADB, OPEC Fund and Iron Ore of railroad and railways bridge; Netherlands, FMO considering co- Company financial restructuring of company. financing; additional co-financing (NIOC) Total cost estimated at $51.1 mil- needed.) lion, of which $45.4 million in foreign exchange costs. Procurement: Retroactive financing may be recommended. MALI Office de 6.5 Technical Assistance to ODIPAC Approved by the Executive Directors Developpement (IDA) aimed at: increasing the effi- on July 28. Financing to help Integre de ciency of agricultural production in preparation was provided for la Production through the retraining of extension by an advance of $50,000 under d-Arachides staff, improving seed production, IDA Project Preparation et de distribution and storage, and Facility. (Co-financing with Cereales overhauling the credit and market- FAC.) (ODIPAC) ing system; promoting the estab- lishment of self-managed farmers- organizations able to take over village development activities; testing diversification programs to reduce the areams dependence on groundnuts as an export crop. Total cost $11.4 million of which $6.6 million in foreign exchange. Office des 11.0 Second Telecommunications Project - Appraisal report being reviewed. Postes et (IDA) Completion of Mali main .transmis- IDA Project Preparation Telecommuni- sions route, including the micro- Facility advance of $310,000 cations du Mali wave section Segou-San Sevare and approved for consulting the Apur VHF links Sevare-Mopti, services for detailed Sevare-Bandiara-Sanga and Segou- design of local networks, Dioro; supply and installation of updating bidding documents; 1,400 lines of switching equipment provide financial expertise in four towns, including construction to Office des Postes et of telephone exchange buildings; Telecommunications du Mali. rehabilitation and extension of local Consultants studies underway. networks; engineering consultants for (Co-financing with CCCE/FAC detailed engineering of network envisaged.) extensions, preparation of bidding documents, and assistance in organizing maintenance programs; consultants to study organization of postal and financial services and establishment of training programs. Total cost estimated at $25.3 million of which $18.3 million in foreign exchange. Office du 5.0 (R) Gasohol Production of ethyl Appraisal mission tentatively scheduled Niger (IDA) alcohol from surplus molasses, for end-September. Studies on modification of existing feasibility of introducing gasohol distillation facilities and financed by IDA Project Preparation provision of infrastructure to Facility advance of $50,000, have handle and store ethyl alcohol for been completed. eventual blending with gasoline. Energie du 24.0 (R) Power/Water - First phase of two- Negotiations tentatively scheduled for Mali (EdM) (IDA) stage program to extend power October. Project prepared with distribution; rehabilitate utility; advance of $970,000 from IDA Project promote. fuel savings through intro- Preparation Facility. (Co-financing duction of biomass fuels and initiate with OPEC and CCCE/FAC.) preliminary reforms in the water sector. Total cost estimated at $43.2 million of which $41.2 million is foreign exchange. See page 1 for footnotes. - 23 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ HALI (Cont'd) Ministere 12.0 Rural water supply in the Western IDA Project Preparation Facility du (IDA) Region - Project to be executed advance of $440,000 approved; Developpement in parallel with IDA Health selection of consultants for Industriel Project. preparation of studies completed. To be 17.7 (R) Mali Sud II - (i) extension of - Appraisal mission scheduled deter- (IDA) production of cotton, maize and for September. (Co-financing mined rice; (ii) development of livestock will be required.) and (iii) strengthening of public health services. MAURITANIA Ministere de 3.5 Fourth Highway Project - Road Negotiations tentatively scheduled 1'Equipement (IDA) maintenance study, preinvestment for October. (Kuwait Fund is financing studies for pavement strengthening, $5.1 million and Arab Fund for Economic completion of unpaved roads started Development $4.4 million.) under Third Highway Project. Total cost estimated at $13.0 million, of which $10.4 million in foreign exchange. Ministry of 3.0 (R) Petroleum exploration promotion Approved by the Executive Directors Energy and (IDA) project. on August 25. Project prepared with Mines advance of $800,000 from IDA Project Preparation Facility. Ministere 5.4 Education II - Strengthening of Appraisal report being prepared. de ''Education (IDA) educational planning and administra- An IDA Project Preparation Facility Nationale tion, training of lower secondary advance of $400,000 has been Ministere school teachers, and vocational approved for: professional fees de 1'Emploi training for the Fisheries and for architectural design work of et de la Industrial Sectors. Total cost project-financed buildings; Formation about $16.7 million, specialists services for project des Cadres; management and start-up of project Ministere de la institutions; scholarships for the Peche et de training of local instructors. 1'Economie (Co-financing with AfDB and EEC.) Maritime To be 2.0 (R) Technical Assistance to the Rural Appraisal mission tentatively deter- (IDA) Sector. scheduled for November. mined Ministry of 3.0 (R) Second Technical Assistance Appraisal report being prepared. Economy and (IDA) Project for Planning. Finance NIGER Ministere 32.0 (R) Highways IV - Strengthening and All preparatory studies underway. des Travaux (IDA) resealing of bitumen roads, road Appraisal mission scheduled Publics construction, training of road for end-September. maintenance personnel. Total cost estimated at $50.0,million. Ministere 7.0 Technical assistance for project Post-appraisal mission scheduled du Plan (IDA) preparation and to strengthen for early September. planning, monitoring, and evalua- tion capabilities of Ministry of Plan and technical ministries. Total project cost estimated at $8.0 million, of which $6.9 million in foreign exchange. Banque de 12.0 (R) Employment Creation II - A follow-up Appraisal report being Developpement (IDA) project consisting of a line of credit prepared. de la Republique to BDRN, technical assistance to du Niger (BDRN)/ OPEN, and development of leather Office de Promotion crafts. de 1'Entreprise Nigerienne (OPEN) See page 1 for footnotes. -24- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ NIGER (Cont'd) Ministere de 11.0 Forestry II -.Establishment and Appraisal report being prepared. Developpement (IDA) management of state-managed and (Cd-financing with FAC and Rural rural forestry plantations; CCCE.) management of rural forests; soil conservation program; institution building; establishment and monitoring of rural mini-nurseries. Total project cost estimated at $18.3 million, of which $10.6 million in foreign exchange. Ministere de 28.5 (N) Irrigation Rehabilitation Project - Financing to help preparation Developpement (IDA) To rehabilitate existing irrigation was provided for by an advance Rural works;, procure equipment for main- of $900,000 from the IDA. tenance and operation of irrigation Project Preparation Facility. works; supply agricultural inputs; train project staff, cooperative managers and farmers. NIGERIA Federal 145.0 Kaduna State Agricultural Develop- Appraisal report under review. Ministry of (Bank) ment would include.a statewide Further processing awaiting decision Agriculture package of basic agricultural of State Government concerning- services to farmers, and a feeder project organization and implemen- road and rural water program. tation. Total cost estimated at $375.0 million. Federal 117.0 (R) Cocoa Project III - Four state- Appraisal report under review. Ministry of (Bank) wide smallholder cocoa projects. Further processing awaits State Agriculture Main components would be new Governments' decision concerning planting and replanting of cocoa, details of credit and financing. rehabilitation of existing cocoa; pest and disease control, feeder roads, strengthening of cocoa developnent units and staff and farmer training. Total cost esti- mated at $544.0 million, of which $41.0 million in foreign exchange. Federal 41.0 Small and medium-scale enterprise: Appraisal report being Ministry (Bank) pilot project. Total cost estimated prepared. of Industries at $72.7 million. Federal 34.0 Cross River State Oil Palm - Expansion Completion of appraisal report Ministry of (Bank) and diversification of Cross River deferred, pending further Agriculture Estates into oil palm production. soil survey. Total cost estimated at $75.2 million. Federal 100.0 Fertilizer project - Nitrogen , Government is negotiating with Ministry of (Bank) complex at Onne. - prospective foreign equity and Industries technical partner. Federal 132.0 (R) Bauchi State Agricultural Develop- Loan signing on September 2. Ministry of (Bank) ment project - Extension of Gombe Agriculture Agricultural Development Project (Loan 1164) - directed to increase food production - would include a package of basic agricultural ser- vices to statewide farmers, and a major feeder road and rural water program. Total cost estimated at $350.0 million, of which $151.0 million in foreign exchange. See page 1 for footnotes. - 25 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ NIGERIA (Cont'd) National 100.0 Power VI (Distribution) - Power trans- Board presentation tentatively Electric (Bank) mission and distribution facilities scheduled for October 27. (Co-financing Power for 23 cities and interconnection of will be requ:'red.) Authority Lagos thermal plant. Total cost esti- mated at $227.0 million, of which $150.5 million in foreign exchange. Anambra 67.0 Anambra Water Supply and Sanitation - Loan approved by the Executive State Water (Bank) Expansion and improvement of water Directors on July 7. Bank Project Corporation supply and sanitation facilities in Preparation Facility advance of $415,000 Onitsha, provision of health and urban approved for consultants- services. development facilities, and strengthen- ing of implementing agency. Total cost Procurement: Retroactive financing estimated at $120.0 million, of which of up to $0.9 million to cover $67.0 million in foreign exchange. detailed design work and recruitment of operational experts. Federal 142.0 (R) Kano State Agricultural Develop- Loan signing on September 2. Ministry of (Bank) ment - provision of a package of Agriculture agricultural services to statewide farmers, and a major feeder road and rural water program. Total cost estimated at $482.0 million, of which - $217.0 million in foreign exchange. Federal 147.0 Sokoto Agricultural Develop- Board presentation tentatively scheduled Ministry of (Bank) ment - Extension of Gusau Agricul- for October 20. Agriculture tural Development Project (Ln. 1099), including statewide rural water Procurement: Retroactive financing and training programs and of up to $1.0 million proposed to improvement of agricultural cover hiring of key staff and other service centers. Total cost project initiation costs. estimated at $499.0 million, of which $221.0 million in foreign exchange. Federal 37.0 Second Urban Development - Imo Board presentation tentatively scheduled Ministry (Bank) State. Total cost estimated at for November. of Housing $87.4 million, of which $27.0 million in foreign exchange. Procurement: Retroactive financing of $2 million proposed to cover project start-up costs from September 1, 1980. Kano State 115.0 Kano State Water Supply IV - Expansion Appraisal report being prepared. Water (Bank) of water supply facilities in Greater Resources Kano. Provision and/or expansion of - Engineering water supplies in several semi-urban and Con- centers. Total cost estimated at struction. $210.0 million, of which $115.0 Agency million in foreign exchange. Federal 70.0 (R) Third Urban Development - Ogun State, Consultants being selected Ministry (Bank) Ondo State and Benue State. to undertake feasibility study. of Housing Federal 35.0 Mambilla (formerly Sardauna) Agri- Appraisal report being prepared. Ministry (Bank) cultural Development - To develop of Agri- seasonal and permanent crops, live- culture stock and forestry by smallholders in a high-potential highland area through farmer services, general infrastructure and land reform. Total cost estimated at $80.0 million. Federal 47.0 (R) Agricultural Technical Assistance. Loan signing on September 2. Ministry of (Bank) To support the food production plan Agriculture for the period 1981-85. Total cost' estimated at $115.0 million, of which $47.0 million in foreign exchange. See page 1 for footnotes. - 26 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ NIGERIA (Cont'd) Federal 120.0 Imo State Agriculture Development - Preparation report being Ministry (Bank) This statewide project would reviewed by Government. of strengthen the existing Ministry Agriculture of Agriculture and Natural Resources to provide technical advice and support to farmers throughout the State. Total cost estimated at $200.0 million. Federal 136.0 Borno State Agricultural Develop- Preparation report being Ministry (Bank) ment - This statewide project reviewed by Government. of would strengthen the existing Agriculture Ministry of Agriculture and Natural Resources to provide technical advice and support to farmers throughout the State. Total cost estimated at $400.0 million. Borno State 100.0 Borno State Water Supply - Improve- Feasibility report being pre- Water Board (Bank) ment and expansion of water supply prepared by Water Board, facilities in Maiduguri and other assisted by Consultants. centers. Ministry of 50.0 Gari Irrigation - To strengthen Project preparation underway. Agriculture and (Bank) the existing Gari dam in Kano Water Resources- State and provide supplementary Kano State irrigation infrastructure and other support services for irrigated agriculture. Federal 60.0 (R) Sokoto Health - Construction and Consultants being selected to Ministry of (Bank) equipping of about 75 rural health complete project preparation. Health and clinics, technical assistance in Sokoto State training for staff development, Ministry of childhood immunization program, Health project monitoring, and institu- tional improvement of the Sokoto Ministry of Health. Project also includes strengthening institutional capacity of the Federal Ministry of Health. SAO TOME & PRINCIPE Ministry of 4.0 (R) First Power/Water - 4 MW diesel- Appraisal report being prepared. Energy and (IDA) electric power plant; reinforcement Project is being prepared by Fisheries of distribution system; supply of consultants financed by IDA transport and communications equip- Project Preparation Facility ment; technical assistance and train- advance of $350,000. (Co- ing; rehabilitation and extension financing will be required.) of water supply facilities and water supply master plan. Total Procurement: Retroactive cost estimated at $11.9 million. financing of $0.6 million to cover hiring of key staff, as well as urgent purchase of spares, materials, etc. to be proposed. SENEGAL Secretariat 19.5 (R) Agricultural Research - Program of Board presentation on September 8. d'Etat a la (IDA) works and technical assistance to IDA Project Preparation Recherche improve the national agricultural Facility advance of $1 million Scientifique research system and to strengthen approved to finance consulting et Techniques the generation and transfer of services and eventual detailed agricultural technology. Total engineering studies. (Co-financing cost estimated at $106.1 million. with French Ministere de la Co- operation, USAID and UN technical agencies.) See page 1 for footnotes. - 27 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ SENEGAL (Cont-d) Office des 20.0 Telecommunications II - Extension of Preparation underway. Postes et (Bank) Dakar telephone exchanges; extension of des Telecom- transmission network to the South and munications East of country; technical assistance. Government 15.0 Primary Health Care Project - Preparation underway. IDA Project of Senegal (IDA) including components for institution Preparation Facility advance of building, drug supplies, intermediate $95,000 approved to finance con- health facilities and information, sulting services for detailed and education programs. Total project preparation. estimated cost $20.5 million. To be 12.5 Dome Flore Appraisal Drilling--Seismic Project preparation including deter- (IDA) tests and drilling to appraise light seismic work underway financed mined oil deposit and collect heavy oil by a $1,000,000 Bank Project samples; geological work; engineering Preparation Facility advance. study to develop light/heavy oil (Commercial drilling partner and fields; and technical assistance to cofinancers will be sought.) the Department of Mines. Preliminary project costs $17.0 million. Societe 19.3 To provide motive power, rolling Approved by the Executive d-Exploitation (Bank) stock, workshop and track works for Directors on June 23. Ferroviaire the railway subsidiary of ICS to move des ICS (Indus- all raw materials and products of tries Chimiques the ICS fertilizer complex. du Senegal) To be 24.0 (R) Irrigation IV - Rehabilitation of Appraisal mission tentatively deter- (Bank) 5,870 ha of irrigation perimeters scheduled for November. mined 10.0 in the Senegal River delta; elec- (IDA) trification of pumping stations at Rong Thiager and Boundoum; con- struction of a power line. Estimated total cost $63 million. SIERRA LEONE Ministry 10.0 Highways II - Three-year maintenance Approved by the Executive Directors of Works (IDA) program, including procurement of on April 7. (OPEC Fund and ADF equipment, spare parts and tools; providing co-financing of $7.0 million staff training and technical and $8.2 million respectively.) assistance. Total cost estimated at $29.0 million of which $21.4 million in foreign exchange. To be 40.0 (R) Power (Hydro) IV - Development of Detailed engineering underway. determined (IDA) Bumbuna hydro plant on Seli river. (Co-financing would be required. Total project cost estimated at Co-financing meeting tentatively $287.0 million, of which $235.0 scheduled for end-October.) million in foreign exchange. (NATIONAL Up to (R) Industrial Finance Company - To Institutional issues being discussed DEVELOPMENT 5.0 provide a line of credit for small with Government. BANK (NDB)) (IDA) and medium enterprise development. Ministry of 10.0 (R) Agricultural Services - Technical Preparation underway, financed in part Agriculture and (IDA) assistance to reorganize and under IDA Technical Assistance Project. Forestry strengthen Ministry-s ability to deliver services to farmers; establishment of national rural credit program. Ministry of 10.0 Education III - Primary school Preparation is progressing satis- Education (IDA) construction, primary teacher factorily and appraisal is tentatively training and upgrading, education scheduled for late 1981. materials and textbooks production, - . and goods and services for institu- tional improvements in education sector. See page 1 for footnotes. - 28 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ TOGO Ministere des 20.0 (R) Highways IV - Road strengthening, Approved by the Executive Directors Mines et des (IDA) road maintenance equipment; train- on May 7. ($7.4 million loan from Travaux ing; pre-investment studies. Total OPEC Fund signed on July 25.) Publics cost estimated at $31.2 million including $25.2 million in foreign exchange. Office 5.7 Studies and basic engineering for Approved by the Executive Directors Togolais (IDA) phosphoric acid plant producing on June 23. IDA Project Preparation des 1,000 t/day. Facility advance of $700,000 approved Phosphates to finance preliminary rock tests. Governments 3.8 (R) Engineering design and preparation Negotiations completed. An of Benin (IDA) of tender documents for the regional advance of $400,000 each for Benin and Togo Nangbeto hydroelectric project. Total and Togo under the IDA Project Pre- project cost $5.0 million, of which paration Facility has been approved $4.7 million in foreign exchange. to finance project preparation. (Co-financing has been arranged with FAC.) Procurement: Retroactive financing of $1.12 million to cover studies required for consulting services to be proposed. Ministers 30.0 Rural Development II - Development Project preparation by RMWA du Developpement (IDA) of cotton and food crops production is underway. Appraisal tentatively Rural by following up on the activities scheduled for November/December. of the cotton project (Cr. 741), and, possibly, including viable elements of the Maritime project (Cr. 638). The project will include institution strengthening, provision of farm inputs and extension services, seed production, animal traction and infrastructure. Total cost about $40.0 million. UPPER VOLTA Ministers du 10.0 Koudougou Pilot - Experimental program Appraisal mission scheduled Developpement (IDA) to improve production techniques and for September. Rural farming systems. Regie Abidjan- 8.1 (R) Railways II - IDA funds would help Appraisal processing depends on Niger (IDA) finance Upper Volta's share of RAN co-donors' meeting expected by (RAN) railway project. Total project end 1981. (Co-financing with cost estimated at $105.0 million of CCCE and CIDA envisaged.) which $73.1 million in foreign exchange. Ministere 46.0 Highways IV - Four year phase Approved by the Executive Directors des Travaux (IDA) (FY82-85) of maintenance operations; on June 16. (Co-financing agreed Publics feeder roads construction and improve- with the Netherlands.) ments. Total cost estimated at $56.7 million, of which $45.0 million in foreign exchange. Ministere du 15.0 (R) Rural Development Fund III - Invest- Appraisal report being reviewed. Developpement (IDA) ments in small scale rural projects (Co-financing with the Netherlands Rural such as bottomland development, small and BOAD.) irrigation projects, erosion controls, open and tubewells, medium term credit for oxen, agricultural equipment and unidentified projects. Total project cost estimated at $28.9 million. Ministere du 15.0 West Volta II - Continuation of rural Appraial mission tentatively Developpement (IDA) development in the ORDs of Bobo scheduled for October. Pre- Rural Dioulasso and Dedougou, including appraisal report being prepared. continued development of extension (Co-financing will be required.) services, expansion of cotton and food crops, support to village groups and expansion of ginnery capacity. See page 1 for footnotes. - 29 - Member Country, and Borrower or Amount & Stage of Process- Implementing, Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ UPPER VOLTA (Cont'd) Ministere 20.0 Kompienga multipurpose (hydro-power, Appraisal tentatively scheduled des Travaux (IDA) fishing, irrigation) project.. Total for early 1982. (Co-financing Publics cost estimated at $100.0 million. will be required.) Ministere 16.0 Telecom III - Expansion and upgrading Appraisal report being reviewed. des Postes (IDA) of telephone and telex facilities (Co-financing with France et Telecom- and increase penetration into rural envisaged.) munications areas. Total cost estimated at $44.0 million, of which $31.0 million in foreign exchange. Ministere de 2.0 (R) Technical Assistance - Establishment Pre-appraisal completed. lEconomie et (IDA) of Development Investment Budget du Plan to strengthen investment budgeting and inonitoring development expenditures. Total project cost estimated at $6.0 million. See,page 1 for footnotes. - 30 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ III. EAST ASIA AND PACIFIC CHINA Ministry 100.0 University Development Project - Approved by the Executive of (Bank) Technical assistance and equipment Directors on June 23. Education 100.0 to help improve the quality of (IDA) education and research in science and engineering. The project would also assist in strengthening the university management systems and preparing future education investments. -Ministry To be Agriculture Project. - Provision Appraisal mission schediled of Agri- . deter-. of irrigation and drainage for September. culture mined facilities for approximately 200,000 ha of farm land. Project focuses on problems of soil salinity and provides agricultural support services. Ministry To be (R) Ports Project - Modernization of Appraisal report being prepared. of Com- deter- existing ports and provision of munications mined modern facilities to meet short- term requirements of increasing container traffic. INDONESIA. Ministry of 60.0 Small Towns Water Supply - Project preparation by Public Works (Bank) Assistance for urban and rural . Government and consultants water systems in East Java. underway. Ministry of 100.0 (R) Marine Transport III (Shipping and Project being prepared by Communications (Bank) Ports) - To develop selected ports, the Government. (Co-financing improve shipping, and possibly develop is envisaged.) dredging capability. Ministry of 75.0 (R) Transmigration III - Development of Appraisal mission scheduled Manpower and (Bank) transmigration schemes in East for September. Transmigration Kalimantan. Ministry of 90.0 (R) Transmigration IV - Development of Project deferred to.FY86. Manpower and (Bank) transmigration schemes. - Reporting will be discontinued. Transmigration Ministry of 75.0 Watershed Development I - Integrated Project Preparation Facility Agriculture (Bank) program of reforestation, soil advance of $463,000 approved conservation, and related develop- to finance consultants and - ment in Java. mapping services to advance the preparation of this project. Ministry 65.0 North Sumatra Transport - To, Project being prepared by of Com- (Bank) develop transport system for Government and consultants. munications estates, and, for other regional (Co-financing is envisaged.) goods and passenger traffic. P.N. Batubara 175.0 (R) Bukit Asam Coal Mining and Trans- Appraisal report being reviewed. and Directorate (Bank) port - Rehabilitation and expansion (Cd-financing is envisaged.) of States of Bukit Asam coal mine and the Railways necessary infrastructural (PJKA) improvements. The output of . the mine would be transported for use at Suralaya Power Plant. Total project cost is estimated at $1 billion. See page 1 for footnotes. 13 - 31 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ INDONESIA (Cont'd) Ministry of 22.0 (R) Education X - Textbooks and Negotiations scheduled for mid- Education (Bank) instructional material development. October. and Culture Ministry of 60.0 Education XI - Second phase Appraisal report being Education (Bank) of teacher training program. prepared. and Culture Ministry of 15.0 (R) Seeds II - Second phase of seed Board presentation scheduled Agriculture (Bank) industry development covering for late October. nine provinces. Bank 80.0 (R) Industrial Finance I - Provision Further preparation of project Indonesia (Bank) of industrial financing to relevant pending discussion with the DFCs. Government. Ministries of 65.0 (R) Rural Roads - Programs to improve Appraisal report being reviewed. Home Affairs (Bank) rural road operations, including and Public new construction, betterment, and Works maintenance in about 25 selected districts. Ministry of 85.0 (R) Jakarta/Cikampek Highway - Con- Board presentation on September 8. Public Works (Bank) struction of toll road and improve- (Co-financing from Kuwait Fund ment of existing road between these for Arab Economic Development.) two cities. Ministry of 100.0 (R) Central Java - Pulp and Paper - A pulp Project preparation underway. Industry (Bank) and paper complex in Central Java. (Co-financing is envisaged.) It will include a pulp and paper plant and mechanical wood industries. Ministry 75.0 Education XII - Construction Industry Project preparation underway. of Public (Bank) Manpower Development Project. Works Ministry of 159.0 (R) Nucleus Estates VI - Assistance to Appraisal mission in the field. Agriculture (Bank) smallholders through nucleus estates. (Co-financing envisaged.) Ministry of 70.0 Jakarta Sewerage I - Improvement of Project being prepared with Public Works (Bank) Jakarta sewerage system. the help of consultants. Ministry of 40.0 Urban V - Urban services and infra- Project being prepared Public Works (Bank) structure improvement in East Java by the Government. cities. Ministry of 170.0 (R) Power XI - Transmission and dis- Negotiations scheduled for mid- Mining and (Bank) tribution networks in Java from September. (Co-financing envisaged.) Energy 1982-86. Estimated cost $1.1 billion. Ministry of 50.0 Forestry - Industrial forest planta- Project preparation underway. Agriculture (Bank) tions; strengthening of forestry sector institutions, and National Forest Land and Timber Inventory. Ministry of 80.0 Irrigation XVI - Primary and Appraisal report being prepared. Public Works (Bank) secondary canals, and sector components on tertiary canals; operation and maintenance and general institution building. Ministry 10.0 Energy - Engineering loan to Project identification underway. of Mines (Bank) prepare feasibility report on and energy project. Energy See page 1 for footnotes. - 32 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ INDONESIA (Cont'd) P.T. Pupuk 61.0 National Fertilizer Distribution - Appraisal report being prepared. Sriwijaya (Bank) to increase capacity to distribute (Co-financing is envisaged.) (PUSRI) output of new fertilizer plants. Ministry 63.0 Irrigation XVII - Improvement of Appraisal report being prepared. of Public (Bank) provincial operation and maintenance Works through training, equipment, facil- ities and transport; development of groundwater potential (East Java) through 180 production tubewells as well as large numbers of exploratory holes, test wells and piezometer wells; rehabilitation works for about 50,000 ha. Ministry of 150.0 (R) Nucleus Estates VII - Assistance to Project preparation underway. Agriculture (Bank) smallholders through nucleus estates. Ministry of 130.0 Nucleus Estates Sugar - Smallholder Project preparation underway. Agriculture (Bank) Development in South Kalimantan for 1,800 families and cultivation of about 3,000 ha of sugarcane land; Nucleus Estate Development of about 2,000 ha of sugarcane area and about 200 ha of cane nurseries. Ministry of 90.0 Health I - The project would cover the Project preparation underway. Health (Bank) three provinces of South, Southeast and Central Sulawesi and would comprise components on infrastructure and staff development, drug supply and distri- bution, disease control programs, health management and administration, and project administration. Ministry of 200.0 Power XII - The project covers mostly Feasibility study in advanced Mining and (Bank) distribution requirements in Java and stage. Energy some important outlying areas of Indonesia for the period 1983-87. Ministries of 80.0 Irrigation XVIII - Preliminary works Feasibility study being updated Public Works (Bank) for Jatigede, Rdungombo, and and designs reviewed. and Mines Batutegi multipurpose dams. and Energy Ministry of 90.0 (N) Swamp Reclamation II - Development Project preparation underway. Public (Bank) of 40,000 ha of low-lying lands on Works the south Sumatra coast to settle about 14,000 families from Java/Bali; drainage, settlement, agricultural infrastructure. KOREA Ministry of 55.0 Agricultural Marketing I - Construc- Appraisal report being prepared. Agriculture (Bank) tion of urban wholesale markets for and Fishery fruits and vegetables and fishery products, with ice making and cold storage facilities. Ministry of 50.0 Small and Medium Machinery Industry - Project being prepared by Commerce and (Bank) To provide technical and financial the Government. Industry assistance to a selected group of small enterprises. Ministry of 60.0 Technological Development - Develop- Appraisal report being prepared. Science and (Bank) ment of policies and institutions Technology for advanced industrial techno- (MOST) logical development. See page 1 for footnotes. - 33 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ KOREA (Cont'd) Ministry of 100.0 Water Supply I - To help improve water Appraisal report being reviewed. Construction (Bank) supply and sewage system in Daegu, Masan, Changwon, Jimhae and Gwangju. Ministry of To be Ports III - To provide additional Project under preparation Transportation/ deter- capacity, especially container by Government and con- Korea Maritime mined handling capacity. sultants. (Co-financing and Port (Bank) is envisaged.) Authority Ministry 250.0 (R) Structural Adjustment Loan - To Negotiations in progress. of Finance/ (Bank) help the Government implement its Board presentation scheduled Economic structural adjustment policies for October 20. Planning over the 1980/81 period. The Board policies in question are related to energy conservation, rationaliza- tion of industry, and resource mobilization. Ministry 125.0 (R) Cement and Coal Distribution - To Project under preparation by of Trans- (Bank) finance part of the foreign exchange Government and consultants. portation needed to improve the efficiency of (Co-financing is envisaged.) coal and cement distribution in Korea. Ministry of 100.0 Rural Roads - To finance part of Project under preparation by Home Affairs (Bank) the foreign exchange costs of Government and consultants. constructing roads in rural areas. (Co-financing envisaged.) LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of 27.0 (R) Rural Roads - Rehabilitation of main Appraisal mission has been Communications, (IDA) roads and construction of access roads, postponed indefinitely. Transport and and improvement of road maintenance. Reporting will be discontinued. Public Works Total project cost estimated at $50-55 million. Ministry of 10.0 (R) Agricultural Rehabilitation and Negotiations tentatively scheduled Agriculture (IDA) Development IV - Strengthening of for October/November. (Co- agricultural support services. financing from IFAD and parallel Total project cost estimated at financing from UNDP being sought.) $23.6 million. Electricite 15.0 (R) Nam Ngum Power Expansion - Third Negotiations tentatively scheduled du Laos (EdL) (IDA) stage expansion of Nam Ngum for for October/November. (Co-financing sale of electricity to Thailand; of $4.0 million with OPEC Fund arrange - - technical assistance. Total project cost estimated at $20 million with foreign exchange component of about $18.9 million. Ministry of To be Small Scale Irrigation - Development Project to be prepared by Agriculture deter- of small and medium-size irrigation consultants financed out mined project covering a total area of of IDA Project Preparation (IDA) about 13,000 ha. Facility advance of $375,000. (Co-financing envisaged.) Ministry of To be Forestry Project - Forest production Project to be prepared by Agriculture deter- and plantation and support to FAO/CP program. mined forest industries. (IDA) Ministry of 18.0 Agricultural Training - Training Appraisal mission scheduled Agriculture (IDA) facilities and technical assistance for September. (Co-financing in support of agricultural develop- with UNDP/FAO and SIDA being ment. Total project cost estimated sought.) at $20 million. See page 1 for footnotes. - 34 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable - ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ MALAYSIA Ministry of 35.0 (R) Education VI - Strengthening of Appraisal mission in the field. Education (Bank) vocational and in-plant training. and Ministry of Labor and Manpower Ministry of 25.0 State Rural Development I (Malacca Appraisal mission scheduled Agriculture (Bank) Agricultural Development) - The state for September. rural development has now been renamed Malacca Agricultural Develop- ment. The project will cover rubber replanting and rehabilitation in the state of Malacca and construction of rural roads. Government 55.0 Industries I - Assistance for Project being prepared (Bank) manufacturing and institutional by Government. development. Government 50.0 Road Construction - Strengthening Project being prepared (Bank) the planning and construction by Government. capability of the road construction industry, technical assistance and training, as well as financing for road construction and maintenance. Ministry of 70.0 Western Johore - Integrated Develop- Project being prepared by Agriculture (Bank) ment - Construction of farm roads Government. and drainage facilities, and provision of agricultural support services. National 85.0 (R) Rural Electrification I - Expansion Appraisal mission in the field. Electricity (Bank) of the rural power network with Board mini-hydro schemes. Total cost is estimated to be $163 million. Government 35.0 (N) Kedah Agricultural Development - Appraisal mission scheduled for (Bank) Rubber replanting, irrigation September. and drainage, rural roads, live- stock and fishery development and agricultural support services. PAPUA NEW GUINEA Department 15.0 Agricultural Credit II - A Approved by the Executive Directors of Primary (IDA) nationwide agricultural project on May 21. Industry/PNG to stipport agricultural produc- Development tion and processing through credit Bank and technical assistance. It would Procurement: Retroactive financing also include a pilot T&V extension of $1.5 million for undertaking component and provincial data expansion of staff and facilities, collection and analysis. processing subloans and making field management arrangements from June 1, 1980. Department 5.0 (R) Petroleum Technical Assistance - Consultants to prepare project of Minerals (IDA) Technical assistance for promotion have been appointed, financed by and of petroleum exploration. IDA Project Preparation Facility Energy advance of $250,000. Department 7.0 Enga Provincial Development - Appraisal report being prepared. of (Bank) Integrated rural development in Provincial 1.0 Enga province. Affairs, (IDA) National Planning Office See page 1 for footnotes. - 35 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ PHILIPPINES Ministry 100.0 (R) Education VII (Elementary) - To Loan signed on August 25. of (Bank) strengthen the regional offices Education of the Ministry of Education and and Culture, assist in the production Culture of textbooks, and improve elementary educational services throughout the country. Development 60.0 (R) DBP - Commercial Tree Crops Production Appraisal mission tentatively Bank of the (Bank) and Processing - Agricultural credit scheduled for November. Philippines for tree crop production, processing (DBP) and marketing. Ministry 19.0 National Fisheries Development - Insti- Appraisal report being prepared. of Natural (Bank) tutional support and infrastructure Resources for fisheries sector, including pro- grams for poor municipal fishermen. Ministry of 45.0 (R) Agricultural Support Services - Loan signed on August 25. Agriculture (Bank) Institutional and facilities support for agencies involved in agriculture and nutrition. To be 80.0 Urban IV - Investments in 4 cities Project being prepared determined (Bank) including selected primary by Government. infrastructure, employment genera- tion and industrial estates, transport, municipal services and facilities, and sanitation and shelter to support a program of spurring regional urban economic development. To be 140.0 (R) Small and Medium Industries III - Appraisal mission scheduled deter- (Bank) To provide funds for relending to for October. (Co-financing mined small and medium industry, and may be sought.) supporting technical assistance to specific subsectors. Ministry 160.0 (R) Textile Sector - Rehabilitation Post-appraisal mission tentatively of-Industry (Bank) of the textile sector. scheduled for end-September. (Co- financing may be sought.) Ministry 50.0 Rural Development IV (Land Project being prepared of Agrarian (Bank) Settlement II) - Further assis- by Government. Reform tance for planning and execution of Government's land settlement program. National 60.0 Rural Electrification II - To finance Project being prepared Electrification (Bank) expansion of Government's on-going by Government. Administration rural electrification program. National 50.0 (R) Communal Irrigation - To finance Appraisal mission in the field. Irrigation (Bank) a part of the Government's communal Administration irrigation program covering about (NIA) 20,000-30,000 ha. Ministry of 175.0 Road Transport - Construction and Project being prepared Public Highways (Bank) improvement of rural roads; nationwide by Government. bridge program on national roads; and maintenance and rehabilitation of national roads. Land Bank 50.0 Small Farmer Development (Land Bank Project being prepared of the (Bank) II) - Further credit, support services by LBP. Philippines and minor infrastructure assistance (LBP) for land reform beneficiaries. See page 1 for footnotes. - 36 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1Y Lender 2/ Project 3/ Procurement 4/ PHILIPPINES (Cont-d) Ministry 60.0 Rainfed Agricultural Development Project being prepared of (Bank) II (Mindanao) - Support services by Government. Agriculture and infrastructure to promote diversified rainfed and upland crop/livestock systems in Mindanao region. To be 100.0 Geothermal Development - Development Project being prepared by deter- (Bank) of geothermal fields for use in Government. mined power generation; purchase of drilling rig; and institutional strengthening. To be . 35.0 (R) Skills Training - To .support.Govern- Post-appraisal mission in the deter- (Bank) ments indu9trial development strategy field. mined with emphasis on regional diversifica- tion and training needs of small- and medium-scale industries. To be 50.0 Region VII Rural Developmeit -In- Project being prepared deter- (Bank) tegrated program of agro-forestry, by Government. Bank Project mined agrarian refo'rm, infrastructure Preparation Facility advance and research in Central Visayas. of $500,000 approved to finance consultancy services, incremen- tal costs in connection with recruitment of staff, and. vehicles and equipment required to assist in the preparation. National 8.0 (N) Urban Engineering - To finance pre- Appraisal report being prepared. Economic and (Bank) liminary and detailed engineering Development for the preparation of two urban Authority projects (Urban IV and VI). Ministry of 50.0 (N) Rural Water Supply - To help improve Project being prepared by Public Works (Bank) water supply and sanitation in Government. and selected rural areas using low-cost Highways schemes. SOLOMON ISLANDS Government of 6.0 Multisector Credit - Multisector Appraisal report being prepared. Solomon Islands (IDA) credit with emphasis on primary' education. 'A small rural transport Procurement: Retroactive financing component likely to be included. Total not to exceed $300,000 is being- project cost estimated at $8-million. considered for consultant services and for force account construction of roads. Government 2.0 (R) Lungga Hydroelectric Power Project - Project dropped from FY82 lending of Solomon (IDA) Total project cost estimated at program. It will be determined by Islands, $55 million. October Whether it will be added Electricity to the FY83 lending program, or Authority a substitute project will be undertaken. THAILAND Ministry of 65.0 (R) Education VI - Strengthening of Post-appraisal mission scheduled Education (Bank) diversified secondary education and for October. of Ministry of Education, Planning and Management. Total project cost estimated at $142 million. Ministry of 57.0 (R) Irrigation XII (Mae Klong) - Construc- Loan signed on August 13. Agriculture (Bank) tion of main, secondary and tertiary & Cooperatives canals and drains, including on-farm development, serving 60,000 ha on the left bank of the Mae Klong in western Thailand. Total project cost estimated at $115 million with.a foreign exchange component of about $57 million. See-page 1 for footnotes. - 37 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency I/ Lender 2/, Project 3/ Procurement 4/ THAILAND (Cont'd) Ministry of 80.0 Irrigation XIII (Medium Scale/Nam Mun) Project being prepared by Agriculture (Bank) - Slice of Royal Irrigation Depart- Royal Irrigation Department, and Cooperatives ment's irrigation development program, assisted by consultants. including construction/rehabilitation (Co-financing from KfW of medium-scale irrigation systems and likely.) construction of storage dams on head- waters of Mun River and of irrigation systems for about 25,000 hectares.. Ministry of 35.0 (R) Provincial roads - Construction Loan signed on August 13. Communications (Bank) and improvement of up to 600 km of provincial roads; provision of laboratory and traffic counting equipment, transport studies and technical assistance. Total cost estimated at $70 million. Ministry of 30.0 (R) Forestry I - Forest protection, Project scope being revised. Agriculture (Bank) wood lot development, industrial Government is undertaking and Cooperatives plantations, forest villages and preparation. (Co-financing research, extension and training for with Australia being explored.) Royal Forestry Department. (RUBBER 145.0 Second Tree Crops - Second phase Negotiations tentatively scheduled REPLANTING (Bank) of rubber replanting project, and for October. (Co-financing of AID FUND initiation of rubber new planting about $25.0 million with CDC being BOARD) and coconut development programs. arranged.) Total cost estimated at $437.0 million. (TELEPHONE 140.0 (R) Fourth Telecommunications Project - Appraisal mission tentatively ORGANIZATION (Bank) Expansion of telephone facilities scheduled for October. (Co- OF THAILAND) particularly in rural and provincial financing with Japan and Sweden areas. Total cost estimated at $545 being explored.) million with a foreign exchange com- ponent of $328 million. - Ministry of 150.0 Rural Roads - Construction of rural Consultants' report being Communications (Bank) roads countrywide. prepared. (Co-financing being explored.) Ministry of 17.0 Land Reform Area Development - Land Appraisal report being Agriculture (Bank) development, titling, irrigation, prepared. and Cooper- reforestation, infrastructure and atives other services in settlement areas. Total project cost estimated at $29 million with a foreign exchange component of about $8 million. (PETROLEUM 100.0 (R) Energy I - Natural gas processing Appraisal mission tentatively AUTHORITY (Bank) and liquified petroleum gas distri- scheduled for November. (Co- OF THAILAND bution; assistance to exploration/ financing from OPEC Fund and (PTT)) delineation drilling and institution- CDC expected; additional financing building measures. Total cost from export credit agencies and estimated at $450 million. commercial banks being explored.) Ministry of 75.0 (R) Population/Health II - Expansion of Identification mission in the Public Health (Bank) the Government's population, health field. (Co-financing likely.) and nutrition activities through the construction of rural health facili- ties, provision of equipment, materials and supplies and training of staff. (PETROLEUM To be (R) Energy II - Retrofitting of industries Project preparation underway. AUTHORITY deter- and institution-building measures OF THAILAND mined to encourage energy conservation or (PTT)). (Bank) substitution of fuels. (ELECTRICITY 140.0 Upper Quae Yai Hydroelectric - Appraisal mission scheduled GENERATING (Bank) 580 MW hydro station. Total cost for November. (Export AUTHORITY about $700 million of which $300 credit and private OF THAILAND million in foreign exchange. co-financing being (EGAT)) considered.) See page 1 for footnotes. - 38 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ THAILAND (Cont'd) (STATE 115.0 (R) Railways VI.- To support SRT-s rail Appraisal mission tentatively RAILWAY (Bank) service expansion program in the scheduled for early OF THAILAND FY82-86 period. Total project October. (Co-financing (SRT)) cost estimated at $450 million with commercial banks and with foreign exchange component export credit agencies being of $250 million. explored.) (PROVINCIAL 130.0 Power Sector II - To support 2-3 Appraisal mission tentatively ELECTRICITY (Bank) year time slice of PEA-s investment scheduled for May 1982. (Co- AUTHORITY program. financing likely.) (PEA)) (BANK FOR 73.0 Agriculture Credit II - Further Appraisal mission tentatively AGRICULTURE (Bank) support to BAAC to help strengthen scheduled for January 1982. AND AGRICUL- the cooperative system as a vehicle TURAL COOPERA- . for channelifig credit and other TIVES (BAAC)) services to small farmers. National 10.0 Eastern Seaboard Engineering - Identification mission scheduled Economic and (Bank) Study and design of transportation for September. Social Develop- and other infrastructure projects ment Board required to support industrial and (NESDB)) town development in Eastern Seaboard region. Ministry of 150.0 (N) Structural Adjustment Loan - To help Appraisal mission in the field. Finance (Bank) the Government implement its structural adjustment policies related to agriculture, industry, energy, fiscal policy and institutional reform. VIET NAM Ministry of To be Coal Expansion I - Development of a Project processing in Electricity deter- coal mine in Quang Ninh Province. abeyance. and Coal mined Total project costs tentatively (IDA) estimated at $112 million. Viet Nam To be Industrial Rehabilitation Project - Project processing in Bank for deter- Rehabilitation and expansion of abeyance. Industry mined textile, pulp and paper, and food (IDA) processing industries. Total proj- ect cost tentatively estimated at $50 million. Ministry To be Nghe Tinh Agricultural Rehabilitation Project processing in of Water deter- and Development - Repair of flood abeyance. Conservancy mined damage on irrigation and drainage (IDA) works in northern part of Viet Nam heavily damaged by typhoons and floods in 1978, and construction of salinity and flood control works. Total project cost estimated at $128 million. Ministry of. To be Transport Rehabilitation - Rehabili- Project processing in Transport deter- tation of port, roads and railways abeyance. mined facilities and inland waterways. (IDA) Ministry To be Agricultural rehabilitation and Project processing in of Water deter- development in provinces ,with high abeyance. Conservancy mined food production potential. (IDA) See page 1 for footnotes. - 39 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ IV. SOUTH ASIA BANGLADESH Ministry of Up to Inland Water Transport III - Project preparation underway. Ports, Ship- 35.0 Components not yet identified. ping and (IDA) Inland Water Transport Telecommuni- About (R) Telecommunications III - Next Appraisal report under preparation. cations Board 40.0 phase of Government-s develop- (Co-financing, including Germany (IDA) ment program. and Japan, envisaged.) Ministry About Road Maintenance - Strengthening Consultant's Phase I of Roads, 40.0 of maintenance organization through report reviewed by Government Highways (IDA) training, provision of equipment and IDA. Further processing and Road and materials and technical assist- contingent upon Government-s Transport ance, possibly including selective decision on focus and rehabilitation of existing primary timing of Phase II. roads. Ministry of About Business Management Training - Assis- Appraisal report being prepared. Education and 10.0 tance to Institute of Public Adminis- Ministry of (IDA) tration and Dacca University for Industries strengthening management training and education. Seed About Seeds II. Construction of facili- Project processing suspended Corporation 14.0 ties for seed production, processing, pending resolution of issues still (to be (IDA) distribution, storage, research and outstanding. established) technical assistance. Ministry of About Extension and Research II. To Appraisal report being prepared. Agriculture 30.0 support extension and research (IDA) on production of rice and wheat. Chittagong About Chittagong Fertilizer - Establish- ADB negotiations with GOB scheduled Urea Fertilizer, 15.0. ment of an integrated ammonia/urea for September. (ADB is organizing Ltd. (IDA) fertilizer plant at Chittagong with co-financing arrangements under a rated capacity of 1,700 metric tons which seven lenders would provide of urea per day, using domestic a total of about $292 million for natural gas as feedstock. the project.) Chittagong About Ports I - Possibly to include Appraisal report being prepared. Port Authority 39.0 construction of multipurpose berths, (CPA) (IDA) dredging, cargo handling, equipment, improved lighting, technical assistance and training. Bangladesh About (R) Textile Industry - Balancing, Negotiations tentatively scheduled Textile 48.0 modernization and replacement, for late October. Manufacturing (IDA) and imported raw materials. Corporation Bangladesh About (R) Sugar - May include mill rehabili- Appraisal mission in the field. Sugar & Food 20.0 tation, improvement in mill farms Corporation (IDA) and transportation in mill zones, (BSFIC) strengthening extension and research, and a pilot gur improve- ment program. Dacca Water About Dacca WASA III - Extensions to Project being prepared by WASA, and Sewerage 25.0 water supply and sewerage assisted by consultants. Authority (IDA) systems. (WASA) Water Devel- About (R) Drainage and Flood Control II - Negotiations substantially opment Board 27.0 Expected to include several small- completed. (WDB) (IDA) scale drainage and flood control subprojects. See page 1 for footnotes. -40- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BANGLADESH (Cont'd) Planning About (R) Imports Program X - Provision of Negotiations scheduled for Commission 75.0 foreign exchange for procurement late September. (IDA) of raw materials and spare parts required to improve utilization of existing capacity. Power About Power II - Expansion of Ashuganj Appraisal report under prepar- Development 45.0 Plant to provide additional ation. Board (IDA) generating capacity. Water About WDB Sector Credit - Small irrigation/ .WDB is reviewing consultants' Development 50.0 drainage/flood control projects. proposals. Board (WDB) (IDA) Water About Barisal Patuakhali - Irrigation, FAO is assisting WDB in Development 60.0 drainage and flood control works project preparation. Board (WDB) (IDA) in Barisal and Patuakhali districts in southwest Bangladesh. Water & About District Town Water Supply - Project being prepared by Sewerage 25.0 Water supply systems for consultants. Authorities (IDA) Khulna and Rajshahi. (to be established) Petrobangla About (R) Gas and oil exploration - To be Project preparation report by 40.0 identified. Government underway. (IDA) Ministry of About Rural Development II -:Extension Subsector report under Local 34.0 of Integrated Rural Development preparation. Government, (IDA) Program (IRDP). Rural Development and Cooperatives Rural About Rural Electrification. Appraisal report being prepared. Electrification 40.0 Board (REB) (IDA) Establishment About Public Administration - Expansion Preparation report being Division of 30.0 of the public administration reviewed. the Cabinet (IDA) training complex. Secretariat National 20.0 Agricultural Training II - Includes Appraisal report-being Committee (IDA) (a) facilities and equipment for prepared. on Rural agriculture extension training Training institutes and a regional academy and of rural development; (b) experi- Ministry mental facilities to try new modes of of extension in trial areas; Agriculture (c) in-service training for present extension staff; and (d) technical assistance. Ministry About Supplementary Credit - First Highway Processing dependent on GOB-s of Roads, 6.0 Project - Strengthening and remedial response concerning construc- Railways, (IDA) work on the 17-1/2 miles Feni Bypass tion method and appointment Highways constructed under Highway Cr. 408-BD. of consultant. and Road Transport Water Devel- About Drainage and Flood Control III - Awaiting selection opment Board 45.0 Expected to include several small- of consultants. (WDB) (IDA) scale drainage and flood control subprojects. Ministry of About Foodgrain Storage III -'Emphasizing Preparation report Food 45.0 investments to strengthen inland being reviewed. (IDA) storage system for domestic procure- ment. See page 1 for footnotes. -41- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BANGLADESH (Cont'd) Fisheries About Fisheries II Project identification Department 20.0 underway. (IDA) Bangladesh About Phosphate Gypsum - To manufacture Awaiting Government Chemical 25.0 cement clinker and recover sulphur response to IDA Industries (IDA) dioxide. Gypsum washing facilities, proposal for a detailed Corporation calcination and storage equipment, study funded under cement kiln and ancillary facilities Technical Assistance will be included. Credit. Ministry of About Rural Roads & Marketing - Project being identified Local Govern- 30.0 Rehabilitation of rural roads, by FAO/CP. ment, Rural (IDA) rural markets and construction Development, and of small-scale storage. Cooperatives Ministry of About Deep Tubewells II - Nationwide Project being prepared Agriculture 60.0 follow-up to the successful by FAO/CP and GOB. (IDA) Northwest Region Tubewells Project (Credit 341BD). Ministry of About Agricultural Research II - To Project preparation underway. Agriculture 30.0 support and develop agricultural (IDA) research over a five year period. Ministry of About Feeder Roads - To rehabilitate Processing dependent on Roads, 35.0 and/or build about 200 miles of selection by GOB of Highways and (IDA) all-weather roads in foodgrain implementing agency. Road Transport surplus areas. BURMA Ministry of To be Fuelwood Supply - First phase of Awaiting finalization of Agriculture deter- ten-year plantation program to preparation report by Government. and Forests mined supply fuelwood and small timber (IDA) for domestic use, particularly for rural areas. Ministry of Up to Fisheries - Investment for fisheries Project is being prepared Agriculture 22.0 development in the Irrawaddy Delta, by Government/IDA with con- and Forests (IDA) which includes a minor fishing harbor, sultants financed by UNDP. shore facilities, fishing vessels and a net-making plant. Ministry of Up to (R) Power I - Power transmission project Appraisal report being prepared. Industry II 70.0 to interconnect the power supply (IDA) system. Ministry of To be Arakan Pulp and Paper - To construct Project preparation under way Industry II deter- a pulp and paper mill with a capacity by Government, with assistance mined of 100 tons per day of printing and from consultants financed (IDA) writing paper produced from a mixture by an advance of $150,000 from of bamboo and indigenous hardwoods. the IDA Project Preparation The project also includes associated Facility. infrastructure facilities. Ministry of Up to Road Rehabilitation and Road Appraisal report completion Construction 35.0 Transport Project - Rehabilitation in abeyance, pending resolution and (IDA) of Pegu-Toungoo Road, pilot road of several issues. Ministry of maintenance program, improvement Co-operatives of vehicle repair capability, and road transport supply program (tires and spare parts). Ministry To be Tubewells I - To increase agriculture Project being prepared of deter- productivity in the Central Dry Zone, by Government with consultants Agriculture mined through installation of tiibewells financed by UNDP and IDA. and (IDA) and provision of agriculture support Forests facilities. See page 1 for footnotes. -42- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BURMA (Cont'd) Ministry of Up to Wood Industries II - To further Preparation mission scheduled Agriculture 50.0 improve the supply of wood for December. and Forests (IDA) products to the domestic market. Ministry of Up to Rubber Rehabilitation II - New Project identification report Agriculture 15.0 plantings and replantings in completed. Preparation mission and Forests (IDA) about 10,000 acres, expand tentatively scheduled for reprocessing facilities, staff November. training and technical assistance. INDIA Krishak Bharati 400.0 (R) Hazira Fertilizer - Construction of Credit approved by the Executive Cooperative (IDA) two ammonia units of 1,350 tons-per- Directors on March 31. Signing Ltd. day each and four urea units of 1,100 awaiting availability of IDA funds. (KRIBHCO) tons-per-day each. Estimated project cost $1,279 million. Indian 285.0 Railway Electrification: Support Appraisal report being prepared. Railways (IDA) of IR's ongoing electrification (IR) program to modernize railway operations and improve efficiency. Government of 25.0 (R) Kanpur Urban Development - Program Negotiations in progress. Uttar Pradesh (IDA) of shelter and infrastructure investment at Kanpur in Uttar Procurement: Retroactive financing Pradesh State. of $0.5 million will be proposed. Government of 220.0 (R) Madhya Pradesh Major Irrigation - Negotiations completed. Board Madhya Pradesh (IDA) Irrigation and command area presentation scheduled for development in major irrigation September 15. systems in Madhya Pradesh State. Government of 100.0 (R) Commercial Forestry - Afforestation Appraisal mission postponed Madhya Pradesh (IDA) of unused land and degraded forests pending project revision. in Madhya Pradesh. National Thermal 400.0 (R) Power - Development of the second Credit approved by the Executive Power Corpora- (IDA) phase of Korba Thermal Power Devel- Directors on July 7. Signing tion (NTPC) opment in Madhya Pradesh State. awaiting availability of IDA funds. Government 29.0 (R) West Bengal Social Forestry Project - Board presentation scheduled for of West (IDA) Afforestation of unused land and October 6. Bengal degraded forests. Procurement: Retroactive financing of up to $1.0 million will be proposed. To be .30.0 Rainfed Agriculture Project - Devel- Project preparation determined (IDA) opment of rainfed agriculture system underway. in selected State(s). To be 30.0 Erosion and Flood Control - Installa- Project preparation underway. determined (IDA) tion of erosion and flood control systems in the selected States. Government 250.0- Madhya Pradesh Pulp and Paper Project preparation underway. of Madhya 300.0 (formerly Forestry Industry) - Pradesh (IDA) Development of forestry industry in Madhya Pradesh State. Government 70.0 Upper Ganga Irrigation - Modernization Project preparation of Uttar (IDA) of irrigation systems in Uttar Pradesh underway. Pradesh State. See page 1 for footnotes. -43- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ INDIA (Cont'd) National 250.0 (R) Power - Development of the second Appraisal report being Thermal (IDA) phase of the Ramagundam Thermal Power prepared. Negotiations Power Development in Andhra Pradesh State. tentatively scheduled for Corporation late-October. (NTPC) Ministry of 250.0 Nhava Sheva Port - Construction of a Project preparation Shipping and (IDA) new port facility to relieve serious underway. Transport/ overcrowding and delays at Bombay Bombay Port Port. Agricultural 350.0 Agricultural Refinance and Develop- Appraisal report being prepared. Refinance and (IDA) ment Corporation (ARDC) Credit IV - Development Financing of portion of ARDC's lend- Corporation ing program for on-farm investments. Government 80.0 (R) Gujarat Water Supply and Sewerage Appraisal report being prepared. of Gujarat (IDA) Project; Implementation of 13 water supply and 5 sewerage sub-projects, Procurement: Retroactive financing as well as a low-cost sanitation of up to $2.5 million will be component, for the State of Gujarat. proposed for consultancy services. Oil and 250.0 Oil/Gas Development - Assistance Appraisal mission tentatively Natural Gas (Bank)- for development of South Bassein scheduled for October. Commission offshore gas field. Government 100.0 (R) Tamil Nadu Newsprint Project - Board presentation scheduled for of Tamil (Bank) Construction of paper mill in September 15. Nadu Tamil Nadu. Procurement: Retroactive financing of up to $10 million will be proposed to cover down payments under contracts awarded to Beloit Walmsley Ltd. (UK) for import of capital goods and to Reed International (UK) for basic engineering. Cement 251.0 (R) Cement Expansion Project - Negotiations tentatively scheduled Corporation (Bank) Increase of 3.2 million tons for September/October. of India per year of cement capacity by construction of one new plant and expansion of two existing ones. To be 300.0 (R) Petrochemicals - Production of Appraisal mission tentatively determined (IDA) petrochemicals based on Bombay High scheduled for November, assuming natural gas and/or production of GOI approval of project details. basic aromatics and selected derivatives. Government 126.0 Kallada Irrigation - Irrigation Appraisal report being revised. of Kerala (IDA) development in South Kerala. Oil and 150.0- (R) Krishna - Godavari: petroleum Appraisal mission scheduled Natural 200.0 exploration assistance. for October. Gas (Bank) Commission (ONGC) Rural 200.0 (R) Third Rural Electrification Appraisal report being prepared. Electrification (IDA) Corporation - Assistance for Negotiations tentatively scheduled Corporation construction and reinforcement for October/November. (REC) of rural electricity distribution network. Indian 415.0 (R) Railway Modernization and Maintenance Results of appraisal being Railways (IDA) Project II - Construction and equip- discussed with Government. (IR) ment of component building workshop; import of components and of 20 proto- Procurement: Retroactive type electric locomotives. financing of up to $1.0 million being proposed. See page 1 for footnotes. -44 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ INDIA (Cont-d) ICICI 150.0 (R) ICICI XIV - Assistance to Industrial Negotiations completed. Board (Bank) Credit and Investment Corporation presentation scheduled for of India (ICICI) industrial sub- October 6. borrowers. Government 50.0 Tamil Nadu Water Supply and Sanitation Project under preparation. of Tamil (IDA) Project: Water supply for three Nadu large towns, and 60 middle-sized towns, and low-cost sanitation for 15 small towns. Ministry of 50.0 Fertilizer Distribution Project - Further project preparation by the Agriculture (Bank) Development of an integrated system Government of India. 50.0 for the distribution of imported/ (IDA) domestically-manufactured fertilizers to main distributing (nodal) points. Government of 42.0 Chambal (Madhya Pradesh) Irrigation Appraisal report being Madhya Pradesh (IDA) II - Irrigation and command area prepared. development in the Chambal River valley in Madhya Pradesh. Government of 50.0 (R) Chambal (Rajasthan) irrigation II Appraisal mission tentatively Rajasthan (IDA) Project - Irrigation and command scheduled for November. area development in the Chambal River valley in Rajasthan. Government 250.0 (R) Upper Indravati Hydro-Electric Preappraisal mission of Orissa (Bank) Project - Construction of a 600 scheduled for October. MW hydro-electric generating station together with associated dams, channels and tunnels in Orissa State. To be 150.0 Fifth Power Transmission Project - Appraisal mission tentatively determined (IDA) Construction of a network of 400 scheduled for January 1982. KV transmission lines and associ- ated sub-stations in several states, spanning four Regions. Five Public 200.0 (R) Oil Refinery Conversion - Addition Appraisal report being prepared. Sector Oil (Bank) of fluid catalytic cracker (FCC) Companies units, energy efficiency and Procurement: Retroactive financing pollution control measures to of up to $20.0 million will be refineries in Bombay, Vizag and proposed. Madras. Government 100.0 Suberfiarekha Irrigation (Bihar) - Project being prepared by of Bihar (IDA) Irrigation and command area Government with consultant development of Subernarekha Project assistance (WAPCOS). in Bihar. Government 45.0 Subernarekha Irrigation (Orissa) - Project being prepared by of Orissa (IDA) Irrigation and command area develop- Government with consultant ment of Subernarekha Project in assistance (WAPCOS). Orissa State. Government of 75.0 UP Tubewells II - Construction of Project preparation underway. Uttar Pradesh (IDA) approximately 5,000 tubewells for irrigation in Uttar Pradesh. Government 10.0 Andhra Pradesh Extension - Appraisal report being prepared. of Andhra (IDA) Improvements to the agricultural Pradesh extension system in the State. Government of 40.0 (N) Haldia Water Supply and Sewerage Project preparation underway. West Bengal (IDA) Project - Construction of 225 million liters/day treatment plant, 4 pumping stations and a 90 km long water transmission main to serve the needs of the Haldia Development Authority, plus 2 towns and rural communities en route. See page 1 for footnotes. - 45 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ INDIA (Cont'd) Government 50.0 (N) Bihar Water Supply - Provision Project preparation underway. of Bihar (IDA) of piped water supply to about 8 towns and surrounding villages in the State of Bihar. Government of 25.0 (N) Madhya Pradesh Urban Development Project preparation underway. Madhya Pradesh (IDA) Project - Shelter and infrastructure investments in several medium-sized cities in the State of Madhya Pradesh. MALDIVES Ministry of . 6.0 Second fisheries - Local storage Project components being Fisheries (IDA) and collection facilities for land- identified. based fish export operations; technical assistance for fish survey, and testing of new technology. NEPAL Department of Up to Cottage Industries - Promotion of Awaiting completion of Cottage and 6.0 cottage and small-scale industries. several actions by Government Village (IDA) prior to scheduling negotia- Industries tions. Ministry of Up to Marsyangdi Hydroelectric - Hydro- Project preparation under- Water Resources 65.0 electric power station in Central way. (Co-financing with (IDA) Nepal with about 50 MW capacity, Federal Republic of Germany and transmission to central grid. being arranged.) Ministry of Up to Education II - Expansion of programs Awaiting completion of several Education 13.3 for technical education in engineer- actions by Government prior to (IDA) ing and agriculture. scheduling negotiations. Ministry To be Cash Crops - Sector line of credit Project preparation of Food deter- to develop sugar, tea, etc., underway. and mined with funds to be channelled through Agriculture (IDA) Agricultural Development Bank in Nepal (ADBN), which would appraise the subprojects. Ministry of To be Transport III - Completion of the Project being prepared Works and deter- East/West Highway. by consultants financed Transport mined by UNDP. (IDA) Nepal Up to Telecommunications IV - Follow-up Project components being Telecom- 30.0 for expansion of local and inter- identified. munications (IDA) national services. Corporation PAKISTAN Karachi 50.0 Expansion of Bulk Water Supply Government of Sind preparing Development (IDA) System and improvement of sewer- project with assistance of Authority age system in Karachi. consultants. Appraisal tentatively scheduled for October. Government 32.0 Grain Storage III - Improvement of Approved by the Executive Directors of Pakistan (IDA) foodgrain handling and storage. on June 2. Ministry of 50.0 Irrigation Systems Rehabilitation - Appraisal report being prepared. Water and (IDA) Program to improve institutional Power and financial capability of provincial irrigation departments. Ministry of 41.0 (R) On Farm Water Management - Program Credit signed on August 19. Water and (IDA) of improved water utilization Power (ground and surface) in selected areas. See page 1 for footnotes. -46- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ PAKISTAN (Cont'd) Government 24.0 (R) Agricultural Research - Strengthening Credit signed on August 19. of Pakistan (IDA) of Pakistan Agricultural Research Council and financing of new institu- tions and research programs. Telegraph and 40.0 (R) Telecommunications IV - To support Negotiations unscheduled, pending Telephone (IDA) Telegraph and Telephone Development information from Government. Department Investment Program for period 1981-1984. Water and Power 50.0 Irrigation/Drainage Project - Project under preparation by Development (IDA) Includes reclamation of saline/ Government. Authority alkaline land and improvement of (WAPDA) extension services. Oil & Gas 80.0 Oil and Gas II - Development of Preappraisal mission Development (IDA) Dhodak field and technical assis- scheduled for December. Corporation tance, training and studies. An IDA Project Preparation Facility advance of $210,000 was approved to help prepare a field development study. Lahore 22.0 Lahore Urban Development Project - Appraisal report being Development (IDA) Including upgrading of low-income prepared. Authority. areas, sites and services, solid waste disposal, and improvements to urban transportation system. Industrial 30.0 (R) Industrial Development Bank of Negotiations completed. Development (IDA) Pakistan - Second project for Bank of onlending to industry. Pakistan (IDBP) Pakistan 50.0 (R) Railways XI - For modernizing and Appraisal mission tenta- Railway (IDA) increasing efficiency of railways. tively scheduled for end-October. Board Sui 60.0 Expansion of capacity of SNGPL's Appraisal tentatively scheduled Northern (IDA) gas transmission system and asso- for November. An IDA Project Gas ciated facilities. Preparation Facility advance Pipelines of $700,000 has been approved Ltd. for consultants to assess (SNGPL) future gas demand; verify evidence of additional gas supplies; formulate an optimum investment program; and carry out a feasibility study of the possible modification of an existing power plant. Government 31.0 Fertilizer Industry IV (Rehabili- Appraisal mission tentatively of (IDA) tation) - Financial and technical scheduled for October. Pakistan assistance to increase production capacity and storage facilities. Government Up to Baluchistan Agriculture Development - Appraisal report being prepared. of 25.0 including perennial and flood irri- Pakistan (IDA) gation schemes, groundwater recharge and improvement of range and live- stock production. Government To be Structural Adjustment Loan - Appraisal mission tentatively of Pakistan deter- To support economic adjustment scheduled for October. mined program of Government by providing foreign exchange for import of raw materials and intermediate goods. See page 1 for footnotes. -47- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ PAKISTAN (Cont'd) Government Up to Population - To assist the The Bank and the Government of Pakistan 30.0 Government of Pakistan in imple- of Pakistan have agreed on an (IDA) menting its population program. advance of $290,000 from the Priority will be given to IDA Project Preparation Facility intensifying services and for the completion of project information, education and preparation work, for the communications. training of key personnel and preparation of an operational plan for the project areas. SRI LANKA Ministry of 90.0 Mahaweli Ganga Development III - Approved by the Executive Mahaweli (IDA) Construction of portion of Right Directors on June 23. (Japan Development Bank Transbasin Canal; and down- and Kuwait Fund have pledged to stream irrigation works and social co-finance $53.2 million and infrastructure for System C. $45 million, respectively.) Procurement: Retroactive financing of about $10.0 million approved for initial work on the Right Bank Transbasin Canal. Award of contract for con- struction of the canal has been made by the Government. Ministry Up to Second Tree Crops Rehabilitation Appraisal report being of State 43.0 (Tea) - Project is expected to prepared. Plantation (IDA) comprise rehabilitation of tea Corporation estates and factories over about 17,000 ha, including infilling and replanting, timber planting, labor housing, improved labor, water supply and health services, and factory rehabilitation. The project will also have a diversi- fication component. Ministry Up to Forestry - Support to Government Project preparation report of Lands 15.0 Scheme to establish 75,000 acres finalized. However, further and Land (IDA) of industrial plantations over project processing being post- Development five years. Strengthening forestry poned at Government request. sector institutions and formulation of a forestry master plan. Ministry Up to Mahaweli Power Transmission - To Appraisal report being prepared. of Power 37.0 transmit power generated from proposed and Energy (IDA) hydroelectric stations in Mahaweli Program. Project components include 220 kv transmission line, associated switching and grid substation facilities, and technical assistance. National Up to (R) Small and Medium Industries II - Negotiations substantially completed. Development 30.0 Replenishment of fund established Board presentation tentatively Bank (IDA) in first project for onlending to scheduled for October 13. private sector small and medium industries. National Up to (R) A credit line to NDB for onlending Appraisal tentatively scheduled Development 23.0 to private and public sector for November. Bank (NDB) (IDA) projects. See page 1 for footnotes. - 48 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ V. EUROPE, MIDDLE EAST AND NORTH AFRICA AFGHANISTAN Progress reports on the Afghanistan .program are being discontinued until circumstances permit renewed project preparation. ALGERIA Ministry of 100.0 Telecommunications -.Project would Project processing suspended, pending Posts and (Bank) consist of elements included in the resolution of issues still outstanding. Telecommuni- first three years of the telecommuni- cations cations investment plan. To be To be (R) Urban Development - Project would Preparation by Government determined deter- consist of slum upgrading, sites and underway. mined services and technical assistance (Bank) to local construction industry in Annaba. To be To be Water Supply/Sewerage in the city Preparation by Government determined deter- of Constantine. underway. mined (Bank) Ministry of To be First phase of general agriculture Appraisal report being prepared. Agriculture deter- development in the region of Sidi Bel and Agrarian mined Abbes of about 73,000 ha. including Revolution (Bank) supply of machinery and equipment, land consolidation, training, strengthening of research and extension facilities. Ministries of 29.0 (R) Education VI - Would include a vete- Appraisal report being prepared. Education, (Bank) rinary college, basic education Higher Edu- . teacher training institutes, cation, Heavy and technical assistance. Industry and Forests To be To be (R) Rural Development in the Aures Further project processing determined deter- region, focussing on development postponed; reporting will be mined of water resources, reforestation, discontinued. (Bank) pasture improvement and technical assistance. State Secre- To be Fisheries I - Small and medium-size Appraisal report being tariat for deter- boats for private fishermen and prepared. Fisheries mined, public fishing company, maintenance (Bank) and supply of fishing equipment. Procurement: Retroactive Improvements of fishing port financing of up to $350,000 facilities, envisaged for consultant services for preparation of detailed designs and bidding documents. To be To be Water Supply in greater Algiers - Appraisal report being prepared. determined deter- Expected to include works needed mined to help alleviate the critical (Bank) water shortage in that area, and water supply/sewerage studies in small and intermediate cities. To be To be (R) Education VII - Possibly including Further project processing deter- deter- training of agriculture person- postponed; reporting will be mined mined nel, paramedics, laboratory discontinued. (Bank) technicians and hospital administrators, and primary and secondary teachers. See page 1 for footnotes. -49- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ALGERIA (cont'd) To be To be Rural roads development, including Preparation underway deter- deter- a maintenance and improvement by Government. mined mined program, in selected regions. (Bank) To be To be Power III - Project would Preparation underway by deter- deter- include rural electrification. Government. mined mined (Bank) CYPRUS To be 12.0 (R) Roads III - Project would include Appraisal mission scheduled determined (Bank) road maintenance and upgrading of for early October. rural and secondary roads, and related technical assistance. To be To be Southern Conveyor Water Resources Project preparation underway determined deter- Development Project. by Government with assistance mined of consultants. (Bank) To be To be (R) Renewable energy production and Project preparation to begin determined deter- energy savings project, on a in November. mined pilot basis. (Bank) EGYPT, ARAB REPUBLIC OF General 56.6 Beheira Provincial Water Supply Credit approved by the Executive Organization (IDA) Project. Directors on June 2. IDA Project for Potable Preparation Facility advance of up Water/Beheira to $982,000 approved to prepare Water Company detailed engineering and tender documents, and to design detailed organizational changes. Egyptian To be Fifth Drainage Project - Continued Project to be prepared Public deter- support for Egypt's field drainage by EPAD and Ministry Authority mined and bilharzia control program. of Health. for Drainage (IDA) Projects (EPAD) and Ministry of Health To be To be (R) Rural Development Project - Support Project being developed determined deter- for improvement of rural planning, by the Government with mined infrastructure, and development of assistance from FAO/IBRD (Bank) rural productive activities in the Cooperative Program. Governorate of Minya. Arab Republic 64.0 Third Telecommunications - Rehabilita- Loan approved by the Executive of Egypt Tele- (Bank) tion and expansion of the local tele- Directors on July 21. communications phone systems and the long distance Organization network in the smaller towns in (ARETO) lower Egypt and all the towns of Upper Egypt, as well as selected rural areas. To be To be El-Dikheila Port Project - Construction Appraisal report being prepared. determined deter- of additional port capacity. mined (Bank) See page 1 for footnotes. - 50 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ EGYPT, ARAB REPUBLIC OF (Cont-d) Arab Republic About Second Urban Development T Project Invitation to negotiate issued. of Egypt, 49.0 would consist of urban transport IDA Project Preparation Facility Governorates (Bank) improvements, pilot area upgrading, advance of up to $1 million approved of Cairo and and solid waste management schemes to prepare designs of selected Giza - for greater Cairo. project items. Procurement: Retroactive financing of up to $400,000 to be recommended. To be To be (R) El Dikheila Steel- Direct Egyptian authorities completing determined deter- Reduction/Electric Furnace Plant negotiations, with group of three mined to .produce rebars -and light Japanese operating steel companies, (Bank) sections. on details of joint venture agree- ment, and with Japanese authorities on financing plan. Depending upon outcome of these negotiations, appraisal mission scheduled for October. Procurement: Prequalification of civil works contractors underway. Ministry of 3 .O Road Rehabilitatioi and Main- Invitation to negotiate issued. Transport (Bank) tenance Project. Bank Project Preparation Facility advance of up to $280,000 approved . for consultant services to assist in preparation of detailed work and training programs and strengthen organization. Egyptian To be Abu Qir off-shore natural gas Appraisal report being prepared. General deter- development and delineation . Petroleum mined project. Procurement: (i) Suppliers of Corporation (Bank) drilling rig services were (EGPC) invited to submit proposals by January 15, 1981. Estimated contract .value: $20 million; (ii) Prequalification of contractors of 6ff-shore production and utility platforms (including ancillary equipment) being finalized. Estimated contract value $25 million. Ministry To be Population III - Continued qupport Project to be prepared of deter- for Egypt's health and population by Ministry of Health. Health mined programs. (Bank) Development To be (R) Fifth Development Industrial Bank/ Appraisal report being prepared. Industrial deter- Small-Scale Industries Project - Bank of mined Project will be designed to meet Egypt (Bank) priority areas in Egypt-s industrial strategy, through the Development Industrial Bank of Egypt, as well - as provide continued technical and financial assistance to the small-and medium-scale industrial sector. Arab 6.9 (R) Technical Assistance - To help Credit signed on August 26. Republic (IDA) develop institutional capacity in of Egypt the agriculture sector for project preparation. JORDAN Ministry of To be Development of rainfed agriculture. Feasibility study being Agriculture deter- prepared by Government with mined - FAO/CP assistance. (Bank) See page 1 for footnotes. - 51 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ JORDAN (Cont'd) Jordan Valley To be Construction of a multi-purpose dam Further project processing Authority deter- on the Yarmouk River at Maqarin and suspended at Government's mined improvement of irrigation facilities request, pending progress on (Bank) in Jordan Valley. international riparian issues. To be To be Expansion and rehabilitation of Project to be defined. determined deter- water, sewerage, and sanita- mined tion systems in selected urban (Bank) areas. To be 23.0 (R) Education IV - Expansion of technical Negotiations scheduled for determined (Bank) and vocational education centers, late September. community colleges and comprehensive secondary schools. (ARAB To be Dead Sea Chemicals - Utilization Feasibility studies being POTASH deter- of by-products of the potash prepared by consultants. COMPANY) mined refinery currently under (Bank) construction. Jordan To be (R) Power V - Stage I of the Aqaba Appraisal mission scheduled Electricity deter- steam power plant (3 x 120 mw) scheduled for September. Authority mined (Co-financing being arranged.) (JEA) (Bank) MOROCCO To be To be Fisheries - Development of fishing Project being prepared by determined deter- fleet and related port infrastructure, Government. Bank Project mined support services to fishing industry, Preparation Facility advance (Bank) and marketing facilities. of $1 million approved to finance sector and feasibility studies, and detailed design of investments. Ministry of 56.0 Education V - Strengthening secondary Appraisal report being Education (Bank) teacher training, rural primary prepared. education, and research coordination. Procurement: Retroactive financing, in an amount to be determined, is expected for preparation of final design and bidding documents. To be To be Sewerage - priority treatment Preparation underway by determined deter- facilities; submarine outfalls; Government and consultants. mined extension of sewer network for (Bank) Casablanca-Mohammedia region. Ministry of 46.0 Agricultural Development in Appraisal report being Agriculture (Bank) the Middle Atlas, including prepared. and Agrarian development of 35,000 ha of Reform pasture land for livestock, forestry development, extension services, small-scale irrigation and related infrastructure. Office 87.0 Water Supply III - Improvement and Loan approved on May 28. National (Bank) extension of water distribution de 1'Eau systems in smaller towns and rural Potable centers; house connections for low- (ONEP) income customers. National 70.0 Ninth DFC project - To assist BNDE in Loan approved by the Executive . Development (Bank) financihg medium and small projects Directors on July 14. Bank (BNDE) in the manufacturing sector, promote export-oriented projects, and provide institutional support to BNDE. See page 1 for footnotes. - 52 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ MOROCCO (Cont'd) Ministry of To be Family Health Program including Preparation underway Public Health deter- basic health services, training, by Government. mined health education, environmental (Bank) sanitation, and technical assis- tance to Ministry of Public Health. To be 100.0 Structural Adjustment Loan - Financing Negotiations in progress. determined (Bank) of selected agricultural and industrial imports, equipment and spare parts in support of Government-s short and medium term program to enhance finan- cial stability, and to maintain credit- worthiness and adequate levels of investment and growth; technical assistance for needed policy and institutional reforms. Fonds 20.0 (R) Municipal and Village Loan Fund - Preparation underway d'Equipement (Bank) Support for FEC's program to assist by Government, Bank and FEC. Communal (FEC) local authorities to identify, prepare, and finance communal infrastructure and production projects. Ministry of To be (R) Agricultural development on about Preparation underway by Agriculture deter- 250,000 ha. in the Khemisset province, Government with assistance , mined including: crop, forage and live- of`FA0/CP. . (Bank) stock development on rainfed 'lands; rehabilitation and extension of small-scale irrigation; and soil conservation measures. CADETAF 9.Q (R) Small-Scale' Mining: Preparation Date of negotiations to (Bank) and pilot phase testing of technical be determined. assistance and equipment programs to increase and upgrade ores mined by small-scale and artisanal miners. Bureau de 19.5 (R) Construction and equipment, and 'Negotiations in progress. Recherches et (Bank) - experimental operation, of a pilot de Partici- unit to extract oil from shale . pations deposits and studies to determine Procurement: Retroactive Minieres the economic feasibility of commercial financing of $2.0 million (BRPM) oil shale extraction; to compare expected to be proposed to several extraction technologies cover expenditures related and to compare oil extraction and to project preparation. direct combustion of shale. To be To be (R) Establishment of 23,000 ha. of Appraisal report being prepared. determined deter- forest plantations for timber, mined fuelwood and tannin; construction (Bank) of 170 km. of forest roads; strengthening forest management. Government 70.0 Small Scale Industry Project - To 'Loan approved by the Executive of Morocco (Bank) finance and provide technical Directors on July 14. assistance to existing and new small industries; includes' studies related to export promotion. To be 60.0 (N) Construction of Dchar el Oued Identification mission scheduled deter- (Bank) multi-purpose dam and power for September. mined plant. Ministry of 80.0 (N) Highway IV - Rehabilitation of Preparation will start in Transport (Bank) primary and secondary roads, October by Government and construction and improvement of consultants. rural roads, completion of Casablanca-Rabat Expressway, and maintenance eqiipment.' See page I for footnotes. - 53 - Member Country, and Borrower or Amount & Stage of.Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ MOROCCO (Cont'd) To be To be (N) Telecommunication project - Preparation by Government deter- deter- Components to be identified. underway. mined mined (Bank) To be To be (N) Third Urban Development - Preparation by Government deter- deter- Components to be identified. underway. mined mined (Bank) Government To be (N) Electro-mechanical Industries Reconnaissance mission scheduled of Morocco deter- Project - To provide sectoral for November. mined support; project scope to be (Bank) defined. OMAN Ministry of 15.0 (R) Highways Maintenance II - Components Invitation to negotiate issued. Communications (Bank) may include equipment, rehabilita- Awaiting Government response. tion, maintenance, and technical assistance and training. PORTUGAL Ministry of About Railways I - Development and Preparation underway. Transportation 40.0 Rehabilitation of National Railways. (Co-financing being sought; (Bank) KfW is likely to participate.) To be To be Industrial Restructuring - Textiles - Project scope under review. - determined deter- Project components to be identified. mined (Bank) Republic About Rural Development in the Tras-os- Appraisal report being prepared. of 50.0 Montes area. Portugal (Bank) To be To be (R) Porto Region Water Supply and Sewer- Preparation underway. determined deter- age - Improvement of water supply and (Co-financing likely to be mined sewerage systems in Porto Region, required.) (Bank) Minho and Tras-os-Montes. To be To be Fisheries development project. Fish stock assessment survey determined deter- Components to be defined. underway (financed under mined Loan 1603). Government (Bank) preparing fisheries master plan. Siderurgia About Expansion of capacity of Seixal Negotiations scheduled for Nacional 50.0 steel plant. September. (Co-financing will be (SN) (Bank) required.) Petrogal 20.0 (R) Engineering Loan for Oil Loan signing on September 2. (Bank) Exploration - Including technical assistance for seismic work and drilling exploratory wells. To be To be (R) Agro-industry - Credit for expanded Preparation underway. deter- deter- production and processing of fruits, (Co-financing likely to be mined mined vegetables, wine, and dairy produce. required.) (Bank) To be About (R) Industrial Energy Efficiency - Retro- Appraisal report being prepared. deter- 25.0 fitting of equipment to minimize (Co-financing likely to be mined (Bank) energy use. required.) Electricidade To be (R) Power VII - Investment Program for Appraisal mission scheduled de Portugal deter- 1982-84 to meet growth in electricity for mid-October. (Co-financing (EdP) mined demand and to maintain reliability likely to be required.) (Bank) of the power system. See page 1 for footnotes. -54- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ROMANIA (INVESTMENT To be (R) Industry XII (Galati Steel) - Awaiting Government's final BANK) deter- Construction at Galati steel enter- decision on project details. mined prise of a cold reduction mill and (Bank) tinning line. (INVESTMENT *To be (R) Industry (Pigments) - Construc- Awaiting Government-s final BANK) deter- tion at Giurgiu of a plant to decision on project details. mined produce pigments for the paint (Bank) industry. (INVESTMENT To be (R) Industry X - Polyurethanes - Plant Awaiting Government's final BANK) deter- to produce about 50,000 tpy of decision on project details. mined polyurethane systems. (Bank) (INVESTMENT To be (R) Industry XI (Energy Saving Project Awaiting Government's final BANK) deter- and Process Improvement in Steel and decision on project details. mined Chemical Sub-sectors) - Project (Co-financing likely to be (Bank) components to be determined. sought.) (AGRICULTURAL To be (R) Agricultural Credit (Moldava) - Agri- Appraisal report being prepared. BANK) deter- cultural credits for Moldava Region (Co-financing likely to be mined through Bank for Agriculture and sought.) (Bank) Food Industry. (AGRICULTURAL - To be (R) Agricultural Credit (Transylvania) - Project preparation report BANK) deter- Regional development project, being prepared. (Co-financing mined including financing of agricultural likely to be sought.) (Bank) and agro-industrial investment in Transylvania Region. (AGRICULTURAL To be (R) Agricultural Credit (Oltania) - Initial preparation report BANK) deter- A line of credit through BAFI being prepared by Government. mined for agricultural development in (Co-financing likely to be (Bank) the Oltania Region. sought.) (AGRICULTURAL To be (R) Irrigation IX - Drainage, land Preliminary discussion with BANK) deter- reclamation and other related Government on drainage and land mined works on a sectorwide basis reclamation investments took (Bank) within the context of the Five- place in June. Subsector review/ Year Plan. identification mission scheduled for mid-October. (Co- financing likely to be sought.) (INVESTMENT To be Petroleum I - Enhanced oil recovery in Appraisal mission scheduled BANK) deter- existing fields (Videle and Baloria). for late September. (Co- mined financing likely to be sought.) (Bank) (INVESTMENT To be Industry XIII (Pharmaceuticals) - Feasibility study BANK) deter- Investment in 4 to 5 plants for underway. mined the manufacture of pharmaceutical (Bank) products and packaging materials. (INVESTMENT To be (R) Power V - Unidentified, but likely Government preparing project BANK) deter- to cover time slice investment for proposal and preliminary mined second half of 1981-85 Plan or technical documents. (Co- (Bank) development series of micro financing likely to be sought.) hydropower stations. (INVESTMENT To be South Constanta - Agigea Port - A Preappraisal mission BANK) deter- deep sea port and inner barge basin tentatively scheduled mined and other related structures for October. (Co-financing (Bank) and equipment. likely to be sought.) See page 1 for footnotes. - 55 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ SYRIAN ARAB REPUBLIC To be 40.0 Sewerage I - Sewerage facilities Awaiting Government decision determined (Bank) for Hama and Homs, and institution- on institutional arrangements. building in sub-sector. (Co-financing arranged with Arab Fund.) Syrian 30.0 Telecommunications II - Expansion Preparation of revised Telecommu- (Bank) of telecommunication services in project underway by nications selected urban and rural areas. STE. Establish- ment (STE) To be To be Priority roads in NE Syria, main- Feasibility study underway. determined deter- tenance operations and training. mined (Bank) Ministry of 15.6 Education II - Expansion of Approved by the Executive Education (Bank) technical/vocational training. Directors on April 23. To be 30.0 Development of rainfed areas, Appraisal report being determined (Bank) fruit tree planting and farm prepared. (Co-financing being mechanization in Southern region. arranged with IFAD and KfW.) To be To be Sewerage II - Secondary treatment Project under preparation deter- deter- works, main interceptors and second- by Government. (Co-financing mined mined ary collection system for Damascus being sought.) (Bank) sewerage facilities. To be To be (N) Education III - Extension of Preparation by Government deter- deter- vocational education and underway. mined mined training. (Bank) TUNISIA SOGITEX 18.6 Rehabilitation, modernization and Loan approved by the Executive (Bank) assistance to reorganize public Directors on June 2. sector textile company. Procurement: Retroactive financing of up to $500,000 for expenditures after April 30. Banque de 30.0 (R) Electrical and Mechanical Industries - Appraisal report being prepared. Developpement (Bank) Financial and technical assistance Economique de support_to subsector. Tunisie (BDET) Ministry of To be Construction of rural roads, and Appraisal report being prepared. Equipment/ deter- associated agricultural investments. Ministry of mined Agriculture (Bank) Ministry of 42.0 (R) Rehabilitation, modernization, and Negotiations substantially Agriculture, (Bank) expansion of Tunisia's capacity for completed. Office des handling, storage, and rail trans- Cereales port of domestic and imported Procurement: Retroactive grain; credit for conversion from financing of up to $300,000 bag to bulk harvest; technical for expenditures after March assistance. 1, 1981, to be recommended. To be To be Urban Development III - Financial Project being prepared by deter- deter- and technical assistance for the Government. mined mined rehabilitation of low-income (Bank) housing areas in several Tunisian towns. See page 1 for footnotes. - 56 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ TUNISIA (Cont'd) Ministries of To be (R) Education V - Establishment and Project being prepared Education and deter- extension of vocational and apprentice by Government. Agriculture mined training centers and agriculture (Bank) Teacher Training Institute. To be To be (R) Irrigation and agriculture Appraisal mission scheduled for deter- deter- development in the Nebhana area. mid-September. mined mined (Bank) Societe To be Water supply project focused on Project being prepared by Nationale deter- rural areas. Government and SONEDE. d-Exploitation mined et de (Bank) Distribution des eaux (SONEDE) Office To be Rehabilitation and expansion Project being prepared National de deter- of sewerage systems in about by ONAS and Consultants. 1'Assainissement mined 30 towns. (ONAS) (Bank) Ministry of To be Central Tunisia Irrigation Project being prepared by Agriculture deter- Project. Government and FA0/CP. mined (Bank) Societe de To be (N) Rehabilitation and expansion Project under preparation by Fonderie et deter- of foundry. Government. de Mecanique mined (SOFOMEGA) (Bank) To be To be (N) Irrigation Network at the Lower Project under preparation by deter- deter- Medjerda River using treated Government and FAQ/CP. mined mined sewerage, and water from Sidi (Bank) Salem Dam. TURKEY To be To be (R) Phase I of sewerage system for inner Second stage appraisal mission determined deter- city population of Istanbul, including scheduled for November. Bank mined sewer networks and marine disposal; Project Preparation Facility (Bank) land use and sewerage study of advance of $500,000 helped finance Golden Horn area; and training. foreign exchange costs of consultant services for project preparation. Ministry of 40.0 (R) Rural Development in Erzurum Appraisal report being prepared. Agriculture (Bank) province. (Joint financing under consideration by IFAD.) Procurement: Advance contracting and retroactive financing of up to $4 million for downpayments on construction equipment to be recommended. Agricultural To be - Agricultural Credit II. To be identified and prepared Bank of deter- during supervision of on-going Turkey (TCZB)- mined projects. (Bank) To be To be Production, processing and Government exploring possibility determined deter- marketing of improved seeds. of private sector involvement in mined proposed project. IFC may be (Bank) involved. State Pulp To be Paper Rehabilitation - Expansion Bank Project Preparation and Paper deter- and modernization of existing Facility advance of $500,000 Enterprise mined facilities. provided to finance consultants' (SEKA) (Bank) services for completing details for rationalizing, and energy saving at existing mills. See page 1 for footnotes. - 57 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ TURKEY (Cont-d) To be To be Livestock Products Development - Draft milk industry study determined deter- Modernization of extraction and completed; meat study mined processing of livestock products preparation being organized (Bank) from slaughtering stage onwards, by Government with Bank for both export and domestic assistance. markets; and rationalization and expansion of milk and milk prod- ucts industry. TSKB 100.0 Export Industries I. Loans to Appraisal report being prepared. (Bank) private sector for investment and (Commercial Bank co-financing to imported raw materials, technical be sought for fund to provide assistance and training. exporters short-term credit for imported raw materials.) To be To be Cement-Rehabilitation/modernization Project being prepared by public determined deter- of public and private sector sector cement company (CISAN) mined plants, and improvement of port and by consultants. (Bank) facilities for cement export. Republic To be Structural Adjustment Loan III - Timing dependent upon progress of Turkey deter- To support structural adjustment under Structural Adjustment mined in key areas. Loan II. (Bank) Selected Public To be (R) Fertilizer Rehabilitation II - Appraisal report being prepared. and Private deter- Rehabilitation and modernization (Co-financing will be sought.) Sector mined of selected facilities. Fertilizer (Bank) Procurement: Advance contracting Companies and retroactive financing of about $3 million for downpayments for critically needed equipment to be recommended. To be To be (R) Completion of on-going Project being prepared by deter- deter- irrigation and on-farm works; Government and Bank, with mined mined strengthening of extension FA0/CP assistance. (Bank) services. General To be (R) Highway Rehabilitation - Rehabili- Appraisal mission planned for Directorate deter- tation and strengthening of early November. of Highway mined priority highway sections and (Bank) improvements in highway rehabili- tation program. Republic To be (R) Development of selected At Government's request, of Turkey deter- lignite field(s) to expand Bank Project Preparation mined production; confirmation of Facility advance being (Bank) lignite local deposits and considered to help finance related technical assistance. foreign exchange costs of preparation work. YEMEN ARAB REPUBLIC National About Industry - Support for construction Feasibility study underway. Company for 5.0 materials industry. (Co-financing likely to be Industrial (IDA) required.) and Con- struction Materials (YEMROC) Ministry of About (R) Education IV - Components include Appraisal report being prepared. Education 10.0 educational development center (IDA) and faculty of engineering. Ministry of About Urban I - Upgrading of low income Appraisal report being prepared. Municipalities 15.0 settlements and provision of sites IDA Project Preparation (IDA) and services in Sanaa; construction facility advance of $480,000 advisory services; housing credit; approved to finance contingency institution building. services. See page 1 for footnotes. - 58- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ YEMEN ARAB REPUBLIC (Cont'd) Ministry of About (R) Agricultural research. Appraisal mission scheduled Agriculture 12.0 for mid-October. (Co-financing (IDA) likely to be required: OPEC Fund has expressed interest.) Ministry of To be (R) Wadi Jawf - Agricultural development. Consultants have started preparation. Agriculture deter- (Co-financing likely to be required: mined Islamic Bank has expressed interest.) (IDA) Ministry About (R) Health - Physical extension of Appraisal mission scheduled of Health 8.0 Health Manpower Institute; for mid-September. (Co-financing (IDA) institutional support to Ministry likely to be required.) of Health and Health Manpower Institute. Highway About (R) Highways IV - Strengthening of Taiz- Pre-appraisal mission rescheduled Authority 10.0 Almafraq Road, construction of 37 km to November, at Government's (IDA) of high-priority secondary roads, request. (Co-financing likely to and engineering studies. be required. Arab Fund likely to participate.) Yemen Oil About (R) Engineering Credit for selected phases Appraisal mission scheduled and Mineral 5.0 of Oil and Gas Exploration; feasi- for September/October. IDA Resources (IDA) bility studies for petroleum pipeline; Project Preparation Facility Corporation and technical assistance to YOMINCO. advance of $850,000 approved (YOMINCO) to finance feasibility studies for petroleum pipeline and services of consultant geologist. (Co-financing likely to be required; OPEC Fund has expressed interest in participating.) Central To be Technical assistance in pre- Project scope under Planning deter- investment, preparation and review review. Organization mined of projects. (IDA) Confederation To be National Rural Development - Preparation underway. of Yemeni deter- Assistance to development by means Development mined of increasing the operating effective- Associations (IDA) ness of the Local Development Associations (LDAs). Ministry of About (N) Agricultural Credit. FAO/CP preparation mission Agriculture 10.0 scheduled for September. (IDA) Yemen General About (N) Regional Electrification Preparation underway. (Co- Electricity 12.0 Phase II. financing likely to be required.) Corporation (IDA) (YGEC) YEMEN, PEOPLE-S DEMOCRATIC REPUBLIC OF Public To be (R) Power II - Electrification of the Appraisal mission tentatively Corporation deter- villages east of Mukalla and technical scheduled for November. (Co- for Electric mined assistance. financing likely to be required.) Power (PCEP) (IDA) Ministry of To be (R) Wadi Hadramout II - follow-up Feasibility study underway. Agriculture deter- project to Wadi Hadramout I to (Co-financing likely to be mined increase crop production through required.) (IDA) groundwater development and irrigation improvement. An IDA Project Preparation Facility advance of $500,000 has been approved to finance consultants- services for the preparation of detailed.designs; hydro-geological studies and topographical maps. See page 1 for footnotes. - 59 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ YEMEN, PEOPLE-S DEMOCRATIC REPUBLIC OF (Cont-d) Ministry To be (R) Fisheries III - Provision of fisheries Appraisal mission scheduled of Fish deter- training institute at Aden, and for late September. (Co-financing Wealth mined village fisheries development in likely to be required.) (IDA) five selected villages. Ministry of To be (R) Education III - Industrial, commer- Appraisal report being prepared. Education deter- cial, agricultural and teacher Post-appraisal mission scheduled mined training institutes and technical for December. (Co-financing (IDA) assistance. likely to be required.) Public To be (R) Water Supply II - Water supply for Project being reidentified. Water deter- Greater Seiyun, and assistance to Corporation mined Public Water Corp. (PWC) on sector (IDA) investment priorities. Ministry To be Health and Nutrition I - Components Government preparing project of deter- to be determined. with assistance of consultants Health mined financed by IDA Project (IDA) Preparation Facility advances of $83,000 and $183,400. Ministry To be Petroleum II - Onshore exploration Government preparing project. of deter- of Shabwa-Mareb Sedimentary Basin. Industry mined (IDA) Ministry To be (R) Education IV - Components to be Identification mission tentatively of deter- determined. planned for December. Education mined (IDA) Ministry To be Highways IV - Components to be Identification mission of deter- determined. scheduled for early 1982. Construction mined (IDA) YUGOSLAVIA To be Up to Montenegro Coastal Region Water Project definition being determined 50.0 Supply project - Regional water reviewed by Yugoslav (Bank) supply development scheme to authorities in light of support the growth of tourism and earthquake damage to water industrial activities in the var- and sewage facilities in ious coastal towns of Montenegro. the project area. Revised proposals awaited. (JUGEL) About Power Transmission III - Progress under ongoing 75.0 Financing of investments for JUGEL project and further (Bank) national transmission network work on feasibility report and control system. will determine timing of this loan. (Substantial co-financing to be required.) Community of About Railway VI - To finance a portion of Development plans being Yugoslav 85.0 the 1981-85 Development Plans of the prepared by Borrower. Railways (Bank) Yugoslav Railway Enterprises. Kosovska Banks About Industrial Credit VI - Line of To be identified and prepared Pristina; 80.0 credit for industrial development during supervision of on-going Privredna (Bank) in Kosovo, Bosnia-Herzegovina, projects. (Co-financing likely Banka Sarajevo; Macedonia and Montenegro. to be required.) Stopanska Banks Skopje; Investiciona Banka Titograd Privredna To be Bosnia Agriculture - Development of Appraisal report being prepared. Banks deter- agriculture and agro-industries Sarajevo mined in Bosnia-Herzegovina. (Bank) See page 1 for footnotes. -60- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ YUGOSLAVIA (Cont-d) Gracanka . About Kosovo/Pristina Water Supply - To Negotiations substantially completed. Water 41.0 improve water supply and distribution Enterprise (Bank) facilities for Pristina, Obilic, Procurement: Retroactive financing Kosovo Polje and Podujevo. up to $6.0 million is recommended. Bids for the supply of pipes invited. To be To be Serbia Regional Development - Regional Preparation underway by determined deter- development primarily focussing on Government authorities. mined agriculture and agroindustries in (Bank) less-developed areas of Serbia. To be To be Montenegro Regional Development - Preliminary preparation determined deter- Regional development primarily begun by Government mined focussing on agriculture and authorities, with FAO/Bank (Bank) agroindustries in less-developed Cooperative Program Assistance. areas of Montenegro. To be To be Kosovo Regional Development - Preparation underway by determined deter- Regional development primarily government authorities, with mined focussing on agriculture and assistance from FAO Co- (Bank) agroindustries in less-developed operative Program. areas of Kosovo. To be To be Water Supply/Sewerage for town of Preparation underway by determined deter- Tuzia. Government authorities. mined (Bank) To be To be Sava Drainage II - Provision of Preparation underway determined deter- drainage to about 32,300 ha in by Sava River Authority. mined Lonsko Polje, pumping stations, (Bank) soil amelioration, livestock farms, and construction and farm equipment. To be About Highways XII - Sector loan covering Master Plans being pre- determined 90.0 a three-year tranche (FY83-85) pared by Republican/ (Bank) of the Highway Master Plans of Provincial governments. selected less-developed Regions. See page 1 for footnotes. - 61 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ VI. LATIN AMERICA AND CARIBBEAN ARGENTINA Ministry of 115.0 (R) Ports I - Expansion and moderniza- Project preparation underway. Economy and (Bank) tion of Bahia Blanca port facilities. Secretariat Total project cost estimated at of Maritime $180 million of which about $130 mil- Affairs lion in foreign exchange. Ministry of 58.0 Technical and Vocational Training - Loan approved by the Executive Education (Bank) Upgrading and expansion of training Directors on October 7. facilities. Total project cost estimated at $149.5 million of which $58 million in foreign Procurement: Retroactive exchange. financing of up to $700,000 approved for preinvestment studies and equipment. To be 50.0 Bajos Submeridionales - Flood control Project preparation largely deter- (Bank) and agricultural development in completed. Proposed project mined northern provinces. design awaits approval by participating provinces and Federal Government. Obras Up to (R) Water Supply and Sewerage - Improve- Project preparation underway. Sanitarias 50.0 ments and extensions to water supply Discussions with Government de la Nacion (Bank) and sewerage systems in Rosario, in September. (OSN) Cordoba, Mendoza, and Buenos Aires including technical assistance for institutional improvement. (YACIMIENTOS 200.0 Refinery Conversion - Modification Loan approved by the Executive PETROLIFEROS (Bank) of YPF-s La Plata and Lujan de Directors on July 7. (Additional FISCALES Cuyo refineries to convert surplus financing of $421 million from (YPF)) fuel oil production into higher foreign commercial sources will value petroleum products. Project be required.) includes institutional assistance to YPF. Total project cost estimated Procurement: Retroactive financing at $878 million of which $439 million of up to $8 million for consultants in foreign exchange. contracts for basic engineering prior to loan signing and advance contracting of $15 million. (BANCO 100.0 Oil and Gas Credits - Financing Loan approved by the Executive NACIONAL (Bank) of private sector petroleum Directors on July 7. (Parallel loans DE projects through BANADE. from private Banks totalling $200 DESARROLLO) million to finance subprojects (BANADE) will be required.) Procurement: Retroactive financing of up to $5 million for the credit component and $200,000 for the technical assistance component for expenditures after April 1, 1981. (BANCO 100.0 (R) Industrial Credit II - Financing Negotiations in progress. NACIONAL (Bank) structural adjustment in industry DE through BANADE. Procurement: Retroactive financing DESARROLLO) of up to $5 million to be proposed (BANADE) to finance the foreign exchange cost of equipment. Retroactive financing would be restricted to small and medium-sized borrowing firms. Ministry 100.0 (R) Highway sector - Improvements and Negotiations scheduled for September. of (Bank) construction of sections of the Transport national highway network in FY1982- and Public 84 investment program. Total Works program cost estimated at $1,060 million of which $350 million in foreign exchange. See page 1 for footnotes. - 62 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ARGENTINA (Cont-d) (YACIMIENTOS 150.0 (R) Oil and Gas Development II Project identification PETROLIFEROS (Bank) in progress. FISCALES (YPF) BAHAMAS Ministry 8.6 (R) Urban Development - Improvement Negotiations scheduled for late of (Bank) in low-income area of Nassau September. (Cofinancing with Finance including upgrading of infra- commercial banks envisaged.) structure and housing, clearing of land titles, investment Procurement: Retroactive promotion and technical assistance. financing of up to $625,000 to Total project cost estimated at be proposed to cover equipment $24.3 million of which $10.6 mil- and technical assistance. lion in foreign exchange. BARBADOS Ministry 12.0 (R) Structural Adjustment Loan - To Proposal under consideration. of (Bank) support government economic program. Finance BOLIVIA (EMPRESA 35.0 Power V - Central Oriental inter- Appraisal report being NACIONAL DE (Bank) connection system, fourth unit for prepared. ELECTRICIDAD- Santa Isabel, and study of ENDE's (ENDE)) and DINE's organizational expansion, Procurement: Advance and a national tariff study. Total contracting under ICB project cost estimated at $57.3 satisfactory to Bank for million of which $45 million in about $2.8 million; foreign exchange. retroactive financing of $0.2 million. Ministry of 10.0 Santa Cruz Agricultural Development - Appraisal report being reviewed. Rural and (IDA) Credit, technical assistance and IDA Project Preparation Facility Agricultural social infrastructure for settlement advance of $50,000 approved for Affairs consolidation in Northern Santa Cruz. technical studies. Total project cost estimated at $16.9 million of which $5.7 million in foreign exchange. Ministry of Up to Agricultural Credit II - Credit and Project preparation dependent Rural and 10.0 technical assistance for crop and on measures now being considered Agricultural (Bank) livestock development. for institutional and financial Affairs strengthening of Banco Agricola de Bolivia. (YACIMIENTOS 60.0 Oil and Gas Development - Liquids Negotiations completed. PETROLIFEROS (Bank) condensate extraction and gas re- FISCALES cycling at Vuelta Grande gas Procurement: (a) Project Prepara- BOLIVIANOS) condensate field and secondary oil tion Facility advance of $1 million (YPFB) recovery at Monteagudo oil fields. approved for gas recycling simulation Total project cost estimated at study, detailed design and prepara- $74 million of which $60 million tion of bidding documents; (b) advance in foreign exchange. contracting under ICB satisfactory to Bank for up to $24 million and retroactive financing of up to $6 million for drilling under con- sideration. Ministries 20.0 Fourth Mining Credit - Assistance for Appraisal report being prepared. of Finance (Bank) small and medium mining operations and Mines through local financial intermediaries, and Banco Industrial and Banco Minero. Metallurgy See page 1 for footnotes. - 63 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BRAZIL (AMAZONAS Up to (R) Carajas Iron Ore Mining - Mine, Appraisal mission scheduled for MINERACOES, 300.0 rail and port facilities for October. (Private cofinancing S.A. (AMZA)) (Bank) export of up to 50 million tons expected to be needed.) per year of high grade iron ore. (REDE Up to RFFSA III (Railways) - Expansion and Project preparation underway. FERROVIARIA 150.0 rehabilitation program. FEDERAL, S.A. (Bank) (RFFSA)) (CENTRAIS 160.0 Power Distribution - Credit line for Awaiting resolution of sector issues. ELETRICAS (Bank) power distribution sub-projects - BRASILEIRAS sector loan. Total project cost S.A.) estimated at $349.2 million of which (ELETROBRAS) $107.6 million in foreign exchange. To be Up to (R) Northwest Region Development Negotiations scheduled for September. deter- 230.0 Program - Highway construction mined (Bank) component. Total project cost estimated at $800 million of which $280 million in foreign exchange. Instituto 80.0 (R) Northwest Region Development Preappraisal mission scheduled for Nacional de (Bank) Program III - New land settlement. January. Colonizacao e Reforma Agraria (INCRA) To be Up to (R) Northwest Region Development Appraisal report being prepared. determined 30.0 Program II - Rural development (Bank) in state of Mato Grosso. Total project cost estiiated at $85 million of which $25 million in foreign exchange. To be 40.0 (R) Maranhao Rural Development - Develop- Appraisal mission in the field. determined (Bank) ment project in two adjacent areas (Baixada Maranhense and part of Alto Turi region) to improve agri- culture and social infrastructure, land tenure situation and access to land by landless farmers. To be Up to (R) Health - Development of health Preparation mission scheduled determined 50.0 services in State of Sao Paulo. for September. (Bank) To be 150.0 Secondary and Feeder Roads III - Preparation mission scheduled determined (Bank) Construction and improvement. for September. To be 110.0 (R) Integrated Urban Development in Awaiting reply from Government determined (Bank) Recife Metropolitan Region. on timing of appraisal mission. To be 30.0 (R) Amazonas Agricultural Development - Appraisal mission scheduled for determined (Bank) Project aimed at improving production October. of foodcrops in selected areas of flood lands and introducing rational cultivation of highlands. About 5,000 ha. of smallholder oil palm may be developed. The project would assist from 8,000 to 10,000 small farmers. See page 1 for footnotes. -64 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ BRAZIL (Cont'd) To be 70.0 (R) Northwest Region Development Program - Negotiations scheduled for deter- (Bank) Agricultural development and envir- September. mined - onmental protection. Consolidation and rural development in Territory of Rondonia, establishment of measures to protect forest reserves and eco- logical stations; ecological research. Total project cost estimated at $210 million of which $44 million in foreign exchange. To be 13.0 (R) Northwest Region Development Program Negotiations scheduled for deter- (Bank) I - Health component. Total project September. mined cost estimated at $29 million of which $6 million in foreign exchange. (BANCO 200.0 (R) Water supply and sewerage in the Appraisal mission scheduled for NACIONAL (Bank) low-income areas of State of Sao October. DE HABITACA0 Paulo. (BNH) Secretaria de 50.0 (R) Bahia Rural Development II - Preparation mission scheduled Planejamento da (Bank) Integrated rural development in for October. Presidencia da northeast Bahia to assist small Republica farmers through provision of improved support services, land redistribution and infrastructure development. To be Up to Forestry Development, including Preparation mission scheduled determined 70.0 reforestation for production of for end-September. (Bank) charcoal in Minas Gerais. Ministry of Up to (N) Education V - Strengthening of Brazil's Identification mission scheduled Education 50.0 secondary agricultural school system for October. and Culture (Bank) through provision of training, equip- ment, furniture, curriculum development and other technical assistance. CHILE Servicio 30.0 Water Supply - In Regions IV and Review with Government in Nacional . (Bank) VIII, and technical assistance. progress. de Obras Sanitarias (SENDOS) To be Up to Industrial Credit - For small and Review with Government in deter- 75.0 medium industries. progress. mined (Bank) To be 35.0 Convento Viejo Irrigation - Includes Review with Government in deter-, (Bank) dam and irrigation canal construction progress. mined as well as rehabilitation of existing infrastructure. COLOMBIA Ferrocarriles 70.0 Railways VII - Track and equipment Awaiting final agreement. Nacionales de (Bank) rehabilitation, engineering studies (Cofinancing of $1.5 million Colombia (CNR) and consultants' services for from UNDP and $8.8 million institutional strengthening. Total from Federacion de Cafeteros project cost estimated at $149 mil- arranged.) lion of which $103 million in foreign exchange. Ferrocarriles Up to Railways VIII - Rehabilitation and Project preparation dependent Nacionales 120.0 modernization of railways and tech- on progress of Railways VII. de Colombia (Bank) nical assistance; possibly construc- (CNR) tion of improved alignments. (CARBOCOL- 10.0 Coal Engineering - National survey Project preparation INGEOMINAS) (Bank) of coal deposits and engineering of underway. one or two most promising cases. Also marketing studies and training. See page I for footnotes. - 65 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ COLOMBIA (Cont-d) (EMPRESA Up to Petroleum Development I - Financing Negotiations postponed to COLOMBIANA 150.0 of secondary recovery, seismic sur- permit Borrower to firm-up DE PETROLEOS (Bank) veys and follow-up discovery invest- investment program and (ECOPETROL)) ments. Total project cost estimated financing plan. (Co- at $341 million of which $205 million financing of about $70 in foreign exchange. million required.) Procurement: Advance con- tracting of $10.6 million for seismic surveys, with retroactive financing esti- mated at $2.5 million. (EMPRESA 359.0 Guavio Power Development - Construction Loan approved by the Executive ENERGIA (Bank) of hydro plant. Total project require- Directors on May 28. ELECTRICA ments estimated at $1,303 million of (Parallel 1DB financing of up DE BOGOTA which $928 million in foreign exchange. to $100 million and co-financing (EEEB)) of up to $470 million, including $130 million suppliers credits, envisaged.) (CORPORACION 36.0 Atlantic Distribution Expansion - Loan approved by the Executive ELECTRICA DE (Bank) Village electrification. Total Directors on May 21. LA COSTA project cost estimated at $68.7 ATLANTICA million of which $36 million in (CORELCA)) foreign exchange. (BANCO DE LA 60.0 Agro-Industries - Credit for large- Project preparation underway. REPUBLICA (Bank) and medium-scale agro-industries; (BOR)) possible pilot credit/technical assistance component for small scale agro-industries; agro-industrial research. (CARBONES DE Up to El Cerrejon Coal - Coal mining for Appraisal to be scheduled when basic COLOMBIA 300.0 export (Block B of the Cerrejon understanding reached with project (CARBOCOL)) (Bank) deposit) and port and railway sponsors. (Substantial co- construction. financing required.) (CAJA 29.0 Agricultural Credit V (Caja) - Credit Appraisal dependent on agreement AGRARIA) (Bank) for small- and medium-scale farmers by CAJA/Government on financial and and ranchers as well as for small- management improvements as pro- scale agro-industries and rural posed by Bank. enterprises. (INSTITUTO DE 7.5 (R) Upper Magdalena Watershed Manage- Negotiations tentatively scheduled LOS RECURSOS (Bank) ment - Pilot project to develop for October. NATURALES support system for managing water- RENOVABLES shed area and for'preventing further Y DEL MEDIO erosion. Pilot phase will test out AMBIENTE series of interventions in 3 sub- (INDERENA)) watershed areas and prepare large project for most important basin. Total project cost estimated at $25.3 million of which $8.9 million in foreign exchange. (EMPRESAS 29.0 Barranquilla Water - Expansion of Project preparation PUBLICAS (Bank) water facilities (construction of underway. MUNICIPALES DE a new water treatment plant); BARRANQUILLA) extension of water distribution and sewerage networks and tech- nical assistance. Fondo 33.0 Rural Roads - Construction of Loan approved by the Executive Nacional (Bank) feeder roads and strengthening Directors on March 31. de Caminos of rural road institution. Total Vecinales project cost estimated at $63 million of which $33 million in foreign exchange. See page 1 for footnotes. - 66 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ COLOMBIA (Cont-d) Instituto 37.0 Irrigation Rehabilitation I - Loan approved by the Exective Colombiano (Bank) Reconstruction and expansion of Directors on May 19. de Hidrologia, existing irrigation schemes for Metereologia y small farmers and beneficiaries Procurement: Retroactive financing Adecuacion de of land reform. Total project of up to $400,000 for civil works Tierras (HIMAT) cost estimated at $86.3 million of approved. which $37 million in foreign exchange. To be 52.0 Rural Development II - Continuation Appraisal report being determined (Bank) of integrated rural development prepared. program initiated under Rural Development 1. Total project cost estimated at $148 million of which $36 million in foreign exchange. (EMPRESAS 45.0 (R) Ports - Modernization of existing Draft final report of UNDP- PUERTOS DE (Bank) ports and installation of container financed study is being reviewed COLOMBIA terminals. by Government and the Bank. (COLPUERTOS)) Pre-appraisal mission scheduled for October. (EMPRESAS 85.0 Playas Power (Hydro) - Development Loan approved by the Executive PUBLICAS DE (Bank) of 200 MW hydroelectric plant. Total Directors on March 3. ($85 mil- MEDELLIN project cost estimated at $311.4 mil- lion IDB co-financing envisaged.) (EPM)) lion of which $176.8 million in foreign exchange. (EMPRESA 60.0 Phosphate Fertilizer-Construcfion of Project preparation underway. COLOMBIANA (Bank) facilities for processing of local DE MINAS) phosphate rock, including phosphoric (ECOMINAS)) acid, sulfuric acid, TSP and DSP plants. Ministerio de 'Up to (R) Highway VIII - Primarily construction Appraisal report being prepared. Obras 145.0 and rehabilitation of roads. Publicas y (Bank) Transporte (MOPT) Interconexion Up to Canafisto Power- Hydropower. Project preparation underway. Electrica 150.0 S.A. (Bank) (ISA) (CORPORACION Up to Urban Transport - Credit program to Project preparation FINANCIERA 50.0 finance the construction of inter- underway. DEL (Bank) urban bus terminals; also, technical TRANSPORTE assistance to improve the efficiency (CFT)) of inter-urban transport services. Ministry of 15.0 (R) Basic Rural Education - Expand Appraisal mission scheduled for Education (Bank) availability, appropriateness September. and quality of rural primary education. Project is national in scope and includes soft-ware as well as buildings. (EMPRESAS Up to Rio Grande Hydropower - Generation. Project preparation underway. PUBLICAS DE 50.0 MEDELLIN) (EPM)) (Bank) (CORPORACION Up to CVC Calima, Distribution/Transmission/ Project preparation underway. AUTONOMA DEL 62.5 Control-Generation, distribution and VALLE DEL RIO (Bank) control. CAUCA)(CVC)) COSTA RICA To be 15.0 Pococi-Limon Regional Agricultural - Project preparation underway. determined (Bank) Development. See page 1 for footnotes. - 67 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ COSTA RICA (Cont-d) Instituto Up to Development of Coto Sur area. Total Project under discussion with de Tierras 26.5 project cost estimated at $49 million Government. (Possible co- y Colonizacion (Bank) of which $26.5 million in foreign financing with CDC.) (ITCO) exchange. Ministry of Up to Education II - Support for manage- Appraisal report being prepared. Education 3.5 ment reorganization and institution Bank Project Preparation (Bank) building for education system. Total Facility advance of $100,000 project cost estimated at $7.0 million approved for consulting services of which $3.5 million in foreign and training of project staff. exchange. Instituto Up to (R) Power VII - Palomo hydroelectric Further processing postponed Costarricense 45.0 power plant and transmission distri- until second half of 1982, de (Bank) bution expansion program. due to changes in ICE-s invest- Electricidad ment program. (ICE) DOMINICAN REPUBLIC (BANCO 30.0 Industry I - Financing of small and Negotiations substantially completed. CENTRAL) (Bank) medium scale industry and export related enterprises. Total project cost estimated at $50 million of which $30 million in foreign exchange. Instituto Up to Sites and Services I - For Santo Appraisal report being prepared. Nacional 25.0 Domingo. Total project cost esti- $500,000 advance granted under de la (Bank) mated at $41 million of which $14 Bank Project Preparation Facility Vivienda million in foreign exchange. for topographic survey, mapping, (INVI) soil investigation; prelimi- nary engineering and final design; survey of target groups; community motivation and assistance program. Ministry 24.0 Cocoa and Coffee Renovation - Total Loan approved by the Executive of Agriculture (Bank) project cost estimated at $40 million Directors on June 23. of which $13 million in foreign exchange. Ministry of 15.0 (R) Education III - Support and expansion UNESCO preparation mission Education (Bank) of rural primary education facilities. scheduled for September. Corporacion 50.0 (R) Rio Blanco Power - Distribution Appraisal mission scheduled Dominicana de (Bank) system for Santo Domingo and for September. (Co-financing Electricidad feasibility studies for three from suppliers will be needed.) hydropower projects. Corporacion 15.0 (R) Coal Port - Construction of wharf for Project preparation underway. Dominicana (Bank) unloading coal vessels, and studies An advance of $500,000 under the de Electricidad for medium and long-term coal import Bank Project Facility was approved needs and required facilities. for preparation of preliminary and final engineering studies. Consultants for the studies have been selected. ECUADOR Instituto 100.0 Power I - INECEL transmission Loan approved by the Executive Ecuatoriano (Bank) system expansion. Total project Directors on July 21. de Electrifi- cost estimated at $151 million cacion (INECEL) of which $115 million in foreign exchange including interest during construction. See page 1 for footnotes. - 68 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ ECUADOR (Cont'd) Ministerio 20.0 Rural Development II (Puerto Ila- Loan approved by the Executive de Agricultura (Bank) Chone) - Project components to include Directors on May 12. y Ganaderia improvement of rainfed agriculture; credit and technical assistance; feeder roads and social infrastructure. Total project cost estimated at $57.1 million of which $19 million in foreign exchange. Ministerio 17.0 Agriculture/Rural Development III - Loan approved by the Executive de Agriculture (Bank) Credit, roads and social infra- Directors on July 21. y Ganaderia. structure in Esmeraldas Province. Total project cost estimated at $48.5 million of which $13.3 million in foreign exchange. Corporacion Up to Petroleum I - Project components Project preparation Estatal 70.0 to include oil field rehabilitation underway. Petrolera (Bank) and water injection in oil fields. Ecuatoriana (CEPE) Instituto Up to (R) Water Supply and Sewerage - For Project preparation Ecuatoriano 40.0 medium-size cities, and a technical underway. de Obras (Bank) assistance program. Sanitarias Banco 35.0 (R) Urban Development II - National Appraisal report being prepared. Ecuatoriano (Bank) low-cost housing program, sites . de la and services and housing loans. Vivienda Total project cost estimated at $112 million of which $27 million in foreign exchange. Ministry of 20.0 Cocoa Rehabilitation - Improvement Project preparation Agriculture (Bank) of existing cocoa crops. underway. and Banco Nacional de Fomento Corporacion Up to DFC V - Credit for industrial firms Appraisal report being Financiera 60.0 through finance companies. Total prepared. (Co-financing Nacional (CFN); (Bank) project cost estimated at $320 being considered.) Ecuatoriana de million of .which $160 million in Desarrollo, S.A.; foreign exchange. Compania Financiera (COFIEC), and other financing companies Servicio 17.8 Education III - Vocational Training. Appraisal report being prepared. Ecuatoriano (Bank) Total project cost estimated at $35.9 de Capacitacion million of which $17.8 million in Profesional foreign exchange. (SECAP) Instituto 80.0 (N) Power Generation - Toachi hydroelectric Project preparation underway. Ecuatoriano de (Bank) development. Electrificacion (INECEL) Corporacion 30.0 (N) Small-Scale Enterprise Credit II - Project preparation underway. Financiera (Bank) For small industries through banks Nacional and finance companies.. (CFN) See page 1 for footnotes. - 69 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ EL SALVADOR Banco 10.0 (R) DFC - Provision of long-term indus- Project priority to be Central (Bank) trial credit for small- and medium- reviewed with Government. size enterprises. Total project cost estimated at $19.8 million of which $10 million in foreign exchange. Instituto Up to (R) Urban Development III - Squatter Project priority to be de Vivienda 30.0 upgrading, serviced-sites, employ- reviewed with Government. Urbana (IVU), (Bank) ment generation and technical Federacion de assistance. Cajas de Credito (FEDECCREDITO), Fundacion Salvadorena de Desarrollo y Vivienda Minima (FSDVM) Comision Up to (R) Ports I - Expansion of Acajutla Project priority to be Ejecutiva 30.0 Port to include container handling reviewed with Government. Portuaria (Bank) facilities. Autonoma (CEPA) Ministry of Up to (R) Water Supply and Sewerage Engineering - Project priority to be Planning 7.0 Preparation of projects for water reviewed with Government. (Bank) supply and sewerage for San Salvador and municipalities and technical assistance. Total project cost estimated at $9 million of which $7 million in foreign exchange. GUATEMALA Banco Nacional To be Urban Development - To benefit about Further preparation de la Vivienda deter- 28,000 households in Guatemala City depends on progress of mined and five to six other major cities; urban component of earth- (Bank) upgrading of existing informal settle- quake reconstruction ments in Guatemala City with infra- project. structure, and individual credits for home improvement and consolidation; as well as credits, technical assis- tance and commercial industrial sites to benefit very small-scale labor- intensive enterprises. Empresa To be (R) Communications III - Further expansion Appraisal mission scheduled Guatemalteca deter- of telephone network including cable for November. de mined network, distribution and long Comunicaciones (Bank) distance facilities. (GUATEL) Instituto 80.0 (R) Power V - Two transmission lines: Preparation mission Nacional (Bank) Eastern and Western; normal distri- planned for October. de bution expansion program of INDE Electricidad, and EEG (distribution company of S.A. (INDE) Guatemala City); detailed engineer- ing for Zunil geothermal develop- ment; and studies of Xalala hydro project, of small hydro development, and another hydro development to be identified. GUYANA Ministry 2.0 (R) Oil Exploration Promotion - Data Appraisal report being of Energy (IDA) compilation and evaluation, review prepared. and of legislation, contract super- Mines vision and training. Total project cost estimated at $2.3 million of which $2 million in foreign exchange. See page 1 for footnotes. - 70 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ HAITI Organisme de Up to Integrated Rural Development of Project preparation underway. Developpement 13.0 Northern Plain - Second stage. du Nord (0DN) (IDA) Office 10.0 Urban Development I - In two provincial Project preparation underway. National (IDA) towns, upgrading of central market IDA Project Preparation Facility du Logement in Port-au-Prince and related advance for consultants' services technical assistance. increased to $1 million. Ministry of 15.0 (R) Education III - Construction, furnish- Appraisal report being prepared. Education (IDA) ing, equipping of primary teacher training and vocational schools. Total project cost estimated at $16.8 million of which $7.7 million in foreign exchange. Ministry of 3.0 Pilot Forestry Project - Pilot Appraisal report being prepared. Agriculture (IDA) forest management, trials and studies, technical assistance, training and extension. Total project cost estimated at $6 million of which $4.2 million in foreign exchange. Ministry 15.0 Highways VI - Bridge reconstruction, Appraisal report being prepared. of Public (IDA) and strengthening/rehabilitation Works, of primary roads. Total project Transports- cost estimated at $20.7 million of tion and which $15 million in foreign Communication exchange. Electricite 26.0 (R) Power III - Generation, transmission Appraisal report being prepared. de Haiti (IDA) and distribution, mainly in Port- (Co-financing may be required.) (EDH) au-Prince area. Total project cost estimated at $36.3 million of which $29.9 million in foreign exchange. HONDURAS Central 30.0 Industrial Credit II - Credit for Appraisal report being prepared. Bank (Bank) small and medium industry. Total project cost estimated at $57 million of which $30 million in foreign exchange. To be Up to Water supply, sewerage and drainage - Review with Government in deter- - - 13.0 for San Pedro Sula or Tegucigalpa. progress. mined (Bank) 12.0 (IDA) JAMAICA Port 13.5 Kingston Free Zone - Construction Negotiations in progress. Authority (Bank) of buildings and infrastructure for of Jamaica free trade zone area, and technical assistance. Total project cost estimated at $24.2 million of which $14.7 million in foreign exchange. Petroleum 7.5 Petroleum Exploration - Offshore Loan approved by the Executive Corporation (Bank) seismic survey, exploration and Directors on June 16. of Jamaica development, technical assistance and training, equipment and materials, and feasibility study of lubricating oil recovery project. Total project cost estimated at $8.4 million of which $7.5 million in foreign exchange. See page 1 for footnotes. - 71 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ JAMAICA (Cont'd) To be 12.0 Urban Transport - Improvement in Project preparation deter- (Bank) infrastructure, traffic manage- underway. mined ment and rolling stock. To be 20.0 Industrial Credit - Long-term Project scope being reviewed. deter- (Bank) development credits to export mined industries, including small- scale industries. To be 6.0 Technical Assistance - Technical President-s Report deter- (Bank). assistance in economic and financial being prepared. mined management. Ministries of 6.8 (R) Technical and Vocational Training - Appraisal report being Youth and (Bank) Improvement of technical/vocational prepared. Community education system. Includes assistance Development for College of Arts, Science and Procurement: Retroactive Technology, the Vocational Training financing of up to $100,000 Development Institute and-establish- for project preparation proposed. ment of two industrial production centers. MEXICO Secretaria de To be (R) Forestry. Awaiting Government submission Agricultura deter- of project proposal. y Recursos mined Hidraulicos (Bank) (SARH) Banco Up to (R) Fisheries. Project preparation mission in Pesquero y 50.0 the field. Portuario (Bank) (BANPESCA) Nacional Up to (R) Installation of foundry forge in Market and feasibility studies Financiers 100.0 Lazaro Cardenas. being reviewed. (Co-financing (NAFINSA) (Bank) being sought.) Nacional 175.0 Rural Development - PIDER III. Loan approved by the Executive Financiera (Bank) Total project cost estimated at Directors on July 21. (NAFINSA) $506 million of which $175 million in foreign exchange. Procurement: Retroactive financing of up to $5 million after January 1, 1981 for civil works and initial operations approved. Nacional 70.0 (R) Fertilizer -Further expansion of Awaiting Government submission Financiers (Bank) manufacturing facilities and improve- of project proposal. (NAFINSA) ment in distribution. and Fertilizantes Mexicanos (FERTIMEX) Secretaria de 75.0 (R) Pujal Coy - Irrigation and agricul- Project preparation Agricultura y (Bank) tural development in the Panuco underway. Recursos Basin. Hidraulicos (SARH) Secretaria 100.0 (R) Agricultural Development - Appraisal report being prepared. de Agricultura (Bank) San Fernando Valley. y Recursos Hidraulicos (SARH) Nacional 150.0 (R) Capital Goods Credit - Development Appraisal report being prepared. Financiers (Bank) of capital goods industries. Total (NAFINSA) project cost estimated at $1,000 million of which $500 million in foreign exchange. See page 1 for footnotes. - 72 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Lender 2/ Project 3/ Procurement 4/ MEXICO (Cont'd) To be Up to (R) Agricultural Marketing - Improvement Project preparation underway. deter- 50.0 of infrastructure and services for mined (Bank) storage, transport, and sale of perishable agricultural products. Secretaria Up to PIDER IV - Integrated rural develop- Project preparation underway. de 200.0 ment. Programacion (Bank) y Presupuesto (SPP) Nacional Up to (R) Pollution Control - Credit to in- Appraisal report being prepared. Financiera 60.0 dustries, mainly those located (NAFINSA) (Bank) in the Mexico Valley, to install pollution control equipment and technical assistance in implementing pollution control programs. Nacional Up to Irrigation Rehabilitation Bajo Appraisal report being prepared. Financiera 100.0 Bravo/Bajo San Juan II - (NAFINSA) (Bank) Continuation of ongoing Bajo Rio Procurement: Advance contracting Bravo irrigation project to in- with possibility of retroactive crease agricultural production financing of up to 10% of loan in the Bajo Rio Bravo/Bajo amount proposed for construction Rio San Juan Irrigation District. of drainage network. Total project cost estimated at $533 million of which $181 million in foreign exchange. Banco 200.0 (R) Water Supply and Sewerage - Con- Project preparation underway. Nacional de (Bank) struction of water supply and Obras y sewerage system in a number of Servicios medium size cities and in a state Publicos water company, including technical (BANOBRAS) assistance for the creation of the state water company. Nacional Up to (N) FONEI V - Credit for development Project preparation underway. Financiera 100.0 of export-oriented industries. (NAFINSA) (Bank) NICARAGUA Ministry of To be (R) Education III - Extension and improve- At the request of the Govern- Education deter- ment of rural primary education, ment, Project withdrawn from mined including adult literacy and skills Board consideration. Re- (Bank) training. appraisal tentatively scheduled for late 1981. Instituto To be Expansion of Managua-s water supply Preparation underway. Nicaraguense deter- system. de Agua y mined Alcantarillados (Bank) (INAA) Fondo Up to (R) Line of credit for agriculture. Appraisal report being prepared. Especial 20.0 de (Bank) Desarrollo (FED) Instituto Up to Stage II of Momotombo Geothermal Preparation underway. Nicaraguense 25.0 Plant. de Energia (Bank) (INE) See page 1 for footnotes. - 73 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ NICARAGUA (Cont-d) Junta Up to (R) Municipal Development - Storm drainage Negotiations underway. de Recon- 16.0 and low income neighborhood improve- struccion (Bank) ment program for Managua, and pilot Procurement: Retrcactive financing de Managua national municipal development invest- of up to $1.4 million proposed (JRM) ment program through financing a muni- after March 1981 for storm drainage and Secretaria cipal fund to provide credit and and protection work. de Asuntos technical assistance to secondary Municipales cities for municipal improvement. (SAMU) Total project cost estimated at $22.8 million, of which $13.9 million in foreign exchange. Ministry of To be Highways - To improve production Preparation underway. Transportation deter- roads to all-weather status and mined road maintenance program. (Bank) PANAMA Instituto de Up to Water Supply and Sewerage II - Appraisal mission planned for Acueductos y 20.0 Improvement of systems in September. Alcantarillados (Bank) Panama City, Colon, Chorrera and Nacionales Santiago; metering program and (IDAAN) technical assistance. Total project cost estimated at $45 million of which $20 million in foreign exchange. Autoridad Up to (R) Improvements of the ports of Balboa, Negotiations tentatively Portuaria 19.0 Cristobal and some smaller ports. scheduled for October. Nacional (APN) <(Bank) Total project cost estimated at $33.6 million of which $20.3 million in foreign exchange. Instituto Up to (R) Fortuna II Hydroelectric Power. Scheduling of appraisal mission de Recursos 25.0 is now dependent on resolution of Hidraulicos y (Bank) technical problem recently discovered Electrificacion in connection with Fortuna I project (IRHE) which also affects this project. (Co-financing may be required.) Corporacion 10.0 Cerro Colorado Engineering Studies - Project preparation underway. de Desarrollo (Bank) Engineering and technical assistance Appraisal planned for October. Minero for copper mining. (CODEMIN) PARAGUAY Ministry of 30.0 Area development in Caazapa Depart- Appraisal report being Agriculture (Bank) ment - Including agricultural prepared. and Livestock credit, extension, research, forest (MAG) management, soil conservation, health facilities and rural roads. Total project cost estimated at $53 million of which $32 million in foreign exchange. Administracion 13.0 (R) Ports II and Inland Waterways - Consultants currently preparing Nacional de (Bank) Development of facilities in final design of project, Navegacion y Ports of Asuncion and Villeta including economic justification. Puertos (ANNP) and improvement in riverways. By November Bank will review progress and decide on reappraisal. To be Up to (R) Rural Development III - Integrated Appraisal mission scheduled for determined 20.0 rural development in Eje Norte mid-September. (Bank) (Chore and San Estanislao) benefit- ting about 12,000 farmers established in private and government settlements. Ministerio 45.0 (R) Highways VII - Construction of Appraisal mission in early de Obras (Bank) Tacuara-Santa Rosa road, Villarica - September. Publicas Numi road and reconstruction of San Lorenzo-Eusebio Ayala road. See page 1 for footnotes. - 74 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ PARAGUAY (Cont'd) Instituto de To be Urban Development - Financing of Project preparation underway. Desarrollo deter- key investment (markets, bus Municipal mined terminals, etc.) in municipalities (Bank) in Southeastern Paraguay. To be To be Agricultural development - Agricul- Project identified. deter- deter- tural extension, credit, research, Preparation will begin in mined mined health facilities, and rural roads October. (Bank) in Southeastern Paraguay. PERU Ministry of 58.0 (R) Aviation I - Improvement and con- Loan signed on August 19. Transport (Bank) struction of four domestic airports Communications equipment under in Amazon corridor, provision of consideration to be financed communications, air navigational and from German sources. other equipment, and final engineering for a new airport for Cuzco. Total project cost estimated at $127.2 mil- Bank Project Preparation lion of which $77 million in foreign Facility advance of $800,000 exchange. is financing final engineering for domestic airports. Con- sultant has started work. Banco Agrario Up to Agricultural Credit VI - Medium- and Project preparation underway. del Peru 40.0 long-term credit for agricultural (Bank) development. (EMPRESA DE 40.0 Lima Water Supply - Rehabilitation Project preparation underway. SANEAMIENTO DE (Bank) and extension of Lima Water Supply. Appraisal mission scheduled LIMA) (ESAL) for September. Ministerio de Up to Roads VIII - Rehabilitation (200 km), Appraisal report being Transportes y 90.0 and improvement, including paving prepared. Comunicaciones (Bank) (390 km). Total project cost estimated at $176 million of Procurement: Advance which $90 million in foreign contracting may be used. exchange. Ministry of 40.0 Education II - Primary education. Preparation mission planned Education (Bank) for September. (CORPORACION 60.0 (R) Second investment credit for Loan signed on August 19. FINANCIERA (Bank) industrial and tourism development. DE DESARROLLO) (CENTROMIN) Up to Mining II - CENTROMIN's 1981-84 Project preparation underway. 50.0 investment program, including expansion (Co-financing being sought.) (Bank) of polymetallic mines, improvement of CENTROMIN-s refinery facilities and infrastructure works. (ELECTROPERU) 25.0 (R) Power Engineering - Feasibility Loan signed on August 19. (Bank) studies for generation and transmission projects in 1982-90 period. Total Project cost estimated at $40.7 million of which $25 million in foreign exchange. (CENTRAL Up to (R) Small Scale Industry - Industrial Appraisal report being prepared. BANK) 25.0 credit for small scale industries. (Bank) Total project cost estimated at $50 million of which $25 million in foreign exchange. Ministry Up to (R) First Health Project - Construction Appraisal mission scheduled for of 20.0 and improvement of primary health November. Health (Bank) care facilities in selected areas of Peru and technical assistance for the health sector. See page 1 for footnotes. - 75 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1/ Lender 2/ Project 3/ Procurement 4/ PERU (Cont-d) Petroleos Up to Petroleum II - Primary and Secondary Project preparation underway. del Peru 80.0 Recovery in the Brea y Parinas Area. Appraisal mission scheduled (PETROPERU) (Bank) for September. To be Up to Urban Development II - Construction Project preparation determined 60.0 of sites and services, public utility underway. (Bank) connections, slum upgrading and supervised credit. Ministerio 25.0 (R) Agricultural research and Appraisal mission scheduled de Agricultura (Bank) extension. for September. (ELECTROPERU) 90.0 (R) Power VI - Distribution expansion Appraisal mission in the field. (Bank) for Lima; engineering and bidding documents for Mantaro water expansion, construction of Yuracmayo reservoir, and engineering for Huinco and Salto Bajo expansion. To be To be Power VII - 420 MW Yuncan hydro- Project preparation underway. determined deter- electric plant and distribution. mined (Bank) SURINAME To be 20.0 Kabalebo Hydroelectric Power - Con- Appraisal report being prepared. determined (Bank) struction of dams and power plant (Cofinancing envisaged with with initial capacity of 300 MW; Netherlands Government, IDB, transmission lines, studies and EDF, EIB, and other official training. Total project cost, in- and private sources.) cluding interest during construction, estimated at $735 million of which $550 million in foreign exchange. To be 5.0 Oil Exploration Promotion - Project preparation underway. determined (Bank) URUGUAY Administracion 40.0 (R) Telecommunications I - Financial Loan signing September 9. Nacional de (Bank) assistance for 1981-85 rehabilitation Tele- and expansion program, which includes comunicaciones major investments in telephone system. (ANTEL) Total project cost estimated at $205.8 million of which $135.8 million in foreign exchange. Ministerio de 40.0 Highways III - Improvement of national Preappraisal mission scheduled Transportes (Bank) highway network and possibly feeder for October. (Co-financing y Obras roads. with commercial banks Publicas probable.) Ministry of 15.0 (R) Education II - Physical and qualita- Preappraisal mission in the field. Education (Bank) tive improvements to key areas of primary and secondary education. Asociacion Up to Oil Exploration. Project preparation underway. Nacional de 10.0 Combustibles, (Bank) Alcohol y Portland (ANCAP) See page 1 for footnotes. - 76 - VII. NEW PROJECTS ADDED IN THIS ISSUE Amount & Member Probable Country Lender Project Stage of Processing EASTERN AFRICA MAURITIUS To be Northern Plains Irrigation - Irrigation Project being prepared, deter- infrastructure for about 2,500 ha; pro- (Co-financing with AfDB mined vision of agricultural services and in- agreed.) (Bank) puts for about 1,200 small farmers growing sugar cane and food crops. TANZANIA 20.0 Power IV - Rehabilitation of existing diesel Appraisal mission scheduled (IDA) units and construction of a 75 MW hydro- for November. (Co-financing station on the existing Mtera Dam with the possibilities being explored.) necessary tunnel, transmission line and substations. Total project cost estimated at $295.7 million. UGANDA 30.0 Export Crops Promotion - Program credit type The reassessment of the Agri- (IDA) operation to help restore production of culture (Coffee) Project export crops. ascertained that other donors are providing adequate assistance to the Coffee Sector and iden- tified the need for a broader based assistance to other export crops. Project pre- paration under way. WESTERN AFRICA NIGER 28.5 Irrigation Rehabilitation Project - To Financing to help preparation (IDA) rehabilitate existing irrigation works; was provided for by an advance procure equipment for maintenance and of $900,000 from the IDA operation of irrigation works; supply Project Preparation Facility. agricultural inputs; train project staff, cooperative managers and farmers. EAST ASIA & PACIFIC INDONESIA 90.0 Swamp Reclamation II - Development of 40,000 Project preparation under way. (Bank) ha of low-lying lands on the south Sumatra coast to settle about 14,000 families from Java/Bali; drainage, settlement, agricultural infrastructure. MALAYSIA 35.0 Kedah Agricultural Development - Rubber re- Appraisal mission scheduled (Bank) planting, irrigation and drainage, rural for September. roads, livestock and fishery development and agricultural support services. PHILIPPINES 8.0 Urban Engineering - To finance preliminary and Appraisal report being (Bank) detailed engineering for the preparation of prepared. two urban projects (Urban IV and VI). 50.0 Rural Water Supply - To help improve water Project being prepared by (Bank) supply and sanitation in selected rural Government. areas using low-cost schemes. THAILAND 150.0 Structural Adjustment Loan - To help the Appraisal mission in the (Bank) Government implement its structural adjustment field. policies related to agriculture, industry, energy, fiscal policy and institutional reform. - 77 - Amount & Member Probable Country Lender Project Stage of Processing SOUTH ASIA INDIA 40.0 Haldia Water Supply and Sewerage Project - Project preparation under (IDA) Construction of 225 million liters/day way. treatment plant, 4 pumping stations and a 90 km long water transmission main to serve the needs of the Haldia Development Authority, plus 2 towns and rural communi- ties en route. 50.0 Bihar Water Supply - Provision of piped water Project preparation under (IDA) supply to about 8 towns and surrounding way. villages in the State of Bihar. 25.0 Madhya Pradesh Urban Development Project - Project preparation under (IDA) Shelter and infrastructure investments in way. several medium-sized cities in the State of Madhya Pradesh. EUROPE, MIDDLE EAST & NORTH AFRICA MOROCCO 60.0 Construction of Dchar el Oued multi-purpose Identification mission (Bank) dam and power plant. scheduled for September. 80.0 Highway IV - Rehabilitation of primary and Preparation will start in (Bank) secondary roads, construction and improve- October by Government and ment of rural roads, completion of Casablanca- consultants. Rabat Expressway, and maintenance equipment. To be Telecommunication Project - Components to be Preparation by Government deter- identified. under way. mined (Bank) To be Third Urban Development - Components to be Preparation by Government deter- identified. under way. mined (Bank) To be Electro-mechanical Industries Project - Reconnaissance mission deter- To provide sectoral support; project scope scheduled for November. mined to be defined. (Bank) SYRIAN ARAB REPUBLIC To be Education III - Extension of vocational educa- Preparation by Government deter- tion and training. under way. mined (Bank) TUNISIA To be Rehabilitation and expansion of foundry. Project under preparation deter- by Government. mined (Bank) To be Irrigation Network at the Lower Medjerda Project under preparation deter- River using treated sewerage,and water from by Government and FAO/CP. mined Sidi Salem Dam. (Bank) YEMEN ARAB REPUBLIC About Agricultural Credit. FAO/CP preparation mission 10.0 scheduled for September. (IDA) About Regional Electrification Phase II. Preparation under way. 12.0 (Co-financing likely to (IDA) be required.) - 78 - Amount & Member Probable Country Lender Project Stage of Processing LATIN AMERICA & CARIBBEAN BRAZIL Up to Education V - Strengthening of Brazil's second- Identification mission 50.0 ary agricultural school system through provi- scheduled for October. (Bank) sion of training, equipment, furniture, curri- culum development and other technical assistance. ECUADOR 80.0 Power Generation - Toachi hydroelectric Project preparation under (Bank) development. way. 30.0 Small-Scale Enterprise Credit II - For small Project preparation under (Bank) industries through banks and finance com- way. panies. MEXICO Up to FONEI V - Credit for development of export- Project preparation under 100.0 oriented industries. way. (Bank) I/