Abstract

Ratings for the Second Phase of the Protection of Basic Services Program Project (PBS II) for Ethiopia were as follows: outcomes were satisfactory, the risk to development outcome was moderate, the Bank performance was satisfactory, and the Borrower performance... See More +

Details

  • 2013/12/20
  • Implementation Completion and Results Report
  • ICR2574
  • 1
  • 1
  • Ethiopia
  • Africa
  • 2014/01/08
  • Ethiopia - Second Phase of the Protection of Basic Services Program Project
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation