Documents & Reports

Disclosable Restructuring Paper - WAPP APL4 (Phase 1) - C?te d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development - P113266 (English)

Abstract

The objectives of the Guinea Power System Re-development Project for the two sub-projects are: (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase...  See More +

Details

  • Torres De Mastle, Clemencia;
  • 2019/05/21 18:32:17
  • Project Paper;
  • RES36899
  • 1
  • 1
  • Western AfricaAfrica
  • Africa
  • 2019/05/21 18:32:17
  • Disclosed
  • Disclosable Restructuring Paper - WAPP APL4 (Phase 1) - C?te d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development - P113266
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation