Translated from Ukrainian UKRAINE DISTRICT HEATING ENERGY EFFICIENCY PROJECT Loan contract dated 26.05.2014 No.8387-UA Loan contract dated 26.05.2014 No.TF016327 PUBLIC UTILITY “KHARKIVSKI TEPLOVI MEREZHI” ENVIRONMENTAL AND SOCIAL MANAGAMENT PLAN (for the projects of В category) Kharkiv – 2018 1 CONTENT 1. INTRODUCTION 11 1.1. General information on the PROJECT 11 1.2. ESMP development objective. 11 2. LEGISLATIVE FRAMEWORK, LICENSES AND PERMISSIONS 13 2.1. Legislative framework. 13 2.2. Licenses. 15 2.3. Permissions. 15 3. CHARACTERISTICS OF THE CURRENT HEAT SUPPLY SYSTEM 17 4. CHARACTERSTICS OF THE PROJECT ACTIVITIES AND LOCARTION, WHERE THE PROJECT WILL BE EXECUTED 19 4.1. Description of the components of the project activities. 19 4.1.1. Construction of cogeneration plants. 20 4.1.2. Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks 21 4.1.3. Reconstruction of boiler houses. 23 4.1.4. Installation of the individual heating points in the residential buildings. 29 4.1.5. Installation of heat meters and other mechanical and electrical equipment in the heat supply stations of the residential houses 29 4.1.6. Commissioning of the steam turbogenerator and reconstruction of the steam boiler CHP-3 30 4.1.7. Modernization of the pump stations and boiler houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps. 31 4.1.8. Reconstruction of heat networks. 32 4.1.9. Implementation of automation system, dispatching and commercial electricity metering system. 37 4.1.10. Implementation of SCADA system. 38 4.2. The boundaries of sanitary protection area. 39 4.3. Description of land plots. 39 4.4. Time-schedule of the PROJECT execution. 42 5. CHARACTERISTICS OF IMPACTS OF THE PROJECT ACTIVITIES ON THE ENVIRONMENT AND SOCIAL SPHERE 45 5. 1 Impact on the atmospheric air 45 5. 2 Noise impact. 48 5. 3 Impact on quality of the surface and underground water. 49 2 5. 4 Impact on soil. 49 5. 5 Waste treatment. 49 5. 6 Waste Storage 51 5. 7 Prevention of emergency situations. 52 5. 8 Impact on flora. 53 5. 9 Transportation impact. 53 5. 10 Impact on human health. 54 5. 11 Impact on social and economic development. 54 6. SAFETY RULES AND LABOUR PROTECTION 58 7. PLAN OF MITIGATION MEASURES 62 8. PLAN OF MONITORING 69 9. THE INSTITUTIONAL CAPACITY 77 10. PARTICIPATION OF COMMUNITY, INFORMATION DISCLOSURE AND CONSULTATION 80 11. THE GRIEVANCE REDRESS MECHANISM 82 Annex 1. Regulation of National Commission No.446 dated March 30, 2017 84 Annex 2. License for production of heat energy at CHP and the units with using of the alternative or renewable power sources. 85 Annex 3. License for electrical power production. 86 Annex 4. Special water use permit. 87 Annex 5. Waste disposal permit in 2014 91 Annex 6. Permit for emissions of pollutants into the atmospheric air by the stationary sources. 92 Annex 7. Project site layout plans on the component “Construction of cogeneration plants”. 93 Construction of cogeneration plant on the 4, Artema Vedelia str., Moskovskyi dstr., Kharkiv 93 Construction of cogeneration plant on the 1, Akademika Proskury str., Kyivskyi dstr., Kharkiv 94 Annex 8. Project site layout plans on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks” 95 boiler houses No.1 and No.2 on the 77, Peremohy ave., Shevchenkivskyi dstr., Kharkiv 95 boiler house on the 199/2, Gagarina avenue, Slobidskyi dstr., Kharkiv 96 boiler house on the 2B, Yudina str., Novobovarskyi dstr., Kharkiv 97 boiler house on the 47A, Pushkarivska str., Novobovarskyi dstr., Kharkiv 98 boiler house on the 45, Liubovi Maloi ave., Novobovarskyi dstr., Kharkiv 99 boiler house on the 51, Liubovi Maloi ave., Novobovarskyi dstr., Kharkiv 100 boiler house on the 12, Kashirskoho str., Novobovarskyi dstr., Kharkiv 102 boiler house on the 46/5, Seminarska str., Novobovarskyi dstr., Kharkiv 103 3 boiler house on the 46, Seminarska str., Novobovarskyi dstr., Kharkiv 104 boiler house on the 57B, Seminarska str., Novobovarskyi dstr., Kharkiv 105 Annex 9. Project site layout plans per the component “Reconstruction of boiler houses”. 106 boiler house on the 7, Hrishchenka, Nemyshlianskyi dstr., Kharkiv 106 boiler house on the 82a, Kulynychivska str., Nemyshlianskyi dstr., Kharkiv 107 boiler house on the 104, Krasnodarska str., Nemyshlianskyi dstr., Kharkiv 108 boiler house “Pivnichnyi-1” on the 9a, Dzherelna str., Moskovskyi dstr., Kharkiv 109 boiler house on the 12, Konieva str., Novobovarskyi dstr., Kharkiv 110 boiler house on the 6/10, Polzunova lane, Novobovarskyi dstr., Kharkiv 111 boiler house on the 90, Novo-Bovarskyi ave., Novobovarskyi dstr., Kharkiv 112 boiler house on the 53, Lomonosova str., Novobovarskyi dstr., Kharkiv 113 boiler house on the 8, Bulvarna str., Novobovarskyi dstr., Kharkiv 114 boiler house on the 88a, Seminarska str., Novobovarskyi dstr., Kharkiv 115 boiler house on the 13, Marka Bernesa str., Novobovarskyi dstr., Kharkiv 116 boiler house on the 5, Metiznyi lane, Novobovarskyi dstr., Kharkiv 117 boiler house on the 7a, St. Nova Bavariia str., Novobovarskyi dstr., Kharkiv 118 Boiler house on the 48, Konotopska str., Novobavarskyi dstr., Kharkiv 119 boiler house on the 26, Kontorska str., Novobavarskyi dstr., Kharkiv 120 boiler house on the 2, Kontorska str., Novobavarskyi dstr., Kharkiv 121 boiler house on the 5/7, Karpivskyi lane, Novobavarskyi dstr., Kharkiv 122 boiler house on the 66, Naboichenka Petra str., Novobavarskyi dstr., Kharkiv 123 boiler house on the 99a, Novo-Bavarskyi ave., Novobavarskyi dstr., Kharkiv 124 boiler house on the 41, Novyi pobut str., Kholodnohirskyi dstr., Kharkiv 125 boiler house on the 49/51, Rylieieva str., Kholodnohirskyi dstr., Kharkiv 126 boiler house on the 67, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv 127 boiler house on the 35, Zaliznychna str., Kholodnohirskyi dstr., Kharkiv 128 boiler house on the 2/15, Blahovishchenska str., Kholodnohirskyi dstr., Kharkiv 129 boiler house on the 12, Baltiiska str., Kholodnohirskyi dstr., Kharkiv 130 boiler house on the 3, Afanasivska str., Kholodnohirskyi dstr., Kharkiv 131 boiler house on the 205, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv 132 boiler house on the 27/5, Berkosa str., build. 5, Kholodnohirskyi dstr., Kharkiv 133 boiler house on the 41, Kurylivska str., Kholodnohirskyi dstr., Kharkiv 134 boiler house on the 65, Ozerianska str., Kholodnohirskyi dstr., Kharkiv 135 boiler house on the 35, Novyi Pobut str., Kholodnohirskyi dstr., Kharkiv 136 boiler house on the 6, Rizdviana str., Kholodnohirskyi dstr., Kharkiv 137 4 boiler house on the 8, Slovianska str., Kholodnohirskyi dstr., Kharkiv 138 boiler house on the 29, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv 139 boiler house on the 7, Ihoria Muratova str., Kholodnohirskyi dstr., Kharkiv 140 boiler house on the 41/43, Andriivska str., Kholodnohirskyi dstr., Kharkiv 141 boiler house on the 30, Hrekivska str., Osnovianskyi dstr., Kharkiv 142 boiler house on the 1, Biolohichnyi lane, Osnovianskyi dstr., Kharkiv 143 boiler house on the 19, Ternopilska str., Osnovianskyi dstr., Kharkiv 144 boiler house on the 1, Lymanskyi lane, Osnovianskyi dstr., Kharkiv 145 boiler house on the 16, Myrhorodska str., Osnovianskyi dstr., Kharkiv 146 boiler house on the 27a, Dyspetcherska str., Osnovianskyi dstr., Kharkiv 147 boiler house on the 89a, Dostoievskoho str., Osnovianskyi dstr., Kharkiv 148 boiler houses on the 14, 20А and 20, Bukova str., Shevchenkivskyi dstr., Kharkiv 149 boiler house, YRC Internationalist, 20, Horianska str., Kyivskyi dstr., Kharkiv 150 boiler house “Piatykhatky” in 1, Akademichna str., Kyivskyi dstr., Kharkiv 151 boiler house on the 10б, Saperna str., Kyivskyi dstr., Kharkiv 152 boiler house on the 27, Pomirky str., Kyivskyi dstr., Kharkiv 153 boiler house “Aeroport” on the 9, Nesterova str., Slobidskyi dstr., Kharkiv 154 boiler house on the 74a, Myru str., Industrialnyi dstr., Kharkiv 155 boiler house on the 10/12, Blahovishchenska str., Kholodnohirskyi dstr., Kharkiv 156 boiler house on the 7a, Konieva str., Novobavarskyi dstr., Kharkiv 157 boiler house on the 5a, Svynarenka, Novobavarskyi dstr., Kharkiv 158 boiler house on the 23a, Svitlanivska str., Novobavarskyi dstr., Kharkiv 159 boiler house on the in 32, Seminarska str., Novobavarskyi dstr., Kharkiv 160 boiler house on the 3, Dostoievskoho entr. (new heat source construction), Osnovianskyi dstr., Kharkiv 161 Annex 10. Project site layout plan on the component “Commissioning of steam turbogenerator and reconstruction of steam boiler at CHP-3”. 162 Annex 11. Project site layout plans of the component “Reconstruction of heat networks”. 163 cl.1. Heat networks of the site MK4826 / 3-MK4826 / 3-1CK, Peremohy ave. Shevchenkivskyi dstr., Kharkiv 163 cl.2. Heat networks of the site MK4304-MK4303, Otakara Yarosha str., Shevchenkivskyi dstr., Kharkiv 164 cl.3 Heat networks of the site МК5223 before CHS 607/2 Heroiv Pratsi str., 54G 165 cl.4. Heat networks of the site MK4115-MK4301, Shekspira str., Shevchenkivskyi dstr., Kharkiv 166 cl.5. Heat networks of the site МК4200АСК-МК4201, Shekspira str. (output No.2 of boiler house Pavlove pole str. on 17, Shekspira str.), Shevchenkivskyi dstr., Kharkiv 167 Picture 4.1.8.65 168 5 cl.6. Heating networks of the site MK 4706-MK 4707, Peremohy ave. Shevchenkivskyi dstr., Kharkiv 169 Picture 4.1.8.66. 170 cl.7. Heat networks of the cite МК4525-МК4531, МК4526-МК4526/2, Dynamivska str., Faninskyi lane, Shevchenkivskyi dstr., Kharkiv 171 cl.8. Heat networks of the site MK3705-MK3706, Mokhnatska str. Industrialnyi dstr., Kharkiv 172 cl.9. Heat networks of the site МК6624-МК66НО42, Haharina ave., Osnovianskyi dstr., Kharkiv 173 cl.10. Heat networks of the site МК1129-МК1134, Bronenostsia Potomkin str., Slobidskyi dstr., Kharkiv 174 cl.11. Heat networks of the site from МК1233 to zh/b on 56, Moskovskyi ave., Osnovianskyi dstr., Kharkiv 175 cl.12. Jumper between terminals No.1 and No.2 boiler house of Slobidskyi dstr. on 2/1, Kostycheva str., Slobidskyi dstr., Kharkiv 176 cl.13. Heat networks of the site MK6316-MK6317, Fonvizina str., Slobidskyi dstr, Kharkiv 177 cl.14. Heat networks of the site MK5203-MK5206A, Saltivske highway, Moskovskyi dstr., Kharkiv 178 cl.15. Heat networks of the site МК1134/5-МК1227А, Zakhisnykiv Ukrainy sqr., Slobidskyi dstr., Kharkiv 179 cl.16. Heat networks of the site MK1802 / 2-MK1807, Moskovskyi ave., Slobidskyi dstr., Kharkiv 180 cl.17. Heat networks of the site MK1807-MK1821, Vilenskyi lane, Slobidskyi dstr., Kharkiv 181 cl.18. Heat networks of the site MK1821 to MK5830, Bilostotskyi lane, Moskovskyi dstr., Kharkiv 182 cl.19. Heat networks of the site MK5830-MK5836B, Kamysheva Ivana str., Moskovskyi dstr., Kharkiv 183 cl.20. Heat networks of the sites МК5836Г-МК5837А, МК5837А-МК5837АСК2, Kamysheva Ivana str., Kaunaskyi lane, Moskovskyi dstr., Kharkiv 184 Picture 4.1.8.67 185 cl.21. Heat networks of the site MK3223A-MK3237, Industrialnyi ave., Industrialnyi dstr., Kharkiv 186 cl.22. Heat networks of the site MK3237-MK3243, Industrialnyi ave., Industrialnyi dstr., Kharkiv 187 Picture 4.1.8.68 188 cl.23. Heat networks of the site МК6206-МК6209, Morozova str., Slobidskyi dstr., Kharkiv 189 cl.24. Heat networks of the site МК6767-МК6768, Heroiv Stalinhrada str., Slobidskyi dstr., Kharkiv 190 cl.25. Heat networks of the site МК6762А-МК6764, Petra Hryhorenka ave., Slobidskyi dstr., Kharkiv 191 cl.26. Heat networks of the site МК6119БСК-МК6120, Lva Landau ave., Slobidskyi dstr., Kharkiv 192 cl27. Jumper between heat mains No.66 and No.14, Enerhetychna str., Slobidskyi dstr., Kharkiv 193 cl.28. Heat networks of the site МК1128А/2-МК1223, Dniprovska str., Slobidskyi dstr., Kharkiv 194 cl.29. Heat networks of the site МК6516-МК6517, МК6515-МК6515А, Zabaikalskyi lane, Slobidskyi dstr., Kharkiv 195 6 Picture 4.1.8.69 196 cl.30. Heat networks of the site MK6612-MK6612Б, Kashtanova str.,Slobidskyi dstr., Kharkiv 197 cl.31. Heat networks of the site MK2243 / 9-MK2243 / 11Б, Sadova str., Kyivskyi dstr., Kharkiv 198 cl.32. Heat networks of the site MK2240A-MK2311A, Shevchenka str., Kyivskyi dstr., Kharkiv 199 cl.33. Heat networks of the site МК2240А-МК2241, Bilhorodskyi descent, Kyivskyi dstr.,Kharkiv 200 Picture 4.1.8.70 201 cl.34. Heat networks of the site MK2301-MK2304, Sliusarnyi lane, Kyivskyi dstr., Kharkiv 202 cl.35. Heat networks from МК-2987 to the boiler house YRC Internatsionalist, 70, Horianska str., with pipeline fittings of boiler house, Kyivskyi dstr., Kharkiv 203 cl.36. Heat networks of the site МК2981СК6-МК2981СК5, Lesia Serdiuka str., Kyivskyi dstr., Kharkiv 204 cl.37. Heat networks of the site MK2985-MK2985T, MK2985-MK2985TK40, Lesia Serdiuka str., Druzhby Narodiv str., Moskovskyi dstr., Kyivskyi dstr., Kharkiv 205 Picture 4.1.8.71. 206 cl.38. Heat networks of the site MK9421-MK9403, Blahodatna str., Nemyshlianskyi dstr., Kharkiv 207 cl.39. Heat networks of the site МК9514/2-МК9514/2СК2, Unetskyi lane, Nemyshlianskyi dstr., Kharkiv 208 cl.40. Heat networks of the site MK9407-MK9408, Khabarova str., Nemyshlianskyi dstr., Kharkiv 209 cl.41. Heat networks of the site MK9601-MK9602, Khabarova str., Nemyshlianskyi dstr., Kharkiv 210 cl.42. Heat networks of the site МК9603-МК9605, Khabarova str., Traktorobudivnykiv ave., Nemyshlianskyi dstr., Kharkiv 211 Picture 4.1.8.72 212 cl.43. Heat networks of the site MK9606-MK9607, Moskovskyi ave., Nemyshlianskyi dstr., Kharkiv213 cl.44. Heat networks of the site MK9801-MK9801СK, Petra Hryhorenka ave., Nemyshlianskyi dstr., Kharkiv 214 cl.45. Heat networks of the site МК9803СК2-МК9804СК1, Petra Hryhorenka ave., Nemyshlianskyi dstr., Kharkiv 215 Picture 4.1.8.73 216 cl.46. Heat networks of the site МК5106А-МК5510, МК5106-МК5107, Hvardiitsiv-Shironintsiv str., Moskovskyi dstr., Kharkiv 217 cl.47. Heat networks of the site MK5208-MK5209, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv 218 cl.48. Heat networks of the site MK5212-MK5215, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv 219 cl.49. Heat networks of the site МК5219СК-МК5220, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv 220 Picture 4.1.8.74 221 7 cl.50. Heat networks of the site from МК5224 to МК5225А, Heroiv Pratsi str., Moskovskyi dstr., Kharkiv 222 cl.51. Heat networks of the site MK2976 / 6T-MK5309, Akademika Pavlova str., Kyivskyi dstr., Kharkiv 223 cl.52. Heat networks of the site MK1138 / 5B-MK1138 / 6, Moskovskyi ave., Moskovskyi dstr., Kharkiv 224 cl.53. Heat networks of the site MK7812-NO22, Alushtinska str., Kholodnohirskyi dstr., Kharkiv 225 cl.54. Heat networks of the site MK8116-MK8119, Hryhorivske highway, Novobavarskyi dstr., Kharkiv 226 cl.55. Heating CHS network in 4a, Yuriia Parashchuka str., from TK8120-1 to TK8120-1TK8, Novobavarskyi dstr., Kharkiv 227 Picture 4.1.8.75 228 cl.56. Heat networks of the site МК1608-МК1608/25, Himnaziina quay, Osnovianskyi dstr., Kharkiv 229 Picture 4.1.8.76 230 cl.57. Heat networks of the site МК1228А-МК1231, Bohdana Khmelnytskoho str., Slobidskyi dstr., Osnovianskyi dstr., Kharkiv 231 Picture 4.1.8.77 232 cl.58. Heat networks of the site from CHP-3 to MK1111, Enerhetychna str., Slobidskyi dstr., Kharkiv 233 cl.59. Heat networks of the site МК5227-МК5227/1, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv 234 cl.60. Heat networks of the site from МК5223 to CHS 606/2 on 140 G, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv 235 Picture 4.1.8.78 236 cl.61. Heat networks of the site from МК5109 to CHS 615/1 on 22V, Hvardiitsiv-Shyronintsiv str., Moskovskyi dstr., Kharkiv 237 Picture 4.1.8.79 238 cl.62. Heat networks of the site МК5114-МК5114СК1, on Hvardiitsiv-Shyronintsiv str., Moskovskyi dstr., Kharkiv 239 cl.63. Heat networks of the site MK5307A-MK5307A / 1, Valentynivska str., Moskovskyi dstr., Kharkiv 240 Picture 4.1.8.80 241 cl.64. Heat networks of the site from МК5220 to CHS 606/1 on 3V, Svitla str., Moskovskyi dstr., Kharkiv 242 Annex 12.Scheme of development of DHS automation and dispatching systerms. 243 Annex13. Front sheet of the relevent documents of volume of the emissions of pollutants into the atmospheric air by the stationary sources. 244 Annex 14. RPIU composition and authorities. 245 8 Annex 15. List of the third parties which will be involved in work execution. 248 Annex 16. Front sheet of EIA project of construction of cogeneration plant at the boiler house at the address 4, Artema Vedelia (Stoletova) str. 249 Аnnex 17. Statement of the environmental results of the project activities. 250 Annex 18. Public hearing minutes on construction of cogeneration plant at the address 4, Artema Vedelia (Stoletova) str . 252 Annex 19. Photo of holding of public discussions dated January 09, 2014 254 Annex 20. Minutes of the public hearings of the Environmental and Social Assessment Program of the PROJECT. 256 Annex 21. List of members of the public hearing dated January 09, 2014 267 Annex 22. Announcement of holding of public hearing of the PROJECT in the local newspaper. 277 Annex 23. Sheet of registration ID card of incoming application. 279 Annex 24. Nontechnical PROJECT summary for public. 280 Annex 25. Register of permits for emissions of pollutants into the atmospheric air by the stationary sources. 286 Annex 26. Explanation letter of the Department of environment and natural resources of Kharkiv Regional State Administration. 294 Annex 27. Letter of intention. 296 Annex 28. List of boilers, which will be dismantled on the component “ Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks”. 298 Annex 29. List of pump units, which will be dismantled on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks”. 300 Annex 30. List of heat-exchange equiment, which will be replaced at the boiler houses by the new one on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks” 302 Annex 31. List of the boliers, which will be dismantled and replaced by the new ones on the component “Reconstruction of boiler houses”. 303 Annex 32. List of the pump units, installed at the sites on the component “Reconstruction of boiler houses”. 308 Annex 33. List of heat-exchange equipment, which will be replaced at the boiler houses by the new one on the component “Recosntruction of boiler houses”. 319 Annex 34. List of IHP on the component “IHP installation in the residential buildings”. 322 Annex 35. List of resident houses on the component “Installation of the heat meters and other mechanical and electrical equipment in the heat supply stations of the residential houses” 328 Annex 36. List of the areas of heating networks on the component“Reconstruction of heat networks” 349 9 Annex 37. List of the automation objects on the component “Implementation of systems of automation, dispatching and commercial electricity metering ”. 358 Annex 38. List of implementation objects of SCADA systems 368 Annex 39. Information concerning the land plots of the PROJECT objects. 377 Commissioning of steam turbogenerator and reconstruction of steam boiler at CHP-3 385 Annex 40 Cadastral survey of construction plots of the new boiler houses 386 Annex 41 Place of location of the boiler houses 402 List of abbreviations PROJECT The common with International Bank for Reconstruction and Development project “Ukraine district heating energy efficiency project ” ПЕСУ/ESMP Environmental protection and social management plan НПС/OPS Oil pump station ТЕЦ/CHP Combined heat power plant ІТП/IHP Individual heating plant ЦТП/CHS Central heat station ГВП/HWS Hot water supply ХВП/CWS Cold water supply МК/MCh Main chamber РДП/ADCC Area dispatch control center АСКОЕ/ACPMS Automated Commercial Power Metering System ПКД/DED Design and estimate documentation СЦТ/DHS Kharkiv District heating system ЦГУП/CPMU Central project management unit РГУП/RPIU Regional project implementation unit ОВНС/EIA Environment impact assessment IFS International Finance Corporation EHS Environmental, Health, and Safety approaches 10 1. INTRODUCTION 1.1. General information on the PROJECT The PROJECT designed to improvement of district heating supply system of Kharkiv and its efficiency and as a result in improvement of heat supply and hot water supply services to consumers. Due to the PROJECT it will be achieved considerable economy of fuel and energy resources (fuel – natural gas, electrical energy, water) and reduce operational costs of the plant at expense of performance of reconstruction and modernization of the equipment of heat sources, heating plants, heat networks and development of the automated management and control systems. The PROJECT composes of the components (sub-projects) in the housing and utilities sector of the city, namely as follows: 1. Construction of cogeneration plants. 2. Decommissioning of boiler houses, installation of heat individual heating stations and reconstruction of heating networks. 3. Reconstruction of boiler houses. 4. Installation of the individual heat stations in the residential houses. 5. Installation of heat meters and other mechanical and electrical equipment in the heat supply station of the residential houses. 6. Commissioning of steam turbo generator and reconstruction of steam boiler at CHP-3. 7. Modernization of the pump stations and boiler-houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps. 8. Reconstruction of heating networks. 9. Implementation of automation, dispatching and commercial consumption energy measurement systems. 10. Implementation of SCADA system. The PROJECT of total cost 107.59 mln. USD will be executed for a period of 6 years from 2015 to 2020 inclusive. 1.2. ESMP development objective. Environmental and social management plan (ESMP) analyzes ecological and social issues connected with selected components in heat supply area, in accordance with requirements of the World Bank in relation to provision if protection of the environment and protection of population. ESMP development objective is provision of execution of all the necessary measures and actions to minimize potential influence of the project on the environment and population. The main ESMP tasks are as follows: 1) identification of site-specific major environmental and health and safety impacts (including emissions, earthworks, vegetation clearance, waste amounts etc.); 2) identification of complex of measures to reduce negative and increase positive environmental and social influence; 3) identification of complex of measures on monitoring and control; 4) identification of institutional structure, that will be responsible for ESMP implementation; 5) identification of schedule of works performance and their cost; 6) development of institutional capabilities. This is PROJECT-level ESMP developed for the benefit of overview of overall PROJECT-related impacts, applicable standards and proposed mitigation and monitoring measures. 11 Site-specific ESMP’s will be developed based on the environmental and social screening checklists by RPMU with the assistance of CPMU and submitted to the Bank for review and clearance. Site- specific ESMPs will be disclosed locally and discussed with interested stakeholders. Any civil works will not start before site-specific ESMP have been consulted and approved by the Client and the Bank. 12 2. LEGISLATIVE FRAMEWORK, LICENSES AND PERMISSIONS 2.1. Legislative framework. The environment protection, rational use of the natural resources, providing environmental safety of human life and activities are the most important components of the PROJECT and regulated by the numerous national laws, legal acts and norms. The basic and directive law constructing all the environmental legislation of Ukraine is Act of Ukraine “On Protection of Natural Environment” dated June 25, 1991 No.1264-XII, which determines tasks and objectives of the environmental policy, directed to preservation of safe existence of the animated and inanimate nature, protection of life and health of population against negative influence, prevention of contamination of the natural environment, achieving of harmonic interaction of community and nature, rational using and reproduction of the natural resources. Act of Ukraine “On Protection of Atmospheric Air” dated October 16, 1992 No.2707 - XII. Atmospheric air is one of the basic vital elements of the natural environment. This Act is directed to preservation of favorable state of atmospheric air, its recovery and improvement to provide the environmental safety of human life and activities, as well as prevention of harmful effect on the natural environment. It determines the basic and organizational essentials and environmental requirements in the field of protection and using of atmospheric air. The Water Code of Ukraine dated June 06, 1995 No.214/95-ВР provides integrity and efficient use if waters, water protection against contamination, improvement of condition of water objects and protection of the rights of water users. Act of Ukraine “On Wastes” dated March 05, 1998 No.187/98-ВР determines legal, organizational and economic principles of activity, connected with prevention or reduction of the waste volume, their collection, transportation, storage, processing, utilization, as well as negative influence of waste on the natural environment and human health. The Land Code of Ukraine dated October 25, 2001 coordinates land relations with purpose of provision of the efficient use of lands, equitable development of all the forms of land ownership, preservation and reproduction of land capability, improvement of the natural environment, protection of the rights of individuals and entities for land. Act of Ukraine “Concerning Provisions for Sanitary and Epidemiological Welfare of Population” dated Fabruary 24, 1994 No.4004-XII regulates public relations, appearing in the field of provision for sanitary and epidemiological welfare, determines appropriate rights and obligations of the state authorities, enterprises, offices, organizations and citizens, establishes the order and carries out state sanitary and epidemiological supervision in Ukraine. Act of Ukraine “Concerning Ecological Appraisal” dated Fabruary 09, 1995 No.45/95 - ВР determines research and practice activities of the authorized state bodies, ecologic- Act of Ukraine “On Ecological Expertise dated Fabruary 09, 1995 No.45/95-ВР determines research and practice activities of the authorized state bodies, ecologic-expert formations and unions of citizens, based on the inter-industry ecological research, analysis and evaluation of pre-project, project and other materials or the objects, realization and action of which can affect adversely or affects on condition of the natural environment and directed to preparation of summaries of correspondence of the planned or performed activities to the norms and requirements of legislation of protection of the natural environment, efficient use and reproduction of the natural resources, provision of the environmental safety. Validity period until December 18, 2017. Act of Ukraine “On Wastes” dated March 03, 1998 No.187/98-ВР determines legal, organizational and economic principles of activity, connected with prevention or reduction of the waste volume, their collection, transportation, storage, sorting, processing, utilization and removal, sterilization and dumping, as well as with diversion of negative influence of waste on the natural environment and human health at the territory of Ukraine. 13 The Law of Ukraine «On Environmental Impact Assessment» establishes the legal grounds and organizational principles of the environmental impact assessment, aimed at preventing environmental damage, ensuring environmental safety, environmental protection, rational use and management of the natural resources, in the process of making decisions on the performance of economic activity, which may have a significant impact on the environment, taking into account state, civil and private interests Comes into force since December 18, 2017. Aarhus Convention of access to information, participation of community in the process of making decisions and access to justice on questions, concerning the environment in version of 1998, is directed to protection of the rights of each person to live in the environment, favorable for his health and welfare, guarantees the rights for access to information, participation of community in the process of making decisions and access to justice on the questions, concerning the environment. Operational policy of the World Bank OP/BP 4.01 “Environmental assessment”. This policy is applied in case of the evident causing by the project of the potential (negative) environmental risks and effects in the area of realization of sub-projects. OP/BP 4.01 embraces effects on the environmental natural environment (air, water and soils), health and human safety; material cultural heritage; trans-border and global environmental questions. Operational Manual OP 4.12 - Involuntary Resettlement. OP 4.12 covers direct economic and social impacts are caused by the involuntary taking of land or the involuntary restriction of access to legally designated parks and protected areas resulting in adverse impacts on the livelihoods of the displaced persons. This policy is applied where it isn't feasible to avoid resettlement. Program Level Environmental and Social Assessment (PLESA) for modernization district heating systems in cities Ivano-Frankivsk, Kamenets-Podilskii, Kharkiv, Kherson, Mykolaiv and Vinnytsia (2014) is directed to performance of research of condition of the natural environment and human health according to provisions of the Operational policy of the World Bank. World Bank IFC EHS guidelines. The General EHS Guidelines contain information on cross-cutting environmental, health, and safety issues potentially applicable to all industry sectors. This document should be used together with the relevant Industry Sector Guideline(s). DBN 2.2-1-2003 “Composition and content of EIA materials when designing and constructing of enterprises, buildings and facilities”. These construction norms establish the order of development of materials of evaluation of influence on environment (EIA) as part of the project documentation for the new construction, extension, reconstruction and engineering re- equipment of the objects of industrial and civil purpose (hereinafter referred to as planning activity), basic requirements to composition and contents of these materials. DBN 2.2-3-2014 “Composition and content of the project documentation for construction” establishes composition and contents of the project documentation for new construction, reconstruction, overhaul and engineering re-equipment of the buildings, facilities of any purpose, their complexes or their parts, linear objects of engineering-transportation infrastructure. DNAOP 0.00-1.07–94. Regulations of design and safe operation of pressure vessels NPAOP 0.00-1.60-66 Safety Operation and Design Codes for Steam and Hot Water Boilers NPAOP 0.00-1.26-96 Rules of construction and safe operation of steam boilers with steam pressure no more than 0.07 MPa (0.7 kGs/cm2), hot-water boilers and feed-water heaters with heating temperature of no higher than 1150С. DNAOP 1.1.10-1.02-01 Rules of safe operation of thermal and mechanical equipment of electric power plants and heat networks. 14 2.2. Licenses. The current licenses of the public utility “Kharkivski teplovi merezhi” to provide the basic activity (Annexes 1-3): License to the right of execution of the economical activity concerning production of heat energy (except for the activity on heat energy production at combined heat and power plants, thermal power plants, nuclear power plants and cogeneration plants and the plants with use of nontraditional and renewable power sources). Series АВ No.597472. License validity - perpetual. National Commission Resolution No. 446 dated March 30, 2017. License for the right of performance of the economical activity on transportation of thermal energy with main and local (distribution) heat networks. Series АВ No.597473. License validity - perpetual. National Commission Resolution No. 446 dated March 30, 2017. License for the right of performance of the economical activity on supply of heat energy. Series АВ No.597474. License validity - perpetual. National Commission Resolution No. 446 dated March 30, 2017. License for production of heat supply at combined and power plants and the plants with use of nontraditional and renewable power sources. Series АГ No.500402. License validity from March 30, 2011 to March 02, 2021 Date of issue – March 30, 2011. Issued by the National Commission of regulation of electric-power industry of Ukraine. License for generation of electric power. Series АГ No.500278. License validity from March 3, 2011 to 02.03.2021 Date of issue – March 3, 2011. Issued by the National Commission of regulation of electric-power industry of Ukraine. 2.3. Permissions. To perform its activity public utility “Kharkivski Teplovi Merezhi” have all the required permission in the field of environment protection (Annexes 4-6). No Permission name Permission Validity term Note . number 1 Permission for special water Ukr. No.04.01-10- 13.05.2016- Annex 4 consumption 872 А/Khar. 14.05.2019 2 Permission for waste disposal No.КKomin 96 01.01.2014 - Annex 5 31.12.2014 3 Permission for emissions of according to according to Sample of one pollutants into the atmospheric air Register (Annex Register (Annex permission by stationary sources 25) 26) indicated in Annex 6 Register of Permissions for emissions of pollutants into the atmospheric air by the stationary sources as of January 01, 2017 in terms of the district branches is given in Table form in Annex 25. By the Act of Ukraine dated April 09, 2014 No.1193-VII “On Amendments being made to the legislative acts of Ukraine relatively to reduction of number of approval documents”, which had come into force since April 26, 2014 the permission was cancelled for disposal of waste and the limits for formation and disposal of waste. In accordance with Article 17 of the Law of Ukraine “On Wastes”, as amended by the law, economic entities in the field of waste management are obliged to have a permit for the waste management (permit for the implementation of waste management operations if their activity lead to the formation of waste, for which IGWF (indicator of the general waste formation) exceeds 1000 Economic entities in the field of waste management, whose activities leads to the formation of waste, for which IGWF from 50 to 1000, are obliged to submit annually a declaration of waste) Ministry of Natural Resources of Ukraine has developed the project of resolution of Cabinet of Ministers of Ukraine “Of approval of the order of issue of permissions to carry out operations in 15 terms of handling with waste and submission of waste declarations” which was submitted for consideration of the Government. At present time the order of issue of the specified permission is not adjusted legally. Regarding finishing validity term of permission for waste disposal and permission for disposal of dangerous waste PU “Kharkivski Teplovi Merezhi” by letter dated January 29, 2015 applied to the Department of environment and natural resources of Kharkov regional state administration, to which by letter dated Fabruary 06, 2015 No. 04.02 -17-827 clarification was provided. The clarification letter is described in Annex 26. 16 3. CHARACTERISTICS OF THE CURRENT HEAT SUPPLY SYSTEM Kharkov is the second largest city of Ukraine with population of 1.5 million people. Historically Kharkov was one of the most developed cities of the former Soviet Union in industries, in which they produced tractors, steam turbines, military equipment and other important products. The main territory of the city is densely built-up. In the old-time quarters the majority of buildings are one-storey and five-storey ones. The five-, nine- and sixteen-storey residential buildings are concentrated in relatively modern districts of the city. Mainly the heat load placed on residential sector in the city. Separate industrial areas consume minor amount of heat. In Kharkov the closed heat supply system is applied. The current heat supply system contains several kinds of schemes, connected with each other and at the same time functioning autonomously and completely autonomous. DHS/District Heating System is most developed, allowing to carry out interaction of different sources of heat energy generation: combined heat and power plants with district and quarter boiler houses. District heating system embrace more landscaped districts of the city with built-up environment, mainly, with multi-storey buildings. Main heating system runs by radial and circular principle from the thermal sources. Heating DHS system allows heat sources to interact. In this case each heat source has its separate area of heating supply. In operation of the enterprise is 1603 km of heating system in 2-tube counting at diameter up to 1200 mm, run in the underground passed, semi-passed and non-passed channels, as well as above ground at trestles. The majority of heating mains were laid in the non-passed reinforced concrete channels with isolation from rock wool, which often is damaged for different reasons. Heating mains are protected from ingress of underground and other water not everywhere, which damage thermal insulation, lead to metal corrosion of pipelines and structures, as well as to occurrence of cracks and ruptures of pipes with heat carrier leakage. In DHS there working 11 OPS of total consumed electrical power over than 25 MW, provided to increase carrying capacity of heat networks and provide necessary hydraulic modes in the end points. The utility consists of 9 heating supply branches, located in each administrative district of the city, branch of CHP-3 and auxiliary services, providing stable functioning of the utility. The installed heat power of its own sources of the enterprise constitutes over than 4.5 thousand Gcal/h. Heat energy is generated by 249 boiler houses and CHP with total number of boilers – 601. At present time all the boiler houses operate on the gaseous fuel, the basic heat loading is carried by the boilers of high and average heating capacity: PTVM-180, PTVM-100, PTVM-50, PTVM- 30, TVG, KVG and others. The most powerful heating sources are CHP-3, with heating capacity 1353 Gcal/h and district boiler houses: Saltivskii residential area (780 Gcal/h), Shevchenkivskii (Dzerzhinskii) district (300 Gcal/h) and Slobidskii (Kominternivskii district) (400 Gcal/h), as well as CHP-4 (680 Gcal/h), operating in the mode of boiler house. The consumers who are located beyond the area of district heating, services by the local and quarter boiler houses within the borders of one or several quarters, as well as integrated basement boiler houses within the borders of one or several buildings. 203 CHS and 86 IHP are connected to the heat networks, at which water heating-up is carried out for needs of centralized hot water supply and distribution of heat carrier through residential blocks to the heat supply stations of the local heating systems of consumers. For needs of hot water supply the cold water of “drinking” quality is used. The majority of heat supply stations use plate heat exchangers. Water from hot water supply system for the majority of residential and public buildings is subject to heating-up at level of heat supply stations and distributed through the system of pipelines. Operating life of the majority of heat supply stations exceeds 20 years. 17 By output of heat supply the public utility “Kharkivski Teplovi Merezhi” is one of the largest enterprises in Ukraine, and DHS remains most developed compared to the other CIS cities. The public utility “Kharkivski Teplovi Merezhi” carries out production, transportation and distribution of thermal energy for all the groups of consumers of Kharkiv, connected to the district heating, including to more than 6100 residential buildings. Hot water supply services are provided for over than 880 000 people. Annual thermal energy production by the plant amounts over than 5 mln. Gcal, and still around 2 mln. Gcal is purchased from the other producers; mainly this is Kharkiv CHP-5. 18 4. CHARACTERSTICS OF THE PROJECT ACTIVITIES AND LOCARTION, WHERE THE PROJECT WILL BE EXECUTED 4.1. Description of the components of the project activities. On the map (picture 4.1.1) below shows the location of objeсts in the city of Kharkiv in the following directions of the PROJECT: - construction of 2 cogeneration plants; - decommissioning of 12 boiler houses, installation of heat individual heating stations and reconstruction of heating networks; - reconstruction of 58 boiler houses; - commissioning of steam turbo generator and reconstruction of steam boiler at CHP-3; - modernization of the pump stations and boiler-houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps. Tentative schedule for PROJECT implementation is provided in Annex 42. Information on civil works timeline would be defined at later development stage and clearly communicated during public consultations in site-specific ESMPs. Picture 4.1.1- The map of Kharkiv with object of PROJECT - reconstruction of 58 boiler houses; - decommissioning of 12 boiler houses, installation of heat individual heating stations and reconstruction of heating networks; construction of 2 cogeneration plants; modernization of the pump stations and boiler-houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps;. - commissioning of steam turbo generator and reconstruction of steam boiler at CHP-3. 19 4.1.1. Construction of cogeneration plants. Construction of 2 cogeneration plants at the district boiler houses is expected, allowing to provide in-house needs in the electric energy, increase electric power supply reliability, get extra thermal energy due to utilization of effluent gases as a result of operation of cogeneration modules, as well as increase efficiency of the thermal source operation as a whole. Besides, due to generation of intrinsic electric energy at heat source the costs of bought-out electric energy from energy- supplying organization will be reduced. The basic expected results of the component implementation: - cost reduction of the electric and heat energy compared to separate production, due to achieving around 15% economy of natural gas, by way of utilization of products of combustion of gas-fired plant (mainly combined production); - improvement of the ecological state of environment, connected with reduction of polluting emissions, as well as thermal atmosphere contamination, at approximate reduction of CO pollutants nearly 400 000 tons for a period of the project implementation. The objects at which construction of cogeneration plants is provided are described in Table 1. Table 1. List of objects on the component “Construction of cogeneration plants”. No. Object, address Land use planning District name Number documents picture and Annex Extract from State Picture 4.1.1.1. boiler house, 4, Artema Vedelia 1 Register No.88154692 Moskovskii Annex 7 (Stoletova) str. dtd. 26.05.17 Extract from State Picture 4.1.1.2. boiler house, 1, Akademika 2 Register No.86419299 Kyivskii Annex 7 Proskury str. dtd. 04.05.17 Production site of the boiler house at the address 4 Artema Vedelia Street (Stoletova) borders: - from the north - transport branch of the Public Utility “Kharkivski teplovi merezhi; - from the north east - warehouses, land of Kharkiv Technical Center "Beryska" - from the east - Service station production association "Komunar"; - from the south-east - bakery "Slobozhanskyi"; - from the south - PU production and technological enterprise "Voda"; - from the southwest - boarding school No.14 (distance from the nearest source of emissions is 80 m); - from the west, Artema Vedel Street, where the houses of a private sector are located. The nearest residential house is located at a distance of 60 m from the nearest source of emissions. The object of the Public Utility “Kharkivski teplovi merezhi" boiler house at the address 1 Academician Proskuri street is located on the territory of the Scientific Production Enterprise "Khartron-Plant". Neighboring boiler houses objects and territories are: - from the north-forest park; - from the south and from the east - manufacturing building of the Scientific Production Enterprise "Khartron-Plant"; - from the west - residential houses. The nearest residential house is located 65m from the nearest source of emissions. Construction of the cogeneration station will be carried out during 30 months. Сompletion of construction – 4 quarter of 2018. The Situation Plans of objects location are given in Annex 7. 20 Construction documents were developed in 2010 in full for the construction site at the boiler house at the address 4 Artema Vedelia Street and had passed her state expertise. Public hearing was held on this issue, developed as a separate pre-project part, an EIA section (Annex 16), held public hearings, etc. (Annex 18). The EIA section will be reviewed in accordance with the norms of legislation. Taking into consideration the specifics of the operation of cogeneration plants and the proximity of residential buildings to the sanitary zone of the boiler-house at the address 1 Akademika Proskury street., an ESIA section will be developed as part of the design documentation, and disclosed before the start of the civil works. Information leaflet about the planned interventions under the project will be posted accordingly. 4.1.2. Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks It is expected to decommission boilers (closing) of 12 boiler houses. The provision of the heat supply is expected at the expense of the pipelines laying and installation in the premises of the boiler-house being liquidated, of the heating unit, from transferring the heat load to the heat source of the district heating supply systems, or else that is next to it, with better performance indicators. During performance of the project works they will determine the points of connection to district heating system. The existing main and auxiliary boilers equipment are deteriorated and obsolete, which reduces operational reliability and quality of heat supply. Also, valid DBN В.2.5-20-2001 "Gas supply" prohibits the introduction of the gas pipelines in basements. Construction of roofing is allowed, with a restriction of gas pressure of 0.6 MPa. Economic effect from implementation of this component is achieved at expense of the following factors: - reduction of natural gas consumption at amount of 142 000 m3; (reduction of specific fuel consumption by 30-50 kg of gr.pr. for 1 Gcal generation); - reduction of electric energy consumption at rate of 11 000 kWh - decrease of emissions of greenhouse gases around 4.0 thousand tones; - payroll budget economy (operators of boiler houses); -reduction of costs, connected with operation and contents of the outdated equipment in sound condition. Boiler houses, subject to closure (decommissioning) are given in Table 2. Table 2. List of objects on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks” No. Object, address Land use planning Administrat Number documents ive district picture and of city Annex 1 boiler house No.1, 77, Boiler house is embedded Shevchenki Picture Peremohy ave. into residential building vskii 4.1.2.1. (roof). No Leave and Annex 8 License Agreement. 2 boiler house No.2, 77, Boiler house is embedded Shevchenki Picture Peremohy ave. into residential building vskii 4.1.2.1. (roof). No Leave and Annex 8 License Agreement. 21 3 boiler house, 199/2, Extract from State register Slobidskyi Picture Gagarina ave. No.67697242 dtd. 09.09.16 4.1.2.3. Annex 8 4 boiler house, 2B, Yudina Extract from State register Novobavars Picture str. No. 77020204 dtd.26.12.16 kyi 4.1.2.4. Annex 8 5 boiler house, 47A, Summary of information Novobavars Picture Pushkarivska str. No. 661183 issued on kyi 4.1.2.5. 18.08.16 Annex 8 6 boiler house, 45, Liubovi No documents Novobavars Picture Maloi ave. kyi 4.1.2.6. Annex 8 7 boiler house, 51, Liubovi Boiler house is embedded Novobavars Picture Maloi ave. into residential building kyi 4.1.2.7. (basement). No Leave and Annex 8 License Agreement. 8 boiler house, 57A, Boiler house is embedded Novobavars Picture Seminarska str. into residential building kyi 4.1.2.8. (basement). No Leave and Annex 8 License Agreement. 9 boiler house, 12, Boiler house is embedded Novobavars Picture Kashyrskogo str. into residential building kyi 4.1.2.9. (basement). No Leave and Annex 8 License Agreement. 10 boiler house, 46/5, Boiler house is embedded Novobavars Picture Seminarska str. into residential building kyi 4.1.2.10. (basement). No Leave and Annex 8 License Agreement. 11 boiler house, 46, No documents Novobavars Picture Seminarska str. kyi 4.1.2.11. Annex 8 12 boiler house, 57B, Boiler house is embedded Novobavars Picture Seminarska str. into residential building kyi 4.1.2.1.12 (basement). No Leave and Annex 8 License Agreement. The object site layout plans are given in Annex 8. The list of boilers and their information which will be dismounted at boiler houses due to liquidation is given in Annex 28. Information on the pumping units, which will be dismounted at boiler houses due to liquidation, is given in tabular form in Annex 29 Information on heat exchange equipment, which will be replaced at boiler houses by the new one, is given in tabular form in Annex 30. Information leaflets regarding planned interventions will be disseminated to the project affected community in due manner. 22 4.1.3. Reconstruction of boiler houses. It is supposed to carry out reconstruction of boiler houses, with help of which the full replacement of the worn-out and obsolete equipment will be carried out, with high indexes of energy consumption: boiler units with automatic safety controls and burning, pump and heat exchange equipment, stop valves and regulators, chemical water treatment etc. by new one meeting the requirements of safety and efficiency of present time. The question of using the current equipment of new types, which was installed over the previous 3-4 years, will be reviewed when designing the reconstruction works, provided satisfaction of hydraulic parameters, determined according to accounts. In case of unserviceability at objects under reconstruction, with engineering services of the enterprise the question will be considered as to the further using at other objects. The economic effect as a result of reconstruction of boiler houses is achieved at cost of the factors as follows: - reduction of the fuel consumption while fueling it in the new high-efficient boilers (efficiency around 95%), in comparison with obsolete boilers, which have efficiency no more than 80%; - reduction of the operation costs, connected with systematic failures in the operation of boilers, due to appearance of defects, pump equipment, automatic controls; - reduction of the electrical energy consumption, due to installation of the pumps of the modern type; - fund saving of payment for labor (operators of boiler house) provided equipping of the boiler house with dispatching system. As a result of implementation of this component it is planned to achieve: - reduction of the natural gas consumption nearly 960 thousand m3; - reduction of electric energy consumption nearly 950 thousand kWh/year; - reduction of CO emissions nearly 38 thousand tones. The boiler houses, which subject to reconstruction are given in Table 3. Place of location of 58 boiler houses are given in picture 4.1.3.59 Annex 41 Table 3. List of the objects on the component “Reconstruction of boiler houses”. No. Object address Land use planning Administrati Number documents ve district of picture and city Annex Documents in the Nemyshlya Picture 1 7, Hryshchenka str. development nskyi 4.1.3.1. Annex 9 Documents in the Nemyshlya Picture 2 82a, Kulynychivska str. development nskyi 4.1.3.2. Annex 9 Documents in the Nemyshlya Picture 3 104, Krasnodarska str. development nskyi 4.1.3.3. Annex 9 Estimated money value, Moskovsky Picture 4 9a, Dzherelna str. extract No. 1403/14 dtd. i 4.1.3.4. 20.05.2014 No. 2657/08 Annex 9 Reserved area for Picture construction (cadastral Novobavars 5 12, Konieva str. 4.1.3.5. survey Annex 40) kyi Annex 9 23 Reserved area for Picture construction (cadastral Novobavars 6 6/10, Polzunova lane 4.1.3.6. survey Annex 40) kyi Annex 9 Extract from State register Picture No. 77046340 dtd. Novobavars 7 90, Novo-Bavarskyi ave. 4.1.3.7. 26.12.16 kyi Annex 9 Reserved area for Picture construction (cadastral Novobavars 8 53, Lomonosova str. 4.1.3.8. survey Annex 40) kyi Annex 9 Reserved area for Picture construction (cadastral Novobavars 9 8, Bulvarna str. 4.1.3.9. survey Annex 40) kyi Annex 9 Estimated money value, Picture extract No.1405/14 dtd. Novobavars 10 88a, Seminarska str. 4.1.3.10. 20.05.2014 No.2655/08 kyi Annex 9 Reserved area for Picture construction (cadastral Novobavars 11 13, Marka Bernesa str. 4.1.3.11. survey Annex 40) kyi Annex 9 Reserved area for Picture construction (cadastral Novobavars 12 5, Metiznyi lane 4.1.3.12. survey Annex 40) kyi Annex 9 Documents in the Picture Novobavars 13 7a, St. Nova Bavariia str. development 4.1.3.13. kyi Annex 9 Documents in the Picture Novobavars 14 48, Konotopska str. development 4.1.3.14. kyi Annex 9 Boiler house is embedded Picture into residential building Novobavars 4.1.3.15. 15 26, Kontorska str. (basement). No Leave and kyi Annex 9 License Agreement. Documents in the Picture Novobavars 16 2, Kontorska str. development 4.1.3.16. kyi Annex 9 Documents in the Picture Novobavars 17 5/7, Karpivskyi lane development 4.1.3.17. kyi Annex 9 Documents in the Picture Novobavars 18 66, Naboichenka Petra str. development 4.1.3.18. kyi Annex 9 Extract from State register Picture No. 77012569 dtd. Novobavars 19 99a, Novo-Bavarskyi ave. 4.1.3.19. 26.12.16 kyi Annex 9 Boiler house is embedded Picture into residential building Kholodnohi 4.1.3.20. 20 41, Novyi pobut str. (basement). No Leave and rskyi Annex 9 License Agreement. Boiler house is embedded Picture into residential building Kholodnohi 4.1.3.21. 21 49/51, Rylieieva str. (basement). No Leave and rskyi Annex 9 License Agreement. 24 State act No. 307889 dtd. Picture 30.05.12 Kholodnohi 22 67, Velyka Panasivska str. 4.1.3.22. rskyi Annex 9 State act No. 307886 dtd. Picture 30.05.12 Kholodnohi 23 35, Zaliznychna str. 4.1.3.23. rskyi Annex 9 Boiler house is embedded Picture 2/15, Blahovishchenska into residential building Kholodnohi 4.1.3.24. 24 str. (basement). No Leave and rskyi Annex 9 License Agreement. Documents in the Picture Kholodnohi 25 12, Baltiiska str. development 4.1.3.25. rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 26 3, Afanasivska str. 4.1.3.26. survey Annex 40) rskyi Annex 9 State act No. 318810 dtd. Picture 205, Velyka Panasivska 19.11.12 Kholodnohi 27 4.1.3.27. str. rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 28 27/5, Berkosa str. 4.1.3.28. survey Annex 40) rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 29 41, Kurylivska str. 4.1.3.29. survey Annex 40) rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 30 65, Ozerianska str. 4.1.3.30. survey Annex 40) rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 31 35, Novyi Pobut str. 4.1.3.31. survey Annex 40) rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 32 6, Rizdviana str. 4.1.3.32. survey Annex 40) rskyi Annex 9 Documents in the Picture Kholodnohi 33 8, Slovianska str. development 4.1.3.33. rskyi Annex 9 State act No. 307954 dtd. Picture 27.07.12 Kholodnohi 34 29, Velyka Panasivska str. 4.1.3.34. rskyi Annex 9 Documents in the Picture Kholodnohi 35 7, Ihoria Muratova str. development 4.1.3.35. rskyi Annex 9 Reserved area for Picture construction (cadastral Kholodnohi 36 41/43, Andriivska str. 4.1.3.36. survey Annex 40) rskyi Annex 9 Documents in the Osnoviansk Picture development yi 4.1.3.37. 37 30, Hrekivska str. Boiler house is located in Annex 9 addition to the residential building 25 Reserved area for Osnoviansk Picture 38 1, Biolohichnyi lane construction (cadastral yi 4.1.3.38. survey Annex 40) Annex 9 Decision No. 757/12 dtd. Osnoviansk Picture 39 19, Ternopilska str. 22.06.2012 on a regular yi 4.1.3.39. basis Annex 9 Estimated money value Osnoviansk Picture 40 1, Lymanskiy lane No. 1404/14 dtd. yi 4.1.3.40. 20.05.2014 No. 2657/08 Annex 9 Documents in the Osnoviansk Picture 41 16, Myrhorodska str. development yi 4.1.3.41. Annex 9 State acts No. 319509, No. Osnoviansk Picture 42 27a, Dyspetcherska str. 319508 dtd. 0.6.11.07 yi 4.1.3.42. Annex 9 Developed grounds of Osnoviansk Picture 43 89a, Dostoievskoho str. borders of land area yi 4.1.3.43. Annex 9 Boiler house in the Shevchenki Picture premise of the 1-st storey vskyi 4.1.3.44. 44 20, Bukova str. of residential building. No Annex 9 Leave and License Agreement Documents in the Shevchenki Picture development vskyi 4.1.3.44. 45 20A, Bukova str. Boiler house is located in Annex 9 addition to the residential building Documents in the Shevchenki Picture development vskyi 4.1.3.44. 46 14, Bukova str. Boiler house is located in Annex 9 addition to the residential building Documents in the Kyivskyi Picture YRC Internationalist, 70, 47 development 4.1.3.47. Horianska str. Annex 9 Documents in the Kyivskyi Picture 48 1, Akademichna str. development 4.1.3.48. Annex 9 State act No. 318782 dtd. Kyivskyi Picture 49 10б, Saperna str. 02.10.12 4.1.3.49. Annex 9 Documents in the Kyivskyi Picture 50 27, Pomirky str. development 4.1.3.50. Annex 9 Extract from State register Slobidskyi Picture 51 9, Nesterova str. ЕЕХ 3277769 dtd. 4.1.3.51. 31.07.15 Annex 9 Documents in the Industrialny Picture 52 74a, Myru str. development i 4.1.3.52. Annex 9 26 Reserved area for Picture 10/12, Blahovishchenska construction (cadastral Kholodnohi 53 4.1.3.53. str. survey Annex 40) rskyi Annex 9 Documents in the Picture Novobavars 54 7a, Konieva str. development 4.1.3.54. kyi Annex 9 Summary of information Picture No. 66633459 dtd. Novobavars 55 5a, Svynarenka str. 4.1.3.55. 26.08.16 kyi Annex 9 State act No. 318905 dtd. Picture 28.11.12 Novobavars 56 23a, Svitlanivska str. 4.1.3.56. kyi Annex 9 Reserved area for Picture construction (cadastral Novobavars 57 32, Seminarska str. 4.1.3.57. survey Annex 40) kyi Annex 9 3, Dostoievskoho entrance Documents in the Osnoviansk Picture (building of new heat development yi 4.1.3.58 source with closing of Annex 9 boiler houses: 58 ● 1, Dostoievskoho str. ● 14, Dostoievskoho entrance ● 35A, Dostoievskoho entrance Table 4. List of boiler houses to be shut down in residential buildings and built on designated land plots. No. Object address New object address 1 12, Konieva str. 12А, Konieva str. 2 6/10, Polzunova lane 8, Polzunova lane 3 53, Lomonosova str. 53А, Lomonosova str. 4 8, Bulvarna str. 8A, Bulvarna str. 5 13, Marka Bernesa str. 13B, Marka Bernesa str. 6 5, Metiznyi lane 11, Barkalova str. 7 3, Afanasivska str. 3B, Afanasivska str. 8 27/5, Berkosa str. 6A, Tsegelnyi lane 9 41, Kurylivska str. 41A, Kurylivska str. 10 65, Ozerianska str. 65A, Ozerianska str. 11 35, Novyi Pobut str. 35B, Novyi Pobut str. 12 6, Rizdviana str. 6A, Lopanskyi lane 13 41/43, Andriivska str. 43A, Andriivska str. 14 1, Biolohichnyi lane 1A, Biolohichnyi lane 15 10/12, Blahovishchenska str. 12A, Blahovishchenska str. 16 32, Seminarska str. 32B, Seminarska str. 17 16, Myrhorodska str. 16, Myrhorodska str. 18 3, Dostoievskoho entrance (building of new heat source with closing of boiler houses: 3, Dostoievskoho entrance ● 1, Dostoevskoho str. ● 14, Dostoievskoho entrance ● 35A, Dostoievskoho entrance 27 The expected period of construction of the new modular boiler houses in Kharkiv will be carried out during 2019-2020. At the photo 1 pesented a block-modular boiler-house (BMB) by full factory production, with dimensions of 6x3 m. Photo 1 of a block-modular boiler-house (BMB) Situational site layouts are given in Annex 9. Cadastral survey of the areas for construction of the new boiler houses is in Annex 40 Information on boilers, which will be dismantled and replaced by the new ones in the boiler houses, is given in tabular form in Annex 31. Information of pump units, which are installed on the objects, is given in tabular form in Annex 32. Information on heat exchange equipment, which is installed at objects, is given in tabular form in Annex 33. 28 4.1.4. Installation of the individual heating points in the residential buildings. Provision is made for arrangement of new IHP and replacement of the worn-out and out-dated equipment of the existing IHP in the residential buildings, installation by correcting pumps and heat meters, allowing avoid irrational use of heat energy, improve quality of services provided on heat supply, reduce range of pipeline transport system from CHS (with IHP installation), as consequence, reduce heat losses and operation costs. In the process of the contract implementation they will replace out-dated and worn-out equipment at existing 236 IHP, as well as installation of 14 new IHP. Besides replacement of heat exchange equipment they will install heat metering units, booster pumps for hot water supply systems, automatic regulation and pump systems of weather regulation of heat supply systems. In table 5 there is information, in which districts of Kharkiv IHP will be installed. Table 5. Quantity of IHP No. Administrative district of the city Number of objects 1 Industrialnyi 92 2 Kyivskyi 37 3 Moskovskyi 16 4 Nemyshlianskyi 20 5 Osnovianskyi 31 (out of them 14 new) 6 Slobidskyi 18 7 Shevchenkivskyi 36 Total 250 (out of them 14 new) The installation of the individual heating points in the residential houses in Kharkiv will be carried out within 30 months. Works completion of 250 HIS installation – 2 quarter of 2019. As a result of this component implementation it is expected to achieve as follows: - reduction of the natural gas consumption nearly 7.2 mln. m3; - reduction of electric energy consumption nearly 300 thousand kWh/year; - reduction of CO emissions nearly 190 thousand tones. List of IHP is given in Annex 34. 4.1.5. Installation of heat meters and other mechanical and electrical equipment in the heat supply stations of the residential houses It is supposed to install heat meters in the heat supply stations of residential houses, providing revenue metering of heat energy which is consumed, and installation of the automatic regulation, allowing avoid irrational use of heat energy, increase quality of services on provided heat supply. Table 6. Number of houses and installed metering units of heat energy with weather regulation systems No. Administrative district of the city Number of buildings Number of metering units 1 Slobidskyi 201 304 2 Nemyshlianskyi 53 64 3 Shevchenkivskyi 23 36 4 Kyivskyi 52 68 5 Moskovskyi 62 163 6 Novobavarskyi 58 78 7 Kholodnohirskyi 102 201 8 Osnovianskyi 18 36 9 Industrialnyi 18 50 Total 587 1000 29 The installation of heat meters and other mechanical and electrical equipment in the heat supply stations of the residential houses in Kharkiv will be carried out within 28 months. Works completion of 1000 heat meters installation - 2 quarter of 2019. As a result of this component implementation it is expected to achieve the following: - reduction of the natural gas consumption is nearly 9.8 mln. m3, at cost of heat consumption to be pump controlled depending on the ambient temperature; - reduction of the electricity energy at heat sources, OPS and CHS nearly 400 thousand kWh×year; - reduction of CO emissions nearly 250 thousand tones. List of residential houses, in which the component implementation is provided, and number of heat meters that will be installed in the heat supply stations is given in Annex 35. Information leaflets about planned interventions under the project will be disseminated at each location with the contact information for feedbacks from the PAP’s. 4.1.6. Commissioning of the steam turbogenerator and reconstruction of the steam boiler CHP-3 It is intended to perform reconstruction of turbogenerator st. No.2 of electrical capacity 20 MW, putting it into operation, performance of overhaul of the power boiler No.3, satisfying parameters of turbine operation. The current CHP-3 equipment has been operating since the end of 30-s of the previous century. In 2013 turbogenerator with capacity 24 MW was decommissioned, thus the installed capacity at CHP-3 was reduced up to 62 MW. Besides, they depleted resource of one more turbogenerator of electrical capacity 24 MW. On the photo 2 and 3 the turbo-generator number 2 which will be reconstructed at CHP-3. Photo 2 of the turbo-generator number 2 at CHP-3. 30 Photo 3 of the turbo-generator number 2 at CHP-3. The component implementation will allow as follows: - renew partially the main production equipment and raise electrical capacity to the required one, to perform electric load schedule; - increase degree of heat energy consumption, produced in the cogeneration cycle; - increase electrical energy supply of nearly 160 mln. kWh×hour (+24%), that will allow improve technical and economical indexes of the plant and the enterprise as a whole; - reduce CO2 emissions of nearly 1 400 thousand tones. Situation layout plan of the object is given in in picture 4.1.6.1 Annex 10. 4.1.7. Modernization of the pump stations and boiler houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps. It is provided installation of the frequency converters at high-voltage electric motors (6 KW) of the pump equipment of DHS objects, namely at district boiler houses, CHP and OPS. List of the objects is given in Table 7. 31 Table 7. List of the objects on the component “Modernization of the pump stations and boiler houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps” No. Object, address Administrative district of the city 1 OPS No.6-2 129/1, “Hlybokyi Yar”, 129/1, Slobidskyi Gagarina ave. 2 OPS No.4-1, 325A, Klochkivska str. Shevchenkivskyi 3 OPS No.2-1, 6, Shchedrynskyi quarter Kyivskyi 4 OPS No.1-2, 15A, Mefodiivska str. Slobidskyi 5 boiler house, 4, Artema Vedelia str. Moskovskyi 6 boiler house, 17, Shekspira str. Shevchenkivskyi 7 boiler house, 2/1, Kostycheva str. Slobidskyi 8 CHP-4, 275, Moskovskyi ave. Industrialnyi Use of the modern speed control measures of the process mechanisms together with wide possibilities of automation will provide optimal consumption of the electric energy by the electrical engines and allow stabilize hydraulic modes. Modernization of the pump stations and boiler houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps will be carried out within 22 months. Works completion of pump stations and boilers modernization - 4 quarter of 2019. Due to the component implementation it will be achieved as follows: - increase of reliability of heat supply, due to keeping permanent of set pressure in the pipelines of heat networks; - decrease of nearly 12.5 mln. kWh×year of consumption of the electric energy (approximately 50-55%) at the objects; - provision of the functions of protection of the electric drives of the pump units; - reduction of the material costs for the technical maintenance and performing repairs; - decrease of CO emissions nearly of 155 thousand tones. 4.1.8. Reconstruction of heat networks. It is planned to replace about 24 km of existing pipelines of heat networks on new pre- insulated pipes in polyurethane-foam insulation and laying of new pipelines.. Today, the wear of pipelines of calorific nets is more than 70%. The pace of aging and deterioration of heat network is comparable with the volume and pace of their transformation, so the existing dynamics has negative values. List of the objects is given in Table 8 32 Table 8 List of the objects reconstruction heat network No. Name of section, object, address District name Number picture and of Annex item 1 Heat networks of section MK4826/3- Shevchenkivskyi Picture 4.1.8.1, MK4826/3-1СK, Peremohy Avenue Picture 4.1.8.66 Annex 11 2 Heat networks of section МК4304-МК4303, Shevchenkivskyi Picture 4.1.8.2, Otakara Yarosha Street Picture 4.1.8.78 Annex 11 3 Heat networks of section МК5223 to CHS Moscovskyi Picture 4.1.8.3 607/2 at the 54G Heroiv Pratsi Street Annex 11 4 Heat networks of section МК4115-МК4301, Shevchenkivskyi Picture 4.1.8.4. Shekspira Street Picture 4.1.8.65 Annex 11 5 Heat networks of section МК4200АСК- Shevchenkivskyi Picture 4.1.8.5, МК4201, Picture 4.1.8.65 Shekspira Street (output No. 2 of boiler room Annex 11 Pavlove pole on the 17 Shekspira Street) 6 Heat networks of section МК4706-МК4707, Shevchenkivskyi Picture 4.1.8.6, Peremohy Avenue Picture 4.1.8.66 Annex 11 7 Heat networks of sections МК4525-МК4531, Shevchenkivskyi Picture 4.1.8.7 МК4526-МК4526/2, Dynamivska Street, Annex 11 Faninskyi Lane 8 Heat networks of section МК3705-МК3706, ndustrialnyi Picture 4.1.8.8 Mokhnatska Street Annex 11 9 Heat networks of section МК6624- Osnovianskyi Picture 4.1.8.9, МК66НО42, Picture 4.1.8.76 Haharina Avenue. Annex 11 10 Heat networks of section МК1129-МК1134, Slobidskyi Picture 4.1.8.10, Moskovskyi Avenue, Bronenostsia Potomkin Picture 4.1.8.77 Street Annex 11 11 Heat networks of section from МК1233 to Osnovianskyi Picture 4.1.8.11 zh/b on Annex 11 56 Moskovskyi Avenue 12 Jumper between terminals No. 1 and No. 2 of Slobidskyi Picture 4.1.8.12 Slobidskyi district boiler room on the 2/1 Annex 11 Kostycheva Street 13 Heat networks of section МК6316-МК6317, Slobidskyi Picture 4.1.8.13, Fonvizina Street Picture 4.1.8.69 Annex 11 33 14 Heat networks of section from fixed support Moscovskyi Picture 4.1.8.14 on the section from МК5203-МК5206A, Annex 11 Saltivske Highway 15 Heat networks of section МК1134/5- Slobidskyi Picture 4.1.8.15, МК1227А, Picture 4.1.8.77 Zakhysnykiv Ukrainy Square micro-district Annex 11 16 Heat networks of section МК1802/2- Slobidskyi Picture 4.1.8.16, МК1807, Picture 4.1.8.67 Moskovskyi Avenue Annex 11 17 Heat networks of section МК1807-МК1821, Slobidskyi Picture 4.1.8.17, Vilenskyi Lane Picture 4.1.8.67 Annex 11 18 Heat networks of section МК1821-МК5830, Moscovskyi Picture 4.1.8.18, Bilostotskyi Lane Picture 4.1.8.67 Annex 11 19 Heat networks of section МК5830- Moscovskyi Picture 4.1.8.19, МК5836В, Picture 4.1.8.67 Kamysheva Ivana Street Annex 11 20 Heat networks of sections МК5836Г- Moscovskyi Picture 4.1.8.20, МК5837А, МК5837А-МК5837АСК2, Picture 4.1.8.67 Kamysheva Ivana Street, Kaunaskyi Lane. Annex 11 21 Heat networks of section МК3232A- Industrialnyi Picture 4.1.8.21, МК3237, Picture 4.1.8.68 Industrialnyi Avenue Annex 11 22 Heat networks of section МК3237-МК3243, Industrialnyi Picture 4.1.8.22, Industrialnyi Avenue Picture 4.1.8.68 Annex 11 23 Heat networks of section МК6206-МК6209, Slobidskyi Picture 4.1.8.23 Morozova Street Annex 11 24 Heat networks of section МК6767-МК6768, Slobidskyi Picture 4.1.8.24 Heroiv Stalinhrada Street Annex 11 25 Heat networks of section МК6762А- Slobidskyi Picture 4.1.8.25 МК6764, Annex 11 Petra Hryhorenka Avenue 26 Heat networks of section МК6119БСК- Slobidskyi Picture 4.1.8.26 МК6120, Annex 11 Lva Landau Avenue 27 Jumper between heat line No. 66 and No. 14, Slobidskyi Picture 4.1.8.27 Enerhetychna Street Annex 11 28 Heat networks of section МК1128А/2- Slobidskyi Picture 4.1.8.28, МК1223, Picture 4.1.8.77 Dniprovska Street Annex 11 29 Heat networks of sections МК6516-МК6517, Slobidskyi Picture 4.1.8.29, МК6515-МК6515А, Zabaikalskyi Lane Picture 4.1.8.69 Annex 11 34 30 Heat networks of section МК6612-МК6612Б, Slobidskyi Picture 4.1.8.30 Kashtanova Street Annex 11 31 Heat networks of section МК2243/9- Kyivskyi Picture 4.1.8.31 МК2243/11Б, Annex 11 Sadova Street 32 Heat networks of section МК2240А- Kyivskyi Picture 4.1.8.32, МК2311А, Picture 4.1.8.70 Shevchenka Street Annex 11 33 Heat networks of section МК2240А- Kyivskyi Picture 4.1.8.33, МК2241, Picture 4.1.8.70 Bilhorodskyi Descent Annex 11 34 Heat networks of section МК2301-МК2304, Kyivskyi Picture 4.1.8.34 Sliusarnyi Lane Annex 11 35 Heat networks from МК2987 to boiler room Kyivskyi Picture 4.1.8.35 MZHK Internatsionalist, 70, Horianska Street Annex 11 with boiler house piping connection 36 Heat networks of section МК2981СК6- Kyivskyi Picture 4.1.8.36, МК2981СК5, Lesia Serdiuka Street Picture 4.1.8.71. Annex 11 37 Heat networks of sections МК2985- Kyivskyi., Picture 4.1.8.37, МК2985Т, МК2985-МК2985ТК40, Lesia Moscovskyi Picture 4.1.8.71. Serdiuka Street, Druzhby Narodiv Street Annex 11 38 Heat networks of section МК9421-МК9403, Nemyshlianskyi Picture 4.1.8.38 Blahodatna Street Annex 11 39 Heat networks of section МК9514/2- Nemyshlianskyi Picture 4.1.8.39 МК9514/2СК, Annex 11 Unetskyi Lane 40 Heat networks of section МК9407-МК9408, Nemyshlianskyi Picture 4.1.8.40, Khabarova Street Picture 4.1.8.72 Annex 11 41 Heat networks of section МК9601-МК9602, Nemyshlianskyi Picture 4.1.8.41, Khabarova Street Picture 4.1.8.72 Annex 11 42 Heat networks of section МК9603-МК9605, Nemyshlianskyi Picture 4.1.8.4, Khabarova Street, Traktorobudivnykiv Picture 4.1.8.72 Avenue Annex 11 43 Heat networks of section МК9606-МК9607, Nemyshlianskyi Picture 4.1.8.43 Moskovskyi Avenue Annex 11 44 Heat networks of section МК9801- Nemyshlianskyi Picture 4.1.8.44, МК9801СК, Picture 4.1.8.73 Petra Hryhorenka Avenue Annex 11 45 Heat networks of section МК9803СК2- Nemyshlianskyi Picture 4.1.8.45, МК9804СК1, Petra Hryhorenka Avenue Picture 4.1.8.73 Annex 11 35 46 Heat networks of sections МК5106А- Moscovskyi Picture 4.1.8.46, МК5510, МК5106-МК5107, Hvardiitsiv- Picture 4.1.8.79 Shyronintsiv Street Annex 11 47 Heat networks of section МК5208-МК5209, Moscovskyi Picture 4.1.8.47, Traktorobudivnykiv Avenue Picture 4.1.8.74 Annex 11 48 Heat networks of section МК5212-МК5215, Moscovskyi Picture 4.1.8.48, Traktorobudivnykiv Avenue Picture 4.1.8.74 Annex 11 49 Heat networks of section МК5219СК- Moscovskyi Picture 4.1.8.49, МК5220, Picture 4.1.8.74 Traktorobudivnykiv Avenue Annex 11 50 Heat networks of section МК5224- Moscovskyi Picture 4.1.8.50, МК5225А, Picture 4.1.8.78 Heroiv Pratsi Street Annex 11 51 Heat networks of section МК2976/6Т- Kyivskyi Picture 4.1.8.51, МК5309, Picture 4.1.8.80 Akademika Pavlova Street Annex 11 52 Heat networks of section МК1138/5Б- Moscovskyi Picture 4.1.8.52, МК1138/6, Picture 4.1.8.77 Moskovskyi Avenue Annex 11 53 Heat networks of section МК7812-НО22, Kholodnohirskyi Picture 4.1.8.53 Alushtynska Street Annex 11 54 Heat networks of section МК8116-МК8119, Novobavarskyi Picture 4.1.8.54, Hryhorivske Highway Picture 4.1.8.75 Annex 11 55 Heat networks CHS on the 4A Yuriia Novobavarskyi Picture 4.1.8.55, Parashchuka Street from ТК8120-1 to Picture 4.1.8.75 ТК8120-1ТК8 Annex 11 56 Heat networks of section МК1608- Osnovianskyi Picture 4.1.8.56, МК1608/25, Himnaziina Quay Picture 4.1.8.76 Annex 11 57 Heat networks of section МК1228A- Slobidskyi, Picture 4.1.8.57, МК1231, Osnovianskyi Picture 4.1.8.77 Bohdana Khmelnytskoho Street Annex 11 58 Heat networks of section from СРЗ-3 to Slobidskyi Picture 4.1.8.58 МК1111, Annex 11 Enerhetychna Street 59 Heat networks of section МК5227- Moscovskyi Picture 4.1.8.59, МК5227/1, Picture 4.1.8.78 Traktorobudivnykiv Avenue Annex 11 60 Heat networks of section from МК5223 to Moscovskyi Picture 4.1.8.60, CHS 606/2 on the 140G Traktorobudivnykiv Picture 4.1.8.78 Avenue Annex 11 36 61 Heat networks of section from МК5109 to Moscovskyi Picture 4.1.8.61, CHS 615/1 on the 22V Hvardiitsiv- Picture 4.1.8.79 Shyronintsiv Street Annex 11 62 Heat networks of section МК5114- Moscovskyi Picture 4.1.8.62, МК5114СК1, Picture 4.1.8.74 Hvardiitsiv-Shyronintsiv Street Annex 11 63 Heat networks of section МК5307A- Moscovskyi Picture 4.1.8.63, МК5307A/1, Picture 4.1.8.80 Valentynivska Street Annex 11 64 Heat networks of section from МК5220 to Moscovskyi Picture 4.1.8.64, CHS 606/1 on the 3V Svitla Street Picture 4.1.8.74 Annex 11 Thanks to the implementation of the component the following is reached: - reduction in 2-2,5 times thermal losses; - increase the service life of transmission and distribution pipelines which are replaced, up to 30 years or more; - to prevent the possibility of damage to the piping from external corrosion (caused by flooding), due to the implementation of the monitoring system moisture insulation; The economic effect from the implementation of this component is achieved through the following factors: - saving of natural gas of about 380 thousand m3; - electricity savings of about 260 thousand kWh×h; - reduction of CO emissions about 13 thousand tons; - reduction of 9-10 times the operating costs of heat networks. A list of sections of heat networks, reconstructed, with brief specifications are given in tabular form in the Annex 36. Situational layout plans of heat networks under reconstruction are given in the Annex 11. Screening checklist will be completed before the start of the civil works to verify that no potential land acquisition issues result from project interventions. 4.1.9. Implementation of automation system, dispatching and commercial electricity metering system. It is provided to develop existing automated dispatch control system (ADCS) parameters, introduction of collection system telemechanics information and ACPMS implementation at all work sites. The purpose of the system creation includes as follows: 1. Providing managerial, operational and maintenance personnel with reliable information about the current state of automation to improve the thermal efficiency of delivery of heat by reducing heat loss in the network 2. Effective control of pressure and temperature of the district heat networks in different parts of the network. 3. Support of the optimal modes of equipment operation during rapid change of consumption electric and thermal energy. 4. The optimization of the control equipment of thermal network is based on multi-factor control model to the prediction that will simultaneously monitor the status of the network and to generate information for manager to make changes to the management process. 37 5. Increasing of the technical level of production and improvement of working conditions due to convenience in obtaining information and control of technological processes and diagnostics of technical means of the system. 6. The creation of new and development of existing APM/dispatchers. Implementation and development of the system will allow you to achieve the best technical- economic performance due to control of the equipment operating parameters of heat sources and network, targeted management processes, awareness-raising and operational activities of the staff. The expected result will be achieved thanks to the efficient management of a centralized system of a heat supply, production, release, transport and distribution of thermal energy with the lowest cost by providing timely and accurate information about the course of technological processes parameters. Implementation of automation system, dispatching and commercial electricity metering system will be carred out within 18 months. Works completion- 4 quarter of 2018. Economical effect of this component implementation is achieved at expense of the factors as follows: - control of parameters of heat networks operation, OPS, CHS, IHP and heat sources; - prompt response to unforeseen change of operating parameters; - reducing the time to containment and subsequent elimination of violations in the modes of heating or damage of thermal network; to reduce loss of the coolant from the pipelines of calorific nets; - compliance caused by modes of heating. As a result of the implementation of this component it is expected to achieve: - reduction of natural gas consumption about 24 million m3; - reduction in electricity consumption about 4.3 million kW×h; - reduction of emissions about 608 thousand tons. List of the automation objects is given in Annex 37. Scheme of DHS development of automation and dispatching systems is given in picture 4.1.9.1 Annex 12. 4.1.10. Implementation of SCADA system. The existing system of supervisory control and data acquisition (SCADA) in the system of Kharkiv district heating was built over than 20 years ago and has limited engineering capacities; software has become outdated and worn-out by now. The number of the objects of control in the system is insufficient, objects telecontrol functions are absent, and there is no capability to determine the places of damage of pipelines (heat carrier leakage), perform regulation of the mode and make decisions on the operational basis. As a result of implementation of the project for implementation of SCADA plans to achieve greater efficiency of operational dispatch management of operating regimes in generation, transmission and distribution of thermal energy with the lowest cost, and also enables remote control of facilities in the district heating system of Kharkiv. Thanks to the implementation of this component it will be achieved as follows: ● reduction of the natural gas consumption of no less than 25 mln. m3 per year; ● reduction of the electric energy consumption of no less than 4.3 mln. kW * per year; ● reduction of heating water losses of no less than 1.0 mln. m3 per year; ● reduction of emissions of the harmful substances into the environment (СОх, NOх) not less than 600 thousand tones per year. List of the objects of SCADA system implementation in Annex 38. 38 4.2. The boundaries of sanitary protection area. The boundaries and sizes of sanitary protection area (SPA) are determined in the documents, in which they ground the volumes of emissions of the contamination substances into environment by the stationary sources. The estimated SPA specified at situational outline maps of layout of the objects in the grounding documents lies across the territory of boiler houses. A copy of the cover sheet with the supporting documents is given in the Annex 13. 4.3. Description of land plots. For the project implementation the development of land plots documentation for 20 objects is required. The land plots are assigned by the city administration. There is no need to provide land plots for the rest of the components, because the Project will be implemented already in the premises of existing boiler houses. No new land acquisition is expected by the project activity, screening will be done for each contract to verify before start of the civil works. Reconstruction of heat networks will be implemented in the current channels of heat networks. Laying of the new pipelines of heat networks, for liquidation of boiler houses and arrangement of new IHP, does not require for separation of the land plot. The laying route will be agreed in accordance with established procedure with the appropriate authorities. Description of the land plots provided by the Kharkiv City Council for the construction of new modular type boiler houses: 1. The land plot at Afanasivska str., 3B The land plot is located on the internal-house territory of the residential house №3 at Afanasivska street and the residential house № 2G on Volonters'ka street. There is an access road. The land plot does not border any buildings. Trash cans are placed to the north of the allocated area at a distance of about 10 meters. 2. The land plot at Tsegelnyi lane, 6А The land plot is located to the east from the residential house №5 at Tsegelnyi lane. There is an access road to the land plot. The land plot does not border any buildings. There are 2 trees and shrub on the territory they will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works. 3. The land plot at Kurylivska str., 41А The land plot is located in the western part of the internal-house territory of the residential house №41 at Kurylivska str. The land plot borders with the stone non-residential building from the east. There is an access road to the land plot. Further on the land plot are trash cans, which will be moved to another place after coordinate with by the municipal authorities and the community. 4. The land plot at Ozerianska str., 65А The land plot is located in the northern part of the internal-house territory of the residential house №65 at Ozerianska str. There is an access way to the land plot. The land plot borders from the north and from the west with non-residential houses. There are 2 trees and 2 shrubs planted on the territory of the land plot, a bench set and a decorative fence are installed. 39 A bench and a fence will be replaced after the preliminary agreement with the residents. The trees will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works. The adjacent area will be landscaped, trees and bushes will be planted after the completion of construction. 5. The land plot at Novyi Pobut str., 35B The land plot is located in the south-eastern part of the internal-house territory of the residential house №35 at Novyi Pobut street. There is an access way to the land plot. There is a metal garage from the north of the land plot. There are trees from the west at a distance of approximately 2,5-3 meters that may have to be prune during the construction work. 6. The land plot at Andriivska str., 43А The land plot is located in the south-western part of the internal-house territory of the residential house No. 41/43 at Andriivska street. There is an access way to the land plot. Trash cans are installed on the territory of the land plot, which will be replaced to another place before the start of construction works. The land plot borders with two metal garages from the west. There is a children's playground from the north from the land plot at a distance of 2meters. The playground will be demounted but installed nearby after the consultations with the community on proper placing. 7. The land plot at Blahovishchenska str., 12А The land plot is located in the north-eastern part of Kharkiv's separate department "Laboratory Center of Railway Transport at the Ministry of Healthcare of Ukraine". The land plot borders from the east with the main non-residential house at Blahovishchenska str., 8. There is one tree on the land plot which will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works 8. The land plot at Lopanskyi lane, 6А. The land plot is located in the western part of the internal-house territory of the residential house No.4 at Lopanskyi lane, 4. There is an access way to the land plot. The plot borders on the north with the permanent garage. There are 2 trees and shrub on the territory which will be will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works. 9. The land plot at Polzunova lane, 8. The land plot is located in the western part of the internal-house territory of the residential house No. 6/10 at Polzunova lane. There is an access way to the land plot of the future construction. There is entrance into the courtyard through the archway width of 3,6 meters and height of 6,0 meters. There is no tree, no flowerbed on the allocated land plot. The land plot borders on the permanent buildings (garages) from the north and north-west. There is a children's playground to the east of the land plot at a distance of 5meters. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night. The special measures will be developed in the-specific ESMP. There will post warning label In public access areas. 40 10. The land plot at Konieva str., 12А. The land plot is located in the southern part of the internal-house territory of the residential house № 12/1 at Konieva street and residential house number 3 at Velyka Honcharivs'ka street. There is an access way to the land plot. Also, there are two entrances to the yard about 3,2 meters width. The land plot adjoins to the end face of a 2-storey residential house. There is a children's playground from the south-east of the land plot about 3 meters long. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night.. The special measures will be developed in the-specific ESMP. There will post warning label in public access areas. There is a non-permanent summerhouse and one small tree on the territory of the allocated land plot. The summerhouse will be dismantled and removed to another place before the start of work which will be previously agreed with the residents. A tree will be removed and be planted in a certain place, which will be coordinated with the community after completion of works. 11. The land plot at Lomonosova str., 53G. The land plot is located in the eastern part of the internal-house territory of the residential house № 13A at Lomonosova street. There is an access way to the area of the future construction. The land plot does not border with any buildings. There are 5 small trees in the allocated land plot. There is a children's playground to the north of the land plot at a distance of about 10 meters. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night. The special measures will be developed in the-specific ESMP. There will post warning label in public access areas.. There are trash cans at a distance of 7 meters in eastern direction from the land plot of the future construction. The trees will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works. 12. The land plot at Marka Bernesa str., 13В. The land plot allocated for the construction of a new modular type boiler house is located in the northern part of the internal-house territory residential house № 13 at Marka Bernesa street. There is an access way to the land plot. The land borders on east with the permanent non-residential building (garage). A playground is located about 20 meters on south from the land plot. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night. The special measures will be developed in the-specific ESMP. There will post warning label in public access areas 13. The land plot at Barkalova str., 11 The land plot allocated for construction is located on the territory of the private Ukrainian Charity "Agroecology" Fund along the road at Barkalova street. There are 3 trees and shrubs that will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works. The allocated land plot does not border with any buildings. 14. The land plot at Seminarska str., 32А. 41 The land plot is located in the northeastern part of the internal-house territory of the residential house number 32 at Seminarska street. There is an access way to the land plot. There is a tree on the territory of the land plot that will be removed and be planted new trees in a certain place, which will be coordinated with the community after completion of works The allocated land plot does not border with any buildings. 15. The land plot at Bulvarna str., 8А The land plot is located on east from the residential house number 8 at Bulvarna street. There is an access road to the land plot. The land plot does not border with any buildings. There is fenced sports ground to the south of the allocated area at a distance of 7 meters and children's playground to the north-west at a distance of 10 meters. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night. The special measures will be developed in the-specific ESMP. There will post warning label in public access areas. The measures will be taken to protect the construction site during the construction works. 16. The land plot at Biolohichnyi lane, 1А. The land plot is located in the western part of the internal-house territory of the residential house number 1 at Biolohichnyi lane. There are 2 access way from the street to the place of planned construction from the Biolohichna street and Zaliznychna street. The land plot borders with the permanent garage from the west. The children's playground is located on the south-west from the land plot at a distance of about 25 meters. The construction site will be carefully fenced ("dense" mesh or solid fence, a height of not less than 1.7 m.) and has lighted at night. The special measures will be developed In the-specific ESMP. There will post warning label in public access areas .There is one tree on the territory of the land plot that will be removed and be planted new tree in a certain place, which will be coordinated with the community after completion of works. There is a tree in close proximity from the north to the land plot that can be prune before start of work. The trees will be planted upon completion of the construction. 17-18. The land plots at Dostoevskoho str. The final decisions have not accepted yet. The project documentations is developing. The 2 land plots for construction of 2 cogeneration is located on existing plants: - boiler house, 4 Artema Vedelia - boiler house “Khartron”, 1 Akademika Proskury Information as to the land plots, on which construction and installation works will be carried out is given in Annex 39 and Annex 40. 4.4. Time-schedule of the PROJECT execution. Information as to the terms and the components of the PROJECT execution according to the previous procurement plan is given in the Table 9 Table 9 Plan schedule of the PROJECT execution 42 № Name of the component, Bid issue Date of Date of the Contract contract date submission of contract completion bid offers signing date 1 Consulting services 1.1 Technical supervision of October November December December construction and installation 2016 2016 2016 2018 works 1.2 Development of the project August January 2016 June 2016 December documentation of stage 2015 2018 “Detail project” (DP) on decommissioning of boiler houses, installation of heat supply stations and reconstruction of heat supply network 1.3 Development of the project June 2016 July 2016 August 2016 June 2017 documentation of stage “Feasibility report” (FR)of putting steam turbogenerator into operation, installed at CHP-3 1.4 Development of the project July 2016 July 2016 August 2016 February documentation of stage 2017 “Technical and economical calculations” (TEC) and bid documents for reconstruction of boiler houses 1.5 Development of the project July 2016 July 2016 August 2016 October 2020 documentation of stage “Detail project” (DP) for reconstruction of heat supply network 1.6 Development of the project June 2016 August 2016 October 2016 June 2020 documentation of stage “Technical and economical calculations” (TEC) and bid documents for SCADA system introduction 2 Designing, supply and installation 2.1 Construction of cogeneration August October 2017 January 2018 December plant with electrical capacity 2017 2019 1 MW at boiler house in 1, Akademika Proskury str. 2.2 Construction of cogeneration January March 2016 June 2016 December plant with electrical capacity 2016 2018 4 MW and thermal capacity 4.3 MW with reconstruction of administrative and industrial case at boiler house in 4, Artema Vedelia str. 2.3 Reconstruction of boiler February March 2017 May 2017 December houses 2017 2019 43 2.4 Installation of the individual January March 2016 June 2016 December heat supply stations in the 2016 2018 residential buildings 2.5 Modernization of the pump August October 2016 December October 2018 stations and boiler houses 2016 2016 with reconstruction of distribution devices 6 kV, replacement of the p[ump units and installation of the frequency converters at electric engines of the pump units 2.6 Commissioning of steam June 2017 August 2017 October 2017 December turbounit, reconstruction of 2019 steam boiler installed at CHP- 3 2.7 First stage of reconstruction January February April 2017 December of heat supply network 2017 2017 2018 2.8 Second stage of October December March 2018 October 2019 reconstruction of heat supply 2017 2017 network 2.9 Third stage of reconstruction October December March 2019 October 2020 of heat supply network 2018 2018 2.10 Decommissioning of boiler January March 2017 May 2017 November houses, installation of heat 2017 2018 supply stations and reconstruction of heat supply network 2.11 Installation of heat meters March 2016 April 2016 June 2016 December and other mechanical and 2018 other electrical equipment in the heat supply stations of the residential buildings 2.12 Introduction of the automated July 2016 September December June 2018 system of commercial 2016 2016 electricity metering 2.13 SCADA system July 2017 September December June 2020 implementation 2017 2017 44 5. CHARACTERISTICS OF IMPACTS OF THE PROJECT ACTIVITIES ON THE ENVIRONMENT AND SOCIAL SPHERE When performing the project activities there can be both positive and negative impacts on the environment and social sphere. The positive effects include the reduction of CO2 emissions and polluting substances in the atmospheric air, as well as it is expected improving quality and reliability of services, increasing of the social welfare level of population. The Project provides to shut dain of crashed boiler houses and renovation of boiler houses, heating DHS networks, modernization of the equipment and arrangement of new IHP, etc. It is important to use correct methods to minimize any considerable impact on the environment. The construction works will be performed either at premises of the current objects, in the streets, or with the other objects of local infrastructure. The Project does not require relocation and will not affect the right of ownership, since the emphasis is on modernization of existing networks and facilities. As well, the Project will not affect archaeological or historic sites. The construction will not harm nature conservation areas. Replacement piping does not have any significant impact on land use because the proposed activities will be carried out on existing buildings through district heat networks. For the same reason, the visual impact on the environment also remains insignificant. The works at construction and repair areas can cause some inconveniences such as noise, dust, vibration and overlapping of transport traffic movement. Especially it concerns the cases, when such works are performed near to residential districts. However, these inconveniences are temporary and can be mitigated, if observing the measures, presented in the Plan of mitigation measures. The main negative impacts of the Project are as follows: 5. 1 Impact on the atmospheric air The main sources of air pollution when performing work are as follows: - exhausted fumes from operation of construction equipment, vehicles and other mechanisms, the formation of dust and suspended solids in Persian bulk materials; - emissions of pollutants in the paint work; - emissions of polluting substances into atmosphere during welding. Point Sources Point sources are discrete, stationary, identifiable sources of emissions that release pollutants to the atmosphere. They are typically located in manufacturing or production plants. Within a given point source, there may be several individual ‘emission points’ that comprise the point source. Point sources are characterized by the release of air pollutants typically associated with the combustion of fossil fuels, such as nitrogen oxides (NOx), sulfur dioxide (SO2), carbon monoxide (CO), and particulate matter (PM), as well as other air pollutants including certain volatile organic compounds (VOCs) and metals that may also be associated with a wide range of industrial activities. Emissions from point sources should be avoided and controlled according to good international industry practice (GIIP) applicable to the relevant industry sector, depending on ambient conditions, through the combined application of process modifications and emissions controls. Fugitive Sources Fugitive source air emissions refer to emissions that are distributed spatially over a wide area and not confined to a specific discharge point. They originate in operations where exhausts are not captured and passed through a stack. Fugitive emissions have the potential for much greater ground- level impacts per unit than stationary source emissions, since they are discharged and dispersed close to the ground. The two main types of fugitive emissions are Volatile Organic Compounds 45 (VOCs) and particulate matter (PM). Other contaminants (NOx, SO2 and CO) are mainly associated with combustion processes, as described emissions should establish the need for ambient quality assessment and monitoring practices. Open burning of solid wastes, whether hazardous or nonhazardous, is not considered good practice and should be avoided, as the generation of polluting emissions from this type of source cannot be controlled effectively. In all the aspects of the Project welding works will be carried out. Emissions from welding operations, exhaust gases from construction equipment, vehicles and paint jobs are minor and temporary and do not affect the surface layer of the atmosphere. During the construction of cogeneration plants and relaying of heat pipelines will be carried out excavation work that will lead to the process of dusting which will have a negative impact on people who live nearby. In the process of operation of cogeneration plants into the air carbon monoxide, nitrogen dioxide, mercury and greenhouse gases (methane, carbon dioxide and the nitrous oxide) will be emitted and formed during natural gas combustion in heat-generating modules. Mobile Sources – Land-based Similar to other combustion processes, emissions from vehicles include CO, NOx, SO2, PM and VOCs. Emissions from on-road and off-road vehicles should comply with national or regional programs. In the absence of these, the following approach should be considered: • Regardless of the size or type of vehicle, fleet owners / operators should implement the manufacturer recommended engine maintenance programs; • Drivers should be instructed on the benefits of driving practices that reduce both the risk of accidents and fuel consumption, including measured acceleration and driving within safe speed limits. Emissions of pollutants and greenhouse gases at 12 the boilers which will closure and installation of individual heating stations are given in Tables 10 respectively (data on the results of 2013). Table 10 Emissions of pollutants and greenhouse gases at 12 the boiler houses Kind of fuel used Current fuel Pollutants and Volume of Reduction of fuel volume greenhouse emissions per consumption Per year, gases year, thousand t volume, thousand thousand.m3 m3 Natural gas 3 558.660 NO2 0.007 142.0 CO 0.008 CO2 6.854 Emissions of pollutants and greenhouse gases at 57 the boilers (reconstruction of 40 existing boiler houses and installation of 17 a new container boiler houses with decommissioning of existing built-in boiler houses in the City of Kharkiv are given in Tables 11 (data on the results of 2013). Table 11. Emissions of pollutants and greenhouse gases at 57 the boilers. Kind of fuel used Current fuel Pollutants and Volume of Reduction of fuel volume greenhouse emissions per consumption volume, Per year, gases year, thousand thousand m3 thousand.m3 t Natural gas 38 008.992 NO2 0.061 960.0 CO 0.061 46 CO2 71.934 Particulate matter The most common pollutant involved in fugitive emissions is dust or particulate matter (PM). This is released during certain operations, such as transport and open storage of solid materials, and from exposed soil surfaces, including unpaved roads. Recommended prevention and control of these emissions sources include:  Use of dust control methods, such as covers, water suppression, or increased moisture content for open materials storage piles, or controls, including air extraction and treatment through a baghouse or cyclone for material handling sources, such as conveyors and bins;  Use of water suppression for control of loose materials on paved or unpaved road surfaces. Oil and oil by-products is not a recommended method to control road dust. Examples of additional control options for unpaved roads include those summarized in table below. Control Type Control Type Wet Suppression – Watering 12% - 98% Speed Reduction 0% - 80% Vacuum Sweeping 0% - 58% Water Flushing/Broom Sweeping 0% - 96% Ozone Depleting Substances (ODS) Several chemicals are classified as ozone depleting substances (ODSs) and are scheduled for phase- out under the Montreal Protocol on Substances that Deplete the Ozone Layer. No new systems or processes should be installed using CFCs, halons, 1,1,1-trichloroethane, carbon tetrachloride, methyl bromide or HBFCs. HCFCs should only be considered as interim / bridging alternatives as determined by the host country commitments and regulations. (Examples include: chlorofluorocarbons (CFCs); halons; 1,1,1-trichloroethane (methyl chloroform); carbon tetrachloride; hydrochlorofluorocarbons (HCFCs); hydrobromofluorocarbons (HBFCs); and methyl bromide. They are currently used in a variety of applications including: domestic, commercial, and process refrigeration (CFCs and HCFCs); domestic, commercial, and motor vehicle air conditioning (CFCs and HCFCs); for manufacturing foam products (CFCs); for solvent cleaning applications (CFCs, HCFCs, methyl chloroform, and carbon tetrachloride); as aerosol propellants (CFCs); in fire protection systems (halons and HBFCs)) Monitoring The air quality monitoring program should consider the following elements:  Monitoring parameters: For combustion processes, indicator parameters typically include the quality of inputs.  Baseline calculations: Before a project is developed, baseline air quality monitoring at and in the vicinity of the site should be undertaken to assess background levels of key pollutants, in order to differentiate between existing ambient conditions and project-related impacts. 47  Monitoring type and frequency: Data on emissions and ambient air quality generated through the monitoring program should be representative of the emissions discharged by the project over time. Examples of time-dependent variations in the manufacturing process include batch process manufacturing and seasonal process variations. Emissions from highly variable processes may need to be sampled more frequently or through composite methods. Emissions monitoring frequency and duration may also range from continuous for some combustion process operating parameters or inputs (e.g. the quality of fuel) to less frequent, monthly, quarterly or yearly stack tests.  Monitoring locations: Ambient air quality monitoring may consists of off-site or fence line monitoring either by the project sponsor, the competent government agency, or by collaboration between both. The location of ambient air quality monitoring stations should be established based on the results of scientific methods and mathematical models to estimate potential impact to the receiving airshed from an emissions source taking into consideration such aspects as the location of potentially affected communities and prevailing wind directions.  Sampling and analysis methods: Monitoring programs should apply national or international methods for sample collection and analysis, such as those published by the International Organization for Standardization,26 the European Committee for Standardization,27 or the U.S. Environmental Protection Agency.28 Sampling should be conducted by, or under, the supervision of trained individuals. Analysis should be conducted by entities permitted or certified for this purpose. Sampling and analysis Quality Assurance / Quality Control (QA/QC) plans should be applied and documented to ensure that data quality is adequate for the intended data use (e.g., method detection limits are below levels of concern). Monitoring reports should include QA/QC documentation. 5. 2 Noise impact. The main sources of noise from construction and dismantling are the traffic, use of construction equipment directly at the construction site (dump trucks, excavators, cranes, bulldozers, graders, etc.), processing of materials, installation of new equipment, piping, demolition of old infrastructure (old boilers). Noise can adversely affect employees in cases where they do not use appropriate personal protective equipment and cause, thus, the risk of occupational diseases. As well the noise may cause inconvenience to the people who live and work near the areas of construction and dismantling. For this purpose, it is necessary to provide noise protection screens in the work execution sites. Methods for prevention and control of sources of noise emissions depend on the source and proximity of receptors. Noise reduction options that should be considered include: · Selecting equipment with lower sound power levels · Installing silencers for fans · Installing suitable mufflers on engine exhausts and compressor components · Installing acoustic enclosures for equipment casing radiating noise · Improving the acoustic performance of constructed buildings, apply sound insulation · Installing acoustic barriers without gaps and with a continuous minimum surface density of 10 kg/m2 in order to minimize the transmission of sound through the · Installing vibration isolation for mechanical equipment · Limiting the hours of operation for specific pieces of equipment or operations, especially mobile sources operating through community areas · Re-locating noise sources to less sensitive areas to take advantage of distance and shielding · Taking advantage of the natural topography as a noise buffer during facility design · Reducing project traffic routing through community areas wherever possible When performing the works on the PROJECT the noise impact will be short-term and insignificant. 48 5. 3 Impact on quality of the surface and underground water. The technological processes which are associated with the constant direct influence on the water environment are absent.. But the discharge of sewage into wastewater treatment systems is the indirect impact. Discharges of industrial wastewater, sanitary wastewater, wastewater from utility operations or stormwater into public or private wastewater treatment systems should: · Meet the pretreatment and monitoring requirements of the sewer treatment system into which it discharges. · Not interfere, directly or indirectly, with the operation and maintenance of the collection and treatment systems, or pose a risk to worker health and safety, or adversely impact characteristics of residuals from wastewater treatment operations. · Be discharged into municipal or centralized wastewater treatment systems that have adequate capacity to meet local regulatory requirements for treatment of wastewater generated from the project. Pretreatment of wastewater to meet regulatory requirements before discharge from the project site is required if the municipal or centralized wastewater treatment system receiving wastewater from the project does not have adequate capacity to maintain regulatory compliance. Surface water and underground water can be contaminated by accidental spills and fuel leaks from machinery and equipment during the period of PROJECT implementation, as well as surface runoff from the temporary construction sites containing suspended substances, organic substances and oil products. Impact on ground water is possible just in case of pipeline accident during operation, when water leaks out till the level of ground waters and causes increase of the level and as a result of this flooding of land. To avoid this impact the emergency prevention activities are provided, which allow exclude contamination of the surface and ground waters in the period of construction and operation. 5. 4 Impact on soil. Soil can be contaminated as a result of accidental spills and leaks of oil and fuel, machinery and equipment, as well as cleaning of vehicles on the construction site. 5. 5 Waste treatment. Facilities that generate and store wastes practices the following: · Establishing waste management priorities at the outset of activities based on an understanding of potential Environmental, Health, and Safety (EHS) risks and impacts and considering waste generation and its consequences · Establishing a waste management hierarchy that considers prevention, reduction, reuse, recovery, recycling, removal and finally disposal of wastes. · Avoiding or minimizing the generation waste materials, as far as practicable · Where waste generation cannot be avoided but has been minimized, recovering and reusing waste Where waste can not be recovered or reused, treating, destroying, and disposing of it in an environmentally sound manner When carrying out works on dismantling the old equipment will form various types of waste, improper storage may lead to contamination of soil, groundwater and surface water, as well as injury to workers, visitors to production areas and passers-by. 49 A general list of waste types that may be formed during the implementation of the Project Wastes Class of hazard Conditions of temporary storage Waste fluorescent lamps 1 Putting in the containers of manufacturer, storage in the warehouse Spent oils and motor grease, 2 To store in hermetic barrels (for transmission example, in the manufacturer's containers) with the appropriate marking Oiled wastes (rags, sand, soil, 3 To use closed containers gaskets which are polluted by oil products, seals) Containers after paint 3 To use a container Waste filament lamp 3 To use closed container Ferrous scrap 3 In a specially designated place with asphalt covering Wastes of PVC-insulated 3 To store in containers cable Non-ferrous scrap 3 To store in containers Wastes of fiberglass 3 To store in containers Wastes of ruberoid 3 To store in containers Asbestos or asbestos- 4 To store in a plastic container or containing materials in the labeled strong plastic (Spoiled materials and disposable bags construction products containing asbestos) Wastes of refractories 4 In a specially designated place with asphalt covering Construction wastes 4 In a specially designated place with asphalt covering Plastic wrap 4 To store in containers Mixed municipal wastes 4 To store in closed containers 50 Used and spoiled cardboard 4 To store in closed containers Wastes of wood 4 To store in closed containers Recycled glass 4 To store in containers Wastes obtained during the 4 To store in containers cleaning of the territory 5. 6 Waste Storage Hazardous waste is stored so as to prevent or control accidental releases to air, soil, and water resources in area location where: - Waste is stored in a manner that prevents the commingling or contact between incompatible wastes, and allows for inspection between containers to monitor leaks or spills. Examples include sufficient space between incompatibles or physical separation such as walls or containment curbs · Store in closed containers away from direct sunlight, wind and rain · Secondary containment systems should be constructed with materials appropriate for the wastes being contained and adequate to prevent loss to the environment · Secondary containment is included wherever liquid wastes are stored in volumes greater than 220 liters. The available volume of secondary containment should be at least 110 percent of the largest storage container, or 25 percent of the total storage capacity (whichever is greater), in that specific location · Provide adequate ventilation where volatile wastes are stored. Hazardous waste storage activities also are subject to special management actions, conducted by employees who have received specific training in handling and storage of hazardous wastes: - Provision of readily available information on chemical compatibility to employees, including labeling each container to identify its contents - Limiting access to hazardous waste storage areas to employees who have received proper training - Clearly identifying (label) and demarcating the area, including documentation of its location on a facility map or site plan - Conducting periodic inspections of waste storage areas and documenting the findings - Preparing and implementing spill response and emergency plans to address their accidental release (additional information on Emergency Plans in provided in Section 3 of this document) - Avoiding underground storage tanks and underground piping of hazardous waste Monitoring Monitoring activities associated with the management of hazardous and non-hazardous waste include the following: - Regular visual inspection of all waste storage collection and storage areas for evidence of accidental releases and to verify that wastes are properly labeled and stored. When 51 significant quantities of hazardous wastes are generated and stored on site, monitoring activities should include:  Inspection of vessels for leaks, drips or other indications of loss  Identification of cracks, corrosion, or damage to tanks, protective equipment, or floors  emissions, or monitoring stations (air, soil vapor, or groundwater)  Documenting any changes to the storage facility, and any significant changes in the quantity of  materials in storage - Regular audits of waste segregation and collection practices - Tracking of waste generation trends by type and amount of waste generated, preferably by facility departments - Characterizing waste at the beginning of generation of a new waste stream, and periodically documenting the characteristics and proper management of the waste, especially hazardous wastes - Keeping manifests or other records that document the amount of waste generated and its destination - Periodic auditing of third party treatment, and disposal services including re-use and recycling facilities when significant quantities of hazardous wastes are managed by third parties. Whenever possible, audits should include site visits to the treatment storage and disposal location - Regular monitoring of groundwater quality in cases of Hazardous Waste on site storage and/or pretreatment and disposal - Monitoring records for hazardous waste collected, stored, or shipped should include: - Name and identification number of the material(s) composing the hazardous waste - Physical state (i.e., solid, liquid, gaseous or a combination of one, or more, of these) - Quantity (e.g., kilograms or liters, number of containers) - Waste shipment tracking documentation to include, quantity and type, date dispatched, date transported and date received, record of the originator, the receiver and the transporter - Method and date of storing, repacking, treating, or disposing at the facility, cross-referenced to specific manifest document numbers applicable to the hazardous waste - Location of each hazardous waste within the facility, and the quantity at each location The revised list and quantitative indicators will be specified in each individual subproject in the project documentation. 5. 7 Prevention of emergency situations. Hazards posed to the public while accessing project facilities may include: · Physical trauma associated with failure of building structures · Burns and smoke inhalation from fires · Injuries suffered as a consequence of falls or contact with heavy equipment · Respiratory distress from dust, fumes, or noxious odors · Exposure to hazardous materials Reduction of potential hazards is best accomplished during the design phase when the structural design, layout and site modifications can be adapted more easily. The following issues should be considered and incorporated as appropriate into the planning, siting, and design phases of a project: Inclusion of buffer strips or other methods of physical separation around project sites to protect the public from major hazards associated with hazardous materials incidents or process failure, as well as nuisance issues related to noise, odors, or other emissions · Incorporation of siting and safety engineering criteria to prevent failures due to natural risks posed by earthquakes, tsunamis, wind, flooding, landslides and fire. To this end, all project structures 52 should be designed in accordance with engineering and design criteria mandated by site-specific risks, including but not limited to seismic activity, slope stability, wind loading, and other dynamic loads · Application of locally regulated or internationally recognized building codes80 to ensure structures are designed and constructed in accordance with sound architectural and engineering practice, including aspects of fire prevention and response · Engineers and architects responsible for designing and constructing facilities, building, plants and other structures should certify the applicability and appropriateness of the structural criteria employed. In case of nonobservance of the established norms and safety rules any accident situations may occur, connected with fire and explosions. This can lead to injury to workers and persons visiting the production area or passing by and to the damage of the objects of property. Measures to prevent emergency situations at the Project sites are reflected in section 6 "Safety rules and labor protection”. 5. 8 Impact on flora. When relaying the pipelines of heat networks, the civil works will be carried out, which may have a negative impact on the flora and fauna. Construction of cogeneration plant at address of 4, Artema Vedelia str. will be carried out at the territory of the current district boiler house. In the area of this planned area of construction felling of trees has not been envisaged. Negative impact on flora of construction of cogeneration plant at boiler house “Hartron” at 1, Akademika Proskury str. is not possible to determine by now, because of absence of the project decisions. During the construction of a modular boiler house, there may be a negative impact of flora objects, such as the relocation of the flower beds, shrubs, trees and their pruning 5. 9 Transportation impact. The growth in traffic of heavy equipment and trucks towards the construction sites and the dismantling of the back increases the risk of road accidents. The cause of road accidents can also be the improper organization of production processes. Traffic safety should be promoted by all project personnel during displacement to and from the workplace, and during operation of project equipment on private or public roads. Prevention and control of traffic related injuries and fatalities should include the adoption of safety measures that are protective of project workers and of road users, including those who are most vulnerable to road traffic accidents. Road safety initiatives proportional to the scope and nature of project activities should include: Adoption of best transport safety practices across all aspects of project operations with the goal of preventing traffic accidents and minimizing injuries suffered by project personnel and the public. Measures should include: Emphasizing safety aspects among drivers  Improving driving skills and requiring licensing of drivers  Adopting limits for trip duration and arranging driver rosters to avoid overtiredness  Avoiding dangerous routes and times of day to reduce the risk of accidents  Use of speed control devices (governors) on trucks, and remote monitoring of driver actions Regular maintenance of vehicles and use of manufacturer approved parts to minimize potentially serious accidents caused by equipment malfunction or premature failure Where the project may contribute to a significant increase in traffic along existing roads, or where road transport is a significant component of a project, recommended measures include:  Minimizing pedestrian interaction with construction vehicles 53  Collaboration with local communities and responsible authorities to improve signage, visibility and overall safety of roads, particularly along stretches located near schools or other locations where children may be present. Collaborating with local communities on education about traffic and pedestrian safety (e.g. school education campaigns)  Coordination with emergency responders to ensure that appropriate first aid is provided in the event of accidents  Using locally sourced materials, whenever possible, to minimize transport distances. Locating associated facilities such as worker camps close to project sites and arranging worker bus transport to minimizing external traffic  Employing safe traffic control measures, including road signs and flag persons to warn of dangerous conditions 5. 10 Impact on human health. Failure to comply with safety rules and hygiene of labor may lead to injury employees in the areas of construction and dismantling. Negative impact on human health during the implementation of dismantling or building with old insulating materials for boilers and pipes containing asbestos. When carrying out welding and dyeing works also possible negative impact on human health. Solid particles from a wide variety of industrial operations, and / or a liquid chemical spray may strike a worker in the eye causing an eye injury or permanent blindness. Exposed or faulty electrical devices, such as circuit breakers, panels, cables, cords and hand tools, can pose a serious risk to workers. Overhead wires can be struck by metal devices, such as poles or ladders, and by vehicles with metal booms. Vehicles or grounded metal objects brought into close proximity with overhead wires can result in arcing between the wires and the object. Projects should implement risk management strategies to protect the community from physical, chemical, or other hazards associated with sites under construction and decommissioning. Risks may arise from inadvertent or intentional trespassing, including potential contact with hazardous materials, contaminated soils and other environmental media, buildings that are vacant or under construction, or excavations and structures which may pose falling and entrapment hazards. Risk management strategies may include: · Restricting access to the site, through a combination of institutional and administrative controls, with a focus on high risk structures or areas depending on site-specific situations, including fencing, signage, and communication of risks to the local community · Removing hazardous conditions on construction sites that cannot be controlled affectively with site access restrictions, such as covering openings to small confined spaces, ensuring means of escape for larger openings such as trenches or excavations, or locked storage of hazardous materials 5. 11 Impact on social and economic development. There is no expected permanent negative impacts on the industrial, housing and commercial facilities, surface and underground structures, cultural landscapes and it will not lead to resettlement. Although temporary negative influences on community and the environment are possible during the implementation of the Project, like temporary traffic constraints, restrictions on access to public places, noise, small emissions, etc. General expected Project effect for the consumer: - improving the quality of services provided to the population for central heating and hot water; - improvement of the environment in the city, due to the reduction of negative effect; 54 - reducing the pressure on raising tariffs for services in a heat supply as a result of lower cost of production, transportation and supply of thermal energy and reduce the operating costs of the enterprise. Implementation of all the directions of the Project to ensure the reliability and quality of the provided heat supply services for the population of Kharkov, as well as reduce the cost of utility bills. Another important intention of this Project is to reduce the losses of heating in the network and to avoid accidents in the networks of district heating, which could cause by pipe breaks. Implementation of Project will provide: - Reduction of natural gas consumption --Reduction of emissions of harmful emissions - Reducing network heating losses - Reducing water loss - Reduced maintenance costs. The construction of cogeneration stations will allow to partially cover the needs for electric energy for boiler houses during the heating period (not less than 70%) and fully in the inter-heating period (100%), increase the reliability of electricity supply, additionally gain heat energy from utilization of waste gases as a result of operation of cogeneration modules, and raise the efficiency of the heat source as a whole. In addition, at the expense of own electric energy generation at the heat source, the cost of purchased electric energy in the energy supply organization will be reduced. As a result of reconstruction 58 of boiler houses, Public Utility “Kharkivski teplovi merezhi” will improve the quality of heat supply services and the following economic effect: • Decrease the consumption of fuel (natural gas) and energy resources due to the replacement of obsolete equipment; • Reduction of future maintenance costs related to depreciation of boiler houses main and ancillary equipment, and due to the installation of equipment which does not require significant expenditures for technical maintenance and repairing; • Reduction of salary fund due to automatization and dispatching control of boiler houses; • Faultless operation of equipment; • Provision of uninterrupted and high-quality services to consumers. Installation of 1,000 of heat meters and other mechanical and electrical equipment in the heat supply stations of residential houses and 250 individual heating points in residential buildings will allow to conduct commercial heat accounting in thermal substations of multi-storey apartment buildings in the city of Kharkov and improve the efficiency of using heat energy and the quality of heat supply services. As a result of implementation of SCADA, Public Utility “Kharkivski teplovi merezhi” plans to achieve greater efficiency of operational dispatch management of operating regimes in generation, transmission and distribution of thermal energy with the lowest cost and improve the quality of services for the population. Аutomation system of commercial electrical power metering will allow to achieve the best technical-economic characteristics due to control of the equipment operating parameters of heat sources and network, targeted management processes, awareness-raising and operational activities of the staff. Other directions of the Project such as Commissioning of steam turbogenerator and reconstruction of steam boiler at CHP-3, Modernization of pump stations and boiler houses with reconstruction of distribution facilities 6 kV, replacement of pumpsets and installation of frequency converters for electric motors of pumps, Reconstruction of heat networks. Decommissioning of 12 boiler houses will improve of the quality of services for the population. Although temporary negative influences on community and the environmental are possible during the implementation of the Project. 55 All the possible PROJECT impacts on the environmental and social sphere are given in Table 12. Table 12. Possible impacts on the environmental and social sphere of Kharkiv during the process of the PROJECT implementation. Main aspects of the project Negative impact Positive impact 1. Construction of cogeneration 1. Impact on atmospheric air. 1. Increase of reliability and plants. 2. Noise impact. quality of provided heat 3. Soil pollution. supply services. 4.Emergency situations. 2. Reduction of СО2 5. Impact on flora. emissions into the 6. Impact when transporting. atmospheric air. 7. Impact on human health. 3. Creating of some additional 8. Impact on the social working places in the process environment of the Project implementation. 4. Accident prevention 2. Decommissioning of boiler 1. Impact on atmospheric air. 1. Increase of reliability and houses, installation of heat 2. Noise impact. quality of provided heat supply stations and 3. Soil pollution. supply services. reconstruction of heat networks. 4.Emergency situations 2. Reduction of СО2 5. Impact on flora. emissions into the 6. Impact when transporting. atmospheric air. 7. Impact on human health. 3. Accident prevention 8. Impact on the social environment 3. Reconstruction of boiler 1. Impact on atmospheric air. 1. Increase of reliability and houses with construction of 16 2. Noise impact. quality of provided heat modular type boiler houses 3. Soil pollution. supply services. 4.Emergency situations 2. Reduction of СО2 5. Impact on flora. emissions into the 6. Impact when transporting. atmospheric air. 7. Impact on human health. 3. Reduction of the heat 8. Impact on the social energy consumption by environment population. 4. Accident prevention 4. IHP installation in the 1. Noise impact. 1. Increase of reliability and residential buildings. 2. Soil pollution. quality of provided heat 3.Emergency situations supply services. 4. Impact on human health. 2. Reduction of СО2 5. Impact on the social emissions into the environment atmospheric air. 3. Increase of number of people who have access to more energy efficient technologies and objects. 4. Accident prevention 5. Installation of heat meters and 1. Noise impact. 1. Reducing the expenditure other mechanical and electrical 2. . Soil pollution. of heat and consequently equipment in the heat supply 3.Emergency situations 56 stations of the residential 4. Impact on human health. improving the quality of buildings 5. Impact on the social services of heat supply. environment 2 Reduction of СО2 emissions into the atmospheric air. 3. Accident prevention 6. Commissioning of steam 1. Noise impact. 1. Reduction of СО2 turbogenerator and 2. Soil pollution. emissions into the reconstruction of steam boiler at 3.Emergency situations atmospheric air. CHP-3 4. Impact on human health. 2. Improving the reliability and quality of provided services 3. Accident prevention 7 Modernization of the pump 1. Noise impact. 1. Increase of reliability and stations and boiler houses with 2. Soil pollution. quality of provided heat reconstruction of distribution 6 3.Emergency situations supply services. KV devices, replacement of the 4. Impact on human health. 2. Reduction of СО2 pump units and installation of emissions into the the frequency converters at atmospheric air. electrical engines of the pump 3. Accident prevention units. 8. Reconstruction of heat 1. Impact on atmospheric air. 1. Increase of reliability and networks 2. Noise impact. quality of provided heat 3. Soil pollution. supply services. 4. Emergency situations 2. Reduction of the heat 5 Impact on flora energy consumption by 6. Impact when transporting. population. 7. Impact on human health. 3. Accident prevention. 8. Impact on the social environment 9. Introduction of automation, 1 Soil pollution. 1. Increase of reliability and dispatching and commercial 2. Emergency situations quality of provided heat electricity metering. supply services. 2. Reduction of СО2 emissions into the atmospheric air. 3. Accident prevention. 10. Introduction of SCADA 1 Soil pollution. 1. Increase of reliability and system. 2. Emergency situations quality of provided heat supply services. 2. Reduction of СО2 emissions into the atmospheric air. 3. Accident prevention. 57 6. SAFETY RULES AND LABOUR PROTECTION Conditions of labor at working place, safety of the technological processes, machines, mechanisms, equipment and other production facilities, state of measures of the collective and individual protection, used by the employee, as well as sanitary-amenity conditions shall meet the legislation requirements and provided at all stages of the PROJECT implementation. The basic normative acts, adjusting safe labor conditions are as follows: - Act of Ukraine “On Labor Protection”; - DBN А.3.2.-2-2009 “Labor protection and industrial safety in construction” - DNAOP 0.00-1.21-98 “Rules of safe operation of the electrical plants of consumers”; - DNAOP 0.00-1.20-98 “Safety rules of gas supply systems of Ukraine”; - NAPB B.06.044-2005 “Fire safety rules in Ukraine”; - GKD 34.20.507-2003 “Rules of the technical operation of the electric plants and network”; - DNAOP 0.00-1.11-98 “Rules of construction of safe operation of pipelines of steam and hot water”; - DNAOP 0.00-1.26-96 “Rules of construction and safe operation of steam boilers with steam pressure no more than 0.07 MPa (0.7 kGs/cm2), hot-water boilers and feed-water heaters with heating temperature of no higher than 1150С”; - DNAOP 1.1.10-1.04-01 “Rules of safe operation with the instrument and appliance”; - DNAOP 1.1.10-1.02-01 “Rules of safe operation of thermal and mechanical equipment of electric power plants and heat networks”; - Rules of technical operation of heat supply plants and network, approved by the order of Ministry of Fuel and Energy of Ukraine Fabruary14, 2007 71. The contractor organization is obliged with customers and subcontractors to develop and adopt measures for safety and industrial hygiene mandatory for all organizations involved in the construction. Construction and assembly works are allowed to proceed only in the presence of the design- budget documentation and the plan of construction organization, which shall be developed in all the activities to ensure safety and industrial hygiene. Construction sites, work areas and workplaces shall be prepared for the safe execution of works. When performing the works at construction site the contractor organization shall provide the employees with sanitary-amenity premises (cloakrooms, shower rooms, wash basins, driers for clothes and shoes, premises for heating up, for having meals and rest, for personal hygiene of women, lavatories etc.), drinking water and medical service according to the current norms. Sanitary-amenity premises and equipment shall be put into operation prior to starting of the works execution. During the operation of construction machines some means of measures on mechanization, fixtures, tooling, manual machines tools should be provided to prevent the impact on workers of dangerous and harmful production factors (GOST 12.0.003): - elevated levels of noise, vibration, air pollution, dustiness of the working area of the driver; - inadequate illumination of working area; - high voltage in an electric circuit, circuit which may occur through the human body. Construction machines shall meet the requirements of the normative documents and operational documentation shall be with them, and cranes and other machines having been purchased abroad shall have certificate of satisfaction to requirements of labor safety (NPAOP 0.00- 1.01). Operation of mechanical means is prohibited without enclosures, blocks, alarm systems and other means of collective protection of the employees provided by their design. When performing transportation and handling operations it is required follow the requirements of DBN А.3.1-5, NPAOP 0.00-1.01, MAPB А.01.001, DBN В.1.1-7, DBN В.1.2-7, NPAOP 60.2-1.28. 58 Handling works and warehousing of cargo using lifting cranes and machines at stationary warehouses, construction sites, bases shall be performed according to requirements of NPAOP 63.11-7.01 and the process maps, developed and approved at enterprise (organization) performing the specified works. During erection of construction structures, products, pipelines and equipment it is required providing measure to avoid negative impact on the employees of such unsafe and harmful production factors as: - the location of wotartion close to the height difference of 1.3 m and more; - moving machines, their actuating devices; travelling of structures, materials; - collapse of structural elements of buildings and structures; - falling down of materials, tools; - performance of the works in the area close to overhead transmission lines; - lifting cargo, weight of which exceeds lifting capacity of mechanisms; - insufficient rigidity of the structure, which can cause its destroy during erection; - roll over of machines, drop their parts; - inadequate illumination of working places; - increased voltage in an electrical circuit, the circuit which might occur through the human body. Due to presence of unsafe and harmful factors safety of erection works shall be provided by means as follows: - exact determination of the place of the crane installation with its grade name, specifying unsafe areas during its work; - determination of the load weight that is to be lifted; - provision of safety of the working places at height; - sequencing and ensure safe installation of structures; - sustainability of structures and building parts in the construction; - specifying the scheme and pre-assembly of structural elements. In the working are of erection works it is prohibited to perform any other works and staying of the unauthorized persons. Prior to the dismantling of buildings and structures and their renovation or demolition the measures shall be provided to prevent workers exposure to the following dangerous and harmful production factors, such as: - the collapse of structural elements of buildings and structures, falling loose structures, equipment; - machines that move and things that move them; - sharp edges, corners, pins; - the high content of airborne dust, harmful substances; - increased noise level, vibration in the workplace; - location of the working place near height difference 1.3 m and higher. Before disassembly, reconstruction and capital repair it is necessary to examine the general condition of the building (construction), as well as the foundations, walls, columns, arches and other structures, as well as for superstructures of the foundations. According to the results of study they draw up the act based on which they develop construction management project (CMP) and work execution project (WEP). During disassembly of buildings, works in the conditions of production or within a city building that we have, access to the work site persons not involved in the execution of these works is prohibited. Areas where the work is performed are necessary to be protected according to GOST 23407. When performing the works, it is necessary to secure the correct technological order of production operations. Location of temporary and permanent transportation ways, power supply network, and cranes of motorized units, storage areas and other appliances shall meet the instructions in the project. 59 At the territory of construction there shall be pointers of driveways and walkways. Dangerous areas shall be enclosed, or put at their borders warning writing and signals, visible at daytime and at night. In case of appearing any dangerous working conditions at site (landslides, sediment grounds under the scaffolding, broken power lines), people shall be evacuated immediately and the unsafe places shall be enclosed. Works performed in the electricity line area with the use of construction machinery (crane, tower) and mechanisms should be carried out under the direct supervision of an engineer and technician worker, in the presence of an admission. Excavation in the area of existing underground utilities should be under the direct supervision of the foreman or the master, and in the buffer zone of the cables, under voltage, or operating a pipeline, except under the supervision of employees of electric or gas facilities. It is not allowed to perform installation work at height in exposed places when the wind speed is 15 m/s or more, ice, storm or fog, excluding the visibility within the scope of work. Traffic Safety Traffic accidents have become one of the most significant causes of injuries and fatalities among members of the public worldwide. Traffic safety should be promoted by all project personnel during displacement to and from the workplace, and during operation of project equipment on private or public roads. Prevention and control of traffic related injuries and fatalities should include the adoption of safety measures that are protective of project workers and of road users, including those who are most vulnerable to road traffic accidents. Road safety initiatives proportional to the scope and nature of project activities should include:  Adoption of best transport safety practices across all aspects of project operations with the goal of preventing traffic accidents and minimizing injuries suffered by project personnel and the public. Measures should include: - Emphasizing safety aspects among drivers - Improving driving skills and requiring licensing of drivers - Adopting limits for trip duration and arranging driver rosters to avoid overtiredness - Avoiding dangerous routes and times of day to reduce the risk of accidents - Use of speed control devices (governors) on trucks, and remote monitoring of driver actions  Regular maintenance of vehicles and use of manufacturer approved parts to minimize potentially serious accidents caused by equipment malfunction or premature failure. Where the project may contribute to a significant increase in traffic along existing roads, or where road transport is a significant component of a project, recommended measures include:  Minimizing pedestrian interaction with construction vehicles  Collaboration with local communities and responsible authorities to improve signage, visibility and overall safety of roads, particularly along stretches located near schools or other locations where children may be present. Collaborating with local communities on education about traffic and pedestrian safety (e.g. school education campaigns)  Coordination with emergency responders to ensure that appropriate first aid is provided in the event of accidents  Using locally sourced materials, whenever possible, to minimize transport distances. Locating associated facilities such as worker camps close to project sites and arranging worker bus transport to minimizing external traffic Employing safe traffic control measures, including road signs and flag persons to warn of dangerous conditions The speed of vehicles on construction sites must not exceed 10 km/h, on bends and in the working areas cranes – 5 km/h. All the workers of the engineering and technical personnel involved in construction shall go through the safety instructions of the company and in the workplace. 60 At the construction sites it is required to place fire extinguishing equipment, fire panels, fire alarm audible signal. When operating the equipment, it is required to strictly adhere to fire safety regulations. Operating staff should monitor the working condition of fire extinguishers.It is prohibited to extinguish electric installations with help of water and foam fire extinquishers. Staff should be trained to provide first aid measures. 61 7. PLAN OF MITIGATION MEASURES To reduce negative impact of the project on environment and social sector, there have been developed mitigation measures, which are to be implemented during the project in order to reduce potential negative environmental impact on the stages of construction works, dismantling and operation. Atmospheric air. Construction work can be a source of dust that creates inconvenience for local residents and risk of harm to construction personnel health With the purpose to reduce this impact the measures will be put in place to ensure permanent use of appropriate individual protection means by the personnel In the course of work in premises, it’s necessary to provide needed ventilation during the excavation work under adverse conditions that lead to increased dustiness, or in case of necessity to minimize dust emissions by means of spraying water, to reduce exhaust emissions from vehicles at the expense of: - carrying out the regular car inspection - to carry out control of flue gases; - optimization of work schedules for minimizing engine operating time. Noise. To reduce noise and vibration, the following activities are provided: - main and auxiliary equipment according to the manufacturers specifications should have design that ensures level of sound and vibration in permanent workplaces according to current regulations. - during loading and transportation, wooden blocks should be utilized under the constructions - when feeding structures to the installation site by crane, guy hemp ropes should be used to facilitate guidance and exclusion of structure swinging. Scaffolding and ladders for installers must be installed at the bottom before they lift. - measurements of noise level near the residential building (in cases, where design documentation (or preliminary analysis) has established the possibility of exceeding the permissible noise level). - to install noise protects screens if necessary (it's determined by design documentation or direct measurement . Works are to be executed during working hours. Provide workers with personal protective equipment (headphones, anti-noise inserts). Soils. When carrying out construction works there is mechanical effect on the ground fertile layer (laying of foundations for building of cogeneration plants, building of modular boiler houses, reconstruction of heat networks). When construction organization, there is ensured location of building materials on paved areas, preventing soil pollution. Departure of vehicles is carried out on the existing paved roads to avoid fuel and lubricants spilling on the soil surface. During the works, it’s necessary to prevent leakage of vehicles fuel. If such cases occur, collect spilled oil or fuel and remove top of soil, contaminated with oil or fuel, with subsequent disposal. Forbid transport washing on the construction site. The project foresees restoration of road asphalt pavement, restoration of vegetation cover/green zone in places of excavations of carriageway streets. 62 Waste management. During the work execution, it will be provided a collection of waste in sealed containers installed in specially prepared places for temporary storage and a separate collection of waste for which there are technologies of recycling/disposal in Ukraine and removal of waste to the landfill, or specialized company in specially equipped vehicles, excluding possibility of loss of the waste, creation of emergency, harm to the environment and human health. Compliance with the necessary domestic and sanitary-hygienic requirements, the availability of places for the implementation of personal hygiene. Organization of biotoilets at the objects of work execution. Preventing of accidents. To prevent accidents is necessary to follow regulations on labour protection and schedules of work. Personnel involved in the works must be trained and have license for works of heightened danger, and be trained before starting work. It is necessary to conduct regular fire and emergency training of personnel, and conducting of training in first aid. Cautionary and warning signs should be put up at work places, to pay special attention to the provision of safety measures during performance of work in residential areas near the children's playgrounds. The area should be additionally fenced and lighted. Impact on flora objects. To reduce the negative impact on flora and fauna during excavation works according to the PROJECT, fertile layer of soil to be removed and taken to designated area. After completion of work, it’s necessary to carry out restoration of soil layer, landscaping of surrounding area, organization of lawns and landing of growing plants. Site-specific measures will be described in site ESMPs Impact during transportation. To reduce negative impact during transportation, there is provided plan development for traffic management in construction area, which includes: - drawing up transport routes, establishing the maximum speed of traffic, time of delivery of building materials, removal of construction waste to the landfill, etc.; - drawing up guidelines for construction workers and permanent workers (such as speed limits, ban on alcohol, etc.); - instructions for contractors (such as drivers, suppliers); - installation of speed limit signs; - warning of city residents about upcoming construction activities; - information on traffic safety; - informational trainings; Ensure safe passage for pedestrians in areas of excavation works. Impact on human health. Impact during the work performance. Provide workers with personal protection equipment (goggles, gloves, respirators) and clothing to reduce negative health effects of toxic materials (asbestos) or their waste, Works with materials containing asbestos must be conducted in isolation from the other premises using a cloth or plastic coatings to avoid asbestos dust spread. Collection of waste containing asbestos, must be carried out in hermetically sealed containers, temporary storage should be in space that has asphalt covering, fencing, marking and driveways. Provide regular wet cleaning of places of work with asbestos and surrounding area. Waste 63 disposal is carried out by the organization having the appropriate licenses (under the terms of the contract). When carrying out welding and dyeing works also possible negative impact on human health. Work performed by the personnel should be carried out only in overalls, footwear, safety helmets and with the use of personal protective equipment if necessary. Impact on human health during excavation work When carrying out excavation work, provide personnel with personal protective equipment, to reduce the negative impact of dust on human health, to take measures on water spraying and moisturize the soil. Impact on human health during operation. The installation of new equipment, the control of pollutants emission from the emission sources and the ambient air condition in the surface layer at the boundary of the sanitary protection zone (SPZ) or near residential house will be conducted after the Project implementation In order to reduce the negative impact on human health during the operation period, personnel should be provided with overalls and personal protective anti-noise equipment. To prevent the injuries staff should observe the rules on labor protection Social Impact Assessment To reduce the negative social impact and inform the population about planned works during the period of Project implementation, the following set of measures being developed: 1. Publication of information about the planned activity and the current state of works on the Project on the company’s website http://www.hts.kharkov.ua/proj_news.php#start, on the website of the city council http://www.city.kharkov.ua/ru/dokumentyi/obyavleniya.html and in workplaces. 2. Information leaflets for all planned interventions under the project to be disseminated in the affected neighborhoods. including consultations with the community. 3. Carrying out public consultation with the population and to identify the places where trees, flowerbeds, playgrounds, rest arenas, and waste collection sites will be moved, if they are situated on the allocated land. 4. Placing information regarding all the components of the Project during the performance of works in public access areas (bulletin boards, etc.) about the following: ● Start of construction and its completion; ● Contractors and Subcontractors of the Project; ● Persons responsible for the works carried out and for technical supervision (with indication of their contact details); ● Company’s phone numbers and focal point information for public appeals and grievances. 5. Information about possible changes of public transport routes is posted by the municipal authorities on the website of the city council http://www.city.kharkov.ua/ru/novosti/operativna-nformaczya.html, in mass media and at public transport stops after the coordination of works performed 64 under the Project, and which may lead to changes in public transport routes around the city. To prevent accidents on sites during works under the Project’s contracts and protect the health of workers performing the works and the population in close proximity to the site, the Contractors must develop and carry out ESMP under each contract in accordance with Table 11. During construction works and replacement of heat networks could create temporary restrictions for the residents of the city, the following measures will be applied to ensure the safety of the population: ● Workplaces should be protected by a fence; ● Information about the works performed should be posted; ● Temporary public transport routes (detour) should be organized, as well as passages for pedestrians; ● Road signs should be installed; ● Illumination of workplaces should be provided at nighttime; ● Red warning lights should be set up for works performed at nighttime. Before the start of the construction works and during the construction phase, periodically, once a week, inspections to detect damage of buildings located along the perimeter of the building site should be carried out. During the implementation of the Project no need for the additional acquisition of land (private or municipal), which can be leased for entrepreneurship, small business or resettlement is expected. However the screening verification should be done prior to the start of the works. Plan of mitigation measures is presented in Table 13. Table 13 - Plan of mitigation measures Impact Mitigation Measures Responsibilit Responsib y for ility for installation operation 1. STAGE - PRIOR TO CONSTRUCTION Waste 1. Identify and prepare places for temporary storage Contractor - managemen of waste. Temporary storage places of waste must t have impermeable base. 2. Prepare sealed containers for waste collection 3. Prepare storage spaces for asbestos materials. 4. Prepare temporary storage places for waste asbestos with impenetrable base, fences and driveways. 5. Prepare sealed labelled containers for the storage of asbestos wastes. 6. To sign the contracts with enterprises for waste management. 65 Impact 1. Fencing of construction site from public areas. Contractor - during 2. Prepare plan of traffic management in transportati construction. on 3. Ensure safe passage-ways for pedestrians. Impact on 1.Provide workers with personal protective Contractor - human equipment health 2. To make the training before work commencement. Impact on To agree with communities (school, etc.) carring Contractor - Public social out works and trees relocation, playgrounds, waste Utility sphere collection plases, fences, gazebos for rest, “Kharkivs flowerbeds. ki teplovi merezhi 2. STAGE - CONSTRUCTION Impact on 1. Ensure minimizing of dust emissions during Contractor - atmospheric construction (water spraying). air 2. Ensure regular cleaning of open surfaces at the site of works and surrounding areas from dust, moisture of access roads and zones of excavation, cleaning area after work. 3 Ensuring proper technical conditions of entire vehicle, machinery, equipment. 4. Ensure minimizing of emissions from vehicles. 5. Carrying out regular inspection of vehicles. 6. Сarry out flue gas control. 7. Prohibit combustion of waste at the site. Impact of 1. Ensure works implementation during working Contractor - noise hours. 2. Ensure timely notification of residents (10 days before) about the need of high noise level works at night time. 3. Ensure workers with individual hearing protection (headphones, anti-noise inserts). 4. If necessary, install noise insulation screens Impact on 1. Regular inspections and proper maintenance of Contractor - the soil vehicles for the leakage of oil/fuel. 2. Prohibit washing vehicles and mechanisms in construction area. 3. Ensure maintenance of vehicles and mechanisms in a specially designated area 4. Ensure collection of spilled oil or fuel and removal of topsoil, temporary storage of contaminated soil in sealed containers and disposal to special company. 5. Ensure recovery of damaged pavement. Waste 1. Ensure separate collection of waste (scrap metal, Contractor - managemen including electrodes, insulation, solid waste, t construction, etc.). 2. Ensure removal of waste for disposal. 3. Restrict access to the area of construction and temporary storage of waste for persons not related to these operations. 66 4. Ensure collection of asbestos waste in special hermetically sealed metal containers. 5. Ensure implementation of work with materials containing asbestos in isolation from the surrounding area using a cloth or plastic coatings. 6. Ensure regular removal of waste containing asbestos to the landfill and conduct regular wet cleaning of places where works are performed and the surrounding area. Preventing 1. Ensure compliance with requirements of fire Contractor - of accidents safety. 2. Ensure development of emergency plan in case of fire. 3. Ensure conducting regular fire fighting and emergency training. Impact on 1. Perform cutting of fertile soil and removal for Contractor - flora objects improvement of the city. 2. Ensure landfilling of holes, leveling of surface, restoration of soil layer, landscaping of surrounding area, organization of lawns and landing of growing plants after completion of work. Impact 1. Develop plan for traffic management in Contractor - during construction area. transportati 2. Establishing limits of safe speed for the works on period. Impact on 1. Ensure compliance with safety regulations. Contractor - human 2. Ensure workers with personal protection health equipment (goggles, gloves, respirators) and clothing when carrying out works with materials containing asbestos and in other works if necessary. 3. Installation of protective screens and shields in the places of welding. Ensuring workers with weld masks. 4. Provide workers with sanitation facilities. 3. STAGE - OPERATION Impact on 1. Priority should be given to new equipment and - Public atmospheric new technologies with low emissions of pollutants. Utility air New equipment must meet the emissions standards “Kharkivs established in Ukraine. This requirement will be ki teplovi included in the tender documentation. merezhi 2. To develop, establish the standards of maximum permissible concentrations of emissions into the atmospheric air. Get permission to emit pollutants into the atmosphere by stationary sources. 3. To control the level of pollutants in the area of influence of emissions sources. Impact of 1. Ensure workers with personal protection against - Public noise noise exposure. Utility “Kharkivs 67 2. Ensure prevent the spread of noise at the highest ki teplovi possible level - using special structures, noise merezhi insulation mats and tissues near sources of noise. Waste 1. Ensure regular updates of plans for waste - Public managemen disposal. Utility t 2. Ensure waste sorting based on maximum “Kharkivs expediency. ki teplovi 3. Ensure regular removal and disposal of waste. merezhi Preventing 1. Ensure compliance with relevant rules and - Public of accidents regulations of fire safety regulations. Utility 2. Develop an emergency plan in case of fire. “Kharkivs 3. Ensure training with simulated emergency ki teplovi situations. merezhi Impact on Ensure compliance with safety regulations - Public human Utility health “Kharkivs ki teplovi merezhi 4. STAGE - DECOMMISSIONING Waste 1. Dismantling the facility and removal of waste Public managemen Utility t “Kharkivs ki teplovi merezhi Impact on 1. Implementation of remediation (cleaning the Public the ground territory from remnants of buildings and equipment, Utility structures, construction waste, refilling of trenches, “Kharkivs sanitary felling of shrub with subsequent replanting ki teplovi of native species and restoration of soil) merezhi 68 8. PLAN OF MONITORING Purpose of monitoring is to conduct observations of the environment state and implementation of measures to reduce potential negative impact on the environment and social sphere. Main tasks of the monitoring are: - fulfilling the requirements of current legislation in organization of ecological monitoring of natural environment and social sphere components; - receipt and storage of data on the sources of pollution and environment components state in area of the object influence; - analysis and comprehensive assessment of different environment components current status; - information provision of the object management for making scheduled and emergency management decisions; - preparation, keeping and execution of reporting documentation on the results of ecological monitoring; - obtaining data on effectiveness of environmental protection measures, development of recommendations and proposals for elimination and prevention of negative impact on environment and social sphere. - collect grievances received during the implementation of the project related to project- related activities from the affected communities and workers Monitoring is conducted to prevent violations of requirements in field of environmental protection and occupational safety and health to reduce negative influence at work on the PROJECT sites, and timely eliminate violations. Tasks of monitoring include: - detection of violations of environmental legislation and labour safety requirements at work on sites, assess their scope and prevent violations; - ensuring proper implementation of measures to mitigate negative impact on the environment and social sphere; - ensuring of compliance with requirements of current legislation of Ukraine by construction companies; - ensuring of design solutions implementation in field of environmental protection by construction companies; - control of work on protection of surrounding environment after completion of construction phase. Control is carried out in form of checks, according to the Monitoring Plan given in Table 14. 69 Table 14 Monitoring Plan. Parameter of monitoring Locatio Type of Periodici Reason Responsibi Respons n of equipmen ty of for lity for ibility monitor t for monitori monito implement for ing monitorin ng ation operatio ring g n 1. STAGE - PRIOR TO CONSTRUCTION Percentage of population, Residen Opinion Determi Definit Public which fall under the tial area poll nation of ion of Utility impact of Project. basic service “Kharki indicator quality vski before improv teplovi construct ing merezhi ion Temporary storage of Near Visually Prior to Preven Contractor waste places the construct ting construc ion negativ tion site e effects on soil Managing of traffic flows Constru Visually Prior to Safety Contractor ction construct of site ion person nel Temporary storage places Contrac Visually Prior to Safety Contractor of waste materials tor construct of containing asbestos construc ion person tion nel base. Constru ction site 2. STAGE - CONSTRUCTION Usage of personal Constru Visually Constant Safety Contractor *Public protective equipment ction ly of Utility (PPE) of breathing organs site person “Kharki nel vski teplovi merezhi ” Usage of hearing organs Constru Visually Constant Safety Contractor *Public PPE. ction ly of Utility Use of appropriate eye site person “Kharki PPE for welding, cutting nel vski and high dust works. Use teplovi of overalls, mittens, merezhi special footwear. ” 70 Spill of oil/fuel on the soil Constru Visually Constant Preven Contractor *Public surface ction ly ting Utility site negativ “Kharki e vski effects teplovi on merezhi soils ” 1. Temporary storage Constru Visually Constant Preven Contractor *Public places of waste ction ly ting Utility 2. Documentation about site negativ “Kharki waste removal and e vski recycling. effects teplovi Visually on merezhi 1 time soils ” per month Compliance with fire Constru In Constant Safety Contractor *Public safety requirements and ction accordanc ly of Utility checking of site e with person “Kharki documentation rules of nel vski fire safety teplovi merezhi ” 1. Cutting of fertile soil Constru Visually Before Preven Contractor *Public layer and its removal ction starting ting Utility 2. Restoration of soil layer site work negativ “Kharki and landscaping of Visually e vski surrounding area At the effects teplovi end of on merezhi construct soils ” ion Managing of traffic flows Constru Accordin Constant Safety Contractor *Public and checking of ction g to the ly of Utility documentation site plans of human “Kharki vehicle health vski and teplovi special merezhi equipmen ” t traffic organizati on 1. Compliance with safety Constru In Constant Safety Contractor *Public regulations ction accordanc ly of Utility 2. Management of toxic site e with human “Kharki waste materials (asbestos) safety health vski Locatio regulation 1 time teplovi ns of s per Safety merezhi asbestos month of ” waste. Visually human Storage health of hazardo 71 us material s. 3. STAGE - OPERATION Percentage of population, Residen Opinion 2 times Definit Public which noted improvement tial area poll per year ion of Utility of quality of heat supply service “Kharki services quality vski improv teplovi ing merezhi The control of pollutants Exhaust Devices, 1 times Imple Public by stationary sources pipe of express per year mentati Utility boiler method on of “Kharki Act of vski house Ukrain teplovi e “On merezhi Protect ion of Atmos pheric Air” The control of NO2, CO in One Devices, 1 time Compli ME surface layer of the samplin methods per year ance "Sanepi atmosphere g point with dservis" on the sanitar border y with welfare housing of the estates populat ion 1. Usage of hearing organs Workpl 1 Visually Constant Compli Public PPE aces in ly ance Utility the with “Kharki 2. Noise level boiler health vski house 2 Sound and teplovi control Level 1 time safety merezhi room Meter per year require SHV ments 1. Temporary storage Territor 1. 1 time Compli Public places of waste y of Visually per ance Utility boiler quarter with “Kharki 2. Documentation about house enviro vski waste removal and 2. In 1 time nment teplovi recycling. accordanc per protect merezhi e with quarter ion requireme require nts of ments environm ental legislatio n 72 Compliance with fire Boiler In Constant Safety Public safety requirements and house accordanc ly of Utility check of documentation e with workin “Kharki rules of g vski fire safety person teplovi nel merezhi Compliance with safety Workpl In Constant Safety Public regulations and check of aces accordanc ly of Utility documentation e with human “Kharki safety health vski regulation teplovi s merezhi Management of asbestos Locatio In 1 time Safety Public waste materials and check ns of accordanc per of Utility of documentation asbestos e with quarter human “Kharki waste requireme health vski nts of teplovi environm merezhi ental protection legislatio n 4. STAGE - DECOMMISSIONING 1 Presence of waste. Object In After Compli Public 2. Documentation of of accordanc decommi ance Utility waste recycling. decom e with ssioning with “Kharki 3. Implementation of missioni requireme enviro vski remediation. ng nts of nment teplovi environm protect merezhi ental ion protection require legislatio ments n *Public Utility “Kharkivski teplovi merezhi” receives monitoring reports on the implementation of mitigation measures plan from the Contractor, and carries out selective monitoring and, accordingly receives breaches reports on elimination of violations by the Contractor. During periodic inspections there is checked implementation of measures to mitigate the negative impact, waste management organization, presence of environment protection documentation, production documentation of construction companies that carry out work at the site, provided by Environmental and Social Management Plan. Regional Project Implementation Unit is responsible for the monitoring of the project objects. Periodicity of monitoring 1 time per month and unscheduled in the case of receiving signals from the population. The act, signed by the Customer representatives, is drawn up on the results of each inspection. Checking is carried out by full-scale survey of the construction site, as well as adjacent areas. Compliance of ongoing work, methods of execution with Ukraine legislation in the field of environmental protection as well as implementation of environmental protection measures stipulated by the project is checked. 73 Also, the task of full-scale survey of the facility includes environmental and social problems impact associated with implementation of construction and requires immediate operative intervention; issuing of practical recommendations on optimization of construction works in order to reduce negative impact on the environment and to the affected community. Identified in the audit violations are recorded by photography if necessary. In later stages of monitoring there is performed control on elimination of previously identified violations and inspection of construction site to identify new disorders, which haven’t been identified here before. Fact of elimination (or non-elimination) of violations also is to be fixed by photography if necessary. All violations are recorded in the Act to verify compliance with environmental requirements, which shall be made on the day of inspection. Control of atmospheric air. Monitoring of air quality is carried out to assess the impact of this work on state of the atmospheric air surface layer. The project will not significantly affect the state of the air through the use of advanced technologies and equipment. Instead, harmful emissions will be decreased Control over the use of personnel respiratory protection by workers when performing dusty works. During operation of boiler houses, which were reconstructed, there is carried out selective monitoring of surface air (NO, CO) 1 time per year in 1 point, considering "wind rose". To carry out system analytical control for other substances (PM or SO2) don't has to. This may be provided on request of the persons concerned. List of boiler, where sampling of surface air will be conducted is shown in Table 15. Location of sampling points is shown on the Situation Plan of respective objects, which are given in Annexes 7,9, 10. Table 15. List of boiler, where selective sampling of surface air will be conducted No. Object, address District name Control point 1 Boiler house, 7 Hryshchenko Street Nemyshlianskyi К1 2 Boiler house, 82A Kulynychivska Street Nemyshlianskyi К2 3 Boiler house, 104 Krasnodarska Street Moskovskyi К3 4 Boiler house “Pivnichnyi-1”, 9A Dzherelna Street Moskovskyi К4 5 Boiler house, 5/7 Karpivskyi Lane Novobavarskyi К5 6 Boiler house, 2/15 Blahovishchenska Street Kholodnohirskyi К6 7 Boiler house, 17 Myrhorodska Street Osnovianskyi К7 8 Boiler houses, 14 Bukova Street, 20 Bukova Shevchenkivskyi К8 Street, 20A Bukova Street 9 Boiler house, 8 Slovianska Street Kholodnohirskyi К9 10 Boiler house, “Airport”, 9 Nesterova Street Slobidskyi К10 74 11 Boiler house, 4 Artema Vedelia Street Moskovskyi К11 12 Boiler house, 74A Myru Stree Industrialnyi К12 13 Boiler house, 1 Akademika Proskury Stree Kyivskyi К13 14 CHP-3, 3 Enerhetychna Street Nemyshlianskyi К14, К15, К16 Sampling and analysis of air samples is performed by certified in the relevant field laboratory. Sampling of atmospheric air is performed by certified laboratory specialist of public utility "Sanepidservis" as per requirements of RD 52.04.186-89. While sampling the atmospheric air, there are considered basic meteorological factors that determine waftage and dispersion of pollutants in the air. Sampling of air is accompanied by the observation of the emissions main sources and meteorological parameters, which include the following: wind speed and direction, air temperature and humidity, atmospheric phenomena, weather and underlying surface conditions, cloudage. Control of noise level. Control is performed using by the workers of personal hearing protection equipment. Сontrol of noise level during the performance of construction work in the places near residential buildings - once a quarter, in the industrial zone - once in half year. During the operation of boiler houses, which were reconstructed, there is carried out selective monitoring of noise level 1 time per year in the boiler house control room. Measurements of the levels of harmful physical impacts (noise) are carried out by specialists of accredited health laboratory at the occupational safety and health service of Public Utility “Kharkivski teplovi merezhi” and are carried out with the help of measuring instruments, which have certificates of state checking. Table 16 contains list of boiler houses, where noise level selective control will be conducted. Table 16. List of boiler houses, where noise level selective control will be conducted No. Object, address District name 1 Boiler house, 7 Hryshchenko Street Nemyshlianskyi 2 Boiler house, 82A Kulynychivska Street Nemyshlianskyi 3 Boiler house, 104 Krasnodarska Street Moskovskyi 4 Boiler house “Pivnichnyi-1”, 9A Dzherelna Street Moskovskyi 5 Boiler house. 7A Konieva Street Novobavarskyi 6 Boiler house, Velyka Panasivska (Kotlova) Street Kholodnohirskyi 7 Boiler house, 8 Slovianska Street Kholodnohirskyi 8 Boiler house, 19 Ternopilska Street Osnovianskyi 9 Boiler house, 27A Dyspetcherska Street Osnovianskyi 10 Boiler house, 20 Bukova (Zavodu Komsomolets) Street Shevchenkivskyi 75 11 Boiler house, 20A Bukova (Zavodu Komsomolets) Shevchenkivskyi Street 12 Boiler house “P’iatykhatky»”, 1 Akademichna Street Kyivskyi 13 Boiler house, 106 Saperna Street Kyivskyi 14 Boiler house, “Airport”, 9 Nesterova Street Slobidskyi 15 Boiler house, 4 Artema Vedelia Street Moskovskyi 16 Boiler house, 1 Akademika Proskury Stree Kyivskyi Control of soils. Visual inspection of the surface layer of soil for oil/fuel spills in the areas of construction/dismantling. Control of waste management. Particular attention is paid to the temporary waste disposal locations, management of waste generated at the construction sites of the object and documentation for removal and disposal of waste, namely: - checking installation of containers for separate waste collection on impermeable foundations; - checking installation of containers for the collection of solid waste on impermeable foundations; - control of all possible kinds of industrial waste and solid domestic waste removal; - control of lack of littering the territory with production and consumption waste. Control is performed visually during construction – constantly, during operation - 1 time every quarter. Control of compliance with fire safety requirements. There is conducted visual inspection of working places and check of compliance with fire safety requirements of Ukraine. Control over the implementation of remediation. There is conducted visual inspection of the territory for soil restoration, landings herbs, trees upon completion under the PROJECT plan of works. Control over management of vehicles. Traffic control at construction sites is conducted according to the plans of organization of vehicles and machinery traffic. Also there is performed monitoring the installation of speed limit signs, documentation checking. Control of compliance with safety regulations. Particular attention is paid to safety at work, personal protective equipment, handling of toxic materials and their waste, documentation checking. 76 9. THE INSTITUTIONAL CAPACITY With the purpose of the PROJECT implementation at public utility “Kharkivski Teplovi Merezhi” by order No.19 dated January 19, 2015 Service of management of the efficiency improvement project was created, performing RPIU functions, according to the Operating manual, and responsible for daily management and its implementation at local level and coordinates its activity with CPMU. RPIU includes the specialists as follows: - RPIU manager; - financial management specialist; - accounting specialist; - procurement specialist; - technical specialist (engineer); - specialist on the environment protection (ecologist). The special composition and the main obligation of RPIU members are given in the Annex 14. The ecologist’s obligations include as follows: - determination and analysis of the potential impacts from the works within the volume of the appropriate part of the PROJECT; - provision of availability of the necessary documentation (reports from EIA (OVNS), ESMP and others) for the works to be performed; within the volume of the appropriate part of the PROJECT; - provision of considering all the necessary measures of attenuation and supervision in the financial plans of the public utility “Kharkivski Teplovi Merezhi”; - coordination with contractors full list of mandatory environmental and social requirements that must be met before beginning work; - verification of compliance by contractors within the relevant part of the PROJECT utilities environmental and social requirements and identify gaps not covered by the arrangements for the protection of the environment and/or budget; - checking (if changes are needed) environmental provisions that will be included in the contracts with contractors; - ensuring the implementation of the oversight plan for each of the contracts within the relevant part of the PROJECT utilities, including the establishment of baselines and the effectiveness of mitigation measures; - preparation of environmental and social reports according to the forms established by the World Bank and CPMU. According to the environmental situation throughout the Project they will conduct monitoring of the state control bodies in the field of ecology and sanitary and hygienic safety at all stages of the PROJECT. The list of public control bodies in the field of ecology is shown in Table 17. Table 17. State control bodies in the field of environment and sanitary-hygienic safety. Supervision State body control name Sphere of activities frequency Department of environment and natural Granting permission for emissions - resources of Kharkiv regional state into the atmosphere, special water administration use, wastewater discharge City Department of Chief Directorate of State Granting permission for production - sanitary-epidemiological service in Kharkiv of solid waste (including fuel ash) region State environmental inspectorate in Kharkiv Waste management Annually region, City Department of Chief Directorate of 77 State sanitary-epidemiological service in Kharkiv region State environmental inspectorate Emissions into the atmosphere Annually State sanitary-epidemiological services within the bounds of the appropriate administrative territories are responsible for the measures as follows: - development (review), expertise, approval and promulgation of sanitary norms; - carrying out of hygienic rating and state registration of the factors, harmful to human health and life; - performance of sanitary and epidemiological expertise; - approval of the projects, documents for assignment of land to locate and construct of the water supply points and purify sewage waters, placement of the industrial and production facilities; - approval of the project and technical documentation for construction, reconstruction, commissioning of the new industrial objects and renovating of the current ones and sanitary protection zones; - inspection of the construction sites and submission of conclusions as to their responsibility to the sanitary norms when putting into operation; - issuing of permits for special water use. Territorial bodies of the State environmental inspection according to the tasks assigned to them shall do as follows: - generalize practice of legislation application regarding the matters, relating to their competency, prepare and offer proposals to the State environmental inspectorate of Ukraine as to its improvement in accordance with the established procedure; - carry out state supervision (control) over compliance with the requirements of the environmental legislation of Ukraine by the territorial bodies of the central authorities of the executive power, local authorities of the executive power, enterprises, institutions and organizations independently of the form of ownership and economy, citizens of Ukraine, foreigners and non-residents, as well as legal entities – nonresidents. - draw up the minutes as to administrative violations of law and consider the cases of administrative violations, impose administrative fines in cases, provided by the law. - submit to the Chairman of State environmental inspectorate of Ukraine the offers as to: issue, suspension of action or cancelling in accordance with the law the permits, limits, quotas for special use of the natural resources, emissions and dropping away of the pollutants into the natural environment, location of waste, handling with dangerous chemical substances, trans-border movement of the flora and fauna objects, including water living resources, as well as establishment of the norms of the allowable levels of harmful effect on the state of the natural environment. - assign the public inspectors of environment protection and issue them certificates, arrange their work, give them guidance and practical assistance, make measures as to eliminating of shortages and violations revealed in their activities. Control over following ESMP recommendations from the side of the public utility “Kharkivski Teplovi Merezhi” at stage of construction and operation is imposed on the ecologist with RPIU with the involvement of experts group of environmental production and technical service of public utility “Kharkivski Teplovi Merezhi”. At stage of construction the contractor organization shall assign the person in charge for observing of ESMP requirements and performing instructions of safety rules for the workers employed in construction. Responsibility for preparation of the public utility personnel and holding qualification upgrading courses is imposed on the service of labor protection, safety rules and personnel training. Laboratory control of noise levels at working places is imposed on the laboratory of labor hygiene at service of labor protection of the public utility “Kharkivski Teplovi Merezhi”. 78 The public utility enterprise “Sanepidemservice” will make control of the atmospheric ground layer. Laboratory of chemical workshop of CHP-3 branch has accreditation for NO2 determination in the atmospheric ground layer. List of the other organizations which will be involved to perform the specific works is given in Annex 15. 79 10. PARTICIPATION OF COMMUNITY, INFORMATION DISCLOSURE AND CONSULTATION According to the requirements of the World Bank, as well as the requirements of the Ukrainian legal system, when performing environmental evaluation of the investment projects it is required to conduct consultations with the groups of the persons, who are subjected to this Project, and with other interested parties on the matters of the environmental and social influence from the project and take their opinion into consideration. The purpose of conducting consultations with public is presentation of the planned PROJECT, results of the work with ESIA(OVNS), discussion of the positive and negative impacts, connected with the Project implementation, ESMP representation. The main tasks of conducting consultations with public are as follows: - openness of the environmental and social documentation (EIA (OVNS), ESMP report); - discussion of the different questions and problems with the groups, who come under this Project, introduction of public with potential negative impacts and problems, that can occur during implementation process of the investment projects; - providing of the feedback between competent authorities and local groups that fall under the impact of the project, in the process of ESIA implementation and in determining the potential positive and negative impacts and the proposed measures to minimize such impact. The main participants of consultations with public are as follows: - credit recipients (municipal public utilities); - local community; - non-governmental organizations (NGO); - major scientific research organizations and carrying out impact assessments on the environment and social sphere; - local state administration; - public authorities (bodies of environmental protection and sanitary-epidemiological service). Within the framework of preparation of the design documentation, the Public Utility “Kharkivski teplovi merezhi” conducted a public hearing on the question of construction of the cogeneration plant heat output 4 288 kW and an electric capacity of 4 000 kW for boiler house at 4, Artema Vedelia str. dated December 22, 2010. According to the requirements of the current normative documents: - EIA was developed, front sheet is given in Annex 16; - statement of intention of the project activities was developed and approved in the Department of the housing maintenance and utilities and power board of Kharkiv municipal council (Annex 27) - appropriate statement of consequences of intents and environmental consequences from the project activities was published in the local newspaper (Annex 17); - public meeting was conducted; copy of minutes of public meeting is given in Annex 18. Within the framework of preparation for the PROJECT implementation, public utility “Kharkivski Teplovi Merezhi” conducted public meeting regarding the Program of the environmental and social evaluation of the Project on January 09, 2014, composed of the reports of the specialists of the enterprise, comments and answers to the questions of the public. As a result the Program of the ecological and social evaluation of the Project, as well as Frame plan of the environmental management at stages of construction and operation and Monitoring Plan were approved. Photos of the public meeting are given in Annex 19. Copies of the minutes of public meeting, list of participants and application in the local newspaper are given in Annexes 20, 21 and 22 accordingly. During performance of public meeting the public utility “Kharkivski Teplovi Merezhi” submitted both post and electronic address to send any comments and proposals. 80 Information as to performance of the public meeting and the results are disclosed at web sites of the enterprise and Kharkiv municipal council. Nontechnical summary of the Project for the public is given in Annex 24. There will be public disclosure of this ESMP and public consultation with the community and other relevant stakeholders before during and after the project activities. Grievance Redress Mechanism accessible for the project affected people will be established by the Utility. 81 11. THE GRIEVANCE REDRESS MECHANISM In the course of performing work on the PROJECT there may be questions related to its impact on the social sphere and the environment. The company has developed and implemented the program of communication with the public, to ensure continuous public awareness of key environmental and social aspects throughout the future PROJECT implementation (including the stages of construction and operation). At Public Utility “Kharkivski teplovi merezhi” they created the service on the work with applications of citizens, which is responsible for timely review and replies to applications of citizens according to the Law of Ukraine “Of applications of citizens”. During the PROJECT implementation all applications from citizens including anonymous will be accepted, registered and sent for the appropriate work in the established terms. The citizens can send their comments by electronic mail as well to address hte@vl.kharkov.ua, or leave message at web site of the enterprise http://www.hts.kharkov.ua. At the enterprise there is information and reference service, on calling where by numbers 758- 56-01, 758-56-02, 758-56-51, 758-56-96, citizens can provide their comments, applications or notices. To receive on-line information regarding the matters of providing with heat supply and hot water supply you can call the dispatcher service of the enterprise by phone 738-21-09. Besides, in the city the Municipal information and dispatching service is operating, which provides submit applications for repair, oral applications of citizens and giving reference information, where you can call by phone 15-62. Project stakeholders will be able to submit questions, complaints and compliments/suggestions through the GRM. The GRM will focus not only on receiving and recording feedback, questions and complaints but also on how complaints are responded to, and resolved. GRM focal point should be appointed by the Head of Utility and be responsible for handling GRM log. GRM log needs to be submitted to CPMU on monthly basis.All incoming requests are subject to registration in electronic form on the registration-control cards. Automated registration of the appeal recorded the following data: date of receipt of request; the surname, first name, middle name, category (social status) of the applicant; where the application date, the index and control; the issues raised-a summary of the indices; the contents and date of resolution, name of the author, performer, date of performance; the date of sending, the index and the contents of the document, decision taken, date of removal from control; the case number on the item. The letter registration and the control card of incoming appeals is given in Annex 23. Each appeal including anonymous is considered mandatory and a response is sent back. If you left the appeal is not related to a running PROJECT, it is routed to the unit that solves this problem and this was reported to the requester. In case the request is sent to the e-mail response to the address sent by email to the address from which you received treatment or, if indicated in the address of the postal address by regular mail. The General deadline for response to the complaint does not exceed 1 month from the date of receipt of the complaint. The public utility keeps records and registers all appeals and complaints regarding the Project from the population and local authorities (grievance log of Public Utility "KhTM" for UDHEEР).The appeal procedure will, if necessary, to change the course of the PROJECT. Construction contractor as well shall implement the procedure of the “Prompt response” with the purpose of maximum efficient and immediate response to urgent complaints of interested persons on the worksite. If no understanding has been reached, or if the person who is experiencing the negative impact will not receive a response, then that person may contact to CPMU, in which the specialist is 82 assigned, who will register complaints and claims and try to solve them at local level, regarding which the World Bank representation will be informed. At meeting with public the people, who have negative impact, will receive contact information for communication with this specialist. If the person, who has negative impact of the project, will be unsatisfied by the decision received, he can apply to the court of competent jurisdiction as a final instance. The public utility “Kharkivski Teplovi Merezhi” can consider the questions of creating commission on the questions of solving of conflict situations (at participation of the enterprise representatives, city council representatives and other authorities) to solve complicated questions raised in the complaints. The purpose of the appeal procedure and commission on questions of solving of conflict situations is prompt and efficient response to the problems of the interested parties and local population accordingly, thus avoiding the escalation of problems to the level of administrative and judicial bodies. 83 Annex 1. Regulation of National Commission No.446 dated March 30, 2017 84 Annex 2. License for production of heat energy at CHP and the units with using of the alternative or renewable power sources. 85 Annex 3. License for electrical power production. 86 Annex 4. Special water use permit. 87 Annex 4 continued. 88 Annex 4 continued. 89 Annex 4 continued. 90 Annex 5. Waste disposal permit in 2014 91 Annex 6. Permit for emissions of pollutants into the atmospheric air by the stationary sources. 92 Annex 7. Project site layout plans on the component “Construction of cogeneration plants”. Construction of cogeneration plant on the 4, Artema Vedelia str., Moskovskyi dstr., Kharkiv Picture 4.1.1.1 93 Construction of cogeneration plant on the 1, Akademika Proskury str., Kyivskyi dstr., Kharkiv Picture 4.1.1.2 94 Annex 8. Project site layout plans on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks” boiler houses No.1 and No.2 on the 77, Peremohy ave., Shevchenkivskyi dstr., Kharkiv Picture 4.1.2.1. 95 boiler house on the 199/2, Gagarina avenue, Slobidskyi dstr., Kharkiv Picture 4.1.2.3. 96 boiler house on the 2B, Yudina str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.4. 97 boiler house on the 47A, Pushkarivska str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.5. 98 boiler house on the 45, Liubovi Maloi ave., Novobovarskyi dstr., Kharkiv Picture 4.1.2.6. 99 boiler house on the 51, Liubovi Maloi ave., Novobovarskyi dstr., Kharkiv Picture 4.1.2.7. 100 boiler house on the 57A, Seminarska str., Novobavarskyi dstr., Kharkiv Picture 4.1.2.8. 101 boiler house on the 12, Kashirskoho str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.9. 102 boiler house on the 46/5, Seminarska str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.10. 103 boiler house on the 46, Seminarska str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.11. 104 boiler house on the 57B, Seminarska str., Novobovarskyi dstr., Kharkiv Picture 4.1.2.1.12 105 Annex 9. Project site layout plans per the component “Reconstruction of boiler houses”. boiler house on the 7, Hrishchenka, Nemyshlianskyi dstr., Kharkiv Picture 4.1.3.1. 106 boiler house on the 82a, Kulynychivska str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.3.2 107 boiler house on the 104, Krasnodarska str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.3.3. 108 boiler house “Pivnichnyi-1” on the 9a, Dzherelna str., Moskovskyi dstr., Kharkiv Picture 4.1.3.4. 109 boiler house on the 12, Konieva str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.5. 110 boiler house on the 6/10, Polzunova lane, Novobovarskyi dstr., Kharkiv Picture 4.1.3.6. 111 boiler house on the 90, Novo-Bovarskyi ave., Novobovarskyi dstr., Kharkiv Picture 4.1.3.7. 112 boiler house on the 53, Lomonosova str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.8. 113 boiler house on the 8, Bulvarna str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.9. 114 boiler house on the 88a, Seminarska str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.10 115 boiler house on the 13, Marka Bernesa str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.11 116 boiler house on the 5, Metiznyi lane, Novobovarskyi dstr., Kharkiv Picture 4.1.3.12. 117 boiler house on the 7a, St. Nova Bavariia str., Novobovarskyi dstr., Kharkiv Picture 4.1.3.13 118 Boiler house on the 48, Konotopska str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.14. 119 boiler house on the 26, Kontorska str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.15. 120 boiler house on the 2, Kontorska str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.16. 121 boiler house on the 5/7, Karpivskyi lane, Novobavarskyi dstr., Kharkiv Picture 4.1.3.17. 122 boiler house on the 66, Naboichenka Petra str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.18 123 boiler house on the 99a, Novo-Bavarskyi ave., Novobavarskyi dstr., Kharkiv Picture 4.1.3.19. 124 boiler house on the 41, Novyi pobut str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.20. 125 boiler house on the 49/51, Rylieieva str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.21 126 boiler house on the 67, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.22 127 boiler house on the 35, Zaliznychna str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.23. 128 boiler house on the 2/15, Blahovishchenska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.24. 129 boiler house on the 12, Baltiiska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.25. 130 boiler house on the 3, Afanasivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.26. 131 boiler house on the 205, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.27. 132 boiler house on the 27/5, Berkosa str., build. 5, Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.28. 133 boiler house on the 41, Kurylivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.29 134 boiler house on the 65, Ozerianska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.30. 135 boiler house on the 35, Novyi Pobut str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.31. 136 boiler house on the 6, Rizdviana str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.32 137 boiler house on the 8, Slovianska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.33. 138 boiler house on the 29, Velyka Panasivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.34 139 boiler house on the 7, Ihoria Muratova str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.35. 140 boiler house on the 41/43, Andriivska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.36 141 boiler house on the 30, Hrekivska str., Osnovianskyi dstr., Kharkiv Picture 4.1.3.37. 142 boiler house on the 1, Biolohichnyi lane, Osnovianskyi dstr., Kharkiv Picture 4.1.3.38. 143 boiler house on the 19, Ternopilska str., Osnovianskyi dstr., Kharkiv Picture 4.1.3.39. 144 boiler house on the 1, Lymanskyi lane, Osnovianskyi dstr., Kharkiv Picture 4.1.3.40. 145 boiler house on the 16, Myrhorodska str., Osnovianskyi dstr., Kharkiv Picture 4.1.3.41. 146 boiler house on the 27a, Dyspetcherska str., Osnovianskyi dstr., Kharkiv Picture 4.1.3.42. 147 boiler house on the 89a, Dostoievskoho str., Osnovianskyi dstr., Kharkiv Picture 4.1.3.43. 148 boiler houses on the 14, 20А and 20, Bukova str., Shevchenkivskyi dstr., Kharkiv Picture 4.1.3.44. 149 boiler house, YRC Internationalist, 20, Horianska str., Kyivskyi dstr., Kharkiv Picture 4.1.3.47. 150 boiler house “Piatykhatky” in 1, Akademichna str., Kyivskyi dstr., Kharkiv Picture 4.1.3.48. 151 boiler house on the 10б, Saperna str., Kyivskyi dstr., Kharkiv Picture 4.1.3.49. 152 boiler house on the 27, Pomirky str., Kyivskyi dstr., Kharkiv Picture 4.1.3.50. 153 boiler house “Aeroport” on the 9, Nesterova str., Slobidskyi dstr., Kharkiv Picture 4.1.3.51. 154 boiler house on the 74a, Myru str., Industrialnyi dstr., Kharkiv Picture 4.1.3.52. 155 boiler house on the 10/12, Blahovishchenska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.3.53. 156 boiler house on the 7a, Konieva str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.54. 157 boiler house on the 5a, Svynarenka, Novobavarskyi dstr., Kharkiv Picture 4.1.3.55. 158 boiler house on the 23a, Svitlanivska str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.56 159 boiler house on the in 32, Seminarska str., Novobavarskyi dstr., Kharkiv Picture 4.1.3.57. 160 boiler house on the 3, Dostoievskoho entr. (new heat source construction), Osnovianskyi dstr., Kharkiv Picture 4.1.3.58 161 Annex 10. Project site layout plan on the component “Commissioning of steam turbogenerator and reconstruction of steam boiler at CHP-3”. CHP-3 on the 3, Enerhetychna str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.6.1 162 Annex 11. Project site layout plans of the component “Reconstruction of heat networks”. cl.1. Heat networks of the site MK4826 / 3-MK4826 / 3-1CK, Peremohy ave. Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.1 163 cl.2. Heat networks of the site MK4304-MK4303, Otakara Yarosha str., Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.2 164 cl.3 Heat networks of the site МК5223 before CHS 607/2 Heroiv Pratsi str., 54G Picture 4.1.8.3 165 cl.4. Heat networks of the site MK4115-MK4301, Shekspira str., Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.4 166 cl.5. Heat networks of the site МК4200АСК-МК4201, Shekspira str. (output No.2 of boiler house Pavlove pole str. on 17, Shekspira str.), Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.5 167 Picture 4.1.8.65 cl.4. Heat networks of the site МК4115-МК4301, cl.5. Heat networks of the site МК4200АСК-МК4201, Shekspira str. (output No.2 boiler house Pavlove pole str. in 17, Shekspira str.). Picture 4.1.8.65 168 cl.6. Heating networks of the site MK 4706-MK 4707, Peremohy ave. Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.6 169 Picture 4.1.8.66. cl.1. Heat networks of the site МК4826/3-МК4826/3-1СК, cl.6. Heating netwoprks of the site МК4706-МК4707, Peremohy ave. Picture 4.1.8.66. 170 cl.7. Heat networks of the cite МК4525-МК4531, МК4526-МК4526/2, Dynamivska str., Faninskyi lane, Shevchenkivskyi dstr., Kharkiv Picture 4.1.8.7 171 cl.8. Heat networks of the site MK3705-MK3706, Mokhnatska str. Industrialnyi dstr., Kharkiv Picture 4.1.8.8 172 cl.9. Heat networks of the site МК6624-МК66НО42, Haharina ave., Osnovianskyi dstr., Kharkiv Picture 4.1.8.9 173 cl.10. Heat networks of the site МК1129-МК1134, Bronenostsia Potomkin str., Slobidskyi dstr., Kharkiv Picture 4.1.8.10 174 cl.11. Heat networks of the site from МК1233 to zh/b on 56, Moskovskyi ave., Osnovianskyi dstr., Kharkiv Picture 4.1.8.11 175 cl.12. Jumper between terminals No.1 and No.2 boiler house of Slobidskyi dstr. on 2/1, Kostycheva str., Slobidskyi dstr., Kharkiv Picture 4.1.8.12 176 cl.13. Heat networks of the site MK6316-MK6317, Fonvizina str., Slobidskyi dstr, Kharkiv Picture 4.1.8.13 177 cl.14. Heat networks of the site MK5203-MK5206A, Saltivske highway, Moskovskyi dstr., Kharkiv Picture 4.1.8.14 178 cl.15. Heat networks of the site МК1134/5-МК1227А, Zakhisnykiv Ukrainy sqr., Slobidskyi dstr., Kharkiv Picture 4.1.8.15 179 cl.16. Heat networks of the site MK1802 / 2-MK1807, Moskovskyi ave., Slobidskyi dstr., Kharkiv Picture 4.1.8.16 180 cl.17. Heat networks of the site MK1807-MK1821, Vilenskyi lane, Slobidskyi dstr., Kharkiv Picture 4.1.8.17 181 cl.18. Heat networks of the site MK1821 to MK5830, Bilostotskyi lane, Moskovskyi dstr., Kharkiv Picture 4.1.8.18 182 cl.19. Heat networks of the site MK5830-MK5836B, Kamysheva Ivana str., Moskovskyi dstr., Kharkiv Picture 4.1.8.19 183 cl.20. Heat networks of the sites МК5836Г-МК5837А, МК5837А-МК5837АСК2, Kamysheva Ivana str., Kaunaskyi lane, Moskovskyi dstr., Kharkiv Picture 4.1.8.20 184 Picture 4.1.8.67 cl.16. Heat networks of the site МК1802/2-МК1807, cl.17. Heat networks of the site МК1807-МК1821, Vilenskyi lane, cl.18. Heat networks of the site МК1821 to МК5830, Bilostotskyi lane, cl.19. Heat networks of the site МК5830-МК5836В, Kamysheva Ivana str., cl.20. Heat networks of the sites МК5836Г-МК5837А, МК5837А-МК5837АСК2, Kamysheva Ivana str., Kaunaskyi lane. Picture 4.1.8.67 185 cl.21. Heat networks of the site MK3223A-MK3237, Industrialnyi ave., Industrialnyi dstr., Kharkiv Picture 4.1.8.2 186 cl.22. Heat networks of the site MK3237-MK3243, Industrialnyi ave., Industrialnyi dstr., Kharkiv Picture 4.1.8.22 187 Picture 4.1.8.68 cl.21. Heat networks of the site МК3223А-МК3237, cl.22. Heat networks of the site МК3237-МК3243, Industrialnyi ave. Picture 4.1.8.68 188 cl.23. Heat networks of the site МК6206-МК6209, Morozova str., Slobidskyi dstr., Kharkiv Picture 4.1.8.23 189 cl.24. Heat networks of the site МК6767-МК6768, Heroiv Stalinhrada str., Slobidskyi dstr., Kharkiv Picture 4.1.8.24 190 cl.25. Heat networks of the site МК6762А-МК6764, Petra Hryhorenka ave., Slobidskyi dstr., Kharkiv Picture 4.1.8.25 191 cl.26. Heat networks of the site МК6119БСК-МК6120, Lva Landau ave., Slobidskyi dstr., Kharkiv Picture 4.1.8.26 192 cl27. Jumper between heat mains No.66 and No.14, Enerhetychna str., Slobidskyi dstr., Kharkiv Picture 4.1.8.27 193 cl.28. Heat networks of the site МК1128А/2-МК1223, Dniprovska str., Slobidskyi dstr., Kharkiv Picture 4.1.8.28 194 cl.29. Heat networks of the site МК6516-МК6517, МК6515-МК6515А, Zabaikalskyi lane, Slobidskyi dstr., Kharkiv Picture 4.1.8.29 195 Picture 4.1.8.69 cl.13. Heat networks of the site МК6316-МК6317, Fonvizina str., cl.29. Heat networks of the site МК6516-МК6517, МК6515-МК6515А, Zabaikalskyi lane. Picture 4.1.8.69 196 cl.30. Heat networks of the site MK6612-MK6612Б, Kashtanova str.,Slobidskyi dstr., Kharkiv Picture 4.1.8.30 197 cl.31. Heat networks of the site MK2243 / 9-MK2243 / 11Б, Sadova str., Kyivskyi dstr., Kharkiv Picture 4.1.8.31 198 cl.32. Heat networks of the site MK2240A-MK2311A, Shevchenka str., Kyivskyi dstr., Kharkiv Picture 4.1.8.32 199 cl.33. Heat networks of the site МК2240А-МК2241, Bilhorodskyi descent, Kyivskyi dstr.,Kharkiv Picture 4.1.8.33 200 Picture 4.1.8.70 cl.32. Heat networks of the site МК2240А-МК2311А, Shevchenka str., cl.33. Heat networks of the site МК2240А-МК2241, Bilhorodskyi descent. Picture 4.1.8.70 201 cl.34. Heat networks of the site MK2301-MK2304, Sliusarnyi lane, Kyivskyi dstr., Kharkiv Picture 4.1.8.34 202 cl.35. Heat networks from МК-2987 to the boiler house YRC Internatsionalist, 70, Horianska str., with pipeline fittings of boiler house, Kyivskyi dstr., Kharkiv Picture 4.1.8.35 203 cl.36. Heat networks of the site МК2981СК6-МК2981СК5, Lesia Serdiuka str., Kyivskyi dstr., Kharkiv Picture 4.1.8.36 204 cl.37. Heat networks of the site MK2985-MK2985T, MK2985-MK2985TK40, Lesia Serdiuka str., Druzhby Narodiv str., Moskovskyi dstr., Kyivskyi dstr., Kharkiv Picture 4.1.8.37 205 Picture 4.1.8.71. cl.36. Heat networks of the site МК2981СК6-МК2981СК5, cl.37. Heat networks of the site МК2985-МК2985Т, МК2985-МК2985ТК40, Lesia Serdiuka str., Druzhby Narodiv str. Picture 4.1.8.71. 206 cl.38. Heat networks of the site MK9421-MK9403, Blahodatna str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.38 207 cl.39. Heat networks of the site МК9514/2-МК9514/2СК2, Unetskyi lane, Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.39 208 cl.40. Heat networks of the site MK9407-MK9408, Khabarova str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.40 209 cl.41. Heat networks of the site MK9601-MK9602, Khabarova str., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.41 210 cl.42. Heat networks of the site МК9603-МК9605, Khabarova str., Traktorobudivnykiv ave., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.42 211 Picture 4.1.8.72 cl.40. Heat networks of the site МК9407-МК9408, cl.41. Heat networks of the site МК9601-МК9602, cl.42. Heat networks of the site МК9603-МК9605, Khabarova str., Traktorobudivnykiv ave.. Picture 4.1.8.72 212 cl.43. Heat networks of the site MK9606-MK9607, Moskovskyi ave., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.43 213 cl.44. Heat networks of the site MK9801-MK9801СK, Petra Hryhorenka ave., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.44 214 cl.45. Heat networks of the site МК9803СК2-МК9804СК1, Petra Hryhorenka ave., Nemyshlianskyi dstr., Kharkiv Picture 4.1.8.45 215 Picture 4.1.8.73 cl.44. Heat networks of the site МК9801-МК9801СК, cl.45. Heat networks of the site МК9803СК2-МК9804СК1, Petra Hryhorenka ave. Picture 4.1.8.73 216 cl.46. Heat networks of the site МК5106А-МК5510, МК5106-МК5107, Hvardiitsiv-Shironintsiv str., Moskovskyi dstr., Kharkiv Picture 4.1.8.46 217 cl.47. Heat networks of the site MK5208-MK5209, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.47 218 cl.48. Heat networks of the site MK5212-MK5215, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.48 219 cl.49. Heat networks of the site МК5219СК-МК5220, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.49 220 Picture 4.1.8.74 cl.47. Heat networks of the site МК5208-МК5209, cl.48. Heat networks of the site МК5212-МК5215, cl.49. Heat networks of the site МК5219СК-МК5220, Traktorobudivnykiv ave., cl.62. Heat networks of the site МК5114-МК5114СК1, in Hvardiitsiv-Shyronintsiv, cl.64. Heat networks of the site from МК5220 to CHS 606/1 in 3в, Svitla str. Picture 4.1.8.74 221 cl.50. Heat networks of the site from МК5224 to МК5225А, Heroiv Pratsi str., Moskovskyi dstr., Kharkiv Picture 4.1.8.50 222 cl.51. Heat networks of the site MK2976 / 6T-MK5309, Akademika Pavlova str., Kyivskyi dstr., Kharkiv Picture 4.1.8.51 223 cl.52. Heat networks of the site MK1138 / 5B-MK1138 / 6, Moskovskyi ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.52 224 cl.53. Heat networks of the site MK7812-NO22, Alushtinska str., Kholodnohirskyi dstr., Kharkiv Picture 4.1.8.53 225 cl.54. Heat networks of the site MK8116-MK8119, Hryhorivske highway, Novobavarskyi dstr., Kharkiv Picture 4.1.8.54 226 cl.55. Heating CHS network in 4a, Yuriia Parashchuka str., from TK8120-1 to TK8120-1TK8, Novobavarskyi dstr., Kharkiv Picture 4.1.8.55 227 Picture 4.1.8.75 cl.54. Heat networks of the site МК8116-МК8119, Hryhorivske highway, cl.55. Heating CHS network in 4a, Yuriia Parashchuka str., site from ТК8120-1 to ТК8120-1ТК8. Picture 4.1.8.75 228 cl.56. Heat networks of the site МК1608-МК1608/25, Himnaziina quay, Osnovianskyi dstr., Kharkiv Picture 4.1.8.56 229 Picture 4.1.8.76 cl.9. Heat networks of the site МК6624-МК66НО42, Gagarina ave., cl.56. Heat networks of the site МК1608-МК1608/25, Himnaziina bund. Picture 4.1.8.76 230 cl.57. Heat networks of the site МК1228А-МК1231, Bohdana Khmelnytskoho str., Slobidskyi dstr., Osnovianskyi dstr., Kharkiv Picture 4.1.8.57 231 Picture 4.1.8.77 cl.10. Heat networks of the site МК1129-МК1134, Bronenostsia Potomkin str., cl.15. Heat networks of the site МК1134/5-МК1227А, Zakhisnykiv Ukrainy sqr., cl.28. Heat networks of the site МК1128А/2-МК1223, Dniprovska str., cl.52. Heat networks of the site МК1138/5Б-МК1138/6, Moskovskyi ave., cl.57. Heat networks of the site МК1228А-МК1231, Bohdana Khmelnytskoho str.. Picture 4.1.8.77 232 cl.58. Heat networks of the site from CHP-3 to MK1111, Enerhetychna str., Slobidskyi dstr., Kharkiv Picture 4.1.8.58 233 cl.59. Heat networks of the site МК5227-МК5227/1, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.59 234 cl.60. Heat networks of the site from МК5223 to CHS 606/2 on 140 G, Traktorobudivnykiv ave., Moskovskyi dstr., Kharkiv Picture 4.1.8.60 235 Picture 4.1.8.78 cl.3 Heat networks of the site МК5223 before CHS 607/2 Heroiv Pratsi, 54G, cl.50. Heat networks of the site from МК5224 to МК5225А, Heroiv Pratsi str., cl.59. Heat networks of the site МК5227-МК5227/1, cl.60. Heat networks of the site from МК5223 to CHS 606/2 in 140г, Traktorobudivnykiv ave. Picture 4.1.8.78 236 cl.61. Heat networks of the site from МК5109 to CHS 615/1 on 22V, Hvardiitsiv-Shyronintsiv str., Moskovskyi dstr., Kharkiv Picture 4.1.8.61 237 Picture 4.1.8.79 cl.46. Heat networks of the site МК5106А-МК5510, МК5106-МК5107 cl.61. Heat networks of the site from МК5109 to CHS 615/1 on 22V, Hvardiitsiv-Shyronintsiv str. Picture 4.1.8.79 238 cl.62. Heat networks of the site МК5114-МК5114СК1, on Hvardiitsiv-Shyronintsiv str., Moskovskyi dstr., Kharkiv Picture 4.1.8.62 239 cl.63. Heat networks of the site MK5307A-MK5307A / 1, Valentynivska str., Moskovskyi dstr., Kharkiv Picture 4.1.8.63 240 Picture 4.1.8.80 cl.51. Heat networks of the site МК2976/6Т-МК5309, Akademika Pavlova str., cl.63. Heat networks of the site МК5307А-МК5307А/1, Valentynivska str. Picture 4.1.8.80 241 cl.64. Heat networks of the site from МК5220 to CHS 606/1 on 3V, Svitla str., Moskovskyi dstr., Kharkiv Picture 4.1.8.64 242 Annex 12.Scheme of development of DHS automation and dispatching systerms. Picture 4.1.9.1. 243 Annex13. Front sheet of the relevent documents of volume of the emissions of pollutants into the atmospheric air by the stationary sources. 244 Annex 14. RPIU composition and authorities. Full name Position Name of the organization, Principal functional Contact details address responsibilities Roman RPIU Director PU “Kharkivski teplovi Overall responsibility for (57) 758 53 42 Yevhenovych merezhi”, 61037, Kharkiv, the Project implementation (57) 738 71 20 Zinchenko Mefodiivska str., 11 at the enterprise, zinchenko.r.e@hts.kh.ua coordination and management of the group activities, quality control of measures within the framework of the Project, operational communication with interested parties, planning, monitoring of performance of contracts, evaluation of achieving the indexes of the Project execution. Yana Anatolivna Financial manager PU “Kharkivski teplovi Preparation of applications (57) 758 53 42 Popova merezhi”, 61037, Kharkiv, and packages of documents (57) 738 71 20 Mefodiivska str., 11 for withdrawal of money, popova.y@hts.kh.ua execution of applications for replenishment, preparation of financial statements, promoting of conducting of the annual audits. Responsibility for accounting records of the Project, financial statements and financial control in accordance with legislation 245 of Ukraine, organization and maintenance of accounting records of the financial operations within the range of the Project. Maryna Purchasing specialist PU “Kharkivski teplovi Preparation of the packages (57) 758 53 42 Yevhenivna merezhi”, 61037, Kharkiv, of documents for purchases, (57) 738 71 20 Kritsyna Mefodiivska str., 11 control and planning of verelusova.m.e@hts.kh.ua purchases, preparation of accounting statements. Daryna Serhiivna Purchasing specialist PU “Kharkivski teplovi Preparation of the packages 57) 758 53 42 Bondarchuk merezhi”, 61037, Kharkiv, of documents for purchases, (57) 738 71 20 Mefodiivska str., 11 control and planning of purchases, preparation of accounting statements. bondarchuk.d.s@hte.vl.net.ua Pavlo Vasyliovych Technical specialist PU “Kharkivski teplovi Designing and checking of (57) 758 53 42 Cherniak (engineer) merezhi”, 61037, Kharkiv, technical specifications, (57) 738 71 20 Mefodiivska str., 11 operation requirements, performance specifications, chernyak.p.v@hts.kh.ua evaluation of technical documentation, checking of the project documentation, work progress monitoring. Liudmila Environmental PU “Kharkivski teplovi Determination and analysis (57) 758 53 42 Hennadiivna engineer (ecologist) merezhi”, 61037, Kharkiv, of potential impacts from (57) 738 71 20 Tkachova Mefodiivska str., 11 the works within a scope of tkachova.l.g@hts.kh.ua the Project, provision of availability of the required documentation (report from EIA, ESMP, etc.), securing of considering all the 246 necessary attenuation measures, agreeing with contractors of the full list of obligatory environmental requirements. Yevheniia Engineer PU “Kharkivski teplovi Preparation of the (57) 758 53 42 Radomirovna merezhi”, 11, Mefodiivska performance specifications (57) 738 71 20 Boiko str., 61037, Kharkiv for purchases of boyko.y.r@hts.kh.ua consultation services, technical specifications and technical requirements for purchase of works, connected with designing, supply and installation of the equipment. Preparation of reports concerning evaluation of expression of interest ant technical evaluation of the bids. Maintenance of database and records relatively to the technical aspects of contracts to be executed within a scope of the Project. Paperwork management. 247 Annex 15. List of the third parties which will be involved in work execution. Name of the organization Place, address Functions during the Executed works Responsible subproject implementation person/contact data Public utility company 104, Holdberhivska str., Ground layer control Kryvonos К.А. / “Sanepidemservice” Kharkiv (057)-733-25-02 248 Annex 16. Front sheet of EIA project of construction of cogeneration plant at the boiler house at the address 4, Artema Vedelia (Stoletova) str. 249 Аnnex 17. Statement of the environmental results of the project activities. 250 251 Annex 18. Public hearing minutes on construction of cogeneration plant at the address 4, Artema Vedelia (Stoletova) str . 252 253 Annex 19. Photo of holding of public discussions dated January 09, 2014 254 255 Annex 20. Minutes of the public hearings of the Environmental and Social Assessment Program of the PROJECT. MINUTES of the public hearing of the Environmental and Social Assessment Program of the Project “Efficiency improvement in the sector of the district heating of Ukraine”, which is implemented on account of loan funds of the World Bank in Kharkov. January 9, 2014 Kharkov Place of holding: 11, Dobrokhotova str., 5 floor, Kharkov, assembly hall of the public utility company “Kharkivski teplovi merezhi”, 1000 by local time. Public Hearing Chairman: Nikolai Andriianovich Kolesnik. Public Hearing Secretary: Marina Yevhenevna Vereliusova. Present at public hearing: On behalf of public utility company “Kharkivski teplovi merezhi”: Yevhenii Andreevich Zinchenko, chief engineer of the public utility company “Kharkivski teplovi merezhi”, work group leader of the Project; Nikolai Andriianovich Kolesnik, deputy General director of the public utility company “Kharkivski teplovi merezhi”; Andrei Petrovich Repin, deputy Chief engineer of the public utility company “Kharkivski teplovi merezhi”, member of the work group; Roman Yevhenevich Zinchenko, deputy Head of production and technical service of the public utility company “Kharkivski teplovi merezhi”, member of the work group; Liudmila Hennadievna Tkacheva, engineer-ecologist of the public utility company “Kharkivski teplovi merezhi”, member of the work group. On behalf of the Department of the public services of Kharkov municipal council. Yuliia Vadimovna Litvinova, head of ecology department of the Department of the public services of Kharkov municipal council On behalf of Kharkov national university of municipal service after A.N.Beketova: Viacheslav Aleksandrovich Tkachev, Dr.-Ing., docent, dean of the Faculty of engineering ecology of cities; 256 Aleksandr Vasilevich Romashko, Dr.-Ing., docent, deputy Dean for training activity of the Faculty of engineering ecology of cities; Feliks Vladimirovich Stolberg, D.Eng.Sc., professor, Head of Chair of the engineering ecology and ecological security of cities; Nikolai Ivanovich Shpika, Dr.-Ing., docent, Dean of the Faculty of electrical transport. Andrei Aleksandrovich Aleksakhin. On behalf of Kharkov scientific and technical society of the public services and domestic services Raisa Vasilevna Sviridova Registered members of the public hearing of the Environmental and Social Assessment Program in amount of 188 members (lists of the members are attached to the minutes, in Annex 1). Agenda Discussion of the Environmental and Social Assessment Program of the Project of modernization of the system of district heating of Ukraine in Kharkov, as well as Frame plan of the environmental management at stages of construction and operation and Monitoring plan. 1. Approval of hearing regulation. HEARD: Of approval of hearing regulation. SPOKE: Kolesnik N.А. – proposed to approve the regulation of the public hearing as follows: for reports and statements – up to 20 minutes; for answers to questions – up to 5 minutes. The questions can be put both orally from place, and in writing, via secretariat. When asking a question orally, you need raise your hand, wait for permission of the Chairman of public hearing, after what stand up, present yourself – give your surname, first name and patronymic and clearly explain heart of the problem. When transferring the question to secretariat in writing, indicate surname, first name and patronymic and heart of the problem. Voted unanimously. RESOLVED: 257 Approve the regulation of hearing as follows: for reports and statements – up to 20 minutes; for answers to questions – up to 5 minutes. HEARD: Of the Environmental and Social Assessment Program of the Project of modernization of the system of district heating of Ukraine in Kharkov, as well as of as well as Frame plan of the environmental management at stages of construction and operation and Monitoring plan. DELIVERED the reports: 1. Zinchenko Е.А. – of implementation of the Project of modernization of district heating system in Kharkov by the public utility “Kharkivski teplovi merezhi”. 2. Tkacheva L.G. – of the Environmental and Social Assessment Program of the Project, as well as of as well as Frame plan of the environmental management at stages of construction and operation and Monitoring plan. Discussion of the questions on the Project and Program. 1 Borshch S.V.. – Will reconstruction concern all the boiler houses in city? Repin A.P. answered the question – No it will not. The works connected with reconstruction of boiler houses will embrace nearly 35% if total number of boiler houses, this includes liquidation of 31-st boiler house and replacement of the obsolete boilers with equipment at 58 boiler houses by the new high-efficient equipment. 2. Fedorov A.P. – Does this Project provide CHP-4 reconstruction and resumption of generation at this heat sourse? Repin A.P. answered the question – When forming strategic approaches of financing, our employees and the experts of the World Bank guided both by engineering and economic efficiency of these approaches. We considered variant of CHP-4 reconstruction with renewal of electrical generation, but at this stage the construction of cogeneration plants at district boiler houses will the most reasonable (both from engineering and from the economic side). Besides, to include the object into the Project we require the project decision for CHP-4, but it is not available for the time being. Zinchenko Е.А. answered the question – Electrical generation renewal at CHP-4 will be performed out of the other funds. 258 3.Atanasova N.М. – According to which criteria have you selected the objects for reconstruction? Repin A.P. answered the question – The objects for reconstruction have been selected based on their indexes of the work, depreciation of the equipment and remoteness from the heat supply network of the district heating system or the other sources with higher indexes. The local boiler houses have depleted their physical and moral resources, so they require for modernization for safe functioning, improving reliability of heat supply and quality of the services provided. 4. Kalutskii V.V. – What does Kharkov municipal council think of cooperation of the company with the World Bank regarding attracting of credit resources? Litvinova Yu.V. answered the question – The executive authorities of Kharkov municipal council support intentions of the public utility “Kharkivski teplovi merezhi” in attracting of the funds of the international financial organizations to perform the works, connected with reconstruction of heat supply system of Kharkov. Besides, for the nearest future session of Kharkov municipal council we will arrive a decision of submitting of the local warranties, in the order, appropriate to the Budget Code of Ukraine and Regulation of Cabinet of Ministers of Ukraine of the order of submitting the local warranties. 5. Shpika N.I. – Which approaches included into the Project are more desirable? Zinchenko Е.А. answered the question – As I have already said, 9 approaches are included into the Project, which were selected by our specialists along with the experts of the World Bank, much attention when selecting was paid to the payback and efficiency period. So all the approaches, included into the Project are very perspective both from the technical and the economic point of view. 6. Naidis G.N. – What is approximate amount to be invested? Zinchenko Е.А. answered the question – The total amount of investments per the Project constitutes more than 100 mln. USA dollars, that is equivalent to the amount nearly of 860 mln., at this about 25% of funds will be assigned to reconstruction of boiler houses and about 20% – to replacement of heat supply network. 7. Hrishchenko Т.S. – What influence of the Project implementation will be on the city inhabitants? What will change? Zinchenko Е.А. answered the question – In the first turn, due to reconstruction of boiler houses and heat supply network, dispatching, we will improve reliability of heat supply system, that will allow render heat supply services error-free and stably. With arrangement of the individual heat supply stations, implementation of automation systems, we will improve quality of the serviced provided on heat supply and hot water supply. 8. Melichenko S.V.– Who will landscape surrounding area, plant the trees after finishing construction works, i.e. deal with land improvement and out from whose funds? 259 Tkacheva L.G. answered the question – Landscaping of the surrounding territory, planting of trees, as well as recovery of the damaged asphalt coating will be performed by the Contractor, performing the construction works on the object or the construction site. Our company will accomplish compliance control. This kind of works will be designed in the cost estimate documentation, so they will be performed at expense of credit resources of the World Bank. 9. Kozyr R.N. – In different articles on cogeneration, which are published in mass media, it is said of noise increasing, as a result of construction of cogeneration plants. Tell me, please, will noise level increase after putting cogeneration plant into operation? Tkacheva L.G. answered the question – On this approach of the Project we have already developed the Project of evaluation of impact on environment - PEIE, in which we described calculation of sound pressure level, produced while operating of cogeneration plant. According to calculation, they will not exceed allowable norms. To reduce noise in the project we have provided to install on engine-generator noise hood and perform erection of equipment according to required tolerances, that will provide allowable vibration and noise level. After performing of the works some additional measurements will be made. 10.Kapustnik S.L. – Does have Ukraine any experience of cooperation with the World Bank? Zinchenko R.E. answered the question. – Yes, it does. The Project “Development of city infrastructure” is coming to end, in which 12 cities of Ukraine have participated, including Kharkov, and the Project “Development of city infrastructure-2” will start. In Nikolayev they introduce the Project “Development of water supply and water discharge system”, which is financed on account of loan funds of the European Investment Bank. So in Ukraine we have experience of cooperation with international financial institutions. 11. Sviridova R.V. issued a proposal of the subsequent cooperation between the public utility “Kharkivski teplovi merezhi” and Kharkov scientific and technical society of the public services and domestic service. Kolesnik N.А. came up with proposal to approve the Environmental and Social Assessment Program of the Project, as well as of as well as Frame plan of the environmental management at stages of construction and operation and Monitoring plan. Voted unanimously. RESOLVED: 260 Approve the Environmental and Social Assessment Program of the Project of modernization of the system of district heating of Ukraine in Kharkov as a whole, as well as Frame plan of the environmental management at stages of construction and operation and Monitoring plan. Chairman of hearing __________________ Kolesnik N.А. (signature) (full name and surname) Secretary of hearing ___________________ Vereliusova М.Е. (signature) (full name and surname) 261 262 263 264 265 266 Annex 21. List of members of the public hearing dated January 09, 2014 267 268 269 270 271 272 273 274 275 276 Annex 22. Announcement of holding of public hearing of the PROJECT in the local newspaper. 277 278 Annex 23. Sheet of registration ID card of incoming application. 279 Annex 24. Nontechnical PROJECT summary for public. PUBLIC UTILITY "KHARKIVSKI TEPLOVI MEREZHI" UKRAINE DISTRICT HEATING ENERGY EFFICIENCY PROJECT NVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) Nontechnical ESMP summary 1. INTRODUCTION. Government of Ukraine pushed forward the Ukraine district heating energy efficiency project, which will be implemented on account of the borrowed funds of the International Bank for Reconstruction and Development and Fund of clean technologies. To participate in the project they selected a number of the companies operating in the housing and public utility sector, including the public utility company “Kharkivski teplovi merezhi”, according to which they concluded Agreement of the project execution between PU “Kharkivski teplovi merezhi” and the International Bank for Reconstruction and Development (IBRD), between PU “Kharkivski teplovi merezhi” and Find of clean technologies (FCT) in accordance with Loan contract between Ukraine and IBRD and Loan contract between Ukraine and FCT. Total amount of the borrowed funds for this Project constitutes 332 mln. USA dollars, from which our company was reserved the funds at rate of 107.59 mln. USA dollars, according to the concluded Subloan agreement between Ministry of Finance of Ukraine, Ministry of regional development, construction and housing and public utilities of Ukraine, Kharkiv municipal council, National commission, carrying out state regulation in the field of energy and public utilities and PU “Kharkivski teplovi merezhi”. Under the terms of Agreements regarding implementation of the Project and Subloan agreements the implementation term of the Project measures amounts 6 years, during the period from 2015 to 2020. Returning of the capital amount subloan will be carried out according to schedule, start of which precedes grace period, namely: for loan granted by IBRD - 5 years (with repayment of the principal sum of subloan during the period from 2019-2031), for FCT loan - 10 years (with repayment of the principal sum of subloan during the period from 2024-2033). This project aims to improve energy efficiency of heat supply systems and improve the quality of services provided by the enterprises of municipal power system of Ukraine, strengthening their financial sustainability, reduction of greenhouse gas emissions into the environment. The purpose of the implementation of the project at the public utility "Kharkivski teplovi merezhi" is reducing of consumption of fuel and energy resources, reducing the cost and improving the quality of services, improving the efficiency and reliability of the district heating system of Kharkiv. In Kharkiv the sub-project which is planned to be implemented, consists of the following components: 1. Construction of 2 cogeneration plants, with electrical power of 4 and 1 MW accordingly. 2. Liquidation of 12 boiler houses, with connection of heat load to the other heat supply source with much more considerable work indexes. 3. Reconstruction of 58 boil houses with replacement of the outdated and worn-out equipment. 4. Setting of 250 individual heat supply stations in the residential houses . 5. Setting of 1000 heat meters in the heat stations of the residential houses. 6. Reconstruction at CHP-3 of turbogenerator (ТG) with electrical power of 20 MW and steam boilerа, satisfying its parameters of TG operation. 280 7. Introduction of the frequency converters at electrical engines of the pump units of 9 objects of the district heating system (boiler houses and pump stations at main heat lines). 8. Reconstruction of nearly 24 km of heat networks. 9. Implementation of systems of automation, dispatching and commercial electricity metering at objects of district heating system. 10. Implementation of SCADA system. General expected Project effect: For the company: - reduction in the consumption of the fuel and energy resources by at least 12.5 million m3 of gas, which will reduce the energy intensity of the production of thermal energy and, consequently, its cost; - increasing the level of automation of heat supply of the city; - reducing negative impact on the environment by reducing emissions by at least 189 thousand tons; - improvement of technical and economic indicators of the enterprise as a result of modernization of equipment; - improving the reliability of heat supply system by reducing indicators of damage to heating systems and primary equipment of power facilities; - reduction in operating costs. For the Consumer: - improving the quality of services provided to the population for central heating and hot water; - improvement of the environment in the city, due to the reduction of negative effect; - reducing the pressure on raising tariffs for services in a heat supply as a result of lower cost of production, transportation and supply of thermal energy and reduce the operating costs of the enterprise. In the course of execution of the works on the PROJECT some negative impacts can occur on the natural environment and social sphere. To reduce these impacts the environmental and social management plan (ESMP) was developed. The main ESMP tasks were as follows: - definition of the main potential positive and negative impacts on the natural environment and the social sphere, which may take place during the implementation of the project 2. activities for the Project; - the definition of the set of measures to mitigate negative and increase positive environmental and social impacts during the construction phase and operation; - definition of complex of measures for monitoring and control; - definition of the institutional structure responsible for ESMP implementation. 2.EXPECTED NEGATIVE IMPACTS DUE TO THE PROJECT AND MEASURES TO REDUCE THEM. To reduce the negative impact of the PROJECT on the environment and the social sphere mitigation measures were developed that must be implemented in the process of the PROJECT execution to reduce potential negative impacts on the environment at the stages of construction works, dismantling and operation. 281 ATMOSPHERIC AIR. Impact. The main sources of the air pollution while performing works will be exhaust gas due to operation of construction machines, motor transport and other mechanisms, dust production processes and substances when pouring bulk materials. Attenuation measures. With the aim of reducing the extent of the influence some measures will be taken to prevent dust formation, wetting of access roads and excavation zones, cleaning of the area after completion of works, conduct regular inspection of vehicles and minimize emissions from vehicles, provision of workers with individual protection means of respiratory organs (respirators, masks, etc). NOISE IMPACT. Impact. The main sources of noise from the construction work and dismantling are traffic, use of construction equipment directly on the construction site (dump trucks, excavators, cranes, bulldozers, graders, etc.), processing of materials, installation of new equipment, piping, demolition of old infrastructure (old boilers). Attenuation measures. For noise reduction the following measures are included: execution of work in the workplace; providing workers with personal protection equipment (headphones, potichomania liners) and timely notification to residents (10 days) regarding the need to work with a high level of noise at night. THE EFFECT ON SOIL AND QUALITY OF SURFACE AND GROUNDWATER. Impact. The soil may be contaminated by accidental spills and leaks of oil and fuel, machinery and equipment, as well as washing vehicles on the construction site. Surface water and groundwater can be contaminated by accidental spills and fuel leaks from machinery and equipment during the period of PROJECT implementation, as well as surface runoff from the temporary construction sites containing suspended substances, organic substances, oil products. Attenuation measures. In the course of the work you should prevent the leakage of fuel of vehicles. If such cases arise collect spilled oil or fuel and the removal of topsoil contaminated with oil or fuel with subsequent utilization. Washing vehicles is prohibited at the construction site. The project includes the roadway of streets rehabilitation of road asphalt pavement at the site, landscaping and green zone. WASTE HANDLING. Impact. When carrying out works on dismantle of the old equipment the various types of waste will be formed, improper storage of which may lead to contamination of soil, groundwater and surface water, as well as injury to workers, visitors to production areas, and passers-by. Attenuation measures. In the course of work the separate collection of waste will be provided in sealed containers installed in specially prepared places for temporary storage and transportation of waste to the landfill, or a company which specializes in specially equipped vehicles, excluding the possibility of loss of waste, the creation of an emergency, the harm to the environment and human health. PREVENTION OF ACCIDENT SITUATIONS. Impact. In cases of non-compliance with established standards and safety regulations the emergencies can cause associated with fires and explosions. This can lead to injury of employees and persons who visit the production area or passing by, and to the damage of objects of property. Attenuation measures. To prevent emergency situations you shall comply with regulations on labor safety and schedules of work. The staff involved in the works must be trained and have a certificate for execution of works with increased hazard training before starting work. It is necessary to conduct regular fire and emergency training with staff. The warning and warning signs should be provided at the sites, dangerous areas should be fenced. 282 IMPACT ON FLORA. Impact. When constructing cogeneration plants and relaying of pipelines of heat supply network earth works will be performed, that will affect on flora and fauna. Attenuation measures. To reduce the negative impact on flora and fauna during excavation works for the PROJECT, fertile layer of soil must be removed and taken to the reserved area. After completion of the work restoration of the soil layer, the landscaping, the organization of lawns and planting of fast-growing plantations will be carried out. TRANSPORTATION IMPACT. Impact. The growth in traffic of heavy equipment and trucks towards the construction sites and removal and back increases the risk of road traffic accidents (RTA). The cause of such accidents can also be the improper organization of production processes. Attenuation measures. To reduce the negative impact during transportation ensure the preparation of the transport routes, determination of the maximum speed of traffic, time of delivery of construction materials, removal of construction waste to the landfill, warning residents about upcoming construction activities, provide safe passageways for pedestrians in the areas of excavation. THE IMPACT ON HUMAN HEALTH Impact. Failure to comply with safety rules and hygiene of labour can lead to injury employees in the areas of construction and dismantling. Negative impact on human health during the implementation of their dismantling, or building have the old insulating materials for boilers and pipes containing asbestos. Attenuation measures. To reduce the negative impact on human health from toxic materials (asbestos) or wastes provide the workers with personal protective equipment (goggles, gloves, respirators) and clothing. Conduct works with asbestos-containing materials in isolation from the surrounding territory with a fabric or plastic coverings. Collect asbestos-containing waste carried out in hermetically closed containers, temporary storage carried out in a designated area that has asphalt pavement, fencing, marking and driveways. Ensure regular wet cleaning of the asbestos and the surrounding area and removal of waste containing asbestos to the landfill. IMPACT ON SOCIAL AND ECONOMIC DEVELOPMENT. Impact. The project does not impact negatively on industrial, housing and commercial facilities, surface and underground structures, cultural landscapes and will not lead to resettlement. 3. CONTROL. With the purpose of prevention of violations of requirements in the field of protection of the environment and labor protection, to reduce negative impact when performing works on the PROJECT objects, as well as timely elimination of the violations revealed they perform monitoring. In accordance with the schedules regular checks of performance of attenuation measures of negative impacts will be carried out, organization of waste handling, availability of the environmental documentation, production documentation, building organizations, producing work on the subject of the Plan's environmental and social management, namely: .ATMOSPHERIC AIR CONTROL. The performed work in all the areas of the PROJECT will not affect the state of the surface layer of the atmosphere. Control is carried out using the workers individual means of respiratory protection when performing dusty work. 283 During the operation of boilers that were reconstructed, the selective monitoring of ground layer of the atmosphere (NO, CO) 1 per year 1 point, taking into account the "wind rose" is performed. Sampling of atmospheric air is carried out by specialist accredited laboratory of the municipal enterprise "Sanepidservis" in accordance with the requirements of RD 52.04.186-89. NOISE LEVEL CONTROL During construction, monitoring is carried out using the workers personal protective equipment hearing. During the operation of boilers that were reconstructed, selective monitoring 1 year per noise level in the control room of the boiler house is performed. Measuring the levels of harmful physical impacts (noise) is conducted by accredited laboratory of hygiene of labour in the labour protection service of the public utility "Kharkivski teplovi merezhi" and carried out with the help of measuring instruments in possession of the valid certificate of state verification. CONTROL OF SOILS. Visual examination of the surface layer of the soils on the subject of oil/fuel in the areas of construction and dismantling. CONTROL OF WASTE MANAGEMENT Special attention is paid to the places of temporary waste disposal, wastes generated at construction sites of the object and documentation for the removal and disposal of waste. Control is carried out visually – constantly during construction period, once a quarter – during operation. CONTROL OVER OBSERVANCE OF REQUIREMENTS OF FIRE SECURITY. Visual inspection of the places where the works will be performed and check of compliance with requirements of safe security of Ukraine is carried out. MONITORING OF THE REHABILITATION WORKS. Visual inspection of territory of renovation of soil coating, planting of grass, trees after finishing the PROJECT works according to the plan is carried out. CONTROL OVER THE MANAGEMENT OF VEHICLES. Monitoring traffic at construction sites is conducted in accordance with the plans of the organization of movement of transport and machinery. Control over the installation of speed limit signs is carried out, documentation is checked. CONTROL OVER SAFETY RULES. Special attention is paid to safety at work, personal protective equipment, handling of toxic materials and waste, review of the documentation. At all stages of the PROJECT the working conditions in the workplace, safety of technological processes, machines, mechanisms, equipment and other means of production, state of collective and individual protection used by the employee and sanitary conditions shall meet the requirements of the legislation. 4. PROJECT MANAGEMENT AND WORK WITH CITIZENS 'APPLICATIONS With the purpose of the PROJECT implementation at public utility “Kharkivski teplovi merezhi” by order №19 dated 19.01.2015 the Service of management of efficiency improvement project is created. It includes the specialists as follows: - director; 284 - financial management specialist; - accounting specialist; - procurement specialist; - technical specialist (engineer); - specialist of environment protection matters (ecologist); - engineer. Monitoring of compliance with the recommendations of the ESMP from the public utility “Kharkivski teplovi merezhi” at the stage of construction and operation refers to the ecologist. In the course of performing work on the PROJECT there may be questions related to its impact on the social sphere and the environment. The company has developed and implemented the program of communication with the public, to ensure continuous public awareness of key environmental and social aspects throughout the future PROJECT implementation (including the stages of construction and operation). At the public utility “Kharkivski teplovi merezhi” the service for work with applicationss of citizens was created that is responsible for the timely review and responses to the complaints of citizens according to the Law of Ukraine "Of applications of citizens". During PROJECT implementation, appropriate appeals from citizens will be accepted, registered and forwarded for appropriate work in a timely manner. Citizens can send their comments also by e-mail to address: hte@vl.kharkov.ua, or put message at web-site of the company http://www.hts.kharkov.ua. The company has call center, if citizens call by numbers 758-56-01, 758-56-02, 758-56-51, 758-56-96, they may give their comments, applications or messages. To obtain the operational information on the provision of heating and hot water you can call in dispatching service of the company on the phone 738-21-09. In addition, the city operates the City information-dispatching service, which ensures the reception of applications for repair and oral treatment of citizens and provision of background information where you can call 15-62. With the aim of rapid response to citizens ' communications, developed a mechanism of receiving complaints from residents. The General deadline for response to the complaint does not exceed 1 month from the date of receipt of the complaint. Thus, regular monitoring of implementation of complex of measures according to the developed ESMP, will allow to reduce the negative impact of the PROJECT on the environment and social sphere of the city. 285 Annex 25. Register of permits for emissions of pollutants into the atmospheric air by the stationary sources. № Administrative district of city, object address Permit № Date of permit Permit validity receipt 1 Shevchenkivskyi boiler house, 17, Shekspira str. 6310136300-130 11.09.2014 11.09.2021 boiler house, 5а, Dynamivska str. 6310136300-1449 13.10.2014 13.10.2024 boiler house, 62, Semena Kuznetsia str. 6310136300-1451 13.10.2014 unlimited boiler house, 22, Ivanivska str. 6310136300-1452 13.10.2014 unlimited boiler house, 195a, Klochkivska str. 6310136300-1453 13.10.2014 unlimited boiler house, 113, Armiiska str. 6310136300-139 24.11.2009 unlimited boiler house, 1, Frontovykiv blvd. 6310136300-140 24.11.2009 unlimited boiler house, 152, Derbentska str. 6310136300-142 24.11.2009 unlimited boiler houses, 14, 20, 20a, Bukova str. 6310136300-143 24.11.2009 unlimited boiler house, 19, Rohatynskyi lane 6310136300-145 24.11.2009 unlimited boiler houses, 77, Peremohy ave. 6310136300-147 24.11.2009 unlimited boiler house, 61/63, Klochkivska str. 6310136300-150 24.11.2009 unlimited CHS 2/26, 9a, Akademika Liapunova str. 6310136300-136 24.11.2009 unlimited CHS 2/19, 50г, Peremohy ave. 6310136300-137 24.11.2009 unlimited CHS 2/9, 4в, Novhorodska str. 6310136300-138 24.11.2009 unlimited OPS 4-3, 325a, Klochkivska str. 6310136300-144 24.11.2009 unlimited CHS 2/13, 9a, Starytskoho str. 6310136300-151 24.11.2009 unlimited 2 Kyivskyi boiler house, 1, Akademichna str. 6310136600-116 11.09.2014 11.09.2021 boiler house, 1, Akademika Proskury str. 6310136600-117 11.09.2014 11.09.2021 boiler house, 12, Akademika Proskury str. 6310136600-1440 09.10.2014 09.10.2024 boiler house, 10б, Saperna str. 6310136600-1441 09.10.2014 09.10.2024 boiler house, 70, Pomirky str. 6310136600-1422 07.10.2014 07.10.2024 boiler house, 301a, Shevchenka str. 6310136600-1427 07.10.2014 07.10.2024 boiler house, 25a, Metrobudivnykiv str. 6310136600-1436 09.10.2014 09.10.2024 286 boiler houses,12, 13, Metrobudivnykiv str. 6310136600-1437 09.10.2014 09.10.2024 boiler house, 281a, Druzhby Narodiv str. 6310136600-1438 09.10.2014 09.10.2024 boiler house, 233a, Shevchenka str. 6310136600-1439 09.10.2014 09.10.2024 boiler house, YRC Internationalist, 70, Gorianska str. 6310136600-1482 03.11.2014 03.11.2024 boiler house, 1, Teplychna str. 6310136600-1423 07.10.2014 unlimited boiler house, 32, Moiseiivska str. 6310136600-1425 07.10.2014 unlimited boiler house, 16, Chernyshevska str. 6310136600-1426 07.10.2014 unlimited котельні, 23,24, Henerala Udovychenka str. 6310136600-1434 07.10.2014 unlimited boiler house, 38, Bilhorodske highway 6310136600-124 24.11.2009 unlimited boiler house, 4a, Ostrohradskyi lane 6310136600-131 24.11.2009 unlimited boiler house, 4, Henerala Udovychenka str. 6310136600-132 24.11.2009 unlimited boiler house, 27, Pomirky str. 6310136600-134 24.11.2009 unlimited boiler house, 83, Pushkinska str. 6310136600-137 24.11.2009 unlimited boiler house, 2г, Skadovskoho str. 6310136600-139 24.11.2009 unlimited boiler house, 29, Budivelna str. 6310136600-141 24.11.2009 unlimited boiler house, 165, Shevchenka str. 6310136600-143 24.11.2009 unlimited boiler house, 180, Shevchenka str. 6310136600-144 24.11.2009 unlimited boiler house, 222, Shevchenka str. 6310136600-145 24.11.2009 unlimited industrial site, 27, Danilevskoho str. 6310136600-125 24.11.2009 unlimited industrial site, 102 Natalii Uzhvii str. 6310136600-130 24.11.2009 unlimited CHS, 7a, Pozdozhnia str. 6310136600-136 24.11.2009 unlimited CHS, 6a, Staroshyshkivska str. 6310136600-140 24.11.2009 unlimited 3 Slobidskyi boiler house, 2/1, Kostycheva str. 6310136900-92 11.09.2014 11.09.2021 boiler house, 199/2, Gagarina ave. 6310136900-1350 11.09.2014 11.09.2024 boiler house, 9, Nesterova str. 6310136900-1384 18.09.2014 18.09.2024 boiler house, 87, Polova str. 6310136900-1385 18.09.2014 unlimited boiler house, 16, Serednouralska str. 6310136900-1388 19.09.2014 unlimited boiler house, 126, Plekhanivska str. 6310136900-1389 19.09.2014 unlimited CHS 4/25, 4/1, Zhasminovyi blvd.; 6310136900-96 22.10.2009 unlimited industrial site 18б, Petra Hryhorenka ave. 287 CHS 4/40, 55/1, Zernova str. 6310136900-97 22.10.2009 unlimited АBК/PAO, 11,15, Mefodiivska str. 6310136900-98 22.10.2009 unlimited 4 Kholodnohirskyi boiler house, 8, Slovianska str. 6310137200-1641 25.12.2014 25.12.2024 boiler house, 29, Velyka Panasivska str. 6310137200-1642 25.12.2014 25.12.2024 boiler house, 36, Poltavskyi Shliakh str. 6310137200-1606 17.12.2014 unlimited boiler house, 19/2, Zaliutynska str. 6310137200-1608 17.12.2014 unlimited boiler house, 30, Kurylivska str. 6310137200-1609 17.12.2014 unlimited boiler house, 60a, Kotsarska str. 6310137200-1610 17.12.2014 unlimited boiler house, 45 (1,2) Kandaurova str. 6310137200-1611 17.12.2014 unlimited boiler houses, 20a, 83 Sochinska str., 35, 41 Novyi Pobut str., 6310137200-1614 17.12.2014 unlimited 40a, Pskovska str. boiler houses, 2/2, 17, Yaroslavska str. 6310137200-1615 17.12.2014 unlimited boiler houses, 67, Velyka Panasivska str., 10, Vosmoho Bereznia str., 6310137200-1619 19.12.2014 unlimited 22/24, Malopanasivska str. boiler houses, 17,13ж,32, Blahovishchenska str. 6310137200-1620 19.12.2014 unlimited boiler house, 41, Kurylivska str. 6310137200-121 24.12.2009 unlimited boiler house, 3, Afansivska str. 6310137200-122 24.12.2009 unlimited boiler house, 11, Volonterska str. 6310137200-123 24.12.2009 unlimited boiler house, 5, Verkhivskyi lane 6310137200-124 24.12.2009 unlimited boiler house, 90, Poltavskyi Shliakh str. 6310137200-125 24.12.2009 unlimited boiler house, 11, Ashhabadskyi lane 6310137200-126 24.12.2009 unlimited boiler house, 25a, Volodymyra Usenka lane 6310137200-127 24.12.2009 unlimited boiler house, 3, Zaliznychna str. 6310137200-128 24.12.2009 unlimited boiler house, 65, Ozerianska str. 6310137200-132 24.12.2009 unlimited boiler house, 2a, Vitebska str. 6310137200-133 24.12.2009 unlimited boiler house, 12, Baltiiska str. 6310137200-134 24.12.2009 unlimited boiler house, 23, Kamianets-Podilska str. 6310137200-135 24.12.2009 unlimited boiler house, 27/5, Berkosa str. 6310137200-136 24.12.2009 unlimited boiler house, 63, Osetinska str. 6310137200-137 24.12.2009 unlimited boiler house, 27a, Blahovishchenska str. 6310137200-139 24.12.2009 unlimited 288 boiler house, 35, Zaliznychna str. 6310137200-142 24.12.2009 unlimited boiler house, 4, Nizhinska str. 6310137200-143 24.12.2009 unlimited boiler house, 205, Velyka Pansivska str. 6310137200-149 24.12.2009 unlimited boiler house, 49/51, Rylieieva str. 6310137200-150 24.12.2009 unlimited boiler house, 41/43, Andriivska str. 6310137200-151 24.12.2009 unlimited boiler house, 8, Skovorodynivska str. 6310137200-152 24.12.2009 unlimited boiler house, 6, Rizdviana str. 6310137200-155 24.12.2009 unlimited boiler houses, 2/15,10/12, Blahovishchenska str. 6310137200-157 24.12.2009 unlimited boiler house, 7, Ihoria Muratova str. 6310137200-160 24.12.2009 unlimited CHS 3/10, 28, Ihoria Muratova str. 6310137200-1607 17.12.2014 unlimited industrial site, 1, Zemivska str. 6310137200-141 24.12.2009 unlimited CHS 3/1, 152б, Poltavskyi Shliakh str. 6310137200-145 24.12.2009 unlimited CHS 3/9, 3, Kholodnohirska str. 6310137200-161 24.12.2009 unlimited 5 Moskovskyi boiler house, 4, Artema Vedelia str. 6310137500-74 11.09.2014 11.09.2021 boiler houses, 9a, Dzherelna str., 228a, Druzhby Narodiv str. 6310137500-1351 11.09.2014 11.09.2024 boiler houses, 20, 27,a, 30, Akademika Pavlova str. 6310137500-1370 16.09.2014 16.09.2024 boiler house, 19/318, Yenakiivska str. 6310137500-1365 16.09.2014 unlimited boiler house, 40, Tiurinska str. 6310137500-1367 16.09.2014 unlimited boiler house, 55, Traktorobudivnykiv ave. 6310137500-1369 16.09.2014 unlimited boiler house, 185, Moskovskyi ave. 6310137500-1371 16.09.2014 unlimited boiler houses, 73г. 73в, Saltivske highway 6310137500-1372 16.09.2014 unlimited boiler house, 104, Krasnodarska str. 6310137500-1373 16.09.2014 unlimited CHS “Budmistechko-1”, 35г, Vladyslava Zubenka str. 6310137500-1366 16.09.2014 unlimited CHS 533/1, 47в, Heroiiv Pratsi str. 6310137500-1368 16.09.2014 unlimited АBК/PAO, 6, Artema Vedelia str. 6310137500-82 22.10.2009 unlimited АBК/PAO, 13, Svitla str. 6310137500-83 22.10.2009 unlimited CHS 531/2, 34є, Buchmy str. 6310137500-84 22.10.2009 unlimited CHS 616, 27a, Hvardiitsiv-Shitonintsiv str. 6310137500-86 22.10.2009 unlimited CHS 607/2, 83ж, Traktorobudivnykiv ave. 6310137500-87 22.10.2009 unlimited CHS 604/2, 139д, Saltivske highway 6310137500-89 22.10.2009 unlimited 289 6 Novobavarskyi boiler house, 99, Moskalivska str. 6310137900-108 11.09.2014 11.09.2021 boiler house, 18, Kybalchycha str. 6310137900-1571 10.12.2014 10.12.2024 boiler house, 7б, Bavarska str. 6310137900-1580 11.12.2014 11.12.2024 boiler houses, 9a, 20, Kataieva str. 6310137900-1582 11.12.2014 11.12.2024 boiler houses, 7a, 12, Konieva str. 6310137900-1602 16.12.2014 16.12.2024 boiler house, 5a, Svynarenka str. 6310137900-1603 16.12.2014 16.12.2024 boiler houses, 90, 99a, Novo-Bavarskyi ave. 6310137900-1604 16.12.2014 16.12.2024 boiler house, 42, Timiriazeva str. 6310137900-1605 16.12.2014 16.12.2024 boiler house, 2б, Yudina str. 6310137900-1640 25.12.2014 25.12.2024 boiler house, 23a, Svitlanivska str. 6310137900-1570 10.12.2014 unlimited boiler house, 4, Stantsiina str. 6310137900-1572 10.12.2014 unlimited boiler house, 1, Lizy Chaikinoi str. 6310137900-1573 10.12.2014 unlimited boiler house, 143, Seminarska str. 6310137900-1574 10.12.2014 unlimited boiler house, 37, Hvardiitsiv-Zaliznychnykiv str. 6310137900-1575 10.12.2014 unlimited boiler house, 21/23, Karpivskyi lane 6310137900-1576 10.12.2014 unlimited boiler house, 42a, Vrubelia str. 6310137900-1577 10.12.2014 unlimited boiler house, 9, Karachivske highway 6310137900-1578 10.12.2014 unlimited boiler houses, 46, 63a, Seminarska str. 6310137900-1579 10.12.2014 unlimited boiler houses, 2, 6. 9, 11, 12, Kontorska str. 6310137900-1581 11.12.2014 unlimited boiler house, 2, Seminarska str. 6310137900-1585 12.12.2014 unlimited boiler houses, 14, Pestrikova str., 5/7, Karpivskyi lane, 6310137900-1586 12.12.2014 unlimited 6/10, Polzunova lane boiler houses, 3/5, 17в, 19, Poltavskyi Shliakh str., 25, Yaroslavska str. 6310137900-1587 12.12.2014 unlimited boiler houses, 45, 51, Liubovi Maloi ave. 6310137900-122 24.12.2009 unlimited boiler house, 47a, Pushkarivska str. 6310137900-123 24.12.2009 unlimited boiler house, 88a, Seminarska str. 6310137900-126 24.12.2009 unlimited boiler house, 14/16, Bondarivska str. 6310137900-128 24.12.2009 unlimited boiler house, 13, Marka Bernesa str. 6310137900-129 24.12.2009 unlimited boiler houses, 32, 46/5. Seminarska str. 6310137900-131 24.12.2009 unlimited boiler houses, 57а,57б, Seminarska str. 6310137900-132 24.12.2009 unlimited 290 boiler house, 12, Kashirskoho str. 6310137900-134 24.12.2009 unlimited boiler house, 1, Odoievskyi lane 6310137900-137 24.12.2009 unlimited boiler house, 113, Valerianivska str. 6310137900-138 24.12.2009 unlimited boiler houses, 22, 36, Moskalivska str. 6310137900-139 24.12.2009 unlimited boiler houses, 58, 59, Moskalivska str. 6310137900-140 24.12.2009 unlimited boiler house, 2/3, Volodymyrska str. 6310137900-141 24.12.2009 unlimited boiler house, 92, Moskalivska str. 6310137900-142 24.12.2009 unlimited boiler house, 142, Moskalivska str. 6310137900-143 24.12.2009 unlimited boiler house, 14, Stoliarnyi lane 6310137900-144 24.12.2009 unlimited boiler house, 17, Konieva str. 6310137900-145 24.12.2009 unlimited boiler house, 35, Volodymyrska str. 6310137900-147 24.12.2009 unlimited boiler house, 26, Kontorska str. 6310137900-151 24.12.2009 unlimited boiler house, 11, Velyka Honcharivska str. 6310137900-152 24.12.2009 unlimited boiler house, 53/55, Poltavskyi Shliakh str. 6310137900-154 24.12.2009 unlimited boiler house, 90, Kontorska str. 6310137900-155 24.12.2009 unlimited boiler house, 93, Kontorska str. 6310137900-156 24.12.2009 unlimited boiler house, 16, Hostynna str. 6310137900-157 24.12.2009 unlimited boiler house, 18, Mariinska str. 6310137900-158 24.12.2009 unlimited boiler house, 5, Metiznyi lane 6310137900-160 24.12.2009 unlimited boiler house, 8, Bulvarna str. 6310137900-164 24.12.2009 unlimited boiler house, 17, Perovskoi str. 6310137900-165 24.12.2009 unlimited boiler houses, 48, Konotopska str., 41, Lysenka str. 6310137900-166 24.12.2009 unlimited boiler house, 17, Hertsena str. 6310137900-167 24.12.2009 unlimited boiler house, 53, Lomonosova str. 6310137900-168 24.12.2009 unlimited boiler house, 11/13, Novo-Bavarskyi ave. 6310137900-169 24.12.2009 unlimited boiler house, 87, Kostiantyna Kalinina str. 6310137900-172 24.12.2009 unlimited boiler house, 10, Timiriazieva str. 6310137900-175 24.12.2009 unlimited boiler house, 66, Naboichenka Petra str. 6310137900-176 24.12.2009 unlimited boiler house, 22, Hryboiedova str. 6310137900-178 24.12.2009 unlimited boiler house, 77, Novo-Bavarskyi ave. 6310137900-179 24.12.2009 unlimited boiler house, 7a, St. Nova Bavariia str. 6310137900-180 24.12.2009 unlimited 291 boiler house, 19, Piatysotnytska str. 6310137900-182 24.12.2009 unlimited CHS, 4, Yuriia Parashchuka str. 6310137900-184 24.12.2009 unlimited CHS, 4a, Mykoly Bazhana str. 6310137900-185 24.12.2009 unlimited 7 Industrialnyi ТPP-4, 275, Moskovskyi ave. 6310138200-88 11.09.2014 11.09.2021 boiler house, 7a, Elektrovozna str. 6310138200-1335 01.09.2014 01.09.2024 boiler house, 11, Piatykhatska str. 6310138200-1357 12.09.2014 12.09.2024 boiler house, 69, Mokhnatska str. 6310138200-1358 12.09.2014 12.09.2024 boiler house, 74a, Myru str. 6310138200-1359 12.09.2014 12.09.2024 boiler house, 6, Rumiantsivska str. 6310138200-1381 17.09.2014 unlimited boiler house, 1, Mekhanizatoriv str. 6310138200-1383 17.09.2014 unlimited boiler house, 1a, Tarkhova str. 6310138200-93 20.10.2009 unlimited CHS, 71A, Oleksandrivskyi ave., 3A, Kosarieva str. 6310138200-94 20.10.2009 unlimited 8 Osnovianskyi boiler house, 16, Litakova str. 6310138800-1496 06.11.2014 06.11.2024 boiler house, 262, Gagarina ave. 6310138800-1504 06.11.2014 06.11.2024 boiler house, 27a, Dyspetcherska str. 6310138800-1519 12.11.2014 12.11.2024 boiler house, 22, Dostoievskogo str. 6310138800-1520 12.11.2014 12.11.2024 boiler house, 1, Biolohichna str. 6310138800-1521 12.11.2014 12.11.2024 boiler house,70, Holdberhivska str. 6310138800-1494 06.11.2014 unlimited boiler house, 1a, Biolohichna str. 6310138800-1497 06.11.2014 unlimited boiler house, 100, Holdberhivska str. 6310138800-1498 06.11.2014 unlimited boiler houses, 17б,17в,17г,17д,17є,17і,17к,17ж,17з, Merefianske 6310138800-1512 10.11.2014 unlimited highway boiler houses, 112, Holdberhivska str., 6310138800-180 24.11.2009 unlimited 57/59, Moskalivska str. boiler houses, 300, 302, 306, Gagarina ave. 6310138800-187 24.11.2009 unlimited boiler house, 314a, Gagarina ave. 6310138800-188 24.11.2009 unlimited boiler house, 334, Gagarina ave. 6310138800-189 24.11.2009 unlimited boiler house, 354, Gagarina ave. 6310138800-190 24.11.2009 unlimited boiler house, 42, Hordiienkivska str. 6310138800-191 24.11.2009 unlimited 292 boiler house, 30, Hrekivska str. 6310138800-192 24.11.2009 unlimited boiler house, 1, Dostoievskoho str. 6310138800-194 24.11.2009 unlimited boiler house, 14, Dostoievskoho str. 6310138800-195 24.11.2009 unlimited boiler house, 89a, Dostoievskoho str. 6310138800-197 24.11.2009 unlimited boiler house, 18a, Karierna str. 6310138800-199 24.11.2009 unlimited boiler house, 25, Kvitkynska str. 6310138800-200 24.11.2009 unlimited boiler house, 1, Biolohichnyi lane 6310138800-204 24.11.2009 unlimited boiler house, 1, Lymanskyi lane 6310138800-205 24.11.2009 unlimited boiler house, 9, Tsyharivskyi lane 6310138800-206 24.11.2009 unlimited boiler house, 3, Poltavska str. 6310138800-207 24.11.2009 unlimited boiler house, 13, Pryvokzalna str. 6310138800-208 24.11.2009 unlimited boiler houses, 1, 5a, 9a, Sokhora str. 6310138800-210 24.11.2009 unlimited boiler house, 19, Ternopilska str. 6310138800-211 24.11.2009 unlimited boiler house, 82, Kharkivska str. 6310138800-212 24.11.2009 unlimited boiler house, 16, Myrhorodska str. 6310138800-202 24.11.2009 unlimited CHS 3/23 62 A, Gagarina ave. 6310138800-183 24.11.2009 unlimited CHS 3/6 174A, Gagarina ave. 6310138800-184 24.11.2009 unlimited CHS 3/5 5A, Moskalivska str. 6310138800-203 24.11.2009 unlimited 9 Nemyshlianskyi boiler house, 7, Hryshchenka str. 6310138500-1379 17.09.2014 17.09.2024 boiler house, 82-A, Kulynychivska str. 6310138500-1380 17.09.2014 unlimited АBК/PAO, 6/8, Stadionnyi alley 6310138500-98 20.10.2009 unlimited CHS 624, 5A, Amosova str. 6310138500-99 20.10.2009 unlimited CHS 4/35 33A, Rybalka str. 6310138500-100 20.10.2009 unlimited CHS 23A (PAO), Olimpiiska str. 6310138500-101 20.10.2009 unlimited CHS 4/1 19/1, Yurieva blvd. 6310138500-102 20.10.2009 unlimited 10 Transport Branch АBК/PAO, 6, Artema Vedelia str. 6310137500-93 24.12.2009 unlimited 11 CHP-3 3, Enerhetychna str. 6310138500-136 30.12.2015 30.12.2022 293 Annex 26. Explanation letter of the Department of environment and natural resources of Kharkiv Regional State Administration. 294 295 Annex 27. Letter of intention. 296 297 Annex 28. List of boilers, which will be dismantled on the component “ Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks”. № Name of the object, address Boiler unit grade Heat efficiency of Commercial Hours in boiler unit, Gcal/h operation year operation (as on 2013) 1 boiler house, 199/2, Gagarina ave. NIISTU-5 0.5 1989 85 358 NIISTU-5 0.5 1976 135 103 NIISTU-5 0.5 1976 122 580 NIISTU-5 0.5 1976 162 759 NIISTU-5 0.5 1976 158 457 NIISTU-5 0.5 1976 261 360 NIISTU-5 0.5 1991 124 077 2 boiler house №1, 77, Peremohy ave. Boiler unit FEH-Vestal (10 heat 1.032 2004 41 520 modules AF-105) 3 boiler house №2, 77, Peremohy ave. Boiler unit FEH-Vestal (10 heat 1.032 2004 41 520 modules AF-105) 4 boiler house, 57A, Seminarska str. NIISTU-5 0.3 1962 227 136 NIISTU-5 0.3 1962 154 960 5 boiler house, 12, Kashirskoho str. Nadtochiia 0.348 1985 126 672 6 boiler house, 46/5, Seminarska str. NIISTU-5 0.25 1958 211 008 NIISTU-5 0.3 1991 77 464 7 boiler house, 47A, Pushkarivska str. Altair RTN E-100 0.086 2007 23 576 Altair RTN E-100 0.086 2007 23 576 8 boiler house, 46, Seminarska str. NIISTU-5 0.5 1998 42 560 NIISTU-5 0.5 1998 41 920 NIISTU-5 0.5 2007 18 410 9 boiler house, 45, Liubovi Maloi ave. NIISTU-5 0.25 1995 82 992 10 boiler house, 51, Liubovi Maloi ave. NIISTU-5 0.5 1993 87 528 NIISTU-5 0.5 2003 48 048 298 11 boiler house, 57Б, Seminarska str. NIISTU-5 0.4 1986 122 304 12 boiler house, 2Б, Yudina str. NIISTU-5 0.565 1987 132 300 NIISTU-5 0.565 1994 47 412 NIISTU-5 0.565 1976 124 184 NIISTU-5 0.565 1976 120 612 NIISTU-5 0.565 1987 80 514 NIISTU-5 0.565 2002 53 064 299 Annex 29. List of pump units, which will be dismantled on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks”. № Name of the object, address Pump grade Pump Efficiency, Head, Electrical Engine Year of application m3/hour m capacity of voltage, installation engine, KW kV 1 boiler house, 199/2, Gagarina ave. К-150-125-250 line 200 20 10 0.4 1982 8К2/26 line 50 32 7.5 380 2005 К-80-50-200 CWS 50 50 7.5 380 1976 К-80-50-200 CWS 50 50 7.5 380 1976 К-65-50-160 HWS 25 32 7.5 380 1976 К-150-125-250 line 200 20 15 380 1988 К-65-50-160 drain 25 32 4 380 1986 2 boiler house №1, 77, Peremohy ave. Wilo Star RS line 3.5 6 0.1 380 2005 25/6 Wilo Star RS line 3.5 6 0.1 380 2005 25/6 Wilo Star RS line 3,5 6 0.1 380 2005 25/6 GRUNDFOS line 51 2.5 1.55 380 2012 UPSD 65-180F 3 boiler house №2, 77, Peremohy ave. GRUNDFOS line 51 2.5 1.55 380 2005 UPSD 65-180F 4 boiler house, 57A, Seminarska str. К-65-50-160 line 25 32 4.5 380 2010 К-80-50-200 line 50 50 7.5 380 2010 5 boiler house, 12, Kashirskoho str. GRUNDFOS NB line 34.5 36 4 380 2007 32-160/163 К-65-50-160 line 25 32 5.5 380 2010 6 boiler house, 46/5, Seminarskaya str. К-65-50-160 line 25 32 5.5 380 2010 300 GRUNDFOS NB line 21 10.8 1.1 380 2011 32-125/106 7 boiler house, 46, Seminarska str. КМ-100-80-160 line 100 32 15 380 1988 КМ-100-80-160 line 100 32 15 380 1988 8 boiler house, 57Б, Seminarska str. К-65-50-160 line 25 32 2.2 380 2010 К-80-65-160 line 50 32 4 380 2010 9 boiler house, 47A, Pushkarivska str. Wilo-TOP-S line 36 16 1.6 380 2007 50/15 Wilo-TOP-S line 36 16 1.6 380 2007 50/15 Wilo HWJ 203 boost 4,5 43 1.1 380 2007 10 boiler house, 45, Liubovi Maloi ave. Wilo-TOP-S circulating 20 15 0,9 380 2013 40/15 К-80-65-160 line 50 32 5.5 380 1995 11 boiler house, 51, Liubovi Maloi ave. Lowara FCE 50- line 51 38 4 380 2009 160/40 Lowara FCE 50- line 51 38 4 380 2009 160/40 12 boiler house, 2Б, Yudina str. К-80-65-160 line 50 33 7.5 380 2000 К-80-65-160 line 50 34 7.5 380 2000 К-65-50-160 HWS 25 35 4 380 2000 К-65-50-160 HWS 25 36 4 380 2000 301 Annex 30. List of heat-exchange equiment, which will be replaced at the boiler houses by the new one on the component “Decommissioning of boiler houses, installation of individual heating stations and reconstruction of heating networks” № Name of object, address Type, construction of heat Application Surface of Number of Year of exchanger heating, m2 plates, pcs. installation 1 boiler house, 199/2, Gagarina ave. Plate heat exchanger R HWS 21 70 1988 0.3p Plate heat exchanger R HWS 22.8 76 1992 0.3p 2 boiler house, 2Б, Yudina str. Plate heat exchanger R HWS 20.1 67 2004 0.3p Plate heat exchanger R HWS 24.9 2004 0.3p 302 Annex 31. List of the boliers, which will be dismantled and replaced by the new ones on the component “Reconstruction of boiler houses”. № Name of the object, address Boiler unit grade Heat efficiency of Commercial Hours in operation boiler unit, Gcal/h operation year (as on 2013) 1 boiler house “Aeroport”, KBNH-3.15 2.7 1999 37 368 9, Nesterova str. KBNH-3.15 2.7 2004 27 060 KBNH-3.15 2.7 2010 7 920 KOLVI-250 0.25 2011 4 402 KOLVI-250 0.25 2011 4 392 2 boiler house, 7, Hryshchenka str. KVH-6.5-150 6.5 1992 62 856 KVH-6.5-150 6.5 1992 69 936 3 boiler house, 82A, Kulynychivska str. NIISTU-5 0.3 1999 59 400 NIISTU-5 0.3 1989 39 600 4 boiler house, 20, Bukova str. AOHV -100 0.086 2003 42 368 AOHV -100 0.086 2003 42 368 5 boiler house, 20A, Bukova str. AOHV -100 0.086 2003 42 368 AOHV -100 0,086 2003 42 368 6 boiler house, 14, Bukova str. AOHV -96к 0.086 2007 28 112 AOHV -50к 0.043 2007 10 920 7 boiler house, 10Б, Sapena str. KVH-7.56 6.5 1991 33 704 KVH-7.56 6.5 1988 78 125 KV-H -6.5-150 6.5 1988 76 492 8 boiler house, 27, Pomirky str. NIISTU-5 0.5 1999 45 000 NIISTU-5 0.5 1999 42 000 NIISTU-5 0.5 2001 40 000 9 boiler house “Piatykhatky”, 1, Akademichna str. DKV-10/13 6.5 1958 110 770 DKV-10/13 6.5 1957 173 376 DKVР-20/13 14.0 1967 219 052 PTVM-30М-4 35 1983 32 750 PTVM-30М-4 35 1983 24 941 303 DKV-10/13 8.6 1958 112 733 DKV-10/13 8.6 1957 61 845 PTVM-30М-4 35 1983 64 800 10 boiler house, YRC Internationalist, 70, Horianska KV-H-7.56-150 6.5 1993 28 360 str. KV-H-7.56-150 6.5 1993 95 160 11 boiler house “Pivnichnyi-1”, 9A, Dzherelna str. KVH-6.5-150 6.5 1994 129 264 KVH-6.5-150 6.5 1994 129 264 KVH-6.5-150 6,5 1994 90 720 12 boiler house, 104, Krasnodarska str. Nika-0.5Hn 0.43 2005 18 144 Nika-0.5Hn 0.43 2005 18 144 NIISTU-5 0.4 2000 48 968 KPa-0.4H 0.26 2011 5 280 KPa-0.4H 0.26 2011 10 560 13 boiler house, 48, Konotopska str. Altair RTN E- 0.086 2007 16 576 100 Altair RTN E- 0.086 2007 23 450 100 14 boiler house, 7A, Konieva str. KV-H-4.65-150 4.0 1999 82545 KV-H-7.65-150 6.5 2001 56784 15 boiler house, 12, Konieva str. NIISTU-5 0.25 1997 65 756 NIISTU-5 0.25 1999 46 200 16 boiler house, 26, Kontorska str. AOHV -100 0.086 1998 46 944 AOHV -100 0.086 1998 45 344 17 boiler house, 6/10, Polzunova lane NIISTU-5 0.3 1985 97 672 NIISTU-5 0.3 1985 91 872 18 boiler house, 5A, Svynarenka str. KBN-Hn3.15М 2.7 2007 20 720 KBN-Hn-3.15М 2.7 2010 15 872 KBN-Hn-3.15М 2.7 2011 9 204 VK-21 1.72 2005 18 180 19 boiler house, 90, Novo-Bavarskyi ave. NIISTU-5 0.25 1988 77 168 NIISTU-5 0.25 2001 43 784 304 RBI HBN-1470 0.308 2002 36 432 RBI HBN-1050 0.219 2002 50 016 20 boiler house, 53, Lomonosova str. Nadtochii 0.348 1965 214 032 21 boiler house, 23A, Svitlanivska str. AOHV -100 0.086 2002 28 416 AOHV -100 0.086 2002 24 432 AOHV -100 0.086 2002 29 232 AOHV -100 0.086 2013 737 NIISTU-5 0.4 1998 28 288 22 boiler house, 8, Bulvarna str. NIISTU-5 0.25 1988 113 568 23 boiler house, 88A, Seminarska str. NIISTU-5 0.3 1998 37 888 NIISTU-5 0.3 1999 31 680 NIISTU-5 0.3 1999 50 520 24 boiler house, 99A, Novo-Bavarskyi ave. KBN-Hn-3.15М 2.7 2007 23 576 KBN-Hn-3.15М 2.7 2010 11 072 NYKA -1.25 1.075 2005 22 680 25 boiler house, 13, Marka Bernesa str. NIISTU-5 0.25 1969 196 560 26 boiler house, 5, Metiznyi lane NIISTU-5 0.5 1989 71 700 NIISTU-5 0,5 1980 73 712 NIISTU-5 0.5 1980 80 240 NIISTU-5 0.5 1980 89 352 27 boiler house, 7A, St. Nova Bavariia str. AOHV -100 0.086 1999 47 520 AOHV -50 0.043 1999 44 520 28 boiler house, 2, Kontorska str. WHN 1685 0.344 2003 34 848 Е-02 AOHV -100 0.086 2003 13 915 29 boiler house, 35, Zaliznychna str. AOHV -100 0.086 1999 60 480 AOHV -100 0.086 1999 52 400 AOHV -100 0.086 1999 24 680 30 boiler house, 41/43, Andriivska str. NIISTU-5 0.3 1987 106 640 NIISTU-5 0.3 1989 74 000 31 boiler house, 8, Slovianska str. KVH-7.56 6.5 1987 218 060 305 KVH-7.56 6.5 1987 178 600 32 boiler house, 41, Novyi Pobut str. Universal-6 0.24 1997 40 740 Universal-6 0.24 1997 39 650 33 boiler house, 49/51, Rylieieva str. Universal-6 0.24 1997 40 800 Universal-6 0.24 1997 45 400 34 boiler house, 29, Velyka Panasivska str. KBN-Hn – 2.7 2002 85 900 3.15М KBN-Hn – 2.7 2002 51 600 3.15М 35 boiler house, 67, Velyka Panasivska str. Lankashyr 1.8 1996 73 440 Lankashyr 0.18 1996 73 440 36 boiler house, 2/15, Blahovishchenska str. Nadtochii 0.24 1972 177 120 37 boiler house, 6, Rizdviana str. HBN 1050E-02 0.219 2003 34 800 HBN 1050E-02 0.219 2000 53 600 38 boiler house, 12, Baltiiska str. Nika-0.5Hn 0.42 1998 64 260 Nika-0.5Hn 0.42 1998 60 490 39 boiler house, 3, Afanasivska str. NIISTU-5 0.3 1986 116 640 NIISTU-5 0.3 1986 100 880 40 boiler house, 205, Velyka Panasivska str. KV-H-4.65 4.0 1984 130 600 KV-H-4.65 4.0 1984 112 640 41 boiler house, 7, Ihoria Muratova str. E-1.0-0.9H-3 0.612 1989 89 800 42 boiler house, 27/5, Berkosa str. NIISTU-5 0.3 1957 241 920 43 boiler house, 41, Kurylivska str. NIISTU-5 0.3 1987 112 320 44 boiler house, 65, Ozerianska str. Universal-5М 0.182 1987 112 280 45 boiler house, 35, Novyi Pobut str. NIISTU-5 0.3 1969 176 900 NIISTU-5 0.3 1969 180 100 46 boiler house, 30, Hrekivska str. NIISTU-5 0.3 2010 15 408 47 boiler house, 1, Biolohichnyi lane AOHV -50Е 0.043 2012 2 892 AOHV -100Е 0.086 2013 1 416 AOHV -50Е 0.043 2006 17 928 48 boiler house, 19, Ternopilska str. NIISTU-5 0.3 1998 69 272 306 NIISTU-5 0.3 1998 25 790 49 boiler house, 1, Lymanskyi lane NIISTU-5 0.4 1998 38 874 NIISTU-5 0.4 1998 28 403 NIISTU-5 0.3 1998 34 439 50 boiler house, 89A, Dostoievskoho str. AOHV -100 0.086 2005 32 094 AOHV -100 0.086 2005 23 404 51 boiler house, 16, Myrhorodska str. Universal-3 0.25 1998 83 518 52 boiler house, 27A, Dyspetcherska str. DKVR-6.5/13 4.0 2006 20 138 DKVR-6.5/13 4.0 2006 0 DKVR-6.5/13 4.0 2006 46 990 DEV-10/14 6.5 1989 15 227 DEV-10/14 6.5 1989 15 047 53 boiler house, 3, Dostoievskoho entrance construction of the new heat source 54 boiler house, 5/7, Karpivskyi lane AOHV -96 0.083 2004 24 850 AOHV -96 0.083 2004 23 810 AOHV -96 0.083 2006 17 680 55 boiler house, 74A, Myru str. TVH-4p 4.3 1969 184 417 TVH-4p 4.3 1969 183 535 KVH-4-150 4 1993 87 106 56 boiler house, 10/12, Blahovishchenska str. NIISTU-5 0.565 1978 79 760 NIISTU-5 0.565 1978 120 950 57 boiler house, 32, Seminarska str. Nadtochii 0,24 1969 196 560 PVKM-M5 0.306 1987 11 772 58 boiler house, 66, Naboichenka Petra str. Universal-5 0.18 1987 71 904 Universal-6 0.24 1997 66304 307 Annex 32. List of the pump units, installed at the sites on the component “Reconstruction of boiler houses”. № Name of the object, address Pump grade Pump application Efficienc Head, Electrical Engine Year of y, m3/h m power, KW voltage, installati kV on 1 boiler house, 7, Hryshchenka str. К-65-50-160 booster 25 32 3 380 2000 К-65-50-160 booster 25 32 3 380 2000 К-100-65-200 network 100 50 45 380 1991 К-100-65-200 network 100 50 45 380 1991 К-50-32-125 salt 12.5 20 1.5 380 2013 К-50-32-125 salt 12.5 20 1,.2 380 2013 К-100-65-200 network 100 50 55 380 1991 К-65-50-160 booster 25 32 4.5 380 1991 К-80-65-160 booster 50 32 7.5 380 1991 SAER MG-80-200A mixing 275 58 37 380 2010 К-100-65-200 mixing 100 50 45 380 1991 2 boiler house, Speroni CS32-160A network 30 36.5 4.3 380 2011 82A, Kulynychivska str. К-65-50-160 network 25 32 5 380 1981 К-80-50-200 network 50 50 7.5 380 1981 3 boiler house, 104, Krasnodarska str. GRUNDFOS KP-150 A1 drain 7.8 5 0.3 380 2011 GRUNDFOS CR 1-2 booster 2.4 12 0.37 380 2011 GRUNDFOS CR 1-2 booster 2.4 12 0.37 380 2011 К-80-65-160 network 50 32 7.5 380 2006 К-80-65-160 network 50 32 7.5 380 2006 EBARA LPS 50/75M recirculating 24 14.8 0,75 380 2006 4 boiler house “Pivnichnyi-1”, 9A, К-100-65-200 HWS 100 50 22 380 1994 Dzherelna str. К-100-65-200 HWS 100 50 45 380 1994 1D200-90 network 200 95 55 380 2000 NKU-90 recirculating 90 38 13 380 1992 1D200-90 network 200 95 110 380 1994 308 KS-12-50 booster 12 50 7.5 380 2006 1D 315-50 network 320 50 75 380 2006 К-100-65-250 network 100 80 55 380 1994 5 boiler house, 12, Konieva str. Wilo-TOP-S 50/15 network 36 16 1.6 380 2011 TsNSh-65 network 26 6 2.8 380 2010 6 boiler house, 6/10, Polzunova lane GRUNDFOS TP 50-190/2 circulating 28 19 1.5 380 2011 7 boiler house, 90, Novobavarskyi GRUNDFOS UPS 32-55 network 9.2 4.6 0.14 380 2005 ave. К-100-80-160 network 100 32 15 380 1999 К-100-80-160 booster 100 32 15 380 1999 GRUNDFOS Hydrojet JP5/24 booster 3 40 0.78 380 2005 GRUNDFOS LP 80-120/124 network 50 15 3 380 2005 К20/18 HWS 20 18 2.2 380 2008 GRUNDFOS UPS 50-120 F network 29.5 9.1 0.76 380 2005 GRUNDFOS UPS 50-120 F network 29.5 9.1 0.76 380 2005 8 boiler house, 53, Lomonosova str. К-65-50-160 network 25 32 4,5 380 2012 GRUNDFOS NB 40-125/105 circulating 39.1 9.3 1.5 380 2013 9 boiler house, 8, Bulvarna str. К-65-50-160 network 25 32 4 380 2010 Wilo-TOP-S 50/15 circulating 36 16 1.6 380 2014 10 boiler house, 88A, Seminarska str. Wilo HWJ 203 booster 4.5 43 1.1 380 2007 GRUNDFOS NB 125/144 network 80.2 22.1 7.5 380 2007 К-80-65-160 network 50 32 4 380 1991 11 boiler house, 13, Marka Bernesa К-50-32-125 network 12.5 20 4 380 2010 str. Wilo-TOP-S 40/15 circulating 20 15 0.9 380 2013 12 boiler house, 5, Metiznyi lane К-100-65-200 network 100 50 22 380 2004 К-150-125-315 network 200 32 30 380 2004 13 boiler house, 7A, St. Nova Bavariia Wilo-TOP-S 40/15 circulating 20 15 0.9 380 2013 str. К-50-32-125 network 12.5 20 2.2 380 2005 14 boiler house, 35, Zaliznychna str. К-65-50-160 circulating 25 32 1.5 380 1999 К-65-50-160 circulating 25 32 1.5 380 1999 К-65-50-160 booster 25 32 1,5 380 1999 К-65-50-160 circulating 25 32 1.5 380 1999 309 15 boiler house, 41/43, Andriivska str. К-80-65-160 network 50 32 7.5 380 1998 К-80-65-160 network 50 32 7.5 380 1998 16 boiler house, 48, Konotopska str. Wilo-TOP-S 50/15 network 36 16 1,6 380 2007 р. Wilo-TOP-S 50/15 network 36 16 1,6 380 2007 р. 17 boiler house, 7A, Konieva str. К-80-50-200 network 50 50 11 380 1988 р. WILO COR - 1MHIE 403-2G network 11 48 1,4 380 2014 р. К-65-50-160 booster 25 32 5,5 380 1999 р. К-65-50-160 booster 25 32 5,5 380 1988 р. К-65-50-160 HWS 25 32 4 380 1999 р. К-65-50-160 desalinization 25 32 5,5 380 1997 р. К-65-50-160 booster 25 32 5,5 380 2005 р. К-65-50-160 booster 25 32 5,5 380 2005 р. GRUNDFOS CR-3-10 booster 4,5 62 0,75 380 2009 р. EMEC PUMP EAPYM 36.5 desalinization 1 1 0,1 380 2010 р. FP К-80-50-200 HWS 50 50 18,5 380 1994 р. 1D315-71 network 320 70 90 380 2000 р. 1D315-71 network 320 70 90 380 2000 р. NKU-90 network 90 38 22 380 1999 р. К-50-32-125 salt 12,5 20 2,2 380 2007 р. К-80-65-160 booster 50 32 7,5 380 1988 р. 18 boiler house, 26, Kontorska str. Wilo-TOP-S 50/15 network 36 16 1,6 380 2011 р. К-80-65-160 network 50 32 5,5 380 1992 р. 19 boiler house, 2, Kontorska str. GRUNDFOS Hydrojet JP5/24 booster 3 40 0,78 380 2005 р. GRUNDFOS UPS 40-50 circulating 9,2 1,6 0,14 380 2003 р. GRUNDFOS UPS 50-60/2F circulating 26,5 5,7 0,39 2003 р. GRUNDFOS UPSD 40-180 network 22 12,5 0,79 380 2003 р. GRUNDFOS UPS 32-120 circulating 14 9,5 0,4 380 2003 р. GRUNDFOS UPS 50-120 F circulating 29,5 9,1 0,76 380 2003 р. 20 boiler house, 5A, Svinarenka str. EMEC PUMP EAPYM 36.5 booster 1 1 0,1 380 2010 р. К-80-65-160 HWS 50 32 18,5 380 1992 р. 310 1D 315-50 network 320 50 55 380 1992 р. 1D315-71 network 320 70 75 380 1992 р. К-50-32-125 booster 12,5 20 4 380 1999 р. К-80-65-160 HWS 50 32 7.5 380 1988 К-100-80-160 recirculating 100 32 15 380 2006 К-80-50-200 network 50 50 15 380 1988 21 boiler house, 23A, Svitlanivska str. К-80-65-160 network 50 32 7.5 380 1999 GRUNDFOS FHE 32-160/22 network 8 15 2.2 380 2011 22 boiler house, 99A, Novo-Bavarskyi К-65-50-160 booster 25 32 4 380 1999 ave. К-65-50-160 booster 25 32 4 380 1999 К-80-50-200 cold water supply 50 50 30 380 1999 К-80-50-200 cold water supply 50 50 30 380 1992 К-200-150-315 network 315 32 40 380 1991 К-200-150-315 network 315 32 40 380 1991 GRUNDFOS DDE 6-10-P dosator 0 10 0,12 220 2014 1D 315-50 network 320 50 75 380 1998 К-80-65-160 circulating 50 32 7.5 380 1992 Wilo BL 50/150-7,5/2 network 84 31 7.5 380 2014 23 boiler house, 41, Novyi Pobut str. CALPEDA NM 40/12AE network 33 22.5 2.2 380 2009 К-65-50-160 network 25 32 2.2 380 1997 24 boiler house, 49/51, Rylieieva str. Wilo-TOP-S 40/7 network 16.5 7 0.39 380 2007 25 boiler house, 67, Velyka К-200-150-250 circulating 315 20 16 380 2011 Panasivska str. К-65-50-160 booster 25 32 4 380 1960 К-200-150-250 circulating 315 20 30 380 1996 26 boiler house, TsNSh -65 network 25 28 1.5 380 1986 2/15, Blahovishchenska str. К-50-32-125 network 12.5 20 2.8 380 2004 27 boiler house, 12, Baltiiska str. К-80-65-160 network 50 32 5,5 380 1965 К-50-32-125 booster 12.5 20 2.2 380 2001 К-80-65-160 network 50 32 7.5 380 1965 28 boiler house, 3, Afanasivska str. К-65-50-160 network 25 32 7.5 380 1985 К-65-50-160 network 25 32 7.5 380 1995 311 29 boiler house, 205, Velyka К-65-50-160 booster 25 32 5.5 380 1988 Panasivska str. К-65-50-160 booster 25 32 5.5 380 1988 КМ-100-65-200 recirculating 100 50 30 380 1985 К-100-65-200 network 100 50 18.5 380 1985 К-100-65-200 network 100 50 18.5 380 1985 К-100-65-200 network 100 50 18.5 380 1985 30 boiler house, 27/5, Berkosa str. К-65-50-160 network 25 32 3 380 2000 К-65-50-160 network 25 32 5 380 2000 TsNSh -28 booster 28 32 5.5 380 1963 Wilo-TOP-S 65/15 network 54 15 1.67 2013 31 boiler house, 41, Kurylivska str. NHS 6/30 booster 6 30 1.1 380 2005 К-50-32-125 network 12.5 20 1.7 380 2010 К-50-32-125 network 12.5 20 1.7 380 2010 32 boiler house, 65, Ozerianska str. К-50-32-125 network 12.5 20 1.7 380 2010 К-50-32-125 network 12.5 20 1.7 380 2010 33 boiler house, 35, Novyi Pobut str. Wilo-TOP-S 50/15 network 36 16 1.6 380 2013 Wilo-TOP-S 50/15 network 36 16 1.6 380 2013 34 boiler house, 6, Rizdviana str. GRUNDFOS UPS 50-120 F circulating 29.5 9.1 0.76 380 2007 GRUNDFOS UPS 50-180F network 31.5 13 1 380 2007 GRUNDFOS UPS 50-180F network 31.5 13 1 380 2007 GRUNDFOS UPS 50-60/2F circulating 26.5 5.7 0.39 2007 GRUNDFOS Hydrojet HJP-5 booster 3.5 40 0.78 380 2007 35 boiler house, 8, Slovianska str. 1D200-90 network 200 95 75 380 1999 Kh 2/30 desalinization 2 30 4 2013 1D 315-50 network 320 50 90 380 1997 К-65-50-160 desalinization 25 32 5.5 380 1999 К-65-50-160 desalinization 25 32 5.5 380 1999 KS -12-50 booster 12 50 5.5 380 2007 К-100-65-250 network 100 80 55 380 1999 К-80-50-200 recirculating 50 50 7,5 380 1999 TsHSH-38-66 HWS 38 66 2,2 380 1997 312 К-65-50-160 CWT 25 32 4 380 1999 К-65-50-160 CWT 25 32 4 380 1999 VK 1/16А desalinization 3,6 16 2.2 380 1997 TsHSH-38-66 HWS 38 66 2.2 380 1997 TsHSH-38-66 HWS 38 66 11 380 1997 NKU-90 recirculating 90 38 37 380 1997 36 boiler house, 29, Velyka К-80-50-200 network 50 50 15 380 1999 Panasivska str. 1D 315-50 network 320 50 55 380 1995 1D 315-50 network 320 50 55 380 1995 К-80-50-200 HWS 50 50 16 380 2009 К-80-50-200 HWS 50 50 16 380 2005 К-80-65-160 network 50 32 7.5 380 2005 К-50-32-125 network 12.5 20 5.5 380 2001 К-80-50-200 HWS 50 50 14 380 2009 К-65-50-160 booster 25 32 7.5 380 1995 К-65-50-160 booster 25 32 7.5 380 1995 К-80-50-200 network 50 50 17 380 2001 37 boiler house, 7, Ihoria Muratova К-65-50-160 condensate 25 32 2.2 380 1999 str. К-65-50-160 desalinization 25 32 4 380 1997 AN 2/16 booster 2 16 2.2 380 2013 38 boiler house, 30, Hrekivska str. К-65-50-160 network 25 32 1,1 380 1988 Wilo-TOP-S 40/4 network 14 4,5 0,2 380 2009 К-65-50-160 network 25 32 4 380 1988 39 boiler house, 1, Biolohichnyi lane GRUNDFOS Hydrojet HJP-5 booster 3.5 40 0.78 380 2003 GRUNDFOS UPSD 50-80F network 3 12.5 0.7 380 2003 40 boiler house, 19, Ternopilska str. К-65-50-160 network 25 32 4,5 380 1996 К-65-50-160 network 25 32 4 380 1999 К-80-50-200 network 50 50 15 380 1989 К-80-65-160 network 50 32 15 380 2006 41 boiler house, 1, Lymanskyi lane К-100-80-160 network 100 32 15 380 1996 К-65-50-160 network 25 32 5.5 380 1998 313 К-50-32-125 booster 12.5 20 1.5 380 2007 GRUNDFOS NB 40-125/124 network 52 22 5.5 380 2010 42 boiler house, 16, Myrhorodska str. Wilo-TOP-S 30/10 HWS 11 11 0.4 380 2008 К-65-50-160 network 25 32 4 380 1996 43 boiler house, К-65-50-160 salt 25 32 5.5 380 2007 27A, Dyspetcherska str. ATsNSH-60/132 network 60 132 55 380 2002 TsHSH -38-220 HWS 38 220 37 380 1996 TsHSH -38-220 recirculating 38 220 37 380 2002 К-80-65-160 booster 50 32 7.5 380 2002 К-50-32-125 booster 12.5 20 3 380 2002 К-65-50-160 HWS 25 32 4 380 2008 К-50-32-125 booster 12.5 20 7.5 380 1997 К-65-50-160 HWS 25 32 4 380 2002 К-65-50-160 salt 25 32 4 380 2002 К-50-32-125 network 12.5 20 4 380 2002 1D315-71 network 320 70 75 380 2004 1D 315-50 network 320 50 75 380 1997 1D315-71 network 320 70 75 380 1997 К-50-32-125 booster 12.5 20 5.5 380 2002 К-80-65-160 network 50 32 5.5 380 1995 К-80-65-160 network 50 32 5.5 380 1995 44 boiler house, 3, Dostoievskoho construction of the new heat entrance source 45 boiler house, К-65-50-160 network 25 32 4 380 1984 89A, Dostoievskoho str. К-65-50-160 network 25 32 4 380 1984 К-50-32-125 network 12.5 20 1.1 380 2005 К-50-32-125 network 12.5 20 1.1 380 2005 46 boiler house, 20, Bukova str. Wilo-TOP-S 30/10 network 11 11 0.4 380 2005 Wilo-TOP-S 30/10 network 11 11 0.4 380 2005 47 boiler house, 20A, Bukova str. Wilo-TOP-S 30/10 network 11 11 0.4 380 2005 Wilo-TOP-S 30/10 network 11 11 0.4 380 2005 314 Wilo-TOP-S 30/10 network 11 11 0.4 380 2005 48 boiler house, 14, Bukova str. Wilo-TOP-S 30/10 network 11 11 0.4 380 2007 Wilo-TOP-S 30/10 network 11 11 0.4 380 2007 49 boiler house, К-80-50-200 HWS 50 50 15 380 2011 YRC Internationalist, 70, К-100-65-250 HWS 100 80 37 380 2011 Horianska str. 1D200-90 circulating 200 95 90 380 2012 К-100-65-200 network 100 50 37 380 2011 К-80-50-200 booster 50 50 15 380 2011 К-80-50-200 hot water supply 50 50 15 380 2011 К-80-50-200 network 50 50 22 380 2011 К-100-65-200 network 100 50 35 380 2011 50 boiler house “Piatykhatky”, 1, К-100-65-200 booster 100 50 18.5 380 2008 Akademichna str. 1D 315-50 network 320 50 75 380 2008 1D 315-50 network 320 50 75 380 2008 1D 315-50 network 320 50 75 380 2008 KSM -30-150 booster 30 150 30 380 2008 KSM -30-150 booster 30 150 30 380 2008 GRUNDFOS DDE 6-10B- chemical water 0 0.1 380 2012 PP/E/C-X-31/001FG treatment KS -32-175 delivery 30 175 22 380 2008 PN 1,6/16Б delivery 1.6 16 2.2 380 2008 PN 1,6/16Б delivery 1.6 16 2.2 380 2008 К-80-65-160 booster 50 32 7 380 2008 К-80-65-160 suction 50 32 7 380 2008 Kh45-31ESD suction 45 30 11 380 2008 Kh45-31ESD suction 45 30 11 380 2008 К-100-65-200 booster 100 50 37 380 2008 SЭ 800-100 network 800 100 6,3 380 2008 SЭ 800-100 network 800 100 320 380 2008 SЭ 800-100 network 800 100 320 380 2008 SЭ 800-100 network 800 100 320 380 2008 315 SЭ 800-100 network 800 100 320 380 2008 SЭ 800-100 network 800 100 320 380 2008 К-80-65-160 booster 50 32 7 380 2008 К-100-80-125 CWS 100 20 6.3 380 2008 К-100-80-125 CWS 100 20 7.5 380 2008 GRUNDFOS TP 40-470/2 backing 32 46 5.5 380 2012 GRUNDFOS TP 40-470/2 backing 32 46 5.5 380 2012 GRUNDFOS CR 5-6 booster 8.5 37 1.1 380 2012 GRUNDFOS CR 5-6 booster 8.5 37 1,1 380 2012 51 boiler house, 10Б, Saperna str. К-100-65-250 HWS 100 80 45 380 1988 К-100-65-250 HWS 100 80 45 380 1988 К-50-32-125 chemical water 12.5 20 5.5 380 2001 treatment KS-12-50 booster 12 50 5.5 380 1988 TNP -0,61 HWS 8 18 4 380 2000 KS-12-50 booster 12 50 5.5 380 1999 К-50-32-125 salt 12.5 20 4 380 2007 1D315-71 network 320 70 90 380 2001 1D315-71 network 320 70 90 380 2001 К-100-65-250 network 100 80 55 380 1988 К-65-50-160 network 25 32 7.5 380 1988 К-65-50-160 network 25 32 7.5 380 1988 52 boiler house, 27, Pomirky str. К-80-50-200 network 50 50 15 380 2006 К-65-50-160 network 25 32 5.5 380 2006 КМ-80-50-200 recirculating 50 50 15 380 2000 К-65-50-160 booster 25 32 4 380 2006 К-65-50-160 network 25 32 4 380 1994 53 boiler house “Aeroport”, 9, К150/20 circulating 150 20 30 380 1998 Nesterova str. К-80-65-160 recirculating 50 32 7.5 380 1997 К-150-125-250 circulating 200 20 15 380 1998 К-150-125-250 circulating 200 20 15 380 2004 316 К80/165 booster 25 32 7.5 380 1996 1D 315-50 network 320 50 75 380 1996 1D 315-50 network 320 50 75 380 1996 1D 315-50 network 320 50 75 380 1996 К-65-50-160 booster 25 32 5.5 380 1996 К-80-65-160 recirculating 50 32 5.5 380 1997 К-65-50-160 CWS 25 32 4 380 1996 К-65-50-160 CWS 25 32 4 380 1981 Wilo Top-Z 30/10 circulating 9.5 9.5 0.3 380 2011 Wilo MHI 1604-1/E/3-400-50 HWS 26 48 2.5 380 2011 Wilo MHI 1604-1/E/3-400-50 HWS 26 48 2.5 380 2011 Wilo-TOP-S 40/7 recirculating 16.5 7 0.39 380 2011 Wilo-TOP-S 40/7 recirculating 16.5 7 0.39 380 2011 Wilo IL 50/200-1,5/4 HWS 44 13.5 1.5 380 2011 Wilo IL 50/200-1,5/4 HWS 44 13.5 1.5 380 2011 54 boiler house, 5/7, Karpivskyi lane Wilo-TOP-S 65/15 network 54 15 1.67 380 2005 Wilo-TOP-S 65/15 network 54 15 1.67 380 2005 55 boiler house, 66, Petra К-50-32-125 network 12.5 20 2.2 380 1999 Naboichenka str. К-50-32-125 network 12.5 20 2.2 380 1999 Wilo HWJ 203 booster 4.5 43 1.1 380 2007 56 boiler house, 74A, Myru str. К-65-50-160 ejector 25 32 4.5 380 1985 К-80-50-200 CWS 50 50 15 380 1967 К-80-65-160 CWS 50 32 7.5 380 1967 К-100-65-250 network 100 80 55 380 1969 К-100-65-250 network 100 80 55 380 1969 К-80-65-160 recirculating 50 32 4.5 380 1989 NKU -90 recirculating 90 38 22 380 1967 К-65-50-160 booster 25 32 4.5 380 1985 К-65-50-160 booster 25 32 4.5 380 1985 Wilo IL 80/200-22/2 HWS 170 60 22 380 2014 Wilo IL 80/200-22/2 HWS 170 60 22 380 2014 317 К-65-50-160 ejector 25 32 4,5 380 1985 К-80-50-200 CWS 50 50 15 380 1967 К-80-65-160 CWS 50 32 7.5 380 1967 57 boiler house, 32, Seminarska str. К-65-50-160 network 25 32 2.8 380 1987 К-65-50-160 network 25 32 2.2 380 1987 58 boiler house, 10/12, К-65-50-160 network 25 32 7.5 380 2008 Blahovishchenska str. К-65-50-160 network 25 32 5.5 380 1997 К-50-32-125 drain 12.5 20 4 380 1976 318 Annex 33. List of heat-exchange equipment, which will be replaced at the boiler houses by the new one on the component “Recosntruction of boiler houses”. № Name of object, address Type, construction of heat exchanger Application Surface of Number of Year of heating, m2 plates, pcs. installation 1 boiler house, 7, Hryshchenka str. Shell-and-tube exchanger HWS 3.4 - 1991 ОSТ 34-558-68 2 boiler house, Capacitance heat exchanger «Енергія» HWS 8.1 - 1977 104, Krasnodarska str. Capacitance heat exchanger «Енергія» HWS 3.73 - 1977 3 boiler house “Pivnichnyi-1”, 9A, Plate heat exchanger R0.5 HWS 25 50 1994 Dzherelna str. Plate heat exchanger RS 0.5p HWS 50 100 1992 4 boiler house, 90, Novo- Plate heat exchanger AlfaLaval M3-FG HWS 0.99 33 2005 Bavarskyi ave. Plate heat exchanger AlfaLaval M3-FG HWS 0.99 33 2005 5 boiler house, 7A, Konieva str. Shell-and-tube exchanger production 2.24 - 1985 PV -12-06 needs Plate heat exchanger HWS 27 30 2007 DANFOSS XG 50 6 boiler house, 2, Kontorska str. Plate heat exchanger production 0.3 2003 SV -14-20 needs 7 boiler house, 5A, Svinarenka str. Plate heat exchanger DAN FP -70 HWS 32.85 47 2009 8 boiler house, 99A, Novo- Plate heat exchanger DAN FP -31 HWS 6.9 2009 Bavarskyi ave. 9 boiler house, 8, Slovianska str. Shell-and-tube exchanger PV -37-09 HWS 3.4 - 1999 Shell-and-tube exchanger PV -37-09 HWS 3.4 - 1999 Shell-and-tube exchanger PV heating 3.3 - 1999 Shell-and-tube exchanger PV heating 3.3 - 1999 10 boiler house, 29, Velyka Plate heat exchanger N -0.1 HWS 4.8 2002 Panasivska str. Plate heat exchanger N -0.1 HWS 4.8 2002 Plate DANFOSS ХB-50-1 HWS 6.86 70 2007 11 boiler house, 7, Ihoria Muratova Capacitance heat exchanger HWS 1.9 - 1994 str. Capacitance heat exchanger HWS 1.9 - 1994 319 12 boiler house, 19, Ternopilska str. Plate heat exchanger R 0.3 HWS 14.7 49 1994 13 boiler house, 1, Lymanskyi lane Plate heat exchanger R 0.3 р HWS 12 2009 14 boiler house, 16, Myrhorodska Plate heat exchanger HWS 2.7 60 2008 str. DANFOSS XD-10 15 boiler house, 27A, Plate heat exchanger R 0.3 р HWS 13.8 46 2000 Dyspetcherska str. Plate heat exchanger R 0.3 р HWS 4.84 16 2000 Plate heat exchanger DAN FP -31 HWS 21 42 2010 16 boiler house, YRC, Plate heat exchanger RS 0.5p HWS 54 108 2011 Internationalist, 70, Horianska Plate heat exchanger RS 0.5p HWS 41 82 2011 str. 17 boiler house “Piatykhatky”, 1, Plate heat exchanger PNH-100 heating 100 344 1995 Akademichna str. Plate heat exchanger PNH-100 heating 100 344 1995 Plate heat exchanger PNH-100 heating 100 344 1995 Plate heat exchanger PNH-100 heating 100 344 1995 Plate heat exchanger production 8.4 86 1995 needs Plate heat exchanger heating 40.4 436 1995 Plate heat exchanger DAN FP -22 HWS 3.99 21 2012 Plate heat exchanger heating 40.4 1995 Plate heat exchanger heating 40.4 1995 Plate heat exchanger heating 40.4 1995 Plate heat exchanger production 40.4 1995 needs 18 boiler house, 10б, Saperna str. Plate heat exchanger R О.6p heating 31.5 56 1996 Shell-and-tube exchanger production 6.66 - 1988 ОSТ34-588-68 needs Plate heat exchanger R О.6p HWS 28.8 96 2006 19 boiler house, 27, Pomirky str. Plate heat exchanger N 0.1 HWS 2.5 25 1999 Shell-and-tube exchanger ОSТ-34-558-68 HWS 6.78 - 1999 20 boiler house “Aeroport”, 9, Plate heat exchanger N 0,1 HWS 5 52 1997 Nesterova str. Plate heat exchanger RS-05 heating 98 1989 320 Plate heat exchanger RS-06 heating 96 1998 Plate heat exchanger RS 0.5p heating 100 200 1999 Plate heat exchanger DAN FP -22 HWS 7.77 39 2011 21 boiler house, 32, Seminarska str. Shell-and-tube exchanger HWS 10 - 1969 PV -109-13 Shell-and-tube exchanger HWS 10 - 1969 PV -109-14 22 boiler house, 74A, Myru str. Shell-and-tube exchanger production 0.93 10 1969 PV -89 needs Plate heat exchanger DAN FP -60 HWS 46.2 79 2014 Plate heat exchanger DAN FP -60 HWS 46.2 79 2014 Plate heat exchanger DAN FP -40 HWS 37.2 95 2014 Plate heat exchanger DAN FP -40 HWS 37.2 95 2014 321 Annex 34. List of IHP on the component “IHP installation in the residential buildings”. ID The address of individual heat station, number Administrative New/current No. of heat station (entryway) District of Kharkiv 1 65-A Frantisheka Krala Street Industrialnyi current 2 71 Frantisheka Krala Street Industrialnyi current 3 69 Frantisheka Krala Street Industrialnyi current 4 65 Frantisheka Krala Street Industrialnyi current 5 63 Frantisheka Krala Street Industrialnyi current 6 57 Frantisheka Krala Street Industrialnyi current 7 55 Frantisheka Krala Street Industrialnyi current 8 45 Frantisheka Krala Street Industrialnyi current 9 33-A Frantisheka Krala Street Industrialnyi current 10 154-A Oleksandrivskyi Avenue Industrialnyi current 11 15/16 Arkhitektora Aloshyna Avenue Industrialnyi current 12 13/11 Arkhitektora Aloshyna Avenue Industrialnyi current 13 6 Lui Pastera Street Industrialnyi current 14 14 Henerala Momota Street Industrialnyi current 15 10/10 Henerala Momota Street Industrialnyi current 16 15 Severyna Pototskoho Street Industrialnyi current 17 36 Dvanadtsiatoho Kvitnia Street Industrialnyi current 18 34-A Dvanadtsiatoho Kvitnia Street Industrialnyi current 19 34 Dvanadtsiatoho Kvitnia Street Industrialnyi current 20 32 Dvanadtsiatoho Kvitnia Street Industrialnyi current 21 30 Dvanadtsiatoho Kvitnia Street Industrialnyi current 22 26 Dvanadtsiatoho Kvitnia Street Industrialnyi current 23 24 Dvanadtsiatoho Kvitnia Street Industrialnyi current 24 22 Dvanadtsiatoho Kvitnia Street Industrialnyi current 25 20 Dvanadtsiatoho Kvitnia Street Industrialnyi current 26 10/46 Dvanadtsiatoho Kvitnia Street Industrialnyi current 27 25 Arkhitektora Aloshyna Avenue Industrialnyi current 28 23 Arkhitektora Aloshyna Avenue Industrialnyi current 29 21/138 Arkhitektora Aloshyna Avenue Industrialnyi current 30 115 Oleksandrivskyi Avenue Industrialnyi current 31 111 Oleksandrivskyi Avenue Industrialnyi current 32 81 Oleksandrivskyi Avenue Industrialnyi current 33 79 Oleksandrivskyi Avenue Industrialnyi current 34 77 Oleksandrivskyi Avenue Industrialnyi current 35 184 Oleksandrivskyi Avenue Industrialnyi current 36 182 Oleksandrivskyi Avenue Industrialnyi current 37 178 Oleksandrivskyi Avenue Industrialnyi current 38 176 Oleksandrivskyi Avenue Industrialnyi current 39 170 Oleksandrivskyi Avenue Industrialnyi current 40 168 Oleksandrivskyi Avenue Industrialnyi current 41 166 Oleksandrivskyi Avenue Industrialnyi current 42 164 Oleksandrivskyi Avenue Industrialnyi current 43 160/32 Oleksandrivskyi Avenue Industrialnyi current 44 158 Oleksandrivskyi Avenue Industrialnyi current 45 156 Oleksandrivskyi Avenue Industrialnyi current 46 154 Oleksandrivskyi Avenue Industrialnyi current 322 47 148 Oleksandrivskyi Avenue Industrialnyi current 48 142 Oleksandrivskyi Avenue Industrialnyi current 49 140 Oleksandrivskyi Avenue Industrialnyi current 50 113 Oleksandrivskyi Avenue Industrialnyi current 51 103/41 Oleksandrivskyi Avenue Industrialnyi current 52 146 Oleksandrivskyi Avenue Industrialnyi current 53 38 Kosarieva Street Industrialnyi current 54 8 Kosarieva Street Industrialnyi current 55 44 Kosarieva Street Industrialnyi current 56 4 Kosarieva Street Industrialnyi current 57 2 Kosarieva Street Industrialnyi current 58 39 Arkhitektora Aloshyna Avenue Industrialnyi current 59 37 Arkhitektora Aloshyna Avenue Industrialnyi current 60 40 Kosarieva Street Industrialnyi current 61 46 Kosarieva Street Industrialnyi current 62 48 Kosarieva Street Industrialnyi current 63 37-A Frantisheka Krala Street Industrialnyi current 64 41 Frantisheka Krala Street Industrialnyi current 65 43 Frantisheka Krala Street Industrialnyi current 66 33 Arkhitektora Aloshyna Avenue Industrialnyi current 67 31 Arkhitektora Aloshyna Avenue Industrialnyi current 68 29 Arkhitektora Aloshyna Avenue Industrialnyi current 69 65/51 Industrialnyi Avenue Industrialnyi current 70 63 Industrialnyi Avenue Industrialnyi current 71 61 Industrialnyi Avenue Industrialnyi current 72 59-A Industrialnyi Avenue Industrialnyi current 73 59 Industrialnyi Avenue Industrialnyi current 74 57 Industrialnyi Avenue Industrialnyi current 75 55-A Industrialnyi Avenue Industrialnyi current 76 55 Industrialnyi Avenue Industrialnyi current 77 54/47 Industrialnyi Avenue Industrialnyi current 78 53 Industrialnyi Avenue Industrialnyi current 79 52 Industrialnyi Avenue Industrialnyi current 80 51-A Industrialnyi Avenue Industrialnyi current 81 51 Industrialnyi Avenue Industrialnyi current 82 50 Industrialnyi Avenue Industrialnyi current 83 49 Industrialnyi Avenue Industrialnyi current 84 47 Industrialnyi Avenue Industrialnyi current 85 46 Industrialnyi Avenue Industrialnyi current 86 45 Industrialnyi Avenue Industrialnyi current 87 44 Industrialnyi Avenue Industrialnyi current 88 43 Industrialnyi Avenue Industrialnyi current 89 42 Industrialnyi Avenue Industrialnyi current 90 37/36 Industrialnyi Avenue Industrialnyi current 91 36 Industrialnyi Avenue Industrialnyi current 92 34 Industrialnyi Avenue Industrialnyi current 93 24-A Kosmichna Street Shevchenkivskyi current 94 4 Hrabovskoho Lane Shevchenkivskyi current 95 82 Ochakivska Street Shevchenkivskyi current 96 16-A Otakara Yarosha Street Shevchenkivskyi current 323 97 11-A Otakara Yarosha Street Shevchenkivskyi current 98 5 Otakara Yarosha Street Shevchenkivskyi current 99 3/5 Shatylivska Street Shevchenkivskyi current 100 1 Shatylivska Street Shevchenkivskyi current 101 16-A Kultury Street Shevchenkivskyi current 102 15 Kultury Street Shevchenkivskyi current 103 10-A Kultury Street Shevchenkivskyi current 104 27 Kolomenska Street Shevchenkivskyi current 105 25 Kolomenska Street Shevchenkivskyi current 106 276-B Klochkivska Street Shevchenkivskyi current 107 274 Klochkivska Street Shevchenkivskyi current 108 244 Klochkivska Street Shevchenkivskyi current 109 46 Peremohy Avenue Shevchenkivskyi current 110 45-A Nauky Avenue Shevchenkivskyi current 111 41/43 Nauky Avenue Shevchenkivskyi current 112 32 Nauky Avenue Shevchenkivskyi current 113 24 Nauky Avenue Shevchenkivskyi current 114 18/9 Nauky Avenue Shevchenkivskyi current 115 12 Nauky Avenue Shevchenkivskyi current 116 11 Nauky Avenue Shevchenkivskyi current 117 5 Pavlivskyi Square Shevchenkivskyi current 118 3-E Liudmyly Hurchenko Lane Shevchenkivskyi current 119 11 Otakara Yarosha Lane Shevchenkivskyi current 120 6 Otakara Yarosha Lane Shevchenkivskyi current 121 4/6 Kravtsova Lane Shevchenkivskyi current 122 1 Derevianka Street Shevchenkivskyi current 123 27 Danylevskoho Street Shevchenkivskyi current 124 3 Bakulina Street Shevchenkivskyi current 125 14-A Oleksiivska Street Shevchenkivskyi current 126 7 Akademyka Liapunova Street Shevchenkivskyi current 127 5 Nezalezhnosti Avenue Shevchenkivskyi current 128 7 Chychybabina Street Shevchenkivskyi current 129 2/2 Konstytutsii Square Osnovianskyi current 18 Himnaziina Quay, IHS No.1 (entrances 130 Osnovianskyi current No.1-No.4) 18 Himnaziina Quay, IHS No.2 (entrances 131 Osnovianskyi current No.5-No.8) 132 11/13 Nikitina Street Osnovianskyi current 133 64-A Moskovskyi Avenue Osnovianskyi current 134 12 Shota Rustaveli Street Osnovianskyi current 135 14 Shota Rustaveli Street Osnovianskyi current 136 13 Bohdana Khmelnytskoho Street Osnovianskyi current 137 1 Kostiurynskyi Lane Osnovianskyi current 1 Zakhysnykiv Ukrainy Square, IHS No.1 138 Osnovianskyi current (entrances No.1-No.5) 1 Zakhysnykiv Ukrainy Square, IHS No.2 139 Osnovianskyi current (entrances No.6-No.13) 140 90 Moskovskyi Avenue Osnovianskyi current 141 90-A Moskovskyi Avenue Osnovianskyi current 142 1/3 Virmenskyi Lane Osnovianskyi current 324 143 4 Himnaziina Quay Osnovianskyi current 144 13/2 Kooperatyvna Street Osnovianskyi current 145 42/1 Shota Rustaveli Street Osnovianskyi current 146 170 K-1 Haharina Avenue Osnovianskyi new 147 174 K-7 Haharina Avenue Osnovianskyi new 148 56 Hroznenska Street Osnovianskyi new 149 56-A Hroznenska Street Osnovianskyi new 150 53-A Makiivska Street Osnovianskyi new 151 58 Hroznenska Street Osnovianskyi new 152 56 Hroznenska Street Osnovianskyi new 153 5 Moskalivska Street Osnovianskyi new 154 7 Moskalivska Street Osnovianskyi new 155 7-V Moskalivska Street Osnovianskyi new 156 9 Moskalivska Street Osnovianskyi new 157 29 Voskresenska Street Osnovianskyi new 158 31 Voskresenska Street Osnovianskyi new 159 8 Netichenska Quay Osnovianskyi new 160 7 Butivskyi Entry Kyivskyi current 161 5 Teatralnyi Lane Kyivskyi current 162 17 Moskovskyi Avenue Kyivskyi current 163 19/23 Moskovskyi Avenue Kyivskyi current 164 5 Alchevskykh Street Kyivskyi current 165 17 Alchevskykh Street Kyivskyi current 166 9 Vorobiova Street Kyivskyi current 167 3 Harshyna Street Kyivskyi current 168 19 Hirshmana Street Kyivskyi current 169 2-A Hoholia Street Kyivskyi current 170 24 Svobody Street Kyivskyi current 171 11/13 Svobody Street Kyivskyi current 172 5 Mystetstv Street Kyivskyi current 173 6 Mystetstv Street Kyivskyi current 174 20 Lermontovska Street Kyivskyi current 175 28 Lermontovska Street Kyivskyi current 176 88 Myronosytska Street Kyivskyi current 177 17 Maksymilianivska Street Kyivskyi current 178 18 Maksymilianivska Street Kyivskyi current 179 7 Yaroslava Mudroho Street Kyivskyi current 180 1 Potebni Street Kyivskyi current 181 3/5 Potebni Street Kyivskyi current 182 3 Pushkinska Street Kyivskyi current 183 32 Pushkinska Street Kyivskyi current 184 96 Pushkinska Street Kyivskyi current 185 5/2 Studentska Street Kyivskyi current 186 68 Sumska Street Kyivskyi current 187 15 Chaikovska Street Kyivskyi current 188 23 Chaikovska Street Kyivskyi current 189 33-B Chaikovska Street Kyivskyi current 190 82 Chernyshevska Street Kyivskyi current 191 85 Chernyshevska Street Kyivskyi current 192 9 Kharkivska Quay Kyivskyi current 325 193 21 Akademika Kurchatova Avenue Kyivskyi current 194 5 Akademika Valtera Street Kyivskyi current 195 7 Akademika Valtera Street Kyivskyi current 196 19A Akademika Valtera Street Kyivskyi current 197 2/58 Akademika Pidhornoho Lane Nemyshlianskyi current 198 4 Akademika Pidhornoho Lane Nemyshlianskyi current 199 5 Akademika Pidhornoho Lane Nemyshlianskyi current 200 6 Akademika Pidhornoho Lane Nemyshlianskyi current 201 7/59 Akademika Pidhornoho Lane Nemyshlianskyi current 202 3-A Komunalnyi Passage Nemyshlianskyi current 203 38 Lva Landau Avenue Nemyshlianskyi current 204 9/11 Komunalnyi Passage Nemyshlianskyi current 205 44 Lva Landau Avenue Nemyshlianskyi current 206 56/3 Lva Landau Avenue Nemyshlianskyi current 207 58/2 Lva Landau Avenue Nemyshlianskyi current 208 55 Oleksandrivskyi Avenue Nemyshlianskyi current 209 18/63 Pozharskoho Street Nemyshlianskyi current 210 19/46 Akademika Filippova Street Nemyshlianskyi current 211 56 Akademika Filippova Street Nemyshlianskyi current 212 62 Akademika Filippova Street Nemyshlianskyi current 213 11/54 Bahrationa Street Nemyshlianskyi current 214 17/53 Bahrationa Street Nemyshlianskyi current 215 12/64 Pozharskoho Street Nemyshlianskyi current 216 16 Pozharskoho Street Nemyshlianskyi current 191 Moskovskyi Avenue, IHS No.2 (entrances 217 Moskovskyi current No.9-No.17) 191 Moskovskyi Avenue, IHS No.1 (entrances 218 Moskovskyi current No.1-No.8) 219 89 Moskovskyi Avenue Moskovskyi current 220 85 Moskovskyi Avenue Moskovskyi current 221 1-A Feiierbakha Street Moskovskyi current 222 10-A Chyhyryna Street Moskovskyi current 223 37/39 Somivska Street Moskovskyi current 224 8 Serhiivska Street Moskovskyi current 225 12 Metalista Street Moskovskyi current 226 50/29 Hvardiitsiv Shyronintsiv Street Moskovskyi current 227 1-B Hvardiitsiv Shyronintsiv Street Moskovskyi current 228 2 Mykhailyka Street Moskovskyi current 229 37 Marshala Batytskoho Street Moskovskyi current 230 20/3 Marshala Batytskoho Street Moskovskyi current 231 10 Marshala Batytskoho Street Moskovskyi current 232 27-A Adyheiska Street Moskovskyi current 233 6 Enerhetychna Street Slobidskyi current 234 2 Enerhetychna Street Slobidskyi current 235 5 Chornomorska Street Slobidskyi current 236 1 Chornomorska Street Slobidskyi current 237 134 Niutona Street Slobidskyi current 238 13-A Morozova Street Slobidskyi current 239 2 Morozova Street Slobidskyi current 240 9-A Kyrhyzka Street Slobidskyi current 326 241 6-B Kyrhyzka Street Slobidskyi current 242 5A Kyrhyzka Street Slobidskyi current 243 16 Dyzelna Street Slobidskyi current 244 1-B Dyzelna Street Slobidskyi current 245 1 Dyzelna Street Slobidskyi current 246 18 Dyzelna Street Slobidskyi current 247 102/112 Moskovskyi Avenue Slobidskyi current 248 21-A Heroiv Stalinhrada Avenue Slobidskyi current 249 96 Moskovskyi Avenue Slobidskyi current 250 96-A Moskovskyi Avenue Slobidskyi current 327 Annex 35. List of resident houses on the component “Installation of the heat meters and other mechanical and electrical equipment in the heat supply stations of the residential houses” ID Administrative District of Postal Address of Facility No. Kharkiv 1 12 Zhasminovyi Boulevard No.1 Slobidskyi 2 12 Zhasminovyi Boulevard No.2 Slobidskyi 3 12 Zhasminovyi Boulevard No.3 Slobidskyi 4 26 Tankopiia Street Slobidskyi 5 10 Zhasminovyi Boulevard Slobidskyi 6 1 Zhasminovyi Boulevard Slobidskyi 7 11 Zhasminovyi Boulevard No.1 Slobidskyi 8 11 Zhasminovyi Boulevard No.2 Slobidskyi 9 11 Zhasminovyi Boulevard No.3 Slobidskyi 10 13 Zhasminovyi Boulevard Slobidskyi 11 13/1 Zhasminovyi Boulevard Slobidskyi 12 3 Zhasminovyi Boulevard No.1 Slobidskyi 13 3 Zhasminovyi Boulevard No.2 Slobidskyi 14 3 Zhasminovyi Boulevard No.3 Slobidskyi 15 5 Zhasminovyi Boulevard Slobidskyi 16 7 Zhasminovyi Boulevard No.1 Slobidskyi 17 7 Zhasminovyi Boulevard No.2 Slobidskyi 18 7 Zhasminovyi Boulevard No.3 Slobidskyi 19 9 Zhasminovyi Boulevard Slobidskyi 20 16 Tankopiia Street No.1 Slobidskyi 21 16 Tankopiia Street No.2 Slobidskyi 22 18 Tankopiia Street Slobidskyi 23 18A Tankopiia Street Slobidskyi 24 20 Tankopiia Street No.1 Slobidskyi 25 20 Tankopiia Street No.2 Slobidskyi 26 22B Tankopiia Street Slobidskyi 27 2 Zhasminovyi Boulevard Slobidskyi 28 4 Zhasminovyi Boulevard No.1 Slobidskyi 29 4 Zhasminovyi Boulevard No.2 Slobidskyi 30 6 Zhasminovyi Boulevard No.1 Slobidskyi 31 6 Zhasminovyi BoulevardNo.2 Slobidskyi 32 12 Kyrhyzka Street Slobidskyi 33 23 Heroiv Stalinhrada Avenue No.1 Slobidskyi 34 23 Heroiv Stalinhrada Avenue No.2 Slobidskyi 35 23 Heroiv Stalinhrada Avenue No.3 Slobidskyi 36 23 Heroiv Stalinhrada Avenue No.4 Slobidskyi 37 23 Heroiv Stalinhrada Avenue No.5 Slobidskyi 38 25 Heroiv Stalinhrada Avenue No.1 Slobidskyi 39 25 Heroiv Stalinhrada Avenue No.2 Slobidskyi 40 25 Heroiv Stalinhrada Avenue No.3 Slobidskyi 41 25 Heroiv Stalinhrada Avenue No.4 Slobidskyi 42 25 К1 Heroiv Stalinhrada Avenue No.1 Slobidskyi 43 25 К1 Heroiv Stalinhrada Avenue No.2 Slobidskyi 44 25 К1 Heroiv Stalinhrada Avenue No.3 Slobidskyi 45 25 К1 Heroiv Stalinhrada Avenue No.4 Slobidskyi 46 39 Heroiv Stalinhrada Avenue No.1 Slobidskyi 328 47 39 Heroiv Stalinhrada Avenue No.2 Slobidskyi 48 41 Heroiv Stalinhrada Avenue No.1 Slobidskyi 49 41 Heroiv Stalinhrada Avenue No.2 Slobidskyi 50 41 Heroiv Stalinhrada Avenue No.3 Slobidskyi 51 41 Heroiv Stalinhrada Avenue No.4 Slobidskyi 52 17 Kostycheva Street No.1 Slobidskyi 53 17 Kostycheva Street No.2 Slobidskyi 54 17 Kostycheva Street No.3 Slobidskyi 55 19 Kostycheva Street No.1 Slobidskyi 56 19 Kostycheva Street No.2 Slobidskyi 57 19 Kostycheva Street No.3 Slobidskyi 58 12А Moniushka Street No.1 Slobidskyi 59 12А Moniushka Street No.2 Slobidskyi 60 12А Moniushka Street No.3 Slobidskyi 61 14 Moniushka Street No.1 Slobidskyi 62 14 Moniushka Street No.2 Slobidskyi 63 14 Moniushka Street No.3 Slobidskyi 64 14 Moniushka Street No.4 Slobidskyi 65 16 Moniushka Street No.1 Slobidskyi 66 16 Moniushka Street No.2 Slobidskyi 67 16 Moniushka Street No.3 Slobidskyi 68 10 Tankopiia Street No.1 Slobidskyi 69 10 Tankopiia Street No.2 Slobidskyi 70 12 Tankopiia Street No.1 Slobidskyi 71 12 Tankopiia Street No.2 Slobidskyi 72 12 Tankopiia Street No.3 Slobidskyi 73 12 Tankopiia Street No.4 Slobidskyi 74 12 Tankopiia Street No.5 Slobidskyi 75 12 Tankopiia Street No.6 Slobidskyi 76 12 Tankopiia Street No.7 Slobidskyi 77 12А Tankopiia Street No.1 Slobidskyi 78 12А Tankopiia Street No.2 Slobidskyi 79 14А Tankopiia Street No.1 Slobidskyi 80 14А Tankopiia Street No.2 Slobidskyi 81 6А Tankopiia Street Slobidskyi 82 8 Tankopiia Street No.1 Slobidskyi 83 8 Tankopiia Street No.2 Slobidskyi 84 8 Tankopiia Street No.3 Slobidskyi 85 8 Tankopiia Street No.4 Slobidskyi 86 8 Tankopiia Street No.5 Slobidskyi 87 8 Tankopiia Street No.6 Slobidskyi 88 8 Tankopiia Street No.7 Slobidskyi 89 8А Tankopiia Street No.1 Slobidskyi 90 8А Tankopiia Street No.2 Slobidskyi 91 8В Tankopiia Street No.1 Slobidskyi 92 8В Tankopiia Street No.2 Slobidskyi 93 8G Tankopiia Street Slobidskyi 94 11А Sadovyi Passage No.1 Slobidskyi 95 11А Sadovyi Passage No.2 Slobidskyi 96 11А Sadovyi Passage No.3 Slobidskyi 329 97 3 Sadovyi Passage No.1 Slobidskyi 98 3 Sadovyi Passage No.2 Slobidskyi 99 5 Sadovyi Passage Slobidskyi 100 5А Sadovyi Passage Slobidskyi 101 9 Sadovyi Passage Slobidskyi 102 10 Petra Hryhorenka Avenue No.1 Slobidskyi 103 10 Petra Hryhorenka Avenue No.2 Slobidskyi 104 10 Petra Hryhorenka Avenue No.3 Slobidskyi 105 10 Petra Hryhorenka Avenue No.4 Slobidskyi 106 10 Petra Hryhorenka Avenue No.5 Slobidskyi 107 10 Petra Hryhorenka Avenue No.6 Slobidskyi 108 10A Petra Hryhorenka Avenue Slobidskyi 109 10V Petra Hryhorenka Avenue Slobidskyi 110 10G Petra Hryhorenka Avenue Slobidskyi 111 10D Petra Hryhorenka Avenue Slobidskyi 112 12 Petra Hryhorenka Avenue No.1 Slobidskyi 113 12 Petra Hryhorenka Avenue No.2 Slobidskyi 114 12A Petra Hryhorenka Avenue Slobidskyi 115 12B Petra Hryhorenka Avenue Slobidskyi 116 12V Petra Hryhorenka Avenue Slobidskyi 117 1 Kyrhyzka Street No.1 Slobidskyi 118 3 Kyrhyzka Street No.1 Slobidskyi 119 3 Kyrhyzka Street No.2 Slobidskyi 120 3 Moniushka Street Slobidskyi 121 5 Zernovyi Lane Slobidskyi 122 5А Zernovyi Lane No.1 Slobidskyi 123 5А Zernovyi Lane No.2 Slobidskyi 124 5А Zernovyi Lane No.3 Slobidskyi 125 5В Zernovyi Lane No.1 Slobidskyi 126 5В Zernovyi Lane No.2 Slobidskyi 127 5В Zernovyi Lane No.3 Slobidskyi 128 5В Zernovyi Lane No.4 Slobidskyi 129 5V Zernovyi Lane No.1 Slobidskyi 130 5V Zernovyi Lane No.2 Slobidskyi 131 5G Zernovyi Lane No.1 Slobidskyi 132 5G Zernovyi Lane No.2 Slobidskyi 133 5G Zernovyi Lane No.3 Slobidskyi 134 6/1 Zernovyi Lane Slobidskyi 135 6/2 Zernovyi Lane Slobidskyi 136 6/3 Zernovyi Lane Slobidskyi 137 6/5 Zernovyi Lane Slobidskyi 138 6/6 Zernovyi Lane No.1 Slobidskyi 139 6/6 Zernovyi Lane No.2 Slobidskyi 140 6/7 Zernovyi Lane Slobidskyi 141 4 Tarasivskyi Entry No.1 Slobidskyi 142 4 Tarasivskyi Entry No.2 Slobidskyi 143 4 Tarasivskyi Entry No.3 Slobidskyi 144 9 Fesenkivskyi Entry No.1 Slobidskyi 145 9 Fesenkivskyi Entry No.2 Slobidskyi 146 1 Dniprovska Street No.1 Slobidskyi 330 147 1 Dniprovska Street No.2 Slobidskyi 148 1 Dniprovska Street No.3 Slobidskyi 149 10 Polova Street No.1 Slobidskyi 150 10 Polova Street No.2 Slobidskyi 151 2 Polova Street No.1 Slobidskyi 152 2 Polova Street No.2 Slobidskyi 153 4 Polova Street No.1 Slobidskyi 154 4 Polova Street No.2 Slobidskyi 155 4 Polova Street No.3 Slobidskyi 156 4 Polova Street No.4 Slobidskyi 157 6 Polova Street No.1 Slobidskyi 158 6 Polova Street No.2 Slobidskyi 159 16 Fesenkivska Street Slobidskyi 160 45A Haharina Avenue No.1 Slobidskyi 161 45A Haharina Avenue No.2 Slobidskyi 162 45A Haharina Avenue No.3 Slobidskyi 163 45A Haharina Avenue No.4 Slobidskyi 164 45A Haharina Avenue No.5 Slobidskyi 165 45A Haharina Avenue No.6 Slobidskyi 166 47А Haharina Avenue No.1 Slobidskyi 167 47А Haharina Avenue No.2 Slobidskyi 168 47А Haharina Avenue No.3 Slobidskyi 169 47А Haharina Avenue No.4 Slobidskyi 170 6 Kyrhyzka Street Slobidskyi 171 1А Zernovyi Lane Slobidskyi 172 175A Haharina Avenue Slobidskyi 173 179 Haharina Avenue No.1 Slobidskyi 174 179 Haharina Avenue No.2 Slobidskyi 175 1/8 Heroiv Stalinhrada Avenue No.1 Slobidskyi 176 1/8 Heroiv Stalinhrada Avenue No.2 Slobidskyi 177 1А Heroiv Stalinhrada Avenue Slobidskyi 178 5 Heroiv Stalinhrada Avenue No.1 Slobidskyi 179 5 Heroiv Stalinhrada Avenue No.2 Slobidskyi 180 5/1 Heroiv Stalinhrada Avenue Slobidskyi 181 7 Heroiv Stalinhrada Avenue Slobidskyi 182 7/1 Heroiv Stalinhrada Avenue Slobidskyi 183 12 Matrosova Street Slobidskyi 184 14 Matrosova Street Slobidskyi 185 16 Matrosova Street Slobidskyi 186 171А Haharina Avenue No.1 Slobidskyi 187 171А Haharina Avenue No.2 Slobidskyi 188 1 К3 Molochna Street Slobidskyi 189 20 Sadovyi Passage Slobidskyi 190 22 Sadovyi Passage Slobidskyi 191 24 Sadovyi Passage Slobidskyi 192 26 Sadovyi Passage Slobidskyi 193 28 Sadovyi Passage Slobidskyi 194 30 Sadovyi Passage Slobidskyi 195 1 Soicha Street Slobidskyi 196 4 Soicha Street Slobidskyi 331 197 122 Moskovskyi Avenue Slobidskyi 198 15 Kovtuna Street Slobidskyi 199 19 Kovtuna Street Slobidskyi 200 23 Kovtuna Street Slobidskyi 201 40 Kovtuna Street Slobidskyi 202 42 Kovtuna Street Slobidskyi 203 87 Polova Street Slobidskyi 204 6B Askoldivska Street Slobidskyi 205 6V Askoldivska Street Slobidskyi 206 9 Kyrhyzka Street Slobidskyi 207 9B Kyrhyzka Street Slobidskyi 208 9D Kyrhyzka Street Slobidskyi 209 15 Spyrydonivska Street Slobidskyi 210 12/14 Fesenkivska Street Slobidskyi 211 5A Brianskyi Lane Slobidskyi 212 11 K4 Molochna Street Slobidskyi 213 11 K5Molochna Street Slobidskyi 214 11 K6 Molochna Street Slobidskyi 215 11 K7 Molochna Street Slobidskyi 216 11 K8 Molochna Street Slobidskyi 217 40 Plekhanivska Street Slobidskyi 218 41/43 Plekhanivska Street Slobidskyi 219 90A Plekhanivska Street Slobidskyi 220 16 Mukhachova Street Slobidskyi 221 18 Mukhachova Street Slobidskyi 222 20 Mukhachova Street Slobidskyi 223 22 Mukhachova Street Slobidskyi 224 24 Mukhachova Street Slobidskyi 225 5 Mukhachova Street Slobidskyi 226 5A Mukhachova Street Slobidskyi 227 2A Dyzelna Street Slobidskyi 228 2B Dyzelna Street Slobidskyi 229 4 Dyzelna Street Slobidskyi 230 6 Dyzelna Street Slobidskyi 231 10 Kovtuna Street Slobidskyi 232 10A Kovtuna Street Slobidskyi 233 12 Kovtuna Street Slobidskyi 234 16 Kovtuna Street Slobidskyi 235 20 Kovtuna Street Slobidskyi 236 24 Kovtuna Street Slobidskyi 237 5 Kovtuna Street Slobidskyi 238 5 Morozova Street Slobidskyi 239 10 Teplovozna Street Slobidskyi 240 2 Teplovozna Street Slobidskyi 241 3 Teplovozna Street Slobidskyi 242 4 Teplovozna Street Slobidskyi 243 5 Teplovozna Street Slobidskyi 244 6 Teplovozna Street Slobidskyi 245 7 Teplovozna Street Slobidskyi 246 9 Teplovozna Street Slobidskyi 332 247 3 Chornomorska Street Slobidskyi 248 22B Morozova Street Slobidskyi 249 124 Moskovskyi Avenue Slobidskyi 250 124/3 Moskovskyi Avenue Slobidskyi 251 124/5A Moskovskyi Avenue Slobidskyi 252 98A Plekhanivska Street Slobidskyi 253 4 Orenburzka Street Slobidskyi 254 73 Plekhanivska Street No.1 Slobidskyi 255 73 Plekhanivska Street No.2 Slobidskyi 256 26 Smolna Street Slobidskyi 257 1 Bronenostsia Potomkin Street No.1 Slobidskyi 258 1 Bronenostsia Potomkin Street No.2 Slobidskyi 259 1В Bronenostsia Potomkin Street No.1 Slobidskyi 260 1В Bronenostsia Potomkin Street No.2 Slobidskyi 261 10 Koshkina Street Slobidskyi 262 124/4 Moskovskyi Avenue Slobidskyi 263 124A Moskovskyi Avenue No.1 Slobidskyi 264 124А Moskovskyi Avenue No.2 Slobidskyi 265 28 Pereizna Street Slobidskyi 266 11 Aeroflotska Street Slobidskyi 267 12 Aeroflotska Street Slobidskyi 268 14 Aeroflotska Street Slobidskyi 269 18 Aeroflotska Street Slobidskyi 270 7 Aeroflotska Street Slobidskyi 271 3 Nesterova Street Slobidskyi 272 4 Nesterova Street Slobidskyi 273 6 Nesterova Street Slobidskyi 274 6A Romashkina Street Slobidskyi 275 1A Pilotiv Lane Slobidskyi 276 3 Pilotiv Lane Slobidskyi 277 5 Pilotiv Lane Slobidskyi 278 7 Pilotiv Lane Slobidskyi 279 7A Pilotiv Lane Slobidskyi 280 203 Haharina Avenue Slobidskyi 281 205 Haharina Avenue Slobidskyi 282 205/1 Haharina Avenue Slobidskyi 283 211 Haharina Avenue Slobidskyi 284 191A Haharina Avenue Slobidskyi 285 193 Haharina Avenue Slobidskyi 286 193A Haharina Avenue Slobidskyi 287 195 Haharina Avenue Slobidskyi 288 195A Haharina Avenue Slobidskyi 289 197 Haharina Avenue Slobidskyi 290 199 Haharina Avenue Slobidskyi 291 199A Haharina Avenue Slobidskyi 292 28 Tankopiia Street No.1 Slobidskyi 293 28 Tankopiia Street No.2 Slobidskyi 294 28A Tankopiia Street Slobidskyi 295 32 Tankopiia Street No.1 Slobidskyi 296 32 Tankopiia Street No.2 Slobidskyi 333 297 34 Tankopiia Street Slobidskyi 298 23 Petra Hryhorenka Avenue Slobidskyi 299 27 Petra Hryhorenka Avenue Slobidskyi 300 31 Petra Hryhorenka Avenue Slobidskyi 301 37 Petra Hryhorenka Avenue Slobidskyi 302 41 Petra Hryhorenka Avenue No.1 Slobidskyi 303 41 Petra Hryhorenka Avenue No.2 Slobidskyi 304 45 Petra Hryhorenka Avenue Slobidskyi 305 21/15 Rybalka Street No.1 Nemyshlianskyi 306 21/15 Rybalka Street No.2 Nemyshlianskyi 307 23 Rybalka Street Nemyshlianskyi 308 27 Rybalka Street Nemyshlianskyi 309 29 Rybalka Street Nemyshlianskyi 310 33 Rybalka Street Nemyshlianskyi 311 35 Rybalka Street Nemyshlianskyi 312 37 Rybalka Street No.1 Nemyshlianskyi 313 37 Rybalka Street No.2 Nemyshlianskyi 314 39 Rybalka Street Nemyshlianskyi 315 220 Moskovskyi Avenue Nemyshlianskyi 316 222 Moskovskyi Avenue Nemyshlianskyi 317 226 Moskovskyi Avenue Nemyshlianskyi 318 226А Moskovskyi Avenue Nemyshlianskyi 319 228 Moskovskyi Avenue Nemyshlianskyi 320 232 Moskovskyi Avenue Nemyshlianskyi 321 232А Moskovskyi Avenue Nemyshlianskyi 322 234 Moskovskyi Avenue Nemyshlianskyi 323 234А Moskovskyi Avenue Nemyshlianskyi 324 236 Moskovskyi Avenue Nemyshlianskyi 325 238 Moskovskyi Avenue Nemyshlianskyi 326 238А Moskovskyi Avenue Nemyshlianskyi 327 240 Moskovskyi Avenue Nemyshlianskyi 328 4 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 329 6 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 330 10 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 331 12 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 332 14 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 333 16 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 334 18 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 335 20 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 336 1 Oshchepkova Street Nemyshlianskyi 337 3 Oshchepkova Street Nemyshlianskyi 338 7 Oshchepkova Street Nemyshlianskyi 339 7А Oshchepkova Street Nemyshlianskyi 340 11 Oshchepkova Street Nemyshlianskyi 341 13 Oshchepkova Street Nemyshlianskyi 342 2 Stadionnyi Passage Nemyshlianskyi 343 2/4 Stadionnyi Passage Nemyshlianskyi 344 4 Stadionnyi Passage Nemyshlianskyi 345 4/3 Stadionnyi Passage Nemyshlianskyi 346 4/4 Stadionnyi Passage No.1 Nemyshlianskyi 334 347 4/4 Stadionnyi Passage No.2 Nemyshlianskyi 348 5 Stadionnyi Passage Nemyshlianskyi 349 6 Stadionnyi Passage Nemyshlianskyi 350 6/1 Stadionnyi Passage Nemyshlianskyi 351 6/3 Stadionnyi Passage Nemyshlianskyi 352 9 Stadionnyi Passage Nemyshlianskyi 353 13 Petra Hryhorenka Avenue Nemyshlianskyi 354 21/1 Petra Hryhorenka Avenue No.1 Nemyshlianskyi 355 21/1 Petra Hryhorenka Avenue No.2 Nemyshlianskyi 356 21 Petra Hryhorenka Avenue Nemyshlianskyi 357 9/23 Tankopiia Street Nemyshlianskyi 358 13А Tankopiia Street No.1 Nemyshlianskyi 359 13А Tankopiia Street No.2 Nemyshlianskyi 360 9А Tankopiia Street No.1 Nemyshlianskyi 361 9А Tankopiia Street No.2 Nemyshlianskyi 362 9А Tankopiia Street No.3 Nemyshlianskyi 363 11/3 Tankopiia Street No.1 Nemyshlianskyi 364 11/3 Tankopiia Street No.2 Nemyshlianskyi 365 11/3 Tankopiia Street No.3 Nemyshlianskyi 366 9/3 Tankopiia Street No.1 Nemyshlianskyi 367 9/3 Tankopiia Street No.2 Nemyshlianskyi 368 9/3 Tankopiia Street No.3 Nemyshlianskyi 369 1 Dvadtsiat tretoho Serpnia Lane No.1 Shevchenkivskyi 370 1 Dvadtsiat tretoho Serpnia Lane No.2 Shevchenkivskyi 371 1 Dvadtsiat tretoho Serpnia Lane No.3 Shevchenkivskyi 372 1 Dvadtsiat tretoho Serpnia Lane No.4 Shevchenkivskyi 373 3 Dvadtsiat tretoho Serpnia Lane Shevchenkivskyi 374 5 Dvadtsiat tretoho Serpnia Lane Shevchenkivskyi 375 6 Dvadtsiat tretoho Serpnia Lane Shevchenkivskyi 376 7 Dvadtsiat tretoho Serpnia Lane Shevchenkivskyi 377 8 Dvadtsiat tretoho Serpnia Lane Shevchenkivskyi 378 10 Dvadtsiat tretoho Serpnia Lane No.1 Shevchenkivskyi 379 10 Dvadtsiat tretoho Serpnia Lane No.2 Shevchenkivskyi 380 10 Dvadtsiat tretoho Serpnia Lane No.3 Shevchenkivskyi 381 77 Dvadtsiat tretoho Serpnia Street Shevchenkivskyi 382 75 Dvadtsiat tretoho Serpnia Street Shevchenkivskyi 383 79 Dvadtsiat tretoho Serpnia Street Shevchenkivskyi 384 81 Dvadtsiat tretoho Serpnia Street Shevchenkivskyi 385 50 Balakirieva Street Shevchenkivskyi 386 50 A Balakirieva Street Shevchenkivskyi 387 46 Derevianka Street Shevchenkivskyi 388 48 Derevianka Street No.1 Shevchenkivskyi 389 48 Derevianka Street No.2 Shevchenkivskyi 390 50 Derevianka Street Shevchenkivskyi 391 52 Derevianka Street Shevchenkivskyi 392 9А Novoprudna Street Shevchenkivskyi 393 59 Otakara Yarosha Street Shevchenkivskyi 394 61 Otakara Yarosha Street No.1 Shevchenkivskyi 395 61 Otakara Yarosha Street No.2 Shevchenkivskyi 396 61 Otakara Yarosha Street No.3 Shevchenkivskyi 335 397 61А Otakara Yarosha Street Shevchenkivskyi 398 6 Starytskoho Street Shevchenkivskyi 399 9 Starytskoho Street No.1 Shevchenkivskyi 400 9 Starytskoho Street No.2 Shevchenkivskyi 401 9 Starytskoho Street No.3 Shevchenkivskyi 402 9 Starytskoho Street No.4 Shevchenkivskyi 403 9 Starytskoho Street No.5 Shevchenkivskyi 404 9 Starytskoho Street No.6 Shevchenkivskyi 405 12 Saperna Street Kyivskyi 406 14 Saperna Street Kyivskyi 407 20 Saperna Street No.1 Kyivskyi 408 20 Saperna Street No.2 Kyivskyi 409 20 Saperna Street No.3 Kyivskyi 410 30 Saperna Street No.1 Kyivskyi 411 30 Saperna Street No.2 Kyivskyi 412 34 Saperna Street No.1 Kyivskyi 413 34 Saperna Street No.2 Kyivskyi 414 34 Saperna Street No.3 Kyivskyi 415 333 Shevchenka Street Kyivskyi 416 335 Shevchenka Street No.1 Kyivskyi 417 335 Shevchenka Street No.2 Kyivskyi 418 335 Shevchenka Street No.3 Kyivskyi 419 339 Shevchenka Street Kyivskyi 420 341 Shevchenka Street No.1 Kyivskyi 421 341 Shevchenka Street No.2 Kyivskyi 422 343 Shevchenka Street No.1 Kyivskyi 423 343 Shevchenka Street No.2 Kyivskyi 424 343 Shevchenka Street No.3 Kyivskyi 425 4 Akademika Kurchatova Avenue Kyivskyi 426 8 Akademika Kurchatova Avenue Kyivskyi 427 8A Akademika Kurchatova Avenue Kyivskyi 428 10 Akademika Kurchatova Avenue No.1 Kyivskyi 429 10 Akademika Kurchatova Avenue No.2 Kyivskyi 430 10 Akademika Kurchatova Avenue No.3 Kyivskyi 431 10 Akademika Kurchatova Avenue No.4 Kyivskyi 432 28 Akademika Kurchatova Avenue Kyivskyi 433 1 Hatseva Street No.1 Kyivskyi 434 1 Hatseva Street No.2 Kyivskyi 435 1 Hatseva Street No.3 Kyivskyi 436 1 Hatseva Street No.4 Kyivskyi 437 7А Hatseva Street Kyivskyi 438 7В Hatseva Street Kyivskyi 439 9 Akademika Valtera Street Kyivskyi 440 10 Akademika Valtera Street Kyivskyi 441 12 Akademika Valtera Street Kyivskyi 442 13 Akademika Valtera Street Kyivskyi 443 15 Akademika Valtera Street Kyivskyi 444 17 Akademika Valtera Street Kyivskyi 445 21 Akademika Valtera Street Kyivskyi 446 21A Akademika Valtera Street Kyivskyi 336 447 5 Akademika Kurchatova Avenue Kyivskyi 448 7 Akademika Kurchatova Street Kyivskyi 449 9 Akademika Kurchatova Avenue Kyivskyi 450 11 Akademika Kurchatova Avenue Kyivskyi 451 13 Akademika Kurchatova Avenue Kyivskyi 452 17 Akademika Kurchatova Avenue Kyivskyi 453 25 Akademika Kurchatova Avenue Kyivskyi 454 27 Akademika Kurchatova Avenue Kyivskyi 455 1 Akademika Synelnykova Street Kyivskyi 456 3 Akademika Synelnykova Street Kyivskyi 457 5 Akademika Synelnykova Street Kyivskyi 458 1 Yevpatoriiskyi Passage Kyivskyi 459 2 Yevpatoriiskyi Passage Kyivskyi 460 3 Yevpatoriiskyi Passage Kyivskyi 461 5 Yevpatoriiskyi Passage Kyivskyi 462 1 Akademika Volkova Street Kyivskyi 463 2 Akademika Volkova Street Kyivskyi 464 3 Akademika Volkova Street Kyivskyi 465 4 Akademika Volkova Street Kyivskyi 466 3 Harkushi Street Kyivskyi 467 1 Myru Boulevard Kyivskyi 468 2 Myru Boulevard Kyivskyi 469 3 Myru Boulevard Kyivskyi 470 4 Myru Boulevard Kyivskyi 471 15 Кисловодська Street Kyivskyi 472 301 Shevchenka Street Kyivskyi 473 14 Lesia Serdiuka StreetNo.1 Moskovskyi 474 14 Lesia Serdiuka StreetNo.2 Moskovskyi 475 218 Druzhby Narodiv StreetNo.1 Moskovskyi 476 218 Druzhby Narodiv StreetNo.2 Moskovskyi 477 236A Druzhby Narodiv Street Moskovskyi 478 40 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 479 40 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 480 40 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 481 40 Hvardiitsiv Shyronintsiv Street No.4 Moskovskyi 482 40 Hvardiitsiv Shyronintsiv Street No.5 Moskovskyi 483 40 Hvardiitsiv Shyronintsiv Street No.6 Moskovskyi 484 40 Hvardiitsiv Shyronintsiv Street No.7 Moskovskyi 485 40 Hvardiitsiv Shyronintsiv Street No.8 Moskovskyi 486 40 Hvardiitsiv Shyronintsiv Street No.9 Moskovskyi 487 40 Hvardiitsiv Shyronintsiv Street No.10 Moskovskyi 488 40 Hvardiitsiv Shyronintsiv Street No.11 Moskovskyi 489 38A Hvardiitsiv Shyronintsiv Street Moskovskyi 490 38B Hvardiitsiv Shyronintsiv Street Moskovskyi 491 38V Hvardiitsiv Shyronintsiv Street Moskovskyi 492 40B Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 493 40B Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 494 40V Hvardiitsiv Shyronintsiv Street Moskovskyi 495 40G Hvardiitsiv Shyronintsiv Street Moskovskyi 496 40D Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 337 497 40D Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 498 83G Traktorobudivnykiv Avenue No.1 Moskovskyi 499 83G Traktorobudivnykiv Avenue No.2 Moskovskyi 500 85G Traktorobudivnykiv Avenue No.1 Moskovskyi 501 85G Traktorobudivnykiv Avenue No.2 Moskovskyi 502 85VTraktorobudivnykiv Avenue No.1 Moskovskyi 503 85V Traktorobudivnykiv Avenue No.2 Moskovskyi 504 85A Traktorobudivnykiv Avenue Moskovskyi 505 87A Traktorobudivnykiv Avenue Moskovskyi 506 87B Traktorobudivnykiv Avenue No.1 Moskovskyi 507 87B Traktorobudivnykiv Avenue No.2 Moskovskyi 508 87B Traktorobudivnykiv Avenue No.3 Moskovskyi 509 71G Traktorobudivnykiv Avenue Moskovskyi 510 71B Traktorobudivnykiv Avenue No.1 Moskovskyi 511 71B Traktorobudivnykiv Avenue No.2 Moskovskyi 512 77A Traktorobudivnykiv Avenue No.1 Moskovskyi 513 77A Traktorobudivnykiv Avenue No.2 Moskovskyi 514 77A Traktorobudivnykiv Avenue No.3 Moskovskyi 515 77 Traktorobudivnykiv Avenue No.1 Moskovskyi 516 77 Traktorobudivnykiv Avenue No.2 Moskovskyi 517 77 Traktorobudivnykiv Avenue No.3 Moskovskyi 518 77 Traktorobudivnykiv Avenue No.4 Moskovskyi 519 77 Traktorobudivnykiv Avenue No.5 Moskovskyi 520 77 Traktorobudivnykiv Avenue No.6 Moskovskyi 521 77 Traktorobudivnykiv Avenue No.7 Moskovskyi 522 77 Traktorobudivnykiv Avenue No.8 Moskovskyi 523 77 Traktorobudivnykiv Avenue No.9 Moskovskyi 524 77 Traktorobudivnykiv Avenue No.10 Moskovskyi 525 77 Traktorobudivnykiv Avenue No.11 Moskovskyi 526 34 Vladyslava Zubenka Street No.1 Moskovskyi 527 34 Vladyslava Zubenka Street No.2 Moskovskyi 528 34 Vladyslava Zubenka Street No.3 Moskovskyi 529 36 Vladyslava Zubenka Street Moskovskyi 530 36A Vladyslava Zubenka Street No.1 Moskovskyi 531 36A Vladyslava Zubenka Street No.2 Moskovskyi 532 34B Vladyslava Zubenka Street No.1 Moskovskyi 533 34B Vladyslava Zubenka Street No.2 Moskovskyi 534 49G Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 535 49G Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 536 49V Hvardiitsiv Shyronintsiv Street Moskovskyi 537 49A Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 538 49A Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 539 49A Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 540 49A Hvardiitsiv Shyronintsiv Street No.4 Moskovskyi 541 24G Valentynivska Street No.1 Moskovskyi 542 24G Valentynivska Street No.2 Moskovskyi 543 22 Valentynivska Street No.1 Moskovskyi 544 22 Valentynivska Street No.2 Moskovskyi 545 22 Valentynivska Street No.3 Moskovskyi 546 22 Valentynivska Street No.4 Moskovskyi 338 547 22 Valentynivska Street No.5 Moskovskyi 548 22 Valentynivska Street No.6 Moskovskyi 549 22 Valentynivska Street No.7 Moskovskyi 550 22 Valentynivska Street No.8 Moskovskyi 551 22 Valentynivska Street No.9 Moskovskyi 552 24 Valentynivska Street No.1 Moskovskyi 553 24 Valentynivska Street No.2 Moskovskyi 554 24 Valentynivska Street No.3 Moskovskyi 555 24 Valentynivska Street No.4 Moskovskyi 556 24 Valentynivska Street No.5 Moskovskyi 557 24 Valentynivska Street No.6 Moskovskyi 558 24A Valentynivska Street Moskovskyi 559 24B Valentynivska Street No.1 Moskovskyi 560 24B Valentynivska Street No.2 Moskovskyi 561 26A Valentynivska Street No.1 Moskovskyi 562 26A Valentynivska Street No.2 Moskovskyi 563 17В Vladyslava Zubenka Street No.1 Moskovskyi 564 17В Vladyslava Zubenka Street No.2 Moskovskyi 565 17В Vladyslava Zubenka Street No.3 Moskovskyi 566 17В Vladyslava Zubenka Street No.4 Moskovskyi 567 21 Vladyslava Zubenka Street No.1 Moskovskyi 568 21 Vladyslava Zubenka Street No.2 Moskovskyi 569 21 Vladyslava Zubenka Street No.3 Moskovskyi 570 21 Vladyslava Zubenka Street No.4 Moskovskyi 571 21 Vladyslava Zubenka Street No.5 Moskovskyi 572 130 Akademika Pavlova Street No.1 Moskovskyi 573 130 Akademika Pavlova Street No.2 Moskovskyi 574 130 Akademika Pavlova Street No.3 Moskovskyi 575 132А Akademika Pavlova Street No.1 Moskovskyi 576 132А Akademika Pavlova Street No.2 Moskovskyi 577 132А Akademika Pavlova Street No.3 Moskovskyi 578 132А Akademika Pavlova Street No.4 Moskovskyi 579 132V Akademika Pavlova Street No.1 Moskovskyi 580 132V Akademika Pavlova Street No.2 Moskovskyi 581 132V Akademika Pavlova Street No.3 Moskovskyi 582 132V Akademika Pavlova Street No.4 Moskovskyi 583 20B Valentynivska Street Moskovskyi 584 32А Yuvileinyi Avenue No.1 Moskovskyi 585 32А Yuvileinyi Avenue No.2 Moskovskyi 586 34А Yuvileinyi Avenue Moskovskyi 587 34В Yuvileinyi Avenue Moskovskyi 588 34D Yuvileinyi Avenue No.1 Moskovskyi 589 34D Yuvileinyi Avenue No.2 Moskovskyi 590 36A Yuvileinyi Avenue No.1 Moskovskyi 591 36A Yuvileinyi Avenue No.2 Moskovskyi 592 36A Yuvileinyi Avenue No.3 Moskovskyi 593 36 Yuvileinyi Avenue Moskovskyi 594 38G Yuvileinyi Avenue Moskovskyi 595 40 Yuvileinyi Avenue Moskovskyi 596 42A Yuvileinyi Avenue No.1 Moskovskyi 339 597 42A Yuvileinyi Avenue No.2 Moskovskyi 598 42A Yuvileinyi Avenue No.3 Moskovskyi 599 42V Yuvileinyi Avenue Moskovskyi 600 42B Yuvileinyi Avenue Moskovskyi 601 44 Yuvileinyi Avenue Moskovskyi 602 44A Yuvileinyi Avenue No.1 Moskovskyi 603 44A Yuvileinyi Avenue No.2 Moskovskyi 604 44A Yuvileinyi Avenue No.3 Moskovskyi 605 44A Yuvileinyi Avenue No.4 Moskovskyi 606 44A Yuvileinyi Avenue No.5 Moskovskyi 607 44A Yuvileinyi Avenue No.6 Moskovskyi 608 156 Lva Landau Avenue No.1 Moskovskyi 609 156 Lva Landau Avenue No.2 Moskovskyi 610 9А Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 611 9А Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 612 5 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 613 5 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 614 5 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 615 5 Hvardiitsiv Shyronintsiv Street No.4 Moskovskyi 616 5V Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 617 5V Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 618 5V Hvardiitsiv Shyronintsiv StreetNo.3 Moskovskyi 619 9B Hvardiitsiv Shyronintsiv Street Moskovskyi 620 27 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 621 27 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 622 27 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 623 25 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 624 25 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 625 25 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 626 25 Hvardiitsiv Shyronintsiv Street No.4 Moskovskyi 627 23 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 628 23 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 629 23 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 630 23 Hvardiitsiv Shyronintsiv Street No.4 Moskovskyi 631 23 Hvardiitsiv Shyronintsiv Street No.5 Moskovskyi 632 23 Hvardiitsiv Shyronintsiv Street No.6 Moskovskyi 633 21 Hvardiitsiv Shyronintsiv Street No.1 Moskovskyi 634 21 Hvardiitsiv Shyronintsiv Street No.2 Moskovskyi 635 21 Hvardiitsiv Shyronintsiv Street No.3 Moskovskyi 636 4 Yuriia Parashchuka Street Novobavarskyi 637 7 Yuriia Parashchuka Street Novobavarskyi 638 57 Hryhorivske Highway No.1 Novobavarskyi 639 57 Hryhorivske Highway No.2 Novobavarskyi 640 57 Hryhorivske Highway No.3 Novobavarskyi 641 57 Hryhorivske Highway No.4 Novobavarskyi 642 63 Hryhorivske Highway Novobavarskyi 643 65 Hryhorivske Highway Novobavarskyi 644 67 Hryhorivske Highway Novobavarskyi 645 10 Tytarenkivskyi Lane Novobavarskyi 646 12 Tytarenkivskyi Lane Novobavarskyi 340 647 3 Petra Bolbochana Street Novobavarskyi 648 4 Petra Bolbochana Street Novobavarskyi 649 5 Petra Bolbochana Street Novobavarskyi 650 6 Petra Bolbochana Street Novobavarskyi 651 7 Petra Bolbochana Street Novobavarskyi 652 23 Permska Street Novobavarskyi 653 25 Permska Street Novobavarskyi 654 123 Poltavskyi Shliakh Street Novobavarskyi 655 51 Hryhorivske Highway No.1 Novobavarskyi 656 51 Hryhorivske Highway No.2 Novobavarskyi 657 51 Hryhorivske Highway No.3 Novobavarskyi 658 51 Hryhorivske Highway No.4 Novobavarskyi 659 2 Kamska Street Novobavarskyi 660 155 Poltavskyi Shliakh Street No.1 Novobavarskyi 661 155 Poltavskyi Shliakh Street No.2 Novobavarskyi 662 155A Poltavskyi Shliakh Street Novobavarskyi 663 28 Timiriazieva Street No.1 Novobavarskyi 664 28 Timiriazieva Street No.2 Novobavarskyi 665 28 Timiriazieva Street No.3 Novobavarskyi 666 28 Timiriazieva Street No.4 Novobavarskyi 667 28 Timiriazieva Street No.5 Novobavarskyi 668 28 Timiriazieva Street No.6 Novobavarskyi 669 30 Timiriazieva Street Novobavarskyi 670 42 Timiriazieva Street Novobavarskyi 671 43 Timiriazieva Street Novobavarskyi 672 47 Liubovi Maloi Avenue Novobavarskyi 673 51 Liubovi Maloi Avenue Novobavarskyi 674 53 Liubovi Maloi Avenue Novobavarskyi 675 6 Kubrakovskyi Lane Novobavarskyi 676 34 Selianska Street Novobavarskyi 677 34A Selianska Street No.1 Novobavarskyi 678 34A Selianska Street No.2 Novobavarskyi 679 34A Selianska Street No.3 Novobavarskyi 680 36 Selianska Street Novobavarskyi 681 18 Dobroliubova Street Novobavarskyi 682 79 Hryhorivske Highway Novobavarskyi 683 81 Hryhorivske Highway No.1 Novobavarskyi 684 81 Hryhorivske Highway No.2 Novobavarskyi 685 83 Hryhorivske Highway No.1 Novobavarskyi 686 83 Hryhorivske Highway No.2 Novobavarskyi 687 83A Hryhorivske Highway Novobavarskyi 688 38B Hryhorivske Highway Novobavarskyi 689 83V Hryhorivske Highway Novobavarskyi 690 85 Hryhorivske Highway Novobavarskyi 691 86A, 86B Hryhorivska Street Novobavarskyi 692 174 Moskalivska Street Novobavarskyi 693 10 Peremozhtsiv Street Novobavarskyi 694 4 Peremozhtsiv Street Novobavarskyi 695 6 Peremozhtsiv Street Novobavarskyi 696 8 Peremozhtsiv Street Novobavarskyi 341 697 177 Poltavskyi Shliakh Street Novobavarskyi 698 107 Novo-Bavarskyi Avenue Novobavarskyi 699 101 Novo-Bavarskyi Avenue Novobavarskyi 700 97 Novo-Bavarskyi Avenue Novobavarskyi 701 95 Novo-Bavarskyi Avenue Novobavarskyi 702 93 Novo-Bavarskyi Avenue Novobavarskyi 703 27 Kybalchycha Street No.1 Novobavarskyi 704 27 Kybalchycha Street No.2 Novobavarskyi 705 27 Kybalchycha Street No.3 Novobavarskyi 706 27 Kybalchycha Street No.4 Novobavarskyi 707 9 Konieva Street No.1 and No.2 Novobavarskyi 708 9 Konieva Street No.3 Novobavarskyi 709 70 Profspilkovyi Boulevard Novobavarskyi 710 8 Kytaienka Street Novobavarskyi 711 7 Bavarska Street Novobavarskyi 712 171 Poltavskyi Shliakh Street Novobavarskyi 713 56 Hertsena Streen Novobavarskyi 714 21 Volonterska Street Kholodnohirskyi 715 48 Volonterska Street No.1 Kholodnohirskyi 716 48 Volonterska Street No.2 Kholodnohirskyi 717 50 Volonterska Street No.1 Kholodnohirskyi 718 50 Volonterska Street No.2 Kholodnohirskyi 719 52 Volonterska Street Kholodnohirskyi 720 54 Volonterska Street No.1 Kholodnohirskyi 721 54 Volonterska Street No.2 Kholodnohirskyi 722 56 Volonterska Street No.1 Kholodnohirskyi 723 56 Volonterska Street No.2 Kholodnohirskyi 724 58 Volonterska Street No.1 Kholodnohirskyi 725 58 Volonterska Street No.2 Kholodnohirskyi 726 62 Volonterska Street No.1 Kholodnohirskyi 727 62 Volonterska Street No.2 Kholodnohirskyi 728 63 Volonterska Street No.1 Kholodnohirskyi 729 63 Volonterska Street No.2 Kholodnohirskyi 730 64 Volonterska Street No.1 Kholodnohirskyi 731 64 Volonterska Street No.2 Kholodnohirskyi 732 65 Volonterska Street No.1 Kholodnohirskyi 733 65 Volonterska Street No.2 Kholodnohirskyi 734 65 Volonterska Street No.3 Kholodnohirskyi 735 41 Illinska Street Kholodnohirskyi 736 63 Illinska Street No.1 Kholodnohirskyi 737 63 Illinska Street No.2 Kholodnohirskyi 738 46 Petra Bolbochana Street Kholodnohirskyi 739 48 Petra Bolbochana Street Kholodnohirskyi 740 50 Petra Bolbochana Street Kholodnohirskyi 741 59 Petra Bolbochana Street Kholodnohirskyi 742 63 Petra Bolbochana Street Kholodnohirskyi 743 67A Petra Bolbochana Street Kholodnohirskyi 744 69 Petra Bolbochana Street Kholodnohirskyi 745 126 Poltavskyi Shliakh Street Kholodnohirskyi 746 128 Poltavskyi Shliakh Street Kholodnohirskyi 342 747 130/132 Poltavskyi Shliakh Street Kholodnohirskyi 748 60 Volonterska Street No.1 Kholodnohirskyi 749 60 Volonterska Street No.2 Kholodnohirskyi 750 60 Volonterska Street No.3 Kholodnohirskyi 751 60A Volonterska Street No.1 Kholodnohirskyi 752 60A Volonterska Street No.2 Kholodnohirskyi 753 60A Volonterska Street No.3 Kholodnohirskyi 754 68 Volonterska Street No.1 Kholodnohirskyi 755 68 Volonterska Street No.2 Kholodnohirskyi 756 68 Volonterska Street No.3 Kholodnohirskyi 757 68A Volonterska Street No.1 Kholodnohirskyi 758 68A Volonterska Street No.2 Kholodnohirskyi 759 68A Volonterska Street No.3 Kholodnohirskyi 760 70 Volonterska Street No.1 Kholodnohirskyi 761 70 Volonterska Street No.2 Kholodnohirskyi 762 70 Volonterska Street No.3 Kholodnohirskyi 763 70A Volonterska Street No.1 Kholodnohirskyi 764 70A Volonterska Street No.2 Kholodnohirskyi 765 70A Volonterska Street No.3 Kholodnohirskyi 766 74 Volonterska Street Kholodnohirskyi 767 7 Cherednychenkivskyi Lane No.1 Kholodnohirskyi 768 7 Cherednychenkivskyi Lane No.2 Kholodnohirskyi 769 7 Cherednychenkivskyi Lane No.3 Kholodnohirskyi 770 7 Cherednychenkivskyi Lane No.4 Kholodnohirskyi 771 7 Cherednychenkivskyi Lane No.5 Kholodnohirskyi 772 7 Cherednychenkivskyi Lane No.6 Kholodnohirskyi 773 7 Cherednychenkivskyi Lane No.7 Kholodnohirskyi 774 7 Cherednychenkivskyi Lane No.8 Kholodnohirskyi 775 7 Cherednychenkivskyi Lane No.9 Kholodnohirskyi 776 7 Cherednychenkivskyi Lane No.10 Kholodnohirskyi 777 7 Cherednychenkivskyi Lane No.11 Kholodnohirskyi 778 8 Kholodnohirska Street No.1 Kholodnohirskyi 779 8 Kholodnohirska Street No.2 Kholodnohirskyi 780 8 Kholodnohirska Street No.3 Kholodnohirskyi 781 8 Kholodnohirska Street No.4 Kholodnohirskyi 782 14 Kholodnohirska Street Kholodnohirskyi 783 16 Kholodnohirska Street No.1 Kholodnohirskyi 784 16 Kholodnohirska Street No.2 Kholodnohirskyi 785 148/2 Poltavskyi Shliakh Street No.1 Kholodnohirskyi 786 148/2 Poltavskyi Shliakh Street No.2 Kholodnohirskyi 787 148/2 Poltavskyi Shliakh Street No.3 Kholodnohirskyi 788 152 Poltavskyi Shliakh Street No.1 Kholodnohirskyi 789 152 Poltavskyi Shliakh Street No.2 Kholodnohirskyi 790 152 Poltavskyi Shliakh Street No.3 Kholodnohirskyi 791 152 Poltavskyi Shliakh Street No.4 Kholodnohirskyi 792 154 Poltavskyi Shliakh Street No.1 Kholodnohirskyi 793 154 Poltavskyi Shliakh Street No.2 Kholodnohirskyi 794 154 Poltavskyi Shliakh Street No.3 Kholodnohirskyi 795 154 Poltavskyi Shliakh Street No.4 Kholodnohirskyi 796 154 Poltavskyi Shliakh Street No.5 Kholodnohirskyi 343 797 154 Poltavskyi Shliakh Street No.6 Kholodnohirskyi 798 12 Staroprudna Street No.1 Kholodnohirskyi 799 12 Staroprudna Street No.2 Kholodnohirskyi 800 14 Staroprudna Street Kholodnohirskyi 801 4 Staroprudna Street Kholodnohirskyi 802 6 Staroprudna Street Kholodnohirskyi 803 8 Staroprudna Street Kholodnohirskyi 804 26 Yhoria Muratova Street Kholodnohirskyi 805 28 Yhoria Muratova Street Kholodnohirskyi 806 30 Yhoria Muratova Street No.1 Kholodnohirskyi 807 30 Yhoria Muratova Street No.2 Kholodnohirskyi 808 1 Pershyi Zolochivskyi Lane Kholodnohirskyi 809 8 Zolochivska Street No.1 Kholodnohirskyi 810 8 Zolochivska Street No.2 Kholodnohirskyi 811 16 Zolochivska Street Kholodnohirskyi 812 17 Zolochivska Street No.1 Kholodnohirskyi 813 17 Zolochivska Street No.2 Kholodnohirskyi 814 17 Zolochivska Street No.3 Kholodnohirskyi 815 17B Zolochivska Street Kholodnohirskyi 816 21 Zolochivska Street Kholodnohirskyi 817 23 Zolochivska Street Kholodnohirskyi 818 25 Zolochivska Street Kholodnohirskyi 819 27 Zolochivska Street Kholodnohirskyi 820 4 Initsiatyvna Street No.1 Kholodnohirskyi 821 4 Initsiatyvna Street No.2 Kholodnohirskyi 822 10/24 Initsiatyvna Street Kholodnohirskyi 823 16 Oharivska Street No.1 Kholodnohirskyi 824 16 Oharivska Street No.2 Kholodnohirskyi 825 16 Oharivska Street No.3 Kholodnohirskyi 826 71/1 Taborova Street No.1 Kholodnohirskyi 827 71/1 Taborova Street No.2 Kholodnohirskyi 828 71/1 Taborova Street No.3 Kholodnohirskyi 829 71/1 Taborova Street No.4 Kholodnohirskyi 830 20 Shchaslyva Street No.1 Kholodnohirskyi 831 20 Shchaslyva Street No.2 Kholodnohirskyi 832 20 Shchaslyva Street No.3 Kholodnohirskyi 833 21 Shchaslyva Street No.1 Kholodnohirskyi 834 21 Shchaslyva Street No.2 Kholodnohirskyi 835 21 Shchaslyva Street No.3 Kholodnohirskyi 836 21 Shchaslyva Street No.4 Kholodnohirskyi 837 11 Slavy Avenue No.1 Kholodnohirskyi 838 11 Slavy Avenue No.2 Kholodnohirskyi 839 11 Slavy Avenue No.3 Kholodnohirskyi 840 11 Slavy Avenue No.4 Kholodnohirskyi 841 7 Slavy Avenue No.1 Kholodnohirskyi 842 7 Slavy Avenue No.2 Kholodnohirskyi 843 7 Slavy Avenue No.3 Kholodnohirskyi 844 7 Slavy Avenue No.4 Kholodnohirskyi 845 9 Slavy Avenue No.1 Kholodnohirskyi 846 9 Slavy Avenue No.2 Kholodnohirskyi 344 847 9 Slavy Avenue No.3 Kholodnohirskyi 848 9 Slavy Avenue No.4 Kholodnohirskyi 849 24A Zolochivska Street No.1 Kholodnohirskyi 850 24A Zolochivska Street No.2 Kholodnohirskyi 851 24A Zolochivska Street No.3 Kholodnohirskyi 852 24A Zolochivska Street No.4 Kholodnohirskyi 853 28 Zolochivska Street No.1 Kholodnohirskyi 854 28 Zolochivska Street No.2 Kholodnohirskyi 855 28 Zolochivska Street No.3 Kholodnohirskyi 856 28 Zolochivska Street No.4 Kholodnohirskyi 857 30/1 Zolochivska Street No.1 Kholodnohirskyi 858 30/1 Zolochivska Street No.2 Kholodnohirskyi 859 30/1 Zolochivska Street No.3 Kholodnohirskyi 860 30/1 Zolochivska Street No.4 Kholodnohirskyi 861 2 Borzenka Street No.1 Kholodnohirskyi 862 2 Borzenka Street No.2 Kholodnohirskyi 863 2 Borzenka Street No.3 Kholodnohirskyi 864 3 Borzenka Street Kholodnohirskyi 865 4 Borzenka Street No.1 Kholodnohirskyi 866 4 Borzenka Street No.2 Kholodnohirskyi 867 4 Borzenka Street No.3 Kholodnohirskyi 868 5 Borzenka Street No.1 Kholodnohirskyi 869 5 Borzenka Street No.2 Kholodnohirskyi 870 5 Borzenka Street No.3 Kholodnohirskyi 871 7 Borzenka Street No.1 Kholodnohirskyi 872 7 Borzenka Street No.2 Kholodnohirskyi 873 7 Borzenka Street No.3 Kholodnohirskyi 874 7 Borzenka Street No.4 Kholodnohirskyi 875 8 Borzenka Street No.1 Kholodnohirskyi 876 8 Borzenka Street No.2 Kholodnohirskyi 877 8 Borzenka Street No.3 Kholodnohirskyi 878 13/1 Borzenka Street Kholodnohirskyi 879 10 Plastychnyi Lane Kholodnohirskyi 880 8 Plastychnyi Lane Kholodnohirskyi 881 17 Donbasivskyi Lane No.1 Kholodnohirskyi 882 17 Donbasivskyi Lane No.2 Kholodnohirskyi 883 17 Donbasivskyi Lane No.3 Kholodnohirskyi 884 11 Druhyi Tarasivskyi Lane Kholodnohirskyi 885 2А Tretii Tarasivskyi Lane Kholodnohirskyi 886 5 Verkhivskyi Lane Kholodnohirskyi 887 6 Verkhivskyi Lane Kholodnohirskyi 888 7 Verkhivskyi Lane Kholodnohirskyi 889 23A Verkhovskoho Lane Kholodnohirskyi 890 84 Poltavskyi Shliakh Street Kholodnohirskyi 891 4/6 Yevhena Kotliara Street Kholodnohirskyi 892 8/10A Yevhena Kotliara Street Kholodnohirskyi 893 8/10B Yevhena Kotliara Street Kholodnohirskyi 894 8/10V Yevhena Kotliara Street Kholodnohirskyi 895 8/10Z Yevhena Kotliara Street Kholodnohirskyi 896 12 Yevhena Kotliara Street Kholodnohirskyi 345 897 38 Blahovishchenska Street Kholodnohirskyi 898 38E Blahovishchenska Street Kholodnohirskyi 899 38D Blahovishchenska Street Kholodnohirskyi 900 38Zh Blahovishchenska Street Kholodnohirskyi 901 10/14 Malynovskoho Street Kholodnohirskyi 902 4 Slov´ianska Street No.1 Kholodnohirskyi 903 4 Slov´ianska Street No.2 Kholodnohirskyi 904 4A Slov´ianska Street No.1 Kholodnohirskyi 905 4A Slov´ianska Street No.2 Kholodnohirskyi 906 6 Slov´ianska Street No.1 Kholodnohirskyi 907 6 Slov´ianska Street No.2 Kholodnohirskyi 908 10 Slov´ianska Street Kholodnohirskyi 909 1, 1A Riznykivskyi Lane Kholodnohirskyi 910 36 Velyka Panasivska Street Kholodnohirskyi 911 38 Velyka Panasivska Street No.1 Kholodnohirskyi 912 38 Velyka Panasivska Street No.2 Kholodnohirskyi 913 38 Velyka Panasivska Street No.3 Kholodnohirskyi 914 250/5 Velyka Panasivska Street Kholodnohirskyi 915 58 Haharina Avenue Osnovianskyi 916 54 Haharina Avenue Osnovianskyi 917 46 Haharina Avenue No.1 Osnovianskyi 918 46 Haharina Avenue No.2 Osnovianskyi 919 46 Haharina Avenue No.3 Osnovianskyi 920 40 Haharina Avenue Osnovianskyi 921 11 Holdberhivska Street Osnovianskyi 922 13 Holdberhivska Street Osnovianskyi 923 33 Chuhuivska Street No.1 Osnovianskyi 924 33 Chuhuivska Street No.2 Osnovianskyi 925 29 Chuhuivska Street No.1 Osnovianskyi 926 29 Chuhuivska Street No.2 Osnovianskyi 927 68 Haharina Avenue Osnovianskyi 928 66 Haharina Avenue Osnovianskyi 929 64 Haharina Avenue Osnovianskyi 930 72 Haharina Avenue No.1 Osnovianskyi 931 72 Haharina Avenue No.2 Osnovianskyi 932 72 Haharina Avenue No.3 Osnovianskyi 933 72 Haharina Avenue No.4 Osnovianskyi 934 72 Haharina Avenue No.5 Osnovianskyi 935 72 Haharina Avenue No.6 Osnovianskyi 936 72 Haharina Avenue No.7 Osnovianskyi 937 72 Haharina Avenue No.8 Osnovianskyi 938 72 Haharina Avenue No.9 Osnovianskyi 939 72 Haharina Avenue No.10 Osnovianskyi 940 72 Haharina Avenue No.11 Osnovianskyi 941 72 Haharina Avenue No.12 Osnovianskyi 942 72 Haharina Avenue No.13 Osnovianskyi 943 74 Haharina Avenue Osnovianskyi 944 80 Haharina AvenueNo.1 Osnovianskyi 945 80 Haharina Avenue No.2 Osnovianskyi 946 80 Haharina Avenue No.3 Osnovianskyi 346 947 86 Haharina Avenue Osnovianskyi 948 84 Haharina Avenue Osnovianskyi 949 27 Voskresenska Street Osnovianskyi 950 23 Katerynynska Street Osnovianskyi 951 1А Biblyka Street No.1 Industrialnyi 952 1А Biblyka Street No.2 Industrialnyi 953 1А Biblyka Street No.3 Industrialnyi 954 1B Biblyka Street No.1 Industrialnyi 955 1B Biblyka Street No.2 Industrialnyi 956 1B Biblyka Street No.3 Industrialnyi 957 1B Biblyka Street No.4 Industrialnyi 958 1V Biblyka Street No.1 Industrialnyi 959 1V Biblyka Street No.2 Industrialnyi 960 1V Biblyka Street No.3 Industrialnyi 961 1V Biblyka Street No.4 Industrialnyi 962 2A Biblyka Street No.1 Industrialnyi 963 2A Biblyka Street No.2 Industrialnyi 964 2A Biblyka Street No.3 Industrialnyi 965 2V Biblyka Street No.1 Industrialnyi 966 2V Biblyka Street No.2 Industrialnyi 967 2V Biblyka Street No.3 Industrialnyi 968 2D Biblyka Street No.1 Industrialnyi 969 2D Biblyka Street No.2 Industrialnyi 970 2D Biblyka Street No.3 Industrialnyi 971 2D Biblyka Street No.4 Industrialnyi 972 2D Biblyka Street No.5 Industrialnyi 973 2D Biblyka Street No.6 Industrialnyi 974 2D Biblyka Street No.7 Industrialnyi 975 2D Biblyka Street No.8 Industrialnyi 976 6A Myru Lane No.1 Industrialnyi 977 6A Myru Lane No.2 Industrialnyi 978 296B Moskovskyi Avenue No.1 Industrialnyi 979 296B Moskovskyi Avenue No.2 Industrialnyi 980 294 Moskovskyi Avenue No.1 Industrialnyi 981 294 Moskovskyi Avenue No.2 Industrialnyi 982 300 Moskovskyi Avenue No.1 Industrialnyi 983 300 Moskovskyi Avenue No.2 Industrialnyi 984 300 Moskovskyi Avenue No.3 Industrialnyi 985 300 Moskovskyi Avenue No.4 Industrialnyi 986 306 Moskovskyi Avenue No.1 Industrialnyi 987 306 Moskovskyi Avenue No.2 Industrialnyi 988 306 Moskovskyi Avenue No.3 Industrialnyi 989 302A Moskovskyi Avenue No.1 Industrialnyi 990 302A Moskovskyi Avenue No.2 Industrialnyi 991 302 Moskovskyi Avenue No.1 Industrialnyi 992 302 Moskovskyi Avenue No.2 Industrialnyi 993 286 Moskovskyi Avenue Industrialnyi 994 288 Moskovskyi Avenue Industrialnyi 995 290 Moskovskyi Avenue Industrialnyi 996 292 Moskovskyi Avenue Industrialnyi 347 997 298 Moskovskyi Avenue No.1 Industrialnyi 998 298 Moskovskyi Avenue No.2 Industrialnyi 999 298 Moskovskyi Avenue No.3 Industrialnyi 1000 298 Moskovskyi Avenue No.4 Industrialnyi 348 Annex 36. List of the areas of heating networks on the component“Reconstruction of heat networks” No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 1 Heat networks of section MK4826/3- Shevchenkivskyi current heat carrier underground 400 80 MK4826/3-1СK, Peremohy Avenue 2 Heat networks of section МК4304-МК4303, Shevchenkivskyi current heat carrier underground 600 120 Otakara Yarosha Street 3 Heat networks of section МК5223 to CHS Moscovskyi current heat carrier underground 300 437 607/2 at the 54G Heroiv Pratsi Street 4 Heat networks of section МК4115-МК4301, Shevchenkivskyi current heat carrier underground 600 170 Shekspira Street 5 Heat networks of section МК4200АСК- Shevchenkivskyi current heat carrier underground 700 195 МК4201, Shekspira Street (output No. 2 of boiler room Pavlove pole on the 17 Shekspira Street) 6 Heat networks of section МК4706-МК4707, Shevchenkivskyi current heat carrier underground 250 220 Peremohy Avenue 7 Shevchenkivskyi current heat carrier underground 200 194 349 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m Heat networks of sections МК4525-МК4531, 400 784 МК4526-МК4526/2, Dynamivska Street, Faninskyi Lane 8 Heat networks of section МК3705-МК3706, Industrialnyi current heat carrier underground 600 150 Mokhnatska Street 9 Heat networks of section МК6624- Osnovianskyi current heat carrier underground 600 105 МК66НО42, Haharina Avenue. 10 Heat networks of section МК1129-МК1134, Slobidskyi current heat carrier underground 600 789 Moskovskyi Avenue, Bronenostsia Potomkin Street 11 Heat networks of section from МК1233 to zh/b Osnovianskyi new heat carrier underground 70 60 on 56 Moskovskyi Avenue 12 Jumper between terminals No. 1 and No. 2 of Slobidskyi new heat carrier underground 600 50 Slobidskyi district boiler room on the 2/1 Kostycheva Street 13 Heat networks of section МК6316-МК6317, Slobidskyi current heat carrier underground 500 102 Fonvizina Street 350 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 14 Heat networks of section from fixed support on Moscovskyi current heat carrier underground 800 1242 the section from МК5203-МК5206A, Saltivske Highway 15 Heat networks of section МК1134/5- Slobidskyi current heat carrier underground 300 230 МК1227А, Zakhysnykiv Ukrainy Square micro-district 16 Heat networks of section МК1802/2-МК1807, Slobidskyi current heat carrier underground 600 633 Moskovskyi Avenue 17 Heat networks of section МК1807-МК1821, Slobidskyi current heat carrier aboveground 600 1250 Vilenskyi Lane 18 Heat networks of section МК1821-МК5830, Moscovskyi current heat carrier underground 600 867 Bilostotskyi Lane 19 Heat networks of section МК5830-МК5836В, Moscovskyi current heat carrier underground 600 747 Kamysheva Ivana Street 20 Heat networks of sections МК5836Г- Moscovskyi current heat carrier underground 600 267 МК5837А, МК5837А-МК5837АСК2, Kamysheva Ivana Street, Kaunaskyi Lane. 400 330 21 Heat networks of section МК3232A-МК3237, Industrialnyi current heat carrier underground 600 940 Industrialnyi Avenue 351 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 22 Heat networks of section МК3237-МК3243, Industrialnyi current heat carrier underground 600 1225 Industrialnyi Avenue 23 Heat networks of section МК6206-МК6209, Slobidskyi current heat carrier underground 600 590 Morozova Street 24 Heat networks of section МК6767-МК6768, Slobidskyi current heat carrier underground 400 220 Heroiv Stalinhrada Street 25 Heat networks of section МК6762А-МК6764, Slobidskyi current heat carrier underground 500 120 Petra Hryhorenka Avenue 600 214 26 Heat networks of section МК6119БСК- Slobidskyi current heat carrier underground 600 32 МК6120, Lva Landau Avenue 27 Jumper between heat line No. 66 and No. 14, Slobidskyi new heat carrier underground 300 48 Enerhetychna Street 28 Heat networks of section МК1128А/2- Slobidskyi current heat carrier underground 600 740 МК1223, Dniprovska Street 29 Heat networks of sections МК6516-МК6517, Slobidskyi current heat carrier underground 500 450 МК6515-МК6515А, Zabaikalskyi Lane 352 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 30 Heat networks of section МК6612-МК6612Б, Slobidskyi current heat carrier aboveground 800 220 Kashtanova Street 31 Heat networks of section МК2243/9- Kyivskyi current heat carrier underground 250 300 МК2243/11Б, Sadova Street 32 Heat networks of section МК2240А- Kyivskyi current heat carrier underground 400 880 МК2311А, Shevchenka Street 33 Heat networks of section МК2240А-МК2241, Kyivskyi current heat carrier underground 500 240 Bilhorodskyi Descent 34 Heat networks of section МК2301-МК2304, Kyivskyi current heat carrier underground 300 270 Sliusarnyi Lane 35 Heat networks from МК2987 to boiler room Kyivskyi new heat carrier underground 200 60 MZHK Internatsionalist, 70, Horianska Street with boiler house piping connection 36 Heat networks of section МК2981СК6- Kyivskyi current heat carrier underground 800 46 МК2981СК5, Lesia Serdiuka Street 37 Kyivskyi current heat carrier underground 800 45 353 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m Heat networks of sections МК2985-МК2985Т, Moscovskyi 400 364 МК2985-МК2985ТК40, Lesia Serdiuka Street, Druzhby Narodiv Street 38 Heat networks of section МК9421-МК9403, Nemyshlianskyi current heat carrier underground 800 90 Blahodatna Street 39 Heat networks of section МК9514/2- Nemyshlianskyi current heat carrier underground 400 28 МК9514/2СК, Unetskyi Lane 40 Heat networks of section МК9407-МК9408, Nemyshlianskyi current heat carrier underground 600 51 Khabarova Street 41 Heat networks of section МК9601-МК9602, Nemyshlianskyi current heat carrier underground 600 116 Khabarova Street 42 Heat networks of section МК9603-МК9605, Nemyshlianskyi current heat carrier underground 600 466 Khabarova Street, Traktorobudivnykiv Avenue 43 Heat networks of section МК9606-МК9607, Nemyshlianskyi current heat carrier underground 600 147 Moskovskyi Avenue 44 Heat networks of section МК9801- Nemyshlianskyi current heat carrier underground 600 133 МК9801СК, Petra Hryhorenka Avenue 354 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 45 Heat networks of section МК9803СК2- Nemyshlianskyi current heat carrier underground 600 156 МК9804СК1, Petra Hryhorenka Avenue 46 Heat networks of sections МК5106А-МК5510, Moscovskyi current heat carrier underground 800 281 МК5106-МК5107, Hvardiitsiv-Shyronintsiv Street 47 Heat networks of section МК5208-МК5209, Moscovskyi current heat carrier underground 800 265 Traktorobudivnykiv Avenue 48 Heat networks of section МК5212-МК5215, Moscovskyi current heat carrier underground 800 497 Traktorobudivnykiv Avenue 49 Heat networks of section МК5219СК- Moscovskyi current heat carrier underground 700 115 МК5220, Traktorobudivnykiv Avenue 50 Heat networks of section МК5224-МК5225А, Moscovskyi current heat carrier underground 600 141 Heroiv Pratsi Street 51 Heat networks of section МК2976/6Т- Kyivskyi current heat carrier underground 600 46 МК5309, Akademika Pavlova Street 355 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 52 Heat networks of section МК1138/5Б- Moscovskyi current heat carrier underground 200 30 МК1138/6, Moskovskyi Avenue 53 Heat networks of section МК7812-НО22, Kholodnohirskyi current heat carrier underground 1200 57 Alushtynska Street 54 Heat networks of section МК8116-МК8119, Novobavarskyi current heat carrier underground 600 495 Hryhorivske Highway 55 Heat networks CHS on the 4A Yuriia Novobavarskyi current heat carrier underground 250 229 Parashchuka Street from ТК8120-1 to ТК8120- 1ТК8 56 Heat networks of section МК1608-МК1608/25, Osnovianskyi current heat carrier underground 400 975 Himnaziina Quay 57 Heat networks of section МК1228A-МК1231, Slobidskyi current heat carrier underground 600 51 Bohdana Khmelnytskoho Street Osnovianskyi 600 397 58 Heat networks of section from СHP-3 to Slobidskyi current heat carrier underground 800 800 МК1111, Enerhetychna Street 356 No. of Name of section, object, address District name New/current Purpose of Type of DN of L of item network network new channel, installation pipeline m 59 Heat networks of section МК5227-МК5227/1, Moscovskyi current heat carrier underground 400 464 Traktorobudivnykiv Avenue 60 Heat networks of section from МК5223 to CHS Moscovskyi current heat carrier underground 300 302 606/2 on the 140G Traktorobudivnykiv Avenue 61 Heat networks of section from МК5109 to CHS Moscovskyi current heat carrier underground 250 196 615/1 on the 22V Hvardiitsiv-Shyronintsiv Street 62 Heat networks of section МК5114- Moscovskyi current heat carrier underground 400 139 МК5114СК1, Hvardiitsiv-Shyronintsiv Street 63 Heat networks of section МК5307A- Moscovskyi current heat carrier underground 400 428 МК5307A/1, Valentynivska Street 64 Heat networks of section from МК5220 to CHS Moscovskyi current heat carrier underground 300 318 606/1 on the 3V Svitla Street TOTAL 24 097 357 Annex 37. List of the automation objects on the component “Implementation of systems of automation, dispatching and commercial electricity metering ”. Administrative District of ID No Facility name, address Kharkiv 1 BH №6, 2A Kostycheva Street Slobidskyi 2 BH №4, 17Shekspira Street Shevchenkivskyi 3 BH №5, 4 Artema Vedelia Street Moskovskyi 4 PS №1-2, 15 Mefodiivska Street Slobidskyi 5 PS №7-1, 1 Zemivska Street Kholodnohirskyi 6 PS №7-2-3, Serafimovycha Street Kholodnohirskyi 7 PS №6-2, 127A Haharina Avenue Slobidskyi 8 PS №9-1, 18 Blahodatna Street Nemyshlianskyi 9 PS №4-1, 325A Klochkivska Street Shevchenkivskyi 10 PS №2-1, 6 Shchedrynskyi Kvartal Street Kyivskyi 11 PS №2-2, 27 Velykyi Danylivskyi Lane Kyivskyi 12 PS №4-3, 2A Shatylivska Street Shevchenkivskyi 13 PS, 4A Biolohichna Street Osnovianskyi 14 BH "Piatykhatky", 1 Akademichna Street Kyivskyi 15 CHP-3, 3 Enerhetychna Street Nemyshlianskyi 16 CHP-4, 275 Moskovskyi Avenue Industrialnyi 17 CHS, 17B Industrialnyi Avenue Industrialnyi 18 МК 3244, Kosarieva Street Industrialnyi 19 AB, 3A Kosarieva Street Industrialnyi 20 МК 3710, Rohanska Street Industrialnyi 21 МК 3905 (УТ 5), Velyka Kiltseva Street Industrialnyi 22 МК 3906 (УТ 6), Myru Street Industrialnyi 23 МК 3909 (УТ 9), Velyka Kiltseva Street Industrialnyi 24 CHS 4/31, 89A Rybalka Street Industrialnyi 25 CHS 4/32, 57A Biblyka Street Industrialnyi 26 CHS " Obrii-2", 126A Velyka Kiltseva Street Industrialnyi 27 CHS 4/3-A, 46B Hrytsevtsia Street Industrialnyi 28 CHS " Obrii-1", 3A Rostovska Street Industrialnyi 29 CHS 4/33-A, 65A Oleksandrivskyi Avenue Industrialnyi 30 CHS 4/33, 71A Oleksandrivskyi Avenue Industrialnyi 31 CHS 4/34, 120A Oleksandrivskyi Avenue Industrialnyi 32 BH №6, 11 Piatykhatska Street Industrialnyi 33 CHS, 353 Lui Pastera Street Industrialnyi 34 CHS 4/34A, 114A Oleksandrivskyi Avenue Industrialnyi 35 CHS 4/39, 65A Plytkova Street Industrialnyi 36 BH №3, 69 Mokhnatska Street Industrialnyi 37 CHS 4/37, 1D Biblyka Street Industrialnyi 38 CHS 4/30, 179A Lui Pastera Street Industrialnyi 39 BH №2, 74A Myru Street Industrialnyi 40 BH №1, 7A Elektrovozna Street Industrialnyi 41 ІHS, 19/85 Arkhitektora Aloshyna Avenue Industrialnyi 42 AB, 35 Arkhitektora Aloshyna Avenue Industrialnyi 43 PB, Henerala Momota Street Industrialnyi 44 CHS (BH №5), 1A Tarkhova Street Industrialnyi 45 MK-6612, 127A Haharina Avenue Slobidskyi 46 MK-6609, 11 Akademika Volkova Street Slobidskyi 47 CHS 4/16, 17A Fonvizina Street Slobidskyi 48 BH, 9 Nesterova Street Slobidskyi 49 CHS, 159A Haharina Avenue Slobidskyi 50 CHS, 25 Kovtuna Street Slobidskyi 51 CHS 4/14, 39/41 Heroiv Stalinhrada Avenue Slobidskyi 52 CHS 4/29, 12/1 Tankopiia Street Slobidskyi 358 53 CHS 4/28, 18В Petra Hryhorenka Avenue Slobidskyi 54 CHS 4/5, 8/1 Fesenkivskyi Entry Slobidskyi 55 CHS 4/6, 43В Haharina Avenue Slobidskyi 56 CHS 4/12, 12/1 Kostycheva Street Slobidskyi 57 CHS 4/24, 35/1 Petra Hryhorenka Avenue Slobidskyi 58 CHS 4/25, 4A Zhasminovyi Boulevard Slobidskyi 59 CHS 4/27, 125/3 Niutona Street Slobidskyi 60 CHS 4/11, 5/1 Zernovyi Lane Slobidskyi 61 CHS 4/57, 171/1 Haharina Avenue Slobidskyi 62 CHS 4/24A, 3A Zhasminovyi Boulevard Slobidskyi 63 CHS, 122 Moskovskyi Avenue Slobidskyi 64 CHS 4/15, 9A Molochna Street Slobidskyi 65 CHS 4/28A, 18B Petra Hryhorenka Avenue Slobidskyi 66 CHS 4/40, 55/1 Zernova Street Slobidskyi 67 CHS 4/13, 4/2 Zernovyi Lane Slobidskyi 68 BH, 199A Haharina Avenue Slobidskyi 69 CHS 4/27A, 148B Heroiv Stalinhrada Avenue Slobidskyi 70 BH, 87 Polova Street Slobidskyi 71 BH, 16 Serednouralskyi Lane Slobidskyi 72 МК 9502 (МК 502, 3502), Yuvileinyi Avenue Nemyshlianskyi 73 МК 9510 (МК 510, 3510), Yurieva Boulevard Nemyshlianskyi 74 МК 9515 (МК 515, 3515), Kharkivskykh Dyvizii Street Nemyshlianskyi 75 МК 9406, 2 Khabarova Street Nemyshlianskyi 76 CHS-4/625, 33А Amosova Street Nemyshlianskyi 77 CHS 4/10, 23А Olympyiskaia Street Nemyshlianskyi 78 CHS, 2В Osypenko Street Nemyshlianskyi 79 CHS, 32 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 80 CHS 4/1, 19/1 Yurieva Boulevard Nemyshlianskyi 81 CHS 4/18, 14/1А Stadionnyi Passage Nemyshlianskyi 82 CHS 4/9, 6/6 Stadionnyi Passage Nemyshlianskyi 83 The building of power service, 6/8 Stadionnyi Passage Nemyshlianskyi 84 CHS 4/3, 7/2 Petra Hryhorenka Avenue Nemyshlianskyi 85 CHS 4/4, 11A Rybalka Street Nemyshlianskyi 86 CHS 4/7, 12/1 Rybalka Street Nemyshlianskyi 87 CHS 4/35, 33A Rybalka Street Nemyshlianskyi 88 CHS 4/36, 42A Rybalka Street Nemyshlianskyi 89 CHS, 112A Saltivske Highway Nemyshlianskyi 90 CHS 4/38, 47G Rybalka Street Nemyshlianskyi 91 CHS 4/624, 5A Amosova Street Nemyshlianskyi 92 CHS 4/625, 23A Amosova Street Nemyshlianskyi 93 CHS 4/626, 48A Amosova Street Nemyshlianskyi 94 CHS 4/624A, 6A Amosova Street Nemyshlianskyi 95 AB, 11/1 Tankopiia Street Nemyshlianskyi 96 BH, 7 Hryshchenka Street Nemyshlianskyi 97 BH, 82 Kulinichivska Street Nemyshlianskyi 98 MK 4808 (MK8), Dzhankoiska Street Shevchenkivskyi 99 MK 4938 (MK 38), Samarska Street Shevchenkivskyi 100 MK 4160, Danylevskoho Street Shevchenkivskyi 101 MK 4802 (MK 2), Novhorodska Street Shevchenkivskyi 102 MK 4803, 203 Klochkivska Street Shevchenkivskyi 103 MK 4950 (MK 50), Shatylivska Street Shevchenkivskyi 104 MK 4623, Pavlivskyi Square Shevchenkivskyi 105 HP, Danylevskoho Street Shevchenkivskyi 106 MK 4215, 19A Derevianka Street Shevchenkivskyi 107 BH №1, 77 Peremohy Avenue Shevchenkivskyi 108 BH №6, 1 Frontovykiv Boulevard Shevchenkivskyi 109 BH №2, 77 Peremohy Avenue Shevchenkivskyi 110 BH, 152 Derbentska Street Shevchenkivskyi 111 IHS 2/54 (BH), 38 Danylevskoho Street Shevchenkivskyi 112 IHS 2/50 (BH), 8 Klasychnyi Lane Shevchenkivskyi 359 113 IHS 2/52 (BH), 1 Chychybabina Street Shevchenkivskyi 114 IHS 2/53 (BH), 3 Chychybabina Street Shevchenkivskyi 115 BH, 19 Rohatynskyi Lane Shevchenkivskyi 116 CHS 2/49 (BH), 366 Klochkivska Street Shevchenkivskyi 117 CHS 2/43 (BH), 7 Myrna Street Shevchenkivskyi 118 MU, 2 Chichibabina Street Shevchenkivskyi 119 BH, 113 Armiiska Street Shevchenkivskyi 120 BH, 61/63 Klochkivska Street Shevchenkivskyi 121 BH, 22 Ivanovska Street Shevchenkivskyi 122 CHS 2/2, 53B Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 123 CHS 2/4, 6A Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 124 CHS 2/6, 32A Tsilynohradska Street Shevchenkivskyi 125 CHS 2/7, 3A Derevianka Street Shevchenkivskyi 126 CHS 2/9A, 23A Kosmichna Street Shevchenkivskyi 127 CHS 2/11, 2 Yesenina Street Shevchenkivskyi 128 CHS 2/13, 9A Starytskoho Street Shevchenkivskyi 129 CHS 2/18, 57 Peremohy Avenue Shevchenkivskyi 130 CHS 2/19, 50 Peremohy Avenue Shevchenkivskyi 131 CHS 2/21, 24A Liudviha Svobody Avenue Shevchenkivskyi 132 CHS 2/22, 19 Derevianka Street Shevchenkivskyi 133 CHS 2/23, 7 Derevianka Street Shevchenkivskyi 134 CHS 2/25, 7 Chychybabina Street Shevchenkivskyi 135 CHS 2/26, 9A LiapunovaStreet Shevchenkivskyi 136 CHS 2/28, 23 Akhsarova Street Shevchenkivskyi 137 CHS 2/29, 101 Klochkivska Street Shevchenkivskyi 138 MU, 14A Kosmichna Street Shevchenkivskyi 139 CHS 2/35, 59A Peremohy Avenue Shevchenkivskyi 140 CHS 2/38, 337A Klochkivska Street Shevchenkivskyi 141 CHS 2/17A, 65 Peremohy Avenue Shevchenkivskyi 142 CHS 2/1, 18A Sumhaitska Street Shevchenkivskyi 143 CHS 2/24, 40 Derevianka Street Shevchenkivskyi 144 MU, 16 Kultury Street Shevchenkivskyi 145 CHS 2/3, 80A Naukovyi Avenue Shevchenkivskyi 146 CHS 2/9, 4B Novhorodska Street Shevchenkivskyi 147 CHS 2/10, 197 Klochkivska Street Shevchenkivskyi 148 CHS 2/14, 35G Liudviha Svobody Street Shevchenkivskyi 149 CHS 2/15, 62 Peremohy Avenue Shevchenkivskyi 150 CHS 2/16, 70 Peremohy Avenue Shevchenkivskyi 151 CHS 2/17, 65 Peremohy Avenue Shevchenkivskyi 152 CHS 2/20, 36A Liudvyha Svobody Street Shevchenkivskyi 153 BH, 62 Semena Kuznetsia Street Shevchenkivskyi 154 CHS 2/30, 237 Klochkivska Street Shevchenkivskyi 155 AB (CHS2/31), 49 Shatylivska Street Shevchenkivskyi 156 BH, 5A Dynamovskaia Street Shevchenkivskyi 157 BH, 14 Bukova Street Shevchenkivskyi 158 BH, 20 Bukova Street Shevchenkivskyi 159 MK-4592, 77/79 Sumska Street Shevchenkivskyi 160 MK 2976 (УT-1), Valentynivska Street Kyivskyi 161 MK 2960 (MK-60), Matiushenka Street Kyivskyi 162 МК 2987, Lesia Serdiuka Street Kyivskyi 163 BH, 12 Akademika Proskury Street Kyivskyi 164 BH, 8 Akademika Proskury Street Kyivskyi 165 BH, 2A Skadovskoho Lane Kyivskyi 166 BH, 301 Shevchenka Street Kyivskyi 167 BH, 16 Chernyshevskoho Street Kyivskyi 168 BH, 180 Shevchenka Street Kyivskyi 169 BH Northern-2, 12 Metrobudivnykiv Street Kyivskyi 170 BH, CHS Northern-4, 25A Metrobudivnykiv Street Kyivskyi 171 BH Northern-3, 13 Metrobudivnykiv Street Kyivskyi 172 MU, 5/2 Studentska Street Kyivskyi 360 173 BH, 27A Pomirky Street Kyivskyi 174 Boiler, Housing Department-3, 85 Chernyshevskoho Street Kyivskyi 175 BH, 70 Pomirky Street Kyivskyi 176 BH, 222 Shevchenka Street Kyivskyi 177 BH, 233A Shevchenka Street Kyivskyi 178 BH, 38 Belhorodskoe Highway Kyivskyi 179 BH, 10A Saperna Street Kyivskyi 180 BH, 23 Henerala Udovychenka Street Kyivskyi 181 BH, 49 MZHK Internatsionalist Kyivskyi 182 BH, 24 Henerala Udovychenka Street Kyivskyi 183 BH, 1 Akademika Proskury Street Kyivskyi 184 BH, 5/6 Studentska Street Kyivskyi 185 BH, 4A Ostrohradskyi Lane Kyivskyi 186 BH, 104 Pushkinska Street Kyivskyi 187 BH, 29 Budivelna Street Kyivskyi 188 BH, 165 Shevchenka Street Kyivskyi 189 BH "Kutuzovka", 1 Teplychna Street Kyivskyi 190 CHS 5/7, 10 Darvina Street Kyivskyi 191 CHS 519, 7A Vladyslava Zubenka Street Kyivskyi 192 CHS, 7A Matiushenka Street Kyivskyi 193 CHS/BH Northern-5, 281 Druzhby Narodiv Street Kyivskyi 194 CHS Northern-3, 13 Metrobudivnykiv Street Kyivskyi 195 CHS Northern-2, 12 Metrobudivnykiv Street Kyivskyi 196 CHS 522/2, 12E Heroiv Pratsi Street Kyivskyi 197 CHS 522/1, 13G Valentynivska Street Kyivskyi 198 CHS, 3A Pozdovzhnia Street Kyivskyi 199 CHS-2, 6 Staroshyshkivskyi Entry Kyivskyi 200 CHS, 7 Elektroinstrumentalnyi Passage Kyivskyi 201 CHS, 12V Kurchatova Avenue CW Kyivskyi 202 CHS, 12V Kurchatova Avenue HW Kyivskyi 203 CHS, 7V Hatseva Street Kyivskyi 204 BH, 27 Pomirky Street Kyivskyi 205 МК 5106 (МК 6), Hvardiitsiv-Shyronintsiv Street Moskovskyi 206 МК 5116 (МК 16), Hvardiitsiv-Shyronintsiv Street Moskovskyi 207 МК-5909 (МК-9), Yuvileinyi Avenue Moskovskyi 208 МК-5309, МК, 134/16 Akademika Pavlova Avenue Moskovskyi 209 МК-5207, 86/137 Traktorobudivnykiv Avenue Moskovskyi 210 МК-5211 AБ, Traktorobudivnykiv Avenue Moskovskyi 211 MU, 13 Adygeiskyi Lane Moskovskyi 212 CHS 601, 86A Yuvileinyi Avenue Moskovskyi 213 AB, 13 Svitla Street Moskovskyi 214 BH, 104 Krasnodarska Street Moskovskyi 215 BH Northern-1, 9A Dzherelna Street Moskovskyi 216 CHS Northern-1, 9A Dzherelna Street Moskovskyi 217 CHS 602/1, 67A Yuvileinyi Avenue Moskovskyi 218 CHS 602/2, 75V Yuvileinyi Avenue Moskovskyi 219 CHS 603/1, 59D Yuvileinyi Avenue Moskovskyi 220 CHS 603/2, 63B Yuvileinyi Avenue Moskovskyi 221 CHS 604/1, 70A Yuvileinyi Avenue Moskovskyi 222 CHS 604/2, 139D Saltivske Highway Moskovskyi 223 CHS 605/1, 77A Traktorobudivnykiv Avenue Moskovskyi 224 CHS 605/2, 65B Traktorobudivnykiv Avenue Moskovskyi 225 IНS, 2A Poznanska Street Moskovskyi 226 HS (BH), 12 Feierbakha Street Moskovskyi 227 BH, 30 Akademika Pavlova Street Moskovskyi 228 CHS Budmistechko-1, 35D Vladyslava Zubenka Street Moskovskyi 229 CHS Budmistechko-2, 46D Valentynivska Street Moskovskyi 230 CHS 535-A, 126A Traktorobudivnykiv Avenue Moskovskyi 231 CHS 614, 1 Pysemskoho Lane Moskovskyi 232 CHS 615/1, 22V Hvardiitsiv-Shyronintsiv Street Moskovskyi 361 233 CHS 615/2, 41A Hvardiitsiv-Shyronintsiv Street Moskovskyi 234 CHS 616, 27A Hvardiitsiv-Shyronintsiv Street Moskovskyi 235 CHS 520/1, 24V Valentynivska Street Moskovskyi 236 CHS 520/2, 132D Akademika Pavlova Street Moskovskyi 237 CHS 656, 40A Yuvileinyi Avenue Moskovskyi 238 CHS 521/1, 50E Hvardiitsiv-Shyronintsiv Street Moskovskyi 239 CHS 521/2, 140E Akademika Pavlova Street Moskovskyi 240 CHS 524/1, 73E Hvardiitsiv-Shyronintsiv Street Moskovskyi 241 CHS 524/2, 12A Lesia Serdiuka Street Moskovskyi 242 CHS 531/1, 37E Heroiv Pratsi Street Moskovskyi 243 CHS 531/2, 34E Lesia Serdiuka Street Moskovskyi 244 CHS 533/1,47D Heroiv Pratsi Street Moskovskyi 245 CHS 533/2, 44A Lesia Serdiuka Street Moskovskyi 246 CHS 606/1, 3V Svitla Street Moskovskyi 247 CHS 606/2, 140G Traktorobudivnykiv Avenue Moskovskyi 248 CHS 607/3, 148А Traktorobudivnykiv Avenue Moskovskyi 249 CHS 607/1, 83 Zh Traktorobudivnykiv Avenue Moskovskyi 250 CHS 607/2, 58G Heroiv Pratsi Street Moskovskyi 251 CHS, 6/32 Avtostradna Street Moskovskyi 252 CHS, 38 Batytskoho Street Moskovskyi 253 CHS, 52 Khalturina Street Moskovskyi 254 BH, 27A Akademika Pavlova Street Moskovskyi 255 BH, 20 Akademika Pavlova Street Moskovskyi 256 MU (BH), 67 Saltivske Highway Moskovskyi 257 CHS, 46 Akademika Pavlova Street Moskovskyi 258 CHS, 9 Poperechna Street Moskovskyi 259 CHS, 44 Akademika Pavlova Street Moskovskyi 260 CHS 531/3, 31A Heroiv Pratsi Street Moskovskyi 261 CHS (BH), 8 Serhiivska Street Moskovskyi 262 BH, 55 Traktorobudivnykiv Avenue Moskovskyi 263 BH, 228A Druzhby Narodiv Street Moskovskyi 264 BH, 185 Moskovskyi Avenue Moskovskyi 265 BH, 73V Saltivske Highway Moskovskyi 266 BH, 73G Saltivske Highway Moskovskyi 267 BH, 40 Tiurinska Street Moskovskyi 268 AB, 4A Yuriia Parashchuka Street Novobavarskyi 269 CHS 3/9, 4 Yuriia Parashchuka Street Novobavarskyi 270 Workroom, 14 Bolharskyi Lane Novobavarskyi 271 Service rooms, 171 Poltavskyi Shliakh Street Novobavarskyi 272 Service rooms, 10 Dudynskoi Street Novobavarskyi 273 AB, 60 Planova Street Novobavarskyi 274 BH, 118 Novo-Bavarskyi Avenue Novobavarskyi 275 BH, 90 Kontorska Street Novobavarskyi 276 BH, 7 Bavarska Street Novobavarskyi 277 BH, 19 Piatysotnytska Street Novobavarskyi 278 BH, 2 Kontorska Street Novobavarskyi 279 BH, 18 Marinska Street Novobavarskyi 280 BH, 5 Metiznyi Lane Novobavarskyi 281 BH, 63A Seminarska Street Novobavarskyi 282 BH, 23A Svitlanivska Street Novobavarskyi 283 BH, 77 Novo-Bavarskyi Avenue Novobavarskyi 284 BH, 90 Novo-Bavarskyi Avenue Novobavarskyi 285 CHS 3/7, 6A Petra Bolbochana Street Novobavarskyi 286 BH, 2/4 Seminarska Street Novobavarskyi 287 BH, 57A Seminarska Street Novobavarskyi 288 BH, 2/3 Volodymyrska Street Novobavarskyi 289 BH, 37 Hvardiitsiv-Zaliznychnykiv Street Novobavarskyi 290 BH, 11 Velyka Honcharivska Street Novobavarskyi 291 BH, 7 Konieva Street Novobavarskyi 292 BH, 12 Konieva Street Novobavarskyi 362 293 BH, 5/7 Karpivskyi Lane Novobavarskyi 294 BH, 12 KashyrskohoStreet Novobavarskyi 295 BH, 6 Kontorska Street Novobavarskyi 296 BH, 9 Kontorska Street Novobavarskyi 297 BH, 11 Kontorska Street Novobavarskyi 298 BH, 12 Kontorska Street Novobavarskyi 299 BH, 26 Kontorska Street Novobavarskyi 300 BH, 46/5 Seminarska Street Novobavarskyi 301 BH, 1 Odoievskyi Lane Novobavarskyi 302 BH, 6/10 Polzunova Lane Novobavarskyi 303 BH, 5 Svynarenka-Petra Street Novobavarskyi 304 BH, 19 Poltavskyi Shliakh Street Novobavarskyi 305 BH, 14 Stoliarnyi Lane Novobavarskyi 306 BH, 25 Yaroslavska Street Novobavarskyi 307 CHS, 5 Hrushevskoho Street Novobavarskyi 308 BH, 53/55 Poltavskyi Shliakh Street Novobavarskyi 309 BH, 11/13 Novo-Bavarskyi Avenue Novobavarskyi 310 BH, 53 Lomonosova Street Novobavarskyi 311 BH, 17 Perovskoi Street Novobavarskyi 312 BH, 17A Poltavskyi Shliakh Street Novobavarskyi 313 BH, 8 Peremozhtsiv Street Novobavarskyi 314 BH, 86 Hryhorivske Highway Novobavarskyi 315 BH, 177A Poltavskyi Shliakh Street Novobavarskyi 316 BH, 8 Bulvarna Street Novobavarskyi 317 BH, 32 Seminarska Street Novobavarskyi 318 BH, 99 Novo-Bavarskyi Avenue Novobavarskyi 319 BH, 175 Poltavskyi Shliakh Street Novobavarskyi 320 BH, 9 Kataieva Street Novobavarskyi 321 BH, 13 Marka Bernesa, Street Novobavarskyi 322 BH, 20 Liubovi Maloi Avenue Novobavarskyi 323 BH, 42 Timiriazieva Street Novobavarskyi 324 BH, 60A Profspilkovyi Boulevard Novobavarskyi 325 CHS, 170 Moskalivska Street Novobavarskyi 326 CHS, 3A Vlasenka Street Novobavarskyi 327 CHS, 4A Mykoly Bazhana Street Novobavarskyi 328 CHS, 10A Mykoly Bazhana Street Novobavarskyi 329 CHS, 37/39 Krushelnytskoho Street Industrialnyi 330 BH, 119 Poltavskyi Shliakh Street Novobavarskyi 331 CHS, 6 Dudynskoi Street Novobavarskyi 332 CHS, 21 Selianska Street Novobavarskyi 333 CHS, 2 Bolharskyi Lane Novobavarskyi 334 BH, 22 Marinska Street Novobavarskyi 335 BH, 22 Moskalivska Street Novobavarskyi 336 BH, 14 Pestrikova Street Novobavarskyi 337 BH, 47 Pushkarivska Street Novobavarskyi 338 BH, 88 Seminarska Street Novobavarskyi 339 BH, 51 Liubovi Maloi Avenue Novobavarskyi 340 BH, 14/16 Bondarivska Street Novobavarskyi 341 BH, 143 Seminarska Street Novobavarskyi 342 BH, 2A Yudina Street Novobavarskyi 343 BH, 17 Konieva Street Novobavarskyi 344 BH, 3 Karpivska Street Novobavarskyi 345 BH, 113 Valerianivska Street Novobavarskyi 346 BH, 45 Liubovi Maloi Avenue Novobavarskyi 347 BH, 93A Kontorska Street Novobavarskyi 348 BH, 12 Chaplyhina Street Novobavarskyi 349 BH, 18 Kybalchycha Street Novobavarskyi 350 BH, 3 Bavarska Street Novobavarskyi 351 BH, 57B Seminarska Street Novobavarskyi 352 BH, 36 Moskalivska Street Novobavarskyi 363 353 BH, 92 Moskalivska Street Novobavarskyi 354 BH, 20 Kataieva Street Novobavarskyi 355 CHS, 12/14 Marinska Street Novobavarskyi 356 BH, 66 Novoprymiska Street Novobavarskyi 357 BH, 46 Seminarska Street Novobavarskyi 358 BH, 42A Vrubelia Street Novobavarskyi 359 BH, 3/5 Poltavskyi Shliakh Street Novobavarskyi 360 BH, 48 Konotopska Street Novobavarskyi 361 BH, 22 Mendelieieva Street Novobavarskyi 362 BH, 17 Hertsena Street Novobavarskyi 363 BH, 4 Liubovi Maloi Avenue Novobavarskyi 364 BH, 99 Moskalivska Street Novobavarskyi 365 BH, 1 Lizy Chaikynoi Lane Novobavarskyi 366 BH, 4 Stantsiina Street Novobavarskyi 367 IНS, 18 Tytarenkivskyi Lane Novobavarskyi 368 МК 7830 (МК 30), Serafymovycha Street Kholodnohirskyi 369 МК 7833 (МК 33), Velyka Panasivska Street Kholodnohirskyi 370 МК 7802 (МК 2), Feeway Kharkiv-Sumy Kholodnohirskyi 371 МК 7101 (МК 4/1), Verkhnia Hyivska Street Kholodnohirskyi 372 МК 7107 (МК 4/7), Nyzhnia Hyivska Street Kholodnohirskyi 373 МК 7835, Lozivska Street Kholodnohirskyi 374 МК 7811, Putyvelskyi Lane Kholodnohirskyi 375 МК 7803, Shchaslyva Street Kholodnohirskyi 376 CHS, 222 Velyka Panasivska Street Kholodnohirskyi 377 CHS 3/3, 28B Zolochivska Street Kholodnohirskyi 378 BH, 2 Kashuby Street Kholodnohirskyi 379 CHS 3/21, 6 Dmytrivska Street Kholodnohirskyi 380 HS, 4 Pershyi Tahanskyi Lane Kholodnohirskyi 381 BH, 190/2 Poltavskyi Shliakh Street Kholodnohirskyi 382 BH, 20 Malynovskoho Street Kholodnohirskyi 383 HS, 1 Riznykivskyi Lane Kholodnohirskyi 384 HS, 7 Tretii Tahanskyi Lane Kholodnohirskyi 385 HS (BH), 3 Kandaurova Street Kholodnohirskyi 386 BH, 90 Poltavskyi Shliakh Street Kholodnohirskyi 387 IHS (BH), 114 Poltavskyi Shliakh Street Kholodnohirskyi 388 HS (BH), 118 Poltavskyi Shliakh Street Kholodnohirskyi 389 BH, 41 Kurylivska Street Kholodnohirskyi 390 BH, 65 Ozerianska Street Kholodnohirskyi 391 BH, 35 Novyi Pobut Street Kholodnohirskyi 392 BH, 11 Volonterska Street Kholodnohirskyi 393 HS (BH), 48 Chobotarska Street Kholodnohirskyi 394 CHS, 7 Berkosa Street Kholodnohirskyi 395 CHS 3/18, 9 Ihoria Muratova Street Kholodnohirskyi 396 IHS, 5 Ozerianska Street Kholodnohirskyi 397 HS, 7/9 Terekhivska Street Kholodnohirskyi 398 BH, 7 Ihoria Muratova Street Kholodnohirskyi 399 HS, 8 Terekhivska Street Kholodnohirskyi 400 HS, 40 Illinska Street Kholodnohirskyi 401 BH, 15 Blahovishchenska Street Kholodnohirskyi 402 BH, 23 Kamianets-Podolska Street Kholodnohirskyi 403 BH, 4 Nizhynska Street Kholodnohirskyi 404 CHS (BH), 110 Poltavskyi Shliakh Street Kholodnohirskyi 405 HS, 190/9 Poltavskyi Shliakh Street Kholodnohirskyi 406 BH, 17 Blahovishchenska Street Kholodnohirskyi 407 BH, 20 Sochynska Street Kholodnohirskyi 408 Warehouse, 29A Kotsarska Street Kholodnohirskyi 409 CHS 3/11, 52 Pashchenkivska Street Kholodnohirskyi 410 HS, 5 Malynovskoho Street Kholodnohirskyi 411 BH, 30 Blahovishchenska Street Kholodnohirskyi 412 HS (BH), 18 Yaroslavska Street Kholodnohirskyi 364 413 BH, 11 Ashhabadskyi Lane Kholodnohirskyi 414 BH, 83 Sochynska Street Kholodnohirskyi 415 BH, 2A Vitebska Street Kholodnohirskyi 416 BH, 36 Poltavskyi Shliakh Street Kholodnohirskyi 417 BH, 13 Zh Blahovishchenska Street Kholodnohirskyi 418 BH, 63 Osetynska Street Kholodnohirskyi 419 BH, 40A Pskovska Street Kholodnohirskyi 420 BH, 22/24 Malopanasivska Street Kholodnohirskyi 421 HS (BH), 3 Donbasivskyi Lane Kholodnohirskyi 422 BH, 10 Vosmoho Bereznia Street Kholodnohirskyi 423 BH, 29 Velyka Panasivska Street Kholodnohirskyi 424 CHS 3/2, 68 Illinska Street Kholodnohirskyi 425 CHS 3/1, 152B Poltavskyi Shliakh Street Kholodnohirskyi 426 CHS 3/9, 3 Kholodnohirska Street Kholodnohirskyi 427 CHS 3/8, 21 Shchaslyva Street Kholodnohirskyi 428 CHS 3/14, 32 Blahovishchenska Street Kholodnohirskyi 429 CHS 3/10, 28 Ihoria Muratova Street Kholodnohirskyi 430 CHS 3/19, 45 Chobotarska Street Kholodnohirskyi 431 CHS, 193 Velyka Panasivska Street Kholodnohirskyi 432 CHS 3/20, 49 Chobotarska Street Kholodnohirskyi 433 BH, 19/1 Zaliutynska Street Kholodnohirskyi 434 BHs No1, No2, 45 Kandaurova Street Kholodnohirskyi 435 BH, 5 Verkhovskyi Lane Kholodnohirskyi 436 BH, 35 Novyi Pobut Street Kholodnohirskyi 437 HS (BH), 19 Kotsarska Street Kholodnohirskyi 438 HS (BH), 54 Kotsarska Street Kholodnohirskyi 439 BH, 2/15 Blahovishchenska Street Kholodnohirskyi 440 HS, 46 Poltavskyi Shliakh Street Kholodnohirskyi 441 BH, 2/2 Yaroslavska Street Kholodnohirskyi 442 BH, 10 Yaroslavska Street Kholodnohirskyi 443 BH, 205 Velyka Panasivska Street Kholodnohirskyi 444 IHS (BH), 34 Chobotarska Street Kholodnohirskyi 445 HS, 24A Poltavskyi Shliakh Street Kholodnohirskyi 446 HS (BH), 190 Poltavskyi Shliakh Street Kholodnohirskyi 447 CHS 3/15, 71/1 Taborova Street Kholodnohirskyi 448 CHS 3/17, 8 Plastychnyi Lane Kholodnohirskyi 449 HS (PS), 24/26 Blahovishchenska Street Kholodnohirskyi 450 Warehouse (PS), 27/29 Illinska Street Kholodnohirskyi 451 CHS 3/16, 11 Druhyi Tahanskyi Lane Kholodnohirskyi 452 BH, 12 Baltiiska Street Kholodnohirskyi 453 BH, 67 Velyka Panasivska Street Kholodnohirskyi 454 BH, 3 Zaliznychna Street Kholodnohirskyi 455 HS, 7 Kashuby Street Kholodnohirskyi 456 HS, 4 Kashuby Street Kholodnohirskyi 457 BH, 14/1 Tahanska Street Kholodnohirskyi 458 BH, 10 Blahovishchenska Street Kholodnohirskyi 459 BH, 41/43 Andriivska Street Kholodnohirskyi 460 HS, 4 Hrusheva Street Kholodnohirskyi 461 CHS 3/4, 17 Donbasivskyi Lane Kholodnohirskyi 462 BH, 27/5 Berkosa Street Kholodnohirskyi 463 BH, 3 Afanasiivska Street Kholodnohirskyi 464 BH, 17 Yaroslavska Street Kholodnohirskyi 465 BH, 60A Kotsarska Street Kholodnohirskyi 466 CHS, 20 Pushkina Street (Solonitsevka) Kholodnohirskyi 467 CHS, 5 Sumskyi Shliakh Street (Solonitsevka) Kholodnohirskyi 468 CHS, 3 Makarenka Street (Podvirky) Kholodnohirskyi 469 CHS, 3 Molodizhna Street (Pesochin) Kholodnohirskyi 470 CHS, Mobil, 7А Kvartalnyi Lane (Pesochin) Kholodnohirskyi 471 BH, 25A Volodymyra Usenka Lane Kholodnohirskyi 472 MK 1619A (19А), 13/2 Kooperatyvna Street Osnovianskyi 365 473 МК 1608, 1606 (МК8), Himnaziina Quay Osnovianskyi 474 PS1-1, 12 Kooperatyvna Street Osnovianskyi 475 CHS, 4 Makiivska Street Osnovianskyi 476 BH, 3 Poltavska Street Osnovianskyi 477 BH, 30 Hrekivska Street Osnovianskyi 478 BH, 334 Haharina Avenue Osnovianskyi 479 BH, 9A Sokhora Street Osnovianskyi 480 BH, 5A Sokhora Street Osnovianskyi 481 BH, 89 Dostoievskoho Street Osnovianskyi 482 BH, 250 Haharina Avenue Osnovianskyi 483 BH, 314A Haharina Avenue Osnovianskyi 484 BH, 300 Haharina Avenue Osnovianskyi 485 BH, 70 Holdberhivska Street Osnovianskyi 486 BH, 98/100 Holdberhivska Street Osnovianskyi 487 BH, 36/1 Sydorenkivska Street Osnovianskyi 488 BH, 16 Myrhorodska Street Osnovianskyi 489 BH, 244 Haharina Avenue Osnovianskyi 490 BH, 82 Kharkivska Street Osnovianskyi 491 BH, 302 Haharina Avenue Osnovianskyi 492 BH, 7/9 Tsyharivskyi Lane Osnovianskyi 493 CHS, 4 Azerbaidzhanska Street Osnovianskyi 494 CHS 3/6, 174A Haharina Avenue Osnovianskyi 495 CHS 3/5, 5A Moskalivska Street Osnovianskyi 496 CHS 3/23, 62A Haharina Avenue Osnovianskyi 497 CHS 3/30, 7A Voskresenska Street Osnovianskyi 498 MU, 12 Kuznechna Street Osnovianskyi 499 BH, 262 Haharina Avenue Osnovianskyi 500 BH, 19 Ternopilska Street Osnovianskyi 501 BH, 5 Karierna Street Osnovianskyi 502 BH, 57/59 Moskalivska Street Osnovianskyi 503 BH, 1 Biolohichnyi Lane Osnovianskyi 504 BH, 22A Dostoievskoho Street Osnovianskyi 505 CHS, 26 Valdaiskyi Lane Osnovianskyi 506 BH, 1A Biolohichna Street Osnovianskyi 507 PS, 22V Dostoievskoho Street Osnovianskyi 508 BH, 266 Haharina Avenue Osnovianskyi 509 BH, 20A Merefianske Highway Osnovianskyi 510 BH, 25 Kvitkynska Street Osnovianskyi 511 BH, 31 Haharina Avenue Osnovianskyi 512 BH, 42 Hordiienkivska Street Osnovianskyi 513 BH, 1 Lymanskyi Lane Osnovianskyi 514 BH, 112 Holdberhivska Street Osnovianskyi 515 CHS, 16 Litakova Street Osnovianskyi 516 BH, 14 Dostoievskoho Street Osnovianskyi 517 BH, 1 Dostoievskoho Street Osnovianskyi 518 AB No.1, 11 Mefodiivska Street Slobidskyi 519 PB, 11 Mefodiivska Street Slobidskyi 520 AB No.2, 11 Mefodiivska Street Slobidskyi 521 AB, 147 Plekhanivska Street Slobidskyi 522 AB, 9 Enerhetychna Street Nemyshlianskyi 523 Workroom, 30G Dyzelna Street Nemyshlianskyi 524 BH, 8 Slovianska Street Kholodnohirskyi 525 CHS, 15A Nadii Street (Pesochin) Kholodnohirskyi 526 BH, 6 Rizdviana Street Kholodnohirskyi 527 CHS, 17B Berkosa Street Kholodnohirskyi 528 BH, 35 Zaliznodorozhnia Street Kholodnohirskyi 529 BH, 2A Plastychnyi Lane Kholodnohirskyi 530 BH, 27 Kurylivska Street Kholodnohirskyi 531 BH, 30 Kurylivska Street Kholodnohirskyi 532 BH, 49/51 Rylieieva Street Kholodnohirskyi 366 533 BH, 8 Skovorodynivska Street Kholodnohirskyi 534 BH, 7A Nova Bavariia Station Novobavarskyi 535 BH, 1 Sokhora Street Osnovianskyi 536 BH, 306 Haharina Avenue Osnovianskyi 537 BH, 27A Dyspetcherska Street Osnovianskyi 538 MU, 30 Merefianske Highway Osnovianskyi 539 BH, 13 Pryvokzalna Street Osnovianskyi 367 Annex 38. List of implementation objects of SCADA systems ID No. Postal Address of Facility Administrative District of Kharkiv List of dispatch centers of Client 1 СDC (Central Dispatch Center), 3 Enerhetychna Nemyshlianskyi Street 2 RDC (regional dispatch center) of Osnovianskyi Osnovianskyi district branch, 5А Moskalivska Street 3 RDC of Kuyivskuy district branch, 13 Kuyivskiy Metrobudivnykiv Street 4 RDC of Industrialnyi district branch, 3А Kosarieva Industrialnyi Street 5 RDC of Shevchenkivskyi district branch, 17 Shevchenkivskyi Shekspira Street 6 RDC of Moskovskyi district branch, 13 Svitla Moskovskyi Street 7 RDC of Slobidskyi district branch, 18B Petra Slobidskyi Hryhorenka Avenue 8 RDC of Novobavarskyi district branch, 60 Planova Novobavarskyi Street 9 RDC of Nemyshlianskyi district branch, 23А Nemyshlianskyi Olimpiiska Street 10 RDC of Kholodnohirskyi district branch, Kholodnohirskyi 152В Poltavskyi Shliakh Street 11 RDC of Shevchenkivskyi district branch, CHS Shevchenkivskyi 2/31, 49 Nauky Avenue List of heat chambers with drainage pumps 1 МК6612А, Kashtanova Street Slobidskyi 2 МК6609, Morozova Street Slobidskyi 3 МК6618, Haharina Avenue Slobidskyi 4 МК6620, Haharina Avenue Osnovianskyi 5 МК6625, Haharina Avenue Osnovianskyi 6 МК2304, Sliusarnyi Lane Osnovianskyi ???? 7 МК1608/15, Himnaziina Quay Osnovianskyi 8 МК1149/12, Osnovianskyi Himnaziina Quay 9 МК1619А, Kooperatyvna Street Osnovianskyi 10 МК7803, Shchaslyva Street Kholodnohirskyi 11 МК7802, Zaliutynska Street Kholodnohirskyi 12 МК7830, Serafymovycha Street Kholodnohirskyi 13 МК7833, Lozivska Street Kholodnohirskyi 15 МК7835, Lozivska Street Kholodnohirskyi 15 МК7107, Kholodnohirska Street Kholodnohirskyi Heat sources 1 CHP-3 (the main building and peak boiler), 3 Nemyshlianskyi Enerhetychna Street 2 CHP-4 (peak boiler), 275 Moskovskyi Avenue Industrialnyi 368 3 CHP-4 (the main building), 275 Moskovskyi Industrialnyi Avenue 4 CHP-5, Podvirku village, Dergachivskiy district, Kholodnohirskyi Kharkiv’s region 5 boiler house, 4 Artema Vedelia Street Moskovskyi 6 boiler house, 2/1 Kostycheva Street Slobidskyi 7 boiler house, 17 Shekspira Street Shevchenkivskyi 8 boiler house "Pivnichnyi-3", 13 Metrobudivnykiv Kuyivskiy Street 9 boiler house "Pivnichnyi-1", 9А Dzherelna Street Moskovskyi 10 boiler house "Pivnichnyi-2", 12 Metrobudivnykiv Kuyivskiy Street 11 boiler house "Pivnichnyi-4", 25А Metrobudivnykiv Kuyivskiy Street 12 boiler house "Pivnichnyi-5", 281А Druzhby Kuyivskiy Narodiv Street Pump stations 1 PS №1-2, 15A Mefodiivska Street Slobidskyi 2 PS №1-1, 12/14 Kooperatyvna Street Osnovianskyi 3 PS №2-1, 6 Shchedrinskyi kvartal Street Kuyivskiy 4 PS №2-2, 27 Velykyi Danylivskyi Lane Kuyivskiy 5 PS №4-3, 3A Nauky Avenue Shevchenkivskyi 6 PS №4-1, 325A Klochkivska Street Shevchenkivskyi 7 PS №6-2, 129/1 Haharina Avenue Slobidskyi 8 PS №7-1, 1 Zemivska Street Kholodnohirskyi 9 PS №7-2 and №7-3, 6 Serafimovycha Street Kholodnohirskyi 10 PS №9-1, 18 Blahodatna Street Nemyshlianskyi Heat cameras 1 МК1111, Moskovskyi Avenue Slobidskyi 2 МК 1121, Moskovskyi Avenue Slobidskyi 3 МК 1132, Bronenostsia Potomkin Street Slobidskyi 4 МК 1136, Zakhysnykiv Ukrainy Square Osnovianskyi 5 МК 1142, Bohdana Khmelnytskoho Street Osnovianskyi 6 МК 1210, Mefodiivska Street Slobidskyi 7 МК 1228А, Zakhysnykiv Ukrainy Square Slobidskyi 8 МК 1407, Enerhetychna Street Slobidskyi 9 МК 1412, Dyzelna Street Slobidskyi 10 МК 1608, Himnaziina Quay Osnovianskyi 11 МК 1619А, Kooperatyvna Street Osnovianskyi 12 МК 1620, Kooperatyvna Street Osnovianskyi 13 МК 1825, Bilostotskyi Lane Moskovskyi 14 МК 1909, Khramova Street Osnovianskyi 15 МК 2240А, Butivskyi Entry Kuyivskiy 16 МК 2307, Kulykivska Street Kuyivskiy 17 МК 4623, Pavlivskyi Square Shevchenkivskyi 18 МК 4629, Bursatskyi uzviz Shevchenkivskyi 19 МК 4641, Rymarska Street Shevchenkivskyi 20 МК 6609, Morozova Street Slobidskyi 21 МК 6609А, Morozova Street Slobidskyi 22 МК 6618, Haharina Avenue Slobidskyi 369 23 МК 6619, Haharina Avenue Slobidskyi 24 МК 6621, Haharina Avenue Osnovianskyi 25 МК 6758, Petra Hryhorenka Avenue Slobidskyi 26 МК 9502, Lva Landau Avenue Nemyshlianskyi 27 МК 9509, Petra Hryhorenka Avenue Nemyshlianskyi 28 МК 9510, Yurieva Boulevard Nemyshlianskyi 29 МК 9515, Kharkivskykh Dyvizii Street Nemyshlianskyi 30 МК 9608, Biblyka Street Nemyshlianskyi 31 МК 3112А, Biblyka Street Industrialnyi 32 МК 3118, Oleksandrivskyi Avenue Industrialnyi 33 МК 3232, Industrialnyi Avenue Industrialnyi 34 МК 3232А, Industrialnyi Avenue Industrialnyi 35 МК 3239, Industrialnyi Avenue Industrialnyi 36 МК 3239А, Industrialnyi Avenue Industrialnyi 37 МК 3244, Kosarieva Street Industrialnyi 38 МК 3701, Dvanadtsiatoho Kvitnia Street Industrialnyi 39 МК 3710А, Rohanska Street Industrialnyi 40 МК 9403, Blahodatna Street Nemyshlianskyi 41 МК 9406, Lodzynska Street Nemyshlianskyi 42 МК 9421, Blahodatna Street Nemyshlianskyi 43 МК 9607А, Biblyka Street Nemyshlianskyi 44 МК 2246, Pushkinska Street Kuyivskiy 45 МК 2248, Svobody Street Kuyivskiy 46 МК 2253, Yaroslava Mudroho Street Kuyivskiy 47 МК 2954, Olesia Honchara Street Kuyivskiy 48 МК 2955, Pushkinska Street Kuyivskiy 49 МК 2968, Narynska Street Kuyivskiy 50 МК 2969, Kozakevycha Street Kuyivskiy 51 МК 2976, Valentynivska Street Kuyivskiy 52 МК 2976/5, Valentynivska Street Kuyivskiy 53 МК 2982, Buchmy Street Kuyivskiy 54 МК 2987, Lesia Serdiuka Street Kuyivskiy 55 МК 4157, Danylevskoho Street Shevchenkivskyi 56 МК 4160, Danylevskoho Street Shevchenkivskyi 57 МК 4648, Rymarska Street Shevchenkivskyi 58 МК 4802, Sofiivska Street Shevchenkivskyi 59 МК 4811, Klochkivska Street Shevchenkivskyi 60 МК 4818, Tsilynohradska Street Shevchenkivskyi 61 МК 4823, Liudviha Svobody Street Shevchenkivskyi 62 МК 4824А, , Liudviha Svobody Street Shevchenkivskyi 63 МК 4827, Peremohy Avenue Shevchenkivskyi 64 МК 4938, Samarska Street Shevchenkivskyi 65 МК 4940Б, Kosmichna Street Shevchenkivskyi 66 МК 4940Б/1, Kosmichna Street Shevchenkivskyi 67 МК 4950, Trinklera Street Shevchenkivskyi 68 МК 4951, Trinklera Street Shevchenkivskyi 69 МК 4952, Sumska Street Shevchenkivskyi 70 МК 7101, Verkhnia Hyivska Street Kholodnohirskyi 71 МК 7107, Kholodnohirska Street Kholodnohirskyi 72 МК 7302, CHP-5, village Podvirky Kholodnohirskyi 370 73 МК 7601А/1, Motorway Kharkiv-Sumy Kholodnohirskyi 74 МК 7602, Zaliutynska Street Kholodnohirskyi 75 МК 7802, Zaliutynska Street Kholodnohirskyi 76 МК 7811, Samodiialna Street Kholodnohirskyi 77 МК 7814А, Verkhnia Hyivska Street Kholodnohirskyi 78 МК 7835, Lozivska Street Kholodnohirskyi 79 МК 7835АН1, Lozivska Street Kholodnohirskyi 80 МК 8116, Hryhorivske Highway Novobavarskyi 81 МК 8611, Hryhorivske Highway Novobavarskyi 82 МК 8615, Profspilkovyi Boulevard Novobavarskyi 83 МК 4115, Shekspira Street Shevchenkivskyi 84 МК 4201, Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 85 МК 4204, Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 86 МК 4205, Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 87 МК 4215/1, Derevianka Street Shevchenkivskyi 88 МК 4306, Novhorodska Street Shevchenkivskyi 89 МК 4515, Otakara Yarosha Street Shevchenkivskyi 90 МК 1822, Marshala Batytskoho Street Moskovskyi 91 МК 5106, Hvardiitsiv Shyronintsiv Street Moskovskyi 92 МК 5106А, Hvardiitsiv Shyronintsiv Street Moskovskyi 93 МК 5111, Hvardiitsiv Shyronintsiv Street Moskovskyi 94 МК 5116, Hvardiitsiv Shyronintsiv Street Moskovskyi 95 МК 5124, Hvardiitsiv Shyronintsiv Street Moskovskyi 96 МК 5207, Saltivske Highway Moskovskyi 97 МК 5211А, Yuvileinyi Avenue Moskovskyi 98 МК 5211Б, Yuvileinyi Avenue Moskovskyi 99 МК 5219, Valentynivska Street Moskovskyi 100 МК 5225, Traktorobudivnykiv Avenue Moskovskyi 101 МК 5227, Traktorobudivnykiv Avenue Moskovskyi 102 МК 5309, Valentynivska Stree Moskovskyi 103 МК 5512, Yuvileinyi Avenue Moskovskyi 104 МК 5711, Traktorobudivnykiv Avenue Moskovskyi 105 МК 5830, Ivana Kamysheva Street Moskovskyi 106 МК 6112, Kyrhyzka Street Slobidskyi 107 МК 6120, Lva Landau Avenue Slobidskyi 108 МК 6203, Kostycheva Street Slobidskyi 109 МК 6408, Haharina Avenue Osnovianskyi 110 МК 6502, Heroiv Stalinhradu Avenue Slobidskyi 111 МК 6604, Enerhetychna Street Slobidskyi 112 МК 6762А, Petra Hryhorenka Avenue Slobidskyi 113 МК 6765, Heroiv Stalinhradu Avenue Slobidskyi Central heat stations 1 ІHS 2/50, 8 Klasychnyi Lane Shevchenkivskyi 2 CHS 2/17, 65 Peremohy Avenue Shevchenkivskyi 3 CHS 2/28, 23В Akhsarova Street Shevchenkivskyi 4 CHS 2/14, 35 G Liudviha Svobody Avenue Shevchenkivskyi 5 CHS 2/15, 64D Peremohy Avenue Shevchenkivskyi 6 CHS 2/16, 70G Peremohy Avenue Shevchenkivskyi 7 CHS 2/18, 57 Peremohy Avenue Shevchenkivskyi 8 CHS 2/19, 50G Peremohy Avenue Shevchenkivskyi 371 9 CHS 2/20, 36A Liudviha Svobody Avenue Shevchenkivskyi 10 CHS 2/21, 24A Liudviha Svobody Avenue Shevchenkivskyi 11 CHS 2/25, 7 Chychybabina Street Shevchenkivskyi 12 CHS 2/26, 9А Liapunova Street Shevchenkivskyi 13 CHS 2/29, 101 Klochkivska Street Shevchenkivskyi 14 CHS 2/9А, 23В Kosmichna Street Shevchenkivskyi 15 CHS 2/32, 36А Arkhitektoriv Street Shevchenkivskyi 16 CHS 2/33, 15 Kultury Street Shevchenkivskyi 17 CHS 2/35, 59А Peremohy Avenue Shevchenkivskyi 18 CHS 2/17А, 65 Peremohy Avenue Shevchenkivskyi 19 CHS 2/36, 6 Kravtsova Lane Shevchenkivskyi 20 CHS 2/37, 46 Peremohy Avenue Shevchenkivskyi 21 CHS 2/30, 237 Klochkivska Street Shevchenkivskyi 22 CHS 2/43, 7V Myrna Street Shevchenkivskyi 23 CHS 2/46, 4 Kosmichna Street Shevchenkivskyi 24 CHS 2/52, 1 Chychybabina Street Shevchenkivskyi 25 CHS 2/47, 22/39 Tsilynohradska Street Shevchenkivskyi 26 IHS 2/34, 14В Oleksiivska Street Shevchenkivskyi 27 IHS 2/39, 23 Balakirieva Street Shevchenkivskyi 28 IHS 2/40, 30 Oleksiivska Street Shevchenkivskyi 29 IHS 2/42, 25 Kolomenska Street Shevchenkivskyi 30 IHS 2/54, 38 Danylevskoho Street Shevchenkivskyi 31 IHS 2/53, 3 Chychybabina Street Shevchenkivskyi 32 CHS 2/11, 2 Yesenina Street Shevchenkivskyi 33 CHS 2/2, 53В Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 34 CHS 2/1, 18А Sumhaitska Street Shevchenkivskyi 35 CHS 2/3, 80А Nauky Avenue Shevchenkivskyi 36 CHS 2/4, 6А Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 37 CHS 2/5, 31 Dvadtsiat Tretoho Serpnia Street Shevchenkivskyi 38 CHS 2/6, 32А Tsilynohradska Street Shevchenkivskyi 39 CHS 2/7, 3А Derevianka Street Shevchenkivskyi 40 CHS 2/9, 4V Novhorodska Street Shevchenkivskyi 41 CHS 2/10, 197Z Klochkivska Street Shevchenkivskyi 42 CHS 2/13, 9A Starytskoho Street Shevchenkivskyi 43 CHS 2/22, 19 Derevianka Street Shevchenkivskyi 44 CHS 2/23, 7 Derevianka Street Shevchenkivskyi 45 CHS 2/24, 40 Derevianka Street Shevchenkivskyi 46 CHS 2/45, 336А Klochkivska Street Shevchenkivskyi 47 CHS 2/38, 337А Klochkivska Street Shevchenkivskyi 48 CHS 2/44, 33 Soldatska Street Shevchenkivskyi 49 CHS 2/49, 366 Klochkivska Street Shevchenkivskyi 50 CHS 2/31, 49 Nauky Avenue Shevchenkivskyi 51 IHS 2/41, 82 Ochakivska Street Shevchenkivskyi 52 IHS 2/10-1, 13 Myrna Street Shevchenkivskyi 53 IHS 2/48, 261 Klochkivska Street Shevchenkivskyi 54 CHS, 22 Marinska Street Novobavarskyi 55 CHS, 4 Yuriia Parashchuka Street Novobavarskyi 56 CHS, 6Б Petra Bolbochana Street Novobavarskyi 57 CHS, 2А Bolharskyi Lane Novobavarskyi 58 CHS, 177А Poltavskyi Shliakh Street Novobavarskyi 372 59 CHS, 20А Liubovi Maloi Avenue Novobavarskyi 60 CHS, 8 Peremozhtsiv Street Novobavarskyi 61 CHS, 5А Hrushevskoho Street Novobavarskyi 62 CHS, 6А Dudynskoi Street Novobavarskyi 63 CHS, 4 Liubovi Maloi Avenue Novobavarskyi 64 CHS 5/7, 8/10 Darvina Street Kuyivskiy 65 CHS, 7А Matiushenka Street Kuyivskiy 66 CHS "Pivnichnyi-4", 25А Metrobudivnykiv Street Kuyivskiy 67 CHS Pivnichnyi-5", 281А Druzhby Narodiv Street Kuyivskiy 68 CHS "Pivnichnyi-3", 13 Metrobudivnykiv Street Kuyivskiy 69 CHS "Pivnichnyi-2", 12 Metrobudivnykiv Street Kuyivskiy 70 CHS 522/2, 12Zh Heroiv Pratsi Street Kuyivskiy 71 CHS 522/1, 16G Valentynivska Street Kuyivskiy 72 CHS 4/6, 43В Haharina Avenue Slobidskyi 73 CHS 4/24, 35/1 Petra Hryhorenka Avenue Slobidskyi 74 CHS 4/5, 8/1 Fesenkivskyi Entry Slobidskyi 75 CHS 4/15, 9А Molochna Street Slobidskyi 76 CHS 4/24а, 3А Zhasminovyi Boulevard Slobidskyi 77 CHS, 122 Moskovskyi Avenue Slobidskyi 78 CHS, 25 Kovtuna Street Slobidskyi 79 CHS 4/27, 125V Niutona Street Slobidskyi 80 CHS,159А Haharina Avenue Slobidskyi 81 CHS 4/14, 41/1 Heroiv Stalinhradu Avenue Slobidskyi 82 CHS 4/12, 17/1 Kostycheva Street Slobidskyi 83 CHS, 27 Lva Landau Avenue Slobidskyi 84 CHS 4/25, 4/1 Zhasminovyi Boulevard Slobidskyi 85 CHS 4/27А, 148G Heroiv Stalinhradu Avenue Slobidskyi 86 CHS 4/28, 18B Petra Hryhorenka Avenue Slobidskyi 87 CHS 4/29, 12/1 Tankopiia Street Slobidskyi 88 CHS 4/11, 5/1 Zernovyi Lane Slobidskyi 89 CHS 4/13, 4/2 Zernovyi Lane Slobidskyi 90 CHS 4/40, 55/1 Zernova Street Slobidskyi 91 CHS 4/57, 171/1 Haharina Avenue Slobidskyi 92 CHS 22of a hospital, 160 Heroiv Stalinhradu Slobidskyi Avenue 93 CHS 4/28А, 18В Petra Hryhorenka Avenue Slobidskyi 94 CHS,27А Lva Landau Avenue Slobidskyi 95 CHS, 199/2 Haharina Avenue Slobidskyi 96 CHS 3/14, 32 Blahovishchenska Street Kholodnohirskyi 97 CHS 3/19, 45 Chobotarska Street Kholodnohirskyi 98 CHS 3/20, 49 Chobotarska Street Kholodnohirskyi 99 CHS 3/21, 6 Dmytrivska Street Kholodnohirskyi 100 CHS 3/3, 28В Zolochivska Street Kholodnohirskyi 101 CHS 3/11, 52 Pashchenkivska Street Kholodnohirskyi 102 CHS 3/2, 68 Illinska Street Kholodnohirskyi 103 CHS 3/1, 152 В Poltavskyi Shliakh Street Kholodnohirskyi 104 CHS 3/9, 3 Kholodnohirska Street Kholodnohirskyi 105 CHS 3/8, 21 Shchaslyva Street Kholodnohirskyi 106 CHS 3/4, 17 Donbasivskyi Lane Kholodnohirskyi 107 CHS, 3А Molodizhna Street Kholodnohirskyi 373 108 CHS 3/10, 28 Ihora Muratova Street Kholodnohirskyi 109 CHS 3/15, 71/1 Taborova Street Kholodnohirskyi 110 CHS 3/16, 3А Druhyi Tarasivskyi Lane Kholodnohirskyi 111 CHS 3/17, 8 Plastychnyi Lane Kholodnohirskyi 112 CHS, 9А Berkosa Street Kholodnohirskyi 113 CHS 3/18, 9 Ihora Muratova Street Kholodnohirskyi 114 CHS, 3 Makarenka Street Kholodnohirskyi 115 CHS, 15А Nadii Street (Pesochin) Kholodnohirskyi 116 CHS, 7А Kvartalnyi Lane Kholodnohirskyi 117 CHS, 222 Velyka Panasivska Street Kholodnohirskyi 118 CHS, 193 Velyka Panasivska Street Kholodnohirskyi 119 CHS, 190/2 Poltavskyi Shliakh Street Kholodnohirskyi 120 CHS, 2 Kashuby Street Kholodnohirskyi 121 CHS, 17В Berkosa Street Kholodnohirskyi 122 CHS, 20 Malynovskoho Street Kholodnohirskyi 123 CHS, 20 Pushkina Street Kholodnohirskyi 124 CHS, 5 Shatylivska Street Kholodnohirskyi 125 CHS, 110 Poltavskyi Shliakh Street Kholodnohirskyi 126 CHS, 46 Akademika Pavlova Street Moskovskyi 127 CHS, 8 Serhiivska Street Moskovskyi 128 CHS, 38 Marshala Batytskoho Street Moskovskyi 129 CHS, 6/32 Avtostradnyi Lane Moskovskyi 130 CHS, 16 Ladozkyi Lane Moskovskyi 131 CHS 606/1, 3V Svitla Street Moskovskyi 132 CHS 533/1, 47G Heroiv Pratsi Street Moskovskyi 133 CHS 615/1, 22 V Hvardiitsiv Shyronintsiv Street Moskovskyi 134 CHS 614, 57B Traktorobudivnykiv Avenue Moskovskyi 135 CHS 605/2. 65B Traktorobudivnykiv Avenue Moskovskyi 136 CHS 603/2, 63B Yuvileinyi Avenu Moskovskyi 137 CHS 602/2. 75B Yuvileinyi Avenu Moskovskyi 138 CHS 601, 86A Yuvileinyi Avenu Moskovskyi 139 CHS 602/1, 67A Yuvileinyi Avenu Moskovskyi 140 CHS 603/1, 59D Yuvileinyi Avenu Moskovskyi 141 CHS 604/1, 70A Yuvileinyi Avenu Moskovskyi 142 CHS 604/2, 139D Saltivske Highway Moskovskyi 143 CHS 605/1, 77A Traktorobudivnykiv Avenue Moskovskyi 144 CHS 656, 40В Yuvileinyi Avenu Moskovskyi 145 CHS 615/2, 41А Hvardiitsiv Shyronintsiv Street Moskovskyi 146 CHS 616, 27А Hvardiitsiv Shyronintsiv Street Moskovskyi 147 CHS 531/1, 37Е Heroiv Pratsi Street Moskovskyi 148 CHS 531/2, 34Е Buchmy Moskovskyi 149 CHS 533/2, 44Е Buchmy Moskovskyi 150 CHS 606/2, 140G Traktorobudivnykiv Avenue Moskovskyi 151 CHS 607/1, 83 Zh Traktorobudivnykiv Avenue Moskovskyi 152 CHS 607/2, 54G Heroiv Pratsi Street Moskovskyi 153 CHS "Budmistechko-1", 35D Vladyslava Zubenka Moskovskyi Street 154 CHS "Budmistechko-2", 46D Valentynivska Street Moskovskyi 155 CHS 535А, 126V Traktorobudivnykiv Avenue Moskovskyi 374 156 CHS 606/3, 148A Traktorobudivnykiv Avenue Moskovskyi 157 CHS 520/1, 24V Valentynivska Street Moskovskyi 158 CHS 520/2, 132D Akademika Pavlova Street Moskovskyi 159 CHS 521/1, 59E Hvardiitsiv Shyronintsiv Street Moskovskyi 160 CHS 521/2, 140E Akademika Pavlova Street Moskovskyi 161 CHS 524/1, 73E Hvardiitsiv Shyronintsiv Street Moskovskyi 162 CHS 524/2, 12A Buchmy Street Moskovskyi 163 CHS "Pivnichnyi-1", 9A Dzherelna Street Moskovskyi 164 CHS, 48 Leonida Bykova Street Moskovskyi 165 CHS, 25 Adygeiskyi Lane Moskovskyi 166 CHS 4/33, 71А Oleksandrivskyi Avenue Industrialnyi 167 CHS 4/34, 120А Oleksandrivskyi Avenue Industrialnyi 168 CHS 4/37, 1D Biblyka Street Industrialnyi 169 CHS 4/34A, 114A Oleksandrivskyi Avenue Industrialnyi 170 CHS 4/33A, 65A Oleksandrivskyi Avenue Industrialnyi 171 CHS 4/31, 89А Rybalka Street Industrialnyi 172 CHS 4/32, 57А Biblyka Street Industrialnyi 173 CHS 4/30, 179В Lui Pastera Street Industrialnyi 174 CHS 4/3А, 46В Hrytsevtsia Street Industrialnyi 175 CHS 4/39, 65А Plytkova Street Industrialnyi 176 CHS "Horyzont-1”, 3A Rostovska Street Industrialnyi 177 CHS "Horyzont-1”, 126А Velyka Kiltseva Street Industrialnyi 178 CHS, 323А Lui Pastera Street Industrialnyi 179 CHS, 19/85 Arkhitektora Aloshyna Avenue Industrialnyi 180 CHS, 1А Tarkhova Street Industrialnyi 181 CHS, 17В Industrialnyi Avenue Industrialnyi 182 CHS, 200 Lui Pastera Street Industrialnyi 183 CHS, 32/38 Bohdana Khmelnytskoho Boulevard Nemyshlianskyi 184 CHS 4/3, 7А Petra Hryhorenka Avenue Nemyshlianskyi 185 CHS 4/36, 42А Rybalka Street Nemyshlianskyi 186 CHS 4/4, 11А Rybalka Street Nemyshlianskyi 187 CHS 4/7, 12/1 Rybalka Street Nemyshlianskyi 188 CHS 4/35, 33А Rybalka Street Nemyshlianskyi 189 CHS 4/38, 49D Rybalka Street Nemyshlianskyi 190 CHS 4/1, 19/1 Yurieva Boulevard Nemyshlianskyi 191 CHS 4/8, 14/1 Stadionnyi Passage Nemyshlianskyi 192 CHS 4/9, 6/7 Stadionnyi Passage Nemyshlianskyi 193 CHS 4/10, 23A Olimpiiska Street Nemyshlianskyi 194 CHS 4/625A, 33A Amosova Street Nemyshlianskyi 195 CHS 4/624, 5A Amosova Street Nemyshlianskyi 196 CHS 4/625, 15A Amosova Street Nemyshlianskyi 197 CHS 4/626, 42A Amosova Street Nemyshlianskyi 198 CHS 4/624A, 26A Amosova Street Nemyshlianskyi 199 CHS "Turkestanska", 106A Saltivske Highway Nemyshlianskyi 200 CHS 3/5, 5А Moskalivska Street Osnovianskyi 201 CHS 3/23, 62А Haharina Avenue Osnovianskyi 202 CHS, 9 Aptekarskyi Lane Osnovianskyi 203 CHS, 14 Shota Rustaveli Lane Osnovianskyi 204 CHS, 4 Azerbaidzhanskyi Passage Osnovianskyi 205 CHS 3/6, 174А Haharina Avenue Osnovianskyi 375 206 CHS, 36/1 Sydorenkivska Street Osnovianskyi 376 Annex 39. Information concerning the land plots of the PROJECT objects. № Object, address, name of the component Name of district Land use documents Land plot Land Area of built-up description plot area, buildings, located m2 on the land plot, m2 CONSTRUCTION OF COGENERATION PLANTS 1 boiler house, 4, Artema Vedelia str. Moskovskyi Extract from State industrial lands 1541 625 Register № 88154692 dated 26.05.17 2 boiler house “Khartron”, 1, Akademika Proskury Kyivskyi Extract from State industrial lands 6221 1502.8 str. Register №86419299 dated 04.05.17 DECOMMISSIONING OF BOILER HOUSES, INSTALLATION OF HEAT SUPPLY STATIONS AND RECONSTRUCTION OF HEAT SUPPLY NETWORK 1 boiler house, 199/2, Gagarina ave. Slobidskyi Extract from State industrial lands 920 359.2 Register №67697242 dated 09.09.16 2 boiler house , 77, Peremohy ave. Shevchenkivskyi Boiler house is built into technical passport is the resident building missing (roof) 3 boiler house №2, 77, Peremohy ave. Shevchenkivskyi Boiler house is built into technical passport is the resident building missing (roof) 377 4 boiler house, 57A, Seminarska str. Novobavarskyi Boiler house is built into 126.0 the resident building (basement) 5 boiler house, 12, Kashirskoho str. Novobavarskyi Boiler house is built into 43.5 the resident building (basement) 6 boiler house, 46/5, Seminarska str. Novobavarskyi Boiler house is built into 198 the resident building (basement) 7 boiler house, 46, Seminarska str. Novobavarskyi Documents are not industrial lands 517 329.4 available (work is in progress) 8 boiler house, 57Б, Seminarska str. Novobavarskyi Boiler house is built into - 74.6 the resident building (basement) 9 boiler house, 47A, Pushkarivska str. Novobavarskyi Information certificate industrial lands 155 79 № 661183 dated 18.08.16 10 boiler house, 45, Liubovi Maloi ave. Novobavarskyi Documents are not industrial lands 404 61.6 available (work is in progress) 11 boiler house, 51, Liubovi Maloi ave. Novobavarskyi Boiler house is built into 213.3 the resident building (basement) 12 boiler house, 2Б, Yudina str. Novobavarskyi Extract from State industrial lands 600 314 Register № 77020204 dated 26.12.16 RECONSTRUCTION OF BOILER HOUSES 378 1 boiler house, 7, Hryshchenka str. Nemyshlianskyi documents are missing industrial lands 1791 763.7 (work is in progress) 2 boiler house, 82A, Kulynychivska str. Nemyshlianskyi documents are missing industrial lands 103 62.4 (work is in progress) 3 boiler house, 104, Krasnodarska str. Nemyshlianskyi documents are missing industrial lands 398 303.3 (work is in progress) 4 boiler house “Pivnichnyi-1”, 9A, Dzherelna str. Moskovskyi Money value, extract № industrial lands 5 304.0 977.8 1403/14 dated 20.05.2014 № 2657/08 5 boiler house, 12, Konieva str. Novobavarskyi The plot allocated for the industrial lands 35.0 construction (cadastral survey Annex № 42) 6 boiler house, 6/10, Polzunova lane Novobavarskyi The plot allocated for the industrial lands 35.0 construction (cadastral survey Annex № 42) 7 boiler house, 90, Novo-Bavarskyi ave. Novobavarskyi Extract from State industrial lands 1 430.0 600.0 Register № 77046340 dated 26.12.16 8 boiler house, 53, Lomonosova str. Novobavarskyi The plot allocated for the industrial lands 50.0 construction (cadastral survey Annex № 42) 9 boiler house, 8, Bulvarna str. Novobavarskyi The plot allocated for the industrial lands 25.0 construction (cadastral survey Annex № 42) 10 boiler house, 88A, Seminarska str. Novobavarskyi Money value, extract industrial lands 298.0 145.9 №1405/14 dated 20.05.2014 №2655/08 11 boiler house, 13, Marka Bernesa str. Novobavarskyi The plot allocated for the industrial lands 50.0 construction (cadastral survey Annex № 42) 379 12 boiler house, 5, Metiznyi lane Novobavarskyi The plot allocated for the industrial lands 70.0 construction (cadastral survey Annex № 42) 13 boiler house, 7A, St. Nova Bavariia str. Novobavarskyi Documents are not industrial lands 77.0 30.6 available (work is in progress) 14 boiler house, 48, Konotopska str. Novobavarskyi Documents are not industrial lands 237.0 69.6 available (work is in progress) 15 boiler house, 26, Kontroska str. Novobavarskyi Boiler house is built into 75.4 the resident building (basement) 16 boiler house, 2, Kontroska str. Novobavarskyi Documents are not industrial lands available (work is in progress) 17 boiler house, 5/7, Karpivska str. Novobavarskyi Documents are not industrial lands 78.0 44.4 available (work is in progress) 18 boiler house, 66, Naboichenka Petra str. Novobavarskyi Documents are not industrial lands 124.0 62.5 available (work is in progress) 19 boiler house, 99A, Novo-Bavarskyi ave. Novobavarskyi Extract from State industrial lands 1 750.0 490.4 Register № 77012569 dtd. 26.12.16 380 20 boiler house, 41, Novyi Pobut str. Kholodnohirskyi Boiler house is built into 154.5 the resident building (basement) 21 boiler house, 49/51, Rylieieva str. Kholodnohirskyi Boiler house is built into 66.4 the resident building (basement) 22 boiler house, 67, Velyka Panasivska str. Kholodnohirskyi State act № 307889 dtd. industrial lands 520.0 403.6 30.05.12 23 boiler house, 35, Zaliznychna str. Kholodnohirskyi State act № 307886 dtd. industrial lands 175.0 100.6 30.05.12 24 boiler house, 2/15, Blahovishchenska str. Kholodnohirskyi Boiler house is built into 97.4 the resident building (basement) 25 boiler house, 12, Baltiiska str. Kholodnohirskyi Documents are not industrial lands 507.0 63.4 available (work is in progress) 26 boiler house, 3, Afanasivska str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 27 boiler house, 205, Velyka Panasivska str. Kholodnohirskyi Stae Act № 318810 dtd. industrial lands 3 435.0 583.1 19.11.12 28 boiler house, 27/5, Berkosa str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 29 boiler house, 41, Kurylivska str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 30 boiler house, 65, Ozerianska str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 381 31 boiler house, 35, Novyi Pobut str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 32 boiler house, 6, Rizdviana str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 33 boiler house, 8, Slovianska str. Kholodnohirskyi Documents are not industrial lands 1081.0 686.0 available (work is in progress) 34 boiler house, 29, Velyka Panasivska str. Kholodnohirskyi State Act № 307954 dtd. industrial lands 2 080.0 588.2 27.07.12 35 boiler house, 7, Ihoria Muratova str. Kholodnohirskyi Documents are not industrial lands 106.0 96.2 available (work is in progress) 36 boiler house, 41/43, Andriivska str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 37 boiler house, 30, Hrekivska str. Osnovianskyi Documents are missing. industrial lands 29.0 29.0 Boiler house is located in the annex to the residential building 38 boiler house, 1, Biolohichny lane Osnovianskyi The plot allocated for the industrial lands 50.0 construction (cadastral survey Annex № 42) 39 boiler house, 19, Ternopilska str. Osnovianskyi Decision № 757/12 dtd. industrial lands 476.0 148.7 22.06.2012 in the permanent use 382 40 boiler house, 1, Lymanskyi lane Osnovianskyi Mobey value № 1404/14 industrial lands 442.0 165.7 dtd. 20.05.2014 № 2657/08 41 boiler house, 16, Myrhorodska str. Osnovianskyi Documents are not industrial lands 75.0 15.1 available (work is in progress) 42 3, Dostoievskoho entr. (construction of the new Osnovianskyi Documents are not industrial lands heat source with closing of boiler houses): available (work is in  1, Dostoievskoho str., progress)  14, Dostoievskoho entr.  35A, Dostoievskoho entr. 43 boiler house, 27A, Dyspetcherska str. Osnovianskyi State Acts № 319509, industrial lands 4790.0 1 171.4 № 319508 dtd. 06.11.07 44 boiler house, 89A, Dostoievskoho str. Osnovianskyi Grounding of the plot industrial lands 104.0 91.0 land boundaries developed 45 boiler house, Shevchenkivskyi Documents are missing. 26.9 20, Bukova str. Boiler house is located at premise of the 1-st storey of the resident building 46 boiler house, Shevchenkivskyi Documents are missing industrial lands 40.0 29.5 20a, Bukova str. (work is in progress) Boiler house is located in the annex to the residential building 47 boiler house, 14 Bukova str. Shevchenkivskyi Documents are missing industrial lands 49.0 22.1 (work is in progress) Boiler house is located in the annex to the residential building 383 48 boiler house, YRC Internationalist, 70, Kyivskyi Documents are not industrial lands 2791.0 518.3 Horianska str. available (work is in progress) 49 boiler house “Piatykhatky”, 1, Akademichna str. Kyivskyi Documents are not industrial lands 15342.0 3526.2 available (work is in progress) 50 boiler house, 10Б, Saperna str. Kyivskyi State Act № 318782 dtd. industrial lands 5 520.0 637.8 02.10.12 51 boiler house, 27, Pomirky str. Kyivskyi Documents are not industrial lands 380.0 214.2 available (work is in progress) 52 boiler house “Aeroport”, 9, Nesterova str. Slobidskyi Extract from State industrial lands 2900.0 902.8 Register ЕЕХ 3277769 dtd. 31.07.15 53 boiler house, 74A, Myru str. Industrialnyi Documents are not industrial lands 2270.0 881.3 available (work is in progress) 54 boiler house, 10/12, Blahovishchenska str. Kholodnohirskyi The plot allocated for the industrial lands 28.0 construction (cadastral survey Annex № 42) 55 boiler house, 7A, Konieva str. Novobavarskyi Documents are not industrial lands 1303.0 498.8 available (work is in progress) 56 boiler house, 5A, Svinarenka str. Novobavarskyi Information certificate № industrial lands 950.0 436.6 66633459 dtd. 26.08.16 384 57 boiler house, 23A, Svitlanivska str. Novobavarskyi State Act № 318905 dtd. industrial lands 223.0 84.5 28.11.12 58 boiler house, 32, Seminarska str. Novobavarskyi The plot allocated for the industrial lands 50.0 construction (cadastral survey Annex № 42) Commissioning of steam turbogenerator and reconstruction of steam boiler at CHP-3 CHP-3, 3, Enerhetychna str. Nemyshlianskyi Extract from State industrial lands 195781.0 Boiler-turbine Register ЕАХ № 576325 workshop- dtd. 14.03.14 13030.8 385 Annex 40 Cadastral survey of construction plots of the new boiler houses 386 387 388 389 390 391 392 393 \ 394 395 396 397 398 399 400 401 Annex 41 Place of location of the boiler houses Picture 4.1.3.59 Place of location of the boiler houses - block-modular boiler. 17 pcs.; - Boiler houses up to 3MW to reconstructed in the existing building. 27pcs.; Boiler houses over to 5MW to reconstructed in the existing building. 14 pcs. 402