Documents & Reports

Tonga - First and Second Economic Recovery Operation Project (English)

Abstract

Ratings for the First and Second Economic Recovery Operation Project for Tonga were as follows: outcomes were moderately satisfactory; risk to development outcome was substantial; Bank performance was satisfactory and borrower performance was also satisfactory... See More +

Details

  • 2013/12/13
  • Implementation Completion and Results Report
  • ICR2857
  • 1 of 1
  • Tonga
  • East Asia and Pacific
  • 2013/12/23
  • Tonga - First and Second Economic Recovery Operation Project
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation