Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 2. Bank’s approval Date of the procurement Plan 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) 2. NCB (Goods) 3. ICB (Works) 4. NCB (Works) 5. (Non-Consultant Services) [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) 2. Single Source (Firms) 3. Individual 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Nepal : Earthquake Housing Reconstruction Project PLAN General Information Country: Nepal Banks Approval Date of the Original Procurement Plan: 2017-05-12 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-28 Project ID: P155969 GPN Date: Project Name: Earthquake Housing Reconstruction Project Loan / Credit No: IDA / 57060 Executing Agency(ies): Ministry of Federal Affairs and Local Development, Nepal Reconstruction Authority, Ministry of Urban Development - EHRP WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOFALD-19176-CW-RFQ / Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 12,641.00 0.00 2017-06-27 2017-07-01 2017-07-09 Partition at CL-PIU Office Quotations Envelope Implementation NP-MOFALD-27995-CW-RFQ / Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 1,474.00 0.00 2017-10-29 2017-11-04 2017-11-12 CL-PIU partition Quotations Envelope Implementation GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Housing Reconstruction EHRP/DoLIDAR/G/DC-1.1 / Contingency Emergency Procurement of SUV vehicles, Response IDA / 57060 Prior Direct Selection Direct N 0.00 219,125.56 Signed 2016-07-12 i.e. Toyota Hilux 4WD Double Project Implementation Support Cab Pickup - 3 Nos. Disaster Risk Management Systems Housing Reconstruction EHRP/DoLIDAR/G/DC-1.2 / Contingency Emergency Procurement of SUV vehicles, Response IDA / 57060 Prior Direct Selection Direct N 0.00 57,797.52 Signed 2016-07-12 i.e. Nissan Navara 4WD Double Project Implementation Support Cab Luxury (LE) Pick Up Disaster Risk Management Systems NP-NRA-GO-RFB-5 / Procurement of Tablets for Single Stage - One Under IDA / 57060 Project Implementation Support Post Request for Bids Open - National 300,000.00 0.00 2017-05-12 2017-05-17 2017-06-01 2017-05-31 2017-06-16 2017-06-13 2017-06-30 2017-09-28 digitization of PA form and Envelope Implementation Inspection form. NP-NRA-GO-RFQ-2-1 / 6 units Request for Single Stage - One Under IDA / 57060 Project Implementation Support Post Limited 14,577.00 0.00 2017-05-16 2017-06-21 2017-07-21 of Motorcycles Quotations Envelope Implementation NP-NRA-GO-RFQ-2-2 / 4 units Request for Single Stage - One Under IDA / 57060 Project Implementation Support Post Limited 7,006.00 0.00 2017-05-16 2017-06-21 2017-07-21 of Scooter Quotations Envelope Implementation NP-NRA-GO-DIR-3 / 2 units of Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 3,000.00 0.00 2017-05-11 2017-05-16 2017-05-31 2017-06-07 DSLR Camera Implementation NP-NRA-GO-RFB-4 / 1 unit of Single Stage - One Under IDA / 57060 Project Implementation Support Post Request for Bids Open - National 35,000.00 0.00 2017-05-11 2017-05-16 2017-05-31 2017-06-07 2017-06-11 2017-06-21 2017-07-21 High-end SAN Storage for MIS Envelope Implementation NP-NRA-GO-RFB-1-2 / 5 units Single Stage - One Under IDA / 57060 Project Implementation Support Post Request for Bids Open - National 299,450.00 0.00 2017-05-11 2017-06-16 2017-05-16 2017-05-31 2017-06-07 2017-06-21 2017-07-21 of Four Wheel Drive Jeep vehicle Envelope Implementation NP-NRA-GO-RFB-6 / 2 units of Single Stage - One Under IDA / 57060 Project Implementation Support Post Request for Bids Open - National 239,560.00 0.00 2017-05-19 2017-06-16 2017-05-24 2017-06-23 2017-06-30 2017-07-14 2017-08-13 Four Wheel Drive SUV Envelope Implementation NP-MOFALD-19165-GO-RFQ / Request for Single Stage - One Pending Photocopy Machine (1) for CL- IDA / 57060 Project Implementation Support Post Limited 2,042.00 0.00 2017-06-30 2017-07-03 2017-07-08 Quotations Envelope Implementation PIU NP-MOFALD-19168-GO-RFQ / desktop computers (including Request for Single Stage - One Pending software) (14),laptop(14), IDA / 57060 Project Implementation Support Post Limited 30,630.00 0.00 2017-06-29 2017-07-04 2017-07-09 Quotations Envelope Implementation photocopier (14) ,printer(14) for DL-PIUs of 14 districts NP-MOFALD-19173-GO-RFQ / Printing and delivery of directives Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 972.00 0.00 2017-06-27 2017-07-04 2017-07-08 related to formation of Quotations Envelope Implementation reconstruction community,2073 NP-MOFALD-19175-GO-RFQ / Request for Single Stage - One Pending Printing and delivery of ESMF IDA / 57060 Project Implementation Support Post Limited 680.00 0.00 2017-06-27 2017-07-03 2017-07-07 Quotations Envelope Implementation Brochure NP-MOFALD-27970-GO-RFQ / CL-PIU furniture and fixtures, Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 12,038.00 0.00 2017-09-14 2017-09-20 2017-09-26 Sofa set, Chairs, Office Table, Quotations Envelope Implementation Hanger, Almira, Carpet, Curtains NP-MOFALD-27971-GO-RFQ / Request for Single Stage - One Pending CL-PIU carpet, curtain, and IDA / 57060 Project Implementation Support Post Limited 6,142.00 0.00 2017-11-01 2017-11-08 2017-11-15 Quotations Envelope Implementation other miscelleneous items NP-MOFALD-27982-GO-RFQ / CL-PIU IT equipments: Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 8,353.00 0.00 2017-09-14 2017-09-21 2017-10-08 Laptoptop Quotations Envelope Implementation ,AC,printer,scanner,UPS NP-MOFALD-27983-GO-RFQ / Request for Single Stage - One Pending Gas heater and other IDA / 57060 Project Implementation Support Post Limited 1,474.00 0.00 2017-11-01 2017-11-07 2017-11-14 Quotations Envelope Implementation miscelleneous items Page 1 NP-MOFALD-27986-GO-RFQ / Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 15,871.00 0.00 2017-10-08 2017-10-15 2017-10-25 Desktop computers Quotations Envelope Implementation NP-MOFALD-19154-GO-RFQ / CL-PIU furniture and fixtures, Request for Single Stage - One IDA / 57060 Project Implementation Support Post Limited 6,806.69 0.00 Canceled 2017-06-29 2017-07-03 2017-07-09 Meeting Table , carpet, curtains , Quotations Envelope steel almira , rack NP-MOFALD-19181-GO-RFQ / Request for Single Stage - One Laptop computers for DL-MIS IDA / 57060 Project Implementation Support Post Limited 9,723.84 0.00 Canceled 2017-06-27 2017-07-02 2017-07-07 Quotations Envelope Specialist NP-MOFALD-19189-GO-RFQ / Request for Single Stage - One desktop computers (including IDA / 57060 Project Implementation Support Post Limited 4,084.00 0.00 Canceled 2017-06-29 2017-07-04 2017-07-08 Quotations Envelope software) (3), laptop(3) for CL-PIU NP-MOFALD-38218-GO-RFQ / Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Open - National 5,380.00 0.00 2017-11-27 2017-12-14 2017-12-29 Tablets for CL-PIU and DL-PIU Quotations Envelope Implementation EHRP/NRA/G/SH-04/2074-75 / Request for Single Stage - One Pending IDA / 57060 Project Implementation Support Post Limited 3,678.00 0.00 2018-01-05 2018-02-02 2018-03-04 Procurement of 5 Video Cameras Quotations Envelope Implementation EHRP/NRA/G/DC-02/2074-75 / Pending Procurement of 10 Double Cab IDA / 57060 Project Implementation Support Post Direct Selection Direct 352,500.00 0.00 2017-12-22 2017-12-29 2018-01-23 2018-02-22 Implementation Pickup Vehicles EHRP/NRA/G/DC-03/2074-75 / Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 43,000.00 0.00 2017-12-22 2017-12-27 2018-01-23 2018-02-22 Procurement of 1 SUV Vehicle. Implementation EHRP/NRA/G/NCB-05/2074-75 / Procurement of 10 Laptop Single Stage - One Pending Computers and 10 Sets Desktop IDA / 57060 Project Implementation Support Post Request for Bids Open - National 15,500.00 0.00 2017-12-31 2018-01-02 2018-02-04 2018-02-14 2018-03-11 2018-04-25 Envelope Implementation Computers with UPS and Accessories EHRP/NRA/G/NCB-06/2074-75 / Procurement of 22 Black and Single Stage - One Pending IDA / 57060 Project Implementation Support Post Request for Bids Open - National 10,000.00 0.00 2017-12-31 2018-01-03 2018-02-04 2018-02-14 2018-03-11 2018-04-25 White LaserJet Printers and 2 Envelope Implementation Heavy duty Photocopy Machines EHRP/NRA/G/NCB-07/2074-75 / Single Stage - One Pending Procurement of 14 Portable IDA / 57060 Project Implementation Support Post Request for Bids Open - National 10,500.00 0.00 2017-12-29 2018-01-02 2018-02-04 2018-02-14 2018-03-11 2018-04-25 Envelope Implementation Projectors EHRP/NRA/G/SH-08/2074-75 / Request for Single Stage - One Pending Publication of Bulletine (Notice IDA / 57060 Housing Reconstruction Post Limited 15,000.00 0.00 2018-01-12 2018-02-09 2018-03-26 Quotations Envelope Implementation and Communication Program)-3 EHRP/NRA/G/DC-9/2074-75 / Pending Publication of Reconstruction IDA / 57060 Housing Reconstruction Post Direct Selection Direct 2,000.00 0.00 2018-03-30 2018-04-06 2018-04-27 2018-05-27 Implementation Profile-1 NP-NRA-GO-RFB-7 / 5 units of Single Stage - One IDA / 57060 Project Implementation Support Post Request for Bids Open - National 299,450.00 0.00 Canceled 2017-05-19 2017-05-24 2017-06-23 2017-06-30 2017-07-14 2017-08-13 Four Wheel Drive Jeep Envelope NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NP-MOFALD-27992-NC-RFQ / Request for Single Stage - One Pending Internet services for 12 DL-PIUs IDA / 57060 Project Implementation Support Post Limited 13,758.00 0.00 2017-09-14 2017-09-22 2017-10-22 Quotations Envelope Implementation under WB and GoN NRA/EHRP/NC/SH-01/2074-75 / Request for Single Stage - One Pending Documentary and Jingles IDA / 57060 Housing Reconstruction Post Limited 9,000.00 0.00 2018-01-02 2018-02-11 2018-05-13 Quotations Envelope Implementation Production-1 EHRP/NRA/NC/DC-02/2074-75 / Pending Procurement for Nonconsulting IDA / 57060 Housing Reconstruction Post Direct Selection Direct 5,000.00 0.00 2017-12-28 2017-12-31 2018-02-11 2018-04-12 Implementation Service for Website Update-1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EHRP/NRA/S/CQS-44/2074-75 / Procurement of consultancy service through CQS method, Consultant WB procedure For " Housing Pending IDA / 57060 Project Implementation Support Post Qualification Open - International 452,874.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Reconstruction Scio-Technical Implementation Selection Assistance Team" for Bigu GP and Kalinchok GP of Dolakha district. EHRP/NRA/S/CQS-45/2074-75 / Procurement of consultancy service through CQS method, Consultant WB procedure For " Housing Pending IDA / 57060 Project Implementation Support Prior Qualification Open - International 582,032.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Reconstruction Scio-Technical Implementation Selection Assistance Team" for Baiteshwor GP and Bhimeshwor NP of Dolakha districts. EHRP/NRA/S/CQS-46/2074-75 / Procurement of consultancy service through CQS method, Consultant WB procedure For " Housing Pending IDA / 57060 Project Implementation Support Post Qualification Open - International 430,861.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Reconstruction Scio-Technical Implementation Selection Assistance Team" for Melung GP and Sailung GP of Dolakha district. Page 2 EHRP/NRA/S/CQS-47/2074-75 / Procurement of consultancy service through CQS method, WB procedure For " Housing Consultant Pending Reconstruction Scio-Technical IDA / 57060 Project Implementation Support Post Qualification Open - International 499,542.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Implementation Assistance Team" for Kispang Selection GP, Meghang GP, Bidur GP, Tarkeshwor GP and Belkotgadi NP of Nuwakot district. EHRP/NRA/S/CQS-48/2074-75 / Procurement of consultancy service through CQS method, Consultant WB procedure For " Housing Pending IDA / 57060 Project Implementation Support Post Qualification Open - International 419,012.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Reconstruction Scio-Technical Implementation Selection Assistance Team" for Kakani GP, Suryagadhi GP, and Tadi GP of Nuwakot district. EHRP/NRA/S/CQS-49/2074-75 / Procurement of consultancy service through CQS method, WB procedure For " Housing Consultant Pending Reconstruction Scio-Technical IDA / 57060 Project Implementation Support Prior Qualification Open - International 574,284.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Implementation Assistance Team" for Selection Dupcheshwor GP, Panchkanya GP, Likhu GP, and Shvapuri GP of Nuwakot district. EHRP/NRA/S/CQS-50/2074-75 / Procurement of consultancy service through CQS method, WB procedure For " Housing Consultant Pending Reconstruction Scio-Technical IDA / 57060 Project Implementation Support Prior Qualification Open - International 530,578.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Implementation Assistance Team" for Ruby Selection Valley GP, Gangajamuna GP, Khaniyabas GP and Netrawati GP of Dhading district. EHRP/NRA/S/CQS-51/2074-75 / Procurement of consultancy service through CQS method, Consultant WB procedure For " Housing Pending IDA / 57060 Project Implementation Support Prior Qualification Open - International 570,501.00 0.00 2017-09-22 2017-10-07 2017-12-06 2018-01-05 2018-02-11 2020-02-11 Reconstruction Scio-Technical Implementation Selection Assistance Team" for Nilkantha NP and Tripurasundari GP of Dhading district. EHRP/NRA/S/QCBS-15/2074-75 Quality And Cost- Pending / Monitoring of Reconstruction IDA / 57060 Housing Reconstruction Post Open - National 60,000.00 0.00 2017-12-26 2017-12-29 2018-01-22 2018-02-21 2018-03-07 2018-03-21 2018-04-08 2018-07-07 Based Selection Implementation Activities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Housing Reconstruction Contingency Emergency EHRP/DoLIDAR/S/SSS-02 / Response Procurement Consultant IDA / 57060 Prior Direct Selection Direct N 0.00 14,602.83 Signed 2016-04-12 Project Implementation Support (Individual) Disaster Risk Management Systems NP-NRA-CS-QBS-01 / Financial Individual Consultant Under Management Consultant Long IDA / 57060 Project Implementation Support Post Open 54,531.00 0.00 2017-06-14 2017-08-25 2021-08-24 Selection Implementation Term 48 person Months NP-NRA-CS-CDS-05 / Social Specialist Intermittent with 3 Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 8,792.00 0.00 2017-05-19 2017-05-31 2017-06-17 2018-06-17 person months input over 12 Implementation months period NP-NRA-CS-QBS-02 / MIS Individual Consultant Under Consultant Long Term 48 Person IDA / 57060 Project Implementation Support Post Open 109,603.00 0.00 2017-05-19 2017-07-30 2021-07-29 Selection Implementation Months NP-NRA-CS-CDS-04 / Environment Specialist Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 8,792.00 0.00 2017-05-19 2017-05-31 2017-06-17 2018-06-17 Intermittent with 3 person months Implementation input over 12 months period NP-NRA-CS-QBS-03 / Procurement Consultant Long Individual Consultant Under Term Intermittant 24 person IDA / 57060 Project Implementation Support Prior Open 27,265.00 0.00 2017-05-19 2017-07-30 2021-07-29 Selection Implementation months input over 48 months period EHRP/MOUD/S/SSS-7 / Hiring " Procurement and contract management individual Pending IDA / 57060 Project Implementation Support Prior Direct Selection Direct 12,000.00 0.00 2017-09-04 2017-09-04 2017-09-04 2018-04-28 consultant" ( Input of maximum 6 Implementation months in 0ne year contract period) EHRP/MOUD/S/SSS-8 / Hiring " Financial Management Expert" Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 12,000.00 0.00 2017-09-04 2017-09-04 2017-09-04 2018-04-30 (Input of maximum 6 months over Implementation one year contract period) NP-MOFALD-27998-CS-INDV / Individual Consultant Pending DL-PIU MIS Specialist for IDA / 57060 Project Implementation Support Post Limited 17,689.00 0.00 2017-09-17 2017-09-24 2017-10-12 2017-10-17 2020-07-31 Selection Implementation Nuwakot EHRP/NRA/IND/SSS-1 / Hiring Pending of Individual Procurement IDA / 57060 Project Implementation Support Prior Direct Selection Direct 12,000.00 0.00 2017-09-17 2017-09-24 2017-09-25 2018-04-11 Implementation Consultant (short term) Page 3 NP-MOFALD-38220-CS-CDS / Participation Agreement (PA) Pending IDA / 57060 Project Implementation Support Post Direct Selection Direct 58,472.00 0.00 2017-11-24 2017-11-26 2017-12-20 2018-01-03 Digitization and upload in MIS Implementation system EHRP/NRA/S/IND-7/2074-75 / Individual Consultant Pending Individual Training Coordinator IDA / 57060 Project Implementation Support Post Open 24,000.00 0.00 2017-12-27 2018-02-07 2018-02-24 2018-03-20 2020-03-19 Selection Implementation Consultant-1 EHRP/NRA/S/IND-12/2074-75 / Individual Consultant Pending Individual Infrastructure IDA / 57060 Project Implementation Support Post Open 24,000.00 0.00 2017-12-31 2018-01-28 2018-02-04 2018-02-14 2020-02-14 Selection Implementation Development Consultant-1 Page 4