Lao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017) I. General 1. Project information: Country: Lao PDR Borrower/Recipient: Lao PDR Project Name: Lao PDR Southeast Asia Disaster Risk Management Project Project ID No: P160930 Project Implementing Agency: • Component 1 – Ministry of Public Works & Transport (MPWT) • Component 2 –Ministry of Natural Resources and Environment (MONRE) • Component 3 – Ministry of Finance (MOF) • Component 4 – Ministry of Planning and Investment (MPI) 2. Bank’s approval Date of the procurement Plan • Original Plan: May 24, 2017 • First Revision: November 15, 2017 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 5 years II. Works and Goods and Non-Consultant Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Procurement Prior Review Threshold Comments Method Method Threshold (US$) 1. ICB (Works) >=2,000,000 All contracts above US$5 million 2. NCB (Works) 200,000 - < None 2,000,000 3. Shopping (Works) < 200,000 None 4. ICB and LIB >= 600,000 All contracts above US$1.5 (Goods) million 5. NCB (Goods) 100,000 - < None 600,000 6. Shopping (Goods) < 100,000 None B7. Direct - All contracts above US$1.5 Contracting (DC) million (Goods) 1 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified in Annex 1 to this Procurement Plan 4. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Ref. No. Contract Est. Cost Procure- Review Expected Comments (Description) (US$) ment by Bank Bids Method Opening (Prior/ Post) Date 1 2 3 4 5 6 7 Component 1: Integrated Urban Flood Risk Management C1/G001 Vehicles 94,000 Shopping Post Dec. 2017 C1/G002 Motorcycles 6,000 Shopping Post Dec. 2017 C1/G003 Technical Equipment 2,700 Shopping Post Dec. 2017 C1/G004 IT Equipment 34,310 Shopping Post Dec. 2017 C1/G005 Office Equipment 30,980 Shopping Post Dec. 2017 C1/W001 Office Renovation for DOW- 12,000 Shopping Post Dec. 2017 Project Management office at KM3Office in Vientiane Capital C1/W002 New Office Construction for 76,000 Shopping Post Dec. 2017 DPWT-Project Implementation office in Oudomxay Province C1/W003 Construction of Muang Xay 4,500,000 ICB Post Dec. 2018 Integrated Urban Flood Risk Management Infrastructure (Package 1) C1/W004 Construction of Muang Xay 4,500,000 ICB Post Dec. 2018 Integrated Urban Flood Risk Management Infrastructure (Package 2) Component 2: Hydromet Modernization and Early Warning Systems C2/G001 ECMWF Products 171,500 DC Post Apr. 2018 C2/G002 ECMWF Visualization 625,000 DC Post Apr. 2018 Hardware/Software C2/G003 Flash Flood Alert System 700,000 ICB Post TBD C2/G004 Media Studio 100,000 DC Post May.2018 C2/G005 Hydrological and 2,000,000 ICB Prior TBD Meteorological Equipment for Upgrading and New Stations C2/G006 Communication System 190,000 NCB Post Jun.2018 2 C2/G007 Hydrological and Hydraulic 349,500 NCB Post Jul.2018 modeling C2/G008 Communication Equipment 190,000 NCB Post TBD and facilities for Provincial Offices C2/G009 Computers for Provincial 13,500 Shopping Post Feb. 2018 Offices C2/G010 Office Furniture 50,000 Shopping Post Nov. 2018 C2/G011 Vehicles 170,000 NCB Post Feb. 2018 C2/G012 Motorcycles 30,000 Shopping Post Feb. 2018 C2/W001 Civil Works for Hydrological 700,000 NCB Post Nov. 2018 and Meteorological Observation Stations (Surveying, Housing and Equipment Installation) C2/W002 Provincial Office Building 400,000 NCB Post Mar. 2018 (Oudomxay and Phongsaly) C2/W003 Improvement of Provincial 403,000 NCB Post Apr. 2018 Offices for Hydrological and Meteorological Investments. Component 3: Strengthening Financial Planning for Disaster Resilience C3/G001 Office Equipment 5,000 Shopping Post Jan 2018 C3/G002 Office Furniture 1,000 Shopping Post Dec 2017 Component 4: Project Management C4.1/G01 Office Furniture 5,000 Shopping Post Nov.2017 C4.1/G02 IT Equipment 35,000 Shopping Post Nov. 2017 Sub-Total for Goods and Works 15,394,49 0 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Procurement Prior Review Comment Method Threshold (US$) Threshold (US$) 1. Competitive Methods >= 300,000 All contracts above (Firms) – Quality & Cost 500,000. Based Selection (QCBS) and Quality Based Selection (QBS) 2 Competitive Methods < 300,000 None (Firms) – Least-Cost Selection (LCS) and Selection Based on 3 Consultant Qualifications (CQS) 3. Single Source (Firms) - All contracts above 500,000 4. Individual Consultants - All contracts above 200,000 for entire project duration. All TORs will require World Bank clearance. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines 3. Consultancy Assignments with Selection Methods and Time Schedule Ref. No. Description of Estimate Selection Revie Expected Commen Assignment d Method w Proposal ts Cost by s US$ Bank Submissi (Prior on / Date Post) 1 2 3 4 5 6 7 Component 1: Integrated Urban Flood Risk Management C1/C00 Feasibility Study, 896,402 QCBS Prior Nov. 1 Detailed Design and 2017 Supervision C1/C00 International Technical 353,312 QCBS Post Nov. 2 Advisor/International 2017 Implementation Support Consultant C1/C00 International Procurement 150,000 IC Post Nov. 3 Specialist 2017 C1/C00 National Procurement 35,000 IC Nov. 4 Consultant 2017 C1/C00 Social Safeguards 70,000 IC Post 5 Consultant C1/C00 International Safeguards 150,000 IC Post Dec. 6 Advisor 2017 C1/C00 Environmental Safeguard 70,000 IC Post Dec. 7 Consultant 2017 4 C1/C00 Resilient Urban Planning 200,000 CQS Post Dec 2017 8 C1/C00 Future Pre-Feasibility 200,000 CQS Post Oct. 2021 9 Study C1/C01 Operation and 150,000 IC Post Oct. 2021 0 Maintenance Handbook, Simulation and Training. Component 2: Hydromet Modernization and Early Warning Systems C2/C00 National Technical 150,000 IC Post Jan. 2018 1 Advisory Consultant C2/C00 Procurement Consultant 110,000 IC Post Jan. 2018 2 C2/C00 Accountant Consultant 90,000 IC Post Jan. 2018 3 C2/C00 International Hydromet 558,000 IC Prior Jan. 2018 4 Advisor C2/C00 Service Delivery Strategy 108,000 IC Post Jul.2018 5 Consultant C2/C00 Sr Technical Expert, NWP 90,000 IC Post 6 (calibration, Jul. 2018 verification, post- processing) C2/C00 Sr Technical Expert, 95,000 IC Post TBD 7 Forecasting C2/C00 System Integrator 1,790,00 QCBS Prior Jul.2018 8 0 Component 3: Strengthening Financial Planning for Disaster Resilience C3/C00 Program Coordinator 120,000 IC Post Dec. 1 2017 C3/C00 Administrative and 50,000 IC Post Dec.2017 2 Finance Officer C3/C00 Preparation for SEADRIF 150,000 CQS Post Jan. 2018 3 Legal Work and Support Insurance Product Design C3/C00 Strengthening National 200,000 CQS Post Mar. 4 DRF Strategy and 2018 Implementation. C3/C00 Consultancy for 250,000 CQS Post Jun. 2018 5 Strengthening Post- Disaster. Component 4: Project Management 5 C4.1/C0 External Financial Audit 100,000 CQS Post Feb. 2018 2 C4.1/C0 International FM 60,000 IC Post Nov. 3 Specialist 2017 C4.1/C0 National Project 150,000 IC Post Dec. 4 Coordinator 2017 C4.1/C0 National Project 118,000 IC Post Dec. 5 Administrator/Accounta 2017 nt C4.2/C0 TA for Study and 350,000 QCBS Post Nov. 1 Supervision for DRM 2017 mainstreaming for MPI and Line Ministries Sub-Total for Consulting 6,813,71 Services 4 Total for Goods, Works and 22,208,2 Consulting Services 04 6 Annex 1 - Conditions for use of National Procurement Procedures. Procurement under National Procurement Procedures will be carried out in accordance with national regulations including the Procurement Decree #03, dated January 9, 2004 and #0861/MOF, dated May 5, 2009 (amended version) and Implementation Rule and Regulations (IRR) #0063 issued by MOF on March 12, 2004; Procurement Manual dated May 2009 and harmonized bidding documents for national competitive bidding and request for quotations agreed between Government of Lao PDR, World Bank and Asia Development Bank. In addition to the provisions stipulated in the above documents, Government and Implementing agencies for Bank financed projects shall implement the following additional provisions: i. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; ii. Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. 7 PROCUREMENT Lao People's Democratic Republic : Lao PDR Southeast Asia Disaster Risk Management Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2018-01-12 2021-03-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160930 GPN Date: 2018-01-11 Project Name: Lao PDR Southeast Asia Disaster Risk Management Project Loan / Credit No: IDA / 61200 M Executing Agency(ies): inistry of Natural Resource and Environment, Department of Meteorology and Hydrology WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned C2/W005 / Refurbishment of Hydromet Modernization and Request for Single Stage - One 2019-02- Lao SEA DRM-C2 Project IDA / 61200 Post Open - National 85,000.00 57,143.55 Completed 2018-06-26 2018-08-21 2018-08-10 Early Warning Systems Quotations Envelope 17 Office in DMH HQ C2/W006 / UXO Clearance for detail survey and civil Hydromet Modernization and Request for Single Stage - One 2019-11- IDA / 61200 Post Open - National 64,000.00 46,126.50 Completed 2019-03-16 2019-05-11 2019-07-10 work for installation of Early Warning Systems Quotations Envelope 07 Hydromet Stations C2-W002 / New Construction of Provincial Hydromet Office Hydromet Modernization and Request for Single Stage - One 2020-07- IDA / 61200 Post Open - National 150,000.00 97,670.16 Signed 2019-11-20 2020-04-05 2020-01-15 2020-03-31 Building in Oudomxay Early Warning Systems Quotations Envelope 13 Province. C2-W003 / New construction of Provincial Hydromet Office Hydromet Modernization and Request for Single Stage - One 2020-07- IDA / 61200 Post Open - National 150,000.00 106,903.00 Signed 2019-11-23 2020-04-06 2020-01-18 2020-03-31 Building in Phongsaly Early Warning Systems Quotations Envelope 16 Province. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2/G010-1 / Office Furniture Hydromet Modernization and Request for Single Stage - One for PMU of Lao SEA DRM-C2 IDA / 61200 Post Open - National 25,000.00 24,020.16 Completed 2018-08-22 2018-10-17 2018-09-10 2019-04-15 2018-10-01 Early Warning Systems Quotations Envelope in DMH HQ . C2/G011 / Vehicles at 5 numbers of 4WD Double Cab Pick Up: 2 Ps for PMU at DMH HQ (1 p for Administrative Use & 1 p for monitoring- Hydromet Modernization and Single Stage - One IDA / 61200 Post Request for Bids Open - National 170,000.00 187,066.88 Completed 2018-09-28 2018-09-13 2018-10-03 2018-11-14 2018-11-01 2018-12-14 2018-11-12 2019-01-18 2018-11-29 2019-07-17 2019-02-27 following up project activities Early Warning Systems Envelope in the fields). 3 Ps for pilot projects in Oudomxay(1), Phongsaly(1), Laungphabang(1) C2/G012 / Motorcycles at 15 numbers for 3 pilot projects: 5 Ps for Oudomxay, 5 Ps for Phongsaly, 5 Ps for Hydromet Modernization and Request for Single Stage - One Laungphabang (For district IDA / 61200 Post Open - National 30,000.00 27,885.31 Completed 2018-10-03 2018-11-28 2018-11-09 2019-05-27 2019-01-03 Early Warning Systems Quotations Envelope staffs using for going to observe weather, climate, water level and collect data from hydromet stations C2/G008-1 / IT equipment Hydromet Modernization and Request for Single Stage - One and facilities for PMU at DMH IDA / 61200 Post Open - National 30,000.00 28,608.18 Completed 2018-10-03 2018-11-28 2018-12-14 2019-05-27 2019-01-11 Early Warning Systems Quotations Envelope HQ C2/G005 / Hydrological and Meteorological Equipment for Upgrading and New Stations (Supply of Instrumentation Hydromet Modernization and Single Stage - One IDA / 61200 Prior Request for Bids Open - International 2,000,000.00 1,737,051.00 Signed 2019-05-22 2019-09-13 2019-05-27 2019-09-25 2019-07-08 2019-11-22 2019-08-07 2020-03-03 2019-09-11 2020-04-20 2020-03-09 and Equipment including Civil Early Warning Systems Envelope Works, Installation, Training, Maintenance and Technical Support) Under C2-G016/DC/2020 / Hydromet Modernization and IDA / 61200 Post Direct Selection Direct 10,000.00 0.00 Implementati 2020-02-28 2020-03-13 2020-03-04 2020-09-01 2020-04-08 2020-10-05 Accounting Software Early Warning Systems on C02-G009/SHP/2021 / Computers, Printers and IT Under Hydromet Modernization and Request for Single Stage - One equipment for three province IDA / 61200 Post Open - National 50,000.00 0.00 Implementati 2021-02-28 2021-03-01 2021-04-25 2021-10-22 Early Warning Systems Quotations Envelope (Louangphabang, Oudomxay on and Phongsaly) C02-G010/SHP/2021 / Under Office furniture for two Hydromet Modernization and Request for Single Stage - One IDA / 61200 Post Limited 75,000.00 0.00 Implementati 2021-03-07 2021-02-08 2021-05-02 2021-10-29 hydromet office in Oudomxay Early Warning Systems Quotations Envelope on and Phongsaly Province NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2/NC001 / Printing the Hydromet Modernization and Request for Single Stage - One Books of Meteorology and IDA / 61200 Post Open - National 19,000.00 15,375.36 Completed 2018-07-02 2018-08-27 2017-07-07 2019-02-23 2018-08-13 Early Warning Systems Quotations Envelope Hydrology Law C2/NC002 / User Satisfactory Hydromet Modernization and IDA / 61200 Post Direct Selection Direct 60,000.00 38,500.00 Signed 2019-09-30 2020-01-31 2019-10-05 2020-07-15 2019-11-09 2020-09-24 2020-05-07 Survey Early Warning Systems Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2/C008 / Detail survey activity for DRM-C2 which Hydromet Modernization and Quality And Cost- cost sharing with C2.4 of M- IDA / 61200 Post Open - National 200,000.00 221,300.00 Completed 2018-04-12 2018-05-02 2018-05-03 2018-05-02 2018-06-16 2018-10-09 2018-07-14 2018-11-05 2018-08-13 2018-11-28 2018-09-17 2019-03-26 2018-10-22 2019-04-19 2019-10-22 2020-05-14 Early Warning Systems Based Selection IWRM Phase II Additional Financing (AF). C2/C007 / System Integrator (hereafter the Consultant Firm) is aimed to work for the provision of comprehensive assistance and services to Hydromet Modernization and Quality And Cost- IDA / 61200 Prior Open - International 2,000,000.00 1,437,972.01 Signed 2018-04-22 2018-06-04 2018-05-13 2018-06-06 2018-06-26 2019-07-09 2018-07-24 2019-09-30 2018-08-23 2020-01-14 2018-09-27 2020-05-07 2018-11-01 2020-07-09 2019-11-01 DMH for the modernization Early Warning Systems Based Selection and integration of their operations to harmonize and improve the quality of their products services INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual C2/C002 / Accountant Hydromet Modernization and IDA / 61200 Post Consultant Open 90,000.00 36,900.72 Signed 2018-02-01 2017-10-23 2018-03-22 2018-06-11 2018-04-12 2018-06-11 2018-05-17 2018-06-14 2018-11-13 Consultant Early Warning Systems Selection C2/C001 / National Individual Hydromet Modernization and Hydromet Project Coordinator IDA / 61200 Post Consultant Open 150,000.00 34,152.00 Completed 2018-04-05 2018-02-20 2018-05-24 2018-05-03 2018-06-14 2018-05-04 2018-07-19 2018-05-15 2019-01-15 2019-05-31 Early Warning Systems for DRM-C2 Selection C2/C013 / Procurement Consultant for DRM-C2, Individual Hydromet Modernization and Hydromet Modernization and IDA / 61200 Post Consultant Open 35,000.00 22,325.64 Completed 2018-04-05 2018-02-01 2018-05-24 2018-06-18 2018-06-14 2018-06-20 2018-07-19 2018-06-22 2019-01-15 2019-06-30 Early Warning Systems Early Warning System for DMH Selection of Lao PDR C2/C003 / International Hydromet Advisor, the consultant's activities must ensure functional Individual Hydromet Modernization and compatibility of the IDA / 61200 Post Consultant Open 190,000.00 144,270.00 Completed 2018-04-22 2018-05-02 2018-06-10 2018-10-26 2018-07-01 2019-06-27 2018-08-05 2019-06-28 2019-02-01 2020-06-30 Early Warning Systems modernized meteorological Selection and hydrological systems with the global/regional systems as recommended by WMO C2/C012 / Re-design and construction supervision for Individual Hydromet Modernization and two provincial offices in IDA / 61200 Post Consultant Open 40,000.00 34,744.67 Signed 2018-10-29 2019-03-15 2018-12-17 2018-11-21 2019-01-07 2018-12-07 2019-02-11 2019-02-28 2019-08-10 Early Warning Systems Oudomxay and Phongsaly Selection Provinces C2/C004 / Hydromet Service Individual Hydromet Modernization and delivery consultant is also IDA / 61200 Post Consultant Open 114,000.00 96,775.44 Signed 2018-12-12 2018-05-02 2019-01-30 2018-11-02 2019-02-20 2018-11-05 2019-03-27 2018-11-15 2019-09-23 Early Warning Systems needed for this component Selection C2/C006 / Sr Technical Individual Hydromet Modernization and Expert, Forecasting IDA / 61200 Post Consultant Open 147,000.00 0.00 Canceled 2019-01-31 2019-08-26 2019-03-21 2020-04-30 2019-04-11 2019-05-16 2019-11-12 Early Warning Systems Consultancy Selection C2/C010 / Bidding Hydromet Modernization and Documentation for UXO IDA / 61200 Post Direct Selection Direct 6,000.00 6,731.00 Completed 2019-02-20 2019-02-21 2019-03-02 2019-02-22 2019-04-16 2019-03-18 2019-10-13 2019-06-17 Early Warning Systems Clearance C2/C005 / NWP Individual Consultant/Sr Technical Hydromet Modernization and IDA / 61200 Post Consultant Open 147,000.00 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2019-11-30 Expert (Calibration, Early Warning Systems Selection Verification Post-processing) LA-MONRE, DMH-129800-CS- Individual Hydromet Modernization and INDV / International Flood IDA / 61200 Post Consultant Open 190,000.00 52,943.30 Signed 2019-08-30 2019-09-09 2019-10-18 2020-05-02 2019-11-08 2020-05-29 2019-12-13 2020-06-01 2020-06-10 Early Warning Systems Forecasting Consultant Selection C2/C013-2019 / National Hydromet Modernization and IDA / 61200 Post Direct Selection Direct 120,000.00 47,217.51 Signed 2019-12-04 2019-05-10 2019-12-14 2019-06-12 2020-02-17 2019-06-20 2020-08-15 Procurement Consultant Early Warning Systems Individual C2-C019 / National Hydromet Modernization and IDA / 61200 Post Consultant Open 100,000.00 0.00 Canceled 2019-12-16 2019-12-16 2020-02-03 2020-02-24 2020-03-30 2020-09-26 Safeguard Consultant Early Warning Systems Selection C2 - C020/2020 / Assessment of the Existing 361 Existing Hydrological- Meteorological Stations and Hydromet Modernization and Under IDA / 61200 Post Direct Selection Direct 150,000.00 0.00 2020-09-28 2020-10-02 2020-10-23 2021-01-12 2020-12-11 2021-12-11 Construction Supervision and Early Warning Systems Implementation Safeguard Monitoring of the 70 New Hydrological- Meteorological Stations. C2-C014/IC/2021 / The Part Individual Time National Consultant for Hydromet Modernization and Pending IDA / 61200 Post Consultant Limited 25,000.00 0.00 2021-03-25 2021-03-30 2021-04-20 2021-05-25 2021-11-21 Design and Supervision of Early Warning Systems Implementation Selection DMH Media Studio Page 2