INTEGRTED FOREST ECOSYSTEM MANAGEMENT PROJECT General Procurement Thresholds and Methods of Procurement: The following methods of procurement shall be used for procurement under the project. It has been agreed that if a invitation for a bid is comprised of several packages, lots or slices, and invited in the same invitation for bid, then the aggregate value of the whole package determines the applicable threshold amount for procurement and also for the review by the Bank. The national competitive bidding (NCB) conditions will be part of the Financing Agreement. Expenditure Contract Bank Prior Review Procurement Method Category Value (USD) >= 5, 000 000 ICB All ICB contracts < 5, 000,000 NCB NA Civil Works <50 000 Shopping NA NA DC >= 5, 000 000 >= 1, 000 000 ICB All ICB contracts <1, 000 000 NCB NA Goods <100 000 Shopping NA NA DC >= 1, 500 000 NA QCBS, QBS, FBS, All contracts >= USD 500,000 Consultant LCS and CQS* for firms; all contracts >= USD Services NA SSS 200,000 for individuals; All NA IC TORs Notes: ICB – International Competitive Bidding NCB – National Competitive Bidding DC – Direct Contracting QCBS – Quality and Cost Based Selection QBS – Quality Based Selection FBS – Fixed Budget Selection LCS – Least Cost Selection *CQS – Selection Based on Consultants’ Qualification below $300,000 depending on the nature of assignment SSS – Single (or Sole) Source Selection IC – Individual Consultant selection procedure NA – Not Applicable July 9, 2010 Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1. PROCUREMENT PLAN (July 2015) WB Date of Proc. Review Item № Contract Description Contract Method (Prior/ Signing Post) GOODS Component 1. Forest Sector Institutional Reform No goods Component 2. Strategic Investments and Piloting of Sustainable Management Approaches 1 Financing the implementation of INRMPs NCB/SH Prior/Post Investments like afforestation of short rotation tree 2 NCB/SH Prior/Post species, natural regeneration through thinning etc. Component 3. Information and Monitoring and Evaluation National Forest Inventory (NFI) and the 3 Management Forest Inventory (MFI) (Non- ICB Prior 9/1/2016 consulting services) 4 Office equipment for FMIS NCB Prior 6/1/2017 Component 4. Project Management, Monitoring and Evaluation 5 Computers for PCU SH Prior 3/1/2016 6 Furniture for PCU SH Post 3/1/2016 7 Car for PCU SH Post 3/1/2016 8 Accounting software for PCU SH Post 3/1/2016 CONSULTANCY LARGE WB Date of Select. Review Item № Contract Description Contract Method (Prior/ Signing Post) Component 1. Forest Sector Institutional Reform Support of introduction of new principles of 1 QCBS Prior 9/1/2016 planning, budgeting and monitoring /a Component 2. Strategic Investments and Piloting of Sustainable Management Approaches Preparation of the Integrated Natural Resource 2 QCBS Prior 9/1/2016 Management Plans (INRMPs) July 9, 2010 Component 3. Information and Monitoring and Evaluation The Forest Management Information System 3 QCBS Prior 1/1/2017 (FMIS) Component 4. Project Management, Monitoring and Evaluation 4 Project Audit LCS Prior 9/1/2016 July 9, 2010 PROCUREMENT Kyrgyz Republic : Integrated Forest Ecosystem Management PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2018-04-04 2019-09-10 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151102 GPN Date: Project Name: Integrated Forest Ecosystem Management Loan / Credit No: IDA / D0950, IDA / 57430 Executing Agency(ies): State Agency on Environment Protection and Forestry WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IFEMP-INVEST-W-SH-10- Strategic Investments and Request for Single Stage - One 2019 / Fencing in Aksu IDA / D0950 Piloting of Sustainable Post Open - National 11,912.00 0.00 Canceled 2019-06-05 2019-07-05 2019-08-05 Quotations Envelope leskhoz 8 hectare Management Approaches IFEMP-INVEST-W-SH-1- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under planting forest crops, fast- Request for Single Stage - One IDA / D0950 Piloting of Sustainable Post Open - National 27,696.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 growing plantations and Quotations Envelope Management Approaches on orchards in Uch-Korgon LH for the current and next years. IFEMP-INVEST-W-SH-2- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 290,772.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Naryn LH in the current and next years. IFEMP-INVEST-W-SH -3- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 80,655.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Batken LH for the current and next years. IFEMP-INVEST-W-SH -4- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 109,980.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Toktogul LH for the current and next years. IFEMP-INVEST-W-SH-5- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 136,138.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Talas LH for the current and next years. IFEMP-INVEST-W-SH -6- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 67,031.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Aksy LH for the current and next years. Page 1 IFEMP-INVEST-W-SH -7- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under planting forest crops, fast- Request for Single Stage - One IDA / D0950 Piloting of Sustainable Post Open - National 202,650.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 growing plantations and Quotations Envelope Management Approaches on orchards in Kara-Kuldzha LH for the current and next years. IFEMP-INVEST-W-SH -8- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under planting forest crops, fast- Request for Single Stage - One IDA / D0950 Piloting of Sustainable Post Open - National 128,234.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 growing plantations and Quotations Envelope Management Approaches on orchards in Toskol-Ata (Kochkor-Ata) LH for the current and next years. IFEMP-INVEST-W-SH-9- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under planting forest crops, fast- Request for Single Stage - One IDA / D0950 Piloting of Sustainable Post Open - National 194,000.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 growing plantations and Quotations Envelope Management Approaches on orchards in Karakol (Aksuu) LH for the current and next years. IFEMP-INVEST-W-SH-11- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 113,259.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in At-Bashy LH for the current and next years. IFEMP-INVEST-W-SH-12- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 64,191.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Chui LH for the current and next years. IFEMP-INVEST-W-SH-13- 2019 / Installation of fencing and soil preparation for Strategic Investments and Under Request for Single Stage - One planting forest crops, fast- IDA / D0950 Piloting of Sustainable Post Open - National 72,780.00 0.00 Implementati 2019-08-14 2019-09-09 2019-11-29 Quotations Envelope growing plantations and Management Approaches on orchards in Frunze LH for the current and next years. GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP-SH-COMPS-005- 2018 / Procurement of Computers and office equipment as a support of Forest Sector Institutional Request for Single Stage - One IDA / D0950 Post Limited 22,000.00 20,997.94 Completed 2018-03-19 2018-04-30 2018-05-30 Joint Forest Management Reform Quotations Envelope Council (JFMC) and Consultative and Coordination Council (CCC) Page 2 KG-IFEMP-SH-FURNITURE- 003-2018 / Office furniture as a support of Joint Forest Forest Sector Institutional Request for Single Stage - One IDA / D0950 Post Limited 4,000.00 0.00 Canceled 2018-03-19 2018-04-23 2018-05-23 Management Council (JFMC) Reform Quotations Envelope and Consultative Coordination Council (CCC) IFMP-SH-PRINT-004-2018 / Forest Sector Institutional Request for Single Stage - One Information Board in pilot IDA / D0950 Post Open - National 8,500.00 2,804.09 Signed 2018-08-03 2018-09-12 2018-10-08 Reform Quotations Envelope leskhozes IFMP-SH-FURNITURE- Forest Sector Institutional Request for Single Stage - One 005/1-2018 / Support CCC IDA / D0950 Post Open - National 10,080.00 4,024.56 Signed 2018-08-08 2018-08-28 2018-09-28 Reform Quotations Envelope and JFMC (office furniture) IFMP-SH-PRINT-005-2018 / Forest Sector Institutional Request for Single Stage - One Information poster in pilot IDA / D0950 Post Open - National 5,000.00 3,708.51 Signed 2018-08-17 2018-09-21 2018-10-21 Reform Quotations Envelope leskhozes IFEMP-SH-COMPS-001-2017 Project Management, Request for Single Stage - One IDA / D0950 Post Limited 7,200.00 6,948.99 Completed 2017-06-05 2017-07-02 2017-07-27 / Computers for PCU Monitoring and Evaluation Quotations Envelope IFEMP-SH-VEHICLE-004- Project Management, Request for Single Stage - One IDA / D0950 Post Limited 80,000.00 80,790.33 Completed 2017-06-26 2017-07-31 2017-08-30 2017 / Car for PCU Monitoring and Evaluation Quotations Envelope KG-IFEMP-SH-MNE-005- 2018 / Server for the Project Management, Request for Single Stage - One development of IFEMP IDA / D0950 Post Open - National 2,000.00 3,684.59 Signed 2018-09-24 2018-10-18 2018-11-18 Monitoring and Evaluation Quotations Envelope database for MnE and office equipment KG-IFEMP- SH-COMPS - Project Management, Request for Single Stage - One 007-2018 / Computers for IDA / D0950 Post Open - National 10,000.00 5,317.87 Completed 2018-11-23 2018-12-17 2019-02-07 Monitoring and Evaluation Quotations Envelope PIU IFEMP-INVEST-G-SH-5- Strategic Investments and 2019 / Purchase of motor Request for Single Stage - One IDA / 57430 Piloting of Sustainable Post Open - National 18,859.00 33,012.91 Signed 2019-06-05 2019-07-05 2019-08-05 cultivato rwith a plow and Quotations Envelope Management Approaches tree shovels IFEMP-INVEST-G-SH-6- Strategic Investments and Pending 2019 / Purchase of materials Request for Single Stage - One IDA / D0950 Piloting of Sustainable Post Open - National 21,540.00 0.00 Implementati 2019-06-05 2019-07-08 2019-08-07 for fencing of 4 km in Quotations Envelope Management Approaches on Naryn leskhoz IFEMP-INVEST-G-NCB-2- Strategic Investments and Under 2019 / Purchase of a car Single Stage - One IDA / 57430 Piloting of Sustainable Post Request for Bids Open - National 471,486.00 0.00 Implementati 2019-06-13 2019-06-18 2019-06-27 2019-07-03 2019-08-05 2019-10-07 with fie-fighting equipment Envelope Management Approaches on (MLPK) for pilot leskozes IFEMP-INVEST-G-NCB-3- Strategic Investments and Under 2019 / Purchase of wheeled Single Stage - One IDA / 57430 Piloting of Sustainable Post Request for Bids Open - National 537,003.00 0.00 Implementati 2019-06-11 2019-06-11 2019-06-27 2019-07-03 2019-08-01 2019-10-07 tractors with mounted Envelope Management Approaches on equipment IFEMP-INVEST-G-NCB-4- Strategic Investments and Under 2019 / Purchase of wheeled Single Stage - One IDA / 57430 Piloting of Sustainable Post Request for Bids Open - National 124,348.00 0.00 Implementati 2019-06-13 2019-06-18 2019-06-27 2019-07-03 2019-08-01 2019-10-07 mini tractors with mounted Envelope Management Approaches on equipment IFEMP-SH-PRINT-010-2019 Under / Development and Forest Sector Institutional Request for Single Stage - One IDA / D0950 Post Open - National 1,500.00 0.00 Implementati 2019-09-06 2019-09-13 2019-09-27 replication of booklets on Reform Quotations Envelope on municipal forests NON CONSULTING SERVICES Page 3 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP- CQS-DESIGN ESTIMATES -05-2019 / Company for the Strategic Investments and Consultant Under development of design IDA / D0950 Piloting of Sustainable Post Qualification Open - National 280,000.00 0.00 2019-06-19 2019-07-10 2019-07-12 2019-08-19 2019-08-23 2019-11-25 Implementation estimates documetation for Management Approaches Selection bridges,greenhouses, irrigation systems KG-IFEMP- CQS-DESIGN ESTIMATES -04-2019 / Company for the Strategic Investments and Consultant Under development of design IDA / D0950 Piloting of Sustainable Post Qualification Open - National 280,000.00 0.00 2019-06-10 2019-07-01 2019-07-12 2019-08-19 2019-08-23 2019-12-23 Implementation estimates documentation for Management Approaches Selection cordons, drying shops and refrigerators INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP-CS-INT-FA- 01/2018 / Selection of Forest Sector Institutional individual consultant for IDA / D0950 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2018-05-23 2018-05-24 2018-05-27 2018-12-02 Reform functional and institutional review of Kyrgyz Forestry KG-SAEPF-CS-ENV- SAFEGUARD-INDV / Selection of Individual Individual Information and Monitoring consultant (national) for IDA / 57430 Post Consultant Limited 10,000.00 29,289.48 Signed 2018-05-23 2018-05-28 2018-06-18 2018-07-23 2019-01-19 and Evaluation providing of consulting Selection services on Environmental Safeguard KG-SAEPF-CS- SOCIALSAFEGUARD-INDV / Individual Selection of Individual Information and Monitoring IDA / 57430 Post Consultant Limited 10,000.00 8,184.22 Signed 2018-05-24 2018-05-29 2018-06-19 2018-07-24 2019-01-20 consultant (national) for and Evaluation Selection providing of consulting services on Social Safeguard CS-NAT-FA-01-2018 / Selection of national Individual Forest Sector Institutional consultant for Functional IDA / D0950 Post Consultant Limited 10,000.00 5,448.81 Signed 2018-05-25 2018-05-28 2018-05-29 2018-05-31 2018-11-27 Reform analyzing of Kyrgyz Forest Selection Sector KG-SAEPF-64439-CS-INDV / Selection of individual Individual consultant for functional and Forest Sector Institutional IDA / D0950 Post Consultant Limited 50,000.00 33,224.00 Signed 2018-05-29 2018-06-01 2018-06-04 2018-06-08 2018-10-16 institutional review of the Reform Selection forestry sector of the Kyrgyz Republic Page 4 SSS-PIUDATABASE- 009/2018 / IT specialist on development of database for Project Management, the Integrated Forest IDA / D0950 Post Direct Selection Direct 8,000.00 8,008.72 Signed 2018-07-31 2018-08-03 2018-08-05 2019-01-06 Monitoring and Evaluation Ecosystem Management Project of the Kyrgyz Republic Individual CS- CCC/JFMC-02-1/2018 / Forest Sector Institutional IDA / D0950 Post Consultant Limited 6,750.00 6,589.93 Completed 2018-02-12 2018-03-17 2018-04-09 2018-05-23 2019-05-08 PIU Local Focal Point Reform Selection Individual CS- CCC/JFMC-02-2/2018 / Forest Sector Institutional IDA / D0950 Post Consultant Limited 6,750.00 11,748.93 Signed 2018-02-12 2018-03-17 2018-04-09 2018-05-23 2019-05-08 PIU Local Focal Point Reform Selection Individual CS- CCC/JFMC-02-3/2018 / Forest Sector Institutional IDA / D0950 Post Consultant Limited 7,100.00 6,975.54 Signed 2018-02-12 2018-03-17 2018-04-09 2018-05-23 2019-05-08 PIU Local Focal Point Reform Selection Individual CS- CCC/JFMC-02-4/2018 / Forest Sector Institutional IDA / D0950 Post Consultant Limited 7,150.00 12,553.24 Signed 2018-02-12 2018-03-17 2018-04-09 2018-05-23 2019-05-08 PIU Local Focal Point Reform Selection Individual CS- CCC/JFMC-02-5/2018 / Forest Sector Institutional IDA / D0950 Post Consultant Limited 7,250.00 7,774.57 Signed 2018-02-12 2018-02-17 2018-04-09 2018-05-23 2019-05-08 PIU Local Focal Point Reform Selection SSS-RTK-03-1/2018 / Development of metodology Forest Sector Institutional IDA / D0950 Post Direct Selection Direct 10,000.00 4,985.34 Signed 2018-04-03 2018-04-13 2018-04-25 2018-10-27 of Calculation the Cost of Reform foresty works SSS-RTK-03-2/2018 / Development of metodology Forest Sector Institutional IDA / D0950 Post Direct Selection Direct 10,000.00 4,569.65 Signed 2018-04-03 2018-04-13 2018-04-25 2018-10-27 of Calculation the Cost of Reform foresty works IC-MF-REGULATORY-012- Strategic Investments and Individual 2018 / Expert on regulatory IDA / D0950 Piloting of Sustainable Post Consultant Open 10,000.00 6,466.45 Signed 2018-09-11 2018-10-12 2018-10-17 2018-10-31 2019-04-30 status of orphan forests Management Approaches Selection IC-MF-INVENTORY-014- 2018 / Expert on forest Strategic Investments and Individual management inventory IDA / D0950 Piloting of Sustainable Post Consultant Open 3,000.00 2,873.98 Signed 2018-09-11 2018-10-12 2018-10-17 2018-10-31 2019-01-31 guidelines for municipal Management Approaches Selection forest IC-MF-FACILITATION-013/1- Strategic Investments and Individual 2018 / Consultants for IDA / D0950 Piloting of Sustainable Post Consultant Open 9,000.00 6,825.69 Signed 2018-09-11 2018-10-12 2018-10-17 2018-10-31 2019-03-31 facilitation in municipal Management Approaches Selection forests (3 positoins) IC-MF-FACILITATION-013/2- Strategic Investments and Individual 2018 / Consultants for IDA / D0950 Piloting of Sustainable Post Consultant Open 9,000.00 8,057.07 Signed 2018-09-11 2018-10-12 2018-10-17 2018-10-31 2019-03-31 facilitation in municipal Management Approaches Selection forests (3 positoins) IC-MF-FACILITATION-013/3- Strategic Investments and Individual 2018 / Consultants for IDA / D0950 Piloting of Sustainable Post Consultant Open 9,000.00 6,825.69 Signed 2018-09-11 2018-10-12 2018-10-17 2018-10-31 2019-03-31 facilitation in municipal Management Approaches Selection forests (3 positoins) IC-FOREST CULTURES- 017/2018 / Consultant on Strategic Investments and Individual devolopment forest IDA / D0950 Piloting of Sustainable Post Consultant Open 10,000.00 7,404.23 Signed 2018-10-05 2018-11-01 2018-11-02 2018-11-09 2019-03-09 management investment Management Approaches Selection projects Page 5 IC-TECHNICAL Strategic Investments and Individual ENGENEER-015/2018 / IDA / D0950 Piloting of Sustainable Post Consultant Open 17,518.00 12,786.25 Signed 2018-10-01 2018-10-26 2018-10-29 2018-11-05 2019-11-05 Technical engeneer for PIU Management Approaches Selection IC-FOREST CULTURES- 017/1/2018 / Short-term Strategic Investments and Individual consultant on development of IDA / D0950 Piloting of Sustainable Post Consultant Open 10,000.00 7,232.37 Signed 2018-10-10 2018-11-01 2018-11-02 2018-11-09 2019-02-01 forest management Management Approaches Selection investments IC-FOOD-SAFETY-016-2019 Strategic Investments and Individual / Short-term consultant on IDA / D0950 Piloting of Sustainable Post Consultant Open 10,000.00 4,842.75 Signed 2019-07-03 2019-07-25 2019-07-26 2019-07-31 2019-11-30 the organization of Management Approaches Selection processing production IC-CFTI FRUNZE -028/2019 / Short-term consultant on organizing the logistics of Strategic Investments and Individual Under "Center for Forest IDA / D0950 Piloting of Sustainable Post Consultant Open 3,000.00 0.00 2019-08-30 2019-09-27 2019-09-30 2019-10-01 2019-10-31 Implementation Technologies and Management Approaches Selection Information" on the basis of the Frunze LH IC-FS.TOURISM-027/2019 / Short-term consultant on the Strategic Investments and Individual development of feasibility Pending IDA / D0950 Piloting of Sustainable Post Consultant Open 10,000.00 0.00 2019-09-06 2019-10-25 2019-10-25 2019-10-31 2020-02-29 studies, logistics and Implementation Management Approaches Selection organization of tourist facilities Page 6