Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Pakistan : PK Sindh Public Sector Management Reform Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2017-04-21 2020-01-08 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145617 GPN Date: Project Name: PK Sindh Public Sector Management Reform Project Loan / Credit No: IDA / 55840 Executing Agency(ies): Sindh Public Sector Management Reform Project WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SPSMRP-12822-GO-RFQ / Laptops, Three, 03, Desktop Computers with Component 2: Technical LED and UPS, Two, 02, Assistance (TA) to support Laser Printers-Multi-function, capacity building and One, 01, Laser Colour Request for Single Stage - One IDA / 55840 institutional strengthening Post Open - National 25,000.00 9,409.51 Completed 2017-04-29 2017-05-26 2017-05-31 Printers, Two, 02 Quotations Envelope associated with achie Photocopier, One, 01, vement of eligible PSM External Hard drives (for reforms. Backup), Five, 05, Connectivity Devices, Three, 03. Component 2: Technical Assistance (TA) to support PK-SPSMRP-12844-GO-RFQ capacity building and Request for Single Stage - One / Procurement of One 1000cc IDA / 55840 institutional strengthening Post Open - National 15,000.00 13,206.74 Completed 2017-05-06 2017-05-31 2017-05-31 Quotations Envelope car. associated with achie vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support capacity building and PK-SPSMRP-12850-GO-RFQ Request for Single Stage - One IDA / 55840 institutional strengthening Post Open - National 2,500.00 1,146.57 Completed 2017-05-06 2017-05-31 2017-05-31 / Two 70cc Motorcycles. Quotations Envelope associated with achie vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-48163-GO-RFB capacity building and / Procurement of ICT Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 55,000.00 48,803.68 Completed 2018-02-12 2018-02-17 2018-03-31 2018-06-04 2018-12-01 Equipment for MEC, P&DD Envelope associated with achie and ERU, FD. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-48174-GO-RFQ capacity building and Request for Single Stage - One / Three 1000cc Cars, One IDA / 55840 institutional strengthening Post Open - National 55,000.00 34,899.58 Completed 2018-02-17 2018-04-14 2018-10-11 Quotations Envelope 1300cc Car. associated with achie vement of eligible PSM reforms. Page 1 PK-SPSMRP-82156-GO-RFQ / Procurement of compatible toners for printers used in ERU. Component 2: Technical Assistance (TA) to support 1. 14 toners for hp Laser capacity building and Request for Single Stage - One jet MFP 521 DW. (US $ IDA / 55840 institutional strengthening Post Open - National 7,000.00 6,806.35 Completed 2018-10-27 2018-12-22 2019-06-20 Quotations Envelope 4200) associated with achie 2. 04 toners for hp Laser vement of eligible PSM jet Colour CLJ M 452DN. reforms. (US $ 2000) 3. 02 toners for hp Laser jet M 706N (US $ 800) Component 2: Technical PK-SPSMRP-93442-GO-RFB Assistance (TA) to support / IFMIS Connectivity in capacity building and Single Stage - One Administrative Departments IDA / 55840 institutional strengthening Post Request for Bids Open - National 150,000.00 130,379.52 Signed 2019-01-21 2019-01-26 2019-03-09 2019-04-08 2019-05-13 2019-11-09 Envelope of Government of Sindh associated with achie (SAP Connectivity). vement of eligible PSM reforms. PK-SPSMRP-99093-GO-RFQ Component 2: Technical / Procurement of 01 Laptop, Assistance (TA) to support 09 Desktop PCs, 09 capacity building and Request for Single Stage - One Monitors (Displays), 15 UPS, IDA / 55840 institutional strengthening Post Open - National 25,500.00 16,646.52 Completed 2019-02-23 2019-04-20 2019-10-17 Quotations Envelope 03 External HDDs, 12 USBs associated with achie for Economic Reform Unit, vement of eligible PSM Finance Department, GoS. reforms. PK-SPSMRP-71505-GO-RFB / Procurement and Upgrading of IT Equipment Component 2: Technical and Soft wares in ERU: Assistance (TA) to support (09 Desktops+Displays), (15 capacity building and UPS), (02 Mono Printers), Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 45,000.00 0.00 Canceled 2018-09-10 2018-09-15 2018-10-27 2018-11-26 2018-12-31 2019-06-29 (03 External HDDs), (12 Envelope associated with achie USBs), Up gradation of vement of eligible PSM existing systems. reforms. Licenses for MS Windows, Office, Project, SPSS and Anti-Virus. Component 2: Technical PK-SPSMRP-109227-GO- Assistance (TA) to support RFB / IT Support to capacity building and Pending Monitoring & Evaluation Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 75,000.00 0.00 Implementati 2019-08-05 2019-08-10 2019-09-21 2019-10-21 2019-11-25 2020-05-23 Cell (MEC), Planning & Envelope associated with achie on Development Department, vement of eligible PSM Government of Sindh. reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109228-GO- capacity building and Pending Single Stage - One RFB / IT Support to Bureau IDA / 55840 institutional strengthening Post Request for Bids Open - National 42,000.00 0.00 Implementati 2019-06-10 2019-06-15 2019-07-27 2019-08-26 2019-09-30 2020-03-28 Envelope of Statistics (BoS), Sindh. associated with achie on vement of eligible PSM reforms. PK-SPSMRP-109206-GO- RFB / Procurement of ITC Resources for Information Component 2: Technical Management Unit (IMU), Assistance (TA) to support Finance Department, GoS: capacity building and Under 03 Laptops, 06 Desktop PCs Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 100,650.00 78,335.41 Implementati 2019-05-06 2019-05-11 2019-05-27 2019-06-03 2019-06-20 2019-09-20 with Display, 04 Server Envelope associated with achie on machines. MS Windows-09 vement of eligible PSM licenses, MS Office-09, MS reforms. Server-04, MS SQL-01, Visual Studio-01, TFS-01, Symantec-09. Page 2 Component 2: Technical PK-SPSMRP-109226-GO- Assistance (TA) to support RFB / ITC support to Sindh capacity building and Public Procurement Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 77,000.00 58,186.73 Signed 2019-05-10 2019-05-15 2019-06-13 2019-06-25 2019-07-15 2019-10-15 Regulatory Authority Envelope associated with achie (SPPRA), vement of eligible PSM Government of Sindh. reforms. PK-SPSMRP-139238-GO- RFQ / Seven (07) Laptops: 02-IMU, 03-Internal Audit Component 2: Technical Unit , 01-Network Assistance (TA) to support Administrator, 01-PO (PFM) capacity building and Pending Five (05) Desktops: 02- Request for Single Stage - One IDA / 55840 institutional strengthening Post Open - National 37,800.00 0.00 Implementati 2019-11-15 2020-01-10 2020-02-28 IMU, 01-Network Asstnt, 02- Quotations Envelope associated with achie on DEOs (MTBF), vement of eligible PSM Five (05) Printers: 02- IMU reforms. (MFP), 01-Ntwork Team, 01- IA Unit (MFP) Twelve (12) Printer Toners Component 2: Technical PK-SPSMRP-109159-GO- Assistance (TA) to support RFB / Development of a capacity building and Fiscal & Financial Single Stage - One IDA / 55840 institutional strengthening Post Request for Bids Open - National 285,000.00 0.00 Canceled 2019-04-15 2019-04-20 2019-06-01 2019-07-01 2019-08-05 2020-08-04 Dashboard for Finance Envelope associated with achie Department, Government of vement of eligible PSM Sindh. reforms. Component 2: Technical PK-SPSMRP-152925-GO- Assistance (TA) to support RFB / Establishment of capacity building and Pending Open - Single Stage - One Data Center in Finance IDA / 55840 institutional strengthening Prior Request for Bids 975,000.00 0.00 Implementati 2020-02-28 2020-03-05 2020-04-10 2020-04-26 2020-05-03 2020-07-31 International Envelope Department, Government of associated with achie on Sindh. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-152934-GO- Assistance (TA) to support RFQ / Procurement of capacity building and Pending "Cloud Space" for Hosting, Request for Single Stage - One IDA / 55840 institutional strengthening Post Open - National 5,000.00 0.00 Implementati 2020-02-05 2020-03-20 2020-08-16 Publishing and Data Storage Quotations Envelope associated with achie on of IT solutions developed in vement of eligible PSM Finance Department. reforms. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Assistance (TA) to support PK-SPSMRP-21665-NC-DIR capacity building and Request for Single Stage - One / Procurement of ACL Audit IDA / 55840 institutional strengthening Post Open - National 5,000.00 0.00 Canceled 2017-08-01 2017-09-26 2018-03-25 Quotations Envelope Software. associated with achie vement of eligible PSM reforms. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Component 2: Technical Assistance (TA) to support PK-SPSMRP-30842-CS-CQS capacity building and Consultant / Third Party Validation of IDA / 55840 institutional strengthening Post Qualification Open - National 200,000.00 187,262.66 Signed 2017-10-06 2017-10-27 2017-12-10 2018-01-09 2018-02-13 2018-08-12 Project Results (Performance associated with achie Selection Audit). vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-30844-CS-CQS capacity building and Consultant / Establishment of Internal IDA / 55840 institutional strengthening Post Qualification Open - National 200,000.00 183,797.12 Signed 2017-10-09 2017-10-30 2017-12-13 2018-01-12 2018-02-16 2018-08-15 Audit Function in associated with achie Selection Government of Sindh. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-48166-CS- Assistance (TA) to support QCBS / Conduct Property capacity building and Quality And Cost- Under and Professional Tax Survey IDA / 55840 institutional strengthening Post Open - National 750,000.00 629,641.85 2018-02-12 2018-03-05 2018-04-18 2018-05-16 2018-06-15 2018-07-20 2018-08-24 2019-08-24 Based Selection Implementation in Sukkur and Develop associated with achie Provincial Digitization Model. vement of eligible PSM reforms. PK-SPSMRP-48168-CS-CQS Component 2: Technical / Development of Training Assistance (TA) to support Modules for SPPRA and capacity building and Consultant upgradation of documents for IDA / 55840 institutional strengthening Post Qualification Open - National 150,000.00 129,846.67 Completed 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-07-09 2019-01-05 Sindh and Reducing time associated with achie Selection taken to undertake vement of eligible PSM procurement activities. reforms. Component 2: Technical PK-SPSMRP-69930-CS-CQS Assistance (TA) to support / SAP Connectivity in capacity building and Consultant Administrative Departments IDA / 55840 institutional strengthening Post Qualification Open - National 150,000.00 0.00 Canceled 2018-10-01 2018-10-31 2018-12-14 2019-01-13 2019-02-08 2020-02-08 of Government of Sindh (For associated with achie Selection support of IFMIS). vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-32108-CS-CQS capacity building and Consultant / Study on "Acturial Under IDA / 55840 institutional strengthening Post Qualification Open - National 100,000.00 0.00 2019-04-22 2019-05-06 2019-06-10 2019-06-24 2019-07-04 2020-01-03 Valuation on Employees Implementation associated with achie Selection Benefits Schemes" vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-71502-CS-CQS capacity building and Consultant / Studies on Development Pending IDA / 55840 institutional strengthening Post Qualification Open - National 150,000.00 0.00 2019-07-08 2019-07-29 2019-09-11 2019-10-11 2019-11-15 2020-05-13 Areas Statistics for Bureau Implementation associated with achie Selection of Statistics (BoS), Sindh. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109212-CS-CQS Assistance (TA) to support / Development of Standard capacity building and Consultant Operating Procedures (SoPs) Under IDA / 55840 institutional strengthening Post Qualification Open - National 40,000.00 0.00 2019-05-20 2019-06-10 2019-07-24 2019-08-23 2019-09-27 2020-03-25 for all Wings of Finance Implementation associated with achie Selection Department, Government of vement of eligible PSM Sindh. reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-27260-CS-CQS capacity building and Consultant / Supporting Implementation Pending IDA / 55840 institutional strengthening Post Qualification Open - National 100,000.00 0.00 2020-01-19 2020-02-09 2020-02-21 2020-02-28 2020-03-08 2020-07-31 of PFM at Local Implementation associated with achie Selection Government Level. vement of eligible PSM reforms. Page 4 Component 2: Technical Assistance (TA) to support PK-SPSMRP-69946-CS-CQS capacity building and Consultant / PPMS Services & Support IDA / 55840 institutional strengthening Post Qualification Open - National 200,000.00 0.00 Canceled 2018-09-10 2018-10-10 2018-12-10 2018-12-31 2019-01-31 2020-01-31 Activity for SPPRA. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-152941-CS-CQS Assistance (TA) to support / Hiring of Consultancy capacity building and Consultant Pending Services to Strengthen IDA / 55840 institutional strengthening Post Qualification Open - National 40,000.00 0.00 2020-01-26 2020-02-28 2020-03-27 2020-04-05 2020-04-20 2020-07-19 Implementation Public Accounts Committee associated with achie Selection (PAC). vement of eligible PSM reforms. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Assistance (TA) to support PK-SPSMRP-12821-CS-INDV capacity building and Individual / Fiscal & Financial IDA / 55840 institutional strengthening Post Consultant Open 36,000.00 43,668.94 Signed 2017-05-15 2017-07-03 2017-07-24 2017-08-28 2019-08-16 Manager (MTBF) associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-12839-CS-INDV capacity building and Individual / Three Data Entry IDA / 55840 institutional strengthening Post Consultant Open 30,000.00 26,292.45 Terminated 2017-05-01 2017-06-19 2017-07-10 2017-08-14 2019-08-09 Operators (DEO) associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-12853-CS-INDV capacity building and Individual Under / Procurement & Contract IDA / 55840 institutional strengthening Prior Consultant Open 87,565.00 0.00 2017-05-01 2017-05-19 2017-05-26 2017-05-31 2018-03-30 Implementation Management Specialist. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support capacity building and Individual PK-SPSMRP-12837-CS-INDV IDA / 55840 institutional strengthening Post Consultant Open 20,000.00 32,837.57 Signed 2017-05-01 2017-06-19 2017-07-10 2017-08-14 2019-08-09 / Financial Analyst. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support capacity building and Individual PK-SPSMRP-14763-CS-INDV IDA / 55840 institutional strengthening Post Consultant Open 5,000.00 3,827.06 Signed 2017-05-10 2017-06-28 2017-07-19 2017-08-23 2018-04-30 / One Data Entry Operator. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-12860-CS-INDV capacity building and Individual / Finance & Accounts IDA / 55840 institutional strengthening Prior Consultant Open 87,565.00 0.00 Under Review 2017-05-01 2017-05-19 2017-05-26 2017-05-31 2017-11-27 Specialist, ERU. associated with achie Selection vement of eligible PSM reforms. Page 5 Component 2: Technical Assistance (TA) to support PK-SPSMRP-21657-CS-INDV capacity building and Individual / Data Base Manager, MTBF IDA / 55840 institutional strengthening Post Consultant Open 15,000.00 47,122.01 Signed 2017-07-24 2017-09-11 2017-10-02 2017-11-06 2018-05-05 Cell, FD, GoS. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-21660-CS-INDV capacity building and Individual / Financial Analyst for IDA / 55840 institutional strengthening Post Consultant Open 12,000.00 25,684.29 Signed 2017-08-01 2017-09-19 2017-10-10 2017-11-14 2018-07-31 MTBF Cell, ERU, FD. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-52027-CS-INDV capacity building and Individual / Network Administrator IDA / 55840 institutional strengthening Post Consultant Open 15,000.00 7,808.00 Signed 2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11 (ERU). associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-52032-CS-INDV capacity building and Individual / Assistant Network IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 4,964.54 Signed 2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11 Administrator associated with achie Selection vement of eligible PSM reforms. PK-SPSMRP-71504-CS-INDV / Hiring of Technical Component 2: Technical Resources (IT Staff) in Assistance (TA) to support SPPRA for rolling out of capacity building and Individual PPMS. IDA / 55840 institutional strengthening Post Consultant Open 15,000.00 9,203.21 Terminated 2018-07-30 2018-09-17 2018-10-08 2018-11-12 2019-05-11 (02 Data Processing associated with achie Selection Assistants, 03 Computer vement of eligible PSM Operators) for a maximum reforms. of six months. Component 2: Technical PK-SPSMRP-99101-CS-INDV Assistance (TA) to support / Hiring of an "Information capacity building and Individual Management Consultant" for IDA / 55840 institutional strengthening Post Consultant Open 45,000.00 0.00 Canceled 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Finance Department, associated with achie Selection Government of Sindh. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-101769-CS- Assistance (TA) to support INDV / Hiring of capacity building and Individual "Information Management IDA / 55840 institutional strengthening Post Consultant Open 50,000.00 43,421.07 Signed 2019-03-05 2019-04-23 2019-05-14 2019-06-18 2019-12-15 Consultant" in Finance associated with achie Selection Department, Government of vement of eligible PSM Sindh. reforms. PK-SPSMRP-101771-CS- Component 2: Technical INDV / Hiring of "Data Assistance (TA) to support Analyst" to support capacity building and Individual Information Management IDA / 55840 institutional strengthening Post Consultant Open 25,000.00 11,842.11 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Consultant, Finance associated with achie Selection Department, Government of vement of eligible PSM Sindh. reforms. PK-SPSMRP-101773-CS- Component 2: Technical INDV / Hiring of "Data Assistance (TA) to support Analyst" to support capacity building and Individual Information Management IDA / 55840 institutional strengthening Post Consultant Open 25,000.00 9,183.67 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Consultant, Finance associated with achie Selection Department, Government of vement of eligible PSM Sindh. reforms. Page 6 Component 2: Technical Assistance (TA) to support PK-SPSMRP-101959-CS- capacity building and Individual INDV / Data Entry Operator IDA / 55840 institutional strengthening Post Consultant Open 18,000.00 9,072.93 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2021-07-09 for MTBF Cell, ERU, associated with achie Selection Finance Department. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-101960-CS- Assistance (TA) to support INDV / 2nd Data Entry capacity building and Individual Operator for MTBF Cell, IDA / 55840 institutional strengthening Post Consultant Open 18,000.00 9,049.98 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2021-07-09 ERU, Finance Department, associated with achie Selection Government of Sindh. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-101961-CS- Assistance (TA) to support INDV / 3rd Data Entry capacity building and Individual Operator for MTBF Cell, IDA / 55840 institutional strengthening Post Consultant Open 18,000.00 9,049.98 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2021-07-09 ERU, Finance Department, associated with achie Selection Government of Sindh. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-102037-CS- capacity building and Individual INDV / "Computer Operator- IDA / 55840 institutional strengthening Post Consultant Open 2,500.00 1,147.78 Completed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 1" for PPMS support in associated with achie Selection SPPRA. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-102039-CS- capacity building and Individual INDV / "Computer Operator- IDA / 55840 institutional strengthening Post Consultant Open 2,500.00 1,530.37 Completed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 3" for PPMS Support in associated with achie Selection SPPRA. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-102040-CS- capacity building and Individual INDV / "Computer Operator- IDA / 55840 institutional strengthening Post Consultant Open 2,500.00 1,530.37 Completed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 2" for PPMS Support in associated with achie Selection SPPRA. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-102041-CS- capacity building and Individual INDV / "Data Processing IDA / 55840 institutional strengthening Post Consultant Open 3,000.00 2,040.49 Completed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Assistant-1" for PPMS associated with achie Selection Support in SPPRA. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109161-CS- capacity building and Individual INDV / "Data Processing IDA / 55840 institutional strengthening Post Consultant Open 3,000.00 2,041.30 Completed 2019-04-15 2019-06-03 2019-06-24 2019-07-29 2020-01-25 Assistant-2" for PPMS associated with achie Selection Support in SPPRA. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109200-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-2 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 4,593.30 Signed 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Page 7 Component 2: Technical PK-SPSMRP-109201-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-3 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 4,593.30 Signed 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109202-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-4 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 4,976.08 Signed 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109203-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-5 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 4,976.08 Signed 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109204-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-6 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 3,827.75 Signed 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109216-CS- capacity building and Individual INDV / Hiring of "One Under IDA / 55840 institutional strengthening Post Consultant Open 22,000.00 0.00 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-10-23 Software Engineer" for Implementation associated with achie Selection Finance Department, GoS. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109217-CS- capacity building and Individual INDV / Hiring of "Web IDA / 55840 institutional strengthening Post Consultant Open 15,000.00 11,479.59 Signed 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-10-23 Developer" for Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-139241-CS- Assistance (TA) to support INDV / Hiring of a "Legal capacity building and Individual Expert" in Finance IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 6,457.03 Signed 2019-10-20 2019-11-08 2019-11-12 2019-11-15 2020-08-31 Department, Government of associated with achie Selection Sindh. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-144967-CS- capacity building and Individual Pending INDV / "Director-Corporate IDA / 55840 institutional strengthening Post Consultant Open 15,000.00 0.00 2019-11-15 2019-12-13 2019-12-15 2020-01-01 2020-08-31 Implementation Affairs " associated with achie Selection vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109222-CS- capacity building and Individual INDV / "Assistant-Finance & IDA / 55840 institutional strengthening Post Consultant Open 7,500.00 0.00 Canceled 2019-05-20 2019-07-08 2019-07-29 2019-09-02 2020-09-11 Accounts" in ERU, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Page 8 Component 2: Technical Assistance (TA) to support PK-SPSMRP-52025-CS-INDV capacity building and Individual / Assistant Financial IDA / 55840 institutional strengthening Post Consultant Open 30,000.00 0.00 Canceled 2018-04-02 2018-05-21 2018-06-11 2018-07-16 2019-01-12 Analyst, DMU, FD. associated with achie Selection vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109213-CS- Assistance (TA) to support INDV / "Data Entry capacity building and Individual Operator-5" for MTBF Cell, IDA / 55840 institutional strengthening Post Consultant Open 5,000.00 0.00 Canceled 2019-06-10 2019-07-29 2019-08-19 2019-09-23 2020-09-11 ERU, Finance Department, associated with achie Selection GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109219-CS- Assistance (TA) to support INDV / Hiring of "Junior capacity building and Individual Communication Specialist-1" IDA / 55840 institutional strengthening Post Consultant Open 5,000.00 0.00 Canceled 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-10-23 for Finance Department, associated with achie Selection GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109215-CS- Assistance (TA) to support INDV / "Data Entry capacity building and Individual Operator-6" in MTBF Cell, IDA / 55840 institutional strengthening Post Consultant Open 5,000.00 0.00 Canceled 2019-05-20 2019-07-08 2019-07-29 2019-09-02 2020-09-11 ERU, Finance Department, associated with achie Selection GoS. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109220-CS- capacity building and Individual INDV / Hiring of "Junior IDA / 55840 institutional strengthening Post Consultant Open 5,000.00 0.00 Canceled 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-10-23 Communication Specialist-2" associated with achie Selection in Finance Department, GoS. vement of eligible PSM reforms. Component 2: Technical PK-SPSMRP-109162-CS- Assistance (TA) to support INDV / Hiring of Junior capacity building and Individual Specialist-1 in Information IDA / 55840 institutional strengthening Post Consultant Open 10,000.00 0.00 Canceled 2019-04-22 2019-06-01 2019-06-10 2019-06-21 2020-06-20 Management Unit, Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-109218-CS- capacity building and Individual INDV / Hiring of "Web IDA / 55840 institutional strengthening Post Consultant Open 6,500.00 0.00 Canceled 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-10-23 Developer-2" in Finance associated with achie Selection Department, GoS. vement of eligible PSM reforms. Component 2: Technical Assistance (TA) to support PK-SPSMRP-12820-CS-INDV capacity building and Individual / Consultant to Strengthen IDA / 55840 institutional strengthening Post Consultant Open 17,500.00 0.00 Canceled 2017-07-03 2017-08-07 2017-08-18 2017-09-01 2018-02-28 PAC (Public Accounts associated with achie Selection Committee). vement of eligible PSM reforms. Page 9