PLAN DE ADQUISICIONES AR Buenos Aires Flood risk management (P145686) Argentina, IBRD/IDA, FY: 2016, Team Leader(s): Maria Catalina Ramirez, Christophe Prevost PROCUREMENT Argentina : AR Flood Risk Management Support Project for the City of Buenos Aires PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2016-11-03 2020-02-05 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145686 GPN Date: Project Name: AR Flood Risk Management Support Project for the City of Buenos Aires Loan / Credit No: IBRD / 86280 Executing Agency(ies): Multilateral Credit Organizations Financing Unit WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-2871-CW-RFB / Flood Mitigation Solicitud de Single Stage - One Agua y Cloacas en Nueva IBRD / 86280 Posterior Open - National 520,000.00 0.00 Cancelado 2016-05-19 2016-05-24 2016-07-05 2016-08-04 2016-09-08 2017-03-07 Infrastructure ofertas Envelope Esperanza AR-UFOMC-2890-CW-RFB / Obras complementarias de Flood Mitigation Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 2,912,000.00 0.00 Cancelado 2016-08-19 2016-08-24 2016-10-05 2016-11-04 2016-12-09 2017-06-07 mejoramiento en Lago Infrastructure ofertas Envelope Soldati AR-UFOMC-3473-CW-RFB / Construcción de ARTEH, Flood Mitigation Solicitud de Open - Single Stage - One IBRD / 86280 Previa 36,582,000.00 0.00 En ejecución 2014-06-23 2014-06-28 2014-08-09 2014-09-08 2014-10-13 2015-04-11 ramal Asturias Sur, Nágera Infrastructure ofertas International Envelope y Villa 6 AR-UFOMC-3720-CW-RFB / Flood Mitigation Solicitud de Open - Single Stage - One Construcción segundo IBRD / 86280 Previa 158,080,000.00 0.00 En ejecución 2015-06-02 2015-08-18 2015-08-18 2015-06-07 2015-10-27 2015-11-26 2015-12-31 2017-06-23 Infrastructure ofertas International Envelope emisario Aº Vega AR-UFOMC-20566-CW-RFB / Obras de Desagües Pluviales de la Cuenca Cildáñez - Ramal Martí y Castañares-Primera Etapa, Flood Mitigation Solicitud de Single Stage - One mediante la ejecución de IBRD / 86280 Previa Open - National 20,000,000.00 0.00 Cancelado 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 2018-08-20 Infrastructure ofertas Envelope conductos rectangulares y circulares con sus respectivas cámaras, sumideros, nexos y demás componentes secundarios AR-UFOMC-3474-CW-RFB / Construcción de tres grupos Flood Mitigation Solicitud de Open - Single Stage - One IBRD / 86280 Previa 70,002,400.00 0.00 Cancelado 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 de ramales secundarios Aº Infrastructure ofertas International Envelope Maldonado AR-UFOMC-40376-CW-RFB / Sub - Componente 2.2 Construcción de tres grupos de ramales C - D - E para la cuenca del Arroyo Flood Mitigation Solicitud de Single Stage - One IBRD / 86280 Previa Open - National 20,000,000.00 0.00 En ejecución 2018-01-09 2018-01-14 2018-03-06 2018-04-05 2018-05-10 2018-11-06 Maldonado: Llamado a LPN Infrastructure ofertas Envelope para la obra "Construcción de los Ramales Secundarios del Arroyo Maldonado GRUPO C" AR-UFOMC-92169-CW-RFB / GESTIÓN INTEGRAL DE Flood Mitigation Solicitud de Single Stage - One AGUAS URBANAS ÁREAS IBRD / 86280 Previa Open - National 24,000,000.00 11,828,034.19 En ejecución 2019-01-10 2019-01-15 2019-02-26 2019-03-28 2019-05-02 2019-10-29 Infrastructure ofertas Envelope MARGINALES DE CUENCA CILDAÑEZ ETAPA II Page 1 AR-UFOMC-28498-CW-RFB / Construcción de tres Flood Mitigation Solicitud de Open - Single Stage - One IBRD / 86280 Previa 70,002,400.00 0.00 Cancelado 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 grupos de ramales Infrastructure ofertas International Envelope secundarios A° Maldonado AR-UFOMC-115113-CW-RFB / Construcción de los Flood Mitigation Solicitud de Single Stage - One Ejecución IBRD / 86280 Previa Open - National 18,000,000.00 0.00 2020-01-15 2020-01-20 2020-03-02 2020-04-01 2020-05-06 2020-11-02 Ramales Secundarios del Infrastructure ofertas Envelope pendiente Arroyo Maldonado Grupo D AR-UFOMC-115115-CW-RFB / Construcción de los Flood Mitigation Solicitud de Single Stage - One Ejecución IBRD / 86280 Previa Open - National 18,000,000.00 0.00 2020-06-15 2020-06-20 2020-08-01 2020-08-31 2020-10-05 2021-04-03 Ramales Secundarios del Infrastructure ofertas Envelope pendiente Arroyo Maldonado Grupo E GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-2868-GO-RFQ / Vehículo aéreo de Flood Mitigation Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 50,000.00 0.00 Cancelado 2016-04-27 2016-06-22 2016-12-19 observación no tripulado Infrastructure cotizaciones Envelope (Drone) AR-UFOMC-2866-GO-RFQ / Institutional Development Solicitud de Single Stage - One Moto triciclo para cargas (x IBRD / 86280 Posterior Open - National 20,000.00 0.00 Cancelado 2016-08-17 2016-10-12 2017-04-10 for Flood Risk Management cotizaciones Envelope 2) AR-UFOMC-2869-GO-RFB / Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 480,000.00 0.00 Cancelado 2016-04-11 2016-04-16 2016-05-28 2016-06-27 2016-08-01 2017-01-28 Vehículos anfibio (x 4) for Flood Risk Management ofertas Envelope AR-UFOMC-2874-GO-RFB / Institutional Development Solicitud de Single Stage - One Trailer para carga general (x IBRD / 86280 Posterior Open - National 150,000.00 0.00 Cancelado 2016-09-11 2016-09-16 2016-10-28 2016-11-27 2017-01-01 2017-06-30 for Flood Risk Management ofertas Envelope 3) AR-UFOMC-2870-GO-RFB / Equipamiento p/emergencias (varios lotes): Grupos Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 670,000.00 0.00 Cancelado 2016-05-11 2016-05-16 2016-06-27 2016-07-27 2016-08-31 2017-02-27 electrógenos x 12 y Grupos for Flood Risk Management ofertas Envelope portátiles de iluminación x 4. AR-UFOMC-2881-GO-RFB / Institutional Development Solicitud de Single Stage - One Ejecución Equipo p/inspección de IBRD / 86280 Posterior Open - National 170,000.00 0.00 2016-05-11 2016-05-16 2016-06-27 2016-07-27 2016-08-31 2017-02-27 for Flood Risk Management ofertas Envelope pendiente conductos AR-UFOMC-2873-GO-RFB / Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 480,000.00 0.00 Cancelado 2016-05-21 2016-05-26 2016-07-07 2016-08-06 2016-09-10 2017-03-09 Maquinaria pesada for Flood Risk Management ofertas Envelope AR-UFOMC-3470-GO-RFB / Camiones (4 lotes): camión de salvataje (de vadeo), Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 1,452,000.00 0.00 Cancelado 2016-04-13 2016-04-18 2016-05-30 2016-06-29 2016-08-03 2017-01-30 camión furgón, camión de for Flood Risk Management ofertas Envelope rescate con plataforma, pick uo 4x4 doble cabina (x4) AR-UFOMC-20563-GO-RFQ Institutional Development Solicitud de Single Stage - One Ejecución IBRD / 86280 Posterior Open - National 50,000.00 0.00 2017-01-20 2017-03-17 2017-09-13 / Equipamiento (varios) for Flood Risk Management cotizaciones Envelope pendiente AR-UFOMC-23762-GO-RFB Institutional Development Solicitud de Single Stage - One Ejecución / VEHICULOS IBRD / 86280 Posterior Open - National 997,000.00 0.00 2017-09-18 2017-09-23 2017-11-04 2017-12-04 2018-01-08 2018-07-07 for Flood Risk Management ofertas Envelope pendiente TERRESTRES PARA DEFENSA CIVIL Page 2 AR-UFOMC-30883-GO-RFB / ADQUISICIÓN EQUIPOS Institutional Development Solicitud de Single Stage - One Ejecución NÁUTICOS PARA LA IBRD / 86280 Posterior Open - National 369,000.00 0.00 2017-10-17 2017-10-22 2017-12-03 2018-01-02 2018-02-06 2018-08-05 for Flood Risk Management ofertas Envelope pendiente EMERGENCIA DE DEFENSA CIVIL AR-UFOMC-23766-GO-RFQ Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 300,000.00 0.00 Cancelado 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 / Software Science on sphere for Flood Risk Management ofertas Envelope AR-UFOMC-2897-GO-RFB / Institutional Development Solicitud de Single Stage - One Equipo desobstructor de IBRD / 86280 Posterior Open - National 290,000.00 0.00 Cancelado 2016-05-21 2016-05-26 2016-07-07 2016-08-06 2016-09-10 2017-03-09 for Flood Risk Management ofertas Envelope tuberías NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-95703-NC-RFQ / Implementación de la Estrategia de Comunicación Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Limited 100,000.00 0.00 En ejecución 2019-02-16 2019-04-13 2019-10-10 Social para la Gestión del for Flood Risk Management cotizaciones Envelope Riesgo de Inundaciones - Etapa I AR-UFOMC-100333-NC-RFB / Implementación de la Institutional Development Solicitud de Single Stage - One IBRD / 86280 Posterior Open - National 200,000.00 0.00 En ejecución 2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 2019-12-04 estrategia de comunicación for Flood Risk Management ofertas Envelope social - Etapa 2 AR-UFOMC-115118-NC-RFQ / Contratación de Encuestas Solicitud de Single Stage - One Ejecución IBRD / 86280 Project Management Posterior Limited 100,000.00 0.00 2019-08-05 2019-09-30 2020-03-28 para la Evaluación Social cotizaciones Envelope pendiente Intermedia del Proyecto AR-UFOMC-115120-NC-RFQ / Contratación de las Solicitud de Single Stage - One Ejecución IBRD / 86280 Project Management Posterior Limited 100,000.00 0.00 2021-10-05 2021-11-30 2022-05-29 encuestas para la Evaluación cotizaciones Envelope pendiente social Final del Proyecto AR-UFOMC-2885-NC-RFQ / Institutional Development Solicitud de Single Stage - One Logística para el seminario IBRD / 86280 Posterior Open - National 100,000.00 0.00 Cancelado 2017-04-25 2017-06-20 2017-12-17 for Flood Risk Management cotizaciones Envelope internacional CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-3471-CS-LCS / Selección basada Ejecución Auditoría 1ra etapa (es una IBRD / 86280 Project Management Posterior Open - National 50,000.00 0.00 2015-03-02 2015-03-23 2015-05-06 2015-06-03 2015-07-03 2015-08-07 2015-09-11 2016-03-09 en el menor costo pendiente auditoría financiera). AR-UFOMC-20569-CS-QCBS Institutional Development Selección basada / Modelo Probabilístico de IBRD / 86280 Posterior Open - National 450,000.00 0.00 Cancelado 2016-10-15 2016-11-05 2016-12-19 2017-01-16 2017-02-15 2017-03-22 2017-04-26 2018-04-26 for Flood Risk Management en calidad y costo Riesgo AR-UFOMC-28316-CS-QBS / Revisión del Proyecto Selección basada IBRD / 86280 Project Management Previa Open - National 1,500,000.00 696,220.49 Firmado 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-01 2018-03-08 2019-03-08 Ejecutivo de los Grupos D y en calidad E + Ramales Vega Page 3 AR-UFOMC-20564-CS-QCBS Institutional Development Selección basada Open - / Inspección segundo IBRD / 86280 Previa 7,332,000.00 0.00 En ejecución 2013-07-20 2013-08-10 2013-09-23 2013-10-21 2013-11-20 2013-12-25 2014-01-29 2015-01-29 for Flood Risk Management en calidad y costo International emisario Aº Vega AR-UFOMC-47959-CS-QCBS / SERVICIOS DE CONSULTORÍA PARA LA ELABORACIÓN DEL DISEÑO DE OBRAS DE Flood Mitigation Selección basada IBRD / 86280 Posterior Open - National 981,572.00 0.00 Cancelado 2018-02-14 2018-03-20 2018-05-03 2018-05-31 2018-06-30 2018-08-04 2018-09-08 2019-09-08 EVACUACIÓN DE Infrastructure en calidad y costo DESAGÜES DE LAS CUENCAS ALTAS DE LOS ARROYOS MALDONADO Y CILDAÑEZ AR-UFOMC-68662-CS-CQS / SERVICIO DE CONSULTORÍA PARA LA EJECUCIÓN DE LOS ESTUDIOS Institutional Development Selección basada COMPLEMENTARIOS IBRD / 86280 Posterior Open - National 500,000.00 0.00 En ejecución 2018-07-20 2018-08-10 2018-09-23 2018-10-21 2018-11-20 2018-12-25 2019-01-29 2020-01-29 for Flood Risk Management en calidad y costo SOBRE EL IMPACTO DE LA DESCARGA DEL ARROYO VEGA SOBRE LA TOMA DE AGUA DE AySA TT3 AR-UFOMC-20771-CS-QCBS Institutional Development Selección basada Open - Ejecución / Mecanismo de IBRD / 86280 Previa 2,700,000.00 0.00 2017-08-03 2017-08-24 2017-10-07 2017-11-04 2017-12-04 2018-01-08 2018-02-12 2019-02-12 for Flood Risk Management en calidad y costo International pendiente financiamiento del riesgo AR-UFOMC-83703-CS-LCS / Realización integral de recursos didácticos gráficos y multimediales para la iniciativa educativa de Institutional Development Selección basada IBRD / 86280 Posterior Open - National 100,000.00 0.00 En ejecución 2018-10-24 2018-11-14 2018-12-28 2019-01-25 2019-02-24 2019-03-31 2019-05-05 2019-11-01 nombre provisorio "Proyecto for Flood Risk Management en el menor costo Educativo del Plan Hidráulico en el marco del Programa Ciudadanía Global" (PEPHPCG) AR-UFOMC-115122-CS-LCS Institutional Development Selección basada Ejecución / Plan de Comunicación IBRD / 86280 Posterior Open - National 165,000.00 0.00 2020-03-30 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-04-07 for Flood Risk Management en el menor costo pendiente Etapa III AR-UFOMC-115123-CS-LCS Institutional Development Selección basada Ejecución / Plan de Comunicación IBRD / 86280 Posterior Open - National 150,000.00 0.00 2021-03-30 2021-04-20 2021-06-03 2021-07-01 2021-07-31 2021-09-04 2021-10-09 2022-04-07 for Flood Risk Management en el menor costo pendiente Etapa IV AR-UFOMC-115140-CS-LCS Institutional Development Selección basada Ejecución / Plan de Educación Etapa IBRD / 86280 Posterior Open - National 200,000.00 0.00 2020-03-30 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-04-07 for Flood Risk Management en el menor costo pendiente II AR-UFOMC-2872-CS-QCBS Institutional Development Selección basada / Campaña publicitaria IBRD / 86280 Posterior Open - National 550,000.00 0.00 Cancelado 2017-03-14 2017-04-04 2017-05-18 2017-06-15 2017-07-15 2017-08-19 2017-09-23 2018-09-23 for Flood Risk Management en calidad y costo (diseño) AR-UFOMC-2891-CS-QCBS Flood Mitigation Selección basada IBRD / 86280 Posterior Open - National 260,000.00 0.00 Cancelado 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-12-25 / Evaluación final Infrastructure en calidad y costo AR-UFOMC-2894-CS-QCBS Flood Mitigation Selección basada / Plan de monitoreo y IBRD / 86280 Posterior Open - National 400,000.00 0.00 Cancelado 2016-08-15 2016-09-05 2016-10-19 2016-11-16 2016-12-16 2017-01-20 2017-02-24 2018-02-24 Infrastructure en calidad y costo operación de aguas pluviales AR-UFOMC-2888-CS-QCBS Selección basada Ejecución / Evaluación de medio IBRD / 86280 Project Management Posterior Open - National 50,000.00 0.00 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2021-06-09 en calidad y costo pendiente término Page 4 AR-UFOMC-2876-CS-LCS / Selección basada Ejecución IBRD / 86280 Project Management Posterior Open - National 55,000.00 0.00 2021-04-01 2021-04-22 2021-06-05 2021-07-03 2021-08-02 2021-09-06 2021-10-11 2022-04-09 Auditoría 21-22 en el menor costo pendiente AR-UFOMC-122561-CS- QCBS / ELABORACIÓN DEL PROYECTO EJECUTIVO DEL TÚNEL ALIVIADOR DEL ARROYO Selección basada Open - MEDRANO, ESTUDIOS Y IBRD / 86280 Project Management Previa 3,000,000.00 0.00 En ejecución 2019-07-22 2019-08-12 2019-09-25 2019-10-23 2019-11-22 2019-12-27 2020-01-31 2021-01-30 en calidad y costo International OBRAS COMPLEMENTARIAS - PLANIFICACIÓN DE MEDIDAS NO ESTRUCTURALES AR-UFOMC-115141-CS-LCS Selección basada Ejecución / Auditoría Financiera 2019- IBRD / 86280 Project Management Posterior Open - National 50,000.00 0.00 2019-11-01 2019-11-22 2020-01-05 2020-02-02 2020-03-03 2020-04-07 2020-05-12 2020-11-08 en el menor costo pendiente 20 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-2883-CS-INDV / Institutional Development Ejecución Consultorías varias (x 14) IBRD / 86280 Posterior Individual Open 1,920,000.00 0.00 2016-01-02 2016-02-20 2016-03-12 2016-04-16 2016-10-13 for Flood Risk Management pendiente para la UEP AR-UFOMC-20568-CS-INDV / Fortalecimiento del Institutional Development IBRD / 86280 Posterior Individual Open 10,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 Programa Primeros for Flood Risk Management Respondedores AR-UFOMC-2879-CS-INDV / Contratación de consultores Institutional Development IBRD / 86280 Posterior Individual Open 65,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 p/ talleres de concientización for Flood Risk Management a los profesionales del rubro. AR-UFOMC-2878-CS-INDV / Contratación de consultores Institutional Development IBRD / 86280 Posterior Individual Open 65,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 p/ talleres de concientización for Flood Risk Management a la sociedad civil Page 5