Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Senegal : Senegal Tourism and Enterprise Development Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2017-08-14 2020-11-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146469 GPN Date: Project Name: Senegal Tourism and Enterprise Development Project Loan / Credit No: IDA / 60190, IDA / Q9590, IDA / Q9940 Executing Agency(ies): WORKS AND INVESTMENTS AGENCY WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned T1 / Sélection d'une entreprise pour la réalisation des travaux physiques de Sustainable Tourism Open - Single Stage - One 40,265,060.2 protection, de restauration et IDA / Q9590 A priori Appel d'offres 35,800,000.00 Signé 2018-09-07 2017-10-16 2018-10-07 2017-11-04 2018-11-27 2018-01-16 2018-12-27 2018-06-20 2019-01-31 2018-08-10 2021-01-20 Development International Envelope 1 d'entretien des plages de la station balnéaire de Saly Portudal T10 / sélection d'une entreprise pour la réalisation des Travaux physiques de Sustainable Tourism Open - Single Stage - One IDA / Q9940 A posteriori Appel d'offres 3,240,000.00 0.00 Annulé 2018-05-16 2018-05-21 2018-07-02 2018-08-01 2018-09-05 2019-03-04 protection et entretien des Development International Envelope plages de Saly Niakh Niakhal T3 / Travaux de construction et de réhabilitation d'infrastructures dans le Sustainable Tourism Single Stage - One En attente IDA / 60190 A posteriori Demande de prix 169,985.00 0.00 2020-06-21 2020-08-16 2021-02-12 cadre du plan Development Envelope d'exécution d'accompagnement social de la protection, restauration et entretien des plages de Saly GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual F5 / Acquisition de goodies, Supporting Enterprise Single Stage - One matériels de communication IDA / 60190 A posteriori Demande de prix Limited 70,000.00 47,054.37 Signé 2018-02-27 2017-12-13 2018-04-24 2018-07-23 2018-07-23 Creation and Growth Envelope dans le cadre du BPC F1 / Acquisition de Single Stage - One En attente IDA / Q9590 Project implementation A posteriori Demande de prix Limited 30,000.00 0.00 2017-12-04 2018-01-30 2018-03-31 fournitures de bureaux Envelope d'exécution F8 / Acquisition de Supporting Enterprise Single Stage - One Matériels et consommables IDA / 60190 A posteriori Appel d'offres Open - National 210,000.00 0.00 Annulé 2018-01-30 2018-07-31 2018-02-04 2018-03-18 2018-09-25 2018-04-17 2018-05-22 2018-07-21 Creation and Growth Envelope informatiques F20 / Acquisition de Single Stage - One matériels de vidéo-conférence IDA / 60190 Project implementation A posteriori Demande de prix Limited 21,000.00 21,988.62 Signé 2019-03-30 2019-07-22 2019-05-25 2019-09-26 2019-11-21 Envelope au profit de l'UGP Page 1 F12 / Solution matérielle et équipement complémentaire du Datacenter DGID (Lot1: Fourniture & install. de modules onduleurs, câbles Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 550,000.00 429,630.29 Signé 2018-12-21 2018-12-17 2018-12-26 2019-02-01 2019-02-06 2019-01-29 2019-03-08 2019-03-12 2019-04-12 2019-07-03 2019-10-09 réseau- lot 2: Fourniture & Creation and Growth Envelope install d'une solution dédiée à SIGTAS et ETAX et mise à niveau de la plateforme virtuelle serveurs) F15 / Acquisition d'une Single Stage - One En cours IDA / 60190 Project implementation A posteriori Demande de prix Limited 40,000.00 40,686.06 2019-06-08 2020-01-06 2019-08-04 2020-01-31 ERP pour l'UGP Envelope d'exécution F3 / Acquisition de Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 154,000.00 0.00 Annulé 2018-12-14 2018-12-19 2019-01-30 2019-03-01 2019-04-05 2019-10-02 véhicules en deux (02) lots Creation and Growth Envelope F9 / Acquisition de Supporting Enterprise Single Stage - One mobiliers de bureau en trois IDA / 60190 A posteriori Demande de prix Limited 24,500.00 23,323.60 Signé 2019-06-15 2019-08-02 2019-08-10 2019-12-17 2020-02-06 Creation and Growth Envelope lots F4 / Réalisation de supports de communication Sustainable Tourism Single Stage - One (support promotionel, IDA / 60190 A posteriori Demande de prix Limited 24,200.00 22,947.03 Signé 2019-08-10 2019-09-06 2019-10-05 2019-12-20 2020-04-02 Development Envelope plaquettes…) au profit de l'ASPT F17 / Acquisition de Supporting Enterprise Single Stage - One matériels et consommables IDA / 60190 A posteriori Demande de prix Limited 30,900.00 11,344.06 Signé 2019-09-15 2019-09-27 2019-11-10 2020-01-08 2020-05-08 Creation and Growth Envelope informatiques en 4 lots F30 / Réalisation et Sustainable Tourism Single Stage - One installation de panneaux IDA / 60190 A posteriori Demande de prix Limited 80,800.00 82,773.78 Signé 2019-10-27 2019-11-07 2019-12-22 2020-05-15 2020-06-19 Development Envelope signalétiques F10 / Acquisition de Sustainable Tourism Single Stage - One matériels audiovisuels pour IDA / 60190 A posteriori Demande de prix Limited 78,000.00 0.00 Annulé 2018-11-20 2018-12-28 2019-01-15 2019-07-14 Development Envelope le Ministère du Tourisme S27 / Conception et installation de panneaux Sustainable Tourism Single Stage - One signalétiques dans les sites IDA / 60190 A posteriori Demande de prix Limited 80,000.00 0.00 Annulé 2019-11-05 2019-12-31 2020-06-28 Development Envelope et circuits touristiques au profit du MTTA F6 / Acquisition d'équipements frigorifiques Sustainable Tourism Single Stage - One En attente dans le cadre du plan IDA / 60190 A posteriori Demande de prix Limited 25,330.00 0.00 2020-05-10 2020-07-05 2021-01-01 Development Envelope d'exécution d'accompagnement social des travaux de Saly F16 / Acquisition de matériels de pêche, de transformation de produits halieutiques et de Sustainable Tourism Single Stage - One En cours IDA / 60190 A posteriori Demande de prix Limited 37,965.00 0.00 2020-05-31 2020-10-20 2020-07-26 2021-01-22 nettoiement dans le cadre Development Envelope d'exécution du plan d'accompagnement social des travaux de Saly ( en 3 lots) F11 / Acquisition d'un Single Stage - One logiciel de gestion de projet IDA / 60190 Project implementation A posteriori Demande de prix Limited 64,000.00 0.00 Annulé 2019-01-01 2019-02-26 2019-08-25 Envelope pour l'UGP Page 2 F23 / Acquisition de matériels informatiques et électroniques pour Supporting Enterprise Single Stage - One En attente IDA / 60190 A posteriori Demande de prix Limited 95,000.00 0.00 2020-05-19 2020-07-14 2021-01-10 l'UGP/PDTE et le Tribunal Creation and Growth Envelope d'exécution de Commerce de Dakar (3 lots) F2 / Acquisition de produits d'entretien pour les Single Stage - One IDA / 60190 Project implementation A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2017-11-27 2018-01-19 2018-03-20 locaux devant abriter l'Unité Envelope de Gestion du Projet F7 / Acquisition de cinq (05) véhicules répartis en Supporting Enterprise Single Stage - One En attente deux (02) lots pour APIX IDA / 60190 A posteriori Appel d'offres Open - National 252,487.00 0.00 2020-09-15 2020-09-20 2020-11-01 2020-12-01 2021-01-05 2021-04-05 Creation and Growth Envelope d'exécution (DEA) et l'ADEPME (FFP/BPC) F18 / Acquisition de kits de protection pour la mise en conformité des Supporting Enterprise Single Stage - One En cours Plateformes de IDA / 60190 A posteriori Demande de prix Limited 5,350.00 0.00 2020-09-06 2020-09-17 2020-11-01 2020-12-11 Creation and Growth Envelope d'exécution l’Investissement et pour l’UGP : gestes barrières contre la Covid-19 F19 / Acquisition de mobiliers de bureau pour les Supporting Enterprise Single Stage - One En cours plateformes (Nord Sud et IDA / 60190 A posteriori Demande de prix Limited 28,750.00 0.00 2020-11-07 2020-11-09 2021-01-02 2021-04-02 Creation and Growth Envelope d'exécution Centre) et l'UGP en deux (02) F24 / Acquisition de matériels informatiques pour l'UGP, les Plateformes d'investissement, le Tribunal Supporting Enterprise Single Stage - One En attente IDA / 60190 A posteriori Appel d'offres Open - National 105,067.00 0.00 2020-10-29 2020-11-03 2020-12-15 2021-01-14 2021-02-18 2021-04-19 Commercial hors classe de Creation and Growth Envelope d'exécution Dakar et le renforcement du dispositif d'alimentation électrique de secours F22 / Acquisition de matériels lourds (camions) dans le cadre du programme Sustainable Tourism Single Stage - One En attente IDA / 60190 A posteriori Appel d'offres Open - National 404,105.00 0.00 2020-11-30 2020-12-05 2021-01-16 2021-02-15 2021-03-22 2021-09-18 d’urgence d’attractivité et Development Envelope d'exécution d’assainissement de la station de Saly NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S6 / Réalisation de reportages vidéo sur les Supporting Enterprise Single Stage - One En attente IDA / 60190 A posteriori Demande de prix Limited 60,000.00 0.00 2017-09-27 2017-11-22 2019-11-12 projets et le concours de Creation and Growth Envelope d'exécution business plans S1 / Sélection d'une agence de communication pour la Single Stage - One Cérémonie de lancement du IDA / Q9590 Project implementation A posteriori Demande de prix Limited 40,000.00 64,846.82 Signé 2017-11-20 2018-09-28 2018-01-15 2018-10-15 2018-03-16 Envelope projet de protection et restauration des plages Page 3 S4 / Sélection d'une agence chargée de de la communication Fonds à Frais Partagé (LOT1) et de Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 445,000.00 182,891.18 Signé 2017-11-03 2017-12-12 2017-11-08 2017-12-20 2018-01-17 2018-01-19 2018-02-08 2018-02-23 2018-06-21 2020-02-13 la communication du Creation and Growth Envelope concours de business plans et de cérémonie de remise des prix (LOT2) S7 / Sélection d'une agence chargée de de la Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 225,000.00 0.00 Annulé 2017-09-15 2017-09-20 2017-11-02 2017-12-02 2018-01-06 2019-06-30 communication Fonds à Creation and Growth Envelope Frais Partagés S20 / Campagne d'affichage pour la deuxième édition du Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Demande de prix Limited 90,000.00 90,790.62 Signé 2018-02-28 2018-10-22 2018-04-25 2019-03-06 2018-10-22 concours national de Creation and Growth Envelope business plan S21 / Acquisition de Single Stage - One En attente supports de promotion pour IDA / 60190 Project implementation A posteriori Demande de prix Limited 33,000.00 0.00 2018-02-20 2018-04-17 2018-06-16 Envelope d'exécution le Projet S30 / SÉLECTION D'UNE AGENCE CHARGÉE DE LA COMMUNICATION DU CONCOURS DE BUSINESS Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 225,000.00 218,045.10 Signé 2018-07-02 2018-08-15 2018-07-07 2018-08-18 2018-09-25 2018-09-17 2018-10-04 2018-10-22 2019-04-24 2020-04-14 PLANS ET DE Creation and Growth Envelope L'ORGANISATION DE LA CÉRÉMONIE DE REMISE DES PRIX ( RELANCE) S28 / Sélection d'une agence de Voyage et de Sustainable Tourism Single Stage - One Tourisme pour l'organisation IDA / 60190 A posteriori Demande de prix Limited 80,000.00 32,501.43 Signé 2018-10-31 2019-02-11 2018-12-26 2019-05-31 2019-06-24 Development Envelope d'Eductours combinés à un voyage de presse S25 / Création de banque d'images et Conception de films et vidéos promotionnels Sustainable Tourism Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 241,000.00 163,702.35 Signé 2019-01-30 2019-08-20 2019-02-04 2019-03-18 2019-09-24 2019-04-17 2019-11-26 2019-05-22 2020-05-26 2019-11-18 au profit de la destination Development Envelope en deux (02) lots pour le Ministère du Tourisme S13 / Sélection d'une agence de communication Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Demande de prix Limited 73,000.00 74,810.00 Signé 2018-11-03 2018-10-26 2018-12-29 2018-12-20 2019-06-27 pour l'organisation du forum Creation and Growth Envelope de la PME S15 / Selection d'une agence de communication Supporting Enterprise Single Stage - One En attente pour la vulgarisation des IDA / 60190 A posteriori Demande de prix Limited 73,000.00 0.00 2018-12-05 2019-01-30 2019-07-29 Creation and Growth Envelope d'exécution activités du Tribunal de Commerce de Dakar S14 / Renouvellement du Supporting Enterprise Single Stage - One système de sécurité réseau IDA / 60190 A posteriori Demande de prix Limited 97,000.00 172,564.79 Signé 2019-01-01 2019-08-20 2019-02-26 2020-02-27 2019-08-25 Creation and Growth Envelope du Datacenter de la DGID S29 / Sélection d'une agence chargée d'accompagner le Ministère Sustainable Tourism Open - Single Stage - One IDA / 60190 A posteriori Appel d'offres 323,283.00 0.00 Annulé 2018-10-17 2018-10-22 2018-12-03 2019-01-02 2019-02-06 2019-08-05 du Tourisme pour Development International Envelope l'organisation de TERANGA DAYS (workshop) S10 / Conception et Sustainable Tourism Single Stage - One installation des signalétiques IDA / 60190 A posteriori Appel d'offres Open - National 200,000.00 0.00 Annulé 2017-10-12 2017-10-17 2017-11-28 2017-12-28 2018-02-01 2018-04-02 Development Envelope dans les sites touristiques Page 4 S9 / Conception et impression de manuels de Sustainable Tourism Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 90,000.00 0.00 Annulé 2018-01-12 2018-01-17 2018-02-28 2018-03-30 2018-05-04 2018-09-01 vente à destination des Development Envelope professionnels du Tourisme F21 / CAMPAGNE DE COMMUNICATION POUR LA DESTINATION Sustainable Tourism Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 200,000.00 0.00 Annulé 2018-02-23 2018-02-28 2018-04-11 2018-05-11 2018-06-15 2018-12-12 SENEGAL SUR SES Development Envelope MARCHES PRIORITAIRES EN EUROPE S11 / Sélection d'un cabinet pour l'organisation d'ateliers Supporting Enterprise Single Stage - One d'informations et de IDA / 60190 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé 2018-01-10 2018-03-07 2019-03-03 Creation and Growth Envelope communication sur l'entreprenariat S5 / Location de panneaux Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Appel d'offres Open - National 180,000.00 0.00 Annulé 2017-12-20 2017-12-25 2018-02-05 2018-03-07 2018-04-11 2020-03-31 numériques et traditionnels Creation and Growth Envelope S32 / Sélection d'une agence chargée d'accompagner le Ministère Sustainable Tourism Single Stage - One du Tourisme pour IDA / 60190 A posteriori Demande de prix Limited 78,400.00 0.00 Annulé 2019-06-22 2019-07-26 2019-08-17 2019-10-16 Development Envelope l'organisation de TERANGA DAYS en France, Belgique et Espagne S33 / Sélection de prestataires pour l’animation Supporting Enterprise Single Stage - One d’une série d’ateliers sur les IDA / 60190 A posteriori Appel d'offres Open - National 113,000.00 0.00 Annulé 2019-10-15 2019-10-20 2019-12-01 2019-12-31 2020-02-04 2020-08-02 Creation and Growth Envelope techniques du commerce international S18 / Sélection d'un prestataire en charge de la Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Demande de prix Limited 48,500.00 44,158.80 Signé 2019-05-05 2020-04-09 2020-04-23 2020-08-19 2020-10-20 notation des candidats du Creation and Growth Envelope Concours Business plan S12 / Sélection d'une agence pour la réalisation de Sustainable Tourism Single Stage - One supports de communication IDA / 60190 A posteriori Demande de prix Limited 96,000.00 0.00 Annulé 2018-10-30 2018-12-25 2019-06-23 Development Envelope pour le Ministère du Tourisme S31 / Sélection d'une agence de Communication pour la mise en place des Supporting Enterprise En attente IDA / 60190 A posteriori Demande de prix 8,080.00 0.00 2020-05-05 2020-05-05 2020-05-05 procédures du Tribunal de Creation and Growth d'exécution Commerce hors classe de Dakar S22 / Sélection d'une agence chargée d'accompagner le Ministère Sustainable Tourism Single Stage - One du Tourisme pour IDA / 60190 A posteriori Appel d'offres Open - National 162,000.00 0.00 Annulé 2019-10-24 2019-10-29 2019-12-10 2020-01-09 2020-02-13 2020-08-11 Development Envelope l'organisation de TERANGA DAYS en France, Belgique et Espagne S26 / Élaboration de supports audio-visuels pour Supporting Enterprise Single Stage - One les projets des éditions IDA / 60190 A posteriori Demande de prix Limited 16,000.00 0.00 Annulé 2018-11-12 2019-01-07 2019-07-06 Creation and Growth Envelope précédentes du Concours Business plan S3 / Création et production des supports de Single Stage - One En attente IDA / 60190 Project implementation A posteriori Demande de prix Limited 23,500.00 0.00 2019-03-03 2019-04-28 2019-10-25 communication pour l'Unité Envelope d'exécution de Gestion du Projet Page 5 S3L2 / Réalisation et production de film institutionnel sur les travaux de protection, d’entretien et Single Stage - One de restauration des plages IDA / 60190 Project implementation A posteriori Demande de prix Limited 43,500.00 21,313.40 Signé 2020-06-27 2020-04-28 2020-08-22 2020-08-19 2021-02-18 Envelope de Saly dans le cadre du Projet de Développement Touristique et des Entreprises S16 / Organisation atelier sur l'entrepreneuriat et Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Demande de prix Limited 37,500.00 0.00 Annulé 2019-04-20 2019-05-29 2019-06-15 2019-12-12 organisation des CRD (Pré- Creation and Growth Envelope campagne) S17 / Sélection d'un prestataire pour la formation Supporting Enterprise Single Stage - One IDA / 60190 A posteriori Demande de prix Limited 89,000.00 0.00 Annulé 2019-07-15 2019-09-09 2020-03-07 des candidats du concours Creation and Growth Envelope national de plan d'affaires CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1 / Recrutement d'un Sélection fondée cabinet en charge de la IDA / 60190 Project implementation A posteriori sur la qualité et Open - National 240,000.00 130,608.46 Signé 2017-06-22 2017-01-30 2017-07-12 2017-08-25 2017-09-07 2017-09-22 2017-11-14 2017-10-22 2018-01-02 2017-11-26 2018-02-08 2017-12-31 2018-06-06 2020-09-16 facilitation et de la le coût communication sociales Sélection fondée C8 / Sélection d'un cabinet IDA / 60190 Project implementation A priori sur la qualité et Open - National 60,000.00 0.00 Annulé 2017-10-12 2017-11-02 2017-12-16 2018-01-13 2018-02-12 2018-03-19 2018-04-23 2021-04-07 chargé de l'Audit financier le coût F13 / Recrutement d'un Sélection fondée Supporting Enterprise Open - assistant technique (firme) IDA / 60190 A posteriori sur la qualité et 200,000.00 0.00 Annulé 2017-10-31 2017-11-21 2018-01-01 2018-01-29 2018-02-28 2018-04-04 2018-05-09 2019-05-09 Creation and Growth International internationale : télépaiement le coût C32 / Mise à jour du logiciel de gestion des Supporting Enterprise Sélection au IDA / 60190 A posteriori Open - National 40,000.00 40,040.65 Signé 2017-09-27 2017-11-06 2017-10-18 2017-12-01 2018-09-27 2017-12-29 2018-10-26 2018-01-28 2019-02-07 2018-03-04 2019-03-12 2018-04-08 2019-07-22 2018-10-05 projets et du système de Creation and Growth moindre coût suivi évaluation C25 / Sélection d'une entité Sélection fondée Supporting Enterprise en charge de la formation et IDA / 60190 A posteriori sur la qualité et Open - National 350,000.00 0.00 Annulé 2017-11-07 2017-11-28 2018-01-11 2018-02-08 2018-03-10 2018-04-14 2018-05-19 2020-05-08 Creation and Growth de la notation des candidats le coût C46 / SELECTION D'UN CABINET CHARGE DE L'ETUDE D'IMPACT Sélection fondée Sustainable Tourism ENVIRONNEMENTAL ET IDA / Q9940 A posteriori sur la qualité et Open - National 162,000.00 179,667.89 Signé 2017-09-20 2017-07-11 2017-10-11 2017-11-24 2017-12-22 2018-02-15 2018-01-21 2018-04-23 2018-02-25 2018-05-31 2018-04-01 2018-09-21 2018-06-30 Development SOCIAL DU DRAGAGE le coût POUR LA RESTAURATION DES PLAGES DE SALY C45 / Sélection d'un cabinet pour une mission Sélection fondée Sustainable Tourism Open - d'assistance technique des IDA / Q9940 A posteriori sur la qualité et 325,000.00 0.00 Annulé 2017-10-04 2017-10-23 2017-10-25 2017-12-08 2018-01-05 2018-02-04 2018-03-11 2018-04-15 2019-04-15 Development International travaux de Saly Niakh le coût Niakhal C35 / Etudes de faisabilité Sélection fondée Sustainable Tourism Open - des projets de Kafountine- IDA / 60190 A posteriori sur la qualité et 400,000.00 299,574.58 Signé 2017-11-23 2017-11-06 2017-12-14 2018-08-24 2018-01-27 2018-11-08 2018-02-24 2019-02-19 2018-03-26 2019-02-07 2018-04-30 2019-03-12 2018-06-04 2019-07-16 2018-09-02 Development International Abéné le coût Page 6 C63 / Sélection d'un Sélection fondée En attente cabinet chargé de l'Audit IDA / 60190 Project implementation A posteriori sur la qualité et Open - National 60,000.00 0.00 2018-10-09 2018-10-30 2018-12-13 2019-01-10 2019-02-09 2019-03-16 2019-04-20 2020-04-19 d'exécution financier le coût C66 / Sélection d'un bureau de contrôle technique pour Sélection fondée les ouvrages fixes des Sustainable Tourism sur les Open - IDA / 60190 A posteriori 242,000.00 243,740.83 Signé 2018-09-12 2018-08-27 2018-10-03 2018-09-28 2018-11-16 2018-12-16 2018-12-18 2019-01-20 2019-03-04 2019-07-19 travaux physiques de Development qualifications des International protection restauration et consultants entretien des plages de Saly Sélection fondée C10 / Elaboration du Plan sur les IDA / 60190 Project implementation A posteriori Open - National 20,000.00 0.00 Annulé 2018-01-17 2018-02-07 2018-04-29 2018-05-29 2018-07-03 2018-10-01 de formation du projet qualifications des consultants Sélection fondée C5 / Sélection d'un cabinet sur les pour l'Audit technique pour IDA / 60190 Project implementation A posteriori Open - National 90,000.00 0.00 Annulé 2017-11-20 2017-12-12 2018-01-25 2018-02-24 2018-03-31 2018-06-29 qualifications des les ouvrages consultants C50 / Etude sur le mode Sélection fondée de gestion, entretien et Sustainable Tourism sur les maintenance des ouvrages IDA / 60190 A posteriori Open - National 24,200.00 206,245.06 Signé 2019-06-03 2019-05-08 2019-06-24 2019-08-21 2019-08-07 2019-11-08 2019-09-06 2019-12-10 2019-10-11 2020-06-02 2020-04-08 Development qualifications des réalisés à Saly dans le consultants cadre du PDTE C69 / Etudes de faisabilité Sélection fondée et d'exécution et mise à Sustainable Tourism Open - IDA / 60190 A posteriori sur la qualité et 484,000.00 0.00 Annulé 2018-12-20 2018-11-26 2019-01-10 2019-02-23 2019-03-23 2019-04-22 2019-05-27 2019-07-01 2020-06-30 niveau du pôle touristique Development International le coût du Lac Rose C34 / Elaboration d'un Sélection fondée master plan d'aménagement Sustainable Tourism Open - IDA / 60190 A posteriori sur la qualité et 500,000.00 0.00 Annulé 2017-09-11 2017-11-06 2017-10-02 2017-11-15 2017-12-13 2018-01-12 2018-02-16 2018-03-23 2018-09-19 touristique de la petite côte Development International le coût et du littoral sud C33 / Sélection d'un Sélection fondée cabinet pour le renforcement Supporting Enterprise sur les IDA / 60190 A posteriori Open - National 46,500.00 0.00 Annulé 2017-11-17 2017-12-12 2018-02-15 2018-02-25 2018-03-28 2020-03-17 de capacités des PME en Creation and Growth qualifications des matière d'exportation. consultants C40 / Etude diagnostic et Sélection fondée de mise à niveau Sustainable Tourism sur les IDA / 60190 A posteriori Open - National 70,000.00 0.00 Annulé 2018-01-19 2018-01-19 2018-01-19 2018-01-19 2018-02-09 2018-05-10 environnemental au profit de Development qualifications des la SAPCO consultants S19 / Sélection d'un Consultant pour l'animation Sélection fondée d'une série d'ateliers de Supporting Enterprise sur les En cours IDA / 60190 A posteriori Open - National 115,000.00 0.00 2019-11-20 2019-10-21 2019-12-11 2020-10-27 2020-01-24 2020-02-07 2020-02-23 2020-03-29 2020-09-25 formation sur les techniques Creation and Growth qualifications des d'exécution du Commerce international consultants pour le FFP. F14 / Services de consultant pour l'étude Sélection fondée filières et investissement, et Supporting Enterprise sur les élaboration du profil IDA / 60190 A posteriori Open - National 180,000.00 0.00 Annulé 2017-11-23 2017-12-14 2018-01-29 2018-02-28 2018-04-04 2020-04-03 Creation and Growth qualifications des d'attractivité des régions et consultants de la cartographie des produits exports C80 / Sélection d'un cabinet pour le coaching des Sélection fondée Supporting Enterprise En attente lauréats de la seconde IDA / 60190 A posteriori sur la qualité et Open - National 161,950.00 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Creation and Growth d'exécution édition du Concours national le coût de Plan d'affaires Page 7 C81 / Recrutement d’un cabinet pour l’élaboration et la mise en œuvre d’une stratégie de marketing Sélection fondée Sustainable Tourism En cours territorial appliquée au IDA / 60190 A posteriori sur la qualité et Open - National 323,000.00 0.00 2020-03-10 2020-04-16 2020-03-31 2020-04-21 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Development d'exécution tourisme au profit de le coût l'Agence sénégalaise de Promotion touristique (ASPT). C82 / Sélection d’un cabinet chargé de l’élaboration de la politique, des procédures et des outils Sélection fondée de gestion environnementale Sustainable Tourism En cours IDA / 60190 A posteriori sur la qualité et Open - National 80,820.00 0.00 2020-03-13 2020-03-27 2020-04-03 2020-10-28 2020-05-17 2020-07-21 2020-06-14 2020-10-05 2020-07-14 2020-10-08 2020-08-18 2020-09-22 2021-09-22 et sociale de la Société Development d'exécution le coût d’Aménagement et de Promotion des Côtes et zones touristiques du Sénégal (SAPCO) C9 / Etat des lieux sur l'environnement ces affaires Sélection fondée locales (cartographie sur les IDA / 60190 Project implementation A posteriori Open - National 60,000.00 0.00 Annulé 2017-10-18 2017-11-08 2017-12-22 2018-01-21 2018-02-25 2018-05-26 investissements privés qualifications des tourisme...) à Saly, consultants Ziguinchor et Saint Louis C2 / Sélection d'un cabinet Sélection fondée pour l'Etude d'impact Sustainable Tourism sur les IDA / 60190 A posteriori Open - National 120,000.00 0.00 Annulé 2018-01-16 2018-02-06 2018-03-22 2018-04-21 2018-05-26 2018-08-24 environnemental et social Development qualifications des pour le dragage consultants C47 / Sélection d'un cabinet pour la réalisation Sélection fondée de l'étude d'impact Sustainable Tourism sur les IDA / Q9940 A posteriori Open - National 48,500.00 0.00 Annulé 2017-10-27 2017-07-31 2017-11-17 2017-12-31 2018-01-30 2018-03-06 2018-06-04 environnemental et social Development qualifications des pour les travaux de Saly consultants Niakh Niakhal C76 / Coaching des Sélection fondée lauréats du Concours Supporting Enterprise IDA / 60190 A posteriori sur la qualité et Open - National 197,000.00 0.00 Annulé 2019-11-04 2019-11-25 2020-01-08 2020-02-05 2020-03-06 2020-04-10 2020-05-15 2021-05-15 national de Plan d'affaires - Creation and Growth le coût Seconde édition C87 / Sélection d'un cabinet pour la mise en Sélection fondée place d'un système Sustainable Tourism En cours IDA / 60190 A posteriori sur la qualité et Open - National 161,645.00 0.00 2020-07-21 2020-08-25 2020-08-11 2020-09-21 2020-09-24 2020-10-22 2020-11-21 2020-12-26 2021-01-30 2022-01-30 d'information géographique Development d'exécution le coût (SIG) au profit de la SAPCO- Sénégal C89 / Recrutement d'un cabinet pour la mission d'assistance technique pour la mise en oeuvre d'un Sélection fondée Sustainable Tourism En cours programme IDA / 60190 A posteriori sur la qualité et Open - National 161,645.00 0.00 2020-08-17 2020-03-27 2020-09-07 2020-11-02 2020-10-21 2020-07-21 2020-11-18 2020-06-10 2020-12-18 2020-10-08 2021-01-22 2021-02-26 2022-02-26 Development d'exécution d'accompagnement de l'unité le coût de gestion environnementale et sociale de la SAPCO- Sénégal C84 / Sélection d'un cabinet pour la création de la marque touristique de la Sélection fondée Sustainable Tourism Open - En cours destination Sénégal et IDA / 60190 A posteriori sur la qualité et 750,000.00 0.00 2020-09-04 2020-08-05 2020-09-25 2020-11-04 2020-11-08 2020-12-06 2021-01-05 2021-02-09 2021-03-16 2022-03-16 Development International d'exécution élaboration et mise en le coût oeuvre de stratégies de marketing touristique Page 8 C83 / Recrutement d’un cabinet chargé de l’élaboration de Business Model, de manuel de Sélection fondée Supporting Enterprise En attente procédures et une IDA / 60190 A posteriori sur la qualité et Open - National 113,150.00 0.00 2020-08-18 2020-09-08 2020-10-22 2020-11-19 2020-12-19 2021-01-23 2021-02-27 2022-02-27 Creation and Growth d'exécution proposition de textes le coût normatifs ou réglementaires pour les Plateformes de l’Investissement C16 / Sélection d'un bureau d'études pour le diagnostic sur l'état des locaux, les études architecturales et d'aménagement et Supporting Enterprise Sélection au IDA / 60190 A posteriori Open - National 135,000.00 220,053.83 Signé 2019-05-28 2019-05-14 2019-06-18 2019-07-31 2019-10-28 2019-08-28 2019-11-13 2019-09-27 2019-11-13 2019-11-01 2019-11-13 2019-12-06 2020-04-21 2020-06-03 supervision des travaux de Creation and Growth moindre coût réhabilitation des locaux abritant les plateformes de Saly et Ziguinchor et Saint- Louis C15 / Sélection d'un bureau d'études pour le diagnostic sur l'état des locaux, les Sélection fondée études architecturales et Supporting Enterprise sur les d'aménagement et IDA / 60190 A posteriori Open - National 35,500.00 0.00 Annulé 2019-07-25 2019-05-14 2019-08-15 2019-09-28 2019-10-28 2019-12-02 2020-05-30 Creation and Growth qualifications des supervision des travaux de consultants réhabilitation des locaux abritant la plateforme de Saint Louis C85 / Sélection d'un cabinet pour le développement de produits touristiques et la mise en Sélection fondée Sustainable Tourism Open - En cours ouvre s'un programme de IDA / 60190 A posteriori sur la qualité et 350,000.00 0.00 2020-08-20 2020-07-17 2020-09-10 2020-11-13 2020-10-24 2020-11-21 2020-12-21 2021-01-25 2021-03-01 2022-03-01 Development International d'exécution promotion des le coût investissements des poles Dakar, Saly - Petite Côte, Delta du Saloum C88 / Sélection d'un cabinet pour l'assistance Sélection fondée Sustainable Tourism Open - En cours technique du Ministère du IDA / 60190 A posteriori sur la qualité et 525,400.00 0.00 2020-10-19 2020-07-17 2020-11-09 2020-11-02 2020-12-23 2021-01-20 2021-02-19 2021-03-26 2021-04-30 2022-04-30 Development International d'exécution Tourisme et des Transports le coût aériens (MTTA) C90 / Sélection d'un cabinet pour le Diagnostic Sélection fondée du dispositif électronique de Supporting Enterprise En attente IDA / 60190 A posteriori sur la qualité et Open - National 210,135.00 0.00 2021-01-11 2021-02-01 2021-03-17 2021-04-14 2021-05-14 2021-06-18 2021-07-23 2022-07-23 la plateforme de création Creation and Growth d'exécution le coût d’entreprises pour la zone centre-ouest S34 / Encadrement des entreprises issues des Sélection fondée Supporting Enterprise En attente lauréats de la première IDA / 60190 A posteriori sur la qualité et Open - National 177,810.00 0.00 2020-11-27 2020-12-18 2021-01-31 2021-02-28 2021-03-30 2021-05-04 2021-06-08 2022-06-08 Creation and Growth d'exécution édition du concours national le coût de business plans. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C4 / Recrutement en En cours Spécialiste en passation de IDA / 60190 Project implementation A priori Individuel Open 108,000.00 0.00 2017-06-27 2017-11-14 2017-08-15 2017-08-10 2017-09-05 2017-10-10 2018-04-08 d'examen marchés Page 9 C7 / Recrutement d'un En cours spécialiste en ingénierie IDA / 60190 Project implementation A priori Individuel Limited 72,000.00 0.00 2017-07-13 2017-10-12 2017-07-18 2017-11-03 2017-08-08 2017-09-12 2020-08-27 d'exécution sociale C11 / Audit technique des IDA / 60190 Project implementation A priori Individuel Limited 20,000.00 0.00 Annulé 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-09-28 bénéficiaires du FFP et BPC C37 / Recrutement d'un Sustainable Tourism IDA / 60190 A priori Individuel Open 180,000.00 0.00 Annulé 2017-06-22 2017-08-10 2017-08-31 2017-10-05 2022-09-09 PMO (Project Mgmt Offcer). Development C6 / Sélection d'un Chargé de mission Environnement IDA / 60190 Project implementation A priori Individuel Limited 72,000.00 0.00 Annulé 2017-10-28 2017-11-02 2017-11-23 2017-12-28 2020-12-12 pour le fonds à frais partagés et l'ADEPME C27 / Sélection d'un Sélection de cabinet pour la mise à Supporting Enterprise IDA / 60190 A priori consultants par Direct 190,000.00 0.00 Annulé 2017-11-23 2017-12-03 2018-02-06 2020-01-27 niveau et maintenance de la Creation and Growth entente directe plateforme IT C39 / Recrutement d'un Sustainable Tourism expert environnementaliste IDA / 60190 A priori Individuel Open 108,000.00 0.00 Annulé 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2023-03-09 Development au profit de la SAPCO C30 / Recrutement d'un Supporting Enterprise expert international pour le IDA / 60190 A priori Individuel Open 120,000.00 0.00 Annulé 2017-10-16 2017-11-10 2017-12-15 2017-12-25 2018-01-25 2019-01-25 Creation and Growth FFP C3 / Recrutement Ingénieur IDA / 60190 Project implementation A priori Individuel Open 216,000.00 0.00 Annulé 2017-10-03 2017-10-22 2017-11-21 2017-12-12 2018-01-16 2020-12-31 côtier Senior C48 / RECRUTEMENT D'UN COORDONNATEUR Sélection de POUR LE PROJET DE IDA / Q9940 Project implementation A priori consultants par Direct 312,000.00 0.00 Annulé 2017-09-15 2017-09-25 2017-11-29 2022-11-03 DÉVELOPPEMENT DU entente directe TOURISME ET DES ENTREPRISES REGC1 / MISSION D'ASSISTANCE A MAITRISE D'OEUVRE DANS LE CADRE DE LA Sélection de REALISATION DES Sustainable Tourism En cours IDA / Q9940 A priori consultants par Direct 1,800,000.00 0.00 2015-01-19 2017-10-12 2015-01-27 2015-01-27 2016-05-07 2018-04-27 TRAVAUX PHYSIQUES DE Development d'examen entente directe RESTAURATION, PROTECTION ET ENTRETIEN DES PLAGES DE SALY C55 / QUANTIFICATION ET CARACTERISATION PHYSICO CHIMIQUE ET BACTERIOLOGIQUE DES SEDIMENTS, DES Sélection de HABITATS ET DES Sustainable Tourism IDA / 60190 A posteriori consultants par Direct 65,000.00 103,041.93 Signé 2017-12-27 2018-03-05 2018-03-12 2018-05-16 2018-10-31 2018-05-25 ESPECES MARINES AU Development entente directe NIVEAU DES ZONES DE DRAGAGE ET D'AMENAGEMENT DES OUVRAGES DE LA ZONE DE SALY C57 / Recrutement d'un expert national en Supporting Enterprise En cours IDA / 60190 A posteriori Individuel Open 54,000.00 0.00 2018-01-30 2018-06-14 2018-03-20 2018-04-10 2018-05-15 2019-05-10 développement des Creation and Growth d'exécution exportations Page 10 C56 / Recrutement d'un Sustainable Tourism assistant technique en génie IDA / 60190 A posteriori Individuel Open 216,000.00 181,273.19 Signé 2018-01-30 2018-03-20 2018-02-22 2018-04-10 2018-06-10 2018-05-15 2018-08-23 2018-11-11 Development côtier C58 / Recrutement d'un IDA / 60190 Project implementation A posteriori Individuel Open 180,000.00 0.00 Annulé 2018-01-31 2019-06-25 2018-03-21 2018-04-11 2018-05-16 2018-11-12 PMO (Project Mgmt Officer) C60 / RECRUTEMENT D'UN COORDONNATEUR Sélection de POUR LE PROJET DE En attente IDA / 60190 Project implementation A posteriori consultants par Direct 312,000.00 0.00 2018-02-15 2018-02-25 2018-05-01 2018-10-28 DÉVELOPPEMENT DU d'exécution entente directe TOURISME ET DES ENTREPRISES C61 / Sélection d'un Sélection de cabinet pour la mise à Supporting Enterprise IDA / 60190 A posteriori consultants par Direct 190,000.00 81,417.20 Signé 2018-03-30 2018-09-17 2018-04-09 2018-11-07 2018-06-13 2019-07-09 2018-12-10 niveau et maintenance de la Creation and Growth entente directe plateforme IT C64 / Sélection d'un Expert Sustainable Tourism Environnementaliste au IDA / 60190 A posteriori Individuel Open 108,000.00 50,709.80 Signé 2018-03-20 2018-01-14 2018-05-08 2018-12-09 2018-05-29 2018-12-05 2018-07-03 2019-06-11 2018-12-30 Development profit de la SAPCO C65 / Recrutement d'un Supporting Enterprise expert international pour le IDA / 60190 A posteriori Individuel Open 120,000.00 173,640.00 Signé 2018-02-28 2017-10-24 2018-04-18 2019-02-05 2018-05-09 2019-02-25 2018-06-13 2019-03-26 2018-12-10 Creation and Growth FFP C70 / Sélection d'un Project Manager Office Sustainable Tourism IDA / 60190 A posteriori Individuel Limited 192,000.00 61,261.35 Signé 2018-04-20 2017-06-01 2018-04-25 2017-09-08 2018-05-05 2018-03-13 2018-05-15 2018-06-12 2019-05-15 (PMO) pour le Ministère du Development Tourisme C71 / Sélection d'un expert Sustainable Tourism en tourisme pour le IDA / 60190 A posteriori Individuel Limited 96,000.00 43,093.88 Signé 2018-07-16 2017-12-21 2018-07-21 2018-11-30 2018-08-11 2019-02-08 2018-09-15 2019-05-22 2020-09-14 Development Ministère du Tourisme C72 / Recrutement d'un cabinet de consultant pour le coaching et le suivi de Sélection de Supporting Enterprise manière personnalisée des IDA / 60190 A posteriori consultants par Direct 180,000.00 235,635.74 Signé 2018-05-25 2018-04-23 2018-06-04 2018-08-08 2018-07-16 2019-02-04 Creation and Growth lauréats du Concours entente directe National de Business édition 2016 C29 / Recrutement d'un Supporting Enterprise juriste (huissier ou avocat) IDA / 60190 A priori Individuel Limited 36,000.00 0.00 Annulé 2017-06-15 2017-06-20 2017-07-11 2017-08-15 2018-02-11 Creation and Growth pour les prix C68 / Recrutement d'un agent pour le suivi- Supporting Enterprise En attente IDA / 60190 A posteriori Individuel Limited 16,000.00 0.00 2018-10-18 2018-10-23 2018-11-13 2018-12-18 2019-06-16 évaluation du Concours Creation and Growth d'exécution national de Plan d'affaires C77 / Mise à jour des Sélection de Sustainable Tourism statistiques 2016-2017 du IDA / 60190 A posteriori consultants par Direct 64,000.00 67,973.60 Signé 2018-11-30 2018-10-15 2018-12-10 2019-02-13 2019-06-03 2019-08-12 Development Ministère du Tourisme entente directe C73 / Sélection d'un expert pour l'élaboration d'un plan IDA / 60190 Project implementation A posteriori Individuel Limited 8,080.00 0.00 Annulé 2019-05-30 2019-06-04 2019-06-25 2019-07-30 2020-01-26 de formation pour l'ensemble du personnel du Projet C59 / Sélection d'un Chargé de mission Environnement Supporting Enterprise IDA / 60190 A posteriori Individuel Open 72,000.00 0.00 Annulé 2018-02-15 2018-04-05 2018-04-26 2018-05-31 2018-11-27 pour le fonds à frais Creation and Growth partagés et l'ADEPME Page 11 C42 / Sélection d'un Sélection de cabinet pour la formation Sustainable Tourism IDA / 60190 A posteriori consultants par Direct 120,000.00 0.00 Annulé 2018-01-01 2018-01-11 2018-03-17 2018-06-15 des guides et acteurs Development entente directe touristiques au Sénégal C78 / Sélection d'un cabinet pour la Préparation du Plan de Gestion Environnemental et Social Sélection de Sustainable Tourism En cours (PGES) des travaux de IDA / 60190 A posteriori consultants par 34,000.00 37,831.02 2019-10-17 2019-05-17 2019-10-17 2019-08-02 2019-10-17 2019-10-17 Development d'exécution restauration protection et entente directe entretien des plages du village de Saly Niakh- Niakhal C79 / Elaboration du plan Sustainable Tourism En cours IDA / 60190 A posteriori Individuel Limited 40,410.00 0.00 2020-04-06 2019-09-25 2020-04-11 2020-05-02 2020-06-06 2020-12-03 de gestion intégrée de Saly Development d'exécution C43 / Enquêtes statistiques Sélection de Sustainable Tourism sur l'offre et la demande IDA / 60190 A posteriori consultants par Direct 34,000.00 0.00 Annulé 2017-10-27 2017-11-08 2017-11-04 2018-01-08 2018-02-07 Development touristiques 2016 et 2017 entente directe C62 / Audit technique des IDA / 60190 Project implementation A posteriori Individuel Limited 20,000.00 0.00 Annulé 2018-06-22 2018-06-27 2018-07-18 2018-08-22 2019-02-18 bénéficiaires du FFP et BPC C12 / Recrutement d’un expert individuel pour le suivi environnemental des Sustainable Tourism En cours IDA / 60190 A posteriori Individuel Limited 43,600.00 0.00 2020-07-10 2020-04-06 2020-07-15 2020-08-10 2020-08-05 2020-09-09 2021-03-08 travaux physiques de Development d'exécution protection, restauration et entretien des plages de Saly. C91 / Etude portant sur l’accompagnement de l’ASTP pour la définition Sélection de Sustainable Tourism En attente d’un programme de IDA / 60190 A posteriori consultants par Direct 148,930.00 0.00 2020-11-10 2020-11-20 2021-01-24 2021-07-23 Development d'exécution formation post- Covid des entente directe acteurs touristiques au Sénégal. Page 12