Documents & Reports

Tanzania : mini hydropower development case studies on the Malagarasi, Muhuwesi, and Kikuletwa Rivers (Vol. 3) : The case study on the Kikuletwa River (English)

Abstract

The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power generation, transmission...  See More +

Details

  • 2000/03/31
  • ESMAP Paper;
  • 25218
  • 3
  • 3 (See all volumes)
  • Tanzania
  • Africa
  • 2010/07/01
  • The case study on the Kikuletwa River
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation