The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Community-Based Recovery and Stabilization Project for the Sahel (P173830) AFRICA WEST | Western Africa | Social Sustainability and Inclusion Global Practice | IBRD/IDA | Investment Project Financing | FY 2021 | Seq No: 1 | ARCHIVED on 23-Sep-2021 | ISR48200 | Implementing Agencies: Burkina Faso - Ministry of Economy, Finance and Development, Republic of Niger, Republic of Niger - Cabinet of the Prime Minister (Executive Secretariat for the SDS Sahel Niger), The States of Liptako-Gourma Integrated Development Authority, Burkina Faso, Republic of Mali, Republic of Mali - Ministry of Economy and Finance, The States of Liptako-Gourma Integrated Development Authority Key Dates Key Project Dates Bank Approval Date: 15-Jun-2021 Effectiveness Date: -- Planned Mid Term Review Date: -- Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2026 Revised Closing Date: 31-Dec-2026 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objective of this project is to contribute to the recovery and resilience of communities in target areas of the Liptako-Gourma Region of Burkina Faso, Mali and Niger through a regional approach supporting (i) integrated socio-economic services and infrastructure, (ii) livelihoods and territorial development, and (iii) regional data and coordination. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Resilient and inclusive recovery of conflict-affected communities:(Cost $75.00 M) Component 2: Transitional support towards stabilization and territorial development of communities:(Cost $183.00 M) Component 3: Regional dialogue, coordination and data and capacity building:(Cost $47.50 M) Component 4: Project Management:(Cost $47.00 M) Component 5: CERC Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- High Implementation Status and Key Decisions Following Board approval of the project on June 15, 2021, the financing agreements have been signed with Burkina Faso (July 14, 2021), Niger (August 5, 2021) and the States of Liptako-Gourma Integrated Development Authority (LGA) (July 29, 2021). The financial agreement with Mali is currently in the process of being signed (expected on September 23, 2021), as the Bank management completed its assessment of the criteria set 9/23/2021 Page 1 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) out in paragraph 5 of OP7.30 (Dealings with De facto Governments) on 6 September 2021. The expected dates for project effectiveness are as follows: Burkina Faso: November 11, 2021; Niger: December 3, 2021; Mali: January 21, 2022; and LGA: November 26, 2021. The required activities are underway to ensure effectiveness of the projects for the four recipients are, notably: (a) the recruitment of key personnel for the project implementation units (PIUs); (b) the preparation of the Project Implementation Manual; (c) the establishment of the National Steering Committee or Technical Committee (for Burkina Faso); and (d) the establishment of a Regional Coordination Committee which will oversee the implementation of the regional program. In line with the Environmental and Social Commitment Plans (ESCPs), the Labor Management Procedures for LGA has been prepared and disclosed on September 15, 2021. However, the three countries are currently completing the preparation of the Sexual Exploitation and Abuse/Sexual Harassment (SEA/SH) Action Plan and the Security Management Plan. Lastly, following project effectiveness, the Grievance Mechanism documents that have already been prepared will be operationalized. The ESF- related communications plans will be prepared by Niger and Mali 30 days after effectiveness; and an external auditor will be appointed by all four recipients no later than 6 months after effectiveness. To support implementation, bilateral video conferences will be organized in preparation for the next technical implementation support mission which is slated for December 2021. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance High -- High Macroeconomic High -- High Sector Strategies and Policies Substantial -- Substantial Technical Design of Project or Program High -- High Institutional Capacity for Implementation and High -- High Sustainability Fiduciary Substantial -- Substantial Environment and Social High -- High Stakeholders Moderate -- Moderate Other High -- High Overall High -- High Results PDO Indicators by Objectives / Outcomes Access to Integrated socio-economic services and infrastructure IN01037974 ►Beneficiaries in project target areas provided with improved access to socio-economic services (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 9/23/2021 Page 2 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Value 0.00 -- 0.00 2,425,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator will measure the number of beneficiaries in project target areas which are provided with improved access to socio-economic services as a result of project activities. Socio-economic services in the context of this indicator refer to services in any kind of sectors that are provided as a result of project Comments: activities. Service sectors therefore include, for example, health and education, water and sanitation services. The values of this indicator will be measures as total and also broken down by females, youth and forcibly displaced. The target for females is 50% of the beneficiaries. IN01037982 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,125,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037984 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 900,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037986 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 400,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037992 ►People provided with access to improved water sources (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 800,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator is a Corporate Results Indicator (CRI). It measures the number of people provided with Comments: access to improved water sources, and will be disaggregated by gender. IN01037993 Females provided with access to improved water sources (Number, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 400,000.00 IN01037994 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 9/23/2021 Page 3 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Value 0.00 -- 0.00 280,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037995 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037996 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 320,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 Resilient livelihoods and territorial development IN01037981 ►Beneficiaries that report an increase in annual income (in %) as a result of project activities (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 675,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the number of beneficiaries that report an increase in annual income (in %) as a Comments: result of project activities. The results of this indicator will also be broken down by females, youth and forcibly displaced (and also by country).The target for females is 50% of the beneficiaries. IN01037983 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 225,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037985 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037987 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 9/23/2021 Page 4 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Value 0.00 -- 0.00 300,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037988 ►Land area where sustainable agricultural, land and water management practices, suited to local and regional agro-ecological conditions, have been adopted as a result of the project (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,057.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This is a CRI with slight modifications. It measures the land area where sustainable agricultural, land and Comments: water management practices (suited to local and regional agro-ecological conditions) has been adopted as a result of the project. IN01037989 Burkina Faso (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 500.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037990 Mali (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01037991 Niger (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 357.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 Improved regional coordination and data IN01037975 ►Joint action plan supporting the regional harmonization of policies and investments in the Liptako-Gourma region, agreed during an annual coordination meeting with participation of the three countries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 5.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator will measure the number of joint action plan supporting the regional harmonization of policies and investments in the Liptako-Gourma region, agreed during an annual coordination meeting Comments: with participation of the three countries. The annual coordination meeting will be organized by the States of Liptako-Gourma Integrated Development Authority (LGA). 9/23/2021 Page 5 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Overall Comments PDO Actual/current data for indicators kept as baseline figures (0), as the project is not yet effective. Intermediate Results Indicators by Components Component 1 and 2 IN01037997 ►People who have received essential household goods (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 528,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the number of people who have received essential household goods. The Comments: number will also be broken down by females, youth and forcibly displaced (and all also by country). The target for females is 50% of total people. IN01037999 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 78,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038000 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038004 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 250,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038005 ►Farmers reached with agricultural assets or services (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 600,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 9/23/2021 Page 6 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) This indicator measures the number of farmers reached with agricultural assets or services as a result of project activities. It is to note that while the word "farmer" is used (as this is a CRI), this definition shall Comments: also include for the purposes of this indicator livestock herders, fishermen and women. The results will be made available in total numbers and broken down by females, youth and forcibly displaced (and by country).The target for females is 50% of the farmers. IN01038008 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038010 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038012 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038013 ►Agriculture infrastructure (crop storage, livestock shelters etc.) rehabilitated with climate and disaster-resilient standards (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator is a corporate climate change indicator. It measures the number of agriculture infrastructure Comments: (crop storage, livestock shelters etc.) rehabilitated with climate and disaster-resilient standards. IN01038015 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038018 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 9/23/2021 Page 7 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) IN01038019 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038021 ►People provided with access to improved sanitation services (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 550,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This is a CRI. It measures the number of people provided with access to improved sanitation services. It Comments: will be reflected as a total number and broken down by females, youth and forcibly displaced. The target for females is 50% of the total people. IN01038024 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038025 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038027 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038028 ►Beneficiaries of job-focused / cash for work interventions (broken down by females, youth and forcibly displaced) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 150,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This is a CRI with slight modifications. It measures the number of beneficiaries of job-focused / cash for Comments: work interventions. It will be reflected as a total number and broken down by females, youth and forcibly displaced. The target for females is 50% of the beneficiaries. IN01038029 9/23/2021 Page 8 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038030 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038031 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038032 ►Roads rehabilitated or improved into climate resilient all-season roads (disaggregated by roads rehabilitated and improved into climate resilient all season roads) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 270.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator is a climate change corporate indicator. It measures the roads rehabilitated or improved into Comments: climate resilient all-season roads and will be broken down by rehabilitated and/or improved into climate resilient all-season roads. IN01038033 Burkina Faso (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 90.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038034 Mali (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 90.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038035 Niger (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 9/23/2021 Page 9 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Value 0.00 -- 0.00 90.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 Component 3 IN01037998 ►Establishment of digital platform for regional data sharing (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator refers to the establishment of digital platform for regional data sharing. This platform will be Comments: established by the LGA and in coordination with the three national level PIUs (Burkina Faso, Mali and Niger) IN01038001 ►Regional events supporting knowledge exchange and/or the harmonization of policies and investments in the Liptako-Gourma region (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 15.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the number of regional events supporting knowledge exchange and/or the Comments: harmonization of policies and investments in the Liptako-Gourma region. Examples of these events include forums, workshops, trainings and seminars. IN01038002 ►People who have participated in social cohesion activities under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 175,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicators measures the number of people who have participated in social cohesion activities under Comments: the project (e.g. psychosocial and mediation trainings and sports and cultural activities). IN01038006 Burkina Faso (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 75,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038007 Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50,000.00 9/23/2021 Page 10 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038009 Niger (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 IN01038003 ►Individuals participating in regional knowledge exchanges and learning activities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 350.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator refers to the number of individuals participating in regional knowledge exchanges and Comments: learning activities (directly financed by the project). IN01038011 ►Sub-projects that address the needs of female beneficiaries / youth / forcibly displaced (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator consist if three sub-indicators/supplemental indicators which measure sub-projects that Comments: address (i) the needs of female beneficiaries; (ii) the needs of youth; and (iii) forcibly displaced. IN01038014 Sub-projects that address the needs of female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 IN01038016 Sub-projects that address the needs of youth (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 75.00 IN01038017 Sub-projects that address the needs of forcibly displaced (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 60.00 IN01038020 ►People using the Community-Driven Development/Citizen Engagement app for feedback to be integrated in project interventions (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 9/23/2021 Page 11 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Value 0.00 -- 0.00 1,000.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the number of people using the Community-Driven Development/Citizen Comments: Engagement app that will be developed under this project. IN01038022 ►Women beneficiaries reporting that they have a say in community decision-making (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the percentage of women beneficiaries reporting that they have a say in Comments: community decision-making (as a result of project activities) IN01038023 ►Grievances relayed through the GRM system that are addressed in the specified timeframe (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 90.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the percentage of grievances relayed through the GRM system that are Comments: adequately addressed. IN01038026 ►Beneficiaries surveyed who believe that communal authorities are transparent (broken down by gender / youth and forcibly displaced) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Apr-2021 -- 09-Sep-2021 31-Dec-2026 This indicator measures the percentage of beneficiaries surveyed who believe that communal authorities Comments: are transparent. It will be broken down by gender, youth and forcibly displaced. Overall Comments IR Actual/current data for indicators kept as baseline figures (0), as the project is not yet effective. Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed 9/23/2021 Page 12 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) Not P173830 IDA-68880 USD 50.00 50.00 0.00 0.00 50.02 0% Effective Not P173830 IDA-68990 USD 50.00 50.00 0.00 0.00 49.25 0% Effective Not P173830 IDA-69050 USD 75.00 75.00 0.00 0.00 73.56 0% Effective Not P173830 IDA-D8210 USD 50.00 50.00 0.00 0.00 50.07 0% Effective Not P173830 IDA-D8300 USD 2.50 2.50 0.00 0.00 2.57 0% Effective Not P173830 IDA-D8310 USD 50.00 50.00 0.00 0.00 49.81 0% Effective Not P173830 IDA-D8330 USD 75.00 75.00 0.00 0.00 74.61 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Not P173830 IDA-68880 15-Jun-2021 05-Aug-2021 -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-68990 15-Jun-2021 -- -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-69050 15-Jun-2021 14-Jul-2021 -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-D8210 15-Jun-2021 05-Aug-2021 -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-D8300 15-Jun-2021 29-Jul-2021 -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-D8310 15-Jun-2021 -- -- 31-Dec-2026 31-Dec-2026 Effective Not P173830 IDA-D8330 15-Jun-2021 14-Jul-2021 -- 31-Dec-2026 31-Dec-2026 Effective Cumulative Disbursements 9/23/2021 Page 13 of 14 The World Bank Implementation Status & Results Report Community-Based Recovery and Stabilization Project for the Sahel (P173830) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 9/23/2021 Page 14 of 14