International Bank for Reconstruction and Development MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of January 31, 1981) SecM81-94 FROM: Vice President and Secretary February \2, 1981 I CONTENTS Section I. - Eastern Africa 1 13 - II, - Western Africa 14 27 - III, East Asia and Pacific 28 37 - IV, - South Asia 38 - 46 V, Europe, Middle East and North Africa 47 60 VI, Latin America and Caribbean 61 - 76 VII, New Projects 77 - 78 Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency !./ Lender'!:_/ Procurement!!._/ I, EASTERN AFRICA BOTSWANA (BOTSWANA 10.0 Development Finance Company II - To Awaiting utilization of DEVELOPMENT (Bank) assist promotion of medium and small funds in first loan, CORPORATION) scale industrial enterprises. (BOTSWANA 15.0 Power I (Coal) - Construction of Project preparation POWER (Bank) 90 MW Pithead power station at underway. (Co-financing CORPORATION) Morupule, and transmission lines. being sought,) Project cost (excluding infrastruc- ture) estimated at $170 million, with foreign exchange component of about $110 million. Ministry of 17.0 (R) Roads V - Construction of the Dumela- Approved by the Executive Works and (Bank) Limbabwe Borders and the Selebi-Phikwe- Directors on January 6. Communications Sefaphe Roads to bituminous paved Loan signing on February 6, standards, and spot improvements to about 150 km of roads in the Tuli Block Area; construction of Roads Department Soils Laboratory and Maintenance Depots, and variety of consulting services to Roads Department. Project cost esti- mated at $23.0 million. Ministry of 12.0 (R) Education III - Assistance for pri- Appraisal tentatively Education (Bank) mary and secondary education. Total scheduled for March, project cost to be determined. (WATER UTILITIES 7.0 Water Supply III - Assistance for Project identification CORPORATION) (Bank) raising the Gaberone Dam to meet under way. Gaberone's future water supply requirements, Total project cost to be determined. !./ If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given, If the Government is not the borrower, the borrower's name is given in capital letters in parentheses, 2/ The amount is in millions of U,S, dollars and is approximate and tentative. "J..! The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since t 1• • last issue of the Summary. Section VII of the Summary contains a recapitulation of the new'projects listed in this issue, This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA, Distribution: Executive Directors and Alternates President Senior Vice Presidents President's Council Vice Presidents, IFC Directors and Department Heads, Bank·and IFC - 2 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:_/ Project 3/ Procurement!!_/ BURUNDI Ministry of About Kirimiro Rural Development - Inte- Appraisal report being Agriculture 15.0 grated rural development (food, crops, prepared. IDA Project and Livestock (IDA) coffee, rural services) in about Preparation Facility 6 communes in the Kirimiro region; Advance of $360,000 extension services to increase pro- approved to finance the duction of cash crops and foodcrops; purchase of vehicles and provision of agricultural inputs; equipment, construction improvement of marketing and social of buildings, recruitment infrastructure. Total project cost of staff and technical to be determined. assistance to speed up the project start-up. Ministry of About (R) Integrated Rural Development II/Ngozi Negotiations tentatively Agriculture 15.0 III - Continuation of coffee improve- scheduled for March, (IDA) ment program and development of (Cofinancing with Kuwait foodcrops in context of an integrated Fund being explored.) rural development of the Ngozi-Muyinga region. Total project cost estimated at $28.9 million. Ministry About (R) Highway III - Construction of first Negotiations tentatively scheduled of Public 25.0 section of Ngozi-Kobero road (about for March. IDA Project Preparation Works and (IDA) 39 km) and continuation of road main- Facility advance of $1,000,000 Equipment tenance. Total project cost for first approved to complete preparation section estimated at $32.1 million. of project. (Co-financing agreed in principle with Belgium, France, Japan, UNDP and AGCD.) Ministry of About (R) Local Construction Industry - Appraisal report being Energy and 5.0 Promotion of local construction prepared. Mines (IDA) industry. Total project cost estimated at $6.1 million. Ministry of About (R) Water Supply II - Rehabilitation Project identification Rural 10.0 of 48 rural aqueducts. Total project underway. Development (IDA) cost to be determined. Regie de produc- About (R) Rwegura Hydroelectric Power - Con- Appraisal mission tion et distri- 28.0 struction of a hydroelectric plant. scheduled for August. bution d'eau et (IDA) Total project cost estimated at (Co-financing with d'electricite $50.0 million. Germany possible.) (REGIDESO) Ministry of About (R) Nickel exploration - Preliminary Appraisal report being Energy and 3.0 studies on a nickel project. prepared. Mines (IDA) (Cofinancing with Finland being explored.) COMOROS Ministry of About (R) Education - Primary education improve- Appraisal mission in the Education 5.0 ment curriculum development including field, (IDA) provision of textbooks; training of teachers, health personnel and civil servants, Project based on UNESCO study. Total project cost estimated at $5.5 million. Ministry of About (R) Highways II - Continuation of Appraisal report being prepared, Equipment and 7.0 road maintenance and improvement (Co-financing with AfDB and Environment (IDA) program started under first OPEC Fund being explored,) highway project, See page 1 for footnotes, - 3 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender II Procurement'!._/ DJIBOUTI Ministry of About Technical Assistance, Techn-ical Project under preparation, Finance and 3,0 assistance in planning, and project (Co-financing being Economy (IDA) preparation and evaluation. explored with UNDP,) Ministry of About (R) Strengthening the Road Maintenance Project preparation Public Works 4.0 Capability of Ministry of Public underway. (IDA) Works. ETHIOPIA Ministry of 40.0 (R) Agricultural Minimum Package Project Credit signing on February 2, Agriculture (IDA) II - Two year support for expansion (Co-financing with SIDA and intensification of integrated and !FAD agreed,) agricultural services, including construction of rural roads; seed multiplication program; the provision of training facilities for peasant associations, Total project cost $71,1 million, excluding taxes and duties, of which $29.9 million foreign exchange, Addis Ababa To be Addis Ababa Water Supply II - Further Project preparation I 1·· Water & Sewer.,- deter- expansion of the water supply system underway,· age Authority' mined of Addis Ababa·. l (AAWSA) (IDA) I Livestock and Meat Board To be deter- Livestock Development and Marketing - A sector credit for further livestock Preparation report to be revised on completion of I (LMB) mined development, Government's comprehensive (IDA) review of livestock sector. Ministry of 32.0 (R) Education V - Support of primary, Negotiations tentatively I ' Education (IDA) secondary and non-formal education. scheduled for February/ March, I ' Ministry of To be Urban Development I - Upgrading of Apprais·al report under Pub'lic Works deter- existing settlements in Addis Ababa review. & Housing mined with basic services and house improve- (IDA) ment loans and development of new sites for self-help housing construction. Ethiopian To be Power III - Electric transmission and Preparation work Electric Light deter- possibly hydroelectric generation underway by EELPA, and Power mined facilities, to be assisted by Authority (IDA) Consultants, (EELPA) AIDB/Hasida To be DFC IV - Provision of credit and tech- Appraisal report being deter- nical assistance to small-scale enter- prepared, mined prises, and possible assistance to (IDA) the agricultural and industrial sector, through the Agricultural and Industrial Development Bank for medium- to large-scale enterprises, Ethiopian To be Roads VIII - Second phase of Preparation underway in Roads deter- 1978/82 Road Sector Program, course of ·supervision of Authority mined Roads VII, (ERA) (IDA) Ministry of To be Coffee Processing II - Second phase Project preparation Agriculture deter- of the ongoing coffee processing underway, mined project, (IDA) See page 1 for footnotes, - 4- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender~/. Procurement!!_/ KENYA Ministries of 25 ,0 (R) Industry I - Soda Ash Project. Expan- Preappraisal mission scheduled Commerce and (Bank) sion of soda ash production and for mid-February, Industry/Kenya improved railway and port facilities, Port Authority Ministry of 40,0 Population II - Support for family Appraisal report under preparation, Health (IDA) planning and rural integrated health (Co-financing being arranged programs. Estimated total project with SIDA, ODA, UNFPA, DANIDA, cost $120,0 million, of which $36.0 USAID, UNICEF and Dutch million in foreign exchange. Government,) ·Ministry of 25,0 Agricultural Credit IV - Institutional Appra~sal report under Agriculture (Bank) strengthening in areas of planning, review. and Agricul- 10,0 credit management and training; and tural Finance (IDA) line of credit to Agricultural Corporation Finance Corporation. Estimated total _project cost $50,0 million, Ministry of 31.0 Cotton Processing and Marketing Appraisal report under Agriculture (IDA) Marketing, storage and processing preparation, of cotton, Total cost estimated at $45.l million, of which $35.0 million in·foreign exchange. Ministries of 35,0 (R) Industry II - Leather Production· Identification/Preparation Commerce and (Bank) Project. Processing of hides and mission scheduled for Industry production of leather goods, February.· Ministry of 50,0 (R) Urban Transpo~t - Improvement of Appraisal report under Urban Develop- (Bank) public transport and pedestrian preparation. ment and Housing facilities, road maintenance, and strengthening of transport manage- ment in Nairobi and Mombasa. Total, project cost estimated at $48'.3 million. Ministry of 40.0 (R) Urban (Small Towns) - Extension Preappraisal mission Urban Develop- (Bank) of urban development programs to scheduled for February. ment and Housing smaller towns. Ministry of 40,0 (R) Education V - Higher technical and Negotiations substantially Basic (IDA~ agricultural education and skill completed. Education training. Total cost estimated at $55.0 million, of which $25.5 million in foreign exchange, (KENYA 40,0 (R) IDB V/Small-Scale Enterprise II - Fifth Project under preparation. INDUSTRIAL (Bank) line of credit to IDB and small-scale ESTATES) and 33,5 industries credit to Kenya Industrial (INPUSTRIAL (IDA) Estates/Commercial Banks, !)EVELOPMENT BANK) Ministry of 58.0 Railways I - Improvements to track Board presentation tentatively Transport and (Bank) standards, railway operations and scheduled for early March. Communica- maintenance, increased transport (Co-financing arranged with tions; Kenya capacity, studies and training. KfW and AfDB,) Railways Total cost estimated at $142.1 million, of which $88,3 million in foreign exchange. Ministry 60,0 (R) Forestry III - Maintenance and Appraisal report being of Environ- (Bank) rehabilitation of existing planta- prepared, (Co-financing ment and 15,0 tions, new industrial plantations, being explored with Swiss Aid Natural (IDA) fuelwood plantations, development and Government of Finland,) Resources of sawmilling industry, and various studies. Total project cost esti- mated at $140 million. See page 1 for footnotes, - 5 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'l._/ Procurement!:_/ KENYA (Cont'd) Ministry 5.0 (R). Petroleum Exploration Promotion: Appraisal teritatively scheduled of Energy (Bank) Would provide technical assistance for May. in petroleum exploration and for legal consultants. Ministry of ss.o Grain Marketing and Storage. Project preparation underway. Agriculture (IDA) (TANA RIVER 60.0 Power IV (Kiambere): Scope and Project preparation underway. DEVELOPMENT (Bank) content still to be identified. (Co-financing being explored COMPANY) ·Total project cost estimated at with AfDB, EEC, CDC and SIDA.) $306.0 million. LESOTHO Ministry of ·10.0 (R) Education III - Provision of primary Appraisal report being prepared. Education (IDA) class~ooms with furniture and equip- ment; supply of textbooks for all primary children in five core subjects; upgrading and expansion of two or three junior vocational schools; funds for pre-investment studies and for evaluation purposes. Total project cost estimated at $16.0 million. . 10.0 Project identification I i' Ministries of Works, and Transport and (IDA) (N) Highways IV - Continuation of road maintenance and rehabilitation begun under Third Roads Project. underway. Communications Possible assistance for construction of,Oxbow-Mokhotlong road. MADAGASCAR Ministries of About Fokonolona I (Rural Development)~ Project under preparation by Rural Develop- 12.0 Medium and long-term credit to smal.l ·Government. ment; Finance (IDA) farmers and artisans; rural develop- and Planning ment fund to finance village-~evel infrastructure, such as irrigation systems, feeder roads, collecti.ve storage facilities, and village water supply systems; training; and estab- lishment of central project manage- ment unit. Ministry 20.0 Forestry II - Follow-up on Forestry I; Appraisal report being of Rural (IDA) planting of 18,000 ha over a 3-year reviewed. (Co-financing Development period. Total cost estimated at being explored with BADEA $30.2 million. and UNDP.) Ministry of About Urban Development Antananarivo - Project preparation underway. Finance and 20.0 Low cost housing, artisan indu~tries, Consultants for studies have been Plan, Industrial (IDA) urban transport, technical assis- selected. Barik is executing Bank and Munici- tance and training. agency for UNDP-financed pality of study. Antananarivo Ministries of 2.3 (R) Plain of Antananarivo - Engineering Credit signed on January 30. Rural Develop- (IDA) studies on flood control and drainage. ment; Finance Total project cost is $2.9 million. and Planning See page 1 for footnotes. - 6 - Member Country, and Borrower or Amount & Stage· of Process- Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement~/ MADAGASCAR (Cont'd) Ministry of About Livestock III - Extension of veteri- Appraisal report being prepared. Rural Develop- 15.0 nary services to the whole Mahajunga (Co-financing with IFAD and Japari ment (IDA) Faritany, including development of being explored.) social and road infrastructure; pilot component of integrated mixed farming and cattle fattening. Total project cost estimated at $20-$30 million. Ministries of About (R) Lac Alaotra II, Irrigation - Appraisal mission postponed Rural Develop- 20,0 Intensification of cultivation in until August pending completion ment; Finance (IDA) Lac Alaotra area (mainiy rice). of preparation. and Planning Includes seed production, marketing, irrigation maintenance, extension, and assistance to SOMALAC. Ministry of About (R) Audit/accounting - Assistance Appraisal report under Economy and 11.5 in establishing national review. Commerce, (IDA) auditing company and associated and RINDRA training. Total project cost (Malagasy estimated at $14.l million. Auditing Firm) Ministry About Middlewest Mixed Farming - Integrated Project under preparation. of Rural 20.0 mixed farming development. (Co-financing likely to be Development (IDA) required.) Ministry 25.0 Highways VI - Highway construction Project being identified. of Public (IDA) and maintenance. Works Office Militaire About Petroleum II - Further development Appraisal mission ten- National pour 20.0 of the petroleum sector, including tatively scheduled for les Industries (IDA) financing of a feasibility study April. Strategiques for heavy oil in Tsimiroro. Total (OMNIS) project cost to be determined. Ministry of About (N) Agricultural services for rice Appraisal mission Rural 10.0 sub-sector, including research, scheduled for March. Development (IDA) seed multiplication, extension services and marketing. MALAWI Department of 20.0 Water Supply II - Possible expansion Project under preparation. Lands, Valuation (Bank/ of water supply facilities for City and Water; IDA) of Lilongwe. Office of the President and Cabinet Ministry of 33.0 (R) Highways IV - Construction of sections Board presentation on Works and (IDA) of Jenda-Mzuzu-Ekwendeni Road, further February 3. · · · Supplies extension of district roads maintenance program, facilities for training semi-skilled Ministry of Works and· Supplies personnel, and consultant services and training. Total project cost estimated at $42.2 million. Ministry of About (R) National Rural Development Progra~ Appraisal report being Agriculture 14.0 III - Third consolidation stage of prepared. and Natural (IDA) the Karonga/Chitipa Project. Resources Ministry of 15.0 (R) Education IV - Facilities for Negotiations substantiaily Education (Bank) secondary school education and completed. Board presenta- 26.0 teacher training; preinvestment tion scheduled for March 17. (IDA) studies for a new teache.r primary training college and Institute of Public Administration; and assista~ce in preparing a national educ~tion · plan. See page 1 for footnotes. - 7 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement!±._/ MALAWI (Cont'd) (INVESTMENT 5 .O (R) DFC II - Assistance to the· Investment Appraisal tentatively AND DEVELOPMENT (Bank) and Development Bank of Malawi. scheduled for March. BANK OF MALAWI (INDEBANK)) Ministry About (R) Structural adjustment loan. Appraisal report under of Finance 45 .o preparation. (IDA) Ministry of About ·(R) Health - Components to be identified. Project preparation Health 15.0 underway. (IDA) MAURITIUS Ministry About Highway I - Road rehabilitation Project scope being defineq. of Public 10;0 including Phoenix La Vigie-Plaisance Preparation mission ten- Works (Bank) Highway. Total project cost undeter- tatively scheduled for March. mined. {Cofinancing being explored). Ministry of About Rural Development II - Promotion of Appraisal mission tentatively Economic s.o small-scale agricultural activities, scheduled for March. (Co- Development (Bank) credit and irrigation, technical financing with !FAD is expected.) and Planning assistance, development of supporting infrastructure. Total project cost not expected to exceed $10 miliion. Ministry of About Education III - To be defined Project identification Education 10.0 in the course of implementation underway. and Cultural (Bank) of on-going projects. Affairs Central About (R) Water Supply - Rehabilitation Project preparation under- Water 15.0 and expansion of water supply way. {Co-financing likely Authority (Bank) systems. Total project cost still with CCCE and ODA.) undetermined. Ministry About Program Loan - Support economic Report under preparation. of Finance 15.0 adjustment program of government (Bank) by providing foreign exchange for import of raw materials and inter- mediate goods. RWANDA Ministry of About Education II - Components still to Appraisal mission scheduled Education 10.0 be determined. Project to focus on for February. (IDA) quality improvement of occupationally- oriented secondary education. Total project cost estimated at $12 .5 million. Banque About (R) Local Construction Industry - Assis- Project to be identified. Rwandaise de 10.0 tance in the promotion of the local Developpement (IDA) · construction industry through t!c'.chnical assistance and credits for equipment. Total project cost undeter~ined. Ministry of. 15.0 {R) Coffee - Coffee snd foodcrop improve- Negotiations substantially completed, Agriculture (IDA) ment on the shore of Lake Kivu in Board presentation scheduled for March. the Western prefectures of Gisenyi, IDA Project Preparation Facili~y Kibuye and Cyangugu; increase in advance of $975,000 to finance coffee production by replanting, consulting services, local staff provision of inputs and extension salaries, incremental operating costs, services; technical as~istance staff housing, two training centers, and training. Total project cost and start-up of training activities, estimated at $16.6 million. See page 1 for footnotes. - B- Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!./ ~'!:..I Procurement f!/ RWANDA (Cont'd) Ministry of About (R) Highways V - Construction of the Appraisal tentatively scheduled Public Works 18,0 Butare-Cyangugu road (153 km), for May, (Co-financing with and Equipment (IDA) Total project cost estimated at FED and AfDB agreed,) $60,0 million, IDA Project Preparation Facility advance of $250,000 to help finance consultants' services and updating of feasibility study, Ministry of About Water Supply - Rehabilitation, Project being prepared, Public Works 10,0 improvement and extension of rural and Equipment (IDA) aqueducts in the Gisenyi and IDA Project Preparation Ruhengeri Prefectures; construction Facility advance of $500,000 of sanitation facilities for Kigali; approved to finance consultants' and renovation and extension of water services during one year of supply systems in a few secondary preparation as well as the urban centers, Total project cost necessary local support staff to be estimated, and equipment. Banque 10,0 BRD III - Third line of Credit Project to be identified, Rwandaise de (IDA) to the Development Bank of Rwanda Developpemen,t to finance industrial development, (BRD) Total project cost to be estimated, Ministry of About Bugesera (Phase II) - Possible com- Project preparation Agriculture 15,0 ponents to include mixed crop and underway,· (IDA) livestock farming, Total project cost to be d~termined, Ministry of About (R) Technical Assistance, Appraisal mission in the Planning s.o field, (IDA) SEYCHELLES Ministry of About (R) Land Reclamation/Highways/Ports - Bank Project Preparation "Planning 6,0 Reclamation of land, improvement of Facility advance of $300,000 (Bank) fi_shing and commercial ports, construc- approved to complete project tion of highway and development of preparation, (Co-financing industrial site, Total project cost being explored with Kuwait estimated at $25,0 million, Fund, Saudi Fund, Abu Dhabi Fund, BADEA, CCCE and U.K.) SOMALIA Somali To be DFC II - Assistance to the Somali Project identification Development deter- Development Bank, underway. Bank mined (IDA) Government 14,0 Ports V - Extension of Port facili- Negotiations substantially of Somalia (IDA) ties in Berbers, completed. Government To be Roads IV - Strengthening of the Project under preparation. of Somalia deter- Algoi-Baidoa road; pilot road main- mined tenance program; training of Somali (IDA) engineers abroad. Ministry 10.2 (R) Education IV - Primary teacher Board presentation scheduled of Education (IDA) training, secondary and technical for March 3, vocation education, and study for improvement of the civil services, Mogadishu To be Mogadishu Water Supply - Extension Appraisal report under Water deter- of Mogadishu water supply facilities, preparation. Authority mined (MWA) (IDA) See page l for footnotes. - 9 - Mem.ber Country, and Borrower or Amount & Stag'e of Process- Implementing Probable ing and Action on Agency !J Lender'!:._/ Procurement'!_/ SUDAN Ministries of 32.0 (R) Blue Nile Pump scheme rehabilitation Negotiations substantially completed. Agriculture (IDA) and consolidation of irrigation pump IDA Project Preparation Facility and Irrigation schemes on Blue Nile River, advance of $340,000 approved- to finance consult.ants' services to carry out Blue Nile Water's feasibility study, Government To be Urban Water Supply - Expansion of Preparation underway by of Sudan deter- Water Schemes in Khartoum, possibly Government and consultants. mined El Obeid, (IDA) Agricultural 18,0 Agriculture Services Project - Credit Appraisal report under review, Bank of Sudan (IDA) for small farmers and possibly agri- IDA Project Preparation Facility cultural machinery through Agricultural advance of $600,000 approved to Bank of Sudan, finance consultancy services, provision of vehicles, equipment and seed material, Ministry To be (R) Technical Assistance II - To finance Appraisal mission in the of National deter- project preparation work, field. ~ Planning mined (IDA) Ministry of To be Gezira Rehabilitation - Trials, studies Project preparation underway, Irrigation deter- and possibly some investments aimed and Gezira mined at improving Gezira production. Board (IDA) Ministry of 35,0 (R) White Nile Pump Scheme - Replace- Negotiations sub.stantially Agriculture (IDA) ment of pumping sets; provision completed. of irrigation works maintenance machinery, tractors, farm implements, improvement of workshops, vehicles for field.staff, and agricultural research, Government To be Port Development II - Extension Appraisal report under of Sudan deter- of facilities at Port Sudan, preparation, mined (IDA) Government To be Agriculture Sector Rehabilitation - Project identification of Sudan deter- Credit would provide assistance for underway, mined rehabilitation of sugar industry (IDA) and· would support policy changes in the sector generally, Government To be Highways III - Construction of Project preparation of Sudan deter- national and/or secondary/feeder underway, mined roads; improvement and maintenance (IDA) of secondary roads; technical assistance to the Southern Region Ministry of Communications, Transport and Roads (SRMCTR), Government To be (R) Petroleum - Petroleum development Appraisal mission scheduled of Sudan deter- and distribution, for February. mined (IDA) SWAZILAND Ministry of To be Low Veldt Development - To be Project identification Agriculture deter- identified, underway. mined (Bank) (NATIONAL To be DFC II - Line of· credit for medium- Awaiting utilization of INDUSTRIAL deter- scale industrial enterprises, funds in first loan, DEVELOPMENT mined CORPORATION) (Bank) See page 1 for footnotes, - 10 Member Country, and Borrower or Amount & Stage o.f .Process- Implementing· Probable ing and .Action-on Agency!/ Lender J:/ Procurement!!._/ SWAZILAND (Cont'd) Ministry for To be Urban I - To be identified, Project identification Water, Power deter- underway. and Communi- mined. cations (Bank) (SWAZILAND 10,0 (R) Power III - Construction of hydro-. Appraisal report reviewed, ELECTRICITY (Bank) generating facilities, provision of Negotiations tentatively BOARD) transmission and distribution facil- scheduled for April, ities, and ecological and tariff (Co-financing with AfDB, studies, Total project cost esti- CDC, EIB, and KfW,) mated at $62,0 million with foreign exchange·component of $44,0 million, Ministry of 15,0 (R) Roads IY - Construction of Muba- Project preparation underway, Works,· Power (Bank) Mafutseni Road to paved standards; and Communi- paving of Nggwavuma River-Lawuma cations Road; rural roads improvement and maintenance pilot project; technical assistance to Roads Branch, TANZANIA Office of Prime 14,0 Rural Development IV (Mara) - Inte- Negotiations substantially Minister (IDA) grated rural development in Mara completed, Board presentation Region, Total project cost esti- scheduled for.March,· IDA Project mated at $17.8 million with Preparation Facility advance of foreign exchange component of $228,000 approved to finance $12 ,0 million, improvements to existing infra- structure and services in Mara region, Ministry of 43,0 Grain Storage and Milling - Approved by the.Executive. Directors Agriculture (IDA) Development of foodgrain storage on May 6, IDA Project Preparation and milling facilities in Tanzania, Facility advance of $924,500 approved Total project cost estimated at to finance consultants for design $58,4 million, with foreign exchange work, technical assistance, and a component of about $35,0 million, variety of preparatory activities, as well, as .associated vehicles and equipment, Ministry of 17,0 Water Supply II - Urban Water Supply Negotiations postponed due to delay Water, Energy (IDA) for Iringa and Moshi, Total project in establishment of the National Urban and Minerals cost estimated at $22,8 million, with Water Supply Authority, IDA Project foreign exchange component of about Preparation Facility advance of $14,1 million, $700,000 approved to finance engineering consultant costs to prepare preliminary and detailed design for the expansion of the water system in two towns (Iringa and Mo,shi), ., Ministry of 30.0 Harbours I - Expansion of Dar-es- Timing· of p9st·-appra)!!a,l depend~nt Communications (IDA) Salaam Port, Total project cost upo.:, progress unde'r Port Eng-ineering and Transport estimated at $135,0 million, with Credit, (Co~financing possibilities foreign exchange component of about being explored with BADEA, Japan, $90,0 million, EXIM, ODA and the Netherla.nds,) (NATIONAL BANK 10.0 Small Scale Industries Project - Appraisai report u~der OF COMMERCE (IDA) To provide a line of credit to review, IDA Project (NBC)) NBC for onlending to small-scale Prepa.:i;atiqn Faci:1.ifY 11dvance industry and to assist in the of $500 ;000 ''approved t.o . development of institutional finance consultant costs capabilities. · ~o prepare detaile~ pro- jections, help NBC in organizing a_nd .establishi~g a. special department, help Ministry of. ~~dus,try to review overall development pl.ans,. and S.Bl!il!i'~ the '!!an~ of. ~anzan~a 'to .set up a cre.d:l,t gu,ai;a.ntee fond and to fina~ce tra,in:l,ng, See page 1 for footnotes, - 11 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender Jj Procurement!!_/ TANZANIA (Cont'd) Ministry of 50.0 (R) Export rehabilitation - To finance Negotiations scheduled for Finance (IDA) essential import of raw materials, mid-February. agriculture, inputs, vehicles, replacement agriculture machinery and spare parts to support the rehabilitation of the export sector, particularly principal cash crop industries. Ministry of 25.0 (R) Telecommunications I - A three- Negotiations tentatively Communications (IDA) year program of expansion and scheduled for early March. and Transport rehabilitation of telecommunica- tion facilities. Total project cost estimated at $45.0 million, with a foreign exchange component of $25.0 million. (TANGANYIKA 15.0 (R) TDFL II - Second line of credit Negotiations tentatively schedul~d DEVELOPMENT (IDA) to TDFL. for March. FINANCE CO. , LTD.) (TDFL) Ministry of 15.0 Dar-es-Salaam Sewerage - Rehabili-' Preparation underway. IDA Project Land, Housing, (IDA) tation and extension of Dar-es- ,Preparation Facility advance ~f and Urban Salaam sewerage system. $1.0 million approved to finance Development consultants for completion of preparatory work, feasibility studies and detailed design. (TANZANI:A 20. 0 , (R) TIB ,V - , Fifth line of \;redi t, to, TIB. Appraisal mission tentatively INVESTMENT (IDA) scheduled for September. BANK) (TIB) (TANZANIA 40.0 Petroleum II. Project being identified. PETROLEUM (IDA) Specific description and DEVELOPMENT components will depend upon CORPORATION) outcome of drilltng of two wells at Songo-Songo field area. Ministry 15.0 Urban III - Squatter area upgrading, Project being identified. of Land, (IDA) surveyed plots infrastructure Housing construction loans, assistance and Urban to small business in Morogoro Development and technical assistance. Ministry 10.0 Forestry II - Second phase of the Project preparation of Natural (IDA) Sno Hill Forestry Project. underway. Resources and Tourism UGANDA Ministry 95.0 Reconstruction Creqit II. Identification mission postpon~d of Finance (IDA) pending further progress under ongoing program. Ministry of 8.0 (R) Technical Assistance - Assistance Credit signed on January 21. Planning (IDA) to Ministry of Planning for project preparation work,. National 9.0 (R) Water Engineering - Studies and designs Negotiations substantially Water and (IDA) of expansion of water and sewerage completed, Board presentation Sewerage systems in principal towns. Total scheduled for March 3. Corporatio'!I project cost estimated at $11,9 million with foreign exchange component of $9,0 million, See page 1 for footnotes. I j. - 12 - Member Country, and Borrower or Amount & Stage of Process- Implementing · Probable ing and Action on Agency Y Lender'!:_/ Procurement!±_/ UGANDA (Cont'd) Ministry of 35.0 Roads III - Rehabilitation of trunk Preparation underway. Works and (IDA) road; re-equipping of maintenance Housing unit, technical assistance; some upgrading, and construction of vital links under consideration. Total project cost estimated at $51.0 million. Ministry of 25.0 DFC I - Credit for the rehabilitation Appraisal postponed pending Industry (IDA) of industry. further preparatory work. Ministry of ·25 .o Agriculture (Coffee). Preparation underway. Lands and (IDA) Natural Resources ZAIRE Department 15.0 (R) Onatra Modernization - River trans- Negotiations tentatively scheduled of Trans- (IDA) port equipment, shipyard equipment; for March. (Co-financing has been portation · railroad equipment; training. Total agreed with KfW-Germany for river (ONATRA) project cost estimated at $89.0 transport equipment.) million. Department of 2.6 (R) Kwango Kwilu Technical Assistance Negotiations scheduled for mid- Agriculture (IDA) Project - Pilot.project for agricul- February. (Co-financing agreed tural development including traditional with BMZ-Germany.) small-scale farming and livestock development; small commercial live- stock, training and extension program; marketing and studies. Total project cost estimated at $5.6 million. GECAMINES To be Gecamines II - Rehabilitation of Project under preparation. deter- existing production facilities. mined (IDA) Societe About (R) Shaba Engineering Power - Rehabilita- Appraisal report being Nationale 1:0 tion of power plants in Shaba. Total prepared. (Co-financing with d'Electricite (IDA) project cost estimated at OPEC Special Fund under con- (SNEL) $26 .O · million. sideration.) Regie de pro- About Water Supply II - Distribution to Appraisal report being prepared. duction et 10.0 several cities. Total project distribution (IDA) cost estimated at $26.0 million. d'eau et d'electricite (REGIDESO) Department of About Highways V - Continuation of Highway Project under preparation. Transp9r~at_ion 12.0 Maintenance Program. (IDA) Department About (R) Ports I (ONATRA) - Expansion of Project preparation underway. of. Trans- 10.0 Matadi Kinshasa Ports; total portation (IDA) project _cost estimated at (ONATRA) $100.0 million. Department About (R) Cotton II - Rehabilitation including Appraisal report under prepa- of s.o road rehabilitation; extension ration. Agriculture (IDA) services, spare parts, farm tools and social infrastructure. Total project cost estimated at $15.0 million. ZAMBIA Ministry of 16.0 (R) Rural Water Supply - Provision and Appraisal mission scheduled Agriculture (Bank/ extension of water supply in ten for February. (Co-financing and Water· IDA). i:ima·~l towns and institution building. with EDF being explored.) Development Total project cost estimated at $22.9 million. ) See page l for footnot~s. - 13 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on A?ency Y Lender II Procurement':.._/ ZAMBIA (Cont'd) Ministry of 25.0 Education V - Assistance for improve- Appraisal tentatively scheduled Education (IDA) ment of basic education; expansion of for March. and Culture teacher training facilities, curricu- lum development and maintenance program. Ministry of 18.0 (R) Eastern Province Agricultural Negotiations delayed pending Agriculture (IDA) Development - Expansion of agri- further project processing. 'and Water cultural production in the Eastern Appraisal report being up-dated. Development Province through strengthening IDA Project Preparation extension and marketing services Facility advance of $975,000 and providing farm inputs on credit. was approved to finance Total project cost estimated at project start-up activities, $29.0 million. including international recruitment of key project staff, housing and vehicles. Ministry of 21.0 Wood~based panel mill - Construction Re-appraisal tentatively scheduled Lands and (Bank/ of a mill to produce fiber board, for March. (Co-financing being Natural IDA) wafer board and particle board. explored.) Resources The mill would be integrated with an existing saw mill, financed under the Second Industrial Forestry Project. Total project cost estimated at $53.0 million. Ministry of About Southern Province Agricultural Appraisal report being Agriculture 25.0 Development III - Expansion of agri- prepared. and Water (Bank/ cultural production in the Southern Development IDA) Province through strengthening extension and marketing services, and providing ·farm inputs on credit. Total project cost estimated at $33 .o million. Ministry of About Forestry III - Expansion of the long- Project preparation underway. Lands and 25.0 term planting and maintenance program Natural (Bank) for industrial plantations. Resources Ministry of About Fisheries - Improve fish production Project preparation underway. Agriculture 7.0 systems and marketing channels in and Water (IDA) Zambia. Development Ministry of Abo_ut Copper - Expansion of copper pro- Project identification underway. Lands and 40.0 duction and rehabilitation of copper (Co-financing being explored.) Natural (Bank) mining infrastructure. Resources Ministry of About (R) Dairy - Introduction of improved Appraisal mission in early Agriculture 7.0 production techniques and services Fe,bruary, and Water (IDA) to increase milk production among Development farmers and to raise farm income. ZIMBABWE Ministry of 65.0 (R) Manufacturing Sector - Rehabilitation Negotiations in early February. Finance (Bank/ Imports. IDA) Ministry of 25.0 (R) Agriculture - Small farmer. Project preparation underway. Agriculture (Bank/ IDA) Ministry of 35.0 Transport Sector Rehabilitation. Project being appraised, Transport (Bank) Ministry of 25.0 Power I - To be identified. Preparation underway, Transport (Bank) and Power See page 1 for footnotes. - lit - Member Country, and Borrower or Amount & .Stage of Process- +mplementing Probable· ing and Action on Agency y Lender J_/ Procurement!!_/ II. WESTERN AFRICA BENIN Ministere du .20.0 (R) ·Rural Development - Strengthen CARDER- Negotiations completed. Developpement (IDA) BORGOU, the project executing agency, An advance of $450,000 Rural et and SONAGRI, the agency. responsible under the IDA Project de l'Action for input supply and operation of Preparation Facility has Cooperative cotton ginneries; improve cotton and been approved to complete (CARDER-BORGOU) food crop production in the Borgou project.preparation and Province. Water development, set up project coordination research, seed production and animal, and evaluation units. traction, Total cost $41.0 million. Ministere des 11.6 (R) Highways IV -.Supply of equipment and Negotiations scheduled for Travaux (IDA) rehabilitation of 500.km of gravel mid-February. An increase· Publics roads and reco~struction of 54. km of. $16.5 million in the.IDA, (DRP) of bituminous r.oads. · T~chnical allocation has been requestea':.' assistance for.implementation, train- (Co-financing from FAC or OPEC ing and road safety. Total cost still a possibility.) estimated at $19.5 million, including $13.8 million in foreign exchange. Ministere 10.0 Construction and equipment of three Appraisal scheduled for mfd-1981., de l'Enseignement (IDA) teacher training colleges, construc- IDA Project Preparation Facility Moyen General, tion of facilities and provision of advance of $400 ;ooo approved · Technique et technical assistanpe for production to prepare architectural studies Professionel and distribution of teaching . and bidding _documents. ( Co- materials, and technical assistance financing wi'th FAC, EEC and· · for project implementation. Total Germany envisaged.) cost $19.0 million. Ministere de l' 5.0 (R) Technical assistance for development Appraisal scheduled for March. Industrie, des (IDA) of appropriate policies. for petroleum Art advance of $500,000 'under the Mines et de l' exploration, assessment ,of enhance- IDA· Project ,Preparation Facility Energie ment methods propo_sed for exploitation is being conside'red for setting · of Seme·oilfield, training and insti- up a tra~ning program for Benin tution building,. nationals. Ministere de 4.7 (R) Cotonou Priority Works and Documentation being prepared. l'Industrie, (IDA) Engineering Assistance Credit. des Mines et de Extension of water di.stribution l'Energie system, drainage and studies. Total cost estima_ted at $5 .9 million. Governments 2.5 (R) Engineering design and preparation · Appraisal underway. ·('Co- of Benin (IDA) of tender documents for the regional financing has been arranged and Togo Nangbeto hydroelect.ric project. with FAC.) Total cost $3.5 million. CAMEROON Ministere de 25.0 (R) Rural Development Northern Province - Loan and credit signep on l'Economie et (Bank) Cotton, food crops and animal husbandry January 2,7. du Plan et 12 .5 , . development; tree planting; rehabilita- Ministere de (IDA) tion of 800 km feeder roads; food crops l'Agricultur~ marketing improvement; applied research and training. Strengthen planning and agricultural research capabilities at provincial level. Total cost $75.0 million. Banque 15.0 Assistance to artisans and small-scale Approved by the Executive Camerounaise (Bank) enterprises, financing of medium-scale Directors on November 18. de Developpe- industrial projects and technical ment (BCD) assistance. Ministere 40.Q (R) U;ban Development Sites and Services Apl'raisal report being prep~riid.· de l'Urbanisme (IDA) in Yaounde and Douala; squatter set- et de l' Habita~ t+ement,s upgrading in Douala, (and pp,sibly others, to be determined) See page 1 for footnotes. - 15 - Member Country, and Borrower or Amount· & Stage of Process- J:mplementing Probable ing and Action on Agency}:_/ Lender~/ Procurement!:_/ CAMEROON (Cont'd) To be 32.0 Wood Processing Industries. Total Project preparation underway. determined (Bank) cost about $37.0 miliion plus $10.0 million for infrastructure. Ministere de 14.0 Construction of Cameroonian portion Project processing in abeyance l'Equipement (IDA) of road between Moundou (Chad) and due to political situation in Guidjiba (Cameroon). Total cost Chad. $90.0 million (tentative). Ministere de 100.0 (R) Roads V - Construction of a paved Appraisal report being prepared. l'Equipement (Bank) road between Douala and Yaounde; preparation of transport plan. Total estimated foreign cost $211.0 million. Ministere de 26.0 (R) Forestry project - Pulpwood planta- Appraisal mission in the l'Agriculture (Bank) tion to supply the Cellucam pulp- field. (and possibly mill of Edea; pole and utility others, to be timber plantations to supply the determined) Northern Province; fuel and pole plantation for the Maga area. Ministere des 24.0 Ports III - Extension of general Appraisal scheduled for Transports, ;ind (Bank) cargo facilities, with provision March. Office National for banana handling. du Port Ministere de 10.0 Technical Assistance II - To Documentation being l'Economie et (IDA) increase absorptive capacity prepared. du Plan through cooperation in develop- ment planning·, policies/programs for energy, industry and other sectors, and.external debt'manag~ment. Ministere des 4.0 Organization and engineering Appraisal scheduled for Postes et Tele- (Bank) project. To establish a February. communications commercially-oriented postal and telecommunication corporation, and to prepare a telecommunications ·project for Bank financing. CAPE VERDE' Ministry of s.o Inter-island Shipping - Purchase of IDA Project Preparation Transport (IDA) replacements and additions to inter- Facility advance of island fleet, technical assistance $100,000 approved, to for nautical training school, con- finance the first stage sulting services and transport survey. of project preparation. Ministry 5.0 (R) Port of Praia - Rehabilitation of the Appraisal scheduled for of (IDA) port; technical assistance. March/April subject to Government Transport decision on co-financing. IDA Project Preparation Facility Advance of $100,000 approved to finance consultant's services. (Co-financing by Portugal for engineering and construc- tion being considered. Additional co-financing proba'bly required.) See page 1 for footnotes. - 16 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!/ ~?:../ Procurement':_/ CENTRAL AFRICAN REPUBLIC To be 8,0 (R) Technical Assistance - Project pre- Docmentation being prepared, deter- (IDA) paration, selected sector studies, mined and assistance for external debt monitoring, Ministere 15,0 (R) Highways IV - Road rehabilitation IDA Project Preparation des (IDA) and maintenance program, Facility advance of $490,000 Travaux approved to finance project Publics preparation, which is underway. CHAD Ministere du· 6.6 Power-Construction of a new power Genie Civil, (IDA) plant in N'Djamena and extension des Mines et de of distribution system. The power la Geologie/ plant will use residual fuel from STEE (Societe a refinery which is part·of a pro- Tchadienne de posed development project, Total l'Energie et de cost estimated at $25.0 million. l'Electricite) To be 2.0 Urban: Squatter settlement upgrading determined (IDA) and sites and services in N'Djamena; assistance to small-scale enterprises in the informal sector; assistance to sanitation and maintenance services of the municipality of N'Djamena; ·technical assistance, Ministere 3,0 Construction of feeder roads, ) des Travaux (IDA) ) Publics, ) Project processing in des Mines ) abeyance due to political et de la ) situation, 0 Geologie ) Ministere des , 14.0 Construction of Chadian portion Travaux Publics (IDA) of road between Moundou (Chad) and Guidjiba (Cameroon}, Total cost $90 mHlion (tentative.) Ministere 9.0 Sategui-Deres_sia .II - Flood irri- de l'Agri- (IDA) gation work, improved rice culture culth•at:l.on-, technical assistance_. Ministere de 14.4 Petroleum Development Project - Con- ) l'Economte (IDA) struction of two oil wells, surface ) separation and storage facilities, .) a pipeline, refinery and associated ) engineering and technical assistance, ) Total cost a,bout $61 million, ) CONGO, PEOPLE'S REPUBLIC OF THE Ministers ·des 5,0 (R) Third ~ighway Project - Road Main- Report on preparatory studies, Travaux Pubiics (IDA) tenance ~nql~di~g procurement of by consultants .under IDA Project et de la equipment and spare parts, workshop Preparation Facility advan~e Constructiol\ impr_ovell\ent, pavemen; r!!surfacing, and of $125,000, expected to ~e technical assistance, and training, completed in February, Appraisal Total cos.t est'imated at $12 ,0 million, scheduled for March, To be. 6,0 (R) Forestry - Logging and processing Feasibility study carried out determined (IDA) unit in the northern provinces near by consultants and financed Ouesso, and technical assistance for under IDA Project Preparation sector institutions and policies, Facility advance of $250,000, Feasibility study and prepara- tion of investment proposals expected to be completed by March, See page 1 for footnotes, - 17 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable· ing and Action on Agency Y Lender 2/ ---- Procurement'!._/ CONGO, PEOPLE'S REPUBLIC OF THE (Cont'd) Agence Trans- 6.0 Rehabilitation and expansion of Appraisal report being pre_pared. congolaise des (IDA) river transport services; equipment Communications and technical assistance to improve (ATC) waterways, services and administration. THE GAMBIA - ---- Ministry of 8.0 Rural Development II - Second phase RMWA revising preparation report. Agriculture (IDA) of ongoing Rural Development Project IDA Project Preparation Facility and Natural (Credit 644) would include: support advance of $300,000 approved Resources for traditional farmers, including to finance detailed architectural extension, input supply and marketing and engineering designs and services on country-wide basis. preparation of tender documents Establishing national seed multi- for the buildings, (Possible plication scheme and research into co-financiers: ODA, IFAD, irrigated and upland food crops. USAID, EEC and CCCE.) Support for livestock marketing and rehabilitation of small irrigation ·schemes. Ports Authority 7.0 (R) Second Banjul Port Project - Rehabil- Feasibility study completed. (IDA) itation of Banjul Port facilities; Awaiting Government decision construction of new berth, cargo on engineering design. handling equipment, technical assis- IDA Project Preparation tance. Facility advance of $300,000 approved to finance the com- pletion of the feasibility study and the preparation of engineering design and tender documents. Ministry of 1.0 Oil Exploration Promotion - Technical Project scope being finalized Economic (IDA) assistance for geophysical studies; following September pre-appraisal Planning and planning, and possible minor assistance mission, (Co-financing confirmed Industrial to power sector. from United Nations Sahelian Development Office (UNSO) and EEC.)· GHANA To be 20.0 Assistance to small-scale Identification/preparation determined (IDA) enterprises. underway. Ministry 15 .o (R) Urban development including sites Project preparation financed by of Works (IDA) and services and upgrading in Accra an IDA Project Preparation & Housing, and selected cities as well as assis- Facility advance of $175,000 or a new tance to small business in project underway. Preparation mission agency areas. Total original cost estimated will visit Ghana in February. at $43.9 million, of which about Reappraisal scheduled for April, $10.0 million was the foreign exchange component. Cost figures will be revised at reappraisal. To be 40.0 (R) Cocoa III - Replanting and rehabil- Cocoa sector report sent to determined (IDA) itation of existing cocoa areas; Government for comments. Bank/ technical assistance for training FAO-CP mission planned for and institution building. mid-February to finalize project identification and terms of reference for project preparation, Ghana Railways 25.0 (R) Rehabilitation of certain parts of Negotiations scheduled for end- Corporation (IDA) Ghana Railways and technical assis- February. (Co-financing will be (GRC) tance for improved management. Total required; AfDB considering.) cost about $50.0 million of which $39.3 million is foreign exchange Procurement: Retroactive financing component. up to $400,000 for advance tech- nical assistance contemplated. See page 1 for footnotes. ,. I - 18 - Member .Country, and .. Borrower or Amq)lnt & Stage. of. ,Proc~ss-, Implementing Probable ing and .Actib_n on Agency "J:_/ Lender'!:_/ Procurement .A/. "GHANA ~Cont'd) Ghana Water 3.2 Water Supply and Sewerage Technical · Awaiting -approval of tariff and Sewerage (IDA) Assistance - Managerial, financial, .increase, Restructuring of Corporation operational assistance to Ghana project scope under consideration, (GWSC) Water and Sewerage Corporation.to aid implementation of existing and future projects; project preparation assistance, Total cost about · $4.7 million,. of which $3,4 million in foreign exchange, To be 35,0 (R) Rehabilitation of woqd industry, Project. preparation completed, determined (IDA) forestry operations, forestry and Decision to.appraise awaiting forest indus,tries develop~ent Government policy decisions, planning study, strengtheriing of (Co-financing will be required,) ins ti tut ion, Ghana Highway 25,0 (R) Fo,;r.th Highway - Rehabili_tat;ion of Proje~t ·p~epa~ati;n underway, Authority (IDA) bridges and main roads, and tech- (Co-:financing._.will be required,) nical assistance, To be 5,0 Petroleum Pre-development - Technical Project preparation, financed by determined (IDA) assistance, studies and surveys IDA.Project Preparation Facility need~d for petroleum exploration,· advance of $340,000, underway. strengthening petroleum institutions and ener_gy planning assis.tance, . . . . . ... . To be 6,6 (R) Public .Administration Technical President's Report .be·ing ..p·repared ,· determined (IDA) Assistance to strengthen .the.Office Project preparation financed· .by of the. Head of Civil Service; mo.ni- an.IDA Project Preparation toring and supervision of parastatals; Facility advance of. $150,000. and retraining and redeployment of· (Commonwealth Fund and UNDP staff, Total cost about $11.3 million have expressed interest_ ·in co- of which $8,9 million in foreign fina1:1cing-.) exch_ange, Ghana Oil Palm 10,0 (R) Oil Palm II - Extension of ongoing Project preparation Corporation (IDA) activities under Oil Palm I project underway, (GOPC) (plantatiqn, smallholder field '·· deve.lopment, training, oil processing), Electric 20,0 (N) Fourth Power Distribution - Rehabili- Identification/preparation Corporation (IDA) tation of. ECG's di!,tribution. network, un.de,;way, of Ghana system maintenance, technical.assis- (ECG) tance and training_: GUINEA Ministere de 28,5 (R) Power (Hydro and Diesel-fired Thermal) Credit signing on February 10, l'Energie et (IDA) - Project would finance part of program (Co-financing by CCCE du Konkoure for reinforcement, rehabilitation and and KfW confi,;med,) extension of the Conakry power system through: network rehabilitation; supply of spare parts ;md tools; te.chnical assistance and training, .and refinancing IDA Project Preparation Faciiity advance and Power Engineering Credit, Project cost estimated at $32 .5. million with foreign exc_h.ange compqnent of $28,5 million, Ministere 50,0 Nimba Iron ore mining and beneficia- Feasibility studies being des Mines (Bank) tion witli. evacuation via existing reviewed, Technical sponsor et Geologie. facilities in Liberia, being._ BC;)Ug_ht, Ministry of 5,0 (R) Industrial Rehabilitation - IDA Project ·Preparation Facility Industry (IDA) Rehabilitati~n of selected public advance of '$290,000 approved and and Credit sector industrial enterprises, detailed feasibility studies National promotion of privately-owned small- expected by A,pril., Appr~isal ·and medium-scale·enterprises, plus· mis!Jion ·tentatively schedu~e4 technical assistance to proje~t" foi; ~ay, inst~tutions, See page 1 for footnotes, ----------------- - 19 - Member' Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender.±_/ Procurement!!._/ GUINEA (Cont'd) Ministry of 7.0 Port of Conakry - Rehabilitation German-financed feasibility Transport (IDA) of port facilities, provision of study under way. (Co- cargo handling equipment, technical financing of project by assistance to improve port adminis- KfW anticipated.) tration and operations. Total cost about $20.0 million. GUINEA-BISSAU Ministry of 9.0 Rehabilitation of Bissau Port; Consultants have been appointed Transport (IDA) technical assistance for port under IDA Project Preparation management and,operations. May .Facility advance of $800,000 include reconstruction of some for completion of studies. riverine ports. (Co-financing with Kuwait Fund envisaged.) Ministry of 6.8 (R) Petroleum Oil .Exploration Promotion - Credit approved by the Executive ,Natural (IDA) Technical Assistance, studies . Directors on January 13 and Resources and surveys needed for promotion signed on January 15. petroleum exploration, strengthen- ing of petroleum institutions ·and energy planning assistanCe. !VORY COAST Ministere 100.0 Highway Sector Loan - Road construc- Approved by the Executive des Travaux (Bank) tion, pavement strengthening, pre- Directors on November 4. Publics et investment studies and technical des Tr.a~sports assi'stance to cover about. 15% of the i~~estm~nt program for. 1981-83. T':'tal' 'cost ab<:,ut '$166~0 million. Regie 49.0 ·Railways II - 'Realignment Petionara- Appraisal report being Abidjan- (Bank) Tafire; track renewal,in Ivory Coast prepared. (Co-financing with Niger and Upper Volta locomotive main- CCCE and CIDA envisaged.) (RAN) tenance facilities, Treichville marshalling yard modernization; railway equipment, ,consulting services and training. Total ,~ost ·about $78.4 million. Ministere 53.0 Urban Development II - Development Appraisal report being des Travaux , (Bank) of transport :infrastructure and prepared. Publics et management in Abidjan; basic infra- des Transports structure in secondary cities and assistance to urban agencies. PETROCI 35.0 (R) Petroleum development. Preliminary discussions in the (Petrole de (Bank) field scheduled for February. la Cote d'Ivoire) Ministere des 25.0 (R) Improvement of water s.;pply,and Second post-appraisal mission Travaux' Publics (Bank) sanitation in urban centers, and scheduled for March/April, pend- et des in small villages. ing Government's decision on Transports ,sector finances. Ministere de 25.0 (R) Centre-West Rural Development - Project preparation 'by l 'Agriculture, (Bank) Strengthening regional development BETPA, (Bureau d'Etudes SATMACI agency; development of smallholder, Techniques de Projets cocoa, coffee and food crops; emphasis Agricoles), Ministry of on co-operatives. Agriculture and RMWA underway. Appraisal mission tentatively scheduled for 'April. (Co-financing with CCCE and FED envisaged.) See page ,1 for footpotes. - 20 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency lf Lender'!:_/ Procurement· '!_I LIBERIA Ministry of 13,0 (R) Education IV - Technical assistance, Project preparation underway, Education, (IDA) fellowships and construction of financed by·an IDA Project Ministry of regional. a.dministration centers to Preparation Facility advance Labor, and strengthen Ministry of Education; of $500,000, (Co-financing· University primary school development, vocational, will be needed.) of Liberia secondary and technical teacher training; commercial training; university science equipment and staff development, To be 5.0 -Rural Development I - Technical and Project preparation underway, determined (Bank) financial support for rural develop- 5.0 ment institutions, development of (IDA) smallholders production, and rural infrastructures in three south- eastern counties. Ministry 15,0 (R) Highways V - Road maintenance; Project preparation underway, of Public (Bank) technical assistance and fellowships (Co-financing will be needed,) Works to Ministry of Public Works; pre- investment and engineering studies, Monrovia 10,0 (R) Urban development including Appraisal report being prepared, .City (Bank) upgrading, assistance in land and Consultants' services, equipment Corporation ownership registry and institu- and training being financed by I tional development. Total cost an advance of $450,000 under I estimated at $13,4 million; including Bank Project Preparation foreign exchange costs of $6,9 mil- .Facility, lion, Ministry of 10.0 (R) Rural Development (LOFA) II - Expansion Project preparation underway, .Agriculture (IDA) of existing project activities in LOFA county and into new areas of the county, It will strengthen agri- ·cultural services and develop swamp rice, upland rice, cocoa and coffee, and provide feeder roads and wells, Ministry of 15,0 (R) National Iron Ore Company (NIOC) - Appraisal report being prepared, Lands and (Bank) ·• Rehabili.tatio)l of mining equipment, Preparation financed by Bank Project Mines construct.ion of ore surge facility; Preparation Facility advance of ' improvements in concentrator; repair $500,000. (ADB and Nether~ands of rai~road and railways brfdge; FMO considering financing; addi- financial restructuring of company, ti.onal co-financing needed,) Totai c9st,esti111ated at $42,0 mii- lion; of which $37.0 million in foreign exchange costs. MALI Min!stere des 17 .o (R) Roads Maintenance - Road maintenance Board presentation sched~led Travaux PJ.!blics (IDA) program and 'technical a·ssistance: · for March 3. (Co-financing et du· Tou:dsme Strengthening road maintenance and agre.ed with Switzerland,) training. Reduction of backlog of periodic maintenance, participation in financing recurrent costs, Total cost .al;>out $43 .3 million., pf which · $26, Z ~.illion' in fore_ign exchange, Operation de 5,0 Te~\m:i.cal. 11.s~istance · to ODIPAQ Project design being reviewed in Developpement (IDA) to prepare an Integrated Agri- IDA and with the Government, Integre cultura~ Development Project; Financing to help in preparation d'Arachides et retraining of extension services; w11s provided·for by an advance de Cereales studies, . Total cost es):imated at of $50,000 under :I:DA Project (ODIPAC) $8,1111illion, Preparation Facility,_ See page 1 for footnotes, - 21 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement !!_I MALI (Cont'd) Office des 10.0 (R) Second Telecommunications Project - Appraisal mission in the field. Postes et (IDA) Completion of Mali main transmis- IDA Project Preparation · Telecommuni- sions route, including the micro- Facility advance of $310,000 cations du Mali wave section Segou-San Sevare and approved for consulting the Apur VHF links Sevare-Mopti, services for detailed Sevare-Bandiara-Sanga and Segou- design of local networks, Dioro; supply and installation of updating bidding documents; 1,400 lines of switching equipment provide financial expertise in four towns, including construction to Office des Postes et of telephone exchange buildings; Telecommunications du Mali. rehabilitation and extension of local Consultants studies underway. networks; engineering consultants for detailed engineering of network extensions, preparation of bidding documents, and ass·istance in organizing maintenance programs; consultants to study organization of postal and financ.ial services and establishment of· training programs. Office du 19.0 (R) Office du Niger II - Rehabilitation of Preparatory studies are being Niger (IDA) irrigation infrastructure of the Office executed by the Office du Niger du Niger and levelling of some assisted by consultants financed 15,000-20,000 ha. of rice fields. under Cr. 854-MLI. Appraisal tentatively scheduled for April. (Co-financing may be required.) Office du 5.0 (R) Gasohol Production of ethyl Appraisal tentatively sched~led for Niger (IDA) alcohol from surplus molasses, May._. A,dvance f.ro!" IDA P.roject modification of existing Preparat'ion Facility of $50,000 distillation facilities and approved.July 1980. Studies provision of infrastructure to on feasibility of introducing handle and store ethyl alcohol for gasohol expected to begin soon. eventual blending with gasoline •. Ministere du 8.0 (R) Petroleum Exploration Promotion - Preparation activities Developpement (IDA) Evaluation of Taoudeni Basin; financed by two advances of Industriel et technical assistance to the $500,000 each from the IDA Project du Tourisme Direction Nationale de Mines et Preparation Facility. Project de la Geologie; and· assessment documents being prepared. (Co- of Agamor oil shale deposits. financing of $2.5 million may be required.) Energie du 20.0 (R) Power (Distribution) - First phase Project prepared with advance Mali (EdM) (IDA) of two-stage program to extend power of $970,000 from IDA Project distribution; rehabilitate utility; Preparation Facility. Appraisal promote fuel savings through intro- report being reviewed. Negotia- duction of biomass fuels and initiate tions scheduled for March, but preliminary reforms in the water may be delayed pending appoint- sector. ment of new General Manager. (Co-financing being arranged.) Ministere 12.0 (N) Rural water supply in the Western IDA Project Preparation Facility de (IDA) Region - Project to be execµted advance of $340,000 approved; Developpement in parallel with IDA Health selection- of consultants for Industriel Project. preparation of studies now undei;-way. MAURITANIA Ministere de 3.0 Fourth Highway Project - Road Documentation being prepared. l'Equipement (IDA) maintenance study, preinvestment (Kuwait Fund is financing studies for pavement strengthening, $5 .O million.) completion of unpaved roads started under Third Highway Project. Total cost estimated at $10.4 million, of which $8.3 million in foreign exchange. See ~age l for footnotes. - 22 .- Member Country, and Borrower or Amount & Stage of.Proce~QT. Implementing · Probable ing and Act.ion,. on Agency !f Lender.'!:_/ Procurem~n·t f:_/:·. · MAURITANIA (Cont'd) Ministry of 2.9 (R) Technical Assistance for Petroleum Docu~entation being prepared, Industry, (IDA) exploration promotion and energy The project has been p·repared Mines and planning, under :two IDA Project Prepara.tion Commerce,' Facility advances totalling $800,000 •. Ministere 5,0 Education II - Strengthening of . Appraisal report being prepared. de (IDA) educational planning and administra- (Co-financing being· .sought.) l'Enseignement tion, training of lower secondary Fondamental et school teachers, and vocational· Secondaire; training for the Fisheries and Ministere Industrial Sectors, du Travail, de la Sante' et des Affaires Soc:iales; Ministere de la Peche et de l'Economie Maritime NIGER Ministere du "18,0 (R) Education l - Improvement ·and exten- . Negotiations tentatively scheduled· Developpement (IDA) sioris of agricultural and animal for +ate February in the field.' Rural et production staff training institutes; Two IDA Project Preparation facility Ministere de funds for education planning and ad~ances'of $200,000.and $500,000 !'Education preparation of future projects; funds respectively. have been .approved·. Nationale et for planning policies and programs to .help,. finance studies and. Ministere de la for upgrading civil servants. Total, drawings by.architectural consultants. Fonction Publique cost estimated at $?2,5 million, Ministere 22.0 Highways IV~ Strengthening and Preparatory.studies under des Travaux (IDA) resealing of bitumen roads, road way, financed under ·Third Publics construction, training of road , Highway 'Project. (.Co-financing maintenance personnel, Total cost with BADEA \)~ing sought •. ) estimated at $40.0 million, Ministere 9,0 Technical ,:issistance for project Pre-appraisal mission scheduled du Plan (IDA) preparation and to strengthen for February, Appraisal mission planning, monitoring; and evalua- tentat;ively schedul~d. for May. tion capabilities' of Ministry of Plan and technical ministries, Banque de 12 .o (R) Employment Creation II - A follow-,up Appraisa~ mission scheduled Developpement (IDA) project consisting of a line of credit for February, de la Republique to BDRN, technical assistance to du Niger (BDRN)/ OPEN, and development of leather Office de Promotion crafts, de l'Entreprise Nigerienne (OPEN) Ministere de 23.0 (N) Forestry II - Establishment and" Project pireparatlon financed Developpement (IDA) management of·state-managed and under first forestry project Rural rural forestry plantations; is underway. Appraisal mission management of rural forests; soil tentatively sc.heduled for conservation· program; insti_tutio~ May. . building; establishment and moni tor.ing of rural mini-nurseries. NIGERIA Federal 145.0 Kaduna State Agricultural.Develop- Appraisal. report: und.er .review. Ministry of (Bank) ment would 'include a statewide Organization and project imple- Agriculture package of basic agricultural mentation. schedule being discussed services to farmers, and a feeder· with Gover.nme~t. road and rural water pi;_ogram, Total cost estimated at $375.0 million, See page 1 for footnotes, - 23 - Member Country,' and Borrowei; or · Amount & Stage.a~ Prpcess- Implementing Probable ing and Action on Agen.cy Y Lender Y Procurement!!._/ NIGERIA (Cont-d) Federal 103.0 Cocoa Project III - Four state- Appraisal report under review. Ministry of (Bank) wide smallholder cocoa projects, Further processing delayed to Agriculture Main components would be riew await government's response planting and repianting of cocoa, on outcome of December meeting, rehabilitation of existing cocoa; pest and disease control, feeder roads, strengthening of-cocoa development units and staff and farmer training. Total cost esti- mated at $473.0 million. Federal 30.0 (R) Small scale enterprise pilot project. Appraisal mission scheduled Ministry (Bank) for February. of Industries Federal 34 .o · Cross River State Oil Palm - Expansion Completion of appraisal report Ministry o~ (Bank) and d;l.versification of Cross River deferred, pending further Agriculture Estates into oil palm production, soil survey, ·Total cost estimated at $75,2 ,million, National 45.0, Ga·s pipeline project'- Pipeline from Feasibility study completed, · Nigerian (Bank) Niger Delta area to Lagos for Results of study and specific Petroleum industr~al· consumpt~on and needs for possible Bank Corporatio~ power generation. assistance being discussed with Government, (Co-financing would be required.) Federal 100.0 Fertilizer project - Nitrogen· Government is negotiating with .Ministry of (Bank) complex.at dnµe. prospective foreign equity and In,dustries ·technical partner.· Federal 132.0 Bauchi State Agricultural Develop- Negotiations substantially completed, Ministry of (Bai;tk)' ment project - Extension of Gombe Agriculture· Agricultural Development .Project Procurement: Retroactive (Loan' 1164) - directed to increase financing of up to $0,6 million food production - would include a proposed to cover hiring of key package of basic agricultural ser- staff for project initiation. vices to statewide faI'l!lers, and a 'major ·feeder road and·rural water program. Total cost estimated at $350.0 million. National· 100,0 Power VI (Distribution) - Power trans- Appraisal report under review. 'Electric (Bank) mis.sion and distribution facilities (Co-financing may be required,) Power for 23 cities and interconnection-of Authority Lagos thermal plant, Total cost esti- mated at $227,0 miHion, Anambra 75 .O (R) Anambr~ Water Supply and Sanitation - Negotiations substantially completed,· State Water (Bank) Expansion and improvement of water Bank Project Preparation Facility Corporation supply and sanitation facilities in advance of $415,000 approved for Onitsha, provision of health and urban consultants- services. development., facil:L tie's, and strengthen- ing of ·implementing agency. Provision Procurement: Retroactive financing of technical assistance to establish of up to· $0. 9 "million proposed to. Federal Water Resource Evaluation, cover·detailed design work and Monitori'ng and Pianning· Unit (EMPU). recruitment of operational experts, Total cost estimated at $138,0 million. croo River 55.0 Cross River'Wat:er Supply - Project under further consideration State Water (Bank) Expansion and improvement of by State Government, Bank Project Board' water supply facilities in Preparation Facility advance of major urban centers in the $325,000 approved for consultants' Cross River State, services. Federal . 142.0 Kano State Agricultural Develop- . Negotiations .sub~tantially completed. Mi'nistry of (Bank) ment - provision of a package of Agric.ulture agricultural services to statewide Procurement: Retroactive financing farmers, and a major feeder road and of up to $0.4 million proposed to . II'' rural·water .Pr6gra~. Total ~ost cover hiring of key staff for estimated at $482.0 million. · project initiation. See page 1 for footnotes. - 24 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender'!:._/ Procurement'!._/ NIGERIA (Cont'd) Federal 148.0 (R) Sokoto State Agricultural Develop- Appraisal report being prepared. Ministry of (Bank) ment - Extension of Gusau Agricul- Agriculture tural Development. Project (Ln.· 1099), Procurement: Retroactive financing including ·s·tatewide rural water of up to $0 .• 6 million proposed to and training programs and cover hiring of key staff for improvement of agricultural project initiation. service centers. Total cost estimated at $_499 .O million. Federal 36 .O (R) Second Urban Development - Imo Appraisal report under review, Ministry (Bank) State, Total cost estimated at of Housing $86.0 million. Procurement: Retroactive financing of $1 million proposed to cover project start-up cost.a from· September l, 1980. Kano State 100.0 (R) Water Supply IV (Kano State) - Appraisal mission scheduled Water Board (Bank) Expansion of water·supply facilities for February. in Kano,· Includes. limited sanitation improvements in Kano City. Federal so.o Agricultural Research project, Preparation to be initiated Ministry of (B_ank) The establishment of adaptive by· Government, Agriculture technology development stations link_ed to agricultural development projects; Total costs estimated at $80.0 million. Federal 70.0 Third Urban Development - Ogun State. Consultants being selected Ministry (Bank) to undertake feasibility study. of Hous:!.ng i Federal 35 .o (R) Nambilla (formerly Sardarna) Agri~ .Appraisal report being prepared, Ministry (Bank) cultura.l Development - To develop of Agri- high-altitude plateau area for I culture livest9ck, tea, coffee, etc. Farmer services including technical, credit, input supplies, land devel~pment and gen~ral infrastructure, Total cost estiinated ~t '$80.Q·. milion, Federal 46 .0 (R) Technica'i Assistance Project to Appr.aisal report being Ministry of (Bank) support the food production plan for reviewed, Agriculture the period '1981-85, Total cost estimated at $95 .o million. SAO TOME & PRINCIPE Ministry of 4.0 Power I (Diesel Electric) - Two 1.0 MW Project is being prepared by Energy and (IDA) dies.el electric generating sets; r~in- consultants financed by IDA Fisheries forcement of dist.ribution system; sup- ProJect Preparation Facility ply of transport and communications advance of $350,000, equipment; technical assistance and training; hyd_ro-electric survey, SENEGAL Secretariat 6,0 Fishing Po.rt Project - Improvement of Feasibility study co~pleted, d'Etat aux (Bank) traditiona'l fishing through establish- Government to decide on Peches ment at Djifer of port facilities at next steps, Mari times an estimated cost of $20 million, See page 1 for footnotes, - 25 - Member Country, · and· Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 2/ Procurement!!_/ SENEGAL (Cont'd) Secretariat 15.0 (R) Agricultural Research - Program of Appraisal report being. pre- d'Etat a la (IDA) works and technical assistance to pared. IDA Project Prepara- Recherche improve the national agricultural tion Facility. advance of Scientifique research system and to strengthen $500,000 approved t'o finance et Techniques the generation and transfer of consulting services and agricultural technology. Total eventual detailed .engineering cost estimated at $129.0 million. studies. (Co-financing with French Ministere de la Co- operation, USAID, Belgium, .· and.UN technical agencies.) Societe 6.5 (R) Third line of Credit to SOFI.SEDIT, Documentatio~ b~ing prepared. Financiere (Bank) and financial and technical assis- Senegalaise 2.4 tance to medium- and small-scale pour le (IDA) enterprises. Developpement Industriel et Touristique (SOFISEDIT), and Societe Nationale d'Etudes et de Promotion Industrielle Direction des 9.3 (R) Forestry - Establishment of rural Board p'rescntation· on Eaux et Forets (IDA) community and industrial forest February 10. IDA Project plantations; management of forest Preparation Facility advance reserves; institution building and of $50,000 approved to st1;1.dies., Total cos.t estima.ted at .financ'e i:echni.cal suryey,s and $17 .O million.• · i:echnical:'services • .·(Pcifiilible. co-financing with CCCE, FAC· and FAO.) Office des 20.0 Telecommunicat.ions II -. Extensi<:>n of Preparation unde~ay. Postes et (Bank) Dakar telephone exchanges; extension of des Telecom- transmission network t.o the South and munications East of country; technical assistance. Ministry 30.0 (R) Loan/Credit for Structural Adjustment. Loan and credit signed on of Finance (Bank) January 26. 30.0 (IDA) Government 10.0 Primary Health Care Project - Preparation·underway. IDA Project of Senegal (IDA) including components for institution Preparation Facility advance of building, drug supplies, intermediate $95,000 approved to finance con- health facilities and information, sulting services for detailed and education programs. Total· project prepar'ation. estimated cost $12.0 million. To be 5.0 (R) Dome Flore Appraisal Drilling--Seismic Project preparation underway deter- (Bank) tests and drilling to appraise light financed by a $200,000 Bank mined oil deposit and collect heavy oil Project Preparation Facility samples; geological work; engineering advance. Preparation to. be study to develop light/heavy oil extended, to include addi- fields; and technical assistance to tional seismic work. Commercial the Department of Mines. Preliminary drilli'ng partner and cofinancer's ,project costs $17.0 million. will be sought. SIERRA LEONE Ministry 10.0 (R) Highways II - Three-year maintenance Negotiations scheduled for mid- of Works (IDA) program, including procurement of February. (OPEC Fund considering equipment, spare parts and tools; co-financing $7.0 million and staff training .and technical ADB $6.0 million.) assistance. Total cost estimated at $27.2 million of which $21.4 million .in foreign exchange. See page 1 for footnotes. - 26 - Member Country, and Borrower or Amount & Stage of·Pro~ess- Implementing Probable ing and Action on· Agency Y Lender '!) Procurement '±_/ ·· SIERRA LEONE (Cont'd) To be 10.0 Power (Hydro) IV - Development o{ Design studies are underway, determined (IDA) Bumbuna hydro plant on Seli river, (Co-financing·would be-required;) (NATIONAL Up to Industrial Finance Company - To· Project components under dis- DEVELOPMENT s.o provide a line of credit for small cussion with NDB and Government. BANK (NDB)) (IDA) and medium enterprise development, Ministry of 12.0 (R) Eastern IADP II - Extension of Approved by the Executive Agriculture (IDA) ·ongoing operations to entire Eastern Directors on January 13, IDA and Forestry Region, strengthening regional Project Preparation Facility agricultural services to improve advance of $100,000 is financing production of rice, cocoa, coffee. start-up activities, (Co- and oil palm; construction of feeder financing with BADEA and UNDP,) and penetration roads and ·village wells, Total cost -estimated at $25,0 million, including $16.0 million in foreign exchange, Ministry of 8,0 (R) Northern IADP II - Extension and Negotiations scheduled for mid- . Agriculture (IDA) ·consolidation of ongoing operations February. (IFAD joint co-financing in Northern Region to increase pro- $6,0 million, ADB parallel financing duction of rice _and other foodcrops; $8,0 million, and UNDP $7,0 million feeder roads and village well construc- grant for technical assistance·,_) tion. Total cost estimated at $26.S million, including $17,6 million in foreign _exchange, TOGO Ministere des 12.0 (R) Highways IV - Road strengthening, Negotiations scheduled ·f~~ ·~~d-· Mines et des (IDA) road maintenance equipment; train- February, (Co-financing of Travaux ing; pre~investment studies, Total about $7 million being sought,) Publics cost estimated at $21,6 million including $17,6 million in foreign exchange, Office s.o (R) Studies and basic· engineering for Appraisal mission in the field, · Togolais (IDA) phosphoric acid plant producing des 1,000 t/day. Phosphates Ministere du 1.0 (R) Rural Development II - Increase in Project will no longer be reported, Developpement (IDA) foodcrops, cotton and tree crop Elements of this project will be Rural production, livestock.improvement, included in new project, listed introduction of· ox-cultivation and below, bottomland development in Bassar area; strengthening of institutions and improvement of infrastructure. Total cost about $25.0 million, Governments 2.5 (R) Engineering design and preparation Appraisal mission in the field, of Benin (IDA) of tender documents for the regional (Co-financing has been and Togo Nangbeto hydroelectric project, Total arranged with FAC,) cost $3,5 million, Ministere 30,0 (N) Rural Development II - Development Project preparation by RMWA du Developpement (IDA) of cotton and food crops production commenced_ in January, Rural by following up on the activities of the cotton project (Cr, 741), and including viable elements of the Maritime project (Cr, 638), The project will ,include institution strengthening, provision of farm inputs and extension services, seed production, animal traction and infrastructure, Total cost about $40,0 million, See page 1 for footnotes, - 27 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agenc;y Y Lender '3-1 · Procurement. 4/ UPPER VOLTA Ministere -du 20.0 (R) Koudougou ORD - strengthening of ORD; Negotiations incomplete pending Developpement (IDA) extension, training; input delivery final financing plan, (Co- Rural and credit; attempt towards low-cost financing with Germany and the farming and experimental program Netherlands,) to improve production techniques and farming systems;. reafforestation; animal health program. Total cost estimated at $30.2 million. Regie Abidjan- ,8.i Railways II - IDA funds would finance Appraisal report being prepared, Niger (IDA) Upper Volta's share of RAN railway (Co-financing with CIDA and CCCE (RAN) project with specific items to be is envisaged.) identified. Ministere du 16.0 (R) Bougouriba II - Re-organization of Approved by the Executive Developpement (IPA) the ORD; extension; training schemes; Directors on January 28, Rural credit and marketing; forestry ,and livestock. Total cost estimated at -$17.5 million. , Ministere 43.0 (R) Highways IV - Four year phase Appraisal report being reviewed. des Travaux (IDA) (FY82-85) of maintenance operations; (Co-financing with the Netherlands. Publics feeder roads construction and improve- ments. Total cost estimated at $57.7 million, of which $44.8 million in foreign exchange. Ministere du 10.0 (R) Rural Development Fund III - Invest- Appraisal tentatively scheduled Developpement (IDA) ments in small scale rural projects for March, (Co-financing with Rural, such as bottomland development, small the Netherlands,) irrigation projec,ts, erosion controls, open and tubewells, medium term credit for oxen, agricultural equipment and unidentified projects. Ministere du 15.0 (R) West Volta II - Continuation of rural FAC-financed preparation Developpement (IDA) development in the ORDs of Bobo report due in February, Rural Dioulasso and Dedougou, including Appraisal tentatively continued development of extension scheduled for May, (Co- services, expansion of cotton and financing will be required.) food crops, small scale irrigation schemes. Ministere 20.0 (R) Kompienga multipurpose (hydro-power, Appraisal tentatively scheduled du Developpe- (IDA) fishing, irrigation) project. Total for May. Co-donor meeting planne< ment cost estimated at $100.0 million. for beginning of March. (Co- Rural/VOLTELEC financing will be required,) Mini st ere 15.0 (R) Telecom III - Expansion and upgrading Appraisal mission scheduled des Postes (IDA) of telephone and telex facilities for February. (Co-financing et Telecom- and increase penetration into rural envisaged.) munications· areas. To be 6.0 (N) Technical Assistance - Establishment· Project preparation underway. determined (IDA) of Development Investment Budget Appraisal scheduled for to plan projects, program budget, April, and control development investments, .. ·. See page 1 for footnotes, - 28 - Member Country, and Borrower or Amount & Stage of Process~ Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement!!_/ III, EAST ASIA AND PACIFIC CHINA China To be (N) Education I - Technical assistance, Appraisal report Ministry deter- equipment and civil·works to help being prepared, of Education mined improve the quality of education and research in sciences and engineering, The project would also assist in strengthening the university management systems and prepare for future education investments. China To be (N) First Agricul·ture Project - Pro- Project being prepared Ministry deter- vision of irrigation and drainage by Government. of Agri- mined of farm land facilities for culture approximately 325,000 ha of farm land, Project focuses on problems of soil salinity and provides agricultural support services, China To be (N) Ports Project - Modernization of Project being prepared Ministry ·deter- existing ports and provision of by Government. of Com- mined modern facilities to meet short- munications term requirements of increasing bulk cargo and container traffic, FIJI Government 18 ,0 (R) Cyclone Reconstruction Project - Loan signed on January 21, (Bank) Reconstruction of roads and drain- age works on Viti Levu damaged by Cyclone Wally (April 1980). Total cost of project estimated at $31,0 million, of which $18,0 million in foreign exchange, INDONESIA Ministry of 60.0 Water Supply III - Assistance for Project preparation by Public Works (Bank) urban and rural water systems in Government and consultants East Java. underway. Ministry of 80.0 Marine Transport III (Shipping and Project being prepared by Communications (Bank) Ports) - To develop selected ports, the Government, improve shipping, and possibly develop dredging capability. Ministry of 50,0 Transmigration III - Development of Project being prepared Manpower and (Bank) transmigration schemes in East by the Government. (Co- Transmigration Kalimantan. financing is envisaged.) Ministry of 100.0 Transmigration IV - Development of Identification underway. Manpower and (Bank) transmigration schemes. Transmigration Ministry of 50.0 Watershed Development I - Integrated Project Preparation Facility Agriculture (Bank) program of reforestation, soil advance of $463,000 approved conservation, and related develop- to finance consultants and ment in Java, mapping services to advance the preparation of this project, Ministry 70,0 North Sumatra Transport - To Project being prepar~d by of Public (Bank) develop transport system for Government and consultants,· Works estates, and. for other regional (Co-financing i~ envisaged,) goods and passenger traffic, See page 1 for footnotes, - 29 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender Jj Procurement!!._/ INDONESIA (Cont'd) P.N. Batubara 170.0 Bukit Asam Coal Mining and Trans- Appraisal report being prepared. and Directorate (Bank) port - Rehabilitation and expansion (Co-financing is envisaged.) of States of Bukit Asam coal mine and the Railways necessary infrastructural (PJKA) improvements. The output of the mine would be transported for use at Suralaya Power Plant. Total project cost is estimated at $1 billion. Ministry of 165.0 (R) Nucleus Estates V - Assistance to Appraisal report being prepared. Agriculture (Bank) smallholders in Java and other islands through nucleus estates. Ministry of 80.0 Education X - Textbooks and Appraisal report being prepared. Education (Bank) instructional material development. and Culture Ministry of 80.0 Education XI - Second phase Project preparation Education (Bank) of teacher training program. underway by Government. and Culture Ministry of 250.0 (R) Power X -·Saguling Hydropower Negotiations substantially completed. Mining and (Bank) (Stage I - 700 MW). Board presentation scheduled for Energy February 24. (Co-financing is envisaged.) Ministry of 17 .s Seeds II - Second phase of seed Appraisal report being reviewed. Agriculture (Bank) industry development covering nine provinces. Bank 150.0 (R) DFC/APEX I - Provision of industrial Project being prepared by the Indonesia (Bank) financing to relevant DFCs. Government, Directorate 70.0 (R) Highways VII (Rural Roads I) - Appraisal mission scheduled General of (Bank) Programs to improve rural road for mid-February. Highways operations, including new con- struction, betterment, and maintenance in about 20 selected districts. Ministry of 85.0 Jakarta/Cikampek Corridor (Highways Appraisal report being prepared. Public Works (Bank) VI) - Construction of toll road and (Co-financing is envisaged.) improvement of existing road between these two cities. Directorate 40.0 Urban Development IV - Kampung Negotiations scheduled for General of (Bank) improvement and sites and services February. Public Works and program in up to ten medium-sized Housing (Cipta cities. Karya) and Municipalities Ministry of 40.0 Jakarta Urban Transport - Improvement Project being prepared by Transport and (Bank) of transport facilities in Jakarta. Government and consultants. Communications and Jakarta City Government Ministry of 22.0 Swamp Reclamation I - To drain swamp Negotiations substantially Public Works (Bank) area and manage water resources in completed; pending Government 9,000 ha. at Karang Agung. Total response to one outstanding project cost estimated at $39 million. procurement issue. Ministry of 100,0 Industry I - Pulp and Paper - A pulp Project preparation underway. Industry (Bank) and paper complex in Central Java. It will include a pulp and paper plant and mechanical wood industries. See page 1 for footnotes. I I \ - 30 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender'!:_/ Procurement 4/ INDONESIA (Cont'd) Ministry of so.o Education XII - Public Administration - Project preparation underway Education (Bank) Improvement of training for staff of by the Government, and Culture provincial governments, Ministry of 215.0 Nucleus Estates VI - Assistance to Project preparation underway, ,Agriculture (Bank) smallholders through nucleus estates, Ministry of 40.0 Jakarta Sewerage I - Improvement of Project being prepared with Public Works (Bank) Jakarta sewerage system. the help of consultants, Ministry of so.o Urban V - Urban services and infra- Project being prepared Public Works (Bank) structure improvement in East Java by the Government, cities, Ministry of 170.0 Power XI - Transmission and dis- Identification underway by Mining and (Bank) tribution networks in Java from Government and consultants, I Energy 1962-86, Estimated cost $1,l (Co-financing envisaged,) l billion, Bank Indonesia, 100,0 Small Enterprise Development II - Appraisal report being I Ministry of Finance (Bank) To extend credit to small enter- prises through Government sponsored prepared, programs and to provide technical I assistance to the leading banks, '[ Ministry cif 50.0 Forestry - Industrial forest planta- Project preparation underway. Agr:l,culture (Bank) tions; strengthening of forestry (Co-financing is envisaged,) sector institutions, and National Forest Land and Timber·Inventory, Ministry of 175.0 Irrigation XVI - Primary and Project preparation underway. Public Works (Bank) secondary canals, and sector I i components on tertiary canals; operation and maintenance and i general institution building. I Ministry of Mines 10,0 (Bank) Energy - Engineering loan to prepare feasibility report on Project preparation underway, and gas distribution, Energy P,T, Pupuk 50.0 (N) Fertilizer Distribution II - To Project preparation underway. Sriwijaya (Bank) increase capacity to distribute (Co~financing is envisaged,) (PUSRI) output of new fertilizer plants, KOREA Ministry of 50 ,0 (R) Agricultural Marketing I - Construc- Second pre-appraisal mission Agriculture (Bank) tion of urban wholesale markets for scheduled for February. and Fishery fruits and vegetables and fishery products, with ice making and cold storage facilities, Ministry of 50.0 Small and Medium Machinery Industry - Project being prepared by Commerce and (Bank) To provide technical and financial · the Government, Industry assistance to a selected group of small enterprises. Ministry of 60.0 Technological Development - Develop- Project being prepared Science and (Bank) ment of policies and institutions by.~overnment and consultants. Technology for advanced industrial techno- (MOST) logical development, See page 1 for footnotes, - 31 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender Y Procurement!!_/ KOREA (Cont'd) Korea Land 100.0 National Urban Land Development and Appraisal report being Development (Bank) Housing - To service residential land prepared. Corporation in about ten cities and construct (KLDC) and housing for low-income families, Korea National Housing Corporation (KNHC) Ministry of 100.0 Water Supply I - To help improve water Appraisal report being prepared. Construction (Bank) supply and sewage system in Daegu, Masan, Changwon, Jimhae and Gwangju, National 60.0 Agriculture Credit III - To assist in Appraisal report being prepared, Agricultural (Bank) financing investments in the entire Cooperative agriculture sector, and also rural Federation industries which will support agri- (NACF) culture during the three-year period, 1981-1983. Small and 45.0 SMIB IV - To finance a portion of Appraisal report being prepared. Medium (Bank) SMIB's foreign exchange requirements, Industry Bank (SMIB) Ministry of 200.0 Ports III and Cement and Coal Distri- Project under preparation Transportation/ (Bank) bution - Ports III will provide addi- by Government and con- Korea Maritime tional capacity, especially container sultants, (Co-financing and Port Authority handling capacity, Cement and Coal is envisaged.) Distribution I To finance part of the foreign exchange needed to improve the efficiency of coal and cement distribution in Korea. (The cement and coal distribution element was previously reported as a separate project,) Minis.try 200.0 (R) Structural Adjustment Loan - To Appraisal mission scheduled of Finance/ (Bank) help the Government implement its for mid-March. Economic structural adjustment policies Planning over the 1980/81 period, The Board policies in question are related to rationalization of industry, streamlining of agriculture and energy conservation, LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of 27.0 Rural Roads - Rehabilitation of main Project preparation underway Communications, (IDA) roads and construction of access roads, with UNDP assistance, (Co- Transport and and improvement of road maintenance, financing with SIDA being Public Works explored,) Ministry of 10.0 Agricultural Rehabilitation and Preparation mission scheduled for Agriculture (IDA) Development IV - Strengthening of February, (Co-financing being agricultural support services. sought,) · Electricite 15,0 Nam Ngum Power Expansion - Third Appraisal report being prepared, du Laos (EdL) (IDA) stage expansion of Nam Ngum for (Co-financing with OPEC Fund sale of electricity to Thailand; and bilateral sources being technical assistance, sought,) Ministry of To be Small Scale Irrigation - Development Project being prepared by Agriculture deter- of small and medium-size irrigation consultants financed out mined project covering a total area of of IDA Project Preparation (IDA) about 13,000 ha. Facility advance of $375,000, (Co-financing envisaged,) Seee page 1 for footnotes, - 32 -' Member Country, and Borrower or Amount &' Stage of Process-, Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement !!J LAO PEOPLE'S DEMOCRATIC REPUBLIC (Cont'd) Ministry, of To be (R) Forestry Project - Forest production Follow-up mission scheduled Agriculture deter- and plantation and support. to for February. Project-to be mined 11 forest industries. prepare~ by FAO/CP program. (IDA) !',AL,\YSIA Perak State so.a (R) Trans Perak Area Development - Drainage Neg~tiat:l.ons !!nb,.tantiall.y Government (Bank) and reclamation of swamplands along completed, Board presenta- Drainage Perak River; development of reclaimed tion scheduled for March 31, & Irrigation areas for padi and treecrop agricul- (Co-financing being considered,) Department ture and settlement by landless farmers, 1 Total project cost esti- mated at $200.0 million, with foreign exchange component of $67.0 million. Ministry of 30.0 Education VI - Strengthening of Project being prepared by Education (Bank) vocational and in-plant training. Government. and Ministry I of Labor and Manpower I I Ministry of 40 .0 (R) Rompin Endau - Irrigation, drainage, Negotiations substantially I Agriculture (Bank) and flood protection along Rompin, Pontian and Endau rivers in Eastern completed. ijoard presentation scheduled for March 17. Pahang, along with settlement facil- (Co-financing being considered,) ities for about 4,750 families. Total cost estimated at $141.0 mil- lion, ,with a'foreign, exchange, component of $59.o'million. Ministry of 37.0 (R) FELCRA Rural Development - Institu- Appraisal report being Agriculture-, (Bank) tion building and time slice of reviewed. Federal Land FELCRA's land consolidation Consolidation program. and Rehabilita- tion Authority (FELCRA) Ministry of 50.0 (R) State Rural Development I - The Project being prepared Agriculture , (Bank) project covers irrigated and non- by Government. irrigated agriculture in Malacca and Kodah Valley. Government 55.0 Industries I - Assistance for Project being prepared (Bank) manufacturing and institutional by Government. development. Government 55.0 (R) Road Construction - Strengthening Project being prepared (Bank) the planning·and construction by Government, capability of the road constuction industry, technical assistance and training, as well as financing for some road construction and maintenance, Ministry of '63,0 (R) Western Jahore ..: Integrated' Develop-' Project being prepared by Agriculture (Bank)' ment - Construction of farm roads Govermbent. and drainage facilities, and provision of agricultural support services, National '75 ,0 (R) Rural Electrification I - Expansion Project being prepared by.the Electricity (Bank) of the rural power network with Government, Board mini-hydro schemes. -Total co$t is estimated to be $163 million. PAPUA NEW GUINEA ,Department 6.0 Education II - Expansion 'of primary Approved by the Executive i' of Education (Ba'nk)'· and basic adult education, essentially Director, on December 23, 12.0 in disadvantaged provinces and assis- (IDA) tance to educational administration and planning. See page 1 for footnotes, -·33 - Member Country, and Borrower or Amount & ·stage of _Process- Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement!:_/ PAPUA NEW GUINEA (Cont'd) Department 15,0 Agricultural Credit II - A Project processing in abeyance, of Primary (IDA) nationwide agricultural project pending resolution' of interest Industry/PNG to support agricultural produc- rate issue, Development tion and processing through credit Bank and technical assistance,· It would Procurement: Retroactive financing also include a pilot T&V extension of $1,5 million for undertaking component and provincial data expansion of staff and facilities, collection and analysis, processing subloans and making field management arrangements from June 1 being considered, Department s.o Petroleum Technical Assistance - Project being prepared by of Minerals (IDA) Technical assistance for' promotion· Government, and of petroleum exploration. Energy Department l4 .o Rural Development - ENGA - Integrated Project being prepared by of (Bank) rural development' in Enge province, Government, Provincial 1,0 Affairs, (IDA) National Planning Office PHILIPPINES Ministry 90,0 (R) Education VII (Elementary) - To Post-appraisal mission of (Bank) strengthen the regional offices in early February, Education of the Ministry of Education and (Co-financing may be sought,) and Culture, assist in the production Culture of textbooks, and improve elementary educational services throughout the country. Development 75,0 DBP - Commercial Crops Production Project being prepared Bank of the (Bank) and Processing - Agricultural credit by the Government, Philippines for crop production, processing and (DBP) marketing. Ministry 16.0 National Fisheries Development - Insti- Appraisal report being prepared, of Natural (Bank) tutional support and infrastructure Resources for fisheries sector, including pro- grams for poor municipal fishermen. Ministry of 41.0 Agricultural Support Services - Appraisal report being Agriculture (Bank) Institutional and facilities support prepared. for agencies involved in agriculture and nutrition. To be 80.0 Urban IV - Investments in 3 to 5 Project being prepared determined (Bank) cities including selected primary by Government. infrastructure, employment genera- tion and industrial estates, transport, municipal services and facilities, and sanitation and shelter to support a program of spurring regional urban economic development. Central Bank 150.0 Financial Sector (Apex) Loan - To Appraisal report being of the (Bank) finance industrial development through prepared. (Co-financing Philippines development finance companies, of about $100 million such as DBP, PDCP and PISO. being sought,) Industrial 75.0 Small and Medium Industries III - Project being prepared by Guarantee (Bank) To provide funds for relending to Government. (Co-financing and Loan Fund small and medium industry, and may be sought. ) supporting technical assistance to specific subsectors. See page 1 for footnotes. - 34 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender it Procurement 4/ PHILIPPINES (Cont'd) Ministry 140.0 Textile Sector - Rehabilitation Appraisal mission scheduled of Industry (Bank) of the textile sector. for February. Ministry 85.0 Rural Development IV (Land Project being prepared of Agrarian (Bank) Settlement II) - Further assis- by Government. Reform tance for planning and execution of Government's land settlement program. National 45.0 (R) Rural Electrification II - To finance Project being prepared Electrification (Bank) expansion of Government's on-going by Government. Administration rural electrification program. National so.o Communal Irrigation - To finance Project being prepared Irrigation (Bank) a part of the Government's communal by the Government. Administration irrigation program covering about (NIA) . 20,000-30,000 ha. Ministry of 125.0 (R) Road Subsector - Construction and Project being prepared Public Highways (Bank) improvement of rural roads; nationwide by Government. bridge program on national roads; and maintenance and rehabilitation of national roads. Land Bank 85.0 Small Farmer Development (Land Bank Project being prepared of the (Bank) II) - Further credit, suppor~ services by LBP. Philippines and minor infrastructure assistance (LBP) for land reform beneficiaries. Ministry 60.0 Rainfed Agricultural Development Project being prepared of (Bank) II (Mindanao) - Support services by Government. Agriculture and infrastructure to promote diversified rainfed and upland crop/livestock systems in Mindanao region. SOLOMON ISLANDS Government of s.o .Multisector Credit - Multisector Project being prepared Solomon Islands (IDA) credit with emphasis on primary by Government. education. A small rural transport component likely to be included. Total project cost estimated at $8 million. Government 1.5 (R) Development Bank:, Solomon Islands - ADB negotiations completed; of Solomon (WA) Total project cost estimated at $5.0 IDA negotiations have been Islands, million. Project appraised by. postponed to February per Development Asian Development Bank (AI)B). request of the Government. Bank (Co-financing expected with ADB in lead.) Government 2.0 Lungga Hydroelectric Power Project~ Project being prepared of Solomon (IDA) Total project cost estimated at by Government and will be Islands, $35 million. appraised by Asian Development Electricity Bank (ADB.) (Co-financing Authority expected, with ADB in lead.) THAILAND Ministry of so.o Education Sector Loan - Improvement Project being prepared by Education (Bank) of primary instructional materials; Government, with assistance strengthening of diversified secondary from UNESCO. education. See page , l for footnot'es. - 35 - Member Country, and Borrower or Amount & Stage- of Process-. Implementing Probable ing and Action on. Agency Y Lender 'l:__/ Procurement!:_/ THAILAND (Cont'd) (INDUSTRIAL 30.0 (R) IFCT IV - Provision of cred-it Negotiations substantially FINANCE (Bank)· to industrial enterprises. At completed. CORPORATION least one-third of the loan will be OF THAILAND) used to help finance small- and (IFCT) medium-scale industries. Ministry of 60.0 Irrigation XII (Mae Klong) - Construc- Appraisal report being Agriculture (Bank) tion of main, secondary and tertiary prepared. & Cooperatives canals and drains, including on-farm development, serving 60,000 ha on the left bank of the Mae Klong in western Thailand. Total project cost estimated at $125 million with a foreign exchange component of about $60 million. Ministry of 84.0 Irrigation XIII (Medium Scale/Nam Mun) Project being prepared by Agriculture (Bank) - Slice of Royal Irrigation Depart- Royal Irrigation Department, and Cooperatives ment's irrigation development program, assisted by consultants. including construction/rehabilitation (Co-financing from KfW of medium-scale irrigation systems and likely.) construction of storage dams on head- waters of Mun River and of irrigation systems for about 25,000 hectares. Ministry of 100.0 Provincial roads - Construction Negotiations tentatively Communications (Bank) and improvement of up to 2000 km scheduled for mid-March. of provincial roads forming part (Co-financing being explored.) of the Government's accelerated agricultural road development program; road maintenance and technical assistance. Total cost estimated at $225 million. Ministry of so.a (R) Forestry I - Forest protection, Negotiations scheduled for Agriculture (Bank) wood lot development, industrial early March. (Co-financing with an.d Cooperatives plantations, forest villages and Australia.being explored.) research, extension and training for Royal Forestry Department. Total cost estimated at $100 million. (RUBBER 145.0 (R) Second Rubber Replanting - Second Appraisal report being pre- REPLANTING (Bank) phase of rubber replanting project. pared. (Co-financing of about AID FUND Total costs estimated at $428.0 $25 million with CDC being BOARD) million. arranged.) (TELEPHONE 90.0 Fourth Telecommunications Project - Project processing delayed pending ORGANIZATION (Bank) Expansion of telephone facilities ongoing work on Third Telecommunica- OF THAILAND) particularly in rural and provincial tions Project. areas. Total costs estimated at $545 million with a foreign exchange com- ponent of $328 million. Department 120.0 Roads Sector - Selection and construc- Identification mission of Highways, (Bank) tion of rural roads in provincial report being prepared. Ministry of areas. (Co-financing being explored.) Communications (ELECTRICITY 100,0 (R) Power Subsector Loan - To support Negotiations scheduled for GENERATING (Bank) EGAT's investment program mid-March. (Co-financing AUTHORITY being explored.) · (EGAT)) See page 1 for footnotes. - 36 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and ,.Act.ion on Agency Y Lender'};_/' Procurement _!:_I THAILAND (Cont'd) Ministry of 30.0 Land Reform Area. Development- -.·Land Appraisal mission scheduled Agriculture (Bank) development, titling, irrigation, for March •.. (Co-financing and Cooper- reforestation; infrastructure and being explored.) atives other services in settlement areas. (PETROLEUM 70.0 Integrated-Energy I - Natural gas. Appraisal mission scheduled for AUTHORITY (Bank) processing and liquified petroleum . late February. (Co-financi~g OF THAILAND gas distribution .to substitute for· •with CDC and commerci.al b?nks. (PTT)) charcoal and for diesel consump- being explored.) tion in public transport; assistance to exploration/delineation drilling and institution-building measures. Total cost tentatively estimated at $300 million, Ministry of 50.0 Population/Health II - Expansion of Identification mission Public Health (Bank) the Government's population, health scheduled for mid-1981. and nutrition activities through the construction of rural health facili- ties, provision of equipment, materials and supplies and training of staff. Dept. of 8.9 (R) Potash Engineering - Studies and Approved by the Executive Mineral (Bank) trial mining operations to estab- Directors on January 28. Resources lish the technical, financial and (DMR) in economic viability of a potash Procurement: Feasibility study Ministry of fertilizer project. Total project and engineering design work Industry cost estimated at $10 million. will be undertaken by consult- ants under a fixed price turnkey contract. Retroactive financing of up to $100,000 for expendi- tures from December l, 1980 for technical advisory services and equipment to allow DMR to prepare for initiation of the study approved. (PETROLEUM 80.0 (R) Integrated Energy II - Expansion Preparation mission AUTHORITY (Bank) of Thailand's refinery capacity, scheduled for late February. OF THAILAND retrofitting industries and (Co-financing being explored.) (PTT)) institution building measures. Total cost estimated at $350 million. VIET NAM Ministry of To be Coal Expansion I - Development of a Project processing in Electricity deter- coal mine in Quang Ninh Province. abeyance. and Coal mined Total project costs tentatively (IDA) estimated at $112 million. Viet Nam To be Industrial Rehabilitation Project - Project processing in Bank for deter- Rehabilitation and expansion of abeyance. Industry mined textile, pulp and paper, and food (IDA) processing industries. Total proj- ect cost tentatively estimated at $50 million, Ministry To be Nghe Tinh Agricultural Rehabilitation Project processing in of Water deter- and Development - Repair of flood abeyance, · Conservancy mined damage on irrigation and drainage (IDA) works in northern part of Viet Nam heavily damaged by typhoons and floods in 1978, and construction of salinity and flood control works, Total project cost estimated at $128 million, See page l for footnotes. - 37 - Member Country, and Borrower or Amount & Stage of Pro~ess- Implementipg Probable ing and Action on Agency;!/. ~~./ Procurement ii VIET NAM {Cont'd) Ministry of To be Transpo·rt Rehabilitation - Rehabili.- Project processing in 'frans11ort · deter-:- tation of port, roads and railway~ abeyance. mined .faciliti~s and inland waterways.' nnA) Miqistry To be Agricultqral rehabilitation and Project processing in of Water deter- development in province~ with high abeyance. Conservancy miped ,ood production potential. 1 0:Di\) See page l for footnotes. - 38 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender'!:_/ Procurement!±._/ IV. SOUTH ASIA BANGLADESH Bangladesh About Agricultural Credit - To support Appraisal report being prepared. Bank 40.0 proposed reform of agricultural (IDA) credit system; funds for credit to farmers for on-farm investments, especially for minor irrigation. Ministry of Up to Inland Water Transport III - Government Agencies/consultants Ports, Ship- 40.0 Components not yet identified. to carry out studies and basic ping and (IDA) preparation work for future Inland Water project. Transport Telecommuni- About Telecommunications III - Next Processing timing dependent cations Board 40.0 phase of Government's develop- on progress of impl11mentation (IDA) ment program. of Telecommunications II. Bakhrabad 85.0 Bakhrabad Gas Development - Field Approved by the Executive Gas (IDA) development drilling of Bakhrabad Directors on December 23. System Gas field and construction of (Co-financing arranged with Ltd. transmission pipeline to OPEC Fund for $21.0 million Chittagong. and with OECF-Japan for about $30._0 million.) Ministry About (R) Road Maintenance - Strengthening Consultant's Phase I of Roads, 40.0 of maintenance organization through report reviewed by Government Highways (IDA) training, provision of equipment and IDA. Further processing and Road and materials and technical assist- contingent upon Government's Transport ance, possibly including selective decision on focus and rehabilitation of existing primary timing of Phase II. roads. Ministry of About Business Management Training - Assis- Appraisal scheduled for early Education and 10.0 tance to Dacca University and Ministry March. Ministry of (IDA) of Industries for strengthening Industries management training and education. Seed About Seeds II. Construction of facili- Negotiations delayed pending Corporation · 13 .o ties for seed production, ·processing,. agreement on major project (to be (IDA) distribution, storage, research and components. established) technical assistance. Ministry of About (R) Extension and Research II. To FAO/CP assisting.Government in Agriculture 40.0 support extension and research project preparation. Report (IDA) on production of rice and wheat.. expected end-April. To be To be Fertilizer Production II - Government working out new determined deter- Ammonia/Urea Factory. financing plan, including mined co-financing possibilities, (IDA) to determine whether IDA financing is necessary. Chittagong About (R) Ports I - Possibly to include Project preparation by Port Authority 45.0 construction of multip°iirpose berths, consultants in progress, (CPA) (IDA) dredging, cargo handling, equipment, Appraisal scheduled for improved lighting, technical April, assistance and training. Bangladesh About (R) Textile Jndustry - Balancing, Appraisal mission scheduled Textile 35.0 modernization and replacement, for March, Manufacturing (IDA) and imported raw materials. Corporation See page 1 for footnotes. - 39 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 'J:._/ ···Lender '!:_/ Procurement'!_/ BANGLADESH (Cont'd) .. Bangladesh About Sugar - May include mill rehabili- Being prepared by BSFIC with Sugar & Food 10.0 tation, improvement in mill farms assistance from FAO/CP, Corporation (IDA). and transportation in mill zones, (BSFIC) strengthening extension and research, and a pilot gur improve- ment program, Bangladesh About (R) BSB II - DFC line of credit to Negotiations scheduled for Shilpa 50.0 assist industrial enterprises, February. Bank (BSB) (IDA) Dacca Water About Dacca WASA III - Extensions to Project being prepared by WASA, and Sewerage 25.0 water supply and sewerage assisted by consultants, Authority (IDA) systems, (WASA) Water Devel- To be (R) Drainage and Flood Control II - Mission in the field to review opment Board deter- Expected to include several small- proposed design changes on (WDB) mined scale drainage and flood control previously-appraised subprojects, (IDA) subprojects, and to appraise two additional subprojects. Bangladesh 25,0 (R) Fertilizer Transport - Transport Approved by the Executive Agricultural (IDA) sector investments designed to Directors on January 22, Development improve fertilizer distribution, Corporation; including improvements in river Procurement: Retroactive Bangladesh port facilities, fertilizer storage financing for up to $500,000 Railways; facilities, rehabilitation of of site work approved, Bangladesh railway wag9ns for fertilizer unit Results of ·tender for dredging Inland Water trains, improvements to rail at Chittagong port under eva- Transport sidings and rail ferry crossing luation, Authority; and dredging at Chittagong Port. and Chittagong Port Authority Planning Up to (R) Technical Assistance IV - Technical Negotiations expected Commission 16,0 assistance activities in various February/March, Timing of (IDA) sectors. Board presentation dependent upon progress in commitment of funds under Technical Assistance III. Planning About (R) Imports Program X - Provision of Pre-appraisal mission Commission 75.0 foreign exchange for procurement scheduled for mid-March. (IDA) of raw materials and spare parts required to improve utilization of existing capacity. Power To be Power II - Expansion of Ashuganj Consultants engaged; Development deter- Plant to provide additional project preparation Board mined generating capacity. underway, (IDA) Water To be WDB Sector Credit - Small irrigation/ WDB is reviewing consultants' Development deter- drainage/flood control projects, proposals. Board (WDB) mined (IDA) Water To be Barisal Patuakhali - Irrigation, FAO is assisting WDB in Development deter- drainage and flood control works project preparation, Board (WDB) mined in Barisal and Patuakhali districts (IDA) in southwest Bangladesh, See page 1 for footnotes. I I I \ - 40 - I Member Country, and Borrower or Amount & Stage of Process- I Implementing Probable ing and Action on Agency!./ Lender'!:._/ Procurement':!_/ I BANGLADESH (Cont'd) I Ministry To be Hand Tubewells - Imported raw Appraisal report being of Local deter- materials to be supplied to local prepared. Government, mined foundries to manufacture pump Rural (IDA) heads; imported pipes and strainers, Procurement: Retroactive Development, tool boxes; training of mechanics. financing for about $50,000 and of civil works expenditure Cooperatives for pumps storage facilities under consideration. Water & About District Town Water Supply - Project being prepared by Sewerage 25.0 Water supply systems for consultants. Authorities (IDA) Khulna and Rajshahi. (to j,e established) Petrol,angla To be Gas exploration - To be Agreement with Government deter- identified. on gas/o1.l developmer>.t mined programs under discussion. (IDA) Ministry of To be Rural Development II - Extension Subsector report under Local deter- of Integrated Rural Development preparation. Government, mined Program (IRDP). Rural (IDA) Development i and I. Cooperatives I Rural About Rural Electrification. REB is preparing project. Electrification 45.0 Pre-appraisal mission scheduled Board (REB) (IDA) for February. Establishment About Public Administration - Expansion Consultants in the field. Division of 30.0 of the public administration Preparation report due the Cabinet (IDA) training complex. June 1981. Secretariat BURMA · Ministry 23 .O (R) Grain Storage .,. Rehabili·tation of Credit signing on February 6. of Trade (IDA) existing storage and provision of new storage facilities, drying facility and equipment for grading at procurement centers, transpor- tation facility, training and technical assistance. Ministry of To be (R) Fuelwood Supply - First phase of Project being prepared by Agriculture peter- ten-year plantation program to Government with assistance · and Forests mined supply fuelwood and small timber of FAO/CP. (IDA) for domestic use, particularly for rural areas. Ministry of To be (R) Fisheries - Investment for fisheries Project is being prepared Agricui i.u!'e deter- development in the Irrawaddy Delta, by Government/IDA with con- and Forests mined which includes a minor fishing harbor, sultants financed by UNDP. (IDA) shore facilities, fishing vessels and a net-making plant. Ministry of To be Power I - Power transmission project Project being prepared Industry II deter- to interconnect the power supply by Government with assistance miried system. from consultants financed by (IDA) Norway. See page 1 for footnotes. - 41 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender JJ Procurement'!_/ BURMA (Cont'd) Ministry of Up to (R) Wood Industries I - To improve Negotiations in early. Agriculture 33.0 recovery and quality of semi-finished February. and Forests (IDA) and finished wood products. Main components include reconstruction of two teak .sawmills and two plywood/ veneer plants, construction of export veneer plant, improvements of furniture factory and a new central timber yard, and workshop facilities. Ministry of Up to · Arakan Pulp and Paper - To co.nstruct Project preparation under way Industry II 40.0 a pulp and paper mill with a capacity. by Government, with assistance (IDA) of 100 tons per day of printing and from consultants financed writing paper produced from a mixture by an advance of $150,000 from of bamboo and indigenous hardwoods. the IDA Project Preparation The project also includes associated Facility. .infrastructure facilities. Ministry of Up to Road Rehabilitation and Road Appraisal report being Construction 35 .o Transport Project - Rehabilitation prepared. and (IDA) of Pegu-Toungoo Road, pilot road Ministry of maintenance program, improvement Co-operatives of vehicle repair capability, and road transport supply program (tires and spare parts). INDIA Krishak Bharati 385.0 (R) Hazira Fertilizer - Construction of Negotiations scheduled Cooperative (IDA) two ammonia units of 1,350 tons-per- for February/~arch. Ltd. day each and four urea units of 1,100 (KRIBCO) tons-per-day each. Estimated project Procurement: Retroactive cost $1,235 million. financing of about $10 million will be proposed. Indian 100 .0 (R) Railway Modernization: Support Appraisal mission in the Railways (IDA) of !R's proposed electrification field. (IR) program to modernize railway operations and improve efficiency. Oil and 400.0 (R) Bombay High Offshore Development II - Loan signed on December 11. Natural Gas (Bank) Support of further development in Commission Bombay High off-shore oil a·nd natural gas fields. National 120.0 (R) National Cooperative Development. Negotiations tentatively scheduled Cooperative (IDA) Corporation II Project - Program for early April. Development to construct cooperative storage, Corporation strengthen the cooperative infra- Procurement: Retroactive financing (NCDC) structure and provide cold storage of about $4 million will be proposed. facilities. Government of 25.0 (R) Kanpur Urban Development - Program Appraisal mission tentatively Uttar Pradesh (IDA) of shelter and infrastructure scheduled for February/March. investment at Kanpur in Uttar Pradesh State. Government of 140.0 (R) Madhya Pradesh Medium Irrigation - Negotiations in early Madhya Pradesh (IDA) Irrigation and command area develop- February. ment in Madhya Pradesh State. Government of 220.0 (R) Madhya Pradesh Major Irrigation - Appraisal report being Madhya Pradesh (IDA) Development and command area prepared. development in major irrigation systems in Madhya Pradesh State. See page l for footnotes. - 42 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on !_gency Y Lender Jj Procurement~/ INDIA (Cont'd) Government of 100.0 Commercial Forestry - Afforestation Project preparation underway, Madhya Pradesh (IDA) of unused land and degraded forests Appraisal mission tentatively in Madhya Pradesh. scheduled for May. To be 250.0 (R) Paradi Fertilizer - Phosphatic Findings of appraisal mission determined (Bank/ fertilizer complex with capacity being reviewed. IDA) of 300,000 metric tons per annum. Post and Tele- 312.0 (R) Telecommunications VIII - Program Negotiations in early graphs Depart- (IDA) for the continued expansion of the February. ment, Indian telecommunications network, partic- Telephone ularly in rural areas, and the - Procurement: Possible retro- Industries Ltd., modernization and upgrading of three active financing of up to Hindustan Cables existing telecommunications equip- $30 million will be proposed, Ltd., Hindustan ment factories, and the addition 7~~2printers Ltd. cf :::i:::-.ae new .:'actories. National Thermal 250.0 Power - Development of the second tt.pprai:-;.dl. L·..:.-;_; 1J:::l ".J2.ing Power Corpora- (IDA) phase of Korba Thermal Power Devel- prepared. I I tion (NTPC) Government of West 35.0 (IDA) (R) opment in Madhya Pradesh State, West Bengal Social Forestry Project - Afforestation of unused land and Appraisal mission in the field. I Bengal degraded forests. i' To be 25.0 Rainfed Agriculture Project - Devel- Project preparation I determined (IDA) opment of rainfed agriculture system in selected State(s). underway,· I l I I To be determined 15.0 (IDA) Erosion ·and, Flood Control - Installa- tion of erosion and flood control systems in the selected States. Project preparation underway. Government 250.0- (R) Madhya Pradesh Pulp and Paper Preparation mission of Madhya 300.0 (formerly Forestry Industry) - scheduled for February/ Pradesh (IDA) Development of forestry industry March, in Madhya Pradesh State. Government 70.0 Upper Ganga Irrigation - Modernization Project preparation of Uttar (IDA) of· irrigation systems in Uttar Pradesh underway. Pradesh State. National 250.0 (R) Power - Development of the second Appraisal mission in the Thermal (IDA) phase of the Ramagundam Thermal Power field. Power Development in Andhra Pradesh State. Corporation (NTPC) Ministry of 250.0 Nhava Sheva Port - Construction of a Project preparation ShiP,ping and (IDA) new port facility to relieve serious underway, ,Transport/ overcrowding and delays at Bombay Bombay Port Port. Agricultural 250 .o Agricultural Refinance and Develop- Appraisal tentatively Refinance and (IDA) ment Corporation (ARDC) Credit IV - scheduled for March, Development Financing of portion of ARDC's lend- Corporation ing program for on-farm investments, Government 100.0 (R) Gujarat Water Supply and Sewerage Preappraisal mission of Gujarat (IDA) Project, scheduled for February/March, Oil and 150,0- Oil/Gas Development~ Assistance Project preparation Natural Gas 200,0 for development of South Bassein underway, Commission (Bank) offshore gas field, Government 100,0 Tamil Nadu Newsprint Project - Appraisal report being of Tamil (IDA) Construction of paper mill in prepared, Nadu Tamil Nadu. Cement 230,0 (R) Cement Expansion Project - Appraisal report being Corporation (IDA) Installation of a cement prepared. of India production capacity, See page 1 for footnotes, - 43 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y ~'!:.I Procurement!!_/ INDIA (Cont~d) Government 54 ,0 . (R) Karnataka Tanks - To finance, over Negotiations scheduled for of Karnataka (IDA) a four-year period, construction mid-February, of about 120-160 minor irrigation systems covering about 25,000 ha throughout the State, To be 300 ,0 (R) Petrochemicals - Production of Appraisal mission tentatively determined (IDA) petrochemicals based on Bombay High scheduled for April, natural gas and/or production of basic aromatics and selected derivatives, Government 126,0 (R) Kallada Irrigation - Irrigation Appraisal report being of Kerala (IDA) development in South Kerala, prepared, Oil and 150,0- Krishna - Godavari: petroleum Appraisal tentatively Natural 200,0 exp~oration, scheduled for March, Gas (Bank) Commission (ONGC) Rural 150,0 (R) Third Rural Electrification Preappraisal mission in Electrification (IDA) Corporation - Assistance for the field, Corporation construction and reinforcement (REC) of rural electricity distribution network. Government 28,0 (R) Tamil Nadu Agricultural Extension - · Negotiations tentatively of Tamil (IDA) Improvement. of extension services scheduled for early March. Nadu in Tamil Nadu, Government 22.0 (R) Maharashtra Agricultural Extension - Negotiations tentatively of (IDA) Improvement of extension services scheduled for February/March, Maharashtra in Maharashtra, Government 30,0 (R) Madhya Pradesh Agricultural Extension - Negotiations tentatively of (IDA) Improvement of extension services scheduled for March, Madhya in Madhya Pradesh, Pradesh Indian 150,0 (N) Proposed Remanufacturing Plant Appraisal mission in the Railways (IDA) for Diesel Locomotives, field, (IR) ICICI 150,0 (N) ICICI XIV - Assistance to Industrial Appraisal tentatively (Bank) Credit and Investment Corporation scheduled for April. of India (ICICI) industrial sub- borrowers. MALDIVES Ministry of 6.0 Second fisheries - Local storage Project components being Fisheries (IDA) and collection facilities for land- identified. based fish export operations; technical assistance for fish survey, and testing of new technology. NEPAL Ministry of 3.5 (R) Irrigation VI - Preparation of Approved by the Executive Water Resources . (IDA) engineering studies for irrigation Directors on January 6. development on approximately 13,500 ha. in the Far Western Region (Babai). See page 1 for footnotes. - 44 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender Jj Procurement 4/ NEPAL (Cont'd) Department of Up to Cottage Industries - Promotion of Appraisal report being Cottag<;! and 6.0 cottage and small-scale industries. prepared. Village (IDA) Industries Ministry of To be (R) Marsyangdi Hydroelectric - Hydro- Project preparation under- Water Resources deter- electric power station in Central way. (Co-financing with mined Nepal with about 50 MW capacity, Germany being arranged.) (IDA) and transmission to central grid. Ministry of a.o (R) Hill Food Production - Program Approved by the Executive Food and (IDA) for increasing food production Directors on February 3. Agriculture in four districts of the Hills. Ministry of 17.5 (R) Extension and Training - Program Approved by the Executive Food and (IDA) for agricultural extension and Directors on February 3. Agriculture tr.aining in the Terai. Mintstry of To be Education II - Expansion of programs Appraisal report being Education deter- for technical education in engineer- prepared. mined ing and agriculture. (IDA) I PAKISTAN \( l Karachi Development 50.0 (IDA) Expansion of Bulk Water Supply System and improvement of sewer- Government of Sind preparing project with assistance of ['., Authority age system in Karachi. consultants. Appraisal I tentatively scheduled for October. Government 32.0 Grain Storage III - Improvement of Appraisal report being prepared. of Pakistan (IDA) foodgrain handling and storage. Ministry of 25.0 (R) Vocational Training - Creation Negotiations completed. Labor ~nd (IDA) of National Training Authority; Board presentation scheduled Manpower promotion of enterprise based for March 10. training and expansion of train- ing opportunities. Ministry of 50.0 Irrigation and Flood Protection Project preparation Water and (IDA) System - Program to improve institu- underway. Power tional and financial capability of provincial irrigation departments. Ministry of 30.0 On Farm Water Management - Program Appraisal report being Water and (IDA) of improved water utilization prepared. Power (ground and surface.) in selected areas. Ministry of 30.0 (R). Small-Scale Industries Negotiations completed. Industries/ (IDA) Development I. Board presentation scheduled Provincial for March 17. Small Industries Corporation Government .30.0 (R) Agricultural Research - Strengthening Negotiations scheduled for of Pakistan (IDA) of Pakistan Agricultural Research mid-March. Council and financing of new institu- tions and research programs. Telegraph and 40.0 (R) Telecommunications IV - To support Appraisal mission scheduled Telephone (IDA) Telegraph and Telephone Development for mid-February. Department Investment Program for period 1981-1984. See page 1 for footnotes. - 45 - Member Country, and Borrower or Amount & Stage of Process-· Implementing Probable ing and Action on Agency Y Lender '!:../ Procurement!:_/ PAKISTAN (Cont'd) Water and Power 50.0 (R) Irrigation/Drainage Project - Project under preparation by Development (IDA) Includes reclamation of saline/ Government •. Authority alkaline land and improvement of (WAPDA) extension services. Oil & Gas 40.0 (R) Oil and Gas II - Further develop- .Project preparation underway. Development (IDA) ment of Toot oil field; delineation Corporation of Dhodak condensate field and technical assistance, training and and studies. Lahore 20.0 (R) Lahore Urban Development Project - Appraisal mission scheduled for Development (IDA) Including upgrading of low-income early March. Authority areas, sites and services solid waste disposal, ·and improvements to urban transportation system. Industrial 25.0 Industrial Development ·Bank of Appraisal report being Development (IDA) Pakistan - Second project for prepared. Bank of onlending to industry. Pakistan (IDBP) Water and Power 38.0 (R) Left Bank Outfall Drain - Phase I - Appraisal mission scheduled Development (IDA) Construction of spinal and dis- for July/August. Authority tributary drains on left bank of (WAPDA) Indus River to relieve current problems of water logging and salinity. Pakistan 30.0 Railways XI - For modernizing and Pre-appraisal mission Railway (IDA) increasing efficiency of railways. scheduled for April. Board SRI LANKA Min.is try 33.5 (R) Second Rural Development Project - Credit signing on February 2. of Plan (IDA) Area development of Puttalam and Implemen- Matale districts, along the lines Procurement: Retroactive tation of the first rural development financing of up to $1.0 million. project focused at the district level for the Kurunegala District Rural Development Project. Ministry of 13 .5 (R) Construction Industry - Financial Negotiations scheduled for Local Govern- (IDA) and technical assistance to the mid-February. An advance from ment, Housing construction sector in order to the IDA Project Preparation atid increase capacity - provision of Facility has been made in Construction equipment and training facilities. the amount of $280,000 to finance consultants who will assist the Secretaries Com- mittee for the Construction Industry in undertaking_some pre-project activities in order to speed up project execution, Ministry of Up to Village Tanks Rehabilitation - Appraisal ·report being Lands and Land 30.0 Rehabilitation of about 3,000 prepared, Development (IDA) village· tanks for irrigation purposes. Procurement: Retroactive financing of up to $3,0 million recommended, See page l for footnotes. - 46 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'jj Procurement'!_/ SRI LANKA (Cont'd) Ministry of Up to ·Mahaweli Ganga Development III - Appraisal report being Mahaweli 90.0 Construction of portion of Right prepared. (Given large Development (IDA) Bank Transbasin Canal; and down- size of the project, stream irrigation works and social co-financing being explored infrastructure for System C. with Japan and Kuwait Fund.) Procurement: Retroactive financing of about $5.0 million is recommended for initial work on the Right Bank Transbasin Canal. Award of contract for con- struction of the canal has been made by the Government. Ministry Up to (R) Second Tree Crops Rehabilitation Appraisal mission in the of State 28.S (Tea) - Project is expected to field. Plantation (IDA) comprise rehabilitation of tea estates and factories over about 25,000 ha, including infilling and replanting, timber planting, labor housing, improved labor, water supply and health services, and factory rehabilitation. Ministry of Up to Second Tree Crops (Tea) Diversifica- Project preparation Agricultural 10.0 tion - Under the project an area of by Government underway. Development and (IDA) about 7,000 ha. unsuitable for Research economic tea production will be diversified and settled. Settler houses in clusters, water supply "-and where necessary, access roads will be constructed. Ministry Up to Forestry - Support to Government Project being prepared by of Lands 15.0 Scheme to establish 75,000 acres consultants, financed by and Land (IDA) of industrial plantations over UNDP Umbrella Program. Development five years. Strengthening forestry sector institutions and formulation of a forestry master plan. See page 1 for footnotes. - - - - - ------ - -------- - 47 - Member Country, and Borrower or Amount & Stage of Process- Implementing .Probable ing and Action on Agency Y Lender 3./ Procurement!!._/ V. EUROPE, MIDDLE EAST AND NORTH AFRICA AFGHANISTAN Progress· reports on the Afghanistan program are being discontinued until circumstances permit renewed project preparation. ALGERIA Ministry of 80.0 (R) Telecommunications - Project would Negotiations in progress. Posts and (Bank) consist of elements included in the Telecommuni- first three years of the telecommuni- Procurement: Retroactive financing cations cations investment plan.. · of up to $100,000 for consultants for technical assistance and train- ing to be recommended. To be To ·be. U~ban Development - Project would Preparation by Government determined deter- consist of slum upgrading, sites and underway. mined services and technical assistance (Bank) to local construction industry in Annaba. To be To be (R) Water Supply/Sewerage in the city Preparation by Government determined deter- of Constantine. underway. mined (Bank) Ministry of To be (R) First phase of ge_neral agriculture Post-appraisal scheduled Agriculture deter- development in the region of Sidi Bel for April. and Agrarian mined Abbes of about 73,000 ha. including Revolution (Bank) supply of machinery and equipment, land consolidation, training, strengthening of research and extension facilities. Ministries of. To be Education VI - Would include a vete- Post-appraisal mission has Education, deter- rinary college, basic education returned. Appraisal report Higher Edu- .. mined teacher training institutes, being updated. cation, Heavy (Bank) and technical assistance. Industry and · Forests To be To b~ Rural Development in the Aures Preparation by Government determined deter- region, focussing on development and consultants underway. mined . of water resources, reforestation, (Bank) pasture improvement and technical assistance. State Secre- To be Fisheries I - Small and medium-size Appraisal report being tariat for deter- boats for private fishermen and prepared. Fisheries mined public fishing company, maintenance (Bank) and supply of fishing equipment. Improvements of fishing port facilities. To be To be Water Supply in greater Algiers - Preparation underway determined deter- Expected to include works needed· by Government. mined to help alleviate the critical (Bank) water shortage in that area, and water supply/sewerage studies in small and intermediate cities. To be To be Education VII - Possibly including Follow up identification deter- deter- training of agriculture person- scheduled for February. mined mined nel, paramedics, laboratory (Bank) technicians and hospital administrators, and primary and secondary teachers. See page 1 for footnotes. - 48 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l/ Lender'!._/ Procurement!!_/ ALGERIA (cont'd) To be To be Rural roads development, including Preparation underway deter- deter- a maintenance and improvement by Government. mined mined program, in selected regions. (Bank) To be To be (R) Power III-· Project would Bank preparation mission deter- deter- include rural electrification. in the field·. mined mined (Bank) CYPRUS To be About Fruit and vegetable Export Appraisal report being determined 8.0 Marketing Project. prepared, (Bank) To be To be Roads III - Project would include Project preparation underway determined deter- road maintenance and upgrading of by Government with assistance mined rural and secondary roads, and of consultants, (Bank) related technical assistance. To be To be Southern Conveyor Water Resources Project preparation underway determined ·deter- Development Project. by Government with assistance mined of consultants. (Bank) EGYPT, ARAB REPUBLIC OF Egyptian Iron 56.0 (R) Steel Processing - Rehabilitation Appraisal _report being and Steel (Bank) of HADISOLB's steel making facili- .prepared. Company ties and related technical· (HADISOLB) assistance. To be 55 .O (R) Beheira Provincial Water Supply Appraisal mission preparing determined (IDA) Project. its report. IDA Project Pre- paration Facility' advance of up to $982,000 approved· to prepare detailed engineering and tender documents, and to design detailed organizational· changes. Egyptian To be Fifth Drainage Project - Continued Project to be prepared Public deter- support for Egypt's field drainage by EPAD and Ministry Authority mined and bilharzia control program. of Health. for Drainage (IDA) Projects (EPAD) and Ministry of Health To be To be Rural Development Project - Support Project being developed determined deter- for improvement of rural planning, by the Government with mined infrastructure, and development of assistance from FAO/IBRD (IDA) rural productive activities in the Cooperative Program. Government of Minya. See page 1 for footnotes. - 49 - ·Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender 'jj Procurement!!_/ EGYPT, ARAB REPUBLIC OF (Cont'd) Ministry 80.0 (R) Agriculture project, involving land Credit signing on February 2. of Land (IDA) reclamation in the area of West (African Development Fund proposes Reclamation Nubariya and the settlement of 'land- to provide $10 million co-financing.) less families. The project would IDA Project Preparation Facility increase agricultural production of advance of up to $1 million oil seeds, milk products, vegetables, approved to complete preparation fruits, and probably sugarbeets. of project, including detailed design of irrigation and drainage works, infrastructure works, engineering feasibility of proposed Regional Main Drain, and continuation of ongoing field trials. Ministry of 14.0 Inland fish farming development Negotiations substantially completed. Agriculture (IDA) project. IDA Project Preparation Facility advance of $1,000,000 approved to prepare layout and detailed engineer- ing design for fish ponds, and detailed engineering and preparation of tender documents. Arab Republic To be Third Telecommunications - Rehabilita- Appraisal report being prepared. of Egypt Tele- deter- tion and expansion of the local tele- communications mined phone systems and the long distance \ Organization (Bank) network in the smaller towns in (ARETO) lower Egypt and all the towns of I Upper Egypt, as well as selected rural areas. To be To be El-Dikheila Port Project - Construction Findings of Bank preparation mission determined deter- of additional port capacity. being reviewed. mined (Bank/ IDA) To be To be (R) Small farmer dairy project. Project work suspended until determined deter- Government completes general miqed livestock study. (Bank) Arab Republic About (R) Second Urban Development - Project Appraisal report being prepared. of Egypt, 49.0 would consist of urban transport IDA Project Preparation Facility Governorates (Bank) improvements, pilot area upgrading, advance of up to $298,000 approved of Cairo and and solid waste management schemes to prepare designs of selected Giza for greater Cairo. project items. Procurement: Retroactive financing of up to $400,000 to be recommended. To be To be (R) El Dikheila Steel - Direct Egyptian authorities completing determined deter- Reduction/Electric Furnace Plant negotiations, with group of three mined to produce rebars and ~ight Japanese operating steel companies, (Bank) sections. on details of joint venture agreement. Appraisal mission scheduled for.February/March • . Procurement: Prequalification of civil works contractors by January 31, 1981. · Ministry of To be Road Rehabilitation and Main- Appraisal report being Transport deter- tenance Project. prepared. mined (Bank) See page 1 for footnotes. - so - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ')j Lender'!:_/ Procurement !:./ EGYPT, ARAB REPUBLIC (Cont'd) Egyptian To be (R) Abu Qir off-shore natural gas Appraisal mission scheduled for General deter- development and delineation February/March, Petroleum mined project, Corporation (Bank) Procurement: Suppliers of (EGPC) drilling rig services have been invited to submit proposals by January 15, 1981, Estimated contract value: $20 million, General To be Railway Coaches Project - Physical SEMAF is having discussion with Company deter- facilities, and technical assis- two potential foreign partners; for Railway mined tance to SEMAF, to manufacture feasibility study under preparation, Wagons and (Bank) passenger coa~hes for railways Bank will review feasibility Coaches as well as trams, study upon completion, tentatively (SEMAF) scheduled for March, Ministry To be Populatlon III - Continued support Project to be prepared of deter- for Egypt's health and population by Ministry of Health, Health mined programs. (IDA:) To be To be (N) Sixth Development Finance Company Identification mission deter- deter- Project - Project will be designed scheduled for mid-February, mined mined to meet priority areas in Egypt's (Bank) industrial strategy, through the country's financial intermediaries, including the Development Industrial Bank of Egypt, JORDAN Ministry of To be Development of rainfed agriculture, Feasibility study being Agriculture deter- prepared by Government with mined FAO/CP assistance, (Bank) Jordan Valley To be Construction of a multi-purpose dam Appraisal report under Authority deter- on the Yarmouk River at Maqarin and preparation, (Co-financing mined imp·rovement of irrigation facilities being arranged,) (Bank) in Jordan Valley, To be To be Expansion and rehabilitation of Project to be defined. determined deter- urban water, sewerage, and sanita- mined tion systems in selected urban (Bank) areas, Jordan 15,0 (R) Power IV - Urban and rural elec- Appraisal report under Electricity (Bank) trification program, including preparation, (Co-financing Authority transmission network, being arranged.) (JEA)/Jordan Electric Procurement: Retroactive Power financing of up to $600,000 Company proposed to cover consultant's (JEPCO) services, and the energy sector study. · To be To be (R) Education IV - Expansion of technical Appraisal mission in the determined deter- and vocational education centers, field. mined community colleges and comprehensive (Bank) secondary schools, ,(ARAB To be Dead Sea Chemicals - By-products Feasibility studies being POTASH deter- of the potash refinery under prepared by consultants, COMPANY) mined construction, (Bank) Jordan To be Power V - Stage I of the Aqaba Feasibility studies being Electricity deter- steam power plant (3 x 120 mw) prepared by JEA and con- Authority mined sultants, (Co-financing (JEA) (Bank) being arranged,) See page 1 for footnotes, - 51 - Member Country, and Borrower or Amourit & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender '}j Procurement,!!._/ MOROCCO To be To be Fisheries - Project composition Project composition under determined deter- being reassessed. discussion, mined (Bank) Credit 100,0 (R) Fourth Loan to CIR - Financing part Approved by the Executive Immobilier (Bank) of the import component of CIH's loans Directors on January 22. et Hotelier to tourism investment projects. Loan signing on February S. (CIR) Mini~try of 36.0 (R) Second Urban Project - Upgrading sites Approved by the Executive Housing and (Bank) and services and employment generation Directors on January 22. Territorial in Meknes and Kenitra and improvement Planning of municipal services. Procurement: Retroactive financing up to $800,000 approved to cover expenditures for preparation of final design of civil works, Ministry of To be Education V - Strengthening secondary Appraisal report being Education deter- teacher training, rural primary prepared. mined education, and research coordination. (Bank) To be To be Sewerage - priority treatment Preparat:j3 underway by determined deter- facilities; submarine outfalls; Government and consultants, mined extension of sewer network for (Bank) Casablanca-Mohammedia region, Ministry of To be (R) Agricultural Development in Appraisal mission Agriculture deter- Central Morocco, including scheduled for March. and Agrarian mined development of 35,000 ha of Reform (Bank) pasture land for livestock, forestry development, extension services, small-scale irrigation and related infrastructure. Office 87.0 (R) . Water Supply III - Improvement and Appraisal report under National (Bank) extension of water distribution preparation. de l'Eau systems in smaller towns and rural Potable centers; house connections for low- (ONEP) income customers. National To be Ninth DFC project and second Small- Appraisal report under Development deter- scale Industries project, preparation. Bank (BNDE) mined (Bank) Ministry of To be Family Health Program including Preparation underway Public Health deter- basic health services, training, by Government. mined health education, environmental (Bank) sanitation, and technical assis- tance to Ministry of Public Health, To be To be (R) Structural Adjustment Loan - Financing President's Report under determined deter- of selected agricultural and industrial preparation, mined imports, equipment and spare parts in (Bank) support of Government's short and medium term program to enhance finan- cial stability, and to maintain credit- worthiness and adequate levels of investment and growth; technical assistance for needed policy and institutional reforms. See page 1 for footnotes, - 52 - Member Country, and Borrower or AmOUYl;t & Stage of Process- Implementing Probable· ing and Action on Agency l/ Lender±_/ Procurement !},_/ MOROCCO (Cont'd)° Fonda To be Municipal and Village Loan Fund - Preparation underway d'Equipement deter- Support for FEC's program to assist by Government and FEC •. Communal (FEC) mined local authorities to identify, (Bank) prepare, and finance communal infrastructure and production projects. Ministry of To be Agricultural development on about Preparation underway by Agriculture deter- 200,000 ha. in the Khemisset province, Government with assistance mined including: crop, forage and live- of FAO/CP, (Bank) stock development on rainfed lands; rehabilitation and extension of small-scale irrigation; and soil conservation measures. Ministry of To be Small-Scale Mining: Preparation Appraisal report under Energy and deter- and pilot phase testing of technical preparation, Mining mined assistance and equipment programs to. (Bank) increase and upgrade ores mined by small-scale and artisanal miners. Bureau de To be (R) Oil Shale Engineering: Studies, Appraisal mission in the Recherches deter- construction and equipment of. a field, de partici- mined pilot unit to extract oil from pations (Bank) surface shale deposits and to experi- Minieres ment with extraction technologies (BRPM) that are less capital-intensive than technologies currently being developed by private sector companies. OMAN Ministry of To be (R) Highways Maintenance II - Components Appraisal report under Communications deter- may include equipment, rehabilita- preparation, mined tion, maintenance, and technical (Bank) assistance. PORTUGAL Ministry of About Railways I - Development and Preparation underway, Transportation 40.0 Rehabilitation of National Railways. (Co-financing being sought; (Bank) KfW is likely to participate,) To be To be (R) Textiles rehabilitation - Project Subsector study completed, determined deter- components to be identified. Feasibility studies on selected mined sub-projects are underway. (Bank) Project scope under review. Portucel About Pulp and Paper - Equipment for pulp Project scope under review 40.0 and paper industry. and likely to be revised. (Bank) Banco de 100.0 (R) BFN II: Development _finance through Approved by the Executive Fomento (Bank) BFN. Directors on January 13, Nacional (BFN) Republic About Rural Development in the Tras-os- Appraisal report being prepared, of 50.0 Montes area. (Co-financing being sought; Portugal (Bank) EIB and KfW may participate.) To be To be (R) Porto Region Water Supply and Sewer- Appraisal mission tentatively determined deter- age - Improvement of water supply and scheduled for May, mined sewerage systems in Porto Region, (Bank) Minho and Tras-os-Montes. See page 1 for footnotes. 1 I - 53 - I Member Country, and Borrower or Implementing Amount & Probable Stage of Process- ing and Action pn I I Agency Y Lender II Procurement!!._/ PORTUGAL (Cont'd) To be To be Fisheries development project. Fish stock assessment survey determined dete'r- Components to be defined, underway (financed under mined Loan 1603), (Bank) Siderurgia About Expansion of capacity of Seixal Appraisal report being prepared. Nacional 45.0 steel plant. (Co-financing will be required.) (SN) (Bank) Petrogal About (R) Engineering Loan for Oil Project documents being prepared. 15.0 Exploration - Including technical (Bank) assistance for seismic work and Procurement: Retroactive drilling exploratory wells, financing expected to be proposed to cover expenditures for preparation activities, To be To be Agro-industry - Credit for expanded Preparation underway. deter- deter- production and processing of fruits, mined mined vegetables, wine, and dairy produce. (Bank) ROMANIA (INVESTMENT To be (R) Industry XII (Galati Steel) - Preappraisal mission scheduled BANK) deter- Construction at Galati steel enter- for April. mined prise of a cold reduction mill and (Bank) tinning line, (INVESTMENT To be (R) Industry (Pigments) - Construc- Preappraisal mission scheduled BANK) deter- tion at Giurgiu of a- plant to for April, mined produce pigments for the paint (Bank) industry, (INVESTMENT To be (R) Industry X - Polyurethanes - Plant Appraisal mission tentatively BANK) deter- to produce about 50,000 tpy of scheduled for April. mined polyurethane systems. (Bank) (INVESTMENT To be Industry XI (Energy Saving Project Project p,eparation by BANK) deter- and Process Improvement in Steel and Government under way. mined Chemical Sub-sectors) - Project (Bank) components to be determined. (INVESTMENT 95.0 (R) Transport I (Land Transport Appraisal report being prepared. BANK) (Bank) project) - Modernization of selected railway lines and roads. (AGRICULTURAL 80.0 (R) Irrigation VIII - Irrigation, drain- Negotiations tentatively BANK) (Bank) age and other related works for scheduled for March. 130,677 ha. in·Caracal (88,000 ha.) and Titu (42,677 ha.). (AGRICULTURAL To be (R) Regional Development (Moldavia) - Preparation report being BANK) deter- Regional development project in reviewed. mined Moldavia Region. (Bank) I (AGRICULTURAL BANK) To be (R) deter- Regional Development (Transylvania) - Regional development project, in- Project preparation by Government underway. I mined (Bank) eluding financing of agricultural and agro-industrial investment, I (AGRICULTURAL To be Regional Development (Oltania) -· Project being developed \ BANK) deter- by Government/Bank. mined I (Bank) I I See page 1 for footnotes. - 54 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ ·Lender II Procurement!:_/ ROMANIA (Cont'd) (AGRICULTURAL To be (R) Irrigation IX - To be defined, Preliminary discussion with BANK) . det_er- Government in irrigation sector mined review scheduled for April, (Bank) ( INVE S.TMENT To be (R) Petroleum I - Onshore and offshore Identification mission BANK) deter- exploration; and enhanced recovery scheduled for end-March, mined in existing fields, (Bank) (INVESTMENT To be (R) Industry XIII (Pharmaceuticals) - Feasibility study BANK) deter- Investment in 4 to 5 plants for underway, mined the manufacture of pharmaceutical (Bank) products and packaging materials, (INVESTMENT To be (R) Powe.r V, Identification mission BANK) deter- tentatively scheduled mined for April, (Bank) (INVESTMENT To be South Constanta - Agigea Port - A Feasibility study BANK) deter- deep sea port and inner barge basin underway, mined and other related structures (Bank) and equipment, SYRIAN ARAB REPUBLIC To be 40,0 (R) Sewerage I - Sewerage facilities Appraisal report being determined (Bank) for Hama and Homs, and institution- prepared, (Co-financing building in sub-sector. arranged with Arab Fund,) Syrian To be Telecommunications II - Expansion Preparation of revised Telecommu- deter- of telecommunication services in project underway by nications mined selected urban and rural areas, STE, Establish- (Bank) ment (STE) To be To be Priority roads in NE Syria, main- ~easibility study underway, determined deter- tenance operations and training, mined (Bank) Ministry of 15.4 (R) Education II - Expansion of Negotiations scheduled for Education (Bank) technical/vocational training, February, To be To be (R) Development of rainfed areas, Appraisal tentatively determined deter- fruit tree planting and farm scheduled for March, mined mechanization in Hauran region, (Co-financing being arranged (Bank) with !FAD and·KfW,) To be To be Sewerage II - Secondary treatment Project under preparation deter- deter- works, main interceptors and second- by Government, (Co-financing mined mined ary collection system for Damascus being sought,) (Bank) sewerage facilities, Ministry 11.0 Integrated health project, including Appraisal report under of Public (Bank) (i) construction of about 80 rural preparation, Health health centers and MCH centers; (ii) extension of about 200 dis- pensaries; and (iii) ambulances and other vehicles, See page 1 for footnotes, - 55 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and·Action on Agency!/ Lender'!:._/ Procurement!!._/ TUNISIA (Cont'd) Government/ 25 .O. (R) Small-scale Industries - This Negotiations tentatively Central Bank/ (Bank) . project likely .t_o._finance small- ·planned for end-February. Commercial Banks ~ scale- industrial projects and to contribute to strengthening insti- tutions providing financial and technical assista~ce to small- scale industrial borrowers. Ministry of 26.0 Education IV - Construction and Negotiations substantially Social (Bank) equipping of apprentice and voca- completed. Affairs tional training centers and modernization of existing workshops. Minfotry 17.0 (R) Rural Development in North- Appraisal report under of (Bank) west Tunisia: Development of preparation. Agriculture rainfed agriculture and livestock for small and medium farmers, soil conse.rvation and related infra- structure. SOGITEX 16.3 (R) Rehabilitation, modernization and Appraisal report under (Bank) assistance to reorganize public preparation. sector textile company. To be To be Electrical and Mechanical Industries - Project being prepared by determined de~er- Financial and technical assistance Government. mined support to subsec.tor. (Bank) Societe 41.5 Power distribution. in urban and Appraisal report under Tunisienne (Bank) rural areas. preparation. d'Electrici te et du Gaz (STEG) To be To be Construction.of rural roads, and Project being prepared by deter- deter- associated agricultural investments. Government and consultants. mined mined (Bank) To be To be (R) Rehabilitation, modernization, and Appraisal mission tentatively deter- deter- expansion of Tunisia's capacity for scheduled for February/March. mined mined handling, storage, and rail trans- (Bank) port of domestic and imported grain;· credit for conversion from bag to bulk harvest; technical assistance. To be To be (R) Urban Development III~ Financial Identification mission deter- deter- and technical assistance for the in the field. mined mined rehabilitation of low-income (Bank) housing areas in several Tunisian towns. To be To be Education V - Establishment and Project being prepared deter- deter- extension of vocational and apprentice by Government. mined mined training centers and agriculture (Bank) Teacher Training Institute. To be To be Irrigation ?nd agriculture Project being prepared deter- deter- development in the Nebhana area. by Government and Consultants. mined mined (Bank) See page 1 for footnotes. - 56 - Member Country, and Borrower or Amount&· Stage of Process~ Implementing Probable ing and Action on Agency!_/ Lender Jj Procurement!!._/ TURKEY To be To be (R) Sewerage system for inner city Appraisal mission scheduled determined deter- population of Istanbul, including for March. Bank Project mined sewer networks and marine disposal; Preparation Facility advance (Bank) land use and sewerage study of of $Soo;ooo helped finance Golden Horn area; and training, foreign exchange costs of consultant services for project preparation, Ministry of To be (R) Rural Development in Erzurum Pre-appraisal mission planned Agriculture deter- province, for February/March. mined (Bank) Agricultural To be Agricultural Credit II. To be identified and prepared Bank of det'er- during supervision of on-going Turkey (TCZB) mined projects, (Bank) To be To be Production, processing and FAO/CP preparation report being determined deter- marketing of improved seeds, prepared, mined (Bank) Sinai 40.0 (R) Labor-Intensive Industry Project. Negotiations completed, Board Yatirim ve (Bank) presentation scheduled for Kredi March 3. Bankasi (SYKB) State Invest- About (R) Industry Finance - Financing of 7 Appraisal report being prepared. ment Bank 65.0 priority on-going projects of State (DYB) (Bank) Economic Enterprises; or modernization. State Pulp To be Paper Rehabilitation - Expansion Project under preparation and Paper 'deter- and modernization of existing by Government, Enterprise mined facilities. (SEKA) · (Bank) Ministry of 45 .O (R) Fruit & Vegetable II - Expansion of Negotiations scheduled Agriculture (Bank) production, marketing and export for mid-February. facilities for fruits and vegetables established under first project. To be To be Livestock Products Development - Draft milk industry study determined deter- Modernization of extraction and completed; meat study mined processing of livestock products preparation being organized (Bank) from slaughtering stage onwards, .by Government with Bank for both export and domestic assistance. markets; and rationalization and expansion of milk and milk prod- ucts industry, Turkish Coal To be Ankara Pollution Control - Manufac- Feasibility study to start Board (TKI) deter- ture of smokeless fuel for use in after appointment of con- mined Ankara. sultants, under Bank engi- (Bank) neering loan, Azot 60,0 Fertilizer Rehabilitation, Appraisal report being prepared, Sanayii (Bank) Bank Project Preparation Facility advance of $600,000 provided to finance foreign exchange costs of. completing project preparation. Republic 200.0 (R) Structural Adjustment Loan II - To Appraisal mission in the field, of Turkey (Bank) support structural adjustment in key areas, TSKB To be (R) Export Industries I, Appraisal mission scheduled for deter- March, mined (Bank) See page l for footnotes, ,.. 57 ,- Member Country, and Borrower or Amount'&· Stage of Process- Implementing Probable ing and Action on Agency Y Lender Jj Procurement!!._/ TURKEY (Cont'd) To be To be Cement-Rehabilitation/modernization Project being prepared by public determined deter- of public and private sector and private ,cement companies, mined plants, (Bank) YEMEN ARAB REPUBLIC Ministry About Industry - Support for construction Preparation of bid documents of Economy 5,0 materials industry, underway, Extent of IDA parti- (IDA) cipation under discussion with the Government. (Co-financing likely to be required,) Industrial 12,0 (R) Development finance and technical Negotiations scheduled for Bank of (IDA) support for Industrial Bank of Yemen mid-February. \ Yemen (IBY) (IBY). I l Yemen General Electricity Corporation 12,0 (IDA) (R) Power II - Regional Electrification, -Board presentation on February 10, IDA Project Preparation Facility advance of $800;000 approved for I (YGEC) _completion of detailed engineering, (Co-financing will be required. \ Netherlands and KfW are likely to participate,) ! Ministry of Education About 10.• 0 (R) Education IV - Components include educational deveiopment-..c~,;ter Project scope under review. (Co-financing likely to be required,) (IDA) and faculty of engineerl~g. Ministry of About (R) Urban I· - Upgrading/of low income Feasibility studies underway, Municipalities· 15.0 settlements and prqvision of sites IDA Project Preparation facility (IDA) and services for major cities; advance of $350,000 approved to construction advisory services; finance contingency services,· housing credit; institution building. (Co-financing likely to be required,) Ministry of To be (R) ~gricultural research, Selection of consultants, ,Agriculture ·deter-, to carry o~t preparation, -mined underway by Government, IDA (IDA) Project Preparation Facility advance of $250,000 approved to finance preparation, (Co-financing likely to be required,) Ministry of To be (R) Wadi Jawf - Agricultural development, FAO/CP identification mission Agriculture deter- in the field, · Feasibility mined study is underway. (Co-financing (IDA) likely to be required,) Ministry About (R) Health - Construction and equipping Preparation underway by of Health 8.0 of primary health care centers; consultants, financed under (IDA) institutional support to Ministry Education III Project, (Co- of Health and Health Manpower financing likely to be required,) Institute; technical assistance to Faculty of Medicine, Highway About (R) Highways IV - Strengthening of Taiz.,. Preparation mission in the Authority 10.0 Almafraq Road, construction of 37 km field, (Co-financing likely (IDA). of high-priority secondary roads, to be required. Arab Fund and enginee,ring studies, likely to participate,) Yemen Oil To be (R) Engineering Credit for Oil and Gas Project content under and Mineral deter- Exploration - 'Development assist- review. Resources mined ance for selected phases of explora- Corporation (IDA) tion and technical assistance to (YOMINCO) YOMINCO, See page 1 for footnotes, - 58 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender!/ Procurement f:_/ YEMEN ARAB REPUBLIC (Cont'd) Central To be Technical assistance in pre- Preparation under~ay, Planning deter- investment preparation and review Organization mined of projects, (IDA) Confederation To be (R) National Rural Development - Project content under of Yemeni deter- Assistance to development by means review, Development mined of increasing. the operating effective- Associations (IDA) ness of the Local Development Associations (LDAs), and implementa- tion of small-scale infrastructure works, YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF Ministry of About Highways III - Road construction; Negotiations tent~tively scheduled Construction 12,0 training and technical assistance for March, (Co-financing being (IDA) for Highways Department, sought,) Ministry of. About Wadi Beihan Agriculture - increased Appraisal report being prepared, Agriculture 8.0 crop production through improved (Co-financing being sought,) (IDA) water management and agricultural practices, feeder roads, extension services, credit, and applied research and studies, Public To be Power II - Electrification of 5 towns Appraisal mission tentatively Corporation deter- east of Mukalla and technical scheduled for April, (Co-financing for Electric mined assistance, likely to be required,) Power (PCEP) (IDA) Ministry of To be Wadi Hadramout II - follow-up Final report being prepared by Agriculture deter- project to Wadi Hadramout I to Government/Consultants, mined increase crop production through (IDA) the use of improved inputs and agricultural practices, Ministry To be Fisheries III - Technical assistance Feasibility study underway. of Fish deter- for fish training institute; village (Co-financing likely to be Wealth mined fish facilities; and technical required,) (IDA) assistance to the Ministry of Fish Wealth, Ministry of To be Education III - Industrial, commer- Preappraisal mission Education deter- cial, agricultural and teacher scheduled for February. mined training institutes and technical (IDA) assistance, Public Water About Mukalla Water Supply Rehabilitation Appraisal report being Corporation 3.0 and Sanitation - Improvement of exist- prepared. (PWC) (IDA) ing water supply system in Mukalla; sewerage studies; and public health education program, Public To be Water Supply II - Construction of new Water resource study due Water deter- well field in Wadi Tuban and expansion for completion in June, Corporation mined of distribution system, (IDA) Ministry To be (R) Health and Nutrition I - Components Government preparing project. of deter- to be determined, Health mined (IDA) Ministry To be (R) Petroleum II - Onshore exploration Government preparing project, of deter- of Shabwa-Mareb Sedimentary Basin, Industry mined (IDA) See page 1 for foonotes, - 59 - Member Country, and Borrower or Amount_& Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender II Procurement!!._/ YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF (Cont'd) Ministry To be (R) Education ~V - Components to _be Government pre_paring project. of deter- determined. Education mined (IDA) Ministry To be Highways IV - Components to be Identification mission of deter- determined. tentatively scheduled for Construction mined May. (IDA) YUGOSLAVIA To be Up to Montenegro Coastal Region Water Project definition being determined so.a Supply project - Regional water reviewed by Yugoslav (Bank) supply development sch~me to authorities in light of 'support the growth of to_urism and earthquake damage to water industrial activities in. the var- and sewage facilities in ious' coastal towns of Montenegro. the project area. Revised proposals awaited. Kosovska About Kosovo Agroindustries and Agricul- Appraisal report being'prepared. Banka 90,0 tural Development - Development of Pristina (Bank) primary production and agro- · industries project in Kosovo. (JUGEL) About Power Transmission III - Progress under ongoing 80.0 Financing of investments for JUGEL project and further (Bank) national transmission network work.on feasibility report and control system. will determine timing of this loan. (Substantial co-financing to be required.) Kosovsk;1 110.0 (R) Industrial Credit V - Line of credit Loan signing on February 9. Banka (Bank) for industrial ·development in Kosovo, (Co-financing likely to be Pristina; Bosnia-Herzegovina, Macedonia and required.) Privredna Montenegro. Banka Sarajevo; Stopanska Banka Skopje; Inves- ticiona Banka Titograd To be To be Macedonia Irrigation II - Development Preparation report being determined deter- of land and water resources in three prepared. mined areas of Macedonia, primarily irriga- (Bank) tion. Commun! ty of About Railway VI - To finance a portion of Development plans being Yugoslav 90.0 the 1981-85 Development Plans of the prepared by BoFrower. Railways (Bank) Yugoslav Railway Enterprises. Investb;mka 87.0 (R) Morava Regional Development II - Board presentation scheduled (Bank) Development of agriculture and for March 3. (Co-financing may agroindustries in less developed be required.) area of Serbia. Procurement: Possible retroactive financing. Kosovska Banka About Industrial Cred;t VI - Line of To be identified and prepared Pristina; 100.0 credit for industria~ development _during supervision of on-going Privredna (Bank) in Kosovo, Bosnia-Herzegovina, projects. (Co-financing likely Banka Sarajevo; Macedonia and Montenegro, to be required.) Stopanska Banka Skopje; Investiciona Banka Titograd See page l for footnotes. - 60 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action_on Agency!/ Lender ?:_/ · Procurement!!_/ YUGOSLAVIA (Cont'd) Ibar Lepenac About Kosovo Irrigation -· Second phase Government assessing priorities Enterprise 85 .o. of Ibar-Lepenac Project comprising in light of substantial local (Bank) irrigation and drainage system for funds required, 43,800 ha,, operation and main- tenance facilities and equipment, f~rm machinery and research station. Railway About Kosovo Railways - To finance a portion Appraisal report being prepared, Transport 30,0 of RTO Pristina's 1981-85 Investment Organization (Bank) Plan, (RTO) - Pristina Privredna To be Bosnia Agriculture - Development of Feasibility studies being Banka deter- agriculture and agro-industries, prepared by Government, Sarajevo mined with some drainage, reclamation· and (Co-financing likely to (Bank) irrigation in Bosnia-Herzegovina, be required,) Stopanska To be Macedonia Agriculture - Development Appraisal report being prepared, Banka deter- of agriculture, primarily investments Skopje mined in primary production, marketing and (Bank) cold stores in Macedonia. Gracanka About (R) Kosovo/Pristina Water Supply - To Appraisal mission in the field, Water 40.0 improve water supply and distribution Enterprise (Bank) facilities for Pristina, Obilic, Kosovo Polje and Podujevo, See page l for footnotes. I I - 61. 7 \ Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'l:._/ Project'}_/ Procurement!!._/ I I VI. LATIN AMERICA AND CARIBBEAN ARGENTINA Ministry of 100.0 Ports I - Expansion and moderniza- Project being reformulated. Economy and (Bank) tion of Bahia Blanca port facilities. Secretariat Total project cost estimated at of Maritime $180 million of which about $100 mil- Affairs lion in foreign exchange. Ministry of 58 .o Technical and Vocational Training - Loan approved by the Executive Education (Bank) Upgrading and expansion of training Directors on October 7. facilities. Total project cost estimated at $149.5 million of which $58 million in foreign Procurement: Retroactive exchange. financing of up to $700,000 approved for preinvestment studies and equipment. To be 80.0 Bajos Submeridionales - Flood· control Project preparation underway. deter- (Bank) and agricultural development in mined northern provinces. Obras Up to Water Supply and Sewerage - Improve- Project preparation underway. Sanitarias 100.0 ments and extensions to water supply de la Nacion (Bank) and sewerage systems in Rosario, (OSN) Cordoba, Mendoza, and Buenos Aires including technical assistance for institutional improvement. ,. ,1 Ministry 10.0 Coal Development - Exploration for Loan approved by the Executive of Economy (Bank) coal in Southern Argentina. Total Directors on December 9. and Secre- project cost estimated at $20 mil- tariat of lion of which $10 million in Energy foreign exchange. (YACIMIENTOS Up to (R) Refinery Conversion -.Modification Appraisal report being reviewed. PETROLIFEROS 150.0 of YPF's La Plata and Lujan de (Export credits of $175 million FISCALES (Bank)" Cuyo refineries to convert. surplus and commercial'bank loans of. (YPF)) fuel oil production into higher $246 million envisaged.) value petroleum products. Project includes institutional assistance to YPF. Total project cost estimated at $878 million of which $439 million in foreign exchange. (BANCO ,100.0 Hydrocarbon Credit - Financing Appraisal report being pre?ared. NACIONAL (Bank) of private sector petroleum DE projects through BANADE. DESARROLLO) (BANADE) (BANCO 150 .0 (R) Industrial Credit II - Financing Appraisal scheduled for February. NACIONAL (Bank) structural adjustment in industry DE through BANADE. DE SARROLLO) (BANADE) Ministry 80 .O (N) Highway sector - Improvements and Appraisal scheduled for of (Bank) construction of sections of the February. Transport national highway network. and Public Works See page 1 for footnotes. - 62 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender];/ Procurement!:_/ BAHAMAS Ministry of 7,0 (R) Education - Quality improvement of Negotiations in early Education (Bank) education system including broaden- February, ing of curriculum· for vocational training in secondary education, teacher training and supervision, and planning, Total project cost estimated at $18 million of which· $11,8 million in foreign exchange: Ministry 9,0 (R) Urban Development - Improvement Apprai~al report being prepared. of (Bank) in low-income area of' Nassau (Cofinancing with commercial Finance including upgrading of infra- banks envisaged,) structure and housing, clearing of land titles, employment genera- tion and technical assistance, BARBADOS (BARBADOS 6.0 (R) Power I - Expansion of generating Loan approved by the Executive LIGHT & (Bank) · capacity (low-speed diesel), trans- Directors on January 6, POWER mission and distribution, Total Loan signing scheduled COMPANY) project cost estimated at $100 for mid-February. (Co- million of which $65 million in financing with CDB, foreign exchange, EIB, CDC and private sources agreed,) Ministry 12.0 Structura_l Adjustment Loan - To Appraisal report being of (Bank) support government_economic program, prepared. Finance BOLIVIA (EMPRESA 35,0 (R) Power V - Central Oriental inter- Project preparation NACIONAL DE, (Bank) connection system, fourth unit for underway, ELECTRICIDAD_;· Santa Isabel, and study of ENDE's (ENDE)) organization, Ministry of 10,0 (R) Santa Cruz Agricultural Development - Appraisal report being prepared, Rural and (IDA) Credit, technical assistance and IDA Project Preparation Facility Agricultural social infrastructure for settlement advance of $50,000 approved for Affairs consolidation in Northern Santa Cruz, technical studies. Ministry of Up to Agricultural Credit II - Credit and Project preparation dependent Rural and 10.0 technical assistance for crop and on institutional and financial Agricultural (Bank) livestock development, strengthening of Banco Agricola Affairs de Bolivia. (YACIMIENTOS Up to (R) Oil and Gas Development - Liquids. Appraisal report being prepared, PETROLIFEROS so.a condensate extraction and gas re- FISCALES (Bank) cycling at Vuelta Grande gas Procurement: (a) Project Prepara- BOLIVIANOS) condensate field and secondary oil tion Facility advance of $1 million (YPFB) recovery at Monteagudo oil fields. for simulation study, detailed Total project cost estimated at design and preparation of bidding $74 million of which $60 million documents requested. (b) retro- in foreign exchange. active financing of up to $6 mil- lion for drilling under consideration. Ministries 10,0 (R) Fourth Mining Credit - Assistance for Appraisal pianned for March, of Finance (Bank) small and medium mining operations and Mines 15.0 through local financial intermediaries, and (IDA) Banco Industrial and Banco Minero, Metallurgy· BRAZIL (AMAZONAS Up to (R) Carajas Iron Ore Mining - Mine, Preparation/Preappraisal mis·sion MINERACOES, 250.0 rail and port facilities for scheduled for February, (Private S ,A, (AMZA)) (Bank) export of up to 50 millio,n tons cofinancing expected to be needed,) per year of high grade iron ore, (REDE Up to RFFSA III (R;lilways) ~-Expansion and Project preparation underway. FERROVIARIA 200.0 ·rehabilitation program. FEDERAL, S,A, (Bank).. (RFFSA)) See page 1 for footnotes. - 6.3 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:_/ Procurement 4/ BRAZIL (Cont'd) Borrower to Up to Agricultural credit in rural areas Project preparation suspended be determined 135,0 of the Northeast states,· until agreement with Government (Bank) on interest rates. Secretaria de Up to Integrated Rural Development - Appraisal report being prepared. Planejamento 28,0 Development project in Northeast da Presidencia (Bank) State of Piaui, Total project cost da Republica estimated at $110 million of which $16 million in foreign exchange, (CENTRAIS Up to Power Distribution - Credit line for Appraisal report being prepared, ELETRICAS 107.0 power distribution sub-projects - (Private co-financing expected BRAS I LEI RAS (Bank) sector loan. Total project cost to be needed,) S .A.) estimated at $349,2 million of which (ELETROBRAS) $107.6 million in foreign exchange, To be 35.0 State of Rio de Janeiro Post-appraisal mission delayed determined (Bank) Poll~tion control program, until agreement is reached on counterpart financing and project scope, (BANCO NACIONAL Up to (R) Multistate Water and Sewerage - Negotiations scheduled for DA HABITACAO 175.0 , Sub-projects in five states, Total' February. (BNH)) (Bank) project cost estimated at $566 million of which $175 million in Procurement: Advanced con- foreign exchange. tracting for a group of urgent works and retroactive financing of up to $7 million for expenses incurred under advanced contracting for civil works and equipment for eligible sub-projects, Empresa Bra- Up to (R) Urban transport infrastructure in Negotiations scheduled for sileira dos 140.0 several medium~sized cities - Project February. Transportes (Bank) would stress improvement of bus ser- Urbanos (EBTU) ,vices, in particular for low-income people, Total project cost estimated at $400 million of which $92 million .. in foreign exchange, Empresa 55,0 Agricultural Research II - Assistance Post-appraisal mission planned Brasileira de (Bank) to government for.strengthening for March. Pesquisa Agro- ~ational Research Agency (EMBRAPA), pecuaria Total project cost estimated at (EMBRAPA) $137 million of which $55 million in foreign exchange. Tp be Up to (R) Northwest Region Development Appraisal mission in the field, determined 225.0 Program I - Highway construction, (Bank) rural development, settlement and environmental protection, Instituto 70,0 Northwest Region Development FAO/CP preparation assistance mission Naef.anal de (Bank) Program II - New land settlement, - scheduled for February. Colonizacao e Reforma Agraria (INCRA) State of Up to Northwest Region,Development FAO/CP preparation assistance mission Mato Grosso 30,0 Program III - Agr:l.cultural develop- scheduled for February, (Bank) ment in Mato Grosso, To be 40,0 Maranh~o Rural Development - Develop- Preparation mission scheduled determined (Bank) ment project in two adjacent areas for March, (Baixada Maranhense and part of Alto Turi region) to improve agri- culture and social infrastructure, land tenure ,situation and access· to,land by landless farme~s. To be 20,0 Health - Development of health Project preparation underway, determined (Bank) services in State of Sao Paulo, See page 1 for footnotes, - 64 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender '!:./ Procurement!!_/ BRAZIL' (Cont'd) To be Up to (R) Fuel Alcohol and Biomass Energy Negotiations scheduled for determined 250,0 Development - Financing of segment February, (Bank) of National Fuel Alcohol program, Total' project cost estimated at $4· billion of which $1 billion in foreign exchange: To be 150,0 Secondary and Feeder Roads III - Awaiting commitment of second determined (Bank) Construction and improvement, loan, To be 70,0 (R) Integrated Urban Development in P·reparation mission in the determined (Bank) Recife Metropolitan Region, field, CHILE Ministerio de 42,0 Highway Reconstruction - 253 km of Loan approved by the Obras Publicas (Bank) main North-South highway and strength- Executive Directors on ening highway maintenance and trans- Dec.ember 9, port planning, Total cost estimated at $92 million of which $42 million in foreign exchange, Servicio 30,0 (R) Water Supply - In Regions IV and Project preparation Nacional (Bank) VIII, and technical assistance, underway, de Obras Sanitarias (SENDOS) To be Up to Industrial Credit - For small and Review with Government in deter- 75,0 medium industries. progress, mined (Bank) To be 35.0 Convento Viejo Irrigation - Includes Project preparation deter- (Bank) dam and irrigation canal construction underway, mined as well as rehabilitation of existing infrastructure, COLOMBIA Ferrocarriles 70,5 (R) Railways VII - Track and equipment Appraisal report being Nacionales de (Bank) rehabilitation, engineering studies prepared, Negotiations Colombia (CNR) and consultants' services for scheduled for March, (Co- institutional strengthening, Total financing of $1,5 million project cost estimated at $175 mi·l- from UNDP and $8 million lion of which $104. million in from Fe~eracion de foreign exchange, Cafeteros envisaged.) Ferrocarriles Up to Railways VIII - Rehabilitation and Project preparation Nacionales 120.0 modernization of railways and tech- underway. de Colombia (Bank) nical assistance; possibly construc- (CNR) tion of improved alignments, (EMPRESA 87.0 (R) Bogota Distribution-Expansion and Loan signing on February 6, DE ENERGIA (Bank) improvement of EEEB's urban trans- ELECTRICA mission and distribution system, DE BOGOTA Total cost estimated at $182.2 (EEEB)) million of which $87 million in foreign exchange, (CARBOCOL- 10 .o Coal Engineering - National survey Project preparation INGEOMINAS) (Bank) of· coal deposits and engineering of underway, one or two·most promising, Also marketing studies and training, See page 1 for footnotes, - 65 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'l:_/ Procurement':_/ COLOMBIA (Cont'd) (EMPRESA Up to Petroleum Development I -·Financing Negotiations postponed to COLOMBIANA 80.0 of secondary recovery, seismic sur- permit Borrower to firm-up DE PETROLEOS (Bank) veys and follow-up.discovery invest- financing plan. (Co- (ECOPETROL)) ments, Total project cost estimated financing of about $70 at $201 million of which $145 million million required,) in foreign exchange, Procurement: Advance con- tracting of $10,6 million for seismic surveys with retroactive financing esti- mated at $2,5 million, (EMPRESA Up to (R) Guavio Power Development - Construction Appraisal report being prepared, ENERGIA 200.0 of hydro plant, Total project cost (Parallel IDB financing of up ELECT RICA (Bank) estimated at $1,200 million of which to $100 million envisaged,) DE BOGOTA $794 million in foreign exchange, (EEEB)) (CORPORACION Up to (R) Atlantic Distribution Expansion - Appraisal report being prepared, ELECTRICA DE 38.0 Village electrification, .Total LA COSTA (Bank) project cost estimated at $68.7 ATLANTICA million of which $36 million .in (CORELCA)) foreign exchange, (BANCO DE LA so.a Agro-Industries - Credit for large- Further preparation required, REPUBLICA (Bank) and medium-scale agro-industries; Appraisal planned for mid-1981, (BOR)) possible pilot credit/technical assistance component for small scale agro-indus tries; agro-indus.trial research, · (BANCO DE·LA 70.0 Agricultural Credit-IV - Long and Further project preparation REPUBLICA) (Bank) medium term credit for commercial awaiting Borrower's assess-· (BOR)) farm sector, ment of estimated credit demand, (CARBONES DE Up to El Cerrejon Coal - Coal mining for Project preparation underway, COLOMBIA 265.0 export (Block B of the Cerrejon .(Substantial co-financing (CARBOCOL)) (Bank) deposit) and.port and railway required.) construction, (CAJA 28.0 Agricultural Credit V (Caja) - Credit Appraisal dependent on agreement AGRARIA) (Bank) for small~ and medium-scale farmers by CAJA/Government on financial and and ranchers as well as for small- management improvements as pro- scale agro-industries and rural posed by Bank, (Possibility of enterprises, co-financing with IDB and KfW will be explored further,) (INSTITUTO DE 5,0 (R) Upper Magdalena Waters.bed Manage- Appraisal tentatively scheduled LOS RECURSOS (Bank)' ment - Pilot project. to .develop for April, subject to completion NATURALES support system for managing water- of project preparation, RENOVABLES shed area and for preventing further Y DEL MEDIO erosion. Pilot phase will test out AMBIENTE series of interventions in 3 sub~ (INDERENA)) watershed areas and prepare large .project for most important basin, (EMPRESAS 30.0 Barranquilla Water - Expansion of Project preparation PUBLICAS (Bank) water facilities (construction of underway. MUNICIPALES DE a new water treatment plant); BARRANQUILLA) extension of water distribution and sewerage·networks and tech- nical assistance. Fondo Up to (R) Rural Roads-· Construction of Negotiations scheduled for Nacional 33.0 feeder roads and strengt~ening February, de Caminos (Bank) of rural road institution, Total Vecinales project cost estimated at .$63 million bf which $3.3 million, in foreign exchange, See page l for footnotes, - 66 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing· and Action on Agency Y '~J:./ Procurement f!/ , COLOMBIA (Cont'd) Instituto 30 .O (R) Irrigation Rehabilita,tion 1·- Appraisal report being prepared, Colombiano (Bank) Reconstruction and expansion of de Hidrologia, existing irrigation schemes for Procurement: Retroactive financing Metereologia y small farmers and b~neficiaries of up to $300,000 for engineering Adecuacion de of land reform. ·Total project studies to be recommended, Tierras (HIMAT) cost estimated at $86.3 million of which $30 million in foreign exchange. To be 50.0 (R) Rural Development II - .Continuat'ion Appraisal scheduled for determined (Bank) of integrated rural 'development February, program initiated under Rural Development I. (EMPRESAS 50 .O (R) Ports - Modernization of existing UNDP-financed study, for PUERTOS DE (Bank) ports and installation of container which Bank is Executing COLOMBIA termii:ials. Agency, under way by (COLPUERTOS)) Consultants, Interim report being reviewed by Bank; (EMPRESAS . 85 .O (R) Playas Power ·(Hydro). - Development Negotiations completed, PUBLICAS DE (~ank) of 200 MW hydroelectric plant. Total· Board presentation planned MEDELLIN project cost .estimated at $311. 4 mil- for March 3, ($85 million (EPM)) lion of which $176.8 million in foreign IDB co-financing envisaged,) exchange. (EMPRESSA 50.0 Phosphate Fertilizer-Construction of Project preparation underway. COLOMBIANA (Bank) facilities for processing of local DE MINAS) phosphate rock, including phosphoric (ECOMINAS)) acid, sulfuric acid, TSP and DSP plants. Ministerio de Up to Highway VIII - Construction and Project preparation underway, Obras 110.0 rehabilitation. Publicas y (Bank) Trans po rte (MOPT) Interconexion Up to Hydropower. Priority ranking being Electrica 135.0 carried out will determine S.A. (Bank) precise project. (ISA) J;,:. COSTA RICA To be 15.0 (R) Pococi-Limon - Regional Agricultural FAO/CP preparation mission in determined . (Bank) Development. the field, Instttuto 26.0 (R) Water Supply - Construction of addi- Loan signed on January 14. Costarricense (Bank) tional supply and distribution facil- (Co-financing agreed with de Acueductos ities for the San Jose Metropolitan Commonwealth Development y Alcanta- Area. Total project cost estimated Corporation.) rillados at $55.3 million of which $35.1 mil- lion in foreign exchange. Procurement: Bank has agreed to advance contracting of $2,3 million for tunnel construction and $0,5 million for engineering services, Retroactive financing of $0,5 million is recommended for these items, Ins ti tu to Up to (R) Development of Coto.Sur area. Total Appraisal report being pre- de Tierras 26.5 project cost estimated at $46.8 mil- pared, (Possible co-financing y Colonizacion (Bank) lion of which $26.5 million in with CDC,) (ITCO) foreign exchange. Ministry of Up to Education II - Support for manage- Project preparation underway, Education 5.0 ment reorganization and institution Bank Project Preparation (Bank) ~uHdi,ng foy educl!,tion.system. Facility advance of $190,000 approved for consulting services and training of pr9ject staff, See page 1 for footnotes, - 67 - Member Country, and Borrower or Amount & Stage of process- Implementing Probable ing and Action ·on ~y Lender Y Procurement [!_I COSTA RICA (Cont'd) Instituto Up to , Power VII - Palomo Hydroelectric Project preparation underway. Costarricense 45.0 .Power Plant. de (Banlt) Electricidad (ICE) DOMINICAN REPUBLIC (BANCO 30.0 Industry I - Financing of small and Appraisal report being prepared, CENTRAL) (Bank)· medium scale industry.and .export related enterprises. Total project cost estimated at $50 million of which $30 million in foreign exchange, To be Up to Si.tes and Services I - ,For Santo Appraisal scheduled for May. determined 30.0 ·,: Domingo, $500 1 0.00 advance granted (Bank) under Bank Project Preparation Facility for topographic survey, mapping, soil investigation; prelimi- nary engineering and final design; survey of target groups; community motivation and assistance program, . . Secretariat Up to Tropical Tree ·crops - Cocoa and Appraisal report being of Agriculture 24.0 coffee renovation, Total project prepared, (Bank) cost estimated at $40 million of which $15 millipµ in foreign exchange, Ministry of 15.0 (R) Education III - Support and ·expansion Appraisal scheduled for Education (Bank) of basic education facilities, June, Corporacion -30.0 (R) Rio Blanco ·Power~ Distribution Preparation mission scheduled· Domi11icana de (Bank) .system for Santo Domingo and · for February, Electricidad feasibiiity studies for three hydropower projects, ECUADOR Instituto Up to (R) Power I - INECEL transmission Appraisal. report being prepared, Ecuatoriano 100.0 system expansion. Total project de Electrifi- (Bank) cost estimated at $151 million cacion (INECEL) of which $115 million in foreign exchange including interest during construction. Ministerio Up to (R) Rural Development II (Puerto lla- Appraisal report being de.Agricultura 19.5 Chone) - Project components to include prepared, y G;maderia (Bank) improvement of rainfed agriculture; credit and technical assistance; feeder .roads and social infrastructure, Total project cost estimated at $57,3 million of which $19,0 million in foreign exchange, lojinisterio Up to ,Ports III - Expansion-of fi~hing Second preappreisal mission de Recursos 10.0. Port Facilities at Manta,. scheduled for February, Naturales (Bank) Ministerio Up to (R) Agriculture/11,ural,Development III - Appraisal report being de Agricultura 11.0 Credit, roads and social ·infra- prepared, y Ganaderia (Bank) structure in Esl!leraldas Province, Corporacion Up to Petroleum I - Project component, Project preparation Estatal 70,0 to include oil.field rehabilitation, underway. Petrolera (Bank) water injection in oil fields and Ecuatoriana construction of pipeline, including (CEPE) storage terminal, See page 1 for footnotes, ,, ....·.. ' <~ - 68 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Acti_on on Agency Y Lender II Procurement !:../ ECUADOR {Cont'd} Institute· Up to. ·water Supply and Sewerage - For Project preparation Ecuatoriano 40.0 medium-size cities, and a national underway, de Obras (Bank) training program. Sanitarias Banco 35.0 Urban Development II - National Project preparation underway, Ecuatoriano (Bank) low-cost housing program, sites de la and services and housing loans. Vivienda Ministry of 20.0 Cocoa Rehabilitation - Improvement Project preparation Agriculture (Bank) of existing cocoa crops. underway. and Banco Nacional de Fomento (CORPORACION Up to (R) DFC V - Credit for industrial firms Preparation mission in the FINANCIERA 80.0 through finance companies. field. NACIONAL (CFN)); (Bank) Ecuatoriana de Desarrollo, S.A.; Compania Financiera {COFIEC), and other financing companies Servicio 20.0 Education IV - Vocational Training. Project preparation underway, Ecuatoriano (Bank) de Capacitacion Profesional {SECAP} EL SALVADOR Banco 10.0 DFC - Provision of long-term indus- Changes in project Central (Bank) trial credit for small- and medium- scope to be discussed size enterprises. Total project cost with Government, estimated at $19.8 million of which $10 million in foreign exchange. Institute Up to Urban Development III - Squatter Project preparation de Vivienda 30.0 upgrading, serviced-sites, employ- underway. Urbana (!VU}, (Bank) ment generation and technical Federacion de assistance. Cajas de Credito (FEDECCREDITO}, Fundacion Salvadorena de Desarrollo y Vivienda Minima (FSDVM) Comision Up to Ports I - Expansion of Acajutla Project preparation Ejecutiva 30.0 Port to include container handling underway_. Portuaria (Bank) facilities. Autonoma (CEPA) Ministry of Up to Water Supply and Sewerage Engineering - Project issues to be Planning 7.0 Preparation of projects for water discussed with Government, (Bank} supply and sewerage for San Salvador and municipalities and technical · assistance·. Total project cost estimated at $9 million of which $7 million in foreign exchange, See page 1 for footnotes, - 69 - Member Country, and Borrower or Amou_nt & Stage of· Process-' Implementing Probable ing and Action on Agency Y Lender Jj Procurement '!_I GUATEMALA Banco Nacional To be Urban Deve~opment - To benefit about Further preparation de la Vivienda deter- 28,000 households in Guatemala °City ·depends on progress of mined and five to six other major cities; urban component of earth- (Bank) upgrading of existing informal settle- quake recon·struction ments in Guatemala City with infra- project. structure, and individual credits for home improvement and consolidation; 'as well as credits, technical assis- tance and commercial industrial sites to benefit very small-scale labor- i~tensive enterprises. Empresa To be Further expansion of telephone Projeci: preparation Guatemaiteca deter- network including cable network, underway. de mined distribution and long distance Comunicaciones (Bank) facilities. (GUATEL) GUYANA Ministry 14 .0 (R) Structural Adjustment Loan - To Board presentation on February 3. l of Finance (Bank) 8.0 support Government economic program. I (IDA) Ministry LS (R) Second Technical Assistance L.oan - Board presentation on February 3. of (Bank) To support institutional develop- Bank Project Preparation Facility Finance ment to carry out Structural, advance of $90,000 approved fo,r Adjustment, Pr,ogram. establishment of Export Develop- ment. Fund. · '· · HAITI Organisme de Up to Integrated Rural Development of Project preparation·und~rway. Developpement 13.0 Northern Plain·- Second stage. du Nord (ODN) (IDA) Office 10.0 Sites & Seryices - In two· provincial , Project,preparation underway. National (IDA) 'towns, upgradihg ·~f 'central market IDA Projec't Preparation Facility du Logement in Port-au-Prince and related advance of $500,000 approved technical assistance. for consultants' services. Additional $100,000 being· considered • Banque 7.0 (R) Industrial Credit Project - Financing . _Negotiations in·early February. de la (IDA) for industrial.development with compo- IDA Project Preparation Facility Republique nent for small and medium enterprises. advance of $375,000 approved 'for de Haiti Project to include establishment or consultants' services. (BRH) .a rediscounting fund in BRH. Total project cost· estimated at $11 million of which $6.6 million in foreign exchange. Natfonal 11.0 (R) Ports I~ Improvement of ports of Negotiations completed. Presenta- Port (IDA) .Port-au-Prince and Cap-Haitian tion to the Executive Directors Authority and construction ·of coastal planned for March. (APN) shipping ports. Total project cost estimated at $23.7 million of which $16.9 million in foreign exchange. Ministry of 15.0 Education III - Construction, furnis~- Preparation assistance mission Education (IDA) ing, equipping of primary schools, scheduled for April. . teacher training and vocational. Ministry of Up' to Pilot Forestry Project. Project preparation underway. Agriculture s.o (I~A) See page 1 for footnotes. - 70 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender!/ Procurement!!__/ HAITI (Cont'd) Ministry 15,0 (R) Highways VI - Bridge reconstruction, Project preparation underway, of Public (IDA) and strengthening/rehabilitation Works, . of primary roads, ··Transpoi:'ta- ' tion and Communication Ministry 3,2 (R) Post-Hurricane Agricultural Rehabilita- Negotiations substantially of (IDA) tion, Rehabilitation of areas most completed, Presentation to Agriculture severely stricken by hurricane the Executive Directors Allan, to help restore food crop planned for March, and coffee production, Electricite 26,0 (N) Power III - Generation, transmission Appraisal scheduled for de Haiti (IDA) and distribution, mainly in Port- April, (EDH) au-Prince area. HONDURAS Ministry of '.;'. 12,0 Education III - Improvement and Preparation underway, Education (Bank) expansion of rural'basic education, 10,0 ·(IDA) Central 30,0 (R) Industrial Credit II, Pre-appraisa~ mission Bank (Bank) in the field. JAMAICA To be 16,0 (R) Kingston Free Zone - Construction Appraisal report being determined (Bank) of buildings and infrastructure for prepared, free trade zone area, and technical assistance, Ministry of 5,0 (R) Offshore Seismic Survey - Petroleum Appraisal mission in the Mines and (Bank) Exploration, Technical Assistance and field, Energy Training, equipment and materials; energy conservation and funds for exploration, Ministry 30.0 Export Development Fund II - Appraisal report being of ::, :,,(Bank) Financing of essential imports prepared, Finance for exporters, To.be 15,0 Urban Transport - Improvement in Project preparation deter- (Bank) infrastructure, traffic manage- underway, mined ment and rolling stock, To be 20,0 (R) Export Industries - Long-term Project preparation deter- (Bank) development credits to export underway. mined industries, MEXICO Secretaria de To be Forestry, Project preparation underway, Agriculture deter- y Recursos mined Hidraulicos (Bank) (SARH) Colegio Nacional Up to (R)' Vocational Training, Appraisal report. being prepared, de Educacion 100,0 Profesional (Bank) Procurement: Call for bids Tecnica likely to be made first quarter 0~ 1981, See page l for footnotes, - 71 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender!/ Procurement 4/ ~ (Cont'd) Nacional Up to Fisheries. Sector report being reviewed Financiera 35.0 by Government. (NAFINSA) (Bank) Banco Nacional 125 .O (R) Medium Size Cities Water Supply and Loan signed on January 23. de Obras y (Bank) Sewerage II. Total project cost Servicios estimated at $297 million of which Procurement: Retroactive Publicos $125 million foreign exchange • financing of up to $5 million approved for civil works, consultant services and equipment. Banco Nacional Up to (R) Urban and Regional Development - Discussions with Government de Obras y 141.0 Sites and services, infrastructure on interest rate issue continuing. Servicios (Bank) works, municipal facilities and Publicos production credits in.the Isthmic Procurement: Retroactive regio.n. Total project cost financing of up to $10 million estimated at $413 million of which being requested for works and $141 million in foreign exchange. preparatory studies begun or carried out by Mexican institutions. ··· S,;,cretaria de Up to Rural Telephones Government decision on Comunicaciones y 90.0 project scope pending. Transportes (SCT) (Bank) Nacional Up to Installation of foundry forge in Discussions with technical Financiera 100.0 Lazaro Cardenas. partners underway. Updated (NAFINSA) (Bank) market study and feasibility studies for second stage to be reviewed during first quarter of 1981. Nacional Up to Rural Development - PIDER III. Appraisal report being Financiera 180.0 Total project cost estimated at prepared. (NAFINSA) (Bank) $506 million of which $100 million in foreign exchange. Procurement: Retroactive financing of up to $18 million proposed after January 1, 1981 for civil works and initial operations. Secretaria 280.0 (R) Rainfed Agricultural Development - Loan approved by the de Agricultura (Bank) Program to increase· agricultural Executive Directors on y Recursos production in rainfed areas. Total January 22. Hidraulicos project cost estimated at $800 million (SARR) of which $232 million in foreign exchange. Procurement: Retroactive financing of up to $6 million approved for design, pre- paration of bidding documents, construction of field offices and research stations; training and studies. Nacional 70,0 (R) Fertilizer -Further expansion of Preparation mission planned Financier a (Bank) manufacturing facilities and improve- for March. (NAFINSA) ment in distribution. and Fertilizantes Mexicanos (FERTIMEX) Ferrocarriles 150.0 (R) Railway IV - Track rehabilitation Loan signing on February 12, Nacionales de (Bank) and acquisition of new rolling stock Mexico (NdeM); equipment. Total project cost esti- Procurement: Action has been Banco Nacional mated at $1,527 million of which initiated with respect to rails .de Obras y $536 million in foreign exchange. and some rolling stock items. Servicios Retroactive financing of up Publicos to $15 million approved for (B,ANOBRAS) such items purchased after November 1, 1980. See page 1 for f9otnotes. - 72 - Member Country, and Borrower or Amount&· Stage of Process-. Implementing Probable· ing and Action on . Agency 1/ Lender~/ Procurement fj_l MEXICO (Cont'd) Secretaria de 100.0 Pujal Coy - Irrigation and agricul- Project preparation Agriculture y (Bank) tural· development in the Panuco underway, Recurses Basin, Hidraulicos (SARH) Secretaria de 23,0 Ocoroni Irrigation Development, Loan approved by the Executive · Agriculture y (Bank) Total project cost estimated at Directors on October 14, Recursos $54,6 million of which $23 million Hidraulicos in foreign exchange, Procurement: Retroactive (SARH) financing up to $350,000 approved to facilitate project implementation, Secretaria 100.0 Agricultural Development - Feasibility report being de Agriculture (Bank) San Fernando Valley, prepared, y Recursos Hidraulicos (SARH) Nacional 100,0 (R) Capital Goods Credit - Development Sector issues being discussed Financiera (Bank) of capital goods industry, with Government, (NAFINSA) Banco 10 ,0 (R) Industrial Ports - Preparation of a Negotiations in early Pesquero y (Bank) Ports complex project at ·Altamira February. Portuario and other port sites, (BANPESCA) To be Up to Agricultural Marketing - Improvement Project preparation underway, deter- 100.0 of infrastructure and services for mined (Bank) storage, transport, and sale of perishable agricultural products, Secretaria Up to PIDER IV - Integrated rural develop- Project preparation underway, de 200.0 ment, Programacion (Bank) y Presupuesto (SPP) NICARAGUA Ministry of Up to Education - Extension and improvement Appraisal report being Education 40.0 of rural primary education, including prepared, (Bank/ adult literacy and.skills training, IDA) Total project cost estimated at $53.l· million of which $13.7 million .in foreign exchange. Institute 2,5 Managua Water Supply - Preparation Appraisal report being Nicaraguense de (Bank) of ·engineering studies, Total project prepared, Agua y cost estimated at $4,8 million of Alcantarillados which $3.5 million in foreign exchange. (INAA) Instituto To be Expansion of Managua's water supply Preparation underway, Nicaraguense deter- system, de Agua y mined Alcantarillados (Bank) (INAA) Corporacion Up to (R) Line of Credit for Agriculture and Project split; see below, Financier a 32,0 Industry. (CORFIN) (Bank) Fondo Up to (N) Line of credit for industry rehabi- Appraisal report being Especial 30,0 litation, prepared, de (Bank) Desarrollo (FED) Corporation Up to (N) Line of credit for agriculture Appraisal report being Financiera 20,0 rehabilitation, prepared, (CORFIN) (Bank) See page l for footnotes, - 7:3 - Member Country, . and Borrower or Amount &- Stage of Process- Implementing Probable ing and A~iion on Agency !J _Lender Jj Procureinerit !:_/ NICARAGUA (Cont'd) Instituto Up to Stage II of Momotombo Geothermal Preparat:'con un_derway. Nicaraguense 25.0 Plant. de Energia (Bank) (INE) To be To be (R) Municipal Upgrading - Municipal Project split; see below. determined deter- improvement program for Managua and mined financing of Municipal Fund to (Bank) provide credits to secondary cities for municipal improvements. Junta Up to (N) Managua Upgrading - Storm drainage Appraisal scheduled for de Recon- _12.0 and low fncome neighborhood improve- February. struccion (Bank) ment program for Managua. de Managua (JRM) Ministry Up to (N) National municipal development Appraisal scheduled for of Financ~ 8.0 investment program through financing February. and (Bank) a municipal fund to provide credit Secretaria and technical assistance to secondary de Asuntos cities for municipal improvement. Municipales (SAMU) Ministry To be Low Cost Housing Program. Preparation underway. of Housing deter- mined (Bank/ IDA) Ministry of To be Highways - To improve production Preparation underway. Transportation deter- roads to all-weather status and mined road maintenance program. (Bank) P1AMA Instituto de. Up to Water Supply_and Sewerage II - Project preparation under-. Acueductos y 20.0 Improveme.nt of systems in way. Alcantarillados (Bank) Panama City and Colon. Nacionales (IDAAN) Autoridad 15 .O (R) Improvements of the ports of Balboa, Appraisal scheduled for Portuaria (Bank) Cristobal and some smaller port.s. February. · Nilcional (APN) · Instituto 6. 5 (R) Petroleum - Technical Assistance. Negotiations completed. de Recursos (Bank) Total project cost estimated'at Hidraulicos y $8 million of which $6.5 million Electrificacion in foreign exchange. (IRHE) Corporacion 20.0 (R) Industrial Credit II - Line of Negotiations in early Financiera (Bank) credit for industry and tourism. February. Nacional Total project cost estimated at (COFINA) $38 million of which $27 million in foreign exchange. See page 1 for footnotes. - 74 - Member Country, and Borrowe.r or:.: Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 2/ Procurement!!._/ ---- PANAMA (Cont'd) Ministerio de .. uP to (R) Highway Maintenance and Reconstruc- Appraisal report being Obras Publicas ; 18.0 tion. Total project cost estimated prepared. ,w (Bank) at $29.5 million, of which $18 mil- lion in foreign exchange. Instituto Up to (R) Power VI - Fortuna hydroelectric Preparation scheduled for de Recursos 25.0 power project - Stage II. February. (Co-financing Hidraulicos y (Bank) may be required.) Electrificacion-"i (IRHE) PARAGUAY Ministry of Up to Area development in Caazapa Depart- Project preparation underway. Agriculture 20.0 ment - Tentatively including river and Livestock (Bank) bank protection, reforestation, (MAG) ro~ds and feeder roads and agri- cultural credit. Ministry 18.0 Education IV - Extension and improve- Appraisal report being of Education (Bank) ment of rural basic education, teacher prepared. training and production of textbooks for basic education. Total project cost estimated at $32 million of which $12 million in foreign exchange. Administracion 13.0 Ports II and Inland Waterways - Awaiting Government's decision Nacional de (Bank) Development of facilities in on project composition. Navegacion y Ports of Asuncion and Villeta Puertas (ANNP) and improvement in riverways. Procurement: Retroactive financing of engineering studies to be proposed. To be Up to Rural Development III - Integrated Project preparation determined 20.0 rural development in Eje Norte underway. (Bank) (Chore and San Estanislao) benefit- ting about 12,000 farmers established in private and government settlements. ~ • Servicio Up to (R) Rural Water II - Construction of Appraisal report being Nacional de 9.5 water supply and waste disposal prepared. Saneamiento (Bank) facilities in about 60 small commu- Ambiental nities. Total project cost estimated (SENASA) at $18.5 million of which $9.5 million in foreign exchange. Livestock 20.0 Livestock Credit - Three year- Appraisal report being prepared. Fund (Bank) country wide credit and technical. (Co-financing with OPEC Fund assistance program for development being considered.) of livestock, beef, dairy, swine and poultry production, including small farmer component aimed at increasing production of crops, mainly soybean and cotton, when part of mixed farming operations. See page 1 for footnotes. - 75 - Member Count.ry, and Borrower or Amount & Stage of Process- Implementin!I Probable ing and Action on Agency Y Lender y Procurement 4/ 'PARAG.UAY' (Cont'd) Industria 30.0 (R) Cement - Construction of cement Government considering alter- Nacional 'del (Bank) plant consisti'ng. of a 570,000 tons native turn-key project proposal. Cemento (INC) per year clinker production facility, Appraisal report being prepared. 600,000 tons per year grinding mill (Private bank's co-financing and associated infrastructure. associated with Bank loan being sought.) Procurement: Equipment to be procured through international competitive bidding among countries willing to extend lines of credit for export financing. ') Ministerio , ·35.0 (R) Highways VII - Construction of Project preparation.under de Obras (Bank) Tacuara-Rio Jejui road, reconstruc~ way_. , Public;as, tion of San Loren~o-Eusebio Ayala' road, and possibly equipment for feeder road construction and ,;.. improvemen,t. PERU Minist.ry of . ,Up to (R) Aviation I - Improvement and con-· Negotiations in early F~bru~ry. Transport 55.0 struction of four domestic airports Communications equipment under con- (Bank) in Amazon corridor, provision of sideration to be financed ·from communications, air navigational and German sources. other equip~ent, and final engineering for, a''ne.,; air p~rt ."f'o'r, Cuzco. Total ' 0 Bank P~·oject Preparation project cost estimated at $108 ll).il- Facility advance of $800,000 lion of which $66 mil.lion in foreign is fin~ncing final engineering . exchange., for domestic airports, Con- l sultant has started work. Revised cost estima~es expected by mid- Fe.bruary. 1· Banco Agrario Up to Agricultural Cre,dit VI - Medium- and Project preparation i del Peru· 40.0 (Bank) long-term credit for agricultural development. underway. (EMPRESA DE .50.0 Lima Water Supply·'- Rehabilitation Project being prepared SMJEAMIENTO DE (Bank) and i;,xtension··or ·'Lima Water•Supply. under the ESAL Engineering LIMA) (ES,µ.} Loan (Loan Sll-PE). Ministerfo de Up to (R) Roads VIII - Rehabilitation (172 km), Project preparation Transportes y so.o paving (235 km), and improvement underway. Comunicacio11es (Bank) including paving (148 km). ' Procurement: Advance contracting may be _used. Minis'try of 40,0 Education I~-.· Subsector identification Educa.tion (Bank) scheduled for M~rch. (CORPORACION 60.0 (R) . s·econd inves.tment credit for·, Negotiation~ ·in early February • FINANCIERA (Bank) industri~l and tourism.development. DE DESARROLLO) (CENTROMIN) Up to 'Mining II - CE.NTROMIN's 1981.:.84 Project preparation underway. so.o investment program,· including expansion (Co-financing being sought,) (Bank) of polymetallic mines, improvement of CENTROMIN's ·ref:Lnery facilities and infrastructure works, I ' (ELECTROPERU) 30.0 (R) Power Engineering~ Feasibility President's Report being (Bank) studies for generation and transmission pr~pared, projects ·in 1982-90 period. ''' ···~' ,' See page 1 for footnotes. - 76 - Member Country, and Borrower or Amount & 'Stage of Process- Implementing Probable ing and Action on Agency Y ~y Procurement !±f PERU (Cont'd) To be Up to (N) Small Scale.Indusery - Industrial Preparation m~ssion deter- 25,0 credit for small scale industries. scheduled for February, mined (Bank) SURINAME To be 20,0 (R) Kabalebo Hydroelectric Power - Con- Completion of field appraisal determined (Bank) struction of dams and power .plant .scheduled for February, (Co- with initial capacity of 250 MW; financing envisaged with transmission lines, studies and Netherlands Government, IDB, training, Total project cost, in- EDF, EIB, and other official . eluding interest during construction, and private sources,) estimated at $650 million of which $500 million in foreign exchange, To be 5,0 Oil Exploration Promotion - Project preparation underway, determined (Bank) Data compilation and evaluation, review of legislation, contract supervision and training, URUGUAY Banco 30,0 (R) Industrial Credit II - Financing Loan signed on Janu~ry 19, Central (Bank) of industrial, agro-industrial, del fisheries and tourism projects, Uruguay Administracion Up to Telecommunications I - Financial Appraisal report being Nacional de 40,0 assistance for 1980-85 rehabilitation . prepared, Tele- (Bank) and expansion program, which includes comunicaciones major investments in telephone system, (ANTEL) . Total project cost estimated at $205,8 million of which $135,8 million in foreign exchange. Ministerio de To be (R) Highways III - Improvement of national Project preparation Transportes deter- highway network and possibly feeder underway, y Obras mined roads, Publicas (Bank) Ministry of Up to Education II - Physical and qualita- Preparation mission Education 15,0 tive improvements to key areas of· scheduled for March, (Bank) primary and secondary education, Asociacion Up to Oil Exploration, . Project'preparation underway, Nacional de 10,0 Combustibles, (Bank) Alcohol y Portland (ANCAP) See page 1 for footnotes, - 77 - VII, NEW PROJECTS ADDED IN THIS ISSUE Amount & Member Probable Country Lender Project Stage of Processing EASTERN AFRICA 10.0 Highways IV - Continuation of road maintenance Project identification under (IDA) and rehabilitation begun under Third Roads way. Project, Possible assistance for construction of Oxbow-Mokhotlong road, MADAGASCAR 10.0 Agricultural services for rice s~b-sector, includ- Appraisal mission scheduled (IDA) ing research, seed multiplication, extension for March, services and marketing, WESTERN AFRICA 20.0 Fourth Power Distribution - Rehabilitation·of Identification/preparation (IDA) Electric Corporation of Ghana's distribution under way. network, system maintenance, technical assistance and training. 12.0 Rural water supply in the West.ern Region - IDA Project Preparation Facility (IDA) Project to be executed in parallel with IDA advance of $340,000 approved; Health Project, selection of consultants for preparation of studies now under way. 23.0 Forestry II - Establishment and management of Project preparation financed (IDA) State-managed and rural forestry plantations; under first forestry project management of rural forests; soil conservation is under way. Appraisal program; institution building; establishment mission tentatively scheduled and monitoring of rural mini-nurseries. for May. · TOGO 30.0 Rural Development II - Development of cotton Project preparation by RMWA (IDA) and food crops production by following up on the. ~ommenced in January. activities of the cotton project (Cr. 741), and including viable elements of .the Maritime project (Cr. 638). The project will include institution strengthening, provision of farm inputs and extension services, seed production, animal traction and infrastructure. Total .cost about $40.0 million. UPPER VOLTA 6.0 Technical Assistance - Establishment of Project preparation under way. (IDA) Development Investment Budget to plan projects, Appraisal scheduled for April, program budget, and control development investments. EAST ASIA & PACIFIC To be Education I - Technical assistance, equipment Appraisal report being prepared. deter- and civil works to help improve the quality mined of education and research in sciences and engineering. The project would also assist in strengthening the university management systems and prepare for future education investments. To be First Agriculture Project - Provision of irriga- Project being prepared by deter- tion and drainage of farm land facilities for Government. mined approximately 325,000 ha of farm land. Project focuses on problems of soil salinity and provides agricultural support services. To be Ports Project - Modernization of existing ports Project being prepared by deter- and provision of modern facilities to meet Government. mined short-term requirements of increasing bulk cargo and container traffic. INDONESIA 50.0 Fertilizer Distribution II - To increase Project preparation under way. (Bank) capacity to distribute output of new fertilizer (Co-financing is envisaged.) plants. - 78 - Amount & Member Probable Country Lender Project Stage of Processing SOUTH ASIA INDIA 150.0 Proposed Remanufacturing Plant for Diesel Appraisal mission in the (IDA) Locomotives. field. 150.0 ICICI XIV - Assistance to Industrial Credit Appraisal tentatively (Bank) and Investment Corporation of India (ICICI) scheduled for April. industrial sub-borrowers. EUROPE, MIDDLE EAST &·NORTH AFRICA To be Sixth Development Finance Company Project Identification mission deter- Project will be designed to meet priority areas scheduled for mid-February. mined in Egypt's industrial strategy, through the (Bank) country's financial intermediaries, including the Development Industrial Bank of Egypt. 0 LATIN AMERICA & CARIBBEAN ARGENTINA 80.0 Highway Sector - Improvements and construction Appraisal scheduled for (Bank) of sections of the national highway network. February. 26.0 Power III - Generation, transmission·and dis- Appraisal scheduled for April. (IDA) tribution, mainly in Port-au-Prince area.· NICARAGUA Up to Line of credit for industry rehabilitation. Appraisal report being prepared. 30.q (Bank) Up to Line of credit for agriculture rehabilitation. Appraisal report being prepared. 20.0 (Bank) Up to Managua Upgrading - Storm drainage and low- Appraisal scheduled for February. 12. il income neighborhood improvement program for (Bank) Managua. Up to National Municipal Development Investment Pro- Appraisal scheduled for February. 8.0 gram through financing a municipal fund to (Bank) provide credit and technical assistance to secondary cities for municipal improvement. Up to Small-scale Industry - Industrial credit for Preparation mission scheduled 25.0 small-scale industries. for February. (Bank)