Sustainable Rural WSS Sector (P147006) Country: Nicaragua Region: LATIN AMERICA AND CARIBBEAN Approval Date: 18-Mar-2014 July 9, 2010 PROCUREMENT Nicaragua : NI Sustainable Rural Water Supply and Sanitation Sector PLAN General Information Country: Nicaragua Banks Approval Date of the Original Procurement Plan: 2017-07-17 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-07 Project ID: P147006 GPN Date: Project Name: NI Sustainable Rural Water Supply and Sanitation Sector Loan / Credit No: IDA / 53770, IDA / H9120 Executing Agency(ies): Social Investment Fund Emergency WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-50-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-07-08 2016-07-09 2016-08-08 2016-08-15 2016-08-29 2017-08-29 Implementation Telpaneca Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-85-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-07-03 2017-07-04 2017-08-03 2017-08-10 2017-08-24 2018-08-24 Implementation Somotillo Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-58-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-04-11 2016-04-12 2016-05-12 2016-05-19 2016-06-02 2017-06-02 Implementation Achuapa Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-293-O-LPN / Agua Sanitation Coverage in Rural Pending y Saneamiento en comunidades Areas Post Request for Bids Open - National 0.00 2017-06-26 2017-06-27 2017-07-27 2017-08-03 2017-08-17 2018-08-17 Implementation de Comalapa Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PSSASR-103-O-PCOM / Sustainable Water Supply and Conclusión de las obras del Sanitation Coverage in Rural Community Driven Pending proyecto: 19176 Construcción Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2015-12-31 Development Implementation Sistema Agua potable Aguas Component 4: Contingent Gatas (II Etapa) Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-45-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-10-17 2016-10-18 2016-11-17 2016-11-24 2016-12-08 2017-12-08 Implementation San Juan de Rio Coco Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-97-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-19 2017-06-20 2017-07-20 2017-07-27 2017-08-10 2018-08-10 Implementation El Almendro Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-59-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-10-10 2016-10-11 2016-11-10 2016-11-17 2016-12-01 2017-12-01 Implementation El Sauce Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-82-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-07-03 2017-07-04 2017-08-03 2017-08-10 2017-08-24 2018-08-24 Implementation Villa Nueva Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-38-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-02-23 2017-02-24 2017-03-26 2017-04-02 2017-04-16 2018-04-16 Implementation El Jicaro Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-92-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-05 2017-06-06 2017-07-06 2017-07-13 2017-07-27 2018-07-27 Implementation San Miguelito Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 1 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-35-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-01-31 2017-02-01 2017-03-03 2017-03-10 2017-03-24 2018-03-24 Implementation Murra Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-36-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-02-07 2017-02-08 2017-03-10 2017-03-17 2017-03-31 2018-03-31 Implementation Wiwili de Nueva Segovia Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-37-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-02-15 2017-02-16 2017-03-18 2017-03-25 2017-04-08 2018-04-08 Implementation Quilali Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-113-O-LPN / 19805 Sanitation Coverage in Rural Pending Agua y Saneamiento San Areas Post Request for Bids Open - National 0.00 2016-08-15 2016-08-16 2016-09-15 2016-09-16 2016-09-17 1901-01-01 Implementation Antonio Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-73-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-26 2017-06-27 2017-07-27 2017-08-03 2017-08-17 2018-08-17 Implementation Camoapa Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-83-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-19 2017-06-20 2017-07-20 2017-07-27 2017-08-10 2018-08-10 Implementation El Castillo Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-74-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-26 2017-06-27 2017-07-27 2017-08-03 2017-08-17 2018-08-17 Implementation Teustepe Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-94-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-12 2017-06-13 2017-07-13 2017-07-20 2017-08-03 2018-08-03 Implementation San Carlos Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-31-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-09-19 2016-11-29 2016-12-29 2017-01-05 2017-01-19 2018-01-19 Implementation Laguna de Perlas Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-76-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-26 2017-06-27 2017-07-27 2017-08-03 2017-08-17 2018-08-17 Implementation El Viejo Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-75-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-26 2017-06-27 2017-07-27 2017-08-03 2017-08-17 2018-08-17 Implementation Boaco Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-32-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-09-19 2016-09-20 2016-10-20 2016-10-27 2016-10-28 2017-10-28 Implementation Bluefields Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-30-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-09-19 2016-11-22 2016-12-22 2016-12-29 2017-01-12 2018-01-12 Implementation Kukrahill Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 2 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-65-O-LPN / Agua y Sanitation Coverage in Rural Saneamiento en comunidades de Pending Areas Post Request for Bids Open - National 0.00 2016-07-25 2016-07-26 2016-08-25 2016-09-01 2016-09-02 2017-09-02 La Desembocadura de Rio Implementation Component 4: Contingent Grande Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-26-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2017-06-05 2017-06-06 2017-07-06 2017-07-13 2017-07-27 2018-07-27 Implementation El Ayote Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-15-O-LPN / 19247 Sanitation Coverage in Rural Pending Agua y Saneamiento comunidad Areas Post Request for Bids Open - National 0.00 2015-08-31 2015-09-01 2015-10-16 2015-10-23 2015-11-06 2016-11-05 Implementation Yahabra Tangny Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-18-O-LPN / 19225 Sanitation Coverage in Rural Pending Sistema de Agua Potable Areas Post Request for Bids Open - National 0.00 2015-08-17 2015-08-18 2015-09-17 2015-09-24 2015-10-08 2017-04-10 Implementation WASPAN Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-34-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-10-03 2016-10-04 2016-11-03 2016-11-10 2016-11-11 2017-11-11 Implementation Puerto Cabezas Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-23-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-08-08 2016-08-09 2016-09-08 2016-09-15 2016-09-16 2017-09-16 Implementation Rosita Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-33-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-10-03 2016-10-04 2016-11-03 2016-11-10 2016-11-11 2017-11-11 Implementation Prinzapolka Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-24-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-08-08 2016-08-09 2016-09-08 2016-09-15 2016-09-16 2017-09-16 Implementation Paiwas Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-22-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-07-25 2016-07-25 2016-07-25 2016-07-25 2016-07-25 2017-07-25 Implementation La Cruz de Rio Grande Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-64-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-07-25 2016-09-14 2016-10-29 2016-11-05 2016-11-19 2017-11-19 Implementation El Tortuguero Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-25-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-08-08 2016-08-08 2016-08-08 2016-08-08 2016-08-08 2017-08-08 Implementation Waspam Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-29-O-LPN / Agua y Sanitation Coverage in Rural Pending Saneamiento en comunidades de Areas Post Request for Bids Open - National 0.00 2016-09-05 2016-11-14 2016-12-14 2016-12-21 2017-01-04 2018-01-04 Implementation El Rama Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PSSASR-78-O-LPN / Sustainable Water Supply and Ejecución de proyectos 19253 Sanitation Coverage in Rural Agua y saneamiento comunidad Pending Areas Prior Request for Bids Open - National 0.00 2015-08-24 2015-09-01 2015-10-16 2015-10-23 2015-11-13 2017-05-06 Shiminka y 19583 Agua y Implementation Component 4: Contingent Saneamiento comunidad Emergency Response Pankawas Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 3 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-19-O-LPN / 19199 - Sanitation Coverage in Rural Pending Mejoramiento sistema de agua Areas Post Request for Bids Open - National 0.00 2015-06-01 2015-06-02 2015-07-02 2015-07-09 2015-07-23 2017-01-23 Implementation TASBAPOUNIE Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-197-O-CD / Sustainable Water Supply and Conclusión de las obras del Sanitation Coverage in Rural proyecto 19433 Proyecto Piloto IDA / 53770 Areas Prior Direct Selection 84,300.00 Signed 2015-09-30 2015-09-01 2015-11-29 Agua, Saneamiento, medio Component 4: Contingent ambiente y Turismo social Corn Emergency Response island Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-67-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-03-30 Development Implementation de Mozonte Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-66-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comundiades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-03-30 Development Implementation de Santa Maria Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-103-O-PCOM / Sanitation Coverage in Rural Agua y Saneamiento en Community Driven Pending Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-05-31 comunidades de San Juan del Development Implementation Component 4: Contingent Norte Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-289-O-PCOM / Sanitation Coverage in Rural Agua y Saneamiento en Community Driven Pending Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-07-03 2018-07-03 comunidades de San Francisco Development Implementation Component 4: Contingent de Cuapa Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-104-O-PCOM / Sanitation Coverage in Rural Agua y Saneamiento en Community Driven Pending Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-06-29 comunidades de Santo Tomás Development Implementation Component 4: Contingent del Norte Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-68-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en Comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-03-30 Development Implementation de Macuelizo Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-108-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-06-29 Development Implementation comunidades de Altagracia Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-106-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-05-31 Development Implementation comunidades de Morrito Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-291-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-07-03 2018-07-03 Development Implementation comunidades de El Coral Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-95-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2015-12-01 2016-11-30 Development Implementation de San Pedro del Norte Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-39-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-12-17 Development Implementation de Ciudad Antigua Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 4 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-105-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-06-29 Development Implementation comunidades de Santa Lucia Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-96-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-06-29 Development Implementation de Puerto Morazán Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-284-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua Y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2015-11-02 2016-10-31 Development Implementation comunidades de Villa Sandino Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-46-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-06-30 Development Implementation de Totogalpa Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-101-O-PCOM / Sanitation Coverage in Rural Agua y Saneamiento en Community Driven Pending Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2018-06-29 comunidades de San José de los Development Implementation Component 4: Contingent Remates Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-290-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-07-03 2018-07-03 Development Implementation comunidades de Santo Domingo Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-48-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-06-30 Development Implementation de San Lucas Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-49-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-11-30 Development Implementation de San Juan de Limay Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-47-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-11-30 Development Implementation de San Nicolas Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-69-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-11-30 Development Implementation ó de Santa rosa Del Peñn Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-292-O-PCOM / Sanitation Coverage in Rural Community Driven Pending Agua Y Saneamiento en Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-07-03 2018-07-03 Development Implementation comunidades de La Libertad Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-51-O-PCOM / Agua Sanitation Coverage in Rural Community Driven Pending y Saneamiento en comunidades Areas Post 0.00 1901-01-01 1901-01-01 1901-01-01 1901-01-01 1901-01-01 2017-06-30 Development Implementation de San José de Cusmapa Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene NI-FISE-22753-CW-RFB / Contratación de la ejecución de Component 2: Increase los proyectos: 19247 Agua y Sustainable Water Supply and Single Stage - One Pending Saneamiento Comunidad IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-12 2017-10-24 2017-11-23 2017-12-26 2018-06-24 Sanitation Coverage in Rural Envelope Implementation Yahabra Tangny y 19583 Agua y Areas Saneamiento Comunidad Pankawas Component 2: Increase NI-FISE-22754-CW-RFB / 19252 Sustainable Water Supply and Single Stage - One Pending Agua y Saneamiento Comunidad IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-24 2017-11-21 2017-12-26 2018-06-24 Sanitation Coverage in Rural Envelope Implementation San Andrés de Bocay Areas Page 5 Component 2: Increase NI-FISE-22756-CW-RFB / 19844 Sustainable Water Supply and Single Stage - One Pending Agua y Saneamiento Comunidad IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-12 2017-10-12 2017-10-19 2017-10-27 2018-04-25 Sanitation Coverage in Rural Envelope Implementation San Juan Areas NI-FISE-24204-CW-RFB / Component 2: Increase PROYECTO 19864 SISTEMA Sustainable Water Supply and Single Stage - One Pending IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-13 2017-11-02 2017-12-10 2018-06-08 DE AGUA Y SANEAMIENTO Sanitation Coverage in Rural Envelope Implementation COMARCA PILAN Areas NI-FISE-25174-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19200 Construcción IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-22 2017-09-27 2017-11-08 2017-12-08 2018-01-12 2018-07-11 Sanitation Coverage in Rural Envelope Implementation Sistema de Agua y Saneamiento Areas El Achiote NI-FISE-25722-CW-RFB / Component 2: Increase Contratación de Obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19811 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad San Areas Pedro / Santa Isabel NI-FISE-25723-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19827 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Kisa Areas Laya NI-FISE-25724-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19828 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Layasiksa II NI-FISE-25725-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Proyecto 19830 Agua y Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Silibila Areas NI-FISE-25727-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19836 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Fruta Areas de Pan NI-FISE-25730-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19839 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Sukatpin NI-FISE-25731-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Proyecto 19840 Agua y Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Lapan Areas NI-FISE-25732-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19845 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Dos Areas Amigos NI-FISE-25733-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19895 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Isnawas NI-FISE-26830-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19848 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad San Areas Pedro del Norte NI-FISE-26831-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19822 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Waspado NI-FISE-26832-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19835 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Kasmitingne NI-FISE-26834-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19834 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Flor de Areas Pino NI-FISE-26835-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19831 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad La Areas Unión NI-FISE-26838-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19851 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad El Areas Cañal / Poblado El Cañalito NI-FISE-26841-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19903 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad La Areas Barra NI-FISE-25728-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19838 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Banacruz NI-FISE-27792-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19670 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento en comunidad El Areas Jicaro NI-FISE-27794-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19800 Agua y IDA / 53770 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Areas Sincoyal NI-FISE-27796-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19821 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Las Areas Palmas NI-FISE-27797-CW-RFQ / Component 2: Increase Contratación de obras del Sustainable Water Supply and Request for Single Stage - One Pending proyecto 19841 Agua y IDA / H9120 Post Open - National 0.00 2017-10-04 2017-11-29 2018-05-28 Sanitation Coverage in Rural Quotations Envelope Implementation Saneamiento comunidad: Areas Amatillo, Las Mesitas NI-FISE-27798-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19936 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Santa Areas Lucia NI-FISE-27799-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19801 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Areas Mateares NI-FISE-27800-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19814 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Rodeo Areas Grande NI-FISE-27801-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19819 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad El Areas Roble Page 6 NI-FISE-27802-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19824 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad Areas Samarcanda NI-FISE-27803-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19826 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad El Areas Quibuto NI-FISE-27804-CW-RFB / Contratación de obras del Component 2: Increase proyecto 19833 Agua y Sustainable Water Supply and Single Stage - One Pending IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Saneamiento comunidad Sanitation Coverage in Rural Envelope Implementation Verapaz, La Pita, Wascasoni y Areas Agua Dulce NI-FISE-27805-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19872 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad La Areas Pilaya NI-FISE-27795-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19810 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento comunidad San Areas José del Guineo NI-FISE-26839-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19852 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Nuevo Areas Amanecer / Poblado El Capirote NI-FISE-26837-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19797 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad La Areas Aurora NI-FISE-26840-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19812 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-09-08 2017-09-13 2017-10-25 2017-11-24 2017-12-29 2018-06-27 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Karawala NI-FISE-36270-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending proyecto 19247 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-11-30 2017-12-05 2018-01-04 2018-02-03 2018-03-10 2018-09-06 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Yahabra Tangny NI-FISE-26833-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19712 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad El Areas Cedro NI-FISE-26836-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19809 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Kahkabila NI-FISE-39656-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending IDA / H9120 Post Request for Bids Open - National 0.00 2017-12-22 2017-12-27 2018-02-07 2018-03-09 2018-04-13 2018-10-10 Proyecto 19830 Agua y Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Silibila Areas NI-FISE-39657-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19836 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-12-22 2017-12-27 2018-02-07 2018-03-09 2018-04-13 2018-10-10 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Fruta Areas de Pan NI-FISE-39658-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19838 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-12-22 2017-12-27 2018-02-07 2018-03-09 2018-04-13 2018-10-10 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad Areas Banacruz NI-FISE-39659-CW-RFB / Component 2: Increase Contratación de obras del Sustainable Water Supply and Single Stage - One Pending Proyecto 19851 Agua y IDA / H9120 Post Request for Bids Open - National 0.00 2017-12-22 2017-12-27 2018-02-07 2018-03-09 2018-04-13 2018-10-10 Sanitation Coverage in Rural Envelope Implementation Saneamiento Comunidad El Areas Cañal / Poblado El Cañalito GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-217-B-CP / Compra Sustainable Water Supply and de material de apoyo para los Sanitation Coverage in Rural Request for Pending talleres de capacitación Areas Post Limited - National 0.00 2017-07-25 2017-08-03 2017-09-02 Quotations Implementation ú iles de oficina) año (papelería y t Component 4: Contingent 2017 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-365-B-CP / Sanitation Coverage in Rural Adquisición de Proyectores, para Request for Pending Areas Post Limited - National 0.00 2017-03-15 2017-03-24 1901-01-01 apoyo y uso de todas las Quotations Implementation Component 4: Contingent oficinas Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-367-B-CP / Sustainable Water Supply and Adquisición de Licencias ESET Sanitation Coverage in Rural Request for Pending Endpoint Security extensión Areas Post Limited - National 0.00 2017-03-15 2017-03-24 1901-01-01 Quotations Implementation para 2 años con vencimiento Component 4: Contingent 29/10/2020 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-368-B-CP / Sanitation Coverage in Rural Adquisición de Licencias ESET Request for Pending Areas Post Limited - National 0.00 2017-03-15 2017-03-24 1901-01-01 Endpoint Security para 2 años Quotations Implementation Component 4: Contingent con vencimiento 29/10/2020 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-216-B-CP / Compra Sustainable Water Supply and de material de apoyo para los Sanitation Coverage in Rural Request for Pending talleres de capacitación Areas Post Limited - National 0.00 2015-07-23 2015-08-13 2015-08-27 Quotations Implementation ú iles de oficina) año (papelería y t Component 4: Contingent 2015 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 7 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-364-B-CP / Compra Sanitation Coverage in Rural de Insumos para realizar Request for Pending Areas Post Limited - National 0.00 2017-03-15 2017-03-24 1901-01-01 mantenimiento correctivo de 180 Quotations Implementation Component 4: Contingent equipos Informáticos. Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene NI-FISE-29702-GO-RFQ / Component 1: Strengthening the Compra de consumibles para Request for Single Stage - One Pending IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-11-01 2017-12-27 2018-01-11 impresoras del Departamento de Quotations Envelope Implementation Sanitation Sector Pre Inversión (tóner) NI-FISE-29703-GO-RFQ / Component 1: Strengthening the Compra de suministros de oficina Request for Single Stage - One Pending IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-10-31 2017-12-26 2018-01-15 para el Departamento de Pre Quotations Envelope Implementation Sanitation Sector Inversión NI-FISE-25011-GO-DIR / Contratación de extensión de Component 1: Strengthening the 250 licencias ESET Endpoint Pending IDA / 53770 Rural Water Supply and Prior Direct Selection Direct 0.00 2017-10-27 2017-11-01 2017-11-25 2017-12-05 Security y Adquisición de 100 Implementation Sanitation Sector nuevas licencias ESET Endpoint Security NI-FISE-36266-GO-RFQ / Component 1: Strengthening the Compra de material fungible para Request for Single Stage - One Pending IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-12-05 2018-01-30 2018-07-29 realización de curso técnico a Quotations Envelope Implementation Sanitation Sector miembros de CAPS NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-353-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural de campo del Taller de Request for Pending Areas Post Limited - National 0.00 2017-03-07 2017-03-16 1901-01-01 capacitación No 2 -AVAR en Quotations Implementation Component 4: Contingent A&SR III Fase-Grupo 3: Emergency Response Chinandega y León Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-354-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo taller de capacitación Areas Post Limited - National 0.00 2017-03-08 2017-03-17 1901-01-01 Quotations Implementation No 2 AVAR en A&SR III Fase - Component 4: Contingent Grupo 4:Managua y Masaya Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-355-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural de campo taller de capacitación Request for Pending Areas Post Limited - National 0.00 2017-03-15 2017-03-24 1901-01-01 No 2 AVAR en A&SR III Fase - Quotations Implementation Component 4: Contingent Grupo 5:Granada, Carazo y Emergency Response Rivas Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-358-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo taller de capacitación Areas Post Limited - National 0.00 2017-03-28 2017-04-06 1901-01-01 Quotations Implementation No 2 AVAR en A&SR III Fase - Component 4: Contingent Grupo 8:Matagalpa y Estelí Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-160-S-CP / Acto de Sanitation Coverage in Rural Request for Pending cierre del proceso AVAR A&SR - Areas Post Limited - National 0.00 2017-09-05 2017-09-14 2017-10-14 Quotations Implementation III Fase - Pacifico, Centro y Norte Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-227-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-09-27 2016-10-06 2016-11-05 A&SR III Fase - Grupo 4: Quotations Implementation Component 4: Contingent Managua y Masaya Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-233-S-CP / Taller Sanitation Coverage in Rural de capacitación N°3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-03-14 2017-03-23 2017-04-22 A&SR III Fase - Grupo 4: Quotations Implementation Component 4: Contingent Managua y Masaya Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-161-S-CP / Acto de Sanitation Coverage in Rural Request for Pending cierre del proceso AVAR A&SR - Areas Post Limited - National 0.00 2017-09-12 2017-09-21 2017-10-21 Quotations Implementation III Fase - RACCN Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-249-S-CP / Sesión Sanitation Coverage in Rural de trabajo para la conformación Request for Pending Areas Post Limited - National 0.00 2015-07-14 2015-07-23 2015-08-22 del comité de proyecto de la Quotations Implementation Component 4: Contingent RACCN Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 8 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-282-S-CP / Sustainable Water Supply and Segundo taller de capacitacion Sanitation Coverage in Rural Request for Pending sobre formulacion de proyectos Areas Post Limited - National 0.00 2016-04-12 2016-04-27 2016-05-11 Quotations Implementation dirigido a proveedores de servicio Component 4: Contingent (formuladores) Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-146-S-CP / Taller Sanitation Coverage in Rural Request for Pending de capacitación N°3 - AVAR en Areas Post Limited - National 0.00 2017-02-14 2017-02-23 2017-03-25 Quotations Implementation A&SR III Fase - Grupo 1: RACCN Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-250-S-CP / Sesión Sanitation Coverage in Rural de trabajo para la conformación Request for Pending Areas Post Limited - National 0.00 2015-07-28 2015-08-06 2015-09-05 del comité de proyecto de la Quotations Implementation Component 4: Contingent RACCS Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-162-S-CP / Acto de Sanitation Coverage in Rural Request for Pending cierre del proceso AVAR A&SR - Areas Post Limited - National 0.00 2017-09-19 2017-09-28 2017-10-28 Quotations Implementation III Fase - RACCS Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-370-S-CP / Sanitation Sector Adquisición de servicios de Component 2: Increase alimentación y hospedaje para Sustainable Water Supply and realizar sesión de trabajo grupal Sanitation Coverage in Rural Request for Pending sobre la elaboración de los Areas Post Limited - National 0.00 2017-06-29 2017-07-08 1901-01-01 Quotations Implementation productos del 1° taller-Grupo Component 4: Contingent meta: Técnicos UMAS de los Emergency Response Municipios de los departamentos Component de Granada, Carazo y Rivas Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-359-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo taller de capacitación Areas Post Limited - National 0.00 2017-03-30 2017-04-08 1901-01-01 Quotations Implementation No 2 AVAR en A&SR III Fase - Component 4: Contingent Grupo 9:Nueva Segovia y Madriz Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-386-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 Areas Post Limited - National 0.00 2017-09-01 2017-09-10 1901-01-01 Quotations Implementation AVAR en A&SR III Fase , Grupo Component 4: Contingent 3: Chinandega y León. Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-387-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 AVAR Areas Post Limited - National 0.00 2017-08-08 2017-08-17 1901-01-01 Quotations Implementation en A&SR III Fase, Grupo 4: Component 4: Contingent Managua y Masaya Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-388-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 AVAR Areas Post Limited - National 0.00 2017-09-09 2017-09-18 1901-01-01 Quotations Implementation en A&SR III Fase, Grupo 5: Component 4: Contingent Granada, Carazo y Rivas Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-391-S-CP / Renta Sustainable Water Supply and de Microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 AVAR Areas Post Limited - National 0.00 2017-08-11 2017-08-20 1901-01-01 Quotations Implementation en A&SR III Fase, Grupo 8, Component 4: Contingent Matagalpa y Estelí Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-392-S-CP / Renta Sustainable Water Supply and de Microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 AVAR Areas Post Limited - National 0.00 2017-08-12 2017-08-21 1901-01-01 Quotations Implementation en A&SR III Fase, Grupo 9, Component 4: Contingent Nueva Segovia y Madriz Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-356-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural de campo taller de capacitación Request for Pending Areas Post Limited - National 0.00 2017-03-23 2017-04-01 1901-01-01 No 2 AVAR en A&SR III Fase - Quotations Implementation Component 4: Contingent Grupo 6: Boaco, Chontales y Río Emergency Response San Juan. Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-357-S-CP / Renta Sustainable Water Supply and de microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo taller de capacitación Areas Post Limited - National 0.00 2017-03-23 2017-04-01 1901-01-01 Quotations Implementation No 2 AVAR en A&SR III Fase - Component 4: Contingent Grupo 7: Jinotega y ZRE-AWB Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 9 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-389-S-CP / Renta Sustainable Water Supply and de Microbús para realizar visita Sanitation Coverage in Rural de campo en el taller No 3 AVAR Request for Pending Areas Post Limited - National 0.00 2017-07-22 2017-07-31 1901-01-01 en A&SR III Fase, Grupo 6, Quotations Implementation Component 4: Contingent Boaco, Chontales y Río San Emergency Response Juan. Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-390-S-CP / Renta Sustainable Water Supply and de Microbús para realizar visita Sanitation Coverage in Rural Request for Pending de campo en el taller No 3 AVAR Areas Post Limited - National 0.00 2017-08-10 2017-08-19 1901-01-01 Quotations Implementation en A&SR III Fase, Grupo 7, Component 4: Contingent Jinotega y ZRE-AWB Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-373-S-CP / Adqu. Sanitation Sector de servicios de alimentación y Component 2: Increase hospedaje para realizar segunda Sustainable Water Supply and sesión de trabajo grupal sobre la Sanitation Coverage in Rural Request for Pending elaboración de los productos del Areas Post Limited - National 0.00 2017-07-12 2017-07-21 1901-01-01 Quotations Implementation 2° taller-Grupo meta: Técnicos Component 4: Contingent UMAS de los Municipios de los Emergency Response departamentos de Granada, Component Carazo y Rivas Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-371-S-CP / Sanitation Sector Adquisición de servicios de Component 2: Increase alimentación y hospedaje para Sustainable Water Supply and realizar sesión de trabajo grupal Sanitation Coverage in Rural Request for Pending sobre la elaboración de los Areas Post Limited - National 0.00 2017-07-04 2017-07-13 1901-01-01 Quotations Implementation productos del 1° taller-Grupo Component 4: Contingent meta: Técnicos UMAS de los Emergency Response Municipios de los departamentos Component de Chinandega y León Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-374-S-CP / Sanitation Sector Adquisición de servicios de Component 2: Increase alimentación y hospedaje para Sustainable Water Supply and realizar segunda sesión de Sanitation Coverage in Rural trabajo grupal sobre la Request for Pending Areas Post Limited - National 0.00 2017-07-27 2017-08-05 1901-01-01 elaboración de los productos del Quotations Implementation Component 4: Contingent 2° taller-Grupo meta: Técnicos Emergency Response UMAS de los Municipios de los Component departamentos de Chinandega y Component 3: Innovations in León. Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-147-S-CP / Taller Sanitation Coverage in Rural Request for Pending de capacitación N°3 - AVAR en Areas Post Limited - National 0.00 2017-02-14 2017-02-23 2017-03-25 Quotations Implementation A&SR III Fase - Grupo 2: RACCS Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-127-S-CP / Taller Sustainable Water Supply and de INTERCAMBIO DE Sanitation Coverage in Rural Request for Pending EXPERIENCIAS ENTRE LAS Areas Post Limited - National 0.00 2017-06-20 2017-06-29 2017-07-13 Quotations Implementation UMAS Y CAPS BENEFICIADOS Component 4: Contingent AÑO 2017 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-215-S-CP / Taller Sustainable Water Supply and de INTERCAMBIO DE Sanitation Coverage in Rural Request for Pending EXPERIENCIAS ENTRE LAS Areas Post Limited - National 0.00 2018-06-21 2018-06-30 2018-07-30 Quotations Implementation UMAS Y CAPS BENEFICIADOS Component 4: Contingent AÑO 2018 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and Sanitation Coverage in Rural 16093 / Especialista Informatico IDA / 53770 Areas Prior Direct Selection Direct N 16,800.00 Canceled para administrar el SIASAR Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and 16094 / Asesor Regional de Sanitation Coverage in Rural Agua y Saneamiento en la IDA / 53770 Areas Prior Direct Selection Direct N 14,400.00 Signed 2015-06-30 Region Sur Oriente Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-229-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-10-25 2016-11-03 2016-12-03 A&SR III Fase - Grupo 7: Quotations Implementation Component 4: Contingent Jinotega y ZRE-AWB Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-237-S-CP / Taller Sanitation Coverage in Rural de capacitación N° 3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-04-25 2017-05-04 2017-06-03 A&SR III Fase - Grupo 7: Quotations Implementation Component 4: Contingent Jinotega y ZRE-AWB Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-228-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-10-11 2016-10-20 2016-11-19 A&SR III Fase - Grupo 5: Quotations Implementation Component 4: Contingent Granada, Carazo y Rivas Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 10 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-235-S-CP / Taller Sanitation Coverage in Rural de capacitación N°3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-03-28 2017-04-06 2017-05-06 A&SR III Fase - Grupo 5: Quotations Implementation Component 4: Contingent Granada, Carazo y Rivas Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-269-S-CP / Alquiler Sanitation Coverage in Rural Request for Pending de Hosting por dos años para el Areas Post Limited - National 0.00 2015-07-14 2015-07-23 2017-07-22 Quotations Implementation desarrollo del SIASAR Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-230-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-11-08 2016-11-17 2016-12-17 A&SR III Fase - Grupo 8: Quotations Implementation Component 4: Contingent Matagalpa y Estelí Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and 16073 / Facilitacion Social en la Sanitation Coverage in Rural Etapa Post Obra del sub IDA / 53770 Areas Prior Direct Selection Direct N 3,718.68 Signed 2015-07-22 proyecto Agua y Saneamiento Component 4: Contingent Mataca" Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-238-S-CP / Taller Sanitation Coverage in Rural de capacitación N° 3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-05-09 2017-05-18 2017-06-17 A&SR III Fase - Grupo 8: Quotations Implementation Component 4: Contingent Matagalpa y Estelí Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-226-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-09-13 2016-09-22 2016-10-22 A&SR III Fase - Grupo 3: Quotations Implementation Component 4: Contingent Chinandega y León Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-232-S-CP / Taller Sanitation Coverage in Rural de capacitación N°3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-02-28 2017-03-09 2017-04-08 A&SR III Fase - Grupo 3: Quotations Implementation Component 4: Contingent Chinandega y León Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-231-S-CP / Taller Sanitation Coverage in Rural de capacitación N°2 - AVAR en Request for Pending Areas Post Limited - National 0.00 2016-11-15 2016-11-24 2016-12-24 A&SR III Fase - Grupo 9: Nueva Quotations Implementation Component 4: Contingent Segovia y Madriz Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-239-S-CP / Taller Sanitation Coverage in Rural de capacitación N° 3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-05-23 2017-06-01 2017-07-01 A&SR III Fase - Grupo 9: Nueva Quotations Implementation Component 4: Contingent Segovia y Madriz Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-236-S-CP / Taller Sanitation Coverage in Rural de capacitación N° 3 - AVAR en Request for Pending Areas Post Limited - National 0.00 2017-04-11 2017-04-20 2017-05-20 A & S III Fase Grupo 6: Boaco, Quotations Implementation Component 4: Contingent Chontales y Río San Juan Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-376-S-CP / Sanitation Coverage in Rural Elaboración de materiales de Request for Pending Areas Post Limited - National 0.00 2017-06-08 2017-06-17 1901-01-01 promoción para el Congreso de Quotations Implementation Component 4: Contingent Agua y Saneamiento Rural Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-385-S-CP / Taller Sanitation Coverage in Rural de Capacitación No 2- AVAR en Request for Pending Areas Post Limited - National 0.00 2017-05-20 2017-05-29 1901-01-01 A&S III Fase Grupo 6: Boaco, Quotations Implementation Component 4: Contingent Chontales y Río San Juan Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-304-S-CP / Alquiler Sanitation Coverage in Rural Request for Pending de Hosting por 1 año para el Areas Post Limited - National 0.00 2015-10-13 2015-11-03 2016-11-02 Quotations Implementation Desarrollo del SIASAR Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 11 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and 16071 / Proyecto Piloto Sanitation Coverage in Rural Desarrollo Integral, Agua, IDA / 53770 Areas Prior Direct Selection Direct N 12,400.00 Terminated 2015-06-15 Saneamiento, Medio Ambiente y Component 4: Contingent Turismo Social Corn Island Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-253-S-CP / Sanitation Coverage in Rural Fotocopias de materiales Request for Pending Areas Post Limited - National 0.00 2016-02-16 2016-02-25 2016-03-10 didácticos - Talleres ambientales Quotations Implementation Component 4: Contingent Año 2016 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-369-S-CP / Sanitation Sector Adquisición de servicios de Component 2: Increase alimentación y hospedaje para Sustainable Water Supply and realizar sesión de trabajo grupal Sanitation Coverage in Rural sobre la elaboración de los Request for Pending Areas Post Limited - National 0.00 2017-06-13 2017-06-22 1901-01-01 productos del 1° taller-Grupo Quotations Implementation Component 4: Contingent meta: Técnicos UMAS de los Emergency Response Municipios de los Component departamentos de Managua y Component 3: Innovations in Masaya Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and NI-PROSAR-372-S-CP / Sanitation Sector Adquisición de servicios de Component 2: Increase alimentación y hospedaje para Sustainable Water Supply and realizar segunda sesión de Sanitation Coverage in Rural trabajo grupal sobre la Request for Pending Areas Post Limited - National 0.00 2017-07-12 2017-07-21 1901-01-01 elaboración de los productos del Quotations Implementation Component 4: Contingent 2° taller-Grupo meta: Técnicos Emergency Response UMAS de los Municipios de los Component departamentos de Managua y Component 3: Innovations in Masaya Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-395-S-CP / Sustainable Water Supply and Seminario/Taller de inducción a Sanitation Coverage in Rural Request for Pending consultores individuales para la Areas Post Limited - National 0.00 2017-04-19 2017-04-28 1901-01-01 Quotations Implementation formulación de proyectos de Component 4: Contingent A&SR (1er grupo) Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-396-S-CP / Sustainable Water Supply and Seminario /Taller de inducción a Sanitation Coverage in Rural Request for Pending consultores individuales para la Areas Post Limited - National 0.00 2017-05-04 2017-05-13 1901-01-01 Quotations Implementation formulación de proyectos de Component 4: Contingent A&SR (2do grupo) Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-350-S-CP / Diseño, Sanitation Coverage in Rural diagramación e impresión de Request for Under Areas Post Limited - National 0.00 2020-12-23 2021-01-01 1901-01-01 materiales FECSA y Compendio Quotations Implementation Component 4: Contingent metodológico Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-186-S-CP / Sanitation Coverage in Rural Fotocopias de materiales Request for Pending Areas Post Limited - National 0.00 2017-02-07 2017-02-16 2017-03-02 didácticos - Talleres N°3 - AVAR Quotations Implementation Component 4: Contingent en A&SR - III Fase Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-187-S-CP / Sustainable Water Supply and Fotocopias de materiales Sanitation Coverage in Rural Request for Pending didácticos - Taller de intercambio Areas Post Limited - National 0.00 2016-11-15 2016-11-24 2016-12-01 Quotations Implementation de experiencias entre las UMAS Component 4: Contingent y los CAPS -año 2016 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-188-S-CP / Sustainable Water Supply and Fotocopias de materiales Sanitation Coverage in Rural Request for Pending didácticos - Taller de intercambio Areas Post Limited - National 0.00 2017-11-15 2017-11-24 2017-12-01 Quotations Implementation de experiencias entre las UMAS Component 4: Contingent y los CAPS -año 2017 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-254-S-CP / Sustainable Water Supply and Fotocopias de materiales Sanitation Coverage in Rural Request for Pending didácticos - Taller de intercambio Areas Post Limited - National 0.00 2018-06-19 2018-06-28 2018-07-12 Quotations Implementation de experiencias entre las UMAS Component 4: Contingent y los CAPS -año 2018 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-153-S-CP / Taller Sanitation Coverage in Rural de evaluación de resultados - Request for Pending Areas Post Limited - National 0.00 2017-08-22 2017-08-31 2017-09-30 AVAR en A&SR III Fase - Quotations Implementation Component 4: Contingent RACCN y RACCS. Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-152-S-CP / Taller Sanitation Coverage in Rural de evaluación de resultados - Request for Pending Areas Post Limited - National 0.00 2017-08-15 2017-08-24 2017-09-23 AVAR en A&SR III Fase - Quotations Implementation Component 4: Contingent Pacífico, Centro y Norte Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 12 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-375-S-CP / Sustainable Water Supply and Adquisición de servicios de Sanitation Coverage in Rural Request for Pending alimentación y hospedaje para Areas Post Limited - National 0.00 2017-06-08 2017-06-17 1901-01-01 Quotations Implementation realizar Congreso de Agua y Component 4: Contingent Saneamiento Rural. Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-214-S-CP / Diseño, Sustainable Water Supply and diagramación e impresión de Sanitation Coverage in Rural documentos institucionales Request for Pending Areas Post Limited - National 0.00 2017-03-21 2017-03-30 2017-09-26 (Manuales, reglamentos, Quotations Implementation Component 4: Contingent cartillas, guías metodológicas, Emergency Response compendios) año 2017 Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-352-S-CP / Diseño, Sanitation Coverage in Rural diagramación e impresión de Request for Pending Areas Post Limited - National 0.00 2016-12-23 2017-01-01 1901-01-01 manuales, cartillas, banner y Quotations Implementation Component 4: Contingent carpetas institucionales. Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene NI-FISE-31136-NC-RFQ / Taller Component 1: Strengthening the Request for Single Stage - One Pending de capacitación No.3 - AVAR en IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-10-25 2017-12-20 2017-12-30 Quotations Envelope Implementation A&SR III Fase - Grupo 1: RACCN Sanitation Sector NI-FISE-31138-NC-RFQ / Taller Component 1: Strengthening the Request for Single Stage - One Pending de capacitación No.3 - AVAR en IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-10-25 2017-12-20 2017-12-30 Quotations Envelope Implementation A&SR III Fase - Grupo 2: RACCS Sanitation Sector NI-FISE-36263-NC-RFB / Servicios de laboratorio para Component 3: Innovations in realizar pruebas de calidad de Single Stage - One Pending IDA / 53770 Rural Water, Sanitation and Post Request for Bids Open - National 0.00 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 agua potable, agua residuales y Envelope Implementation Hygiene lodos fecales, en sistemas de Agua y Saneamiento Rurales NI-FISE-36264-NC-RFQ / Contratación de Universidad para Component 1: Strengthening the realizar cursos especializados en Request for Single Stage - One Pending IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-12-05 2018-01-30 2018-07-29 Agua y Saneamiento para Quotations Envelope Implementation Sanitation Sector gobiernos territoriales y regionales NI-FISE-36267-NC-RFQ / Component 1: Strengthening the Fotocopia de material educativo Request for Single Stage - One Pending IDA / 53770 Rural Water Supply and Post Open - National 0.00 2017-12-05 2018-01-30 2018-07-29 para curso técnico a miembros Quotations Envelope Implementation Sanitation Sector de CAPS NI-FISE-36712-NC-RFQ / Taller Component 3: Innovations in de Presentación Sistematización Request for Single Stage - One Pending IDA / 53770 Rural Water, Sanitation and Post Open - National 0.00 2017-12-05 2018-01-23 2018-07-22 Fase - 1, Proyectos Pilotos de Quotations Envelope Implementation Hygiene Saneamiento CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-117-CF-SCC / Sanitation Coverage in Rural Consultant Formulación de proyectos a Pending Areas Post Qualification Open - National 0.00 2016-07-04 2016-09-22 2017-05-20 ejecutarse en el departamento de Implementation Component 4: Contingent Selection Boaco Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-116-CF-SCC / Sanitation Coverage in Rural Consultant Formulación de proyectos a Pending Areas Post Qualification Open - National 0.00 2016-07-04 2016-09-22 2017-05-20 ejecutarse en el departamento de Implementation Component 4: Contingent Selection Chinandega Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-114-CF-SCC / Sanitation Coverage in Rural Consultant Formulación de Proyectos a Pending Areas Post Qualification Open - National 0.00 2016-07-04 2016-09-22 2017-05-20 ejecutarse en los departamentos Implementation Component 4: Contingent Selection de Rio San juan y Rivas Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-110-CI-CD / 16 Sustainable Water Supply and consultores para concluir la Sanitation Coverage in Rural asistencia social en la etapa de Areas Prior Direct Selection National 6,964.93 Signed 2015-04-30 2015-07-22 2015-10-27 post obra en 19 proyectos Component 4: Contingent ejecutados con fondos Emergency Response PRASNICA Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-111-CI-CD / Sanitation Coverage in Rural Especialista Social para la Costa IDA / 53770 Areas Prior Direct Selection National 15,600.00 Signed 2015-09-01 2015-07-01 2019-05-03 caribe Sur Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-113-CI-CD / Sanitation Coverage in Rural Facilitador social en la etapa de Areas Prior Direct Selection National 12,400.00 Signed 2015-07-28 2015-06-15 2015-10-26 post obra de los proyectos 19433 Component 4: Contingent y 19635 Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 13 Component 1: Strengthening the Rural Water Supply and Sanitation Sector NI-PROSAR-14-CF-SCC / Component 2: Increase CONTRATACION DE Sustainable Water Supply and UNIVERSIDAD PARA REALIZAR Sanitation Coverage in Rural Consultant CURSOS ESPECIALIZDOS EN Under Areas Post Qualification Open - National 0.00 2016-06-20 2016-07-25 2016-10-23 AGUA Y SANEAMIENTO PARA Implementation Component 4: Contingent Selection LOS GOBIERNOS Emergency Response TERRITORIALES Y Component REGIONALES Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-25-CI-CD / Técnico Sanitation Coverage in Rural informático para apoyo del FISE Areas Prior Direct Selection National 14,400.00 Signed 2015-05-04 2015-06-19 2019-05-31 en el seguimiento del proyecto Component 4: Contingent Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the 16010 / AUDITORIA Rural Water Supply and (PROYECTO DE Sanitation Sector SOSTENIBILIDAD DEL SECTOR Component 2: Increase DE ABASTECIMIENTO DE Sustainable Water Supply and AGUA Y SANEAMIENTO EN Sanitation Coverage in Rural LAS ZONAS RURALES IDA / 53770 Quality And Cost- Areas Prior Open - International N 113,836.73 Signed 2015-01-26 2015-04-14 PROSASR) CONVENIO DE IDA / H9120 Based Selection Component 4: Contingent DONACI N No. H9120 Y DE Emergency Response CREDITO No. 53770 Component EJECUTADOS POR EL FONDO Component 3: Innovations in DE INVERSI N SOCIAL DE Rural Water, Sanitation and EMERGENCIA (FISE) Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-316-CF-SCC / Sustainable Water Supply and Estudio de Pre-Inversión para el Sanitation Coverage in Rural Consultant proyecto 20016 Mejoramiento y Under Areas Post Qualification Open - National 0.00 2015-12-21 2016-03-02 2016-06-30 Ampliación del Sistema de Agua Implementation Component 4: Contingent Selection Potable en el municipio de Corn Emergency Response Island Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PROSAR-192-CI-CD / Sanitation Coverage in Rural Especialista hidrogeólogo para IDA / 53770 Areas Prior Direct Selection National 21,818.18 Signed 2015-06-30 2015-06-10 2019-04-26 apoyar a la DODL en el marco Component 4: Contingent del proyectos Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-17-CF-SCC / Sustainable Water Supply and CURSOS DE Sanitation Coverage in Rural Consultant ESPECIALIZACION Y/O Pending Areas Post Qualification Open - National 0.00 2016-06-13 2016-08-19 2017-02-15 ACTUALIZACION DE TEMAS EN Implementation Component 4: Contingent Selection AGUA Y SANEAMIENTO PARA Emergency Response EL PERSONAL DEL FISE 2016 Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector NI-PSSASR-117-CF-SCC / Component 2: Increase Firma Consultora para realizar la Sustainable Water Supply and formulación de proyectos a Sanitation Coverage in Rural Consultant Pending ejecutarse en el Departamento Areas Post Qualification Open - National 0.00 2017-01-19 2017-02-23 1901-01-01 Implementation de Nueva Segovia, en los Component 4: Contingent Selection Municipios de Quilalí, Santa Emergency Response María y Macuelizo Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-13-CF-SCC / Sustainable Water Supply and CONTRATACION DE FIRMA Sanitation Coverage in Rural Consultant Pending PARA REALIZAR LA Areas Post Qualification Open - National 0.00 2019-09-02 2019-11-08 2020-02-06 Implementation EVALUACION DE IMPACTO Component 4: Contingent Selection DEL PROYECTO Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PSSASR-89-CF-SCC / Firma Sustainable Water Supply and consultora para realizar la Sanitation Coverage in Rural Consultant Pending formulación de proyectos a Areas Post Qualification Open - National 0.00 2016-01-18 2016-03-12 2016-11-07 Implementation ejecutarse en el departamento de Component 4: Contingent Selection Matagalpa Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-76-CF-SCC / Firma Sanitation Coverage in Rural Consultant consultora para la Supervisión de Pending Areas Post Qualification Open - National 0.00 2016-06-06 2016-08-10 2018-02-01 los sub proyectos PROSASR en Implementation Component 4: Contingent Selection el departamento de Madriz Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector NI-PSSASR-116-CF-SCC / Component 2: Increase Firma Consultora para realizar la Sustainable Water Supply and formulación de proyectos a Sanitation Coverage in Rural Consultant Pending ejecutarse en el Departamento Areas Post Qualification Open - National 0.00 2017-01-19 2017-02-23 1901-01-01 Implementation de Nueva Segovia, en los Component 4: Contingent Selection Municipios de El Jícaro, Murra, Emergency Response Ciudad Antigua y Mozonte. Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PSSASR-118-CF-SCC / Sustainable Water Supply and Contratación de 1 firma Sanitation Coverage in Rural Consultant consultora para realizar la Pending Areas Post Qualification Open - National 0.00 2017-03-01 2017-04-05 1901-01-01 formulación de proyectos a Implementation Component 4: Contingent Selection ejecutarse en el departamento de Emergency Response Madriz Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase Sustainable Water Supply and NI-PSSASR-119-CF-SCC / Sanitation Coverage in Rural Consultant Firma consultora para realizar la Pending Areas Post Qualification Open - National 0.00 2017-03-01 2017-04-05 1901-01-01 formulación de proyectos en los Implementation Component 4: Contingent Selection departamentos de León y Estelí Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Page 14 Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PROSAR-288-CF-SCC / Sustainable Water Supply and Firma consultora para la Sanitation Coverage in Rural Consultant Pending formulación de sub proyectos a Areas Post Qualification Open - National 0.00 2016-07-04 2016-09-21 2017-03-20 Implementation ejecutarse en el departamento de Component 4: Contingent Selection Chontales Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector NI-PSSASR-106-CF-SBCC / Component 2: Increase Firma consultora para realizar la Sustainable Water Supply and formulación de proyectos a Sanitation Coverage in Rural Quality And Cost- ejecutarse en la Costa Caribe IDA / 53770 Areas Prior Open - National 175,745.00 Signed 2015-11-30 2016-01-28 2016-02-11 2016-03-10 2016-03-03 2016-03-14 2016-09-29 Based Selection Nicaragüense (Región Norte y Component 4: Contingent Sur) municipios de Paiwas, Emergency Response Rosita y Waspam Component Component 3: Innovations in Rural Water, Sanitation and Hygiene Component 1: Strengthening the Rural Water Supply and Sanitation Sector Component 2: Increase NI-PSSASR-110-CI-CD / Sustainable Water Supply and Acompañamiento Social en la Sanitation Coverage in Rural Etapa de Post Obra del Proyecto IDA / 53770 Areas Prior Direct Selection National 5,637.00 Signed 2016-08-08 2016-04-05 2016-11-08 19197 Saneamiento en Sandy Component 4: Contingent Bay Emergency Response Component Component 3: Innovations in Rural Water, Sanitation and Hygiene NI-PROSAR-18-CF-SCC / POSTGRADO EN DISEÑO Y Component 1: Strengthening the Consultant EVALUACIÓN DE PROYECTOS Pending IDA / 53770 Rural Water Supply and Post Qualification Open - National 0.00 2017-08-21 2017-09-04 2017-09-18 2017-10-28 2017-11-20 2018-05-31 DE AGUA Y SANEAMIENTO Implementation Sanitation Sector Selection RURAL, DIRIGIDO AL PERSONAL TÉCNICO DE FISE INDIVIDUAL CONSULTANTS Page 15