FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN I. GENERAL 1. Project information: Country: Nigeria Borrower: Federal Government of Nigeria Project Name: Nigeria Erosion and Watershed Management Project-(NEWMAP) Loan / Credit No.: PIA: National NEWMAP Coordinating Unit. 2. Bank’s approval Date of the procurement Plan: March, 2012 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments (US$ equivalent) 1. ICB and LIB (Goods and services other > 750,000.00 ALL than consultancy services) 2. NCB 50,000.00 ≤ 750,000.00 NONE 3. ICB (Works) > 5,000,000.00 ALL 4. NCB (Works) 200,000 ≤ 5,000,000.00 NONE 5 Shopping-Goods < 50,000.00 NONE 6 Shopping-Works < 100,000.00 NONE 7 Training, Workshops, Study Tours All Values Based on Annual Work Plans & Budgets 2. Prequalification. Bidders for major works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Shall apply 4. Reference to (if any) Project Operational/Procurement Manual: shall apply 5. Any Other Special Procurement Arrangements: Not Applicable 6. Procurement Packages with Methods and Time Schedule Procurement of Goods : 1 2 3 4 5 6 7 8 9 Re Contract Estimate Procure Prequalificati Domestic Review Expected Comments f. (Description) d ment on (yes/no) Preference by Bank Bid- No Cost Method (yes/no) (Prior / Post) Opening . US$’000 Date 1 Computer Systems, Office, software and Accessories Computers and 684 NCB NO NO POST June 7, Procureme Accessories, software (see 2012 nt by each remark of the 7 packages, Photo- Colum) SPMU & copiers, UPS, Printers FPMU is and Scanners, Fax estimated Machines, Laptops, at ( USD Stationeries, 85.5) Consumables, LAN, Telephony,Lasers Software Licenses and Application,. 2 Office Furniture’s and Equipment Computer workstations 680 NCB NO NO PRIOR June 7, Procureme and Office Furniture (see 2012 nt by each remark of the 7 Water Dispenser, Colum) SPMU & Refrigerators, FPMU is Airconditioners, estimated Tables, Chairs, etc at ( USD 85) 3 Operational Vehicles 4-WD Vehicles (32 1440 NCB NO NO PRIOR June 7, Procureme units) (see 2012 nt by each remark of the 7 Colum) SPMU & FPMU is estimated at (180USD 4 Generator 40KVA Sound-Proof 240 NS NO NO PRIOR June 7, Procureme Electricity Generating (see 2012 nt by each Set-Purchase and remark of the 7 Installation (8 units) Colum) SPMU & FPMU is estimated at (30 USD 5 Training Communication, Presentation, Media Equipment and materials, etc Multimedia 364 NS NO NO PRIOR June 7, Procureme Projectors, (see 2012 nt by each remark of the 7 Flip Chart Stands, Colum) SPMU & Boards, GSM FPMU is TV/Video/Radio/Reco estimated rders and Digital at (45.5 Cameras, Internet USD Facilities, GPS, Raincoats and Enumerators bags, Program information kit, Program posters Community oriented Implementation manual 6 Field Equipment Purchase of Weather 2,400 NCB NO NO PRIOR June 7, Procureme Monitoring Stations, (see 2012 nt by each GPSs, Laser Measures, remark of the 7 Measuring Wheels, 1- Colum) SPMU & 2km Range Radios and FPMU is other survey equipment estimated and tools to gauge and at (300 trace watershed, USD terrestrial carbon and water flow 7 Geographic Information System Purchase of GIS 3520 NCB NO NO PRIOR June 7, Procureme data/Satellite Imagery,, (see 2012 nt by each Overhead photography, remark of the 7 etc Colum) SPMU & FPMU is estimated at (440 USD Sub Total 9,328.00 Procurement of Civil Works 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procure Prequalificati Domestic Review Expected Comments No. (Description) Cost ment on (yes/no) Preference by Bank Bid- US$’000 Method (yes/no) (Prior / Post) Opening Date 1 Civil works, and 252,000.00 ICB NO YES PRIOR October Procureme maintenance of flood 12, 2012 nt by ICB and gully erosion sites for all 7 SPMU 2 Office accommodation 240,000 NS NO NO PRIOR July, 2012 for 7 SPMU & FPCU SUB TOTAL 252,240.00 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1 Consultant Services-QCBS- All Values ALL International 2 Consultant Services-QCBS-National > 200,000.00 ALL 3 Consultant Services-CQS < 200,000.00 NONE 4 Consultant Services-lC > 50,000.00 ALL 5 Consultant Services-lC < 50,000.00 ToR only but ALL 6 Consultant Services- Single Source All Values ALL Selection Note: All ToRs to be prior review QCBS = Quality and Cost Based Selection SSS = Single Source Selection CQ = Consultant Qualification LCS = Least Cost Selection IC = Individual Consultant 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review Expected Comments No. Method by Bank Proposals Cost. (Prior / Submission US$’000 Post) Date 1 Consultancy for the detailed 3,395.24 QCBS Prior On-going Consultancy for Engineering designs and data (see remark Priority sites collation for 35 sites Colum by each of the 7 SPMU (see each State Proc. Plan). 2 Consultancy for the supervision 6,824.47 QCBS Prior September Consultancy for of Civil Works for 35sites (see remark 2012 Priority sites Colum by each of the 7 SPMU (see each State Proc. Plan). 3 Consultancy for the RAP study 875.00 IC Prior On-going Consultancy for for 35 sites (see remark Priority sites Colum by each of the 7 SPMU is estimated at (25 USD. 4 Consultancy for the ESIA study 875.00 IC Prior On-going Consultancy for for 35 sites (see remark Priority sites Colum by each of the 7 SPMU is estimated at (25 USD. 5 Consultancy for the Socio- 875.00 IC Prior On-going Consultancy for Economic study 35 sites (see remark Priority sites Colum by each of the 7 SPMU is estimated at 25 USD per site 6 Consultancy for GIS data 875.00 IC Prior On-going Consultancy for collection and Mapping for 35 (see remark Priority sites sites Colum by each of the 7 SPMU is estimated at 75 USD per site 7 Consultancy for the detailed 3500.00 QCBS Prior August, 2012 Consultancy for Engineering designs and data (see remark 5 additional collation for additional 35sites Colum sites by each of the 7 SPMU is estimated at 100 USD per site 8 Consultancy for the detailed 2625.00 QCBS Prior June, 2013 Consultancy for ESIA, RAP and Socio (see remark 5 additional Economic Studies for Colum sites by each of additional 35 sites the 7 SPMU is estimated at 75 USD per site 9 Environmental engineering and 800 QCBS 9 design consultancy, 10 Procurement consultancy for 800 QCBS 10 June 1012 support of FPMU and SPMUs 11 M&E consultancy 400 QCBS 11 12 Consultancy for the support of 800.00 QCBS 12 Sept., 2012 Consultancy by SPMUs and FPMU (see remark each of the 7 Colum SPMU & FPMU is estimated at (100 USD 13 Consultancy for Legal Services 800.00 IC 13 Sept., 2012 Consultancy by each of the 7 (see remark SPMU & Colum FPMU is estimated at (100 USD 14 Consultancy for valuation and 3500.00 14 Sept., 2012 Consultancy by resettlement implementation (see remark each of the 7 Colum SPMU, to cover all sites is estimated at (500 USD per SPMU 15 Consultancy for Training and 1600.00 QCBS Prior August, 2012 Consultancy by Capacity Building (see remark each of the 7 Colum SPMU & FPMU is estimated at (200 USD 16 Consultancy-External Auditor 400.00 QCBS Prior March, 2013 Consultancy by (see remark FPMU to cover Colum each SPMU 17 Consultancy on Community 800.00 IC Prior Sept., 2012 Consultancy by consultation, Public Education (see remark each of the 7 and Erosion Management and Colum SPMU & awareness Techniques, FPMU is estimated at (100 USD Sub Total 27,744.71 IV. Implementing Agency Capacity Building Activities with Time Schedule 1. In this section the agreed Capacity Building Activities are listed with time schedule below; No. Expected outcome / Estimated Estimated Start Date Com Activity Description Cost US$ Duration m ‘000 e n t s A. TRAINING 1 3. Nos. Training courses for August 2012 Capacity Building PMU staff; Project activities for each Coordinator, Procurement of the 7 SPMU & Specialist, and financial mgt, FPMU is estimated at (90 USD M&E, Environmental specialists, Communication, Livelihood, Engineering 720.00(see 2WKS, specialists remark Colum each 2 Training of project finance August 2012 Capacity Building staff(FMS, APA, FO, IA) on 160.00(see activities for each flexible accounting software remark Colum 1wk of the 7 SPMU & FPMU is estimated at (20 USD B. WORKSHOP 3 September Capacity Building 2012 activities for each of the 7 SPMU & Capacity Building for key 240.00(see FPMU is estimated stakeholders remark Colum 3 days at (30 USD 4 September, Capacity Building 2012 activities for each of the 7 SPMU & 160(see FPMU is estimated ICT Training remark Colum 1 wk at (20 USD 5 Various Capacity Building activities for each Professional of the 7 SPMU & Seminars/Workshops/ 120.00(see FPMU is estimated subscriptions remark Colum Various at (15 USD 6 September Capacity Building 2 Days Sensitization/ activities for each 2012 Workshop for State and Local of the 7 SPMU & Govt. Officials on erosion and 200.00(see FPMU is estimated watershed management remark Colum 2 days at (25 USD 7 October Capacity Building 3 Day workshop for Line activities for each 2012 Ministries and MDAs on of the 7 SPMU & addressing and prevention of 240.00(see FPMU is estimated Land Degradation remark Colum 3- days at (30 USD 8 3 Day workshop for local October Capacity Building Govt. Focal Persons and 2012 activities for each Community Erosion watch of the 7 SPMU & Dogs on prevention of erosion FPMU is estimated 240.00(see at (30 USD and land degradation remark Colum 3-days 9 2013 Capacity Building activities for each Capacity Building on use of of the 7 SPMU & Metrological and GPS 200.00(see FPMU is estimated Equipment remark Colum 5-days at (25 USD C. STUDY/TOURS 10 240.00(see Various October Capacity Building remark Colum times 2012 activities for each Baseline survey/ Community of the 7 SPMU & needs assessment and capacity FPMU is estimated building at (30 USD 11 240.00(see Various August, Capacity Building remark Colum times 2012 activities for each Sensitization/ Awareness of the 7 SPMU & creation of NEWMAP in the FPMU is estimated 18 LGA at (30 USD 12 160.00(see WB and Capacity Building remark Colum FAO to activities for each Participation in watershed of the 7 SPMU & determine studies organized by the world FPMU is estimated bank and FAO at (20 USD 13 240.00(see Various December, Capacity Building remark Colum 2012 activities for each of the 7 SPMU & Launching of ESIA and RAP FPMU is estimated for priority sites at (30 USD 14 160.00(see Various Oct., 2012 Capacity Building remark Colum activities for each of the 7 SPMU & FPMU is estimated livelihood studies at (20 USD 15 160.00(see Various World Bank Capacity Building Participation in remark Colum activities for each determined Biodiversity/forest carbon of the 7 SPMU & study organized by the World FPMU is estimated Bank at (20 USD 16 120.00(see 4-days each July 2012 Capacity Building remark Colum activities for each Recognizance survey of of the 7 SPMU & Project sites (Erosion and FPMU is estimated Watershed) at (15 USD 17 2480.00(see 4-wks February., Capacity Building remark Colum 2013 activities for each of the 7 SPMU & International Training and FPMU is estimated study tours at (310 USD 18 Various World Bank Capacity Building determined activities for each Attendance of World Bank of the 7 SPMU & Organized training, meetings, 800.00(see FPMU is estimated seminar and workshops remark Colum at (100 USD Sub Total 6,880.00 PROCUREMENT Nigeria : Nigeria Erosion and Watershed Management Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2017-06-12 2020-03-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P124905 GPN Date: Project Name: Nigeria Erosion and Watershed Management Project Loan / Credit No: IDA / 51050 Executing Agency(ies): ANAMBRA SPMU WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ANS/NEWMAP/WKS/ICB/17- 03 / Construction of Erosion Component 1: Erosion and Pending Open - Single Stage - One Control at St. Thomas IDA / 51050 Watershed Management Prior Request for Bids 2,500,000.00 0.00 Implementati 2016-12-05 2017-02-14 2017-04-17 2017-05-17 2017-06-28 2019-06-18 International Envelope Aquinas/Neros Plaza, Ifite Infrastructure Investments on Awka ANS/NEWMAP/WKS/NS/17- 02 / Renovation of Project Component 1: Erosion and Under Financial Management Office Request for Single Stage - One IDA / 51050 Watershed Management Post Open - National 30,000.00 0.00 Implementati 2017-05-29 2017-07-10 2017-08-09 Block - Flood Control and Quotations Envelope Infrastructure Investments on Construction and of Overhead Tank ANS/NEWMAP/WKS/NCB/17- Component 1: Erosion and 01 / Re-tendering of Erosion Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids Open - National 10,000,000.00 5,668,211.20 Signed 2017-06-23 2018-06-13 2017-07-31 2018-06-18 2017-09-15 2018-07-31 2017-10-31 2018-09-10 2017-12-05 2018-10-12 2019-11-25 Control Works at Umudunu, Envelope Infrastructure Investments Abagana ANS/NEWMAP/WKS/ICB/16- 03 / Construction of Erosion Component 1: Erosion and Control Works at 4 Sites - Open - Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids 20,000,000.00 5,282,467.85 Signed 2017-10-13 2017-10-18 2017-11-29 2016-10-28 2017-12-29 2018-01-12 2018-02-02 2018-02-27 2018-08-01 Ugamuma-Obosi, Ndiagu- International Envelope Infrastructure Investments Ikenga, Ogidi, Enugwu-Ukwu and Abidi-Umuoji (Phase 1) ANS/NEWMAP/WKS/ICB/17- 01 / Construction of Erosion Component 1: Erosion and Under Control Works at 4 Gully Open - Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids 42,500,000.00 0.00 Implementati 2016-12-23 2017-02-07 2017-04-17 2017-05-02 2017-05-17 2018-08-30 2017-06-28 2019-03-14 Sites - Nnewi-Ichi, Ojoto, Ire- International Envelope Infrastructure Investments on Obosi and Nkpor-Flyover (Phase 2) ANS/NEWMAP/WKS/ICB/17- 02 / Construction of Erosion Component 1: Erosion and Open - Single Stage - One Control at Ire-Obosi and IDA / 51050 Watershed Management Prior Request for Bids 15,823,000.00 0.00 Canceled 2016-06-19 2016-09-02 2016-10-28 2017-05-02 2017-02-02 2017-03-22 2019-03-12 International Envelope Nkpor Flyover, Onitsha - Infrastructure Investments Phase 2 (Lot 2) ANS/NEWMAP/WKS/ICB/16- 02 / Construction of Erosion Component 1: Erosion and Open - Single Stage - One Control at Abidi, Umuoji IDA / 51050 Watershed Management Prior Request for Bids 63,291,110.00 0.00 Canceled 2016-06-02 2016-09-02 2016-10-28 2016-10-28 2017-02-02 2017-04-05 2019-03-26 International Envelope and Enugu-Ukwu Erosion Infrastructure Investments Site, Enugu-Ukwu ANS/NEWMAP/WKS/ICB/16- Component 1: Erosion and 01 / Construction of Erosion Open - Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids 63,291,110.00 0.00 Canceled 2016-06-20 2016-09-02 2016-10-28 2016-10-28 2017-02-08 2017-03-22 2019-03-12 Control at Ugamuma-Obosi International Envelope Infrastructure Investments and Ndiagu-Ikenga, Ogidi Page 1 ANS/NEWMAP/WKS/NCB/18- 01 / Prevention Works - Desliting and clearing of refuse from drainages, Component 1: Erosion and construction & rehabilitation Single Stage - One IDA / 51050 Watershed Management Post Request for Bids Open - National 1,700,000.00 0.00 Canceled 2018-03-28 2018-04-11 2018-05-23 2018-06-22 2018-08-03 2019-01-30 of drainage and Channels Envelope Infrastructure Investments around flood prone areas lot 1:Awka, Lot 2: Idemili, Lot 3-Onitsha, Lot 4- Anambra East/west and Lot 5-Nnewi. ANS/NEWMAP/WKS/ICB/18- Component 1: Erosion and 01 / Engagement of Open - Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids 65,200,000.00 0.00 Canceled 2018-10-31 2018-11-05 2018-12-17 2019-01-16 2019-02-20 2019-08-19 Contractor for Agulu-Nanka- International Envelope Infrastructure Investments Oko Gully Erosion Works ANS/NEWMAP/WKS/ICB/16- 03B / Construction of Component 1: Erosion and Open - Single Stage - One Erosion Control Works at IDA / 51050 Watershed Management Prior Request for Bids 10,000,000.00 5,723,753.81 Signed 2016-01-12 2016-01-17 2016-02-28 2016-10-28 2016-03-29 2018-06-12 2016-05-03 2018-05-14 2016-10-30 International Envelope Abidi, Umuoji and Enugu- Infrastructure Investments Ukwu - Phase 1, Lot 1 ANS/NEWMAP/WKS/ICB/17- 01B / Construction of Component 1: Erosion and Erosion Control Works at 4 Open - Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids 42,500,000.00 22,079,183.00 Signed 2016-12-23 2016-12-28 2017-02-08 2017-05-02 2017-03-10 2018-04-25 2017-04-14 2018-05-23 2017-10-11 Gully Sites: Nnewi-Ichi, International Envelope Infrastructure Investments Ojoto, Ire-Obosi and Nkpor- Flyover (Phase 2) ANS/NEWMAP/WKS/NCB/18- 03 / Construction works for Component 1: Erosion and Single Stage - One Emergency Palliative at IDA / 51050 Watershed Management Post Request for Bids Limited 2,300,000.00 0.00 Canceled 2018-06-22 2018-08-06 2018-06-27 2018-08-08 2018-09-07 2018-10-12 2019-04-10 Envelope High Court/Ekwueme Square Infrastructure Investments Erosion Site, Awka ANS/NEWMAP/WKS/LIB/18- 01 / Construction works for Component 1: Erosion and Single Stage - One Emergency Palliative at IDA / 51050 Watershed Management Prior Request for Bids Limited 2,300,000.00 2,138,872.47 Signed 2018-08-10 2018-08-29 2018-08-15 2018-09-05 2018-09-26 2018-10-04 2018-10-26 2018-10-08 2018-11-30 2018-10-12 2019-05-29 Envelope High Court/Ekwueme Square Infrastructure Investments Erosion Site, Awka ANS/NEWMAP/WKS/NCB/14- Component 1: Erosion and 02 / Construction of Erosion Single Stage - One IDA / 51050 Watershed Management Prior Request for Bids Open - National 3,800,000.00 0.00 Canceled 2013-11-13 2014-01-27 2014-02-24 2014-05-01 2014-11-27 2015-11-22 Control at Umudunu, Envelope Infrastructure Investments Abagana ANS/NEWMAP/WKS/NCB/14- Component 1: Erosion and Single Stage - One 03 / Construction of Erosion IDA / 51050 Watershed Management Prior Request for Bids Open - National 2,500,000.00 0.00 Canceled 2013-11-13 2014-01-27 2014-02-24 2014-05-01 2014-11-27 2015-11-22 Envelope Control at Amachalla, Awka Infrastructure Investments ANS/NEWMAP/WKS/NCB/14- Component 1: Erosion and Single Stage - One 01 / Construction of Erosion IDA / 51050 Watershed Management Prior Request for Bids Open - National 1,700,000.00 0.00 Canceled 2013-10-25 2013-11-13 2014-01-27 2014-02-24 2015-04-30 2016-04-24 Envelope Control at Omagba, Onitsha Infrastructure Investments ANS/NEWMAP/WKS/NS/19- 01 / Procurement of Contractor for the Component 1: Erosion and Under Single Stage - One construction of slope IDA / 51050 Watershed Management Post Request for Bids Open - National 350,000.00 0.00 Implementati 2019-04-23 2020-03-12 2019-05-07 2020-03-12 2019-06-18 2019-07-18 2019-08-22 2020-08-16 Envelope stabilization, perimeter Infrastructure Investments on fencing works at Omagba gully erosion site ANS/NEWMAP/WKS/NCB/19- 01 / Procurement of contractor for the Component 1: Erosion and Pending Single Stage - One construction of gully erosion IDA / 51050 Watershed Management Post Request for Bids Open - National 3,000,000.00 0.00 Implementati 2019-07-17 2019-07-31 2019-09-11 2019-10-21 2019-12-09 2020-12-03 Envelope works at High Infrastructure Investments on Court/Ekwueme Square erosion site, Awka Page 2 ANS/NEWMAP/WKS/NCB/201 9-02 / Procurement of Component 1: Erosion and Pending Single Stage - One Contractor for Erosion IDA / 51050 Watershed Management Post Request for Bids Open - National 5,000,000.00 0.00 Implementati 2020-01-31 2020-02-05 2020-03-18 2020-04-17 2020-05-22 2021-06-18 Envelope Control Works at Umuagu- Infrastructure Investments on Ufuma ANS/NEWMAP/CW/NS/2020/0 1 / Procurement and Component 1: Erosion and Pending installation of solar powered Request for Single Stage - One IDA / 51050 Watershed Management Post Limited 100,000.00 0.00 Implementati 2020-02-15 2020-03-21 2020-04-30 borehores and its facilities Quotations Envelope Infrastructure Investments on for some Communities in Anambra State. GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ANS/NEWMAP/GDS/NS/16/11 / Procurement of Personal Protective Equipments: Rain Under Component 4: Project Request for Single Stage - One Coat, Rain Boot, Tip Toe IDA / 51050 Post Open - National 20,000.00 5,341.80 Implementati 2016-12-08 2016-12-21 2017-01-20 Management Quotations Envelope Boat, Hig Visibility VEST, on Helmet and Gloves for SPMU/Site Visit Use ANS/NEWMAP/GDS/NS/17/01 / Procurement of three Number Work Stations, Five Number Andriod Tablets, Under Component 4: Project Request for Single Stage - One Four Number HD Cameras, IDA / 51050 Post Open - National 70,000.00 0.00 Implementati 2017-01-31 2017-03-21 2017-04-20 Management Quotations Envelope Six Number I7 laptops, Two on Number Coloured Printers and Networking of Office Equipment ANS/NEWMAP/GDS/NS/17/04 Pending Component 4: Project Request for Single Stage - One / Procurement of Two 4x4 IDA / 51050 Post Open - National 122,000.00 0.00 Implementati 2017-02-07 2017-03-28 2017-04-27 Management Quotations Envelope Pickups for SPMU on ANS/NEWMAP/GDS/NS/17/03 / Procurement of 8 Nos. Under Component 4: Project Request for Single Stage - One High Efficiency Hand Held IDA / 51050 Post Open - National 5,000.00 0.00 Implementati 2017-06-12 2017-07-24 2017-08-23 Management Quotations Envelope GPS for Anambra NEWMAP on SPMU ANS/NEWMAP/GDS/NS/2018/ 01 / Procurement of office equipment, appliances and Component 4: Project Request for Single Stage - One other items for equiping and IDA / 51050 Post Open - National 50,000.00 40,553.30 Completed 2018-03-13 2018-05-08 2018-05-03 2018-06-07 2018-06-01 Management Quotations Envelope setting up of Anambra NEWMAP new office accommodation. ANS/NEWMAP/GO/NS/2019/0 2 / Procurement of Personal Protective Equipment (PPEs) Component 4: Project Request for Single Stage - One and Environmental IDA / 51050 Post Limited 20,000.00 21,950.96 Completed 2019-04-22 2019-03-29 2019-06-17 2019-04-25 2019-07-17 2019-05-22 Management Quotations Envelope Monitoring gadgets for Anambra State Project Management Unit ANS/NEWMAP/GDS/NS/2019/ 02 / Procurement of Information & Educational Component 4: Project Request for Single Stage - One IDA / 51050 Post Limited 60,000.00 58,058.47 Signed 2019-06-07 2019-03-27 2019-08-02 2019-04-18 2019-09-11 materials, Compendum and Management Quotations Envelope Brochures for NEWMAP Success Stories Page 3 ANS/NEWMAP/GDS/NS/2019/ 03 / Procurement of 4 Nos. large standard-guage Pending Component 4: Project Request for Single Stage - One BillBoards with a concrete IDA / 51050 Post Limited 20,000.00 0.00 Implementati 2019-04-11 2019-06-06 2019-07-06 Management Quotations Envelope Base for Before and after on picture display at Anambra NEWMAP Sites. ANS/NEWMAP/GDS/NS/2019/ 04 / Procurement of a vendor for the Supply of Under Component 4: Project Request for Single Stage - One Office Stationaries and office IDA / 51050 Post Limited 50,000.00 0.00 Implementati 2019-04-09 2019-06-11 2019-12-08 Management Quotations Envelope consumables for a Period of on Six Months Renewable ( Frame Work Agreement) ANS/NEWMAP/GDS/NS/2019/ Pending 05 / Procurement of ICT Component 4: Project Request for Single Stage - One IDA / 51050 Post Limited 40,000.00 0.00 Implementati 2019-04-09 2019-06-04 2019-07-04 equipment for the State Management Quotations Envelope on Project Management Unit ANS/NEWMAP/GO/NS/2019/0 Component 4: Project Request for Single Stage - One 1 / Procurement of 2 Nos IDA / 51050 Post Limited 125,000.00 137,646.00 Completed 2019-04-22 2019-03-28 2019-06-24 2019-05-07 2019-08-03 2019-06-03 Management Quotations Envelope 4x4 Pickup Vehicles. ANS/NEWMAP/GDS/NS/2020/ 01 / Procurement of 13 Nos. large standard-guage Pending Component 4: Project Request for Single Stage - One BillBoards with a concrete IDA / 51050 Post Limited 60,000.00 0.00 Implementati 2020-10-12 2020-12-07 2021-02-05 Management Quotations Envelope Base for Before and after on picture display at Anambra NEWMAP Sites. ANS/NEWMAP/GDS/NS/2020/ 02 / Procurement and Component 1: Erosion and Pending installation of Solar power Request for Single Stage - One IDA / 51050 Watershed Management Post Limited 100,000.00 0.00 Implementati 2020-02-15 2020-03-21 2020-04-30 facilities for some schools or Quotations Envelope Infrastructure Investments on health centers in Anambra State. ANS/NEWMAP/GDS/NS/2020/ 03 / Procurement of energy Pending Component 4: Project Request for Single Stage - One saving Bulbs to be IDA / 51050 Post Limited 50,000.00 0.00 Implementati 2020-02-09 2020-04-05 2020-05-05 Management Quotations Envelope destributed to selected on communities. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ANS/NEWMAP/GDS/NS/17/04/ 01C-RFQ / Procurement & Component 1: Erosion and Under Request for Single Stage - One Installation of Advance IDA / 51050 Watershed Management Post Open - National 20,000.00 0.00 Implementati 2017-06-02 2017-07-07 2017-08-06 Quotations Envelope ArcGIS Software for the Infrastructure Investments on SPMU GIS Unit ANS/NEWMAP/GDS/NCB/17/0 5 / Non-Consultancy Services for Resuscitation of MoEnv Component 1: Erosion and Pending and Min. of Agric Nurseries Request for Single Stage - One IDA / 51050 Watershed Management Post Open - National 500,000.00 0.00 Implementati 2017-03-01 2017-05-31 2017-06-30 for the Producution of Trees Quotations Envelope Infrastructure Investments on and Seedlings for Bio- remediation and Gully Prevention Projects Page 4 ANS/NEWMAP/GDS/SS/17/08 / Renewal of Annual Pending Component 4: Project Subscription and upgrading IDA / 51050 Post Direct Selection Direct 7,000.00 0.00 Implementati 2017-01-31 2017-01-31 2017-04-04 2018-04-04 Management of Interenet Service for on Anambra NEWMAP NG-ANAMBRA SPMU- 17277-NC-DIR / Renewal of Pending Component 4: Project Microsoft Windows, Microsoft IDA / 51050 Post Direct Selection Direct 19,000.00 0.00 Implementati 2017-01-31 2017-02-14 2017-03-21 2018-03-16 Management Office and Antivirus Licenses on for One Year ANS/NEWMAP/GDS/SS/17/10 Pending / Renewal of Comprehensive Component 4: Project IDA / 51050 Post Direct Selection Direct 16,000.00 0.00 Implementati 2017-07-03 2017-07-17 2017-08-21 2018-08-16 Fleet Insurance Cover for Management on Project Vehicles NG-ANAMBRA SPMU- Pending 17269-NC-RFQ / Provision of Component 4: Project Request for Single Stage - One IDA / 51050 Post Open - National 15,000.00 0.00 Implementati 2017-07-04 2017-08-29 2018-08-24 Insurance Cover for Office Management Quotations Envelope on Equipment and Furniture ANS/NEWMAP/GDS/NC/2018/ 01 / Renewal of Annual Component 4: Project IDA / 51050 Post Direct Selection Direct 10,000.00 15,146.69 Completed 2018-08-23 2018-02-08 2018-08-28 2018-02-09 2018-09-11 2018-02-26 2019-09-06 2018-03-07 Subscription of Interenet Management Service ANS/NEWMAP/GDS/NC/2018/ 02 / Renewal of Microsoft Pending Component 4: Project Windows, Microsoft Office IDA / 51050 Post Direct Selection Direct 19,000.00 0.00 Implementati 2018-03-31 2018-04-05 2018-05-10 2018-11-06 Management and Antivirus Licenses for on One Year ANS/NEWMAP/GDS/NC/2018/ 05 / Procurement of Service provider for the Refurbishing and re-setting of Office Pending Component 4: Project Request for Single Stage - One Chairs, logistics for IDA / 51050 Post Open - National 10,000.00 0.00 Implementati 2018-03-13 2018-05-08 2018-11-04 Management Quotations Envelope relocation of office on equipment, appliances/gadgets to new office (generator- installations). ANS/NEWMAP/GDS/NC/2018/ 06 / Engagement of Service provider for Communication & Media Activities-Radio Component 4: Project Request for Single Stage - One IDA / 51050 Post Open - National 60,000.00 0.00 Canceled 2018-05-29 2018-07-24 2018-12-31 talk shows, News reports, Management Quotations Envelope Publication of IEC Materials & Brochures, Website redesign ANS/NEWMAP/GDS/NC/2018/ 07 / Engagement of service provider for the Production Component 4: Project Request for Single Stage - One and Airing of Documentaries IDA / 51050 Post Open - National 40,000.00 0.00 Canceled 2018-05-29 2018-07-24 2019-01-20 Management Quotations Envelope on NEWMAP success stories & Documentry on erosion control & prevention ANS/NEWMAP/GDS/NC/2019/ 01 / Renewal of yearly Pending subscription and Component 4: Project IDA / 51050 Post Direct Selection Direct 10,000.00 0.00 Implementati 2019-08-23 2019-09-06 2019-10-11 2020-10-05 maintenance of internet Management on service State Project Management Unit Page 5 ANS/NEWMAP/GDS/NC/2019/ 02 / Procurement of service Pending provider to develop and Component 4: Project Request for Single Stage - One IDA / 51050 Post Limited 40,000.00 0.00 Implementati 2019-06-07 2019-08-02 2020-07-27 maintenance Anambra Management Quotations Envelope on NEWMAP Website for a period one year ANS/NEWMAP/GDS/NC/2020/ 01 / Procurement of service Pending provider for the Production Component 4: Project Request for Single Stage - One IDA / 51050 Post Limited 90,000.00 0.00 Implementati 2020-03-30 2020-05-25 2020-11-21 and Broadcast of TV, Radio Management Quotations Envelope on Programmes/Jingles & Print Media for a period One year CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ANS/NEWMAP/CS/CQS2014/0 1 / Consultancy Services for Component 1: Erosion and Consultant GIS Data Collection and Pending IDA / 51050 Watershed Management Post Qualification Open - National 199,000.00 0.00 2015-06-04 2015-10-22 2016-04-21 2016-04-25 2016-05-30 2016-07-29 Mapping of Flood and Gully Implementation Infrastructure Investments Selection Erosion Sites in Anambra State ANS/NEWMAP/CS/QCBS/201 4/02 / Engagement of Component 1: Erosion and Quality And Cost- Open - Pending Consultant for Engineering IDA / 51050 Watershed Management Prior 4,000,000.00 0.00 2013-09-25 2014-01-27 2015-02-06 2015-04-30 2015-05-18 2015-05-28 2015-07-03 2018-06-17 Based Selection International Implementation Design and Supervision of Infrastructure Investments Gully Erosion Sites ANS/NWEMAP/CS/CQS/2014/ Component 1: Erosion and Consultant 03 / Engagement of Pending IDA / 51050 Watershed Management Post Qualification Open - National 240,000.00 0.00 2014-05-21 2014-12-08 2015-03-26 2015-04-09 2015-05-14 2017-05-03 Consultant for Focal NGO Implementation Infrastructure Investments Selection for AnamNEWMAP ANS/NEWMAP/CS/QCBS/201 Component 2: Erosion and 5/01 / Engagement of Watershed Management Quality And Cost- Open - Consultant for Onitsha IDA / 51050 Prior 1,000,000.00 0.00 Under Review 2015-09-28 2015-11-05 2016-10-27 2017-03-06 2017-03-06 2017-03-20 2017-05-15 2018-02-19 Institutions and Information Based Selection International Urban Stormwater Services Management Master ANS/NEWMAP/CS/CQS/2015/ 02 / Consultancy Services for Environmental & Social Consultant Management Plan (ESMP) Component 4: Project Pending IDA / 51050 Post Qualification Open - National 130,000.00 0.00 2015-09-14 2015-12-14 2016-03-11 2016-03-22 2016-04-26 2016-06-25 and Abbreviated Management Implementation Selection Resettlement Action Plan (ARAP) for Abidi-Umuoji and Enugu-Ukwu Erosion Sites ANS/NEWMAP/CS/CQS/2015/ 02/A / Consultancy Services for Environmental & Social Management Plan (ESMP) Consultant Component 4: Project Pending and Abbreviated IDA / 51050 Post Qualification Open - National 130,000.00 0.00 2015-09-14 2016-01-04 2016-03-17 2016-03-24 2016-04-21 2016-06-20 Management Implementation Resettlement Action Plan Selection (ARAP) for Ugamuma-Obosi and Ndiagu-Ikenga, Ogidi Erosion Sites Page 6 ANS/NEWMAP/CS/CQS/2016/ 07 / Consultancy Services to Develop and Implement Risk Assessment, Flood Mapping Component 1: Erosion and and Risk Management Plans Quality And Cost- Open - Under IDA / 51050 Watershed Management Prior 800,000.00 0.00 2016-12-13 2017-03-08 2017-05-10 2017-05-30 2017-06-20 2017-08-22 2017-10-09 2018-10-04 in Anambra East, Anambra Based Selection International Implementation Infrastructure Investments West, Ayamelum, Onitsha, Ogbaru, Awka/Igbariam, Oraukwu/Alor Catchment Areas ANS/NEWMAP/CS/CQS/2016/ 04 / Consultancy Services for the Design and Supervision Consultant Component 4: Project Pending of Household & Community IDA / 51050 Post Qualification Open - National 199,000.00 0.00 2016-01-27 2016-01-27 2016-03-30 2016-04-13 2016-05-11 2016-07-10 Management Implementation Rain Water Harvesting for Selection Communities in Anambra State ANS/NEWMAP/CS/CQS/2017/ 05 / Consultancy Services for Environmental & Social Consultant Management Plan (ESMP) Component 4: Project Pending IDA / 51050 Post Qualification Open - National 160,000.00 0.00 2017-01-30 2017-02-13 2017-04-24 2017-07-03 2017-08-14 2017-10-13 and Abbreviated Management Implementation Selection Resettlement Action Plan (ARAP) for Ire-Obosi and Nkpor-Flyover ANS/NEWMAP/CS/CQS/2017/ 06 / Consultancy Services for Environmental & Social Consultant Management Plan (ESMP) Component 4: Project Pending IDA / 51050 Post Qualification Open - National 160,000.00 0.00 2016-11-30 2017-01-30 2017-03-13 2017-04-24 2017-06-19 2017-08-18 and Abbreviated Management Implementation Selection Resettlement Action Plan (ARAP) for Nnewi-Ichi and Ojoto ANS/NEWMAP/CS/CQS/2017/ 10 / Engagement of Consultant Consultant to Prepare M&E Component 4: Project Under IDA / 51050 Post Qualification Open - National 200,000.00 0.00 2017-10-02 2019-06-24 2017-10-23 2020-01-06 2017-12-06 2018-01-05 2018-02-09 2018-08-08 Baseline Studies for Agulu- Management Implementation Selection Nanka-Oko Gully Erosion Site ANS/NEWMAP/CS/CQS/2017/ 11 / Engagement of Consultant Consultant to Prepare Component 4: Project Under IDA / 51050 Post Qualification Open - National 200,000.00 0.00 2017-09-29 2019-06-24 2017-10-20 2020-01-06 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Livelihood Needs Assessment Management Implementation Selection for Agulu-Nanka-Oko Gully Erosion Site ANS/NEWMAP/CS/CQS/2017/ 12 / Consultancy Services for Environmental & Social Management Plan (ESMP) Consultant Component 4: Project and Abbreviated IDA / 51050 Post Qualification Open - National 100,000.00 0.00 Canceled 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Management Resettlement Action Plan Selection (ARAP) for Omagba Downstream Gully Erosion Site ANS/NEWMAP/CS/QCBS/201 8/01 / Engagement of Component 1: Erosion and Consultant for Designs and Quality And Cost- Open - Under IDA / 51050 Watershed Management Prior 2,000,000.00 0.00 2018-02-12 2019-01-09 2018-03-05 2019-01-28 2018-04-18 2019-04-23 2018-05-16 2019-07-22 2018-06-15 2019-10-14 2018-07-20 2020-02-27 2018-08-24 2019-08-24 Supervision of selected Based Selection International Implementation Infrastructure Investments Gully Erosion Sites in Anambra State. ANS/NEWMAP/CS/CQS/2017/ 09 / Consultancy Services for Consultant Component 4: Project Pending a Full Resettlement Action IDA / 51050 Post Qualification Open - National 65,000.00 0.00 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08 Management Implementation Plan (RAP) for Agulu-Nanka- Selection Oko Gully Erosion Site Page 7 ANS/NEWMAP/CS/CQS/2017/ 08 / Consultancy Services for Consultant a Full Environmental & Component 4: Project Pending IDA / 51050 Post Qualification Open - National 70,000.00 0.00 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08 Social Impact Assessment Management Implementation Selection (ESIA) for Agulu-Nanka-Oko Gully Erosion Site INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ANS/NEWMAP/CS/CQS/2016/ 05 / Engagement of Consultant for Livelihood Component 1: Erosion and Individual Needs Assessment in 4 Under IDA / 51050 Watershed Management Post Consultant Open 99,000.00 0.00 2016-03-16 2016-03-30 2016-06-20 2016-04-13 2016-05-11 2016-07-10 Erosion Sites: Enugwu- Implementation Infrastructure Investments Selection Ukwu, Ikenga-Ogidi, Ugamuma-Obosi and Abidi- Umuoji ANS/NEWMAP/CS/IC/2016/08 / Engagement of Consultant to Conduct M&E Baseline Individual Component 4: Project Under Studies in 4 Erosion Sites: IDA / 51050 Post Consultant Open 99,000.00 0.00 2016-04-29 2016-05-13 2016-06-20 2016-05-27 2016-06-17 2016-08-16 Management Implementation Enugwu-Ukwu, Ikenga-Ogidi, Selection Ugamuma-Obosi and Abidi- Umuoji ANS/NEWMAP/CS/IC/2016/12 / Engagement of Consultant Individual to Conduct M&E Baseline Component 4: Project Under IDA / 51050 Post Consultant Open 99,000.00 0.00 2017-01-31 2017-02-14 2017-04-07 2017-02-28 2017-03-14 2017-05-13 Studies in 4 Erosion Sites - Management Implementation Selection Ire-Obosi, Nkpor-Flyover, Nnewi-Ichi and Ojoto ANS/NEWMAP/CS/IC/2017/03 / Engagement of Consultant for Livelihood Needs Component 1: Erosion and Individual Under Assessment in 4 Erosion IDA / 51050 Watershed Management Post Consultant Open 60,000.00 0.00 2017-01-10 2017-03-25 2017-04-07 2017-04-08 2017-04-29 2017-06-28 Implementation Sites: Ire-Obosi, Nkpor- Infrastructure Investments Selection Flyover, Nnewi-Ichi and Ojoto ANS/NEWMAP/CS/SSS/2017/1 1 / Extention of Current Component 1: Erosion and Focal NGO's contract for Pending IDA / 51050 Watershed Management Post Direct Selection Direct 190,000.00 0.00 2017-03-22 2017-06-21 2017-06-30 2019-06-20 Additional Period of 2-years Implementation Infrastructure Investments to Accommodate New Erosion Sites ANS/NEWMAP/CS/SSS/2017/1 2 / Extension of Current Design and Supervision Component 1: Erosion and Firms' Contract to conclude IDA / 51050 Watershed Management Prior Direct Selection Direct 2,000,000.00 0.00 Canceled 2017-03-22 2017-06-19 2017-06-30 2018-06-25 on-going Site Designs and Infrastructure Investments Accommodate Additional Gully Designs ANS/NEWMAP/CS/INDV/2017 /03 / Engagement of Individual Consultant to Prepare M&E Component 4: Project Pending IDA / 51050 Post Consultant Open 50,000.00 0.00 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11 Baseline Studies for Omagba Management Implementation Selection Downstream Gully Erosion Site Page 8 ANS/NEWMAP/CS/INDV/2017 /04 / Engagement of Component 1: Erosion and Individual Consultant to Prepare Pending IDA / 51050 Watershed Management Post Consultant Open 50,000.00 0.00 2017-10-06 2017-11-24 2017-12-15 2018-01-19 2018-07-18 Livelihood Needs Assessment Implementation Infrastructure Investments Selection for Omagba Downstream Gully Erosion Site ANS/NEWMAP/CS/INDV/17- 02 / Consultancy Services for Individual Resettlement Action Plan Component 4: Project Under IDA / 51050 Post Consultant Limited 30,000.00 0.00 2017-10-09 2017-10-14 2017-11-16 2017-11-04 2017-12-09 2018-06-07 (RAP) for Abagana Management Implementation Selection Redesigned Erosion Works - Addendum ANS/NEWMAP/CS/INDV/17- 09 / Supplementary Resettlement Action Plan Component 4: Project Pending (RAP) for New Heritage IDA / 51050 Post Direct Selection Direct 20,000.00 0.00 2017-10-27 2017-11-06 2018-01-10 2018-07-09 Management Implementation Omagba Phase 2 Erosion Site to address legacy issues. ANS/NEWMAP/CS/INDV/2017 /12 / Consultancy Services for Environmental & Social Management Plan (ESMP) Individual Component 4: Project Pending and Abbreviated IDA / 51050 Post Consultant Limited 25,000.00 0.00 2017-11-10 2017-11-15 2017-12-06 2018-01-10 2018-07-09 Management Implementation Resettlement Action Plan Selection (ARAP) for Omagba Downstream Gully Erosion Site ANS/NEWMAP/CS/IC/2018/01 / Engagement of Consultant to Conduct Needs Component 1: Erosion and Individual Assessment for Livelihood IDA / 51050 Watershed Management Post Consultant Open 20,000.00 0.00 Canceled 2018-02-22 2018-04-12 2018-05-03 2018-06-07 2018-12-04 Options in the Community Infrastructure Investments Selection for New Judiciary/ Federal High court gully Erosion site, Awka ANS/NEWMAP/CS/IC/2018/05 / Engagement of Individual Component 4: Project Under Procurement Consultant to IDA / 51050 Prior Consultant Limited 60,000.00 0.00 2018-11-09 2019-01-09 2018-11-14 2018-12-05 2019-01-09 2019-07-08 Management Implementation Assist SPMU in Procurement Selection Activities ANS/NEWMAP/CS/IC/2017/09 / Engagement of Individual Component 4: Project Procurement Consultant to IDA / 51050 Post Consultant Open 99,000.00 0.00 Canceled 2017-02-08 2017-04-05 2017-04-12 2017-05-10 2018-05-05 Management Assist SPMU in Procurement Selection Activities ANS/NEWMAP/CS/SSS/2019/0 1 / Renewal of Focal NGO Component 2: Erosion and 's contract for community Watershed Management Pending IDA / 51050 Post Direct Selection Direct 190,000.00 0.00 2019-06-03 2019-07-01 2019-09-04 2021-08-24 sensitization, & Awareness Institutions and Information Implementation creation to cover from July Services 2019 to June 2021 ANS/NEWMAP/CS/IC/2019/01 / Engagement of Consultancy Services for the preparation of Abbreviated Resettlement Individual Action Plan & Component 4: Project Pending IDA / 51050 Post Consultant Limited 40,000.00 0.00 2019-04-23 2019-05-07 2019-06-04 2019-07-09 2020-01-05 Environmental & Social Management Implementation Selection Magement Plan (ARAP/ESMP) for Federal High Court/ Ekwueme Square gully erosion site Page 9 ANS/NEWMAP/CS/CDS/2019/ Component 1: Erosion and 01 / Engagement of Interim IDA / 51050 Watershed Management Prior Direct Selection Direct 365,000.00 713,361.92 Signed 2019-03-29 2019-04-05 2019-04-08 2019-04-15 2019-05-06 2019-05-02 2019-11-02 Engineering Supervision for Infrastructure Investments Anambra NEWMAP ANS/NEWMAP/CS/IC/2019/03 / Consultancy Services for Component 1: Erosion and Individual Under M&E Baseline and Socio IDA / 51050 Watershed Management Post Consultant Limited 30,000.00 0.00 2020-01-10 2020-01-14 2020-01-15 2020-02-05 2020-03-11 2020-06-14 Implementation Economic Studies at Infrastructure Investments Selection Umuagu-Ufuma ANS/NEWMAP/CS/IC/2019/02 Component 1: Erosion and Individual / Consultancy Services for Under IDA / 51050 Watershed Management Post Consultant Limited 40,000.00 0.00 2020-01-10 2020-01-14 2020-01-17 2020-03-31 2020-05-18 2020-08-12 ESMP and RAP at Umuagu- Implementation Infrastructure Investments Selection Ufuma ANS/NEWMAP/CS/IC/2020/02 / Engagement of Consultant to Conduct Needs Individual Component 4: Project Pending Assessment for Livelihood IDA / 51050 Post Consultant Limited 50,000.00 0.00 2020-03-30 2020-04-13 2020-05-04 2020-06-08 2020-08-07 Management Implementation Options at Federal High Selection Court/Ekwueme Square Phase 2 Erosion Site, Awka Page 10