Documents & Reports

Uganda - HIV/AIDS Control Project (English)

Abstract

Ratings for the Uganda HIV/AIDS Control Project were as follows: outcomes were moderately satisfactory, the risk to development outcome was substantial, the Bank performance was satisfactory, and the Borrower performance was moderately satisfactory. Some... See More +

Details

  • 2007/06/29
  • Implementation Completion and Results Report
  • ICR360
  • 1 of 1
  • Uganda
  • Africa
  • 2007/07/17
  • Uganda - HIV/AIDS Control Project
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation