Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 May 05, 2017 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Package Domesti Review Comments No. Cost s c by Bank US$ Preferen (Prior / million ce Post) (yes/no) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract the NCB for Prior (Goods) Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule May 05, 2017 1 2 3 4 5 6 7 Ref. Description of Estimated Selection Review by Expected Comments No Assignment cost (US$ method the Bank proposal / equivalen (prior/pos s completio t) t) submissi n date on date For the Support for the 1 Post first year preparation of Statutory 20,000 IC 21/08/15 24/09/15 Instruments (30 days) 2 Study on the definition 40,000 Post 22/04/16 of a planning CQS 25/01/16 (03 methodology at months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the (03 communes and urban months) communities 4 Study for the 20,000 IC Post 19/02/16 24/03/16 establishment of local (30 days) public service in communes 5 Study on the 40,000 CQS Post 11/04/16 18/07/16 sustainability of the (03 PNDP months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization process (03 in Cameroon/supports months) to the finalization of the national strategy for decentralization 7 Selection of a 20,000 IC Post 20/11/15 30/12/15 consultant to develop (30 days) the practitioner's manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Conventio n) 9 Training of procurement 100,000 SSS Prior NA Service commissions provided by ARMP (Conventio n) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract project for the first 2 for 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract 12 Design and 90,000 CQS Post 12/02/16 22/08/16 development of an (06 months) May 05, 2017 1 2 3 4 5 6 7 Ref. Description of Estimated Selection Review by Expected Comments No Assignment cost (US$ method the Bank proposal / equivalen (prior/pos s completio t) t) submissi n date on date internet portal on the PNDP and communes 13 Translation of 90,000 CQS Post 11/05/16 20/08/16 documents (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and 70,000 QCBS Post 13/12/16 26/06/17 Social Assessment (06 months) 17 Service Follow-up of training SSS Prior NA provided deployment and by AIMF 70,000 technical assistance to expert Sim_ba software in (Conventio communes n) 18 IC Post 27/05/15 Annual contract (the 10,000 current contract ends June Insurance advice 30, 2015) 19 QCBS Post 01/12/16 16/04/16 Preparation of CDPs for 80,000 (06 the 31 communes months) May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-05-30 2020-11-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144637 GPN Date: 2016-09-06 Project Name: Community Development Program Support Project-Phase III Loan / Credit No: IDA / 57180 CELLULE REGIONALE DE COORDINATION - CENTRE Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 001/T/CE/ENDOM/2017 / Construction 02 hangars de 30 comptoirs avec bloc Component A: Local Single Stage - One 2017-04- 2018-01- 2017-07- 2018-10- 2017-10- latrines 02 compartiments IDA / 57180 A posteriori Demande de prix Limited 92,720.00 84,048.13 Signé development support Envelope 28 15 03 03 31 dans 02 sites des marchés de Edjom et de Mengwa à d'Endom 002/T/CE/ENDOM/2017 / Travaux de Construction de deux (02) puits productifs Component A: Local Single Stage - One 2017-04- 2018-01- 2017-05- 2018-10- 2017-09- équipés de Pompe à Motricité IDA / 57180 A posteriori Demande de prix Limited 24,000.00 15,289.24 Signé development support Envelope 01 15 27 03 24 Humaine dans deux (02) localités (Edjom, Mengwa) d'Endom 003/T/CE/AKOEMAN/2017 / Construction de 04 puits équipés de Pompes à Motricité Humaine dans Component A: Local Single Stage - One 2017-04- 2017-04- 2017-06- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 48,000.00 33,584.99 Signé quatre localités (Ngamba, development support Envelope 28 10 18 28 16 Akoéman ville, Melen et Akoa Zolé) dans la Commune d'Akoéman, Région du Centre 004/T/CE/AKOEMAN/2017 / Travaux de Construction d'un hangar de 32 comptoirs Component A: Local Single Stage - One 2017-04- 2017-07- 2017-05- 2017-07- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 80,406.00 68,521.20 Signé et 01 bloc de 04 latrines a development support Envelope 01 04 27 06 24 Akoeman ville, dans la Commune d'Akoéman, Région du Centre 005/T/CE/MBANDJOCK/201 77 / Travaux de Construction d'un abattoir Component A: Local Single Stage - One 2017-04- 2017-06- 2017-05- 2017-09- 2017-09- avec latrines incorporées, au IDA / 57180 A posteriori Demande de prix Limited 56,000.00 68,341.34 Résilié development support Envelope 01 09 27 20 24 centre ville de Mbandjock dans la Commune de Mbandjock, Région du Centre 007/T/CE/EBEBDA/2017 / Travaux de Construction de 02 hangars de 32 comptoirs avec 02 blocs latrines à 03 Component A: Local Single Stage - One 2017-04- 2017-06- 2017-05- 2017-09- 2017-09- compartiments au marché de IDA / 57180 A posteriori Demande de prix Limited 89,801.00 45,170.00 Signé development support Envelope 01 05 27 04 24 Nkog Edzen et au marché de Elig-Edouma dans la Commune d'Ebebda, Région du Centre 019/T/CE/OMBESSA/2017 / Travaux de Construction d'une mini AEP avec forage Component A: Local Single Stage - One 2017-04- 2017-06- 2017-05- 2017-08- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 24,000.00 15,662.01 Signé productif et construction development support Envelope 05 19 31 28 30 d'un château à Ombessa, dans la Commune de Ombessa, Région du Centre 022/T/CE/YAOUNDE 7/2017 / Travaux de Construction d'un magasin de stockage avec un bloc Component A: Local Single Stage - One 2017-04- 2017-06- 2017-06- 2017-08- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 50,000.00 44,717.18 Signé latrines à deux (02) development support Envelope 21 14 10 22 08 Compartiments à Minkoameyos dans la commune de Yaoundé 7, Région du Centre 023/T/YAOUNDE 7/2017 / Travaux de rehabilitation d'un pont definitif de 06m de portee et 04m de large sur la riviere Angaha et de Component A: Local Single Stage - One 2017-04- 2017-06- 2017-06- 2017-10- 2017-10- réhabilitation d'une piste IDA / 57180 A posteriori Demande de prix Limited 76,971.00 30,694.96 Signé development support Envelope 21 14 10 16 08 agricole de 400m allant du carrefour nkolnkoumou au Centre de Promotion de la Femme, dans la commune de Yaoundé 7, Région 026/T/CE/MFOU/2017 / Travaux de Construction d'un forage productif Component A: Local Single Stage - One 2017-04- 2018-04- 2017-06- 2018-07- 2017-09- équipés d'une Pompe à IDA / 57180 A posteriori Demande de prix Limited 17,000.00 12,035.42 Achevé development support Envelope 28 18 17 26 15 Motricité Humaine dans la localité de Nkongoa dans la Commune de Mfou, Région du Centre 032/T/CE/DIBANG/2017 / Travaux de realisation d'une electrification rurale de Component A: Local Single Stage - One 2017-04- 2017-04- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 57,608.00 31,031.18 Signé 2700m dans le village development support Envelope 21 11 10 06 08 Tamalong, Commune de Dibang, Région du Centre 033/T/CE/DIBANG/2017 / Travaux de Construction d'un magasin de stockage Component A: Local Single Stage - One 2017-04- 2017-04- 2017-06- 2017-07- 2017-10- avec un bloc latrines à deux IDA / 57180 A posteriori Demande de prix Limited 50,000.00 49,609.26 Signé development support Envelope 21 13 10 11 08 (02) compartiments à Ndongo dans la Commune de Dibang, Région du Centre 020/T/CE/OLANGUINA/2017 / Travaux de Construction dun (01) hangar de 32 comptoirs au marché de Koltock et rehabilitation du Component A: Local Single Stage - One 2017-04- 2018-09- 2017-06- 2018-10- 2017-10- marché d'Olanguina (10 IDA / 57180 A posteriori Demande de prix Limited 94,057.00 35,853.11 Signé development support Envelope 21 20 10 30 08 boutiques) et Construction de (02) bloc latrines à trois (03) compartiments, dans la Commune d'Olanguina, Région du Centre 021/T/CE/OLANGUINA/2017 / Travaux de Construction d'un (01) forage productif Component A: Local Single Stage - One En cours 2017-04- 2018-09- 2017-06- 2017-10- équipé d'une pompe à IDA / 57180 A posteriori Demande de prix Limited 17,000.00 17,174.35 development support Envelope d'exécution 21 20 10 08 motricité humaine au marche de Koltock dans la Commune d'Olanguina, Région du Centre 027/T/CE/MENGANG/2017 / Travaux de réalisation d'électrification rurale dans certaines localités, en 02 Component A: Local Single Stage - One 2017-04- 2017-04- 2017-06- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 108,698.00 71,736.81 Achevé axes : lycée de Mengang- development support Envelope 21 28 16 30 14 Meyo-Evoung et lycée de Menoa-Ekinguili-Bifembe, Commune de Mengang, Région du Centre 35/T/CE/BOT MAKA/2017 / Travaux de Construction d'un (01) puits équipés de Component A: Local Single Stage - One 2017-04- 2018-09- 2017-06- 2018-11- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 12,000.00 96,337.00 Signé pompes à motricité humaine development support Envelope 08 21 03 13 01 à Ndjock Bané, dans la Commune de Bot Makak, Région du Centre 006/T/CE/MBANDJOCK/201 77 / Construction d'une mini AEP par raccordement au reseau CDE et construction Component A: Local Single Stage - One 2017-04- 2018-08- 2017-05- 2018-12- 2017-09- d'un château d'eau avec un IDA / 57180 A posteriori Demande de prix Limited 7,427.00 75,091.46 Signé development support Envelope 01 08 27 12 24 cubitenaire de 4000 litres au centre ville de Mbandjock dans la Commune de Mbandjock, Région du Centre 041/T/CE/NKOTENG/2017 / Travaux de Construction d'un (01) hangar de 32 comptoirs et un bloc latrines Component A: Local Single Stage - One 2017-03- 2017-04- 2017-05- 2017-07- 2017-08- IDA / 57180 A posteriori Demande de prix Limited 42,733.00 40,318.28 Signé à quatre (04) compartiments development support Envelope 11 05 06 25 04 au carrefour Ndoumba dans la Commune de Nkoteng, Région du Centre 042/T/CE/NKOTENG/2017 / Travaux de Construction d'un (01) puits équipé de Component A: Local Single Stage - One 2017-03- 2017-06- 2017-05- 2017-08- 2017-07- Pompe à Motricité Humaine IDA / 57180 A posteriori Demande de prix Limited 8,010.00 7,513.44 Signé development support Envelope 11 09 06 31 05 au carrefour Ndoumba dans la Commune de Nkoteng, Région du Centre 043/T/CE/MBANGASSINA/20 17 / Travaux de construction d'un réseau d'électrification Component A: Local Single Stage - One 2017-06- 2017-09- 2017-08- 2018-03- 2017-12- de 9,700 km de MT et 3,400 IDA / 57180 A posteriori Demande de prix Limited 100,756.00 95,061.98 Achevé development support Envelope 20 25 15 28 13 km de BT du village Talba, dans la Commune de Mbangassina, Région du Centre Page 1 157/C/T/CE/KON YAMBETTA/2018 / / Construction d'un forage positif équipé de PMH au Component A: Local Single Stage - One 2018-04- 2018-10- 2018-06- 2019-02- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 17,146.00 12,622.17 Signé hangar de marché de development support Envelope 12 09 07 05 06 Diodare, Commune de Kon Yambetta, lieu : NWAL A MANDOKI, Région du Centre. 158/C/T/CE/BOKITO/2018 / / Réhabilitation en pavé de béton du tronçon carrefour Eglise catholique place de Component A: Local Single Stage - One 2018-03- 2018-10- 2018-05- 2019-02- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 61,669.00 64,480.07 Signé l’indépendance, rond-point development support Envelope 10 16 05 04 03 finance, entrée résidence du sous-préfet (300) ml, Commune de Bokito 159/C/T/CE/BIKOK/2018 / / Construction d’un bloc de trois (03) salles de classe équipées et 01 bloc de trois Component A: Local Single Stage - One 2018-02- 2018-05- 2018-04- 2018-08- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 68,152.00 58,893.19 Signé (03) latrines à l'EP de development support Envelope 18 07 15 31 13 NKELASSI, localité d’EVINDISSI, et Commune de Bikok 140/C/T/CE/AYOS/2018 / / Construction de six forages positifs équipés de PMH à Koba, à l’EP de Mbang, à l’EP Component A: Local Single Stage - One 2018-01- 2018-01- 2018-03- 2018-07- 2018-07- IDA / 57180 A posteriori Demande de prix Limited 99,536.00 77,122.81 Résilié d’Atong, à Melane, à development support Envelope 13 29 10 16 08 Mekouma et à Nkolmveng (carrefour Endo), Commune d'Ayos 141/C/T/CE/MINTA/2018 / / Construction de (04) forages positifs équipés de Component A: Local Single Stage - One 2018-01- 2018-04- 2018-03- 2018-07- 2018-07- PMH à l’EP d’Elot, au Marché IDA / 57180 A posteriori Demande de prix Limited 69,409.00 49,620.38 Signé development support Envelope 13 23 10 16 08 de Minta ville, à Mbargue et à l’EP d’Afan Oveng, Commune de Minta, Région du Centre 142/C/T/CE/MINTA/2018 / / Construction de deux blocs de latrines à quatre (04) Component A: Local Single Stage - One 2018-04- 2018-01- 2018-06- 2018-06- 2018-12- compartiments au marché de IDA / 57180 A posteriori Demande de prix Limited 14,168.00 11,608.62 Signé development support Envelope 12 14 07 28 04 Minta ville et à l'EP d’Elot, Commune de Minta, Région du Centre. 143/C/T/CE/AKONOLINGA/2 018 / / Construction d'un (01) hangar de 22 comptoirs Component A: Local Single Stage - One 2018-01- 2018-02- 2018-03- 2018-05- 2018-05- et d'un (01) bloc de latrines à IDA / 57180 A posteriori Demande de prix Limited 36,145.00 28,081.75 Achevé development support Envelope 13 26 10 11 09 trois (03) compartiments au marché du quartier Haoussa, Commune d'Akonolinga, 144/C/T/CE/AKONOLINGA/2 018 / / Construction d'un forage positif équipé de PMH Component A: Local Single Stage - One 2018-01- 2018-04- 2018-03- 2018-08- 2018-05- à l'EM d'application Groupe1 IDA / 57180 A posteriori Demande de prix Limited 16,967.00 11,736.43 Signé development support Envelope 13 18 10 27 09 d'Akonolinga, Commune d'Akonolinga, Région du Centre 145/C/T/CE/NKOLAFAMBA/ 2018 / / Electrification en MT (0.8 Km)/BT (1.1 Km) Component A: Local Single Stage - One 2018-01- 2018-03- 2018-03- 2018-07- 2018-07- IDA / 57180 A posteriori Demande de prix Limited 79,535.00 61,434.27 Signé triphasée de 160 KV, du development support Envelope 13 29 10 30 08 village EKOM, Commune de NkolAfamba, Région du Centre. 146/C/T/CE/SOA/2018 / / Electrification en MT (2 Km)/BT (3.8 Km), triphasée Component A: Local Single Stage - One 2018-01- 2018-03- 2018-03- 2018-06- 2018-07- de 160 KVA, du village IDA / 57180 A posteriori Demande de prix Limited 105,813.00 93,305.05 Signé development support Envelope 18 12 15 12 13 NTOUESSONG V Centre, Commune de Soa, Région du Centre. 147/C/T/CE/OMBESSA/2018 / / Construction de (03) forages positifs équipés de Component A: Local Single Stage - One 2018-01- 2018-04- 2018-03- 2018-08- 2018-07- PMH à Edane, Bouyoumenou IDA / 57180 A posteriori Demande de prix Limited 49,688.00 121,710.75 Signé development support Envelope 13 05 10 24 08 et Boyaba Paris (Boyamelie), Commune d'Ombessa, Région du Centre 148/C/T/CE/AFANLOUM/20 18 / / Construction d'un forage positif équipé de Component A: Local Single Stage - One 2017-06- 2018-10- 2017-08- 2018-01- 2017-10- Pompe à Motricité Humaine IDA / 57180 A posteriori Demande de prix Limited 17,146.00 15,405.30 Signé development support Envelope 20 16 15 11 14 (PMH) dans la localité d'Ekoukout, Commune d'Afanloum, Région du Centre 149/C/T/CE/MFOU/2018 / / Construction d'un forage équipé positif d'une Pompe à Component A: Local Single Stage - One 2018-04- 2018-04- 2018-06- 2018-07- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 16,003.00 11,971.96 Signé Motricité Humaine à development support Envelope 07 18 02 26 29 Nkongoa, Commune de Mfou, Région du Centre. 150/C/T/CE/OLANGUINA/20 18 / / Construction d’une mini adduction d’eau potable avec forage équipé d'une PES Component A: Local Single Stage - One 2018-05- 2018-09- 2018-07- 2018-11- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 66,000.00 41,139.99 Signé à Olanguina Centre et d'un development support Envelope 15 20 10 02 07 puits équipé de PMH au Marché de Nkoltop dans la Commune d'Olanguina, Région du Centre 151/C/T/CE/OLANGUINA/20 18 / / Construction d'un hangar de 24 comptoirs, Component A: Local Single Stage - One 2018-05- 2018-09- 2018-07- 2018-11- 2018-10- d'un bloc de 04 latrines et IDA / 57180 A posteriori Demande de prix Limited 40,000.00 35,699.86 Signé development support Envelope 15 20 10 02 08 d'une unité de traitement des déchets, dans la Commune d'Olanguina, Région du Centre 154/C/T/CE/OKOLA/2018 / / Construction d'un (01) bloc de deux salles de classe et Component A: Local Single Stage - One 2018-05- 2018-09- 2018-07- 2019-03- 2018-11- d'un (01) bloc de deux IDA / 57180 A posteriori Demande de prix Limited 46,000.00 33,518.77 Signé development support Envelope 15 28 10 18 07 latrines à l'EP de Nyemeyong, Commune d'Okola, Région du Centre 158/C/T/CE/BIKOK/2018 / / Construction d'un puit avec pompe à motricité humaine à Component A: Local Single Stage - One 2018-02- 2018-05- 2018-04- 2018-07- 2018-10- IDA / 57180 A posteriori Demande de prix Limited 13,700.00 11,087.49 Signé l'EP de NKELASSI, dans la development support Envelope 18 07 15 30 12 localité d'EVINDISSI, Commune de Bikok 166/C/T/CE/BAFIA/2018 / Construction de bloc de Component A: Local Single Stage - One 2018-06- 2018-09- 2018-08- 2019-01- 2018-12- boutiques au marché de IDA / 57180 A posteriori Demande de prix Limited 30,000.00 15,978.09 Signé development support Envelope 25 18 20 18 18 Djoumba, dans la Commune de Bafia, Région du Centre 167/C/T/CE/BAFIA/2018 / const de hangars et latr au Component A: Local Single Stage - One 2018-06- 2018-09- 2018-08- 2019-05- 2018-12- marché de Djoumba, dans la IDA / 57180 A posteriori Demande de prix Limited 30,000.00 76,893.68 Signé development support Envelope 25 17 20 25 18 Commune de Bafia, Région du Centre 168/C/T/CE/NSEM/2018 / / réhabilitation du réseau Component A: Local Single Stage - One 2018-06- 2018-11- 2018-08- 2019-04- 2018-11- CAMWATER et raccordement IDA / 57180 A posteriori Demande de prix Limited 69,775.00 56,393.04 Signé development support Envelope 25 01 20 09 18 du CETIC de Nsem, commune de Nsem, Région du Centre 017/T/CE/MONATELE/2017 / Travaux de Construction deux (02) hangars de 32 comptoirs avec deux (02) blocs latrines à trois (03) Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 102,904.00 0.00 Annulé compartiments aux marchés development support Envelope 21 10 08 de deux (02) respectivement dans les localités de Ezezang et Lenouk, dans la Commune de Monatélé, Région de Centre 036/T/CE/NTUI/2017 / Travaux de Construction de deux (02) magasins de stockage de cacao et construction de 02 blocs Component A: Local Single Stage - One 2017-05- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 125,749.00 0.00 Annulé latrines à deux (02) development support Envelope 01 20 18 compartiments dans les localités de Nguila, et Ntui ville) dans la Commune de Ntui, Région du Centre 03/T/CE/MAKAK/2017 / Travaux de Construction d'un magasin de stockage avec un bloc latrines à deux Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé (02) compartiments dans la development support Envelope 28 17 15 localités de Mbeng dans la Commune de Makak, Région du Centre 014/T/CE/OBALA/2017 / Travaux de Construction Component A: Local Single Stage - One 2017-04- 2017-05- 2017-07- d'un puits equipe de PMH à IDA / 57180 A posteriori Demande de prix Limited 12,000.00 0.00 Annulé development support Envelope 04 30 29 nkol-Ekui dans la Commune d'Obala, Région du Centre Page 2 016/T/CE/MONATELE/2017 / Travaux de Construction deux (02) hangars de 32 comptoirs avec deux (02) blocs latrines à trois (03) Component A: Local Single Stage - One 2017-04- 2017-05- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 102,904.00 0.00 Annulé compartiments aux marchés development support Envelope 04 30 27 de deux (02) respectivement dans les localités de Ezezang et Lenouk, dans la Commune de Monatélé, Région de Centre 028/T/CE/ESEKA/2017 / Travaux de Construction de 02 forages equipes de Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- pompes a motricite humaine IDA / 57180 A posteriori Demande de prix Limited 31,923.00 0.00 Annulé development support Envelope 25 14 12 à l'hopital de district et à l'EP G2 ABCD, dans la Commune d'Eséka, Région du Centre 015/T/CE/OBALA/2017 / Travaux de Construction d'un bloc de deux (02) salles de classes équipé de 60 table- Component A: Local Single Stage - One 2017-04- 2017-05- 2017-08- IDA / 57180 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé bancs de niveau 2, de 02 development support Envelope 04 30 28 bureaux pour enseignants à nkol-Ekui dans la Commune d'Obala, Région du Centre 031/T/CE/MAKAK/2017 / Travaux de Construction d'un (01) puits équipé de Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- Pompe à Motricité Humaine IDA / 57180 A posteriori Demande de prix Limited 12,000.00 0.00 Annulé development support Envelope 28 17 15 au marché de Makak Centre, dans la Commune de Makak, Région du Centre 36/T/CE/NTUI/2017 / Travaux de Construction de deux (02) magasins de stockage de cacao et construction de 02 blocs Component A: Local Single Stage - One 2019-06- 2019-08- 2019-12- IDA / 57180 A posteriori Demande de prix Limited 125,749.00 0.00 Annulé latrines à deux (02) development support Envelope 24 19 17 compartiments dans les localités de Nguila, et Ntui ville) dans la Commune de Ntui, Région du Centre 016/T/CE/OBALA/2017 / Travaux d'extension du réseau électrique à sur la Component A: Local Single Stage - One 2017-04- 2017-05- 2017-08- IDA / 57180 A posteriori Demande de prix Limited 84,221.00 0.00 Annulé route Elig bodo- Yemsoa development support Envelope 04 30 28 dans la commune d'Obala, Région du Centre 027/T/CE/MENGUEME/2017 / Travaux de Construction de deux (02) puits équipés de Pompes à Motricité Humaine Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 24,000.00 0.00 Annulé dans deux (02) localités development support Envelope 21 10 08 (Yeneassi et Mebemezoa) dans la commune de Mengueme, Région du Centre 008/T/CE/EBEBDA/2017 / Travaux de Construction d'un (01) forage équipé de Component A: Local Single Stage - One 2017-04- 2017-05- 2017-09- Pompe à Motricité Humaine IDA / 57180 A posteriori Demande de prix Limited 17,000.00 0.00 Annulé development support Envelope 01 27 24 sur le site du marché de Elig- Edouma, dans la Commune d'Ebebda, Région du Centre 013/T/CE/ELIG MFOMO/2017 / Travaux de Construction de sept (07) forages productifs équipés de Pompe à Motricité Component A: Local Single Stage - One 2017-03- 2017-10- 2017-05- 2017-12- 2017-09- Humaine dans sept (07) IDA / 57180 A posteriori Demande de prix Limited 113,854.00 74,642.46 Résilié development support Envelope 31 23 26 19 23 localités (Nkol-Obang, Ban Edouma 2, EP de Mebomo, Lekoukoua, Bodo, Enobita et CES de Kokodo) dans la Commune d'Elig Mfomo, Région du Centre 152/C/T/CE/SA A/2018 / / construction et réhabilitation de 02 hangars Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- et d'un bloc de quatre IDA / 57180 A posteriori Demande de prix Limited 173,065.00 0.00 Annulé development support Envelope 25 20 18 latrines et d'une Unité de traitement au marché municipal B dans la Commune de Sa'a, Région du Centre 139/C/T/CE/MONATELE/201 8 / / Construction de (02) puits productifs équipés de Component A: Local Single Stage - One 2018-06- 2018-08- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 20,189.00 0.00 Annulé PMH au marché d’Edjom et development support Envelope 25 20 18 Mengbwa, Commune d'Endom, Région du Centre 200/C/T/CE/MINTA/2019 / Construction de (02) blocs latrines à (04) compartiments Component A: Local Single Stage - One 2019-04- 2019-05- 2019-06- 2019-06- 2019-10- au hangar de marché de IDA / 57180 A posteriori Demande de prix Limited 15,000.00 47,241.76 Signé development support Envelope 13 07 08 18 06 Minta ville et à l'Ecole Publique d’Elot, dans la commune de Minta 201/C/T/CE/NANGA EBOKO/2019 / Réhabilitation de (01) puits équipé de PMH Component A: Local Single Stage - One 2019-02- 2019-04- 2019-04- 2019-07- 2019-07- IDA / 57180 A posteriori Demande de prix Limited 12,000.00 5,746.14 Signé au marché de Essimeyong development support Envelope 19 23 16 01 15 dans la Commune de Nanga et Eboko 202/C/T/CE/NANGA EBOKO/2019 / Construction de (01) hangar avec Component A: Local Single Stage - One 2019-02- 2019-02- 2019-04- 2019-06- 2019-08- comptoirs et (01) bloc de IDA / 57180 A posteriori Demande de prix Limited 54,000.00 33,320.89 Signé development support Envelope 19 01 16 14 14 latrines à (03) compartiments au marché d'Essimeyong dans la commune de Nanga et Eboko 203/C/T/CE/OBALA/2019 / Construction de Six (06) forages équipés de PMH dans les localités de Nkoltsogo II, Component A: Local Single Stage - One 2019-03- 2019-05- 2019-05- 2019-08- 2019-09- IDA / 57180 A posteriori Demande de prix Limited 108,000.00 72,099.53 Signé Afambassi, Yemsoa, development support Envelope 26 15 21 27 18 Ntuissong, Nkomtou II et Mbelle, dans la Commune d'Obala 204/C/T/CE/SOA/2019 / Construction de six forages positifs équipé de PMH à Component A: Local Single Stage - One 2019-04- 2019-04- 2019-06- 2019-07- 2019-09- Akondo, Akak I, Mbansan IDA / 57180 A posteriori Demande de prix Limited 102,000.00 74,766.21 Signé development support Envelope 06 24 01 29 29 (Voisinage Chefferie), NGALI II, NSAN GMI et Ntouessong V dans la Commune de Soa 205/C/T/CE/AYOS/2019 / Contruction de sept (07) forages équipés de PMH dans les localités de Koba, Component A: Local Single Stage - One 2019-01- 2019-04- 2019-03- 2019-06- 2019-07- IDA / 57180 A posteriori Demande de prix Limited 133,000.00 91,403.94 Signé Nkolmveng (Carrefour Endo), development support Envelope 07 11 04 18 02 Mekouma, Melane, Atong, Mbang et Ndélé, dans la Commune d’Ayos 206/C/T/CE/ELIG MFOMO/2019 / Construction de cinq (05) forages positifs équipés d’une PMH dans les localites de bodo, kokodo I Component A: Local Single Stage - One 2019-04- 2019-07- 2019-06- 2019-10- 2019-10- IDA / 57180 A posteriori Demande de prix Limited 84,000.00 61,727.35 Signé (ecole publique), development support Envelope 13 10 08 31 06 MbanedoumaII, Enobita (carrefour nang mbono) et lycee d’elig-mfomo dans la commune d’elig mfomo 207/C/T/CE/DIBANG/2019 / Construction d’un magasin de stockage avec un bloc Component A: Local Single Stage - One 2019-04- 2019-08- 2019-06- 2019-11- 2019-10- IDA / 57180 A posteriori Demande de prix Limited 70,000.00 51,637.72 Signé latrines à deux (02) development support Envelope 13 23 08 19 06 compartiments à Ndongo dans la Commune de Dibang 208/C/T/CE/NGUIBASSAL/20 19 / Construction d’un dalot simple 2,5x1, 5ml sur la rivière Massagbe avec Component A: Local Single Stage - One 2019-04- 2019-05- 2019-06- 2019-09- 2019-10- aménagement des accès au IDA / 57180 A posteriori Demande de prix Limited 44,000.00 3,187.65 Signé development support Envelope 13 31 08 10 06 dalot sur 500ml (route rurale Nkoumisse Sud-Maholo II), dans la Commune de Nguibassal 210/C/T/CE/MBALMAYO/20 19 / Construction d'un hangar de 48 comptoirs, Component A: Local Single Stage - One 2018-12- 2019-01- 2019-02- 2019-04- 2019-06- d'un magasin avec bureau et IDA / 57180 A posteriori Demande de prix Limited 100,000.00 74,596.33 Signé development support Envelope 09 07 03 18 03 d'un bloc de latrine à 04 cabines au marché Japon dans la commune de Mbalmayo 211/C/T/CE/MBALMAYO/20 19 / Construction d'un forage équipé d'une pompe à énergie solaire muni d'un Component A: Local Single Stage - One En cours 2019-01- 2019-03- 2019-07- IDA / 57180 A posteriori Demande de prix Open - National 30,000.00 0.00 cubitenaire sur ossature en development support Envelope d'exécution 06 03 01 Beton Armé avec quatre bornes fontaines, dans la commune de Mbalmayo 212/C/T/CE/BOKITO/2019 / Travaux d’éclairage public Component A: Local Single Stage - One 2019-05- 2019-07- 2019-11- solaire de la Commune de IDA / 57180 A posteriori Demande de prix Limited 64,000.00 0.00 Annulé development support Envelope 13 08 05 Bokito, Département du Mbam et Inoubou Page 3 213/C/T/CE/BOKITO/2019 / Travaux de réhabilitation en pavé de béton du tronçon carrefour église catholique Component A: Local Single Stage - One 2019-01- 2018-10- 2019-03- 2019-02- 2019-07- IDA / 57180 A posteriori Demande de prix Limited 66,000.00 53,187.00 Signé place de l’indépendance, development support Envelope 14 16 11 05 09 rond-point finance, entrée résidence du sous-préfet (300) ml 214/C/T/CE/NGOMEDZAP/2 019 / Construction de quatre forages positifs équipés d'une pompe à motricité Component A: Local Single Stage - One 2018-12- 2018-10- 2019-02- 2019-01- 2019-06- humaine au marché d’Abang- IDA / 57180 A posteriori Demande de prix Limited 68,000.00 57,612.01 Signé development support Envelope 10 25 04 08 04 Akongo, à l'Ecole Publique d’Agonfeme, Ekoud- bessanda et l'Ecole Publique de Nyengue, Commune de Ngomedzap 215/C/T/CE/NSEM/2019 / réhabilitation du réseau SCANWATER avec Component A: Local Single Stage - One 2018-12- 2019-01- 2019-04- 2019-05- IDA / 57180 A posteriori Demande de prix Open - National 72,000.00 55,495.11 Signé raccordement du CETIC de development support Envelope 02 27 09 27 Nsem dans la commune de Nsem 216/C/T/CE/BAFIA/2019 / travaux de construction de 02 hangars de 32 comptoirs chacun, d’un bloc de trois Component A: Local Single Stage - One 2018-12- 2018-09- 2019-02- 2019-05- 2019-06- IDA / 57180 A posteriori Demande de prix Limited 100,000.00 76,719.75 Signé latrines et d’une unité de development support Envelope 26 18 20 22 20 traitement au marché de Djoumba dans la commune de Bafia 217/C/T/CE/KON YAMBETTA/2019 / Construction de deux blocs de 02 salles de classes équipées de 120 tables- Component A: Local Single Stage - One 2019-01- 2018-09- 2019-03- 2019-03- 2019-07- IDA / 57180 A posteriori Demande de prix Limited 90,000.00 66,212.87 Signé bancs, de 04 bureaux development support Envelope 27 20 24 29 22 complets pour enseignants et de 04 armoires de rangement et un bloc latrine à l'Ecole Publique de Bape Montagne 218/C/T/CE/KON YAMBETTA/2019 / Construction d’un puits Component A: Local Single Stage - One 2019-01- 2018-09- 2019-03- 2019-03- 2019-06- positif équipé d'une PMH à IDA / 57180 A posteriori Demande de prix Limited 13,000.00 9,198.62 Signé development support Envelope 27 20 24 29 22 l’école publique de Bape Montagne dans la Commune de Kon Yambetta 219/C/T/CE/OKOLA/2019 / Construction (01) bloc de deux salles de classes équipées de tables bancs et Component A: Local Single Stage - One 2019-05- 2019-07- 2019-03- 2019-11- IDA / 57180 A posteriori Demande de prix Open - National 50,000.00 32,880.32 Signé (01) bloc de deux latrines à development support Envelope 17 12 18 09 l’Ecole Publique de Nyemeyong, dans la Commune d’Okola 220/C/T/CE/KON YAMBETTA/2019 / Construction d’un (01) forage positif équipé d’une Component A: Local Single Stage - One 2018-12- 2018-10- 2019-02- 2019-02- 2019-05- IDA / 57180 A posteriori Demande de prix Limited 18,000.00 12,415.51 Signé PMH au hangar du marché du development support Envelope 26 09 20 04 21 village Diodaré place Nwal à Mandoki, dans la Commune de Kon Yambetta 221/C/T/CE/BAFIA/2019 / construction d’un forage positif équipé d’une pompe à Component A: Local Single Stage - One 2018-12- 2018-09- 2019-02- 2019-01- 2019-05- IDA / 57180 A posteriori Demande de prix Limited 18,000.00 12,882.54 Signé motricité humaine au marché development support Envelope 26 18 20 18 21 de Djoumba dans la commune de Bafia 222/C/T/CE/BAFIA/2019 / Construction d’un bloc de Component A: Local Single Stage - One 2018-12- 2018-09- 2019-02- 2019-01- 2019-06- quatre (04) boutiques au IDA / 57180 A posteriori Demande de prix Limited 30,000.00 16,441.35 Signé development support Envelope 26 18 20 07 20 marché de Djoumba dans la commune de Bafia 029/T/CE/MAKAK / Travaux de Construction d'un (01) hangar de 48 comptoirs avec un (01) bloc latrines à trois Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 59,835.00 0.00 Annulé (03) compartiments au development support Envelope 28 17 15 marché de Makak centre, dans la Commune de Makak, Région du Centre 138/C/T/CE/MONATELE/201 8 / / Construction : d'un (01) hangar de 32 comptoirs, d'une unité de Traitement Component A: Local Single Stage - One 2018-06- 2018-08- 2019-02- des Déchets (UTDM, et d'un IDA / 57180 A posteriori Demande de prix Limited 52,228.00 0.00 Annulé development support Envelope 25 20 16 (01) bloc latrines de (02) compartiments sur le site du marché d'Edjom, Commune d'Endom, Région du Centre. 138/C/T/CE/MONATELE/201 8 / / Construction (02) hangars de 32 comptoirs, Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- (02) unité de Traitement des IDA / 57180 A posteriori Demande de prix Limited 102,418.00 0.00 Annulé development support Envelope 25 20 18 Déchets et (02) blocs de 02 latrines à Endjom et Mengbwa Commune d'Endom, Région du Centre 164/C/T/CE/MBALMAYO/20 18 / const d' un Magasin de Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- stockage au marché Japon, IDA / 57180 A posteriori Demande de prix Limited 46,000.00 0.00 Annulé development support Envelope 25 20 18 dans la Commune de Mbalmayo, Région du Centre 163/C/T/CE/MBALMAYO/20 18 / construction d' une cloture et aménagement Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- IDA / 57180 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé extérieur au marché Japon, development support Envelope 25 20 18 dans la Commune de Mbalmayo, Région du Centre 169/C/T/CE/NSEM/2018 / construction d'un bloc de Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- IDA / 57180 A posteriori Demande de prix Limited 44,000.00 0.00 Annulé salle classe et des latrines à development support Envelope 25 20 18 Nsem, commune de Nsem 161/C/T/CE/NGORO/2018 / construction d'un bloc de 10 boutiques avec bloc Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- IDA / 57180 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé latrines à quatre development support Envelope 25 20 18 compartiments au marché de Ngoro, commune de Ngoro 162/C/T/CE/MBALMAYO/20 18 / construction d' un mini- réseau électrique alimenté Component A: Local Single Stage - One 2018-06- 2018-08- 2018-11- par les panneaux IDA / 57180 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé development support Envelope 25 20 18 photovoltaiques et installation de 8 candélabre au marché Japon, dans la Commune de Mbalmayo 153/C/T/CE/SA A/2018 / / Construction de trois (03) forages équipés de pompe à motricité humaine au Component A: Local Single Stage - One 2018-06- 2018-08- 2018-11- marché municipal B de Sa'a, IDA / 57180 A posteriori Demande de prix Limited 54,000.00 0.00 Annulé development support Envelope 25 20 18 au village NSAN MENDOUGA (Ayissi Elé) et au marché municipal de SAA, dans la Commune de Sa'a, Région du Centre 38/T/CE/MINTA/2017 / Travaux de construction d'un Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- puits équipé de PMH à l'EP de IDA / 57180 A posteriori Demande de prix Limited 1,200.00 0.00 Annulé development support Envelope 08 03 01 Ndjombe, dans la commune de Minta, Région du Centre 034/T/CE/BOT MAKAK/2017 / Travaux de Construction de (07) sept forages positifs equipés Component A: Local Single Stage - One 2017-04- 2018-09- 2017-06- 2018-11- 2017-10- d'une pompe à motricité IDA / 57180 A posteriori Demande de prix Limited 29,803.00 95,381.14 Signé development support Envelope 28 20 17 13 15 humaine dans la commune de bot-makak, departement du nyong et kelle, region du centre en deux lots : 256/C/T/CE/AFANLOUM/20 19 / Construction d'un Bloc de deux salles équipées et Component A: Local Single Stage - One 2019-06- 2019-08- 2019-11- d'un bloc latrine à trois IDA / 57180 A posteriori Demande de prix Limited 50,120.00 0.00 Annulé development support Envelope 06 01 29 compartiments à l'EP de Afanloum Centre, dans la Commune d'Afanloum 257/C/T/CE/AFANLOUM/20 19 / Construction d’un logement d'Astreinte Component A: Local Single Stage - One 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Demande de prix Limited 26,446.00 0.00 Annulé (Appartement deux development support Envelope 06 01 29 chambres, 01 salon, 01 cuisine et 01 douche) à l' EP d'Afanloum 258/C/T/CE/AFANLOUM/20 19 / Rehabilitation du Centre Component A: Local Single Stage - One 2019-06- 2019-08- 2019-11- de Santé Intégré (CSI) IDA / 57180 A posteriori Demande de prix Limited 16,166.00 0.00 Annulé development support Envelope 06 01 29 d'Afanloum Centre, dans la Commune d'Afanloum 259/C/T/CE/AFANLOUM/20 19 / Réhabilitation des Component A: Local Single Stage - One 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Demande de prix Limited 2,675.00 0.00 Annulé latrines au Centre de Santé development support Envelope 06 01 29 Intégré (CSI) d'Afanloum Centre Page 4 169/C/T/CE/NANGA EBOKO/2018 / / Travx de construction d'un bloc de 03 Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- salles de classe équipées et IDA / 57180 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé development support Envelope 25 20 18 d'un bloc de 03 latr à l'EP de Ndjombe dans la commune de Nanga et Eboko 010/T/CE/NKOTENG/2017 / Travaux de Construction d'une mini adduction Component A: Local Single Stage - One 2017-04- 2017-05- 2017-09- d'approvisionnement en eau IDA / 57180 A posteriori Demande de prix Limited 16,000.00 0.00 Annulé development support Envelope 01 27 24 potable sur le site de l'abattoir de Nkoteng dans la Commune de Nkoteng, Région du Centre 171/C/T/CE/NANGA EBOKO/2018/ / Travx de Construction de (02) hangars avec comptoirs et (02) blocs Component A: Local Single Stage - One 2018-06- 2018-08- 2018-12- IDA / 57180 A posteriori Demande de prix Limited 108,000.00 0.00 Annulé de latr à (03) compartiments development support Envelope 25 20 18 au marché d'Essimeyong et à Biboa dans la commune de Nanga et Eboko 170/C/T/CE/NANGA EBOKO/2018/ / Travx de réhabilitation de (02) puits équipés de Pompe à Motricité Component A: Local Single Stage - One 2018-06- 2018-08- 2018-10- Humaine au marché de IDA / 57180 A posteriori Demande de prix Limited 12,000.00 0.00 Annulé development support Envelope 25 20 19 Essimeyong et au marché de Biboa, dans la Commune de Nanga et Eboko, Région du Centre 009/T/CE/NKOTENG/2017 / Travaux de Construction d'un abattoir avec un bloc Component A: Local Single Stage - One 2017-04- 2017-05- 2017-09- latrine à trois (03) IDA / 57180 A posteriori Demande de prix Limited 32,014.00 0.00 Annulé development support Envelope 01 27 24 compartiments à l'abattoir de Nkoteng dans la Commune de Nkoteng, Région du Centre 37/T/CE/NANGA/2017 / Travaux de construction d'un bloc de 03 salles de classe équipées et construction Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé d'un bloc de trois latrines à development support Envelope 08 03 01 l'EP de Ndjombe dans la commune de Nanga et Eboko, Région du Centre 40/T/CE/NANGA/2017 / Travaux de réhabilitation de deux (02) puits équipés de Pompe à Motricité Humaine Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 12,000.00 0.00 Annulé au marché de Essimeyong et development support Envelope 08 03 01 au marché de Biboa, dans la Commune de Nanga et Eboko, Région du Centre 265/C/T/CE/MESSONDO/20 19 / Travaux de construction de six forages équipés de PMH à l'EP de Bodi, à Massale Component A: Local Single Stage - One 2019-03- 2019-05- 2019-10- 2019-08- quartier Pygmés, à Libanga IDA / 57180 A posteriori Demande de prix Open - National 100,234.00 84,963.05 Signé development support Envelope 06 01 31 29 Mogui, Ecole Publique messondo Ville, Bassomo et à Messondo ville lieu dit Nyemkong 266/C/T/CE/NKOTENG/201 9 / Travaux de construction de deux puits positifs Component A: Local Single Stage - One 2019-03- 2019-05- 2019-05- 2019-09- 2019-08- équipés de PMH à l’école IDA / 57180 A posteriori Demande de prix Limited 22,845.00 14,260.89 Résilié development support Envelope 06 08 01 27 29 publique de DOUA et à l’école publique GROUPE IV, dans la Commune de NKOTENG 035/T/BOT MAKAK/2017 / Travaux de Construction d'un (01) puits équipés de Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 12,000.00 0.00 Annulé pompes à motricité humaine development support Envelope 28 17 15 à Ndjock Bané, dans la Commune de Bot Makak, Région du Centre 157/C/T/CE/BOKITO/2018 / / Eclairage Public Solaire de Component A: Local Single Stage - One 2018-03- 2018-05- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 59,134.00 0.00 Annulé Bokito Centre, Commune de development support Envelope 10 05 03 Bokito, Région du Centre. 156/C/T/CE/DEUK/2018 / / Construction d'un forage positif équipé de PMH au Component A: Local Single Stage - One 2018-05- 2018-06- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 17,146.00 0.00 Annulé hangar de marché de Deuk, development support Envelope 05 30 29 Commune de Deuk, Région du Centre. Component C: Coordination, 01/T/CRC/CE/2017 / Petits management, monitoring Single Stage - One 2017-07- 2017-09- 2017-10- travaux d'aménagement dans IDA / 57180 A posteriori Demande de prix Limited 9,800.00 0.00 Annulé and evaluation and Envelope 25 19 19 les nouveaux locaux Centre communication 160/C/T/CE/NGORO/2018 / construction d'un forage équipé de PMH au marché Component A: Local Single Stage - One 2018-06- 2018-08- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 16,000.00 0.00 Annulé Hebdomadaire de Ngoro et development support Envelope 25 20 18 EP de Mbengué, dans la Commune de Ngoro 165/C/T/CE/MBALMAYO/20 18 / construction d'un forage Component A: Local Single Stage - One 2018-06- 2018-08- 2018-11- équipé d'une pompe solaire IDA / 57180 A posteriori Demande de prix Limited 24,000.00 0.00 Annulé development support Envelope 25 20 18 et de deux bornes fontaine, Commune de Mbalmayo 39/T/CE/NANGA/2017 / Travaux de Construction de deux (02) hangars avec comptoirs et Construction de deux (02) blocs de latrines à Component A: Local Single Stage - One 2017-04- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 104,743.00 0.00 Annulé trois (03) compartiments development support Envelope 08 03 01 dans 02 marchés à Essimeyong et à Biboa dans la commune de Nanga et Eboko dans la Région du Centre 209/C/T/CE/AYOS/2019 / Travaux d'Electrification du village Mbang -3,8km), dans Component A: Local Single Stage - One En attente 2019-05- 2019-07- 2019-11- IDA / 57180 A posteriori Demande de prix Limited 50,000.00 0.00 la commune d'Ayos, development support Envelope d'exécution 20 15 12 Département du Nyong et Mfoumou 309/C/T/CE/YOKO/2020 / Travaux d'Electrification du nouveau quartier Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- administratif de la ville de IDA / 57180 A posteriori Demande de prix Open - National 58,568.00 0.00 development support Envelope d'exécution 02 28 25 Yoko Commune de Yoko, Departement Du Mbam Et Kim, Region du Centre 310/C/T/CE/YOKO/2020 / Travaux de Construction de six forages équipés de PMH dans les villages Donga- Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- IDA / 57180 A posteriori Demande de prix Open - National 98,480.00 0.00 Yangoula, Guéré, linté et development support Envelope d'exécution 02 28 25 dans les EP de Foufouing, Mbimbim et Meteing dans la Commune de Yoko 311/C/T/CE/OKOLA/2020 / Travaux de Construction d'un puits équipé de PMH à Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-10- IDA / 57180 A posteriori Demande de prix Open - National 9,898.00 0.00 l’Ecole Publique Bilingue development support Envelope d'exécution 02 28 26 d'Okola, dans la Commune d'Okola, Region du Centre 312/C/T/CE/YOKO/2020 / Travaux de Construction et équipement d'un bloc de deux salles de classes avec Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- bureau du Directeur au CES IDA / 57180 A posteriori Demande de prix Open - National 71,483.00 0.00 development support Envelope d'exécution 02 28 25 de Linté et de deux blocs de trois latrines au CES de Linté et à l'EP de Makouri, dans la Commune de Yoko 313/C/T/CE/YOKO/2020 / Travaux de Construction et équipement d'un bloc de deux salles de classes et d'un Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- IDA / 57180 A posteriori Demande de prix Open - National 46,058.00 0.00 bloc de trois latrines à l’EP de development support Envelope d'exécution 02 28 25 Makouri, dans la Commune de Yoko, Departement Du Mbam Et Kim, Region du Centre 314/C/T/CE/OKOLA/2020 / Travaux de Construction et équipement d’un bloc de Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- deux salles de classes à IDA / 57180 A posteriori Demande de prix Open - National 38,895.00 0.00 development support Envelope d'exécution 02 28 25 l’Ecole Publique Bilingue d'Okola, dans la Commune d'Okola, Region du Centre 315/C/T/CE/OBALA/2020 / Travaux de construction d’un bloc de deux salles de Classes équipées de 60 Tables Bancs, 02 Bureaux Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- Complets pour enseignants IDA / 57180 A posteriori Demande de prix Open - National 41,943.00 0.00 development support Envelope d'exécution 02 28 25 et 02 armoires de Rangement, et d’un bloc latrines à quatre (04) compartiments à l’EP de Nkol Ekui, dans la Commune d’Obala Page 5 316/C/T/CE/OBALA/2020 / Travaux d’extension du reseau electrique entre bile Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-11- IDA / 57180 A posteriori Demande de prix Open - National 34,348.00 0.00 binomo et nkolmeting dans development support Envelope d'exécution 02 28 25 la commune d’obala, departement de la lekie, region du Centre 317/C/T/CE/OBALA/2020 / Travaux de Construction de quatre (04) puits positif équipé de PMH dans la Component A: Local Single Stage - One En attente 2020-08- 2020-10- 2021-02- IDA / 57180 A posteriori Demande de prix Open - National 42,368.00 0.00 localité de Ntuiessong, Nkol- development support Envelope d'exécution 29 24 21 Obili, Nkometou et Ngok- Ossan (entre Nto et Nkolfep) dans la commune d'Obala 318/C/T/CE/MBALMAYO/20 20 / Travaux de Construction deux Blocs de Component A: Local Single Stage - One En attente 2020-01- 2020-03- 2020-07- huit (08) Boutiques au IDA / 57180 A posteriori Demande de prix Open - National 94,340.00 0.00 development support Envelope d'exécution 11 07 05 marché Japon, Commune de Mbalmayo, Departement du Nyong et So'o, Region du Centre 319/C/T/CE/MFOU/2020 / Travaux de construction d’un pont définitif de 20 ml d'ouverture à deux travées sur la rivière Mefou à Component A: Local Single Stage - One En attente 2020-09- 2020-09- 2020-11- 2020-12- 2021-01- 2021-07- IDA / 57180 A posteriori Appel d'offres Open - National 342,490.00 0.00 Ngoumoudou et development support Envelope d'exécution 19 24 05 05 09 08 aménagement des voies d’accès au pont sur 30ml, dans la Commune de Mfou, Région du Centre 320/C/T/CE/MBANGASSINA/ 2020 / travaux de Construction d'un puits Component A: Local Single Stage - One En attente 2020-06- 2020-07- 2020-10- équipé de PMH au quartier IDA / 57180 A posteriori Demande de prix Open - National 11,116.00 0.00 development support Envelope d'exécution 02 28 26 ESSOH II dans la Commune de Mbangassina, Departement Du Mbam Et Kim, Region du Centre 320/C/T/CE/MBANKOMO/20 20 / Travaux de Construction d’un Bloc Maternel équipé de 100 Component A: Local Single Stage - One En attente 2020-08- 2020-10- 2021-02- IDA / 57180 A posteriori Demande de prix Open - National 70,448.00 0.00 chaisettes, 10 tables et de 03 development support Envelope d'exécution 29 24 21 bureaux d’un bloc latrine à trois compartiments à l'Ecole Maternelle de Nomayos, dans la commune de Mbankomo 321/C/T/CE/NTUI/2020 / travaux de construction d'un complexe commercial constitué de deux (02) blocs Component A: Local Single Stage - One En attente 2020-08- 2020-10- 2021-02- de dix (10) boutiques, d'un IDA / 57180 A posteriori Demande de prix Open - National 137,848.00 0.00 development support Envelope d'exécution 29 24 21 bloc latrine à quatre (04) cabines et d'une (01) unité de traitement des déchets au centre Ville de Ntui 322/C/T/CE/NGOUMOU/202 0 / Achèvement des Travaux de réhabilitation de la route Component A: Local Single Stage - One En attente 2020-09- 2020-11- 2021-03- Ngon – Ovangoul 1 (3,70km) IDA / 57180 A posteriori Demande de prix Open - National 51,580.00 0.00 development support Envelope d'exécution 24 19 19 dans la Commune de Ngoumou, Département de la Mefou et Akono, Région du Centre 323/C/T/CE/BOT MAKAK/2020 / travaux de construction d’un (01) forage positif dans la localité de Nkoulkloum et achevement Component A: Local Single Stage - One En attente 2020-06- 2020-08- 2020-12- IDA / 57180 A posteriori Demande de prix Open - National 28,000.00 0.00 de trois (03) forages equipés development support Envelope d'exécution 29 24 22 de pompes à motricite humaine dans les localités de Manking, Heinguegue et Mandjock commune de bot- makak 324/C/T/CE/NKOTENG/202 0 / Travaux de construction de deux puits positifs équipés d’une pompe à Component A: Local Single Stage - One En attente 2020-08- 2020-10- 2021-02- motricité humaine à l’école IDA / 57180 A posteriori Demande de prix Open - National 22,845.00 0.00 development support Envelope d'exécution 29 24 21 publique de DOUA et à l’Ecole Publique GROUPE IV, dans la Commune de NKOTENG, Région du Centre CM-CRC CENTRE-204723- CW-RFQ / Travaux d'achèvement de construction d'un hangar de 32 comptoirs, d'une unité de Component A: Local Single Stage - One En attente 2020-11- 2021-01- 2021-01- traitement des déchets de IDA / 57180 A posteriori Demande de prix Open - National 36,116.00 0.00 development support Envelope d'exécution 18 20 29 marché et d'un bloc latrines de 03 cabines au marché d’Essimeyong dans la Commune de Nanga Eboko, Département de La Haute Sanaga, Région du Centre GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/F/CRC/CE/2017 / Component C: Coordination, Acquisition des fournitures management, monitoring Single Stage - One 2017-03- 2017-08- 2017-05- 2017-10- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 19,600.00 9,476.64 Achevé de bureau et divers à la CRC, and evaluation and Envelope 23 23 07 02 06 04 Région du Centre communication 04/F/CRC/CE/2017 / Component C: Coordination, Acquisition des management, monitoring Single Stage - One 2017-03- 2017-08- 2017-05- 2017-10- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 19,600.00 9,468.08 Achevé consommables informatiques and evaluation and Envelope 23 31 07 02 06 12 à la CRC, Région du Centre communication 05/F/CRC/CE/2017 / Component C: Coordination, AcquisItion des fournitures management, monitoring Single Stage - One 2017-03- 2017-08- 2017-05- 2017-11- 2017-06- 2017-10- IDA / 57180 A posteriori Demande de prix Limited 16,070.00 9,368.51 Achevé pour véhicules à la CRC, and evaluation and Envelope 23 23 07 22 06 20 Région du Centre communication 09/F/CRC/CE/2017 / Component C: Coordination, Fourniture des services de management, monitoring Single Stage - One 2017-03- 2018-05- 2017-05- 2018-10- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 9,600.00 8,296.92 Signé gardiennage à la CRC, Région and evaluation and Envelope 23 07 07 29 06 du Centre communication 06/F/CRC/CE/2017 / Component C: Coordination, Fourniture de service de management, monitoring Single Stage - One 2017-03- 2018-05- 2017-05- 2018-10- 2017-06- maintenance du réseau IDA / 57180 A posteriori Demande de prix Limited 3,600.00 6,100.67 Signé and evaluation and Envelope 23 07 07 19 06 informatique et téléphonique communication à la CRC, Région du Centre 070/C/F/CE/AKOEMAN / Fourniture du matériel Component A: Local Single Stage - One 2018-06- 2018-06- 2018-08- 2018-07- 2018-09- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 10,000.00 9,020.27 Achevé médical au CSI d'Akoeman, development support Envelope 25 12 20 26 19 17 Commune d'Akoeman, Région du Centre 071/C/F/CE/AKONOLINGA/2 018 / Fourniture et équipement de neuf (09) salles de classes en soixante Component A: Local Single Stage - One 2018-01- 2018-04- 2018-03- 2018-08- 2018-04- (60) tables bancs des Ep de IDA / 57180 A posteriori Demande de prix Limited 27,056.00 23,159.54 Signé development support Envelope 20 11 17 23 16 Mve, Efoulan, Djoudjoua,Soudjeugue, Fang Sso, Ndibidjeng,Ntonga,Biyoka et Ate,Commune d’akonolinga 072/C/F/CE/AKONOLINGA/2 018 / fourniture fourniture des équipements en matériel Component A: Local Single Stage - One 2018-06- 2018-02- 2018-08- 2018-05- 2018-09- 2018-08- médical de quatre (04) CSI IDA / 57180 A posteriori Demande de prix Limited 61,440.00 52,151.33 Achevé development support Envelope 25 26 20 28 19 29 d'Emvanesso, Zalom, Ate et Mengueme Si dans la Commune d’Akonolinga Component C: Coordination, 01/F/CRC/CE/2017 / management, monitoring Single Stage - One 2017-03- 2017-05- 2017-06- Acquisition du kit CCI à la IDA / 57180 A posteriori Demande de prix Limited 4,500.00 0.00 Annulé and evaluation and Envelope 23 07 06 CRC, Région du Centre communication 08/F/CRC/CE/2017 / Component C: Coordination, Fourniture de service de management, monitoring Single Stage - One 2017-03- 2017-05- 2017-06- transport des colis en vue de IDA / 57180 A posteriori Demande de prix Limited 9,800.00 0.00 Annulé and evaluation and Envelope 23 07 06 déménagement des locaux à communication la CRC, Région du Centre Component C: Coordination, 03/F/CRC/CE/2017 / management, monitoring Single Stage - One 2017-03- 2017-05- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 19,600.00 0.00 Annulé fourniture d'un kit CCI and evaluation and Envelope 23 07 06 communication 07/F/CRC/CE/2017 / Component C: Coordination, Fourniture de service de management, monitoring Single Stage - One 2017-03- 2017-05- 2017-06- maintenance des copieurs et IDA / 57180 A posteriori Demande de prix Limited 2,400.00 0.00 Annulé and evaluation and Envelope 23 07 06 imprimantes à la CRC, communication Région du Centre 255/F/CRC/CE/2019 / Fourniture de services en vue de l'Accompagnement des communes d’intervention du Component A: Local Single Stage - One En attente 2019-06- 2019-08- 2020-08- PNDP de la région du centre IDA / 57180 A posteriori Demande de prix Limited 48,750.00 0.00 development support Envelope d'exécution 08 03 02 dans l’édition d’un bulletin trimestriel d’informations communal dans la Région du Centre en deux zones Page 6 325/C/F/CE/MBALMAYO/20 20 / fourniture de 150 Tables Bancs et 30 Petites Component A: Local Single Stage - One En attente 2020-06- 2020-08- 2020-11- tables assorties de 04 petites IDA / 57180 A posteriori Demande de prix Open - National 9,910.00 0.00 development support Envelope d'exécution 21 16 14 chaises pour certaines Ecoles Primaires et Maternelles dans la Commune de Mbalmayo NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 080/C/EF/CE/EDZENDOUAN/ 2018 / Selection d'un Consultant Individuel pour l'Etude de Faisabilité du Sélection fondée microprojet de construction Component A: Local sur les 2017-12- 2017-12- 2018-01- 2017-12- 2018-02- 2018-06- 2018-03- 2018-05- IDA / 57180 A posteriori Open - National 1,800.00 0.00 Annulé 2017-11-15 d'un Point d'eau au Marché development support qualifications des 13 06 19 27 18 08 25 09 d'Edzendouan Centre et à consultants l'EP d'Akondog, Commune d'Edzendouan, Région du Centre 307/C/SC/CE/MFOU/2020 / Sélection d'un BET pour la Maitrise d’Œuvre des travaux de construction d’un pont Sélection fondée définitif de 20 ml d'ouverture Component A: Local sur les En attente 2020-10- 2020-11- 2020-12- 2021-01- 2021-07- IDA / 57180 A posteriori Open - National 13,700.00 0.00 2020-09-19 à 02 travées sur la rivière development support qualifications des d'exécution 10 23 23 27 26 Mefou à Ngoumoudou et consultants aménagement des voies d’accès au pont sur 30ml, dans la Commune de Mfou INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 001/C/EF/CE/NDIKINIMEKI/2 017 / Sélection d'un consultant pour l'élaboration des études de faisabilité de construction d'un (01) Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- hangar de marché avec bloc IDA / 57180 A posteriori Individuel Open 3,000.00 2,968.59 Signé 2017-03-07 development support 02 25 24 16 25 20 29 19 de trois latrines à Etoundou 1 et d'un (01) magasin de stockage avec bloc de deux latrines à Nebolen, Commune de Ndikinimeki 1/C/SC/CE/ENDOM/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction deux (02) hangars de 30 Component A: Local 2017-08- 2017-06- 2017-11- 2017-06- 2018-01- 2017-07- 2019-01- 2017-10- IDA / 57180 A posteriori Individuel Open 3,709.00 3,373.97 Signé 2017-04-23 comptoirs avec bloc latrines development support 21 03 27 10 14 02 01 30 deux (02) compartiments dans 02 sites des marchés de Edjom et de Mengwa dans la Commune d'Endom, Région du Centre 2/C/SC/CE/ENDOM/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de deux (02) puits productifs Component A: Local 2018-05- 2017-05- 2017-11- 2017-06- 2019-01- 2017-06- 2019-01- 2017-10- IDA / 57180 A posteriori Individuel Open 960.00 649.93 Signé 2017-04-23 équipés de Pompe à Motricité development support 15 31 27 07 14 29 01 27 Humaine dans deux (02) localités (Edjom, Mengwa) dans la Commune d'Endom, Région du Centre. 3/C/SC/CE/AKOEMAN/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de 04 puits équipés de Pompes Component A: Local 2017-07- 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-11- IDA / 57180 A posteriori Individuel Open 1,056.00 1,203.65 Signé 2017-04-23 à Motricité Humaine dans development support 24 14 13 21 28 13 09 10 quatre localités (Ngamba, Akoéman ville, Melen et Akoa Zolé) dans la Commune d'Akoéman, Région du Centre 003/C/EF/CE/BIYOUHA/201 7 / Sélection d'un consultant pour l'élaboration des études de faisabilité de réhabilitation de la route Component A: Local 2017-06- 2017-04- 2017-09- 2017-05- 2017-08- 2017-06- 2017-11- 2017-08- IDA / 57180 A posteriori Individuel Open 4,400.00 5,499.50 Signé 2017-03-07 bang sombi-Song Bayang- development support 13 25 25 16 23 20 28 04 Song Nkoumondo (7,00 km) et réfection de 02 ponts définitifs sur les rivières NGO NUMBA et KELLE, dans la Commune de BIYOUHA 4/C/SC/CE/AKOEMAN/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2017-09- 2017-10- IDA / 57180 A posteriori Individuel Open 3,216.00 2,854.41 Signé 2017-04-23 d'un hangar de 32 comptoirs development support 01 31 18 07 04 29 06 27 et 01 bloc de 04 latrines a Akoeman ville, dans la Commune d'Akoéman, Région du Centre 5/C/SC/CE/MBANDJOCK/201 7 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-05- 2017-06- 2017-06- 2017-06- 2017-10- 2017-07- 2017-10- 2017-10- d'un abattoir avec latrines IDA / 57180 A posteriori Individuel Open 2,240.00 2,339.29 Signé 2017-04-23 development support 17 03 13 10 10 02 10 30 incorporées, au centre ville de Mbandjock dans la Commune de Mbandjock, Région du Centre 004/C/EF/CE/BIYOUHA/201 7 / Sélection d'un consultant pour l'élaboration des études de faisabilité techniques et environnementales des Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-06- 2017-08- IDA / 57180 A posteriori Individuel Open 2,400.00 5,725.33 Signé 2017-03-07 microprojets d'Electrification development support 16 25 24 16 26 20 07 04 des axes Song Bayang-Song dibong, Tum-Ngog-Sindjap sur 06 Km, Commune de Biyouha 005/C/EF/CE/EBEBDA/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité techniques et Component A: Local 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- environnementales des IDA / 57180 A posteriori Individuel Open 2,200.00 2,854.41 Signé 2017-03-07 development support 02 25 16 24 20 29 04 microprojets de Réhabilitation de la route rurale Ebebda 1 - Tsang, dans la commune d'Ebebda 006/C/EF/CE/EBEBDA/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- environnementale du IDA / 57180 A posteriori Individuel Open 1,000.00 1,141.76 Signé 2017-03-07 development support 02 25 16 25 20 24 19 microprojet de construction d'un (01) forage équipé de PMH au CETIC de Ngog Saa, dans la commune d'Ebebda 007/C/EF/CE/EBEBDA/2017 / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité de construction d'un bloc de deux salles de Component A: Local 2017-03- 2017-04- 2017-05- 2017-03- 2017-06- 2017-09- 2017-08- IDA / 57180 A posteriori Individuel Open 2,400.00 2,556.94 Signé 2017-03-07 classes équipés, bloc development support 13 25 16 24 20 01 19 administratif, atelier de maçonnerie, salle informatique et bloc de 03 latrines au CETIC de Ngog Saa 008/C/EF/CE/EBEBDA/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- environnementale du IDA / 57180 A posteriori Individuel Open 1,740.00 1,655.56 Signé 2017-03-07 development support 02 25 16 24 20 24 19 microprojet d'Extension du réseau électrique Lendong- Ebebda 1 (2500 m), dans la commune d'Ebebda 009/C/EF/CE/MAKENENE/20 17 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-05- 2017-04- 2017-06- 2017-04- 2017-09- 2017-05- 2017-11- 2017-06- environnementale du IDA / 57180 A posteriori Individuel Open 1,400.00 2,557.94 Signé 2017-04-10 development support 03 10 13 10 27 01 17 30 microprojet de constructio d'un bloc maternel équipé et d'un bloc de trois latrines à l'Ecole Maternelle de Baloua, dans la commune de Makenene Page 7 010/C/EF/CE/MAKENENE/20 17 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-03- 2017-05- 2017-06- 2017-06- 2017-11- 2017-07- 2017-11- 2017-09- IDA / 57180 A posteriori Individuel Open 1,000.00 1,278.97 Signé 2017-04-10 environnementale du development support 13 29 13 19 17 24 17 22 microprojet de construction d'un forage équipé de PMH à l'école Maternelle de Baloua, dans la Commune de Makenene, 012/C/EF/CE/LOBO/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité des microprojets de construction Component A: Local 2017-03- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-11- 2017-09- IDA / 57180 A posteriori Individuel Open 3,000.00 3,381.41 Signé 2017-04-10 d'un bloc de deux (02) salles development support 23 29 16 19 27 24 28 22 de classe équipées, d'un bloc de 03 latrines à l'EP de Kelle et d'un hangar de marché à Lobo centre, commune de Lobo 014/C/EF/CE/OKOLA/2017 / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité pour la const de 02 blocs de 02 salles de Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-05- 2017-09- IDA / 57180 A posteriori Individuel Open 3,000.00 2,548.80 Signé 2017-04-10 classes équipées, de 02 development support 01 29 17 19 25 24 24 22 blocs de 03 lat au CES de VOA et à d'okola Centre, d'un atelier de maçonnerie et d'un bloc 03 lat au CETIC d'Elig 015/C/EF/CE/OKOLA/2017 / Sélection d'un consultant pour les études de faisabilité de construction de (03) forages équipés de PMH au Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-04- 2017-09- CES de VOA II, au CETIC IDA / 57180 A posteriori Individuel Open 3,000.00 3,410.58 Signé 2017-04-10 development support 30 29 30 19 25 24 25 22 d'ELIG ONANA et à l'Ecole bilingue d'Okola Centre et réhabilitation d'une mini adduction d'Eau Potable derrière SOCCOPO 017/C/EF/CE/NANGA EBOKO/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-04- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-06- 2017-09- IDA / 57180 A posteriori Individuel Open 1,000.00 1,193.70 Signé 2017-04-10 environnementale du development support 24 29 16 19 24 24 28 22 microprojet de construction d'un forage équipé de PMH à l'EP de Ndjombe dans la commune de Nanga et Eboko 018/C/EF/CE/MAKAK/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité du microprojet Component A: Local 2017-06- 2017-05- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- d'éclairage à l'énergie solaire IDA / 57180 A posteriori Individuel Open 2,800.00 3,788.06 Signé 2017-04-10 development support 13 29 19 11 24 23 22 du centre ville de Makak sur 6 km et électrification du village Mbeng sur environ 15 km, commune de Makak 019/C/EF/CE/MNTA/2017 / Sélection d'un consultant les études de faisabilité de construction d'un hangar de marché avec comptoirs et Component A: Local 2017-08- 2017-06- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-11- IDA / 57180 A posteriori Individuel Open 2,800.00 3,410.58 Signé 2017-04-23 bloc latrine à (04) development support 22 13 16 20 27 12 02 09 compartiments au marché de Minta ville et d'un bloc de 02 salles de classes équipées avec 01 bloc de trois latrines à l'EP 020/C/EF/CE/MINTA/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité pour la construction de 05 forages Component A: Local 2017-09- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- IDA / 57180 A posteriori Individuel Open 2,000.00 3,405.40 Signé 2017-04-10 équipés de PMH à l'EP de development support 26 29 16 19 28 24 02 22 ELOT, à l'EP d'Afan Oveng, à Mbargue, au marché de Minta ville et à Meba dans la commune de Minta 022/C/EF/CE/MBALMAYO/2 017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-05- 2017-05- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-09- environnementale du IDA / 57180 A posteriori Individuel Open 1,200.00 1,902.94 Signé 2017-04-10 development support 02 29 20 19 30 24 24 22 raccordement en eau potable au réseau CDE et la construction de deux bornes fontaines au marché Japon, dans la Commune de Mbalmayo 023/C/EF/CE/NSEM/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité de construction d'un bloc de (02) salles de Component A: Local 2017-06- 2017-05- 2017-06- 2017-09- 2017-07- 2017-09- 2017-09- IDA / 57180 A posteriori Individuel Open 2,800.00 4,529.65 Signé 2017-04-10 classe équipées à l'EP de development support 13 29 19 27 24 27 22 Mbenda, d'un atelier d'électricité au CETIC de Nsem et de 02 bloc de 03 latrines à l'EP de Mbenda et au CETIC de 024/C/EF/CE/NSEM/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité pour la réhabilitations d'un puits Component A: Local 2017-06- 2017-05- 2017-06- 2017-09- 2017-07- 2017-09- 2017-09- IDA / 57180 A posteriori Individuel Open 1,600.00 4,735.08 Signé 2017-04-10 équipé de PMH à l'EP de development support 13 29 19 29 24 29 22 Mbenda, du réseau CAMWATER et raccordement au CETIC de Nsem, dans la commune de Nsem 025/C/EF/CE/AWAE/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et environnementale du Component A: Local 2017-06- 2017-05- 2017-09- 2017-06- 2017-09- 2017-07- 2017-09- 2017-09- microprojet de construction IDA / 57180 A posteriori Individuel Open 3,000.00 4,969.67 Signé 2017-04-10 development support 13 29 18 19 11 24 29 22 d'un parc à gros porteur de 100 camions et d'un bloc latrines à deux compartiments à Ekiembie 1, commune d'Awae 026/C/EF/CE/AWAE/2017 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et environnementale du Component A: Local 2017-06- 2017-05- 2017-06- 2017-09- 2017-07- 2017-09- 2017-09- IDA / 57180 A posteriori Individuel Open 800.00 1,581.23 Signé 2017-04-10 microprojet de construction development support 13 29 19 28 24 28 22 d'un puits équipé de PMH au parc à gros porteur de 100 camions d'Ekiembie 1, commune d'Awae 027/C/EF/CE/AKONOLINGA/ 2017 / Sélection d'un consultant pour l'élaboration des études de faisabilitédu microprojet de construction Component A: Local 2017-06- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- de deux hangars de 36 IDA / 57180 A posteriori Individuel Open 2,000.00 3,398.40 Signé 2017-04-10 development support 02 29 16 19 27 24 02 22 comptoirs + un bloc latrines de trois (03) compartiments au marché quartier Haoussa à Akonolinga, dans la Commune d'Akonolinga 029/C/EF/CE/NKOLAFAMBA/ 2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité du microprojet d'extension de Component A: Local 2017-09- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- 02 réseaux électriques : 1 IDA / 57180 A posteriori Individuel Open 2,400.00 3,823.20 Signé 2017-04-10 development support 18 29 16 19 27 24 02 22 km de MT et 300m de BT tryphasé de Mbe Ekom-Lycée technique-CSI d'Omvan- extension BT (900m), et 3,2km de MT et BT tryphasé de 030/C/EF/CE/NGOUMOU/20 17 / Sélection d'un consultant pour l'élaboration des étude de faisabilité Component A: Local 2017-09- 2017-05- 2017-03- 2017-06- 2017-09- 2017-07- 2017-09- 2017-09- technique et IDA / 57180 A posteriori Individuel Open 2,400.00 3,410.48 Signé 2017-04-10 development support 27 29 16 19 28 24 28 22 environnementale du microprojet de réhabilitation de la route Nkolmen - Ovangoul sur 5 km, commune de Ngoumou 031/C/EF/CE/NGOUMOU/20 17 / Sélection d'un consultant pour l'élaboration des étude de faisabilité technique et Component A: Local 2017-06- 2017-05- 2017-06- 2017-06- 2017-10- 2017-07- 2017-09- 2017-09- environnementales du IDA / 57180 A posteriori Individuel Open 2,800.00 3,394.05 Signé 2017-04-10 development support 05 29 13 19 02 24 27 22 microprojet d'extension du réseau électrique 1,3Km de BT et MT d' Ovangoul -Tega Minboman et de Minlo Minzoa 2,3Km à Ofoumbi, commune de Ngoumou 032/C/EF/CE/MATOMB/201 7 / Sélection d'un consultant pour l'élaboration des études de faisabilité du microprojet de construction de (02) Component A: Local 2017-06- 2017-05- 2017-06- 2017-10- 2017-07- 2017-09- 2017-09- hangars de marché avec IDA / 57180 A posteriori Individuel Open 2,800.00 2,849.81 Signé 2017-04-10 development support 07 29 19 16 24 29 22 comptoirs et construction de (02) bloc de (04) latrines aux marchés de Mandoumba et Nkeng Likock, Commune de Matomb Page 8 033/C/EF/CE/MATOMB/201 7 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et environnementales du Component A: Local 2017-05- 2017-05- 2017-06- 2017-06- 2017-10- 2017-07- 2017-10- 2017-09- IDA / 57180 A posteriori Individuel Open 1,200.00 1,705.29 Signé 2017-04-10 microprojet de construction development support 15 29 13 19 02 24 02 22 de 02 forages équipés de PMH au marché de Mandoumba et au marché de Nkeng Likock, commune de Matomb 034/C/EF/CE/NGOG MAPUBI/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité pour la Component A: Local 2017-05- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- construction de 04 forages IDA / 57180 A posteriori Individuel Open 1,600.00 5,092.08 Signé 2017-04-10 development support 11 29 16 19 27 24 02 22 équipés de pompes à motricité humaine à Mode chefferie, à l'EP de Ngog Mapubi, à Omog et à l'EP de Dibodi, dans la Commune de Ngog Mapubi 035/C/EF/CE/NGOG MAPUBI/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-06- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- IDA / 57180 A posteriori Individuel Open 1,400.00 5,075.87 Signé 2017-04-10 environnementale du development support 02 29 16 19 27 24 02 22 Microprojet de réhabilitation de la station scan water de Ngog Mapubi, dans la Commune de Ngog Mapubi 036/C/EF/CE/NGOG MAPUBI/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-06- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- IDA / 57180 A posteriori Individuel Open 1,400.00 5,097.61 Signé 2017-04-10 environnementale du development support 02 29 16 19 27 24 02 22 Microprojet d'électrification rurale de Libengoï Bethel sur 4 km, dans la Commune de Ngog Mapubi 037/C/EF/CE/SAA/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité pour la construction d'un hangar Component A: Local En cours 2017-05- 2017-05- 2017-09- 2017-06- 2017-09- 2017-07- 2017-09- IDA / 57180 A posteriori Individuel Open 2,800.00 2,548.80 2017-04-10 avec comptoirs et blocs de development support d'exécution 09 29 06 19 27 24 22 quatre latrines et de réhabilitation d'un hangar au marché municipal B de Sa'a, dans la Commune de Sa'a 038/C/EF/CE/SAA/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité pour la construction de 03 forages Component A: Local 2017-06- 2017-05- 2017-06- 2017-11- 2017-07- 2017-10- 2017-09- IDA / 57180 A posteriori Individuel Open 1,200.00 3,219.85 Signé 2017-04-10 équipés de PMH au marché development support 13 29 19 01 24 02 22 municipal de Sa'a, au marché municipal B, au village NSAN MENDOUGA (Ayissi Elé), dans la Commune de SAA 041/C/EF/CE/DIBANG/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité de construction Component A: Local 2017-05- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2017-09- IDA / 57180 A posteriori Individuel Open 1,600.00 2,557.94 Signé 2017-04-10 de quatre (04) forages dans development support 24 29 16 19 24 24 29 22 les localités de Mapubi, Mahole, Ndoupe et Somapan, dans la commune de Dibang 042/C/EF/CE/MAKAK/2017 / Sélection d'un consultant pour l'élaboration des études Component A: Local 2017-06- 2017-05- 2017-06- 2017-11- 2017-07- 2017-11- 2017-09- de faisabilité de construction IDA / 57180 A posteriori Individuel Open 3,000.00 2,365.17 Signé 2017-04-10 development support 13 29 19 24 24 24 22 d'un centre commercial de 100 boutiques multi standing à Makak, commune de Makak 011/C/SC/CE/NKOTENG/20 17 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-04- 2017-06- 2017-06- 2017-07- 2017-07- 2017-07- 2017-09- 2017-11- de Construction d'un (01) IDA / 57180 A posteriori Individuel Open 1,760.00 1,597.47 Signé 2017-04-23 development support 18 11 13 02 28 31 26 28 hangar avec comptoirs et un bloc latrines à quatre (04) compartiments au carrefour Ndoumba dans la Commune de Nkoteng, Région du Centre 012/C/SC/CE/NKOTENG/20 17 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-04- 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-09- 2017-11- de Construction d'un (01) IDA / 57180 A posteriori Individuel Open 480.00 299.43 Signé 2017-04-23 development support 18 11 13 18 28 17 26 14 puits équipé de Pompe à Motricité Humaine au carrefour Ndoumba dans la Commune de Nkoteng, Région du Centre 019/C/SC/CE/OMBESSA / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-09- 2017-06- 2017-07- 2017-06- 2017-07- 2017-07- 2017-12- 2017-10- IDA / 57180 A posteriori Individuel Open 960.00 626.48 Signé 2017-04-23 d'une mini AEP avec forage development support 04 02 21 09 28 01 26 29 productif et construction d'un château à Ombessa, dans la Commune d'Ombessa Région du Centre 022/C/SC/CE/YAOUNDE 7/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un Component A: Local 2017-06- 2017-06- 2017-06- 2017-06- 2017-10- 2017-07- 2017-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,788.69 Signé 2017-04-23 magasin de stockage avec un development support 07 02 13 09 10 01 27 29 bloc latrines à deux (02) Compartiments à Minkoameyos dans la commune de Yaoundé 7, Région du Centre 023/C/SC/CE/YAOUNDE 7/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de rehabilitation d'un pont definitif de 06m de portee et Component A: Local 2019-04- 2017-06- 2017-06- 2017-06- 2017-10- 2017-07- 2018-04- 2017-10- 2018-08- IDA / 57180 A posteriori Individuel Open 3,079.00 1,227.58 Achevé 2017-04-23 04m de large sur la riviere development support 11 02 13 09 19 01 08 29 28 Angaha et de réhabilitation d'une piste agricole de 400m allant du carrefour nkolnkoumou au Centre de Promot 016/C/EF/CE/NANGA EBOKO/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité du microprojet de construction Component A: Local 2017-02- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-06- 2017-09- IDA / 57180 A posteriori Individuel Open 2,000.00 1,821.89 Signé 2017-04-10 d'un bloc de 02 salles de development support 20 29 16 19 25 24 30 22 classe équipées et d'un bloc de trois latrines à l'EP de Ndjombe, dans la commune de Nanga Eboko 028/C/EF/CE/AKONOLINGA/ 2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-06- 2017-05- 2017-06- 2017-06- 2017-09- 2017-07- 2017-10- 2017-09- environnementale du IDA / 57180 A posteriori Individuel Open 1,000.00 849.60 Signé 2017-04-10 development support 02 29 16 19 27 24 02 22 microprojet de construction d'un forage équipé de PMH à l'EM d'application GI, G2 du Centre administratif, commune d'Akonolinga 020/C/SC/CE/OLANGUINA/2 017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction dun (01) Component A: Local 2018-12- 2017-06- 2018-04- 2017-06- 2018-10- 2017-07- 2018-12- 2017-10- IDA / 57180 A posteriori Individuel Open 3,762.00 1,427.99 Signé 2017-04-23 hangar de 32 comptoirs au development support 07 02 24 09 20 01 21 29 marché de Koltock et rehabilitation du marché d'Olanguina (10 boutiques) et Construction de (02) bloc latrines à trois (03) comp 002/C/EF/CE/NDIKINIMEKI/2 017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-04- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-04- 2017-08- environnementale du IDA / 57180 A posteriori Individuel Open 1,000.00 1,023.17 Signé 2017-03-07 development support 10 25 16 16 25 20 25 19 microprojet de construction d'un 01 forage équipé d'une PMH au hangar de marché d'Etoundou 1 dans la commune de Ndikinimeki 021/C/EF/CE/MBALMAYO/2 017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-05- 2017-09- IDA / 57180 A posteriori Individuel Open 2,000.00 1,759.01 Signé 2017-04-10 environnementale du development support 16 29 16 19 24 24 24 22 microprojet de construction d'un hangar et de boutiques avec blocs de quatre latrines au marché Japon, dans la Commune de Mbalmayo Page 9 035/C/SC/CE/NTUI/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de deux (02) magasins de stockage de cacao et Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 5,030.00 0.00 Annulé 2017-04-25 construction de 02 blocs development support 04 11 03 31 latrines à deux (02) compartiments dans les localités de Nguila, et Ntui ville) dans la Commune de Ntui, 018/C/SC/CE/MONATELE/20 17 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- de Construction d'un (01) IDA / 57180 A posteriori Individuel Open 680.00 0.00 Annulé 2017-04-23 development support 02 09 01 29 forage productif équipé d'une pompe à motricité humaine au marché de Lenouk, dans la Commune de Monatélé, Région du Centre 028/C/SC/CE/MAKAK/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un (01) hangar de 48 Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 2,393.00 0.00 Annulé 2017-04-24 comptoirs avec un (01) bloc development support 03 10 02 30 latrines à trois (03) compartiments au marché de Makak centre, dans la Commune de Makak, Région du Centre 014/C/SC/CE/OBALA/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Component A: Local 2017-06- 2017-06- 2017-07- 2017-11- Travaux de Construction IDA / 57180 A posteriori Individuel Open 480.00 0.00 Annulé 2017-04-23 development support 02 17 16 13 d'un puits equipe de PMH à nkol-Ekui dans la Commune d'Obala, Région du Centre 029/C/SC/CE/MAKAK/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un magasin de stockage Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2017-04-25 avec un bloc latrines à deux development support 04 11 03 31 (02) compartiments dans la localités de Mbeng dans la Commune de Makak, Région du Centre 015/C/SC/CE/OBALA/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un bloc de deux (02) salles Component A: Local 2017-06- 2017-06- 2017-07- 2017-11- IDA / 57180 A posteriori Individuel Open 1,600.00 0.00 Annulé 2017-04-23 de classes équipé de 60 table- development support 02 17 16 13 bancs de niveau 2, de 02 bureaux pour enseignants à nkol-Ekui dans la Commune d'Obala, Région du Centre 013/C/SC/CE/ELIF MFOMO/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de sept (07) Component A: Local 2017-06- 2017-07- 2017-07- 2017-11- forages productifs équipés IDA / 57180 A posteriori Individuel Open 4,554.00 0.00 Annulé 2017-04-23 development support 11 02 31 28 de Pompe à Motricité Humaine dans sept (07) localités (Nkol-Obang, Ban Edouma 2, EP de Mebomo, Lekoukoua, Bodo, Enobita et CES de Kokodo) 017/C/SC/MONATELE/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction deux (02) hangars de 32 Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 4,116.00 0.00 Annulé 2017-04-23 comptoirs avec deux (02) development support 02 09 01 29 blocs latrines à trois (03) compartiments aux marchés de deux (02) dans les localités de Ezezang et Lenouk, à monatélé 030/C/SC/CE/MAKAK/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- d'un (01) puits équipé de IDA / 57180 A posteriori Individuel Open 480.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 Pompe à Motricité Humaine au marché de Makak Centre, dans la Commune de Makak, Région du Centre 011/C/EF/CE/MAKENENE/20 17 / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Component A: Local 2017-05- 2017-06- 2017-07- 2017-09- IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-04-10 environnementale du development support 29 19 24 22 microprojet de construction d'une tribune de 1000 places assises à Makenene Centre, dans la Commune de Makenene 016/C/SC/CE/OBALA / Sélection d'un Consultant pour le Suivi/contrôle des Travaux d'extension du Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 3,369.00 0.00 Annulé 2017-04-23 réseau électrique à sur la development support 02 09 01 29 route Elig bodo- Yemsoa dans la commune d'Obala, Région du Centre 025/C/SC/CE/MENGUEME/2 017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-06- 2017-06- 2017-07- 2017-11- IDA / 57180 A posteriori Individuel Open 5,060.00 0.00 Annulé 2017-04-24 de Réhabilitation des points development support 03 17 16 13 critiques sur la piste agricole Nemeyong-benebelot dans la commune de Mengueme, Région du Centre 031/C/SC/CE/DIBANG/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de realisation d'une Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 2,304.00 0.00 Annulé 2017-04-25 electrification rurale de development support 04 11 03 31 2700m dans le village Tamalong, Commune de Dibang, Région du Centre 027/C/SC/CE/MENGANG/20 17 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de réalisation d'électrification Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 4,348.00 0.00 Annulé 2017-04-24 rurale dans certaines development support 03 10 02 30 localités, en 02 axes : lycée de Mengang-Meyo-Evoung et lycée de Menoa-Ekinguili- Bifembe, Commune de Mengang, Région du Centre 024/C/SC/CE/MENGUEME/2 017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de deux (02) Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 960.00 0.00 Annulé 2017-04-23 puits équipés de Pompes à development support 02 09 01 29 Motricité Humaine dans deux (02) localités (Yeneassi et Mebemezoa) dans la commune de Mengueme, Région du Centre 8/C/SC/CE/EBEBDA/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-06- 2017-07- 2017-11- d'un (01) forage équipé de IDA / 57180 A posteriori Individuel Open 680.00 0.00 Annulé 2017-04-23 development support 13 20 12 09 Pompe à Motricité Humaine sur le site du marché de Elig- Edouma, dans la Commune d'Ebebda, Région du Centre 234/C/SC/CE/MINTA/2019 / Sélection d'un controleur pour les travaux de construction de (02) blocs Component A: Local 2018-10- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-10- IDA / 57180 A posteriori Individuel Limited 600.00 1,880.91 Signé 2019-04-08 latrines à quatre (04) development support 05 13 09 04 08 08 18 06 compartiments au hangar de marché de Minta ville et à l'Ecole Publique d’Elot, dans la commune de Minta 235/C/SC/CE/NANGA EBOKO/2019 / Sélection d'un controleur pour les travaux de Réhabilitation de (01) Component A: Local 2019-01- 2019-02- 2019-01- 2019-03- 2019-05- 2019-04- 2019-07- 2019-07- IDA / 57180 A posteriori Individuel Limited 480.00 213.34 Signé 2019-02-14 puits équipé de PMH au development support 11 19 07 12 07 16 30 15 marché de Essimeyong dans la Commune de Nanga et Eboko, Région du Centre 223/C/EF/CE/MESSONDO/20 19 / Selection Consultant individuel pour la réalisation des EF de 06 forages équipés Component A: Local 2018-11- 2019-01- 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-04- de PMH à l'EP de BODI, à IDA / 57180 A posteriori Individuel Limited 3,000.00 3,444.58 Signé 2019-01-04 development support 19 09 10 30 08 06 23 20 LIBANGA MBODI, Massale quatier Pygmés, MESSONDO,Bassomo,dans la commune de Messondo 224/C/EF/CE/AWAE/2019 / Selection Consultant individuel pour la réalisation Component A: Local 2019-06- 2019-07- 2019-08- 2019-09- des EF de réhabilitation du IDA / 57180 A posteriori Individuel Limited 2,500.00 0.00 Annulé 2019-06-05 development support 10 01 05 19 reseau d'adduction d'eau de la ville d'Awae, dans la Commune d'Awae Page 10 225/C/EF/CE/NKOTENG/201 9 / Selection Consultant individuel pour la réalisation Component A: Local 2018-11- 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-04- 2019-03- des EF de construction de 02 IDA / 57180 A posteriori Individuel Limited 1,500.00 1,680.75 Signé 2018-11-20 development support 28 25 10 16 08 20 02 06 puits équipés de PMH aux EP Groupe IV et Doua dans la Commune Nkoteng 226/C/EF/CE/MENGUEME/20 19 / Selection Consultant individuel pour la réalisation des EF de (02) forages Component A: Local 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-04- 2019-06- 2019-05- IDA / 57180 A posteriori Individuel Limited 1,000.00 1,688.37 Signé 2019-02-01 positifs équipés d’une PMH development support 10 06 10 27 08 03 12 18 à l’Ecole Publique de Bilon (Nyimi) et à pont so’o, dans la Commune de Mengueme 227/C/EF/CE/AYOS/2019 / Selection Consultant individuel pour la réalisation Component A: Local 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-11- 2019-01- 2019-01- IDA / 57180 A posteriori Individuel Limited 2,400.00 2,066.11 Signé 2018-09-20 des EF d’électrification du development support 08 25 15 16 14 20 08 04 village Mbang -3,8km), dans la Commune d'Ayos 229/C/EF/CE/NGOMEDZAP/ 2019 / Selection Consultant individuel pour la réalisation Component A: Local 2018-12- 2019-02- 2019-01- 2019-02- 2019-03- 2019-04- 2019-05- 2019-05- des EF d'un forage équipé de IDA / 57180 A posteriori Individuel Limited 1,000.00 3,358.76 Signé 2019-02-01 development support 03 06 04 27 05 03 21 18 PMH à l'EP d'Onanambessa dans la Commune de Ngomedzap 230/C/EF/CE/DEUK/2019 / Selection Consultant individuel pour la réalisation des EF d`un bloc de salle de classe, d'un bloc larine à 3 Component A: Local 2019-02- 2019-02- 2019-04- 2019-05- IDA / 57180 A posteriori Individuel Limited 4,300.00 0.00 Annulé 2019-02-01 Cabines a l`EMa de Gah, Reh development support 06 27 03 18 bloc de salle de classe et constr bloc 3 larine à l`EP de Nyamzom, dans la Commune de Deuk 231/C/EF/CE/AKOEMAN/201 9 / Selection Consultant individuel pour la réalisation Component A: Local 2019-02- 2019-02- 2019-04- 2019-05- des EF d' Electrification du IDA / 57180 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2019-02-01 development support 06 27 03 18 village Yanga sur ……… km de MT, dans la Commune de Mbangassina 232/C/EF/CE/MBANGASSINA /2019 / Selection Consultant individuel pour la Component A: Local 2019-06- 2019-07- 2019-08- 2019-09- réalisation des EF de IDA / 57180 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2019-06-05 development support 10 01 05 19 Construction et équipement du Centre de Santé Intégré de Boura, ans la Commune de Mbangassina 233/C/EF/CE/MBANGASSINA /2019 / Selection Consultant individuel pour la réalisation des EF de Construction et Component A: Local 2019-02- 2019-02- 2019-04- 2019-05- IDA / 57180 A posteriori Individuel Limited 2,000.00 0.00 Annulé 2019-02-01 Réhabilitation de deux puits development support 06 27 03 18 et d'un d’un forage équipés de PMH au village Nyambala Rural, au quartier ESSOH et à Mbangassina - Centre dans la Commune de Mbangassina 236/C/SC/CE/NANGA EBOKO/2019 / Sélection d'un controleur pour les travaux de Construction de (01) Component A: Local 2019-01- 2019-02- 2019-01- 2019-03- 2019-05- 2019-04- 2019-07- 2019-08- hangar avec comptoirs et IDA / 57180 A posteriori Individuel Limited 2,160.00 1,330.41 Signé 2019-02-14 development support 11 19 07 12 07 16 30 14 (01) bloc de latrines à (03) compartiments au marché d'Essimeyong dans la commune de Nanga et Eboko 237/C/SC/CE/OBALA/2019 / Sélection d'un controleur pour les travaux de Construction de (06) forages Component A: Local 2019-03- 2019-04- 2019-05- 2019-09- équipés de PMH dans les IDA / 57180 A posteriori Individuel Limited 4,320.00 0.00 Annulé 2019-03-21 development support 26 16 21 18 localités de Nkoltsogo II, Afambassi, Yemsoa, Ntuissong, Nkomtou II et Mbelle, dans la Commune d'Obala 238/C/SC/CE/SOA/2019 / Sélection d'un controleur pour les travaux de Construction de 06 forages Component A: Local 2019-03- 2019-04- 2019-05- 2019-09- positifs équipé de PMH à IDA / 57180 A posteriori Individuel Limited 4,080.00 0.00 Annulé 2019-03-20 development support 25 15 20 17 Akondo, Akak I, Mbansan (Voisinage Chefferie), NGALI II, NSAN GMI et Ntouessong V dans la Commune de Soa 239/C/SC/CE/AYOS/2019 / Sélection d'un controleur pour les travaux de Contruction de sept (07) Component A: Local 2017-09- 2019-01- 2017-11- 2019-01- 2018-01- 2019-03- 2018-06- 2019-07- forages équipés de PMH dans IDA / 57180 A posteriori Individuel Limited 5,320.00 5,882.63 Signé 2019-01-02 development support 26 07 27 28 08 04 08 02 les localités de Koba, Nkolmveng (Carrefour Endo), Mekouma, Melane, Atong, Mbang et Ndéllé, dans la Commune d’Ayos 241/C/SC/CE/DIBANG/2019 / Sélection d'un controleur pour les travaux de Construction d’un magasin Component A: Local 2019-08- 2019-04- 2019-08- 2019-05- 2019-10- 2019-06- 2019-11- 2019-10- IDA / 57180 A posteriori Individuel Limited 2,800.00 2,264.49 Signé 2019-04-08 de stockage avec un bloc development support 05 13 21 04 21 08 01 06 latrines à deux (02) compartiments à Ndongo dans la Commune de Dibang 242/C/SC/CE/NGUIBASSAL/2 019 / Sélection d'un controleur pour les travaux de Constr d’un dalot simple 2,5x1, 5ml sur la rivière Component A: Local 2019-04- 2019-04- 2019-04- 2019-05- 2019-08- 2019-06- 2019-09- 2019-10- IDA / 57180 A posteriori Individuel Limited 1,760.00 1,332.35 Signé 2019-04-08 Massagbe avec development support 26 13 26 04 29 08 17 06 aménagement des accès au dalot sur 500ml (route rurale Nkoumisse Sud-Maholo II), Commune de Nguibassal 243/C/SC/CE/MBALMAYO/2 019 / Sélection d'un controleur pour les travaux de Construction d'un hangar Component A: Local 2018-09- 2018-12- 2018-10- 2018-12- 2018-10- 2019-02- 2019-03- 2019-06- de 48 comptoirs, d'un IDA / 57180 A posteriori Individuel Limited 4,000.00 3,084.78 Signé 2018-12-04 development support 18 09 05 30 30 03 18 03 magasin avec bureau et d'un bloc de latrine à 04 cabines au marché Japon dans la commune de Mbalmayo 244/C/SC/CE/MBALMAYO/2 019 / Sélection d'un controleur pour les travaux de construction d'un forage Component A: Local 2018-09- 2019-06- 2018-10- 2019-07- 2018-10- 2019-08- 2019-11- 2019-09- équipé d'une PES muni d'un IDA / 57180 A posteriori Individuel Limited 1,200.00 1,079.84 Signé 2019-06-05 development support 10 10 05 01 19 05 01 19 cubitenaire sur ossature en Beton Armé avec 04 bornes fontaines, dans la commune de Mbalmayo 245/C/SC/CE/BOKITO/2019 / Sélection d'un controleur pour les travaux d’éclairage Component A: Local 2019-05- 2019-06- 2019-07- 2019-11- public solaire de la IDA / 57180 A posteriori Individuel Limited 2,560.00 0.00 Annulé 2019-05-08 development support 13 03 08 05 Commune de Bokito, Département du Mbam et Inoubou, Région du Centre 246/C/SC/CE/BOKITO/2019 / Sélection d'un controleur pour les travaux de réhabilitation en pavé de béton du tronçon carrefour Component A: Local 2019-01- 2019-01- 2018-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-07- IDA / 57180 A posteriori Individuel Limited 2,640.00 2,738.16 Signé 2019-01-09 église catholique place de development support 15 14 02 04 27 11 27 09 l’indépendance, rond-point finance, entrée résidence du sous-préfet (300) ml, Commune de Bokito 247/C/SC/CE/NGOMEDZAP/ 2019 / Sélection d'un controleur pour les travaux de construction de 04forages positifs équipés d'une PMH Component A: Local 2019-01- 2018-12- 2019-05- 2018-12- 2019-06- 2019-02- 2019-08- 2019-06- IDA / 57180 A posteriori Individuel Limited 2,720.00 539.65 Signé 2018-12-05 au marché d’Abang-Akongo, development support 10 10 09 31 02 04 23 04 à l'Ecole Publique d’Agonfeme, Ekoud- bessanda et l'Ecole Publique de Nyengue, Commune de Ngomedzap 248/C/SC/CE/NSEM/2019 / Sélection d'un controleur pour les travaux de Component A: Local 2018-08- 2018-12- 2018-10- 2018-12- 2019-02- 2019-01- 2019-04- 2019-05- réhabilitation du réseau IDA / 57180 A posteriori Individuel Limited 2,880.00 3,358.76 Signé 2018-11-27 development support 06 02 05 23 21 27 09 27 SCANWATER avec raccordement du CETIC de Nsem dans la commune de Nsem 249/C/SC/CE/BAFIA/2019 / Sélection d'un controleur pour les travaux de construction de 02 hangars Component A: Local 2018-08- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2019-02- 2019-06- de 32 comptoirs chacun, IDA / 57180 A posteriori Individuel Limited 4,000.00 6,007.98 Signé 2018-12-21 development support 06 26 05 16 20 20 12 20 d’un bloc de trois latrines et d’une unité de traitement au marché de Djoumba dans la commune de Bafia Page 11 250/C/SC/CE/KON YAMBETTA/2019 / Sélection d'un controleur pour les travaux de construction de 02 blocs de 02 salles de Component A: Local 2018-09- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2019-03- 2019-04- classes équipées de 120 IDA / 57180 A posteriori Individuel Open 3,600.00 2,640.10 Signé 2018-11-06 development support 17 25 05 15 19 19 29 05 tables-bancs, de 04 bureaux complets pour enseignants, 04 armoires de rangement et un bloc latrine à l'Ecole Publique de Bape Montagne 251/C/SC/CE/KON YAMBETTA/2019 / Sélection d'un controleur pour les travaux de construction d’un Component A: Local 2018-08- 2018-08- 2018-10- 2018-09- 2018-10- 2018-10- 2019-03- 2019-02- IDA / 57180 A posteriori Individuel Limited 3,360.00 586.72 Signé 2018-08-15 puits positif équipé d'une development support 27 20 05 10 26 15 29 12 PMH à l’école publique de Bape Montagne dans la Commune de Kon Yambetta 252/C/SC/CE/OKOLA/2019 / Sélection d'un controleur pour les travaux de construction (01) bloc de Component A: Local 2018-07- 2018-09- 2018-07- 2018-10- 2018-10- 2018-11- 2018-03- 2019-03- deux salles de classes IDA / 57180 A posteriori Individuel Limited 1,760.00 1,585.15 Signé 2018-09-19 development support 25 24 25 15 20 19 18 19 équipées de tables bancs et (01) bloc de deux latrines à l’Ecole Publique de Nyemeyong, dans la Commune d’Okola 253/C/SC/CE/KON YAMBETTA/2019 / Sélection d'un controleur pour les travaux de construction d’un Component A: Local 2018-12- 2019-01- 2019-02- 2019-05- (01) forage positif équipé IDA / 57180 A posteriori Individuel Limited 720.00 0.00 Annulé 2018-12-21 development support 26 16 20 21 d’une PMH au marché du village Diodaré place Nwal à Mandoki, dans la Commune de Kon Yambetta 254/C/SC/CE/BAFIA/2019 / Sélection d'un controleur pour les travaux de Component A: Local 2018-09- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2018-10- 2019-05- construction d’un forage IDA / 57180 A posteriori Individuel Limited 720.00 840.38 Signé 2018-12-21 development support 03 26 05 16 20 20 26 21 positif équipé d’une PMH au marché de Djoumba dans la commune de Bafia 255/C/SC/CE/BAFIA/2019 / Sélection d'un controleur pour les travaux de Component A: Local 2018-09- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2019-02- 2019-06- IDA / 57180 A posteriori Individuel Limited 1,200.00 517.36 Signé 2018-12-21 construction d’un bloc de development support 03 26 05 16 20 20 12 20 (04) boutiques au marché de Djoumba dans la commune de Bafia 240/C/SC/CE/ELIG MFOMO/2019 / Sélection d'un controleur pour les travaux de onstruction de cinq (05) forages positifs Component A: Local 2019-06- 2019-07- 2019-08- 2019-12- IDA / 57180 A posteriori Individuel Limited 3,360.00 0.00 Annulé 2019-06-25 équipés d’une PMH à bodo, development support 30 21 25 23 kokodo I (EP), MbanedoumaII, Enobita (carrefour nang mbono) et lycee d’elig-mfomo dans la commune d’elig mfomo 026/C/SC/CE/MFOU/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- d'un forage productif IDA / 57180 A posteriori Individuel Open 680.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 équipés d'une Pompe à Motricité Humaine dans la localité de Nkongoa dans la Commune de Mfou, Région du Centre 037/C/SC/CE/MINTA/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- Travaux de construction d'un IDA / 57180 A posteriori Individuel Open 480.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 puits équipé de PMH à l'EP de Ndjombe, dans la commune de Minta, Région du Centre 260C/SC/CE/AFANLOUM201 9 / Sélection d'un controleur pour les travaux de construction d'un Bloc de Component A: Local 2019-06- 2019-06- 2019-08- 2019-11- deux salles équipées, d'un IDA / 57180 A posteriori Individuel Limited 2,004.00 0.00 Annulé 2019-06-01 development support 06 27 01 29 bloc latrine à trois compartiments à l'EP de Afanloum Centre, dans la Commune d'Afanloum 261C/SC/CE/AFANLOUM201 9 / Sélection d'un controleur pour les travaux de construction d’un logement Component A: Local 2019-06- 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Individuel Limited 1,058.00 0.00 Annulé 2019-06-01 d'Astreinte (Appartement development support 06 27 01 29 deux chambres, 01 salon, 01 cuisine et 01 douche) à l' EP d'Afanloum 262C/SC/CE/AFANLOUM201 9 / Sélection d'un controleur pour les travaux de Component A: Local 2019-06- 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Individuel Limited 754.00 0.00 Annulé 2019-06-01 rehabilitation du Centre de development support 06 27 01 29 Santé Intégré (CSI) et bloc latrine d'Afanloum Centre 036/C/SC/CE/NANGA EBOKO/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- 03 salles de classe équipées IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 et construction d'un bloc de trois latrines à l'EP de Ndjombe dans la commune de Nanga et Eboko, Région du Centre 038/C/SC/CE/NANGA EBOKO/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de deux (02) hangars avec comptoirs et Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 4,190.00 0.00 Annulé 2017-04-25 Construction de deux (02) development support 04 11 03 31 blocs de latrines à trois (03) compartiments dans 02 marchés à Essimeyong et à Biboa dans la commune de Nanga et 010/C/SC/CE//NKOTENG/20 17 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-06- 2017-06- 2017-07- 2017-11- de Construction d'une mini IDA / 57180 A posteriori Individuel Open 640.00 0.00 Annulé 2017-04-16 development support 04 25 30 27 adduction d'approvisionnement en eau potable sur le site de l'abattoir de Nkoteng dans la Commune de Nkoteng, Région du Centre 9/C/SC/CE/NKOTENG/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-03- 2017-07- 2017-03- 2017-07- 2017-05- 2017-08- d'un abattoir avec un bloc IDA / 57180 A posteriori Individuel Limited 1,281.00 0.00 Annulé 2017-03-01 development support 01 06 24 27 28 01 29 latrine à trois (03) compartiments à l'abattoir de Nkoteng dans la Commune de Nkoteng, Région du Centre 255/C/EF/CE/NTUI/2019 / réalisation des études de faisabilité techniques et socio environnementales Component A: Local 2018-12- 2019-02- 2019-01- 2019-02- 2019-03- 2019-04- 2019-03- 2019-05- IDA / 57180 A posteriori Individuel Limited 6,000.00 7,015.66 Signé 2019-02-01 d’un complexe commercial à development support 05 06 28 27 05 03 15 18 Ntui Ville, dans la commune de Ntui, Département du Mbam et Kim, Région du Centre 258/C/EF/CE/DZENG/2019 / Etudes de Faisabilité de Réhabilitation et extension Component A: Local 2019-01- 2019-03- 2019-01- 2019-03- 2019-02- 2019-05- 2019-04- 2019-06- de l'adduction d'eau de IDA / 57180 A posteriori Individuel Limited 2,600.00 2,517.24 Signé 2019-03-01 development support 02 06 02 27 08 01 02 15 Dzeng Centre et Equipement du CSI d’Assok, dans la Commune de Dzeng, Région du Centre 259/C/EF/CE/DZENG/2019 / Etudes de Faisabilité de Construction d’un hangar de marché et d’un bloc latrines Component A: Local 2018-11- 2019-02- 2019-01- 2019-02- 2019-02- 2019-04- 2019-05- 2019-05- IDA / 57180 A posteriori Individuel Limited 2,400.00 2,519.07 Signé 2019-02-01 au hangar de marché de development support 28 06 02 27 08 03 30 18 Dzeng Centre, dans la Commune de Dzeng, Région du Centre 260/C/EF/CE/AWAE/2019 / Etudes de Faisabilité de réhabilitation du reseau Component A: Local 2019-03- 2019-03- 2019-05- 2019-06- IDA / 57180 A posteriori Individuel Limited 3,360.00 0.00 Annulé 2019-03-01 d'adduction d'eau de la ville development support 06 27 01 15 d'Awae, dans la Commune d'Awae, Région du Centre 261/C/EF/CE/MENGUEME/20 19 / Etudes de Faisabilité de construction d’un forage Component A: Local 2018-12- 2019-02- 2019-01- 2019-02- 2019-02- 2019-04- 2019-06- 2019-05- IDA / 57180 A posteriori Individuel Limited 1,200.00 1,680.75 Signé 2019-02-01 équipé de PMH à l'EP de Bilon development support 13 06 10 27 08 03 12 18 (Nyimi), dans la Commune de Mengueme, Région du Centre Page 12 263/C/EF/CE/NGOMEDZAP/ 2019 / Etudes de Faisabilité socio environnementale de Construction d'un forage Component A: Local 2018-12- 2019-02- 2019-01- 2019-02- 2019-01- 2019-04- 2019-05- 2019-05- IDA / 57180 A posteriori Individuel Limited 1,200.00 3,361.80 Signé 2019-02-01 équipé de PMH à l'EP development support 04 06 25 27 25 03 21 18 d'Onanambessa dans la Commune de Ngomedzap, Région du Centre 264/C/SC/CE/MESSONDO/2 019 / Sélection d'un controleur pour les travaux de construction de six forages équipés de PMH à Component A: Local 2019-05- 2019-03- 2019-05- 2019-03- 2019-10- 2019-05- 2019-10- 2019-08- IDA / 57180 A posteriori Individuel Limited 4,009.00 3,470.99 Signé 2019-03-01 l'EP de Bodi, à Massale development support 09 06 06 27 15 01 31 29 quartier Pygmés, à Libanga Mogui, Ecole Publique messondo Ville, Bassomo et à Messondo ville lieu dit Nyemkong 267/C/SC/CE/NKOTENG/20 19 / Sélection d'un controleur pour les travaux de construction d deux puits Component A: Local 2019-03- 2019-03- 2019-05- 2019-03- 2019-06- 2019-05- 2019-09- 2019-08- positifs équipés de PMH à IDA / 57180 A posteriori Individuel Limited 914.00 923.74 Signé 2019-03-01 development support 10 06 09 27 08 01 27 29 l’école publique de DOUA et à l’école publique GROUPE IV, dans la Commune de NKOTENG 257/C/EF/CE/DZENG/2019 / Etudes de Faisabilité de Construction de huit puits équipés de PMH aux CSI de Komassi et Mbanga, aux Component A: Local 2018-11- 2019-03- 2019-01- 2019-03- 2019-02- 2019-05- 2019-04- 2019-06- IDA / 57180 A posteriori Individuel Limited 3,000.00 2,187.06 Signé 2019-03-01 villages Obofianga, Endoum, development support 18 06 02 27 08 01 02 15 Ebabot chefferie, au marché de Dzeng Centre, à l’EP d’Akak, au CETIC d’Assok, dans la Commune de Dzeng 264/C/EF/CE/NGORO/2019 / Etudes de Faisabilité socio environnementale de construction cinq (05) forages positifs équipés Component A: Local 2018-12- 2019-03- 2019-02- 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- IDA / 57180 A posteriori Individuel Limited 2,000.00 4,201.88 Signé 2019-03-01 d’une pompe à motricite development support 11 06 08 27 02 01 30 15 humaine dans les localités de Nyamtong, Nyakengdeng, Nyabidi, Lendzong et Koutaba, dans la Commune de Ngoro 039/C/EF/CE/SAA/2017 / Sélection d'un consultant pour l'élaboration des études de faisabilité technique et environnementale du Component A: Local 2017-05- 2017-06- 2017-07- 2017-09- IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-04-10 microprojet d'Extension de development support 29 19 24 22 l'énergie électrique dans le quartier Engolo sur 2km à l'EST du village, dans la Commune de Sa'a 039/C/SC/CE/NAGA EBOKO / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de réhabilitation de deux (02) puits équipés de Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- IDA / 57180 A posteriori Individuel Open 480.00 0.00 Annulé 2017-04-25 Pompe à Motricité Humaine development support 04 11 03 31 au marché de Essimeyong et au marché de Biboa, dans la Commune de Nanga et Eboko, Région du Centre 6/C/SC/CE/MBANDJOCK/201 7 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Mini AEP par raccordement au reseau CDE Component A: Local 2017-04- 2017-05- 2017-06- 2017-09- et construction d'un château IDA / 57180 A posteriori Individuel Open 297.00 0.00 Annulé 2017-03-24 development support 22 07 01 29 d'eau avec un cubitenaire de 4000 litres au centre ville de Mbandjock dans la Commune de Mbandjock, Région du Centre 021/C/SC/CE/OLANGUINA/2 017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- de Construction d'un (01) IDA / 57180 A posteriori Individuel Open 680.00 0.00 Annulé 2017-04-23 development support 02 09 01 29 forage productif équipé d'une pompe à motricité humaine au marche de Koltock dans la Commune d'Olanguina, Région du Centre 034/C/SC/CE/BOT MAKAK/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- de Construction d'un (01) IDA / 57180 A posteriori Individuel Open 480.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 puits équipés de pompes à motricité humaine à Ndjock Bané, dans la Commune de Bot Makak, Région du Centre 033/C/SC/CE/BOT MAKAK/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de deux (02) Component A: Local 2018-02- 2017-06- 2017-06- 2017-07- 2017-10- forages productifs équipés IDA / 57180 A posteriori Individuel Open 1,192.00 0.00 Annulé 2017-04-25 development support 13 04 11 03 31 de pompes à motricité humaine au CETIC et Centre Administratif de Bot-Makak, dans la Commune de Bot Makak, Région du Centre 013/C/EF/CE/LOBO/2017 / Sélection d'un consultant pour l'élaboration de l'Étude de faisabilité technique et Component A: Local 2017-05- 2017-06- 2017-07- 2017-09- environnementale du IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2017-04-10 development support 29 19 24 22 microprojet de construction d'un forage au marché de Lobo centre, dans la commune de Lobo 7/C/SC/CE/EBEBDA/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de 02 hangars de 32 comptoirs Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- avec 02 blocs latrines à 03 IDA / 57180 A posteriori Individuel Open 3,592.00 0.00 Annulé 2017-04-23 development support 03 10 02 30 compartiments au marché de Nkog Edzen et au marché de Elig-Edouma dans la Commune d'Ebebda, Région du Centre 032/C/SC/CE/DIBANG/2017 / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction Component A: Local 2017-06- 2017-06- 2017-07- 2017-10- d'un magasin de stockage IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2017-04-25 development support 04 11 03 31 avec un bloc latrines à deux (02) compartiments à Ndongo dans la Commune de Dibang, Région du Centre 262/C/SC/CE/AKOEMAN/20 19 / Etudes de Faisabilité socio environnementale de construction de deux forages Component A: Local En attente 2020-04- 2020-05- 2020-06- 2020-08- IDA / 57180 A posteriori Individuel Limited 2,000.00 0.00 2020-04-20 équipés de PMH à Nyep Beth development support d'exécution 25 16 20 04 et à Sep I ( Quartier Omvang), dans la Commune d'Akoeman, Région du centre 228/C/EF/CE/AKOEMAN/201 9 / Selection Consultant individuel pour la réalisation Component A: Local En attente 2020-04- 2020-05- 2020-06- 2020-12- des EF de deux forages IDA / 57180 A posteriori Individuel Limited 1,600.00 0.00 2020-04-20 development support d'exécution 25 16 20 17 équipés de PMH à Nyep Beth et à Sep I ( Quartier Omvang), dans la Commune d'Akoeman 300/C/SC/CE/YOKO/2020 / Sélection d'un CI pour le suivi contrôle des travaux de Construction de six forages équipés de PMH dans les Component A: Local En attente 2020-09- 2020-09- 2020-10- 2021-02- IDA / 57180 A posteriori Individuel Open 3,940.00 0.00 2020-07-15 villages Donga-Yangoula, development support d'exécution 02 23 28 25 Guéré, linté et dans les EP de Foufouing, Mbimbim et Meteing dans la Commune de Yoko 301/C/SC/CE/OKOLA/2020 / Sélection d'un CI pour le suivi contrôle des travaux de Construction d'un puits Component A: Local En attente 2020-10- 2020-11- 2020-12- 2021-03- IDA / 57180 A posteriori Individuel Open 396.00 0.00 2020-08-24 équipé de PMH à l’Ecole development support d'exécution 12 02 07 07 Publique Bilingue d'Okola, dans la Commune d'Okola, Region du Centre 302/C/SC/CE/YOKO/2020 / Sélection d'un CI pour le suivi contrôle des travaux de Construction et équipement d'un bloc de 02 salles de Component A: Local En attente 2020-09- 2020-09- 2020-10- 2021-02- classes avec bureau du IDA / 57180 A posteriori Individuel Open 2,860.00 0.00 2020-07-15 development support d'exécution 02 23 28 25 Dircteur eu CES de Linté et de deux blocs de 03 latrines au CES de Linté et à l'EP de Makouri, dans la Commune de Yoko Page 13 303/C/SC/CE/YOKO/2020 / Sélection d'un CI pour le suivi contrôle des Travaux de Construction et équipement d'un bloc de deux salles de Component A: Local En attente 2020-09- 2020-09- 2020-10- 2021-02- IDA / 57180 A posteriori Individuel Open 1,842.00 0.00 2020-07-15 classes et d'un bloc de trois development support d'exécution 02 23 28 25 latrines à l’EP de Makouri, dans la Commune de Yoko, Departement Du Mbam Et Kim, Region du Centre 304/C/SC/CE/OKOLA/2020 / Sélection d'un CI pour le suivi contrôle des travaux de Construction et équipement Component A: Local En attente 2020-09- 2020-09- 2020-10- 2021-02- d’un bloc de deux salles de IDA / 57180 A posteriori Individuel Open 1,556.00 0.00 2020-07-15 development support d'exécution 02 23 28 25 classe à l’Ecole Publique Bilingue d'Okola, dans la Commune d'Okola, Region du Centre 305/C/SC/CE/OBALA/2020 / Sélection d'un CI pour le suivi contrôle des travaux de construction de quatre (04) puits positif équipé de PMH Component A: Local En attente 2020-10- 2020-11- 2020-12- 2021-01- dans la localité de IDA / 57180 A posteriori Individuel Open 1,695.00 0.00 2020-08-24 development support d'exécution 12 02 07 21 Ntuiessong, Nkol-Obili, Nkometou et Ngok-Ossan (entre Nto et Nkolfep) dans la commune de à dans la Commune d'Obala 306/C/SC/CE/MBALMAYO/2 020 / Sélection d'un CI pour le suivi contrôle des travaux de Construction deux Blocs Component A: Local En attente 2020-02- 2020-03- 2020-04- 2020-08- de huit (08) Boutiques au IDA / 57180 A posteriori Individuel Open 3,774.00 0.00 2020-01-06 development support d'exécution 24 16 20 18 marché Japon, Commune de Mbalmayo, Departement du Nyong et So'o, Region du Centre 308/C/SC/CE/MBANGASSINA /2020 / Sélection d'un CI pour le suivi contrôle des travaux de construction d'un Component A: Local En attente 2020-09- 2020-10- 2020-11- 2021-02- puits équipé de PMH au IDA / 57180 A posteriori Individuel Open 445.00 0.00 2020-07-28 development support d'exécution 15 06 10 08 quartier ESSOH II dans la Commune de Mbangassina, Departement Du Mbam Et Kim, Region du Centre 307/C/SC/CE/NTUI/2020 / Sélection d'un CI pour le suivi contrôle des travaux de construction d'un complexe commercial constitué de 02 Component A: Local En attente 2020-11- 2020-11- 2021-01- 2021-05- blocs de 10 boutiques, d'un IDA / 57180 A posteriori Individuel Open 5,514.00 0.00 2020-09-19 development support d'exécution 07 28 02 02 bloc latrine à 04 cabines et 01 unité de traitement des déchets au centre Ville de Ntui, dans la Commune de Ntui 308/C/SC/CE/MBANKOMO/2 020 / Sélection d'un CI pour le suivi contrôle des travaux de construction d’un Bloc Maternel équipé de 100 Component A: Local En attente 2020-10- 2020-11- 2020-12- 2021-04- IDA / 57180 A posteriori Individuel Open 2,818.00 0.00 2020-08-24 chaisettes, 10 tables et de 03 development support d'exécution 12 02 07 06 bureaux d’un bloc latrine à trois compartiments à l'Ecole Maternelle de Nomayos, dans la commune de Mbankomo 326/C/SC/CE/OBALA/2020 / Sélection d'un CI pour le suivi contrôle des travaux de construction d’un bloc de deux salles de Classes Component A: Local En attente 2020-10- 2020-11- 2020-12- 2021-04- IDA / 57180 A posteriori Individuel Open 1,677.00 0.00 2020-08-24 équipées et d’un bloc development support d'exécution 12 02 07 06 latrines à (04) compartiments à l’Ecole Publique de Nkol Ekui, dans la Commune d’Obala, Région du Centre 328/C/SC/CE/OBALA/2020 / Sélection d'un CI pour le suivi contrôle des travaux de construction de quatre (04) puits positif équipé de PMH Component A: Local En attente 2020-10- 2020-11- 2020-12- 2021-04- IDA / 57180 A posteriori Individuel Open 1,694.00 0.00 2020-08-24 dans la localité de development support d'exécution 12 02 07 06 Ntuiessong, Nkol-Obili, Nkometou et Ngok-Ossan (entre Nto et Nkolfep) dans la commune d'Obala Page 14