MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 1st STEP ANNUAL PROCUREMENT PLAN BASED ON THE FEBRUARY 2017 SUPERVISORY MISSION AND AVAILABLE BUDGET SIMPLIFIED (THRESHOLD) PROCUREMENT PLAN FOR THE SHIRE RIVER BASIN MANAGEMENT PROGRAM (PHSE 1) PROJECT (SRBMP) A. General Information 1 Project Information (i) Country Malawi (ii) Project Name Shire River Basin Management Project (iii) Credit No. 51250 (iv) Grant No H 775 (v) Project ID P117617 (vi) Implementation Agency Ministry of Agriculture, Irrigation and Water Development 2 Bank’s approval Date of the 5 Year Procurement June 2012 Plan 3 Bank’s approval Date of 1ST Revised 5 Year 19 March 2013 Procurement Plan 4 Date of General Procurement Notice 29th February 2012 5 Date of General Procurement Notice 1st Revision 24 March 2013 6 Period Covered by this Procurement Plan April 2017 – March 2018 7 Versions of Applicable Procurement Guidelines For Goods and Works Governed by IDA’s Guidelines for Procurement of Goods, Works, and Non- Consulting Services Under IBRD Loans and IDA Credits & Grants by World Bank Borrowers published January 2011 Governed by IDA’s Guidelines for Selection and For Consultant’s Services Employment of Consultant Under IBRD Loans and IDA Credits & Grants by World Bank Borrowers published January 2011 Community Participation Procurement will be Community Driven Procurement Activities carried out as defined in the Project Appraisal Document (PAD), Project Implementation Plan (PIP) and the SRBMP CPP Guidelines B. Works, Goods and Consultant’s Services with Thresholds for Prior Review 1. Prior Review threshold: Procurement Decisions subject to Prior Review by the Bank will be as follows: No Procurement Method Prior Review Threshold Comments (USD) (i). ICB and LIB (Goods) 1,000,000.00 and above All Contracts (ii) NCB (Goods and Non-Consulting 200,000.00 and below First Contract only Services) 1,000,000.00 Page 1 of 9 No Procurement Method Prior Review Threshold Comments (USD) (iii) ICB (Works) 5,000,000.00 and above All Contracts (iv) NCB (Works) 200,000 00.00and below First Contract only 5, 000,000.00 (v) Direct Contracting All Values All Contracts (vi) Force Account All Values All Contracts (vii) Shopping (Goods and Non- Below 200,000.00 None Consulting Services) (viii) Shopping (Works) Below 200,000.00 None (ix) Community Participation (a) Local Bidding Below 10,000.00 None (b) Local Shopping Below 3,000.00 None (c ) Direct contracting All Values All Contracts 2. Prequalification None 3. Proposed Procedures for CDD Components. As per paragraph. 3.17 of the Guidelines and supported project procurement guidelines and project implementation plans. 4. Training and Workshop programmes and plans will be submitted separately for prior review and no objection by the Bank. 5. Reference to (if any) Project Operational/Procurement Manual Project Implementation Plan and Fiduciary Management manual for CPP 6. Any Other Special Procurement Arrangements: None C: Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: No Selection Method Prior Review Threshold Comment (i) Competitive Methods Above USD200,000.00 All Contracts (Firms) (ii) Single Source All Values All Contracts (iii) Individual Consultants Above USD100,000.00 All Contracts 2. Short list comprising entirely of national consultants Short list of consultants for services, estimated to cost less than $200,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements Page 2 of 9 Not applicable D.Procurement Packages with Methods and Time Schedule Page 3 of 9 1. GOODS: – SHIRE RIVER PLANNING Page 4 of 9 1 2 3 4 5 6 7 8 9 10 11 Package Contract Description Source Proc. Estimated Procurement Prequalifi Domestic Review by Expected Bid Comments No. of Funds Unit Cost in US$ Method cation Preference Bank Opening Date (Yes/No) (Yes/No) (Prior/Post) 1 Supply and delivery of IDA SRBMP 100,000.00 NCB No No Post 7 February 2017 Bids Evaluated and BER Field Equipment including Secretaria awaiting next IPC early flood warning t meeting to get approval. Equipment like Delivery expected before megaphones, bicycles, end of April 2017 dinghy boats, etc for use in the Flood areas of Chikwawa and Nsanje 2 Framework Arrangement IDA SRBMP 250,000.00 NCB No No Post March 2017 Bids Evaluated and BER for motor vehicle and Secretaria awaiting next IPC motor cycle tyres and t meeting to get approval. tubes for the SRBMP Contract signing Fleet expected before end of April 2017 HOWEVER delivery of items will be within one week BASED UPON ACTUAL REQUEST/ NEED and budget 3 Framework Arrangement IDA SRBMP 100,000.00 NCB No No Post March 2017 Bids Evaluated and BER for common stationery Secretaria awaiting next IPC and toners used by project t meeting to get approval. during implementation Contract signing expected before end of April 2017 HOWEVER delivery of items will be within one week BASED UPON ACTUAL REQUEST/ NEED and budget Sub-Total Goods 450,000.00 Page 5 of 9 2. WORKS 1 2 3 4 5 6 7 8 9 10 11 Package Contract Description Source of Proc. Unit Estimated Cost Procure Prequalifica Domestic Review by Expected Bid Comments No. Funds in USD $ ment tion Preferenc Bank Opening Method (Yes/No) e (Yes/No) (Prior/Post) Date 1 Construction Works IDA SRBMP NCB No No Post 10 February Bids opened and Package 1 under Flood Secretariat 2017 evaluated; BER awaiting Risk Management next IPC meeting for Package 1 review and approval. Contracts expected to be signed before end of April 1,300,000.00 2017 2 Contraction of Lengwe IDA SRBMP NCB No No Post 10 March Bids opened; evaluation Nation Parks Secretariat 2017 scheduled for week Infrastructure beginning 10 April 2017. Because of financial constraint, only the conference room and ranger camps will be 500,000.00 considered for award Sub-Total ALL Works 1,800,000.00 Page 6 of 9 3. CONSULTANCY SERVICES - SHIRE RIVER PLANNING Page 7 of 9 1 2 3 4 5 6 7 8 9 Consultancy Description of Source Procuring Unit Estimated Selection Review by Expected Proposal Comments No. Assignment of Funds Cost in US $ Method Bank Submission Date (Prior/Post) 1 Engage Chief IDA SRBMP Secretariat 144,000 IC Post March 2017 Executive Officer for NWRA 2 Contract renewal for IDA SRBMP Secretariat 232,000.00 IC Post June-Oct 2017 From June next 12 months for 2017 SRBMP Secretariat staff (3 Procurement Specialists, 2 Financial Management Specialists, 1 Communication Specialist, 1 Liaison Officer and 1 Assistant Accountant based at Lengwe National Parks) 3 Phase 2 Feasibility IDA SRBMP Secretariat 500,000.00 SSS Prior May 2017 ToRs being Study: Rehabilitation developed/ of Mpira Balaka for refined for water supply and submission to various smaller WB for no multipurpose dams objection to be identified later Sub-Total Consultancy Services 966,000.00 Page 8 of 9 4. TRAINING AND WORKSHOPS The strategic Training Plan will be submitted separately later Page 9 of 9 PROCUREMENT Malawi : Malawi: Shire River Basin Management Program (Phase-I) Project PLAN General Information Country: Malawi Banks Approval Date of the Original Procurement Plan: 2017-04-05 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-09-21 Project ID: P117617 GPN Date: Project Name: Malawi: Shire River Basin Management Program (Phase-I) Project Loan / Credit No: IDA / 51250, IDA / Q7630, IDA / H7750 Executing Agency(ies): Shire River Basin Management Program WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-SRBMP-18263-CW-RFB / IDA / 51250 Single Stage - One Pending Construction of Infrastructures in IDA / Q7630 CATCHMENT MANAGEMENT Post Request for Bids Open - National 3,000,000.00 0.00 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-30 2017-12-27 Envelope Implementation Lengwe National Park IDA / H7750 MW-SRBMP-18373-CW-RFB / WATER-RELATED Single Stage - One Pending Civil Works for the Upgraded IDA / 51250 Prior Request for Bids Open - International 1,913,198,336.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-10-31 INFRASTRUCTURE Envelope Implementation Kamuzu Barrage at Liwonde GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 021/IPC/SRB/16/07F/06G / IDA / 51250 Supply and Delivery of 27 Push Request for Single Stage - One Pending IDA / Q7630 CATCHMENT MANAGEMENT Post Limited 1,800.00 0.00 2017-04-12 2017-05-12 2017-06-02 Bicycles for PICs in Chingale and Quotations Envelope Implementation IDA / H7750 Kapichila Catchments 021/IPC/SB/17/04/01 / Supply, Delivery and Installation of IDA / 51250 Request for Single Stage - One Pending Fridges (2) and Air Conditioners IDA / Q7630 SHIRE BASIN PLANNING Post Limited 10,200.00 0.00 2017-04-21 2017-05-25 2017-06-24 Quotations Envelope Implementation (10) to the SRBA Offices in Area IDA / H7750 47 021/IPC/SB/17/04/02 / Supply, IDA / 51250 Delivery and Installation of 1 Request for Single Stage - One Pending IDA / Q7630 SHIRE BASIN PLANNING Post Limited 900.00 0.00 2017-04-21 2017-05-25 2017-06-24 Projector to the SRBA Offices in Quotations Envelope Implementation IDA / H7750 Area 47 IDA / 51250 021/IPC/SB/17/04/03 / Supply Request for Single Stage - One Pending IDA / Q7630 SHIRE BASIN PLANNING Post Limited 3,000.00 0.00 2017-04-21 2017-05-25 2017-06-24 and Delivery of Hardware Items Quotations Envelope Implementation IDA / H7750 021/IPC/SB/17/04/04 / Supply and Delivery of Protective Wear IDA / 51250 Request for Single Stage - One Pending (Working Suits, Leather Gloves IDA / Q7630 SHIRE BASIN PLANNING Post Limited 5,300.00 0.00 2017-04-21 2017-05-25 2017-06-24 Quotations Envelope Implementation and Gum Boots (37 per set) for IDA / H7750 Gauge Readers MW-SRBMP-18243-GO-RFQ / IDA / 51250 Procurement of stationery and Request for Single Stage - One Pending IDA / Q7630 SHIRE BASIN PLANNING Post Limited 3,015.00 0.00 2017-06-16 2017-07-05 2017-07-19 toner (item types not included in Quotations Envelope Implementation IDA / H7750 current framework agreement) MW-SRBMP-18332-GO-RFB / Supply and Installation of Gates WATER-RELATED Single Stage - One Pending IDA / 51250 Prior Request for Bids Open - International 9,683,573.59 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-08-15 and Weed Boom for the INFRASTRUCTURE Envelope Implementation Upgraded Kamuzu Barrage MW-SRBMP-18331-GO-RFB / Supply and Installation of Jib WATER-RELATED Single Stage - One Pending IDA / 51250 Prior Request for Bids Open - International 1,411,467.56 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-11-20 Crane for the Upgraded Kamuzu INFRASTRUCTURE Envelope Implementation Barrage MW-SRBMP-18374-GO-RFB / IDA / 51250 Supply and Installation of Single Stage - One Pending IDA / Q7630 SHIRE BASIN PLANNING Prior Request for Bids Limited 2,013,763.32 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-07-31 Hydromet Equipment and Envelope Implementation IDA / H7750 Ancillary Works MW-SRBMP-19674-GO-RFQ / Supply and delivery of IT IDA / 51250 Request for Single Stage - One Pending equipment for SRBMP (2nd IDA / Q7630 SHIRE BASIN PLANNING Post Limited 50,000.00 0.00 2017-07-24 2017-09-18 2017-10-18 Quotations Envelope Implementation Batch), National Spatial Data IDA / H7750 Centre, ODSS and Hydromet MW-SRBMP-19677-GO-RFQ / IDA / 51250 Request for Single Stage - One Pending Supply and Delivery of 2018 IDA / Q7630 SHIRE BASIN PLANNING Post Limited 10,000.00 0.00 2017-09-11 2017-11-06 2017-12-21 Quotations Envelope Implementation Diaries and Calendars IDA / H7750 MW-SRBMP-27202-GO-RFQ / IDA / 51250 Request for Single Stage - One Pending Supply and Delivery of a Server IDA / Q7630 SHIRE BASIN PLANNING Post Limited 5,000.00 0.00 2017-09-22 2017-10-16 2017-10-30 Quotations Envelope Implementation to the Department of Surveys IDA / H7750 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 MW-SRBMP-18293-CS-QCBS / IDA / 51250 Consultancy Services for Quality And Cost- Pending IDA / Q7630 SHIRE BASIN PLANNING Prior Open - International 3,859,835.00 0.00 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2018-01-31 Consolidated Monitoring and Based Selection Implementation IDA / H7750 Evaluation IDA / 51250 MW-SRBMP-18298-CS-QCBS / Quality And Cost- Pending IDA / Q7630 SHIRE BASIN PLANNING Prior Open - International 3,540,180.00 0.00 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2018-01-31 Hydromet Consultancy Based Selection Implementation IDA / H7750 MW-SRBMP-18300-CS-QCBS / Implementation Service Provider IDA / 51250 Quality And Cost- Pending Catchment Management Upper IDA / Q7630 CATCHMENT MANAGEMENT Prior Open - International 4,389,430.87 0.00 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2018-01-31 Based Selection Implementation Lisungwi and Upper IDA / H7750 Wamkulumadzi MW-SRBMP-18303-CS-QCBS / IDA / 51250 Implementation Service Provider Quality And Cost- Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Open - International 4,159,824.36 0.00 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2017-06-16 2018-01-31 Catchment Management in Based Selection Implementation IDA / H7750 Kapichira and Chingale IDA / 51250 MW-SRBMP-18305-CS-QCBS / Quality And Cost- Pending IDA / Q7630 SHIRE BASIN PLANNING Prior Open - International 4,199,730.97 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 ODSS Consultancy Based Selection Implementation IDA / H7750 MW-SRBMP-18306-CS-QCBS / Architectural Design and IDA / 51250 Quality And Cost- Pending Construction Supervision for the IDA / Q7630 SHIRE BASIN PLANNING Prior Open - International 305,374.45 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-12-31 Based Selection Implementation Shire River Basin Agency Offices IDA / H7750 in Blantyre MW-SRBMP-18309-CS-QCBS / IDA / 51250 WATER-RELATED Quality And Cost- Pending Implementation Service Provider IDA / Q7630 Prior Open - International 3,955,253.56 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 INFRASTRUCTURE Based Selection Implementation Flood Risk Management IDA / H7750 MW-SRBMP-18318-CS-QCBS / Consultancy Services to IDA / 51250 Strengthen Information Base of Quality And Cost- Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Open - International 672,495.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 Natural Habitats, Biodiversity and Based Selection Implementation IDA / H7750 Environmental Services in the Shire Basin MW-SRBMP-18320-CS-QCBS / IDA / 51250 Consultancy Services to Conduct Quality And Cost- IDA / Q7630 CATCHMENT MANAGEMENT Prior Open - International 246,927.61 219,660.75 Signed 2017-06-17 2017-07-14 2017-06-17 2017-07-24 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-07-28 2017-06-17 2017-07-28 2017-07-31 Study to Enhance the Potential Based Selection IDA / H7750 of Nature Based Tourism MW-SRBMP-18322-CS-QCBS / Construction Supervision for the WATER-RELATED Quality And Cost- IDA / 51250 Prior Open - International 6,239,132.52 5,372,313.43 Signed 2017-06-17 2017-07-14 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-09-03 2017-06-17 2017-09-18 2018-01-31 Upgraded Kamuzu Barrage at INFRASTRUCTURE Based Selection Liwonde MW-SRBMP-18326-CS-QCBS / Consultancy Services for Climate IDA / 51250 Resilience, Livelihoods and Quality And Cost- Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Open - International 599,186.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-12-31 Sustainable Natural Resources Based Selection Implementation IDA / H7750 Management in the Elephant Marshes INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 021/IPC/SRB/16/07F/08C / Phase 2 Feasibility Study of IDA / 51250 WATER-RELATED Pending Mpira Balaka for water supply IDA / Q7630 Prior Direct Selection Direct 500,000.00 0.00 2017-04-28 2017-05-08 2017-07-12 2017-10-10 INFRASTRUCTURE Implementation and various smaller multipurpose IDA / H7750 dams to be identified later 021/IPC/SRB/16/07F/09C1 / IDA / 51250 Contract renewal for next 12 Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 35,750.00 0.00 2017-05-17 2017-05-27 2017-06-17 2017-07-22 2018-07-17 months for SRBMP Secretariat Selection Implementation IDA / H7750 Procurement Specialist 021/IPC/SRB/16/07F/09C2 / IDA / 51250 Contract Renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 35,750.00 0.00 2017-05-17 2017-05-27 2017-06-17 2017-07-22 2018-07-22 for SRBMP Secretariat Selection Implementation IDA / H7750 Communications Specialist 021/IPC/SRB/16/07F/09C3 / IDA / 51250 Contract Renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 35,750.00 0.00 2017-08-09 2017-08-19 2017-09-09 2017-10-14 2018-10-14 for SRBMP Secretariat Financial Selection Implementation IDA / H7750 Management Specialist 021/IPC/SRB/16/07F/09C4 / IDA / 51250 Contract renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 35,750.00 0.00 2017-08-09 2017-08-19 2017-09-09 2017-10-14 2018-10-14 for SRBMP Secretariat Liaison Selection Implementation IDA / H7750 Officer 021/IPC/SRB/16/07F/09C5 / IDA / 51250 Contract renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 24,700.00 0.00 2017-05-17 2017-05-27 2017-06-17 2017-07-22 2018-07-22 for SRBMP Secretariat Assistant Selection Implementation IDA / H7750 Financial Management Specialist 021/IPC/SRB/16/07F/09C6 / IDA / 51250 Contract renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 24,700.00 0.00 2017-08-23 2017-09-02 2017-09-23 2017-10-28 2018-10-28 SRBMP Secretariat Assistant Selection Implementation IDA / H7750 Procurement Specialist 021/IPC/SRB/16/07F/09C7 / IDA / 51250 Contract renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 24,700.00 0.00 2017-08-23 2017-09-02 2017-09-23 2017-10-28 2018-10-28 for SRBMP Secretariat Assistant Selection Implementation IDA / H7750 Procurement Specialist 021/IPC/SRB/16/07F/09C8 / IDA / 51250 Contract renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Post Direct 14,900.00 0.00 2017-07-23 2017-08-02 2017-08-23 2017-09-27 2018-09-27 for SRBMP Secretariat Assistant Selection Implementation IDA / H7750 Accountant Page 2 021/IPC/SRB/16/07F/10C / IDA / 51250 Contract Renewal for 12 months Individual Consultant Pending IDA / Q7630 SHIRE BASIN PLANNING Prior Direct 151,000.00 0.00 2017-06-06 2017-06-12 2017-06-16 2017-06-20 2017-12-31 for GIS Expert for the Shire River Selection Implementation IDA / H7750 Basin Management Project MW-SRBMP-18325-CS-CDS / IDA / 51250 Consultancy Services for IDA / Q7630 SHIRE BASIN PLANNING Prior Direct Selection Direct 1,003,020.87 1,003,020.87 Signed 2017-06-17 2017-06-17 2017-06-17 2017-09-18 2018-01-31 Hydrogeological and Water IDA / H7750 Quality (Aquifer) Mapping MW-SRBMP-18327-CS-CDS / IDA / 51250 Infrastructures Design and Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Direct Selection Direct 197,815.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-12-31 Supervision of Construction Implementation IDA / H7750 Works in Lengwe National Park MW-SRBMP-18329-CS-INDV / IDA / 51250 Consultancy Services Technical Individual Consultant Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Limited 222,015.48 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-07-08 Assistance Forestry Selection Implementation IDA / H7750 Comanagement Specialist MW-SRBMP-18375-CS-INDV / IDA / 51250 Consultancy Services Technical Individual Consultant IDA / Q7630 CATCHMENT MANAGEMENT Prior Open 200,202.52 0.00 Under Review 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2017-07-31 Assistance Biodiversity and Selection IDA / H7750 Protected Areas Specialist MW-SRBMP-18376-CS-INDV / Panel of Experts Geotechnical WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Direct 48,000.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 Engineering for the Upgraded INFRASTRUCTURE Selection Implementation Kamuzu Barrage at Liwonde MW-SRBMP-18378-CS-INDV / Panel of Experts Hydraulic WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Direct 32,800.00 0.00 2017-06-23 2017-06-23 2017-06-23 2017-06-23 2018-01-31 Engineering Upgraded Kamuzu INFRASTRUCTURE Selection Implementation Barrage at Liwonde MW-SRBMP-18379-CS-INDV / Independent Panel of Experts WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Direct 32,800.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 Hydraulic Engineering Upgraded INFRASTRUCTURE Selection Implementation Kamuzu Barrage MW-SRBMP-18380-CS-INDV / Independent Panel of Experts WATER-RELATED Individual Consultant Pending Mechanical Engineering IDA / 51250 Prior Direct 52,000.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 INFRASTRUCTURE Selection Implementation Upgraded Kamuzu Barrage at Liwonde MW-SRBMP-18381-CS-INDV / Independent Panel of Expert WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Direct 27,888.00 0.00 2017-06-17 2017-06-17 2017-06-17 2017-06-17 2018-01-31 Structural Engineering Upgraded INFRASTRUCTURE Selection Implementation Kamuzu Barrage at Liwonde MW-SRBMP-19683-CS-INDV / Individual Consultancy Services IDA / 51250 Individual Consultant Pending Chief Executive Officer for IDA / Q7630 SHIRE BASIN PLANNING Post Open 144,000.00 0.00 2017-06-30 2017-08-04 2017-08-18 2017-09-15 2018-09-15 Selection Implementation National Water Resources IDA / H7750 Authority MW-SRBMP-19685-CS-INDV / Dispute Boards Civil Works (Mr. WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Limited 30,000.00 0.00 2017-06-30 2017-06-30 2017-06-30 2017-06-30 2018-06-25 Henry Musonda) Upgraded INFRASTRUCTURE Selection Implementation Kamuzu Barrage MW-SRBMP-19687-CS-INDV / Dispute Board Mechnical (Mr. WATER-RELATED Individual Consultant Pending IDA / 51250 Prior Limited 30,000.00 0.00 2017-06-30 2017-06-30 2017-06-30 2017-06-30 2027-05-09 March Hammick) for Upgraded INFRASTRUCTURE Selection Implementation Kamuzu Barrage MW-SRBMP-26732-CS-CDS / IDA / 51250 Facilitate a Study Tour Site Pending IDA / Q7630 CATCHMENT MANAGEMENT Prior Direct Selection Direct 12,540.00 0.00 2017-09-21 2017-10-01 2017-10-10 2017-11-09 Visits of Government of Malawi Implementation IDA / H7750 Officials in Ethiopia Page 3