Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: last approved PP on 2. Date of General Procurement Notice: June 07, 2017 3. Period covered by this procurement plan: The procurement period of project covered from year May 2016 until December 2013 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: To be updated accordingly Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) 2. NCB (Goods) 3. ICB (Works) 4. NCB (Works) 5. (Non-Consultant Services) [Add other methods if necessary] PROCUREMENT Brazil : BAHIA ROAD REHABILITATION AND MAINTENANCE PROJECT - 2ND PHASE PLAN General Information Country: Brazil Bank’s Approval Date of the Original Procurement Plan: 2017-01-19 2021-09-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147272 GPN Date: 2017-06-07 Project Name: BAHIA ROAD REHABILITATION AND MAINTENANCE PROJECT - 2ND PHASE Loan / Credit No: IBRD / 85800 S Executing Agency(ies): ecretariat of Infrastructure of the State of Bahia WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BR-SEINFRA-BA-18665-CW- Component 2: Performance- RFB / Obras de Restauracao e based State Highway Solicitação de Single Stage - One 35,276,278.0 23,746,003. 2018-04- IBRD / 85800 Prévia Open - International Assinado 2017-06-20 2017-07-13 2017-06-25 2017-07-19 2017-08-06 2017-08-23 2017-09-05 2017-10-17 2017-10-10 2017-11-16 Manutencao de Rodovias Rehabilitation and Ofertas Envelope 0 28 08 Grupo I Lotes 1 e 2 Maintenance BR-SEINFRA-BA-18669-CW- Component 2: Performance- RFB / Obras de Restauracao e based State Highway Solicitação de Single Stage - One 40,772,794.0 19,228,370. 2018-04- IBRD / 85800 Prévia Open - International Assinado 2017-06-20 2017-07-13 2017-06-25 2017-07-19 2017-08-06 2017-08-23 2017-09-05 2017-10-18 2017-10-10 2017-11-21 Manutencao de Rodovias Rehabilitation and Ofertas Envelope 0 28 08 Grupo II Lotes 1 e 2 Maintenance BR-SEINFRA-BA-18670-CW- Component 2: Performance- RFB / Obras de Restauracao e based State Highway Solicitação de Single Stage - One 42,040,996.0 24,922,606. 2018-04- IBRD / 85800 Prévia Open - International Assinado 2017-06-20 2017-07-13 2017-06-25 2017-07-19 2017-08-06 2017-08-24 2017-09-05 2017-10-17 2017-10-10 2017-11-16 Manutencao de Rodovias Rehabilitation and Ofertas Envelope 0 76 08 Grupo III Lotes 1 e 2 Maintenance BR-SEINFRA-BA-18672-CW- Component 2: Performance- RFB / Obras de Restauracao e based State Highway Solicitação de Single Stage - One 42,587,247.0 27,214,572. 2018-04- IBRD / 85800 Prévia Open - International Assinado 2017-06-20 2017-07-13 2017-06-25 2017-07-19 2017-08-06 2017-08-24 2017-09-05 2017-10-17 2017-10-10 2017-11-21 Manutencao de Rodovias Rehabilitation and Ofertas Envelope 0 61 08 Grupo IV Lotes 1 e 2 Maintenance BR-SEINFRA-BA-109160-CW- Component 2: Performance- RFP / Obras de Restauração e based State Highway Solicitação de Single Stage - One 47,043,011.0 47,365,110. 2024-08- Manutenção de Rodovias IBRD / 85800 Prévia Open - International Em Análise 2019-04-17 2019-08-07 2019-04-22 2019-09-25 2019-06-03 2019-11-13 2019-07-03 2019-12-20 2019-08-07 2020-02-17 Rehabilitation and Ofertas Envelope 0 75 05 Lote 1-Grupo VI Maintenance Lote 2 - Grupo VII BR-SEINFRA-BA-188211-CW- RFB / Obras de Melhoramentos em Estradas Vicinais de Municípios do Component 3: Feeder Road Solicitação de Single Stage - One 5,450,697.0 2021-11- IBRD / 85800 Posterior Open - National 7,291,667.00 Assinado 2020-08-10 2019-12-13 2020-08-15 2020-09-26 2020-01-31 2020-10-26 2020-03-06 2020-11-30 2020-03-31 Consórcio de Improvement Ofertas Envelope 4 25 Desenvolvimento Sustentável do Território Bacia do Paramirim (Lote 1) BR-SEINFRA-BA-188220-CW- RFB / Obras de Melhoramentos em Estradas Component 3: Feeder Road Solicitação de Single Stage - One 10,416,667.0 7,849,961.2 2021-11- Vicinais de Municípios do IBRD / 85800 Posterior Open - National Assinado 2020-08-10 2020-03-21 2020-08-15 2020-09-26 2020-05-06 2020-10-26 2020-10-06 2020-11-30 2020-10-28 Improvement Ofertas Envelope 0 1 25 Consórcio Público de Desenvolvimento Sustentável do Território do Sisal (Lote 2) BR-SEINFRA-BA-188222-CW- RFB / Obras de Melhoramentos em Estradas Vicinais de Municípios do Solicitação de Single Stage - One 5,105,403.6 2021-11- IBRD / 85800 Component 4: Road Safety Posterior Open - National 5,625,000.00 Assinado 2020-08-10 2020-07-24 2020-08-15 2020-09-26 2020-09-01 2020-10-26 2020-10-27 2020-11-30 2020-11-11 Consórcio Público de Ofertas Envelope 1 25 Desenvolvimento Sustentável do Território Bacia do Jacuípe (Lote 3) BR-SEINFRA-BA-188226-CW- RFB / Obras de Melhoramentos em Estradas Component 3: Feeder Road Solicitação de Single Stage - One 3,802,808.8 2021-11- Vicinais de Municípios do IBRD / 85800 Posterior Open - National 5,208,333.00 Assinado 2020-08-10 2020-08-02 2020-08-15 2020-09-26 2020-09-29 2020-10-26 2020-11-09 2020-11-30 2020-11-25 Improvement Ofertas Envelope 3 25 Consórcio Público de Desenvolvimento Sustentável Portal do Sertão (Lote 4) BR-SEINFRA-BA-188231-CW- Component 2: Performance- RFB / Obras de Restauração e based State Highway Solicitação de Single Stage - One 6,192,539.5 2025-12- Manutenção de Trechos de IBRD / 85800 Posterior Open - National 8,333,333.00 Assinado 2020-08-15 2020-07-24 2020-08-20 2020-10-01 2020-10-01 2020-10-31 2020-10-20 2020-12-05 2020-11-09 Rehabilitation and Ofertas Envelope 4 04 Rodovias, BA-131 a BR-407 Maintenance (Senhor do Bonfim a BR-324) BR-SEINFRA-BA-206107-CW- RFB / Obras Corredores piloto de engenharia de segurança Solicitação de Single Stage - One Implementaç 2021-11- IBRD / 85800 Component 4: Road Safety Posterior Open - National 7,572,450.00 0.00 2021-02-01 2021-02-06 2021-03-20 2021-04-19 2021-05-24 viaria para trecho de 102,7 Ofertas Envelope ão Pendente 20 Km de extensão localizado nas rodovias BA-502 e BA- 420. BR-SEINFRA-BA-206105-CW- Component 2: Performance- RFB / Restauração e based State Highway Solicitação de Single Stage - One 13,916,501.0 9,842,173.4 2022-01- Manutenção de Trecho da IBRD / 85800 Posterior Open - National Assinado 2021-04-07 2020-10-27 2021-04-12 2021-05-24 2020-11-30 2021-06-23 2020-12-10 2021-07-28 2020-12-30 Rehabilitation and Ofertas Envelope 0 6 24 Rodovia BA-001 (Itacaré- Maintenance Camamu-Valença) BR-SEINFRA-BA-246454-CW- RFB / Obras de Reabilitação e Manutenção de Rodovias Estaduais com base no Component 2: Performance- Request for Bids - desempenho, nas Rodovias BA- based State Highway Solicitação de Single Stage - Two Works (without 7,175,443.1 2022-07- 130, trecho: Entr. BA 052 – IBRD / 85800 Posterior Open - National 8,653,846.00 Assinado 2021-07-31 2021-01-06 2021-08-05 2021-09-16 2021-04-08 2021-11-29 2021-06-01 2022-01-03 2021-07-13 Rehabilitation and Ofertas Envelope prequalification) 6 02 Macajuba – Rui Barbosa – Entr. Maintenance SPD BR 242 (Zuca), extensão de 80,54 km e BA-233, trecho: Ipirá – Itaberaba, extensão de 73,33 km BR-SEINFRA-BA-246458-CW- Component 2: Performance- Request for Bids - RFB / Obras de restauração e Em fase de based State Highway Solicitação de Single Stage - One Works (without 2022-05- manutenção de trecho de IBRD / 85800 Posterior Open - National 8,269,231.00 0.00 Implementaç 2021-07-30 2021-09-01 2021-08-04 2021-09-22 2021-09-15 2021-10-15 2021-11-19 Rehabilitation and Ofertas Envelope prequalification) 18 rodovia: BA-001 (Itacaré- ão Maintenance SPD Ilhéus / Nazaré-Valença) Page 1 BR-SEINFRA-BA-254997-CW- Component 2: Performance- Request for Bids - RFB / Obras de restauração e based State Highway Solicitação de Single Stage - One Works (without Implementaç 2027-02- manutenção de trechos de IBRD / 85800 Posterior Open - National 4,807,692.00 0.00 2021-10-30 2021-11-14 2021-12-14 2022-01-13 2022-02-17 Rehabilitation and Ofertas Envelope prequalification) ão Pendente 16 rodovias: BA-290 (Alcobaça- Maintenance SPD Teixeira de Freitas) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SEINFRA-BA-55182-GO- RFB / Instalações e Solicitação de Single Stage - One Implementaçã Equipamentos de Escritório IBRD / 85800 Component 4: Road Safety Posterior Open - National 100,000.00 0.00 2018-03-21 2018-03-26 2018-05-07 2018-06-06 2018-07-11 2019-07-06 Ofertas Envelope o Pendente para Agência-Líder em Segurança Viária BR-SEINFRA-BA-206108-GO- RFB / Aquisicao de Component 5: Project Solicitação de Single Stage - One Implementaçã IBRD / 85800 Posterior Open - National 6,958.00 0.00 2016-10-21 2016-10-26 2016-12-07 2017-01-06 2017-02-10 2017-08-09 computadores para Management Ofertas Envelope o Pendente treinamento do pessoal da SIT BR-SEINFRA-BA-206100-GO- RFB / Aquisicao e Manutencao Solicitação de Single Stage - One Implementaçã IBRD / 85800 Component 4: Road Safety Posterior Open - National 500,000.00 0.00 2016-10-02 2016-10-07 2016-11-18 2016-12-18 2017-01-22 2017-07-21 de Etilometros Ativos e Ofertas Envelope o Pendente Passivos BR-SEINFRA-BA-54600-GO- RFB / Aquisição e Manutencao Solicitação de Single Stage - One IBRD / 85800 Component 4: Road Safety Posterior Open - National 500,000.00 0.00 Cancelado 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2020-12-25 de Etilômetros Ativos e Ofertas Envelope Passivos NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SEINFRA-BA-18633-NC- RFB / NCB Nº 001/2017 - Prestação de serviços de Levantamento de Condições de Superfície, Medições de Component 1: : Institutional Solicitação de Single Stage - One IBRD / 85800 Posterior Open - National 1,676,829.00 0.00 Cancelado 2017-06-19 2017-06-19 2017-07-18 2017-07-18 2017-08-07 2017-09-21 2017-09-07 2018-03-06 Deflexões Recuperáveis e Strengthening Ofertas Envelope Irregularidade Longitudinal da Superfície dos pavimentos da malha rodoviária estadual pavimentada da Bahia. BR-SEINFRA-BA-55181-NC- RFP / Implantação de Marcos Component 1: : Institutional Solicitação de Single Stage - One IBRD / 85800 Posterior Open - National 792,683.00 693,820.49 Assinado 2018-03-21 2018-07-11 2018-03-26 2018-05-07 2018-08-27 2018-06-06 2018-11-19 2018-07-11 2019-01-22 2019-07-06 Quilométricos em Toda Rede Strengthening Propostas Envelope Pavimentada BR-SEINFRA-BA-72268-NC- RFP / Projeto de Engenharia Component 3: Feeder Road Solicitação de Single Stage - One IBRD / 85800 Posterior Open - National 1,829,268.00 638,479.44 Assinado 2018-04-20 2018-08-14 2018-04-25 2018-06-06 2018-07-09 2018-07-06 2018-08-17 2018-08-10 2018-09-10 2019-08-05 para Estradas Vicinais, Grupos Improvement Propostas Envelope 1 a 4. BR-SEINFRA-BA-54598-NC- Solicitação de Single Stage - One Implementaçã IBRD / 85800 Component 4: Road Safety Posterior Open - National 1,317,707.00 0.00 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2021-06-23 RFP / para apagar. Propostas Envelope o Pendente BR-SEINFRA-BA-133558-NC- RFB / *Georreferenciamento do ativo da faixa de domínio das rodovias, bem como Solicitação de Single Stage - One realização de inventário das IBRD / 85800 Component 4: Road Safety Posterior Open - National 1,454,545.00 769,695.97 Assinado 2019-09-30 2020-03-21 2019-10-05 2019-11-16 2020-05-19 2019-12-16 2020-07-27 2020-01-20 2020-11-24 2023-01-04 Ofertas Envelope ocupações, estudos e inspeções em campo para assessorar sua gestão, monitoramento e fiscalização. BR-SEINFRA-BA-133688-NC- RFB / Pesquisa Domiciliar de Component 1: : Institutional Solicitação de Single Stage - One Campo em Trechos de IBRD / 85800 Posterior Open - National 389,610.00 201,017.06 Assinado 2019-09-23 2019-11-27 2019-09-28 2019-11-09 2020-01-09 2019-12-09 2020-02-10 2020-01-13 2020-03-21 2022-12-28 Strengthening Ofertas Envelope Estradas Vicinais – Coleta de Dados BR-SEINFRA-BA-134219-NC- RFB / Disponibilização, Instalação, Operação e Solicitação de Single Stage - One IBRD / 85800 Component 4: Road Safety Posterior Open - National 3,974,026.00 1,708,083.48 Assinado 2019-09-12 2019-08-17 2019-09-17 2019-09-18 2019-10-29 2019-10-16 2019-11-28 2019-10-16 2020-01-02 2020-02-14 2020-06-30 Manutenção de Equipamentos Ofertas Envelope Eletrônicos de Controle de Tráfego. BR-SEINFRA-BA-54596-NC- RFP / Operacionalização do Sistema de Gestão de Pavimentos(SGP): Medição de Irregularidade (IRI), de Component 1: : Institutional Solicitação de Single Stage - One Deflexão Recuperável (FWD) e IBRD / 85800 Prévia Open - National 914,634.00 0.00 Cancelado 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2023-06-13 Strengthening Propostas Envelope das Condições do Pavimento através Levantamento Visual Contínuo (LVC-DNIT PRO08/2004) ou Índice de Gravidade Global (IGG - DNIT) BR-SEINFRA-BA-206115-NC- RFB / Operacionalizaçao do Sistema de Gestao de Pavimentos(SGP): Mediçao de Irregularidade (IRI), de Component 1: : Institutional Solicitação de Single Stage - One IBRD / 85800 Posterior Open - National 914,634.00 448,311.33 Assinado 2016-10-01 2017-06-14 2016-10-06 2016-11-17 2017-07-18 2016-12-17 2017-10-02 2017-01-21 2017-12-15 2017-07-20 Deflexao Recuperável (FWD) e Strengthening Ofertas Envelope das Condições do Pavimento atraves Levantamento Visual Contínuo ou Índice de Gravidade Global Page 2 BR-SEINFRA-BA-206110-NC- RFB / Apoio à Coordenação de Component 3: Feeder Road Solicitação de Single Stage - One Vicinais na supervisão de IBRD / 85800 Posterior Open - International 994,036.00 410,659.93 Assinado 2020-06-01 2020-10-23 2020-06-06 2020-07-18 2020-12-15 2020-08-17 2021-01-13 2020-09-21 2021-03-23 2021-03-20 Improvement Ofertas Envelope obras em estradas vicinais em 64 municípíos BR-SEINFRA-BA-206106-NC- RFB / Serviços Técnicos para Projetos Básicos de Solicitação de Single Stage - One Implementaçã Engenharia de Segurança IBRD / 85800 Component 4: Road Safety Posterior Open - International 298,211.00 0.00 2021-07-30 2021-08-04 2021-09-15 2021-10-15 2021-11-19 2022-05-03 Ofertas Envelope o Pendente Viária para Trecho de 102,7 Km localizado nas rodovias BA- 502 e BA-420. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 7.179/2014 / Engineering Seleção Baseada Design and Supervision of Component 1: : Institutional IBRD / 85800 Prévia na Qualidade e Open - International 0.00 1,512,085.26 Assinado 2016-03-01 2016-04-19 Road Rehabilitation and Strengthening Custo Maintenance Works MI - 001/2017 / Manutencao do Plano Diretor de Logistica de Transportes, visando a Seleção Baseada atualizacao do conjunto de Component 1: : Institutional IBRD / 85800 Prévia na Qualidade e Open - International 2,134,146.00 0.00 Cancelado 2017-06-07 2017-06-30 2017-08-13 2017-09-10 2017-10-10 2017-11-14 2017-12-19 2018-12-19 investimentos em Strengthening Custo infraestrutura de logistica de transportes apresentado no PDLT. BR-SEINFRA-BA-18582-CS- Component 2: Performance- Seleção Baseada QCBS / Execucao de Projeto based State Highway IBRD / 85800 Prévia na Qualidade e Open - International 2,510,976.00 2,355,627.43 Assinado 2017-07-13 2017-08-03 2017-09-16 2017-10-14 2017-11-13 2017-08-10 2017-12-18 2017-11-03 2018-01-22 2017-12-15 2019-01-22 de Engenharia e Supervisao Rehabilitation and Custo das Obras do CREMA GRUPO V Maintenance BR-SEINFRA-BA-24799-CS- Component 2: Performance- Seleção Baseada QCBS / Execucao de Projeto based State Highway IBRD / 85800 Prévia na Qualidade e Open - International 2,203,480.00 1,562,872.77 Assinado 2017-08-14 2017-09-04 2017-10-18 2017-11-15 2017-07-17 2017-12-15 2018-01-19 2017-10-30 2018-02-23 2018-01-18 2021-02-07 de Engenharia e Supervisao Rehabilitation and Custo das obras do CREMA Grupo Maintenance VI BR-SEINFRA-BA-24801-CS- Component 2: Performance- LCS / Execucao de Projeto de based State Highway Seleção Baseada IBRD / 85800 Posterior Open - International 1,427,143.00 1,352,485.88 Assinado 2017-08-15 2016-10-21 2017-09-05 2017-10-19 2016-12-23 2017-11-16 2017-07-20 2017-12-16 2017-08-28 2018-01-20 2017-08-28 2018-02-24 2017-11-27 2021-02-08 Engenharia e Supervisao das Rehabilitation and no Menor Custo Obras do CREMA GRUPO VII Maintenance BR-SEINFRA-BA-24802-CS- Component 2: Performance- LCS / Execucao de Projeto de based State Highway Seleção Baseada IBRD / 85800 Posterior Open - International 1,427,241.00 490,313.16 Assinado 2017-08-15 2016-10-18 2017-09-05 2017-10-19 2016-12-23 2017-11-16 2017-07-20 2017-12-16 2017-08-18 2018-01-20 2017-09-06 2018-02-24 2017-11-27 2018-08-23 Engenharia e Supervisao das Rehabilitation and no Menor Custo Obras do CREMA - Grupo VIII Maintenance BR-SEINFRA-BA-24803-CS- Seleção Baseada QCBS / Implantacao de um Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 313,480.00 0.00 2017-09-02 2017-09-23 2017-11-06 2017-12-04 2018-01-03 2018-02-07 2018-03-14 2019-03-14 Sistema de Base de Dados de Strengthening Pendente Custo Jazidas BR-SEINFRA-BA-24805-CS- QCBS / Suporte para Seleção Baseada Implantacao de Reorganizacao Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 344,828.00 0.00 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2018-12-08 Funcional da Superintendencia Strengthening Pendente Custo de Infraestrutura de Transportes BR-SEINFRA-BA-24809-CS- QCBS / Operacionalizacao do Seleção Baseada Sistema de Gestao de Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 313,480.00 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-02 2018-02-01 2018-03-08 2018-04-12 2024-03-11 Pavimentos (SGP) - Suporte Strengthening Pendente Custo para a Gestao/Atualizacao do Sistema Informatizado BR-SEINFRA-BA-24812-CS- Seleção Baseada QCBS / Estudo para Component 1: : Institutional IBRD / 85800 Posterior na Qualidade e Open - International 407,524.00 441,892.26 Assinado 2018-01-02 2018-11-29 2018-01-23 2019-02-08 2018-03-08 2019-05-16 2018-04-05 2019-07-23 2018-05-05 2019-08-28 2018-06-09 2019-07-11 2018-07-14 2020-06-15 2019-07-09 Readequacao da Malha Strengthening Custo Ferroviaria Estadual BR-SEINFRA-BA-24819-CS- Seleção Baseada QCBS / Estudo para Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 758,621.00 0.00 2018-01-02 2018-01-23 2018-03-08 2018-04-05 2018-05-05 2018-06-09 2018-07-14 2019-07-09 Potencializacao da Ferrovia de Strengthening Pendente Custo Integracao Oeste-Leste (FIOL) BR-SEINFRA-BA-24823-CS- Seleção Baseada QCBS / Estudo para Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 344,828.00 0.00 2018-01-02 2018-01-23 2018-03-08 2018-04-05 2018-05-05 2018-06-09 2018-07-14 2019-07-09 Potencializacao de Novos Strengthening Pendente Custo Terminais BR-SEINFRA-BA-24831-CS- Component 1: : Institutional Seleção Baseada IBRD / 85800 Posterior Open - International 344,828.00 0.00 Cancelado 2017-10-01 2017-10-22 2017-12-05 2018-01-02 2018-02-01 2018-03-08 2018-04-12 2019-04-07 QCBS / Estudo sobre Strengthening na Qualidade e Biomassa Custo BR-SEINFRA-BA-24859-CS- Seleção Baseada QCBS / Estudo de Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 344,828.00 0.00 2017-08-14 2017-09-04 2017-10-18 2017-11-15 2017-12-15 2018-01-19 2018-02-23 2018-12-20 Potencialidades da Faixa de Strengthening Pendente Custo Dominio BR-SEINFRA-BA-24881-CS- QCBS / Pesquisa de Satisfacaoo dos Usuarios das Seleção Baseada Component 1: : Institutional Rodovias Estaduais com os IBRD / 85800 Posterior na Qualidade e Open - National 413,793.00 0.00 Cancelado 2017-08-14 2017-09-04 2017-10-18 2017-11-15 2017-12-15 2018-01-19 2018-02-23 2019-02-18 Strengthening Resultados a Serem Custo Publicados no Site da SEINFRA/SIT BR-SEINFRA-BA-24888-CS- QCBS / Banco de Dados sobre Seleção Baseada Seguranca Viaria e Sistema de Implementação IBRD / 85800 Component 4: Road Safety Posterior na Qualidade e Open - International 2,000,000.00 0.00 2017-08-14 2017-09-04 2017-10-18 2017-11-15 2017-12-15 2018-01-19 2018-02-23 2019-08-17 Policiamento - Re- Pendente Custo Desenvolvimento e Treinamento Page 3 BR-SEINFRA-BA-24997-CS- QCBS / Estabelecimento de Planos e Documentação para Criar Agencia Lider em Segurança Viaria / Seleção Baseada Desenvolvimento de IBRD / 85800 Component 4: Road Safety Posterior na Qualidade e Open - International 246,771.00 0.00 Cancelado 2018-06-05 2018-06-26 2018-08-09 2018-09-06 2018-10-06 2018-11-10 2018-12-15 2019-12-10 Estrategia de Longo Prazo Custo para Seguranca Viaria / Monitoramento e Auditoria dos Resultados dos Programas de Segurança Viaria BR-SEINFRA-BA-25004-CS- QCBS / Treinamento em Seleção Baseada Implementação Seguranca Viaria do Pessoal IBRD / 85800 Component 4: Road Safety Posterior na Qualidade e Open - National 300,000.00 0.00 2017-08-15 2017-09-05 2017-10-19 2017-11-16 2017-12-16 2018-01-20 2018-02-24 2019-02-19 Pendente da SIT, Policia Rodoviaria e Custo dos Municipios BR-SEINFRA-BA-25007-CS- QCBS / Execucao Projeto para Obras Corredores-Piloto Seguranca Viaria Lote 1: BA502 (Feira de Seleção Baseada Santana a BR101) Component 5: Project IBRD / 85800 Posterior na Qualidade e Open - International 651,950.00 0.00 Cancelado 2017-09-02 2020-08-28 2017-09-23 2017-11-06 2017-12-04 2018-01-03 2018-02-07 2018-03-14 2018-07-12 Lote 2: BR420 (BR324 a Sao Management Custo Felix) Lote 3 - BA262 (Vitoria da Conquista a Brumado) Lote 4 - BA-263(Conquista a Itambe) BR-SEINFRA-BA-25012-CS- Seleção Baseada QCBS / Programa de Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - National 689,655.00 0.00 2017-08-15 2017-09-05 2017-10-19 2017-11-16 2017-12-16 2018-01-20 2018-02-24 2021-02-08 Capacitacao da Consultoria Strengthening Pendente Custo do Pessoal da SEINFRA BR-SEINFRA-BA-25018-CS- Seleção Baseada Component 1: : Institutional QCBS / Pesquisa Origem- IBRD / 85800 Posterior na Qualidade e Open - International 1,137,931.00 551,452.26 Assinado 2017-09-01 2018-09-13 2017-09-22 2017-11-05 2019-01-23 2017-12-03 2019-03-28 2018-01-02 2019-04-12 2018-02-06 2019-06-05 2018-03-13 2019-09-16 2019-01-07 Strengthening Destino Ilhéus-Itabuna Custo BR-SEINFRA-BA-25019-CS- Seleção Baseada Component 1: : Institutional Implementação QCBS / Logistica Urbana IBRD / 85800 Posterior na Qualidade e Open - International 344,828.00 0.00 2018-01-02 2018-01-23 2018-03-08 2018-04-05 2018-05-05 2018-06-09 2018-07-14 2019-07-09 Strengthening Pendente Ilheus-Itabuna Custo BR-SEINFRA-BA-24995-CS- FBS / Operacionalizacao e Seleção Baseada Component 1: : Institutional Implementação Desenvolvimento do Sistema IBRD / 85800 Posterior em Orçamento Open - International 313,480.00 0.00 2017-08-15 2017-09-05 2017-10-19 2017-11-16 2017-12-16 2018-01-20 2018-02-24 2019-02-19 Strengthening Pendente de Gestao de Obras de Arte Fixo Especiais BR-SEINFRA-BA-24211-CS- Seleção Baseada QCBS / PDLT Atualizacao do Component 1: : Institutional IBRD / 85800 Posterior na Qualidade e Open - International 1,692,790.00 965,321.48 Concluído 2017-08-07 2017-04-18 2017-08-28 2017-10-11 2017-10-02 2017-11-08 2017-11-21 2017-12-08 2017-12-19 2018-01-12 2018-02-02 2018-02-16 2018-03-15 2019-02-16 2019-12-24 Plano Diretor de Logistica de Strengthening Custo Transportes BR-SEINFRA-BA-24213-CS- LCS / iRAP Levantamento, Seleção Baseada IBRD / 85800 Component 4: Road Safety Posterior Open - International 1,250,000.00 224,363.24 Assinado 2017-08-07 2015-09-29 2017-08-28 2017-10-11 2017-02-03 2017-11-08 2017-03-23 2017-12-08 2017-05-31 2018-01-12 2017-07-06 2018-02-16 2017-11-22 2018-08-15 Codificacao e Analise de 4200 no Menor Custo km BR-SEINFRA-BA-32915-CS- Component 2: Performance- QCBS / Supervisão Ambiental: Seleção Baseada based State Highway apoio à Coordenação de Meio IBRD / 85800 Prévia na Qualidade e Open - International 2,037,618.00 2,124,777.77 Assinado 2017-10-19 2019-08-27 2017-11-09 2017-12-23 2018-09-05 2018-01-20 2017-02-06 2018-02-19 2018-03-26 2019-08-27 2018-04-30 2017-09-13 2019-04-30 Rehabilitation and Ambiente nas Obras de Custo Maintenance CREMA e em Vicinais BR-SEINFRA-BA-24873-CS- CDS / Metodologia de Seleção Baseada Avaliação do Impacto Component 1: : Institutional IBRD / 85800 Posterior na Qualidade e Open - National 344,828.00 213,141.17 Assinado 2018-03-16 2018-04-25 2018-04-06 2018-05-20 2018-08-03 2018-06-17 2018-09-04 2018-07-17 2018-10-09 2018-08-21 2018-11-20 2018-09-25 2019-04-12 2019-09-25 Socioeconômico Provocado Strengthening Custo pelas Intervenções nas Estradas Vicinais BR-SEINFRA-BA-24854-CS- QCBS / Consultoria para Seleção Baseada Component 1: : Institutional Manuais Técnicos da IBRD / 85800 Posterior na Qualidade e Open - International 344,828.00 0.00 Cancelado 2017-08-14 2017-09-04 2017-10-18 2017-11-15 2017-12-15 2018-01-19 2018-02-23 2024-01-23 Strengthening Coordenacao de Meio Custo Ambiente (CMAM) BR-SEINFRA-BA-100839-CS- QCBS / Elaboração de Modelo Inter-regional de Insumo- Produto e Modelo Inter- Seleção Baseada Component 1: : Institutional Regional de Equilíbrio Geral IBRD / 85800 Posterior na Qualidade e Open - National 439,338.00 0.00 Cancelado 2019-02-14 2019-01-31 2019-03-07 2019-03-14 2019-04-20 2019-04-24 2019-05-18 2019-06-03 2019-06-17 2019-06-18 2019-07-22 2019-08-06 2019-08-26 2020-08-25 Strengthening Computável (IEGC) para Custo Avaliação dos Impactos em Investimentos em Transportes no Estado da Bahia BR-SEINFRA-BA-107102-CS- Component 2: Performance- Seleção Baseada QCBS / Execução de Projeto based State Highway IBRD / 85800 Prévia na Qualidade e Open - International 1,893,838.00 1,066,813.44 Em Análise 2019-03-31 2020-11-12 2019-04-21 2019-06-04 2020-12-02 2019-07-02 2015-05-25 2019-08-01 2021-04-15 2019-09-05 2021-08-06 2019-10-10 2016-04-19 2020-10-09 de Engenharia e Supervisão Rehabilitation and Custo das Obras do CREMA, GRUPO Maintenance IV BR-SEINFRA-BA-24212-CS- Seleção Baseada QCBS / Manutenção do Plano Component 1: : Institutional IBRD / 85800 Posterior na Qualidade e Open - National 2,385,686.00 1,865,182.77 Assinado 2020-09-11 2020-12-08 2020-10-02 2021-02-09 2020-11-15 2021-04-20 2020-12-13 2021-06-14 2021-01-12 2021-07-12 2021-02-16 2021-08-03 2021-03-23 2021-09-15 2024-03-07 Diretor de Logística de Strengthening Custo Transportes (PDLT) BR-SEINFRA-BA-206096-CS- QCBS / Estudo de viabilidade Seleção Baseada Component 1: : Institutional Implementação para a duplicacao da Linha IBRD / 85800 Posterior na Qualidade e Open - International 397,614.00 0.00 2020-10-01 2020-10-22 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 Strengthening Pendente Verde com implantacao de Custo nova praça de pedagio BR-SEINFRA-BA-206111-CS- QCBS / Atualizacao da Seleção Baseada pesquisa OD na regiao Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - National 1,192,843.00 0.00 2020-10-01 2020-10-22 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-04-12 metropolitana de Salvador e Strengthening Pendente Custo avaliacao de impacto da implantação do metro Page 4 BR-SEINFRA-BA-206097-CS- Seleção Baseada QCBS / Estudo logistico de Component 1: : Institutional Implementação IBRD / 85800 Posterior na Qualidade e Open - International 397,614.00 0.00 2021-05-01 2021-05-22 2021-07-05 2021-08-02 2021-09-01 2021-10-06 2021-11-10 2022-11-10 preparaçao para um possivel Strengthening Pendente Custo PREMAR 3 BR-SEINFRA-BA-25000-CS- Seleção Baseada CQS / Auditoria / Fiscalizacao IBRD / 85800 Component 4: Road Safety Posterior nas Qualificações Open - International 50,000.00 0.00 Cancelado 2017-11-02 2017-11-23 2018-01-06 2018-02-05 2018-03-12 2020-08-28 para Obras dos Corredores- dos Consultores Piloto de Segurança Viaria BR-SEINFRA-BA-206092-CS- QCBS / Execução de Projeto Component 2: Performance- Seleção Baseada de Engenharia e Supervisao based State Highway Implementação IBRD / 85800 Prévia na Qualidade e Open - International 1,053,678.00 0.00 2014-08-21 2014-09-11 2014-10-25 2014-11-22 2014-12-22 2015-01-26 2015-03-02 2016-03-01 das Obras do CREMA, Grupo I Rehabilitation and Pendente Custo (processado e contratado Maintenance antes do uso do STEP) BR-SEINFRA-BA-206095-CS- QCBS / Execução de Projeto Component 2: Performance- Seleção Baseada de Engenharia e Supervisão based State Highway Implementação IBRD / 85800 Prévia na Qualidade e Open - International 1,510,934.00 0.00 2014-08-21 2014-09-11 2014-10-25 2014-11-22 2014-12-22 2015-01-26 2015-03-02 2016-03-01 das Obras do CREMA, Grupo Rehabilitation and Pendente Custo III (processado e contratado Maintenance antes do uso do STEP) BR-SEINFRA-BA-234228-CS- Component 2: Performance- Seleção Baseada QCBS / Execução de Projeto based State Highway Em fase de IBRD / 85800 Posterior na Qualidade e Open - National 1,033,797.00 0.00 2021-05-11 2015-03-24 2021-06-01 2021-07-15 2021-08-12 2021-09-11 2021-10-16 2021-11-20 2022-11-20 de Engenharia e Supervisão Rehabilitation and Implementação Custo das Obras do CREMA, Grupo II Maintenance BR-SEINFRA-BA-206094-CS- QCBS / Execução de Projeto Component 2: Performance- Seleção Baseada de Engenharia e Supervisao based State Highway IBRD / 85800 Prévia na Qualidade e Open - International 1,033,797.00 0.00 Cancelado 2014-08-21 2014-09-11 2014-10-25 2014-11-22 2014-12-22 2015-01-26 2015-03-02 2016-03-01 das Obras do CREMA Grupo II Rehabilitation and Custo (processado e contratado Maintenance antes do uso do STEP) BR-SEINFRA-BA-234212-CS- LCS / Atualização da Pesquisa Origem-Destino na Região Component 1: : Institutional Seleção Baseada Em fase de IBRD / 85800 Prévia Open - National 2,115,843.87 0.00 2021-05-17 2021-07-13 2021-06-01 2021-08-30 2021-07-05 2021-08-02 2021-09-01 2021-09-27 2021-11-01 2023-01-25 Metropolitana de Salvador e Strengthening no Menor Custo Implementação avaliação de impacto da implantação do metrô. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SEINFRA-BA-25022-CS- INDV / Reforço da Diretoria de Component 3: Feeder Road IBRD / 85800 Posterior Individual Limited 192,000.00 0.00 Cancelado 2017-10-02 2017-10-07 2017-10-28 2017-12-02 2019-11-22 Construcoes e Manutencao - Improvement Apoio as Obras Vicinais BR-SEINFRA-BA-25023-CS- INDV / Estabelecimento do Component 1: : Institutional Implementação IBRD / 85800 Posterior Individual Open 10,282.00 0.00 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2018-06-13 Regimento do Fundo Strengthening Pendente Rodoviario BR-SEINFRA-BA-25024-CS- INDV / Reforço da Diretoria de Component 3: Feeder Road IBRD / 85800 Posterior Individual Open 192,267.00 0.00 Cancelado 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2019-12-06 Construcoes e Manutencao - Improvement Apoio Vicinais BR-SEINFRA-BA-25025-CS- Component 2: Performance- INDV / Biologo para Reforco based State Highway IBRD / 85800 Posterior Individual Open 96,000.00 73,388.15 Assinado 2017-11-01 2018-04-26 2017-12-20 2018-05-09 2018-01-10 2018-06-05 2018-02-14 2018-06-19 2019-02-09 da Coordenacao de Meio Rehabilitation and Ambiente Maintenance BR-SEINFRA-BA-25026-CS- INDV / Estatistico para IBRD / 85800 Component 4: Road Safety Posterior Individual Open 96,000.00 0.00 Cancelado 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2018-12-10 Reforco da Diretoria de Operacoes e Trafego BR-SEINFRA-BA-25027-CS- Component 2: Performance- INDV / Auditoria Tecnica da based State Highway PPP-CREMA, apoio a AGERBA IBRD / 85800 Posterior Individual Open 192,000.00 0.00 Cancelado 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2019-12-05 Rehabilitation and e SEINFRA na execucao do Maintenance contrato BR-SEINFRA-BA-25028-CS- INDV / Especialista em Procedimentos e Controles Component 5: Project IBRD / 85800 Posterior Individual Open 84,639.00 0.00 Cancelado 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2018-12-10 Internos para Reforco do Management Gabinete da Superinetencia de Infraestrutura de Transportes BR-SEINFRA-BA-25029-CS- INDV / Estudo de Longo Prazo Component 1: : Institutional Implementação IBRD / 85800 Posterior Individual Open 25,705.00 0.00 2017-09-01 2017-10-20 2017-11-10 2017-12-15 2018-12-10 para Estruturacao do Fundo Strengthening Pendente Rodoviario BR-SEINFRA-BA-24800-CS- CDS / iRAP - Controle e Auditoria dos Processos de Seleção Direta de Em fase de IBRD / 85800 Component 4: Road Safety Posterior Direct 156,740.00 0.00 2017-08-14 2017-12-06 2017-08-24 2017-05-18 2017-10-28 2018-10-23 Levantamento, Analise e Consultores Implementação Codificacao de Seguranca Viaria BR-SEINFRA-BA-54437-CS- INDV / Reforço da Component 1: : Institutional Coordenação de Meio IBRD / 85800 Posterior Individual Open 106,707.00 0.00 Cancelado 2018-05-07 2018-06-25 2018-07-16 2018-08-20 2019-02-16 Strengthening Ambiente (CMAM) - Manuais Técnicos BR-SEINFRA-BA-72579-CS- Component 2: Performance- INDV / Especialista em based State Highway Pavimentação para Apoio à IBRD / 85800 Posterior Individual Open 272,317.00 284,327.49 Assinado 2018-08-02 2015-06-26 2018-09-20 2015-10-21 2018-10-11 2015-10-23 2018-11-15 2016-06-17 2019-11-10 Rehabilitation and Diretoria de Projetos e Maintenance Programas Especiais (DPPE)* Page 5 BR-SEINFRA-BA-72588-CS- Component 2: Performance- INDV / Especialista em based State Highway Terraplanagem para Apoio à IBRD / 85800 Posterior Individual Open 272,317.00 64,756.90 Concluído 2018-08-02 2015-04-20 2018-09-20 2015-07-01 2018-10-11 2016-06-10 2018-11-15 2016-06-14 2019-11-10 2018-06-13 Rehabilitation and Diretoria de Projetos e Maintenance Programas Especiais (DPPE)* Component 2: Performance- BR-SEINFRA-BA-72589-CS- based State Highway INDV / Especialista em IBRD / 85800 Posterior Individual Open 155,610.00 54,119.12 Concluído 2018-08-02 2016-05-16 2018-09-20 2016-11-30 2018-10-11 2016-12-28 2018-11-15 2017-02-14 2019-11-10 2019-02-11 Rehabilitation and Orçamento* Maintenance BR-SEINFRA-BA-72590-CS- INDV / Técnico em Apoio Component 5: Project IBRD / 85800 Posterior Individual Open 93,366.00 51,635.46 Assinado 2018-08-02 2015-05-29 2018-09-20 2015-07-05 2018-10-11 2015-07-23 2018-11-15 2016-06-14 2019-11-10 Financeiro para a Unidade de Management Coordenação do Projeto (UCP)* BR-SEINFRA-BA-72594-CS- Component 2: Performance- INDV / Reforço para Diretoria based State Highway de Construção e Manutenção IBRD / 85800 Posterior Individual Open 259,350.00 229,482.24 Assinado 2018-08-02 2017-09-27 2018-09-20 2017-10-09 2018-10-11 2017-10-17 2018-11-15 2017-11-13 2020-11-14 Rehabilitation and (DCM) e Apoio às Obras Maintenance CREMA* BR-SEINFRA-BA-72597-CS- INDV / Apoio à Unidade de Component 3: Feeder Road Coordenação do Projeto (UCP) IBRD / 85800 Posterior Individual Open 350,000.00 0.00 Cancelado 2018-08-02 2018-09-20 2018-10-11 2018-11-15 2020-11-14 Improvement na Gestão do Componente Vicinais* BR-SEINFRA-BA-72601-CS- INDV / Reforço da Diretoria de Component 3: Feeder Road Construções e Manutenção IBRD / 85800 Posterior Individual Open 103,740.00 89,236.50 Assinado 2018-08-02 2017-08-21 2018-09-20 2017-10-23 2018-10-11 2017-11-06 2018-11-15 2017-11-30 2019-11-10 Improvement (DCM) e Apoio Obras nas Vicinais, consultor 01* BR-SEINFRA-BA-72603-CS- INDV / Reforço da Diretoria de Component 3: Feeder Road Construções e Manutenção e IBRD / 85800 Posterior Individual Open 103,740.00 80,296.42 Assinado 2018-08-02 2017-08-21 2018-09-20 2017-10-20 2018-10-11 2017-11-06 2018-11-15 2017-11-30 2019-11-10 Improvement Apoio às Obras em Vicinais, Consultor 02* BR-SEINFRA-BA-72605-CS- INDV / Reforço da Diretoria de Component 3: Feeder Road Construções e Manutenção e IBRD / 85800 Posterior Individual Open 103,740.00 60,961.62 Assinado 2018-08-02 2017-08-21 2018-09-20 2017-10-23 2018-10-11 2017-11-06 2018-11-15 2017-11-27 2019-11-10 Improvement Apoio às Obras em Vicinais, Consultor 03* BR-SEINFRA-BA-72608-CS- INDV / Especialista em IBRD / 85800 Component 4: Road Safety Posterior Individual Open 165,984.00 131,455.79 Assinado 2018-08-02 2017-02-02 2018-09-20 2017-03-03 2018-10-11 2017-03-31 2018-11-15 2017-04-12 2019-11-15 Segurança Viária* BR-SEINFRA-BA-72733-CS- Component 5: Project IBRD / 85800 Posterior Individual Open 38,902.00 30,815.12 Concluído 2018-08-03 2016-07-20 2018-09-21 2016-08-03 2018-10-12 2016-08-04 2018-11-16 2016-11-10 2019-11-16 2017-12-10 INDV / Tradutor* Management BR-SEINFRA-BA-72736-CS- INDV / Especialista em Aquisições para Reforço à Component 5: Project IBRD / 85800 Posterior Individual Open 70,024.00 31,644.60 Rescindido 2018-08-03 2016-06-06 2018-09-21 2016-06-16 2018-10-12 2016-11-04 2018-11-16 2016-11-09 2021-11-15 Unidade de Coordenação do Management Projeto (UCP) e Comissão Permanente de Licitação(CPL)* BR-SEINFRA-BA-72737-CS- INDV / Especialista em Component 5: Project Procedimentos e Controles IBRD / 85800 Posterior Individual Open 114,114.00 107,676.51 Concluído 2018-08-03 2017-06-06 2018-09-21 2017-08-15 2018-10-12 2017-09-21 2018-11-16 2017-10-09 2020-11-15 2020-10-08 Management Internos para Reforço do Gabinete da SIT* BR-SEINFRA-BA-72739-CS- INDV / Especialista em Controles de Projetos Component 5: Project Técnicos de IBRD / 85800 Posterior Individual Open 129,675.00 72,732.62 Concluído 2018-08-03 2018-01-22 2018-09-21 2018-02-20 2018-10-12 2018-05-08 2018-11-16 2018-05-25 2019-11-11 2019-12-25 Management Engenharia(contratações e pagamentos) pra Reforço do Gabinete da SIT* BR-SEINFRA-BA-72740-CS- INDV / Especialista em Component 3: Feeder Road Em fase de IBRD / 85800 Posterior Individual Open 77,805.00 0.00 2018-08-03 2018-04-26 2018-09-21 2018-10-12 2018-11-16 2019-11-11 Drenagem, para Reforço da Improvement Implementação DPPE* BR-SEINFRA-BA-72741-CS- INDV / Consultor em IBRD / 85800 Component 4: Road Safety Posterior Individual Open 38,967.00 36,553.78 Concluído 2018-08-03 2018-05-22 2018-09-21 2018-05-29 2018-10-12 2018-06-27 2018-11-16 2018-07-09 2019-11-11 2019-07-09 Segurança Viária / Gestão e Operação de Tráfego BR-SEINFRA-BA-73490-CS- Component 2: Performance- INDV / Especialista Social para based State Highway IBRD / 85800 Posterior Individual Open 96,000.00 112,657.84 Assinado 2018-08-09 2018-05-21 2018-09-27 2018-05-29 2018-10-18 2018-07-03 2018-11-22 2018-07-11 2019-11-22 reforço da Coordenação de Rehabilitation and Meio Ambiente (CMAM)* Maintenance BR-SEINFRA-BA-109141-CS- CDS / Reforço Técnico da Component 5: Project Seleção Direta de IBRD / 85800 Prévia Direct 466,129.00 441,406.59 Assinado 2019-04-04 2019-04-14 2015-05-04 2019-06-18 2015-06-11 2021-06-17 Unidade de Coordenação do Management Consultores Projeto (UCP)* BR-SEINFRA-BA-72731-CS- INDV / Reforço Técnico da Component 5: Project IBRD / 85800 Prévia Individual Open 466,129.00 0.00 Cancelado 2018-08-03 2018-09-21 2018-10-12 2018-11-16 2022-11-15 Unidade de Coordenação do Management Projeto (UCP)* BR-SEINFRA-BA-86332-CS- Component 2: Performance- INDV / Auditoria Técnica da based State Highway PPP-CREMA e apoio à AGERBA IBRD / 85800 Posterior Individual Open 192,000.00 80,764.87 Assinado 2018-11-08 2019-05-06 2018-12-27 2019-07-31 2019-01-17 2019-08-02 2019-02-21 2019-10-07 2021-02-10 Rehabilitation and e SEINFRA na Execução do Maintenance Contrato BR-SEINFRA-BA-72738-CS- INDV / Elaboração de Manuais Component 1: : Institutional Técnicos em Reforço para a IBRD / 85800 Posterior Individual Open 90,772.00 0.00 Cancelado 2018-08-03 2018-09-21 2018-10-12 2018-11-16 2019-11-11 Strengthening Coordenação de Meio Ambiente (CMAM)* Page 6 BR-SEINFRA-BA-134216-CS- INDV / Consultor para Apoio à Component 3: Feeder Road Unidade de Coordenação do IBRD / 85800 Posterior Individual Open 350,527.00 220,915.29 Assinado 2019-09-11 2016-07-20 2019-10-30 2016-07-06 2019-11-20 2016-07-29 2019-12-25 2016-10-03 2020-12-19 Improvement Programa (UCP) na Gestão do Componente Vicinais BR-SEINFRA-BA-134775-CS- Component 2: Performance- INDV / Especialista Social para based State Highway reforço da Coordenação de IBRD / 85800 Posterior Individual Open 77,992.00 36,479.38 Rescindido 2019-09-17 2016-08-16 2019-11-05 2016-08-26 2019-11-26 2016-08-26 2019-12-31 2016-11-24 2020-12-30 Rehabilitation and Meio Ambiente (CMAM), Maintenance primeira contratação. BR-SEINFRA-BA-188209-CS- INDV / Gestão de Segurança Viária: estabelecimento de planos e documentação para criar agência líder, IBRD / 85800 Component 4: Road Safety Posterior Individual Open 62,500.00 39,091.88 Assinado 2020-08-10 2020-02-19 2020-09-28 2020-02-19 2020-10-19 2020-02-26 2020-11-23 2020-04-23 2021-07-21 desenvolvimento de estratégia de longo prazo, monitoramento e auditoria dos resultados dos programas de segurança viária BR-SEINFRA-BA-188240-CS- INDV / Auditoria e Implementação Fiscalização para Obras no IBRD / 85800 Component 4: Road Safety Posterior Individual Open 31,250.00 0.00 2021-03-01 2021-04-19 2021-05-10 2021-06-14 2023-06-14 Pendente Corredor-Piloto em Segurança Viária BR-SEINFRA-BA-225527-CS- INDV / Consultor Social para realizar consultas para a retomada e atualização do Component 2: Performance- PPIQ da BA-210, Trecho BR- based State Highway IBRD / 85800 Posterior Individual Open 60,000.00 0.00 Em Análise 2021-04-02 2021-05-30 2021-05-21 2021-06-11 2021-07-16 2022-07-16 110 (p/ Paulo Afonso)/Acesso Rehabilitation and à Barragem de Itaparica / Maintenance Rodelas/ Barra do Tarrachil / Abaré / BR-116 (acesso Ibó) Curaçá/ Juazeiro BR-SEINFRA-BA-225530-CS- INDV / Consultor de apoio Component 2: Performance- socioambiental para based State Highway Em fase de IBRD / 85800 Posterior Individual Open 60,000.00 0.00 2021-04-02 2021-04-06 2021-05-21 2021-04-28 2021-06-11 2021-06-22 2021-07-16 2022-07-16 finalização do PREMAR2 e Rehabilitation and Implementação estruturação do novo Maintenance financiamento. BR-SEINFRA-BA-250078-CS- INDV / Assessoramento técnico e de gestão para Component 5: Project IBRD / 85800 Posterior Individual Open 97,784.00 0.00 Em Análise 2021-08-24 2021-08-01 2021-10-12 2021-11-02 2021-12-07 2022-06-05 estruturação do novo Management programa de empréstimo junto ao Banco Mundial. BR-SEINFRA-BA-251703-CS- INDV / Gestão e atualização Component 5: Project Em fase de do Sistema de IBRD / 85800 Posterior Individual Open 5,769.23 0.00 2021-09-02 2021-08-31 2021-10-21 2021-11-11 2021-12-16 2022-06-14 Management Implementação Acompanhamento de Aquisições (STEP) Page 7