Documents & Reports

Bosnia and Herzegovina - Sava Waterway Rehabilitation Project : environmental assessment (Vol. 4) : Standard for mine clearance and explosive ordnance disposal operations (English)

Abstract

The objective of the Sava Waterway Rehabilitation Project for Bosnia and Herzegovina is to improve the operational performance and safety of commercial and leisure vessels on the Sava River, thereby contributing to improved utilization of the river ports... See More +

Details

  • 2013/10/07
  • Environmental Assessment
  • E4213
  • 4
  • 10 (See all volumes)
  • Bosnia and Herzegovina
  • Europe and Central Asia
  • 2013/10/07
  • Standard for mine clearance and explosive ordnance disposal operations
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation