Documents & Reports

Indonesia - Upper Cisokan Pumped Storage Power Project (English)

Abstract

The objective of the Upper Cisokan Pumped Storage (UCPS) Power Project for Indonesia is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional... See More +

Details

  • 2011/04/27
  • Project Appraisal Document
  • 57895
  • 1
  • 1
  • Indonesia
  • East Asia and Pacific
  • 2011/05/27
  • Indonesia - Upper Cisokan Pumped Storage Power Project
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation