PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2018-10-04 2020-09-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / D2880, IDA / D2860 Executing Agency(ies): Ministry of Environment and Sustainable Development WORKS Procureme Bid Evaluation Activity Reference No. / Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract Description Component Review Type Method Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Document Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion (US$) Documents Justification Type Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74186-CW-RFQ / Component 3: Strengthening Mise en place d'une clôture Single Stage - One 2019-11- IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,168.67 Achevé 2018-11-10 2019-11-08 2019-01-05 2019-11-13 2019-07-04 grillagée autour de la marre Envelope 30 Investments à Spartines MR-MEDD-74188-CW-RFQ / Component 3: Strengthening Single Stage - One En attente Aménagement du site de IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-20 2019-01-15 2019-07-14 Envelope d'exécution l'éco-loge Investments MR-MEDD-74189-CW-RFQ / Component 3: Strengthening Single Stage - One En attente Travaux de construction de IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-02-09 2019-04-06 2019-10-03 Envelope d'exécution l'éco-loge Investments MR-MEDD-74202-CW-RFQ / Travaux d'entretien des Component 3: Strengthening Single Stage - One couloirs de pare-feux du IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-12-30 2019-02-24 2019-08-23 Envelope Typha au niveau de Investments Diawling MR-MEDD-74205-CW-RFB / Component 4: National Single Stage - Two Construction des sièges de IDA / D2880 A posteriori Appel d'offres Open - National 0.00 Annulé 2018-09-03 2018-09-08 2018-10-20 2019-01-02 2019-02-06 2019-08-05 Coordination Envelope l'Observatoire et de l'UGP MR-MEDD-75951-CW-RFQ / Component 3: Strengthening Travaux pour passages de Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-01-15 2019-03-12 2019-09-08 piétons sur le cordon dunaire Envelope d'exécution Investments de NKTT MR-MEDD-75955-CW-RFB / Component 3: Strengthening Single Stage - One Colmatage des brèches du IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 Annulé 2018-11-05 2018-11-10 2018-12-22 2019-01-21 2019-02-25 2019-08-24 Envelope littoral de NKTT Investments MR-MEDD-75986-CW-RFQ / Component 3: Strengthening Single Stage - One En attente Travaux pour la fixation des IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-06 2018-12-01 2019-05-30 Envelope d'exécution dunes au niveau de Chami Investments MR-MEDD-75993-CW-RFQ / Travaux de restauration des Component 3: Strengthening paysages des carrières de Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-12-05 2019-01-30 2019-07-29 coquillages en frange Envelope d'exécution Investments continentale du cordon dunaire du littoral MR-MEDD-76006-CW-RFQ / Component 3: Strengthening Restauration des éco- Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-20 2019-01-15 2019-07-14 systèmes du Parc National Envelope d'exécution Investments d'Awleigatt (PNA) Page 1 MR-MEDD-82725-CW-RFQ / mise en place d'une Component 2: Strengthening Single Stage - One En attente pépinière pour les besoins de IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-10-27 2018-12-22 2019-06-20 Envelope d'exécution la fixation des dunes du Framework littoral MR-MEDD-75980-CW-RFQ / Component 3: Strengthening Travaux de fixation de dunes Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-20 2018-12-15 2019-06-13 du littoral de NKTT sur un Envelope d'exécution Investments premier site pilote MR-MEDD-115356-CW-RFQ / Réalisation de clôture grillagée autour du périmètre Component 3: Strengthening Single Stage - One 2019-07- de 15 ha de fixation IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,467.31 Achevé 2019-05-25 2019-06-13 2019-06-10 2019-06-21 2019-07-20 Envelope 22 mécanique et biologique du Investments cordon dunaire de Nouakchott MR-MEDD-115655-CW-RFQ Component 3: Strengthening / Fixation de 15 ha de Single Stage - One 2019-09- IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,984.27 Achevé 2019-06-01 2019-06-12 2019-06-11 2019-06-28 2019-08-10 dunes du littoral de Envelope 16 Investments Nouakchott MR-MEDD-115657-CW-RFQ / Travaux d'entretien de Component 3: Strengthening Single Stage - One En attente couloirs de pare-feus pour la IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-05-30 2019-06-12 2019-07-12 Envelope d'exécution restauration des mangroves Investments au niveau de Diawling MR-MEDD-115659-CW-RFQ Component 3: Strengthening Single Stage - One 2019-08- / Réalisation de pépinières IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 34,921.07 Achevé 2019-06-08 2019-07-19 2019-06-21 2019-08-01 2019-07-21 Envelope 29 de mangroves au Diawling Investments MR-MEDD-124501-CW-RFQ Component 3: Strengthening / mise en place d'une cloture Single Stage - One 2019-08- IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 8,464.35 Achevé 2019-08-26 2019-07-25 2019-10-21 2019-08-02 2020-04-18 de protectionsur les 2 ha de Envelope 29 Investments dunes fixées au PND MR-MEDD-124500-GO-RFQ / Component 3: Strengthening mise en place de clotures Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-09-07 2019-10-19 2020-04-16 pour abriter les pépinières Envelope d'exécution Investments de mangroves au PND MR-MEDD-129309-CW-RFQ / Clôture grillagée pour la Component 3: Strengthening Single Stage - One 2019-10- protection d'une fixation de IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,983.98 Achevé 2019-09-07 2019-09-13 2019-11-02 2019-09-17 2020-04-30 Envelope 23 dunes de 15 ha du littoral Investments de Nouakchott MR-MEDD-137084-CW-RFQ / Mise en place de couloirs Component 1: Strengthening Single Stage - One En attente IDA / D2880 A posteriori Demande de prix Limited 0.00 2019-10-06 2019-10-16 2019-11-15 de pare-feux de Typha au Regional Integration Envelope d'exécution niveau du Diawling MR-MEDD-137891-CW-DIR / Component 3: Strengthening Passation de Renforcement de la résilience IDA / D2880 National Physical and Social A posteriori marché de gré à Direct 0.00 Annulé 2019-10-02 2019-10-04 2019-10-04 2020-01-02 des communautés et des Investments gré écosystèmes de Ndiago. MR-MEDD-75953-CW-RFQ / Component 3: Strengthening Mise en place de de bacs à Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-12-17 2019-02-11 2019-08-10 fleurs pour la sécurisation Envelope d'exécution Investments du littoral MR-MEDD-156359-CW-RFQ / Mise en place d'une clôture Component 3: Strengthening grillagée autour de la marre Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-02-10 2020-03-05 2020-04-19 à Spartine à la Baie de Envelope d'exécution Investments l'Etoile de Nouadhibou (phase II) Page 2 MR-MEDD-170440-CW-RFQ Component 3: Strengthening / Confection et mise en place Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-05-26 2020-07-21 2020-09-19 de bacs pour la sécurisation Envelope d'exécution Investments du littoral MR-MEDD-170442-CW-RFQ Component 3: Strengthening Single Stage - One En attente / Construction de Loges des IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-05-13 2020-07-08 2020-11-05 Envelope d'exécution agents de surveillance Investments MR-MEDD-170443-CW-RFQ Component 3: Strengthening Single Stage - One En attente / Travaux de fixation des IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-06-13 2020-08-08 2020-11-06 Envelope d'exécution dunes au diawling Investments MR-MEDD-170445-CW-RFQ Component 3: Strengthening Single Stage - One En attente / Clôture grillagée fixation IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-05-14 2020-07-09 2020-10-17 Envelope d'exécution dunes au Diawling Investments MR-MEDD-170447-CW-RFQ Component 3: Strengthening / Travaux de coupe de typha Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-06-24 2020-08-19 2021-02-15 au Parc National du Envelope d'exécution Investments Diawling MR-MEDD-170449-CW-RFQ Component 3: Strengthening Single Stage - One En attente / Mise en place de pépinière IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-06-24 2020-08-19 2020-10-03 Envelope d'exécution de mangroves au Diawling Investments MR-MEDD-170453-CW-RFQ Component 3: Strengthening / clôture pour protéger les Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-06-13 2020-08-08 2020-11-16 plantations de mangroves au Envelope d'exécution Investments Diawling Component 3: Strengthening MR-MEDD-170456-CW-RFQ Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-07-16 2020-09-10 2020-11-09 / Plantation de mangroves Envelope d'exécution Investments MR-MEDD-170457-CW-RFQ Component 3: Strengthening / Travaux d’entretien des Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-05-15 2020-07-10 2020-10-08 couloirs et de coupe de Envelope d'exécution Investments Typha déjà réalisés MR-MEDD-170571-CW-RFB / Travaux pour la réalisation Component 3: Strengthening de passages de Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 2020-11-16 2020-11-21 2021-01-02 2021-02-01 2021-03-08 2021-09-04 franchissement du cordon Envelope d'exécution Investments dunaire et équipement des passages piétons MR-MEDD-170572-CW-RFB / Travaux de réhabilitation Component 3: Strengthening En attente et extension de la digue IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 2020-08-10 2020-09-09 2020-10-09 2020-10-29 2020-11-28 2021-05-27 d'exécution Nord du Parc National du Investments Diawling (PND) MR-MEDD-170567-CW-RFB Component 2: Strengthening Open - Single Stage - One En attente / Travaux de fixation de IDA / D2880 the Policy and Institutional A posteriori Appel d'offres 0.00 2021-01-04 2021-01-19 2021-03-02 2021-04-01 2021-05-06 2022-05-03 International Envelope d'exécution dunes du littoral Framework MR-MEDD-170569-CW-RFB Component 3: Strengthening Open - Single Stage - One En attente / Travaux pour le colmatage IDA / D2880 National Physical and Social A posteriori Appel d'offres 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 2022-01-29 International Envelope d'exécution des brèches Investments MR-MEDD-178901-CW-RFQ Component 3: Strengthening / Entretien des claies et du Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-06-15 2020-06-28 2020-07-28 reboisement (au niveau du Envelope d'exécution Investments PND) Page 3 GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74169-GO-RFQ / Acquisition d'équipements de Component 2: Strengthening Single Stage - One bureaux au profit de IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 1,680.00 Achevé 2018-10-06 2019-07-22 2018-12-01 2019-07-25 2019-05-30 2019-08-30 Envelope l'Autorité de la Zone franche Framework de NDB MR-MEDD-74193-GO-RFQ / Component 3: Strengthening Acquisition d'équipements et Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-13 2018-12-08 2019-06-06 de matériels de protection du Envelope d'exécution Investments cordon dunaire de Diawling MR-MEDD-74196-GO-RFQ / Component 3: Strengthening Achat de plants pour la Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-25 2019-01-20 2019-07-19 fixation biologique du cordon Envelope d'exécution Investments dunaire de Diawling MR-MEDD-74201-GO-RFQ / Acquisition de matériel pour Component 3: Strengthening Single Stage - One En attente la surveillance des IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-12-01 2019-01-26 2019-07-25 Envelope d'exécution investissements physiques Investments pour Diawling MR-MEDD-74203-GO-RFQ / Acquisition d'équipement Component 3: Strengthening Single Stage - One En attente pour l'observatoire IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-06 2018-12-01 2019-05-30 Envelope d'exécution ornithologique au niveau de Investments Diawling MR-MEDD-74204-GO-RFB / Component 4: National Single Stage - One En attente IDA / D2880 A posteriori Appel d'offres Open - National 0.00 2018-08-30 2018-09-04 2018-10-16 2018-11-15 2018-12-20 2019-06-18 Achat de véhicule Coordination Envelope d'exécution MR-MEDD-75952-GO-RFQ / Component 3: Strengthening Equipements pour passages Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-01-20 2019-03-17 2019-09-13 de franchissement du cordon Envelope d'exécution Investments dunaire de NKTT MR-MEDD-75959-GO-RFQ / Component 2: Strengthening Acquisition d'équipements Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-12-10 2019-02-04 2019-08-03 pour l'observatoire national Envelope d'exécution Framework du littoral mauritanien MR-MEDD-75977-GO-RFQ / Acquisition d'équipements de Component 2: Strengthening Single Stage - One surveillance et de secourisme IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 Annulé 2018-10-30 2018-12-25 2019-06-23 Envelope au profit de la Direction de Framework la Protection Civile MR-MEDD-75978-GO-RFQ / Component 2: Strengthening Single Stage - One En attente Acquisition d'équipements au IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-10-20 2018-12-15 2019-06-13 Envelope d'exécution profit de l'ONM Framework MR-MEDD-75979-GO-RFQ / Component 2: Strengthening Acquisition d'équipements Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-11-20 2019-01-15 2019-07-14 pour l'opérationnalisation du Envelope d'exécution Framework plan POLMAR MR-MEDD-75988-GO-RFQ / Component 3: Strengthening Acquisition d'équipements Single Stage - One En attente IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-20 2019-01-15 2019-07-14 pour la fixation des dunes Envelope d'exécution Investments au niveau de Chami MR-MEDD-75990-GO-RFQ / Component 3: Strengthening Single Stage - One Mise en place de pépinières IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-10 2019-01-05 2019-07-04 Envelope de mangroves à Nouamghar Investments Page 4 MR-MEDD-75995-GO-RFQ / Acquisition d'équipements Component 2: Strengthening Single Stage - One En attente pour le réseau des IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-12-10 2019-02-04 2019-08-03 Envelope d'exécution Parlementaires et élus locaux Framework de l'environnement MR-MEDD-75997-GO-RFQ / Component 2: Strengthening Acquisition de matériel pour Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-12-04 2019-01-29 2019-07-28 la coordination du Master Envelope d'exécution Framework Gaed MR-MEDD-75998-GO-RFQ / Acquisition d'équipements Component 2: Strengthening Single Stage - One En attente pour l'opérationnalisation de IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-11-04 2018-12-30 2019-06-28 Envelope d'exécution la base de données du Framework MEED MR-MEDD-76001-GO-RFQ / Acquisition d'équipements Component 2: Strengthening Single Stage - One En attente pour le laboratoire des IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2018-11-04 2018-12-30 2019-06-28 Envelope d'exécution études environnementales et Framework de géographie (LEERG) MR-MEDD-76866-GO-RFQ / Component 3: Strengthening Single Stage - One En attente Acquisition de matériel pour IDA / D2880 National Physical and Social A posteriori Demande de prix Open - National 0.00 2018-10-15 2018-12-10 2019-06-08 Envelope d'exécution les AGR Investments MR-MEDD-124789-GO-RFQ / impression de cartes de Component 3: Strengthening distributions des formations Single Stage - One IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 16,666.67 Achevé 2019-08-26 2019-12-09 2019-10-21 2019-12-17 2020-04-18 2020-01-13 de mangroves du BAS Envelope Investments DELTA DU FLEUVE SENEGAL rive droite. MR-MEDD-170405-GO-RFQ / Component 2: Strengthening Acquisition de matériel pour Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2020-06-16 2020-08-11 2020-09-25 la coordination du Master Envelope d'exécution Framework GAED MR-MEDD-170352-GO-RFQ / Component 2: Strengthening Équipement du centre de Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2020-07-01 2020-08-26 2020-10-10 documentation électronique Envelope d'exécution Framework de la CNOEZA MR-MEDD-170370-GO-RFQ / Component 2: Strengthening Équipements au profit des Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2020-05-15 2020-07-10 2020-08-09 Délégations Régionales de Envelope d'exécution Framework l'Environnement (littoral) MR-MEDD-170397-GO-RFQ / Component 2: Strengthening Acquisition d'équipement de Single Stage - One En attente IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2020-08-25 2020-10-20 2020-12-04 bureau au profit de l'autorité Envelope d'exécution Framework de la zone franche MR-MEDD-170462-GO-RFQ / Component 2: Strengthening Single Stage - One En attente Acquisition d'équipements au IDA / D2880 the Policy and Institutional A posteriori Demande de prix Limited 0.00 2020-08-23 2020-10-18 2021-04-16 Envelope d'exécution profit de la DAPL/MEDD Framework MR-MEDD-172827-GO-RFB / Acquisition d'équipements de Component 2: Strengthening Open - Single Stage - One En attente surveillance et de secourisme IDA / D2880 the Policy and Institutional A posteriori Appel d'offres 0.00 2020-08-18 2020-08-23 2020-10-04 2020-11-03 2020-12-08 2021-06-06 International Envelope d'exécution au profit de la Direction de Framework la Protection Civile MR-MEDD-172830-GO-DIR / Passation de Component 4: National En attente logiciel gestion suivi- IDA / D2880 A posteriori marché de gré à Direct 0.00 2020-08-10 2020-08-15 2020-09-19 2020-09-28 Coordination d'exécution évaluation (RUCH) gré NON CONSULTING SERVICES Page 5 Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74195-NC-RFQ / Collecte et transport sur Component 3: Strengthening Single Stage - One En cours sites de matériaux de IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-13 2019-04-02 2019-01-08 2019-07-07 Envelope d'exécution fixation mécanique de dunes Investments au niveau de Diawling MR-MEDD-170490-NC-RFQ / Component 4: National Single Stage - One En attente Maintenance et suivi IDA / D2880 A posteriori Demande de prix Limited 0.00 2020-05-15 2020-07-10 2021-07-07 Coordination Envelope d'exécution informatique MR-MEDD-170472-NC-DIR / Component 3: Strengthening Passation de Opérationnalisation du En attente IDA / D2880 National Physical and Social A posteriori marché de gré à Direct 0.00 2020-06-23 2020-07-08 2020-08-12 2021-02-08 mécanisme de gestion de d'exécution Investments gré plaintes (MGP) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74182-CS-QCBS / Sélection fondée Component 2: Strengthening Elaboration de la directive sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 d'aménagement du littoral de qualifications des Framework NDB consultants Sélection fondée MR-MEDD-74184-CS-QCBS / Component 2: Strengthening sur les En attente Etude sur le classement de IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 qualifications des d'exécution la Baie de l'Etoile de NDB Framework consultants MR-MEDD-74207-CS-QCBS / Analyse du rapport EIE du Sélection fondée Component 2: Strengthening projet Ahmeyin/Guembeul sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 pour la production de gaz qualifications des Framework offshore en Mauritanie et au consultants Sénégal MR-MEDD-74256-CS-CQS / Sélection fondée Component 3: Strengthening Etude pour le franchissement sur les En attente IDA / D2880 National Physical and Social A posteriori Limited 0.00 2018-10-08 2018-10-22 2018-11-21 2018-12-26 2019-06-24 du cordon dunaire de qualifications des d'exécution Investments NKTT consultants MR-MEDD-75957-CS-QCBS / Sélection fondée Component 2: Strengthening Evaluation des risques liés sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 aux inondations de la ville qualifications des Framework de NKTT consultants MR-MEDD-75958-CS-QCBS / Sélection fondée Component 2: Strengthening Elaboration de la directive sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-28 2018-10-19 2018-12-02 2019-01-01 2019-02-05 2019-08-04 d'aménagement du littoral de qualifications des Framework NKTT consultants MR-MEDD-75960-CS-QCBS / Sélection fondée Component 2: Strengthening Elaboration d'une stratégie sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-21 2018-10-12 2018-11-25 2018-12-25 2019-01-29 2019-07-28 de gestion intégrée du qualifications des Framework littoral mauritanien consultants MR-MEDD-75970-CS-QCBS / Sélection fondée Component 2: Strengthening Evaluation du capital sur les IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 Annulé 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 sédimentologique de la ville qualifications des Framework de NKTT consultants MR-MEDD-76863-CS-QBS / élaboration de plans de Component 2: Strengthening Sélection fondée En attente développement communaux IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 2018-09-26 2018-10-17 2018-11-30 2018-12-28 2019-01-27 2019-02-26 2019-04-02 2020-04-01 sur la qualité d'exécution pour Tevragh Zeine ,sebkha Framework et Elmina Page 6 MR-MEDD-76873-CS-QCBS / Component 2: Strengthening Sélection fondée Etude sur les pressions et Open - En attente IDA / D2880 the Policy and Institutional A posteriori sur la qualité et 0.00 2018-10-08 2018-10-29 2018-12-12 2019-01-09 2019-02-08 2019-03-15 2019-04-19 2020-04-18 enjeux exercés sur l'espace International d'exécution Framework le coût vital du PNBA MR-MEDD-115364-CS-CQS / Sélection fondée Etude de faisabilité pour la Component 3: Strengthening sur les réhabilitation et l'extension IDA / D2880 National Physical and Social A posteriori Limited 0.00 Annulé 2019-05-27 2020-04-27 2019-06-03 2019-06-07 2019-06-14 2019-07-24 qualifications des de la digue de protection au Investments consultants niveau du Diawling MR-MEDD-115676-CS-CQS / Sélection fondée Component 3: Strengthening Etude technique pour le sur les En attente IDA / D2880 National Physical and Social A posteriori Limited 0.00 2018-06-15 2018-06-29 2018-07-13 2018-08-10 2018-09-24 colmatage des brèches du qualifications des d'exécution Investments littoral de Nouakchott consultants MR-MEDD-117326-CS-QCBS / recrutement d'un cabinet Sélection fondée Component 4: National En attente d'audit pour audit extezrne IDA / D2880 A posteriori sur la qualité et Open - National 0.00 2019-05-29 2019-05-31 2019-06-08 2019-06-11 2019-06-14 2019-06-20 2019-06-23 2019-07-13 Coordination d'exécution du projet pour les années le coût 2018 2019 2020 et 2021. MR-MEDD-124791-CS-INDV / etude sur la mise en place du système Waves pour le littoral et l'espace maritime : Component 2: Strengthening Sélection fondée Open - evaluation des ecosystèmes IDA / D2880 the Policy and Institutional A posteriori sur la qualité et 0.00 Annulé 2019-09-12 2019-10-03 2019-11-16 2019-12-14 2020-01-13 2020-02-17 2020-03-23 2021-03-23 International physiqueset monetaire pour Framework le coût la selection des comptes du capital naturel côtier . MR-MEDD-135519-CS-QCBS / Etude environnementale Component 2: Strengthening Sélection fondée Open - stratégique pour l'exploitation IDA / D2880 the Policy and Institutional A posteriori sur la qualité et 0.00 Annulé 2019-10-04 2019-10-06 2019-10-09 2019-10-14 2019-10-29 2019-11-03 2019-11-13 2019-12-13 International du sable noir sur le littoral Framework le coût mauritanien MR-MEDD-157694-CS-CQS / Sélection fondée Etude environnementale Component 2: Strengthening sur les Open - En cours stratégique pour l'exploitation IDA / D2880 the Policy and Institutional A posteriori 0.00 2020-02-11 2020-02-06 2020-02-26 2020-04-10 2020-05-10 2020-06-14 2020-12-11 qualifications des International d'exécution du sable noir sur le littoral Framework consultants mauritanien MR-MEDD-170561-CS-CQS / Sélection fondée Component 2: Strengthening Élaboration des directives sur les Open - En attente IDA / D2880 the Policy and Institutional A posteriori 0.00 2020-05-11 2020-06-01 2020-07-15 2020-08-14 2020-09-18 2020-12-17 d’aménagement du littoral de qualifications des International d'exécution Framework Nouakchott de Nouadhibou consultants MR-MEDD-170564-CS-CQS / Sélection fondée Etude pour l’évaluation des Component 2: Strengthening sur les Open - En attente risques liés aux inondations IDA / D2880 the Policy and Institutional A posteriori 0.00 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-10-20 qualifications des International d'exécution de Nouakchott et Framework consultants Nouadhibou MR-MEDD-170573-CS-CQS / Sélection fondée Component 3: Strengthening Activités de renforcement de sur les Open - En cours IDA / D2880 National Physical and Social A posteriori 0.00 2020-05-11 2020-07-06 2020-06-01 2020-07-15 2020-08-14 2020-09-18 2021-09-15 la résilience des populations qualifications des International d'exécution Investments de N’Diago consultants MR-MEDD-170566-CS-CQS / Étude pour la détermination Sélection fondée du trait de côte du littoral Component 2: Strengthening sur les En attente mauritanien par images IDA / D2880 the Policy and Institutional A posteriori Open - National 0.00 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-04-21 qualifications des d'exécution satellitaires avec quelques Framework consultants relevés du terrain par GNSS de N’Diago au Cap blanc MR-MEDD-170480-CS-INDV / Action pilote de recherche Sélection fondée Component 3: Strengthening (introduction de plantes sur les En attente IDA / D2880 National Physical and Social A posteriori Open - National 0.00 2020-07-15 2020-08-05 2020-09-18 2020-10-18 2020-11-22 2021-01-21 aquatiques, atténuation du qualifications des d'exécution Investments PH de l’eau,…) de la mare consultants de Riyad Page 7 MR-MEDD-170392-CS-INDV Sélection fondée Component 2: Strengthening / Etude de faisabilité sur la sur les Open - En cours IDA / D2880 the Policy and Institutional A posteriori 0.00 2020-05-20 2020-05-20 2020-06-10 2020-07-24 2020-08-23 2020-09-27 2020-12-26 délocalisation du site qualifications des International d'exécution Framework d'orpaillage de Chami consultants MR-MEDD-182699-CS-CQS / accompagnement de l'UGP et des structures beneficiaires Sélection fondée Component 2: Strengthening dans la mise en oeuvre des sur les En attente IDA / D2880 the Policy and Institutional A posteriori Limited 0.00 2020-07-01 2020-07-15 2020-08-14 2020-09-18 2020-12-17 activitesd qualifications des d'exécution Framework investissement(identification consultants des sites screening environnemental reporting...) MR-MEDD-170427-CS-CQS / Sélection fondée Component 2: Strengthening Etude impact sur les Open - IDA / D2880 the Policy and Institutional A posteriori 0.00 Annulé 2020-10-12 2020-08-03 2020-10-27 2020-12-10 2021-01-09 2021-02-13 2021-05-04 environnemental et social ( qualifications des International Framework colmatage de brèches ) consultants Sélection fondée MR-MEDD-192591-CS-CQS / Component 2: Strengthening sur les Open - En attente Etude de la bathymétrie et IDA / D2880 the Policy and Institutional A posteriori 0.00 2020-09-15 2020-09-30 2020-10-15 2020-10-30 2020-12-04 2021-06-02 qualifications des International d'exécution de l'hydrométrie au PNBA Framework consultants INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74127-CS-INDV / Diagnostic et évaluation de Component 2: Strengthening la capacité de tous les En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-08-17 2019-03-28 2018-08-22 2018-09-12 2018-10-17 2019-04-15 organismes concernés avec d'exécution Framework l'OLM (inclus consultations, séminaires, ateliers) MR-MEDD-74130-CS-INDV / Component 2: Strengthening En attente Elaboration des plans de IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-08-20 2018-08-25 2018-09-15 2018-10-20 2019-04-18 d'exécution résilience de N'Diago Framework MR-MEDD-74133-CS-INDV / Identification des actions Component 2: Strengthening prioritaires de l'antenne En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-10 2018-10-15 2018-11-05 2018-12-10 2019-06-08 nationale de la MOLOA d'exécution Framework (inclus consultations, ateliers, séminaires) MR-MEDD-74135-CS-INDV / Component 3: Strengthening Elaboration de textes IDA / D2880 National Physical and Social A posteriori Individuel Limited 14,000.00 Achevé 2018-11-02 2019-02-05 2018-11-07 2019-02-02 2018-11-28 2019-01-02 2019-02-25 2019-07-01 2020-02-10 juridiques relatifs aux Investments principes pollueur-payeurs MR-MEDD-74137-CS-INDV / Conception et mise en place d'une plateforme de gestion Component 2: Strengthening environnementale relative à IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 Annulé 2018-09-03 2018-09-08 2018-09-29 2018-11-03 2019-05-02 l'évaluation des activités et Framework le suivi de leurs impacts environnementaux sur le littoral mauritanien MR-MEDD-74141-CS-INDV / Analyse du cadre foncier Component 2: Strengthening En cours relatif au littoral (inclus IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-15 2020-07-08 2018-10-20 2018-11-10 2018-12-15 2019-06-13 d'exécution consultations, séminaires, Framework ateliers) MR-MEDD-74152-CS-INDV / Component 2: Strengthening Elaboration de guide des En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-11-01 2018-11-06 2018-11-27 2019-01-01 2019-06-30 acteurs et des métiers du d'exécution Framework littoral mauritanien Page 8 MR-MEDD-74153-CS-INDV / Revue et amendement du Component 2: Strengthening En cours système des études d'impact IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-01 2020-02-11 2018-10-06 2018-10-27 2018-12-01 2019-05-30 d'exécution environnemental en Framework Mauritanie MR-MEDD-74154-CS-INDV / Rédaction des termes de Component 2: Strengthening référence de l'étude relative En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-03 2018-10-08 2018-10-29 2018-12-03 2019-06-01 aux plans de résilience de d'exécution Framework N'Diago (inclus consultations, ateliers, séminaires) MR-MEDD-74164-CS-INDV / Recrutement d'un assistant Component 2: Strengthening En attente technique au profit de IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2018-09-13 2018-11-01 2018-11-22 2018-12-27 2019-06-25 d'exécution l'Autorité de la Zone franche Framework de NDB MR-MEDD-74174-CS-INDV / Component 2: Strengthening Actualisation du schéma En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-12-03 2018-12-08 2018-12-29 2019-02-02 2019-08-01 opérationnel de la Zone d'exécution Framework franche de NDB MR-MEDD-74175-CS-INDV / Component 2: Strengthening Etat des lieux de En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-11-01 2018-12-20 2018-11-06 2018-11-27 2019-01-01 2019-06-30 l'environnement au niveau de d'exécution Framework la Zone franche de NDB MR-MEDD-74185-CS-INDV / Actualisation du plan Component 2: Strengthening En attente d'aménagement et de gestion IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2018-09-20 2018-11-08 2018-11-29 2019-01-03 2019-07-02 d'exécution de la Baie de l'Etoile de Framework NDB MR-MEDD-74187-CS-INDV / Component 3: Strengthening En attente Etude relative à la mise en IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2018-09-18 2018-11-06 2018-11-27 2019-01-01 2019-06-30 d'exécution place de l'éco-loge Investments MR-MEDD-74191-CS-INDV / Component 2: Strengthening Elaboration d'une carte de En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-11-13 2018-11-18 2018-12-09 2019-01-13 2019-07-12 potentialités de la Zone d'exécution Framework franche de NDB MR-MEDD-74192-CS-INDV / Component 3: Strengthening Evaluation des risques En attente IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-12-17 2018-12-22 2019-01-12 2019-02-16 2019-08-15 d'inondations pour la ville de d'exécution Investments NBD MR-MEDD-74194-CS-INDV / Component 3: Strengthening Etudes de faisabilité des En cours IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-10-01 2018-11-24 2018-10-06 2018-10-27 2018-12-01 2019-05-30 travaux de fixation du d'exécution Investments cordon dunaire de Diawling MR-MEDD-74199-CS-INDV / Recrutement d'un consultant Component 3: Strengthening pour le suivi et le contrôle IDA / D2880 National Physical and Social A posteriori Individuel Limited 9,240.00 Achevé 2018-11-05 2019-03-28 2018-11-10 2019-03-28 2018-12-01 2019-01-05 2019-03-28 2019-07-04 2019-04-02 des travaux du cordon Investments dunaire de Diawling MR-MEDD-74200-CS-INDV / Component 3: Strengthening Elaboration d'une carte IDA / D2880 National Physical and Social A posteriori Individuel Limited 17,280.00 Achevé 2018-11-15 2019-03-28 2018-11-20 2019-03-28 2018-12-11 2019-01-15 2019-03-28 2019-07-14 2019-05-15 d'occupation des éco-systèmes Investments de mangroves MR-MEDD-75945-CS-INDV / Component 3: Strengthening En cours Etude pour le franchissement IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-10-01 2019-02-12 2018-10-06 2018-10-27 2018-12-01 2019-05-30 d'exécution du cordon dunaire de NKTT Investments MR-MEDD-75972-CS-INDV / Component 2: Strengthening En attente Conception et mise en place IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-11-05 2018-11-10 2018-12-01 2019-01-05 2019-07-04 d'exécution d'un site web pour l'OLM Framework Page 9 MR-MEDD-76164-CS-INDV / Component 2: Strengthening En attente Recrutement d'un Comptable IDA / D2880 the Policy and Institutional A priori Individuel Open 0.00 2018-08-31 2018-10-19 2018-11-09 2018-12-14 2019-06-12 d'exécution pour le Projet Framework MR-MEDD-76422-CS-INDV / Component 4: National En cours Recrutement d'un auditeur IDA / D2880 A priori Individuel Limited 0.00 2018-09-12 2018-09-17 2018-10-08 2018-11-12 2019-05-11 Coordination d'exécution interne MR-MEDD-76867-CS-INDV / Component 3: Strengthening Mise à jour du SIG de la IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 Région de Nouakchott Investments MR-MEDD-76868-CS-INDV / Component 3: Strengthening Adaptation du fonds IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 d'Investissement communal Investments (région de NKTT) MR-MEDD-82696-CS-INDV / Component 2: Strengthening recrutement d'un consultant En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-31 2018-11-20 2018-11-05 2018-11-26 2018-12-31 2019-06-29 pour appuyer la cellule d'exécution Framework Changement Climatique MR-MEDD-82701-CS-INDV / recrutement d'un consultant Component 2: Strengthening national pour l'appui à En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-29 2018-11-03 2018-11-24 2018-12-29 2019-06-27 l'étude de faisabilité du d'exécution Framework projet WACA-CCA en Mauritanie MR-MEDD-82704-CS-INDV / Component 2: Strengthening En attente réalisation d'un documentaire IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2018-10-19 2018-10-24 2018-11-14 2018-12-19 2019-06-17 d'exécution sur la baie de l'étoile Framework MR-MEDD-82731-CS-INDV / Component 4: National En attente Maintenance et suivi IDA / D2880 A posteriori Individuel Limited 0.00 2018-11-19 2018-11-24 2018-12-15 2019-01-03 2019-07-02 Coordination d'exécution informatique MR-MEDD-82737-CS-INDV / accompagnement de l'UGP et des structures beneficiaires Component 3: Strengthening dans la mise en oeuvre des IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2018-11-15 2018-11-20 2018-12-11 2019-01-15 2019-07-14 activitesd Investments investissement(identification des sites screening environnemental reporting...) MR-MEDD-76859-CS-NPO / Component 3: Strengthening En attente Mise en place d'un système IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-11-01 2018-11-06 2018-11-27 2019-01-01 2019-06-30 d'exécution de Gestion de plaintes Investments MR-MEDD-76166-CS-INDV / Component 2: Strengthening Recrutement d'un IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 9,600.00 Signé 2018-09-05 2019-03-18 2018-09-10 2018-07-26 2018-10-01 2018-11-05 2019-07-31 2019-05-04 Responsable de Suivi- Framework Evaluation MR-MEDD-76167-CS-INDV / Component 2: Strengthening En attente Recrutement d'un Spécialiste IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2018-09-05 2018-10-24 2018-11-14 2018-12-19 2019-06-17 d'exécution en communication Framework MR-MEDD-76173-CS-INDV / Component 2: Strengthening Recrutement en IDA / D2880 the Policy and Institutional A posteriori Individuel Open 9,600.00 Signé 2018-09-05 2019-07-25 2018-10-24 2019-07-25 2018-11-14 2018-12-19 2019-08-01 2019-06-17 Développement Institutionnel Framework MR-MEDD-76168-CS-INDV / Component 2: Strengthening Recrutement d'un Spécialiste En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 en Développement Social, d'exécution Framework sauvegarde sociale et genre Page 10 MR-MEDD-76158-CS-INDV / Component 2: Strengthening Recrutement Coordinateur du IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 4,320.00 Signé 2018-08-29 2017-09-28 2018-09-03 2017-09-28 2018-09-24 2017-09-28 2018-10-29 2020-01-02 2019-04-27 Projet WACA Framework MR-MEDD-76160-CS-INDV / Component 2: Strengthening Recrutement d'un IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 3,520.00 Signé 2018-08-29 2018-02-01 2018-09-03 2018-02-01 2018-09-24 2018-10-29 2018-05-02 2019-04-27 Coordinateur-Adjoint juriste Framework pour le Projet WACA MR-MEDD-76162-CS-INDV / Component 2: Strengthening Recrutement d'un IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 1,600.00 Signé 2018-08-29 2018-06-28 2018-09-03 2018-06-28 2018-09-24 2018-10-29 2018-08-02 2019-04-27 Responsable de Passation des Framework Marchés MR-MEDD-74190-CS-INDV / Component 3: Strengthening Elaboration d'un plan de En attente IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2018-09-19 2018-11-07 2018-11-28 2019-01-02 2019-07-01 gestion environnementale et d'exécution Investments sociale du site de l'éco-loge MR-MEDD-115334-CS-INDV / Elaboration des TDR de Component 2: Strengthening l'étude de détermination du En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2019-05-30 2019-10-01 2019-06-12 2019-06-14 2019-06-18 2019-07-08 trait de côte du Littoral d'exécution Framework mauritanien par GNSS de N'Diago au Cap blanc MR-MEDD-115272-CS-INDV / Etude pour l'élaboration Component 2: Strengthening d'une stratégie et d'un plan IDA / D2880 the Policy and Institutional A posteriori Individuel Open 23,826.67 Achevé 2019-05-30 2019-06-07 2019-06-13 2019-06-13 2019-06-15 2019-06-18 2019-06-21 2019-06-27 2019-08-05 2019-09-05 de communication pour le Framework Projet MR-MEDD-115327-CS-INDV Component 3: Strengthening / L'élaboration d'une étude IDA / D2880 National Physical and Social A posteriori Individuel Open 21,493.34 Achevé 2019-05-30 2019-06-12 2019-06-11 2019-06-13 2019-06-13 2019-06-17 2019-06-27 2019-07-27 2019-09-05 d'identification de sous-projets Investments dans les communes littorales MR-MEDD-115350-CS-INDV / Elaboration de cahier de Component 3: Strengthening prescriptions techniques pour IDA / D2880 National Physical and Social A posteriori Individuel Open 7,466.67 Signé 2019-05-30 2019-10-02 2019-06-12 2019-06-13 2019-06-17 2019-06-18 2019-06-20 2019-06-27 2019-07-16 le colmatage des brèches du Investments cordon dunaire de Nouakchott MR-MEDD-115371-CS-CDS / Component 2: Strengthening Etat des lieux du foncier du IDA / D2880 the Policy and Institutional A posteriori Individuel Open 24,773.34 Achevé 2019-05-30 2019-10-01 2019-06-11 2019-09-05 2019-06-13 2019-09-05 2019-06-17 2019-09-09 2019-08-16 2019-11-21 littoral de N'Diago et de la Framework Zone Franche de Nouadhibou MR-MEDD-124785-CS-INDV / etude sur l'état des lieux Component 2: Strengthening et le mapping des bases de En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2019-08-05 2019-08-10 2019-08-15 2019-09-12 2019-10-12 donnees et SIG des zones d'exécution Framework côtières et arides de la mauritanie. MR-MEDD-124792-CS-INDV / Inventaire des textes juridiques relatifs à la Component 2: Strengthening gestion des zones côtières et IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 Annulé 2019-08-21 2019-08-26 2019-09-16 2019-10-21 2020-04-18 marines et ratifications des Framework protocoles de la convention d'Abidjan. MR-MEDD-129310-CS-CQS / Opérationalisation et Mise en Component 3: Strengthening Sélection de En cours place d'un système de IDA / D2880 National Physical and Social A posteriori consultants par Direct 0.00 2019-09-24 2019-10-01 2019-09-27 2019-10-02 2020-03-30 d'exécution gestion de plaintes pour le Investments entente directe Projet WACA Page 11 MR-MEDD-137101-CS-INDV / sélection d'un consultant Component 3: Strengthening En attente pour préparer le dossier IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2019-10-08 2019-10-13 2019-10-20 2019-10-23 2019-12-22 d'exécution relatif aux fixations des Investments dunes du littoral MR-MEDD-74150-CS-INDV / Analyse et révision de Component 2: Strengthening l'ordonnance relative au IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 Annulé 2019-10-22 2019-11-15 2019-11-20 2019-11-30 2020-01-09 littoral et élaboration des Framework textes d'application MR-MEDD-149021-CS-INDV / Recrutement d'un consultant pour une mission d'assistance pour la saisie, Component 1: Strengthening En attente sur le STEP, de l’ensemble IDA / D2880 A posteriori Individuel Limited 0.00 2019-12-09 2019-12-11 2019-12-13 2019-12-17 2020-01-01 Regional Integration d'exécution des marchés passés par les Projets PGDP et WACA/Mauritanie au cours de l’exercice 2019. MR-MEDD-74172-CS-INDV / Component 2: Strengthening Analyse du schéma En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-01-29 2020-02-10 2020-03-18 2020-04-08 2020-05-13 2020-07-12 opérationnel de la Zone d'exécution Framework franche de NDB MR-MEDD-157985-CS-INDV Component 2: Strengthening / Etude de faisabilité de la En cours IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2020-02-10 2020-02-19 2020-02-15 2020-02-26 2020-03-11 2020-04-10 délocalisation du centre de d'exécution Framework traitement de l'or à Chami MR-MEDD-158682-CS-INDV Component 2: Strengthening / étude de faisabilité de la En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-02-13 2020-04-02 2020-04-23 2020-05-28 2020-11-24 délocalisation du Centre de d'exécution Framework traitement de l'or de Chami MR-MEDD-170414-CS-INDV / Élaboration du décret Component 2: Strengthening En attente portant modalités du IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2020-05-11 2020-05-16 2020-06-06 2020-07-11 2020-10-09 d'exécution fonctionnement de Framework l'observatoire du littoral MR-MEDD-170415-CS-INDV Component 2: Strengthening / Révision du décret portant En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Limited 0.00 2020-05-18 2020-05-23 2020-06-13 2020-07-18 2020-09-01 création du conseil d'exécution Framework consultatif du littoral MR-MEDD-170446-CS-INDV Component 3: Strengthening / suivi des travaux de En cours IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2020-05-29 2020-06-24 2020-06-13 2020-07-04 2020-08-08 2020-09-22 fixation des dunes au d'exécution Investments Diawling MR-MEDD-170469-CS-INDV / Elaboration de l’étude d’impact environnemental ou Component 3: Strengthening En cours de notice d’impact IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-07-06 2020-06-23 2020-08-24 2020-09-14 2020-10-19 2021-04-17 d'examen environnemental pour Investments l’extension de la digue Nord du PND MR-MEDD-170484-CS-INDV Component 3: Strengthening En cours / Expert Côtier (gestion IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-05-15 2020-07-09 2020-07-03 2020-07-24 2020-08-28 2021-08-25 d'exécution intégrée des zones costières ) Investments MR-MEDD-170486-CS-INDV / Expert en système de Component 3: Strengthening gestion de l'information En cours IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-06-15 2020-08-18 2020-08-04 2020-08-25 2020-09-29 2020-12-28 environnementale pour le d'exécution Investments littoral (Système de données et d'information) MR-MEDD-170488-CS-INDV Component 4: National En cours / Spécialiste en sauvegarde IDA / D2880 A posteriori Individuel Open 0.00 2020-06-22 2020-05-20 2020-08-10 2020-08-31 2020-10-05 2021-01-03 Coordination d'exécution environnementalement Page 12 MR-MEDD-170410-CS-INDV Component 2: Strengthening En attente / Révision de l'ordonnance du IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-01-29 d'exécution littoral Framework MR-MEDD-170431-CS-INDV / Élaboration APS, APD et Component 3: Strengthening En cours DAO pour passage de IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-10-13 2020-09-10 2020-12-01 2020-12-22 2021-01-26 2021-04-26 d'examen franchissement du cordon Investments dunaire MR-MEDD-170466-CS-INDV / Elaboration des études Component 3: Strengthening En attente (APS, APD, DAO) de IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-07-20 2020-09-07 2020-09-28 2020-11-02 2021-05-01 d'exécution l’extension de la digue Nord Investments du PND MR-MEDD-170420-CS-INDV Component 2: Strengthening En attente / Révision du décret portant IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-06-08 2020-07-27 2020-08-17 2020-09-21 2020-11-05 d'exécution création du FIE Framework MR-MEDD-170401-CS-INDV Component 2: Strengthening / Élaboration d'une carte de En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-08-25 2020-10-13 2020-11-03 2020-12-08 2021-06-06 potentialités pour la zone d'exécution Framework Franche de NDB MR-MEDD-170403-CS-INDV / Élaboration du Plan de Component 2: Strengthening En attente Gestion Environnementale et IDA / D2860 the Policy and Institutional A posteriori Individuel Open 0.00 2020-05-25 2020-07-13 2020-08-03 2020-09-07 2020-11-06 d'exécution Sociale de la Zone Franche Framework de Nouadhibou MR-MEDD-170400-CS-INDV / Etude pour réaliser un état des lieux des capacités des Component 2: Strengthening En cours usines de production de IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-07-15 2020-08-18 2020-09-02 2020-09-23 2020-10-28 2021-01-26 d'examen farine de poisson Framework d'Elbountiya en matière de gestion environnementale MR-MEDD-170174-CS-INDV / Recrutement d'une assistance technique pour Component 2: Strengthening En attente l'intégration de la dimension IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2020-12-27 d'exécution résilience climatique dans Framework l'ensemble des stratégies du littoral MR-MEDD-170396-CS-INDV Component 2: Strengthening / Etat de lieu de la pollution En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2021-06-27 métallique dans le milieu d'exécution Framework littoral de la baie du Lévrier MR-MEDD-170408-CS-INDV Component 2: Strengthening En cours / Analyse de l'ordonnance IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-05-11 2020-06-23 2020-06-29 2020-07-20 2020-08-24 2020-10-08 d'exécution du littoral Framework MR-MEDD-170425-CS-INDV / Etude sur l'état des lieux Component 2: Strengthening et le mapping des bases de En attente IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 2020-07-20 2020-09-07 2020-09-28 2020-11-02 2021-05-01 données et systèmes d'exécution Framework géographiques des zones côtières de la Mauritanie MR-MEDD-170478-CS-INDV Component 3: Strengthening / Elaboration du Plan de En attente IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-08-17 2020-10-05 2020-10-26 2020-11-30 2021-05-29 gestion et d’exploitation de d'exécution Investments la mare de Riyad MR-MEDD-170430-CS-INDV Component 3: Strengthening / Etude pour la préparation En attente IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 2020-06-22 2020-08-10 2020-08-31 2020-10-05 2021-01-03 du dossier technique pour la d'exécution Investments fixation des dunes Page 13 MR-MEDD-170476-CS-INDV / Réalisation de l’étude sur Component 3: Strengthening la caractérisation des déchets IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2020-08-10 2020-06-03 2020-09-28 2020-10-19 2020-11-23 2021-01-22 urbains à NDB et Investments proposition d’un système de gestion approprié MR-MEDD-183319-CS-CDS / Complément à l'étude Component 3: Strengthening Sélection de En attente relative à l'identification de IDA / D2880 National Physical and Social A posteriori consultants par Direct 0.00 2020-07-08 2020-07-18 2020-07-28 2020-08-04 d'exécution sous-projets sociaux dans les Investments entente directe communes littorales MR-MEDD-192575-CS-INDV Component 3: Strengthening / Etude impact En attente IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2020-09-21 2020-09-26 2020-10-11 2020-11-15 2020-12-30 environnemental et social d'exécution Investments (colmatage de brèches) MR-MEDD-170422-CS-INDV Component 2: Strengthening / Etude de la bathymétrie et IDA / D2880 the Policy and Institutional A posteriori Individuel Open 0.00 Annulé 2020-08-18 2020-09-05 2020-10-06 2020-10-27 2020-12-01 2021-03-01 de l'hydrométrie au PNBA Framework Page 14