(P159843) Metropolitan Buenos Aires Urban Transformation Project PROCUREMENT PLAN Country: Argentina Region: LATIN AMERICA AND CARIBBEAN Approval Date: 27-Feb-2017 General Procurement Notice published on: 24-Feb-2017 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Argentina : Metropolitan Buenos Aires Urban Transformation Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 2020-07-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159843 GPN Date: 2017-02-24 Project Name: Metropolitan Buenos Aires Urban Transformation Project Loan / Credit No: IBRD / 87060 Executing Agency(ies): Multilateral Credit Organizations Financing Unit WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-UFOMC-10275-CW-RFB Urban and social integration Solicitud de Single Stage - One 23,261,984.9 / Completamiento de red IBRD / 87060 Previa Open - National 24,000,000.00 Firmado 2017-04-06 2017-05-16 2017-04-11 2017-06-01 2017-06-21 2017-07-01 2017-09-11 2017-08-05 2017-10-26 2018-09-29 of Barrio 31 in CABA ofertas Envelope 7 fina (Barrio 31) AR-UFOMC-13527-CW-RFB Urban and social integration Solicitud de Open - Single Stage - One 103,000,000.0 82,830,721.2 / Construcción de Vivienda IBRD / 87060 Previa Firmado 2017-06-26 2017-07-20 2017-08-01 2017-08-02 2017-09-15 2017-09-19 2017-10-27 2017-12-07 2017-12-26 2017-12-29 2019-04-01 of Barrio 31 in CABA ofertas International Envelope 0 5 Nueva YPF AR-UFOMC-10277-CW-RFB / Readecuación de Urban and social integration Solicitud de Single Stage - One 13,153,560.1 IBRD / 87060 Posterior Open - National 12,685,729.00 Firmado 2017-10-27 2018-08-01 2017-11-01 2017-12-13 2017-11-13 2018-01-12 2017-11-29 2018-02-16 2017-12-29 2019-04-12 infraestructura existente of Barrio 31 in CABA ofertas Envelope 0 (Barrio 31) AR-UFOMC-28520-CW-RFB Urban and social integration Solicitud de Single Stage - One / Infraestructura de Media IBRD / 87060 Posterior Open - National 3,214,930.13 4,821,832.91 Firmado 2017-09-18 2017-09-22 2017-10-11 2017-10-27 2017-11-10 2017-12-26 2017-12-29 2018-01-17 2018-02-05 2019-02-03 of Barrio 31 in CABA ofertas Envelope Tensión AR-UFOMC-32028-CW-RFB / Urbanización nueva YPF Urban and social integration Solicitud de Single Stage - One 12,473,135.8 en el Barrio 31 Carlos IBRD / 87060 Posterior Open - National 14,628,934.70 Firmado 2017-10-31 2017-11-03 2017-12-06 2017-12-20 2018-01-05 2018-01-25 2018-02-09 2018-02-20 2018-08-08 of Barrio 31 in CABA ofertas Envelope 2 Mujica, Retiro, Ciudad Autónoma de Buenos Aires AR-UFOMC-73116-CW-RFB / Infraestructura de Baja Tensión en el Marco de la Urban and social integration Solicitud de Single Stage - One Integración Social y Urbana IBRD / 87060 Previa Open - National 16,033,334.00 0.00 En ejecución 2018-10-31 2019-02-08 2018-11-05 2018-12-17 2019-03-29 2019-01-16 2019-06-04 2019-02-20 2019-08-19 of Barrio 31 in CABA ofertas Envelope de la Villa 31 en la Ciudad Autónoma de Buenos Aires (CABA) AR-UFOMC-90019-CW-RFB / Obra de demolición y Desarme para la creación Urban and social integration Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 7,629,179.00 1,883,881.20 Firmado 2018-12-21 2019-02-21 2018-12-26 2019-02-06 2019-03-29 2019-03-08 2019-04-29 2019-04-12 2019-06-18 2019-10-09 del Espacio Urbano en el of Barrio 31 in CABA ofertas Envelope Sector Bajo Autopista - Barrio 31 y 31 bis- Retiro. AR-UFOMC-93035-CW-RFB / Construcción de Viviendas Urban and social integration Solicitud de Single Stage - One Nuevas YPF, Infraestructura IBRD / 87060 Posterior Open - National 8,128,654.55 0.00 En ejecución 2019-01-03 2019-02-19 2019-01-08 2019-02-19 2019-05-02 2019-03-21 2019-04-25 2019-10-22 of Barrio 31 in CABA ofertas Envelope y Espacio Publico, Barrio 31 - Retiro AR-UFOMC-114369-CW-RFB Urban and social integration Solicitud de Single Stage - One / Apertura de Calles y IBRD / 87060 Posterior Open - National 4,243,364.64 0.00 En ejecución 2019-05-17 2019-06-07 2019-05-22 2019-06-21 2019-07-23 2019-07-21 2019-08-25 2020-02-21 of Barrio 31 in CABA ofertas Envelope Nueva Calle 14 GOODS Page 1 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-134079-GO-RFQ / Adquisición de bienes para Project Management and Solicitud de Single Stage - One el fortalecimiento del IBRD / 87060 Posterior Limited 92,000.00 55,954.99 Finalizado 2019-10-06 2019-10-17 2019-12-01 2019-12-02 2020-05-29 2020-06-05 Monitoring – CABA cotizaciones Envelope Programa de Formalización del Barrio 31 AR-UFOMC-145648-GO-DIR / Adquisición de 195 cortinas Urban and social integration Adquisición para las nuevas Viviendas IBRD / 87060 Posterior Direct 8,921.00 9,110.69 Finalizado 2019-11-18 2019-11-11 2019-11-23 2019-11-19 2019-12-28 2019-12-09 2020-06-25 2020-01-30 of Barrio 31 in CABA directa sector Cristo Obrero, Barrio Padre Carlos Mugica AR-UFOMC-156114-GO-RFQ / Adquisición de mini proyector, proyector, tablets, totem de autogestión, scanner, smart TV 50" Project Management and Solicitud de Single Stage - One Ejecución RCA, auriculares bluetooth, IBRD / 87060 Posterior Limited 16,000.00 0.00 2020-02-14 2020-04-10 2020-05-10 Monitoring – CABA cotizaciones Envelope pendiente parlantes, láser, pantalla y trípode para proyector, PC ALL IN ONE, Medidor de distancia Láser y pinza amperimétrica NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-97097-NC-RFB / Contratación de Servicio de Mudanza para la Relocalización de Unidades Urban and social integration Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 1,210,000.00 646,106.90 Firmado 2019-01-28 2019-03-19 2019-02-02 2019-03-16 2019-04-22 2019-04-15 2019-05-07 2019-05-20 2019-06-28 2019-11-16 Funcionales (Hogares y of Barrio 31 in CABA ofertas Envelope Comercios) en el marco del Plan de Urbanización Barrio 31 - Retiro AR-UFOMC-118087-NC-RFB / Servicio especializado de control integral de plagas en el Barrio Padre Carlos Project Management and Solicitud de Single Stage - One Mugica y Saldías, en el IBRD / 87060 Posterior Open - National 100,000.00 131,832.37 Firmado 2019-07-18 2019-06-26 2019-07-23 2019-09-03 2019-09-18 2019-10-03 2019-09-23 2019-11-07 2019-10-31 2020-05-05 Monitoring – CABA ofertas Envelope marco del plan de urbanización integral Retiro- Puerto de la Secretaría de Integración Social y Urbana AR-UFOMC-128140-NC-RFB / Servicio de logística Project Management and Solicitud de Single Stage - One IBRD / 87060 Posterior Open - National 750,000.00 520,555.24 Firmado 2019-08-30 2019-08-28 2019-09-04 2019-10-16 2019-10-21 2019-11-15 2019-11-14 2019-12-20 2019-12-30 2020-06-17 externa de recolección de Monitoring – PBA ofertas Envelope residuos áridos AR-UFOMC-147685-NC-RFB / Servicio de mantenimiento, desobstrucción y limpieza de Urban and social integration Solicitud de Single Stage - One Ejecución IBRD / 87060 Posterior Open - National 920,000.00 0.00 2020-01-04 2021-01-03 redes cloacales y pluviales of Barrio 31 in CABA ofertas Envelope pendiente en el Barrio Padre Carlos Mugica y Saldías Page 2 AR-UFOMC-170987-NC-RFQ / Servicio de Mudanzas de Urban and social integration Solicitud de Single Stage - One Ejecución unidades funcionales (hogares IBRD / 87060 Posterior Open - National 100,000.00 0.00 2020-05-05 2020-06-30 2020-12-27 of Barrio 31 in CABA cotizaciones Envelope pendiente y comercios) del sector Bajo Autopista CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-47028-CS-QCBS / Desarrollo e Strenghtening institutional implementación de un Selección basada Open - IBRD / 87060 capacities for metropolitan Posterior 500,000.00 0.00 Cancelado 2018-02-09 2018-03-02 2018-04-15 2018-05-13 2018-06-12 2018-07-17 2018-08-21 2019-08-21 sistema de información del en calidad y costo International urban management área metropolitana de buenos aires AR-UFOMC-78401-CS-QCBS / Servicio de Consultoria destinado a la contratación de Recursos Humanos para Urban and social integration Selección basada Open - la conformación de la IBRD / 87060 Posterior 1,024,532.00 1,232,818.20 Firmado 2018-09-18 2018-10-01 2018-10-04 2019-01-31 2018-11-17 2018-12-11 2018-12-15 2019-01-07 2019-01-14 2019-01-18 2019-02-18 2019-01-29 2019-03-25 2019-05-10 2020-03-24 of Barrio 31 in CABA en calidad y costo International Gerencia Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro AR-UFOMC-90015-CS-CQS / "Fortalecimiento de la Strenghtening institutional Selección basada coordinación de políticas IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 67,017.30 0.00 En ejecución 2018-12-07 2019-11-01 2018-12-28 2019-02-10 2019-03-12 2019-04-16 2019-10-13 públicas en el Área urban management de consultores Metropolitana Buenos Aires" AR-UFOMC-92033-CS-CQS / Diseño de App Nativa Strenghtening institutional Selección basada Responsive BA IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 50,491.00 56,085.02 Finalizado 2018-12-18 2019-01-03 2019-01-08 2019-02-21 2019-03-11 2019-03-23 2019-05-07 2019-04-27 2019-05-24 2019-10-04 2019-07-23 INTEGRACIÓN para el urban management de consultores Barrio 31 AR-UFOMC-93031-CS-CQS / Strenghtening institutional Selección basada Generación de información IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 30,521.37 0.00 En ejecución 2019-01-02 2019-01-23 2019-03-08 2019-05-14 2019-04-07 2019-05-12 2019-11-08 relevante para el desarrollo urban management de consultores de AMBA Data AR-UFOMC-78400-CS-QCBS / Servicio de Consultoría destinado a la Gestión, Diseño e Implementación de Urban and social integration Selección basada IBRD / 87060 Posterior Open - National 256,410.00 0.00 Cancelado 2018-09-17 2018-10-01 2018-09-18 2018-11-01 2018-11-29 2018-12-29 2019-02-02 2019-03-09 2020-03-08 los procesos de la Gerencia of Barrio 31 in CABA en calidad y costo Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro AR-UFOMC-78400-CS-QCBS- 2 / Servicio de Consultoría destinado a la Gestión, Selección basada Diseño e Implementación de Urban and social integration IBRD / 87060 Posterior en calificaciones Limited 256,410.00 367,067.53 Finalizado 2019-01-07 2018-09-27 2019-01-14 2019-01-08 2019-02-13 2019-02-22 2019-03-20 2019-03-27 2020-03-19 2020-03-31 los procesos de la Gerencia of Barrio 31 in CABA de consultores Operativa de Reasentamiento para la urbanización del Barrio 31 - Retiro Page 3 AR-UFOMC-92035-CS-CQS / Consultoría para la recolección de información y Selección basada análisis de encuesta de Project Management and IBRD / 87060 Posterior en calificaciones Open - National 44,210.00 88,205.15 Finalizado 2018-12-20 2018-12-21 2019-01-10 2019-02-23 2019-03-20 2019-03-25 2019-05-16 2019-04-29 2019-09-30 2019-10-26 2020-01-02 opinión pública y estudio de Monitoring – CABA de consultores satisfacción del Proyecto de Integración Social y Urbana del Barrio 31 AR-UFOMC-96264-CS-CQS / Evaluación Económica y Selección basada Social del Proyecto de Project Management and IBRD / 87060 Posterior en calificaciones Open - National 20,304.37 0.00 En ejecución 2019-02-04 2019-01-31 2019-02-25 2019-04-10 2019-05-06 2019-05-10 2019-06-14 2019-12-11 Integración Social y Urbana Monitoring – CABA de consultores del Barrio Padre Carlos Mugica AR-UFOMC-97122-CS-CQS / Fortalecimiento de Strenghtening institutional Selección basada Ejecución Capacidades Institucionales IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 63,380.00 0.00 2019-01-31 2019-02-21 2019-04-06 2019-05-06 2019-06-10 2019-12-07 pendiente para la Gestión Urbana urban management de consultores Metropolitana AR-UFOMC-105967-CS-CQS / Formulación de una Strenghtening institutional Selección basada estrategia de Gestión IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 61,822.00 0.00 En ejecución 2019-03-13 2019-03-22 2019-04-03 2019-05-17 2019-06-16 2019-07-21 2020-01-17 Comunitaria de urban management de consultores Regularización de Servicios Públicos en el Barrio 31 AR-UFOMC-113329-CS- QCBS / Consultoría para el desarrollo e implementación del sistema CRM Salesforce Project Management and Selección basada Open - Ejecución IBRD / 87060 Posterior 691,906.00 0.00 2019-05-03 2019-05-24 2019-07-07 2019-08-04 2019-09-03 2019-10-08 2019-11-12 2020-11-11 y plataforma Intranet en el Monitoring – CABA en calidad y costo International pendiente marco del Proyecto de la Secretaría de Integración Social y Urbana AR-UFOMC-97125-CS-QCBS / Auditoria Externa Contable y Financiera del Proyecto de Project Management and Selección basada IBRD / 87060 Posterior Open - National 50,000.00 0.00 En ejecución 2019-02-08 2019-03-01 2019-04-14 2019-05-12 2019-06-11 2019-05-15 2019-07-16 2019-08-20 2020-02-16 Transformación Urbana del Monitoring – CABA en el menor costo Área Metropolitana de Buenos Aires. AR-UFOMC-99141-CS-CQS / Evaluación de Impacto del Programa de Reasentamiento y Mejoramiento de Viviendas Project Management and Selección basada IBRD / 87060 Posterior Open - National 354,214.00 392,617.69 Firmado 2019-05-08 2019-02-05 2019-05-29 2019-07-12 2019-05-15 2019-08-09 2019-06-26 2019-09-08 2019-09-05 2019-10-08 2019-09-18 2019-11-12 2019-11-29 2020-11-11 del Proyecto de Integración Monitoring – CABA en calidad Social y Urbana del Barrio Padre Carlos Mugica para el sector Bajo Autopista AR-UFOMC-99141-CS-QCBS / Evaluación de Impacto del Programa de Reasentamiento y Mejoramiento de Viviendas Project Management and Selección basada IBRD / 87060 Posterior Open - National 354,214.00 0.00 Cancelado 2019-02-05 2019-02-05 2019-02-26 2019-02-27 2019-04-11 2019-05-09 2019-06-08 2019-07-13 2019-08-17 2020-08-16 del Proyecto de Integración Monitoring – CABA en calidad y costo Social y Urbana del Barrio Padre Mugica para el sector Bajo Autopista AR-UFOMC-122846-CS-CQS / Consultoría para el diseño Selección basada del modelo teórico para la Project Management and IBRD / 87060 Posterior en calificaciones Open - National 87,471.00 0.00 Cancelado 2019-09-01 2019-07-08 2019-10-03 2019-11-16 2019-09-18 2019-12-16 2020-01-20 2020-07-18 implementación y Monitoring – CABA de consultores replicabilidad del Proyecto de Integración Social y Urbana Page 4 AR-UFOMC-121658-CS-CQS / Estudio cualitativo de tipo etnográfico en el marco de Project Management and Selección basada Ejecución la Estrategia de Evaluación IBRD / 87060 Posterior Open - National 114,740.00 0.00 2019-09-06 2019-09-27 2019-11-10 2019-12-08 2020-01-07 2020-02-11 2020-03-17 2020-09-13 Monitoring – CABA en el menor costo pendiente y Monitoreo Integral del Proyecto de Integración Social y Urbana AR-UFOMC-124190-CS-CQS / Asesoramiento y evaluación para el fortalecimiento del Project Management and Selección basada IBRD / 87060 Posterior Open - National 173,363.00 0.00 En ejecución 2019-09-08 2019-08-01 2019-09-29 2019-11-12 2019-11-08 2019-12-10 2019-12-11 2020-01-09 2019-12-26 2020-02-13 2020-03-19 2021-03-19 eje de desarrollo económico Monitoring – CABA en calidad y costo del Barrio Padre Carlos Mugica AR-UFOMC-148005-CS-LCS / Servicio integral de dictado de talleres para el desarrollo Project Management and Selección basada IBRD / 87060 Posterior Open - National 48,000.00 0.00 En ejecución 2019-12-03 2020-01-27 2019-12-24 2020-01-31 2020-02-06 2020-03-05 2020-04-04 2020-05-09 2020-06-13 2020-12-10 e inclusión económica de los Monitoring – CABA en el menor costo vecinos y las vecinas del Barrio Padre Carlos Mugica AR-UFOMC-149935-CS-CQS / Desarrollo de lineamientos generales para una Selección basada estrategia coordinada de Project Management and Ejecución IBRD / 87060 Posterior en calificaciones Open - National 31,100.00 0.00 2020-01-02 2020-01-16 2020-02-21 2020-03-06 2020-04-04 2020-10-01 visión urbana entre la Monitoring – CABA pendiente de consultores Ciudad Autónoma de Buenos Aires y el Municipio de Lanús. AR-UFOMC-170973-CS-CQS / Desarrollo e Strenghtening institutional Selección basada Ejecución Implementación de mejoras IBRD / 87060 capacities for metropolitan Posterior en calificaciones Open - National 77,000.00 0.00 2020-04-30 2020-05-21 2020-07-04 2020-08-03 2020-09-07 2021-07-04 pendiente en la interfaz y usabilidad urban management de consultores del sitio AMBA Data AR-UFOMC-125031-NC-RFP / Contratación de firma consultora para prestar el servicio de implementación de los programas que Project Management and Selección basada Open - IBRD / 87060 Posterior 1,000,000.00 0.00 Cancelado 2019-08-01 2019-08-15 2019-08-22 2019-09-04 2019-10-05 2019-10-28 2019-11-02 2019-12-02 2020-01-06 2020-02-10 2021-08-03 conforman el Plan de Monitoring – CABA en calidad y costo International Formalización del Barrio Padre Carlos Mugica”, en el marco del Plan Maestro de Integración Retiro – Puerto INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-42945-CS-INDV / servicio de un profesional dedicado a la evaluación y Project Management and IBRD / 87060 Posterior Individual Limited 16,500.00 16,500.00 Firmado 2018-01-08 2018-02-01 2018-01-08 2018-03-21 2018-01-08 2018-08-15 2018-01-15 2018-08-16 2018-07-14 monitoreo durante de 6 Monitoring – CABA meses, con 4 productos entregables AR-UFOMC-23943-CS-INDV / Consultoría Proyecto Plusvalía: contratación de Strenghtening institutional dos consultores IBRD / 87060 capacities for metropolitan Posterior Individual Direct 36,500.00 0.00 Cancelado 2017-08-08 2017-08-15 2017-08-18 2017-09-08 2017-10-13 2018-04-11 internacionales para la urban management evaluación y propuesta de mejoras del Proyecto de Ley de Plusvalías. Page 5 AR-UFOMC-24874-CS-CDS / Consultoría Proyecto Plusvalía: contratación de Strenghtening institutional Selección directa una firma para la evaluación IBRD / 87060 capacities for metropolitan Posterior Direct 18,350.00 0.00 Cancelado 2017-08-08 2017-08-15 2017-08-18 2017-10-22 2018-04-20 de consultores y propuesta de mejoras del urban management Proyecto de Ley de Plusvalías. AR-UFOMC-83913-CS-INDV / Selección de Consultores de apoyo a la Gestión para el Project Management and Proyecto de Transformación IBRD / 87060 Posterior Individual Open 7,162.32 5,144.68 Finalizado 2018-11-01 2018-09-12 2018-11-11 2018-11-26 2018-11-15 2018-11-26 2018-11-18 2018-11-27 2019-06-06 2019-09-30 Monitoring – CABA Urbana del Área Metropolitana de Buenos Aires. AR-UFOMC-83922-CS-INDV / Coordinador para la Strenghtening institutional Ejecución experiencia piloto de IBRD / 87060 capacities for metropolitan Posterior Individual Open 7,297.30 0.00 2018-11-01 2018-11-19 2018-11-29 2018-12-23 2019-06-21 pendiente articulación de la normativa urban management urbana en el AMBA AR-UFOMC-85481-CS-INDV / Consultarías Individuales - Contrataciones de los Responsables del Diseño y Project Management and Ejecución Seguimiento de la Gestión IBRD / 87060 Posterior Individual Open 25,918.68 0.00 2018-11-02 2018-11-12 2018-11-16 2018-11-19 2019-11-19 Monitoring – CABA pendiente Comunitaria y Participativa en los componentes del Plan Integral de Urbanización e Integración en el Barrio 31. AR-UFOMC-85494-CS-INDV / Consultor experto en planificación urbana Strenghtening institutional Ejecución validación para la IBRD / 87060 capacities for metropolitan Posterior Individual Open 8,108.11 0.00 2018-11-01 2018-11-19 2018-11-29 2018-12-23 2019-06-21 pendiente experiencia piloto de urban management articulación de la normativa urbana en el AMBA AR-UFOMC-85495-CS-INDV / Consultor experto en Strenghtening institutional planificación urbana para la Ejecución IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,864.86 0.00 2018-11-01 2018-11-19 2018-11-29 2018-12-23 2019-06-21 experiencia piloto de pendiente urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85500-CS-INDV / Consultor experto en Strenghtening institutional asuntos legales y jurídicos Ejecución IBRD / 87060 capacities for metropolitan Posterior Individual Open 5,675.68 0.00 2018-11-02 2018-11-20 2018-11-30 2018-12-24 2019-06-22 para la experiencia piloto de pendiente urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85501-CS-INDV / Consultor experto en Strenghtening institutional economía urbana para la Ejecución IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,864.86 0.00 2018-11-01 2018-11-19 2018-11-29 2018-12-23 2019-06-21 experiencia piloto de pendiente urban management articulación de la normativa urbana en el AMBA. AR-UFOMC-85503-CS-INDV / Asistente en manejo de información territorial y Strenghtening institutional Ejecución técnicas proyectuales para la IBRD / 87060 capacities for metropolitan Posterior Individual Open 4,378.38 0.00 2018-11-02 2018-11-20 2018-11-30 2018-12-24 2019-06-22 pendiente experiencia piloto de urban management articulación de la normativa urbana en el AMBA AR-UFOMC-85506-CS-INDV Strenghtening institutional Ejecución / Asistente para la Gestión IBRD / 87060 capacities for metropolitan Posterior Individual Open 2,702.70 0.00 2018-11-01 2018-11-19 2018-11-29 2018-12-23 2019-04-22 pendiente del Proyecto AMBA Data urban management Page 6 AR-UFOMC-97114-CS-INDV Strenghtening institutional / Contratación de un Ejecución IBRD / 87060 capacities for metropolitan Posterior Individual Open 13,026.00 0.00 2019-02-01 2019-03-22 2019-04-12 2019-05-17 2019-11-13 especialista lider de Proyecto pendiente urban management de AMBA DATA. AR-UFOMC-97117-CS-INDV Strenghtening institutional / Contratación de un Ejecución IBRD / 87060 capacities for metropolitan Posterior Individual Open 8,527.00 0.00 2019-02-01 2019-03-22 2019-04-12 2019-05-17 2019-05-27 consultor Desarrollador Web pendiente urban management para AMBA DATA AR-UFOMC-117911-CS- INDV / Especialista en Energía y Eficiencia Project Management and Ejecución IBRD / 87060 Posterior Individual Limited 34,600.00 0.00 2019-06-03 2019-06-13 2019-07-13 2019-09-21 2020-04-18 Energética para el proyecto Monitoring – CABA pendiente de integración social y urbana del Barrio 31 AR-UFOMC-117914-CS- Project Management and INDV / Especialista en IBRD / 87060 Posterior Individual Limited 37,745.00 41,139.48 Firmado 2019-06-03 2019-06-05 2019-06-13 2019-07-04 2019-07-13 2019-07-26 2019-09-21 2019-08-01 2020-04-18 Monitoring – CABA Marcos Regulatorios AR-UFOMC-123775-CS- INDV / Experto en Gestión de Acceso y Sostenibilidad de usuarios de bajos Project Management and IBRD / 87060 Posterior Individual Open 9,300.00 21,568.19 Firmado 2019-08-20 2019-07-22 2019-10-08 2019-08-05 2019-10-29 2019-09-12 2019-12-03 2019-09-13 2020-05-31 recursos en las redes de Monitoring – CABA Aguas y Energía para el Plan de Inclusión en Servicios Públicos Básicos AR-UFOMC-126298-CS-CDS / Servicio consultoría para llevar adelante la supervisión de la obra denominada “Construcción de Urban and social integration Selección directa Ejecución IBRD / 87060 Posterior Direct 444,000.00 0.00 2019-08-30 2019-09-09 2019-11-13 2020-05-11 Viviendas Nuevas YPF – of Barrio 31 in CABA de consultores pendiente Etapa III”, Licitación Pública Nacional, Referencia STEP Nº AR-UFOMC-93035-CW- RFB. AR-UFOMC-130081-CS- Project Management and INDV / Especialista en IBRD / 87060 Posterior Individual Open 8,200.00 8,183.58 Firmado 2019-09-08 2019-10-23 2019-10-27 2019-09-18 2019-11-17 2019-10-16 2019-12-22 2019-10-17 2020-06-19 Monitoring – PBA Desarrollo Comercial y Económico AR-UFOMC-139188-CS-CDS / Servicio de Soporte para la Gestión Territorial de los Recursos Humanos que Project Management and Selección directa IBRD / 87060 Posterior Direct 551,977.00 81,656.35 Firmado 2019-10-11 2019-10-22 2019-10-21 2019-11-11 2019-12-25 2019-12-05 2020-06-22 participan en la Monitoring – CABA de consultores Implementación del Plan de Formalización en el Barrio Padre Carlos Mugica AR-UFOMC-144410-CS- INDV / Asesor Técnico para Urban and social integration IBRD / 87060 Posterior Individual Open 13,585.00 14,520.67 Firmado 2019-11-10 2019-10-29 2019-12-29 2019-11-15 2020-01-19 2019-12-19 2020-02-23 2019-12-23 2020-08-21 la obra “Creación del of Barrio 31 in CABA Espacio Urbano Bajo Autopista” AR-UFOMC-145633-CS-CDS / Servicio Profesional de Asistencia Técnica para las tareas de Inspección Urban and social integration Selección directa IBRD / 87060 Posterior Direct 241,506.00 254,107.10 Firmado 2019-11-18 2019-11-14 2019-11-28 2019-11-27 2020-02-01 2019-12-10 2020-07-30 referidas a las Obras de of Barrio 31 in CABA de consultores Sectores de Completamiento (SC) y Renovación de Infraestructura (RI) Page 7 AR-UFOMC-145696-CS-CDS / Servicio Profesional de Supervisión Integral de Obras de Construcción de Edificios de Vivienda Urban and social integration Selección directa IBRD / 87060 Posterior Direct 859,000.00 903,681.39 Firmado 2019-11-17 2019-08-15 2019-11-27 2019-11-27 2020-01-31 2019-12-10 2020-07-29 Multifamiliares con of Barrio 31 in CABA de consultores Infraestructuras y Espacios Públicos en el denominado “Sector EX YPF” del Barrio 31 AR-UFOMC-180995-CS- INDV / Especialista en Project Management and Ejecución IBRD / 87060 Posterior Individual 8,200.00 0.00 2020-07-16 2020-07-31 2020-07-31 2020-08-05 2021-02-01 aspectos fiduciarios y Monitoring – CABA pendiente contrataciones AR-UFOMC-180996-CS- INDV / Coordinador Técnico Project Management and Ejecución IBRD / 87060 Posterior Individual Open 11,000.00 0.00 2020-07-16 2020-07-21 2020-07-21 2020-07-26 2021-01-22 para la ejecución del Monitoring – CABA pendiente componente 3 AR-UFOMC-184055-CS- Project Management and Ejecución INDV / Especialista Senior IBRD / 87060 Posterior Individual Open 9,700.00 0.00 2020-07-15 2020-07-20 2020-07-20 2020-07-25 2021-01-21 Monitoring – CABA pendiente en Procesos y Calidad AR-UFOMC-184057-CS- Project Management and Ejecución INDV / Especialista en IBRD / 87060 Posterior Individual Open 9,700.00 0.00 2020-07-16 2020-07-21 2020-07-21 2020-08-16 2021-02-12 Monitoring – CABA pendiente Desarrollo Económico Territorial Page 8