PROCUREMENT PLAN Project information: Colombia Sustainable Low Carbon Development In Orinoquía Region Project P160680 Project Implementation agency: Ministerio de Agricultura y Desarrollo Rural -MADR- Date of the Procurement Plan: 02/06/2019 Period covered by this Procurement Plan: 02/06/2019 – 12/31/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Sustainable Low-Carbon Development in Orinoquia region Project PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2019-02-13 2021-08-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160680 GPN Date: 2019-02-13 Project Name: Sustainable Low-Carbon Development in Orinoquia region Project Loan / Credit No: TF / A6377, TF / A6376 Ministerio de Agricultura y Desarrollo Rural Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Document Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion Type (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-149145-GO-RFQ / Adquirir Equipos de computo, cámara, software Project Coordination, licenciado , ayudas Solicitud de Single Stage - One 2020-02- 2020-04- 2020-02- 2020-06- 2020-05- TF / A6377 Management, Monitoring Posterior Open - National 25,000.00 20,492.96 Finalizado tecnologicas audiovisulaes y cotizaciones Envelope 23 19 18 03 25 and Evaluation de telecomunicacion para apoyar la gestión del Proyecto Fondo biocarbono . CO-MADR-177410-GO-RFQ / Adquirir Equipos de Definition of Emission cómputo, software licenciado Reduction Program and Solicitud de Single Stage - One 2020-06- 2020-08- 2020-10- TF / A6377 Posterior Open - National 61,200.00 0.00 Cancelado y accesorios para apoyar la Monitoring, Reporting and cotizaciones Envelope 20 15 14 gestión del Proyecto Fondo Verification biocarbono CO-MADR-205824-GO-RFB / Adquirir Equipos de Definition of Emission cómputo, software licenciado Reduction Program and Solicitud de Single Stage - One 2020-11- 2020-12- 2020-12- 2021-02- 2021-01- 2021-02- 2021-02- 2021-04- 2021-03- 2021-06- 2021-09- TF / A6376 Posterior Open - National 231,158.77 148,408.08 Firmado y accesorios para apoyar la Monitoring, Reporting and ofertas Envelope 27 29 02 08 13 18 12 09 19 18 15 gestión del Proyecto Fondo Verification biocarbono CO-MADR-222435-GO-RFQ / Adquisición de equipos Project Coordination, accesorios para la operación Solicitud de Single Stage - One 2021-03- 2021-05- 2021-11- TF / A6376 Management, Monitoring Posterior Open - National 36,084.00 0.00 Cancelado del Proyecto Biocarbono cotizaciones Envelope 20 15 11 and Evaluation Orinoquia y la Dirección de Innovación NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-125771-NC-RFQ / SUMINISTRO DE TIQUETES AÉREOS AL PROYECTO: DESARROLLO SOSTENIBLE Project Coordination, BAJO EN CARBONO EN LA Solicitud de Single Stage - One 2019-09- 2019-10- 2019-10- 2020-10- TF / A6377 Management, Monitoring Posterior Open - National 20,000.00 17,788.20 Firmado REGIÓN DE LA ORINOQUIA, cotizaciones Envelope 05 09 15 08 and Evaluation ASÍ COMO LA PRESTACIÓN DE SERVICIOS DE AGENCIA DE VIAJES -AÑO 1 - COMPONENTE 4 CO-MADR-132942-NC-RFQ Project Coordination, / Taller de socializacion y Solicitud de Single Stage - One 2019-09- 2019-09- 2019-09- TF / A6377 Management, Monitoring Posterior Open - National 4,000.00 0.00 Cancelado arranque Fondo Biocarbono cotizaciones Envelope 05 20 30 and Evaluation Septiembre 2019 CO-MADR-163819-NC-RFQ / Prestar los servicios logísticos (alimentación, salón y ayudas audiovisuales) para los asistentes a la Project Coordination, Solicitud de Single Stage - One 2020-03- 2020-03- 2020-04- primera Mesa Técnica TF / A6377 Management, Monitoring Posterior Open 8,000.00 0.00 Cancelado cotizaciones Envelope 09 21 20 Intercomponentes para el and Evaluation proyecto, “DESARROLLO SOSTENIBLE BAJO EN CARBONO EN LA REGIÓN DE LA ORINOQUIA” CO-MADR-197658-NC-RFB / Implementar la actualización catastral con Integrated Land- Use enfoque multipropósito para Planning and Improved Adquisición 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-12- el municipio de Arauquita, en TF / A6377 Posterior Direct 1,500,000.00 1,180,395.29 Firmado Governance for directa 06 20 11 20 08 28 08 el departamento de Arauca, Deforestation Control en el marco del Proyecto Desarrollo Sostenible Bajo en Carbono para la Orinoquia. CO-MADR-201158-NC-RFB / Inventario Forestal de la Definition of Emission región de la Orinoquía, Reduction Program and Solicitud de Single Stage - One 2020-11- 2020-11- 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09- dentro del Componente 3: TF / A6376 Posterior Open - National 941,000.00 0.00 Cancelado Monitoring, Reporting and ofertas Envelope 17 19 22 21 03 02 09 05 Preparación del Programa de Verification Reducción de Emisiones y del MRV CO-MADR-211404-NC-RFB / Elaborar el inventario forestal de la región Orinoquia siguiendo los Definition of Emission parámetros establecidos en Reduction Program and Solicitud de Single Stage - One 2020-12- 2020-12- 2021-01- 2021-01- 2021-01- 2021-02- 2021-01- 2021-03- 2021-04- 2021-09- el Documento Marco Rector, TF / A6376 Posterior Open - National 941,000.00 764,771.05 Firmado Monitoring, Reporting and ofertas Envelope 28 28 02 04 19 03 19 10 05 06 el marco estadístico y Verification geoestadístico, los procedimientos, metodologías y protocolos técnicos definidos por el IDEAM para la impleme CO-MADR-218458-NC-RFB / Prestar servicios como Integrated Land- Use Operador logístico para la Planning and Improved Solicitud de Single Stage - One 2021-04- 2021-04- 2021-04- 2021-06- 2021-05- 2021-07- 2021-06- 2021-08- 2021-07- 2022-02- puesta en marcha de las TF / A6376 Posterior Open - National 194,750.00 0.00 Firmado Governance for ofertas Envelope 22 14 27 08 18 08 03 12 27 08 diferentes actividades y Deforestation Control estrategias del proyecto BIOCARBONO Page 1 CO-MADR-224155-NC-RFQ / Prestar sus servicios profesionales con autonomía técnica y administrativa, para Project Coordination, la grabación, edición, Solicitud de Single Stage - One Ejecución 2021-05- 2021-07- 2021-12- TF / A6376 Management, Monitoring Posterior Open - National 18,187.00 0.00 animación y entrega de cotizaciones Envelope pendiente 08 03 30 and Evaluation videos y fotografías para el Proyecto Desarrollo Sostenible bajo en carbono en la región de la Orinoquia CO-MADR-218263-NC-RFB / Formular un plan de Integrated Land- Use ordenamiento social de la Planning and Improved Solicitud de Single Stage - One 2021-02- 2021-02- 2021-04- 2021-05- 2021-06- 2021-12- propiedad rural en un TF / A6376 Posterior Open - National 300,000.00 0.00 Cancelado Governance for ofertas Envelope 22 27 10 10 14 11 municipio priorizado por el Deforestation Control Proyecto, con base en los lineamientos de la ANT CO-MADR-218264-NC-RFB Integrated Land- Use / Formular dos (2) planes de Planning and Improved Solicitud de Single Stage - One 2021-02- 2021-02- 2021-04- 2021-05- 2021-06- 2021-12- ordenación forestal, con base TF / A6376 Posterior Open - National 300,000.00 0.00 Cancelado Governance for ofertas Envelope 22 27 10 10 14 11 en los lineamientos de las Deforestation Control Corporaciones y MADS CO-MADR-231937-NC-DIR / Suministro de tiquetes Integrated Land- Use aéreos de pasajeros en rutas Planning and Improved Adquisición 2021-04- 2021-04- 2021-05- 2021-05- 2021-06- 2021-07- 2021-12- TF / A6376 Posterior Direct 45,714.00 41,656.00 Firmado nacionales o internacionales Governance for directa 30 30 05 24 09 09 06 para el desarrollo del Deforestation Control Proyecto BIOCARBONO - ORINOQUIA CO-MADR-222433-NC-RFQ / Prestar el servicio de diseño e impresión de afiches, folletos, cartillas, u otras publicaciones a demanda, Project Coordination, Solicitud de Single Stage - One 2021-03- 2021-05- 2021-11- impresas o digitales, hacer TF / A6376 Management, Monitoring Posterior Open - National 30,312.00 0.00 Cancelado cotizaciones Envelope 20 15 11 las respectivas gestiones para and Evaluation la adquisición del ISBN para las publicaciones que lo requieran, realizar la producción CO-MADR-218245-NC-RFB / Establecer factores de Definition of Emission emisión para los usos del Reduction Program and Solicitud de Single Stage - One Ejecución 2021-09- 2021-09- 2021-10- 2021-11- 2021-12- 2022-06- TF / A6376 Posterior Open - National 1,070,000.00 0.00 suelo distintos a bosque y los Monitoring, Reporting and ofertas Envelope pendiente 01 06 18 17 22 20 cambios de uso del suelo de Verification la Orinoquia CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-172824-CS- QCBS / “Elaborar los lineamientos y criterios técnicos establecidos en la Integrated Land- Use Ley 1776 "por la cual se Planning and Improved Selección basada 2020-06- 2020-05- 2020-07- 2020-10- 2020-07- 2020-11- 2020-07- 2021-01- 2020-08- 2021-01- 2020-09- 2021-04- 2021-01- TF / A6377 Posterior Open - National 72,750.00 69,472.22 Firmado 2020-05-08 crean y se desarrollan las Governance for en calidad y costo 08 22 05 09 19 27 24 25 13 15 10 27 08 zonas de interés de Deforestation Control desarrollo rural, económico y social, ZIDRES"; definiendo las condiciones de presentación, evaluación elegibilidad, CO-MADR-182002-CS-QBS / “Consultoría para la gestión de agroecosistemas Sustainable Land- Use Selección basada Open - 2020-07- 2020-07- 2020-08- 2020-08- 2020-12- 2020-09- 2021-02- 2020-09- 2021-03- 2020-09- 2021-08- 2020-10- 2021-12- TF / A6377 Previa 1,000,000.00 0.00 En ejecución 2020-06-30 ganaderos sostenibles bajos Management en calidad International 30 21 12 19 23 03 09 13 23 23 24 21 15 en carbono en paisajes priorizados de la Orinoquia” CO-MADR-183810-CS- QCBS / “Apoyar la Sustainable Land- Use Selección basada 2020-07- 2020-07- 2020-09- 2020-10- 2020-10- 2020-11- 2020-10- 2020-12- 2020-11- 2020-12- 2020-12- 2021-03- 2021-09- estructuración de programas TF / A6377 Posterior Open - National 181,667.00 163,459.11 Firmado 2020-07-13 Management en calidad y costo 16 28 26 05 11 20 21 23 15 23 20 23 16 y proyectos de Pagos por Servicios Ambientales CO-MADR-196095-CS-QBS / Consultoría para identificar, validar y socializar modelos productivos sostenibles bajos Sustainable Land- Use Selección basada Open - 2020-10- 2020-10- 2020-10- 2020-11- 2020-12- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-01- 2021-03- 2021-04- 2022-03- en carbono para el cultivo de TF / A6377 Posterior 600,000.00 368,742.33 Firmado 2020-09-30 Management en calidad International 09 21 30 19 10 03 12 18 29 02 29 02 29 02 arroz en Arauca (Arauca), Paz de Ariporo (Casanare), Villavicencio, Puerto López y Puerto Gaitán (Meta). CO-MADR-197663-CS-CQS / Identificar, documentar, analizar y validar los factores de emisión para plantaciones Definition of Emission forestales de Colombia y en Selección basada Reduction Program and 2020-10- 2020-10- 2020-12- 2020-12- 2021-01- 2021-01- 2021-03- 2021-01- 2021-05- 2021-07- particular de la región TF / A6377 Posterior en calificaciones Open - National 74,538.00 58,176.38 Firmado 2020-10-09 Monitoring, Reporting and 09 13 16 27 25 01 23 25 25 24 Orinoquia, como insumo del de consultores Verification sistema nacional de MRV para AFOLU y a través de un ejercicio concertado entre las entidad CO-MADR-178416-CS- QCBS / Actualizar el Definition of Emission inventario de Gases Efecto Reduction Program and Selección basada 2020-06- 2020-06- 2020-08- 2020-08- 2020-08- 2020-09- 2020-10- 2020-12- TF / A6377 Posterior Open - National 85,000.00 0.00 Cancelado 2020-06-12 Invernadero (GEI) de la región Monitoring, Reporting and en calidad y costo 10 26 09 23 28 17 15 14 de la Orinoquía con variables Verification representativas (proxy) a escala municipal. CO-MADR-194714-CS- QCBS / Inventario Forestal de Definition of Emission la región de la Orinoquía, Reduction Program and Selección basada Open - 2020-09- 2020-10- 2020-09- 2020-12- 2020-12- 2021-01- 2021-02- 2021-03- 2022-03- dentro del Componente 3: TF / A6377 Posterior 941,000.00 0.00 Cancelado 2020-09-24 Monitoring, Reporting and en calidad y costo International 23 14 25 13 27 01 05 06 06 Preparación del Programa de Verification Reducción de Emisiones y del MRV CO-MADR-201847-CS- QCBS / Caracterizar, validar y socializar sistemas agroforestales (SAF) bajos en carbono para el cultivo de Sustainable Land- Use Selección basada 2021-06- 2020-11- 2021-01- 2021-02- 2021-03- 2021-04- 2021-05- 2022-05- TF / A6376 Posterior Open - National 383,000.00 0.00 En ejecución 2020-11-09 cacao en las subregiones del Management en calidad y costo 11 30 13 10 12 16 21 21 Sarare (Arauca) y la cuenca alta y media del río Ariari (Meta), en la Orinoquia colombiana Page 2 CO-MADR-204779-CS-LCS / Realizar la auditoria externa al proyecto Desarrollo Project Coordination, Sostenible Bajo en Carbono Selección basada 2021-01- 2020-12- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- 2021-05- 2021-04- 2021-06- 2021-06- 2021-12- TF / A6376 Management, Monitoring Posterior Open - National 37,651.00 7,615.24 Firmado 2020-11-27 para la Orinoquia , para el en el menor costo 28 18 31 04 28 04 30 07 04 06 08 04 05 and Evaluation periodo comprendido entre el 1 de junio del 2019 y hasta el 31 de diciembre de 2020 CO-MADR-218250-CS-LCS Definition of Emission / Diseñar el Plan de Reduction Program and Selección basada 2021-03- 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2022-02- financiación para la TF / A6376 Posterior Open - National 80,000.00 0.00 Cancelado 2021-02-19 Monitoring, Reporting and en el menor costo 12 25 23 22 27 31 27 implementación de las Verification acciones e intervenciones previstas del ERPD CO-MADR-218252-CS-LCS / Implementar las salvaguardas establecidas a Definition of Emission nivel nacional, con las Reduction Program and Selección basada 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- 2022-04- comunidades de la región, y TF / A6376 Posterior Open - National 75,000.00 0.00 Cancelado 2021-03-26 Monitoring, Reporting and en el menor costo 16 30 27 27 31 05 03 desarrollar los reportes de Verification dichas actividades de acuerdo con los lineamientos nacionales (MGAS, PPI, MP) CO-MADR-218269-CS- QCBS / Desarrollo de un modelo de negocios para la consolidación de la producción de aceite de Sustainable Land- Use Selección basada Ejecución 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- palma sostenible en paisajes TF / A6376 Posterior Open - National 300,000.00 0.00 2021-03-15 Management en calidad y costo pendiente 05 19 16 16 20 24 24 palmeros priorizados a partir de la realización de análisis costo - beneficio de mejores prácticas bajas en carbono y el diseño de herrami CO-MADR-218270-CS-CQS / Identificar especies vegetales, desarrollar Selección basada protocolos y fortalecer Sustainable Land- Use Ejecución 2021-05- 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior en calificaciones Open - National 150,000.00 0.00 2021-04-30 capacidades para procesos Management pendiente 21 04 03 07 06 de consultores de reconversión, restauración y fomento de SAF en paisajes priorizados CO-MADR-218271-CS- QCBS / Definir e implementar Sustainable Land- Use Selección basada 2021-04- 2021-03- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-09- TF / A6376 Posterior Open - National 300,000.00 0.00 En ejecución 2021-03-01 mesas técnicas Management en calidad y costo 05 22 05 02 02 06 10 10 agroclimáticas en la Orinoquia CO-MADR-199060-CS- QCBS / Diseñar, apoyar y hacer recomendaciones a la implementación de acciones Integrated Land- Use dirigidas a la reducción de la Planning and Improved Selección basada Open - 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2022-02- TF / A6376 Posterior 550,000.00 0.00 Cancelado 2020-10-20 deforestación, la promoción Governance for en calidad y costo International 12 03 20 28 05 21 14 14 de la legalidad de la cadena Deforestation Control forestal y la conservación de los bosques en la región de la Orinoquia CO-MADR-222430-CS-LCS / Diseñar un Protocolo con guías de actuación en situaciones de riesgo, crisis comunicativa y reputacional, Project Coordination, Selección basada Ejecución 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2022-03- socializarlo y capacitar a los TF / A6376 Management, Monitoring Posterior Open - National 18,826.00 0.00 2021-03-12 en el menor costo pendiente 02 16 13 13 17 21 20 voceros del Proyecto and Evaluation Desarrollo Sostenible bajo en carbono en la región de la Orinoquia, en acuerdo con lo establecid CO-MADR-222431-CS-CQS / Prestar servicios de monitoreo de medios de comunicación nacionales, Project Coordination, Selección basada regionales y municipales Ejecución 2021-03- 2021-04- 2021-06- 2021-11- TF / A6376 Management, Monitoring Posterior en calificaciones Limited 10,609.00 0.00 2021-03-15 (prensa escrita, radio, pendiente 29 28 02 29 and Evaluation de consultores televisión, internet y redes sociales) en temas de interés del proyecto Biocarbono Orinoquia CO-MADR-222428-CS- QCBS / Prestar sus servicios como central de medios o agencia de medios para el diseño, ejecución y Project Coordination, Selección basada Ejecución 2021-05- 2021-06- 2021-07- 2021-08- 2021-09- 2021-11- 2022-05- seguimiento de un plan de TF / A6376 Management, Monitoring Posterior Open - National 87,853.00 0.00 2021-04-23 en el menor costo pendiente 14 27 25 24 28 02 01 medios que acompañe la and Evaluation estrategia de comunicaciones y participación del Proyecto Desarrollo Sostenible bajo en carbono en la región de l CO-MADR-218256-CS- Integrated Land- Use QCBS / Actualizar y socializar Planning and Improved Selección basada 2021-06- 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-12- TF / A6376 Posterior Open - National 200,000.00 0.00 Cancelado 2021-05-31 el MOTRO con el gobierno Governance for en calidad y costo 21 04 01 01 05 10 10 regional actual Deforestation Control CO-MADR-233553-CS- QCBS / Preparar un plan de financiación y un plan de Definition of Emission distribución de beneficios Reduction Program and Selección basada 2021-05- 2021-05- 2021-07- 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- para el Programa de TF / A6376 Posterior Open - National 160,000.00 0.00 En ejecución 2021-05-10 Monitoring, Reporting and en calidad y costo 27 31 14 11 10 15 19 19 Reducción de Emisiones de la Verification región de la Orinoquia en Colombia, a partir de una evaluación de costos y beneficios CO-MADR-218457-CS- QCBS / Diseñar e implementar un programa de formación de formadores en Integrated Land- Use planificación territorial Planning and Improved Selección basada Ejecución 2021-08- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2022-11- enfocado a bajo carbono, TF / A6376 Posterior Open - National 392,440.00 0.00 2021-08-02 Governance for en calidad y costo pendiente 23 06 03 03 07 11 08 hacedores de política, Deforestation Control organizaciones, EPSEAS y demás temas relacionados con los componentes 1 y 2 del Proyecto BIOCARBONO CO-MADR-218257-CS-CQS / Realizar acompañamiento técnico y jurídico para la Integrated Land- Use Selección basada adopción de las Planning and Improved 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- TF / A6376 Posterior en calificaciones Open - National 120,000.00 0.00 Cancelado 2021-05-31 determinantes ambientales Governance for 21 04 03 08 06 de consultores regionales en las Deforestation Control corporaciones (CORPORINOQUIA y CORMACARENA) CO-MADR-218259-CS-CQS / Implementar en los POT de Integrated Land- Use Selección basada los municipios priorizados Planning and Improved 2021-06- 2021-08- 2021-09- 2021-10- 2022-04- TF / A6376 Posterior en calificaciones Open - National 150,000.00 0.00 Cancelado 2021-05-31 del Vichada, acciones de Governance for 21 04 03 08 06 de consultores gestión de cambio climático Deforestation Control basado en EEP Page 3 CO-MADR-240660-CS- QCBS / Incorporar la gestión del cambio climático en las Integrated Land- Use determinantes ambientales Planning and Improved Selección basada Ejecución 2021-08- 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2023-01- (CORPORINOQUIA - TF / A6376 Posterior Open - National 270,000.00 0.00 2021-07-12 Governance for en calidad y costo pendiente 02 15 13 12 17 21 21 CORMACARENA) y desarrollar Deforestation Control un piloto a escala local a través del modelo de estructura ecológica principal CO-MADR-218266-CS- QCBS / Construir el plan de acción para la implementación de la Integrated Land- Use estrategia integral de control Planning and Improved Selección basada Ejecución 2021-08- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2023-02- TF / A6376 Posterior Open - National 300,000.00 0.00 2021-08-05 de la deforestación y Governance for en calidad y costo pendiente 26 09 06 06 10 14 14 propuesta de fortalecimiento Deforestation Control de capacidades e involucramiento de actores, con énfasis en las autoridades ambientales y municipales CO-MADR-218273-CS- QCBS / Diseñar la estrategia de gestión del conocimiento Sustainable Land- Use Selección basada 2021-05- 2021-07- 2021-08- 2021-08- 2021-10- 2021-11- 2022-11- para el desarrollo regional TF / A6376 Posterior Open - National 80,000.00 0.00 Cancelado 2021-04-30 Management en calidad y costo 21 04 01 31 05 09 09 bajo en carbono de la Orinoquia y la consolidación de circuitos cortos bajos en carbono CO-MADR-218251-CS-LCS Definition of Emission / Construir propuestas de Reduction Program and Selección basada 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- 2022-04- TF / A6376 Posterior Open - National 60,000.00 0.00 Cancelado 2021-03-26 articulación en áreas de Monitoring, Reporting and en el menor costo 16 30 27 27 31 05 03 traslape Verification CO-MADR-218253-CS-LCS Definition of Emission / Diseñar el Plan de Reduction Program and Selección basada 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- 2022-04- distribución de beneficios del TF / A6376 Posterior Open - National 80,000.00 0.00 Cancelado 2021-03-26 Monitoring, Reporting and en el menor costo 16 30 27 27 31 05 03 Programa de Reducción de Verification Emisiones de la Orinoquia CO-MADR-218254-CS-CQS / Realizar el proceso de Definition of Emission Selección basada mejoramiento de información Reduction Program and 2021-03- 2021-05- 2021-06- 2021-07- 2022-01- TF / A6376 Posterior en calificaciones Open - National 60,000.00 0.00 Cancelado 2021-02-26 y de los sistemas de Monitoring, Reporting and 19 02 01 06 02 de consultores información relacionados con Verification tierras forestales (SNIF) CO-MADR-218275-CS- QCBS / Ajustar los instrumentos de Sustainable Land- Use Selección basada Ejecución 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2023-02- financiamiento e incentivos TF / A6376 Posterior Open - National 200,000.00 0.00 2021-08-16 Management en calidad y costo pendiente 06 20 17 17 21 25 25 forestales y de bosques de conservación y evaluar y/o diseñar instrumentos regulatorios CO-MADR-243539-CS- QCBS / Diseñar y validar una Integrated Land- Use metodología para la Planning and Improved Selección basada Ejecución 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2022-08- TF / A6376 Posterior Open - National 100,000.00 0.00 2021-08-16 valoración económica de Governance for en calidad y costo pendiente 06 20 17 17 21 25 24 predios con atributos Deforestation Control ambientales CO-MADR-201848-CS- QCBS / Caracterizar, validar y socializar modelos de producción - conservación Sustainable Land- Use Selección basada Ejecución 2021-09- 2021-10- 2021-11- 2021-12- 2022-01- 2022-02- 2023-02- TF / A6376 Posterior Open - National 200,000.00 0.00 2021-08-16 para el cultivo de marañón Management en calidad y costo pendiente 06 20 17 17 21 25 25 bajo en carbono a escala de paisaje en la altillanura colombiana CO-MADR-218246-CS- Definition of Emission QCBS / Generar factores de Reduction Program and Selección basada 2021-04- 2021-03- 2021-05- 2021-05- 2021-06- 2021-08- 2021-09- 2022-09- emisión Tir2 para arroz de TF / A6376 Posterior Open - National 353,000.00 0.00 Cancelado 2021-02-26 Monitoring, Reporting and en calidad y costo 27 19 02 30 29 03 07 07 secano y ganadería de cría en Verification la región de la Orinoquía INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-99638-CS-INDV Project Coordination, 2019-02- 2019-02- 2019-04- 2019-02- 2019-04- 2019-03- 2019-06- 2020-03- 2020-02- / Profesional de TF / A6377 Management, Monitoring Posterior Individual Open 24,500.00 55,379.34 Finalizado 2019-02-11 26 21 10 22 19 01 04 01 20 adquisiciones para la UIP del and Evaluation proyecto CO-MADR-99663-CS-INDV Project Coordination, 2019-02- 2019-02- 2019-04- 2019-02- 2019-04- 2019-03- 2019-06- 2019-08- / Profesional financiero para TF / A6377 Management, Monitoring Posterior Individual Open 24,500.00 54,491.02 Firmado 2019-02-11 26 19 10 20 19 01 04 28 el apoyo en la UIP and Evaluation CO-MADR-99665-CS-INDV Project Coordination, 2019-02- 2019-02- 2019-04- 2019-02- 2019-04- 2019-03- 2019-06- 2019-08- 2020-04- / Coordinador general para la TF / A6377 Management, Monitoring Posterior Individual Open 45,000.00 79,276.45 Finalizado 2019-02-11 13 19 10 22 19 01 04 28 07 UPI and Evaluation CO-MADR-99654-CS-INDV / Asistente administrativo y Project Coordination, operativo para apoyar al 2019-04- 2019-05- 2019-06- 2019-12- TF / A6377 Management, Monitoring Posterior Individual Open 48,000.00 0.00 Cancelado 2019-02-25 IDEAM en la coordinación de 15 06 10 07 and Evaluation las acciones de gestión del programa CO-MADR-99650-CS-INDV / Seis consultores que obtengan los insumos para la Project Coordination, elaboración del ER-Programa 2019-04- 2019-04- 2019-06- 2019-11- TF / A6377 Management, Monitoring Posterior Individual Open 210,000.00 0.00 Cancelado 2019-02-18 desde las instituciones 08 29 03 30 and Evaluation gubernamentales (MADS, MADR, UPRA, DNP, FINAGRO, PRICCO) CO-MADR-107364-CS-INDV Project Coordination, / Apoyo Administrativo a la 2019-06- 2019-04- 2019-08- 2019-04- 2019-09- 2019-05- 2019-09- 2019-12- TF / A6377 Management, Monitoring Posterior Individual Open 17,000.00 31,945.63 Firmado 2019-04-05 Unidad de Implementación 25 19 06 23 02 01 12 31 and Evaluation del proyecto CO-MADR-107357-CS-INDV / Líder Especialista en Project Coordination, 2019-06- 2019-04- 2019-08- 2019-04- 2019-09- 2019-05- 2019-10- 2019-12- Planificación y Políticas TF / A6377 Management, Monitoring Posterior Individual Open 23,900.00 35,046.00 Firmado 2019-04-05 18 22 13 25 13 01 25 31 Públicas en la Unidad de and Evaluation Implementación del Proyecto CO-MADR-107358-CS-INDV / Líder Especialista en Project Coordination, 2019-06- 2019-04- 2019-08- 2019-04- 2019-08- 2019-05- 2019-10- 2019-12- Monitoreo de la Unidad de TF / A6377 Management, Monitoring Posterior Individual Open 28,120.00 41,839.39 Firmado 2019-04-05 18 22 02 25 28 01 25 31 Implementación del Proyecto and Evaluation MADR Page 4 CO-MADR-107362-CS-INDV / Asesor de Comunicaciones Project Coordination, 2019-06- 2019-04- 2019-08- 2019-04- 2019-08- 2019-05- 2019-09- 2019-12- 2020-04- y Participación de la Unidad TF / A6377 Management, Monitoring Posterior Individual Open 23,900.00 45,256.30 Finalizado 2019-04-05 25 22 09 25 02 01 12 31 07 de Implementación del and Evaluation Proyecto MADR CO-MADR-107363-CS-INDV / Líder Especialista en Project Coordination, Desarrollo Rural de Bajas 2019-06- 2019-04- 2019-08- 2019-04- 2019-08- 2019-05- 2019-10- 2019-12- TF / A6377 Management, Monitoring Posterior Individual Open 28,000.00 41,230.59 Firmado 2019-04-05 Emisiones de la Unidad de 18 22 02 25 28 01 25 31 and Evaluation Implementación del proyecto MADR CO-MADR-132927-CS-INDV Project Coordination, 2019-08- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2019-11- 2019-12- / Apoyo Departamental TF / A6377 Management, Monitoring Posterior Individual Open 10,833.00 48,997.23 Firmado 2019-09-05 01 05 05 05 18 12 15 31 Arauca - Primer (1)año and Evaluation CO-MADR-132931-CS-INDV Project Coordination, 2019-08- 2019-09- 2019-10- 2019-09- 2019-10- 2019-09- 2019-11- 2019-12- / Apoyo Departamental TF / A6377 Management, Monitoring Posterior Individual Open 10,833.00 48,320.94 Firmado 2019-09-05 01 05 18 05 17 12 25 31 Casanare (1) primer año and Evaluation CO-MADR-132935-CS-INDV Project Coordination, 2019-08- 2019-09- 2019-10- 2019-09- 2019-10- 2019-09- 2019-11- 2019-12- / Apoyo Departamental Meta TF / A6377 Management, Monitoring Posterior Individual Open 10,833.00 48,997.23 Firmado 2019-09-05 01 05 08 05 18 12 15 31 - Primer (1)año and Evaluation CO-MADR-132937-CS-INDV Project Coordination, 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-12- 2019-12- / Apoyo Departamental TF / A6377 Management, Monitoring Posterior Individual Open 10,833.00 25,176.86 Firmado 2019-09-05 01 05 05 05 05 12 02 31 Vichada - Primer (1) año and Evaluation CO-MADR-153426-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2021-03- Ambientales del el Instituto TF / A6377 Posterior Individual Direct 34,320.00 25,510.40 Firmado 2020-02-06 Monitoring, Reporting and 11 27 13 03 13 13 10 13 de Hidrología, Meteorología y Verification Estudios Ambientales IDEAM, como profesional experto en los análisis espaciales y estructuración de CO-MADR-143405-CS-INDV Project Coordination, 2019-10- 2019-11- 2020-01- 2019-11- 2020-02- 2020-02- 2020-03- 2020-08- / Especialista en TF / A6377 Management, Monitoring Posterior Individual Open 28,000.00 13,851.04 Firmado 2019-10-29 30 06 28 27 04 18 03 16 comunicación Digital and Evaluation CO-MADR-143406-CS-INDV Project Coordination, 2019-10- 2019-11- 2020-01- 2019-11- 2020-02- 2020-02- 2020-03- 2020-05- / Profesional en medios e TF / A6377 Management, Monitoring Posterior Individual Open 2,000.00 1,484.04 Firmado 2019-10-29 30 06 31 26 07 24 03 08 Identidad Grafica and Evaluation CO-MADR-148038-CS-INDV / Gestor Técnico, para la implementación y seguimiento técnico del Integrated Land- Use componente 1 del Proyecto: Planning and Improved 2020-03- 2020-03- 2020-05- 2020-03- 2020-04- 2020-04- 2020-05- 2021-04- 2020-05- Desarrollo Sostenible bajo en TF / A6377 Posterior Individual Open 34,000.00 25,368.42 Finalizado 2020-02-24 Governance for 12 21 29 26 23 09 01 09 01 carbono en la región de la Deforestation Control Orinoquia, específicamente apoyando el desarrollo de la arquitecturafuncional y de componentes del sistema CO-MADR-153424-CS-CDS / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Subdirección de Estudios Definition of Emission Ambientales del el Instituto Reduction Program and 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2021-03- TF / A6377 Posterior Individual Direct 34,320.00 25,358.02 Firmado 2020-02-06 de Hidrología, Meteorología y Monitoring, Reporting and 11 27 13 03 13 13 06 13 Estudios Ambientales IDEAM, Verification como profesional agropecuario para la caracterización y seguimiento de CO-MADR-132919-CS-INDV Project Coordination, 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-11- 2020-07- / Especialista Sector privado TF / A6377 Management, Monitoring Posterior Individual Open 12,500.00 58,528.16 Firmado 2019-09-05 01 05 30 05 30 12 26 26 - año 1 and Evaluation CO-MADR-153423-CS-CDS / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2020-02- 2020-02- 2020-04- 2020-03- 2020-02- 2020-03- 2020-03- 2021-03- Ambientales del el Instituto TF / A6377 Posterior Individual Direct 34,320.00 25,510.40 Firmado 2020-02-06 Monitoring, Reporting and 11 27 13 03 13 13 06 13 de Hidrología, Meteorología y Verification Estudios Ambientales IDEAM, como profesional experto en análisis espaciales para la recopilación, CO-MADR-153429-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2020-02- 2020-02- 2020-06- 2020-03- 2020-06- 2020-03- 2020-07- 2021-03- Ambientales del el Instituto TF / A6377 Posterior Individual Direct 31,680.00 25,189.40 Firmado 2020-02-06 Monitoring, Reporting and 11 27 08 03 08 13 15 13 de Hidrología, Meteorología y Verification Estudios Ambientales IDEAM, liderando la articulación de los procesos de Monitoreo Comunitario Par CO-MADR-132940-CS-INDV Project Coordination, 2020-01- 2020-09- 2020-02- 2020-09- 2020-03- 2020-09- 2020-03- 2021-01- / Coordinador Regional - TF / A6377 Management, Monitoring Posterior Individual Open 38,000.00 28,352.94 Firmado 2020-09-06 08 06 07 06 03 13 06 01 Primer (1) año and Evaluation CO-MADR-153428-CS-CDS / Prestar sus servicios profesionales con autonomía técnica apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2021-03- Ambientales del el Instituto TF / A6377 Posterior Individual Direct 37,180.00 27,636.27 Firmado 2020-02-06 Monitoring, Reporting and 11 27 13 03 13 13 06 13 de Hidrología, Meteorología y Verification Estudios Ambientales IDEAM, asesorando estadísticamente los procesos necesarios para el levantamien Integrated Land- Use CO-MADR-142886-CS-INDV Planning and Improved 2019-12- 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- TF / A6377 Posterior Individual Open 34,000.00 25,649.94 Firmado 2020-02-20 / GESTOR TECNICO DNP Governance for 05 16 18 21 16 06 17 06 Deforestation Control Integrated Land- Use CO-MADR-146069-CS-INDV Planning and Improved 2019-12- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-07- TF / A6377 Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 / PROFESIONAL ZIDRES 4 Governance for 05 06 27 14 27 27 26 25 Deforestation Control Integrated Land- Use CO-MADR-146065-CS-INDV Planning and Improved 2019-12- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- 2020-07- TF / A6377 Posterior Individual Open 6,000.00 4,526.46 Firmado 2020-02-27 / PROFESIONAL ZIDRES 1 Governance for 05 28 27 28 27 09 25 07 Deforestation Control Page 5 Integrated Land- Use CO-MADR-146066-CS-INDV Planning and Improved 2019-12- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-07- TF / A6377 Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 / PROFESIONAL ZIDRES 2 Governance for 05 06 27 14 27 23 26 21 Deforestation Control Integrated Land- Use CO-MADR-146068-CS-INDV Planning and Improved 2019-12- 2020-03- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-07- TF / A6377 Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 / PROFESIONAL ZIDRES 3 Governance for 05 06 27 14 27 27 26 25 Deforestation Control CO-MADR-159519-CS-INDV / Prestar sus servicios profesionales como consultor SOCIAL de salvaguardas con Definition of Emission autonomía técnica y Reduction Program and 2020-02- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2020-04- 2021-04- 2020-07- administrativa, apoyando a la TF / A6377 Posterior Individual Open 34,000.00 25,121.58 Finalizado 2020-02-20 Monitoring, Reporting and 13 25 09 30 11 10 02 10 28 Unidad Implementadora del Verification Proyecto, UIP, al Ministerio de Agricultura y Desarrollo Rural, bajo la orientación del Ministerio de CO-MADR-159520-CS-INDV / Prestar sus servicios profesionales como consultor AMBIENTAL de salvaguardas Definition of Emission con autonomía técnica y Reduction Program and 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-04- 2021-04- administrativa, apoyando a la TF / A6377 Posterior Individual Open 34,000.00 25,121.58 Firmado 2020-02-20 Monitoring, Reporting and 13 25 09 30 11 15 02 15 Unidad Implementadora del Verification Proyecto UIP: Desarrollo sostenible bajo en carbono en la región de la Orinoquia, al Ministerio de CO-MADR-159522-CS-INDV / Prestar sus servicios profesionales, con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, 2020-03- 2020-03- 2020-06- 2020-03- 2020-06- 2020-04- 2021-04- Innovación, Desarrollo TF / A6377 Management, Monitoring Posterior Individual Open 34,000.00 31,046.40 En ejecución 2020-02-20 04 25 23 30 23 14 14 Tecnológico y Protección and Evaluation Sanitaria del Ministerio de Agricultura y Desarrollo Rural, en la realización de los procesos de adqui Definition of Emission CO-MADR-151449-CS-INDV Reduction Program and 2020-01- 2020-01- 2020-02- 2021-02- / Profesional Programador TF / A6377 Posterior Individual Open 26,667.00 0.00 Cancelado 2020-01-13 Monitoring, Reporting and 13 13 17 17 senior Verification CO-MADR-99651-CS-INDV / Un consultor para implementar una plataforma Project Coordination, 2019-04- 2019-05- 2019-06- 2019-12- de gestión del conocimiento TF / A6377 Management, Monitoring Posterior Individual Open 35,000.00 0.00 Cancelado 2019-02-25 15 06 10 07 y experiencias en el diseño e and Evaluation implementación de ER- Program CO-MADR-99659-CS-INDV / Líder técnico especialista en uso y cambios de uso del Project Coordination, 2019-04- 2019-05- 2019-06- 2019-12- suelo de apoyo al IDEAM en TF / A6377 Management, Monitoring Posterior Individual Open 72,000.00 0.00 Cancelado 2019-02-25 15 06 10 07 la estimación y el reporte de and Evaluation emisiones y remociones de GEI para el sector AFOLU Definition of Emission CO-MADR-151447-CS-INDV Reduction Program and 2020-01- 2020-01- 2020-02- 2020-11- / Profesional Interprete 1 TF / A6377 Posterior Individual Open 20,000.00 0.00 Cancelado 2020-01-17 Monitoring, Reporting and 17 17 21 04 (junior) Verification CO-MADR-151444-CS-INDV / Profesional experto tematico para fortalecer capacidades del ideam en Definition of Emission analisis de cambio de uso del Reduction Program and 2020-01- 2020-02- 2020-03- 2021-03- TF / A6377 Posterior Individual Direct 26,667.00 0.00 Cancelado 2020-01-10 suelo , en las cateforias Monitoring, Reporting and 20 10 16 16 claves a ser incluidas en la Verification estimacion de liena base , escenario de referencia y los reportes del PRE CO-MADR-99656-CS-INDV / Dos analistas de datos que fortalezcan las capacidades Project Coordination, 2019-04- 2019-05- 2019-06- 2019-12- del IDEAM de estimación y TF / A6377 Management, Monitoring Posterior Individual Open 96,000.00 0.00 Cancelado 2019-02-25 15 06 10 07 reporte de emisiones y and Evaluation remociones de GEI para el sector AFOLU CO-MADR-99653-CS-INDV / Consultor senior para la Project Coordination, consolidación coordinada del 2019-04- 2019-05- 2019-06- 2019-12- TF / A6377 Management, Monitoring Posterior Individual Open 100,000.00 0.00 Cancelado 2019-02-25 ER-Program a partir de 15 06 10 07 and Evaluation insumos técnicos específicos generados. CO-MADR-99657-CS-INDV / Líder técnico especialista en Actividades agrícolas que Project Coordination, fortalezca las capacidades del 2019-04- 2019-05- 2019-06- 2019-12- TF / A6377 Management, Monitoring Posterior Individual Open 72,000.00 0.00 Cancelado 2019-02-25 IDEAM de estimación y 15 06 10 07 and Evaluation reporte, de emisiones y remociones de GEI para el sector AFOLU CO-MADR-157971-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Sustainable Land- Use 2020-03- 2020-03- 2020-04- 2020-11- Innovación, Desarrollo TF / A6377 Posterior Individual Open 50,000.00 0.00 Cancelado 2020-02-06 Management 11 18 01 02 Tecnológico y Protección Sanitaria del Ministerio de Agricultura y Desarrollo Rural como profesional de apoyo para la formulación CO-MADR-162169-CS-INDV Sustainable Land- Use 2020-02- 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-08- TF / A6377 Posterior Individual Open 19,500.00 14,494.55 Firmado 2020-02-28 / Profesional Pdeas meta Management 19 23 16 23 21 10 02 08 CO-MADR-158772-CS-INDV Sustainable Land- Use 2020-02- 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-08- TF / A6377 Posterior Individual Open 19,500.00 14,494.55 Firmado 2020-02-28 / Profesional P DEAs Management 29 23 16 23 16 10 02 08 vichada CO-MADR-162170-CS-INDV Sustainable Land- Use 2020-03- 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-08- / Profesional P DEAs TF / A6377 Posterior Individual Open 19,500.00 14,549.54 Firmado 2020-02-28 Management 19 23 17 23 23 10 02 08 Casanare CO-MADR-162171-CS-INDV Sustainable Land- Use 2020-02- 2020-03- 2020-04- 2020-03- 2020-04- 2020-04- 2020-06- 2020-08- TF / A6377 Posterior Individual Open 19,500.00 14,494.55 Firmado 2020-02-28 / Profesional P DEAS ARAUCA Management 19 23 21 23 21 10 02 08 Page 6 Definition of Emission CO-MADR-143404-CS-INDV Reduction Program and 2019-11- 2019-11- 2020-04- 2020-02- 2020-01- 2020-02- 2020-02- 2020-08- / Apoyo Administrativo - TF / A6377 Posterior Individual Open 11,000.00 14,818.43 Firmado 2019-10-29 Monitoring, Reporting and 29 05 25 14 31 19 17 17 IDEAM - Primer año Verification Definition of Emission CO-MADR-156564-CS-INDV Reduction Program and 2020-03- 2020-04- 2020-04- 2021-04- / profesional ambiental- TF / A6377 Posterior Individual Open 34,000.00 0.00 Cancelado 2020-02-20 Monitoring, Reporting and 30 20 30 30 salvaguardas Verification Definition of Emission CO-MADR-156563-CS-INDV Reduction Program and 2020-03- 2020-04- 2020-04- 2021-04- / profesional social - TF / A6377 Posterior Individual Open 34,000.00 0.00 Cancelado 2020-02-20 Monitoring, Reporting and 30 20 30 30 salvaguardas Verification CO-MADR-163818-CS-INDV / Prestar sus servicios profesionales como coordinador del proceso del Definition of Emission estimación y reporte de Reduction Program and Selección directa 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- 2021-05- emisiones y remociones de GI TF / A6377 Posterior Direct 46,000.00 27,353.81 Firmado 2020-04-14 Monitoring, Reporting and de consultores 16 24 20 16 03 16 para AFOLU en la Orinoquía, Verification en las categorías relacionadas con actividades agrícolas y su inclusión en el MRV del proyecto CO-MADR-163817-CS-INDV / Prestar sus servicios profesionales, como coordinador del proceso de Definition of Emission estimación y reporte de Reduction Program and Selección directa 2020-04- 2020-04- 2020-04- 2020-05- 2020-06- 2021-05- emisiones y remociones de TF / A6377 Posterior Direct 46,000.00 27,353.81 Firmado 2020-04-14 Monitoring, Reporting and de consultores 16 24 20 16 03 16 GEI para el sector AFOLU de Verification la región de la Orinoquía, en las categorías relacionadas con uso y cambios de uso de la tierra CO-MADR-168115-CS-INDV Project Coordination, 2020-04- 2020-05- 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-12- / Coordinador General del TF / A6377 Management, Monitoring Posterior Individual Open 70,000.00 44,839.76 Firmado 2020-04-15 21 06 13 11 13 21 12 31 Proyecto and Evaluation CO-MADR-149179-CS-INDV / Profesional de Project Coordination, 2020-03- 2020-03- 2020-05- 2020-12- Comunicación e intercambio TF / A6377 Management, Monitoring Posterior Individual Open 18,750.00 0.00 Cancelado 2020-02-11 31 31 05 25 de información de los and Evaluation resultados del proyecto Definition of Emission CO-MADR-172096-CS-INDV Reduction Program and 2020-05- 2020-05- 2020-07- 2020-06- 2020-07- 2020-06- 2020-08- 2021-06- / Consultor modelamiento TF / A6377 Posterior Individual Open 21,243.00 19,476.72 Firmado 2020-05-04 Monitoring, Reporting and 06 28 10 02 17 17 20 17 del riesgo SMByC Verification CO-MADR-172097-CS-INDV Definition of Emission / Experto encargado de la Reduction Program and 2020-10- 2020-05- 2020-10- 2020-06- 2020-10- 2020-06- 2021-01- 2021-06- TF / A6377 Posterior Individual Open 22,449.00 32,232.00 Firmado 2020-05-04 coordinación para Monitoring, Reporting and 07 28 28 02 30 17 04 17 elaboración del ERPD para la Verification Orinoquia CO-MADR-172098-CS-INDV Definition of Emission / Intérpretes de imágenes Reduction Program and 2020-05- 2020-05- 2020-07- 2020-06- 2020-07- 2020-06- 2020-08- 2021-06- TF / A6377 Posterior Individual Open 48,000.00 19,476.72 Firmado 2020-05-04 satelitales para el Cubo de Monitoring, Reporting and 06 28 16 02 17 17 20 17 datos de IDEAM (x2) Verification CO-MADR-172808-CS-CDS / Consultor junior en suelos gestionados : Prestar sus servicios profesionales apoyando a la Subdirección Definition of Emission del IDEAM, en el proceso de Reduction Program and 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2021-07- TF / A6377 Posterior Individual Direct 26,000.00 20,673.12 Firmado 2020-06-02 incorporación de las Monitoring, Reporting and 02 12 03 17 03 11 15 11 metodologías paraa Verification estimación de las emisiones asociadas a los suelos gestionados en el sector AFOLU Definition of Emission CO-MADR-172107-CS-CDS Reduction Program and 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2021-07- / Líder temático del Cubo de TF / A6377 Posterior Individual Direct 35,200.00 25,443.84 Firmado 2020-06-02 Monitoring, Reporting and 02 12 03 17 03 11 15 11 datos de IDEAM Verification CO-MADR-172800-CS-CDS / Consultor junior para el sector de uso y cambio de uso de la tierra: Hidrología, Definition of Emission Meteorología y Estudios Reduction Program and 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2021-07- Ambientales IDEAM, en el TF / A6377 Posterior Individual Direct 26,000.00 22,263.36 Firmado 2020-06-02 Monitoring, Reporting and 02 12 03 17 03 11 15 11 proceso de estimación y Verification reporte de emisiones y remociones de GEI para el sector AFOLU de la región de la Orinoquía, en las c CO-MADR-172806-CS-CDS / Consultor temático en ganadería: Prestar sus servicios profesionales apoyando a la Subdirección Definition of Emission de Estudios Ambientales del Reduction Program and 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2021-07- TF / A6377 Posterior Individual Direct 26,000.00 20,673.12 Firmado 2020-06-02 Instituto de Hidrología, Monitoring, Reporting and 02 12 03 17 03 11 15 11 Meteorología y Estudios Verification Ambientales IDEAM, en el proceso de ajuste de las metodologías para la estimación CO-MADR-172796-CS-CDS / Consultor junior en actividades agrícolas: Prestar sus servicios profesionales Definition of Emission apoyando a la Subdirección Reduction Program and 2020-06- 2020-06- 2020-06- 2020-06- 2020-06- 2020-07- 2020-07- 2021-07- de Estudios Ambientales del TF / A6377 Posterior Individual Direct 26,000.00 22,263.36 Firmado 2020-06-02 Monitoring, Reporting and 02 12 03 17 03 11 15 11 Instituto de Hidrología, Verification Meteorología y Estudios Ambientales IDEAM, en el proceso de estimación y reporte de emisiones y Integrated Land- Use CO-MADR-178996-CS-INDV Planning and Improved 2020-06- 2020-07- 2020-10- 2020-07- 2020-10- 2020-08- 2020-11- 2021-01- / Apoyo Administrativo TF / A6377 Posterior Individual Open 4,970.00 3,853.34 Firmado 2020-06-10 Governance for 12 04 09 09 13 06 11 03 Cartas del paisaje UIP-UPRA Deforestation Control CO-MADR-178997-CS-INDV Integrated Land- Use / Profesional en análisis de Planning and Improved 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2021-01- sistemas productivos TF / A6377 Posterior Individual Open 10,833.00 8,802.95 Firmado 2020-06-10 Governance for 12 04 29 09 19 06 17 03 agrícolas del paisaje Deforestation Control agropecuario CO-MADR-178999-CS-INDV Integrated Land- Use / Profesional en análisis Planning and Improved 2020-06- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2020-09- 2020-12- TF / A6377 Posterior Individual Open 12,008.00 9,418.38 Firmado 2020-06-10 ambiental y Ecológico del Governance for 12 04 05 09 06 24 28 21 paisaje agropecuario Deforestation Control Page 7 CO-MADR-179001-CS-INDV Integrated Land- Use / Profesional en Planning and Improved 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2020-08- 2020-11- 2021-01- TF / A6377 Posterior Individual Open 10,833.00 8,399.30 Firmado 2020-06-10 comunicación social para el Governance for 12 04 29 09 05 06 03 03 desarrollo del paisaje Deforestation Control agropecuario CO-MADR-179002-CS-INDV Integrated Land- Use / Profesional en análisis Planning and Improved 2020-06- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2021-01- TF / A6377 Posterior Individual Open 12,008.00 9,418.38 Firmado 2020-06-10 económico del paisaje Governance for 12 04 03 09 19 06 17 03 agropecuario Deforestation Control CO-MADR-179003-CS-INDV Integrated Land- Use / Profesional en Planning and Improved 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-09- 2021-01- TF / A6377 Posterior Individual Open 14,355.00 11,258.91 Firmado 2020-06-10 Ordenamiento territorial y Governance for 12 04 27 09 28 06 17 03 prospectiva Deforestation Control CO-MADR-179004-CS-INDV Integrated Land- Use / Profesional en análisis de Planning and Improved 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-09- 2021-01- sistemas productivos TF / A6377 Posterior Individual Open 10,833.00 8,496.80 Firmado 2020-06-10 Governance for 12 04 29 09 29 06 28 03 pecuarios del paisaje Deforestation Control agropecuario CO-MADR-181730-CS-INDV / Gestor Técnico gestión de la información apoyando al Integrated Land- Use Departamento Nacional de Planning and Improved 2020-06- 2020-07- 2020-07- 2021-07- TF / A6377 Posterior Individual Direct 34,000.00 0.00 Cancelado 2020-06-24 Planeación, DNP para la Governance for 29 04 19 19 implementación y Deforestation Control seguimiento técnico del componente 1 CO-MADR-181986-CS-INDV Definition of Emission / Consultor técnico de Reduction Program and 2020-06- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2021-08- TF / A6377 Posterior Individual Open 32,728.00 28,674.00 Firmado 2020-06-25 cambio climático para el Monitoring, Reporting and 26 24 26 29 26 20 29 20 MADS Verification Definition of Emission CO-MADR-181989-CS-INDV Reduction Program and 2020-06- 2020-07- 2020-08- 2020-07- 2020-09- 2020-08- 2020-09- 2021-08- TF / A6377 Posterior Individual Open 32,728.00 28,235.52 Firmado 2020-06-25 / Asesor jurídico y legal Monitoring, Reporting and 26 24 26 29 02 20 28 20 Verification CO-MADR-182723-CS-INDV / Gestor Técnico gestión de la información apoyando al Integrated Land- Use Departamento Nacional de Planning and Improved 2020-03- 2020-07- 2020-05- 2020-07- 2020-05- 2020-08- 2020-07- 2021-08- TF / A6377 Posterior Individual Direct 34,000.00 28,031.64 Firmado 2020-06-30 Planeación, DNP para la Governance for 12 10 29 15 29 04 15 04 implementación y Deforestation Control seguimiento técnico del componente 1 CO-MADR-182724-CS-INDV Integrated Land- Use / Profesional experto en Planning and Improved 2020-07- 2020-08- 2020-09- 2020-08- 2020-09- 2020-08- 2020-12- 2021-01- TF / A6377 Posterior Individual Open 13,388.00 11,046.58 Firmado 2020-07-03 desarrollo sostenible bajo en Governance for 16 01 21 06 24 30 17 27 carbono Deforestation Control CO-MADR-184009-CS-INDV Integrated Land- Use / Profesional ecología del Planning and Improved 2020-07- 2020-07- 2020-08- 2020-07- 2020-08- 2020-08- 2020-09- 2021-01- TF / A6377 Posterior Individual Direct 13,388.33 31,187.32 Firmado 2020-07-15 paisaje y sensoramiento Governance for 16 25 14 30 19 23 03 20 remoto Deforestation Control CO-MADR-190104-CS-CDS / Actualización de los inventarios de GEI con proxys Definition of Emission para los 59 municipios de la Reduction Program and Selección directa 2020-08- 2020-09- 2020-09- 2020-10- 2021-02- 2020-12- región de la Orinoquía, TF / A6377 Posterior Direct 85,000.00 84,982.67 Firmado 2020-08-24 Monitoring, Reporting and de consultores 25 24 28 28 01 27 dentro del Componente 3: Verification Preparación del Programa de Reducción de Emisiones y del MRV CO-MADR-190915-CS-INDV / Prestar sus servicios profesionales como consultor SOCIAL de salvaguardas con Definition of Emission autonomía técnica apoyando Reduction Program and 2020-08- 2020-08- 2020-08- 2020-09- 2020-08- 2020-10- 2020-09- 2021-10- a la Unidad Implementadora TF / A6377 Posterior Individual Direct 34,000.00 27,592.02 Firmado 2020-08-27 Monitoring, Reporting and 31 29 27 03 27 01 28 01 del Proyecto, UIP, al Verification Ministerio de Agricultura y Desarrollo Rural, bajo la orientación del Ministerio de Ambiente y Desarr CO-MADR-194082-CS-INDV / Prestar sus servicios profesionales en la realización de los procesos de adquisiciones y Project Coordination, contrataciones que se 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-10- 2021-10- TF / A6377 Management, Monitoring Posterior Individual Direct 47,287.00 40,784.64 Firmado 2020-09-17 requieran, de acuerdo con lo 18 21 16 23 16 12 16 12 and Evaluation establecido en el Acuerdo Legal, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las Regulaciones de CO-MADR-197661-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2020-11- 2020-11- 2020-11- 2020-11- 2021-05- 2020-12- 2021-12- Ambientales del IDEAM como TF / A6377 Posterior Individual Open 21,825.00 0.00 Cancelado 2020-10-21 Monitoring, Reporting and 17 20 30 20 10 09 09 profesional experto para Verification realizar la descarga y procesamiento de imágenes, interpretación digital, validación, reporte y ajustes n CO-MADR-199053-CS-INDV / Prestar sus servicios profesionales apoyando a la Secretaria técnica del Nodo Integrated Land- Use Regional de Cambio Planning and Improved 2020-12- 2020-11- 2021-01- 2020-11- 2021-04- 2020-12- 2021-05- 2021-12- Climático de la Orinoquia – TF / A6376 Posterior Individual Open 28,991.00 27,892.92 Firmado 2020-10-14 Governance for 29 14 19 16 10 05 04 05 NORECCO (CORMACARENA), Deforestation Control como consultor de apoyo para orientar, implementar y hacer seguimiento a la estrategia de Fortalecimiento d CO-MADR-199054-CS-INDV / consultor de apoyo técnico para la implementación y Integrated Land- Use seguimiento de medidas de Planning and Improved 2021-01- 2020-11- 2021-01- 2020-11- 2021-04- 2020-12- 2021-05- 2021-12- cambio climático territoriales, TF / A6376 Posterior Individual Open 100,905.00 85,326.92 Firmado 2020-10-14 Governance for 18 14 21 16 12 05 07 05 con un enfoque al Deforestation Control ordenamiento territorial y el fomento de un desarrollo sostenible bajo en carbono (4) CO-MADR-199055-CS-INDV / facilitador para preparar el diseño metodológico, realizar Integrated Land- Use la moderación, desarrollar, Planning and Improved 2020-12- 2020-11- 2021-02- 2020-11- 2021-04- 2020-12- 2021-05- 2021-12- analizar, documentar y TF / A6376 Posterior Individual Open 25,226.00 21,480.47 Firmado 2020-10-14 Governance for 29 14 08 16 06 05 07 05 sistematizar los espacios de Deforestation Control participación y para la socio construcción del conocimiento Page 8 CO-MADR-199058-CS-INDV / consultor de apoyo técnico para la implementación y seguimiento de medidas de Integrated Land- Use cambio climático en el Planning and Improved 2020-12- 2020-11- 2021-02- 2020-11- 2021-04- 2020-12- 2021-05- 2021-12- TF / A6376 Posterior Individual Open 25,226.00 21,480.47 Firmado 2020-10-14 ordenamiento territorial, en Governance for 29 14 08 16 08 05 07 05 el cumplimiento de los Deforestation Control PIGCCT y como enlace de NORECCO en jurisdicción de CORPORINOQUIA, CO-MADR-199069-CS-INDV / Prestar sus servicios como el Profesional en análisis Integrated Land- Use socio-cultural del paisaje Planning and Improved 2020-10- 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-11- 2021-04- agropecuario, para TF / A6376 Posterior Individual Direct 10,197.00 8,508.83 Firmado 2020-10-09 Governance for 16 17 13 20 19 08 11 07 desarrollar el componente Deforestation Control socio-cultural de la formulación de las Cartas del paisaje agropecuario. CO-MADR-197659-CS-INDV / Consultor Temático forestal quien prestara sus servicios profesionales en el análisis Definition of Emission de bases de datos de Reduction Program and 2020-10- 2020-11- 2020-11- 2020-12- 2021-12- TF / A6377 Posterior Individual Open 25,462.00 0.00 Cancelado 2020-10-09 actividad alfanuméricos y Monitoring, Reporting and 16 12 12 01 01 geográficos requeridos para Verification la estimación y el reporte de emisiones y remociones de GEI del sector AFOLU CO-MADR-201159-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la UIP y a la Project Coordination, 2020-11- 2020-11- 2020-10- 2020-11- 2020-11- 2020-12- 2020-11- 2021-06- Dirección de Innovación, TF / A6376 Management, Monitoring Posterior Individual Direct 34,781.00 30,823.64 Firmado 2020-10-22 03 01 22 22 25 27 25 25 Desarrollo Tecnológico y and Evaluation Protección Sanitaria del MADR como Asesor (a) de Comunicaciones y Participacion CO-MADR-200275-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, como ingeniero de Definition of Emission sistemas generando los Reduction Program and 2020-11- 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- 2021-12- desarrollos tecnológicos TF / A6376 Posterior Individual Direct 30,121.00 27,234.24 Firmado 2020-11-03 Monitoring, Reporting and 03 09 04 12 04 01 01 01 necesarios para la captura, Verification almacenamiento, procesamiento, análisis y divulgación de la información del IFN CO-MADR-200277-CS-INDV / Profesional de Calidad Operación estadística Inventario Forestal Nacional, para la implementación de Definition of Emission las operaciones estadísticas Reduction Program and 2020-11- 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- 2021-12- TF / A6376 Posterior Individual Direct 30,121.00 26,402.88 Firmado 2020-11-03 de USO DE LOS RECURSOS Monitoring, Reporting and 03 09 03 12 03 01 01 01 FORESTALES- URFN, y de Verification INVENTARIO FORESTAL NACIONAL-IFN, y de los procesos para la interoperabilidad CO-MADR-179000-CS-INDV Integrated Land- Use / Profesional en análisis socio- Planning and Improved 2020-08- 2020-07- 2020-07- 2020-08- 2021-01- TF / A6377 Posterior Individual Open 10,833.00 0.00 Cancelado 2020-06-10 cultural del paisaje Governance for 20 04 09 06 03 agropecuario Deforestation Control CO-MADR-99660-CS-INDV / Líder técnico de apoyo Project Coordination, 2019-05- 2019-05- 2019-06- 2019-11- para la estimación y el TF / A6377 Management, Monitoring Posterior Individual Open 78,000.00 0.00 Cancelado 2019-04-25 14 21 02 29 reporte de emisiones y and Evaluation remociones de GEI para el sector AFOLU CO-MADR-200276-CS-INDV / Prestar sus servicios profesionales como consultor experto coordinando la Definition of Emission caracterización de las causas Reduction Program and 2020-11- 2020-11- 2020-11- 2020-11- 2020-12- 2020-12- 2020-12- 2021-12- y agentes de la TF / A6376 Posterior Individual Direct 37,021.00 33,143.39 Firmado 2020-11-19 Monitoring, Reporting and 20 25 03 28 17 17 17 17 transformación del bosque y Verification sus emisiones asociadas, los procesos de modelación y el monitoreo comunitario participativo CO-MADR-201844-CS-INDV / Prestar sus servicios profesionales apoyando a la Subdirección de Estudios Definition of Emission Ambientales del Instituto de Reduction Program and 2020-11- 2020-11- 2020-11- 2020-12- 2020-11- 2021-01- 2020-12- 2021-07- Hidrología, Meteorología y TF / A6376 Posterior Individual Direct 25,462.00 23,102.52 Firmado 2020-11-19 Monitoring, Reporting and 20 29 20 20 20 24 16 23 Estudios Ambientales IDEAM, Verification en el proceso de incorporación y generación de propuesta metodológica y seguimiento de acciones CO-MADR-178998-CS-INDV Integrated Land- Use / Profesional en análisis socio- Planning and Improved 2020-08- 2020-07- 2020-07- 2020-08- 2021-01- TF / A6377 Posterior Individual Open 10,833.00 0.00 Cancelado 2020-06-10 cultural del paisaje Governance for 20 04 09 06 03 agropecuario Deforestation Control CO-MADR-205823-CS-CDS / Prestar sus servicios como el Profesional en análisis Integrated Land- Use sociocultural del paisaje Planning and Improved 2020-11- 2020-12- 2020-11- 2020-12- 2020-11- 2021-02- 2021-01- 2021-07- agropecuario, para TF / A6376 Posterior Individual Direct 10,833.00 8,938.48 Firmado 2020-11-27 Governance for 23 07 23 28 23 01 15 31 desarrollar el componente Deforestation Control sociocultural de la formulación de las Cartas del paisaje agropecuario CO-MADR-208056-CS-INDV / Prestar sus servicios profesionales apoyando a la Subdirección de Estudios Definition of Emission Ambientales del Instituto de Reduction Program and 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-08- Hidrología, Meteorología y TF / A6376 Posterior Individual Limited 25,462.00 23,599.80 Firmado 2020-12-10 Monitoring, Reporting and 07 15 15 05 21 09 19 08 Estudios Ambientales IDEAM, Verification en el análisis de bases de datos de actividad alfanuméricos y geográficos requeridos para la est Page 9 CO-MADR-209804-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del paisaje Integrated Land- Use agropecuario, para apoyar la Planning and Improved 2020-12- 2021-01- 2020-12- 2021-01- 2020-12- 2021-02- 2021-01- 2022-02- TF / A6377 Posterior Individual Direct 26,107.00 24,198.22 Firmado 2020-12-22 coordinación de la Governance for 16 01 16 22 17 26 15 26 formulación de la Carta del Deforestation Control paisaje agropecuario, brindado el enfoque de ordenamiento territorial en todo el pr CO-MADR-197660-CS-INDV / Prestar servicios Definition of Emission profesionales para el el Reduction Program and 2020-11- 2020-11- 2020-11- 2020-11- 2021-11- TF / A6377 Posterior Individual Open 164,000.00 0.00 Cancelado 2020-10-12 control de calidad de datos Monitoring, Reporting and 20 11 11 30 30 de campo del inventario Verification forestal de la Orinoquia (x5) CO-MADR-211405-CS-INDV / Apoyar al especialista de adquisiciones en la realización de los procesos de adquisiciones y Project Coordination, contrataciones que se 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- TF / A6376 Management, Monitoring Posterior Individual Direct 23,576.00 21,110.86 Firmado 2021-02-08 requieran, de acuerdo con lo 05 18 05 11 09 15 15 12 and Evaluation establecido en el Acuerdo Legal, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las Regulaciones CO-MADR-215613-CS-INDV / Apoyar al especialista financiero del Proyecto BIOCARBONO en la gestión Project Coordination, 2021-02- 2021-02- 2021-02- 2021-03- 2021-02- 2021-04- 2021-02- 2021-10- financiera del proyecto, de TF / A6376 Management, Monitoring Posterior Individual Direct 23,576.00 21,110.86 Firmado 2021-02-08 05 18 05 11 05 15 15 12 acuerdo con lo establecido en and Evaluation el Acuerdo Legal, el Manual Operativo del Proyecto y el Plan de Adquisiciones CO-MADR-217660-CS-INDV / Prestar sus servicios personales apoyando a la Unidad de Implementación del Proyecto (UIP) en la Definition of Emission implementación de los Reduction Program and 2021-02- 2021-02- 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-10- TF / A6376 Posterior Individual Limited 2,000.00 1,665.34 Firmado 2021-02-15 procesos de gestión de Monitoring, Reporting and 03 20 01 13 08 17 14 14 conocimiento a partir de la Verification información sobre las prácticas bajas en carbono para las cadenas priorizadas y las p CO-MADR-217665-CS-INDV / Apoyar a la Subdirección de Ecosistemas e Información Ambiental del Instituto de Definition of Emission Hidrología, Meteorología y Reduction Program and 2021-02- 2021-04- 2021-03- 2021-05- 2021-04- 2021-06- 2021-05- 2021-12- Estudios Ambientales IDEAM, TF / A6376 Posterior Individual Open 50,832.00 21,088.35 Firmado 2021-02-22 Monitoring, Reporting and 16 12 15 03 30 07 21 04 en la verificación de las Verification actividades que adelanten las brigadas en campo para el levantamiento de los conglomerados, d CO-MADR-217669-CS-INDV / Realizar el análisis de información a través de SIG para el soporte al marco Definition of Emission geoestadístico como apoyo a Reduction Program and 2021-02- 2021-02- 2021-03- 2021-03- 2021-05- 2021-04- 2021-05- 2021-10- TF / A6376 Posterior Individual Limited 54,000.00 16,402.05 Firmado 2021-02-22 la operación en campo y la Monitoring, Reporting and 16 27 03 20 04 24 21 21 generación de cartografía Verification relacionada con la implementación del IFN en la región de la Orinoquia CO-MADR-217672-CS-INDV / Apoyar los procesos de capacitación en los procedimientos Definition of Emission metodológicos del IFN, el Reduction Program and 2021-02- 2021-04- 2021-03- 2021-05- 2021-07- 2021-06- 2021-07- 2021-12- análisis de la información, el TF / A6376 Posterior Individual Open 24,161.00 18,050.20 Firmado 2021-02-22 Monitoring, Reporting and 16 12 15 03 14 07 29 04 seguimiento a las actividades Verification de campo y al aseguramiento, control de calidad y crítica de los procesos de supervisión propios del IFN CO-MADR-217673-CS-INDV / Consultor desarrollador para consolidar la nueva Definition of Emission plataforma informática que Reduction Program and 2021-03- 2021-04- 2021-05- 2021-06- 2021-12- TF / A6376 Posterior Individual Open 18,826.00 0.00 Cancelado 2021-02-22 permite la captura y Monitoring, Reporting and 15 12 03 07 04 administración de datos del Verification Inventario Forestal Nacional - IFN CO-MADR-218247-CS-INDV / Fortalecer las capacidades de la Dirección de Cambio Definition of Emission Climático y Gestión del Reduction Program and 2021-03- 2021-04- 2021-05- 2021-11- Riesgo (DCCGR) del MADS TF / A6376 Posterior Individual Limited 36,000.00 0.00 Cancelado 2021-03-12 Monitoring, Reporting and 17 07 12 08 para la formulación, Verification cuantificación, reporte y registro de iniciativas de mitigación de GEI CO-MADR-218248-CS-INDV / Realizar el diseño, Definition of Emission validación metodológica e Reduction Program and 2021-04- 2021-02- 2021-04- 2021-03- 2021-06- 2021-04- 2021-07- 2021-10- implementación del sistema TF / A6376 Posterior Individual Limited 35,000.00 18,224.50 Firmado 2021-02-15 Monitoring, Reporting and 05 20 27 13 01 17 01 14 de monitoreo, reporte y Verification verificación del sector AFOLU e n la Orinoquia CO-MADR-218249-CS-INDV Definition of Emission / Realizar la identificación de Reduction Program and 2021-04- 2021-02- 2021-04- 2021-03- 2021-06- 2021-04- 2021-07- 2021-10- TF / A6376 Posterior Individual Limited 35,000.00 15,957.00 Firmado 2021-02-15 Beneficios No carbono del Monitoring, Reporting and 05 20 22 13 17 17 08 14 ERPD Verification CO-MADR-218255-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Subdirección de Estudios Reduction Program and 2021-02- 2021-03- 2021-04- 2021-10- Ambientales del Instituto de TF / A6376 Posterior Individual Limited 30,191.00 0.00 Cancelado 2021-02-19 Monitoring, Reporting and 24 17 21 18 Hidrología, Meteorología y Verification Estudios Ambientales IDEAM, en el diseño y validación metodológica del sistema de monitoreo, reporte Page 10 CO-MADR-199085-CS-INDV / Diseñar la estrategia de interoperabilidad para Integrated Land- Use recopilar y procesar Planning and Improved 2021-03- 2021-03- 2021-04- 2022-04- información espacial y TF / A6376 Posterior Individual Open 33,886.00 0.00 Cancelado 2021-02-22 Governance for 25 27 15 15 geográfica del área de Deforestation Control intervención del Proyecto Biocarbono y entidades beneficiarias CO-MADR-218260-CS-INDV / Apoyar la recopilación y Integrated Land- Use procesamiento de Planning and Improved 2021-04- 2021-05- 2021-06- 2021-12- TF / A6376 Posterior Individual Open 23,340.00 0.00 Cancelado 2021-02-25 información espacial y Governance for 15 06 10 07 geográfica del área de Deforestation Control intervención del Proyecto Biocarbono, y Minagricultura CO-MADR-201950-CS-INDV / Apoyar la formulación, implementación y seguimiento de estrategias Sustainable Land- Use 2021-03- 2021-04- 2021-05- 2022-05- asociadas al fortalecimiento TF / A6376 Posterior Individual Open 36,000.00 0.00 Cancelado 2021-02-22 Management 23 02 07 07 institucional de las mesas de ganadería sostenible de la Orinoquia y su desarrollo sostenible bajo en carbono CO-MADR-201953-CS-INDV / Apoyar el fortalecimiento de las mesas de ganadería sostenible departamentales Sustainable Land- Use 2021-03- 2021-03- 2021-03- 2021-04- 2021-06- 2021-05- 2021-07- 2022-05- TF / A6376 Posterior Individual Open 94,000.00 53,382.42 Firmado 2021-02-22 de la Orinoquia (Meta, Management 25 23 29 02 18 07 06 07 Casanare, Arauca y Vichada) y el desarrollo regional sostenible bajo en carbono CO-MADR-218459-CS-INDV / Fortalecer la institucionalidad regional del SNIA (Sistemas Territoriales Innovación, mesas Sustainable Land- Use 2021-02- 2021-03- 2021-05- 2021-03- 2021-07- 2021-05- 2021-07- 2021-10- TF / A6376 Posterior Individual Limited 25,000.00 22,049.00 Firmado 2021-03-01 departamentales de C&T, Management 24 06 18 27 06 01 08 28 innovación, actualización PECTIA, C&T regalías, supervisión apoyos profesionales PDEA) CO-MADR-218460-CS-INDV / Apoyo para la puesta en Sustainable Land- Use Ejecución 2021-03- 2021-03- 2021-05- 2021-10- marcha y el seguimiento del TF / A6376 Posterior Individual Limited 25,000.00 0.00 2021-03-01 Management pendiente 06 27 01 28 PIGCC sector agropecuario / NDC 2020 por parte del MADR CO-MADR-218461-CS-INDV / Apoyo seguimiento y Sustainable Land- Use 2021-02- 2021-03- 2021-03- 2021-03- 2021-04- 2021-05- 2021-04- 2021-10- supervisión del proyecto TF / A6376 Posterior Individual Limited 25,000.00 22,709.45 Firmado 2021-03-01 Management 24 06 02 27 13 01 21 28 BIOCARBONO ORINOQUIA por parte de la DIDTPS CO-MADR-222427-CS-INDV Project Coordination, / Prestar servicios 2021-05- 2021-04- 2021-05- 2021-04- 2021-07- 2021-05- 2021-07- 2021-11- TF / A6376 Management, Monitoring Posterior Individual Limited 6,903.00 7,300.16 Firmado 2021-03-29 profesionales como apoyo 26 03 31 24 01 29 14 25 and Evaluation administrativo regional CO-MADR-223832-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-11- Innovación, Desarrollo TF / A6376 Management, Monitoring Posterior Individual Limited 21,964.00 0.00 Cancelado 2021-03-15 17 20 12 10 15 11 Tecnológico y Protección and Evaluation Sanitaria del Ministerio de Agricultura y Desarrollo Rural, como apoyo departamental del Proyecto Biocar CO-MADR-223836-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Sustainable Land- Use 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-05- 2021-11- Innovación, Desarrollo TF / A6376 Posterior Individual Limited 20,803.00 17,768.89 Firmado 2021-03-15 Management 10 20 12 10 27 15 12 11 Tecnológico y Protección Sanitaria del Ministerio de Agricultura y Desarrollo Rural como profesional de apoyo para la formulación CO-MADR-222434-CS-INDV / Realizar el análisis del cambio de uso del suelo en las categorías clave a ser Definition of Emission incluidas en la estimación de Reduction Program and 2021-03- 2021-03- 2021-04- 2021-05- 2021-11- línea base, escenario de TF / A6376 Posterior Individual Direct 3,187.00 0.00 Cancelado 2021-03-15 Monitoring, Reporting and 09 25 15 20 16 referencia y los reportes del Verification programa de reducción de emisiones considerando usos forestales, agrícolas y otros tipos de CO-MADR-224148-CS-INDV / Realizar el análisis del cambio de uso del suelo en las categorías clave a ser Definition of Emission incluidas en la estimación de Reduction Program and 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-04- 2021-11- línea base, escenario de TF / A6376 Posterior Individual Direct 13,179.00 10,934.70 Firmado 2021-03-15 Monitoring, Reporting and 10 25 12 15 07 20 07 16 referencia y los reportes del Verification programa de reducción de emisiones considerando usos forestales, agrícolas y otros tipos de CO-MADR-228016-CS-INDV / Análisis del cambio de uso del suelo en las categorías clave a ser incluidas en la Definition of Emission estimación de línea base, Reduction Program and 2021-04- 2021-04- 2021-04- 2021-04- 2021-05- 2021-06- 2021-05- 2021-11- escenario de referencia y los TF / A6376 Posterior Individual Direct 19,906.00 18,745.20 Firmado 2021-04-12 Monitoring, Reporting and 15 22 22 27 03 01 18 28 reportes del programa de Verification reducción de emisiones considerando usos forestales, agrícolas y otros tipos de cobertura v CO-MADR-230636-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa para apoyar a la Unidad Sustainable Land- Use 2021-04- 2021-05- 2021-04- 2021-05- 2021-05- 2021-06- 2021-05- 2021-12- Implementadora del Proyecto TF / A6376 Posterior Individual Direct 36,000.00 32,804.10 Firmado 2021-04-23 Management 26 03 22 24 07 28 10 25 Biocarbono UIP en la formulación y seguimiento de iniciativas relacionadas con la validación de modelos productivos sostenibles Page 11 CO-MADR-218262-CS-INDV Integrated Land- Use / Apoyar la recopilación y Planning and Improved 2021-04- 2021-05- 2021-06- 2021-12- procesamiento de TF / A6376 Posterior Individual Open 23,340.00 0.00 Cancelado 2021-02-25 Governance for 15 06 10 07 información espacial y Deforestation Control geográfica del área de intervención para la región CO-MADR-218267-CS-INDV Integrated Land- Use / Asesorar la implementación Planning and Improved 2021-05- 2021-05- 2021-06- 2021-12- TF / A6376 Posterior Individual Open 31,000.00 0.00 Cancelado 2021-03-15 de estrategia de gobernanza Governance for 03 24 28 25 y control de la deforestación Deforestation Control CO-MADR-218268-CS-INDV Integrated Land- Use / Apoyar la Implementación Planning and Improved 2021-06- 2021-06- 2021-07- 2022-01- de la estrategia de control a TF / A6376 Posterior Individual Open 24,371.00 0.00 Cancelado 2021-04-15 Governance for 03 24 29 25 la deforestación (uno por Deforestation Control foco de deforestación) CO-MADR-231537-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Planning and Improved 2021-05- 2021-05- 2021-06- 2021-05- 2021-06- 2021-12- Agricultura y Desarrollo Rural TF / A6376 Posterior Individual Limited 33,886.00 0.00 En ejecución 2021-04-30 Governance for 04 05 02 26 30 27 (Min agricultura) y a la Deforestation Control Unidad Implementadora del Proyecto Biocarbono en la gestión y procesamiento de la información espa CO-MADR-231548-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Planning and Improved 2021-05- 2021-05- 2021-06- 2021-05- 2021-06- 2021-12- Agricultura y Desarrollo Rural TF / A6376 Posterior Individual Limited 23,340.00 0.00 En ejecución 2021-04-30 Governance for 04 05 02 26 30 27 (Minagricultura) y la Unidad Deforestation Control Implementadora del Proyecto Biocarbono UIP como gestor para el desarrollo la estrategia de fo CO-MADR-230654-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa apoyando al Ministerio de Integrated Land- Use Agricultura y Desarrollo Rural Planning and Improved 2021-05- 2021-05- 2021-06- 2021-05- 2021-06- 2021-12- TF / A6376 Posterior Individual Limited 42,000.00 0.00 En ejecución 2021-04-26 (Min agricultura) desde Governance for 04 01 02 22 26 23 CORPORINOQUIA y o Deforestation Control CORMACARENA como apoyo técnico para la implementación del Sistema de Información CO-MADR-230658-CS-INDV / Prestar sus servicios como Gestor técnico de gobernanza y control a la Integrated Land- Use deforestación, desde la Planning and Improved 2021-05- 2021-05- 2021-06- 2021-05- 2021-07- 2021-06- 2021-07- 2021-12- Dirección de Bosques, TF / A6376 Posterior Individual Limited 31,000.00 18,657.36 Firmado 2021-04-30 Governance for 04 05 09 26 14 30 30 27 Biodiversidad y Servicios Deforestation Control Ecosistémicos del Ministerio de Ambiente y Desarrollo Sostenible, para la formulación, seguimiento y cumplimient CO-MADR-230661-CS-INDV / Apoyar a la Dirección de Bosques, Biodiversidad y Servicios Ecosistémicos del Integrated Land- Use Ministerio de Ambiente y Planning and Improved 2021-05- 2021-05- 2021-05- 2021-06- 2021-12- Desarrollo Sostenible, a la TF / A6376 Posterior Individual Limited 37,371.00 0.00 En ejecución 2021-04-30 Governance for 04 05 26 30 27 Unidad implementadora del Deforestation Control Proyecto, y a los respectivos Departamentos en la planeación, programación, ejecución, monitoreo CO-MADR-231771-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa a la Dirección de Innovación, Sustainable Land- Use 2021-05- 2021-05- 2021-05- 2021-05- 2021-06- 2021-06- 2021-06- 2021-12- Desarrollo Tecnológico y TF / A6376 Posterior Individual Limited 10,971.00 10,212.48 Firmado 2021-04-30 Management 05 05 07 26 02 30 08 27 Protección Sanitaria del Ministerio de Agricultura y Desarrollo Rural como apoyo operativo para el seguimiento del Proyecto B CO-MADR-232603-CS-INDV / Prestar sus servicios profesionales apoyando a la Unidad Implementadora del Definition of Emission Proyecto UIP, para la Reduction Program and 2021-05- 2021-06- 2021-07- 2021-08- 2022-02- construcción del Marco de TF / A6376 Posterior Individual Open 22,857.00 0.00 Cancelado 2021-05-07 Monitoring, Reporting and 04 25 16 20 16 Gestión Ambiental y Social Verification del Programa de Reducción de Emisiones para la Orinoquia, de acuerdo con los lineamientos de la Iniciati CO-MADR-232604-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Dirección de Cambio Reduction Program and 2021-05- 2021-06- 2021-07- 2021-08- 2022-02- Climático y Gestión del TF / A6376 Posterior Individual Open 22,286.00 0.00 Cancelado 2021-05-07 Monitoring, Reporting and 31 25 16 20 16 Riesgo del Ministerio de Verification Ambiente y Desarrollo Sostenible (MADS), en el seguimiento de las acciones y políticas de reducción a la deforest CO-MADR-232605-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa para apoyar al MADR – Dirección Sustainable Land- Use 2021-07- 2021-05- 2021-06- 2021-07- 2022-01- de Innovación, Desarrollo TF / A6376 Posterior Individual Limited 24,286.00 0.00 En ejecución 2021-05-07 Management 28 12 02 07 03 Tecnológico y Protección Sanitaria en el desarrollo de agroecosistemas ganaderos sostenibles bajos en carbono en la Orinoq CO-MADR-234657-CS-INDV / Prestar sus servicios profesionales como Gestor Integrated Land- Use Senior para el seguimiento y Planning and Improved 2021-05- 2021-05- 2021-05- 2021-05- 2021-05- 2021-06- 2021-06- 2021-12- TF / A6376 Posterior Individual Direct 24,000.00 22,991.64 Firmado 2021-05-19 monitoreo del proyecto Governance for 22 22 26 25 26 04 01 31 Desarrollo Sostenible Bajo en Deforestation Control Carbono en la Región de la Orinoquia Page 12 CO-MADR-235332-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa Integrated Land- Use apoyando al Ministerio de Planning and Improved 2021-05- 2021-05- 2021-06- 2021-07- 2022-01- Agricultura y Desarrollo Rural TF / A6376 Posterior Individual Limited 10,293.00 0.00 En ejecución 2021-05-24 Governance for 28 29 19 24 20 (Min agricultura) y Deforestation Control específicamente a la Unidad de Planificación Rural Agropecuaria (UPRA) y a la Unidad Implementadora del CO-MADR-234498-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del paisaje Integrated Land- Use agropecuario, para apoyar la Planning and Improved 2021-05- 2021-05- 2021-05- 2021-06- 2021-06- 2021-07- 2021-06- 2022-01- TF / A6376 Posterior Individual Direct 13,535.00 12,568.61 Firmado 2021-05-21 coordinación de la Governance for 22 31 12 21 03 26 21 22 formulación de la Carta del Deforestation Control paisaje agropecuario, brindado el enfoque de ordenamiento territorial en todo el pr CO-MADR-237680-CS-INDV Definition of Emission / Profesional análisis Reduction Program and 2021-07- 2021-06- 2021-06- 2021-08- 2022-01- TF / A6376 Posterior Individual Limited 12,641.00 0.00 En ejecución 2021-06-04 distribución de la propiedad Monitoring, Reporting and 14 09 30 04 31 en la Orinoquia Verification CO-MADR-237682-CS-INDV Definition of Emission / Prestar servicios como Reduction Program and 2021-07- 2021-06- 2021-06- 2021-08- 2022-01- Profesional para el TF / A6376 Posterior Individual Limited 12,641.00 0.00 En ejecución 2021-06-04 Monitoring, Reporting and 14 09 30 04 31 diagnóstico de la tenencia de Verification la tierra en la Orinoquía CO-MADR-237683-CS-INDV / Prestar sus servicios profesionales con autonomía técnica y administrativa, apoyando a la Dirección de Project Coordination, 2021-06- 2021-06- 2021-06- 2021-06- 2021-08- 2021-08- 2021-08- 2022-01- Innovación, Desarrollo TF / A6376 Management, Monitoring Posterior Individual Limited 20,000.00 18,174.80 Firmado 2021-06-04 11 09 24 30 04 04 06 31 Tecnológico y Protección and Evaluation Sanitaria del Ministerio de Agricultura y Desarrollo Rural, como apoyo departamental del Proyecto Biocar CO-MADR-240007-CS-INDV / Prestar sus servicios profesionales con autonomía técnica, apoyando a la Definition of Emission Dirección de Cambio Reduction Program and 2021-06- 2021-06- 2021-07- 2021-08- 2022-08- Climático y Gestión del TF / A6376 Posterior Individual Limited 24,474.00 0.00 En ejecución 2021-06-18 Monitoring, Reporting and 16 23 14 18 18 Riesgo del Ministerio de Verification Ambiente y Desarrollo Sostenible (MADS), en el seguimiento de las acciones y políticas de reducción a la deforest Integrated Land- Use CO-MADR-240822-CS-INDV Planning and Improved Ejecución 2021-07- 2021-07- 2021-08- 2022-08- / Coordinador infraestructura TF / A6376 Posterior Individual Limited 39,663.00 0.00 2021-06-28 Governance for pendiente 03 24 28 28 de datos MADR-UPRA Deforestation Control Definition of Emission CO-MADR-240877-CS-INDV Reduction Program and 2021-06- 2021-07- 2021-07- 2021-08- 2022-02- TF / A6376 Posterior Individual Direct 13,714.00 0.00 En ejecución 2021-06-22 / Consultor mapas biomasa Monitoring, Reporting and 23 02 23 27 23 Verification CO-MADR-218462-CS-INDV / Apoyo encadenamientos Sustainable Land- Use 2021-03- 2021-03- 2021-05- 2021-10- productivos y circuitos cortos TF / A6376 Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-03-01 Management 06 27 01 28 bajos en carbono & negocios verdes CO-MADR-218276-CS-INDV / Evaluar y consolidar Sustainable Land- Use 2021-06- 2021-07- 2021-08- 2022-02- propuesta de turismo TF / A6376 Posterior Individual Open 55,000.00 0.00 Cancelado 2021-04-30 Management 18 09 13 09 sostenible asociado al sector AFOLU CO-MADR-218241-CS-INDV / Prestar sus servicios profesionales como Definition of Emission intérprete junior 1 para Reduction Program and 2021-02- 2021-03- 2021-04- 2021-10- TF / A6376 Posterior Individual Limited 11,000.00 0.00 Cancelado 2021-02-15 análisis de cambio de uso del Monitoring, Reporting and 20 13 17 14 suelo en el cubo de datos del Verification Sistema de Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-218242-CS-INDV / Consultor individual par el análisis de incertidumbre de Definition of Emission datos de actividad en el Reduction Program and 2021-03- 2021-03- 2021-04- 2021-10- TF / A6376 Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-02-26 grupo de Procesamiento Monitoring, Reporting and 03 24 28 25 Digital de Imágenes del Verification Sistema de Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-218243-CS-INDV / Consultor desarrollador para análisis de cambio de Definition of Emission uso del suelo en el grupo de Reduction Program and 2021-03- 2021-03- 2021-04- 2021-10- TF / A6376 Posterior Individual Limited 28,000.00 0.00 Cancelado 2021-02-26 Procesamiento Digital de Monitoring, Reporting and 03 24 28 25 Imágenes del Sistema de Verification Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-241138-CS-INDV Integrated Land- Use / Profesional apoyo cambio Planning and Improved 2021-06- 2021-07- 2021-07- 2021-07- 2021-07- 2021-08- 2022-08- TF / A6376 Posterior Individual Limited 25,227.00 20,895.96 En ejecución 2021-06-28 climatico- NORECCO - Governance for 29 03 01 24 30 28 28 Vichada Deforestation Control CO-MADR-241139-CS-INDV Sustainable Land- Use 2021-06- 2021-07- 2021-07- 2021-08- 2022-05- TF / A6376 Posterior Individual Limited 21,415.00 0.00 En ejecución 2021-06-28 / Apoyo MGS Vichada Management 29 03 24 28 25 CO-MADR-242940-CS-INDV Integrated Land- Use / Profesional Analista de Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2021-12- TF / A6376 Posterior Individual Limited 6,611.00 0.00 2021-07-16 información infraestructura Governance for pendiente 21 11 15 14 de datos Deforestation Control Integrated Land- Use CO-MADR-242941-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-08- / Líder monitoreo cultivos TF / A6376 Posterior Individual Limited 35,451.00 0.00 2021-07-16 Governance for pendiente 21 11 15 11 infraestructura de datos Deforestation Control Integrated Land- Use CO-MADR-242942-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-03- / Analista software calidad TF / A6376 Posterior Individual Limited 13,222.00 0.00 2021-07-16 Governance for pendiente 21 11 15 14 infraestructura de datos Deforestation Control Page 13 Integrated Land- Use CO-MADR-242943-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-09- / Apoyo gestión proyectos TF / A6376 Posterior Individual Limited 9,255.00 0.00 2021-07-16 Governance for pendiente 21 11 15 15 infraestructura de datos Deforestation Control CO-MADR-242944-CS-INDV Integrated Land- Use / Apoyo técnico SIG Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior Individual Limited 14,875.00 0.00 2021-07-16 monitoreo cultivos Governance for pendiente 21 11 15 14 infraestructura de datos Deforestation Control Integrated Land- Use CO-MADR-242945-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-05- / Arquitecto solución TF / A6376 Posterior Individual Limited 20,714.00 0.00 2021-07-16 Governance for pendiente 21 11 15 13 infraestructura de datos Deforestation Control CO-MADR-242946-CS-INDV Integrated Land- Use / Desarrollador servicios web Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2021-12- TF / A6376 Posterior Individual Limited 6,611.00 0.00 2021-07-16 interoperabilidad Governance for pendiente 21 11 15 14 infraestructura de datos Deforestation Control Integrated Land- Use CO-MADR-242947-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-03- / Desarrollador software TF / A6376 Posterior Individual Limited 15,536.00 0.00 2021-07-16 Governance for pendiente 21 11 15 14 funcionalidad UPRA Deforestation Control CO-MADR-242948-CS-INDV Integrated Land- Use / Desarrollador software Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior Individual Limited 15,536.00 0.00 2021-07-16 tablero infraestructura de Governance for pendiente 21 11 15 14 datos Deforestation Control Integrated Land- Use CO-MADR-242949-CS-INDV Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-05- / Diseñador gráfico TF / A6376 Posterior Individual Limited 10,357.00 0.00 2021-07-16 Governance for pendiente 21 11 15 13 infraestructura de datos Deforestation Control CO-MADR-242950-CS-INDV Integrated Land- Use / Profesional estandarización Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2021-12- TF / A6376 Posterior Individual Limited 6,611.00 0.00 2021-07-16 de la información Governance for pendiente 21 11 15 14 infraestructura de datos Deforestation Control CO-MADR-242951-CS-INDV Integrated Land- Use / Gestion del conocimiento, Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2022-07- TF / A6376 Posterior Individual Limited 22,036.00 0.00 2021-07-16 uso y apropiación Governance for pendiente 21 11 15 12 infraestructura de datos Deforestation Control CO-MADR-242952-CS-INDV Integrated Land- Use / Profesional en pruebas de Planning and Improved Ejecución 2021-07- 2021-08- 2021-09- 2021-12- TF / A6376 Posterior Individual Limited 5,288.00 0.00 2021-07-16 calidad servicios web Governance for pendiente 21 11 15 14 infraestructura de datos Deforestation Control Definition of Emission CO-MADR-242953-CS-INDV Reduction Program and Ejecución 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior Individual Limited 25,000.00 0.00 2021-07-16 / Profesional tipificación Monitoring, Reporting and pendiente 21 11 15 14 Verification CO-MADR-242986-CS-INDV Integrated Land- Use / Profesional ciencia política Planning and Improved 2021-08- 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior Individual Limited 14,875.00 0.00 En ejecución 2021-07-16 regularización de la Governance for 24 21 11 15 14 propiedad Deforestation Control CO-MADR-242987-CS-INDV Integrated Land- Use / Jurídico estrategia Planning and Improved 2021-08- 2021-07- 2021-08- 2021-09- 2022-03- TF / A6376 Posterior Individual Limited 13,883.00 0.00 En ejecución 2021-07-16 regularización de la Governance for 24 21 11 15 14 propiedad Deforestation Control Definition of Emission CO-MADR-242996-CS-INDV Reduction Program and 2021-07- 2021-09- 2021-09- 2021-10- 2022-04- TF / A6376 Posterior Individual Open 25,416.00 0.00 En ejecución 2021-07-16 / Supervisor local IFN Monitoring, Reporting and 19 03 24 29 27 Verification CO-MADR-242999-CS-INDV / Implementar las salvaguardas establecidas a Definition of Emission nivel nacional, con las Reduction Program and Ejecución 2021-09- 2021-09- 2021-10- 2022-04- comunidades de la región, y TF / A6376 Posterior Individual Open 25,102.00 0.00 2021-07-16 Monitoring, Reporting and pendiente 03 24 29 27 desarrollar los reportes de Verification dichas actividades de acuerdo con los lineamientos nacionales (MGAS, PPI, MP) Definition of Emission CO-MADR-243001-CS-INDV Reduction Program and Ejecución 2021-09- 2021-09- 2021-10- 2022-04- TF / A6376 Posterior Individual Open 20,000.00 0.00 2021-07-16 / Desarrollador IFN Monitoring, Reporting and pendiente 03 24 29 27 Verification Definition of Emission CO-MADR-243540-CS-INDV Reduction Program and 2021-08- 2021-08- 2021-08- 2021-10- 2022-03- / Ingeniero de sistemas TF / A6376 Posterior Individual Limited 15,000.00 0.00 En ejecución 2021-08-02 Monitoring, Reporting and 02 07 28 02 31 AFOLU Verification Definition of Emission CO-MADR-243541-CS-INDV Reduction Program and 2021-07- 2021-09- 2021-10- 2021-11- 2022-07- TF / A6376 Posterior Individual Open 25,157.00 0.00 En ejecución 2021-07-31 / Consultor MGAS Monitoring, Reporting and 19 18 09 13 11 Verification CO-MADR-243542-CS-INDV Definition of Emission / Profesional intérprete de Reduction Program and 2021-07- 2021-07- 2021-07- 2021-08- 2021-07- 2021-09- 2021-08- 2022-01- TF / A6376 Posterior Individual Direct 15,061.00 12,462.72 Firmado 2021-07-16 imágenes cubo de datos Monitoring, Reporting and 19 26 21 16 21 20 17 18 IDEAM Verification Definition of Emission CO-MADR-244991-CS-INDV Reduction Program and 2021-07- 2021-08- 2021-08- 2021-09- 2022-09- TF / A6376 Posterior Individual Limited 47,066.00 0.00 En ejecución 2021-07-30 / Escritor principal ERPD Monitoring, Reporting and 30 04 25 29 29 Verification Integrated Land- Use CO-MADR-245000-CS-INDV Planning and Improved 2021-08- 2021-08- 2021-09- 2021-10- 2022-04- / Profesional distribución y TF / A6376 Posterior Individual Limited 12,727.00 0.00 Bajo Revision 2021-08-16 Governance for 25 21 11 16 14 tenencia de la tierra Deforestation Control CO-MADR-245002-CS-INDV Integrated Land- Use / Profesional con Experticia Planning and Improved 2021-08- 2021-08- 2021-09- 2021-10- 2022-04- TF / A6376 Posterior Individual Limited 12,727.00 0.00 Bajo Revision 2021-08-16 en Ordenamiento Social de La Governance for 25 21 11 16 14 Propiedad Rural Deforestation Control Page 14