SFG3778 Environmental and Social Management Plan for Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Jiangxi PMO November 2017 1 Project name: Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Entrusted by: Jiangxi Provincial Water Investment Group, PMO of World Bank-Financed Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Assessed by: Beijing Research Institute of Uranium Geology Institution qualification certificate No.: National EIA A No. 1057 Institution leader: Li Ziying Company address: No. 10, Anwai XiaoGuanDongLi, Chaoyang District, Beijing Contact information: 010-84802421 (Office) General leader of project: Liu Yuemiao Compiled by: Yang Ying, Wang Zhongqiong, Liang Bin, Wang Feiyu, Ma Xiao, Zou Zhaozhuang, Su Dongxu and Han Chaole 2 Contents Chapter I Project Introduction ........................................................................................................................... 4 1.1 Project Background ................................................................................................................................. 4 1.2 Purpose of the Environmental and Social Management Plan ................................................................ 11 1.3 Compilation of the Environmental and Social Management Plan......................................................... 11 1.4 Design of the Environmental and Social Management Plan ................................................................. 11 Chapter II Policies, Laws and Administrative Management Framework ........................................................ 13 2.1 Policies, Laws and Regulations for Environmental Protection ............................................................. 13 2.2 Assessment Standards ........................................................................................................................... 15 Chapter III Environmental Management System ............................................................................................ 18 3.1 Environmental Management System ..................................................................................................... 18 3.2 Capabilities and Responsibilities of Environmental Management Institutions ..................................... 21 3.3 Environmental Management Training ................................................................................................... 25 Chapter IV Environmental Social Impact and Mitigation Measures ............................................................... 27 Chapter V Environmental Monitoring Plan..................................................................................................... 56 5.1 Purpose of monitoring ........................................................................................................................... 56 5.2 Environmental Monitoring Agency ....................................................................................................... 56 5.3 Implementation of monitoring ............................................................................................................... 56 Chapter VI Public Complaint Mechanism....................................................................................................... 75 6.1 Continuous Public Engagement Plan .................................................................................................... 75 6.2 Complaints and grievances channels ..................................................................................................... 75 Chapter VII Information Management of Environmental Social Management Plan ...................................... 78 7.1 Information exchange ............................................................................................................................ 78 7.2 Record mechanism ................................................................................................................................ 78 7.3 Reporting mechanism ............................................................................................................................ 78 7.4 Document Management ......................................................................................................................... 80 Chapter VIII Estimation of Environmental Investment ................................................................................... 81 Appendix I Implemented environment protection regulations Appendix II Material resources management plan Appendix III Checklist for Environmental Pollution Alleviation Measures of Project of Urban & Rual Water Supply Integration and Rural Sewage Treatment in Jiangxi Province, China. 3 Chapter I Project Introduction 1.1 Project Background The 13th Five Year Plan (FYP) of Jiangxi Province proposes to create a powerful modern agricul- tural province. The prerequisite of agricultural development is to guarantee the safety of rural drinking water and to ensure a healthy water environment. Therefore, when establishing its 13th FYP, Jiangxi Province has proposed water supply and wastewater management in rural areas as a prioritized task and as one of the poverty alleviation measures across the province. The provincial government clearly stated in the 13th FYP that by the end of 2020, 90% of the rural population across the province will have access to piped water supply, wastewater management rate at County level will be up to 85% and wastewater management in rural areas below County level will enjoy substantial improvement. Since 2009, Jiangxi Provincial Water Investment Group has established an integrated urban and rural water supply model, with the government as the liability party and the company as the investment party. With the help of overall planning and reallocation of public ser- vice resources in less-developed economic regions, it has improved the safety of drinking water in rural areas and the utilization rate of water resources. Using reasonable layouts of water source lo- cations, water plants and pipe networks, it allows for the further urbanization and development of the industrial park. Jiangxi Provincial Water Investment Group had applied for a loan of 200 million USD from the World Band for the Jiangxi Integrated Rural and Urban Water Supply and Wastewater Manage- ment Project, with an estimated total investment of about 2.4 billion RMB. The locations of the project are distributed across the 7 counties of Fuzhou, Ji’an, Jiujiang, Jingdezhen etc, including Yongxin County of Ji’an City, Jinxi County, Linchuan County, Nanfeng County and Dongxiang District of Fuzhou City, Xiushui County of Jiujiang City and Leping City of Jingdezhen City. The main construction work include urban water supply, rural water supply and rural wastewater man- agement. Refer to Figure 1.1-1 for the locations of the project. Refer to Table 1.1-1 for details on the construction work. 4 Figure 1.1-1 Distribution map of World Bank-Financed Jiangxi Provincial Integrated Rural and Urban Water Supply and Wastewater Management Project. 5 Table 1.1-1 Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Type Subproject Project Investment No Content and Construction Scale Name Nature (10,000RMB) I. Construction and Renovation of Water Supply Infrastructure Improvement of urban water 1 supply facilities New Construc- New New construction of one auto-flowing pontoon of 100,000 m3/d and 21.5 km DN1200 muddy wa- tion of Urban con- ter pipe; new waterworks construction in southern city, 50,000 m3/d in the short term and 100,000 20,299.84 Waterworks in struc- m3/d in the long term; new construction of 11.2 km DN900 main delivery pipe of clean water, Yongxin County tion with the county area as its service scope New Construc- New tion of Urban New construction of water intake engineering, 55,000 m3/d pumping house in the short term; new con- Waterworks in construction of two DN800 raw water pipes of 2.4 km; new construction of waterworks, 50,000 9,198 struc- Linchuan Dis- m3/d in the short term, with the urban area as its service scope tion trict New Construc- New Renovation tion of Urban New construction of water intake engineering, 42,000 m3/d pumping house; new construction of con- and new Waterworks in DN800 raw water pipe of 17.4 km; new construction of waterworks, 40,000 m3/d in the short 8,685.25 struc- construc- Dongxiang Dis- term; with the county area as its service scope 1.1 tion tion of ur- trict ban wa- Exten- terworks Extension of si- New construction of water intake engineering, extending the pumping house to 105,000 m3/d from Urban Water- on/new 85,000 m3/d; new construction of 22.6 km DN1200 raw water pipe, extending the waterworks to 10,953.29 works in con- 100,000 m3/d from 50,000 m3/d, covering 29403 households,with the county area as its service Xiushui County struc- scope tion Exten- Extension of si- New construction of water intake engineering, pumping house of 120,000 m3/d of the total scale Urban Water- on/new of water intake; new construction of 36.9 km DN1000 raw water pipe, extending the waterworks 13,341.77 works in Leping con- to 100,000 m3/d from 50,000 m3/d, with the county area as its service scope City struc- tion 6 Type Subproject Project Investment No Content and Construction Scale Name Nature (10,000RMB) Renovation of Urban Pipe Reno- Renovation of 6.97 km DN100~DN500 water supply pipe network, new construction of 41.3 km Network of Tap 5,873.35 vation DN300~DN800 water supply pipe network, with the county area as its service scope Water in Yongxin County Renovation and Renova New Construc- va- tion of Urban tion/ne Renovation of 13.4 km DN200~DN600 pipe network, new construction of 22.9 km Pipe Network of 7,306.56 w con- DN200~DN1000 pipe network, with the urban area as its service scope Tap Water in struc- Linchuan Dis- tion trict Renovation Renovation of Renova and new Urban Pipe va- construc- Network of Tap tion/ne Renovation of 16.3 km DN200~DN1000 pipe network, new construction of 6.74 km 1.2 tion of ur- 8,748.75 Water in w con- DN600~DN800 pipe network, with the county area as its service scope ban water Dongxiang Dis- struc- supply pipe trict tion network Renovation and Renova New Construc- va- tion of Urban tion/ne Renovation of 10.5 km DN500~DN600 pipe network, new construction of 24.1 km 6,680.73 Pipe Network of w con- DN300~DN500 pipe network, with the county area as its service scope Tap Water in struc- Jinxi County tion Renova New Construc- va- tion and Reno- tion/ne Renovation and new construction of 149 km DN200~DN1000 pipe; with the county area as its vation of Urban 21,027.7 w con- service scope Pipe Network in struc- Xiushui County tion 7 Type Subproject Project Investment No Content and Construction Scale Name Nature (10,000RMB) Renova New Construc- va- tion and Reno- Renovation of 15.1 km DN200~DN1000 nodular cast iron pipe and 112 m steel pipe across river; tion/ne vation of Urban new construction of 40.9 km DN200~DN700 nodular cast iron pipe, with the county area as its 9,654.28 w con- Pipe Network in service scope struc- Leping City tion Consolidation and upgrading 2 of rural drinking water safety Extension of New Extending to 40 villages in Shiqiao Town, Caifeng Town, Lianzhou Town, Huaizhong Town and Pipe Network in con- Gaoqiaolou Town from the pipe network of the county’s waterworks, new construction of 24.7 km 5,260.45 Towns of struc- DN200-DN500 pipe network, covering 16035 households Yongxin County tion Extension of New Pipe Network in con- Extending to 22 villages in Zuofang Town, Shuangtang Town and Heshi Town from the pipe net- 2,852.68 Towns of Jinxi struc- work of the county’s waterworks, new construction of 34.4 km DN200-DN300 pipe network County tion Extension of New Pipe Network in Extending to 36 villages in Wenquan Town, Liancheng Town and Chonggang Town from the pipe con- Towns of network of the county’s waterworks, new construction of 14 km DN200~DN300 pipe network, 1,357.5 struc- Extension Linchuan Dis- covering 5643 households tion of counties’ trict 2.1 pipe net- Extension of New work Pipe Network in Extending to 54 villages in Dengjia Town, Gangshangji Town, Huxu Town, Pogan Town, con- Towns of Xushangqiao, Xiaohuang Town, Xiaogang Town from the pipe network of the county’s water- 8,520.19 struc- Dongxiang Dis- works, new construction of 40.9 km DN200~DN300 pipe network, covering 52252 households tion trict Extension of New Extending to 27 villages in Shishan Town, Qiawan Town and Laixi Town from the pipe network Pipe Network in con- of the county’s waterworks, new construction of 19.5 km DN200~DN350 pipe network, covering 2,378.58 Towns of struc- 6807 households Nanfeng County tion Extension of New Extending to 28 villages in Jiedu Town, Legang Town and Hougang Town from the pipe network Pipe Network in con- of the county’s waterworks, new construction of 21.3 km DN200~DN300 pipe network and two 12,440.68 Towns of Leping struc- integrated booster pump stations, covering 17893 households City tion 8 Type Subproject Project Investment No Content and Construction Scale Name Nature (10,000RMB) Consolidation and Upgrading New Laying 49.47 km pipe network in Longyuankou Town, Yange Town and Zaizhong Town; new of Rural Drink- con- construction of one booster pump station, covering a total of 22 villages, covering 3547 house- 661.3 ing Water Safety struc- holds in Yongxin tion Renovation County and exten- New Construc- sion of ru- tion and Reno- New 2.2 New construction and renovation of pipe network of the original waterworks in Zhajin Town, ral water vation of Pipe con- Ma’ao Town, Xigang Town, Shankou Town and Gangkou Town, covering a total of 46villages, 8,264.85 supply pipe Network in struc- covering 23990 households, new construction of 65.5 km DN200~DN600 pipe network network Towns of tion Xiushui County Extension of New Extension of pipe network of the original Wukou, Lingang, Yongshan, Xingfu, Dongfanghong, Pipe Network in con- Nangang, Lilin, Zhongbu and Zhenqiao waterworks in nine towns, covering a total of 77 villages, 5,642.22 Towns of Leping struc- new construction of 44.3 km DN200~DN300 pipe network and 17 integrated booster pump sta- City tion tions, covering 55945 households New Construc- New construction of one box-type water intake head, with 1,200 m3/d of its intake scale; new con- tion of Water- New struction of two DN200 raw water pipes of 90m; new construction of waterworks of 1,200 m³/d in New con- works in con- Huangtong Town; new construction of 8 km DN200~DN250 pipe network of waterworks and 1,983.61 struction, Huangtong struc- 150m DN200 steel pipe network, 4 villages in Huangtong Town as its service scope, covering renovation Town of Jinxi tion 12154 households 2.3 and expan- County sion of ru- Renovation and Reno- ral water- Expansion of vation Extending Lilin Waterworks to 10,000m3/d from 5,000 m3/d, 26 villages in Lilin Town as its ser- works Waterworks in and 3,964.49 vice scope the Town of exten- Leping City sion II. New Construction of Rural Wastewater Treatment Facilities New construction of New wastewater pipe network and con- New construction of wastewater treatment plant of 2,000 m3/d and 14.5km DN300~DN400 HDPE 1 4,496.03 treatment plant in Zhajin Town struc- wastewater pipe network, covering 2,800 households of Xiushui County tion III. Improvement and Enhancement of Service Quality: Water Supply Pipe Storage Engineering, Layout of Pipe Network Monitoring, Information Management Sys- 9 Type Subproject Project Investment No Content and Construction Scale Name Nature (10,000RMB) tem of Water Supply Pipe Network, etc. 10 1.2 Purpose of the Environmental and Social Management Plan The environmental and social management plan aims to establish practical measures which improve activities such as project site selection, planning, design and implementation, thus preventing, eliminating, alleviating or compensating adverse environmental impact and enhancing favorable environmental impact. Throughout the implementation of the entire project, adverse environmental impact is alleviated and managed by taking such measures, while the actual effect of alleviation measures is assessed by implementing environmental monitoring. Suggestions for the further im- provement of alleviation measures are proposed based on these monitoring results. The functions of environmental and social management plan are to propose necessary alleviation measures, monitoring measures, legal supervision methods as well as guarantees for the aforemen- tioned measures. These are to be applied during project implementation and operation. Meanwhile, it is also a crucial tie linking environmental impact to alleviation and substitution measures during the environmental impact assessment. The environmental and social management plan stipulates technical expertise, implementation plan, institutions that perform the execution and supervision, monitoring as well as the estimation and source of investment funds for each environmental man- agement measure. To achieve the target of reduction, methods involving environmental impact as- sessment report and the environmental and social management plan must be applied. 1.3 Compilation of the Environmental and Social Management Plan The environmental and social management plan of China Jiangxi Integrated Rural and Urban Wa- ter Supply and Wastewater Management Project was compiled by the project owner and environ- mental impact assessment company. The environmental and social management plan of the entire project has been compiled based strictly on national and provincial laws and regulations for envi- ronmental management. On the premise of meeting relevant Chinese laws and regulations for envi- ronmental protection, it also meets the requirements of safety guarantee policy of the World Bank. 1.4 Design of the Environmental and Social Management Plan The environmental and social management plan is an action plan based on environmental and social impact assessments. It is established to alleviate anticipated, potential and adverse environmental and social impact during project implementation and to enhance environmental and social benefits of the project. It includes the following four main parts: (1) Environmental impact and alleviation measures: main environmental impacts of project con- struction and operation periods; engineering and management measures are taken to prevent or alle- viate adverse environmental impact from the project. (2) Establishment of environmental management institutions: environmental management institu- tions and management systems are established to guarantee synchronous implementation of envi- ronmental protection measures, engineering construction and operation. (3) Environmental monitoring: environmental monitoring is performed to guarantee engineering operational safety and effectiveness of environmental protection measures. (4) Capability development (i.e. personnel training) plan: during project implementation, knowledge and skill trainings are provided for management, environment supervision, full-time or part-time environmental management personnel to guarantee implementation of environmental and social management plan. Focusing on the characteristics of the project, two attachments have been compiled for the Plan, including: (1) Implementation procedure of environmental protection: focusing on the common environmental impact of plumbing pipe network construction and other civil works (water and wastewater treat- ment plants) of the project during construction and operational periods, general solutions and alle- viation measures are established which will be considered as environmental management require- ments and included into tender documents and relevant civil contracts for the future implementation of the project; (2) Management plan of physical cultural resources: according to requirements of physical cultural resources policy (OP4.11) of the World Bank, specific actions and protective measures are estab- lished for local physical cultural resources (include 6 ancient trees and 1 ancestral temple) which may be affected directly/indirectly during construction and operation of the project. They will also be adopted by relevant sub-category projects in the future. Chapter II Policies, Laws and Administrative Management Framework According to provisions of Notice on Enhancing Environmental Impact Assessment Management of Projects with Loan from International Financial Institution, Jiangxi Provincial Integrated Rural and Urban Water Supply and Wastewater Management Project must implement Chinese laws, regula- tions and standards for environmental protection as well as its environmental impact assessment system. While implementing relevant Chinese laws and regulations for environmental protection, it shall also abide by the technical requirements of international financial institutions. 2.1 Policies, Laws and Regulations for Environmental Protection 2.1.1 National Laws and Regulations (1) Environmental Protection Law of the People's Republic of China (Implemented on Dec. 26,1989 and revised on April 24, 2014); (2) Environmental Impact Assessment Law of the People's Republic of China (Implemented on September 1, 2003 and revised on July 2, 2016); (3) Water and Soil Conservation Law of the People's Republic of China (Implemented on June 29, 1991 and revised on December 25, 2010); (4) Land Management Law of the People's Republic of China (Implemented on January 1, 1987 and revised on August 28, 2004); (5) Air Pollution Control Law of the People's Republic of China (Implemented on June 1, 1988 and revised on August 29, 2015); (6) Environmental Noise Pollution Control Law of the People's Republic of China (Implemented on March 1, 1997); (7) Water Pollution Control Law of the People's Republic of China (Implemented on May 11, 1984 and revised on February 28, 2008); (8) Solid Waste Polluting Environment Control Law of the People's Republic of China (Imple- mented on April 1, 1996 and revised on November 7, 2016); (9) Regulations for Environmental Protection Management of Construction Projects the Sate Council Decree No. 253 (Implemented on November 29, 1998); 2.1.2 Local Laws and Regulations and Administrative Provisions (1) Jiangxi Province Regulation for Pollution Prevention and Control (Implemented on January 1, 2009); (2) Jiangxi Province Regulation for Environmental Pprotection of Construction Projects (Imple- mented on April 29, 1995 and revised on September 17, 2010); (3) Jiangxi Province Methods for Implementing Land Management Law of the People's Republic of China (Implemented in December 1986). (4) Jiangxi Province Technical Guidance (trial) for Rural Diffused and Domestic Pollution Con- trol, 2011. (5) Jiangxi Province Prevention and Control Methods for Water Source Pollution of Domestic Potable Water (Implemented on August 1, 2006); (6) Jiangxi Province Regulation for Water Resource (Implemented on March 30, 2006); 2.1.3 Technical Specifications (1) Technical Guidelines for Environmental Impact Assessment General Principle (HJ2.1-2011), implemented on January 1, 2017; (2) Control Standards for Soil and Water Erosion on Development and Construction Projects (GB50434-2008), implemented on July 1, 2008; (3) Notice on Practically Enhance Risk Prevention and Strict Environmental Impact Assessment Management Ministry of Environmental Protection Issued [2012] No. 98, implemented on July 3, 2012; 2.1.5 Safety Guarantee Policy of the World Bank The safety guarantee policy serves as the due diligence of the World Bank on the social and envi- ronmental impacts attributed by World Bank- financed projects. It includes the analysis of potential impact and measures to alleviate negative impact. According to the assessed project impact, this project involves the following safety guarantee policies of the World Bank: (1) Environmental assessment (OP/BP 4.01) (2) Physical cultural resources (OP/BP 4.11) (3) Non-voluntary immigration (OP/BP 4.12) (4) Dam safety (OP/BP 4.37) (5) Information disclosure (BP17.50) In addition, environmental quality and pollutant discharge standard of this project shall also fulfill the standards and requirements stated in General EHS Guidelines, Water and EHS Guidelines and Waste Management Facility EHS Guidelines. 2.2 Assessment Standards 2.2.1 Environmental Quality Standards 2.2.1.1 Air Quality Standards (1) Ambient air: Classified under Category II, ambient air quality zone shall follow Level II stand- ard in Ambient Air Quality Standards (GB3095-2012). Refer to the following Table for Ambient Air Quality Standards (GB3095-2012) Table 2.2-1 Ambient Air Quality Standards (GB3095-2012) Pollutant name Sampling time Level II standard value (mg/Nm3) TSP Daily average 0.30 2.2.1.2 Environmental Quality Standards for Surface Water Surface water in assessment zone follows Category II and III standard in Environmental Quality Standards for Surface Water (GB3838-2002). Refer to Table 2.2-2 for standard values. Table 2.2-2 Environmental Quality Standards for Surface Water (Excerpt) Unit: mg/L (exclude pH) Petroleum Item pH COD BOD5 DO NH3-N Total phosphorus category Category II standard 6-9 ≤15 ≤3 ≥6 ≤0.05 ≤0.5 0.1 Category III stand- 6-9 ≤20 ≤4 ≥5 ≤0.05 ≤1.0 0.2 ard 2.2.1.3 Environmental Quality Standards for Noise Level As the project is located in a rural area, it follows Category 1 & 2 in Environmental Quality Stand- ards for Noise Levels (GB3096-2008). Category 1 applies to Villages and Category 2 to towns. Re- fer to the following Table for standard values. Table 2.2.-3 Current situational assessment standards of noise levels Unit: dB (A) Period Daytime Night-time Standard Category 1 55 45 Category 2 60 55 2.2.2 Pollutant Discharge Standards (1) Waste gas: Emission of waste gas for the project follows Level II standard in Integrated Emis- sion Standard of Air Pollutants (GB16297- 1996) and discharge of air pollutant for wastewater treatment plant follows Level II standard requirements in Table 4 of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002). Refer to the following table for specific standard values. Table 2.2-4 Discharge standards of air pollutants for project Unit: mg/m3 Monitoring concentration limit of intermittent discharge Pollutant Standard Monitoring point Concentration (mg/m3) Maximum concentration point, TSP 1.0 Level II in GB16297-1996 beyond perimeter Table 2.2-5 Maximum concentration tolerance of emission of waste gas at boundary of town wastewater treatment plant Pollutant Unit Guideline value 3 Ammonia mg/m 1.5 3 Hydrogen sulfide mg/m 0.06 (2) Sewage and wastewater: In 2006, the now-defunct National Bureau of Environmental Protection issued a revision for the Discharge Standards of Pollutants for Municipal Wastewater Treatment Plants. The revision indi- cated that Standard B of Level I standard shall be followed when draining outlet water of wastewater treatment plant to Category III functional surface water (exclude classified potable wa- ter source conservation area and swimming area) in GB3838 and to Category II functional seawater in GB3097. Currently, there are no discharge standards for domestic wastewater management in rural China. As a result, discharge of domestic wastewater management in rural areas is required to have the endurance capacity of the local economy, maturity of technology, reliability of operation and other factors in consideration. The receiving water body of this project is known as Zhajin Wa- ter, which belongs to the Xiuhe source and its water quality target is Category III based on func- tional zone classification of water environment in Jiangxi Province. The water functional zone is considered the reserve for Zhajin in Xiushui Town and the discharge standard of project domestic sewage in rural areas adopts Standard B of Level I based on Discharge Standard of Pollutants for Municipal Wastewater Treatment Plants. Refer to the following table for details. Table 2.2-6 Discharge Standards of Pollutants for Municipal Wastewater Treatment Plants Unit: mg/L (exclude pH) Pollution factor pH COD BOD5 NH3-N TP Level I standard (Standard B) 6-9 60 20 8(15) 1 (3) Noise: Noise during construction follows the standard limit in Emission Standard of Environ- ment Noise for Boundary of Construction Site (GB12523-2011), refer to Table 2.2-7; periphery noise during project operational period follows standard of Category 1 & 2 zone in Emission Standard for Industrial Enterprises Noise at Boundary (GB 12348-2008), refer to Table 2.2-8. Table 2.2-7 Emission Standard Limit of Environment Noise for Boundary of Construction Site Unit: dB (A) Daytime Night-time 70 55 Table 2.2-8 Emission Standard Limit for Industrial Enterprises Noise at Boundary Unit: dB (A) Standard Daytime Night-time Category 1 55 45 Category 2 60 50 Chapter III Environmental Management System 3.1 Environmental Management System As the Owning Company of China Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project financed by the World Bank, the Water Conservation Bureau in Jiangxi Province has established a leading group (provincial project leading group or PLG for short) for the World Bank-financed Integrated Rural and Urban Water Supply and Wastewater Manage- ment Project. The PLG mainly takes charge of organizing, leading and coordinating the construc- tion of urban and rural water supply and wastewater management project, researching and deploy- ing project financing and implementation as well as deciding, planning, guiding and coordinating relevant issues during project preparation and implementation. The office under the PLG, mainly takes charge of the day-to-day coordination and implementation of the project, organizing and holding regular meetings regularly as well as supervising and urging project preparation and im- plementation. During the project construction stage, Water Conservation Bureau in Jiangxi Province entrusted Jiangxi Provincial Water Investment Group to establish “PMO of World Bank -Financed Jiangxi Provincial Integrated Rural and Urban Water Supply and Wastewater Management Project” (pro- vincial PMO or PPO for short). As the legal institution of project construction, it mainly takes charge of project differentiation, preparation, pre-assessment, assessment, negotiation and imple- mentation. The PMO is under the supervision of the PLG and its office. Each project County (city) establishes its own County (city) leading group and office to lead and coordinate the World Bank projects in areas under its jurisdiction. They are required to coordinate the construction of local integrated urban and rural water supply and wastewater management pro- jects, and to solve relevant issues such as land requisition, relocation, immigration and environ- mental protection during project implementation which need to be dealt with at the governmental level. During the project operational stage, Water Investment & Water Affairs Group undertakes opera- tional management responsibilities of water supply sub-item under the project and the Water In- vestment Ecological Environment Company undertakes sewage sub-item. As the environmental management of construction and operational periods vary greatly and have different time limits (temporal or long-term), the contractor and operation provider shall establish institutions based on the different stages and practice the model of staged responsibilities. After completing construction, the corresponding management institution shall be annulled immediately and the management institution of operational period shall commence operation. A certain overlap- ping period is allowed based on the specific situation. Refer to Figure 3-1 and 3-2 for environmental management institutions of construction and operational periods. World Bank PRC Ministry of Environmen- tal Protection Water Conservation Bureau in JIiangxi established “Provincial Project Leading Group” (PLG) , which oversees the PLG office Environmental Protection Bureau in Jiangxi Jiangxi Provincial Water Investment Group Each County Leading Group (CLG)established their respective CLG World Bank PMO Jiangxi Water Group office Co., Ltd. Bureau of individual project County Environmental Contractor External monitoring EIA Company Institution Design Com- Engineering Supervi- pany sion Institution Supervision/Management relationship Coordination/Cooperation relationship Figure 3-1 Environmental Protection Management System during construction PRC Ministry of Environmental World Bank Protection Water Conservation Bureau in JIiangxiestab- lished “Provincial Project Leading Group”(PLG), which oversees the PLG office Environmental Pro- tection Bureau in- Jiangxi Jiangxi Provincial Water Investment Group Jiangxi Water Jiangxi Provincial Group Co., Ltd. Water Investment Ecological Resource Development Group Co., Ltd. County Environmental Bureau of individual project Water supply pro- Wastewater jects projects External monitoring Institution Supervision/Management relationship Coordination/Cooperation relationship Figure 3-2 Environmental Protection Management System during operation 3.2 Capabilities and Responsibilities of Environmental Management Institutions As environmental management varies greatly during construction and operation, different departments are respon- sible for the implementation of the environmental and social management plan. To ensure the seamless imple- mentation of the project environmental and social management plan, several full- and part-time environmental management personnel have been assigned to the project owner, provincial PMO, contractor, construction super- vision institution and operation provider. Refer to Table 3-1 for environmental management responsibilities and personnel allocation of each project management institution at different stages of project implementation. Table 3-1 Environmental Management Responsibilities of Relevant Institutions Person- Phase Related project party Main environmental management responsibilities nel allo- cation Water Conservation Bu- Owning company organizes and coordinates the construction reau in Jiangxi Province 1 of the World Bank-financed project (oversees PLG) Jiangxi Provincial Water Undertakes responsibilities such as project selection and ar- 1 Investment Group rangement of supporting funds. 1. Takes charge of environmental protection management during project design and preparation stages. 2. Takes charge of coordinating and implementing environ- Provincial PMO mental management issues with relevant environmental de- 1 Design partments of the government. and 3. Invites consultation institutions such as design and envi- prepa- ronmental impact assessment companies. ration 1. Includes environmental protection measures into design plan and budget. Design company 2. Includes alleviation measures in environmental and social 3 management plan into technical specification of tender documents. 1. Provides technical support for environmental protection of engineering design. Environmental impact as- 2. Compiles project environmental impact assessment docu- 5 sessment company ments. 3. Establishes environmental and social management plan. 1. Takes charge of environmental protection management. Implement environmental protection funds during project constructionphase. 2. Manages and supervises environmental protection during construction phase. Investigates and resolves disturbance disturbance s caused towards residents and pollution issues Con- during construction. struc- Provincial PMO 1 3. Takes charge of coordinating and implementing environ- tion mental management issues with relevant environmental pro- phase tection departments of the government. 4. Tracks implementation of environmental and social ma- nagement plan and send regular reports to relevant de- partments and the World Bank. 5. Handles public complaints. Integrated urban and rural 1. Manages and supervises environmental protection of 1 Person- Phase Related project party Main environmental management responsibilities nel allo- cation water supply PMO of sub-projectprojects of Yongxin County. Investigates and Yongxin County resolves disturbance disturbance s caused towards residents and pollution issues during construction. 2. Takes charge of coordinating and implementing environ- mental management issues with local relevant environmental protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Yongxin County and reports to provincial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-projectproject of Linchuan County. Investigates and re- solves disturbance disturbance s caused towards residents and pollution issues during construction. Integrated urban and rural 2. Takes charge of coordinating and implementing environ- water supply PMO of mental management issues with local relevant environmental 1 Linchuan County protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Linchuan County and reports to provincial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-project of Jinxi County. Investigates and resolves dis- turbance disturbances caused towards residents and pollution issues during construction. Integrated urban and rural 2. Takes charge of coordinating and implementing environ- water supply PMO of Jinxi mental management issues with local relevant environmental 1 County protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Jinxi County and reports to provincial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-project of Leping County. Investigates and resolves dis- turbance disturbance s caused towards residents and pollu- tion issues during construction, Integrated urban and rural 2. Takes charge of coordinating and implementing environ- water supply PMO of Lep- mental management issues with local relevant environmental 1 ing County protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Leping County and report to provincial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-project of Nanfeng County. Investigates and resolves disturbance disturbance s caused towards residents and Integrated urban and rural pollution issues during construction, water supply PMO of 1 Nanfeng County 2. Takes charge of coordinating and implementing environ- mental management issues with local relevant environmental protection departments. 3. Tracks implementation of environmental and social ma- Person- Phase Related project party Main environmental management responsibilities nel allo- cation nagement plan of Nanfeng County and reports to provincial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-project of Dongxiang County. Investigates and resolves disturbance disturbance s caused towards residents and pollution issues during construction. Integrated urban and rural 2. Takes charge of coordinating and implementing environ- water supply PMO of mental management issues with local relevant environmental 1 Dongxiang County protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Dongxiang County and reports to provin- cial PMO regularly. 4. Handles public complaints. 1. Manages and supervises environmental protection of sub-project of Xiushui County. Investigates and resolves disturbance disturbance s caused towards residents and pollution issues during construction. Integrated urban and rural 2. Takes charge of coordinating and implementing environ- water supply PMO of mental management issues with local relevant environmental 1 Xiushui County protection departments. 3. Tracks implementation of environmental and social ma- nagement plan of Xiushui County and reports to provincial PMO regularly. 4. Handles public complaints. 1. Launches and implements environmental protection measures and various works during construction phase, as per tender documents, contract and the environmental and social management plan. Each en- 2. Accepts guidance and supervision of environmental man- gineering agement personnel of the PMO construction supervision en- contractor gineer and relevant functional departments of the govern- to arrange ment. at least 1 Contractor environ- 3. Accepts technical support provided by environmental pro- mental tection consultation institution. manage- 4. Takes safety preventive measures, for eg. Setting up in- ment formation signs on construction site and enclosing construc- person tion site with a boundary. Establishes communication chan- nels with the public to guarantee construction safety. 5. Implements environmental and social management plan. Each con- 1. Supervises contractor to implement environmental and struction social management plan. Carries out environmental allevia- supervi- tion measures in the contract. sion to 2. Supervises contractor’s implementation on site. arrange at Construction supervision least 1 3. Cooperates with owner in environmental management. environ- 4. Records implementation of environmental and social mental management plan. Compile reports and report to owner reg- manage- ularly. ment person Person- Phase Related project party Main environmental management responsibilities nel allo- cation To be 1. Completes environmental monitoring of engineering con- deter- struction phase based on project owner’s delegation and en- mined External monitoring com- vironmental monitoring plan proposed in the assessment. based on pany 2. Supervises implementation of environmental management scope of measures and report to owner regularly. entrusted task 1. Supervises and inspect implementation of environmental protection measures on construction site. County Environmental 2. Arranges contingency measures in the event of abnormali- 1 Protection Bureau ties during construction. 3. Coordinates and handles public complaints. 1. Provides technical support for engineering construction phase based on project owner’s delegation and achievements of the environmental impact and environmental protection Technical aid/consultation design. Not lim- advisor ited 2. Provides contractor with technical guidance of environ- mental protection and provides environmental protection trainings during construction phase. 1. Takes charge of post-operational environmental protection management of water supply projects. Implements allevia- tion measures and monitoring of environmental and social management plan during operational phase. 2. Takes charge of contacting relevant governmental depart- Jiangxi Water Group Co., ments. Coordinates and implements environmental manage- ment issues. 1 Ltd. 3. Contingency handling of environmental accidents. 4. Provides staff with training regularly to improve their ca- pabilities, while encouraging active exchange of technical knowledge and expertise for the further improvement of en- vironmental management. 1. Takes charge of post-operational environmental protection management of wastewater projects. Implements alleviation measures and monitoring of environmental and social man- Opera- agement plan during operational phase. tion al Jiangxi Province Water 2. Takes charge of contacting relevant governmental depart- phase Investment Ecological Re- ments. Coordinates and implements environmental manage- ment issues. 1 source Development Group Co., Ltd. 3. Contingency handling of environmental accidents. 4. Provides staff with training regularly to improve their ca- pabilities, while encouraging active exchange of technical knowledge and expertise for the further improvement of en- vironmental management. 1. Completes environmental monitoring of engineering oper- To be ational phase based on project owner’s delegation and envi- deter- ronmental monitoring plan of operational phase as proposed mined External monitoring com- in the assessment. based on pany scope of 2. Supervises operation of environmental management situa- entrusted tion and submits regular reports to owner. task County Environmental 1. Manages and supervises environmental protection to meet 1 Person- Phase Related project party Main environmental management responsibilities nel allo- cation Protection Bureau standard requirements during operational phase. 2. Conducts daily supervision and inspection of operation of completed environmental protection facility. 3.3 Environmental Management Training 3.3.1 Training Purpose To ensure seamless and effective project implementation, it is necessary to provide environmental management and supervision personnel from the owning company, supervision company and con- tractor with training on environmental protection knowledge and skills as well as training on vari- ous environmental management measures in EIA and ESMP. This will ensure that they fully com- prehend and are well-acquainted with engineering environmental protection and have acquired the competency for project environmental management and supervision. Hence providing personnel and technical assurance to the implementation of various environmental protection measures in ESMP. 3.3.2 Training Objective Personnel from owning company, supervision company and contractor, who engage in environ- mental management and supervision of the project. Each construction contractor and supervision company will ensure that their employees will receive functional trainings relating to environment and laws and regulations as required in the environ- mental and social management plan. 3.3.3 Training Content Training content mainly involves environmental protection laws and regulations, environmental protection technology, ESMP environmental management measures, environmental monitoring technology, etc. 3.3.4 Training Plan During the early stage of construction, the owning company shall organize environmental aware- ness training for staff from relevant departments. During construction, it shall organize personnel assigned to significant posts (including management personnel on construction site from owning company, engineering supervision company and contractor, as well as contractor project manager and on-site environmental protection leader) to take part in training on environmental management knowledge. It shall also organize relevant personnel who participate directly in water management and the contractor to take part in training on environmental management skills. During the opera- tional phase, it shall organize management personnel from each water plant and wastewater treat- ment plant to receive special training on operational phase-environmental management. Refer toTa- ble 3-2 for specific training schedule. Table 3-2 Capability Development and Training Schedule Unit Number Budget price Training topic Training target Specific training contents of at- (10,000 (10,000 tendees yuan) yuan) Construction phase I Laws and regulations for Laws, regula- Provincial PMO 0.1 60 environmental protection tions and poli- County PMO, Project II Policies and plans for en- cies for envi- Owner, construction 0.1 60 18 vironment ronmental pro- company and supervi- tection sion company III Environmental manage- 0.1 60 ment of the World Bank I Responsibilities of envi- ronmental protection during 0.1 50 project construction phase II Main tasks of environmen- tal protection during project 0.1 50 construction period III Main contents of envi- ronmental protection during 0.1 50 Implementation project construction phase of environ- Construction Compa- IV Environmental and social mental and ny, Project Owner and 40 management plan (including social man- Supervision Company 0.2 50 environmental management agement plan procedure) V Improvement and revision of environmental and social 0.1 50 management plan VI Internal monitoring meth- ods, data collection and pro- 0.1 50 cessing etc. VII Construction safety 0.1 50 Subtotal of construction phase 58 Operational phase Inspection and Inspect environmental protec- report of envi- Project operation tion facility, monitor envi- 0.2 20 4 ronmental company ronment quality and compile monitoring reports I Rules, regulations and pro- Environmental cedures of environmental 0.2 20 protection fa- Project operation safety 8 cilities and company measures II Contingency plan for facil- 0.2 20 ity faults Subtotal of operational phase 12 Total 70 Chapter IV Environmental Social Impact and Mitigation Measures The main components of the project includes improvement of urban water supply facilities, up- grading of rural drinking water safety and construction of new rural sewage treatment facilities. This chapter summarizes all the main environmental and social impacts involved in this project and the corresponding mitigation measures/action plans. It forms the environmental and social man- agement plan for the integration of urban and rural water supply and sewage treatment projects in Jiangxi City. It also sets a clear budget of all measures and the institution for implementation and supervision. The major environmental impacts and mitigation measures during the design phase, construction phase and operational phase are shown in Table 4-1 to Table 4-8. The Environmental Implementation Regulations have been formulated as an annex to the environmental and social management plan in response to common measures and mitigation measures. Environmental impacts and mitigation measures during the design stage are summarized in 4-1. Ta- ble 4-2 to 4-8 show the environmental impacts and mitigation measures during the construction phase and operational phase. Table 4-9 displays the social impacts and mitigation measures. There are 6 sub-projects in this main project which relies on existing reservoirs as water sources. This in- volves 10 dams and hence, the project has completed the Dam Safety Assessment Report. Before the project is put into operation, all dam measures shall have been rectified. The action plan and recti- fication plan of this project are summarized in Table 4-10. Mitigation measures will be incorporated into detailed design, bidding documents, construction contracts and project management manuals. They are to be implemented by design units, contrac- tors and implementing agencies under the supervision of PMO, the local environmental protection department and the environmental experts in this project team. The effectiveness of these measures will be assessed on the basis of environmental inspection and monitoring results to determine whether these measures are to be continued or improved/adjusted. Table 4-1 List of Environmental Impact and Mitigation Measures During Design Phase Implementing Supervisory County Sub-project name Environmental focal point Potential Impact Mitigation/prevention measures agency body Modification of tap wa- The original design scheme adopts a large excavation plan to pass A directional transfer construction scheme with less environmental ter pipeline network in River He through River He, which has a large influence on it. impact, about 350 meters long, shall be adopted. urban area Yongxin County water Yongxin For the sakes of farmland, pipeline construction to be laid along the plant construction pro- Hengxi Village 3rd batch Pipeline construction temporarily occupies farmland, affecting farming County bank ject Consolidation and im- The ancient trees of Yongxin Shiqiao Town need to be transplanted in Avoidance measures are adopted in the design and the pipeline is in- provement of Rural Ancient trees the original design scheme. creased by 85 m. drinking water safety The pipeline from Shishan town to Luoxi Village is routed through the This design is designed to reduce the influence of the water supply Fu-Gan optical cable. The gas pipeline is laid on the side of the optical Feasibility Provincial Underground infrastruc- pipeline on the current pipeline. The pipe length is about 550 meters in cable, while the present optical cable and the gas pipeline are in the road study unit PMO ture(cables and gas pipelines) the non-motorized driveway, which is 10 meters away from the green green belt. There may be problems with gas pipe network and optical belt. Road damage and recovery works are increased. Nanfeng Extension of town pipe cable breakage during construction. County network The original design scheme needs to pass through public housing and In order to avoid public housing, a bypass is planned and the pipeline Public housing has a disturbing influence on it. is increased by 125m. The optimized design pipeline route shall be reasonable for Laixi Pri- The original scheme pipeline construction affects the students, with a Laixi Primary School mary School. Pipeline shall be laid across the school road, increasing larger construction area and higher noise level. by about 100m. Technical School in The optimized design pipeline route shall be reasonable for the tech- Construction of urban The original plan pipeline construction affects the surrounding resi- Dongxing District, Xiao nical school and the nursing house. Pipeline shall be increased by Dongxiang water plant dents, with a larger construction area and higher noise level. Huang’s Nursing Home 353m. District Extension of County In the design scheme, it is necessary to transplant the ancient trees in the To avoid the ancient trees, a bypass is planned and the line is in- Ancient trees city pipe network growth area of the ancient trees in Yong Shan Town. creased by 160m. Construction and modi- The original design scheme passes through the provincial road of 307. The optimum design scheme shall adopt pipe jacking construction. To Leping 307, Provincial fication of urban water The impact range of water and soil erosion in the road construction is reduce the influence of noise, the mechanical equipment with strong Highway Leping City plant large, affecting the travel of the surrounding residents. process performance and low noise levels shall be chosen. Extenstion of town pipe In order to avoid Pancun Ancestral Hall, water distribution pipe line is Pancun Ancestral Hall The original design scheme needs to go through Pancun Ancestral Hall network increased by 245m with a bypass. Construction and modi- Feasibility Provincial The original scheme pipeline construction affects the students, with a The optimized design pipeline route is reasonable for Ma’ao No 2 fication of urban pipe Ma'ao No. 2 Primary School study unit PMO larger construction area and higher noise level. Primary School. Pipeline length is increased by about 63m. network Construction and modi- The original design scheme has a potential impact on river flooding and The pipeline is laid along the current bridge across the river, crossing Xiushui fication of town pipe Donjin River. environment. the Dongjin River to reduce the impact on the river. County network Construction of new The optimization scheme is designed to set up acoustic barriers on one The original design scheme is close to the Ancestral Hall (about 30m). sewage pipe network side of the Ancestral Hall to reduce the influence of construction Ancestral Hall Construction noise and the odor generated by operation may affect the and sewage treatment noise. The sewage treatment process design adopts the integrated worship of the surrounding residents. plant sewage treatment technology, which has less environmental impact. Table 4-2 List of Environmental Impact and Mitigation Measures for Sub-projects in Yongxin County Project Time inter- Environmental sensitive Implementing Budget Activities Potential Impact Mitigation/prevention measures Supervisory body Name val point agency (10,000 yuan,) Jiangdongbian , Long- Civil construction, According to Annex 1 of the Environmental Management yuankou, Ma Pi, Wangshe Dust, wastewaterand noise gener- construction materials Plan, the urban and rural water supply integration in Project Contrac- CPMO, County-level En- Village, E Village, Xiquan ated from construction machinery Included in and earthwork trans- Jiangxi Province and the environmental protection im- tor, Construction vironmental Protection Mountain, Shangyao and and transport vehicles, construction project costs portation, construction plementation regulations of the rural sewage treatment Supervision Bureau other Villages along the waste, etc. access road, etc. project shall be implemented. line The pipeline route of the project is Extension of pipe Construction activities shall be carried out strictly in ac- Project Contrac- about 15m away from the ancient Included in network in Shiqiao Ancient trees cordance with the requirements of Annex 2 of the Envi- tor, Construction Local forestry department trees, which is mainly influenced by project costs Town ronmental Social Management Plan. Supervision construction dust. The highway management department requires the design unit to propose the construction scheme for the pipeline section concerned with the highway facilities during pro- ject preparation. The design unit shall inform the high- The distance pipes of G319 and way department before the construction and construction Extension of Coun- S228 are 20m and 15m respectively, can only be initiated with permission from the highway Project Contrac- ty-town Pipeline Net- which is parallel to the pipeline but Local traffic management Included in G319、S228 department. The project implementation process shall tor, Construction work in Yongxin do not cross it. The main influence is department project costs strictly adhere to the requirements of highway manage- Supervision County the possible settlement of the road ment, to ensure no damage to the highway facilities, no surface during and after construction. occupation of highway land, strict control of the width of operational belt and compliance with relevant national operation specifications. The affected area shall be re- stored immediately after construction. Construction phase (1) Control area of tap water plant Sub-project Engineering measures: site leveling 2.78hm2, topsoil Project in backfilling 9,700m3, arch-shaped framework slope pro- Yongxin tection of 1.78hm2, intercepting ditch of 442m, flood County discharge channel is 467m, drain ditch is 680 m, rain pipe is 1760m, and rainwater well is 26. Plant measures: gardening 1.47hm2, parking lot afforest- ed for 200m2. The area of disturbance disturbance Temporary measures: topsoil stripping removed to and damage is 86.69 hm2. Corre- 9,700m3, soil-filled straw bag retaining wall is 210m, sponding maximum amount of water tarpaulin covers 7000 m2, drain ditch is 220m, 2 sand Included in wa- Project Contrac- County-level CPMO, Lo- Digging and disposing and soil erosion caused is 44532t and basins, 1 car washing tank and removes concrete floor for ter and soil / tor, Construction cal Water Conservancy soil the new amount of water and soil 450m3. conservation Supervision Bureau erosion is 44302t. works (2) Control area of pipeline works and ancillary facilities Engineering measures: 28.63hm2 of site leveling, 85,900m2 of topsoil backfilling and 8.90hm2 of restoring cultivation. Plant measures: 13.00hm2 of Green Belt Recovery, 1.65hm2 of forestation and grass planting and 5.08hm2 of sowing grass; Temporary measures: 85,900m3 of topsoil stripping, 2,500m of soil-filled straw bag retaining wall, 5,000m2 of tarpaulin covers and 100 m color steel plate. 1. Set up primary and secondary protection zones, where The water source protection zone has the range of the first-level protection zone is from the Local Environmental Pro- Operational Expansion of urban not been divided and it is difficult to water intake point to the water area of 1 km to the down- local Water Con- Government Longyuankou Reservoir tection Bureau ; Water phase water plant guarantee the water quality of the stream 100m from the water intake point and the land servancy Bureau budget Conservancy Bureau reservoir for a prolong period area extending 100m from the water intake point side to the back surface of the water intake point. The sec- Project Time inter- Environmental sensitive Implementing Budget Activities Potential Impact Mitigation/prevention measures Supervisory body Name val point agency (10,000 yuan,) ond-level protection zone is to start from land area of 100m from the side of the water area and the water intake point of 3000m the upper bound of the primary protection zone. included in the Water plant oper- local Water Conservancy operation cost Installing on-line water quality monitoring system. ational unit, Bureau of the water plant It is recommended to sign the agreement with Long- yuankou Hydropower Station to generate electricity on During low-water level years, the Included in the the premise of meeting the urban water supply and irriga- Local Environmental Pro- power generation capacity of the Water plant oper- operating ex- tion water. The corresponding compensation for Long- tection BureauWater Con- Longyuankou Reservoir will be re- ational unit penses of the yukou Hydropower Station is carried out by 07 yuan/m3, servancy Bureau duced by 1130,000 kilowatt hour. water plant and relevant compensation measures have been included in the social evaluation report. The backwashed waste water in tap water plant is lifted to the water distribution well after being lifted by the reuse water tank. The sludge discharged from the sedimentation tank is returned to the dewatering machine room for reuse after being concentrated by the sludge concentration tank. The Included in the Tap Water plant backwashes waste Water Plant Op- remaining part enters the dewatering machine room to be Municipal Environmental operating ex- Tap water plant / water, sludge discharge waste water erational and dehydrated. The filtrate generated by the sedimentation Protection Bureau penses of the etc. Maintenance Unit process reaches the municipal sewage standard and can water plant be reused for irrigation and road irrigation in the plant area. The domestic sewage of the pressurized pumping station shall be discharged into the municipal pipe network after being treated by the septic tank. (1) to establish safe operation procedures, the staff must be specially trained to operate strictly according to the operation procedures, and the education management shall be strengthened to avoid the leakage of chlorine gas caused by operation mistakes. (2) to strengthen liquid chlorine storage and transport management (3) to strengthen the maintenance and management of Included in the Water Plant Op- Local Environmental Pro- Chlorine gas leakage may occur in equipments operating ex- Running water plant Authoritative staff erational and tection BureauEnviron- the chlorine-intensive room penses of the (4) to ensure being equipped with necessary protective Maintenance Unit mental Protection Bureau water plant equipments (5) to formulate contigency plan; to handle in the remote plan, if necessary, to promptly alarm and timely cooperate to deal with the accident. (6) green tree species near the water plant shall be the select with strong resistance to chlorine gas, such as yew, hemlock, jujube, Holly, etc. 1, according to the specification of design construction, the pipeline maintenance and accident emergency work Included in the shall be properly done; pipeline maintenance workers Water Plant Op- Local Water Conservancy operating ex- Running water plant / Sludge and domestic garbage shall receive special training; important node along the erational and BureauEnvironmental penses of the pipeline shall be set up with clear identification in order Maintenance Unit Protection Bureau water plant to avoid other units damage in pipeline construction. 2. When crossing major river channels and highways, the Project Time inter- Environmental sensitive Implementing Budget Activities Potential Impact Mitigation/prevention measures Supervisory body Name val point agency (10,000 yuan,) materials shall be used to enhance the ability of anti-risk; the pipe shall be set up at a certain distance to set the cut-off valve and the bypass pipe. 3, to establish and improve the engineering water inlet water pollution emergency plan, once finding upstream pollution incident, the water intake and related measures shall be taken in time, according to the pollu- tion disposal situation, real time optimization of diversion scheme, to ensure the safety of water diversion water as much as possible. Table 4-3 List of Environmental Impact and Mitigation Measures for Sub-projects in Jinxi County Project Time inter- Implementing Budget Activities Environmental sensitive point Potential Impact Mitigation/prevention measures supervisory body Name val agency (10,000 yuan,) Yu Fang Village, Shan- Civil construction, chengxiang Village, Xia Jim- According to Annex 1 of the Environmental Management Dust, wastewater and noise PMO local Environmental construction materials iao, Tianxiantou, Wangjiadun, Plan, the urban and rural water supply integration in Project Contrac- Construction generated from construction Protection BureauEnvi- Included in and earthwork trans- Li Jia-bian, Zhuqiao Village, Jiangxi Province and the environmental protection im- tor, Construction phase machinery and transport vehicles, ronmental Protection Bu- project costs portation, construc- Maotaofeng, Yinshan Village plementation regulations of the rural sewage treatment Supervision construction waste etc. reau tion road, etc. and other Villages along the project shall be implemented. line 1. Set the first-grade and second-grade protection zones. The first-grade protection zones is from the water intake point to the water area of 1 km to the downstream 100m from the water intake point and the land area ex- tending 100m from the water intake point side to the back surface of the water intake point. The second-grade pro- tection zone is in the upper bound of the primary protec- Local Environmental Pro- Government It belongs to the new water source local Water Con- tion zone, A land area of 100m from the surface of the tection BureauWater Con- area, which is not divided into the servancy Bureau budget t; water area and the water intake point of 3000m, and servancy Bureau water source protection area. It is difficult to guarantee the water 100m extensive from the upstream face of water to the Construction of back surface of the water surface. Huangtong town Wa- Gao Fanghe River quality of the reservoir for a pro- ter Plant long period 2. Strengthen water conservation and environmental pro- tection publicity. Install online water quality monitoring system included in the Water plant oper- local Water Conservancy operation cost Install online water quality monitoring system ational unit Bureau of the water plant Sub-project in Jinxi Without other important water Local Environmental Pro- Water plant oper- County users It will have less impact on Water intaking shall strictly adhere to the approved scale. tection BureauWater Con- / ational unit other users. servancy Bureau Operational The backwashed waste water in tap water plant is lifted phase to the water distribution well after being lifted by the re- use water tank. -The sludge discharged from the sedimentation tank is returned to the dewatering machine room for reuse after being concentrated by the sludge concentration tank, the Included in the Tap water plant backwashes Water Plant Op- Local Environmental Pro- Operation of tap remaining part enters the dewatering machine room to be operating ex- / waste water, sludge discharge erational and tection BureauEnviron- water plant dehydrated. The filtrate generated by the sedimentation penses of the waste water etc. Maintenance Unit mental Protection Bureau process reaches the municipal sewage standard and can water plant be reused for irrigation and road irrigation in the plant area. -The domestic sewage of the pressurized pumping station shall be discharged into the municipal pipe network after being treated by the septic tank. _The noise reduction and noise reduction measures of damping cushion and sound insulation door and window shall be adopted for the dewatering machine room and the back washing room, and the sound absorption wall Included in the Water Plant Op- Local Environmental Pro- Operation of tap wa- Noise impact of various pump measures shall be added in addition to the above operating ex- / erational and tection BureauEnviron- ter plant stations measures in pumping house ; penses of the Maintenance Unit mental Protection Bureau --Strengthen the operation and maintenance of the water plant equipment. Strictly control the key noise sources (such as fan, water pump, etc.), propose noise control require- ments to the equipment manufacturers, and choose low noise equipment as much as possible; The sludge water of the water purification plant is dehy- drated to the water content less than 60% by drying. Included in the Thereafter, the sludge water shall be transported to the Water Plant Op- Runningtap water Municipal Environmental operating ex- / Sludge and domestic garbage waste landfill site at regular intervals. erational and plant Protection Bureau penses of the Maintenance Unit --The staff's domestic garbage shall be collected and dis- water plant posed of by the local sanitation department. (1) to establish safe operation procedures, the staff must be specially trained to operate strictly according to the operation procedures, and the education management shall be strengthened to avoid the leakage of chlorine gas caused by operation mistakes. (2) to strengthen liquid chlorine storage and transport management (3) to strengthen the maintenance and management of Included in the Water Plant Op- Running the water Chlorine gas leakage may occur equipments Local Environmental Pro- operating ex- Authoritative staff erational and plant in the Chlorine-intensive room tection Bureau penses of engi- (4) to ensure being equipped with necessary protective Maintenance Unit neering equipments (5) to formulate contigency plan; to handle in the remote plan, if necessary, to promptly alarm and timely cooperate to deal with the accident. (6) green tree species near the water plant shall be the select with strong resistance to chlorine gas, such as yew, hemlock, jujube, Holly, etc 1, according to the specification of design construction, the pipeline maintenance and accident emergency work shall be properly done; pipeline maintenance workers shall receive special training; important node along the pipeline shall be set up with clear identification in order to avoid other units damage in pipeline construction. 2. When crossing major river channels and highways, the Included in the materials shall be used to enhance the ability of anti-risk; Water Plant Op- Running the water Water quality pollution risk of Local water conservation operating ex- / the pipe shall be set up at a certain distance to set the erational and plant water intake and pipeline bureau penses of engi- cut-off valve and the bypass pipe. Maintenance Unit neering 3, to establish and improve the engineering water inlet water pollution emergency plan, once finding upstream pollution incident, the water intake and related measures shall be taken in time, according to the pollu- tion disposal situation, real time optimization of diversion scheme, to ensure the safety of water diversion water as much as possible. Table 4-4 List of Environmental Impact and Mitigation Measures of Sub-Projects in Nanfeng County Budget Project Time inter- Implementing Supervisory Activities Environmental sensitive point Potential Impact Mitigation/prevention measures (10,000 Name val agency body yuan,) Civil construction, Shishan town, Xi Village, Dong construction materials According to Annex 2 of the Environmental Management Village, Shangkaokeng Village and earthwork trans- Dust, wastewater and noise generated Plan, the urban and rural water supply integration in Jiangxi Project Contrac- PMO local Envi- Included Xinjiabao Village, Pengjiabao portation, construction from construction machinery and Province and the environmental protection implementation tor, Construction ronmental Pro- in project Village, Zihe Village, Guanjia- access road, etc. transport vehicles, construction waste etc. regulations of the rural sewage treatment project shall be Supervision tection Bureau costs bao Village and other Villages implemented. along the line. The highway management department requires the design unit to propose the construction scheme for the pipeline sec- tion concerned with the highway facilities during project preparation. The design unit shall inform the highway de- G206 runs parallel to the construction partment before the construction and the construction can Extension of town pipeline, about 20m away from the pipe- only be initiated with permission from the highway depart- Project Contrac- Local traffic Included pipe network in G206 line. The main impact could be the possi- ment. The project implementation process shall strictly ad- tor, Construction management de- in project Nanfeng County ble settlement of the road surface during here to the requirements of highway management to ensure Supervision partment costs and after the construction. no damage to the highway facilities, no occupation of high- way land, strict control of the width of operation belt and compliance with relevant national operation specifications. The affected area shall be restored immediately after con- struction. During construction, temporary measures shall be taken, such as adding piles, beam erection or local excavation pro- tection etc., to protect the pipelines above and to ensure their normal operation during construction and their safety after construction. Within 5m on both sides of the pipleline, it is Sub-project Construction prohibited to plant trees, use fire, soil, stones or stack heavy in Nanfeng The project is extended to the pipeline phase objects and other corrosive materials. It is forbidden to use County construction of Shishan Town by the mechanical tools for excavation and mining, construction of County water plant pipe network, which Extension of town buildings and other buildings behaviors threatening the pipe- Project Contrac- Included is 15m away from the gas pipeline in pipe network in Gas pipeline line security etc. Without the permission of the management tor, Construction Gas Company in project Shishan town. The project construction or Nanfeng County unit, it is forbidden to construct, expand highway, bury un- Supervision costs inadequate supervision may affect the gas derground cables, optical cables etc within five to fifty me- pipe network, causing leakage and break- ters from the center line of the pipeline. Before construction, age. the gas company shall be informed and agree with the other party, the construction scope shall be more than 50 cm away from the gas pipeline, and the pipeline depth of gas company is about 1.2m. The pipeline shall not be damaged during construction. Prepare the risk contingency plan beforehand and equip the corresponding personnel and facilities For the engineering section concerned with optical cable, detailed construction plan shall be formulated before con- struction. The construction plan shall be reported to the pipe- line management department. Construction activities can be The pipeline route of the project is about carried out only after the approval of the department. Con- Extension and Con- 15m away from the optical cable. Con- struction shall be carried out strictly in accordance with the Project Contrac- Optical cable Inclusion struction of Pipeline struction involves excavation, compac- national standard operation. The optical cable installation Optical cable tor, Construction management de- of project Network in Shishan tion, rolling etc, which may cause certain shall be protected. During construction, warning signs shall Supervision partment costs town and County potential safety hazards and threats to the be set before and after the construction section, correspond- optical cable. ing safety management plan shall be made, cross-laying of pipeline lines shall be reduced; inflammable and explosive materials shall not be piled up beside the optical cable com- munication line. Construction waste, earthwork, construction materials and the like shall be prohibited from being piled up Budget Project Time inter- Implementing Supervisory Activities Environmental sensitive point Potential Impact Mitigation/prevention measures (10,000 Name val agency body yuan,) above the surface of the optical cable. Trunk pipeline shall be worn under the cross-line. During construction, temporary measures (such as adding piles, beam erection or local exca- vation protection etc.) shall be taken to protect the pipelines above and ensure their normal operation during construction and their safety after completion. It shall be restored in time after the construction is completed. Prepare the risk contin- gency plan beforehand and equip the corresponding person- nel and facilities The project pipeline route is about 15m Extension of the away from three ancient trees , with ages Construction activities shall be carried out strictly in accord- Project Contrac- Included County town pipe net- 1000 years, 280 years and unknown. They ance with the requirements of Annex 2 of physical cultural Local forestry Ancient tree tor, Construction in project work in the town of the are considered national and tertiary pro- resources management plan in the Environmental Social department Supervision costs Qia bay tected ancient trees respectively. Mainly Management Plan. affected by construction dust. During the construction of the project, attention shall be paid to the control of noise level. Construction time shall be ar- ranged in the non-teaching time as much as possible to avoid Extension of water Project pipeline is 5m away from Laixi the influence on the classrooms. Watering will be done dur- Project Contrac- Local traffic bu- supply network in Laixi Primary School Primary School. Noise and dust impact ing construction to reducedust. Extra attention shall be paid tor, Construction reau, local police 1 Laixi Town during construction. to safety. The construction area shall set temporary noise Supervision team barrier no less than 2m with higher noise reduction effect. After the construction, the environmental impact of the con- struction shall be promptly restored. Table 4-5 Schedule of Environmental Impact and Mitigation Measures for Sub-projects in Leping County Imple- Budget Project Environmental Sensi- Supervisory Period Activities Potential Impact Mitigation/Control Measures menting (10,000 yu- Name tive Point Body Agency an) Civil construction, PMO local En- Nearby Villages in- Project construction materi- vironmental cluding Bayu, Guankou As required by Annex 2 of Environmental Management Plan - China Jiangxi Contractor, als and earthwork Dust, wastewater and noise by machin- Protection Bu- Included in and its new rural area, Provincial Integrated Rural and Urban Water Supply and Wastewater Man- Construc- transportation, con- ery & vehicles, construction waste etc. reauEnviron- project costs Chexi, Kuqian, agement Project tion Super- struction access road, mental Protec- Gujinshan and Liucha visor etc. tion Bureau The highway management department requires the design unit to propose the construction scheme for the pipeline section concerned with the highway facil- ities during project preparation. The design unit shall inform the highway de- With a distance of 15m, S307 runs par- Project partment before the construction and the construction can only be initiated Construction & mod- allel with the pipeline of the project. Contractor, Local traffic Included in with permission from the highway department. The project implementation ification of urban S307 The main effect is the possible Construc- management the project process shall strictly adhere to the requirements of highway management to water plants inccurence of earth subsidence during tion Super- department cost ensure no damage to the highway facilities, no occupation of highway land, or after the construction. visor strict control of the width of operation belt and compliance with relevant na- tional operation specifications. The affected area shall be restored immediately Leping after construction. Construction County phase Optical cable protection requirements state that it is strictly prohibited to break sub-project ground within 5m, to excavate within 3m and to carry out engineering survey The pipeline route of the project runs and construction within 50m. It is prohibited to pile up flammable and explo- Project parallel to the optical cable and the dis- Construction & mod- sive materials alongside the optical cable communication line, or construction Contractor, Optical cable Included in tance is about 10m. The construction ification of urban Optical cable waste, earth work and construction materials on the ground above the cable. Construc- management the project involves digging, punning and rolling water plants Prior permission of the management units is required and relevant precaution- tion Super- department cost soil, which may cause certain safety ary measures shall be taken if there is any possible danger to the cable. Prepare visor hazards and threats to the optical cable. the risk contingency plan beforehand and equip the corresponding personnel and facilities During the construction of the project, attention shall be paid to the control of The pipeline of the project is about noise level. Construction time shall be arranged in the non-teaching time as Project Local traffic Extension of urban Leping Qimingxing 15m from Leping Qimingxing Experi- much as possible to avoid the influence on the classrooms. Watering will be Contractor, bureau, local water supply pipeline Experimental Kinder- mental Kindergarden. It will be im- done during construction to reducedust. Extra attention shall be paid to safety. Construc- 1 traffic police network garden pacted by noise and dust during the The construction area shall set temporary noise barrier no less than 2m with tion Super- brigade construction. higher noise reduction effect. After the construction, the environmental impact visor of the construction shall be promptly restored. It is necessary to take provisional measures during the construction, such as adding piles, setting up beams or excavating underground locally to protect the pipeline above, and to ensure normal operation and security after the construc- tion. Within 5m along the two sides of the center pipeline, any possible dan- The project is to pass through the gas gerous act is strictly prohibited such as planting trees, setting fire, digging pipeline in Hougang Town. The main earth, quarrying stones, or piling up heavy stuff or corrosive substance, exca- Project trunk pipeline is planned to pass un- vating by means of machinery equipment, building houses or any other struc- Contractor, Gas pipeline Included in Gas pipeline der the crossing pipeline. Improper tures and so on. It is prohibited to build or extend roads, burry cable or optical Construc- management the project Extension of construction or supervision may lead to cable underground within 5 to 50m from the center pipeline without prior per- tion Super- department cost Leping Construction Hougang Town water adverse effects like leakage or breakage mission of relative management units. It is necessary to inform the gas com- visor Sub-project phase plant pipeline net- on the gas pipeline network. pany before the activity and obtain its permission, and make sure the distance work between the construction scope and the gas pipeline is more than 50cm. As the gas pipeline is buried about 1.2m deep underground, it is important to make sure the pipeline is not damaged during the activity. Prepare the risk contin- gency plan beforehand and equip the corresponding personnel and facilities The ancient trees are about 10m away Construction activities shall be carried out in strict accordance with the re- Project Included in Local forestry Ancient trees from the project pipeline route and may quirements of Annex 2 of the Environmental Social Management Plan – Plan Contractor, the project Construc- department suffer from construction dust. of Physical Cultural Resource Management. cost tion Super- Imple- Budget Project Environmental Sensi- Supervisory Period Activities Potential Impact Mitigation/Control Measures menting (10,000 yu- Name tive Point Body Agency an) visor During the construction of the project, attention shall be paid to the control of noise level. Construction time shall be arranged in the non-teaching time as Project Star Experimental Kindergarden is Local traffic Leping County Star much as possible to avoid the influence on the classrooms. Watering will be Contractor, about 10m from the project pipeline bureau, local Experimental Kinder- done during construction to reducedust. Extra attention shall be paid to safety. Construc- 1 and may suffer from construction noise traffic police garden The construction area shall set temporary noise barrier no less than 2m with tion Super- and dust. brigade higher noise reduction effect. After the construction, the environmental impact visor of the construction shall be promptly restored. Build a brick fence around the ancient trees during the construction. It is rec- ommended that the radius of the fence be 50m more than that of the root of the tree and the fence be 50m above the ground for fear that the construction waste Project Extension of the ex- liquid might permeate into the root soil and result in hardened soil and bad air The ancient trees are about 8m away Contractor, Included in isting pipeline net- breathability, hence affecting the growth of the trees or impairing its roots di- Local forestry Ancient trees from the project pipeline route and may Construc- the project work of Yongshan rectly. It is prohibited to operate with fire or gas around the trees, and it is department suffer from construction dust. tion Super- cost Water Plant necessary to keep clean around the trees, without clutter but sufficient fire ex- visor tinguishers. Layered backfill with planting soil is suggested to ensure that the soil used caters to the growth of the trees. It is also necessary to improve the constructors’ protection awareness. (1) Control Area of Water Treatment Plant Engineering measures: site formation 2.68m2, topsoil backfill 7700m3, drain- age ditch 2,340m; Plant measures: landscaping 2.57hm2, sowing grass seeds 886m2, parking lot greening 208m2, and planting 46 trees; Temporary measures: topsoil stripping 7700m3, soil- or straw-filled bag re- The area of disturbance disturbance taining wall 202m, tarpaulin covering area 2,566m2, drain ditch 1,286m, sand basin 4, car washing tank 1. PMO, local En- and damage is 46.14hm2. After balanc- vironmental (2) Control Area of Pipeline Project Included in ing allocation of earthwork and stone- Contractor, Protection Bu- the project Construction Digging and dispos- work, it needs to borrow 67,700m3 and Engineering measures: site formation 8.70hm2, topsoil backfill 2600m3, sec- Construc- reau, / cost of water phase ing soil dispose 72,300m3. The possible total ond ploughing 15.02hm2; tion Super- local Water and soil con- water and soil erosion is 3515t and Plant measures: Green belt restoration 7.84hm2, forest planting and grass visor Conservancy servation newly increased water and soil erosion seeding 0.86hm2; Bureau 3321t. Temporary measures: topsoil stripping 2600m3, soil- or straw-filled bag re- taining wall 5,400m, tarpaulin covering 38,880m2, color steel plate 5,400m, Leping and sand basin 41. Sub-project (3) Control Area of Crossing Project Engineering measures: second ploughing 0.18hm2; Temporary measures: color steel plate 678m, drainage ditch 650m, and sand basin 46. The water source pro- 1. Set primary and secondary conservation areas. The primary conservation tection area area covers the water area from 1km upstream of the water intake point to shall be in- 100m downstream, the beach area at one side of the water intake point and the Water plant cluded in the It belongs to the newly added water Local Water land area of 100m from the angle of the head-on dam to the inverse side. The operational water con- Construction & mod- source area and water source conserva- Conservancy Operational secondary conservation area is 3,000m upstream of the upper bound of the unit, local servancy de- ification of urban Communist reservoir tion area has yet to be divided. Hence it BureauEnvi- phase primary conservation area, the beach area at one side of the water intake point Water Con- partment; water plants is difficult to guarantee the water qual- ronmental Pro- and the land area of 100m from the angle of the head-on dam to the inverse servancy The online ity of the reservoir for a prolong period. tection Bureau side. Bureau monitoring 2. Install online monitoring system of water quantity and quality. system shall be included in the operation cost of the Imple- Budget Project Environmental Sensi- Supervisory Period Activities Potential Impact Mitigation/Control Measures menting (10,000 yu- Name tive Point Body Agency an) water plant The power generation capacity of the 1. It is recommended to enter into agreement with Yongshan, Gutian and Guxi Included in Yongshan, Gutian and Guxi hydro- Hydropower Station to generate electricity on the premise of meeting the urban Water plant Local Water theoperational power stations at the downstream of the water supply and irrigation water, and compensate Yongshan, Gutian and Guxi operational Conservancy cost of the dam site of the reservoir is reduced by hydropower station by 0.07 yuan/m3. Relevant compensation measures have unit Bureau water plant 260,000 kwh respectively. been included in the social evaluation report; -The backwashed waste water in tap water plant is lifted to the water distribu- tion well after being lifted by the reuse water tank. -The sludge discharged from the sedimentation tank is returned to the de- Environmental Included in watering machine room for reuse after being concentrated by the sludge con- Backwashed wastewater and Water plant Protection Bu- the operating centration tank, the remaining part enters the dewatering machine room to be / sludge-discharged wastewater of tap operational reauLocal Envi- expense of dehydrated. The filtrate generated by the sedimentation process reaches the water plant filter tank unit ronmental Pro- the water municipal sewage standard and can be reused for irrigation and road irrigation tection Bureau plant in the plant area. -The domestic sewage of the pressurized pumping station shall be discharged into the municipal pipe network after being treated by the septic tank. / -The noise reduction and noise reduction measures of damping cushion and sound insulation door and window shall be adopted for the dewatering ma- chine room and the backwashing room. Sound absorption wall measures shall Environmental Included in be added in addition to the above measures in pumping stations. Water plant Protection Bu- the operating Noise impact of various pump stations operational reauLocal Envi- expense of -Strengthen the operation and maintenance of the equipment. Strict control of unit ronmental Pro- the water key noise sources (such as fan, water pump etc.). Propose noise control re- tection Bureau plant quirements to the equipment manufacturers and choose low noise equipment as much as possible. / ----The sludge water of the water treatment plant is transported to the refuse Local Environ- Included in landfill at regular intervals for disposal after being dehydrated to the water mental Protec- Water plant the operating content less than 60%. tion BureauEn- Sludge and domestic garbage operational expense of vironmental ----Staff’s domestic garbage is collected together by local sanitation unit for unit Protection Bu- the water unified disposal. plant reau Authorattive staff (1) to establish safe operation procedures, the staff must be specially trained to operate strictly according to the operation procedures, and the education man- agement shall be strengthened to avoid the leakage of chlorine gas caused by operation mistakes. (2) to strengthen liquid chlorine storage and transport management Included in (3) to strengthen the maintenance and management of equipments Water plant Local Environ- Chlorine gas leakage may occur in the the operating operational mental Protec- chlorine-intensive room (4) to ensure being equipped with necessary protective equipments expense of unit tion Bureau (5) to formulate contigency plan; engineering to handle in the remote plan, if necessary, to promptly alarm and timely coop- erate to deal with the accident. (6) green tree species near the water plant shall be the select with strong re- sistance to chlorine gas, such as yew, hemlock, jujube, Holly, etc / 1, according to the specification of design construction, the pipeline mainte- nance and accident emergency work shall be properly done; pipeline mainte- nance workers shall receive special training; important node along the pipeline shall be set up with clear identification in order to avoid other units damage in Included in Water plant Local Environ- Water quality pollution risk of water pipeline construction. the operating operational mental Protec- intake and pipeline expense of 2. When crossing major river channels and highways, the materials shall be unit tion Bureau engineering used to enhance the ability of anti-risk; the pipe shall be set up at a certain dis- tance to set the cut-off valve and the bypass pipe. 3, to establish and improve the engineering water inlet water pollution emer- Imple- Budget Project Environmental Sensi- Supervisory Period Activities Potential Impact Mitigation/Control Measures menting (10,000 yu- Name tive Point Body Agency an) gency plan, once finding upstream pollution incident, the water intake and related measures shall be taken in time, according to the pollution disposal situation, real time optimization of diversion scheme, to ensure the safety of water diversion water as much as possible. Happiness Reservoir, set up the first class and second class water conservation areas, the former in- Coqing Reservoir and cluding the range distance between 1km upstream level and 100m downstream local water con- Red Orient Reservoir level beaches and shallow and extended 100 m bank; the latter including the local water servation bureau Government range from the upper reaches of the former 3000m water and shallow and ex- conserva- and local Envi- tion bureau ronmental Pro- Budget Rural water supply The current water source areas shall be tended 100m bank pipe network trans- not divided as required by Water Con- tection Bureau formation and exten- servation Bureau project, so the water sion works quality is not so good in the long-term local water con- The water Water plant servation bureau included in install online water quality monitoring system operational and local Envi- the operation unit ronmental Pro- cost of the tection Bureau water plant Table 4-6 Schedule of Environmental Impact and Mitigation Measures for Sub-projects in Xiushui County Project Environmental Sensitive Implementing Supervisory Budget Period Activities Potential Impact Mitigation/Control Measures Name Point Agency Body (10,000 yuan) Civil con- Nearby Villages like struction, con- Longbei, Bailuoqiu, struction ma- Zoujiawan, Youjiacha, terials and Dust, wastewater and noise by As required by Annex 1 of Environmental Management Plan - China Jiangxi Project Contrac- Local Environ- Zhishanyuan, Duanshang Included in earthwork machinery & vehicles, construc- Provincial Integrated Rural and Urban Water Supply and Wastewater Manage- tor, Construction mental Protec- Primary School, Baitu, project costs transportation, tion waste etc. ment Project Supervisor tion Bureau Chenjiazui, Songshanxia, construction Shangwuping, Xiawuping, access road, Kengkoupushang, etc. etc. During the preparation period, the design institute shall put forward a construc- tion plan based on the involved pipeline sections, and permissions shall be ob- tained from related highway units before the work starts. The management re- 15m away from S304 provincial quirements of related highway units shall be adhered to strictly during the im- Expansion of road in a parallel direction plementation process without impairment to the highway facilities or occupation urban water of highway land. The breadth of working area shall be controlled strictly accord- Project Contrac- Local road Subsidence of the road surface Included in the plant in Provincial Highway S304 ing to relative national working standards. Restoration work shall be done with- tor, Construction management during and after the construction, project cost Xiushui out delay in the affect area after the work is finished. Supervisor department County and the road hump caused by un- derdigging top pipe. For road sections crossing roads and railways, relevant protective measures shall be taken during the construction period, and strictly comply with the Technical Specification for Top Pipeof Water Supply and Drainage Works (CECS246-2008) Construction pipeline south sec- 1. Construction work shall be arranged during non-teaching time as much as pos- Construction sible so as not to disturb the classrooms. Project Contrac- LocalEnviron- Ma'ao Town Duanshang tion 20m from Duanshang Prima- of the origial tor, Construction mental Protec- 1 Water supply Primary School ry School,impacted by construc- 2. Set temporary sound barrier of at least 2m on the construction area near the water pipeline Supervisor tion Bureau sub-project of Construc- tion noise and dust Primary School to reduce noise efficiently. Xiushui tion phase (1) Control Area of Plant Area County Engineering measures: site formation 0.28hm2, top soil backfilling 7,700m3, drainage ditches 2,340m; Plant measures: Landscaping 0.28hm2, grass seeding 886m2, parking lot greening 208m2, and plantingtrees 46; Temporary measures: top soil stripping 7,700m3, soil- or straw-filled bag retain- The area of the original earth’s ing wall 202m, tarpaulin covering 2,566m2, drainage ditch 1,286m, sand basin 4, surface and the conservation facil- car washing tank 1. ities of water and soil disturbed (2) Control Area of Pipeline Works local environ- and damaged by the sub-project is Engineering measures: site formation 8.70hm2, top soil backfilling 2,600m3, mental protec- 40.09hm2. The gross earthwork second ploughing 15.02hm2; tion Included in the Contractor, Digging and / and stonework of the project is Plant measures: Green Belt Restoration 7.84hm2, forest planting and grass seed- Construction bureau, cost of water disposing soil 410,800m3, among which digging ing 0.86hm2; and soil con- Supervisor local Water is 205,400m3 and filling Temporary measures: top soil stripping 2,600m3, soil- or straw-filledbag retain- servation works 205,400m3. After balancing allo- Conservancy ing wall 5,400m, tarpaulin covering 38,880 m2, color steel plate 5,400m, and Bureau cation, there is no borrowing or sand basin 41. disposing earthwork and stone- work. (3) Control Area of Crossing Project Engineering measures: Second ploughing 0.18hm2; Temporary measures: Color steel plate 678m, drainage ditch 650m and sand ba- sins 16. Water and soil conservation monitoring: the monitoring content includes dis- turbance disturbance of land condition, soil erosion and water and soil con- servation measures. The water and soil conservation monitoring period starts from the construction preparation period to the end of the design level year, i.e. Project Environmental Sensitive Implementing Supervisory Budget Period Activities Potential Impact Mitigation/Control Measures Name Point Agency Body (10,000 yuan) from January 2018 to December 2019, for totally 24 months. The monitoring scope is the project construction area and the direct impact area, with a total area of 66.51 hm2. The monitoring method is combing locating observation and inves- tigation. Evaluate the result according to the characteristics of engineering con- struction and the condition of soil erosion. The project set 3 observation sample plots and 5 investigation sample plots in total. Annual water intake of the project It is recommended to enter into an agreement with Jiangxi Dongjin Power Gen- accounts for 3.51% ~ 8.43% of Included in eration Co., Ltd., to generate electricity under the premise of meeting the urban Local Water the power generation of Dongjin Water plant op- operational cost water supply and irrigation, and compensate Dongjin Power Generation Co., Ltd. Conservancy Reservoir in a typical year. which erational unit of the water by 0.07 yuan/m3. Relevant compensation measures have been included in the Bureau will occupy the power generation plant Dongjin Reservoir social evaluation report. water of Dongjin Reservoir; Included in the Local Water Uncertainty of long-term guaran- Water plant op- operating ex- Install on-line water quality and quantity monitoring system Conservancy tee of reservoir water quality erational unit pense of the Bureau water plant -The backwashed waste water in tap water plant is lifted to the water distribution well after being lifted by the reuse water tank. -The sludge discharged from the sedimentation tank is returned to the dewatering machine room for reuse after being concentrated by the sludge concentration Included in the Backwashed wastewater and LocalEnviron- Expansion of tank, the remaining part enters the dewatering machine room to be dehydrated. Water plant op- operating ex- / sludge-discharged wastewater of mental Protec- Operati- urban water The filtrate generated by the sedimentation process reaches the municipal sewage erational unit penses of the tap water plant filter tank tion Bureau periodontal plant in standard and can be reused for irrigation and road irrigation in the plant area. water plant phase Xiushui ----Domestic sewage from both the water plant and the booster pumping station County is discharged into the municipal pipeline network after being treated by the septic tank. Noise impact of various pump -The noise reduction and noise reduction measures of damping cushion and stations sound insulation door and window shall be adopted for the dewatering machine room and the backwashing room. Sound absorption wall measures shall be added Included in the in addition to the above measures in pumping stations. Local Environ- Water plant op- operating ex- / mental Protec- -Strengthen the operation and maintenance of the equipment. Strict control of key erational unit pense of the tion Bureau noise sources (such as fan, water pump etc.). Propose noise control requirements water plant to the equipment manufacturers and choose low noise equipment as much as pos- sible. Sludge and domestic garbage ----The sludge water of the water treatment plant is transported to the refuse landfill of Shizi Town, Jiujiang County at regular intervals for disposal after be- Included in the Local Environ- ing dehydrated to the water content less than 60%. Water plant op- operating ex- / mental Protec- erational unit pense of the ----Staff’s domestic garbage is collected together by local sanitation unit for uni- tion Bureau water plant fied disposal. Dust, wastewater and noise by (1) to establish safe operation procedures, the staff must be specially trained to machinery & vehicles, construc- operate strictly according to the operation procedures, and the education man- Civil con- tion waste etc. agement shall be strengthened to avoid the leakage of chlorine gas caused by op- struction, con- eration mistakes. struction ma- (2) to strengthen liquid chlorine storage and transport management Sewage Included in the terials and Group 6, 13, 5 and 10 of (3) to strengthen the maintenance and management of equipments Local Environ- treatment Water plant op- operational ex- Construc- earthwork Putian Village. Authorita- mental Protec- sub-project of (4) to ensure being equipped with necessary protective equipments erational unit pense of the tion phase transportation, tive staff tion Bureau Xiushui (5) to formulate contigency plan; engineering construction County access road, to handle in the remote plan, if necessary, to promptly alarm and timely cooper- etc. ate to deal with the accident. (6) green tree species near the water plant shall be the select with strong re- sistance to chlorine gas, such as yew, hemlock, jujube, Holly, etc Digging and / Water quality pollution risk of 1, according to the specification of design construction, the pipeline maintenance Water plant op- Local water Included in the Project Environmental Sensitive Implementing Supervisory Budget Period Activities Potential Impact Mitigation/Control Measures Name Point Agency Body (10,000 yuan) disposing soil water intake and pipeline and accident emergency work shall be properly done; pipeline maintenance erational unit conservation operational ex- workers shall receive special training; important node along the pipeline shall be Environmental pense of the set up with clear identification in order to avoid other units damage in pipeline Protection Bu- engineering construction. reau 2. When crossing major river channels and highways, the materials shall be used to enhance the ability of anti-risk; the pipe shall be set up at a certain distance to set the cut-off valve and the bypass pipe. 3, to establish and improve the engineering water inlet water pollution emergency plan, once finding upstream pollution incident, the water intake and related measures shall be taken in time, according to the pollution disposal situation, real time optimization of diversion scheme, to ensure the safety of water diversion water as much as possible. New con- struction and All water plant operation agencies (water companies) shall go to the local Envi- renovation All water plants in Xiushui ronmental Protection Bureau as soon as possible to supplement relevant proce- Local Environ- works of County are not subject to envi- Xiushui County l dures to ensure environmental protection measures and environmental manage- mental Protec- l Xiushui ronmental assessment and ac- Water Plant ment methods meeting the requirements of local environmental protection au- tion Bureau County and ceptance procedures thorities township network 1. Improve the construction of sewage collection pipe network in the district. Included in the 20m,15m,20m,15m respectively Operational unit Local Environ- operating ex- away from the pipelineSewage 2. Strengthen the operation management to ensure the sewage reaches relevant Influence on Zhajin River of sewage treat- mental Protec- pense of the discharge of the sewage treatment standards. ment plant tion Bureau sewage treat- plant will affect Zhanjin river. 3. Establish accident prevention and emergency measures. ment plant In order to minimize the influence of odors, it is recommended to create a green Included in the the total amount of dug earth isolation belt, such as planting trees, seeding grass etc., around the plant area to PMO, Municipal Operational unit operating ex- stone generated during wastewater form a three-dimensional shelter forest system of grass, shrub and arbor. The Environmental / of sewage treat- pense of the treatment will affect the atmos- interspace between buildings in the plant area shall be planned accordingly, es- Protection Bu- ment plant sewage treat- pheric environment pecially around the areas that will generate odors. Make sure that the green area reau ment plant of the plant area is not less than 30%. Prioritize the use of advanced low-noise equipment such as submersible pump. Try to place the water pump inside the room and isolate noise by utilizing build- Construction ings. Further optimize the plane layout of the plant during the stage of construc- of new sew- tion drawing design.Equipment with high noise level shall be kept far away from 30m away from Ancestral Hall Included in the Operati- age pipe net- the residential areas. Enforce the maintenance of water pump, check the electrical Operational unit Local Environ- Noise generated by lifting pump operating ex- periodontal work and / machinery as well as the concentricity of pump spindle regularly, and ensure of sewage treat- mental Protec- and treatment facilities of the pense of the phase sewage treat- good lubrication of the bearings. Reducing the wear of components in the pump. ment plant tion Bureau sewage treatment project engineering ment plant in Properly arrange sound absorbing materials and vibration damping devices at the Zhajin Town periphery of the inner wall of the pump room, the floor of the roof and the ma- chine set, such as asbestos boards, shock absorbers, etc., which can effectively control and eliminate the propagation and reflection of noise. (1) design considerations allowance, according to the maximum capacity of 0.5 times the reserved, accident situation of buffering capacity, with a considerable processing equipment (reflux pump, reflux pipe, valve and instrument, etc.), one thousand when the normal operation of equipment failure affect the processing Included in the Effects of Effluent discharge on system, startup system buffer and reflow equipment, will not be qualified to deal Operational unit Local Environ- operating ex- Zhajin River the water environment of the with water, until meet the emission standards. of sewage treat- mental Protec- pense of the Zhajin River (2) take multiple sets of spare equipment for vulnerable equipment and ensure ment plant tion Bureau sewage treat- sufficient spare parts for maintenance and renovation. ment plant The electromechanical devices in the processing system shall be used in at least one way. (3) choose quality equipment. Project Environmental Sensitive Implementing Supervisory Budget Period Activities Potential Impact Mitigation/Control Measures Name Point Agency Body (10,000 yuan) For all kinds of machinery, electrical appliances, instruments and other equip- ment in the facility, we must choose the products which have good quality, low failure rate, meet the design requirements, and are suitable for long-term opera- tion and maintenance. (4) during operation, the operator must strictly follow the rules and regulations of the treatment facilities, check the equipment regularly, carry out maintenance in time, and reduce the failure rate of the equipment. (5) the electrical equipment shall be carried out according to the grounding pro- tection procedure; And equipped with automatic tripping circuit, main equipment operation by using the computer data monitoring, timely report to the police, and to record the scene, nature and the accident of time, etc., in order to organize workers to timely make emergency repair. All electrical equipment installation protection must meet the electrical equip- ment related safety regulations. (6) take the power supply of dual-circuit power supply to ensure the normal op- eration of power supply facilities and lines (7) formulate management measures for the operation of sewage treatment plants, and deal with the risks of power failure and emergent wastewater discharge. (1) strengthen safety education for operators and management personnel, estab- lish safe operation procedures and management systems, carry out strict imple- mentation after operation, and check frequently. (2) the design of the buildings shall taken into account the sanitary requirements of water supply, drainage, heating and ventilation, lighting and lighting, and air conditioning facilities in the place where the staff works for a long time. For some sealing structures, poor ventilation conditions, mechanical ventilation is adopted. (3) the factory shall be equipped with life jackets, life belts, safety belts, safety caps and other labor protective equipment. To the operation of the under well pipeline inspection or homework workers must wear necessary protective equipment, such as safety clothing gas mask, supply air masks, gas detection instruments, test, etc., in case of poisoning, and at Equipments least two people are present. included in the (4) the edge of the ikebana walkway is provided with a support column and expense of the Health risks to the staff in the lighting facilities to ensure pedestrian safety. Operational unit engineering and Authoritative staff of the state of accident, including gas, (5) the installation and protection of all electrical equipment shall meet the safety of sewage treat- maintenance sewage treatment plant pathogens, etc. requirements of electrical equipment and ensure the grounding protection of ment plant and manage- high-voltage equipment. ment included (6) dangerous parts of mechanical equipment, such as transmission belts, gears, in the opera- grinding wheels, etc. must be installed. tional expense (7) to strengthen the management of safety work, set up post responsibility sys- tem, the factory all of the danger area set up warning sign in eye-catching place, more than 1.2 m above the platform of a guardrail, on May gather the poisonous and harmful gas, are due and ventilation equipment, set up safety labor protection agencies, is responsible for the security of safe production and labor protection. (8) based on the actual needs of each section and easy to use, set up the produc- tion health room, toilet, bathroom, wardrobe, etc.), conditions of section and open operation, besides strengthening ventilation set shade, shall also be a lounge. The factory has a central bathroom. (9) all workers who have direct contact with sewage, sludge and household waste shall check their bodies regularly and regularly inject relevant vaccines (such as hepatitis a, hepatitis b, etc.). Table 4-7 List of Environmental Impact and Mitigation Measures for Sub-projects in Linchuan DistrictCounty Project Period of Environmental Sensitive Implement Supervision Budget Activities Potential Impact Mitigation/Prevention Measures Name Time Point Mechanism Mechanism (10,000 yuan,) Civil construction, Wuhu Yan, Wenquan Town, construction mate- Zhou Jia Village, Yang Jia Construction dust, construction The construction shall be implemented according to Annex 2 of the En- Project Con- PMO, Municipal rials and earthwork Village, Zhu Jia Village, waste water, noises generated from vironmental Management Plan of environmental protection implementa- tractor, Con- Environmental Included in transportation, con- Liangxian Primary School, construction machinery and transport tion regulations of China Jiangxi Intergrated Rural and Urban Water struction Su- Protection Bu- project costs struction access Dongliang Jia Village and vehicles, construction wastes, etc. Supply and Wastewater Management Project. pervision reau road, etc. other Villages along the line During the construction of the project, attentions shall be taken to control the noise. The construction time shall be arranged in the non-teaching Project pipeline is about 10m from time as far as possible to avoid the influence on the teaching order. In the construction activities, it is necessary to pay attention to the water sprin- Project Con- Extension of Town Liangxian Primary School and the Local traffic bu- kling and dust falling work. In the construction process, attention shall be tractor, Con- Pipeline in Wen- Liangxian Primary School noise influence during construction reau, local police 1 paid to safety, and the construction area shall be provided with a struction Su- quan Town period, and construction fugitive team pervision dust influence temporary sound barrier of not less than 2 meters high with higher noise reduction effect; environmental restoration work shall be carried out timely on the affected area after construction. (1) Control area of water intake pump station Contractor, Project Dept. and Engineering measures: site leveling is 1487m2, and the topsoil is Construction local environ- back-filled with 700m3, drain ditch is 408 meters; Supervision mental protection Plant measures: landscape greening 1487m2, planting of 96 trees, ; Bureau, Temporary measures: topsoil stripping 700m3, the concrete floor is re- Local Water Sub-project moved for 500m2, build 64m of the soil-filled straw bag retaining wall, Conservancy Construc- 233m2 of the covered tarpaulin, 125 meters of the drain ditch and 2 of the Bureau of Linchuan tion Period sand basin. County (2) Water purification plant control area Engineering measures: site leveling 2.68hm2, and the topsoil is The area of disturbance and damage back-filled with 7700m3, drainage ditches 2340 meters; is 9.96hm2; damage to the water and Plant measures: 2.57hm2 of garden greening, 886m2 of sowing grass soil conservation facility area is seeds , 208m2 of greening in parking lot, and planting 46 trees; Cost to be in- 9.96hm2; the total amount of water cluded in wa- Take soil and soil erosion caused by the pro- Temporary measures: 7700 m3of topsoil stripping, 202 meters of / ter and soil Discard soil ject may be 3515t, and the total soil-filled straw bag retaining wall, 2566m2 of tarpaulin covering, 1286 conservation amount of water and soil erosion is meters of drain ditch, 4 sand basins and 1 car washing tank. works 3321t. (3) Control area of pipeline project Engineering measures: 8.70hm2 of site leveling , and the topsoil is back- filled with 2600 m3, 15.02hm2 of re-cultivation; Plant measures: 7.84hm2 of Green Belt Recovery .0.86hm2 of forrestation and grass planting Temporary measures: topsoil stripping 2600m3, 5400 meters of soil-filled straw bag retaining wall, 38880 m2 of tarpaulin covering, 5400 meters of color steel plate, and 41 sand basins. (4) Control Area of Crossing Engineering Engineering measures: Re-cultivation 0.18hm2; Temporary measures: 678 meters of color steel plate, 650 meters of drain ditch, and 46 sand basins. 1. Strengthen water-saving and environmental protection publicity; It belongs to the new water source Local Environ- Sub-project 2. Setting the primary and secondary protection zones, where the range of New Project of area, and has not divided the water local Water mental Protection project of Operating the first-level protection zone is 1 km upstream to 100 meters down- Government Second Water Plant Chongren River source protection zone, and is diffi- Conservancy Bureau ; Water Linchuan Period stream from the water area and one side of water intake point to the land budget in Linchuan District cult to guarantee the water quality of Bureau Conservancy County area 100m extended from the land surface of embankment angle to the the reservoir for a long time; Bureau back surface; and the second-level protection zone is 3000 meters up- Project Period of Environmental Sensitive Implement Supervision Budget Activities Potential Impact Mitigation/Prevention Measures Name Time Point Mechanism Mechanism (10,000 yuan,) stream of one side of the back surface of the water area and water intake point and land surface extended 100 meters from the land surface of embankment agle to the back surface. Included in the Local Water Installing on-line water quality monitoring system; Water plant operating ex- Conservancy operating unit penses of the Bureau water plant - the flushing wastewater of the water plant has been upgraded to the back of the water distribution well after the recovery of the water tank; - tank mud wastewater after concentrated sludge concentration pool that The water plant filter backwash Local Water the supernatant fluid recycling recycling pool, the rest into the dewatering Water plant l wastewater, sludge discharge Conservancy / machine room, the filtrate after precipitation treatment to city miscella- operating unit wastewater etc. Bureau neous water standard back to factory green land irrigation, flushing roads. -- water plant, pressure pumping station staff life sewage treatment of sewage treatment back into the municipal network. -- to reduce noise, noise reduction and noise reduction measures for the dewatering machine room and the anti-flushing room, and increase the sound absorption wall measures in addition to the above measures; The noise effects of various pumping Huangshi Village -- strengthen equipment operation and maintenance. stations Strictly control key noise sources (such as fan, water pump, etc.), make noise control requirements to equipment manufacturers, and select low-noise equipment as far as possible; -- the sludge water from the water purification plant will be transported to the lion town landfill site in Jiujiang County on a regular basis after the l Sludge, household waste drying rate is less than 60%. -- staff living waste is collected and disposed of by the local sanitation department. (1) to establish safe operation procedures, the staff must be specially trained to operate strictly according to the operation procedures, and the education management shall be strengthened to avoid the leakage of chlorine gas caused by operation mistakes. (2) to strengthen liquid chlorine storage and transport management Chlorine gas leakage may occur in (3) to strengthen the maintenance and management of equipments Authoritative staff the chlorine-intensive room (4) to ensure being equipped with necessary protective equipments (5) to formulate contigency plan; to handle in the remote plan, if necessary, to promptly alarm and timely cooperate to deal with the accident. (6) green tree species near the water plant shall be the select with strong resistance to chlorine gas, such as yew, hemlock, jujube, Holly, etc 1, according to the specification of design construction, the pipeline maintenance and accident emergency work shall be properly done; pipe- line maintenance workers shall receive special training; important node along the pipeline shall be set up with clear identification in order to avoid other units damage in pipeline construction. Water quality pollution risk of water 2. When crossing major river channels and highways, the materials shall l intake and pipeline be used to enhance the ability of anti-risk; the pipe shall be set up at a certain distance to set the cut-off valve and the bypass pipe. 3, to establish and improve the engineering water inlet water pollution emergency plan, once finding upstream pollution incident, the water intake and related measures shall be taken in time, according to the pollu- tion disposal situation, real time optimization of diversion scheme, to en- Project Period of Environmental Sensitive Implement Supervision Budget Activities Potential Impact Mitigation/Prevention Measures Name Time Point Mechanism Mechanism (10,000 yuan,) sure the safety of water diversion water as much as possible. Table 4-8 List of Environmental Impact and Mitigation Measures for Sub-project Works in Dongxiang District Budget Project Period of Environmental Sensitive Mitigation/ Implement Activities Potential Impact Supervision Mechanism (10,000 Name time Point Prevention Measures Mechanism yuan,) Civil construc- Shu Jia Source, Paishang Construction dust, con- tion, construc- New Village, Fenglin Vil- struction waste water, The construction shall be implemented according to Annex 2 of the Environmental Project Con- tion materials PMO, Municipal Envi- lage, Upper Xigang, Aijia noises generated from Management Plan of the environmental protection implementation regulations of tractor, Con- Included in and earthwork ronmetal Protection Bu- Village, Cao Jia Village construction machinery China Jiangxi Provincial Integrated Rural and Urban Water Supply and struction Super- project costs transportation, reau and other Villages along the and transport vehicles, Wastewater Management Project vision construction line construction wastes, etc. access road, etc. Leakage and damage to The construction scheme shall be constructed after the approval of the Company, the excavation of the gas the construction scope shall be greater than 50 cm from the gas pipeline; the Construction pipe network may caused large-scale operation vehicle shall be reduced passing above the gas pipeline, the process of new by the construction of civ- width of the operation belt shall be strictly controlled, the cross-laying of pipelines Project Con- Fuzhou Station of construction of West-East Gas Transmis- il works; forced construc- shall be reduced; the corresponding safety management plan shall be made; and tractor, Con- Inclusion of CNPC West-East Gas water plant in sion Pipeline tion with uncleared the operation of mechanical excavation, blasting, hoisting and hoisting shall be struction Super- project costs Transmission Dongxiang Dis- location of the pipeline prohibited at the vicinity of the gas pipeline, and emergency measures shall be vision trict may resulting in accidents established in advance; additional piles, beam erection or local excavation protec- such as rupture of the pipe tion shall be added in the construction. After the construction, vegetation restora- network, etc. tion work shall be carried out on the periphery of the pipeline. During the preparation of the project, the design unit shall put forward the con- struction scheme for pipeline sections related to road facilities. Before the con- struction, the design unit shall inform them in advance that the construction can be The settlement of the road started only after obtaining the permission of the highway department; in the im- Extension Con- surface during the con- plementation of the project, the management requirements of the highway depart- struction of struction process and in ments shall be strictly enforced, so as to ensure that the road facilities are not Project Con- County Pipeline G320, S210, S208,S213, the completion of the con- damaged or the highway land is not occupied; strictly control the width of the op- tractor, Con- Local road management Inclusion of Water Network in G60, High-speed Rail struction, as well as the struction Super- department project costs Supply eration scope, observe the relevant national operation specifications; and restore Construction Dongxiang pavement uplift caused by the affected area in time after the construction is completed. vision Sub-project County the under-digging top of Xiushui Period For sections crossing roads and railways, relevant protective measures shall be pipe, etc. County taken during the construction period and strictly complying with the Technical Specification for Pipe Jacking of Water Supply and Sewerage Engineering (CECS246-2008) New Project of 1. The construction activities shall be arranged in non-teaching time as much as 10m,50m,15m,15m repec- possible, so as to avoid the influence on the teaching order; Water Plant in tively away fromDongxing Dongxiang Dis- Influence of construction 2. The construction section near the school shall have a temporary sound barrier Technology School, Project Con- trict, Extension on air environment of with a high noise reduction effect of not less than 2 meters, so as to reduce the PMO, Municipal Envi- Guangchang Primary tractor, Con- Project of school; influence of con- influence of noise; ronmetal Protection Bu- 4 School of Dongxiang Dis- struction Super- County Pipeline struction of noise to stu- 3. Special attention shall be paid to the control of construction period during the reau trict, Pogan High School, vision Network in dents' class construction of the road section near Xiaohuang Nursing Home of Dongxiang Xiaohuang Town Nursing Dongxiang Dis- District, so as to avoid the rest period at noon and night and so as to avoid the in- Home trict fluence of construction noise on the senior citizens in the nursing home. The area of disturbances 1.Control area of water intake pump station and damage caused by Engineering measures: site leveling is 1487m2, and the topsoil is back-filled with sub-project construction in 700m3, drain ditch is 408 meters; Dongxiang District is Cost to be Plant measures: landscape greening 1487m2, planting of 96 trees, ; PMO local environmental 22.13hm2; damage to the protection included in Take soil Temporary measures: strip 700 m3 of topsoil, the concrete floor is removed for Contractor, water and water and soil conserva- Discard soil / tion facility area is 500m2, build 64m of the soil-filled straw bag retaining wal, 233m2 of the covered Construction Bureau, soil conser- tarpaulin, 125 meters of the drain ditch and 2 of the sand basin. Supervision Local Water Conservancy 22.13hm2. In the absence vation of any water and soil con- 2. Control area of water purification plant Bureau works servation measures, the Engineering measures: 2.68hm2 of site leveling, and the topsoil is backfilled with total amount of water and 7700 m3, drainage ditches 2340m; soil erosion that may be Plant Measures: 2.57hm2 of garden greening, 886m2 of sowing grass seeds, 208m2 Budget Project Period of Environmental Sensitive Mitigation/ Implement Activities Potential Impact Supervision Mechanism (10,000 Name time Point Prevention Measures Mechanism yuan,) caused by the project is of greening in parking lot, and planting 46 trees; 3515t, and the total Temporary measures: 7700 m3of topsoil stripping, 202 meters of soil-filled straw amount of newly in- bag retaining wall, 2566m2 of tarpaulin covering, 1286m of drain ditch, 4 sand creased water and soil basins and 1, car washing tank. erosion is 3321t. 3. Control area of pipeline engineering Engineering measures: 8.70hm2 of site leveling , and the topsoil is backfilled with 2600 m3, 15.02hm2 of re-cultivation; Plant measures: 7.84hm2 of Green Belt Recovery .0.86hm2 of forrestation and grass planting; Temporary measures: topsoil stripping 2600m3, 5400 meters of soil-filled straw bag retaining wall, 38880 m2 of tarpaulin covering, 5400 meters of color steel plate, and 41 sand basins. 4.Control Area of CrossingEngineering Engineering measures: Re-cultivation 0.18hm2; Temporary measures: 678 meters of color steel plate, 650 meters of drain ditch, and 46 sand basins. It belongs to the newly Setting the primary and secondary protection zones, where the range of the added water source area, first-level protection zone is 1 km upstream to 100 meters downstream from the has not divided the water water area and one side of water intake point to the land area 100m extended from local Water Local Environmental source protection area, Government the land surface of embankment angle to the back surface; and the second-level Conservancy Protection Bureau;Water and it is difficult to guar- budget protection zone is 3000 meters upstream of one side of the back surface of the Bureau Conservancy Bureau antee the water quality of water area and water intake point and land surface extended 100 meters from the the reservoir for a long land surface of embankment angle to the back surface. Hefang Reservoir, time. Hengshan Reservoir The water supply guaran- tee rate is 90%, which can Included in meet the requirement of Installation of online water quality monitoring system the operat- water supply guarantee Water plant op- Local Water Conservancy ing expens- rate of the water plant; the erating unit Bureau es of the water quality status is in water plant accordance with Class III water quality standard New Project of The back-washing waste water of the filter tank of the tap water plant is transport Operating Water Plant in to the water distribution well for reuse after being lifted by the reuse water tank; Period Dongxiang Dis- The waste water of sludge discharged from the sedimentation tank is concentrated trict Included in by the sludge concentration tank and the liquid supernatant after concentration is Filter tank back-washing the operat- returned to the reuse water tank for reuse the remaining part enters the dewatering Water plant op- Municipal Environmetal / waste water, sludge dis- ing expens- machine room to be dehydrated, and the filtrate generated by the sedimentation erating unit Protection Bureau charge waste water, etc. es of the process reaches the municipal sewage standard, and is reused for irrigation and water plant road irrigation in the plant area. The domestic sewage of the staff of the pressurized pumping station shall be dis- charged into the municipal pipe network after being treated by the septic tank. _The noise decrease and noise reduction measures of damping cushion and sound insulation door and window shall be adopted for the dewatering machine room and the back washing room, and the sound absorption wall measures shall be Included in added in addition to the above measures; the operat- Noise impact of various Water plant op- Municipal Environmetal / ing expens- pump houses _Strengthen the operation and maintenance of the equipment. Strictly control the erating unit Protection Bureau es of the key noise sources (such as fan, water pump, etc.), propose noise control require- water plant ments to the equipment manufacturers, and choose low noise equipment as much as possible; / Sludge and domestic gar- -After the sludge water of the water purification plant is dehydrated to less than Water plant op- Municipal Environmetal Included in Budget Project Period of Environmental Sensitive Mitigation/ Implement Activities Potential Impact Supervision Mechanism (10,000 Name time Point Prevention Measures Mechanism yuan,) bage 60% of the water content by drying, the sludge water shall be transported to the erating unit Protection Bureau the operat- domestic garbage landfill site in Yangyuanli of Dongxiang District on a regular ing expens- basis. es of the _The staff's domestic garbage shall be collected and disposed of by the local sani- water plant tation department. Table 4-9 Summary of Social Impact and Mitigation Measures Risk Measures or actions Actors Time Funding Monitoring indicators a) Strengthen publicity on the Project to guide villagers to use tap water and treatment 1. Insufficient project PMOs, design agency, township Preparation, con- Project budget, gov- a) Project publicity materials, publicity frequency and sign-in form of awareness and par- facilities voluntarily; governments, village commit- struction, operation ernment finance participants; ticipation b) Strengthen project information disclosure; tees, villagers b) Time, location and participants of publicity; c) Optimize the design of water supply and sewer pipelines in consultation with vil- c) Grievances about interior decoration damage and handling; lagers; d) Number of villagers recognized d) For any inevitable damage, conduct functional restoration or offer compensation properly; e) Set villagers with good water conservation and environmental awareness as exam- ples. 2. LA risks a) Develop a detailed RAP; PMOs, owner, RAP preparation Preparation, con- Project budget a) RAP b) Pay special attention to the income restoration of vulnerable groups in the RAP. agency, external M&E agency struction 3. Construction risks a) Lay pipelines along flat terrains, and avoid living areas where possible; PMOs, contractor Preparation, con- Budget of the Envi- a) Pipeline routing and distance from living areas; b) Avoid the busy season of farming; struction ronmental Manage- b) Construction time and disbursement of compensation; c) Conduct publicity before construction, and carry out construction in segments; ment Plan c) Modes and frequency of publicity; d) Take measures to control noise; d) Grievances about environmental pollution and handling; e) Sprinkle access roads regularly to prevent flying dust; e) Inclusion of construction safety management in construction con- f) Set up non-horning signs in densely populated areas, and avoid overnight construc- tracts, and safety awareness publicity and education; tion where possible; f) Number of signs and repaired public facilities; g) Strengthen the supervision over material sources to ensure construction quality, and g) Material quality and maintenance mechanism establish a pipeline maintenance mechanism. 4. Maintenance staff a) Appoint staff for system operation and maintenance, and offer professional training; PMOs, owner, village commit- Preparation, con- Project budget, town- a) Time and scope of training; and training, and b) Keep the staff stable and assign responsibilities clearly; tees, villagers struction, operation ship and village fi- b) Stability of operation and maintenance staff; option comparison c) Establish appeal and supervision mechanisms, and contact points above the village nance c) Establishment of appeal and supervision mechanisms, and contact level; points above the village level; d) Conduct option comparison in consideration of operation and maintenance costs. d) Project design 5. Ability to pay of a) Develop preferential policies on water charges and wastewater treatment charges Water supply companies, civil Operation Government finance a) Number of persons covered by preferential policies, and amount ex- vulnerable groups for poor population; affairs bureaus empted; b) Hold a public hearing when adjusting water and wastewater treatment rates. b) Time, location and participants of the public hearing 6. Women’s partici- a) Not less than 40% of participants in public participation activities at the preparation Design agency, contractor, Construction, opera- Project budget, gov- a) Number of public participation activities, number of female partici- pation stage should be women; PMOs, county / district agen- tion ernment finance pants, and minutes; b) Not less than 30% of members of village maintenance teams should be women; cies concerned, township gov- b) Number and proportion of female members, feedback and sugges- c) Compensation should be received after signature by a couple; ernments, village committees, tions; d) Each project agency (PMOs, water supply companies, sewerage companies, etc.) local women, poor people c) Signature of women; should have at least two female members; d) Number of female members in project agencies; e) Conduct project publicity at times and locations, and in forms suitable for women; e) Time, location and mode of publicity and training f) Tailor publicity to women’s cognition; g) Give publicity and training on water conservation and tap water use to women. 7. Job opportunities a) Make unskilled jobs first available to women and other vulnerable groups. PMOs, contractor, labor and Construction Contractor budget a) Number of vulnerable people doing unskilled jobs at the construction for vulnerable groups b) Ensure equal pay to equal work. social security bureau, village stage; committees, local women b) Number of vulnerable people doing public welfare jobs at the opera- tion stage 8. Women’s employ- a) Recruit some female members for PMOs for the convenience of women-related PMOs, contractor, labor and Construction Contractor budget a) Number of vulnerable people doing unskilled jobs at the construction ment in IAs work; social security bureau, village stage; b) Employ a certain number of female workers for water supply companies, such as committees, local women b) Number of vulnerable people doing public welfare jobs at the opera- meter readers and coordinators, running maintenance staff, toll collector, etc. tion stage; c) Offer training for women’s recruitment and emplo yment. c) Location, scope and frequency of female employees 9. Impact on power a) Coordinate interests between water supply companies and hydropower stations, and Owners, PMOs, water supply Construction Project budget, profit a) Compensation measures between water supply companies and hy- generation offer rational compensation; companies, power generation of water supply com- dropower stations; b) Develop compensation measures based on practical conditions to make up losses companies pany b) Annual amount of compensation and payment arising from water supply. 10. Social risks a) Strengthen publicity and education on public health and AIDS prevention; Contractors, local agencies Construction Project budget, budg- a) Provisions of construction contract, and implementation; b) Include education on public health and AIDS prevention in construction contracts concerned, owners, enterprises, ets of local agencies b) Number of participants in training on public health and AIDS preven- for effective performance; township governments, village concerned tion; c) Establish a physical checkup mechanism for construction staff (i.e., setting up tem- committees c) Number of health centers; porary infirmaries and utilizing local medical resources); d) Quantities of publicity materials on AIDS prevention at the construc- d) Conduct diversified publicity on AIDS prevention (brochure, poster, album, etc.); tion stage; e) Conduct publicity on local social and cultural customs to reduce potential conflicts. e) Quantities of publicity materials on local social and cultural customs at the construction stage Table 4-10 Summary Table of Dam Action Plan and Rectification Scheme Total Estimated Storage Dam Last Time Location (Township, Construction Last Time for Action Plan for Reinforcement and Im- Costs Operation Manage- S/N Reservoir Name Capacity Reservoir Functions Dam Type Height for Safety River) Year Reinforcement Identification Conclusion proved Management (10,000 ment Department (10,000 (m) Identification Yuan) m3 ) The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators It is mainly used for power of the reservoir have met the standard re- Upstream of Xiuhe river Jiangxi Dongjin generation, and it also Dongjin reser- in Xiushui county, Reinforced con- quirements, and the proposed operation and 1 voir in Xiushui northwest of Jiangxi 79500 has the flood prevention, 85.5 1995 2012 2010 Keep observing during flood time. 0 Power Genera- irrigation, aquaculture and crete face maintenance supervision plan, and the county Province rock-fill dam tion Co., Ltd other comprehensive utili- emergency plan can effectively maintain zation functions and guarantee the safe operation of the reservoir dam. In general, the reservoir dam meets the requirements of World Bank Safeguard Policy OP4.37 The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and maintenance supervision plan, and the emergency plan can effectively maintain and guarantee the safe operation of the (1)Due to the lack of supporting funds, part reservoir dam. In general, the reservoir dam of the danger elimination and reinforcement meets the requirements of World Bank project of the reservoir will not be completed Safeguard Policy OP4.37 according to the approval plan. Therefore, (1) Due to the lack of supporting funds, part this project has not yet been completed and of the danger elimination and reinforcement accepted. Although it does not affect normal project of the reservoir will not be com- and safe operation, we suggest to complete It is mainly used for water the project as soon as possible. supply in urban area and pleted according to the approval plan. (2)The road upstream of 1# dam is the debris Leping Communist Communist Middle and upstream of irrigation, and it also has Therefore, this project has not yet been Earth dam with road and is not hardened, and it is relatively Reservior Engi- 2 Reservoir in Chexi, tributary of Lean 14370 the flood prevention, pow- 34.2 1959 2006 2001 completed and accepted. Although it does 60 inclined clay simple. There are more weeds and shrubs on neering Manage- Leping City river er generation, aquaculture not affect normal and safe operation, we core both sides, and vehicles are not easy to go on ment Bureau and other comprehensive suggest to complete the project as soon as the dam in flood or rainseason, which is not utilization functions possible. conducive to flood prevention. It is recom- (2) The road upstream of 1# dam is the mended to harden and broaden the road. debris road and is not hardened, and it is Weeds upstream and downstream of dam relatively simple. There are more weeds and have a rapid speed of growth, and we suggest shrubs on both sides, and vehicles are not to regularly clear them. easy to go on the dam in flood or rainsea- (3)Some rain stations, the tubing have been son, which is not conducive to flood pre- damaged, it’s better to repair them vention. It is recommended to harden and broaden the road. Weeds upstream and downstream of dam have a rapid speed of growth, and we suggest to regularly clear them. (3)Some rain stations, the tubing have been damaged, it’s better to repair them The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and maintenance supervision plan, and the (1) The reservoir management department emergency plan can effectively maintain should prepare the flood prevention plan It is mainly used for irriga- and guarantee the safe operation of the according to requirements of Guidelines for tion, and it also has the Leping Dong- Dongfanghong reservoir dam. In general, the reservoir dam the Preparation of Emergency Response Plan Tributary of upstream of flood prevention, water Earth dam with fanghong Reser- 3 reservoir in 1381 24.0 1969 2010 2005 meets the requirements of World Bank for Reservoir Flood Prevention, making the 13 Lean river, Raohe supply, aquaculture and cement core voir Management Leping City Safeguard Policy OP4.37 plan more scientific and operable. other comprehensive utili- Institute (1) The reservoir management department (2) We suggest that the piezometer tubes zation functions should prepare the flood prevention plan should be regularly monitored for reorgani- according to requirements of Guidelines for zation and record keeping the Preparation of Emergency Response Plan for Reservoir Flood Prevention, mak- ing the plan more scientific and operable. (2) We suggest that the piezometer tubes should be regularly monitored for reorgani- zation and record keeping The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and maintenance supervision plan, and the (1)The piezometer tubes should be regularly emergency plan can effectively maintain monitored for reorganization and record and guarantee the safe operation of the keeping. It is mainly used for irriga- reservoir dam. In general, the reservoir dam (2) The reservoir management department Happiness res- Guanzhuang water trib- tion, and it also has the Earth dam with Leping Happiness meets the requirements of World Bank should prepare the flood prevention plan 4 ervoir in Leping utary of middle of Lean 1267 flood prevention, aquacul- cement and clay 22.8 1958 2010 2002 13 Reservoir Man- Safeguard Policy OP4.37 according to requirements of Guidelines for City river, Raohe ture and other comprehen- core agement Institute (1)The piezometer tubes should be regular- the Preparation of Emergency Response Plan sive utilization functions ly monitored for reorganization and record for Reservoir Flood Prevention, making the keeping. plan more scientific and operable. (2) The reservoir management department should prepare the flood prevention plan according to requirements of Guidelines for the Preparation of Emergency Response Plan for Reservoir Flood Prevention, mak- ing the plan more scientific and operable. The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and maintenance supervision plan, and the (1) The weeds in the downstream slope of the emergency plan can effectively maintain dam grow faster and are regularly cleared. and guarantee the safe operation of the The water level of downstream dam is higher reservoir dam. In general, the reservoir dam than that of the drainage dikes. It is suggest- meets the requirements of World Bank ed to reduce the water level in the ponds and Safeguard Policy OP4.37 to inspect whether there is abnormal water It is mainly used for irriga- (1) The weeds in the downstream slope of seepage in the ponds during the flood season. tion, and it also has the the dam grow faster and are regularly Leping Town Qi- Gongqiang res- Kengpan water of (2) There is water resistance phenomenon in flood prevention, aquacul- Homogeneous cleared. The water level of downstream aozhen Water 5 ervoir in Leping downstream of Lean 1412 16.0 1958 2012 2008 the inlet of spillway, and we suggest to re- 33 ture, travel and other com- earth dam dam is higher than that of the drainage Management Sta- City river move. prehensive utilization dikes. It is suggested to reduce the water tion (3) It is suggested that the flood prevention functions level in the ponds and to inspect whether contingency plan prepared by the reservoir there is abnormal water seepage in the management townships should be refined, ponds during the flood season. specific and operable with the relevant (2) There is water resistance phenomenon charts. in the inlet of spillway, and we suggest to (4) We suggest to improve the relevant safety remove. management system (3) It is suggested that the flood prevention contingency plan prepared by the reservoir management townships should be refined, specific and operable with the relevant charts. (4) We suggest to improve the relevant safety management system The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and It is mainly used for water Jinxi County Gaofang reser- Junction of Huangtong maintenance supervision plan, and the We suggest to update and improve the flood supply, with irrigation, Homogeneous Gaofang Reservior 6 voir in Jinxi and Lufang in Jinxi 6750 40.2 1959 2013 2002 emergency plan can effectively maintain prevention plan and relevant management 8 flood prevention and pow- earth dam Management Bu- county county and guarantee the safe operation of the system er generation reau reservoir dam. In general, the reservoir dam meets the requirements of World Bank Safeguard Policy OP4.37 We suggest to update and improve the flood prevention plan and relevant management system The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and maintenance supervision plan, and the The reservoir management department It is mainly used for water emergency plan can effectively maintain should prepare the flood prevention plan Dong Xiang Dis- Hefang reservoir Hefang village of supply, and combined with Earth dam with and guarantee the safe operation of the according to requirements of Guidelines for trict Hefang Reer- 7 in Dongxiang Dongjiaoxiaogang in 1138 irrigation, flood prevention inclined clay 16.7 1961 2009 2002 reservoir dam. In general, the reservoir dam the Preparation of Emergency Response Plan 5 vior Engineering district Dongxiang district and other comprehensive core meets the requirements of World Bank for Reservoir Flood Prevention, making the Management Bu- utilization functions Safeguard Policy OP4.37 plan more scientific and operable reau The reservoir management department should prepare the flood prevention plan according to requirements of Guidelines for the Preparation of Emergency Response Plan for Reservoir Flood Prevention, mak- ing the plan more scientific and operable The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and The mountain formed of the new construc- maintenance supervision plan, and the tion of road on the right bank of the dam near It is mainly used for irriga- emergency plan can effectively maintain the upper reaches of the bank is relatively Dongxiang District Hengshan res- tion, and it also has the and guarantee the safe operation of the Hengshan village of steep, the rock mass is broken and the Hengshan Re- ervoir in flood prevention, daily reservoir dam. In general, the reservoir dam 8 Xiaohuang township in 2879 Earth dam with 25.2 1959 2010 2004 weathering is serious, forming a hidden dan- 20 servior Engineer- Dongxiang dis- water supply, aquaculture, meets the requirements of World Bank Dongxiang district cement core ger. It is suggested that the contractor should ing Management trict and other comprehensive Safeguard Policy OP4.37 take appropriate safety measures. Bureau utilization functions The mountain formed of the new construc- tion of road on the right bank of the dam near the upper reaches of the bank is rela- tively steep, the rock mass is broken and the weathering is serious, forming a hidden danger. It is suggested that the contractor should take appropriate safety measures. The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and It is mainly used for urban Dongxiang district Happniess Re- maintenance supervision plan, and the Being flushed by wind and waves, the rocks Zhujiayuan of Xiaomin industry, domestic water Happniess Re- servior in Earth dam with emergency plan can effectively maintain piled up at the upstream of the reservoir are 9 Town in Dongxiang 4675 supply, agriculture irriga- 21.0 1958 2004 2000 30 servior Engineer- Dongxiang dis- clay core and guarantee the safe operation of the very messy, which should be smoothed out district tion, fllod prevention and ing Management trict reservoir dam. In general, the reservoir dam timely. aquaculture Bureau meets the requirements of World Bank Safeguard Policy OP4.37 Being flushed by wind and waves, the rocks piled up at the upstream of the reservoir are very messy, which should be smoothed out timely. The main responsibility for the operation management of the reservoir dam is clear and well-defined, the rules and regulations are sound, various performance indicators of the reservoir have met the standard re- quirements, and the proposed operation and (1) The mountain and rock body of dam left maintenance supervision plan, and the bank near the dam road bend and the right emergency plan can effectively maintain dam abutment roadside are relatively steep, and guarantee the safe operation of the broken and weathering is serious, forming a reservoir dam. In general, the reservoir dam hidden danger. We suggest to take safety Upstream of Long- meets the requirements of World Bank Yongxin County It has irrigation, flood pre- Fine stone con- measures; Longyuankou yuankou, and upstream Safeguard Policy OP4.37 Longyuankou Re- vention, power generation crete block stone (2) We suggest that the reservoir manage- 10 reservoir in of Hengxi village in 4560 57.3 1992 2010 2007 (1) The mountain and rock body of dam left 25 servior Engineer- and other comprehensive hyperbolic arch ment department should prepare the flood Yongxin county Longyuankou township, bank near the dam road bend and the right ing Management benefits dam prevention plan according to requirements of Yongxin county dam abutment roadside are relatively steep, Bureau Guidelines for the Preparation of Emergency broken and weathering is serious, forming a Response Plan for Reservoir Flood Preven- hidden danger. We suggest to take safety tion, and we should make the plan more sci- measures; entific and operable (2) We suggest that the reservoir manage- ment department should prepare the flood prevention plan according to requirements of Guidelines for the Preparation of Emer- gency Response Plan for Reservoir Flood Prevention, and we should make the plan more scientific and operable Chapter V Environmental Monitoring Plan In order to carry out the environmental protection work of the project, verify the results of the envi- ronmental impact mitigation measures, prevent the harm of the sudden accident to the environment, perfect and revise the environmental protection measures according to the requirements, it’s nece s- sary to carry out environmental monitoring work during the construction period and operation peri- od. The implementation of environmental monitoring can also provide scientific basis for environ- mental pollution control, environmental management and regional environmental protection in the construction period and operation period. 5.1 Purpose of monitoring The environmental monitoring includes two phases of the project, construction period and operation period, the purpose of which is to provide comprehensive and timely information on the pollution dynamics of the proposed project, understand the environmental quality change degree, influence scope, and the environment quality dynamics of the operation period in the area where the project construction is located, and timely report the condition information to the competent department, to provide scientific basis for environmental management of the project. 5.2 Environmental Monitoring Agency The environmental monitoring of the construction period and the operation period shall be borne by the project contractor or the operator to qualified agency, which shall be the national environmental quality monitoring certificating unit with full equipment and high technology that the environment monitoring task undertaken can be completed with few difficulties. 5.3 Implementation of monitoring According to the environmental impact prediction result, take the sensitive focus which may be more obvious as the monitoring point, to track the pollution situation during the construction period and operation period of the projecton noise, air environment and surface water environment, which have greater impacts on the environment. The monitoring factors shall be determined according to the engineering pollution characteristic factors. The monitoring and analysis method adopts the corresponding monitoring and analysis method of the project in the Environmental Monitoring Technical Specification promulgated by the State Environmental Protection Administration. And the evaluation standard of each sub-project shall be carried out according to the national standard for environmental assessment. This project monitoring focuses on construction period and operation period. The key scope of pro- ject environmental monitoring includes the surrounding environment of 7 counties, (prefectures and districts) in the project area. See Table 5-1 to Table 5-8 for the Project Monitoring Plan for Water Supply Project and Sewage Treatment Plant of the Project. In addition, PMO can arrange for random environmental monitoring of personnel who have re- ceived environmental monitoring training in order to identify problems and address them in time. Daily monitoring includes: noise monitoring around the project site and sensitive points with porta- ble noise meter; visual observation to check the adverse environmental impact caused by the project, such as causing large area of water and soil erosion, etc. Table 5-1 Environmental Monitoring Plan and Budget Details for the Sub-project of County Yongxin Monitoring point Monitoring Environmental Unit price Annual cost Monitoring Item (s) layout Monitoring items Monitoring frequency Period elements (yuan) (Yuan/year) Institution (Quantity) Sensitive points along the original water pipes: 1 monitoring Once a quarter, 2 days/term, 2 point is set separately Noise LeqdB(A) times/day, once every day and 300 3600 at the east side of the night river, the Longyuan port and the Shang Qiaotou Village Each monitoring sec- Construction tion shall be arranged period at 500m from up- The construction influence PH, DO, total phosphorus NH3-N, Surface water stream and 500m period shall be detected once 1000 6000 COD, BOD2Petroleum from downstream of a day for 2 days Urban the Three Bay Bridge water of Hehe River supply 1 monitoring point 3 terms/year, 1 day/term, 1 facili- Utions with shall be on the drain- time,/day ties Construction monitoring age port of the con- COD, BOD5, SS 1000 3000 con- Waste water qualifications struction sedimenta- struc- tion tank tion water and soil ero- There are four obser- (1)Disturbance surface area, t digging Background check 1 time. project sion vation sites and six and filling amount, runoff amount, During the construction and sample sites temporary piled up, the number of natural convalescence period temporary protection measures and during the rainy season (April control effects of soil and water ero- ~ September), once every sion area shall be monitored. month, the non-rainy season Operating (2) changes in soil erosion and ero- shall be monitored once every 5000 200000 Period sion of water, and the effect of soil three months. erosion on the prevention and control During the rainstorm period measures shall be monitored. (the daily rainfall is greater (3) the quantity and quality of soil than 50mm). and water conservation control Soil and water conservation measures, the survival rate, retention years shall be monitored three rate, growth situation and coverage of to four times. Monitoring point Monitoring Environmental Unit price Annual cost Monitoring Item (s) layout Monitoring items Monitoring frequency Period elements (yuan) (Yuan/year) Institution (Quantity) forest grass measures, the stability, Soil and water conservation integrity and operation of the engi- measures being implemented neering measures shall be monitored. shall be continuously moni- (4) soil and water conservation tored and monitored every 10 measures are being implemented days. (5) changes in topography, topogra- The changes in the topogra- phy and water systems phy, topography and water systems, and the damage to the downstream and sur- rounding areas shall be mon- itored at least once every six months. 1 monitoring point shall be set on the Atmosphere Cl2 4 terms,/year, 1 day/term 600 2400 boundary of the water plant The Longyuankou Reservoir has 3 mon- itoring points: 500m 3 terms/yearforlow flow pe- Be included in from upstream of the PH, DO, total phosphorus, NH3-N, riod, high flow period ,and routine moni- 2000 10000 water intake, water COD, BOD5, petroleum class normal flow period : 1 Phase,, toring of water intake and 1,000m 3 days/term, 1 time/day plant from the downstream of the water intake; Color, turbidity, smell and taste, gross Surface water visible matter, ph, total hardness (calculated as caco3), aluminum, iron, The water inlet and manganese, copper, zinc, anionic the water outlet of the Be included in synthetic detergent, volatile phenol, water plant are re- According to the water plant routine moni- sulfate, chloride, fluoride, cyanide, 2000 20000 spectively provided management requirements toring of water total soluble solids, arsenic, selenium, with monitoring plant mercury, cadmium, chromium (hexa- points; valent)), lead, nitrate nitrogen, chlo- roform, carbon tetrachloride, total number of colonies, total coliforms, Monitoring point Monitoring Environmental Unit price Annual cost Monitoring Item (s) layout Monitoring items Monitoring frequency Period elements (yuan) (Yuan/year) Institution (Quantity) heat-resistant coliforms, free residual chlorine, ammonia , oxygen con- sumption Monitoring section shall be separately set for 500m from The construction influence PH, DO, total phosphorus, NH3-N, Surface water upstream and 500m period shall be detected for 2 1000 3000 COD, BOD5, petroleum class from downstream of days and once a day Tianxi Village of County Rongjiang River city Monitoring points are water arranged separately at Institutions supply Construction the Guangming Vil- with monitor- network period lage of Lianzhou ing qualifica- exten- Township, Longan tions sion Villageof Fengxiang Once a quarter, 1 day/term, 2 project Noise Town, TaishanVillage LeqdB(A) times/day, once every day and 300 6000 of Gaolou Bridge night Town, Quantang Vil- lage of Huaizhong Town and Qishan Village of Shiqiao Town Table 5-2 Environmental Monitoring Plan and Budget Details for the Sub-project of County Jinxi Envi- Monitor- Monitoring point ron- Unit price Annual cost Monitoring Item (s) ing Peri- layout Monitoring items Monitoring frequency mental (yuan/year) (yuan/year) Institutions od (Quantity) elements Along the original water pipeline line: County city monitoring points water supply Construc- Once a quarter, 1 day/term, 2 are arranged sepa- network tion peri- Noise LeqdB(A) times/day, once every day and 300 3600 rately at Shuangtang extension od night Town, Chonglu project Town of He City, Zufang Town Along the original water pipeline: 1 monitoring point is Once a quarter, 1 day/term, 2 Noise LeqdB(A) 300 1200 set at Huangtong times/day, once every day and night Construc- Town, Huangtong tion peri- Township od 1 monitoring point COD, BOD5, SS 3 terms/year, 1 day/term, onceday Con- Institutions shall be set at the struction with moni- drainage port of the 1000 3000 wastewat toring quali- construction sedi- er fications mentation tank Huangtong Monitoring point Township shall be set at the Water Sup- Atmos- expansion water ply Project Cl2 Once a quarter, 1 day/term 600 2400 phere plant and the boundary of water intake pump house Operating (1)Disturbance surface area, digging and Background value check once time. Period filling amount, runoff amount emporary During the construction period and piled up, the number of temporary protec- natural convalescence period during water Set six observations tion measures and control effects of soil and the rainy season (April ~ Septem- and soil and eight sample 5000 224000 water erosion area shall be monitored. ber), once every month, the erosion sites (2) changes in soil erosion and erosion of non-rainy season shall be monitored water, and the effect of soil erosion on the once every three months. prevention and control measures shall be During the rainstorm period (the monitored. daily rainfall is greater than 50mm). (3) the quantity and quality of soil and wa- Soil and water conservation years ter conservation control measures, the sur- shall be monitored three to four vival rate, retention rate, growth situation times. and coverage of forest grass measures, the Soil and water conservation stability, integrity and operation of the en- measures being implemented shall gineering measures shall be monitored. be continuously monitored and (4) soil and water conservation measures monitored every 10 days. are being implemented The changes in the topography, (5) changes in topography, topography and topography and water systems, and water systems the damage to the downstream and surrounding areas shall be moni- tored at least once every six months. Three monitoring Water temperature, pH, DO, permanganate points: 500m from index, total phosphorus, total nitrogen, Be included upstream of water NH3-N, COD, BOD5, copper, zinc, fluo- 3 terms/year, low flow period, high in routine Surface intake, water intake ride, selenium, arsenic, mercury, cadmium, flow period, and normal flow peri- 2000 30000 monitoring water and 1,000m from chromium, lead, cyanide, volatile phenol, od3 days/term, once aday of water downstream of wa- petroleum, anionic surfactant, sulfide, fecal plant ter intake coliforms, Table 5-3 Environmental Monitoring Plan and Budget Details for the Sub-project of County Nanfeng Envi- Unit price Monitoring ronmen- Monitoring point layout Annual cost Monitoring Sub-project Monitoring items Monitoring frequency (Yu- Period tal ele- (quantity) (yuan/year) Institution an/Period) ments Monitoring sections shall be separately set at 500m from upstream and 500m down- stream of the Junfeng Surface PH, DO, total phosphorus, NH3-N, COD, The construction influence period shall be Bridge of Shishan County, 1000 6000 water BOD5, petroleum class detected for 2 days and once a day 500m from the upstream, and 500m downstream of Jiulian Bridge in Laixi Township Sensitive points along the pipe network: monitoring points are separately set up Once a quarter, 1 day/term, twice/day, Noise in the town of County LeqdB(A) 300 3600 once every day and night Shishan, Changling Village Extension of Qiawan County, Laixi project of tap Township Primary School. Institutions with Construction water pipe Background value check once time; monitoring period (1)Disturbance surface area, t digging and filling network in During the construction period and natural qualifications amount, runoff amount, temporary piled up in the area of County convalescence period during the rainy pile soil, useless quantity layer stripping and temporary season (April ~ September), once every piled up, the number of temporary protection measures month, the non-rainy season will be moni- and control effects of soil and water erosion area of tored once every three months. change During the rainstorm period (the daily (2) changes in soil erosion and erosion of water, and the water There are four obser- rainfall is greater than 50mm). effect of soil erosion on the prevention and control and soil vation sites and six Soil and water conservation years shall be 5000 180000 measures erosion sample sites monitored three to four times. (3) the quantity and quality of soil and water conservation Soil and water conservation measures control measures, the survival rate, retention rate, growth being implemented shall be continuously situation and coverage of forest grass measures, the sta- monitored and monitored every 10 days. bility, integrity and operation of the engineering measures The changes in the topography, topography (4) soil and water conservation measures being imple- and water systems, and the damage to the mented downstream and surrounding areas shall be (5) changes in topography, topography and water systems monitored at least once every six months. Table 5-4 Environmental Monitoring Plan and Budget Details for the Sub-project of County Leping Unit price Annual cost Monitoring Environmental Monitoring point layout (quanti- Monitoring Item (s) Monitoring items Monitoring frequency (yu- (Yu- Period elements ty) Institution an/year) an/year) Monitoring sections shall be set at The construction influ- 500m from upstream of the Gutian PH, DO, total phosphorus, NH3-N, ence period shall be de- Surface water 2000 4000 Bridge and 500m from down- COD, BOD5, petroleum class tected for 2 days and once stream of the Gutian Bridge a day The monitoring point shall be on 3 terms/year, 1 day/term, Construction the drainage port of the construction COD, BOD5, SS once a day 1000 3000 wastewater sedimentation tank Once a quarter, 1 Primary SchoolStar Experimental day/term, twice/day, and Noise LeqdB(A) 300 6000 kindergarden, Huanggang Town once every day and night (1)Disturbance surface area, t dig- Background value check ging and filling amount, runoff once time. amount, temporary piled up in the During the construction area of pile soil, useless quantity period and natural conva- Expansion layer stripping and temporary piled lescence period during the Institutions Project of Construc- up, the number of temporary pro- rainy season (April ~ with moni- Water Plant tion period tection measures and control effects September), once every toring quali- in Lep- of soil and water erosion area of month, the non-rainy fications ingCity change season will be monitored (2) changes in soil erosion and ero- once every three months. sion of water, and the effect of soil During the rainstorm Water and soil There are four observation sites and erosion on the prevention and con- period (the daily rainfall 5000 200000 erosion six sample sites trol measures is greater than 50mm). (3) the quantity and quality of soil Soil and water conserva- and water conservation control tion years shall be moni- measures, the survival rate, reten- tored three to four times. tion rate, growth situation and cov- Soil and water conserva- erage of forest grass measures, the tion measures being im- stability, integrity and operation of plemented shall be con- the engineering measures tinuously monitored and (4) soil and water conservation monitored every 10 days. measures being implemented The changes in the to- (5) changes in topography, topog- pography, topography and Unit price Annual cost Monitoring Environmental Monitoring point layout (quanti- Monitoring Item (s) Monitoring items Monitoring frequency (yu- (Yu- Period elements ty) Institution an/year) an/year) raphy and water systems water systems, and the damage to the down- stream and surrounding areas shall be monitored at least once every six months. Monitoring point shall be set at the expansion water plant and the Once a quarter, 1 Atmosphere Cl2 600 2400 boundary of water intake pump day/term house There are 3 monitoring points in the 3 terms/year,for the low Be Included Communist Reservoir: 500m from flow period ,high flow PH, DO, total phosphorus, NH3-N, in routine upstream of the water intake, water period, and normal flow 2000 10000 COD, BOD5, petroleum class monitoring of intake and 1,000m from down- period 3 days/term, once water plant stream of the water intake; day Color, turbidity,smell and taste, gross visible matter, ph, total hard- Operating ness (calculated as CaCO3), alumi- Period num, iron, manganese, copper, zinc, anionic synthetic detergent, volatile Surface water phenol, sulfate, chloride, fluoride, Be Included The water inlet and the water outlet cyanide, total soluble solids, arse- Fixed according water in routine of the water plant are respectively nic, selenium, mercury, cadmium, plant management re- 2000 20000 monitoring of provided with monitoring points; chromium (hexavalent)), lead, ni- quirements water plant trate nitrogen, chloroform, carbon tetrachloride, total number of colo- nies, total coliforms, heat-resistant coliforms, free residual chlorine, ammonia nitrogen, oxygen con- sumption, Primary SchoolStar Experimental County city Institutions kindergarden, Huanggang Town, Once a quarter, 1 water sup- with moni- Construc- Handu Village of Legang Town, day/term, twice/day, and ply pipeline Noise LeqdB(A) 300 6000 toring quali- tion period and Wankou Primary School of once every day and extension fications Hougang Villiage; and one moni- night project toring point shall be set for the in- Unit price Annual cost Monitoring Environmental Monitoring point layout (quanti- Monitoring Item (s) Monitoring items Monitoring frequency (yu- (Yu- Period elements ty) Institution an/year) an/year) tegrated pressurized pump station Each monitoring point is arranged Recon- at Chang Songgang Village of struction Yongshan Town, Zhongnao Village and Exten- of Zhongbu Town, Cangxia Village Once a quarter, 1 sion Project Construc- of Shiligang Town, Mingkou Noise LeqdB(A) day/term, twice/day, once 300 7200 of Rural tion period Township, Longkou Village of every day and night Water Sup- Gaojia Town, and Wukou Town; ply Net- and 1 monitoring point is set in the work integrated pressurizing pump sta- tion. The monitoring point shall be pro- 3 terms/year, 1 day/term, Construc- Construction vided at the drainage port of the COD, BOD5, SS once a day 1000 3000 tion period wastewater construction sedimentation tank The monitoring point shall be set at Once a quarter, 1 Atmosphere Cl2 600 2400 the boundary of the water plant day/term There are 3 monitoring points for 3 terms /year, for low Be Included the An Yin water: 500m from sec- flow period, high flow PH, DO, total phosphorus, NH3-N, in routine tion upstream of the water intake, period, and normal flow 2000 10000 COD, BOD5, petroleum class monitoring of water intake and 1,000m from period , 3 days/term, once water plant downstream of the water intake; a day Color, turbidity, odor and taste, Lilin Water gross visible matter, ph, total hard- Plant Ex- ness (calculated as caco3), alumi- tension Operating num, iron, manganese, copper, zinc, Project Period anionic synthetic detergent, volatile Surface water phenol, sulfate, chloride, fluoride, Be Included The water inlet and the water outlet cyanide, total soluble solids, arse- Fixed according to water in routine of the water plant are respectively nic, selenium, mercury, cadmium, plant management re- 2000 20000 monitoring of provided with monitoring points; chromium (hexavalent)), lead, ni- quirements water plant trate nitrogen, chloroform, carbon tetrachloride, total number of colo- nies, total coliforms, heat-resistant coliforms, free residual chlorine, ammonia nitrogen, oxygen con- sumption, Table 5-5 Environmental Monitoring Plan and Budget Details for the Sub-project of Xiushui Mon- Unit Annual itor- Environ- price cost Monitoring Item (s) ing mental Monitoring point layout (quantity) Monitoring items Monitoring frequency (yu- (Yu- Institution Peri- elements an/year an/year od ) ) Along the original water pipeline: Zhishan Once a quarter, 1 day/term, Noise Yuan Village and Shangwu Ping Village each LeqdB(A) twice/day, once every day 300 2400 set 1 monitoring point and night The monitoring point shall be provided for the COD, BOD5, SS 3 terms/year, 1 day/term, Construc- drainage port of the construction sedimentation once a day tion tank 1000 3000 wastewater Background value check once time. During the construction (1)Disturbance surface area, t digging and period and natural conva- filling amount, runoff amount, temporary lescence period during the piled up in the area of pile soil, useless rainy season (April ~ Sep- Expan- quantity layer stripping and temporary tember), once every month, sion Pro- piled up, the number of temporary protec- Con- the non-rainy season will be Institutions ject of tion measures and control effects of soil struc- monitored once every three with moni- Water and water erosion area of change tion months. toring qual- Plant in (2) changes in soil erosion and erosion of period During the rainstorm period ifications Xiushui water, and the effect of soil erosion on the County (the daily rainfall is greater Water and There are four observation sites and six sample prevention and control measures 12000 than 50mm). 5000 soil erosion sites (3) the quantity and quality of soil and 0 Soil and water conservation water conservation control measures, the years shall be monitored survival rate, retention rate, growth situa- three to four times. tion and coverage of forest grass Soil and water conservation measures, the stability, integrity and op- measures being imple- eration of the engineering measures mented shall be continu- (4) soil and water conservation measures ously monitored and moni- being implemented tored every 10 days. (5) changes in topography, topography The changes in the topog- and water systems raphy, topography and wa- ter systems, and the damage to the downstream and sur- rounding areas shall be monitored at least once every six months. The monitoring point shall be set at the bound- Atmosphere Cl2 Once a quarter, 1 day/term 600 2400 ary of the water plant Be Included There are 3 monitoring points in Dongjin Res- 3 terms /year, for low flow in routine ervoir: section 500m from upstream of water PH, DO, total phosphorus, NH3-N, COD, period, high flow period, 2000 10000 monitoring intake, water intake, and 1,000m from down- BOD5, petroleum class and normal flow period, 3 of water stream of water intake; days/term, once a /day plant Color, turbidity, odor and taste, gross Oper- visible matter, ph, total hardness (calcu- ating lated as CaCO3), aluminum, iron, man- Period Surface ganese, copper, zinc, anionic synthetic water detergent, volatile phenol, sulfate, chlo- Be Included The water inlet and the water outlet of the water ride, fluoride, cyanide, total soluble sol- Fixed according to the wa- in routine plant are respectively provided with monitoring ids, arsenic, selenium, mercury, cadmi- ter plant management re- 2000 20000 monitoring points; um, chromium (hexavalent)), lead, nitrate quirements of water nitrogen, chloroform, carbon tetrachlo- plant ride, total number of colonies, total coli- forms, heat-resistant coliforms, free re- sidual chlorine, ammonia nitrogen, oxy- gen consumption, New Monitoring sections shall be arranged at 500m The construction influence Surface PH, DO, total phosphorus, NH3-N, COD, Construc- from upstream and 500m from downstream of period shall be detected for 1000 2000 water BOD5, petroleum class tion and Con- Dongjin River Dongjin Bridge respectively. 2 days and once a day Institutions Recon- struc- Monitoring points are arranged at the Zhajin- with moni- struction tion Village Zhajin Town, Xiushui Village of Once quarter, 1 day/term, toring qual- Project of period Noise Shankou Town, the Gangbei Village of the LeqdB(A) twice/day, once every day 300 6000 ifications Township Gangkou Town, and the Xizhuang Village of and night Network Xigang Town. Table 5-6 Environmental Monitoring Plan and Budget Details for the Sub-project of Linchuan District Monitor- Environmental Monitoring point layout Monitoring fre- Unit price Annual cost Monitoring Item (s) ing Peri- Monitoring items elements (Quantity) quency (yuan/year) (Yuan/year) Institutions od Once a quarter, 1 Four monitoring points in day/term, twice/day, Noise each layout of water plant and LeqdB(A) 300 4800 once every day and water intake pump house night Construction Phase 3/year, 1 wastewater 1 monitoring point COD, BOD5, SS day/period, 1 2400 7200 time,/day Background value check once time. During the construc- (1)Disturbance surface area, t digging tion period and natu- and filling amount, runoff amount, ral convalescence temporary piled up in the area of pile period during the soil, useless quantity layer stripping and rainy season (April ~ temporary piled up, the number of September), once New Project temporary protection measures and every month, the Institutions of Water Construc- control effects of soil and water erosion non-rainy season will with monitor- Plant in tion peri- area of change be monitored once ing qualifica- Linchuan od (2) changes in soil erosion and erosion every three months. tions District of water, and the effect of soil erosion During the rainstorm Water and soil There are four observation on the prevention and control measures period (the daily 5000 200000 erosion sites and six sample sites (3) the quantity and quality of soil and rainfall is greater than water conservation control measures, 50mm). the survival rate, retention rate, growth Soil and water con- situation and coverage of forest grass servation years shall measures, the stability, integrity and be monitored three to operation of the engineering measures four times. (4) soil and water conservation Soil and water con- measures being implemented servation measures (5) changes in topography, topography being implemented and water systems shall be continuously monitored and moni- tored every 10 days. The changes in the topography, topogra- phy and water sys- tems, and the damage to the downstream and surrounding areas shall be monitored at least once every six months. The monitoring point shall be Phase 1/quarter, 1 Atmosphere set at the boundary of the Cl2 600 2400 day/period water plant Three monitoring sections of Phase 3/year, for low Chongren River: section Be included in flow period, high 500m from upstream of water PH, DO, total phosphorus, NH3-N, routine moni- flow period, and 2000 10000 intake, water intake and COD, BOD5, petroleum class toring of water normal flow period, 3 1,000m from downstream of plant days/term, once a day water intake; Color, turbidity, odor and taste, gross visible matter, ph, total hardness (cal- culated as caco3), aluminum, iron, Surface water manganese, copper, zinc, anionic syn- Operating thetic detergent, volatile phenol, sulfate, The water inlet and the water Be included in Period chloride, fluoride, cyanide, total soluble Fixed according to the outlet of the water plant are routine moni- solids, arsenic, selenium, mercury, water plant manage- 2000 20000 respectively provided with toring of water cadmium, chromium (hexavalent)), ment requirements monitoring points; plant lead, nitrate nitrogen, chloroform, car- bon tetrachloride, total number of colo- nies, total coliforms, heat-resistant col- iforms, free residual chlorine, ammonia nitrogen, oxygen consumption, 4 monitoring points shall be set at the boundary of the 4 terms/year, 1 water plant and the boundary day/term, twice/day, Noise LeqdB(A) 300 6000 Institutions of the water pump house; 1 once every day and with monitor- monitoring point shall be set night ing qualifica- in Huangshi Village tions Water Sup- Construc- Monitoring sections shall be The construction PH, DO, total phosphorus, NH3-N, ply Pipeline tion peri- Surface water set at 500m from upstream of influence period shall 1000 2000 COD, BOD5, petroleum class Extension od and 500m from downstream be detected for 2 days Project in of Linchuan Bridge of and once a day Linchuan Chongchuan River District The monitoring points are 4 terms/year, 1 respectively set in the Lijia day/term, twice/day, Noise Village of Wenquan Town, LeqdB(A) 300 2700 once every day and Liancheng Town and Hujia night Village in Chonggang Town. Table 5-7 Environmental Monitoring Plan and Budget Details for the Sub-project of Dongxiang District Monitoring Environmental Monitoring point layout Monitoring fre- Unit price Annual cost Monitoring Item (s) Monitoring items Period elements (Quantity) quency (yuan/year) (Yuan/year) Institutions 4 terms/year, 1 Along the original water pipeline: day/term, twice/day, Noise 1 monitoring point shall be set in LeqdB(A) 300 1200 once every day and the Village of Daping night The monitoring point shall be 3 terms/year, 1 Construction provided for the drainage port of COD, BOD5, SS day/term, once a /day 1000 3000 wastewater the construction sedimentation tank Background value check once time. (1)Disturbance surface area, t digging During the construc- and filling amount, runoff amount, tion period and natu- temporary piled up in the area of pile ral convalescence soil, useless quantity layer stripping period during the and temporary piled up, the number rainy season (April ~ New Project of temporary protection measures and September), once Institutions of Water control effects of soil and water ero- every month, the Construc- with moni- Plant in sion area of change non-rainy season will tion period toring quali- Dongxiang (2) changes in soil erosion and ero- be monitored once fications District sion of water, and the effect of soil every three months. erosion on the prevention and control During the rainstorm Water and soil There are four observation sites measures period (the daily rain- 5000 200000 erosion and six sample sites (3) the quantity and quality of soil fall is greater than and water conservation control 50mm). measures, the survival rate, retention Soil and water con- rate, growth situation and coverage of servation years shall forest grass measures, the stability, be monitored three to integrity and operation of the engi- four times. neering measures Soil and water con- (4) soil and water conservation servation measures measures being implemented being implemented (5) changes in topography, topogra- shall be continuously phy and water systems monitored and moni- tored every 10 days. The changes in the topography, topogra- phy and water sys- tems, and the damage to the downstream and surrounding areas shall be monitored at least once every six months. The monitoring point shall be set Once a quarter, 1 Atmosphere Cl2 600 2400 at the boundary of the water plant day/term Three monitoring sections are arranged in each of the Hefang 3 terms/year,for low Be included Reservoir and Hengshan Reser- flow period, high low in routine PH, DO, total phosphorus, NH3-N, voir: 500m from upstream of the period, and normal 2000 10000 monitoring COD, BOD5, petroleum class water intake, water intakes and flow period, 3 of water 1,000m from downstream of the days/term , once a day plant water intake; Color, turbidity, odor and taste, gross visible matter, ph, total hardness Operating (calculated as caco3), aluminum, iron, Period Surface water manganese, copper, zinc, anionic synthetic detergent, volatile phenol, Be included The water inlet and the water sulfate, chloride, fluoride, cyanide, Fixed according to the in routine outlet of the water plant are re- total soluble solids, arsenic, selenium, water plant manage- 2000 20000 monitoring spectively provided with moni- mercury, cadmium, chromium (hexa- ment requirements of water toring points; valent)), lead, nitrate nitrogen, chlo- plant roform, carbon tetrachloride, total number of colonies, total coliforms, heat-resistant coliforms, free residual chlorine, ammonia nitrogen, oxygen consumption, County city 4 terms/year, 1 Institutions Monitoring points shall be set at pipe net- Construc- day/term, twice/day, with moni- Noise Xiaohuang Town and Pogan LeqdB(A) 300 2400 work exten- tion period once every day and toring quali- Middle School sion project night fications Table 5-8 Environmental Monitoring Plan for Sewage Treatment Project Monitoring Environmental Unit price Annual cost Monitoring Item (s) Monitoring point layout (quantity) Monitoring items Monitoring frequency Period elements (yuan/year) (Yuan/year) Institutions 4 terms /year, 1 day/term, 4 monitoring points shall be set at the Noise LeqdB(A) twice/day, once every day 300 4800 boundary of sewage treatment plant and night Monitoring sections are arranged at The construction influence 500m from upstream of the Zhajin Riv- pH, DO, COD, BOD5, Surface water period shall be detected for 1000 3000 er and 500m from downstream of the NH3-N, TP 2 days and once a day Zhajin River The monitoring point shall be provided 3 terms/year, 1 day/term, Construction for the drainage port of the construction COD, BOD5, SS once/day 1000 3000 wastewater sedimentation tank (1)Disturbance surface Background value check area, t digging and filling once time. amount, runoff amount, During the construction Construc- temporary piled up in the period and natural conva- tion of area of pile soil, useless lescence period during the new sew- age pipe quantity layer stripping rainy season (April ~ Sep- network and temporary piled up, tember), once every month, Institutions and sew- the number of temporary the non-rainy season will be Construc- with moni- age protection measures and monitored once every three tion period toring quali- treatment control effects of soil and months. fications plant in Mujin water erosion area of During the rainstorm period Town, change (the daily rainfall is greater Xiushui Water and soil There are four observation sites and six (2) changes in soil erosion than 50mm). County 5000 400000 erosion sample sites and erosion of water, and Soil and water conservation the effect of soil erosion years shall be monitored on the prevention and three to four times. control measures Soil and water conservation (3) the quantity and qual- measures being imple- ity of soil and water con- mented shall be continu- servation control ously monitored and moni- measures, the survival tored every 10 days. rate, retention rate, The changes in the topog- growth situation and cov- raphy, topography and wa- erage of forest grass ter systems, and the damage measures, the stability, to the downstream and integrity and operation of surrounding areas shall be the engineering measures monitored at least once (4) soil and water conser- every six months. vation measures being implemented (5) changes in topogra- phy, topography and wa- ter systems The monitoring point shall be set on the Atmosphere H2S, NH3 Once quarter, 1 day/term 1500 6000 boundary of sewage treatment plant Be included Three monitoring sections are arranged 3 terms /year,for low flow in routine in the Zhajin River: section 500m from pH, DO, COD, BOD5, period, high flow period, monitoring of upstream of the water outlet, water 2000 10000 NH3-N, TP and normal flow period , 3 sewage intake and 1,000m from downstream of days/term, once a day treatment the water outlet; plant PH, chemical oxygen demand, BOD 5, ammo- nia nitrogen, suspended Surface water substance, animal and Operating Be included plant oil, petroleum, ani- Period in routine The water inlet and outlet of the sewage onic surfactant, total ni- According to the sewage monitoring of treatment plant shall be respectively trogen, total phosphorus, treatment plant manage- 2000 10000 sewage provided with monitoring points chroma, fecal coliforms, ment requirements treatment total mercury, alkyl mer- plant cury, total cadmium, total chromium, hexavalent chromium, total arsenic, total lead, Institutions 4 monitoring points shall be set in the 4 terms/year, 1 day/term, with moni- Noise plant boundary of sewage treatment LeqdB(A) twice/day, once every day 300 4800 toring quali- plant and night fications Chapter VI Public Complaint Mechanism 6.1 Environmental complaints mechanism The office of the project leadership team of each county shall establish an environmental impact complaint mechanism. The team leader shall be the member selected from the PMOs of each County, related county Environmental Protection Bureau, contractor, environmental assessment unit, etc. Environmental complaints acceptance offices located in various counties of sub-projects are in charge of daily complain. Each subcontractor shall have a special person on site to record the public complaints Environmental Protection BureauIn the construction period or operation period of the project, the public can make comments to the construction executing unit or construction unit in forms of letters, calls, faxes, e-mails, etc; the opinions may also be expressed through the Environ- mental Protection Bureau of each project County (prefecture) and the Complaint Office. Meanwhile, during the construction and operation of the project, each sub-project conducts a random return visit to each environment-sensitive target each year, and a public participation in-site survey will be held in the environment-sensitive target comparison and concentrated area once a year. According to the investigation results, the satisfaction level of the public is evaluated and the relevant opinions are analyzed, and the environmental mitigation measures are improved if necessary. The environmental assessment unit, the construction executing unit, the construction unit and the operation unit shall organize the visit and investigation immediately in conjunction with relevant departments such as design department and other relevant departments after receiving the rectifica- tion notice of administrative departments or environmental protection complaints, and conduct rec- tification according to the actual conditions, and publicize the rectification scheme to solve the problem of environmental disputes. 6.2 Complaints and grievances channels 1. Establishment and composition of the institution In order to protect the legitimate rights of the affected persons better, a complaint mechanism will be established to provide a convenient, transparent, fair and effective way of complaint for the af- fected persons, therefore the sub-PMO of each County shall establish an environmental impact complaint handling leading group. The team leader shall be the relevant personnel taking charge of the sub-project, and the group members shall be from sub-project, construction unit, relevant County Environmental Protection Bureau, contractor, environmental assessment unit, etc. The complaint handling office of the environmental impact complaint acceptance leading group is set up under the sub-project of each County, and the daily complaints will be collected, collated, and summarized by the complaint handling office. Each sub-project contractor shall designate special personnel on site to record grievances and complaints received from the masses. 2. Complaint and Grievance Procedure The complaint handling leading group and office will begin receiving complaints within one week after the commencement of the construction, and simultaneously open the complaint telephone and complaint letter box, and disclose relevant complaint and grievance ways on the construction site. 75 Detailed complaint procedures are as follows: Where the affected person considers his or her rights to be violated in any aspects involving envi- ronmental protection, a complaint in writing or orally to the complaint handling office or directly to the Contractor is allowed, and if it is an oral complaint, a detailed record shall be made and orga- nized by the member of the complaint handling office or the Contractor, and the comments shall be submitted within two weeks. If the complainant is not satisfied with the opinion of the complained contractor or the acceptance office, he or she may lodge a complaint with the Environmental Protection Bureau of the relevant County or prefecture in written form within 1 month, and after receiving the treatment opinion, the relevant County or prefecture Environmental Protection Bureau shall give a treatment opinion within the prescribed time. If the complainant is still not satisfied with the treatment opinions of the relevant County or prefec- ture Environmental Protection Bureau, he may file a complaint tothe environmental protection de- partment at the superior level or the Jiangxi Provincial Environment Protection Department after receiving the treatment opinion, or directly prosecute to the local people's court according to the Civil Procedure Law of the People's Republic of China, and the case shall be adjudicate by the court. PMO social migration and resettlement public complaint mechanism, during the process of prepara- tion and implementation of projects, as direct stakeholders as well as direct participants, residents may be trapped into some unforeseen problems and related recommendations. In order to ensure the enthusiasm and breadth of the residents and community participation, the project has established a transparent and effective channel for complaints and advices as shown in figure 6-1. The residents may lodge complaints or suggestions to the management of the community, subdis- trict, PMO or related departments if they have complaints and suggestions. Community neighbor- hood committee/Villagers committee, subdistrict office/township, management office of County (prefecture, district) sub-project or leading group or provincial project management leading group shall set up special personnel or department to accept, process and feedback complaints from resi- dents and residents groups and register the Report. 76 Villagers/neighbourhood committee Stage 1:The residents bring up the conplaints or suggestions Subdistrict/county or prefecture PMO or relevant management de- partments stage2:Units accept complaint and suggessions from villiager or village groups process and feedback within 15 days Provincial PMO or relevant manage- ment departments Stage3:Residents shall make relevant registration if they accept the feedback or process of the corresponding level; if not, a complaint or suggession to the superior department can be made. Figure 6-1 Complaint and Grievancce Handling Flow Chart 77 Chapter VII Information Management of Environmental Social Management Plan 7.1 Information exchange Environmental management requires the necessary information exchange between different de- partments and different positions in each County (prefecture, district), owner, contractor and opera- tor of the organization, and the organization shall also inform the outside (relevant party, social public, etc.) of relevant information. Internal information exchange can be conducted in a variety of ways, such as meetings, internal briefings, etc., but there must be one formal meeting once a month, all of which shall be document- ed and archived. The external information exchange shall be conducted once every half year or every year, and the information exchange with the collaboration unit shall be formed in a summary and be filed. 7.2 Record mechanism In order to ensure the effective operation of the environmental management system, the Owner must organize a perfect recording system and keep records in the following aspects: (1) Legal and regulatory requirements; (2) licensing; (3) Environmental factors and related environmental impacts; (4) Training; (5) Check, verification and maintenance activities; (6) Monitoring data; (7) Problems in environmental management and environmental protection; (8) Effectiveness of corrective and preventive measures; (9) Information about relevant items; (10) Check ; (11) Review. It is also necessary to control the above types of records, including the identification, collection, catalog, filing, storage, management, maintenance, inquiry, shelf life and disposal of records. 7.3 Reporting mechanism The PMO of Jiangxi Province, PMO of each County project, contractor, environmental supervision unit and the project operation agency shall carry out daily supervision and inspection on the pro- gress of the project, the implementation of environmental measures, the implementation of the training, the data and conclusions of environmental monitoring, etc, during the implementation of the project, all those information shall be reported to the relevant departments timely. Specifically, the method comprises the following steps: (1) The project environmental supervision engineer shall record the implementation of the ESMP in 78 detail monthly, and timely submit weekly report, monthly report to the project owner and County PMO of the where the project is located, the reports shall include the implementation of environmental protection measures, the implementation of environmental monitoring and the monitoring data. (2) The owner or operator shall record the progress of the project and the implementation of ESMP quarterly, and timely report the quarterly report to the PMO in the County in which the project is located, and at the same time, copy the quarterly report to the County Environmental Protec- tion Bureau of the project. (3) During the construction period, relevant County project construction units or contractors shall entrust local monitoring stations or qualified monitoring bodies to conduct environmental mon- itoring and submit the reports to the local environmental protection department. (4) During the operation period of the project, each project operation and maintenance unit shall conduct environmental monitoring on the operation of the project according to the environ- mental assessment requirements, and the monitoring unit shall timely submit the monitoring report to the owner after completing the monitoring and commissioning task. The Owner shall submit the monitoring report to the local environmental protection department in time. The monitoring report mainly includes monitoring time, frequency, monitoring point position, mon- itoring item, method and monitoring data and statistical analysis. (5) The PMO of each County shall timely submit the project progress report to the provincial PMO and copy the project progress report to the provincial Environmental Protection Bureau at the same time. (6) In the event of special irregularities in environmental protection happens, the supervision engi- neer and the PMO of each County (prefecture, district) will inform the local environmental protection administration department, and submit the event step-by-step if necessary. (7) The ESMP performance report may include the following main contents for the EMP imple- mentation report which shall be submitted to the World Bank twice a year: a) Status of project progress; b) Implementation of Project Environmental Protection Measures c) Implementation of environmental monitoring and main monitoring results; d) Implementation of the training plan; continuous public participation: whether there is a public complaint; if a complaint occurs, the main content, solution and public satisfaction of the complaint are recorded; e) Existing problems and solutions; f) ESMP Execution Plan for the second half of the year. 79 7.4 Document Management In the implementation process of the Environmental Social Management Plan, the World Bank, Provincial Project Leading Group, PMO, Project Leading Group, PMO, the EIA Unit, Engineering Project Supervisor, and the construction unit shall manage the corresponding documents. For details, please refer to Table 7-1 below. Table 7-1 Requirements for Document Management of Agencies Operation pe- Name of the Document Management riod institution 1. Prepare the contents of the Environmental Social Management Plan, and file the first Design period EIA Unit draft, draft for review and approval documents. 1. Weekly record,file, and report the construction implementation details, to the engi- neering supervisor; 2. To complete and archive the construction site verification form and with the project supervisor before construction, and report it to the County project management; Construction Unit 3. When emergency and emergency situations happen, record and file the implementation of the construction, and report the situations to the engineering supervisor; 4. After receiving rectification notice, the rectification shall be completed within 3 work- ing days (rectification demands coordination of management institutions shall be completed within 10 working days) and the documents shall be filed. 1. Record and file the construction situation of the construction unit weekly, and report the situation to the County PMO; 2. The construction site verification form shall be completed and filed together with the construction unit before construction, and shall be reported to the County PMO; Engineering Supervision Unit 3. In case of emergency and emergency situations, the specific implementation plan of the construction unit shall be recorded, filed and reported to the County PMO. 4. The construction unit shall propose a rectification solution for environmental protec- Construction tion issues during construction activities and follow up the implementation, including issu- period ance of rectification notification, rectification check list and filing of inspection documents. 1. To record, organize and archive the contents of the complaint during the construction process; 2. Record and file the report of the engineering project supervisor quarterly, and submit PMO of each the report to the provincial PMO (report forms) ; County 3. Check the site verification form reported by the construction unit and the engineering project supervisor, verifying the environment-sensitive issue and file the form and issues; 4. Manage and archive the reported rectification notification. 1. To supervise and file the implementation of the Environmental Social Management Plan and archive; 2. Record the report of each town project leading group and PMO every six months, and Provincial PMO submit relevant reports and archives to the World Bank; 3. Coordinate with other relevant departments to solve major environmental problems and record and archive the specific measures; 1. Record and file the reports of provincial project leading group and PMO every six World Bank months; 1. To supervise and file the implementation of the Environmental Social Management Plan and archive; Provincial PMO 2. Record, organize and archive the contents of the complaint during the operation of the Operation period project; 1. Record and file the reported condition of the provincial project leading group and World Bank PMO every six months 80 Chapter VIII Estimation of Environmental Investment Environmental investment proposed in this EMSP for the stage of design, construction and operation of “Jiangxi Integrated Rural and Urban Water Supply and Wastewater Treatment Project” (hereinafter referred to as “this Project”) includes 1) environmental protection measures; 2) envi- ronment monitoring; 3) environment management training; 4) water and soil conservation; 5) cost of external monitoring; as well as 6) cost of environmental assessment and acceptance. The specific investment on environmental protection in this Project is RMB 1086.22(in RMB 10,000), tthe de- tails are as shown in table below: Table 8.1 List of Estimation for Project Environmental Investment Estimated Investment (in RMB Item 10,000) 1 Design stage 116 1.1 Assessment on environmental impact 116 2 Construction stage 813.7 2.1 Environmental protection measures 14 2.2 Soil and water conservation measures and monitoring 272.8 2.2.1 Soil and water conservation measures (included in engi- 0 neering cost) 2.2.2 Soil and water conservation and monitoring 272.8 2.3 Environmental monitoring 51.9 2.4 Implementation of dam safety operation plan 177 2.5 External environment monitoring plan 240 2.6 Personnel training in construction period 58 3 Operation stage 136.52 3.1 Completion acceptance of environmental protection 80 3.2 Environmental monitoring (excluding the routine monitoring 44.52 cost of water plant and sewage treatment plant) 3.3 Personnel training in operation period 12 Total 1086.22 81 Appendix 1 Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project Implementation Procedure of Environ- mental Protection Jiangxi PMO Beijing Research Institute of Uranium Geology November 2017 82 Contents Chapter I Overview 84 1.1 Project Context 84 1.2 Purpose of Environmental Protection Implementation Regulations 84 1.3 Principle for Environmental Protection Implementation Regulations 85 1.4 Scope of Application 86 Chapter II Relevant Laws, Regulations and Safety Guarantee Policies of World Bank 87 2.1 Relevant Laws and Regulations of China 87 2.2 Security Guarantee Policies of World Bank 87 Chapter III Management System for Environmental Protection Implementation Regulations 88 3.1 Setting of Management System for Environmental Protection Implementation Regulations 88 3.2 Responsibilities and Personnel Configuration of All Institutions in Environmental Management System 91 3.3 Environment Management Task in All Stages of this Project 96 3.4 Working Process for Environmental Protection Implementation Institutions in Construction Period 97 3.5 File Management of Environmental Protection Implementation Regulations 98 Chapter IV General Requirements for Environmental Protection Implementation Regulations 100 4.1 Implementation of Environment Measures in Construction Drawing and Bidding Documents 100 4.2 Preparation prior to Construction 101 4.3 Department Permission and Public Opinions 102 Chapter V Management of Construction Site 103 Chapter VI Air Pollution Control 106 Chapter VII Water Pollution Control 108 Chapter VIII Noise Pollution Control 110 Chapter IX Solid Waste Management 112 Chapter X Ecological Environment Protection 112 Chapter XI Cultural Relics and Historic Sites 114 Chapter XII Population Health and Safety 115 Schedule 1 Pre-construction Site Checklist 116 Schedule 2 Construction Management Checklist 119 Schedule 3 Environmental Rectification Notice 125 Schedule 4 Emergency Response Flow Chart of Cultural Relics Discovering 126 83 Chapter I Overview 1.1 Project Context By applying for World Bank Loan, Water Resources Department of Jiangxi Province implemented the Project of Urban & Rural Water Supply Integration and Rural Sewage Treatment in Jiangxi Province in order to realize the purpose of “increasing the supply coverage of tap water to about 90% in rural population of overall province, reach the sewage treatment ratio of 85% at County lev- el, and realize substantial improvement of sewage treatment in rural area by the end of 2020 (to to- tally eliminate the black and odorous water body; the present water is lower than the Category V discharge standard)”. Contents of this Project include: building and transformation of water supply facilities in urban area, consolidation and improvement of water supply facilities in rural area, as well as building of sewage treatment plant and supporting pipelines. By implementing this Project, it can further improve the water supply guarantee rate and pipeline coverage rate in urban area, en- hance the rural concentrated water supply rate, tap water popularizing rate, water qualification rate, and sewage collection rate and handling rate; further improve the living conditions in rural areas, and promote the comprehensive, coordinated and sustainable development of rural economy. The aforementioned work shall be implemented in accordance with the requirements of municipal pipe network projects. Environmental Protection Implementation Regulations mainly include project introduction, setting of environment management institution, implementation plan of environmental protection measures, environment supervision plan, reporting procedure, as well as requirements for file management. 1.2 Purpose of Environmental Protection Implementation Regulations Corresponding alleviation measures shall be conducted in process of implementation in accordance with national environment impact assessment requirements for municipal pipeline projects, in order to determine and recognize the potential negative effects of this Project. Environmental impact as- sessment shall be implemented to sub-item in feasibility research process. In accordance with re- quirements of security policies (OP4.01) of World Bank, the environment in this Project is classi- fied as Class B, specific to the potential adverse environment influences such as temporary storage and handling in municipal pipeline project. The Environmental Protection Implementation Regula- tions are hereby prepared in order to keep safety of construction personnel and the personnel in sen- sitive area, prevent the interference from construction period to sensitive area and surrounding are- as. The Regulations are hereby prepared for, in the implementation process of this Project, clarifying the responsibilities and duties of relevant departments in environmental protection; being used as the action guidance for environment management of this Project; guiding the Contractor to plan and 84 implement the alleviation measures of adverse influences of environment in construction period; guiding the Owner of projects to take contracted environmental protection measures after construc- tion and operation of facilities. The Regulations bring forward the standard measures for preventing potential adverse environment impacts in the construction process of municipal pipeline project, contain a set of detailed, technically feasible, financially sustainable and operable environment measures, so as to eliminate or recover the adverse influences from this Project on the environment and society and reduce them to the acceptable level. The detailed objectives include: (1) Clarifying responsibilities for environment management County Environmental Protection Bureau, environment assessment unit and design unit shall im- plemented detailed field check to environment protection objectives, put forward effective envi- ronmental pollution alleviation measures and include them in the project design as the contractual obligations of the Contractor and the Operator. Project Management Department shall implement supervision inspection in accordance with the requirements of World Bank. (2) Operation guide for environment management of project The environment supervision plan prior to and during construction, as well as reporting procedure and file management procedure as proposed in the Regulations can ensure effective implementation of environment alleviation measures and, as the environment protection documents, they shall be submitted to the construction supervision unit, environment supervision unit and other relevant units, in order to clarify the responsibilities and functions of relevant functional departments and management institutions, and put forward the communication channels and methods between de- partments. 1.3 Principle for Environmental Protection Implementation Regulations (1) Principle of science, objectivity and fairness: the Regulations shall be scientific, objec- tive and fair, give full considerations for the potential influences from the Regulations on the environmental factors, as well as the ecological system composed of such factors, and provide scientific basis for decision-making. (2) Principle of integrity: the Regulations shall link the relevant policies, plans and pro- jects in order to have overall considerations. (3) Principle of public participation: public participation is encouraged and supported in the process of the Regulations and full considerations shall be attached to the interests and ad- vocating of all. (4) Principle of consistency: the work in the Regulations shall be consistent with the con- struction layer and detailed level. (5) Principle of operability: methods which are simple, practical and feasible shall be se- lected and the Regulations shall have operability. 85 1.4 Scope of Application By implementing environment screening to type, position, sensitivity, scale and characteristics of potential environment influence of World Bank in accordance with requirements of environment screening and classification in safety guarantee policy and environment assessment (OP4.01) of World Bank, this Project is defined as Class B Project. The Regulations are mainly applicable to municipal pipeline and small civil construction projects, including municipal water supply pipeline, sewage pipeline project, water supply plant and rural sewage treatment plants. 86 Chapter II Relevant Laws, Regulations and Safety Guarantee Policies of World Bank 2.1 Relevant Laws and Regulations of China (1) Environmental Protection Law of People’s Republic of China (implemented as of December 26, 1989 and revised on April 24, 2014); (2) Law of the People's Republic of China on Evaluation of Environmental Effects (implemented as of September 1, 2003, revised on July 2, 2016); (3) Law of The People's Republic of China on Water and Soil Conservation (implemented as of June 29, 1991 and revised on December 25, 2010); (4) The land administration law of the people's Republic of China (implemented as of January 1, 1987 and revised on August 28, 2004); (5) Atmospheric Pollution Prevention and Control Law of the People's Republic of China (im- plemented as of June 1, 1988 and revised on August 29, 2015); (6) Law of the People's Republic of China on Prevention and Control of Pollution From Envi- ronmental Noise (implemented as of March 1, 1997); (7) Law of the People’s Republic of China on Prevention and Control of Water Pollution (im- plemented as of May 11, 1984, revised on February 28, 2008); (8) Law of the People's Republic of China on the Prevention and Control of Environmental Pol- lution by Solid Wastes (implemented as of April 1, 1996, revised on November 7, 2016); (9) Regulations on the Administration of Construction Project Environmental Protection No. 253 Decree of the State Council (implemented as of November 29, 1998); 2.2 Security Guarantee Policies of World Bank Environmental management regulations prior to construction and during the construction and oper- ation period are prepared in accordance with environmental assessment business policy OP4.01 and combining the Environmental, Health, and Safety Guidelines of international finance corporation. 87 Chapter III Management System for Environmental Protection Implementation Regulations 3.1 Setting of Management System for Environmental Protection Implementation Regulations In accordance with relevant regulations and needs of actual project, regulatory functions of this Project shall be performed by Environmental Protection Department pursuant to the laws, specific person shall be assigned by PMOs of all levels and one set of integral environment management system shall be established, in order to better realize the demonstration results of this Project. Environmental management organization in construction and operation period is as shown in Fig. 3-1 and Fig. 3-2. 88 Ministry of Environ- World Bank mental Protection Water Conservation Bureau in JIiangxi Establish “Provincial Project Leadership Team” and its subor- Environmental Protection dinate “Provincial Project Leadership Office” Bureau oin Jiangxi Jiangxi Province Water Resources Investment Group Jiangxi Water Group Co., PMO of World Bank Leadership teams of all counties Ltd. County Environmental Protec- Environment Design Unit tion Bureau of All Projects The Contractor Design Unit External Supervision Institution Engineering Supervision Unit 监督 /管理关系 relationship Supervision/management 协调 /配合关系 Coordination/cooperation relationship Fig. 3-1 Environmental Protection Management System in Construction Period 89 Ministry of Environmen- tal Protection World Bank Water Conservation Bureau in JIiangxi Establish “Provincial Project Leadership Team” and its subor- dinate “Provincial Project Leadership Office” Environmental Protection Bureau in Jiangxi Jiangxi Province Water Resources Investment Group Jiangxi Water Group Jiangxi Investment Co., Ltd. Ecological Resources Development Group Environmental Protection Bureau Water Supply Project Sewage Project of All Projects External Supervision Unit 监督/管理关系 Supervision/management relationship 协调/配合关系 relationship Coordination/cooperation Fig. 3-2 Environmental Protection Management System in Operation Period 90 3.2 Responsibilities and Personnel Configuration of All Institutions in Environmental Management System The environmental management system of this Project is composed of hired consultancy servicing institutions and external institutions bearing different working contents and responsibility scopes. Responsibilities and personnel configuration of all institutions in this Project are as shown in Table 3.2-1 below: Table 3-1 Contents of Staged Environmental Management Relevant Parties of Personnel Stage Major Contents of Environmental Management Project Configuration Water Resources Department of Jiang- xi Province The Owner shall organize, lead and coordinate the construc- 1 (Establish Provincial tion of loan project of World Bank. Project Leadership Team) Jiangxi Province Bearing the responsibilities of project selection and arrange- 1 Water Resources In- ment of supporting funds. vestment Group 1. Managing environmental protection in project design and preparation stage; 2. Coordinating and implementing environment management Design and Provincial PMO affairs with environment management department of gov- 1 preparation ernment; 3. Hiring consultancy institutions such as design unit and environment assessment unit; 1. Incorporating environmental protection measures in design plan and budget; Design Unit 2. Incorporating alleviation measures of environmental and 3 social management plan into the technical specification of bidding documents. 1. Providing technical supports for environmental protection work of project design; Environmental As- 2. Preparing environment impact assessment documents of 5 sessment Unit this Project; 3. Preparing environmental and social management plan. 1. Implementing a series of environmental protection and management work in construction period and handling the expense of environmental protection work; Construction 2. Managing and supervising environmental protection work Provincial PMO 1 period in construction period; investigating and handling the or pollution problems occurred in construction process; 3. Coordinating and implementing environmental manage- ment with the environmental protection management de- 91 Relevant Parties of Personnel Stage Major Contents of Environmental Management Project Configuration partment of government; 4. Tracking the execution of environmental and social man- agement plan, and submitting report to competent depart- ments of the same level and to World Bank on a regular ba- sis. 5. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Yongxin County; investigating and handling the disturbance or pollution problems occurred in construc- tion process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Yongxin partment; County 3. Tracking the execution of environmental and social man- agement plan of Yongxin County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Linchuan County; investigating and han- dling the disturbance or pollution problems occurred in con- struction process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Linchuan partment; County 3. Tracking the execution of environmental and social man- agement plan of Linchuan County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Jinxi County; investigating and handling the disturbance or pollution problems occurred in construction process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Jinxi County partment; 3. Tracking the execution of environmental and social man- agement plan of Jinxi County, and submitting report to Pro- vincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Leping County; investigating and handling the disturbance or pollution problems occurred in construc- tion process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Leping partment; County 3. Tracking the execution of environmental and social man- agement plan of Leping County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. Urban and Rural Wa- 1. Managing and supervising environmental protection work 92 Relevant Parties of Personnel Stage Major Contents of Environmental Management Project Configuration ter Supply Integration in sub-project of Nanfeng County; investigating and handling PMO of Nanfeng the disturbance or pollution problems occurred in construc- County tion process; 2. Coordinating and implementing environmental manage- ment with local environmental protection management de- partment; 3. Tracking the execution of environmental and social man- agement plan of Nanfeng County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Dongxiang County; investigating and han- dling the disturbance or pollution problems occurred in con- struction process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Dongxiang partment; County 3. Tracking the execution of environmental and social man- agement plan of Dongxiang County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Managing and supervising environmental protection work in sub-project of Xiushui County; investigating and handling the disturbance or pollution problems occurred in construc- tion process; Urban and Rural Wa- 2. Coordinating and implementing environmental manage- ter Supply Integration ment with local environmental protection management de- PMO of Xiushui partment; County 3. Tracking the execution of environmental and social man- agement plan of Xiushui County, and submitting report to Provincial PMO on a regular basis. 4. Receiving and handling the public complaint. 1. Implementing the environmental protection measures and work in construction period in accordance with the bidding documents, contracting documents and this environmental and social management plan; 2. Receiving the guidance and supervision by environment management personnel and construction supervision engineer At least 1 en- of PMO as well as relevant functional departments of gov- vironment ernment; manager shall The Contractor be assigned by 3. Receiving the technical supports provided by environmen- each Contrac- tal protection consultancy institutions; tor 4. Taking safety protection measures; for example, establish- ing indication mark at construction site; building fences at boundary of construction site, establishing communication channel with the public and ensuring safety of construction. 5. Executing environmental and social management plan. 1. Supervising the environmental and social management At least 1 en- Construction Super- plan executed by the Contractor, and implementing the envi- vironment visor ronment alleviation measures in the Contract; manager shall be assigned by 2. Providing on-site supervision to the implementation condi- each Con- 93 Relevant Parties of Personnel Stage Major Contents of Environmental Management Project Configuration tions of the Contractor; struction Su- 3. Implementing environment management in cooperation pervisor with the Owner; 4. Recording the execution of environmental and social management plan, preparing report and submitting them to the Owner on a regular basis. 1. Finishing environment monitoring work in construction period in accordance with the entrust by the Owner and en- vironment monitoring plan proposed in this assessment; Depending on External Monitoring scope of en- Unit 2. Supervising the implementation of environment manage- trusted task ment measures and submitting them to the Owner on a regu- lar basis. 1. Implementing supervision and inspection to the practicing of environmental protection measures at construction site; County Environmen- 2. Arranging emergency measures in case of abnormal envi- 1 tal Protection Bureau ronment conditions in the process of construction; 3. Receiving the public complaint and handling it. 1. Providing technical supports for environmental protection work in process of construction in accordance with entrust of the Owner, this environment impact report and the design Technical Assis- result of environmental protection; Unlimited tance/Consultant 2. Providing technical guidance for environment protection work and well implementing environmental protection train- ing in the process of construction. 1. Implementing environment protection and management after operation of water supply project, and implementing alleviation measures and monitoring in environmental and social management plan of operation period; 2. Having communication with the competent departments of government, coordinating and implementing the affairs about Jiangxi Water Group environment management; 1 Co., Ltd. 3. Emergency treatment of environment accidents; 4. Providing training to workers on a regular basis to improve their capability; meanwhile, actively implementing commu- nication activities about environment protection skills and experience, in order to further improve the environment management work. Operation period 1. Implementing environment protection and management after operation of sewage project, and implementing allevia- tion measures and monitoring in environmental and social management plan of operation period; 2. Having communication with the competent departments of Jiangxi Province government, coordinating and implementing the affairs about Water Resources In- environment management; 1 vestment Group 3. Emergency treatment of environment accidents; 4. Providing training to workers on a regular basis to improve their capability; meanwhile, actively implementing commu- nication activities about environment protection skills and experience, in order to further improve the environment management work. External Monitoring 1. Finishing environment monitoring work in construction Depending on 94 Relevant Parties of Personnel Stage Major Contents of Environmental Management Project Configuration Unit period in accordance with the entrust by the Owner and en- the scope of vironment monitoring plan proposed in this assessment; entrusted task 2. Supervising the operation of environment management measures and submitting the reports to the Owner on a regu- lar basis. 1. Managing and supervising the realization of environmental County Environmen- protection objectives in operation period; 1 tal Protection Bureau 2. Implementing daily supervision and inspection to the op- eration of built environment protection facilities. The Public or Organ- Social supervision Unlimited ization 95 3.3 Environment Management Task in All Stages of this Project As shown in Fig. 3.3-1, the contents of the Regulations vary in different stages of project imple- mentation. Project Stage Management Task of Environmental Protection Implementation Regulations Feasibility research Identifying the type of items in the Regulations, guiding domestic environmental assessment and having connec- tion with the regulations of World Bank. Preliminary design of Preparing the environmental protection implementation regulations for project of this type, and ensuring that project environmental protection measures proposed in the Regulations are implemented in the environment supervision plan. Construction of Implementing the plan of the Regulations; Engineering Supervisor should implement field supervision and man- Project agement to the construction activities of the Owner. Environmental protection As required in the Regulations, the results of acceptance should be submitted to corresponding parties. acceptance of project Engineering run- Implementing greening and other measures in operation period. ning Fig. 3.3-1 Working Contents of Environmental Protection Implementation Regulations in Different Stages of Project 96 The primary working task for the Regulations is to have effective implementation of all environ- mental protection measures, including ① Environmental protection measures of project design and construction contract included in the Regulations; ② Supervising the implementation of environ- mental protection measures by the Contractor in construction period with the help of environment supervisor in the process of construction; ③ The mechanism of inspection, reporting and archiving in the Regulations. Effectiveness of work shall be reflected by checking daily work. 3.4 Working Process for Environmental Protection Implementation Institutions in Construction Period Whether environmental protection measures in construction period can conform to the requirements of the Regulations? Unsatisfactory Satisfactory Rectification is satisfac- Environment inspector should implement rectification tory Engineering Supervisor should implement archiving within the deadline demanded by the Owner in accord- and reporting in accordance with construction field ance with the requirements of the Regulations. checklist and rectification checklist. Rectification is unsatis- factory Rectification requirements are finally met Engineering Supervisor should make report to the re- Environmental protection measures, which are sponsible person for environment management of town implemented by the Owner in accordance with Rectification is satisfac- project office truthfully, and the responsible person of requirements of the Regulations, should be re- town project office should coordinate with the Owner in tory checked by Engineering Supervisor and the check- finishing the rectification of Engineering Supervisor. list should be prepared. Rectification is unsatis- factory Responsible person of County Project Office should report it to Town Project Office truthfully. The Town Project Office or Leadership Team should, in accordance with regulations of contract, deduct the project funds as overdue fine for environmental protection and entrust others to implement rectification of environmental pro- tection measures. 97 3.5 File Management of Environmental Protection Implementation Regulations Relevant files shall be managed by the World Bank, provincial leadership teams, PMOs, town project leadership teams, PMOs, environment assessment unit, Engineering Supervisor and the Contractor while implementing the Regulations. The details are as shown in Table 3.5-1 below: Table 3.5-1 Requirements for File Management of Institutions Name of Institution File Management 1. Recording detailed conditions of implementation, implementing archiving and re- porting them to Engineering Supervisor on a weekly basis; 2. Finishing construction site checklist and implementing archiving together with En- gineering Supervisor prior to construction, and reporting it to town PMO; ① The Contractor 3. Recording detailed conditions of construction and implementing archiving in case of emergency and reporting it to Engineering Supervisor; 4. Finishing rectification within 3 working days upon receiving the notice of rectifica- tion (or such rectification shall be finished within 10 working days if coordination is needed by management institution) and implementing archiving of files. 1. Recording detailed conditions of implementation by the Contractor, implementing archiving and reporting them to town PMO on a weekly basis; 2. Finishing construction site checklist and implementing archiving together with the Contractor prior to construction, and reporting it to town PMO; ② Engineering Su- 3. Recording detailed conditions of construction of the Contractor and implementing pervisor archiving in case of emergency and reporting it to town PMO; 4. Putting forward rectification solution and implementing follow-up practicing to the environmental protection problems in construction activities of the Contractor, in- cluding issuing of rectification notice, rectification checklist and archiving of check files. 1. It is needed to prepare detailed implementation scheme for the Regulations, and im- ③ The Contractor plement archiving of first draft, draft for review and the draft for approval in all pro- jects. 1. Preparing and implementing environmental management rules and regulations of subproject and implementing archiving; 2. Preparing domestic environmental assessment file for approval and implementing archiving; 3. Preparing and implementing environment management training plan and imple- menting archiving; ④ County project 4. Well implementing recording, arranging and archiving of complaint in construction leadership team and running process; and PMO 5. Recording the report by Engineering Supervisor, implementing archiving and sub- mitting report (statement) to provincial PMO on a quarterly basis; 6. Receiving and signing the field checklist from the Contractor and Engineering Su- pervisor, verifying the sensitive problems of environment and implementing archiv- ing; 7. Implementing management and archiving to the aforementioned rectification notice. ⑤ Provincial lead- 1. Preparing and supervising the implementation of the Regulations and implementing ership team and archiving; PMO 2. Recording the report of town project leadership teams and PMO on a semiannual 98 basis, submitting relevant reports to World Bank and implementing archiving; 3. Solving major environmental problems together with other relevant departments and implementing recording and archiving to the detailed measures; 1. Recording the reporting of provincial project leadership team and PMO and imple- ⑥ World Bank menting archiving on a semiannual basis; 99 Chapter IV General Requirements for Environmental Protection Implementation Regulations The Contractor plays a critical role in implementing environment management, pollution control and prevention measures in the process of project construction. General requirements listed in this Chapter shall be applicable to all major institutions of project construction process, in order ensure the execution of the Regulations. The Contractor shall, under the coordination of town PMO and Engineering Supervisor and internal/external supervision management, execute the environment measures proposed in the Regulations. 4.1 Implementation of Environment Measures in Construction Drawing and Bidding Documents If this Project enters the stage of implementation, procurement activities in construction of all projects shall be launched in accordance with procurement guidance of World Bank. All County PMOs shall, under coordination, guidance and supervision of provincial PMO ask the preparation institution of bidding documents to write the alleviation measures against potential adverse envi- ronment impacts in the Regulations and environment impact assessment of subproject into the tech- nical specification and construction drawing of bidding documents. All contents and requirements for the Regulations shall be included in the bidding documents and Contract by the Tenderee. 1. The Contractor shall establish supervisory responsibility system for environmental protection measures in construction period, undertake the implementation of environmental protection measures in the entire construction period, ensure that engineering construction activities of and construction activities of subcontractor (if any) can conform to the requirements of the Regula- tions, and ensure that necessary environmental protection measures are adopted in the process of construction. 2. In process of construction, the Contractor shall have communication and negotiation with the masses in all areas of this Project, establish bulletin board in all construction units, and notify the construction activities and construction period to the masses. Meanwhile, contact person and contact telephone of the Contractor shall be provided, in order to help the masses to implement complaint and provide suggestions for the construction activities. 3. The Contractor shall comply with the relevant regulations for safe and civilized constructions in local places. 4. The Contractor and Construction Supervisor shall, prior to start of construction, accept the training about environment protection and management. Hired experts, as entrusted by provin- cial PMO shall provide training to the Contractor and Engineering Supervisor, and identify the environmental protection requirements related to this Project. 5. For any severe risk occurred due to violation of environmental protection measures specified in the Regulations, the Engineering Supervisor or the Contractor shall notify them to the County PMO within 24h after occurrence. In such case, County PMO and environmental protection de- partments of all levels shall immediately ask the Contractor to take remedy measures; the Con- tractor shall ensure the effectiveness of remedy measures, in order to prevent the reoccurrence of similar risks. Meanwhile, the Contractor shall keep records for the implementation of such measures, report it to the Engineering Supervisor on a regular basis; and Engineering Supervisor shall make report to town PMO and implement archiving of files. 6. Deposit for environment management shall be paid by the Contractor and included in the con- tracted funds in accordance with yearly reserved budget, and the amount of deposit shall ac- count for about 3% of budget. If the Contractor shall, if found taking any adverse measures in environmental protection, be fined by provincial PMO in accordance with the contract; in such case, the project funds shall be deducted as environmental protection overdue fine and others shall be entrusted to take environmental protection measures. 4.2 Preparation prior to Construction Under the coordination, guidance and supervision of provincial PMO County PMOs shall, after award of contract and prior to construction commencement, submit the results for environmental assessment of subproject, including the copies of environmental assessment report and local envi- ronmental assessment approval files, to the Contractor. The Contractor shall implement environ- mental investigation to construction site, in order to verify and identify the description of sub-project environment impact assessment to ambient environment, as well as the environmental limiting factors of this engineering area. Contents to be included are seen in Appendix 1 of the Regulations; besides, corresponding environmental protection measures shall be proposed for the sensitive environment problems, which are newly detected in environment investigation prior to commencement of construction. Construction shall not be commenced unless it is approved by En- gineering Supervisor, so that construction activities in each stage can conform to the requirements of the Regulations. Sensitive environment problems found in investigation prior to commencement of construction in- clude:  Check if pipelines for power supply, water supply, gas, optical cable and communication are buried in the construction road section;  Check if there are sensitive points, such as school, hospital and concentrated residence in pipe- line water plant, sewage treatment plant and pipeline construction road section;  Check if there are famous woods and ancient trees to be transplanted in the construction road section;  Check if procedures are handled in relevant departments such as Planning Bureau and Munici- pal Bureau of Parks and Woods and construction is legal. 4.3 Department Permission and Public Opinions The Contractor shall, in the entire process of construction, have close cooperation with local gov- ernment departments and other departments in order to fully comply with the laws and regulations of government. The Contractor shall make advanced notice of construction site to local residents, including the lasting period of construction. Sufficient information shall be provided to the masses, including construction behavior affecting public safety, as well as matters, sensitive area and tem- porary stacking ground which may impair the interests of the masses. The Contractor shall provide public and transparent participation of the masses and establish hotline to receive the consultancy and suggestions from the masses. The hotline shall be used for handling the calls about construction interference, and all dialogues shall be recorded, in order to reflect the hot issues cared by the callers. Meanwhile, fast response mechanism shall be established to answer the hot issues of the masses. Chapter V Management of Construction Site As the main contents of the Regulations, this Chapter sets down the environmental protection measures and basic requirements for environment management to be adopted by the Contractor in this Project. This Chapter introduces the management requirements for construction site, including construction period, construction nameplate, construction fence, barricade, temporary road, con- struction camps and management of accident risk prevention. The Contractor shall comply with the management regulations of local environmental protection department and accept the regular in- spection by environment supervisor. Regulations for Construction Period  Construction period: 6:00 a.m. ~ 22:00 p.m., 12:00~14:00 is for lunch break and construction is paused; the in-out time of construction vehicles shall conform to the requirements of local gov- ernment;  Night construction shall be limited and if it is inevitable, the residents nearby shall be informed in time; meanwhile, it is needed to handle relevant procedures and take measures to reduce the influences on the residents nearby. Setting of Construction Nameplate:  Information about construction and project schedule, service interruption, traffic detour circuit, temporary bus route and demolition shall be provided by the Contractor on the construction nameplate;  Construction activities at night shall be limited;  If necessary, influences from night construction to surrounding areas shall be controlled and community shall be informed in advance in order to help the masses take necessary measures;  A prior notice shall be posted to the project site, bus station, affected residences and enterprises at least 5 days prior to interruption of services (including water, power, gas and bus circuit) in order to inform the masses. Setting of Construction Fence:  Construction fences shall be established at the boundary of construction site if construction pe- riod is > 30 days; such fences shall be metal sheets made of hard materials; generally, the height of fence shall be ≥2m in general area, or be ≥2.5m for fences at key construction areas;  Fences shall be straight, neat, have clean surface and be free from damage; their surfaces shall be coordinated with the ambient environment;  The fences in road construction shall be within 5m of sight distance of intersection; such fences shall be straight and rigid metal plate, avoid blocking the sight of drivers and pedestrians to keep safety of traffic; it is forbidden to stack objects within the sight distance of 5m;  If fence is ≤5m of residence, or within 15m of sensitive buildings such as residence, hospital and school, it is needed to increase the fence height or set noise barrier which conforms to the relevant specifications and standards; it shall be kept clean within 5m at outer side of fence;  It is forbidden to stack materials and earthwork within 1m at inner side of fence;  It is forbidden to use fence as the support of retaining wall or other facilities and equipment;  Fences shall be established at the boundary of construction site for pipeline engineering in key areas. Setting of Construction Barricade:  For road engineering with construction period ≤30 days, its construction boundary shall be pr o- vided with construction barricade;  It is forbidden to use red and white isolation rope or other materials as substitution of construc- tion barricade;  The construction barricade shall be continuously enclosed fence. Such barricades shall be firmly fastened, neat and uniform and be kept clean and free from damage;  Folding construction barricades shall be established if manhole covers have to be opened or lifted for construction at the town roads where traffic shall be maintained.  While setting construction barricades, it is needed to keep the long-side section of base channel steel facing at construction area; the width of construction channel needed between construc- tion barricade and construction area shall be ≥0.6m;  The Contractor’s name shall be printed on the construction barricade at horizontal direction. It is forbidden to use construction barricade of which name is inconsistent with this unit;  Fully enclosed construction barricade shall be established at boundary of operation area before coating or cleaning the surface of buildings (structures); the machinery equipment, tools and materials shall be placed within the range of fence;  It is forbidden to remove the construction barricade before traffic measures are adopted or pro- ject is completed;  The construction method of “Excavating one section, paving one section, repairing one section” shall be adopted in road pipeline construction of key areas; it is forbidden to implement exca- vation simultaneously in the whole line. Setting of Temporary Roads:  If urban roads are occupied for construction, it is needed to conform to relevant regulations of public security and transportation department and road administration department, properly handle review and approval procedure, and set temporary channels in accordance with specifi- cation;  It is needed to strictly follow the regulations in construction period, and it is forbidden to oc- cupy road without permission or violate the regulations of construction period;  If urban roads are occupied and bringing influences on access of vehicles and personnel, it is needed to set temporary roads in accordance with the regulations;  If sidewalk is occupied for construction, it is needed to erect solid, smooth and continuous sidewalk at the entrance side of commerce, enterprise and office building or residential building and it is needed to keep safe passing of pedestrians;  Steel plate coverage construction shall be adopted by the Contractor if trenches or pipe grooves need to be excavated on the urban roads which are not completed in that day but used as access roads;  If trench (pit) excavation width is ≥0.8m, the lower end of coverage steel pipe shall be rei n- forced using metal sections;  The supporting and reinforcement scheme shall pass safety confirmation and be submitted to the Owner for recognition; the steel pipe covered on roads shall have thickness ≥0.03. The steel pipe and metal slope frame shall be grinded along with the edge, so that it can be free from sharp corner and burr and keep safety of personnel and vehicles. Setting of Construction Camps:  Existing facilities at surrounding areas shall be fully utilized and houses shall be rent by the Contractor in order to reduce the influences on ambient environment;  All solid wastes generated from construction site shall be reasonably arranged, stored and han- dled;  Natural wood shall not be used as fuels for processing or preparing the materials for project, or cooking and heating. Accident Risk Prevention:  The Contractor shall set prevention measures of accident in advance, set responsible person for emergency and, in case accident occurs, timely contact the relevant departments for help. Chapter VI Air Pollution Control (1) During construction and operation of the project, the operation activities may result in the emis- sion of air pollutants. (2) The main air pollutants during the construction include:  Dust caused by uncovering of side slope, stacking area, earth excavation and transport ac- tivity;  Dust caused by material transportation on the construction road;  Gas emitted during road surfacing;  Exhaust gas emission of construction machinery and vehicles; (3) The main air pollutants during the operation includes:  Foul gas of wastewater treatment plant; (4) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  In dry weather, water shall be sprayed on the construction site to reduce dust;  The cement silo and mortar dry powder silo on the site shall have effective dust control measures in the material in/out link;  Measures such as grass seed planting for simple greening, dust-proof screen covering and new sealing process shall be taken for the muck and bare soil on the site;  The soil from pipeline excavation shall be cleaned every day;  The stacking height of muck on the site shall not exceed the height of fences or construc- tion barrier;  The vehicle for transporting powders shall be covered and washed before leaving the site;  The powder materials shall be wetted during transportation;  After removing the stacker, the rest dust shall be wetted and cleaned away from the road surface;  The dusty pavement shall be hardened or keep wet through water-spraying;  The water for reducing dust shall not influence the surface flow or the water consumption of the local community;  The powder material storage yard shall be covered or sprayed with water for reducing dust;  The cement bag shall be opened in a sheltered place;  Construction shall be conducted within specified time to reduce air pollution. The con- struction time is from 6:00 to 22:00, and 12:00 to 14:00 is the lunch break and the con- struction shall be stopped during the period;  The goods shall be covered and bound firmly during transportation, and vehicles for trans- porting the earthwork, spoil and waste slag shall not be overloaded and avoid scattering;  The influence of wind direction shall be considered when choosing the stacking position, and power materials shall not be disposed on the windward position;  Windproof and dust-suppression measures shall be taken during construction material stacking;  Confirm reasonable route of solid waste transportation, try to choose smooth-riding pave- ment and avoid bumping in order to reduce dust emission;  Water shall be sprayed on the construction site of removal project;  Temporary fence shall be arranged along the boundary of the construction site;  The road access to the construction site and the construction road shall have speed limit signs, and the construction vehicle shall follow the speed limit regulation. (5) Strengthen the environment management to reduce the influence of project operation on the en- vironment, and put forward the following measures:  The main odor polluting source thick grid station, thin grid station, sludge pump tank and sludge tank of the wastewater treatment plant shall have top cover or capping plate, the sludge dewatering equipment room shall be enclosed, and the collected exhaust gas shall be treated by biological deodorization device and emitted through an exhaust funnel of the length of 15m. The exhaust gas collection efficient shall be no lower than 90%, the purifi- cation efficiency of biological deodorization device shall be no lower than 80%, and the foul gas collection system shall be equipped;  Tree species such as boxtree, oleander, planetree, southern magnolia and cedar and other flowers and plants shall be planted in the space, roadside and fence of the wastewater treatment plant to form multi-level isolation belt and protection forest belt Chapter VII Water Pollution Control (1) The wastewater of construction activity may have a bad effect on the aquatic ecosystem and water quality. (2) During construction of the project, the following activity will influence the water quality:  The wastewater of construction equipment, such as the uncontrollable bentonite discharged from the perforating machine;  Wastewater from the drilling hole;  Water and soil erosion caused by uncovering of material stack and excavation point under bad weather;  The uncontrolled surface runoff will carry sediment into the water body directly, such as stream, fishpond and river; (3) During construction of the project, the following activity will influence the water quality:  The influences of water intake project on the hydrological regime of water source, the downstream ecological water demand and the receiving capacity of water functional area;  The influence of the industrial wastewater and sewage of water plant, the backwash wastewater of filter and the discharged wastewater of sedimentation tank on the local water environment;  The influence of wastewater treatment plant drainage on the receiving water;  Domestic wastewater of staff of water plant and wastewater treatment plant. (4) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  A horizontal long drainage channel shall be arranged inside the entrance along the door line of the construction site with the fence and connected with the drainage system on the construction site;  The arrangement of vehicle washing drainage channel shall be designed according to the vehicle size, whose surface shall be troweled and pressed polish with commercial pre-mixed mortar, and the channel mouth shall be covered with strong metal mesh;  The construction site shall have a large sedimentation tank, and the sedimentation tank shall be dredged periodically according to the disposal mode of solid wastes;  Domestic wastewater shall be discharged into the septic tank for three-level biochemical treatment firstly and further discharged into natural channel or the municipal pipe for proper treatment;  Construction shall be conducted within specified time so as to reduce wastewater;  The wastewater discharged into the surface water body and sewer line shall conform to the Chinese water environment protection laws and regulations;  The construction unit shall arrange personnel to clean the deposits in the pipe chase, blind shaft and sedimentation tank, once every 10 days for major area, and once a month for general area;  The wastewater treatment system (the sedimentation tank) on the construction site shall be maintained periodically;  The mud or muddy water shall be discharged into the city pipe network directly;  The vehicle and equipment shall be cleaned before leaving the construction site;  The transferring public road/place, entrance and temporary fence on the construction site shall be kept clean;  The wastewater treatment system shall be stored in a place which is large enough;  The discharging position of wastewater shall be specified. (5) Strengthen the environment management to reduce the influence of project operation on the en- vironment, and put forward the following measures:  The sewage of water plant shall be discharged into the municipal wastewater line;  The backwash wastewater of the water plant filter and the discharged wastewater of sedi- mentation tank shall be settled, and the supernate shall be reused for greening;  Strengthen the monitoring on tail water quality of wastewater treatment plant and establish the online monitoring on effluent quality of wastewater treatment project;  Strengthen the operation management and inspection on the structure of wastewater treat- ment project and the tour inspection and maintenance on the instrument and equipment for wastewater treatment, and ensure the safe operation;  The domestic wastewater of staff shall be discharged into municipal wastewater pipe net- work after the treatment of septic tank; Chapter VIII Noise Pollution Control (1) A lot of equipment that may generate noise will be used during construction, such as back-acting shovel, bulldozer, crane, truck, generator, earthwork, transportation and vehicle traffic. (2) The noise may be caused by the following activities:  Operation of construction equipment (such as mechanical equipment, bulldozer and exca- vator);  The transport vehicle transports materials inside and outside the construction site.  Operation noise from intake pump, lift pump, blower room, sludge dehydration machine room and membrane treatment facilities of the water plant and the booster pump station. (3) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  Noise regulations shall be followed during construction;  The unapproved or recorded construction shall not be carried out on the construction site;  Except the special pipeline construction site that may be influenced by the traffic at day- time, night construction is prohibited;  The night construction of special construction site shall be recorded by the administrative department synchronously, and mechanical equipment that generates noise shall not be started arbitrarily without authorization;  During the college entrance examination and senior high school entrance examination, the construction unit shall arrange the construction procedure reasonably for the construction site where is no more than 100m away from the residential building and examination room except emergency repair and rescue, prevent excavation of pile foundation and foundation pit and follow the construction stopping regulation;  Conduct pipeline construction, and construct using covering method when working on damage and excavated hard pavement;  The pavement damage device shall be placed in the mobile operation room, and the pave- ment damage power machinery shall have noise reduction measures to control the noise effectively;  During construction, use low-noise equipment or take noise reduction measures (sound barrier and noise reduction barrier);  The Contractor shall maintain the construction equipment periodically and ensure the best working state and minimum noise level;  Vehicle no-horn signs shall be set in sensitive places such as school, hospital, sanatorium and office building. (3) Strengthen the environment management to reduce the influence of project operation on the en- vironment, and put forward the following measures:  Optimize the plane arrangement of water plant and wastewater treatment plant, and keep the noisy equipment away from the side of residential area;  Take noise reduction measures (shock pad and sound insulating doors and windows) for the dehydration machine room and backwash room of water plant, increase sound insula- tion wall for the pump room except the above measures, and strengthen the operation and maintenance of equipment;  Choose low-noise equipment and accomplish equipment operation and maintenance;  Set centralized sound insulation control room in the noisy work shop, and use double-layer sound insulation door and window. Chapter IX Solid Waste Management (1) Solid wastes generally include all wastes. For example, the construction waste and removal waste in the construction area. (2) The solid wastes may be caused by the following activities:  The excessive earthwork during earthwork excavation shall be disposed;  Disposal of wood, steel, site coaming and packing material during construction;  Domestic solid waste of construction personnel;  Sludge of water plant and wastewater treatment plant;  Domestic wastewater of staff of water plant and wastewater treatment plant; (3) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  The construction site shall be clean and tidy (not chaotic);  Clean and store the construction waste, reclaimable waste and ordinary waste on the con- struction site periodically and by categories;  During construction, clean the polluted soil at once if oil overflows;  Clean away the sand precipitated during facility flushing periodically;  After completing the project, clean all remaining wastes on the construction site at once, and dispose them properly;  Collect and remove all facility garbage periodically, and transport the domestic garbage to designated refuse landfill with covered container or truck;  The area for storing the solid wastes on the construction site temporarily shall be large enough;  Dehydrate sludge till the moisture content is below 60%, and deliver it to the refuse landfill for burying;  Keep the transaction receipt for solid wastes transportation Chapter X Ecological Environment Protection (1) The ecological environment will be influenced by the project during construction, and sugges- tions for mitigation measures shall be put forward during environment social management plan. (2) The ecological influence during construction is related with the following activities:  Site and vegetation clearing may result in erosion of border trees and roadside vegetation;  Excavation may result in soil interference; (3) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  The Contractor shall try to shorten the temporary land occupation time on the premise of guaranteeing the construction quality and quantity, control the earthwork construction time, maintain stable excavation and filling, reduce the influence on the exterior project con- struction scope, especially in rainy season, optimize the arrangement of construction site reasonably, try to reduce the construction activity scope, transport and use the construction material synchronously and recover greening after construction;  After the construction of the temporary land, it is necessary to multiple crop the border tree timely and select the appropriate local species to compensate for planting and restoration of green  Exposed soils need timely site restoration and revegetation and finished areas need to be restored to their original conditions for slope stability and soil integrity.  The education and training of the ecological environmental protection common sense shall be carried out for the contractors and construction workers before the construction;  Ensure there is no nature reserve, ecological garden and cultural protection zone near the construction site. (4) Prohibitions:  It is forbidden to cut down trees arbitrarily going beyond the approved construction;  It is forbidden to disturb animals and plants outside the construction area. Chapter XI Cultural Relics and Historic Sites (1) Cultural sites and cultural relics may be affected by the project. These sites have been identified in the EIA report and shall be highlighted in the environmental and social management plan of the project. (2) In the construction period, cultural relics and historic sites may be affected by the following:  Disappearance or destruction of cultural sites due to the project;  Potential damage to the structure and stability of cultural sites during construction and op- eration. (3) According to the relevant survey, there are no cultural relics and historic sites in the construction area of the project. However, if any cultural relics or historic sites are discovered or suspected during excavation or construction, the following measures shall be taken:  Immediately suspend constructions at the site finding such relics and reinforce the preser- vation of the scene;  The contractor shall immediately report to polices and competent departments of cultural relics about cultural relics for authentication and treatment;  The erosion caused by the shutdown of the contractor shall be compensated by the relevant departments of the state;  Once they are identified as cultural relics, the scope of protection shall be timely delimited;  It needs to rescue and excavate these relics due to the urgent construction period or risks of natural damages;  Rescuing and exploration of relics shall be performed by specialists by dedicated equip- ment, rather than arbitrarily done by the contractor;  If it is confirmed as a major cultural relics discovery, decisions shall be made about wheth- er it needs to change the construction site of the project. (4) Prohibitions:  Do not allow to disturb anything that has architectural or historical value. (5) Emergency Flow Chart The emergency treatment flow chart of finding cultural relics is shown in Schedule 4. Chapter XII Population Health and Safety (1) The contractor has the responsibility to protect workers and property from construction acci- dents and comply with the national and local safety standards. (2) Some key risks related to construction include:  Risks of falling objects and working on unstable platforms;  Fire risks;  Risk of construction in unstable geological layer;  Traffic safety in the construction area;  Personal hygiene and spread of infectious diseases.  To promote the safety awareness related to the law, public security and traffic safety of the employees.  To impart health knowledge to employees, particularly HIV information; to encourage in- dividuals to take protective measures by using condoms to avoid passing the disease on to others  .Environmental protection education shall be given to employees to ensure that the on-site water sewage and solid waste are treated in accordance with the requirements of ESMP lest the spread of disease occur. (3) Strengthen the environment management to reduce the influence of construction on the envi- ronment, and put forward the following measures:  Keep the supply of traffic sign, road marking and guardrail products (including paint, easel and sign material, etc.) to make sure the safety of pedestrians during construction;  Carry out training of safety for construction workers before starting the project;  Provide personal protective equipment and clothing for construction workers and enforce them to use;  Suspend all the works when encountering a rainstorm or any urgent accidents;  Increase the prevention and education of AIDS for construction workers, such as imple- menting the information communication strategy, enhancing face-to-face consultation work, solve systemic problems affecting the individual behavior and encourage individuals to take protective measures, etc. (4) Prohibitions:  It is forbidden to use naked flame;  It is forbidden to use unapproved poisonous material, including lead paint and asbestos;  Workers are prohibited from using alcohol. Schedule 1 Pre-construction Site Checklist No.: Contract No. and name: Project name: Cc Unit: Current construction stage: Inspector: Date: Implementation conditions Remarks/proposed Inspection item Not imple- N/A Implementation actions mented 1. Natural habitats 1.1 Is the construction area lo- cated in or near any national park (existing or planning), na- ture reserve or area of high cul- tural value? 1.2 Is there any vulnerable or endangered species (land or aquatic) in the construction ar- ea? 1.3 Is there any natural habitat in the construction area? 1.4 If there is a natural habitat in the construction area, is it vulnerable, rare and limited scope? 1.5 Is there wetland or saturated soil area (permanent or tempo- rary) in the construction area? 1.6 Is there any known archae- ological, historical or other cultural heritage (including graves and cemeteries) on the construction site? 1.7 Others (please specify in detail) 2. Physical Cultural Re- sources 2.1 Whether the project will cause permanent or temporary migration, or whether it will have other effects on the known physical cultural resources? 2.2 Whether the physical cul- tural resources of the project will be of significance for local residents (such as cemeteries)? 2.3 Is there any known archae- ological, historical or other cultural heritage (including graves and cemeteries) on the construction site? Implementation conditions Remarks/proposed Inspection item Not imple- N/A Implementation actions mented 2.4 Others (please specify in detail) 3. Pre-construction Prepa- ration 3.1 Has the construction team been hired? 3.2 Has the location of the storage area been decided? 3.3 Have the seeds, native veg- etation and topsoil been col- lected and stored for reuse in case of site recovery? 3.4 Are the road sections of the construction cleared, including roots and organic waste? 3.5 Investigate to see whether there are power supply lines, water pipelines, gas pipelines, optical cable, pipelines of tele- communications and other fa- cilities buried in the construc- tion section or not? 3.6 Investigate to see whether there are schools, hospitals, concentrated residentials and other sensitive points in the pipeline construction section or not? 3.7 Investigate to see whether there are ancient and famous trees needed to be transplanted among the border trees in the pipeline construction section or not? 3.8 Whether someone goes to the Planning Bureau, Municipal Gardens Bureau and other rele- vant departments for handling formalities prior to com- mencement and the project is commenced legally? 3.9 Others (please specify in detail) 4. Surrounding Environ- ment and Population 4.1 Whether this project will violate the interests of sur- Implementation conditions Remarks/proposed Inspection item Not imple- N/A Implementation actions mented rounding farmers? 4.2 Whether the construction of the pipeline will affect sur- rounding farmers? 4.3 Whether the project will involve temporary land occupa- tion? 4.4 Whether this project will involve claim payment? 4.5 Whether this project will affect production facilities? 4.6 Whether this project will affect the service or resource channel? 4.7 Whether this project will hinder normal life? 4.8 Others (please specify in detail) Schedule 2 Construction Management Checklist No.: Contract No. and name: Project name: Cc Unit: Current construction stage: Inspector: Date: Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented 1. Air Pollution Control 1.1 Whether the construction site is sprinkled to reduce dust? 1.2 Whether the vehicles shipping the powder are covered or cleaned before leaving the site? 1.3 Whether dusty road is hardened or sprin- kled to keep wet? 1.4 Has it been ensured that the water for re- ducing dust shall not influence the surface flow or the water consumption of the local commu- nity? 1.5 Shall the powder material storage yard be covered or sprayed with water for reducing dust? Shall the cement bag be opened in a sheltered place? 1.6 Whether the tire washing facilities are in- spected, maintained and cleaned regularly? 1.7 Whether the goods transported are covered properly and bound securely during transporta- tion? 1.8 Whether the effect of wind is considered when choosing the location of the material stack? 1.9 Whether the stack of the construction ma- terials is given measures of preventing wind and suppressing dust? 1.10 Whether a reasonable route for solid waste transportation has been identified to re- duce dust emissions or not? 1.11 Whether the demolition project is sprin- kled or not? 1.12 Whether the place (such as blunging) generating dust is closed? 1.13 Whether a temporary wall on the con- struction site is set up? 1.14 Whether speed limit and a speed limit sign has been erected on the construction road? 1.15 Whether the construction vehicles comply with the speed limit? 1.16 Whether the construction is done within the specified working time or not so as to re- duce dust emission? Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented 1.17 Whether the powdered materials are wet- ted before shipped? 1.18 Whether any remaining dust materials are wetted by water and removed from the pave- ment after the material is removed? 1.19 Shall the cement silo and mortar dry powder silo on the site have effective dust con- trol measures in the material in/out links? 1.20 Whether the earth from excavating the pipeline is cleared away every day? 1.21 Others (please specify in detail) 2. Water Pollution Control 2.1 Whether a horizontal long drainage channel is set up inside the entrance and along the door on the construction site where a fence is erect- ed? 2.2Whether the drainage channel is connected to the drainage system of the construction site? 2.3 Whether the flushing flume set of the vehi- cle is designed according to the specific size of the vehicle? 2.4 Whether the sedimentation tank with enough capacity is set up in areas without sew- er and on the construction site? 2.5 Whether the sedimentation tank is dredged regularly and handled according to the han- dling method of solid waste? 2.6 Whether the domestic wastewater is dis- charged into the sewer? 2.7 Whether the drainage tank is exposed to sludge discharge? 2.8 Whether the construction is done within the specified working time so as to reduce the generation of wastewater? 2.9 Shall the wastewater discharged into the surface water body and sewer line conform to the Chinese water environment protection laws and regulations? 2.10 Whether the wastewater treatment system (such as sedimentation tank) is handled and maintained normally on the construction site? 2.11 Whether the vehicles and equipment are cleaned before leaving the construction site? 2.12 How about the maintenance condition of the washing facilities? Whether it is possible to prevent sediment from overflowing or being Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented submerged? 2.13 Whether public roads/places, entrances and temporary walls around the construction site are kept clean or covered with mud? 2.14 Whether there is enough place to store the wastewater treatment system? 2.15 Whether the location of the wastewater discharge point is defined? 2.16 Others (please specify in detail) 3. Noise Pollution Control 3.1. Shall noise regulations be followed during construction? 3.2. Whether there is a valid Construction Noise Permit in the noise-restricted period? 3.3 Conduct pipeline construction, and shall the covering method be used to conduct when working on damage and excavated hard pave- ment? 3.4 Whether the construction of special sites at night is put on the record to the administrative department? 3.5 Shall during the college entrance examina- tion and senior high school entrance examina- tion, the construction unit arrange the construc- tion procedure reasonably for the construction site where is no more than 100m away from the residential building and examination room ex- cept emergency repair and rescue, prevent ex- cavation of pile foundation and foundation pit and follow the construction stopping regula- tion? 3.6 Shall the pavement damage device be placed in the mobile operation room ? And shall the pavement damage power machinery have noise reduction measures to control the noise effectively? 3.7 Whether the low-noise equipment is used during construction? 3.8 Whether the construction is done within the specified working time so as to reduce the generation of noise? 3.9 Whether the low-noise equipment is used and noise reducing measure (sound boarding noise barrier) is taken during construction? 3.10 Whether the contractor maintains the con- struction equipment and controls it in their best Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented working condition and lowest noise level to the greatest extent? 3.11 Whether no-tooting signs of vehicles are set up in schools, hospitals, sanatoriums, office buildings and other sensitive spots? 3.12 Others (please specify in detail) 4. Solid Waste Management 4.1. Whether a unit with business license will be selected for solid waste management? 4.2 Whether the construction site is clean and tidy (whether there is the situation of disorder)? 4.3 Whether the construction waste, recyclable waste, general rubbish, ect. on the construction site is cleaned and classified and stored regu- larly? 4.4 Whether there is oil overflowing and the contaminated soil is cleaned immediately dur- ing construction? 4.5 Whether the obstruction in the drainage channel and sewer is cleared away during con- struction? 4.6 Whether sediment deposited at flushing facilities is cleared away regularly? 4.7 Shall all remaining wastes on the construc- tion site be cleaned at once and be disposed properly? 4.8 Whether garbage of all the facilities is col- lected and removed regularly? 4.9 Whether there is enough area for temporary storage of solid waste on the construction site? 4.10 Whether the transportation route of solid waste is defined? 4.11 Whether the detailed list of solid waste disposal is drawn up? 4.12 Whether the transport transaction docu- ments of solid waste are retained? 4.13 Others (please specify in detail) 5. Ecological Environment Management 5.1 Whether recovery measures are taken for damaged border trees? 5.2 Were the suitable native species chosen for compensatory planting and greening recovery? Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented 5.3 Were there any types of pets or animals feeding on the construction site? 5.4 Were the ancient and famous trees which need not be exploited protected in the largest degree on the construction site? 5.5 Was the construction process carefully ar- ranged to reduce the construction time? 5.6 Was the education and training of the eco- logical environmental protection common sense carried out for the contractors and con- struction workers before the construction? 5.7 Others (please specify in detail) 6. Personnel health and safety management 6.1 Were there the signs to ensure the health and safety of people on the construction site? 6.2 Does the construction unit provide the con- struction workers with safety equipment and educate them on safety and AIDS? 6.3 Was there any firefighting equipment con- figured on the campsite, to the site facilities and on the construction areas? 6.4 Did the various mechanical operators and vehicle operators have the operating certifi- cates? 6.5 Was there enough fire-fighting equipment, fire-fighting water pipes and fire hydrants to prevent the fire on the construction site? 6.6 Was there any safety sight distance set in the construction area? 6.7 Others (please specify in detail) 7. Cultural relics and historic sites 7.1 Were the constructions Immediately sus- pended at the site where cultural relic was found, and was the preservation for the site reinforced? 7.2 Did the contractor immediately report to the police and the competent departments of cultural relics for authentication and treatment? 7.3 Was the erosion caused by the shutdown of the contractor compensated by the relevant departments of the state? 7.4 Once cultural relics were identified by ex- perts, was the scope of protection timely de- Implementation conditions Remarks/proposed Inspection item Not imple- Implementation N/A actions mented limited? 7.5 were the cultural relics rescued and exca- vated due to the urgent construction period or risks of natural damages? 7.6 Were the cultural relic rescued and exca- vated by professionals with professional equipment? 7.7 Was the demonstration of project construc- tion in another place executed once it was de- fined as significant cultural relics discovery? 7.8 Others (please specify in detail) Schedule 3 Environmental Rectification Notice No.: Contract No. and name: Project name: Cc Unit: Current construction stage: Date: Problems concluded from the on-site inspection: Reasons analysis and improvements: Rectification opinions of Environmental Protection Department (if necessary): Environment inspector: Date: Qualified rectification date: Finished within _ Accepter: Date: Review conclusion: Re-examiner: Date: Schedule 4 Emergency Response Flow Chart of Cultural Relics Discover- ing Discoveries of suspected cultural rel- ics by the construction units Report to town PMO immediately The construction units immediately shut down to protect the site where the County (District) PMO suspected cultural relics were found. Report to provincial PMO and coun- ty-level competent departments of cul- tural relics at the same time County-level competent depart- Provincial PMO ments of cultural relics Identify the suspected cultural relics and make responses and judgments within 24 hours. Preliminary judgment of Identified as Identified as the protection level cultural relics non-cultural relics Provincial competent Delimit the protection scope im- departments of cultural County (District) mediately. Protect the scene with relics PMO the help of the public security organ. Notice Provincial or national County-level cultural relics The contractor resumes cultural relics the construction work after the approvals of State Bureau of Cul- Determine the protective relevant departments. tural Relics measures Make responses and judgements within 15 days. Rescue and exca- Have a demonstration of Rescue and exca- Have a demonstration of vate by the profes- proposed project con- vate by the profes- proposed project con- sional cultural relic struction in another place sional cultural relic struction in another place Practice the measures and excavation per- to protect the original site excavation per- to protect the original site restart the project after ac- sonnel of the cultural relic sonnel of the cultural relic quiring the back-to-work leg- islation by the Cultural Relics Bureau. Appendix 2 Jiangxi Provincial Integrated Urban-rural Water Supply and Rural Wastewater Treatment Project Physical Cultural Resources Management Plan JiangXi Province Water Resources Investment Group September 2017 1. Investigation of local physical cultural resources According to the results of the EIA survey, the local physical cultural resources that may be affect- ed by Jiangxi Provincial Integrated Urban-rural Water Supply and rural wastewater treatment project are mainly ancient trees and Putian Six Groups ancestral hall. The details are as follows. Figure 1-1: List of Local Physical Cultural Resources Which May Be Affected by Jiangxi Provincial Integrated Urban-rural Water Supply and Rural Wastewater Treatment Project Dis- Sub-project tance County/ Loca- Name from Description Site photos City Name tion the project Pipe Net- Located in work Exten- An- Zhangshi Village, Shiqiao Yongxin sion Project cient 15m camphor tree, Town of Yongxin trees tree-age unknown, County grow well Located in Taoyuan Village, camphor tree, a An- 1000-year-old cient 15m tree, a first grade trees state protection ancient tree, grow well Located in Pipe Net- Taoyuan Village, work Exten- An- camphor tree, a Qiawan cient 15m 280-year-old tree, Nanfeng sion Project Town trees a third grade state of Nanfeng County protection ancient tree, grow well Located in Taoyuan Village, An- camphor tree, cient 15m tree-age unknown, trees a third grade state protection ancient tree, grow well Township Pipe Net- Located in Panxi An- work Exten- Hougan Village, camphor Leping cient 10m sion project g Town tree, tree-age un- trees of Leping known, grow well City Rural Water Supply Pipe Network Located in Fangjia An- Transfor- Yongsha Village, camphor cient 8m mation and n Town tree, tree-age un- trees Extension known, grow well Project of Leping City Rural Putian Single-storey Wastewater Group building, located Treatment Zhajin Six at the group six of Xiushui 30m Project of Town An- Zhajin town, used Xiushui cestral for fete by Villag- County Hall ers 2. Project influences on the physical cultural resources and the protective measures The basic protective measures for the affected physical cultural resources have been included in the environment social management plan of this project. According to the field investigation, Jiangxi Provincial Integrated Urban-rural Water Supply and Rural Wastewater Treatment Project does not involve the transplantation of the affected rare and ancient trees and only involves some noise and dust affections in the project construction process. Putian Group Six Ancestral Hall located about 30m southeast of the wastewater treatment plant area is mainly affected by the noise and dust dur- ing the construction. Figure 1-2: Protective Measures to Local Physical Cultural Resources Which May Be Affect- ed by Jiangxi Provincial Integrated Urban-rural Water Supply and Rural Wastewater Treatment Project Physical cultural Key influ- S/N Name Mitigation measures resources ences type All the an- The construction shall be strictly carried out in accordance with cient trees are Measures for the Protection of Ancient and Famous Trees and not sited in relevant laws and regulations to ensure that the project construc- the scope of tion will not adversely affect the ancient trees. Specific measures construction include: and are 1. Number each tree and hang tags with the name, diameter and 8~15m away age of the tree and the protection precautions on each tree; and from the con- provide dedicated tools. struction area. 2. Establish tree files including the photo of each tree in addition Famous The influ- Camphor to the text information; implement the tracking management of the 1 and an- ences of pipe tree entire construction process. cient tree network con- struction on 3. Strengthen the environmental management during the construc- ancient trees tion for the soaking of construction waste liquid into the roots of mainly in- the trees and soil can result in soil compaction and poor permea- clude the bility, and can affect the growth of trees or directly injure the roots ecological of trees. influence and 4. Prohibit operations under fire or gas around the ancient trees, construction keep clean it and pile no sundries around the ancient trees, ensure fugitive dust that each tree is equipped with sufficient fire-fighting equipment influence. within10m radius around it. 1. Before construction, the construction unit shall negotiate with the family patriarch of the ancestral hall and the Village head to formulate practical and effective protection plans. 2. Before construction, a detailed construction plan shall be for- mulated. At the construction site, the protection identifier of the Putian Group ancestral hall shall be clear. The identifier shall indicate the nature Six Ancestral of the ancestral hall, the Village it belongs to, the scope of protec- Hall located tion and the protective measures as well as the contact person and about 30m contact information of the administrative agency of the ancestral southeast of hall. wastewater 3. Before the construction team enters into the site, first of all, all treatment the construction workers shall be organized to study in-depth the Putian construction operation rules. The construction shall be regulated to plant area is Group prevent random expanding of the construction scope. Ancestral mainly under 2 Six An- hall noise and dust 4. During the construction process, temporary fence and noise bar- cestral influences rier shall be set around the construction site. Watering shall be Hall during the carried out regularly to reduce the construction dust. In order to construction, avoid influencing the normal worship activities in Putian Ances- and noise and tral Hall, Villagers shall be consulted in advance and the construc- atmosphere tion can be continued only after the Villagers' agreement. influences 5. The ecological restoration work in the affected areas shall be during the immediately carried out after the completion of construction activ- operation. ities. 6. During operation of the wastewater treatment plant, the major odor pollutants shall be added with top cover or cover plate. The dehydration machine room shall be sealed. The exhaust gas col- lected be handled by the deodorizing device and discharged after reaching the standard. 3. Measures for discovering cultural relics during the construction process Purpose This procedure is intended to illustrate good practices of the cultural relics discovered during the construction process. Risk: This procedure will explain what measures shall be taken if a historic site of great importance is discovered during the construction process. These measures include staff training and the mecha- nism of notifying and reporting to the environmental management department of the construction contractors to determine the appropriate management measures that shall be taken. In addition to the cultural relics that have been identified, it can be told from the current information that there is little possibility to find valuable resources in this project. Actions plan No. Action description Supervision Construction personnel training 1 Training for the construction workers shall include a description of possible cultural Check the regis- relic sites or objects. Construction workers shall know the reporting and informing tration form of the procedure for a suspected object of cultural relic and the importance of the proce- training participa- dures. tion If the location is confirmed, the steps shall be taken. 2 The following steps will be taken to protect the unidentified cultural relic -- sites/objects: i. Once the worker identifies a(n) site/object that may be cultural relics, he/she shall immediately notify the construction supervisor on site. ii. The construction supervisor will determine whether the site/object is a cultural relic or not; iii. If it is considered as cultural relics, the operation within 50m of the site shall be immediately stopped by the construction supervisor; iv. Construction supervisor shall immediately notify the environmental coordinator of the construction contractor; v. The environment coordinator of the construction contractor will follow up the notification procedure and notify the environmental supervisor of the environmental management department who will notify the project manager of the construction supervision company and the County PMO. The reporting form shall be completed within 24 hours after determining the loca- tion. 3 Temporary fence or similar facility within a 50m radius of the site shall be set. Check Instruction by the design units 4 No operation shall be continued within a 50m radius of the area until it is directed by Visual inspection the environmental management unit. during the check 5 The environmental coordinator of the construction contractor shall be notified 15 Check days before the commencement of construction at the identified target or location. The instructions on the protection measures of the site or the requirements by the environmental management unit of the construction supervision company shall be recorded by the environmental supervisor of the construction contractor and the site inspector and shall be conveyed to the construction personnel. Schedule 1 Possible Cultural Relic Site Notification Form Part 1 - Location Confirmation Location confirmation date Description of place and location (including the name of the construction area) Location type General description of the location Person who confirms the location Time and date of stopping the operation Time and date of notifying the construction con- tractor - the environment coordinator Time and date of notifying the environmental management unit - the environment supervisor Person who fills in the form Person who verifies the form Part 2: Instruction and suggestions of the environmental management unit Date of receiving the request of the environmental management unit Summary of the environmental management unit requirements (refer to the attachment if necessary) Workers' training date Verification of the implementation of require- ments by the environmental management unit (signature & date) Complementation Transportation Yongxin County Yangqiao Village, Tu- Will the construction plan be submitted to the arrangement tian Village, Huangmen Village, Rongxi traffic police department and the transporta- Village, Guangming Village, Shuanghu tion department before the construction work Village, Longan Village, United Village, has affected the public transport? Qingtang Village and other Villages Are you ready to make public transit plans along the road; and get a permit? Yueping dike Village, Guankou Village, Do you put a sign on the site before construc- Chexi Village, Kui Village, Ancient tion? Jinshan Village, Liuxi Village and other Do you specify the project content, construc- Villages along the road; tion time, and inform the contact person and Xiushui County, Dragon Village, Bailuo the complaint hotline pager? Foothill, Zou Family Harbor and other Have you used news media, weibo, WeChat Villages along the road. and other platforms to inform you in ad- Duanshang Primary School, Maoao vance? town, Xiushui County, Laixi Primary Is the project divided into sections and com- School, Nanfeng County; Liang Xian pleted the excavation and backfill as soon as Primary School, Liuchuan District; possible? Dongxing technician training Primary School, Dongxiang Village; Boyu middle In the near Village construction, is it possible school, Dongxiang District; Guangchang to set up special construction roads, reduce Primary School, Dongxinag District; the use of rural roads, and avoid the destruc- tion of roads by large instruments and vehi- Star Experimental Kindergarden, Lep- cles? ing City and other schools along the Shall the traffic police conduct the traffic raod; control and dispatch during peak hours of school, and set up temporary traffic signals and other indicators? Xiushui County sewage water plant, Will the water plant be shut down, employee Closure of Nanfeng County water plant, Nanfeng resettlement and other information be in- small-sized County mountain bay water plant, formed to every employee of the relevant wa- water plants Dongxiang County Huimin water plant, ter plant at least 3 months in advance? Daongxiang County Xiaohuang town Does the original private business owner water plant, Dongxiang County Gang- make a one-stop provisional compensation for shangjichengwang water plant- a total of other employment based on labor laws and 36 employees employees' wishes? With labor ability and skills, will employees stay after the restructuring of the new water plant, by means of business skills and on-the-job training and then signing labor contract, making Runquan water plants to hire contracted staff for the laid-off reemployment? Will the project implementation, operational maintenance and other low-skill positions provided during the post-operation period for reemployment in the new water plant?