Page 1 UPBSN IESA Report for UPSLRP-III 1 CHAPTER-1 INTRODUCTION 1.1 BACKGROUND The Government of Uttar Pradesh is in the process of preparing the UP Sodic Land Reclamation III Project (UPSLR III P) with proposed financing from the World Bank. The development objective of the proposed project is to increase agricultural productivity in selected areas of degraded lands in Uttar Pradesh. The objective will be achieved through reversal of water-induced land degradation, enhancement of soil fertility and improved provision of agricultural support services. It aims to sustainably reverse the process of land degradation and fertility loss, thus enhancing agricultural productivity. By focusing on the reclamation of land for the poorest of the farmers, the project is expected to contribute significantly to poverty alleviation and improved food/nutrition security in the project areas. It is expected to have favorable environmental impacts as was seen in earlier efforts of sodic land reclamation, wherein, independent studies show that, over a ten-year period, there was a fivefold increase in floral and faunal diversity and seven-fold increase in microbial biomass carbon. Further, no major environmental and social adverse impacts are expected. Impacts, both direct and indirect, that are likely can be mitigated and contained with appropriate measures in place. 1.2 NEED FOR THE PROJECT The state of Uttar Pradesh (UP) has a total geographical area of about 24,107 thousand hectare out of which 16,812 thousand hectare is under cultivation. The crop sector of the state faces many constraints including low penetration of latest agricultural technology to the farmer level, inadequate flow of institutional credit to farmers, especially marginal and small ones, low seed replacement rate, poor adoption of sustainable agricultural practices/inputs such as integrated plant nutrient management, integrated pest management, vermicompost, bio-fertilizers, bio-pesticides, etc. Diversification of the agriculture as a whole through introduction of non-crop activities like goat rearing, sheep rearing, piggery, bee keeping, etc needs further boost. The thrid UPSLRP aims to reclaim about 1,30,000 hectares of sodic lands and also address various constraints facing the agriculture and allied sectors including livestock in a planned and systematic manner in the selected project districts. The expected results from the project include increased crop production, increased cropping intensity, crop diversification, especially cereal to non-cereal crops, breed improvement, improvement in animal nutrition and health and increased milk productivity. 1.3 PROJECT DESIGN AND COMPONENTS The overall project design is environmentally sound and socially acceptable to the communities in the districts it will be implemented. This is largely based on IESA consultations and also from earlier experiences of Sodic I and II. The design of the current project takes into consideration that land reclamation should also be coupled with a range of agriculture support services that leads to increased farm incomes. The project E2152 Page 2 UPBSN IESA Report for UPSLRP-III 2 design includes provisions to expand positive environmental and social impacts of the project and this IESA study is providing appropriate measures to contain any potential negative impacts. The will have the following five components: 1.3.1 Component A: On-Farm Development and Land Treatment This component is central to the project and accounts for more than half of project costs. Its objective is to sustainably reverse water-induced land degradation —salinization, sodification, and water-logging—through carefully sequenced technical interventions on about 130,000 ha of sodic lands. Activities to be financed under this component would include (a) mobilization of village communities; (b) detailed mapping and classification of sodic lands; (c) formation of water user groups (WUGs); (d) clarification and confirmation of land titles and tenure arrangements; (e) on-farm development through land-leveling, bunding, and linking field drains to link and main drains; (f) provision of shallow tube-wells to help in reclamation operations and provide irrigation; and (g) application of chemical/organic amendments and plant nutrients to the soil; and (h) cultivation of rice-wheat-green manure crop. In total about 130,000 ha of sodic lands covering 25 districts will be reclaimed under this component. The reclamation model to be followed has been developed and validated in the earlier phases of Sodic Lands Reclamation Projects. The expected results from this component, in the reclaimed areas are: (a) improved soil quality; (b) increased productivity; and (c) higher cropping intensity. A pilot on ravine reclamation covering an area of about 5,000 ha will also be included under this component. The pilot will follow a watershed development approach, focusing on in situ moisture conservation, local water harvesting, reducing soil erosion, improving natural vegetation, and enhancing crop and livestock productivity. 1.3.2 Component B: Improvement of the Drainage Network The objective of this component is to improve the drainage networks in the project area to remove/leach effluents, excess rain, and irrigation water from reclaimed and adjoining areas. The activities to be financed include: (a) re-modeling and rehabilitation of main drains; (b) maintenance of main drains; (c) training and capacity building of Uttar Pradesh Bhumi Sundar Nigam (UPBSN) and Irrigation Department (ID) staff on technical and management aspects, and training of WUGs for appropriate O&M of drainage network. The expected results from this component are: (a) improved drainage capacity of the drainage network; and (b) reduced water-logging in adjacent land area (with resultant improvement in land productivity). For reclamation of about 130,000 ha of sodic lands under Component A, about 6,700 km of the drainage network would require rehabilitation. The remodeling and rehabilitation of main drains will be undertaken by the ID, in collaboration with UPBSN through participatory processes that involve stakeholder consultation in planning, design and execution of the physical works. Maintenance of the rehabilitated main drains and their connectivity with the link drains will be done by the ID and monitored by the UPBSN through its staff supported by external technical Page 3 UPBSN IESA Report for UPSLRP-III 3 assistance consultants. The relevant WUGs and Site Implementation Committees (SICs) will maintain link and field drains. 1.3.3 Component C: Agriculture support services This component will aim at increasing agricultural productivity, and thereby contribute to enhanced rural livelihoods, by introducing improved technology and better agronomic practices and more effective provision of key support services. The activities to be financed include: (a) training farmers in effective land and water management practices, including efficient water use, drainage, and crop planning; (b) dissemination of improved agricultural technology and production practices through on-farm demonstrations; (c) support for livestock production, including dairy development and small ruminants (goat and sheep) as appropriate; (d) exposure visits, farmer fairs, animal health camps and other “means” for rural communication and outreach; and (e) training and capacity building of line department staff and other relevant providers of support services to farmers. The expected results are: (i) increased productivity; (ii) greater cropping intensity; and (iii) agriculture diversification (crops, vegetables and livestock). 1.3.4 Component D: Institutional Strengthening and Capacity Building for Market Access The objective of this component is to improve the profitability of farm production and enhance livelihoods of the poor. This would be done through better input–output market linkages, more efficient and effective delivery of key support services and augmentation of community level capacities as well as provision of some basic infrastructure. Activities under this component will involve WUGs and Self Help Groups (SHGs) from earlier projects as well as from this project to achieve the necessary scale and critical mass for input procurement (e.g., seeds, fertilizers) and output marketing. The activities to be financed include: (a) mobilization and capacity building of community based institutions like WUGs, SHGs and Farmer Service Centers (FSCs); (b) value chain analysis of selected commodities; (c) support to cluster level producer groups; (d) investment support for productive infrastructure (e) improving rural market infrastructure; (f) exposure visits and buyer-seller meets; and (g) organization of innovation forums. The expected results are: (i) increase in share of produce marketed (by project area farmers); (ii) access to non-traditional markets; and (iii) mobilization of landless families to form SHGs. 1.3.5 Component E: Project Management This component will ensure smooth implementation of all project activities, monitoring of project implementation progress and outputs/outcomes, and learning from project experience. Activities to be financed include: (a) establishing and supporting project units at the state and district levels; (b) creating a project monitoring, evaluation, and learning system to regularly inform project staff and stakeholders of progress and processes; (c) engaging the services of an external Monitoring and Evaluation (M&E) Page 4 UPBSN IESA Report for UPSLRP-III 4 agency to track project progress and confirm reporting from the project system; 1 (d) technical assistance to improve implementation and nurture innovations in that regard; (e) liaising with project partner organizations, support organizations, external professional agencies and the World Bank; and (f) documentation of project experience and its dissemination to the wider development community. At the central level, the main implementing agencies are UPBSN, Departments of Agriculture, Animal Husbandry and Irrigation and Remote Sensing Applications Centre (RSAC). At the local level, project planning/coordination committees will be established at village panchayat, block and district levels, with a convergence plan developed to help these committees interact better with existing public institutions as well as government development programs at these levels. 1.4 NEED FOR IESA STUDY While the earlier two sodic reclamation projects did not result in any major environmental and social adverse impacts, the proposed project includes a number of activities which are small and could have reversible social and environmental impacts if considered at the individual project activity level. However, the cumulative impact of all activities might be significant. Therefore, there is a need to anticipate and assess the potential impacts which would help plan measures to avoid them through good project design and where they become inevitable there is a need to develop measures to mitigate them, both during project planning and implementation. Similarly, there is also a need to enhance the positive impact and social and environmental benefits of the proposed activities of the project. This could be achieved by establishing procedures for enhancement measures. Considering this, GoUP proposes mainstreaming environmental and social concerns in the project planning and implementation. It is in this context that, as part of the project preparation, an Integrated Environmental and Social Assessment (IESA) of the proposed project has been undertaken. The IESA report will act as a decision-making tool to ensure that the project design and implementation are socially responsive and environmentally sound. The main outcome of the IESA is a detailed Environmental and Social Management Framework (ESMF) that would guide investments under the project and propose mitigation measures for the identified negative impacts. 1.5 OBJECTIVES OF THE IESA STUDY The main objective of the IESA is to identify the key environmental and social issues related to the proposed activities under the project, assess their impacts and provide appropriate mitigation measures. The IESA is expected to identify both opportunities to enhance environmental and social benefits as well as mitigate any potential concerns. The IESA study will be a strategic assessment, since much of the work on environmental and social assessments is required to be mainstreamed into the project itself, where it could have more impact in subsequent phases of project implementation, and new areas are identified for inclusion in the project. Specifically, the IESA will attempt to achieve the 1 The ICR for UPSLRIIP has explicitly endorsed the usefulness of having an independent M&E agency. Page 5 UPBSN IESA Report for UPSLRP-III 5 following to: · Improve decision making by mainstreaming the environmental and social objectives and safeguards into the planning and implementation of project activities and operation of the concerned institutions. · Identify indicators, methods of measuring the key environmental and social issues and give baseline figures against the indicator to enable an objective assessment of impact of the project at regular intervals and end of the project. · Assess capacity of existing and proposed institutions and determine the appropriate institutional arrangements to mainstream management of social and environmental issues in the agriculture sector on a sustainable basis. · Design appropriate safeguards and measures to mitigate any adverse impacts of proposed project activities (undertaking identification of stakeholders, assessment of impacts, analyzing the alternatives and the policy frameworks, preparing the mitigation measures and action plans) and enhancement measures to increase positive impacts. · Compile and enhance the relevant knowledge base on social and environmental aspects of the project. · Study that the project is in accordance with existing environmental and social legal and regulatory environment. 1.6 SCOPE OF WORK The scope of IESA includes the following specific aspects. · Stakeholder assessment and social analysis · Establishing indicators and baselines for key environmental and social parameters · Identifying the detailed positive and negative social and environmental impacts of the proposed project activities and measures to enhance the positive social and environmental impacts. · Identifying vulnerable groups, assessing impacts on them (including women) and firming their role in the proposed project through proactive participation · Assessment of physical and/or economic displacement caused by the project and the development of Resettlement Action Plan (RAP) including participation of potentially affected groups · Understand and assess the willingness of the community to contribute · Assessing institutional issues and building capacity for mitigating adverse environmental and social impacts and enhancing positive impacts · Analysis of induced impacts · Development of an Environmental and Social Management Framework (ESMF): · Awareness-building, Information Management and Knowledge Base Development · Assess functioning of community institutions for benefit sharing and developing appropriate conflict resolution mechanism · Propose any further studies that may be required in the course of the project Page 6 UPBSN IESA Report for UPSLRP-III 6 The detailed scope of work as outlined in the RFP is enclosed as Annex I. 1.7 THE STUDY AREA AND SCOPING MATRIX FOR IESA The Study area adopted for the IESA includes sample of sodic areas already covered under previous projects and sodic/ravine sites/areas proposed to be included under the project in the state of Uttar Pradesh. As a part of the study one district from each zone of Uttar Pradesh namely Western, Central and Eastern has been selected. The districts selected were Etah (Western), Kanpur Dehat (Central), and Sultanpur (Eastern). In each district 10 villages were selected, of which, 2 villages were reclaimed in earlier phases, and the balance villages were to be reclaimed in phase-III of the project. In addition 4 ravine villages were also covered as a part of the study. Before the start of any Environmental and Social Assessment study, it is necessary to identify the baseline levels of relevant environmental and social parameters which are likely to be affected as a result of implementation of the proposed project. A Scoping Matrix has been formulated to identify various issues likely to be affected as a result of the proposed project. Based on the specific inputs likely to accrue in the proposed project, aspects for IESA were identified. The scoping matrix adopted for IESA study is given in Table-1.1. TABLE-1.1 Scoping Matrix for IESA Study for the proposed UPSLR III P Aspect of Environment Likely Impacts A. Land Environment Reclamation phase ƒ Increase in soil erosion ƒ Pollution by construction spoils ƒ Acquisition of land for various project appurtenances ƒ Disposal of sedimentation/bed material due to cleaning of main drains. ƒ Impacts due to extraction of material from borrow pits. Post-Reclamation phase ƒ Improvement in soil quality ƒ Impacts on crop diversification ƒ Reduction in the area under water logging. ƒ Changes in land use pattern, i.e. cropping intensity, conversion of wastelands to agriculture land. ƒ Impacts on soil productivity due to increased use of agro-chemicals and other inputs. ƒ Reduction in soil erosion rates as a result of land reclamation and improved vegetal cover in the reclaimed area. B. Water quality Reclamation phase ƒ Increase in turbidity of nearby water bodies Post-Reclamation phase ƒ Eutrophication risks due to increased use of agro-chemicals. ƒ Impacts on ground water level. ƒ Impact on groundwater quality due to infiltration of water with high TDS level. ƒ Impacts due to disposal of effluents from main drains into receiving water bodies. Page 7 UPBSN IESA Report for UPSLRP-III 7 Aspect of Environment Likely Impacts C. Aquatic Ecology Post-Reclamation phase ƒ Impacts on wetlands due to improvement in natural drainage. D. Terrestrial Ecology Reclamation phase Post-Reclamation phase ƒ Loss of forest land if any ƒ Loss of fodder resources due to acquisition of pastures and plantation land ƒ Improvement in fodder availability due to increased agricultural production. ƒ Impacts on nature reserves due to various project components ƒ Impacts on wildlife habitats ƒ Improvement in soil micro flora and fauna ƒ Improvement in vegetal cover E. Socio-Economic Reclamation phase ƒ Acquisition of land and private properties ƒ Impacts on archaeological and cultural monuments ,if any ƒ Impacts on mineral reserves, if any Post-Reclamation phase ƒ Increased soil productivity and agricultural productivity due to sodic/ravine land reclamation ƒ Improved irrigation intensity ƒ Impacts on cropping pattern ƒ Use of improved seeds ƒ Changes in farming practices ƒ Increased use of IPM and IPNM practices ƒ Increased use of farmyard manure ƒ Improvement in income from sodic/ravine lands with an overall increase in income level ƒ Improvement in employment scenario ƒ Improvement in wage rates in the area ƒ Impacts on migration of labour from the villages ƒ Access to amenities ƒ Increase in land price ƒ Impacts due to improvement of social capital in the project ƒ Impacts on vulnerable groups, e.g. women, SC, ST families, landless tillers, small and marginal farmers, etc. ƒ Impacts on inter-relationship across class and caste group of farmers ƒ Impacts on role of women in social setup. ƒ Impacts due to capacity building under the project ƒ Impacts due to farmer field schools and similar interventions due to the project ƒ Impetus to growth and development in the area F. Public Health Reclamation phase Post-Reclamation phase ƒ Reduction in incidence of vector-borne diseases as a result of decrease in the waterlogged area due to improvement of drainage network. As mentioned earlier, relevant environmental and social impacts out of the entire gamut of issues outlined in the Scoping Matrix have been identified. For these impacts/aspects, environmental and social baseline data has been collected. Page 8 UPBSN IESA Report for UPSLRP-III 8 1.8 APPROACH AND METHODOLOGY The assessment has been undertaken at three levels, household, village and community. The data for the IESA study has been collected from both primary and secondary sources. The household level assessment has been undertaken through sample survey of the potential project beneficiaries with the help of pre-tested semi-structured interview schedules. Village level assessment was undertaken with the help of a structured village profile format and participatory resource mapping. The village level community level assessment was undertaken through Participatory Rural exercises including Focus Group Discussion and Stakeholder Consultation with farmers, women, Gram Pradhan and other representatives of Gram Panchayat. Consultation was also undertaken with other stakeholders such as project staff, state, district and block level officers/functionaries of line departments, agriculture, irrigation, Panchayati Raj, NGOs, farmers’ cooperatives, Agriculture Technology Management Agency. The secondary data/ information were collected for co-relating the findings from the primary data. This was essentially carried-out through review of available secondary data and other publications of the Primary Census Abstract, Village Directory of the Census of India, District Census Handbooks, Statistical Handbook, etc. The village level stakeholder meetings were organized to share and collect information through workshops organized at village level. The findings of the phase-I and phase-II of the proposed Uttar Pradesh Sodic Land Reclamation Project were also collected and reviewed for suitable incorporation in the IESA study for UPSLRP-III. 1.8.1 Sampling Design Selection of zones : All three zones of Uttar Pradesh, eastern, western and central were selected under the study. Selection of districts within a zone : In each zone, one project district was selected, thus 3 districts were covered in the IESA study. Selection of villages within a district : For Sodic Land (a) In each project district, 10 villages were selected, thus (30 villages were covered); and in every sampled village 25% households (with sodic land) or 25 households) which ever was higher, was covered in the IESA study. (b) In each sampled (project) village, farm households were selected for survey representing different landholding sizes; (c) In each selected district, 2 villages were selected, which were covered under the previous Sodic project and at least 25 beneficiary households were covered as a part of the survey. For Ravine Land (a) One project district where the ravine reclamation project is to be taken up was covered. (b) In the selected project district, 4 villages were selected. (c) In each village, 25% of the farm households with ravine land were selected for survey. The Sampling design is summarized in Table-1.2. Page 9 UPBSN IESA Report for UPSLRP-III 9 T ABLE-1.2 Summary of sampling design adopted for the study S. No. Sample level Method of selection Size (number) 1 Zone Purposive All 3 zones 2 District Random 3 districts (1 district per zone) 3 Village Random 30 villages (10 villages per district) 4 Household Stratified random Minimum 750 (25 households per village In addition, 4 villages were selected from ravine areas. 1.8.2 Methods of data collection While secondary data was collected through review of published records and reports, primary data was collected with the help of different appropriate methods. Methods of collection of primary data at different levels are summarized in table 1.3. TABLE – 1.3 Methods of data collection S. No. Level of assessment Method of data collection 1 Household Direct interview of sample farmers with the help of a pre-tested interview schedule 2 Village Collection of information from Gram Pradhan, other members of Gram Panchayat, and other informed citizens of the village with the help of a semi-structured format 3 Community Participatory Rural Appraisal tools and techniques, Focus Group Discussions 4 Other stakeholders Stakeholder consultation through structured/semi-structured interviews and discussions 1.8.3 Data Collection Tools Interview Schedule After selecting the list of indicators pertaining to environmental and socio-economic aspects, questions on various indicators were framed. Once probable questions on each of the indicators were framed, they were evaluated for their suitability, simplicity and adequacy for capturing the desired information on indicators. Subsequently, list of questions were finalized on the basis of this evaluation process. Then, sequence of questions was finalized to ensure smooth flow of interview from respondents during the survey and Draft Interview Schedule was formulated. The draft schedules were discussed with the Environmental and Social Experts of the World Bank during their visit to Lucknow on 14/01/09 and 15/01/09. The said Draft Interview Schedule was used for data collection in few villages during the field visit undertaken in district Sultanpur on 16/01/09. Based on the findings of this exercise, several questions which were not in line with objectives of IESA were deleted. Likewise, some questions were included to capture the information required for objective assessment of the issues related to the project interventions. Based on the findings of the above referred exercise, the Final Interview Schedule was prepared. The final Interview schedule used in the household survey is enclosed as Annex II . Page 10 UPBSN IESA Report for UPSLRP-III 10 Format for Village Level Assessment Village level assessment was undertaken with the help of a semi-structured format. On the basis of different aspects to be captured a draft format was designed and shared with UPBSN. Incorporating their suggestions it was finalized and used for field work. (Copy enclosed as Annex III ). In addition, a note on Focus Group Discussions was also prepared for guidance of the field staff (copy enclosed as Annex IV ). Questionnaire for R&R Survey Although, there were no R&R issues in the sodic and ravine villages selected for survey under IESA study, a format for families affected due to the project was formulated and is enclosed as Annex V . If required, this format can be used during project implementation phase for any project related activity, which entails acquisition of private properties. Other Guidelines/Questionnaires/Formats The other guidelines/formats used under the IESA study are listed as below: ƒ Guidelines for discussion to address gender development issues ( Annex-VI ) ƒ Guidelines for discussions with Panchayati Raj Institutions ( Annex-VII ) ƒ Interview format/guidelines for interaction with project staff ( Annex-VIII ) ƒ Guidelines for consultation with farmers ( Annex-IX ) ƒ Guidelines for consultation with women’s groups ( Annex-X ) ƒ Guidelines for consultation with ATMA officials ( Annex-XI ) ƒ Guidelines for consultation with Institutional Stakeholders including UPBSN, Department of Agriculture, Animal Husbandry Department, Irrigation Department ( Annex-XII ) ƒ Guidelines for stakeholder consultation with Office-bearers of local farmers’ cooperatives ( Annex-XIII ) ƒ Guidelines for stakeholder consultation with Local NGO working on farming issues ( Annex-XIV ) 1.8.4 Sample coverage Field survey was conducted in three districts, Sultanpur, Etah, and Kanpur Dehat. Ten villages each from the three districts were selected in the sample. For sodic villages, in every sampled village 25% households (with sodic land) or 25 households) which ever was higher, were covered in the IESA study. Prior to start of survey, the number of families with sodic land in each village was ascertained, based on which sample size in each village was finalized. A total of 886 families were surveyed in 30 sodic villages (Table 1.4). TABLE-1.4 Number of households surveyed in various sodic villages S. No. Village Name Households who have sodic land (nos.) Households surveyed (nos.) A. District Sultanpur 1 Ismailpur 150 38 2 Baithoo 109 28 3 Sarme 122 31 4 Bhoye 102 26 5 Sukhi 101 24 Page 11 UPBSN IESA Report for UPSLRP-III 11 S. No. Village Name Households who have sodic land (nos.) Households surveyed (nos.) 6 Kohar 118 30 7 Ramshapur 102 26 8 Guddoor 73 23 9 Deeh Dhaggupur 101 26 10 Sakarsi 98 25 Sub-Total (A) 1076 277 B. District Kanpur Dehat 1 Jugrajpur Bithoor 135 34 2 Aliyapur 126 32 3 Newada Devrai 115 29 4 Khalakpur 121 31 5 Nahi Junia 142 36 6 Patra Sadva 120 30 7 Chhataini 131 33 8 Behta 101 26 9 Maujampur 130 33 10 Dhakpurwa 114 29 Sub-Total (B) 1235 313 C. District Etah 1 Rajpura 110 28 2 Mubarikpur Nebarua 135 34 3 Bijauri 133 34 4 Dastampur 96 24 5 Sena Kala 122 31 6 Chhaprai 110 28 7 Baghwala 130 33 8 Raja Rijaula 105 27 9 Ranethi 108 27 10 Jari 119 30 Sub-Total –C 1168 296 Total (A+B+C) 3479 886 For ravine villages, 25% of the farm households with ravine land were selected for survey. Prior to start of the survey, the number of families with ravine land in each village was ascertained, based on which sample size in each village was finalized. A total of 102 families were surveyed in 4 ravine villages. The details are given in Table-1.5. TABLE-1.5 No. of households surveyed in various ravine villages S. No. Village Name No. of households who have ravine land No. of households surveyed 1 Sanaya Salwahan 104 26 2 Paronkh 98 25 3 Khalla 107 27 4 Jarsen 95 24 Total 404 102 Page 12 UPBSN IESA Report for UPSLRP-III 12 1.9 STAKEHOLDER CONSULTATION Stakeholder consultation was undertaken with farmers, women groups, and office-bearers of Gram Panchayat, NGOs working on farming issues, representatives of Cooperatives, ATMA officials, District Agriculture Officers, project staff (Project Manager, Deputy Manager and Assistant Manager), institutional stakeholders including UPBSN, Department of Agriculture, Animal Husbandry Department, Irrigation Department, and Panchayati Raj Department. The village level workshops were also held in one village per district covered as part of the IESA Study. The schedule is given in Table-1.6. The proceedings of these workshops are presented separately. TABLE-1.6 Schedule of village level stakeholders’ workshops S. No. Village District Date of Workshop 1. Village Kohar Sultanpur 01.02.09 2. Village Jugrajpur Kanpur Dehat 07.02.09 3. Village Dastampur Etah 22.02.09 1.10 DATA ANALYSIS AND REPORT PREPARATION Household data was computerized with the help of a customized data entry program written on FoxPro. Analysis of data was undertaken with the help of Statistical Package for Social Sciences (SPSS) and MS Excel. Qualitative data collected through focus group discussion and consultation methods was analyzed and compiled through matrices. Report has been prepared on the basis of both quantitative and qualitative findings. Page 13 UPBSN IESA Report for UPSLRP-III 13 CHAPTER-2 REGULATORY FRAMEWORK FOR ENVIRONMENTAL AND SOCIAL ASPECTS 2.1 GENERAL The Chapter highlights the salient features of select laws, acts, guidelines, etc which have a bearing on the design and implementation of the Project. These are listed as below: TABLE-2.1 Design and implementation of the Project S. No. Act Applicability and Implication Environmental Legislative Framework 1 Environment (Protection) Act, 1986 As per the provisions of this Act, the Central Government has the power to take all such measures as it deems necessary for the purpose of protecting and improving the quality of the environment and preventing, controlling and abating environmental pollution. The Act covers the standards of quality of air, water or soil for various areas and purposes. This Act also covers recommendations for prevention, control, and abatement of environmental pollution. Applicable Since the project may impact surface and/or ground water quality, the provisions of this act become applicable. 2 The Water (Prevention and Control of Pollution) Act 1974 and The Water (Prevention and Control of Pollution) Rules 1975 The Act and Rules outlines the activities which are prohibited on account of their potential to cause water pollution. Agriculture practices are excluded but activities like Dairy, Irrigation, etc. are covered under the act for which necessary assessment is required. If needed, water pollution control measures be recommended. Partial Applicability If project funds dairy sub- projects, including processing plants, then the act may be applicable 3 The Air (Prevention and Control of Pollution) Act 1981 and The Air (Prevention and Control of Pollution) Rules, 1982 The Act and Rules outlines the activities which are prohibited on account of their potential to cause air pollution. The proposed project is not expected to lead to any significant increase in air pollution. Not applicable 4 Forest (Conservation) Act, 1980 This act provides guidelines fo r conservation of Not applicable The project is not envisaged to Page 14 UPBSN IESA Report for UPSLRP-III 14 S. No. Act Applicability and Implication forests and diversion of forest land for non-forest use. The law also states guidelines on de-reservation of various categories of forests for diversion of forest land. This law describes the penalty for contravention of the provisions of the Act. Restriction on the de- reservation of forests or use of forest land for non- forest purpose. acquire any forestland. 5 The Indian Wildlife (Protection) Act, 1972, amended 1993, The Wild Life (Protection) Amendment Act, 2002 This Act provides guidelines for protection of [Wild animals, birds and plants] and for matters connected therewith or ancillary or incidental thereto. It also states the norms for hunting of wild animals, prohibition of picking, uprooting, etc., of specified plants. The Act deals with the declaration of area as Sanctuary, National Park, and closed area and also states the restriction of entries in the sanctuary. Not applicable The project is not going to work on any protected area, 6 Biodiversity Act 2002 and Biodiversity Rules 2004 The Act essentially controls access to indigenous biodiversity resources. No agency/person referred to in sub-section (2) shall, without previous approval of the National Bio-diversity Authority, obtain any biological resource occurring in India or knowledge associated thereto for research or for commercial utilization or for bio-survey and bio-utilization. Not applicable 7 Insecticides Act, 1968 This Act is to regulate the import, manufacture, sale, transport, distribution and use of insecticides with a view to prevent risk to human beings or animals, and for matters connected therewith. The Central Insecticides Board is the administrative and the advisory body for state and central government for this act. Partially applicable Registration of Insecticides under this act may not be required, as it is for import or manufacture of insecticides. However, procurement of insecticides/pesticides shall be done from the registered outlets, which have proper license for importing, stocking and selling of insecticides. 8 Bio-Medical Waste (Management and Handling) Rules, 1998 and Bio-Medical Waste (Management and Handling) (Amendment) Rules 2003 Any project activity, which will generate bio medical waste like an imal parts, animal waste s, use of Partially applicable Only to the component under which livestock development is targeted. Needles and other animal parts may require Page 15 UPBSN IESA Report for UPSLRP-III 15 S. No. Act Applicability and Implication medical essentials like needles etc will come under this Act. animal parts may require proper disposal. 9 Environmental Impact Assessment Notification, 2006 It delineates the steps required for obtaining Environmental clearance. As per the notification, a list of projects, requiring Environmental Clearance from regulatory agencies at the State or Central government level has been provided. As per this notification, land reclamation projects do not require Environmental Clearance. Not applicable 10 Other various acts/rules The Seed Act 1966; Seed Rules 1968; Seeds (Control) Order 1983; Insecticide Act 1968; Insecticide Rules 1971; Insecticide (Control) Order 1985; Fertilizer Control Order 1985; Fertilizer Movement Control Order 1973; Essential Commodities Act (Amended - 1986) Applicable As project investments are finalized provisions of some of these would be relevant Social Legislative Framework 11 Land Acquisition Act The Act lays down procedures for acquisition of land, including notification, payment for damages, hearing of objections, declaration of the intended acquisition, enquiry into measurement, values and claims and award by the competent authority and finally taking possession of the land Applicable If there is land acquisition, this Act will become applicable 12 National Resettlement and Rehabilitation Policy, 2007 The policy applies to all projects where more than 500 families are displaced in plain areas and more than 250 families in hilly and scheduled areas. The policy outlines a set of recommendation for compensation of various categories of families using land, homestead and other private properties. A Resettlement & Rehabilitation Plan, if required, shall be prepared for the families using land, homestead or other private properties Applicable If there are adverse impacts, some of the provisions of this policy will be applied 13 Minimum Wages Act, 1948 This act makes it mandatory for the employer to pay every employee in a scheduled employment under him wages at the rate not less than the minimum rates of Applicable Page 16 UPBSN IESA Report for UPSLRP-III 16 S. No. Act Applicability and Implication wages fixed under the Act. The Part II of the Act specifies that employment in agriculture {cultivation and tillage of soil, diary farming, production, cultivation, growing and harvesting of any agricultural or horticultural commodity, raising of livestock, bees or poultry and conjunction with farm operations (including any forestry or timbering operations and the preparation for market and delivery to storage or to market or to carriage for transportation to market of farm produce)} is applicable for the provisions of the legislation. 14 National Policy for Empowerment of Women, 2001 The policy advocates for equal access to participation and decision making of women in social, political and economic life of the nation and mainstreaming a gender perspective in the development process. Applicable Project shall provide equal access to women to career and vocational guidance, employment, equal remuneration, occupational health and safety, social security and public office etc. 15 Child Labour (Prohibition and Regulation) Act, 1986 The Act prohibit the engagement of children in certain employments and to regulate the conditions of work or children in certain other employments. Applicable The Scheduled Tribes and Other Traditional Forest Dwellers (Recognition Of Forest Rights) Act, 2006 This Act safeguards the interests of tribal communities and tribal people Not Applicable Page 17 UPBSN IESA Report for UPSLRP-III 17 World Bank Safeguard policies Various World Bank safeguard policies and their implications are summarized in Table- 2.2. TABLE-2.2 Various World Bank safeguard policies and their implications WB Safeguards Policy Relevance to the Project Status Environmental Assessment (BP/OP 4.01) Project activities include activities like land leveling, drainage, drain rehabilitation etc that could have an impact on the environment. Similarly the project has a significant impact on social environment with issues around gender and equity of participation. Applicable Forestry (OP 4.36) Project activities do not affect the forest areas in the state. None of the identified project sites fall with in forest range or have any direct impact on forest lands. Not applicable Pest Management (OP 4.09) Project involves demonstration of best-practices for on-farm productivity improvement; diversification and intensification of production may happen in future course due to improved access to markets and may increase use of agrochemicals especially pesticides. As part of ESMF an IPM strategy including soil and nutrient management approaches has been developed Applicable Indigenous Peoples (OD 4.20) Indigenous people (tribal communities in Indian context) are concentrated only in two districts of the state and these districts are non-project districts. There are no significant population and/or pockets of tribal communities in project areas. Not Applicable Natural Habitat (OP 4.04) The project activities have a likelihood of impacting small-sized, seasonal or permanent waterbodies or wetlands, including having a potential to impact natural habitat of the Sarus Crane. Applicable Involuntary Resettlement (OP 4.12) There is no land acquisition proposed under the project and the project does not involve any involuntary resettlement. Yet, encroachments on sodic lands cannot be ruled out, which may result in economic displacement of some persons. Applicable Physical and Cultural Properties (OPN 11.03) There is no risk of project activities damaging physical and/or cultural properties Not applicable Safety of Dams (OP/BP 4.37) The project also does not envisage construction of any new dam. Not applicable Page 18 UPBSN IESA Report for UPSLRP-III 18 WB Safeguards Policy Relevance to the Project Status Projects in Disputed Areas (OP/BP/GP 7.60) There are no disputed areas within the project area. Not applicable Projects on International Waterways (OP/BP/GP 7.50) There are no international waterways in the project area. Not applicable Page 19 UPBSN IESA Report for UPSLRP-III 19 CHAPTER -3 ENVIRONMENTAL AND SOCIAL BASELINE SETTING 3.1 GENERAL Before the start of any Environmental Impact Assessment study, it is necessary to identify the baseline levels of relevant environmental and social parameters which are likely to be affected as a result of the implementation of various interventions envisaged in the project. A similar approach has been adopted for conducting the IESA study for the proposed UPSLR III P. A scoping matrix was formulated to identify various aspects likely to be affected as a result of the proposed project. Based on the specific inputs likely to accrue in the proposed land reclamation project, aspects to be covered in the IESA study were identified. The other issues as outlined in the Scoping Matrix were then discarded. Thus, planning of baseline survey commenced with the short-listing of impacts and identification of parameters for which the data was collected. The information on various environmental and social aspects was collected. While environmental information was collected from secondary sources, information on macro-profile (both social and environmental aspects) of sampled villages and households was collected with the help of village profile format and semi-structured interview schedule, respectively. 3.2 ABOUT THE PROJECT DISTRICTS 3.2.1 Meteorology The climate of the study area districts namely Etah, Kanpur Dehat and Sultanpur is characterized by a hot summer and general dryness except during the south-west monsoons. Climatologically, a calendar year can be divided into four seasons. The period from March to about the middle of June is the summer season. This is followed by the south-west monsoons, which lasts till about the end of September-October and the first half of November from the post-monsoon or transition period. The winter season spreads from about the middle of November to February. The average annual rainfall in the study area districts ranges from 782 to 994 mm. Majority of rainfall in the districts is received during the south-west monsoon months from June to September. May is generally the hottest month of the year with the mean daily maximum temperature at about 40.5 to 41.4 °C and the mean daily minimum at about 25 °C. The nights are warmer in June than in May. With the onset of the south-west monsoons by about the third week of June, there is an appreciable drop in the day temperature. There is a rapid drop in the night temperature after the withdrawal of the monsoon. After November both day and night temperatures decrease rapidly till January, which is usually the coldest month with the mean daily maximum temperature of about 21-26 °C and the mean daily minimum temperature at about 7.4 to 8.5 °C. 3.2.2 Geology The state of Uttar Pradesh is characterized by rock formations ranging in age from the Archean (the Bundelkhand Granitic gneisses) to the Recent (the Ganga alluvium). The three study area districts lie within Ganga plain. The Ganga plain which dominates the landscape and nearly covers three fourth of the geographical area of the state, lies between the rocky Himalayan belt in the north and the southern hilly tract comprising mainly of Pre-Cambrian rocks. Flexing of the Indian lithosphere in response to the compressive forces due to collision, and thrust fold loading Page 20 UPBSN IESA Report for UPSLRP-III 20 produced the Ganga Plain foreland basin. It is filled with recent alluvial sediments which is at places more than 1,000 m. thick and an amalgam of sand, silt, clay in varying proportions 3.2.3 Land Use Pattern As per the revenue data, major land use category in study area districts is agriculture land, which accounts for nearly 78 to 93% of the total area of the district. The other major land use categories in the project area districts are not available for cultivation and barren lands. The land use pattern of study area details are given in Table-3.1. TABLE-3.1 Details of land use pattern of study area districts Particular Etah Kanpur Dehat Sultanpur Forest Land 16086.29 (3.7) 10171.894 (4..4) 24568.446 (0.8) Irrigated Agricultural Land 326043.39 (75.5) 134023.432 (58.4) 271738.5373 (9.3) Un-Irrigated Agricultural Land 31718.58 (7.3) 45622.441 (19.9) 2501678.737 (85.3) Culturable Waste Land 24585.38 (5.7) 12935.2355 (5.6) 80904.6075 (2.8) Area not Available for Cultivation 33313.13 (7.7) 26888.2865 (11.7) 53439.563(1.8) Total Area 431746.77 (100.0) 229641.29 (100.0) 2932329.89 (100.0) Source: District Census Book 2001 Note : Figure in brackets indicate percentage 3.2.4 Ground Water Resources The estimation of groundwater resources of Uttar Pradesh has been carried out using the methodology recommended by Groundwater Evaluation Committee (GEC’97). The details of groundwater recharge and abstraction in study area districts is given in Table-3.2. TABLE-3.2 Details of groundwater recharge and abstraction in the study area districts District Groundwater recharge (Mm 3 ) Groundwater Abstraction (Mm 3 ) Percentage of groundwater recharge Etah 1129 884 78.34% Kanpur (Dehat) 891 440 49.38% Sultanpur 1579 1149 72.77% The groundwater utilization was highest in Etah (78.34%). The area irrigated by groundwater was also highest in this district. Similarly percentage groundwater abstraction was the lowest in Kanpur Dehat. In this district, the area irrigated by groundwater was lower than other study area districts. The groundwater level data from State Ground Water Board was collected and the results are presented in Annex XV . The data for districts Etah and Kanpur Dehat was collected for five years from 2002-2006. The data for district Sultanpur was collected for a five year period from 2003 to 2007. In study area districts, i.e., Etah, Kanpur Dehat and Sultanpur, most of the observation wells had groundwater level within 2 to 8 m below ground level. Some of the wells got dried, but again get filled up in subsequent years. The aspect needs to be studied, while selecting the sodic land for reclamation in the command area to be irrigated by these wells. Some of the observation wells water levels more than 8 m below ground level. The sodic land around wells with water table Page 21 UPBSN IESA Report for UPSLRP-III 21 deeper than 8 m, needs to be excluded for reclamation in the project, as cost of groundwater pumping would be high and also groundwater absorption for sodic land reclamation and irrigation would further deplete the ground water table. 3.2.5 Flora The forests in the districts covered as a part of IESA Study are mainly moist mixed deciduous forests as for Champion & Seth classification. The sub-forest type is West Gangetic Moist Mixed Deciduous forests. In the study area districts forest area is generally absent. The area is densely populated with agriculture being the major land use categories. The increased level of human interferences is responsible for lack of vegetal cover. In villages, trees such as Mango, Eucalyptus, Jamun, Guava, Peepal, Bargad, Bel, Mahua, Neem are commonly observed. Most of the tree cover is on account of plantations including eucalyptus, lemon, bamboo, mango, banana etc. The commonly observed grass species in the study area districts are Doob ( Cynodon dactylon ), Baib ( Erialiopsis bineta ), Kans ( Saccharum sontaneum ), etc. 3.2.5 Fauna The project area as mentioned earlier does not have good quality of forest. This coupled with increased human interferences in the area, is responsible for the near absence of faunal population in the study area districts. Within the project villages covered under IESA survey, faunal population is largely absent due to lack of dense vegetal cover and increased human interferences. 3.2.7 Demographic Profile The demographic profile of study area districts is given in Table-3.3. TABLE-3.3 Demographic profile of study area districts Districts Parameter Etah Kanpur Dehat Sultanpur Population 2790000 1563000 3215000 Population Density, No./km 2 628 517 725 SC Population 478665 388419 715927 Percentage of SC population to total population, % 17.2 24.9 22.3 ST Population 30 382 1932 Percentage of ST Population to total population, % 0.001 0.024 0.060 Source: Census 2001, Statistical Diary, Uttar Pradesh The population was highest in Sultanpur amongst the study area districts covered as a part of IESA study. The highest population density of 729/km 2 amongst the study area district was also observed in district Sultanpur which is higher than the state average of 690/km 2 . The population density in districts Etah (628/km 2 ) and Kanpur Dehat (517/km 2 ) was lower than the state average of 690/km 2 . The percentage of SC population to total population was highest in district Kanpur Dehat (24.9%) which is higher than the state average of 18.54%. In district Sultanpur too, the percentage of SC population was higher than the state average of 18.54%. In district Etah, the percentage of ST population was marginally lower than the state average of 18.54%. The percentage of ST population is less than 0.1% in the study area districts. Page 22 UPBSN IESA Report for UPSLRP-III 22 3.2.8 Land Holdings The distribution of land holdings study area districts is given in Table-3.4. TABLE-3.4 Land holding pattern in districts covered under IESA Type Etah Kanpur Dehat Sultanpur Marginal 286000 (65.6%) 314000 (71.4%) 526000 (74.4%) Small 66000 (15.1%) 67000 (15.2%) 52000 (7.4%) Large 84000 (19.3%) 59000 (13.4%) 129000 (18.2%) Total 436000 (100%) 440000 (100%) 707000 (100%) Note: Figure in brackets indicate percentage The farms with marginal land holdings were dominant in the three districts covered as a part of the study. The highest percentage of marginal farmers was observed in district Sultanpur (74.4%), followed by Kanpur Dehat (71.4%). The percentage of small farmers was found to be highest in Kanpur Dehat (15.2%). The large farms accounted for 13.4% to 19.3% of total land holdings in the study area districts. 3.2.9 Agriculture The details of area under agriculture along with source of irrigation are given in Tables 3.5 and 3.6 respectively. TABLE-3.5 Details of area under agriculture in study area districts Sown Area (‘000 ha) Irrigation area (‘000 ha) %age of irrigated area District Gross Net Gross Net Gross Net Etah 504 317 434 295 86.12 92.96 Kanpur (Dehat) 301 222 204 157 67.78 70.80 Sultanpur 402 280 329 154 94.61 93.61 TABLE-3.6 Sources of Irrigation in study area districts Source District Net Irrigated Area (ha) Canal Govt. tubewells Pvt. Tubewell Other sources Etah 294751 37606 (12.8%) 11925 (4.1%) 212426 (72.1%) 32794 (11%) Kanpur (Dehat) 156985 58262 (37.1%) 7393 (4.7%) 91103 (58.01%) 137 (10.2%) Sultanpur 229542 62234 (27.1%) 10853 (4.7%) 156044 (68%) 411 (0.2%)) Note: Figure in brackets indicate percentage The major source of irrigation in the study area districts is groundwater as it accounts for 76.2% and 72.7% of total irrigated area in districts Etah and Sultanpur, respectively. In district Kanpur Dehat too, about 62.7% of the area was irrigated using groundwater. Majority of the area irrigated by groundwater was done through private tubewells. Canals accounted for 37.1% and 27.1% of the total irrigated area in districts Kanpur Dehat and Sultanpur respectively. In district Etah, area irrigated by canal was only 12.8%. Page 23 UPBSN IESA Report for UPSLRP-III 23 3.3 MACRO SOCIO-ECONOMIC PROFILE OF SAMPLED VILLAGES Village level assessment has been undertaken with the help of a semi-structured format with an objective to capture the macro profile of the villages included in the study, particularly relating to those dimensions which are not covered in the household survey. Thus, emphasis was laid on the village as an entity. The findings are summarized in tabulated form and are enclosed as Annex- XVI . The findings are discussed in the following sections. 3.3.1 Distance and location of villages The villages selected for survey as part of IESA study are located, on an average, at a distance of 9.18 km and 33.09 km from their respective Block and District headquarters. Further, they are located at a distance of about 7.04 km from the main road. In district Sultanpur, the average distance of the selected villages from their respective Block(s) and District headquarters and Highway is 7.10 km, 39.7 km, and 8.0 km, respectively. On the other hand, in district Kanpur Dehat, the average distance of the villages from their respective Block(s) and District headquarters and Highway is 9.64 km, 33.36 km, and 7.11 km, respectively. In addition, selected villages in district Etah are located at an average distance of about 10.6 km, 26.1 km, and 6.0 km from their respective Block(s) and District headquarters and Highway. 3.3.2 Demographic profile of the villages The demographic profile of the study area villages has been summarized in Table 3.7. The total population in the 34 study area villages is about 70164. The male and female population constitutes 53.51% and 46.49% of the total population. The overall sex ratio i.e., number of females per 1000 males, is 869. It is also observed that backward caste households are a dominant community in the villages covered as a part of the survey, as they constitute about 50.1% of the total households. Scheduled Caste and Schedule Tribe households are the second dominant caste group in terms of numbers as well as households. They constitute about 27.7% of the households. The General Caste category comprises about 22.2% of the total households in the villages covered as a part of the survey. TABLE-3.7 Demographic profile of the villages covered as a part of the survey Caste Category Parameters GC BC SC/ST Total Households 2289 5249 2959 10497 Population Male 8606 18508 10431 37545 Female 6960 16660 8999 32619 Total 15566 35168 19430 70164 The average family size is 6.7. The family size is highest in General Caste category (6.8).The family size amongst Backward Caste and Scheduled Caste and Schedule Tribe households is 6.7 and 6.6 respectively. Thus, family size was observed to be almost same across various caste categories. The average sex ratio in villages covered as a part of IESA Survey is 869. The sex ratio is highest in Backward Caste category (900). The sex ratio in General Caste category was lowest (809).The sex ratio amongst SC/ST households is 863. Thus, sex ratio varied significantly across various caste categories. Page 24 UPBSN IESA Report for UPSLRP-III 24 3.3.3 Farm size groups Farm size group composition of households in the study area villages is summarized in Table 3.8. TABLE-3.8 Land holdings in villages covered as a part of the survey Caste Category (Unit :%) Parameters GC BC SC/ST Total Landless 0 0 1 1 Marginal 55 69 79 69 Small 30 23 18 23 Large 15 8 2 7 Total 100 100 100 100 It can be observed from Table-3.8, that about 93% of the beneficiaries belong to economically weaker sections of the society which 1% landless beneficiaries as well. Marginal and small farmers account for about 92% of the total beneficiaries. About 7% of the beneficiaries are large farmers. The percentage of large farmers was highest in General category and lowest in scheduled caste and schedule tribe category. The percentage of marginal farmers was highest in scheduled caste and schedule tribe category and lowest in General caste category. 3.3.4 Natural resource base Natural resource base of the villages in terms of land resources, forests, ponds and wetlands is summarized in Table 3.9. Natural resource base has also been captured and documented through participatory resource mapping. Village-wise resource maps are given as Attachments . TABLE-3.9 Natural resource base of the study area villages Overall Sodic villages Ravines S. No. Particulars Total Avg. Total Avg. Total Avg. 1 Total geographical area 17220 506 14100 470 3120 780 2 Total uncultivable land 2148 63 1754 58 394 99 3 Inhabited area 605 18 526 18 79 20 4 Area under orchard 278 8 268 9 10 2 5 Area under forest 338 10 138 5 200 50 6 Area under reserved forest 4 0 4 0 0 0 7 Area under protected forest 204 6 124 4 80 20 8 Designated Protected area 129 4 9 0 120 30 9 Area under ponds 174 5 161 5 13 3 10 Area under wetlands other than ponds 42 1 42 1 0 0 11 Area under ponds lost in past 5 years 2 0 2 0 0 0 12 Area under wetlands lost in past 5 years 0 0 0 0 0 0 13 Area under common grazing land/pastures 58 2 58 2 0 0 14 Area under road, canal and other permanent uses 654 19 562 19 92 23 15 Total cultivable land 15069 443 12343 411 2726 682 16 Uncultivated area 2214 65 1452 48 762 191 Page 25 UPBSN IESA Report for UPSLRP-III 25 Overall Sodic villages Ravines S. No. Particulars Total Avg. Total Avg. Total Avg. 17 Cultivated area 12856 378 10892 363 1964 491 18 Mono-cropped area 1265 37 1068 36 198 49 19 Multiple-cropped area 11591 341 9824 327 1766 442 20 Total sodic land 1 4638 136 3502 117 1136 284 21 Barren sodic land (C class) 2 2214 65 1452 48 762 191 22 Mono-cropped sodic land (B class) 3 1265 37 1068 36 198 49 23 Double-cropped sodic land (B+ class) 4 1159 34 982 33 177 44 24 Community land owned by Gram Sabha (yet to be allotted) 517 15 517 17 0 0 25 Community land allotted by Gram Sabha (on which possession is awaited) 192 6 92 3 100 25 Notes: 1= low productivity land is ravines, 2= barren land in ravines, 3= low productivity mono-cropped in ravines, 4= low productivity double-cropped land in ravines As shown in table 3.9, average geographical area of study villages is 506 ha (470 ha in sodic areas and 780 ha in ravines), out of which about 12 percent (12 percent in sodic area and 13 percent in ravines) is uncultivable. Such uncultivable area consists of inhabitation, forests, ponds, wetlands, and other permanent uses. Average cultivable area is 443 ha (411 in sodic areas and 682 in ravines) out of which 378 ha (363 ha in sodic area and 491 ha in ravines) is cultivated and remaining 65 ha (48 in sodic area and 191 in ravines) is uncultivated. Thus, cultivated area constitutes about 85 percent (88 percent in sodic areas and 72 percent in ravines) of total cultivable area. Remaining 15 percent (12 percent in sodic areas and 28 percent in ravines) of the cultivable area is uncultivated. Out of cultivated area of 378 ha (363 ha in sodic areas and 491 ha in ravines), 341 ha (327 ha in sodic areas and 442 ha in ravines) is under multiple cropping and 37 ha (36 ha in sodic areas and 49 ha in ravines) is under mono-cropping. The multiple-cropped and mono-cropped areas constitute about 90 percent of the total cultivated area in sodic areas as well as ravines. Average area under ponds comes out to be 5 ha (5 ha in sodic areas and 3 ha in ravines). In many villages, the area under ponds is scattered over many small ponds. All these ponds are rainfed. Pond water is generally used by animals and sometimes for irrigation. Fishing is not very common in these ponds due to small quantity of water. Wetlands are found in very few villages, that too, to very small extent. Average area under wetlands is about 1 ha in sodic areas (nil in ravines). An average area of 2 ha under ponds was lost during last 5 years due to change in land use. Such area was converted into cultivated land. Area under forest is observed to be 10 ha (5 ha in sodic area and 50 ha in ravines) whereas average area under common grazing land/pastures is 2 ha (2 ha in sodic areas and nil in ravines). An assessment of sodic/low productivity land has been made. Sodic land is classified into three categories, barren (C class), mono-cropped (B class) and double-cropped (B+ class). C class land is absolutely uncultivated; only one crop is grown in B class lands; and two crops are cultivated in B+ class land. All these types of land suffer from the problem of sodicity at varying degrees. In case of ravines, sodic land is equivalent to low-productivity land. Hence, C class land indicates uncultivated land, B class represents mono-cropped land and B+ class land connotes double- cropped land. However, all these three types of land in ravine areas suffer from low productivity. Average sodic area is 117 ha (C class: 48 ha, B class: 36 ha, and B+ class= 33 ha) in the villages of sodic areas. Average area suffering from the problem of low productivity in ravines is 284 ha Page 26 UPBSN IESA Report for UPSLRP-III 26 (uncultivated area: 191 ha, mono-cropped area: 49 ha and double-cropped area: 44 ha). Thus, it is clear from above analysis that there is need for appropriate intervention to enhance the productivity of land resources available in these villages. The project intervention will not only bring uncultivated and mono-cropped area under multiple cropping but also improve its productivity. It can also be seen from table 3.9 that an average area of 17 ha still belongs to respective Gram Sabhas which can be allotted to eligible persons in sodic area villages. In villages representing ravines, there is no community land to be allotted. It is also observed that possession is pending, on an average, 3 ha in sodic area villages. In case of ravine villages, possession is pending on 25 ha area. The project should facilitate both new allotments and possession on old allotments through improving coordination with the Revenue Department. 3.3.5 Access to irrigation facilities The information on irrigation facilities in the villages covered as a part of the survey was also gathered during the field-work. In all there are about 2385 borings/tube wells in the villages covered under the survey, with an average of about 70 borings/tube wells per village. Like-wise, there are a total of 199 ponds in these assessment villages; an average of about 6 ponds per village. The average area occupied by these ponds is about 25.43 bighas per village. Further, it is also observed that about 22 out of 34 villages covered under the survey have access to canal water for irrigation purposes. The maximum number of villages in district Sultanpur had access to irrigation facilities. In 3 assessment villages, the canal water overflowed. The canal water was adequate in 10 villages. Thus, in 24 of the 34 of the villages covered under the survey farmers are dependent on groundwater for meeting their entire or partial irrigation requirements. 3.3.6 Access to drainage facilities It was gathered during field-work that all the assessment villages had access to a main drain, located at a distance of 0 to 5 km from the village. It was also reported that in 18 out of 34 villages covered under the survey main drain was smooth flowing. In other 16 villages, flow was impeded in the drain on account of weed growth, siltation, etc. Thus, drain rehabilitation as part of the project would go long way in improving the drainage system of the village. 3.3.7 Seed quality and variety Information on the seed types and seeds for the next crop was also collected through participatory approach. The commonly used seed varieties for various crops in villages selected for sodic land reclamation is given in Table-3.10. Likewise, the commonly used seed varieties for various crops in ravine villages are given in Table-3.11. TABLE-3.10 Seed varieties used in sodic area villages Crop District Sultanpur District Kanpur Dehat District Etah Paddy Masoori,6444,Prathvi Sarju52,NDR Nrendr359,Sambhr mansoori Usar Sudh,Narendr- 359,phb-71, Pant-10,6444 Nar endra - 80, Lokmanya - Mansoori,6444,5444 Asami50, Pionior, Dehradooni Satyaman, Sarju 52,Ndr, Narendr 359, Sambhr mansoori, Usar Sudh, Narendar-359,Phb-71 Ramraj, Bilaspuri, P-10, Sugandha, Kranti, Mahamaya, Narendra Vanaspati, Pant-4, Basmati,Sarju-52 Page 27 UPBSN IESA Report for UPSLRP-III 27 Crop District Sultanpur District Kanpur Dehat District Etah 510,509,Gorkhnath, Pionior, Sonam Mansoori, Ganga Kaveri 5006,5008 Indrasan, Lokmanya- 510,6444,Asami,Basmati, Kranti, Modi Wheat 2285, ,Malviya 3029,RR- 21,2368,pbw-502,pbw-343, 2338,pbw154,Murly-334, hd2285, Malviya, 543, 433, 732,285 RR-21,2285,2368, 2338, 343, pbw343, Malviya, Lokmanya 2338, Pbw154,Murly-334, pbw-154, hd2285 rr21, 2285, 433, 732, 285, 2329, Lokvan-1 343,3077,502,2329,Lokva n-255,Puja Lokvan-1, Pbw 343, 234, 2285, 323, 1100, Pusa, Halwa, 2329,234.Pbw- 373, 154 1100 Bajra 931,2210,9444 931 2210 Barley k-512,pl-173,172 Mustard Kranti Kranti Kranti, Alankar, Arhar Bahar Bahar Bahar Masoor Masoor-desi Masoor-desi Masoor-desi Potato Chandramukhi Chandramukhi Chandramukhi TABLE-3.11 Seed varieties used in ravine villages Crop District Kanpur Dehat Paddy Kranti, Indrasan Saket Wheat Pionior,4321,4222,4322 Gram Udai, Radhe, Tarky As far as farmers arranging seeds for the next season is concerned, they most commonly resort to “new purchase” of seeds. The other methods include, exchanging seeds, using old seeds, or continue with the same seeds. The commonly observed weeds in the agriculture fields were mama, motha, bathua, and dub. Weedicides were not used and if required, weeds were mainly removed manually. 3.3.8 Access to basic amenities As per the information collected as a part of the survey, it is observed that the residents of the assessment villages on an average travelled for a distance of about 5.77 km, 9.18 km and 9.32 km to access Primary Health Centre, Community Health Centre and Veterinary hospital, respectively. Only 3 villages covered as a part of the survey had Primary Health Centre within the village vicinity. Only 1 village covered as a part of the survey had Community Health Centre and veterinary hospital within the village vicinity. The information pertaining to the access to basic amenities is depicted in Table 3.12. TABLE-3.12 Distance of various amenities from the villages covered under the survey S . No. Particulars Within village <3 km 3-5 km 5-10 km >10 km Av. distance from the village vicinity (km) 1 Primary health centre 3 10 5 6 10 5.77 2 Community health centre 1 3 5 12 13 9.18 3 Veterinary hospital 1 7 6 12 8 7.32 4 Bank 2 8 10 11 3 5.03 5 Post office 10 12 8 4 0 2.59 6 PCO 19 7 5 2 1 1.70 Page 28 UPBSN IESA Report for UPSLRP-III 28 S . No. Particulars Within village <3 km 3-5 km 5-10 km >10 km Av. distance from the village vicinity (km) 7 Seed supply centre 0 8 6 14 6 7.52 8 Fertilizer supply centre 0 9 7 12 6 6.73 9 Krishi Raksha Ekai 7 4 4 10 9 6.78 10 Kisan Vidyalaya 24 3 0 7 0 2.00 11 Go-down facility 3 1 2 1 27 18.97 12 Cold storage 1 0 1 2 30 20.23 13 Village roads 31 0 0 1 3 0.39 Further, Bank, Post office and PCO facilities are accessible at an average distance of about 5.03, 2.59 and 1.70 km, respectively. Only 2 villages covered as a part of the survey had Health Centre within the village. Post office and PCO within the villages were observed in 10 and 19 villages respectively. Agricultural support systems such as seed supply centre, fertilizer supply centre, Krishi Raksha Ekai, Godown facilities and cold storage facilities are located at an average distance of 7.52 km, 6.73 km, 6.78 km, 2.00 km, 18.97 km, and 20.23 km respectively. This aspect needs to be improved significantly. Likewise infrastructure for godown and cold storage facility also needs to be improved. Village market is held on an average twice a week in villages covered as a part of a survey. Village roads, on an average are located at a distance of about 0.39 km. 3.3.9 Access to educational facilities All the villages have access to a Balwadi/ Anganwadi. Only two villages do not have a Balwadi/ Anganwadi, and the residents have to travel about 1 to 1.5 km to access the same. Three villages, amongst the assessment villages, do not have access to primary school with the village itself. 19 villages had middle school within the village, while in remaining villages; children travel an average distance of about 1.19 km to attend middle school. Children from the assessment villages on an average travel about 4.93 km to access high school. None of the assessment villages have high school within the village. Children attending Intermediate, Graduation and Post graduation levels have to travel an average distance of about 7.13, 17.36 and 27.61 km respectively. 3.3.10 Human resources In the 34 assessment villages, it was observed that male and female graduates/professionals comprised about 1888 and 643 individuals, persons employed in Government or Private Service included 1063 males and about 38550 females. 3.3.11 Migration pattern Agricultural activities in the villages do not fully support the farmers and their families. Thus, many of the farmers and their family members migrate in search of jobs to sustain their livelihood. It was observed that about 4385 individuals were engaged in migratory labor. Of these, men on an average were engaged for about 115 days per year in migratory wage earning. On the other hand, women folk were engaged for about 34 days per year in migratory wage earning. It was further inquired, that the average wage rate for men engaged in migratory labor was about Rs. 85/day), while that of women was Rs. 37/day. The details are given in Table-3.13. Page 29 UPBSN IESA Report for UPSLRP-III 29 T ABLE-3.13 Migration pattern in villages covered under the survey Parameter Average Men folk engaged in migratory wage earning (days/year) 115 Women folk engaged in migratory wage earning (days/year) 34 Wage rate of men folk engaged in migratory labor (Rs/day) 85 Wage rate of women folk engaged in migratory labor (Rs/day) 37 3.3.12 Livestock It was observed that the local residents reared cattle, which is an integral part of the farming activity and community. It was observed that Cow, Buffalo, Bullock, were reared. Besides, goats, sheep, pigs, and poultry birds were also reared. Poultry was reared in 25 out of 34 villages covered as a part of the survey. Pigs and sheep were reared in 16 and 7 out of 34 villages respectively covered as a part of the survey. Duck was reared in only one village out of 34 villages covered as a part of the survey. It was observed that out of the total livestock heads, only about 568 animals were insured. The dung from the livestock was essentially used as fuel and manure. The livestock holding pattern in villages covered as a part of the survey is summarized in Table-3.14. TABLE-3.14 Livestock holding pattern in villages covered under the survey Livestock Total (Number) Average Number per village Cow 3060 90 Buffalo 9335 275 Bullock 1391 43 Goat 12516 379 He buffalo 410 14 Pig 840 34 Baker 100 14 Sheep 1085 181 Hen 2508 157 Total* 28537 Note: Total excluding poultry 3.3.13 Agricultural implements Agricultural implements such as wooden plough, metal ploughs, seed drill, cultivators, harvesters, tractors, bullock carts, chaff cutters, pump-sets, etc., were most commonly observed (refer Table- 3.15). TABLE-3.15 Agriculture implements in villages covered under the survey Agricultural implements Total number Average number per village Wooden plough 1076 31.6 Metal plough 998 29.4 Seed drill 9 0.3 Cultivator 263 7.7 Harvester 175 5.1 Tractor 288 8.5 Bullock cart 214 6.3 Page 30 UPBSN IESA Report for UPSLRP-III 30 Agricultural implements Total number Average number per village Chaff cutter 4510 132.6 Pumpset (electric) 66 1.9 Pumpset (diesel) 1530 45.0 On an average, almost 32 and 29 wooden and metal ploughs respectively were observed in the villages covered as a part of IESA survey. Seed drill was observed in almost in about 1 in 3 villages. The average number of cultivators and harvesters observed were 7.1 and 5.1 respectively. About 8-9 tractors per village were observed. About 47 pumpset per village were observed, of which more then 95% were diesel operated. 3.3.14 Water supply Water supply in the villages was primarily from hand pumps. In few villages wells were also commonly used for meeting drinking water requirements. Ponds and wells were used for meeting drinking water requirements in two and one villages respectively. The details are given in Table- 3.16. TABLE-3.16 Water supply in villages covered under the survey Source Total number Average number per village Hand pumps – private 4719 139 Hand pumps - government 905 27 Well 259 8 3.3.15 Electrification Most of the villages covered under the survey were electrified. Only 4 villages in district Etah were not electrified. The other villages covered as a part of the survey were electrified. 3.3.16 Ongoing programs in the village The details of ongoing social welfare programmes being implemented in the village were collected as a part of the survey. Only National Rural Employment Guarantee Scheme was being implemented in most of the villages covered as a part of the survey. This scheme was operational in 30 out of 34 villages covered in the IESA survey. 3.3.17 Access to credit facilities In the assessment villages, it was observed that a large majority of the credit is taken care by borrowing from neighbors and Kisan Credit Cards facilities. The other major source of credit is borrowing from relatives, followed by borrowing from friends. It is also observed that farmers resort to loans from Commercial, Nationalized and Cooperative banks. The farmers also resort to short term loans from self help groups. 3.4 Macro profile of sampled villages - Environmental aspects 3.4.1 Ponds There are 83 ponds in sodic villages covered as a part of IESA survey in district Sultanpur, of which 9 have been renovated in last two years. In sodic villages of district Kanpur Dehat covered as a part of survey, 47 ponds were observed of which 9 have been renovated in last two years. In Page 31 UPBSN IESA Report for UPSLRP-III 31 district Etah, 37 wells were observed in ten villages covered under survey, of which 17 have been renovated in last two years. In ravine villages of district Kanpur Dehat, 23 ponds were observed of which 9 have been renovated in last two years. 3.4.2 Vector-borne diseases The major vector-borne diseases in the study area villages are Japanese Encephalitis, Malaria and Dengue. The incidence of malaria is observed in all the 34 villages covered under the survey. Dengue and Japanese Encephalitis are reported in 31 and 25 villages respectively out of 34 villages covered under the survey. Thus, the villages are affected by vector-borne diseases. The water logged condition in monsoon months is the chief cause for proliferation of mosquitoes, which leads to increased incidence vector-borne diseases. 3.4.3 Waterlogging Waterlogging was prevalent in majority of the villages in district Sultanpur and Etah covered under the IESA survey. The villagewise details are given in Annex-XVI. Water logging was observed in 7, 4 and 9 out of 10 villages in districts Sultanpur, Kanpur Dehat and Etah respectively. As a result, these conditions, not only cause discomfort and affects communication during monsoon, but such areas serves as excellent sites for breeding of mosquitoes, which leads to increase in the incidence of various vector-borne diseases. Waterlogging was not observed in any of the ravine villages covered as a part of survey for IESA study. 3.4.4 Trees The commonly observed tree species in the study area villages are Neem, Babool, Eucalyptus, Mango, Arjun, etc. A total of approximately 65,000 trees were observed in the villages covered under the survey. The details are given in Table-3.17. TABLE-3.17 List of tree observed in the villages covered under the survey Tree Estimated Number Neem 9610 Chilbil 1020 Mahua 1245 Mango 6525 Jamun 815 Ber 190 Bel 22 Amrood 1020 Kela 2 Babool 10300 Peepal 228 Bargad 37 Eucalyptus 27960 Sisam 420 Bans 275 Imali 38 Gular 216 Sagon 210 Arjun 5000 Nibu 15 Karonda 80 Total 65228 Page 32 UPBSN IESA Report for UPSLRP-III 32 3.5 HOUSEHOLD PROFILE As a part of the IESA Study, a household survey in 34 villages pertaining to environmental and socio-economic aspects has been conducted. All three zones of Uttar Pradesh, eastern, western and central were selected under the study. In each zone, 1 project district was selected, thus 3 districts were covered in the IESA study. To represent sodic areas, in each project district, 10 villages were selected, thus (30 villages were covered. To represent ravine areas, 1 project district where the ravine reclamation project is to be taken up was covered. In the selected project district, 4 villages were selected. For sodic villages, in every sampled village 25% households (with sodic land) or 25 households) which ever is higher, were covered in the IESA study. The number of beneficiaries in various project villages could not be provided by UPBSN. Hence, prior to start of survey, the number of families with sodic land in each village was ascertained, based on which sample size in each village was finalized. A total of 886 families were surveyed in 30 sodic villages. For ravine areas, 25% of the farm households with ravine land were selected for survey. The number of families with ravine land in various ravine villages could not be provided by UPBSN. Hence, prior to start of survey, the number of families with ravine land in each village was ascertained, based on which sample size in each village was finalized. A total of 102 families were surveyed in 4 ravine villages. A questionnaire for the household level survey was developed which was used to conduct survey in the field. The main purpose of conducting the household survey is to generate/provide baseline information on pre-intervention environmental and socio-economic status of the beneficiary- households so that the impact of the project on them can be assessed later. Findings in tabulated form are given at Annex XVII and salient points are discussed in following paragraphs. 3.5.1 Socio-demographic profile The socio-demographic variables, which were incorporated in the pre-reclamation benchmark assessment, include gender, age, caste, family structure, educational status, and landholding status. Findings on the respective aspects are being presented in the following sub-sections. 3.5.1.1 Caste composition of respondent households Out of total 886 beneficiary-households covered in the survey for sodic villages, 28.6% belonged to general caste category, about 36.8% to backward caste and 34.6% to scheduled caste/tribe category. In respondent households, in ravine villages, the percentage of general caste, backward, caste scheduled caste/tribe was 7.8%, 45.1% and 47.1%, respectively. Thus the lower caste households (backward and scheduled caste/tribe categories) constitute about 71.4% and 92.2% of the respondent households in sodic and ravine villages covered as a part of the study. 3.5.1.2 Farm-size composition of respondent households Households ’ landholding status has been assessed on the basis of quantity of land owned by the household as a whole. It is in consonance with the definition of household, which has been defined as a single production and consumption unit. On the basis of land ownership and size of landholding, households have been classified into three categories – marginal-farm households (households owning less than 1 hectare land), small-farm households (households owning 1-2 hectare land) and big-farm households (households owning more than 2 hectare land). The findings of the survey are summarized in Table-3.18. Page 33 UPBSN IESA Report for UPSLRP-III 33 T ABLE-3.18 Land holding pattern of respondent households covered as a part of Survey Land holding category Sodic villages (%) Ravine villages (%) Marginal (<1 ha) 66.9 54.9 Small (1-2 ha) 26.7 30.4 Big (>2 ha) 6.4 14.7 Total 100 100 Marginal and small farmers together constitute majority of respondent households (93.6% in sodic and 85.3% in ravine villages) covered as a part of the study. 3.5.1.3 Gender aspects The information has been collected and compiled on gender composition of population and sex ratio. Findings are presented in the Table-3.19. TABLE-3.19 Male-female population in various land holding categories in respondent households Sodic villages Ravine villages Parameter Marginal Small Large Overall Marginal Small Large Overall Male population, % 54 54 51 54 56 57 53 56 Female population, % 46 46 49 46 44 43 47 44 No. of females per 1000 males 846 857 942 857 774 761 895 794 The females constitute less than half of the population in respondent households covered as a part of the survey across the household categories. It implies that numerical male dominance is equally prevalent in all the landholding categories. However, sex ratio is better in large farm households. Sex ratio, i.e. number of females per 1000 males is 857 and 794 in respondent households in sodic and ravine villages, respectively. This sex ratio is quite low as compared to the sex ratio of the state as per Census 2001 (964). 3.5.1.4 Age composition of population Working age group is considered to be between 15 and 60 years. Age composition of population, in a way, determines physical quality of manpower. This is particularly important in the rural areas wherein agriculture (a labor intensive enterprise) is main source of livelihood. Age composition also reflects the proportion of the population physically capable of carrying out the farming activities effectively. Findings are summarized in the Table-3.20. TABLE-3.20 Age composition in respondent households covered as a part of Survey Parameter Sodic villages Ravine villages Male population % <5 years 18 13 5-14 years 19 17 15-60 years 58 61 > 60 years 5 9 Female population % <5 years 21 14 Page 34 UPBSN IESA Report for UPSLRP-III 34 Parameter Sodic villages Ravine villages 5-14 years 17 24 15-60 years 56 53 > 60 years 6 9 Total population % <5 years 20 14 5-14 years 18 20 15-60 years 54 33 > 60 years 6 15 As per Table-3.20, about 42% of population in respondent households in sodic villages is either in its childhood or has crossed the working age. Thus, only 58% people are fit for working. Likewise, about 61% people in respondent households in ravine villages are fit for working. Huge children population is one of the reasons for high dependency and hence low income of the households. 3.4.1.6 Family size Family size (i.e. number of members in family) together with the proportion of family members in the working age group determines the work force available in a family. It also determines per capita availability of goods and services at a given level of household income. Moreover, the relative size of family indicates social cohesiveness of lineage. That is why; number of members living in a single household has been examined in the study. It is important to mention here that for the study family is synonymous with household, which is a single production and consumption unit. It is not merely a social and biological group of people living under a single roof. All the persons sharing the same kitchen have been treated as members of same household. Findings on family size are summarized in the Table-3.21. TABLE-3.21 Average family size of respondent households covered as a part of IESA Survey Household category Average number of persons in family Sodic Villages 6.7 Marginal farmers 7.7 Small farmers 9.6 Large farmers 7.1 Ravine Villages Marginal farmers 6.3 Small farmers 6.4 Large farmers 9.6 Overall 6.8 The overall family size of respondent households in sodic and ravine villages is 7.1 and 6.8, respectively. The fami ly size of marginal and small farmers’ families is closer to average size. Larger families were observed in big farm households. The larger family size of big farm households has two explanations. Either such households have seen lesser family disintegration or such families are still together so are big farmers. Integrating the findings on family size and age structure of population it can be seen that working members have to support quite large number of persons in addition to bearing the cost of life of their own. Page 35 UPBSN IESA Report for UPSLRP-III 35 3.4.1.7 Literacy rate Educational attainment of a person is harbinger of his overall growth and development. The study of educational status of people would help to understand the knowledge and awareness perspective in which they live and function; and to explain many socio-demographic patterns existent among them. In consonance with the census of India, for measuring/assessing the literacy among people, population below 7 years is excluded. This system is being followed since the Census of 1981 before which population below 5 years was excluded. Study findings on literacy/education status of the covered population are summarized in Table-3.22. TABLE-3.22 Literacy rate in respondent households covered as a part of Survey Parameter Sodic villages Ravine villages Literacy rate (%) Male 72 77 Female 47 57 Total 61 68 Crude literacy rate (%) Male 59 67 Female 37 49 Total 49 59 The study findings given in the Table-3.22 show that literacy among respondent households in sodic villages is 61%. Male and female literacy rates are 72% and 47% respectively. Crude literacy rate is 49% (males: 59% and females: 37%). The literacy among respondent households in ravine villages is 68%. Male and female literacy rates are 77% and 57% respectively. Crude literacy rate is 59% (males: 67% and females: 49%). High children population explains lower crude literacy rate. 3.4.1.8 Work status and occupational profile of workers Work status (working or non-working) depends on willingness and ability of person to work as well as availability of work. The survey has captured the number of male and female workers. It has been observed that no child is involved in work as such (though children often accompany their parents to family work). Hence, the work status is represented through an indicator defined as percentage of workers in total population aged 15 years and above. Findings are summarized in Table-3.23. TABLE-3.23 Percentage of workers and persons with secondary occupation Sodic villages Ravine villages Particulars/Household categories Males Females Persons Males Females Persons Workers (%) Marginal 83 10 50 93 18 61 Small 81 17 53 90 15 60 Large 79 15 47 72 17 51 Overall 82 13 51 88 17 59 Secondary occupation (%) Marginal 47 7 29 30 3 19 Small 28 4 18 28 9 20 Large 6 0 3 15 10 13 Overall 38 5 23 26 6 18 Page 36 UPBSN IESA Report for UPSLRP-III 36 As shown in table 3.23, percentage of workers among males is 82 in sodic villages and 88 in ravine villages, whereas percentage of workers among females is 13 in sodic villages and 17 in ravines. About 38 percent of males and 5 percent of females are engaged in secondary occupation in sodic villages. In case ravines, 26 percent males and 6 percent females are involved in secondary occupation for their livelihood. It is clear from above analysis that work involvement is higher among males than that among females. Women are fully engaged in household chore and affiliated activities including even animal care. Since these activities are excluded from the category of employment, the percentage of workers is quite low among females. The people who are not working at present cannot be termed as unemployed as such because they may not be willing to or available for work. For example, an aged person or woman may not wish to work. Working on family farm is the major primary occupation for the male population, as 73% of respondent households in sodic villages covered under the survey were working on family farm. The percentage was lower in large farmers, as because of their better economic status they could diversify in other occupation, e.g. salaried jobs, trade/business, etc. For small and marginal farmers, working as labor was the major secondary occupation. For large farmers, trade/business was the major secondary occupation. For female population in households in sodic villages, working on family farm was the major primary occupation for marginal and small farmers. However, for female population of large farmers, a salaried job was the major primary occupation. As far as secondary occupation is concerned, the females in small and marginal farmer households were mainly involved as labor. Female population of large farm households was not involved in any secondary occupation. Similar trend was observed in ravine villages households except for the fact that the major primary occupation for male population along with family farm was labor as well. This implied that due to ravines, the productivity was quite low, and due to smaller land holdings farmers were forced to work as labor to supplement their family income. 3.4.1.9 Laborer profile Male laborers on an average worked for 247 days. The average wage earning days were much lower for large farmers. For small and marginal farmers, the wage earning days in local were almost 55% of the total wage earning days. However, for large farmers this figure was marginally higher than 20%. Thus, labor from large households worked more outside the village. The major type of work for local wage earning days in which male labor population was involved was farm work. Labor from small and marginal household was also involved in brick making and construction. On the other hand, major work type for outside wage earning days was construction. The percentage involved in farm work was quite less. This implied that migration outside the village was mainly in cities or urban areas. The average wage rate was Rs.70/- in local and Rs.100/- for outside work. As far as female labor population is concerned, the number of wage earning days for marginal and small households was 205 and 57 respectively. In marginal farm households, majority of wage earning days were outside, while for small farmers, almost entire wage earning was local. In large farm household, female population was not involved in wage earning. For local labor, female population was mainly involved in farm labor. For outside wage earning days, the female population was mainly involved as labor in construction and factory. The average wage income (Rs./year/household) of marginal, small and large farmers in sodic villages was Rs.9404, Rs.5858 and Rs.1718, respectively. Page 37 UPBSN IESA Report for UPSLRP-III 37 For respondent households in ravine villages, male laborers on an average worked for 210 days. The wage earning days for small and marginal farmers was both local and outside. However, for large farmer, it was only in local and they did not migrate outside for wage earning. The major type of work in which male labor population was involved was farm work. Labor from small and marginal household was also involved in brick making. On the other hand, major work type for outside wage earning days was construction, farm work and in factories. The average wage rate was Rs.76/- in local and Rs.100/- for outside work. As far as female labor population is concerned, the number of wage earning days for marginal and small households was 134 and 135 respectively. In small farm households, female laborers did not work outside the village. In large farm household, female population was not involved in wage earning days at all. For local labor, female population was mainly involved in farm labor and brick fields. For outside wage earning days, the female population was mainly involved as labor in farm. The average wage income (Rs./year/household) of marginal, small and large farmers in ravine villages was Rs.11895, Rs.5882 and Rs.400, respectively. 3.5.2 Agricultural aspects The various aspects of agricultural profile of the beneficiary households on which baseline information has been generated include land utilization, cropping pattern, crop yield, agricultural inputs including seed, fertilizer, and irrigation. The findings of the study on these aspects are discussed in following paragraphs. 3.5.2.1 Land utilization The details of land utilization are given in Table-3.24. TABLE-3.24 Land utilization of respondent households covered as a part of Survey Particulars Unit Marginal farmers Small farmers Large farmers Overall Sodic Villages Average holding size ha/household 0.50 1.33 3.33 0.90 Average leased-in area ha/household 0.07 0.04 0.06 0.06 Average leased-out area ha/household 0.02 0.04 0.71 0.07 Cropping Intensity % 121.10 118.80 77.76 110.09 Cultivated area % of holding 64% 65% 47% 61% Mono-cropped area % of cultivated area 11% 18% 36% 18% Multiple-cropped area % of cultivated area 89% 82% 64% 82% Uncultivated area % of holding 36% 35% 53% 39% Ravine Villages Average holding size ha/household 0.49 1.46 2.79 1.12 Average leased-in area ha/household 0.15 0.20 0.00 0.14 Average leased-out area ha/household 0.01 0.05 0.36 0.07 Cropping Intensity % 67% 88% 44% 67% Cultivated area % of holding 49% 67% 29% 49% Mono-cropped area % of cultivated area 63% 68% 51% 63% Multiple-cropped area % of cultivated area 37% 32% 49% 37% Uncultivated area % of holding 51% 33% 71% 51% The average holding amongst respondent households in sodic villages was 0.90 ha/household. The average holding amongst marginal, small and large households was 0.55 ha/household, 1.33 ha/household and 3.33 ha/household, respectively. The cropping intensity was more than 100% in Page 38 UPBSN IESA Report for UPSLRP-III 38 marginal (121.1%) and small (118.8%) households. For larger farm households, the cropping intensity was 77.8%. This could be attributed to the fact that generally large farmers have greater proportion of normal soils as well, on which they grow crops. As a result, the cultivation on sodic lands owned by large farmers is not given priority or is left fallow. This leads to lower cropping intensity for large farmer households. On the other hand the major holding of small and marginal farmers is sodic land, as they own lesser proportion of normal soils. Thus, these farmers have no option, but to grow double crops over sodic soils to sustain their livelihood. This is also reflected by the fact that the percentage of mono-cropped area is highest among large farmers (36%). The corresponding figure for marginal and small farmers is 11% and 18% respectively. The cultivated area as proportion of land holding is higher in marginal (64%) and small (65%) farmers as compared to large farmers (47%). Thus, large farmers cultivate their normal soils on priority and leave their sodic soils fallow. As a result, they leave larger proportion of their land uncultivated as compared to marginal and small farmers. The average holding amongst respondent households in ravine villages was 1.12 ha/household. The average holding amongst marginal, small and large households was 0.45 ha/household, 1.46 ha/household and 2.79 ha/household. The cropping intensity in ravine villages was much lower than sodic villages, but cropping intensity across various landholding categories was similar to that of sodic villages. 3.5.2.2 Cropping pattern Cropping pattern implies distribution of gross sown area across different crops in an agriculture year. Cropping pattern is determined by physical characteristics such as soil, climate, rainfall etc., nature and availability of irrigation facility, and socio-economic factors. Findings are given in Table-3.25. TABLE-3.25 Cropping pattern of respondent households covered as a part of Survey Crop Marginal farmers Small farmers Large farmers Overall Sodic Villages Paddy 43.6% 40.4% 35.1% 40.7% Wheat 51.3% 53.0% 54.1% 52.5% Bajra 2.6% 2.8% 3.4% 2.8% Mustard 1.3% 2.4% 4.7% 2.3% Potato 0.5% 0.4% 1.1% 0.6% Gram 0.8% 1.0% 1.6% 1.0% Ravine Villages Paddy 37.1% 32.2% 40.7% 38.7% Wheat 54.6% 55.0% 52.1% 53.1% Bajra 3.5% 4.0% 3.2% 3.4% Mustard 3.0% 5.6% 2.2% 2.8% Potato 0.5% 1.3% 0.6% 0.7% Gram 1.3% 1.9% 1.1% 1.2% Paddy and wheat are the major crops grown by the respondent households in sodic and ravine villages, irrespective of their farm size. The other crops grown are Bajra, Mustard, Potato and Gram. This phenomenon was observed in households of both sodic and ravine villages. Paddy was grown over 40.7% and 38.7% of the gross cropped area of respondent households in sodic and ravine villages respectively. The corresponding figure for wheat in sodic and ravine villages Page 39 UPBSN IESA Report for UPSLRP-III 39 was 52.5% and 53.1%, respectively. The other crops grown in sodic and ravine villages include bajra, mustard, potato and gram. The cropping pattern practices by the farmers are predominated by paddy-wheat. Predominance of paddy & wheat is attributed to the following: (a) farmers give top priority to paddy and wheat cultivation, as these grains constitute staple food for them; (b) the size of landholding is small so farmers are left with small area after sowing paddy and wheat to take other crops; (c) predominance of subsistence farming and near absence of commercial approach towards farming is also responsible for the observed cropping pattern. 3.5.2.3 Use of seeds Majority of farmers are not using certified seed in almost all crops. In case of paddy, use of certified seeds was 29% by respondents of sodic and ravine villages. The use of certified seeds for wheat was 29% and 31% in sodic and ravine villages respectively. The use of certified seeds for bajra was 32% and 38% in sodic and ravine villages respectively. For other crops, e.g. mustard, gram and potato, use of certified seed is nil. 3.5.2.4 Irrigation Paddy requires substantial amount of water for its proper growth and maturity. Though Kharif season in the state coincides with monsoons but irrigation is required to compensate for dry spell and insufficient or erratic rainfall. The survey tried to assess number of irrigation supplied. Findings are given in Table-3.26. TABLE-3.26 Average number of irrigation Particulars Marginal farmers Small farmers Large farmers Overall Paddy Sodic villages 2.67 2.94 3.32 2.78 Ravine villages 2.50 2.67 3.00 2.71 Wheat Sodic villages 2.99 3.29 3.72 3.12 Ravine villages 3.33 3.00 2.90 3.13 Mustard Sodic villages 3.67 2.00 2.33 2.72 Ravine villages 0.50 0.38 0.50 0.44 Potato Sodic villages 3.6 3.5 2.8 3.4 Ravine villages 4.0 4.0 4.0 4.0 Gram Sodic villages 0.61 0.40 0.25 0.50 Ravine villages 0.61 0.40 0.25 0.50 Bajra Sodic villages 2.00 2.18 2.00 2.07 Ravine villages 0.20 0.29 0.43 0.28 Farmers supplied, on an average, 2.8 and 2.7 irrigations paddy crop in sodic and ravine villages, respectively. Rabi season is normally dry season. However, residual moisture is available for wheat crop. Quantum of such residual moisture depends on the rainfall during the preceding Page 40 UPBSN IESA Report for UPSLRP-III 40 season. Minimum irrigation, therefore, is necessary for wheat cultivation. On an average, farmers supplied 3.1 irrigations to wheat crop in sodic and ravine. The information on source of irrigation is summarized in Table-3.27. TABLE-3.27 Source of irrigation for respondent households covered as a part of survey Percentage of source wise irrigation Name of Crop Tube well Canal Others Paddy 72 26 2 Wheat 77 21 2 Bajra 92 2 6 Mustard 94 6 0 Potato 96 4 0 Gram 80 20 0 The data related to irrigation indicates that the tube wells are the major source of irrigation. A small proportion of cropped area is under canal irrigation. The number of irrigations given to different crops also appears low because the cost of tube well irrigation, mostly operated through diesel pump sets is very high with the result the required number of irrigation is not provided which ultimately results in low productivity. 3.5.2.5 Use of Chemical Fertilizers The commonly used fertilizers in the surveyed villages are urea, DAP and MOP. The information on use of chemical fertilizers is given in Table-3.28. TABLE-3.28 Use of chemical fertilizers by respondent households covered as a part of survey Particulars Sodic Villages Ravine Villages Paddy Nitrogen consumption, kg/ha 129.68 131.00 Phosphorus consumption, kg/ha 54.36 29.87 Potash consumption, kg/ha 3.74 0.00 Wheat Nitrogen consumption, kg/ha 131.49 130.14 Phosphorus consumption, kg/ha 71.09 77.32 Potash consumption, kg/ha 6.84 5.51 Mustard Nitrogen consumption, kg/ha 107.13 46.29 Phosphorus consumption, kg/ha 63.85 30.93 Potash consumption, kg/ha 0.00 0.00 Potato Nitrogen consumption, kg/ha 173.02 165.00 Phosphorus consumption, kg/ha 81.73 69.00 Potash consumption, kg/ha 0.00 0.00 Gram Nitrogen consumption, kg/ha 10.13 10.13 Phosphorus consumption, kg/ha 13.33 13.33 Potash consumption, kg/ha 0.00 0.00 Bajra Nitrogen consumption, kg/ha 83.46 90.87 Phosphorus consumption, kg/ha 44.25 34.79 Page 41 UPBSN IESA Report for UPSLRP-III 41 Particulars Sodic Villages Ravine Villages Potash consumption, kg/ha 1.86 0.00 The above data indicates that there is no balanced use of fertilizer i.e. NPK. Almost all farmers applied nitrogen in one form or other in their paddy crop of the sodic lands. The average dose of nitrogen is 130 kg/ha in sodic and 131 kg/ha in ravine villages. In wheat, the nitrogen consumption is about 130 kg/ha in sodic and ravine villages. The nitrogen consumption for potato is 173kg/ha and 165 kg/ha in sodic and ravine villages. For mustard, about 130 kg/ha of nitrogen consumption is observed in sodic villages. The average dose of phosphorus in paddy is about 53 kg/ha in sodic and 30 kg/ha in ravine villages. In wheat, the phosphorus consumption is about 71 kg/ha and 77 kg/ha in sodic and ravine villages. The phosphorus consumption for potato is 82 kg/ha and 69 kg/ha in sodic and ravine villages. For mustard, about 65 kg/ha and 12 kg/ha of nitrogen consumption is observed in sodic and ravine villages respectively. The use of potassium is low or negligible in various crops. The above data indicates that there is no balanced use of fertilizer i.e. NPK. The ratio is 20:60:40 in case of paddy and 120:60:50 in case of Wheat. Thus, it is very much clear that from the point of view of soil health use of NPK ratio be as per recommendation and based on soil test. 3.5.2.6 Use of farmyard manure The information on use of farmyard manure is given in Table-3.29. TABLE-3.29 Use of farmyard manure by respondent households (%) covered as part of survey Particulars Sodic Villages Ravine Villages Paddy 19 29 Wheat 7 39 Mustard 6 0 Potato 9 100 Gram 3 3 Bajra 9 28 It can be observed from Table-3.29 that use of farmyard manure is quite low in the villages covered as a part of the survey. Thus, the project need to promote “Integrated Plant Nutrient Management” in which use of organic manure and proper proportion of NPK and micro-nutrients on soil test basis must be encouraged. The project authorities also need to provide proper training to the farmers on this aspect and in each project at least two demonstrations in each season be arranged under the direct supervision of the Assistant Manager so as to show the need of IPNM. Similarly, to make available the organic manures, use of green manuring crops and preparation of NADEP and vermi-compost is also necessary. With the project interventions due emphasis be given on IPNM training and demonstrations along with preparation of vermi-compost and NADEP compost. Necessary training should be arranged on these issues. In fact, this should be one of the major component for discussions during SIC meetings. 3.5.2.7 Crop Productivity The information on crop productivity of lands owned by respondent households is given in Table- 3.30. Page 42 UPBSN IESA Report for UPSLRP-III 42 TABLE-3.30 Crop Productivity for respondent households covered as part of survey (qtl/ha) Particulars Marginal farmers Small farmers Large farmers Overall Paddy Sodic villages 22.29 23.57 25.13 23.25 Ravine villages 21.45 23.55 24.30 22.92 Wheat Sodic villages 20.97 22.01 22.56 21.69 Ravine villages 20.45 21.85 22.47 21.67 Mustard Sodic villages 10.15 9.12 8.50 8.88 Ravine villages 8.45 8.78 9.15 8.78 Potato Sodic villages 119.32 113.67 130.56 115.41 Ravine villages --- 125.00 -- 125.00 Gram Sodic villages 11.51 10.38 10.98 10.88 Ravine villages 11.51 10.38 10.98 10.88 Bajra Sodic villages 10.57 11.50 11.25 10.92 Ravine villages 11.45 12.54 13.15 12.52 The paddy productivity in sodic and ravine villages is 23.25 qtl/ha and 22.92 qtl/ha. Likewise, wheat yield was about 21.7 qtl/ha in sodic and ravine villages. Based on the review of productivity of other crops, it can be concluded, that productivity in sodic soils was higher than ravine areas. However, the yield was much lower than normal soils. 3.5.2.8 Marketing of agriculture produce As a part of the study, information on marketing of agriculture produce was also collected. In sodic villages, percentage of respondent-households selling paddy and wheat is observed to be 36 and 38, respectively. The corresponding percentages in ravines are 7 and 30, respectively. It is also clear from the table that large farmers sell larger quantities, which is obviously attributed to higher production and marketable surplus. Farmers dispose off their produces to itinerary traders, fellow farmers, haat painth, town market and Mandi. Taking the marketable produce to the organized market (Mandi) is more common among large farmers than that among marginal and small farmers. Larger quantity of saleable agricultural produce motivates the large farmers to transport the produce to Mandi. 3.5.3 Economic & quality of life aspects The current section presents the benchmark status of respondent-households with respect to working status and activity profile, household income, housing accommodation, livestock, asset & goods and access to basic amenities. 3.5.3.1 Household Income Page 43 UPBSN IESA Report for UPSLRP-III 43 Households draw their livelihood from both farming and other activities. Non-farm sources of income include wage income, income from trade/business, professional/skill works, caste-based occupations and salary/pension/remittances and other sources. Annual income of the respondent households in sodic and ravine villages is Rs. 43,241/household and Rs. 47,580/household, respectively. In sodic villages, non-farm income (including wage income) accounts for about 78% of the total income. The marginal and large farmers draw only 22% of their income from farming, while small farmers earn about 37% of their income from this source. In ravine villages, non-farm income including wage earning accounts for about 83% of the total income. For marginal and small farmers, non-farm income including wage earning accounts for about 85.4% and 77.7% respectively of the total income. The share of farm income in respondent households of sodic villages is 27%. The share of marginal, small and large farmers was 22%, 37% and 22%, respectively. Similar trend was observed for respondents in ravine villages as well. 3.5.3.2 Housing accommodation In the study areas mainly three types of housing accommodations are prevalent, viz., Pucca , Kachcha and Chhappar . The first type involving the highest construction cost is indicator of higher economic status with the last type the lowest. Findings reveal that about one-fourth of respondent-households in sodic and ravine villages have fully Pucca accommodation. Households with chappar accommodation were about 5% and 1% of respondent households in sodic and villages respectively. About 39% and 29% of the respondent households had fully Kachcha house in sodic and ravine villages. Analysis of housing accommodation of different categories of households shows the obvious pattern, which is in line of the differences in economic condition. About 46% and 39% of the respondent households in sodic and ravine villages have independent cattle yards. However, the proportion of such households is higher among large farmers and the lower among marginal farmers. As far as type cattle yard is concerned only 4% of them is pucca among sodic village respondents. No cattle yard is pucca among ravine village respondents. Construction of pucca cattle yard is rare phenomenon in the rural areas. Even well to do farmers (who can afford it) avoid investing in pucca cattle yard. Housing details are given in Annex- XVII. 3.5.3.3 Basic amenities The basic amenities (other than house accommodation) baseline status of which has been assessed include access to safe drinking water, source of lighting, sanitation facilities, and fuel for cooking. Only 7% of the respondent households in sodic villages and 4% of the respondent households in ravine villages reported electricity as a source of light. The balance households were depending on kerosene as source of light in their house. About 90% of the respondent households in sodic villages and 93% of respondent household in ravine villages did not have latrines. The situation was much better for large farmers in both sodic and ravine villages. Bathrooms within the households were observed in 14% and 7% of respondent households in sodic and ravine villages respectively covered as a part of the survey. Separate kitchen space in house space was found in only 11% of respondent households and 4% in respondent households in sodic and ravine villages. One common feature was that in terms of basic amenities, sodic households were better as compared to ravine households. 3.5.3.4 Drinking water sources Page 44 UPBSN IESA Report for UPSLRP-III 44 Households have mainly two sources of drinking water, i.e., hand pump and dug wells. The major drinking water sources in the surveyed households was hand pump followed by dug well. About 36% of respondent households in sodic villages and 7% of respondent households in ravine villages had drinking water source within the premises. Majority of the households had drinking water source near the premises. The percentage of households with drinking water source away for their place of stay was higher in ravine villages (21%) as compared to sodic villages (8%). Generally, drinking water source was shared between various household and very few households (14% of respondent households in sodic villages and 8% of respondent households in ravine villages) had privately owned drinking water source. 3.5.3.5 Source of fuel Baseline status of source of fuel with respect to households covered in the survey is given in Table-3.31. TABLE-3.31 Source of fuel for respondent households covered as part of survey Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Firewood %HH 12% 14% 9% 12% Crop residue %HH 4% 2% 4% 3% Cow dung cake %HH 14% 10% 9% 12% LPG %HH 0% 1% 0% 0% Firewood + crop residue %HH 2% 1% 2% 2% Firewood + cow dung cake %HH 54% 54% 52% 54% Firewood + coal %HH 1% 0% 0% 1% Firewood + kerosene %HH 11% 11% 7% 11% Firewood + LPG %HH 1% 3% 13% 2% RAVINE VILLAGES Firewood %HH 4% 0% 0% 2% Crop residue %HH 0% 0% 0% 0% Cow dung cake %HH 2% 0% 0% 1% LPG %HH 0% 0% 0% 0% Firewood + crop residue %HH 4% 0% 13% 4% Firewood + cow dung cake %HH 82% 65% 56% 73% Firewood + coal %HH 4% 10% 0% 5% Firewood + kerosene %HH 4% 26% 19% 13% Firewood + LPG %HH 0% 0% 0% 0% The major source of fuel is Firewood + Cow dung cake as it is used in 52% and 73% of the respondent households in sodic and ravine villages. Crop residue + Firewood is also used as a source. Use of LPG and kerosene for fuel is negligible. 3.5.3.6 Livestock Buffalo was the most common livestock owned by 49% and 53% of respondent household in sodic and ravine villages respectively. The other commonly observed livestock was goat owned by 15% and 32% of the respondent households sodic and ravine villages respectively. Cow was owned by 8% and 17% of respondent households in sodic and ravine villages respectively. In Page 45 UPBSN IESA Report for UPSLRP-III 45 general, livestock holding was higher in ravine households as compared to sodic households. Majority of the livestock (buffalo, cow, and goat) was of Desi or indiscriminate breed. Majority of livestock was fed through stall feeding. The major source of fodder was crop residue as it is fed to animals by 82% and 17% of respondent households in sodic and ravine villages (Refer Table-3.31). The fodder requirements of remaining animals were met by fodder grass. The use of fodder grass was higher in large farmers in both sodic and ravine households covered as a part of the survey. The major source of fodder grass was through forests/wild for small and marginal farmers. However, large farm households purchased fodder grass farm open market. Livestock feed was generally absent. In case livestock suffered from diseases, 84% of the respondent households in sodic villages and 100% of respondent households in ravine villages availed veterinary services. 3.5.3.7 Access to Credit Bank and moneylender were the major sources of credit for the households in sodic and ravine villages. In ravine villages, about 20% of the borrowers took money from their fellow villagers and relatives. However, this figure was only 4% for households covered in sodic villages. The major purpose of taking loan in sodic villages was agriculture, marriage in the house, purchase of livestock and other dairy related activities. In ravine villages, loans were mainly taken for house improvement, followed by agriculture, marriage in the family, and dairy related activities. The average loan by respondent households in sodic and ravine villages was Rs.22471/- and Rs.15900/- per household, respectively. The percentage of respondent households with Kisan Credit Cards was only 12% in both sodic and ravine villages. 3.6 Summary of findings Based on the findings of the environmental and social baseline setting, the summary of findings are given as below: · About 93% of the beneficiaries belong to economically weaker sections of the society which 1% landless beneficiaries as well. Marginal and small farmers account for about 92% of the total beneficiaries. · All the assessment villages had access to a main drain, located at a distance of 0 to 5 km from the village. · It was also reported that in 16 out of 34 villages covered under the survey flow in main drain was impeded on account of weed growth. · It was observed that Cow, Buffalo, Bullock, were reared. Besides, goats, sheep, pigs, and poultry birds were also reared. · All the villages have access to a Balwadi/ Anganwadi. Only two villages do not have a Balwadi/ Anganwadi, and the residents have to travel about 1 to 1.5 km to access the same. Three villages, amongst the assessment villages, do not have access to primary school with the village itself. · On an average, almost 32 and 29 wooden and metal ploughs respectively were observed in the villages covered as a part of IESA survey. · Seed drill was observed in almost in about 1 in 3 villages. The average number of cultivators and harvesters observed were 7.1 and 5.1 respectively. · About 8-9 tractors per village were observed. Page 46 UPBSN IESA Report for UPSLRP-III 46 · it was observed that a large majority of the credit is taken care by borrowing from neighbors and Kisan Credit Cards facilities. The other major source of credit is borrowing from relatives, followed by borrowing from friends. · The major vector-borne diseases in the study area villages are Japanese Encephalitis, Malaria and Dengue. The incidence of malaria is observed in all the 34 villages covered under the survey. Dengue and Japanese Encephalitis are reported in 31 and 25 villages respectively out of 34 villages covered under the survey. · In sodic villages, 28.6% belonged of respondent households belonged to general caste category, about 36.8% to backward caste and 34.6% to scheduled caste/tribe category. In respondent households, in ravine villages, the percentage of general caste, backward, caste scheduled caste/tribe was 7.8%, 45.1% and 47.1%, respectively. · Marginal and small farmers together constitute majority of respondent households (93.6% in sodic and 85.3% in ravine villages) covered as a part of the study. · Percentage of workers among males is 82 in sodic villages and 88 in ravine villages, whereas percentage of workers among females is 13 in sodic villages and 17 in ravines. · Male laborers on an average worked for 247 days. The average wage earning days were much lower for large farmers. For small and marginal farmers, the wage earning days in local were almost 55% of the total wage earning days. However, for large farmers this figure was marginally higher than 20%. · The average holding amongst respondent households in sodic villages was 0.90 ha/household. The average holding amongst marginal, small and large households was 0.55 ha/household, 1.33 ha/household and 3.33 ha/household, respectively. · Paddy and wheat are the major crops grown by the respondent households in sodic and ravine villages, irrespective of their farm size. · Majority of farmers are not using certified seed in almost all crops. · Farmers supplied, on an average, 2.8 and 2.7 irrigations paddy crop in sodic and ravine villages, respectively. On an average, farmers supplied 3.1 irrigations to wheat crop in sodic and ravine. · The fertilizer data indicates that there is no balanced use of fertilizer i.e. NPK. · The paddy productivity in sodic and ravine villages is 23.25 qtl/ha and 22.92 qtl/ha. Likewise, wheat yield was about 21.7 qtl/ha in sodic and ravine villages. · In sodic villages, percentage of respondent-households selling paddy and wheat is observed to be 36 and 38, respectively. The corresponding percentages in ravines are 7 and 30, respectively. Page 47 UPBSN IESA Report for UPSLRP-III 47 CHAPTER 4 STAKEHOLDER ASSESSMENT AND SOCIAL ANALYSIS 4.1 BACKGROUND Stakeholder assessment/analysis is a term used to describe a process where all the individuals or groups that are likely to be affected by the activities of a project are identified and then sorted according to how much they can affect the project and how much the project can affect them. This information is used to assess how the interests of those stakeholders should be addressed in the project plan. A stakeholder is any person or organization, who can be positively or negatively impacted by, or cause an impact on the actions of an organization. Types of stakeholders are: primary stakeholders (those ultimately affected, either positively or negatively by project actions); secondary stakeholders (the ‘intermediaries’, that is, persons or organizations who are indirectly affected by project actions); and key stakeholders: (who can also belong to the first two groups) have significant influence or importance in the project. Stakeholder analysis has the goal of developing cooperation between the stakeholder and the project team and, ultimately, assuring successful outcomes for the project. A stakeholder analysis is performed when there is a need to clarify the consequences of envisaged changes or at the start of new projects and in connection with organizational changes generally. It is important to identify all stakeholders for the purpose of identifying their success criteria and turning these into quality goals. Stakeholder analysis (including stakeholder assessment and social assessment) has been conducted to initiate the participation process through · Identifying various stakeholders; · Soliciting and documenting their feedback/concerns; · Identifying their roles & responsibilities in planning, implementing and monitoring project activities; and to develop a strategy for continuing this process. The assessment has been conducted with the help of various tools such as village-level stakeholders & disclosure workshops, participatory group exercise, focus group discussion, semi-structured/structured interview, checklist-based interaction. In addition, some village level stakeholder-cum-disclosure workshops were also organized to get feedback of the village community as a whole. 4.2 IDENTIFICATION OF STAKEHOLDERS AND METHODS OF CONSULTATION Various stakeholders who were identified include farmers, women, functionaries/officials of Agriculture Technology Management Agency (ATMA), office bearers of local farmers’ cooperatives, local non- government organizations (NGO) working on farming issues, field staff of UPBSN, District Agriculture Officer, and institutional stakeholders including UPBSN, department of Agriculture, Animal Husbandry department, Panchayati Raj department, Irrigation Department. Various stakeholders, method of consultation with them and issues covered in the consultation are summarized below: Stakeholder Method Key issues covered Farmers Participatory Group Exercise ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizers and pesticides ƒ Use of Irrigation; effect on groundwater ƒ Small farmers’ opportunity to participate Page 48 UPBSN IESA Report for UPSLRP-III 48 Stakeholder Method Key issues covered ƒ Weed invasion on agricultural fields ƒ Cattle productivity; unproductive cattle/fodder shortages ƒ Dependence on natural resource base (wetlands/pastures / forests, etc) ƒ Ownership/occupancy issues and the extent of encroachment Women’s groups Focus Group Discussion ƒ An assessment of number of women (de facto) cultivators ƒ Impact of migration of male workers on the role of women in agricultural productivity ƒ Impact on household consumption / nutrition ƒ Adequacy of skills to manage farming (on improved land) and skills to take up improved agriculture ƒ Wage payment at par with male members for equal work ƒ Involvement of child labor in the construction activities ƒ Cooking media/indoor; impact on health ƒ Gender impact on environment: grass/fodder/ firewood collection ƒ Incidence of HIV/AIDS in the area ATMA officials Interviews with field staff ƒ Readiness to take up improved farming ƒ Accessibility to farm inputs (seeds, fertilizers, plant protection chemicals) ƒ Feedback on the working of ATMA in terms of their effectiveness in the area Institutional Stakeholders: UPBSN and other line departments (Agriculture, Livestock, Irrigation, etc) Structured interview ƒ Encroachment on natural habitats (wetlands) as sodicity increases ƒ Construction related issues (drain rehabilitation / field drains, etc) ƒ Water conservation approaches ƒ Drainage and sanitation ƒ Cattle productivity; unproductive cattle/ fodder shortages ƒ Strategies to deal with livestock sector issues Office-bearers of local farmers’ cooperatives Semi-structured interview ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizer and pesticides ƒ Use of irrigation; effect on groundwater ƒ Small farmers’ opportunity to participate ƒ Extent of encroachment in the drains ƒ Alternatives on the mode of use of drain water for irrigation purposes Local NGO working on farming issues Semi-structured interview ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizer and pesticides ƒ Use of irrigation; effect on groundwater ƒ Cattle productivity; unproductive cattle, fodder shortages ƒ Impact on household consumption / nutrition ƒ Impact on health Page 49 UPBSN IESA Report for UPSLRP-III 49 Stakeholder Method Key issues covered ƒ Relationship between various project institutions at village level (like SIC, WUG, Farmers Cooperatives, etc) with PRIs ƒ Gender impacts ƒ HIV/AIDS among the construction workers and migrant labor District level Agriculture Officers Structured interview ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizers and pesticides ƒ Use of irrigation; effect on groundwater ƒ Cattle productivity; unproductive cattle/ fodder shortages; common cattle diseases 4.3 FEEDBACK/CONCERNS AND SUGGESTIONS OF STAKEHOLDERS Detailed feedback/concerns and suggestions of various stakeholders are given at Annex-XVIII . Proceedings of village-level stakeholder-cum-disclosure workshops are given at Annex-XIX . Key findings are given below: Particulars Feedback/Concerns Suggestions Land, water and agriculture related issues Project impact on agricultural bio- diversity ƒ\03 Agricultural bio-diversity will improve ƒ\03 Entire village to be saturated as far as reclamation is concerned Use of chemical fertilizers and pesticides (trends and current level and impact on soil quality) ƒ\03 High dozes of chemical fertilizers ƒ\03 Imbalanced dozes ƒ\03 Increasing trend ƒ\03 Soil quality adversely affected ƒ\03 Awareness on balanced fertilizer use ƒ\03 Propagation of soil friendly practices, e.g., IPM, IPNM Use of irrigation: effect on groundwater ƒ\03 Borewell intensity increasing day by day due to inadequacy of canal water ƒ\03 Groundwater is depleting ƒ\03 Poor awareness about conjunctive use of water ƒ\03 Improvement in availability of canal water ƒ\03 Cautioning farmers against excessive irrigation (in command area) ƒ\03 Awareness on water conservation and moisture conservation in soil Small farmers’ opportunity to participate in the project ƒ\03 If beneficiary selection is based on objective criteria, no problem is anticipated ƒ\03 Tiny landholders may not take adequate interest in the project because they would tend to stick to alternative livelihood sources ƒ\03 Transparent beneficiary selection criteria ƒ\03 Tiny landholders to be encouraged to participate in the project Weed invasion on agriculture fields ƒ\03 Substantial weed invasion ƒ\03 Manual weeding ƒ\03 Provision of more effective and efficient weed control Cattle productivity: unproductive cattle, fodder shortages ƒ\03 Low cattle productivity due to inferior breed, poor animal nutrition ƒ\03 Substantial number of unproductive cattle ƒ\03 Acute fodder shortages ƒ\03 Breed improvement ƒ\03 Awareness on animal nutrition ƒ\03 Fodder production Animal diseases ƒ\03 FMD most common ƒ\03 High frequency and spread ƒ\03 Vaccination programme ƒ\03 Improved veterinary care services Page 50 UPBSN IESA Report for UPSLRP-III 50 Particulars Feedback/Concerns Suggestions during rains ƒ\03 Poor access to veterinary care services through public-private partnership Dependence on natural resource base (wetlands, pastures, forests) ƒ\03 Villages generally lack these resource bases ƒ\03 High dependence among poor farmers ƒ\03 Pastures to be maintained ƒ\03 Social forestry to be promoted along with right to use Perceived hesitation, if any, to join socio- economically neutral water users’ groups which are to be formed on the basis of proximity of sodic land ƒ\03 Farmers will prefer to join homogeneous groups ƒ\03 If necessary, they will also join heterogeneous groups ƒ\03 Group feeling may be weak ƒ\03 In addition to water sharing, more binding forces to be explored Participation in proposed site implementation committee meetings ƒ\03 Farmers will generally participate in SIC meetings ƒ\03 However, some farmers may take interest if SIC is not fully effective ƒ\03 SIC to be made effective and a real platform for local level decision making Willingness to allow for field drain between two adjoining plots ƒ\03 Individual farmers will be reluctant to spare a portion of their land for field drains; however, if done collectively no issues are anticipated ƒ\03 All the beneficiary farmers of a WUG should be sensitized and motivated at one go to spare land for field drains ƒ\03 Group approach to be adopted for field drain network Willingness to allow for common irrigation channels within the area of a water users’ group ƒ\03 Individual farmers will be reluctant to spare a portion of their land for irrigation channel network; however, if done collectively no issues are anticipated ƒ\03 All the beneficiary farmers of a WUG should be sensitized and motivated at one go to spare land for irrigation channel network ƒ\03 Group approach to be adopted for irrigation channel network ƒ\03 If WUG members do not agree, no need to bother Women and children related issues Women (de facto) cultivators ƒ\03 A few active woman cultivators in upper caste households ƒ\03 Large number of woman cultivators in lower caste households ƒ\03 None Impact of migration of male workers on the role of women in agricultural production ƒ\03 Women’s roles and responsibilities increase manifold ƒ\03 Their individual welfare level adversely affected ƒ\03 Women empowerment in terms of skill and training ƒ\03 Health awareness among women Adequacy of skills to manage farming (on improved land) and skills to take up improved agriculture ƒ\03 Only general skills possessed ƒ\03 Lacking specific and complex skills ƒ\03 Skill enhancement through training and exposure visits Wage payment at par with male members for equal work ƒ\03 Female wage rate is lower than male wage rate irrespective of location and type of work ƒ\03 Awareness about provisions of the Minimum Wages Act Involvement of child ƒ\03 No major involvement ƒ\03 None Page 51 UPBSN IESA Report for UPSLRP-III 51 Particulars Feedback/Concerns Suggestions labor in the construction activities Cooking media/media; impact on health ƒ\03 Barring a few families, firewood, cow dung cake and crop residue are the chief cooking media. ƒ\03 Use of cow dung cake causes respiratory problems among women ƒ\03 Absence of separate and proper kitchen accentuates the problem ƒ\03 Cooking becomes drudgery for women when they use cow dung cake that too in congested kitchen space. ƒ\03 Families encouraged and motivated to adopt Improved Choolha Gender impact on environment: grass/fodder/firewood collection ƒ\03 Women from only scheduled caste households collect firewood from forest/orchards. However, some backward caste women are also engaged in this activity ƒ\03 None Child rearing and education ƒ\03 Child rearing – the sole responsibility of women ƒ\03 Low role in children education decisions ƒ\03 Sensitization of men about gender equity Homemaking ƒ\03 Operational part of external matters handled by males and internal matters by females ƒ\03 However, males dominate in both the matters ƒ\03 Economic and educational empowerment of women Education, training and skills ƒ\03 Women lag behind men in these areas ƒ\03 Intensive efforts for women ƒ\03 Training programmes to be organized at local level Job opportunities ƒ\03 Low opportunities for women compared to men due to lower educational attainment, social prejudices, etc ƒ\03 Improved employability of women through education and training ƒ\03 Mass awareness against social inhibitions around working women While on family farm ƒ\03 Women are allotted time- consuming and laborious tasks on family farm ƒ\03 Skill enhancement of women through training and exposure visits Primary processing of farm produces ƒ\03 Sole responsibility of women ƒ\03 Women’s income to be enhanced so that they could go for custom hiring services Access to and control over household resources ƒ\03 Women generally have reasonable access to (right to use) household resources but they do not have control (power to define their use) them ƒ\03 Economic empowerment of women by increasing their income through various micro-enterprises ƒ\03 Financial empowerment of women through associating them with saving & credit groups Gram Panchayat related issues Probable roles which Gram Panchayat can play in the project ƒ\03 In planning including SIP preparation, awareness generation, motivating farmers, ƒ\03 Gram Panchayat should be actively involved in the project since beginning Page 52 UPBSN IESA Report for UPSLRP-III 52 Particulars Feedback/Concerns Suggestions conflict resolution, etc Possibilities of institutional linkage of the proposed Site Implementation Committee and Water Users’ Group with the Gram Panchayat and its committees ƒ\03 Any institution should have perennial relevance. Site Implementation Committee and Water Users’ Group are relevant only for those farmers who possess sodic land which has been included in the land reclamation program. Principally, we should not consider sodic land as permanent sodic land. There is every possibility of its reclamation, even without project intervention. Moreover, SIC and WUG are project- specific institutions meant only for project period. ƒ\03 Project needs to explore proactive role of Gram Panchayat rather than a passive role in form of approving authority ƒ\03 Linkage with Gram Panchayat should be starting point ƒ\03 Gram Panchayat should also be involved in planning and execution of field activities including field and link drain construction Possibilities and willingness on part of Gram Panchayat to take up the task of maintenance of village level assets (such as link drains, field drains) created during the course of project implementation ƒ\03 If the Gram Panchayat is involved in holistic manner from the very beginning, it will not have any hesitation in accepting these responsibilities. But if you implement various activities at your own without any role for Gram Panchayat please do not expect us to take these responsibilities in post project period ƒ\03 Gram Panchayat should be involved from the very beginning in planning and execution of field drain and link drain network installation and creation of other assets ƒ\03 It should be attempted to develop a sense of ownership in Gram Panchayat towards these assets since beginning. Identification of main hurdles in development of social capital in the village and suggested measures to overcome such hurdles ƒ\03 Main hurdles in development of social capital include socio- economic heterogeneity in the village, local politics, inter- family relations, physical proximity of households, past records of mutual help, differences in educational achievements, caste dynamics, etc ƒ\03 The only way to overcome such hurdles is to evolve some common binding force strong enough bring and retain households together for the common cause ƒ\03 Making consensus-based approvals and decisions in SIC and WUG meetings may be one way of promoting such binding. Prospects and willingness for post- project handholding of social capital, such as SIC, WUG, SHG, generated during project implementation ƒ\03 Gram Panchayat will have no hesitation in handholding of these institutions after the project withdrawal if these institutions continue to exist and remain functional. ƒ\03 The project authorities should not impress upon sustainability of specific-purpose institutions to sustain even after project withdrawal. ƒ\03 If they want these institutions to become permanent institutions in the village, their mandate should be designed in such a way that it remains relevant even after completion of the project activities. Status of community land, sodic and non- sodic, owned by the Gram Sabha and prospects, plan and ƒ\03 Major part of community land has already been allotted to the eligible beneficiaries; only small portion remains to be allotted ƒ\03 There is no problem in land ƒ\03 Project authorities should identify the sodic plots to be included in the land reclamation program and forward the list to the Gram Panchayat well in advance. Such Page 53 UPBSN IESA Report for UPSLRP-III 53 Particulars Feedback/Concerns Suggestions problems in its allotment to eligible farmers allotment ƒ\03 Sodic plots, if identified for the reclamation program, will be allotted on priority basis plots will be allotted to the eligible villagers in accordance with the extant government policy. Status of possession on already-allotted Gram Sabha land and prospects, plan and problems in providing possession on allotted land ƒ\03 Possession on already-allotted land is pending in a few cases ƒ\03 Possession can be provided if coordination with the Revenue Department improves ƒ\03 Project should facilitate coordination with the Revenue Department Perceived Social Risks/issues Social issues/risks associated with the proposed project ƒ\03 Sodic/ravine land is owned mostly by resource-poor farmers. They may not take the critical interest in the project because they will have to devote time and some money for reclamation of their sodic/ravine land. Such farmers are virtually settled with their alternative livelihood sources such as wage earning and petty businesses. ƒ\03 Moreover, wage-dependent households may not take adequate interest in the project because their holding is tiny and may not compensate their wage earning. Thus, they might not prefer to leave wage earning in order to get involved in farming on their small sized farms. ƒ\03 Farmers have somehow developed a feeling that sodic land is sodic land and cannot be improved. Such farmers may not accept the project message that sodic land can be reclaimed on sustainable basis. ƒ\03 Prevalent local socio-economic dynamics may adversely affect the participatory model of project implementation. ƒ\03 Water users’ groups are formed on the basis physical proximity of sodic plots. Thus, the WUG may be socio-economically heterogeneous which may be the main reason for poor performance of these groups. ƒ\03 There are some influential persons in the village who expect special favor from the field staff. But project design ƒ\03 Resource-poor farmers should be motivated to take up sodic/ravine land reclamation program by convincing about the fact that once reclaimed such lands will become their permanent source of livelihood. ƒ\03 Wage-dependent households should also be motivated that reclaimed sodic/ravine land will become their permanent source of livelihood. Thus, sacrifice of some wage earning days will be worth of doing so. ƒ\03 In addition to convincing the farmers about the possibility of reclamation of sodic land through awareness campaign they should also be exposed to villagers covered in earlier projects, especially success stories. ƒ\03 Effort should be made to bring the farmers together on the issue of sodic/ravine land. Resolve to reclaim sodic/ravine land should be developed as common objective and the key binding force among farmers. ƒ\03 In absence of alternative, farmers should be motivated to join the water users’ group for common cause. ƒ\03 From the very beginning, the focus should be sharpened on the objectivity and transparency in the selection of sodic/ravine plots and beneficiaries. The selection criteria should be disclosed to the public in clear manner. The selection criteria should, in no condition, be compromised. However, the selection criteria should be practical to the possible extent. ƒ\03 Project should identify women cultivators in the villages. They Page 54 UPBSN IESA Report for UPSLRP-III 54 Particulars Feedback/Concerns Suggestions does not permit such favoritism. Unhappiness of such influential people may adversely affect participation of general farmers in the project. ƒ\03 Women are important players in farming system, especially animal husbandry. But we generally neglect them in our training programs. ƒ\03 Many a time, contiguous patch of 4 ha does not become available. In such cases small patches are left un-reclaimed. should be imparted suitable training along with men. For women, training programs should be preferably organized at local level so that they could attend without fail. ƒ\03 Authorities should consider selecting even individual plots (which cannot be a part of a contiguous water users’ group) for the reclamation program, provided irrigation water is available and the concerned farmer is ready to dig the field drain up to the link drain point. 4.5 ROLES & RESPONSIBILITIES OF STAKEHOLDERS IN PLANNING, IMPLEMENTING AND MONITORING PROJECT ACTIVITIES In addition to recording their feedback and concerns on different issues related to the proposed interventions, the study has also assessed probable roles and responsibilities of various stakeholders in planning, implementing and monitoring project activities. These roles and responsibilities were suggested by/discussed with the stakeholders with whom consultation was undertaken. Findings are summarized below: Stakeholder Probable roles & responsibilities Farmers ƒ Farmers will contribute in planning the activities by providing input in preparation of site implementation plan (SIP) as members of SIC. SIP will include plan for all interventions planned for a village. They will also participate in monitoring project activities through giving their feedback in SIC meetings in which progress is to be periodically reviewed. They (WUG leaders) will also participate in intensive monitoring and evaluation of activities through Core Team review of physical progress. ƒ Farmers will contribute in WUG level planning, implementation and monitoring of project activities. WUG level activities include OFD work including bunding, land leveling, preparation of layout and digging of field drain and irrigation channel, preparation of water roster, crop production and follow up activities, etc. ƒ Farmers will be exclusively responsible for execution of all activities in their field as per the intimated schedule. ƒ In addition to acting as general farmer, some farmers will have higher responsibilities when they become office-bearers of different institutions such as WUG, SIC, SHG, etc. These responsibilities will have to be borne by the concerned farmers. ƒ Farmers will play an important role in development of the community for the project through information sharing. ƒ Progressive farmers will facilitate farmer-to-farmer extension and can act as change agents in their respective areas. Women ƒ Women will contribute in planning through providing their inputs in SIP; in implementation through joining their male counterparts in executing the activities at field level; and in monitoring through providing feedback in SIC meetings and other review occasions. ƒ Some women are active cultivators. Such women will play varied roles as men will do. ƒ Self - help group program will necessitate involvement of women at all Page 55 UPBSN IESA Report for UPSLRP-III 55 Stakeholder Probable roles & responsibilities the stages of project cycle, i.e., planning, implementation and monitoring. ƒ Women will decide upon the saving and credit activities of their self- help groups. As members of SHG, they will also plan and execute income generating activities for their livelihood. ƒ Women can also play an active role in adoption of latest farming technology because they would persuade their male counterparts to adopt the improved technology. ƒ Since women are the key players in animal husbandry at household level they will be crucial participant in improvement of livestock activities. ƒ Women will play proactive role in development of community for the project through peer discussion. It will improve adoption of project concepts and philosophy. ATMA officials ƒ ATMA can contribute in awareness generation. ƒ They can also provide crucial inputs for planning project interventions because they would be aware of the agro-economic situations prevalent in their respective service areas. ƒ They can make special contribution in planning and implementation of agricultural extension activities as these are main constituents of their mandate. ƒ ATMA can take active part in implementing extension services both during and after the project. Post-project technological backstopping is crucial for sustainability of reclamation program in which ATMA will play major role. ƒ ATMA will also be in a position to undertake concurrent monitoring and evaluation of project activities. Institutional stakeholders UPBSN : ƒ UPBSN will be the agency overall responsible for conceptualizing, planning, implementing and monitoring & evaluating project activities. ƒ It will also be responsible for coordinating and overseeing the activities of line departments. ƒ UPBSN will shoulder the exclusive responsibility of implementing OFD and Land Reclamation component of the project. ƒ It will also be responsible for consuming the feedback from internal as well as external monitoring & evaluation system and ensuring compliance to the recommendations. ƒ UPBSN will also coordinate with various institutions/bodies planned to be created at state, district and sub-district level. Agriculture Department : ƒ Agriculture department will plan, implement and monitor crop demonstrations, IPM/IPNM demonstrations, etc. ƒ In addition, it will facilitate seed village program, opening of seed- cum-fertilizer outlets in the project areas through issuance of appropriate license to eligible people. ƒ It will provide technical backstopping to the project. ƒ Crop cutting experiments will also be undertaken by the department. ƒ The department will help in spreading the project message through Kisan Sahayak. ƒ The department will provide its inputs through participating in meetings of state and district level committees. Animal Husbandry Department : ƒ The department will be an important implementation partner in the project. ƒ Livestock sub - component will be implemented by the Animal Page 56 UPBSN IESA Report for UPSLRP-III 56 Stakeholder Probable roles & responsibilities Husbandry department through its district, block and Nyaya Panchayat level functionaries. ƒ The Nodal cell to be created at the state headquarters will coordinate and supervise the sub-component activities. ƒ The department will contribute in planning, implementing and monitoring project activities through providing input and feedback in periodical meetings of various committees to be created at state and district level. Panchayati Raj Department : ƒ Panchayati Raj department will contribute in management of Sodic Haat and ruminant markets in the project areas. ƒ It will also contribute through orientation of Gram Panchayat. Irrigation Department : ƒ ID will undertake rehabilitation and maintenance of main drains. ƒ A special cell will coordinate and supervise the component activities and also liaise with UPBSN. ƒ The department will also provide inputs in overall planning, implementing and monitoring of project activities through various committees. RSAC : ƒ RSAC will play key role in planning of OFD and Land Reclamation component through sodic area identification. ƒ In addition, it will also be responsible for annual soil monitoring and groundwater monitoring. Gram Panchayat ƒ Gram Panchayat can make great contribution in awareness generation and motivation of farmers. ƒ It can also help in village level planning of project activities, including preparation of Site Implementation Plan. ƒ Gram Panchayat can be an effective forum for conflict resolution at local level. ƒ It can monitor project activities at village level. ƒ It can play crucial role in beneficiary selection process. ƒ If Gram Panchayat is involved at all stages of project cycle it will improve transparency and acceptance of the project at local level. ƒ Gram Panchayat shoulder the responsibility of maintenance of community assets after project withdrawal from the village. Non-Government Organization (NGO) ƒ There will be some participant NGOs who will be implementing partners in the project. These NGOs will play crucial role in awareness generation, community mobilization and ensuring participation of farmers for effective and efficient implementation of the activities. ƒ These NGOs will be important player in preparation of village level plan, its execution and monitoring. ƒ In addition to partner NGOs, there are some NGOs who are working with farmers as per their own mandate. Such NGOs should be identified and requested to contribute in project activities, especially community mobilization and awareness generation, on voluntary basis. ƒ NGO field staff will act as a link between the project management and farmers. Thus, they will contribute in two-way flow of information and feedback which is likely to improve project effectiveness. Farmers’ Cooperatives ƒ Farmers’ Cooperatives can take part in improving availability of seed, fertilizers and pesticides at local level. ƒ Cooperatives can extend seed and fertilizer credit to farmers. District Agriculture Officer ƒ District Agriculture Officer, a functionary of the Agriculture department will perform various functions envisaged for the department. Page 57 UPBSN IESA Report for UPSLRP-III 57 Stakeholder Probable roles & responsibilities Project staff (Project Manager, Deputy Manager, Assistant Manager) ƒ Project staff will be the key player in the project. Their roles and responsibilities are elaborated in detail in project documents. CHAPTER – 5 PREDICTION OF IMPACTS 5.1 GENERAL Based on the project details and the baseline environmental status ascertained through data collected from primary and secondary sources, potential impacts as a result of the implementation of various components of Uttar Pradesh Sodic Land Reclamation III Project have been identified. This Chapter addresses the potential impacts likely to accrue as a result of the proposed land reclamation project. Both positive as well as negative impacts likely to accrue during various phases of implementation of the proposed project have been presented. The project comprises of various sub-components each of which is likely to have an impact on environment. Thus, it is important to understand and analyze each activity so as to assess its impact on environment. The various components of project which have been considered in the study are listed as below: · On-farm Development works · Agriculture Support Services · Livestock Development · Improvement of Drainage System · Institutional strengthening and capacity building for Market oriented production. The impacts on various aspects of environment have been assessed and are discussed in the following sections of this Chapter. 5.2 IMPACTS ON LAND ENVIRONMENT The following impacts on land environment are envisaged: · Acquisition of land for OFD works · Improvement in soil quality · Impacts due to extraction of soil material · Increased soil productivity · Change in land use pattern · Reduction in soil erosion rates · Reduction in area under water logging The above referred impacts are briefly described in the following section. 5.2.1 Loss of land for OFD works The construction of bunds, field drains, irrigation channel, link channel, etc. will reduce the land available for cultivation for the individual farmer on whose land these structures shall be constructed. It has been observed in earlier phases of the project that farmers in due course of time, i.e. from second year onwards from reclamation, start dismantling the field drains, irrigation Page 58 UPBSN IESA Report for UPSLRP-III 58 channels, etc. and the area under these structures is brought under agriculture. This tendency is more pronounced in small and marginal farmers, as they have smaller land holdings and want to bring maximum area under agriculture. This can adversely affect the overall drainage system, which is a key aspect for sustenance of reclamation process. This phenomenon can be controlled through creating greater awareness amongst farmers during implementation of various reclamation activities. As per the findings of stakeholders discussion, individual farmers will be reluctant to spare a portion of their land for field drains; however, if done collectively no issues are anticipated. 5.2.2 Improvement in soil quality The proposed project will reclaim sodic and ravine lands, with corresponding improvement in soil quality. As a part of UPSLR II P, detailed soil quality monitoring was conducted by RSAC. Plots from reclaimed areas were monitored by sampling up to a depth of 120 cm every year in post-rabi season. The soil monitoring results of pre-reclamation plots and three years after reclamation indicated that there is an improvement in soil quality in the surface horizon (0-15 cm) with significant reduction in pH and EC values in all the districts. The reduction in Electrical Conductivity after reclamation was much more rapid, as soluble salts are leached out easily. The reduction in pH and Electrical Conductivity will result in the significant improvement of soil quality and thereby creating relatively favorable environment for growing of crops. Based on findings of the RSAC for UPSLR II P, majority of the plots showed good improvement. However, some of the plots showed improvement in soil quality initially, but soil quality started deteriorating afterwards. Very few plots showed no improvement in soil quality. The reasons could be poor surface drainage, high water table and discontinued cropping. In the sub-surface horizon, no significant improvement in soil quality is expected to be observed immediately or during initial years after reclamation, as reclamation process is initially affecting the upper plough layers only. However, with continuous cropping the subsurface horizon too is expected to show improvement in soil quality. In the next phase of the project too, similar improvement in soil quality is envisaged. However, greater emphasis needs to be given to create awareness that continuous cropping be done year after year in post-reclamation phase. 5.2.3 Impacts due to extraction of construction material The construction of OFD works, especially on ravine lands would require excavation of construction material form quarry and borrow areas. The borrow pits and quarry sites need to be reclaimed once the excavation for construction material is complete. Normally, such sites are left untreated, which results in formation of stagnant pools of water during monsoons. These sites then serve as breeding grounds for proliferation of mosquitoes. Appropriate measures for treatment of such sites need to be implemented to ensure proper reclamation and drainage of the borrow areas and quarry sites. 5.2.4 Improvement in crop productivity Crop yield is a function of a number of factors including soil quality, input consumption, incidence of crop disease and crop protection measures and cultivation practices. The land under discussion was adversely affected by salt concentration before leaching. Likewise, ravine lands were affected due to soil erosion. Treatment of sodic soils with chemical amendment (Gypsum) will reduce the salt concentration and hence improve soil quality. Consequently, C class land will come under double crop cultivation. The B class land, which is mono-cropped at present, i.e. prior to reclamation, will also be double cropped. Soil quality of B+ class land will improve as a Page 59 UPBSN IESA Report for UPSLRP-III 59 result of reclamation. As far as input consumption/application in crop is concerned, the project will provide the beneficiary-farmers subsidized certified seeds, adequate doze of fertilizers, development of assured irrigation facility in the project areas, help in green manuring. In addition to above, the project shall also provide extension, guidance and technology support to the beneficiary-farmers. In the reclaimed lands, farmers shall grow mainly two crops, i.e. paddy and wheat. However, some farmers (mainly farmers with large land holdings) will also diversify their cropping pattern into other crops also. Achieved paddy and wheat yields in the treated sodic land in UPSLR II P land have been shown in Tables-5.1 and 5.2. TABLE-5.1 Crop Yield in treated sodic areas -Paddy [ Unit: Quintal/ha] Land Class Pre- Project Post- Project Overall 19.26 28.92 B+ land 22.05 32.67 B land 17.61 30.03 C land - 27.85 TABLE-5.2 Crop Yield in treated sodic areas -Wheat [ Unit: Quintal/ha] Land Class Pre-project Post- project Overall 18.61 25.26 B+ land 18.61 28.54 B land - 26.01 C land - 24.39 It can be observed from Tables-5.1 and 5.2 that paddy and wheat yields increased considerably after reclamation. Similar increase in crop yield is expected in UPSLR III P, once sodic and ravine lands are reclaimed. 5.2.5 Change in land use pattern At present, C class land is generally left barren, while B class land is under single crop. As a result of reclamation, both B and C class of land would come under double crop cultivation. Thus, land which is barren at present (throughout the year for C lass land and 8 to 9 months for B class of land), would be double cropped as a result of project interventions. Likewise, the proposed project would reclaim 5000 ha of ravine lands, through implementation of various soil conservation measures. The land which at present is left fallow or is mono-cropped will be double cropped after reclamation. Thus, increased cropping intensity would lead to change in land use pattern. As observed in case of UPSLR II P, cropping intensity in the treated sodic land increased from 43 % during pre-reclamation phase to 269 % during the first year. Similar improvement is expected after reclamation of sodic and ravine lands in UPSLR III P. 5.2.6 Reduction in soil erosion rates As a part of land reclamation on ravine lands, detailed measures for control of soil erosion are proposed to be implemented. These include: · Field bunds in all the fields located in table land, peripheral land and shallow lands. · Contour bunding over mildly sloping agriculture lands with long slope length. · Peripheral bunding in peripheral land along with gullies. · Gully plugs/check dams across gully Page 60 UPBSN IESA Report for UPSLRP-III 60 · Other structures, i.e. outlets, drop spillway, drop inlet structures. The construction of these structures would significantly reduce the soil erosion on ravine lands, which in turn significantly improves the soil quality. The OFD works, i.e., field bunds on reclaimed soils will also control soil erosion rate. The continuous cropping over reclaimed soils and increased area under fodder grass would act as soil binder and reduce the soil erosion rates. Likewise, increased cropping will increase organic matter in the soil, which also binds the soil and reduces soil erosion rates. The project in general aims at intensive cropping over lands after reclamation, which will lead to significant reduction in soil erosion rates. 5.2.7 Reduction in area under water logging As a part of the IESA study, village level survey was conducted in 34 villages. Based on the findings of the village level survey, it was observed that all the assessment villages had access to a main drain, located at a distance of 0 to 5 km from the village. It was also reported that in 18 out of 34 villages covered under the survey main drain was smooth flowing, while in other 16 villages, flow was impeded in the drain on account of weed growth, siltation, etc. Water logging was observed in 7, 4 and 9 out of 10 villages in districts Sultanpur, Kanpur Dehat and Etah respectively. As a result, these conditions, not only cause discomfort and affects communication during monsoons, but such areas serves as excellent sites for breeding of mosquitoes, which leads to increased incidence of various vector-borne diseases. In the project area, malaria is the predominant vector borne disease. Thus rehabilitation of drainage network as a part of the project would lead to reduction in habitats where mosquitoes proliferate. The proposed project would lead to improvement in drainage system. About 1247 drains with a total length of 6659 km will be improved as a part of the proposed project. The net area benefited from main drain rehabilitation shall be 133040 ha. Thus, the proposed project would lead to reduction in vulnerability to water logging for an area of 1.33 lakh ha, which is a significant positive impact. 5.3 IMPACTS ON WATER ENVIRONMENT The following key impacts on water environment including are anticipated as a part of the project: · Overflow of drains · Increased water requirements · Impacts on ground water level 5.3.1 Overflow of Drains The improvement of drainage system would lead to increased flow out-falling into link and main drains. There is a possibility that some of the drains, especially main drains would overflow on account of flow outfalling in them which is in excess of their carrying capacity. Thus, it is recommended that the carrying capacity of link and main drains being covered under the project be estimated and assessed vis- à-vis total discharge likely to outfall in these drains. If required, the drains be remodeled to carry the increased flows. 5.3.2 Increased water requirements Page 61 UPBSN IESA Report for UPSLRP-III 61 The proposed project envisages reclaiming 130,000 ha of sodic land and 5,000 ha of ravine land. The break up of sodic land to be reclaimed is given as below: · C Class : 85,000 ha · B Class : 32,000 ha · B + Class : 13,000 ha The C class land which at present is left fallow will be double cropped. The B class land which at present is mono-cropped will also be double cropped. The proposed project would lead to cropping over an additional area of 264,500 ha. The details are given in Table-5.3. TABLE-5.3 Increase in cropped area due to reclamation (Unit: ha) Before reclamation (ha) After reclamation (ha) Type of land C B B + Total C B B + Total Increased in cropped area Sodic - 32,000 26,000 58,000 170,000 64,000 26,000 260,000 202,000 Ravine - - - 2500* 5000 2500 Total 60,500 265,000 264,500 Note: Assuming only 50% of the ravine land to be reclaimed is being cropped at present Assuming that on an average, 700 mm of water is applied for irrigation, the additional water requirement for irrigation works out to about 1850 Mm 3 /year. In addition, water will also be required to meet the requirements of additional livestock as well. Thus, the proposed project would lead to significant increase in water requirements. Most of the additional water requirement for irrigation shall be met from ground water resources. As a part of the project borings will be developed @ 1 boring per 4 ha. Thus, about 34,000 wells will be developed as a part of the project. Most of the borings will be dug as a part of the project and pump set will be installed. However, a small portion of existing borings will be used and only the pump set will be provided as a part of the project. Thus, it will lead to significant abstraction of groundwater, which could have an adverse impact in areas with deeper water table. Thus, it is recommended that areas with water table greater than 8 mbgl be excluded from the project, not only because it causes increased pressure on ground water resources, but also because of the fact that cost of ground water abstraction will also be high. The risk envisaged is Water users’ groups are formed on the basis physical proximity of sodic plots. Thus, the WUG may be socio-economically heterogeneous which could affect the working of the groups. Effort should be made to bring the farmers together on the issue of sodic/ravine land. Resolve to reclaim sodic/ravine land should be developed as common objective and the key binding force among farmers. 5.3.3 Impacts on ground water level As a part of studies for UPSLR II P, RSAC monitored ground water level at various locations in project districts. Monitoring was conducted for a period of 6 years during 1999-2005. The percentage of hydrographs/area showing critical waterlogged conditions in pre-monsoon remained same at 1% during the period from the year 1999 to 2005. Critical water logged condition in terms of percentage of hydrographs in post-monsoon season decreased from 30% (1999) to 8.0% (2005). During the project phase, there were significant variations in the proportion of hydrographs stations having critical waterlogged conditions. In Page 62 UPBSN IESA Report for UPSLRP-III 62 years of good rainfall percentage of hydrographs with critical waterlogged condition increased and vice-versa. The area under agriculture in project area districts is much larger than the area brought under agriculture after sodic land reclamation due to project interventions. Ground water abstraction due to borings developed for irrigation due to the project is much lower than the recharge due to canal irrigation or rainfall. Thus, groundwater abstraction in the reclamation areas is not expected to make a significant reduction in groundwater level, as there is significant recharge due to irrigation from canals and rain water in the project area districts. The groundwater abstraction in the project area districts is much higher that envisaged as a result of the project. It has been observed that based on RSAC studies, that rise or fall in water table depends mainly on rainfall received. The rise in water table depends primarily on the rainfall received in the previous year. The proposed project would reclaim about 135,000 ha of sodic and ravine lands. The increase in gross cropped area shall be of the order of 2.6 lakh ha. The total irrigated area of 25 districts being covered under reclamation is 72.68 lakh ha, of which 36.80 lakh ha is irrigated by groundwater sources. Thus, the increase in area irrigated by groundwater sources is only 7% of the total area irrigated in the project area districts (Refer Table-5.4). Thus the project is not expected to lead to any significant impact on groundwater resources. TABLE-5.4 Cropping and Irrigation details in project districts ( Unit: ‘000 ha) S. No. District Area under agriculture Gross irrigated area Gross Area Irrigated by well Percentage of irrigated area by well 1 Aligarh 498 411 265 64.45 2 Ferozabad 278 202 153 75.84 3 Auraiya* 0 0 0 4 Etawah 466 342 124 36.22 5 Etah 521 410 154 37.48 6 Farukhbad 216 162 115 70.80 7 Kannauj 227 167 115 69.02 8 Mainpuri 281 266 139 52.36 9 Lucknow 208 178 103 58.02 10 Barabanki 513 426 168 39.54 11 Unnao 456 353 194 55.02 12 Hardoi 641 499 310 62.11 13 Sitapur 640 484 312 64.42 14 Kanpur nagar 258 170 89 52.40 15 Kanpur dehat 316 210 93 44.52 16 Ghazipur 415 349 163 46.79 17 Azamgarh 504 424 220 51.95 18 Jaunpur 442 360 170 47.33 19 Sant Ravidas Nagar 98 79 46 58.85 20 Allahabad 518 401 116 29.00 21 Kaushambi 179 115 76 66.32 22 Fatehpur 405 267 143 53.43 23 Raebareli 418 356 133 37.34 24 Pratapgarh 325 278 113 40.82 25 Sultanpur 438 359 163 45.30 Total 9261 7268 3680 50.63 Note: * included in Etawah District Page 63 UPBSN IESA Report for UPSLRP-III 63 Source Statistical Abstract, UP, 2006. As a part of stakeholder analysis the following concerns were raised: ƒ\03 Borewell intensity increasing day by day due to inadequacy of canal water ƒ\03 Groundwater is depleting ƒ\03 Poor awareness about conjunctive use of water As a part of the project borings will be developed @ 1 boring per 4 ha. Thus, about 34,000 wells will be developed as a part of the project. In areas where, groundwater is depleting or water table is low, say more than 8 mbgl, it is recommended that such areas be excluded from the project. 5.4 IMPACTS ON WATER QUALITY The following impacts on water quality are envisaged due to the proposed project interventions: · Impacts on water quality of receiving surface water bodies · Impacts due to disposal of bed material · Impacts on groundwater quality · Impacts due to increased use of fertilizers · Impacts due to increased waste from livestock 5.4.1 Impacts on quality of receiving water bodies It is a general perception that disposal of runoff from agriculture fields after flushing of gypsum and other soil amendments can adversely affect the water quality of the receiving water body which could be a river or a natural drain. As a part of monitoring studies for UPSLR II P, RSAC monitored water quality of various drains in 17 districts during monsoon season from 1999 to 2005. Various parameters including pH, SAR, EC were found to be within the limits specified for irrigation use. This could be attributed to the fact that disposal of runoff through surface drains after leaching, is done during monsoon season. The contribution from non-reclaimed area dilutes the runoff from reclaimed agriculture fields. Also during monsoons, the receiving water bodies had maximum discharge due to contribution of runoff from their catchments; as a result, adequate water is available for dilution in the receiving water bodies. Based on the above findings, no major impact on quality of receiving water bodies was anticipated. The reclamation of ravine lands will reduce the soil erosion rates. As a result, turbidity levels in the runoff from agriculture land will reduce. This will reduce the suspended sediment load on the receiving water bodies and will marginally improve the quality of receiving water bodies. 5.4.2 Impacts due to disposal of drain bed material As a part of maintenance and rehabilitation of drains, the drain bed will be cleared and the bed material comprising mainly of suspended material in the runoff which gets settled as a result of reduction in flow velocity. The agro-chemicals from agriculture fields which cling to the eroded soil particles will also get settled along with suspended solids in the drain bed. It is felt that the bed material after excavation needs to be properly disposed so as to avoid soil and water pollution. As a part of Environmental studies for UPSLR II P, RSAC had collected soil samples from some surface drain bed and were analyzed for pH & EC. The pH layer between 7.5 to 9.4 and EC ranged from 0.13 to 1.10 dSm -1 . The results indicate that soil/sediment extracted from the drain is not saline/sodic. In few drains, however, bed material was found to be sodic. Normally bed Page 64 UPBSN IESA Report for UPSLRP-III 64 material is distributed to free of cost to farmers of nearby fields, and is used as fertilizer, because of its nutrient level. However, it is recommended that bed material from each drain bed be analyzed for salt content prior to its disposal. 5.4.3 Impacts on ground water quality It is a common apprehension that there will be a significant increase in TDS level of groundwater due to use of gypsum and other soil amendments. However, this phenomenon is not expected because sodic soils have very low or negligible infiltration. As a part of reclamation, process salts are flushed out from only top 30-40 cm layer. The sub-surface horizon remains sodic and allows very little infiltration. Also because of improved drainage water the entire gypsum-soil mixture is flushed out from the field. Thus, impacts on groundwater quality are not expected to be significant. As a part of Environmental studies for UPSLR II P, ground water quality was monitored in various wells in pre-monsoon and post-monsoon seasons. The monitoring was conducted for six years from1999 to 2005. The EC value in most of the samples was below the permissible limit of 2250 m s/cm, except for a few wells. SAR values in all the ground water samples was lower than 10. No significant variation in ground water quality was observed over a period of six years. Thus, it can be concluded that no adverse impacts on groundwater quality are envisaged as a result of the proposed project. At some locations, RSAC monitored ground water quality data from different depths (4.0-30 m bgl).The results indicated that Sodium, SAR and RSC showed no significant increase in the phreatic ground water which indicates that the groundwater is not contaminated due to application of gypsum at the time of reclamation process. 5.4.4 Impacts due to increased use of fertilizers Under the best farming practices, only 40-50% of the applied fertilizers are used by the crop and the balance finds its way into the aquatic environment through drainage runoff. An unexpected intense shower immediately after the spread of fertilizers may bring even greater amount of nutrients as a part of the runoff into the receiving water body. Washdown of fertilizers and organic matter rich in nutrients from the surrounding agricultural fields can cause eutrophication of water bodies. Overgrowth of aquatic weeds affects the survival of aquatic organisms through depletion of oxygen, change in odour and taste of water. The drainage system (natural or man-made) is likely to contain much higher level of nutrients. The climatic condition in the project area too is suitable for the proliferation of eutrophication in the project area. Thus, in the post-reclamation phase, there will be increased probability of eutrophication in the water bodies receiving agricultural runoff. As a part of stakeholder analysis, the following concerns were raised: ƒ\03 High dozes of chemical fertilizers ƒ\03 Imbalanced dozes ƒ\03 Increasing trend ƒ\03 Soil quality adversely affected Page 65 UPBSN IESA Report for UPSLRP-III 65 The following suggestions were made: ƒ\03 Awareness on balanced fertilizer use ƒ\03 Propagation of soil friendly practices, e.g., IPM, IPNM, NADEP, Vermi-composting. 5.4.5 Impacts due to increased waste generation from livestock Various interventions envisaged for livestock development as a part of the project, will not only improve livestock quality but will also significantly increase the livestock number as well. This will also increase waste mainly dung which needs to be properly disposed. As a part of the project, significant emphasis shall be laid to generate organic manure through NADEP and vermi- composting. This will not only take care of disposal problems of dug, but will also produce organic manure, which can be utilized by the farmers. 5.5 IMPACTS ON AGRICULTURE The following impacts are envisaged on agriculture as a result of the proposed project: · Increased cropping intensity · Improved irrigation intensity · Increased agricultural productivity due to land reclamation · Impacts on cropping pattern · Greater use of agro-inputs · Increased use of IPM and IPNM practices 5.5.1 Increased cropping intensity The concept of cropping intensity helps in examination and evaluation of the extent of utilization of cultivable land resources. It is defined as the percentage distribution of gross sown area across various crops during a crop year. A mix of factors including quality of soil, availability and affordability of irr igation facility, farmers’ resources and historical and conventional cultivation practices, etc determines cropping intensity. There are three cropping seasons, Kharif, Rabi and Zaid. If at least one crop were grown in each cropping season the cropping intensity would be 300 percent. Zaid season being hot and dry season agriculturists propagate attainment of 200 percent cropping intensity as satisfactory. Though green manure crop is normally not treated as a crop, it needs to be included in calculation of cropping intensity because if land is occupied by green manure crop during Zaid season no other crop can be sown. The proposed project would lead to double cropping over C class (barren at present), B class (mono-cropped at present). Agricultural and Socio-Economic Impact Assessment (ASIA) Study was conducted under UPSLR II P. The study reported that cropping intensity in the treated sodic land increased from 43 % in pre-reclamation period to 269 % during the first year after reclamation. The level of cropping was maintained even in subsequent years as well. Similar impacts on cropping intensity are anticipated as a result of implementation of various project interventions. 5.5.2 Improved irrigation intensity The proposed project would lead to development of borings @ 1boring per 4 ha. Thus, the project is likely to develop about 34,000 borings. Some of the existing borings will be provided with pump sets. However, in most of the cases new borings along with pump sets will be commissioned as a part of the project. At present, ground water is the major source of irrigation Page 66 UPBSN IESA Report for UPSLRP-III 66 in the project area districts. The development of boring wells will meet the irrigation requirements of additional area to be cropped as a result of sodic and ravine land reclamation. As per the household survey conducted as a part of the IESA study, on an average, 5.3 irrigations are required in the paddy crop (after accounting for the rainfall) but as per the household survey, farmers supplied only 2.8 and 2.7 irrigations in sodic and ravine villages. On an average, 4.1 irrigations are required in the wheat crop (as per farmers’ assessment) but farmers supplied only 3.1 irrigations in sodic and ravine. It implies that about one-fourth irrigation requirement was not fulfilled. It implies that about 50% and 25% of irrigation requirement are not fulfilled in paddy and wheat crops respectively. Farmers attributed this shortfall to high cost of tube well irrigation and priority given to the crops on their normal soil. It implies that low quantum of water application in terms of number of irrigation as discussed here does not necessarily mean low water consumption by the crop; rest of the requirement might have been fulfilled by the rainfall. Correspondingly, high number of irrigation may clearly imply low rainfall. However, in case of Rabi crops, almost entire water consumption by the crop is attributed to artificial irrigation. Development of 34,000 borings as a part of the project would go a long way in improving the irrigation facilities in the area, and would also reduce the dependence of farmers on rainfall. Even in years with low rainfall though water table may fall, but still farmers will have a source to meet their irrigation requirements. Thus, improved irrigation facility as a part of the project is a significant positive contribution. 5.5.3 Increased agricultural productivity due to land reclamation Crop yield is a function of a number of factors including soil quality, input consumption, incidence of crop disease and crop protection measures and cultivation practices. It is needless to mention that the land under discussion was adversely affected by salt concentration before leaching. Reclamation of sodic and ravine soils will improve the soil quality. Consequently, the C class land will be double cropped, and B class land, which is mono-cropped at present, will also come under double crop cultivation. Soil quality of B+ class land will improve. As far as input consumption/application in crop is concerned, the project will help the beneficiary-farmers by providing subsidized certified seeds, adequate dose of fertilizers, development of assured irrigation facility in the project areas, help on green manuring. In addition, the project will also provide extension, guidance and technology support to the beneficiary-farmers. In the reclaimed land, farmers shall mainly grow two crops i.e. paddy and wheat. As per the household survey, paddy productivity in sodic and ravine villages is 23.25 qtl/ha and 22.92 qtl/ha. Likewise, wheat yield was about 21.7 qtl/ha in sodic and ravine villages. The project will provide various agro- inputs in the first year after reclamation. Hence, as a result, crop yield will increase significantly. Based on the findings of Agricultural and Socio-economic Impact Assessment study under UPSLR II P, it can be predicted that crop yield increases significantly due to land reclamation. The details are given in Table-5.5. TABLE-5.5 Crop Yield in treated area Land Class Pre –Project [Quintal/ha] Post –Project [Quintal/ha] Paddy Overall 19.26 28.92 B+ land 22.05 32.67 B land 17.61 30.03 C land - 27.85 Wheat Page 67 UPBSN IESA Report for UPSLRP-III 67 Overall 18.61 25.26 B+ land 18.61 28.54 B land - 26.01 C land - 24.39 It is clear from above table that paddy and wheat yields increased considerably in project villages of phase-II. Similar impacts on crop productivity are anticipated in the phase-III of the sodic land reclamation project. 5.54 Impacts on cropping pattern The proposed project would reclaim various categories of sodic and ravine lands. The project would lead to increase in cropping intensity as well as improvement in crop yields as well. The major crops grown shall be paddy and wheat. The farmers would grow paddy and wheat on their reclaimed soils and after few years, diversify the cropping pattern over normal soils. This trend is expected to be more pronounced for large farmer household. This development was noticed in earlier phases of the project as well. 5.5.5 Greater use of agro-inputs Given the quality of soil and other weather and climatic conditions, crop productivity depends substantially on the quality and quantity of various inputs used/applied in the crop. The important inputs discussed here include seed, farmyard manuring, and plant nutrients. Discussion on input use in crop is limited to paddy and wheat crops. Seed Rate Agriculture scientists recommend a seed rate of 50 - 60 kilograms per hectare for paddy and 100 - 120 kilograms per hectare for wheat. The project provision is also commensurate with these recommendations. The project shall provide certified paddy and wheat seeds at the rate of 60 and 120 kilograms per hectare respectively for B and C class lands during the post-reclamation first crop year. Seeds will not be provided by the project for the B+ class sodic lands. For such lands farmers have to rely on their own resources even during the post-leaching first year. From second year onwards, farmers have to tap their own resources for all three classes of treated land. The Agricultural and Socio-Economic Impact Assessment (ASIA) Study conducted for UPSLR II P indicated that farmers use the recommended quantity of both paddy and wheat seeds at the recommended rates even after the inputs form the project have stopped from second reclamation year onwards. With the improvement in crop yield and corresponding increase in income from agriculture, farmers have additional amount of money to invest in various agro-inputs including seeds. In the proposed project seed rates shall be sustained even after the project withdrawal from second year onwards. Use of improved Seed With respect to seed, not only quantity but also quality is important for crop production. Higher yield potential of certified seed remains more or less intact for three generations (including parent seed and two consecutive progenies) after which it becomes ordinary seed. It implies that higher yield potential of certified seed comes down to normal level in the fourth year. It is, therefore, recommended that farmers should change their seed at least in fourth year. However, it is ideally desirable that farmers change seed every year in order to harvest higher yield. In UPSLR II P Page 68 UPBSN IESA Report for UPSLRP-III 68 also, use of improved seed had considerably increased in project area in case of both paddy and wheat. As a sub-component of the proposed project, seed villages will be developed in selected project villages. This will ensure local availability of quality seed of paddy and wheat in adequate quantity and timely manner. Seed Village concept for paddy and wheat will be implemented in 120 and 325 villages respectively. Seed production will be undertaken on about 5 hectares in each village. Willing farmers will be identified and selected for seed production in close consultation with the concerned Seed Certification Agency. Foundation seed shall be used for seed production. Foundation seed will be obtained from State Agricultural Universities, institutes of Indian Council of Agricultural Research, and Seed Corporation. The project will facilitate certification and grading of the produce from these units through coordination with Seed Certification Agency of the State and some Grading Agency. Once, the produce of these plots is properly certified by the competent Seed Certification Agency, it will take the form of ‘Certified Seed’. The project will provide guarantee to buy back 50 percent of total seed produced under the seed village activity. Farmers will be free to sell the remaining seed to other farmers or Uttar Pradesh Seed Corporation. Since the requirement under the project is estimated to be higher than the seeds likely to be produced by the farmers, UPBSN can buy back entire quantity of seed produced by the farmers during the project period. Thus, the greater requirement of certified seeds as a result of increased area under agriculture over reclaimed lands will be met through project intervention itself, and no shortage of such seeds is envisaged. Farmyard manure application As per the findings of household survey, use of farmyard manure is quite low in the villages covered as a part of the survey. Use of farmyard manure is strongly recommended in field immediately before sowing/transplantation. It not only adds plant nutrients (nitrogen, phosphorus and potash at the rate of 0.05, 0.025 and 0.05 percent respectively) in the soil but also improves soil quality by adding biomass. From the point of view of sustainability of reclamation also, continuous use of farmyard manure is necessary. The project functionaries would popularize the use of FYM and green manuring in the treated soil. Based on the findings of ASIA study conducted for UPSLR II P, area coverage of farmyard manuring increased marginally after project intervention. This could be attributed to the fact that the application of farmyard manure is constrained by its availability. Over the period, cattle population has declined in the rural areas, which has reduced the supply of farmyard manure with farmers. Moreover, declining availability of fuel wood has enhanced the use of cow dung for fuel purpose further reducing its availability for farm use. The proposed project would help in managing the shortage of farmyard manure in two ways. First as a sub-component of the project, livestock number would increase significantly. Secondly, project will undertake demonstration of NADEP and vermicompost in each project village. The project will provide support for five units each of NADEP and vermicompost in every project village. The selected farmers mount NADEP and vermi-compost units in their house premises or on fields. Selected farmers will be provided assistance for either one unit of NADEP or one unit of vermicompost. Thus, the six farmers selected for NADEP and vermicompost will be different. Master Trainers of farmers field school and Mitra Kisan and Mahila Mitra Kisan will be given orientation on NADEP and vermicompost. They will in turn provide training and guidance to the farmers. Technical support will be provided by the project staff on regular basis. Thus, it is expected that area under farmyard manure will increase significantly in the proposed project, as greater emphasis is being laid on increased use of farmyard manure. Page 69 UPBSN IESA Report for UPSLRP-III 69 Nitrogen application Nitrogen is one of the three main plant nutrients required by plant for its proper growth and maturity. It is supplied to plant mainly in three forms i.e. chemical fertilizers, farmyard manure and green manuring. Among chemical fertilizers, Urea contains 46 % and DAP 18% nitrogen. Farmyard manure contains about 0.05 % nitrogen. Green manuring, if done properly, fixes nitrogen in the soil at a rate of about 40 kilograms per hectare. Nitrogen fixed in soil becomes available to the immediately next crop, which is generally paddy. Some experts are of the view that the entire nitrogen fixed in soil by green manuring does not become available to the next crop i.e. paddy. The immediately next crop extracts according to them about 75 percent of the total nitrogen fixed and the remaining 25 percent are available to the second crop after paddy/other kharif crop. For nitrogen application, the project would help the farmers in two ways, it will provide them nitrogen in form of chemical fertilizers at a rate of 130 kilograms per hectare for paddy crop in C class and 57.50 kilograms per hectare in B class land during the post-reclamation first kharif. From the second year onwards farmers will be required to tap their own resources for fertilizer application in crop. For B+ class land, no help on this account will be provided. For wheat crop the project shall provide nitrogen to farmers at the rate of 120 kilograms/hectare for B as well as C class treated land during the post-reclamation first crop year. The B+ class land again will not get any project help in this regard. In addition to the provision of nitrogen in the form of chemical fertilizers, the project shall help farmers for green manuring. It will popularize Dhaincha seed at the rate of 60 kilograms/hectare and 30 hours irrigation charges immediately before the second kharif for all three categories of sodic land undertaken in the project. In the second year (i.e. immediately before the second kharif), only Dhaincha seed will be provided at the rate of 60 kilograms per hectare. Status of nitrogen application in paddy and wheat crops was studied as a part of ASIA study for UPSLR II P. The nitrogen use in paddy as well as wheat increased substantially with the project support in form of subsidized chemical fertilizers. The information about second and third years indicated that farmers sustained the enhanced dose of nitrogen in paddy and wheat crops even after project withdrawal. This could be attributed to the fact that increased crop productivity and higher income level, allows farmers to invest in various agro-inputs. Similar trend is anticipated in the proposed project as well. Phosphorus application Phosphorus is the second important plant nutrient required by plant for its proper growth and maturity. It is supplied to plant mainly in two forms i.e. chemical fertilizers and farmyard manure. DAP contains about 46 % and farmyard manure about 0.025 % phosphorus. The project shall provide the beneficiaries phosphorus in form of chemical fertilizers at a rate of 10 kilograms per hectare for paddy crop in C class. From the second year onwards farmers will be required to tap their own resources for fertilizer application in paddy crop. For paddy crop of B+ and B class land phosphorus will not be supplied to beneficiary households. For wheat crop, the project shall Page 70 UPBSN IESA Report for UPSLRP-III 70 provide phosphorus to farmers at the rate of 40 kilograms/hectare for B as well as C class treated land during the post-reclamation first crop year. The B+ class land again will not get any project help in this regard. Such help will be withdrawn from the post-reclamation second year onwards. It implies that from the second year onwards, farmers will have to rely on their own resources for phosphorus application in paddy as well as wheat crops of all three categories of project land. Status of phosphorus application in paddy and wheat crops was studied as a part of ASIA study for UPSLR II P. The phosphorus application rate in paddy crop had increased. Similar trend is anticipated in the proposed project. Potash application Potash is the third important plant nutrient required by plant. It is supplied to plant mainly in two forms i.e. in form of chemical fertilizers and farmyard manure. MOP contains about 60% and farmyard manure about 0.05 % potash. The project will not provide potash for paddy crop of any category of reclaimed land. Farmers apply potash in paddy crop mainly in the form of farmyard manure. For wheat crop, the project shall provide potash to farmers at the rate of 20 kilograms/hectare for B as well as C class treated land during the post-reclamation first crop year. The B+ class land will not get any project help in this regard. From the post-reclamation second year onwards, farmers will mobilize their own resources for potash application in wheat crop. Status of potash application in paddy and wheat crops was studied as a part of ASIA study for UPSLR II P. The potash application rate in wheat crop increased as a result of the project. Similar trend is anticipated in the proposed project as well. 5.5.6 Increased use of IPM and IPNM practices Post-reclamation use of fertilizers and pesticides is expected to increase as crops extract nutrient from the soil. To compensate the nutrient removal by crops, additional dose of nutrients, i.e. fertilizers dosing needs to be given. The project will emphasize on use of IPM and IPNM practices. Likewise, area under green manuring and farmyard coverage shall also increase as a result of the project. As a part of Environmental Management Framework, appropriate control measures in the form IPM and IPNM measures have been recommended. 5.6 IMPACTS ON ECOLOGY The following impacts are envisaged on ecology due to the proposed project: · Improvement in vegetal cover · Impacts on wildlife · Increased fodder availability · Impacts on soil micro-flora and –fauna · Impacts on wetlands 5.6.1 Improvement in vegetal cover The proposed project does not envisage acquisition of forest land. The project will reclaim sodic and ravine lands which at present are barren or left fallow. On reclamation, with the increase in cropping and irrigation intensities, vegetal cover is expected to improve significantly. In addition Page 71 UPBSN IESA Report for UPSLRP-III 71 project will also aim to increase the area under fodder grass. This will also improve the vegetal cover. Thus, overall the project is expected to have a positive impact on the ecology of the area. 5.6.2 Impacts on wildlife As mentioned earlier, no forest land is likely to be acquired as a result of the proposed project. Thus, no loss of habitat for any wildlife is envisaged in the proposed project. The project would not include any land under reserve forest, national park or wildlife sanctuary. The area to be brought under reclamation is generally devoid of dense tree cover and few patches of trees are observed. The project area is interspersed with settlements and agricultural land. In such settings, large scale faunal population is not observed. Thus, no significant impact on wildlife is anticipated due to the project. 5.6.3 Increased fodder availability During project operation phase, foodgrains production will increase significantly. Assuming even 50% of agriculture byproduct is usable as fodder. In addition project will also aim to increase the area under fodder grass. Hence, the project would satisfy the fodder requirements of a large number of livestock. This will reduce the pressure on the existing vegetal cover in the area. 5.6.4 Impacts on soil micro-flora and –fauna The increase in vegetal cover would improve the organic content of the soils. As a result, microbial activity would improve, leading to increase in the type and number of micro-organisms observed in the soils of the reclaimed areas. During Phases I & II of the Project, biodiversity evaluation for reclaimed sodic lands was incorporated to substantiate environmental impact of land reclamation and to monitor the changes in the site conditions, which inhibit or promote the specific floral and faunal species including soil microbial biomass carbon. NBRI had taken up the study in 10 districts prior to reclamation, 5 and 10 years after reclamation. Based on the findings of the study, following impacts are envisaged. Prior to reclamation, agro-system was static and no natural succession had taken place. The floral species showed presence sodic land indicator species. But, in 5 th year study, the agro-ecosystem had changed to dynamic state due to anthropogenic and agricultural practices. Frequency, density, abundance, species richness and diversity indices were also analyzed by NBRI. Significant changes in comparison to prior to reclamation, five and ten years after reclamation. were observed with the addition/replacement/recruitment of new floral and faunal species due to the change in land-use pattern. Several new species found during 10 th year in comparison to zero and 5 th year which shows enrichment of floral and faunal diversity in reclaimed plots. Based on the findings the study the following impacts are envisaged in the proposed project: · In floral diversity, dominant grasses of sodic land, Sprobolus diander, Sporobolus coromandelianus , Desmostachya bipinatata and Imperata cylinderica are likely to be replaced by species such as Cynodon dactylon, Cyperus spp ., and Euphorbia spp. Page 72 UPBSN IESA Report for UPSLRP-III 72 · Floral diversity of the reclaimed area is expected to increase significantly. Several faunal groups such as mollouscs, reptiles and amphibians, not found in prior to reclamation are likely to be observed once a functional agro-ecosystem is established. · Number and diversity of other groups like insects, mollouscs, amphibia, reptiles, birds and mammals will also increase. · Annelids and fishes are likely to appear few years after reclamation. · Increase in insect and annelid population and increase in diversity of different groups of animals particularly insects are indicators of increase in fertility of the soil undertaken for reclamation. · Microbial biomass carbon in surface soil of rhizosphere (0-15 cm) will increase significantly. However, at greater depths, significant impacts are not expected. 5.6.5 Impacts on wetlands The improvement in drainage system will not only lead to reduction in water logged area, but could also affect any wetland within the catchment area. It is recommended that the presence of wetland in catchment area of each drain be assessed. The drains which are likely to affect wetlands be excluded from the project. The water quality of wetlands in the project area is increasingly under the threat. Deterioration in water quality as runoff waters from sodic reclaimed areas and other agricultural areas treated with gypsum, fertilizers, manure and agricultural chemicals joins drains, river and other surface water bodies such as wetlands. Runoff waters containing salts chemicals can potentially change the balance of water and deteriorate the quality. Increased soil erosion deteriorates the quality of surface waters, especially water ecology. Other possible contaminants could be oils, greases, and detergents from domestic or commercial activities. The proposed project is not expected to increase pollution load on these wetlands. Hence, adverse impacts as a result of the proposed project are not anticipated. 5.7 IMPACTS ON AIR ENVIRONMENT The major sources of air pollution during the proposed land reclamation project are listed as below: · Fuel combustion in various agriculture equipments · Reduction in fugitive emissions 5.7.1 Pollution due to fuel combustion in various agriculture equipments The operation of various agriculture equipments requires combustion of fuel. Normally, diesel is used in such equipment. The major pollutant, which gets emitted as a result of diesel combustion, is SO 2. The SPM emissions are minimal due to low ash content. Based on past experience SPM and SO 2 are not expected to increase significantly as a result of operation of agriculture equipments. 5.7.2 Reduction in fugitive emissions The proposed project would lead to increase in vegetal cover. As a result, entrainment of dust due to wind action from barren area will reduce significantly. Also the increase in organic matter will Page 73 UPBSN IESA Report for UPSLRP-III 73 improve the binding action amongst soil particles. This will reduce the entrainment of fugitive emissions. Thus, overall ambient air quality is likely to improve as a result of the project. 5.8 IMPACTS ON PUBLIC HEALTH 5.8.1 Impacts on incidence of vector-borne diseases The preferred environmental setting for vectors is fresh water open to sunshine or moderate shade. The habitats for larvae growth are permanent or semi-permanent standing fresh water such as small ponds, pools, standing agricultural water, permanent or semi-permanent fresh water such as open stretches or canals. Thus, waterlogged areas serve as favorable conditions for breeding of vectors such as mosquitoes. The improvement in drainage system would lead to reduction in area under waterlogging. As a result the habitat for proliferation of mosquitoes would reduce. This is likely to reduce the incidence of various vector-borne diseases, especially malaria which is a significant positive impact. However, increased area under paddy could lead to areas suitable for breeding of mosquitoes. The paddy fields especially between transplanting could be liable to increased level of mosquito breeding. Inadequate drainage could lead to increase in the severity of the problem. 5.8.2 Impacts on Water-borne diseases The water-borne diseases are common in the project area. Most of the water borne diseases can largely be prevented by adequate hygiene. The experience of various projects confirms the above mentioned hypothesis. Improvement in availability of water for various uses, increased agricultural production, availability of diversified food, strengthening of educational and health facilities significantly improves public health in the project area. 5.9 IMPACTS ON LIVESTOCK The following impacts are envisaged as a result of livestock development: · Increased fodder availability · Use of mineral mixture · Impacts on Animal Health · Breed Improvement · Impetus to Goat rearing · Impetus to sheep rearing · Impetus to Backyard Poultry Farming · Impetus to pig rearing 5.9.1 Increased fodder availability The project will organize 8000 demonstrations (2000 per year for four years) on two fodder crops - berseem and oat. This will improve the fodder availability. This is essential because various project interventions are likely to increase the livestock population and there will be increased fodder demand. The lack of fodder could lead to adverse impacts on existing vegetal cover. Thus, the proposed project would go a long way in meeting the increased availability. This will take care of the concern raised by stakeholders regarding acute fodder shortage. 5.9.2 Use of mineral mixture Page 74 UPBSN IESA Report for UPSLRP-III 74 A major concern raised by stakeholders was Low cattle productivity due to poor animal nutrition. The project will facilitate use of mineral mixture as a supplement to diet of livestock through demonstration of use of mineral mixture. This will motivate the farmers to know its benefits in terms of production and health of animals. The consumption of this mineral mixture will ensure optimum level of genetic production of milk of the milch animals and increase the milk production. 5.9.3 Impacts on Animal Health The livestock health in the project area will improve on account of following interventions: · All animals in project area shall be vaccinated against Foot and Mouth Diseases (FMD), Hemorrhagic septicemia (HS), and Peste des petitis ruminants (PPR). · Animal Health Camps and Pashupalak Gosthi will be organized to identify unproductive ill-managed animals and to provide necessary treatment. This will improve the access veterinary care services, which was a point of concern for the stakeholders. 5.9.4 Breed Improvement A major concern raised by stakeholders was low cattle productivity due to inferior breed. The project will implement various programmes to improve livestock breed in the project area. These programmes are listed as below: · Comprehensive Cattle Development Centers/programme · Breed improvement through Natural Service · Castration of Scrub Bulls 5.9.5 Impetus to Goat rearing The project will strengthen the livelihood of poor farmers by educating them on quality goat keeping. It is also proposed to strengthen the management of goat health through providing the farmers appropriate health kit. It is also planned to guide the goat farmers on marketing and related aspects. The activity will be implemented by the Department of Animal Husbandry through Goat Rearing Groups (GRG), which will be formed by inviting members of women self-help groups. GRG may be formed within a WSHG or across the WSHGs. Under this project Barbari Breed of Goat will be selected for promotion. 5.9.6 Impetus to Sheep Rearing Sheep are reared traditionally in the state and confined to a particular section of the society. The traditional sheep keeping has increased disease incidence many folds leading to high mortality rate and lower production. The technology dissemination regarding vaccination, health management, deworming, foot bath, use of mineral mixture, improved rearing technique, breed improvement etc. will be covered as apart of the project. 5.9.7 Impetus to Backyard Poultry Farming Page 75 UPBSN IESA Report for UPSLRP-III 75 The farmers shall be supported with high quality pullets through Department of Animal Husbandry with the involvement of private poultry breeders to establish commercialized backyard poultry farming for better return. The private poultry breeders shall be invited to transfer technical knowledge; demonstrate and supply inputs to identified farmers and to look after until self-sustainability is developed in farmers group to act independently. 5.9.8 Impetus to Pig Rearing In India, pig rearing is in hands of traditional pig keepers belonging to the weaker socio-economic stratum. They are compelled to follow old and primitive methods of breeding through scrub Boar. It is proposed therefore grading up of local pigs with exotic donor breeds. The breeding programme will make available some 900 exotic graded Boars and 9000 Sows over project period to the pig farmers, rapidly enabling progressively increasing supply of high yielding pigs for the meat market. 5.9.9 Impacts due to generation of bio-medical waste As mentioned earlier, all animals in project area shall be vaccinated against Foot and Mouth Diseases (FMD), Hemorrhagic septicemia (HS), and Peste des petitis ruminants (PPR). In addition Animal Health Camps and Pashupalak Gosthi will be organized to identify unproductive ill-managed animals and to provide necessary treatment. This will lead to generation of Bio- Medical wastes. As per the Bio-Medical Waste (Management and Handling) Rules 1998, the bio- medical waste has been classified into various categories outlined in Table-5.6. TABLE-5.6 Categories of bio-medical waste Waste Category No. Waste category type Category No. 1 Human Anatonical Waste Human tissues, organs, body parts Category No. 2 Animal Waste Animal tissues, organs, body parts, carcasses, bleeding parts, fluid, blood and experimental animals used in research, waste generated by veterinary hospitals, colleges, discharge from hospitals, animal houses Category No. 3 Micro-biology and Biotechnology wastes Wastes from laboratory cultures, stocks or specimens of micro-organisms, live or attenuated vaccines, human and animal cell culture used in research and infections agents from research and industrial laboratories, wastes from production of biologicals, toxins, dishes and devices used for transfer of cultures Category No. 4 Waste sharps Needles, syringes, scalpels, blades, glass, etc. that may cause punctures and cuts, including both used and unused drugs Category No. 5 Discarded medicines and cytotoxic drugs Wastes comprising of outdated, contaminated and discarded medicines Category No. 6 Soil Waste Items contaminated with blood and body fluids including cotton, dressings, soiled plaster casts, lines bleedings other material contaminated with blood. Category No. 7 Solid Waste Wastes generated from disposable items other than the waste sharps, such as tubings, catheters, intravenous sets, etc. Category No. 8 Liquid waste Waste generated from laboratory and washing, cleaning, house keeping and Page 76 UPBSN IESA Report for UPSLRP-III 76 Waste Category No. Waste category type disinfecting activities Category No. 9 Incineration Ash Ash from incineration of any bio-medical waste Category No. 10 Chemical Waste Chemicals used in production of biologicals, chemicals used in disinfection, as insecticides, etc. As a part of the project, bio-medical waste comprising of the following categories is likely to be generated: Category No. 2 : Animal Waste comprising of Animal tissues, organs, body parts, carcasses, bleeding parts, fluid. Category No. 4 : Waste sharps comprising of needles, syringes, scalpels, blades, glass, etc. that may cause punctures and cuts, including both used and unused drugs. Category No. 5 : Discarded medicines comprising of wastes of outdated, contaminated and discarded medicines. The above referred categories would be generated in varying quantities in various vaccination programmes, animal health camps, etc. The waste needs to be properly disposed so as to prevent adverse impacts. 5.10 IMPACTS ON SOCIO-ECONOMIC ENVIRONMENT The following impacts are envisaged on socio-economic environment due to the proposed project: - Acquisition of land and private properties - Impacts on archaeological and cultural monuments ,if any - Impacts on mineral reserves, if any - Improvement in income from sodic/ravine lands with an overall increase in income level - Improvement in employment scenario - Improvement in wage rates in the area - Impacts on migration of labour from the villages - Impacts on land value - Access to amenities - Impacts due to improvement of social capital in the project - Impacts on vulnerable groups, e.g. women, SC, ST families, landless tillers, small and marginal farmers, etc. - Impacts on inter-relationship across class and caste group of farmers - Impacts on role of women in social setup. - Impacts due to capacity building under the project - Impacts due to farmer field schools and similar interventions due to the project - Willingness of the community to contribute - Impetus to growth and development in the area 5.10.1 Acquisition of land and private properties At the present level of investigations, no private land or property is to be acquired in the proposed project. No project component is likely to entail acquisition of land. Thus, no impacts on account of acquisition of private land or properties are envisaged.However, if at a later date, during the course of project implementation, land acquisition is envisaged, then Resettlement and Rehabilitation Plan as per the norms of National Resettlement & Rehabilitation Policy (NRR) 2007 shall be formulated. Page 77 UPBSN IESA Report for UPSLRP-III 77 5.10.2 Impacts on archaeological and cultural monuments The project does not envisage any impact on archaeological and cultural monuments 5.10.3 Impacts on mineral reserves The proposed project does not envisage acquisition of mineral bearing land. Hence, no impact is envisaged on the account. 5.10.4 Improvement in income from sodic/ravine lands As a part of the study, farm planners use enterprise budgeting and whole farm budgeting for planning. An enterprise is defined as single crop or livestock commodity whereas whole farm consists of a combination of several enterprises. An enterprise (crop) budget represents only one point on production function. Strictly speaking there is an enterprise budget for every point on a production function so a budget does not automatically determine the profit maximizing input levels. However, in the real sense, it is crop income expenditure analysis rather than crop budget analysis. But following the convention of farm management literature the study calls it crop budget analysis. Crop budget analysis has been done for the two crops – paddy and wheat. Details were provided in various annual reports submitted to UPBSN from time to time. Only net income from paddy and wheat cultivation in sodic land is presented here (refer table-5.7). TABLE-5.7 Improvement in income level respondent households covered as part of survey Particulars Unit Marginal farmers Small farmers Large farmers Overall Sodic villages Paddy Cost of cultivation Rs/ha 10125 11458 12247 1386 Gross income Rs/ha 17813 18830 20080 18580 Net income Rs/ha 7688 7372 7833 17194 Gross income Rs/Respo. 4922 13102 20191 8075 Net income Rs/Respo. 2124 5129 7876 7473 Wheat Cost of cultivation Rs/ha 11616 12552 13187 12291 Gross income Rs/ha 24111 25313 25941 24944 Net income Rs/ha 12494 12760 12755 12654 Gross income Rs/Respo. 7699 21701 38528 13393 Net income Rs/Respo. 3990 10940 18943 6794 Ravine Villages Cost of cultivation Rs/ha 10125 11458 12247 106316 Gross income Rs/ha 17139 18816 19416 18315 Net income Rs/ha 7014 7358 7169 -88001 Gross income Rs/Respo. 581 1214 1450 901 Net income Rs/Respo. 238 475 535 -4331 Wheat Cost of cultivation Rs/ha 12150 11575 12550 11886 Gross income Rs/ha 23518 25128 25841 24925 Page 78 UPBSN IESA Report for UPSLRP-III 78 Particulars Unit Marginal farmers Small farmers Large farmers Overall Net income Rs/ha 11368 13553 13291 13039 Gross income Rs/Respo. 2418 13115 9096 6651 Net income Rs/Respo. 1169 7074 4678 3479 It can be observed from Table-8.6, that income level from wheat and paddy on account of low productivity form sodic and ravine soils is quite low. After reclamation, the crop productivity will increase and net income form agriculture would increase significantly. As per the findings of ASIA study conducted for phase-II, the income level from paddy and wheat increased significantly. The details are given in Table-5.8. TABLE-5.8 Increase in income levels due to reclamation in phase-II Land Class Pre –Project [Rs./ha] Post –Project [Rs./ha] Paddy B+ land 6160 12229 B land 4115 10735 C land - 9275 Wheat B+ land 6760 14495 B land - 12783 C land - 11194 In consonance with improvement in crop yield, net income from paddy and wheat cultivation in reclaimed sodic lands increased to a large extent in UPSLR II P. Similar impacts, i.e., increased in income levels are anticipated in the proposed project as well. The risks which need to be considered in the proposed project is that sodic/ravine land is owned mostly by resource-poor farmers. They may not take the critical interest in the project because they will have to devote time and some money for reclamation of their sodic/ravine land. Such farmers are virtually settled with their alternative livelihood sources such as wage earning and petty businesses. Moreover, wage-dependent households may not take adequate interest in the project because their holding is tiny and may not compensate their wage earning. Thus, they might not prefer to leave wage earning in order to get involved in farming on their small sized farms. Farmers have somehow developed a feeling that sodic land is sodic land and cannot be improved. Such farmers may not accept the project message that sodic land can be reclaimed on sustainable basis. These risks need to be specifically considered while planning the training course, awareness programme and exposure visits for the farmers. 5.10.5 Improvement in employment scenario Employment situation in rural areas is grim. In the rural economy, there is very little open or outright unemployment but there is considerable seasonable unemployment and/or underemployment and disguised unemployment. In the absence of off-farm employment Page 79 UPBSN IESA Report for UPSLRP-III 79 opportunities almost all the adult members get themselves engaged in the household farming in excess of actual labor requirement. Marginal productivity of such surplus family members on the household farm is nil. Meaning thereby, if they are withdrawn from field there will not be any adverse effect on the farm productivity or production. The project implementation will enhance overall employment opportunities in benefited villages. However, only employment from hitherto sodic land owned by the beneficiary households has been estimated. It is assumed that paddy cultivation generates an employment of 190 days per hectare and wheat cultivation generates an employment of 125 days per hectare. The details of increase in employment generation are given in Table-5.9. TABLE-5.9 Increase in employment potential due to UPSLRP-III Pre –Project Post –Project Land Class Area (ha) Employment (days/ha) Total employment (million mandays) Area (ha) Employment (days/ha) Total employment (million mandays) Sodic villages B+ land 13000 315 4.1 13000 315 4.1 B land 32000 190 6.1 32000 315 10.1 C land 85000 - - 85000 315 26.8 Total 130000 10.2 130000 42.0 Information presented in Table-5.9 shows that reclamation program shall result in additional employment opportunities for beneficiary households. On C class land (pre-project barren land) the entire employment generated is incremental whereas on B class land, employment generated only by wheat cultivation is additional as paddy was already being grown on such land. The employment potential due to sodic land reclamation shall increase by 31.8 million mandays. Marginal increase in employment potential shall increase due to sodic land reclamation as well. As per the general definition, a main worker is defined as one who is engaged in any economically productive activity for at least for 183 days or six months in a year. Thus, land reclamation will ensure employment to about 173,000 additional persons per year. This is a significant positive impact. 5.10.6 Improvement in wage rates in the area The income that laborers earn is a function of employment days and wage rate at which they work. The wage rate has two variants: money wage rate and real wage rate. The money (nominal) wage rate is the rate, which laborers receive from the employer (of course at current prices) whereas real wage rate is worked out after accounting and adjusting for the price rise over the base year. Laborers’ consumption level and hence welfare level is determined by the real wage rate as their purchasing power is direct function of real wages. Real wage rate may be less or more than money wage rate depending on price movement. Falling prices push real wage ahead of money wage and rising prices leave it behind. Falling prices being a rare phenomenon, real Page 80 UPBSN IESA Report for UPSLRP-III 80 wage is generally lower than money wage, hence the need for assessing the changes in former. Real wage rate has been worked out by deflating the nominal/money wage by the Consumer Price Index for Agricultural Laborers. Based on the findings of ASIA survey for UPSLR II P villages, money (nominal) wage rate has increased for male as well as female laborers. Wage rate for male laborers increased from Rs. 43 to 50 per day, whereas it increased from Rs. 37 to 43 for female laborers. It was also found that real wage rate for male laborers increased from Rs. 41 to 46 per day and for female laborers from Rs. 35 to 40 per day. Rise in real wage rate was attributed to increase in demand for local labor, which was in turn caused by increased farming activities after sodic land reclamation. Similar impacts are envisaged in the post-reclamation phase of the UPSLRP-III as well. 5.10.7 Impacts on migration of labor from the villages Labor migration is a socio-economic phenomenon. With tiny holdings and poor access to other income generating opportunities many a families are forced to offer their labor services for wage earning. While small size of holding is attributed to historical reasons, increase in population and disintegration of family, poor access to employment opportunities is explained mainly by poor educational attainment. Educational incapacity in turn is caused by poverty. The entire process is represented by a vicious circle of poverty. Wage earning becomes more painful when laborers are required to leave their place in search of remunerative work. However, this cannot be generalized as in case of upper caste families, local wage earning is considered to be sordid situation. They would prefer to work for wages out of their village. Labor migration, in spite of providing higher wage rate, is normally not preferred due to two major reasons – the pain associated with leaving the familiar village vicinity and transportation cost which reduces the actual amount of wage income. As a result of labour migration, women’s roles and responsibilities increase manifold and their individual welfare gets adversely affected. This issue was quite commonly raised by villagers during stakeholders interaction as well. The labor migration in villages covered under the survey for IESA study was 114 and 51 days for male and female population in sodic villages. Corresponding figure for male and female population in ravine villages is 100 and 80 days respectively. Findings of ASIA study under UPSLR II P reveal that by reducing the extent of labor migration in terms of number of days the project has made very important contribution in the quality of life of people in general and beneficiaries in particular. As a result of enhanced employment opportunities in the project villages, labor migration came down from 98 to 45 man-days per year in case of male laborers and from 38 to 5 days per year in case of female laborers. While increased farming activities in project villages became the main cause for reduced labor migration. Such reduction took place in spite of the fact that town wage rate is higher than local wage rate. Laborers, by remaining in the village vicinity, are able to look after their own farming and family in better way. They devote odd hours on their own farm and spare the normal working time for wage earning. During the off-season they migrate to cities in search of work. Moreover, the skilled laborers are still migrating to towns to get appropriate job opportunities. Decline in labor migration has a very big value for their family members. Now they are in a position to give more and more time to their family. The process of socialization of children gets strengthened due to presence of the parent at the home. It would be worthwhile to mention here that no laborer would leave wage earning as an occupation even after reclamation/improvement of sodic land. This is mainly due to the fact that land resources are not sufficient to feed family members. They Page 81 UPBSN IESA Report for UPSLRP-III 81 have no option but to resort to wage earning. It may also be noted that reduction in labor migration will be more in case of female laborers. This pattern is attributed to the fact that most of the increased workload on own farm will be taken up by female members of the beneficiary families. Thus, females would concentrate on family farm and males would supplement their efforts and also devote some time for wage earning from outside village. 5.10.8 Impacts on land value The increased value of land is an outcome variable, which is the result of improvement of sodic and ravine lands. After reclamation, quality of sodic land is expected to improve considerably. It is envisaged that incremental change in land value will be the highest in case of C class lands, followed by B and B+ class lands. However, it may also be noted that B+ class land commands the highest price in both pre- and post-reclamation situations, whereas the C class lands commands the lowest in both situations. 5.10.9 Access to amenities The list of basic amenities includes number of facilities and services. Many of them are exogenous to individual household economies. Since, the impact assessment primarily focuses on various outcomes and impacts at household-gate, the amenities with external characteristics have been included in the study. Moreover, changes are likely to be observed only in those amenities, which are directly related to households’ economic capability. Various aspects, which have been covered in this regard, include access to house accommodation and possession of farm equipments, consumer durables including electric & electronic goods, conveyance goods, and animals. A. House accommodation Some change will be observed in the housing condition of the participating families. Few beneficiary-families (though small in number) will be able to improve their housing condition. Such improvements are expected to be terms of house extension (adding pucca portion in the house) or conversion of a kachcha portion of the house into pucca structure. This can be attributed to improvement in income levels. B. Farm implements/equipments Enhanced income shall enable beneficiary-households to purchase new farm implements. As a result, the percentage of households owning these implements is expected to increase. However, it may also be kept in mind that such change may not be the exclusive impact of the project intervention. C. Electric/electronic goods As a result of rise in income some beneficiary-households are likely to purchase electric/electronic items and home appliances including radio/transistor, cassette player, television set, watch/clock, sewing machine, air cooler, and air circulator, etc. The betterment is expected on two counts. On one hand, some households may acquire these items for the first time and on the other hand, some household will have increased number of such items. Page 82 UPBSN IESA Report for UPSLRP-III 82 D. Conveyance goods/vehicles The percentage of households having different conveyance goods/vehicles will increase over the pre-project period. Change will be observed with respect to bicycle, scooter/motor cycle, and four-wheelers. However, increase in number of four wheelers is likely to be marginal. E. Health and hygiene The project is likely to make indirect contributions in improvement of health and hygiene of the beneficiary-households and their members. These could be · Development of systematic and well-integrated drainage network (comprising of field, link and main drains) in the project villages will reduce water logging. It will save people from the adverse effects of impeded drainage. Various negative effects of impeded drainage on the health and hygiene of villagers include mainly susceptibility to vector- borne diseases. Incidence as well as risk of such diseases is likely to go down. · Improvement in health and hygiene is likely on account of reduction in susceptibility to respiratory problems. Before reclamation, Usar dust gets entrained in air at the time of strong wind, which is very dangerous for their health. Treatment of salt-affected soils will reduce the entrainment of fugitive dust. This is expected to reduce the incidence of respiratory disease. 5.10.10 Impacts due to improvement of social capital in the project Social capital refers to the institutions, relationships, and norms that shape the quality and quantity of a society’s social interactions. Increasing evidence shows that social cohesion is critical for societies to prosper economically and for development to be sustainable. Social capital is not just the sum of the institutions, which underpin a society – it is the glue that holds them together. Social capital facilitates coordination and cooperation. Social capital has an important down side also: communities, groups or networks which are isolated, parochial, or working at cross-purposes to society’s collective interests can actually hinder economic and social development. A broader understanding of social capital accounts for both positive and negative aspects including vertical as well as horizontal associations between people, and includes behavior within and among organizations. The broadest and most encompassing view of social capital includes the social and political environment that shapes social structure and enables norms to develop. Salient observations regarding dimensions and direction of project-induced changes in social capital are being presented below: · The project shall facilitate multiplication of stock of social capital through creation of various local level institutions, which shall serve as a platform for social interactions. Though these institutions are primarily meant for beneficiaries, other farmers will also avail the benefits. Especially after completion of project activities, these institutions shall become more or less general bodies open to all farmers and households of the respective villages. · The SIC shall provide a forum for vertical social association, self-help groups shall offer avenues for horizontal association among like-needy people and households. These institutions will also help non-members in their socio-economic endeavors. For instance, Page 83 UPBSN IESA Report for UPSLRP-III 83 self-help groups also provide credit support to non-members in case of emergency. Farmers will generally participate in SIC meetings. · The project will facilitate vertical social integration through establishing institutional linkages with other organizations/agencies such as banks. · The project shall inculcate the culture of collective action amongst farmers, especially beneficiaries. · The project shall create socio-political environment in the village society, and hence, improve the stock of village level social capital, which is going to be harbinger of socio- economic development in future. 5.10.11 Impacts on vulnerable groups In spite of planned development for five decades, more than one-fourth population of India still lives in poverty. Rural people are in worse position with poverty incidence of about 30 percent as compared to urban poverty of about 25 percent. The poverty situation is more alarming in the State of Uttar Pradesh with rural and urban headcount ratios of 34 and 30 percent respectively. Feeble asset base and livelihood opportunities are widely-accepted determinants of poverty which has in turn severe repercussions on resilience and vulnerability to risks and risk management strategies at the household level. Households caught in the ‘poverty trap’ are vulnerable to various risks, and their poorly-backstopped responses to risks can further lead to lower quantities and qualities of assets, and subsequently to lower income flows and hence loss of welfare. Vulnerable groups in the project areas include landless households, marginal farmers, people of scheduled caste and scheduled tribe and women across the caste and class categories. Likely impact on women is discussed separately; the probable impacts on other vulnerable groups are discussed below. Landless households are entirely dependent on non-farm livelihood sources mainly wage earning for which they often migrate out of the village vicinity away from their family. Many a time, they do not find adequate work opportunity. Thus, in spite of willing and able to do physical work they are deprived of income. Exclusive dependence on wage income has its own socio-economic implications like lower status in society, uncertainly and variability in income flow, etc. Project interventions may directly benefit some of the landless households through allotment of community sodic land and its reclamation. At the same time, laborers will get more work in the village itself so they will not require migrating out of village. Marginal farmers are suffering from double-deprivation. On one hand, their holdings are tiny and on the other major portion of these holdings are unproductive due to the problem of sodicity. Thus, most of the marginal farmers are also heavily dependent on wage earning. These farmers will also be benefited from the project intervention as the landless people will be. In addition, reclamation of sodic and ravine lands will improve agriculture production/productivity on such farms. Ultimately, income of these households is likely to increase due to project intervention. Scheduled caste/tribe households are also characterized by tiny or no landholding and heavy dependence on wage earning. Allotment of Gram Sabha land, its reclamation and increased availability of wage employment at local level will benefit these households. Various vulnerable groups will also be benefited from training and capacity building initiatives to be taken under the proposed project. 5.10.12 Impacts on inter-relationship across class and caste group of farmers Though caste is dominant factor in social stratification even today, economic status in terms of possession of assets and wealth and annual income is also an important determinant of socio- economic dynamics. However, caste and class generally coincide in rural areas. It implies that richer households generally belong to upper caste categories and poorer households to lower caste Page 84 UPBSN IESA Report for UPSLRP-III 84 groups. However, it has been observed that caste factor takes backseat if differences in economic status are quite large. For example, an upper caste farmer would prefer to befriend a lower caste farmer over an upper caste farmer if the former is significantly richer and resourceful. Education has also played an important role in bridging the social gaps across the caste and class groups. Educated people from all caste and class groups are welcomed by other educated people. The project interventions, especially various institutions such as Site Implementation Committee, Water Users’ Groups and Self-Help Groups are likely to bridge the social gap among different sections of the society. Farmers of all categories will come together and closer for common cause and similar individual reasons. All the farmers will be treated equally in these institutions with equal opportunity to raise issues and get solutions. 5.10.13 Impacts on role of women in social setup As a part of stakeholder discussions, the level of adequacy of farming skills was discussed. It was observed that females had Only general skills and lacked specific and complex skills. This needs to be addressed through Skill enhancement through training and exposure visits. Thus, female farmers too need to considered while selecting the trainees for various agriculture related activities. Project should identify women cultivators in the villages. They should be imparted suitable training along with men. For women, training programs should be preferably organized at local level so that they could attend without fail. It was observed that barring a few families, firewood, cow dung cake and crop residue are the chief cooking media. Use of cow dung cake causes respiratory problems among women. Families need to be motivated and encouraged to adopt improved choolha The project shall contribute in women empowerment mainly through Women Self-Help Groups. The literacy campaign, training on various income generating activities and interface with commercial banks shall valuable contribution in their socio-economic development. The various impacts are discussed in the following paragraphs: A. Educational empowerment: The project shall launch special literacy drive for the members of women self-help groups. Educated ladies of the groups will be motivated to teach their fellow members, especially illiterate ones, according to their convenience with respect to time and place. Such voluntary teachers will be provided literacy kits from the project. Such measures have yielded positive results in phase-II the project. Before the project interventions in phase-II, only about 30 percent group members were literate. During the project period, additional 25 percent women learnt reading and signing. Similar improvement in literacy level is anticipated in Phase-III as well. B. Financial empowerment: Women became financially empowered as a result of their association with the women self-help groups. Before the project, such women have almost nil saving of their own whereas in the post reclamation phase, they will have an accumulated saving. Moreover, they will have an easy financial assess to the group money as well. C. Economic empowerment: Page 85 UPBSN IESA Report for UPSLRP-III 85 With the financial, training and technical help extended by the project, women could start various income generating activities, which will improve their economic position. In Phase-II, about one- third of WSHG women got engaged in self-designed income generating activities such as sewing, running petty shops, leaf plate making, and animal husbandry. As a result of these initiatives, such women started earning Rs. 2500 to 3000 per month. Earlier they were not contributing in the household economy directly. It will be an important contribution of the project towards promoting self-dependence among the member women. Similar income generation activities are envisaged in phase-III of the project as well. D. Social empowerment: Through their female members, households will have an access to the alternative credit structure created by the project. It will reduce their dependence on the village moneylenders to great extent. Women shall start to supplement the other sources of household income, which will impro ve the households’ economic status. Consequently, respectability of group women is expected to improve in the close society in general and in respective households in particular. 5.10.14 Impacts due to capacity building under the project Though the project focuses on reclamation of sodic lands, it will also address human resource development aspects as well. Project shall have a provision of number of training and skill development programs pertaining to agriculture, livestock, hygiene, vocational skills, etc. This will improve the quality of human capital in the project villages. As part of its implementation strategy, the project shall and train some persons to act as Mitra Kisan, Mahila Mitra Kisan, boring mechanic, pumpset mechanic, and other animators, such as health, literacy, and animal husbandry animators in these villages. Mitra Kisan and Mahila Mitra Kisan will perform twin role under the project. They will function as contact farmer and extension agent for the project/external agencies and as a resource person for their fellow farmers. They shall act as a mid-link between the project and beneficiaries. Their presence in the project villages will facilitate motivation and pursuance of the potential beneficiaries to participate actively in the program. Other animators will help the project authorities in the direction of meeting the social objectives and concerns. They will be able to remove varied apprehensions existing in the minds of beneficiaries. Capacity building of general beneficiary-farmers In addition to identification and skill development of above mentioned animators and contact persons through training and orientation courses, the project shall also contribute in capacity building of farmers, especially beneficiaries. Capacity building will be undertaken in the area of agriculture, horticulture, livestock, micro enterprises, credit management, community mobilization, etc. In a nutshell, the capacity of beneficiary-farmers shall improve substantially as a result of project intervention. The salient aspects of capacity building are summarized below: · Farmers’ awareness with latest farming technology shall improve as result of trainings, workshops, demonstrations, and exposure visits. The major knowledge areas include balanced dozes of fertilizers, proper land and water management, nutrient management, and crop management and cultivations practices. · Their capacity to manage and operate micro enterprises shall improve. Page 86 UPBSN IESA Report for UPSLRP-III 86 · Better management of their credit requirements and their fulfillments from various resources. · Capacity to manage external intervention and support will enhance. 5.10.15 Impacts due to farmer field schools and similar interventions due to the project Project envisages establishment and strengthening of farmers’ field school for farmer-led extension; cluster level producers’ organization for improvement in input & output marketing, grading, packaging and storage facilities, processing and other agribusiness activities and contract farming; and cluster level federation of self-help groups for handholding of women self-help groups. These institutions are likely to have various positive impacts which are discussed below: Farmers’ Field Schools It is being increasingly difficult for the public extension system to reach each and every farmer due to its shrinking size and limited financial resources. This situation necessitates creation of an alternate mechanism for providing extension services to the farming community. Farmer Field School is one such alternative. Farmers are the primary stakeholders in the project and they would be directly involved in the decision making processes related to planning, implementation and monitoring and evaluation of the project activities. In UPSLR II P, progressive farmers of 10-12 villages, located in the radius of 5 kilometers were encouraged to establish their own institutions called “Farmers Field School (FFS). UPSLR III P also proposes for FFS. FFS would be created as learning centers of the farmers, by the farmers and for the farmers. These unique local level institutions would belong to the farmers and shall be managed by the farmers for the benefits of the farmers. The FFS shall strive to work as forum where farmers can share their traditional knowledge, experiences and skills. The institutions would also facilitate development and dissemination of local, farmer-friendly, cost effective technologies. In order to develop FFS as knowledge centers, libraries with computer facilities would also be promoted. These schools will reduce the burden of concerned departments of the government through taking up the extension responsibility. Cost of services will also go down because most of the master trainers will be farmers. Moreover, FFS is likely to be more effective because trainees will be more comfortable while obtaining training from their own fellow farmers. They will also feel more confident in raising questions and doubts and get appropriate answers. Most importantly, master trainers will hail from the same area and hence will be familiar with agro-climatic and socio-economic environment facing the trainee farmers. Thus, they will be able to provide customized solutions to farmers’ problems. Cluster-level Producers Organization (CO) Under UPSLR III P, it is planned to federate producers under water users’ groups as cluster-level organization (CO). Producers under water users’ groups of earlier projects (UPSLRP Pilot and UPSLR II P) will also be motivated and encouraged to join such cluster-level organization. CO will promote input marketing, output marketing, grading, packaging and storage, processing and other agribusiness activities and contract farming. Through CO farmers are expected to reap the benefits of collective marketing for both inputs and outputs. Such benefits will be in terms of better price terms, better quality and timely availability and reduced overhead cost involved in transport, etc. Grading, packaging and storage facilities will lead to better price terms for their produces and hence they will earn higher income from the marketed surplus. Overall, CO will lead to more commercialization of agriculture including value adding activities. Page 87 UPBSN IESA Report for UPSLRP-III 87 Cluster-level Self-Help Group Federation (SHGF) SHGF would work for strengthening of weak women groups by assisting them in record- keeping, bank linkages, auditing, conflict resolution and initiation of marketable income generation activities. SHGF would also be linked with the COs operating in their area for carrying out production and marketing related activities. Active cluster members would be groomed as resource trainers for further strengthening of SHG movement. On social development aspects, members of cluster committees would be motivated to regularly monitor the functioning of Aanganwadi centers, primary schools and effectiveness of ANMs etc. and put peer pressure for further improvement. CO will also utilize these SHG federations during the process of production, procurement, service delivery system, contract marketing, etc. These interventions are likely to have positive impact on women and their livelihood, especially access to credit and saving, enhanced income, better capability to manage the enterprises, etc. 5.10.16 Wllingness of the community to contribute The project envisages contribution from the community to take up land development and infrastructure works. As part of the IESA study, an assessment of the willingness of the potential project beneficiaries to contribute to the infrastructure development under the project has been made. It has also been attempted to ascertain the extent and type of contribution; and the terms and conditions for the same. In addition, the success in ensuring community contribution for the O&M of assets created under previous phases of the project has also been examined. Willingness, extent, type and terms & conditions of contribution Willingness of potential beneficiaries to contribute to land development and infrastructure development and extent, type, and terms and conditions of such contributions was assessed as part of household interview and stakeholder consultation with farmers. Findings are presented hereunder: ƒ Almost all the potential beneficiaries expressed their willingness to contribute. However, some farmers (negligible number) demanded that UPBSN should bear entire expenditure towards land development and infrastructure because it is part of government. ƒ Farmers are ready to contribute in terms of only labor. Most of the respondents (about 90 percent) are ready to contribute their labor time to the full extent as far as work in their own field is concerned. However, for community infrastructure/assets, they think that project should bear the primary responsibility even for labor work and farmers’ labor should be sought only on supplementary basis. Other farmers (about 10 percent), mostly large farmers or those belonging to general caste category, are ready to contribute in cash in lieu of their labor time. ƒ Farmers in general are not ready to make cash contribution to infrastructure development. However, they are ready to contribute for maintenance of these assets after the project withdrawal. Farmers also mentioned that when a few farmers do not contribute to maintenance of community infrastructure/asset, others also withdraw. So, project should sensitize all the farmers to participate. ƒ Farmers are also ready to make nominal cash contribution towards the cost of inputs such as gypsum, seed, fertilizers and veterinary care services under the project. Farmers did not mention the exact extent of contribution. However, they feel that most of the potential beneficiaries are poor farmers. Thus, project should not expect much contribution in cash for inputs and services. Page 88 UPBSN IESA Report for UPSLRP-III 88 ƒ Farmers did not impose any condition on such contributions; their only concern is that entire project package should be available to farmers with utmost honesty of the part of project staff. Contribution for O&M assets under previous projects As part of the IESA study, 6 villages of UPSLR II P were visited. Findings reveal that during initial 2-3 years beneficiary-farmers made contribution to maintenance of link drain. Most of the farmers contributed in terms of labor, meaning thereby, they participated in link drain cleaning work. However, some farmers contributed in kind (agricultural produces) and cash which was used to hire labor in lieu thereof. Subsequently, the concerned Gram Panchayats took up the task of maintenance/cleaning of these link drains from other funds. However, Gram Panchayats were not regular in such maintenance work. They executed the task depending upon availability of funds. If Gram Panchayat takes up the task of maintenance of assets/infrastructure created under the project, it will go a long way in sustainability of these assets. 5.10.17Impetus to growth and development in the area The commissioning of the project will increase the gross money flow in the project area. This will lead to significant impacts in the project area. The area will have increased demands for services, such as sewerage system, communication, transportation, medical and educational facilities, etc. It is presumed that all these developments would result in generation of additional employment. Thus, with the increased income level, there will be a greater impetus to development in the project area. Thus, the project will provide an impetus to growth and development in the area. Page 89 UPBSN IESA Report for UPSLRP-III 89 CHAPTER – 6 ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK 6.1 ENVIRONMENTAL AND SOCIAL CONCERNS OF THE PROJECT ACTIVITIES This Chapter outlines the Environmental and Social Management Framework (ESMF) which is broadly based on the environmental and social baseline conditions, planned project activities and impacts identified and assessed as part of IESA. For the environmental and social impacts (both positive and negative), the ESMF provides a set of measures to minimize the adverse impacts and enhance the positive impacts which are intended to be adopted during the project implementation. The most reliable way to ensure the implementation of ESMF is to integrate the management measures in the overall project planning, designing, construction and operation phases. This will not only ensure that ESMF activities are implemented in accordance with the framework and processes but also that there are adequate funds/resources for implementation and supervision and of social and environmental management plans. Assessment made in the process of formulating the ESMF indicated that the nature and scale of environmental and social impacts, their severity, extent and the duration would vary depending on the type, size, and location of activities. ESMF has carefully assessed the potential/anticipated adverse environmental and social impacts that are likely to occur during the implementation of subprojects. These issues and concerns are broadly identified as follows. 6.2 KEY SOCIAL AND ENVIRONMENT CONCERNS The potential adverse impacts anticipated from the proposed project interventions are presented in Table-6.1. TABLE-6.1 Summary of Social and Environmental Concerns Social Concerns Environmental concerns Encroachment of the land proposed for reclamation of sodic land and restoration of drains Elite capture in the program Poor participation and involvement of vulnerable groups (SC, landless, women, marginal and small farmers) Collective action of WUG Conflicts on water use WUG management of irrigation wells and regular O&M Maintenance of irrigation distribution network Use of reclaimed land and impact on livelihoods Drains not maintained properly Lack of consultation process Low participation of women management Lack of environmental awareness among farmers, community members, and extension workers Likely Use of higher quantities of agro-chemicals due to change in cropping pattern Likely impacts during execution of physical works Base flows to be maintained Page 90 UPBSN IESA Report for UPSLRP-III 90 6.3 SALIENT FEATURES OF ESMF It is essential that the potential environmental and social concerns of the proposed project activities are thoroughly looked during planning phase and appropriate measures are recommended for implementation. If during the design phase, these concerns are thoroughly examined, adverse impacts could be prevented or reduced significantly. The ESMF has been developed as a decision making tool to ensure that the project activities selected and implemented under project are socially responsive and environmentally sound. These guidelines serve as a tool to guide the project implementers the optimal project interventions required to address social and environmental concerns, prepare mitigation plans, and to ensure complete integration of social and environmental concerns and mitigation measures in the design of the project activities. The ESMF recognizes the need for an early environmental and social assessment, during pre- panning stage of activities at the field level, to identify any adverse impacts, plan for mitigation measures and help in mainstreaming these aspects through out the implementation phase. ESMF has been prepared fully considering the World Bank Safeguard Policies and GoI and GoUP regulatory/policy requirements. This framework includes (i) environmental and social screening of project activities; (ii) environmental codes of practice; (iii) integrated pest and nutrition management plan; (iv) resettlement and rehabilitation (R&R) policy and entitlement framework, strategies for the development of vulnerable peoples, women (gender), and community consultation and communication, (vi) institutional arrangement, and (vii) monitoring and evaluation. The ESMF will be applied to all proposed sub-project activities, through the different stages of the sub-project cycle. The proposed ESMF interventions are designed on the basis of the current understanding of the social and environmental issues identified and discussed in the previous chapters. As the project planning and implementation gains momentum, more learning will be generated, and the ESMF will be altered accordingly. 6.4 ENVIRONMENTAL AND SOCIAL SCREENING It will be ensured that the project design and implementation of the proposed project components/ activities are socially responsive and environmentally sound. While currently, project components and their subcomponents and individual activities are identified, precise identification of areas will be finalized during project implementation. Most of the adverse social and environmental impacts are component and site specific and are reversible. The environmental and social impacts of components/ subcomponents and activities under the project will vary in their extent, magnitude and duration as per the nature and scale of the interventions and location. All the potential physical activities to be financed will be screened against a set of environmental and social criteria, which will determine the need for social and environmental assessment. 6.4.1 Environmental and social screening criteria All project activities will pass through a set of social and environmental screening criteria and as per the nature and magnitude of impacts; and these will be categorized as given in Table-6.1. Page 91 UPBSN IESA Report for UPSLRP-III 91 TABLE-6.1 Social and environmental screening criteria Category Screening criteria Category-I Activities which can not be taken up under the project (applying exclusion criteria discussed below) Category-II Project activities requiring social assessment if R&R is triggered Category-III Project activities not requiring any formal assessment but will need environmental and social monitoring during implementation This screening process will provide information to the project implementing agencies about the nature of project activities before its implementation. Screening criteria for the above categories are described in the following paragraphs. Category – I: On environmental considerations, sites involving physical activities in protected areas and heritage sites will be excluded. Similarly, from social considerations, project sites involving project activities resulting in (i) loss of common property resources affecting the livelihood systems of local people; (ii) major land acquisition; and (iii) relocation of local population. Category – II: As far as possible ensure that a project activity does not result in any land acquisition or involuntary resettlement, or both and if any project intervention is resulting to disturb the economic livelihood of the people dependent on land required for the proposed reclamation/restoration will require an assessment of impacts and preparation of a mitigation plan. If there are any indication of elite capture, include measures to ensure involvement of vulnerable groups (scheduled castes, women, landless and other poor families) and that they have access to project benefits. Where required project activities will prepare integrated nutrient and pest management. Category III: Project interventions, which do not have any adverse environmental and social impacts and which involve vulnerable sections of the project areas (scheduled castes, women, landless and other poor) in project implementation do not require any social and environmental management plans but need to be monitored (through a monitoring mechanism) during implementation. 6.4.2 Screening Processes and Procedure for Approval Environmental and social requirements are linked with subproject steps and there are environmental and social requirements at the time of subproject application. Environmental and social requirements in subproject steps are illustrated in Table-6.2. Page 92 UPBSN IESA Report for UPSLRP-III 92 T ABLE-6.2 Environmental and social screening of project components/activities Project component Environmental Requirement Social Requirement Component 1 - On- Farm Development and Land Treatment a) Assess impact of project interventions - potential adverse impacts on physical and biological environment – extent, duration and level of impacts b) Apply screening criteria to categorize impact category d) Drop the area if it conforms to Category 1 c) Formulate appropriate mitigation and enhancement measures for Category 2 a) Drop the village identified if it conforms to Category 1 b) Formulate appropriate mitigation and enhancement measures for Category 2 c) Identify target groups – ensure vulnerable groups are involved on preferential basis d) Assess that the occupancy of land – identify if any person affected e) Ensure activities do not involve children f) Ensure that vulnerable have access to employment opportunities Increased water requirements a) Criteria for selection of reclaimed lands - Ground water level should be below 2 meter below ground water (bgl) b) In canal command areas the minimum distance from the main /branch canal should be 500 meters. c) The water table should not be below 8 meter depth to prevent over-extraction of groundwater and ensure efficient and safe operation of tube wells. d) Tube well water quality (installed in WUG’s land) should be suitable for reclamation of sodic lands in terms of residual sodium carbonate and electrical conductivity. e) Quality of water of existing bore wells and open wells in the potential sodic villages shall be analyzed at the time of area selection for electrical conductivity and residual sodium carbonate content. f) If the water is not suitable for irrigation, then exclude such areas from reclamation. Page 93 UPBSN IESA Report for UPSLRP-III 93 Project component Environmental Requirement Social Requirement Ravine Reclamation Activities as detailed above Activities as detailed above Component 2 – Improvement of Drainage System a) Assess impact of project interventions - potential adverse impacts on physical and biological environment – extent, duration and level of impacts b) Apply screening criteria to categorize impact category d) Drop the area if it conforms to Category 1 c) Formulate appropriate mitigation and enhancement measures for Category 2 a) This component may adversely impact people dependent on drains b) Assess subproject interventions - identify type and magnitude of impacts c) Drop the area identified if it conforms to Category 1 d) Assess that the occupancy of land – identify if any person affected e) Formulate appropriate mitigation – appropriation of land and R&R and enhancement measures for Category 2 f) Public consultation for socially sensitive subprojects affecting large population to gain acceptance by subproject affected local g) Ensure activities do not involve children h) Ensure that vulnerable have access to employment opportunities Agriculture Support Services Increased use of chemical fertilizers and pesticides a) Elite capture b) Vulnerable not able to access benefits c) Lack of agril. extension to vulnerable beneficiaries Institutional Strengthening and Capacity Building a) Inadequate institutional arrangement b) Lack of skills on environmental management c) Lack of awareness of stakeholders on environmental issues a) Inadequate institutional arrangement b) Lack of skills on social c) Lack of awareness of stakeholders on social issues 6.5 STAGE-SPECIFIC ESMF INTERVENTIONS AND OUTCOMES The ESMF will be applied to all proposed sub-project components/activities, through the different stages of the implementation cycle. The proposed ESMF interventions are designed on the basis of the current understanding of social and environmental issues identified and discussed in the previous chapters. As the project planning and implementation gains momentum, more learning will be generated, and the ESMF will be revised accordingly. The proposed ESMF interventions during the implementation cycle of the project sub-components/activities cycle are described in Table-6.3. Page 94 UPBSN IESA Report for UPSLRP-III 94 T ABLE-6.3 ESMF in various stages of sub-project cycle Stage Key sub-project activities ESMF Activities Outcome Documenta tion Identificatio n · Identify sodic land villages · Project sensitization and awareness generation through meetings with beneficiaries · Involve village level functionaries of line departments / PRIs · Collect baseline environ. & social data · Identify LA & encroachment in project area (if any) · Identify sodic land · Identify impacts on forest lands/ natural habitat, cultural properties, (if any) · Screen sub- component/activities from the social and environmental perspectives · Completed social and environ. screening of sub-projects · Preliminary assessment of environ. issues, LA & assess for encroachment, if any Complete Form SEM- 1 (by SIC, NGO, Dist. Unit of UPBSN) Pre-planning · Identify sodic patches for reclamation · Identify beneficiaries · Collect baseline data · Format WUG · Assess readiness of WUG and others on undertaking project activities · Prepare SIP · Maintenance of documents, books and accounts by WUA · Social Mapping & identify beneficiaries and other all stakeholders (SIC, WUG and PRI members) · Assess readiness for voluntary surrender of land · Agree on RAP where required · List of beneficiaries & other stakeholders · Where required agreed RAP Complete form SEM-2 (by xyz) RAP, if required (by SIC, NGO, Dist. Unit of UPBSN) Planning · Organize stakeholder consultation · Data collection through PRAs · Issue of Chayan Patra (selection letter)/ ID card to beneficiaries · Asses technical aspects of reclamation · Implement RAP, if triggered · Provide initial training to WUG members on SIP preparation (Particularly estimate preparation, etc) · RAP implementation - entitlements extended to eligible PAPs & ensure productive use of R&R assistance · Assess issues related to vulnerable groups and development plan (VDP) · Assess gender related issues and prepare gender action plan (GAP) · Assess pest and nutrient management issues and prepare integrated pest and nutrie nt plans (IPM · RAP implantation completed. · SIP/Sub- component plan including IESMP all social and environ. management plans. · Construction stage social & environ. management measures are incorporated in the tender documents Complete form SEM-3 (details of RAP implementat ion and IESMP) (by SIC, NGO, Dist. Unit of UPBSN) Completed SEM-4 Form (constructio n stage management measures to be attached d Page 95 UPBSN IESA Report for UPSLRP-III 95 Stage Key sub-project activities ESMF Activities Outcome Documenta tion preparation, etc) · Selection of boring/pump set mechanic/animators, etc. · Collect soil samples. · Topographical survey. · Training Plan · Livelihoods Plan, · Prepare SIP · Ratify SIP by SIC · Open WUG bank account · Ratify SIP by SIC · Approval of SIP UPBSN dist. unit · Prepare procurement plan for materials & manpower for works by WUA · Preparation of tender documents for works to be tendered · Maintenance of documents, books and accounts · Selection of demonstration plots. · Review of on-farm development works. and INP) · Assess cultural property impact, if any, and prepare cultural property plan (CPP) · Identify anticipated construction stage impacts and develop appropriate management measures to address these impacts. · Consolidate all mitigation plans (RAP, VDP, GAP, IPM, INP) as well as construction stage management measures, with the associated costs and institutional arrangements, into an Integrated Social & Environmental Management Plan (IESMP) in SIP/sub- component plan and ensure that budget is included in SIP/sub- component plan before submission for approval. · Ensure construction stage social and environmental management measures are adequately incorporated in the tender documents. to tender documents) (by NGO, UPBSN staff) Reclamation · Public display of project information on wall / notice board Demarcate sodic land · Identify beneficiaries · Land allotment to beneficiaries · Promote SHG savings. · Select animators (Literacy, Health, · Monitor impact of RAP implementation · Monitor implementation of ESMP & construction stage (social & environ.) measures · Decide on facilities to be given to WUG, ensure proper utilization of inputs · RAP completed certified. · Payment contractors only on certifying successful completion of construction stage social and environ. Completed form SEM-5 (by WUG, SIC, NGO and UPBSN dist. unit) Completed form SEM-6 (by UPBSN) Page 96 UPBSN IESA Report for UPSLRP-III 96 Stage Key sub-project activities ESMF Activities Outcome Documenta tion Animal Husbandry, etc) at the village level according to different socio- economic needs · Implement civil works by WUG/contractor, · Review OFD works in each WUG including link drain construction. · Distribute inputs as per project stipulations · Supervise land reclamation & drain restoration works · Quality assurances through agreed mechanism and reporting · Carry out trainings (WUG management / livelihood / financial management / O&M / M&E / water management, etc) · Mobilize & form common interest groups for agri. mkg. · Implement livelihoods & agri- business plans etc. · Strengthen linkages with departments, commercial banks and private sector · Maintenance of documents, books and accounts · Participatory monitoring at village level & resolve disputes · Technology dissemination about crop production, nutrition & pest management plan · Ensue vulnerable groups avail employment, paid minimum wages · Ensure equal wages for equal work · Ensure no child labour is involved · Review payments to WUGs · SHGs are actively involved measures · Work completion report · WUG, SHG and SIC are active Post - Reclamation · Ensure participation of beneficiaries in maintenance of drainage system developed during project period. · Review group-wise programs of crop production · Monitor ESMP parameters pertaining to the post-implementation stage of sub- component/activity, including implementation of IPNM plan & social · Status report on implementing INPM/ GAP/VDP activities Post- implementat ion stage monitoring & evaluation report on ESMP Project completion Page 97 UPBSN IESA Report for UPSLRP-III 97 Stage Key sub-project activities ESMF Activities Outcome Documenta tion management and irrigation arrangements in reclaimed area and provide technical guidance on important points. · Select individuals for establishment of agril. input centre at village level according to the project guidelines. · Review progress/status of savings in SHGs. · Facilitate fixing Cash Credit Limit for crop production activities and saving groups. · Review unsuccessful reclamation cases, borings and drop outs. · Assess WUG for refresher trainings & organize training for WUGs · Maintenance of documents, books and accounts · Preparation of project completion report on agreed format plans (VDP/GAP) · Ensure active involvement of vulnerable groups in post implementation · Ensure SHGs are actively involved & have significant savings · Ensure vulnerable beneficiaries access agril. input centers · Ensure WUGs are working well & disputes are settled amiacably report on agreed format 6.5.1 Sub-component/activity Level ESMF Activities In addition to social and environmental activities at the project sub-component/activity level, the ESMF stipulates assessments and studies required to identify and address the macro level social and environmental aspects of the project intervention. These include provisions for studies to address the issues that may emerge during the project implementation and to suggest approaches for addressing the identified ESMF deficiencies. UPBSN shall coordinate the collection of information on basic social and environmental parameters, as a part of the regular (half-yearly) M&E report prepared for the project by M&E unit of UPBSN on the project implementation. The relevant social and environmental parameters are presented in the Table 9.4 which will also be covered in both UPBSN and external Agency monthly M&E reports. The ESMF also stipulates integration of the detailed social and environmental auditing with the overall project M& E strategy. In addition, the ESMF requires two (one, prior to the mid-term review, and another at the end of the project) additional external Page 98 UPBSN IESA Report for UPSLRP-III 98 environmental and social audits, including an assessment of social and environmental impacts owing to project interventions and the adequacies and effectiveness of ESMF activities. The audit shall be conducted on 2% of the sub-projects completed by the time of audit. 6.6 PROCESSES FOR IMPLEMENTATION OF ESMF ACTIVITIES At the sub-component /village identification stage, the district units of UPBSN (DPUs) and social and environmental specialist of UPBSN along with NGO and local communities conduct site specific preliminary assessment for the proposed project activities/interventions, with the objective of identifying social and environmental issues. Form SEM-1, is to be completed as part of this assessment which includes recommendations for selecting or dropping the sub- project/activity in consideration. Form SEM-1 is submitted to the DPU, who will take this recommendation in finalization of the sub-project/village selection. For all selected villages/sub-projects in the pre-planning stage, the NGO will facilitate SIC/WUG in undertaking social mapping, identifying resettlement issues, and developing RAP, if required. Form SEM-2, will be completed by SIC/WUG with assistance from NGO and will be submitted to the respective specialist of DPU. The DPU shall not allow any project activities unless RAP (where triggered) is prepared and implemented in accordance with the R&R policy and entitlement framework agreed for the project and counter signs Form SEM-2. At the planning stage, SIC/WUG will be responsible for implementing the RAP with support from NGO and DPU specialists. At the same time, a detailed assessment of various social and environmental issues expected from the proposed project interventions will be undertaken by the SIC/WUGs, with assistance of NGO and DPU specialist. Similarly, SIC will prepare the required management plans (VDP, GAP, INM, IPM). DPU specialists, to assess their conformity with the project ESMF, will review these plans. DPU specialists, who will also document it in the Form SEM-3, will consolidate the finalized plans as IESMP and will be an integral part of SIP/sub- component/activity plan. This Form will also include the status of RAP implementation. The SIP/sub-component/activity plan shall not be signed unless this is accompanied by completed Form SEM-3, duly certified and countersigned by the DPU and UPBSN project level social and environmental specialists. The DPU specialists will also complete the Form SEM-4 (prescribing appropriate construction stage linked social and environmental management measures) in consultation with SIC, WUG and NGO. This Form SEM-4 will be attached to all tender documents pertaining to the physical works of the sub-project/project activity. At the beginning of implementation stage, the SIC will testify to the complete implementation of the RAP, by completing the Form SEM-5. This form is forwarded to DPU where the relevant specialist shall verify (through site visits) RAP completion and countersign the Form SEM-5. The concerned specialist will attach this form to the order for the release of first installment of the funds required for implementation. The DPU shall ensure that no payments are released to the contractor/SIC/WUG, unless the Form SEM-5 is completed and certified by the specialist as described above. The SIC/WUG with the assistance from NGO will ensure the implementation of the agreed construction stage social and environmental management measures. The SIC/WUG shall certify the adequate implementation of these measures in the Form SEM-6, which shall be forwarded to the DPU. The DPU will ensure that the last installment of the payment is not released without the receipt of Form SEM-6, indicating the satisfactory completion of construction stage social and Page 99 UPBSN IESA Report for UPSLRP-III 99 environmental management measures. The various SEM Forms to be used by key project implementers are presented in Annex –XX. 6.7 GUIDELINES FOR SELECTION OF APPROPRIATE SOCIAL AND ENVIRONMENTAL MANAGEMENT MEASURES Various suggested mitigation measures are required to minimize the negative impacts of the proposed intervention and given in the Table 6.4 and Environmental Management Plans during various stages. TABLE-6.4 Mitigation measures Stages Impacts Mitigation Measures Responsibility Pre-planning · Acquisition/appropriati on of land · Encroachment in drains · Loss of CPR · Ecological impacts due to clearance of trees/vegetation · Storage of construction materials · Emergencies and contingencies · Avoid or minimize LA & adverse impacts · Identify area impacted · Identify affected families · Encourage voluntary surrender, if not prepare LA during the design stage · Prepare RAP after details identification of PAPs · Ensure compensation at replacement value for land, structures, trees & other assets · Plan R&R support to affected land owners, encroachers, squatters · Identify suitable sites for storage · Instructions about person to be contacted in case of emergency UPBSN, DPU, NGO, SIC, PRI, WUG, M&E , third party Quality Assurance Page 100 UPBSN IESA Report for UPSLRP-III 100 SOCIAL · Loss of land/ structure · Loss of livelihood · Loss of access to CPRs · Elite capture · Low participation of SC, women, SF/MF, landless · Lack of involvement of local community · Involvement of child labour · Less wages for labour · Discriminate in wage payment to women · Limited access to employment opportunities · No damage to standing crop · Prepare RAP in accordance with R&R entitlements · Preparation of VDP to ensure active participation of vulnerable groups · Co-opt women and other vulnerable groups in SIC/WUG · Encourage women SHGs for their active involvement · Training of women co-opted members of SIC/WUG and SHG members · Specific trainings to women on livelihoods · Exposure visits of women to increase their exposure and create awareness · Involve NGOs · No child labour involvement · Ensure minimum wages · Equal wages for equal work · SIP/sub-project activity plan to include preferential access to employment to vulnerable groups UPBSN, DPU, NGO, SIC, PRI, WUG, M&E , third party Quality Assurance RECLAMATION STAGE IMPACTS Planning · Site clearance · Site accesses & cleanliness · Management of debris · Damage to standing crops · Involvement of child labour · Less wages for labour · Discrimination in wage payment to women · Awareness and sensitization program · Involve PRIs to mobilize community · Ensure no dumping of material on private lands – no damage to standing crop. Remove excavated materials to identified sites · Vegetation to be removed only from the required areas · .Site of labor camp to selected in consultation with community · Avoid construction works in night if close to habitations · Provision of protective care to labour force · Prior information to local community regarding operations · Avoid any temporary works near natural canals · No child labour · Equal wages for equal work · Preference to local labour/ skilled persons · Ensure minimum wages UPBSN, DPU, NGO, SIC, PRI, WUG, Contractor, third part M&E agency and third party Quality Assurance, Contractor Page 101 UPBSN IESA Report for UPSLRP-III 101 Reclamation · Procuring and transporting gypsum to sites · Disposal of debris · Water pollution · Damage to standing crops · Involvement of child labour · Less wages for labour · Discrimination in wage payment to women · Ensure gypsum is procured from recognized sources - sites/quarries · Periodic inspection of the disposal of debris · Examine for water contamination due to fertilizer use · Avoid any temporary works near natural canals · No child labour · Equal wages for equal work · Preference to local labour/ skilled persons · Ensure minimum wages UPBSN, DPU, NGO SIC, WUG, Contractor, third party M&E and Quality A ssurance Post- reclamation · Excessive irrigation affects on soil fertility · High usage of agro- chemicals · More usage of HYV · Sustained involvement of vulnerable groups · Conflict resolution · Introduce improved water usage practices · Enable WUG to adopt IPM, INM · Introduce better soil management practices · Adopt recommended cropping pattern and rotation · Ensure SIC/WUGa are active and have better conflict resolution UPBSN, DPU, SIC, WUG and NGO The strategies and development plans to address various social and environmental aspects of the project are discussed in detail in the subsequent chapter of this IESA report . . The Potential Environment and Social Impacts and Suggested Mitigation Measures are given in Annex-XXI. 6.8 INSTITUTIONAL ARRANGEMENT The project proposes to adopt a community-based approach in sodic land reclamation and improvement and restoration of link drains. Hence it is essential that right from the beginning (starting with identification process), community participation is ensured in addressing social and environment concerns and also that these are planned and integrated in the overall project framework and plan. Social and environmental issues and concerns identified definitely affect the performance the planned land reclamation, development and restoration of link drains, and agriculture support program under the project. This essentially means that due importance is given to address these social and environmental concerns in the planning and implementation process. This, however, requires appropriate institutional arrangements, including adequate staffing with specialization in social and environmental management project institutional structure at different levels. Accordingly, the following institutional structure is proposed. At the UPBSN/Project level, the social and environmental management experts are the part of the project team and are responsible for addressing social and environmental concerns of the proposed project interventions. At the district level the project envisages DPUs with similar arrangement for personnel with required skills and expertise to address social and environmental aspects of the project. At the sub-unit level, these responsibilities will be vested with the support organizations or NGOs and PIC/WUGs. The TOR for NGO will include specific responsibilities to manage social and environmental management activities. The project will develop capacities at Page 102 UPBSN IESA Report for UPSLRP-III 102 all levels – project, district and sub-district or sub-project levels, WUGs and NGOs through training to plan and implement social and environmental management activities. 6.9 MONITORING OF ENVIRONMENT AND SOCIAL ASPECTS Monitoring of social and environmental issues forms one of the important elements of ESMF. Actions need to be planned by the project to integrate the monitoring within the project monitoring and evaluation system. The monitoring will involve not only the progress on activities and inputs but generating learning on results and outcomes of project interventions on social and environmental issues. The project will have both internal and external monitoring along with participatory monitoring by beneficiaries. 6.9.1 Internal monitoring This is done at three levels. At the WUG level, as a part of participatory monitoring, the Representative of MIC, WUGs, NGO and representatives local communities would be monitoring the progress of the implementation and report to MIC and DPU. At the District level, DPU will monitor the implementation of social management plans (RAP, VDP and GAP). The DPU will submit quarterly progress reports to PMU. At the state level, the PMU will monitor implementation of the project and ESMF activities. Both at DPU and PMU levels the respective Social Environmental Units will be overall responsible for monitoring of implementing of the ESMF. 6.9.2 External Monitoring The monitoring of ESMF should be made an integral part of the overall M&E system. The external M&E agency will be given specific tasks for monitoring of ESMF based on the indicators identified. These consultants would undertake preferably crop-season based social and environmental auditing. 6.9.3 Impact Evaluation This will be done as part of impact assessment as part of the project M&E system which includes mid-term and end evaluation. The indicators for monitoring are summarized in Table-6.5. TABLE-6.5 Indicators for Monitoring Parameter Indicator Frequency Agency Environmental parameters Soil Fertility through soil testing Extent of waste land through survey Annual DPU, WUG – after training Water and Quality Surface and sub surface Water quality through testing for Standard parameters Pesticide residues (both in water and sediment) Pre monsoon Post Monsoon DPU, WUG – after training Agri chemicals Consumption of Fertilizers, pesticides through Survey Crop-season DPU, WUG – after training Biodiversity Changes in diversity and density of avains, natural Pre monsoon Post monsoon DPU, WUG – after training Page 103 UPBSN IESA Report for UPSLRP-III 103 Parameter Indicator Frequency Agency predators, weeds in water bodies, fields Fish growth Social parameters Encroachment · No. of SIP with RAP · Extent of land acquired/appropriated · No. of affected families eligible for and received R&R entitlements Before initiating SIP/sub-project plan implementation DPU, WUG, SIC – after training & external M&E agency Participation · No. of WUGs formed · % of WUG/SIC membership from vulnerable sections · Participation of vulnerable groups in WUG/SIC meetings Quarterly and half yearly DPU, WUG, SIC – after training & external M&E agency Access to project benefits · % of beneficiaries from vulnerable groups · No. of days of employment generated and availed by vulnerable groups · % of vulnerable groups accessing agril support Quarterly and half yearly DPU, WUG, SIC – after training & external M&E agency Conflicts · No. and nature of conflicts reported · No. of conflicts resolved Quarterly and half yearly DPU, WUG, SIC – after training & external M&E agency Page 104 UPBSN IESA Report for UPSLRP-III 104 CHAPTER – 7 PROJECT SPECIFIC STRATEGIES 7.1 GENERAL This chapter outlines strategies and development plans that have been prepared specifically to ensure social inclusion of vulnerable groups, conflict resolution and enhance positive environmental impacts due to project interventions. At the same time, these strategies and plans are aimed at containing the adverse impacts and mitigate the resultant negative impacts of the project interventions. The following strategies have been developed which are discussed in detail in subsequent sections. · Integrated Plant Nutrient Management · Integrated Pest Management · Resettlement and Rehabilitation · Gender Development Plan · Plan for Development of Vulnerable Groups · Consultation and communication Assessment of functioning of community institutions · Conflict resolutions 7.2 STRATEGY FOR INTEGRATED PLANT NUTRIENT MANAGEMENT (IPNM) Under the best farming practices, only 40-50% of the applied fertilizers are used by the crop and the balance find their way into the aquatic environment through drainage runoff. Besides eutrophication of neighboring water bodies through washing down of fertilizers and organic matter rich in nutrients from the surrounding agricultural fields, the soil productivity is also threatened due to continuous overdosing of fertilizers. Since sodic and soils of ravine lands are nutrient poor with low organic matter, IPNM approach would be useful for building soil productivity and improving crop yields. IPNM is an approach for maintenance or adjustment of soil fertility in relation to plant nutrient supply at an optimum level for sustaining desired crop productivity. This is done through optimization of the benefits from all possible sources of plant nutrients in an integrated manner. Some benefits of the IPNM are listed in Box 1. Maintenance of soil health with maximum use of organic manure and recycling of organic waste along with chemical fertilizers and bio-fertilizers in an integrated manner is environmentally sound and cost effective alternative. BOX 1: Benefits of Integrated Plant Nutrient Management · Helps achieve highest production per unit of investment by way of reducing unavoidable losses due to leaching and volatilization. · Helps reduce toxicity, which happens due to excessive use of single nutrients. · Helps in quality production besides enhancement of Benefit Cost (B/C) ratio. · Provides natural safeguard against biotic and abiotic stresses. · Soils using only chemical fertilizer exhibit declining productivity per unit of plant nutrient used. · Using only major nutrients (NPK) results in deficiencies of micro and secondary nutrients. · Helps maintain soil health through organic matter and results in better fertilizer use efficiency. · Organic manures and plant residues are available locally and thus if managed properly are cost effective. Page 105 UPBSN IESA Report for UPSLRP-III 105 7.2.1 Components of IPNM IPNM Demonstrations 10,000 IPNM demonstrations will be conducted over the project period ƒ Distribution of IPNM villages across reclamation years will be in proportion to the distribution of total project villages across the reclamation years ƒ Distribution of number of demonstrations across the crops and districts will be decided in consultation with the Site Implementation Committees and it will be based on the potential of different crops and districts where demonstrations are planned Select blocks of 3 hectares distributed over 10 individual plots of 0.3 hectare each. Corresponding to the 10 demonstration plots, also select 10 control plots of 0.1 hectare each. ¾ Each IPNM village to have only one demonstration block. ¾ Ensure that individual plots of demonstration block are close to each other. IPNM demonstrations are planned to be conducted on pulses and oilseeds. ƒ Chickpea, pea, and mustard are planned for all project districts ƒ Lentil demonstrations only in Ghazipur, Jaunpur and Azamgarh districts ƒ Black gram and green gram demonstrations only in Etah district ¾ Other crops may be considered later depending upon willingness and interest of farmers and potential for that crop ¾ Distribution of IPNM demonstration across crops and districts will be decided at the UPBSN headquarters in consultation with the district project units and District Agriculture Officers, in accordance with the assessed potential. Farmer feedback and demand for demonstration would be considered District and crop wise distribution of IPNM demonstrations will be incorporated in Annual Action Plans of different years and the same will also be communicated to the concerned Project Management Units at district level Once number of IPNM demonstrations is allotted to a crop and a district, the concerned District Project Unit will identify the villages in consultation with sub-unit level officers of the concerned sub-unit, deputy managers and assistant managers of the project. Through the same consultation process, the District Project Unit will also identify the crops on which IPNM demonstrations will be conducted in the selected project villages After finalization of villages and crops for IPNM demonstrations, the concerned Site Implementation Committee will be duly intimated by the DPU through the concerned Deputy Manager/Assistant Manager/NGO Motivators for further necessary action. The SIC in turn will discuss the matter in its meeting and invite informal proposal from the farmers to offer the plots (0.4 hectare) for conducting demonstration. General farmers, other than project participants, will also be invited to participate in the demonstrations. If the SIC receives offers from farmers in excess to the desired number, 10 plots will identified and selected in accordance with the technical requirements for block demonstration. If the SIC receives offers from farmers which is less than the desired number, it will persuade other farmers to participate and make sure that the number of plots offered for IPNM demonstrations is at least 10. Once the list of 10 plots of 0.4 hectare along with consent of the concerned farmer is finalized, it will be forwarded by the SIC to the District Project Unit through the concerned Assistant Manager/NGO Supervisor/Deputy Manager. The finalized list of IPNM demonstrations will also be forwarded to the Department of Agriculture. District Project Unit (DPU) will intimate the schedule of activities for these demonstrations along with dates for distribution of inputs and orientation of farmers. Such schedule will be intimated to the concerned SICs for further sharing among the farmers. The project staff will provide necessary technical backstopping to the farmers. Field days will be organized on the sites of IPNM demonstrations so that general farmers are also benefited from the activity. Outcome of demonstrations will be documented by the concerned field staff for wider publicity. The cost of fertilizers for IPNM demonstrations will be shared between the project and the farmer in the ratio of 75:25, whereas cost of seed, soil testing, input cost associated with seed treatment including cost of bio- fertilizers and bio-pesticides will be borne by the project. Farmer will deposit his/her share in cash before receiving the inputs for the demonstration plot. In addition to sharing in the input cost, farmers will fully bear the labor cost involved in various activities related to the demonstration. Page 106 UPBSN IESA Report for UPSLRP-III 106 7.3 INTEGRATED PEST MANAGEMENT The Integrated Pest Management (IPM) is a sustainable approach for managing pests by combining biological, cultural, mechanical and chemical tools in a way that minimizes economic, health and environmental risks. The principles of IPM are: · Identifying key pests and beneficial organisms · Defining the management unit, the Agro-ecosystem · Developing management strategy · Establishing Economic thresholds (loss & risks) · Developing assessment techniques · Evolving description of predictive pest models 7.3.1 Components of IPM The major components of IPM in increasing order of complexity are as under: IPM Component · Key Component Practices Cultural practices · Preparation of nurseries or main fields free from pest infestation by removing plant debris, trimming of bunds, treating of soil and deep summer ploughing which kills various stages of pests. Proper drainage system in field be adopted. · Testing of soil for nutrients deficiencies on the basis of which fertilizers should be applied. · Selection of certified seeds and treating seeds with fungicide or biopesticides before sowing for seed borne disease control. · Selection of seeds of relatively pest resistant/tolerant varieties which play a significant role in pest suppression. · Adjustment of time of sowing and harvesting to escape peak season of pest attack. · Rotation of crops with non-host crops. It helps in reduction of incidence of soil borne diseases. · Proper plant spacing which makes plants more healthy and less susceptible to pests. · Optimum use of fertilizer. Use of FYM and biofertilizers should be encouraged. · Proper water management (alternate wetting and drying to avoid water stagnation) as the high moisture in soil for prolonged period is conducive for development of pests especially soil borne diseases. · Proper weed management. It is well known fact that most of weeds besides competing with crop for micronutrients also harbour many pests. · Setting up yellow pan sticky traps for white flies and aphids at far above canopy height. · Synchronized sowing to sow the crops simultaneously in vast area so that pest may not get different staged crops suitable for its population build up and if pest appears in damaging proportion, control operation could be applied effectively in whole area. · Growing trap crops on the borders or peripheries of fields. There are certain crops which are preferred more by a pest species are known as trap crops for that pest. By growing such crops on the border of the fields, pest population develop there which can be either killed by using pesticides or its natural enemies are allowed to develop there for natural control. · Root dip or seedling treatment in pest infested area. · Inter-cropping or multiple cropping wherever possible. All the crops are not preferred by each pest species and certain crops act as repellents, thus keeping the pest species away from preferred crops resulting in reduction of pest incidence. · Harvesting as close as to ground level. This is because certain developmental stages of insect pests/diseases remain on the plant parts which act as primary inoculum for the next crop season. Hence, harvesting crops at ground level will lessen the incidence of pests in next season. · Before planting, nursery plants be sprayed/dipped in copper fungicide/biopesticide solutions to protect the plants from soil borne diseases. · While pruning fruit trees, remove crowded/dead/broken/diseased branches and Page 107 UPBSN IESA Report for UPSLRP-III 107 IPM Component · Key Component Practices destroy them. · Large pruning wounds should be covered with Bordeaux paste/paint to protect the plants from pest/disease attack. · For excellent fruit set, pollinizer cultivars should be planted in required proportion in the orchards. · Keeping bee hives or placing flower bouquets of pollinizer cultivars facilitate better pollination and subsequent fruit set. Mechanical practices · Removal and destruction of egg masses, larvae, pupae and adults of insect pests and diseased parts of plants wherever possible. · Installation of bamboo cage cum bird perchers in the field and placing parasitized egg masses inside them for conservation of natural enemies and withholding of pest species wherever possible. · Use of light traps and destruction of trapped insects. · Use of rope for dislodging leaf feeding larvae e.g. caseworm and leaf folders. · Installation of bird scarer in the field where required. · Installation of bird perchers in the field for allowing birds to sit and feed on insects and their immature stages viz., eggs, larvae and pupae. · Use of pheromones for mating disruption and kill zone creation. · Use of pheromone traps for monitoring and suppression of pest population. · Use of pheromen traps for mass trapping. Genetical practices · Selection of high yielding varieties for different crops · Selection of comparatively pest resistant/tolerant varieties · Use of genetically modified seeds e.g. B.t. cotton · Release of sterile males of insects in sufficient number in field to compete with fertile males. Sterility in males is induced in laboratory either through chemosterilants or through radiation. Biological practices · Biocontrol is use of living organisms to control unwanted living organisms (pests). It involves deliberate use of parasitoids, predators and pathogens to maintain pest population at level blow those causing economic loss either by introducing a new bioagent into the environment of pest or by increasing effectiveness of those already preset in the field. · Parasitoids: These are the organisms which lay eggs in or on the bodies of their hosts and complete their life cycles on host bodies as a result of which hosts die. A parasitoid may be of different type depending on the host developmental stage in or on which it completes its life cycle. These include different species of Trichogramma, Apanteles, Bracon, Chelonus, Brachemeria, Pseudogonotopus etc. · Predators: These are free living organisms which prey upon other organisms for their food. These include species of spiders, dragon flies, damsel flies, lady bird beetles, Chrysopa species, birds etc. · Pathogens: These are micro-organisims which infest and cause diseases in their hosts as a result of which hosts are killed. Major groups of pathogens are fungi, viruses and bacteria. Some nematodes also cause diseases in some insect pests. Important examples of fungi are different species of Hirsutella, Beauveria, Nomurae and Metarhizium which have been reported to infest and kill large number of insects (upto 90%) in the fields. Among viruses, most important examples are of nuclear polyhedrosis virus (NPV) and granulosis viruses. Outbreak of viruses in armyworms, cut worms, leaf folders, hairy caterpillars and plant hoppers have been reported many times. Among bacteria, Bacillus thuringiensis (B.t.) and B. popillae are very common examples. · Diseases of pests can be mass multiplied in the laboratory at a low cost in liquid or powdered formulations that can be sprayed like ordinary chemical pesticides. These formulations are known as biopesticides. Chemical practices · Use of chemical pesticides is the last resort when all other methods fail to keep the pest population below economic loss. Although there is a great advancement in pest management research, yet pesticides would continue to play an important role in crop protection in view of complexity of pest problems. Therefore, use of pesticides should be need based, judicious, based on pest surveillance and economic threshold level Page 108 UPBSN IESA Report for UPSLRP-III 108 IPM Component · Key Component Practices (ETL) to minimise not only the cost involved, but also to reduce associated problems, following aspects need to be considered: · ETL and pest defender ratio must be observed · Relatively safer pesticides should be selected e.g. neem based and biopesticides. · If pest is present in strips or isolated patches, whole field should net be sprayed. The measures for IPM for various crops are enclosed as Annex –XX. 7.3.2 Strategy for Implementing IPM Activity Years Action Points Training of UPBSN/Agri/Hort/ AH staff (project and line department) in IPM Train at ……………………… The trained personnel will act as in-house training team Training of Facilitators/ Paravets(?) in IPM Will be useful for inclusion and orientation of women stakeholders in IPM approaches, as they are the main agricultural workers and attend to livestock needs Developi ng relevant literature and pamphlets for distribution with list of banned chemicals (update lists as required) Should be in local language and appealing visually. Distribute these during awareness camps. Involve Panchayats in enforcing the Insecticide Act,etc. Farmer and livestock owners awareness building Organize awareness camps in villages on latest technology in production, organic farming, IPM concept, safe use and disposal of insecticides/pesticides, fumigation of shelters, identification and distinction between predators and pests. Aware livestock owners for keeping animals in hygienic conditions Identifica tion of potential stakeholders Following mass-awareness buildup identify farmers and livestock owners that have potential to take up & sustain IPM Provide technical inputs and support to identified farmers and later use them as models for replication by other interested farmers Provide inputs in form of bio- pesticides, bio-weedicides, bio- fungicides, bio-fertilizers, bio-control agents (predators) etc Page 109 UPBSN IESA Report for UPSLRP-III 109 Activity Years Action Points Develop and distribute guidelines on safe use of pesticides/insectici des Emphasize avoiding use of broad-spectrum pesticides, chemicals that wipe out useful insects etc. Use recommended dose and concentration of pesticides. Do not support sale and use of banned fertilizers, pesticides, insecticides etc. Organize lectures and presentations Use Gram Sabhas and Gram Panchayat meetings to give visually aided presentation Soil testing Test for micronutrients deficiencies. Provide a list of soil testing laboratories to farmers/Panchayats and facilitate the process of getting samples tested. Encourage government- sponsored laboratories to visit the fields and collect samples. Conduct bench-mark survey and prepare checklist of pests/pathogens Assess the knowledge, attitude and practice of farmers and identify major pests responsible for low yield Developi ng linkages with line departments for organizing farmers training and continued assistance in adopting IPM Organize at least one linkage workshop every year. This would be critical to sustain IPM approaches beyond the project period. Training of farmers in Krishi Vigyan Kendra, Farmer filed Schools, etc. Training in improved farm practices, use of bio-fertilizers, switching to bio-manures, vermin- composting etc Tie-up for supply of vermi-compost Will be required for farmers to immediately switch over to bio- fertilizers, as absence may diminish interest Legume plantations in farm bunds and fields, promoting use of mulch, setting up of vermi-compost units Link with other arable land development programmes. Plantations be raised simultaneously with vermi- compost units so that increase in productivity can be seen in fields. Long- term availability of vermi-compost is needed to sustain IPM Encourag e stall feeding and proper stall maintenance (including fumigation) Restrict free grazing to avoid exposing animal to other pests and pathogens that may be free-roaming. Use dung and other wastes for FYM/vermi- composting, ensure proper drainage and hygiene Set up Set up demonstration plots Page 110 UPBSN IESA Report for UPSLRP-III 110 Activity Years Action Points demonstration plots once farmer awareness and training has initiated and after setting up of vermin- compost units. This will reduce delays in adopting IPM and will lead to quick results encouraging others to follow suit Introduce and provide readily available IPM packages Available IPM packages be provided to farmers for immediate adoption. Provide, as required, available bio- control agents Use existing provisions of line departments or state bio-control labs for this purpose. Introduce organic farming Organize training and exposure visits, supply bio-fertilizer mini-kits etc and identify and select at least two bio villages for demonstrating organic farming Docume nt progress Record changes in inputs and outputs and develop economic gains table for popularizing it among farming community 7.3.3 Milestones Activity Milestones Awareness building ƒ Cover at least 30% farmers in first year from project start ƒ Cover the remaining by the end of second year Identification of potential farmers ƒ Identify at least three farmers in each village (which have been selected under the project) within 15 days of awareness building for training and taking up IPM as demonstration Training ƒ Staff and line department training completed in 1 st and 2 nd year ƒ Farmer training completed within three months of identifying potential farmers ƒ Training for other interested farmers completed within one year after awareness building IPM coverage ƒ Provide IPM package to trained farmer within 30 days of training ƒ 10% farmers within project area be covered every year ƒ 50% farmers to be covered by fifth year Use of Bio- fertilizers/bio- pesticides ƒ At least 10% reduction in use of chemical fertilizers achieved every year ƒ At least 10% reduction in use of chemical pesticides achieved every year ƒ 50% reduction achieved in use of chemical fertilizers and pesticides after 5 years Monitoring and evaluation ƒ Formation of joint monitoring team (staff and community) within one year from project start ƒ Monitoring schedule for each half-yearly prepared and implemented ƒ Monitoring reports be prepared for each monitoring visit and compiled annually to show progress Process documentation ƒ Annual progress reports on IPM status prepared giving coverage, replication and sustainability ƒ Knowledge, practice and coverage change documented Page 111 UPBSN IESA Report for UPSLRP-III 111 7.3.4 Constraints/Risks in IPM Implementation Strategy Constraint/Risks Mitigation Availability of selective pesticides, effective against crop pests but not against natural enemies of pests, is a problem. Make available selective bio-pesticides to farmers, as per their requirements. One of the basic points of IPM is ETL, which have not been worked out for all the pests and combination of pests for different varieties and regions. Support research programmes to work out ETL for various pests within different project districts and areas and use this information to implement chemical pesticides, insecticides etc. Potential of bio-control agents has not been evaluated fully for many agents. Do not introduce bio-control agents that have not been worked out in detail and are still in study stage. Use only ready to release and duly approved bio-control agents. Techniques of mass rearing of several bio-agents are still not well developed. Ensure timely breeding and supply of predators to farmers; improve linkages with relevant line departments and other institutions. Farmers, by and large, are not well educated and have different socio-cultural environment, which is also a constraint in introducing a new technology. Ensure that demonstrations are alongside awareness building and that there is no gap between demonstration and supply of new technology, lest people will lose interest. 7.4 RESETTLEMENT AND REHABILITATION (R&R) The proposed project interventions, including land reclamation and restoration of link drains, do not envisage any new land acquisition/appropriation and R&R issues. The villages identified for IESA neither involved any acquisition of land nor any physical displacement. Project sites identified are encumbrance free. Thus, adverse impacts on this account are not anticipated. However, if at a later date, during the course of project implementation, land acquisition is envisaged, then R&R issues trigger and an R&R Plan (RAP) will be prepared in accordance with the R&R policy and entitlement framework agreed for the project. In addition, there is a need to develop a social management framework to be applied during the project implementation to address any resettlement and rehabilitation (R&R) issues resulting from the proposed project interventions. Following the screening process (described under ESMF), the requirement or otherwise of a Resettlement Plan (RP) shall be established. This will be based on the type and extent of impacts and the measures required to mitigate them. The R&R framework below will help in categorizing the impacts and the type/extent of support that would be extended to the project affected families (PAF) in their R&R process. This framework has been developed taking into account the provisions of the R&R Policy of Uttar Pradesh Water Sector and State Highways Projects (funded by the Bank) and National Resettlement and Rehabilitation Policy 2007. In addition, experiences of implementing R&R component under the above two referred Bank funded projects (UP Water Sector Project and UP State Highways Project) and the feedback received from the stakeholders’ consultation have provided input into preparing the R&R entitlement framework. Principles in addressing R&R issues: The following guiding principles will be adopted to address any eventuality of R&R issues under the project. (a) No sub-project/activity will be undertaken if it involves physical displacement of local people either from their residences and/or commercial places. Page 112 UPBSN IESA Report for UPSLRP-III 112 (b) The project does not envisage acquisition for private land for the proposed project interventions, however, if any exigencies arise, compensation will be paid at the replacement value. (c) Encroachers, if adversely affected by project interventions, will get support to mitigate losses. (d) Efforts will be made to encourage voluntarily surrender of land required for project interventions. However, no force will be applied for this voluntary surrender. (e) The affected families will be consulted throughout the planning, implementing and monitoring of the R& R activities. (f) Adequate resources including physical, financial, and human will be made available to implement R & R activities under the project. (g) Affected families will be given preference in wage employment under the project. (h) Loss of common properties (religious structures, grazing land. etc) will either be replaced or the affected community is compensated appropriately. (i) Every subproject shall be screened for their likely adverse impacts, in the Preparatory stage itself. If in a sub-project R&R is triggered, a resettlement plan (RP) will be prepared for that specific sub project at the Planning stage itself. Implementation Guidelines Voluntary surrender of land : Surrender of any land for undertaking project interventions should be properly documented through consent letters. Such ‘voluntary surrender letter’ would be signed by the person surrendering land, leader of WUG, President of SIC, the concerned Gram Panchayat representative and the concerned revenue staff. Land surrendered should be free of any encumbrances. However, all steps should be taken to ensure that such persons (donating/surrendering land) benefit from the project. Any grievances by the people will be resolved at the SIC and Gram Panchayat level and if unresolved the same will be referred to DPU and District Coordination Committee of the project. Compensating land: Where ever acquisition of private land becomes inevitable, compensation norms will be fixed in consultation with the land losers failing which it will be fixed as per the provisions of the Land Acquisition Act, 1894. Compensation so fixed along with rehabilitation assistance will ensure replacement value of the land. In case alternate land is provided, occupancy price will be deducted from the compensation. Compensating loss of trees and crops: These will be compensated based on the productivity as assessed by the departments of agriculture/horticulture/forest. R&R assistance to affected families: In addition to the compensation, the affected families will get (i) a one time productive asset grant (up to Rs 25,000) for taking up Income Generation Activity (IGA); (ii) where required, skill training will be organized; (iii) support to access institutional credit and government schemes; and (iv) preference for wage employment under the project. However, the assistance to individual affected family will be based on the extent of impacts and this is spelt out in the following R&R Entitlement framework for economic rehabilitation. Entitlement for economic rehabilitation: Based on the type and extent of adverse impacts resulting from the proposed project interventions, an entitlement framework for the economic Page 113 UPBSN IESA Report for UPSLRP-III 113 rehabilitation of the project affected families (PAF) has been developed. Based on this framework, the affected families will be receiving their entitlements to improve, if not at least, restore their economic livelihood. The entitlement framework has been presented in Table 7.1. TABLE-7.1 Entitlement Framework for Economic Rehabilitation Type of Impact Unit of entitlement Entitlement Loss of Agricultural land (i) Owners ( with valid title) Titleholders family The affected families will have option to choose any one from the following. Option 1: Cash compensation as fixed by LA authorities. If alternate land is allotted, price fixed by Govt. for this land will be deducted from the compensation. Option 2: Cash compensation as fixed by LA authorities + Rehabilitation assistance equal to minimum agricultural wages of (a) 750 days for families losing entire land, (b) 500 days for families losing part land and becoming marginal farmer and (c) 375 days for families losing part land and after loss becoming small farmers. Option 3: Cash compensation as fixed by LA authorities O i f IGA of equivalent amount for regular (ii) Tenants, share croppers & lease h lders Family Reimbursement for unexpired lease (iii) Encroachers Family These families are not eligible for any compensation. However, vulnerable among them, if become landless, will be eligible for support to take up IGA for regular 2. Loss of other assets Owner Cash compensation as fixed by authorities 3. Loss of access to Common Property Resources (CPR)/ facilities a. Loss of CPRs b. Civic Community Community Replacement/augmentation of common property resources 4. Loss of standing crops/trees a. With valid title b. Tenant/lessee Family cultivating For either category, only the cultivator will get compensation at market rate for crops and fruit bearing Institutional set up: All sub projects shall be screened for their likely adverse (R&R) impacts in the Preparatory Stage itself. This will be reflected in SC Form 1.The Social expert from UPBSN/DPU and NGO will be responsible for guiding and supervising the preparation and implementation of RP. At the field level, the SIC/WUG will be responsible for planning and implementing RP at the sub-project/village level. At the field level, the Gram Panchayat/Market Committee will be responsible for addressing grievances related to RP. 7.5 STRATEGY FOR DEVELOPMENT OF VULNERABLE GROUPS 7.5.1 Indigenous Peoples There are not indigenous peoples (referred as tribal in India) as distinct ethnic communities with distinct culture and language. In this state, according to 2001 census there are a little more than hundred thousand (about 108,000) in a population of more than 170 million. More than half of these tribals are in two districts (Khiri, Balrampur) which are not project district. The tribal of this state are mainstreamed into the local culture and living pattern and do not have distinct identity as ethnic groups. Therefore, the World Bank’s operational policy (OP 4.10) on Indigenous Peoples Page 114 UPBSN IESA Report for UPSLRP-III 114 does not apply to the project. It may be mentioned that although these tribal population do not emerge as distinct cultural group, they are socially, culturally, politically and economically safeguarded through the country’s constitutional provisions and supported through various social and economic development programs. Nevertheless, these people under the project will be treated as vulnerable groups and will get focused attention through the vulnerable development strategy described below. 7.5.2 Vulnerable groups In the context of this project, the vulnerable groups are those who are socio-economically backward and are generally marginalized in the decisions making process at the sub-project or village level. As a result, quite often it is observed that they remain at the margin of the development process and do not access benefits at par with others. Most of these socio- economically backward or vulnerable groups include scheduled castes and tribes, women, landless families, and marginal and small framers. These groups, majority of whom are poor, constitute significant proportion. The marginal and small farmers constitute 93.6% of the project beneficiaries in sodic villages covered as a part of the survey and 85.3% in ravine villages covered as a part of the survey. Therefore, it is important that their issues, in relation to the proposed project interventions are addressed up-front mainly to enhance their participation in the project and to ensure that they have access to project benefits at par with others. 7.5.3 Assessment of issues Detailed discussions were held with various vulnerable groups (VG) including one-to-one contact (through beneficiary survey) during the social assessment as part of IESA. These discussions were through specific structured interviews, FGDs and stakeholders consultations. The aim of these discussion/consultations was to identify issues related to VGs that are relevant to the proposed project and to formulate measures to enhance their participation. At the same time, it was expected that such consultations would help in framing strategies to help them access project benefits along with others. Important observations from the FGDs and other consultations held with VG groups in the project locations are presented below. 7.5.4 Major vulnerable groups in project areas In the project areas, major vulnerable groups include landless households (LLH), marginal farmers (MF), scheduled caste (SC)/tribe (ST) families, and women. According to the sample survey undertaken as part of for IESA, marginal and small farmers account for 93.6% and 85.3% of the respondent households in sodic and ravine villages. Landless families accounted for 1% of the respondent households. The female population accounts for 46% and 44 % of the total population of respondent households in sodic and ravine villages. STs are very few in the project areas. While issues related to women and their development strategy will be discussed in a separate section under this chapter, the following sections focus on other important vulnerable groups. 7.5.5 Dependency of vulnerable groups in the project area Landless households are entirely dependent on non-farm livelihood sources mainly wage earning for which they often migrate out of the village away from their family. Many a time, they do not find adequate work opportunities. Thus, in spite of willing and able to do physical work they are deprived of income. Exclusive dependence on wage income has its own socio-economic implications like lower status in society, uncertainly and variability in income flow, etc. Project Page 115 UPBSN IESA Report for UPSLRP-III 115 interventions may directly benefit some of these landless households through the allotment of community sodic land and its reclamation. At the same time, laborers will get more work in the village itself, thus checking their migration from the village. Marginal farmers are suffering from double-deprivation. On one hand, their holdings are tiny and on the other major portion of these holdings are unproductive due to the problem of sodicity. Thus, most of the marginal farmers are also heavily dependent on wage earning. These farmers will also be benefited from the project intervention as the landless people will be. In addition, reclamation of sodic and ravine lands will improve agriculture production/productivity on such farms. Ultimately, income of these households is likely to increase due to project intervention. Landless is predominant among ST/SC households and are also characterized by landlessness or marginal landholdings and resultant heavy dependence on wage earning. Allotment of Gram Sabha land, its reclamation and increased availability of wage employment at local level will benefit these households. Various vulnerable groups will also be benefited from training and capacity building initiatives to be taken under the proposed project. In addition to above deprivations in terms of livelihood opportunities and the instability, people of vulnerable groups have no or subdued voice in community decisions, especially in management of 7.5.6 Issues faced by vulnerable groups Any development project needs address issues and take appropriate steps in order to reduce the susceptibility of the people belonging to disadvantaged groups towards risks or shocks to their livelihood. Moreover, there is also a need to take suitable initiatives to increase their voice and participation in planning, implementation and evaluation of project activities, especially related to management of community assets and infrastructure to be created. This also demands that these groups have access, if not greater at least at par with others, to project benefits and opportunities. This becomes all the more important for project like Sodic land reclamation which throws open lot of hope for such vulnerable groups to participate in and benefit from the demand-based and participatory approaches proposed to be followed in the project implementation. In order to define specific strategies, we have first identified in the following, some of important issues faced by these vulnerable groups in the project. · Access to wage employment: As indicated above, majority of the vulnerable groups are dependent on wage employment and the in the project the opportunities are limited. Further, the extent of employment is mainly confined to cropping season and the wages offered are too low. As a result these people migrate out to other places for greater employment and higher wage earnings. · Low wages: As indicated above the wages paid (especially for farm and allied activities) to the labour is low in the project area and do not remunerate the efforts made by the labour. Further, there is discrimination in the wage payment between male and female. Lower wage rate is attributed mainly to excess supply of labor. Excess supply of labor is also one of the reasons for out migration of labor from the village. Due to low earnings, families from the vulnerable groups also involve their children in wage earning to supplement their household earnings. There is · Landlessness: This has emerged as one of the important constraints of a significant percentage of households in the project villages and for majority of these households, wage earning is the main source of earning. However, as described above due to inadequate employment opportunities and low wage earnings, these households continue to live in abject poverty whose living could be improved if land is allotted to them for cultivation and help then supplement their living on a sustainable basis. Marginal landholding: Majority of the holdings in project villages is marginal spread over different plots. Marginal farmers account for about 66.9% and 54.9% of the Page 116 UPBSN IESA Report for UPSLRP-III 116 respondent household covered as a part of IESA survey in sodic and ravine villages respectively. · The average holding in the project villages is 0.90 ha. Moreover, major portion of their landholdings is unproductive or characterized by low productivity for several reasons – low fertility, traditional agriculture, lack/inadequate access to farm inputs, farm credit, and agriculture extension and market. Consequently, these households are also dependent on wage earning or petty trades and other non-farm activities. They face the same level of susceptibility in their livelihood as the wage-dependent households face. · Low productivity: A good number of scheduled caste/tribe and other poor households have been allotted Gram Sabha land in small pieces which are largely barren lands. Though they are the proud owners of these lands but they hardly derive any return from these lands. · Need to supplement household earning: Due to low productivity and low returns, a number of vulnerable groups perceive farming not remunerative. As a result, a number of them either lease out their land or continue with subsistence agriculture. Considering the low productivity, there is a need to supplement the household income through suitable income generation activities. · Inadequate access to credit institutions: As stated above, vulnerable groups do not have adequate access to credit institutions to help them take up improved farming and supplement household income through taking up animal husbandry activities and other IGA. · Inadequate participation: One of the most important issues faced by the vulnerable groups in the project areas is the lack of or inadequate participation in community based decision making process and in planning and implementing development programs. Most often their participation in such programs is through wage earning. · Grievance redressal system: It is the general observation that the vulnerable groups though face a lot of issues and problems, their grievances are hardly listened or attended to. The grievances are not properly recorded and there is no systematic approach or mechanism to address these grievances and there is also no follow up on the actions agreed to be taken to address a grievance. 7.5.7 Opportunities for VGs under the project The project design and its components provide a number of opportunities to vulnerable communities not only for their involvement in the planning and implementing project activities but also to benefit from project. The project design and prescribed processes are aimed at increasing the access to project opportunities to vulnerable groups. Some of the specific opportunities are briefly described below. · Increased employment opportunities: Project interventions in form of OFD works and reclamation of sodic/ravine land and restoration of link drains are likely to increase the demand for labor in the project areas. Sodic/ravine land reclamation will increase overall cropping intensity in the area leading to higher labor requirement. It will again benefit more to the wage earners, majority of whom belong to VGs. · Wage payment: The project will ensure wages under Minimum Wages Act, thus protecting the interests of labourer. Further, there will be no discrimination in wage rates based on gender which will help particularly the women members in getting fair wages in accordance with ‘equal wage for equal work’. · Improvement in marginal holdings: Majority of the landholdings in is marginal and hardly able to support the livelihood of the family. Major portion of these marginal landholdings Page 117 UPBSN IESA Report for UPSLRP-III 117 is unproductive or characterized by low productivity. Reclamation and improvement of marginal (sodic) land will not only help improve the livelihood but would also reduce the dependency on wage earning for their living. · Development of allotted land: Some of the members of VG are allotted Gram Sabha land (mainly sodic land) which is in small pieces and largely barren lands. Therefore, these lands remain uncultivated. After reclamation of such sodic lands under the project, it will help improve the livelihood of households such sodic land. Since the reclaimed lands will be self-cultivated, the paid out cost of labour will be quite low which ensures profitable cultivation of crops in reclaimed sodic lands. · Preference to VG: Vulnerable groups will be given priority in various income generating activities proposed to be implemented through cluster level producers organizations (CO). Though the membership of CO is open to all, a certain minimum percentage from these groups will be mandatory. Relaxation in margin money or other requirements for provision of productive assets to these households will also help VG families. · Increased involvement/participation: Proposed SIC will be constituted by involving all the beneficiaries of a village. Thus, all the beneficiaries irrespective of their caste and class categories will automatically become members of the SIC. They will also be encouraged and sensitized to participate in SIC meetings where all the village level decisions will be taken. To encourage participation of VGs, meetings will be scheduled at a time convenient to such households. · Giving voice to VGs: Emphasis will be laid under the project on detailed recording of proceedings (of WUG and SIC) with names of farmers raising various issues which will improve the interest and confidence of people of vulnerable groups to participate in the meetings because they will find greater utility in attending the meetings. The same mechanism will also be adopted in the meetings of cluster- level producers’ organizations. · Grievance redressal: The minutes of the SIC meeting in which major decisions are taken will record the number and category of farmers present in the meeting. This will also include dissents along with reason for rejection and action taken on grievances recorded earlier. This arrangement will not only help in giving greater voice to VGs but also address their grievances. It will improve the faith and confidence in SIC and other farmers’ institutions. Regular monitoring at various levels will also help in recording and addressing grievances. 7.5.8 Vulnerable groups development strategy Keeping in view some of the above issues faced by the vulnerable groups and the opportunities available under the project, a vulnerable group development (VGD) strategy has been developed which will be applied during the process of planning and implementing various project components, sub-components and activities in the project villages. This strategy has been presented below in Table 7.2. TABLE-7.2 Vulnerable Group Development Strategy Issues Strategies Proposed activities Responsibilities Lack or low level of participation Educate WUG / project staff on involvement of VG in the WUG, SIC and other local institutions Frequent meetings, periodical review & interactions with VG members. DPU, NGO, SIC, WUG Page 118 UPBSN IESA Report for UPSLRP-III 118 Issues Strategies Proposed activities Responsibilities Lack or poor leadership qualities Training in leadership & organizational development · Work with groups to communicate the goals, strategies and plans of the project. · Ensure adequate representation for members in SIC/WUGA committees · Design and organize specific capacity building programs for these groups DPU, NGO, SIC, WUG Low level of participation in the improved agricultural development process Ensure need based agricultural extension and support services · Facilitate exposure to improved agriculture practices including IPM, with support from the line Agril. Department and research institutes · Ensure supply of seeds, fertilizers, pesticides and technical know how in coordination with line departments and credit agencies · Support in periodic soil testing and demonstration of techniques to make the best use of soil conditions. · Organize special training programs/demonstrations in fields of VG with the help of Agril. Department. · Organize exposure trips to agricultural farms, research stations and progressive farmers under the project · Establish linkages with the agriculture- marketing network, provide logistic support. DPU, SIC, WUG, NGO, in partnership with local banks and cooperatives, Kisan Mitra, Agril. Extension worker Access to institutional credit Extend support to access to institutional credit · Provide information on various formal credit-lending institutions available in the area · Help the eligible families to complete formalities · Ensure that the credits received are productively used for improving farming DPU, SIC, NGO, WUG in partnership with local banks and cooperatives Access to IGA Provide information in IGAs Support to access to institutional credit · Provide information on various IGAs · Inform credit institutions helping IGAs in the area · Help the eligible families to complete formalities · Ensure that the credits received are productively used for taking intended IGAs · Help in marketing aspects – both for inputs and production DPU, SIC, WUG, NGO, in partnership with local banks and cooperatives Low literacy Promote functional literacy. Tune agril. extension to the needs of the illiterates · Integrate with mass education and total literacy programs · Farm extension programs to include audio-visual aids and participatory learning methods. · Customize training programs to meet the needs of illiterate and neo-literate communities UPBSN, DPU, NGO, PRI, SIC in partnership with local NGO/agency promoting literacy Page 119 UPBSN IESA Report for UPSLRP-III 119 Issues Strategies Proposed activities Responsibilities Limited access to project benefits Facilitate the intra- social group interaction to lessen the effect of rigid class and caste- based hierarchy Organize social mobilization campaigns by involving all types of indigenous and Dalit group people for public awareness to share irrigation development benefits equitably. Create social space for all to have their say in the process of benefit sharing IDD, NGO WUA facilitator in partnership with local NGO. 7.5.9 VG strategy through project stages The stage wise implementation process of the vulnerable group development strategy is presented in Table 7.3. TABLE-7.3 Vulnerable group development strategy through project cycle Stages Procedures Outcome Identify concerns/issues in relation to the project activities through PRA exercises List of issues Organize consultation with VGs to inform about the project activities and benefits No. of consultations held Organize WUG/SIC with greater representation from VG No. of VG members in WUG/SIC Identify key areas of constraints that may be improved through the project List areas of constraints Number of consultations Preparation Develop detailed plan for VG development List of activities identified specifically targeting VG development Ensure equal participation of VGs in monitoring Representation of members from VGs in participatory itoring Implement ation Employment to members from VGs in project execution activities Ensure minimum wages and equal wages No. of VG members employed No. of days of employment Wage norms Ensure active participation of VGGs in WUG/SIC decision making Ensure representation of VGs in the marketing groups No. of VG members participating in WUG/SIC meetings No. of members in marketing groups Capability building of VGV members and skill up-gradation Training calendar prepared Number of trainings undertaken Number of VG members trained Employment generation for VG members in project activities Number of VG members employed Wages paid Post implement ation Help build linkages with major government schemes for VG development particularly skill enhancement and technology up- gradation Number of projects linked in the sub project locations Page 120 UPBSN IESA Report for UPSLRP-III 120 7.6 GENDER DEVELOPMENT STRATEGY Women play an important role in rural livelihood including agriculture and allied activities which are in additional to their regular household chores, child care, fuel wood collection, animal care, etc. Traditional division of labor between male and female and latter’s poor educational and income earning status are the two main reasons for the drudgery facing them. The IESA has attempted to assess different issues facing them. Findings are discussed in following paragraphs: 7.6.1 Assessment process Detailed discussions were held with women members/groups in the selected sub-project areas. These discussions were through specific structured interviews, FGDs and stakeholders consultations. The aim of these discussion/consultations were to identify gender issues that are relevant to the proposed project and to formulate measures to enhance their participation and at the same time help them access project benefits along with others.. 7.6.2 Specific issues Important observations from the FGDs and other consultations held with women groups in the project locations are presented below. Low women participation in development programs: In almost all discussions held with women groups in the sub-projects covered under IESA, it came out clearly that women do not participate in the social and community activities at the village level. As a result, they are confined to their houses and are considered as caretakers of home. Due to less/no participation in the development programs, gender concerns are not adequately addressed and hence women are often deprived of benefits from the development activities. Role of women in Agriculture and other economic activities: While women play significant role in agriculture and other economic activities besides performing household work, their contributions are often not credited. Most often it is not considered productive. Access to employment opportunities: The discussion with women groups, it came out clearly that the women have less access to employment opportunities and quite often are denied when ever such opportunities arise. Discrimination in wages: It was observed that not only women have less access to employment opportunities, even the wages paid are more often far less that the minimum wages or wages paid to the male members. The wage discrimination comes out more clearly in case of agricultural activities. Lack of ownership of agricultural land: The IESA team observed that in majority of cases land ownership lies with men and in only some exceptional cases, it is held by women. As a result, there is relatively very little land holding among women of the project area. Limited access to market: Women cultivators have problems in accessing markets particularly because of social and economic constraints in reaching nearby markets. Women have to carry produce on foot or use local transport especially bus services to reach the market. Also, due to smaller quantities, women face problems in sourcing markets and thus encounter social constrains. Their roles is limited in the value addition process and hardly any in marketing aspects. 7.6.3 Approach From the above, it is clear that there a number of issues that relate to women’s participation in the proposed project activities. While, it would be unrealistic to expect the project to address all Page 121 UPBSN IESA Report for UPSLRP-III 121 issues and concerns of women, however a right approach would help to focus on specific issues that relate to project and could be tackled under the project. The approach, therefore, is to formulate sub-project specific interventions focusing on women. Efforts are required to dovetail the existing relevant government programs for the socio-economic benefit of the women members. 7.6.3 Gender development strategy Following the above approach, the project level gender development strategy is presented below. This strategy (Table 7.4) will be followed to address issues and remove constraints in women participation at each stage of the project cycle - preparation, implementation and operation. TABLE-7.4 Gender Development Strategy ƒ Beneficiaries as well as their respective spouses should be the members of SIC and WUG. Such arrangement will facilitate their stronger participation in decision making. Moreover, adoption of extension messages disseminated in the SIC will improve because two members of a family participate. ƒ Project should launch special literacy/educational drive for adult women, at least for SHG members. The experience of earlier projects shows that literacy improves due to such drives and women feel empowered when they become able to read and write. ƒ Possibility of group-based enterprises needs to be explored. However, there is a need to act selectively because group-based activities will involve socio-economic and group dynamics. ƒ Women should be imparted training on micro-enterprises and other IGAs as per their willingness and interest. Trained women should be helped to access credit facility. The project should help SHGs in procurement of capital assets for the micro-enterprises. Technical backstopping for at least initial 1-2 years should be extended through some specialized agency/organizations. ƒ Provide market support to woman entrepreneurs including market intelligence, exploring new markets, establishing linkages with potential buyers (including bulk buyers such as institutions, organizations, etc). ƒ SHGs approach should be continued with more rigor and sincerity. IGA/micro-enterprises should be emphasized from the very beginning. ƒ Organize training for women in animal husbandry including animal health management and milk production. ƒ Promote allied activities such as poultry, goat keeping among women through special-purpose SHGs. ƒ The proposed cluster-level SHGs federation will go a long way in strengthening the SHG movement with managerial and technical backstopping. This federation will establish linkages with cluster- level producers’ organizations for development of agribusiness and value adding activities. ƒ 7.6.4 Guidelines for Implementing Gender Strategy Following the above strategic options, guidelines (Table 10.5) have been developed which need to be adopted in addressing issues related to women under the project and help them benefit from and access to project benefits. Page 122 UPBSN IESA Report for UPSLRP-III 122 TABLE-7.5 Guidelines for Implementing Gender Strategy Stage Process Activities Outcome Identify gender concerns/issues in relation to the project activities through PRA exercises · List issues and prioritize · Special attention should be made to identify infrastructure needs and facilities for women members at the market · Issues identified that need be addressed under the project Inform about the project activities and benefits · Organize women stakeholders meeting · No. of consultations · Recorded minutes of the meetings · Feedback from these consultations Sensitize other stakeholders on gender concerns/issues · Organize workshops on gender sensitization · No. of meetings held · No. of participants Preparation Identify key areas/constraints that impact women’s involvement in the project · Organize workshops and specific meetings with women in project villages · List concerns and constraints Ensure women participation in project activities · Work with women SHG · Help SHGs for active participation in the project activities · Monitor women representation in SIC, WUG and Market committee · Record no. of women involved in construction activities Ensure equal wages for equal work in all construction related works under the project · Maintain a Wage register at the site and ensure it is filled on a daily basis. · Monitor wage payment · Try involve local SHGs in the construction activities · Actual wages paid to women · No. of complaints on wage payment Implementation Ensure that women are not discriminated · Maintain Complaint register at the village level to be checked periodically by NGO/SIC/PRI/ Market Committee. · Ensure quick redressal to complaints by women · No. of complaints registered · No. of cases resolved Ensure women participation in WUG, SIC and market committees. Involve women in land reclamation and subsequent agriculture and in other project components · Organize training for active participation of women in WUG, SIC and market committees · Ensure that women members attend meetings of these local institutions · Form/activate SHGs · No. of trainings organized · No. of women completing trainings · No. of women producers getting a fair price of their produce Operation Capacity building of women members and skill up- gradation · Training calendar to be prepared and accordingly training to be organized · No. of trainings organized · No. of women members trained Page 123 UPBSN IESA Report for UPSLRP-III 123 Stage Process Activities Outcome Employment generation under the project · Involve SHGs · Source out some of the activities to women · No. of women members employed · No. of activities undertaken by SHGs Ensure minimum wages Avoid wage discrimination · Maintain employment records · Maintain records of wages paid · No. of women getting minimum wages · No. of complaints on wage discrimination · Maintain Complaint register at the village level to be checked periodically by NGO/SIC/PRI/ Market Committee. · Ensure quick redressal to complaints by women · No. of complaints registered · No. of cases resolved 7.7 INFORMATION, EDUCATION AND COMMUNICATION STRATEGY 7.7.1 Need for IEC In order to ensure effective participation of various stakeholders and for achieving the desired project objectives, there is a need to ensure effective two way knowledge – between the project and project communities. Sharing of information is required at various levels and on different aspects of the project. As part of IESA, an attempt was need to assess the existing communication among stakeholders and the type of information shared based on which Information, Education and Communication (IEC) strategy has been prepared with clear timelines and roles and responsibilities of concerned stakeholders. Broad objectives of IEC include: awareness generation and motivation, technology dissemination, developing the information system, improving access to project information, and educating the stakeholders. The task of educating and communicating the target people, especially beneficiary farmers, is quite challenging due to their literacy/educational level and access to and use of modern communication sources. There is widespread illiteracy (lack of reasonable ability to read and understand printed material with narration) among the farmers and other people of rural areas. Moreover, people’s access to electronic media is also limited due to electronic media in the rural areas. This is particularly important for UP SOdic III project considering its expanse of the project area and difficulty in reaching large number of households. Thus, there is a need for the project to evolve suitable IEC strategy and make available required information, in the form and time, which could help project stakeholders. The IEC strategy discussed here intends to cover mainly environmental and social aspects of the project implementation. 10.7.2 Generation of information and knowledge base In addition to the information that is required to be made available to seeking it under National Right to Information Act, the foremost task in the IEC is to generate an information and knowledge base on the basis of which education and communication could be undertaken and in this regard the suggested strategy is presented in Table-7.6. Page 124 UPBSN IESA Report for UPSLRP-III 124 TABLE-7.6 Suggested strategy and framework for IEC Thematic area Target audience Contents Form of knowledge material Information on social aspects · Affected families · Vulnerable groups · Members of SIC, WUG, SHGs and other groups · R&R entitlements · Extent of loss · Project benefits particularly for VG · Project information · Printed documents along with pictographs · Pamphlets and booklets · Public display of affected families and their entitlements Social conflict resolution mechanisms · Headquarters level officers of UPBSN and line departments · District level officers of the project and line departments · Field staff of the project and line departments · Functionaries & representatives of PRIs, NGO and others · Members of SIC, WUG, SHG and marketing groups · Extent of LA and no. of beneficiaries and their entitlements · Description of social conflicts arising in rural areas including economic, institutional and legal. · Description of existing resolution system in different socio-economic settings · Applicability of such resolution system in other socio-economic settings · Success and failure stories · Information on project implementation – activities and beneficiaries · List of affected families · Entitlements to individual families · Printed documents along with pictographs · Pamphlets and booklets · Sharing of information in the meetings of various institutions · Pamphlets and booklets · List of affected families and their entitlements are publicly displayed in villages · Availability if wage employment announced in village meetings and in groups Social risks · Headquarters level officers of UPBSN and line departments · District level officers of the project and line departments · Field staff of the project and line departments · Village institutions – PRIs, SIC, TUG and other groups · Project beneficiaries · Description of various social risks to implementation of the project activities · Ways and means to reduce/mitigate such risks · Suggested precautions · Dates of the meetings of various institutions · List of beneficiaries and the type of benefits · Printed document · Pamphlets and booklets · List of beneficiaries and their benefits are publicly displayed in villages · Making available information in various meetings Participatory decision making · Headquarters level officers of UPBSN and line departments · District level officers of the project and line departments · Field staff of the project and line departments · Functionaries/ representatives of Gram Panchayat, NGO and others · General villagers and farming community including women · Preparation of work breakdown structure for the project components along with delineation of roles and responsibilities of each level of project management · Delineation of primary and secondary implementing responsibilities along with schedule and quality standards · Delineation of activities which are to be implemented through proactive involvement of beneficiaries in planning, implementation and monitoring and · Descriptive documents along with matrix of roles and responsibilities · Schematic exhibition of participatory process and participatory structure · Pamphlets and booklets Page 125 UPBSN IESA Report for UPSLRP-III 125 Thematic area Target audience Contents Form of knowledge material Information on social aspects · Affected families · Vulnerable groups · Members of SIC, WUG, SHGs and other groups · R&R entitlements · Extent of loss · Project benefits particularly for VG · Project information · Printed documents along with pictographs · Pamphlets and booklets · Public display of affected families and their entitlements evaluation · Description of participation process for the concerned activities · Expectations from various stakeholders, especially farmers for different activities · Process protocols for various activities Environmental awareness · Headquarters level officers of UPBSN and line departments · District level officers of the project and line departments · Field staff of the project and line departments · Functionaries/ representatives of Gram Panchayat, NGO and others · General villagers and farming community including women · Interaction between project activities and the environment including air, water and soil · Positive and negative impacts of the project activities on the environment · Proposed measures for enhancing the positive impacts along with primary, supervisory and policy- making responsibilities for these measures · Proposed measures to reduce the negative impacts along with primary, secondary and policy-making responsibilities for these measures · Proposed mechanism for monitoring and evaluation of various impacts and measures · Expectations from each and every stakeholder · Printed material in descriptive form · Project activity wise positive and negative impacts along with proposed measures and implementation responsibility and expectations from stakeholders in form of matrix so that all concerned could easily grasp and internalize the information · Expectations from farmers and general villagers should be straightforward in language and form Monitoring and Evaluation · Headquarters level officers of UPBSN and line departments · District level officers of the project and line departments · Field staff of the project and line departments · Functionaries/ representatives of Gram Panchayat, NGO and others · General villagers and farming community including women · Documentation of project activities, targets, timelines, primary and secondary responsibilities for implementation of various measures to improve environmental and social performance of the project and expected output, outcome and impacts · Timelines for monitoring and evaluation · Compliance review mechanism · Printed material in matrix form Page 126 UPBSN IESA Report for UPSLRP-III 126 Entire information base suggested above should be preferably generated in a single document so that officers and functionaries of UPBSN, DPUs and line departments could access it easily. This should also be made available in the website of UPBSN/project. However, a separate document in form of booklet should be designed and developed for the farmer community. While the knowledge material for officers and functionaries could be in English and Hindi, the material for farmers must be in Hindi language. 7.7.3 Dissemination of information and knowledge The information and knowledge base generated should be properly communicated to all concerned for educating them about the environmental and social issues/risks, proposed mitigation measures in order to solicit their contribution in reducing negative impacts and enhancing the positive impacts. Moreover, there should be an arrangement for receiving concurrent feedback from various stakeholders about the knowledge base, communication methods and tools and internalizing such feedback to improve the knowledge base and communication system. Though an exclusive communication framework and system could be designed for environmental and social aspects, it will not be an efficient proposition because it may involve huge cost. Moreover, separate communication system for environmental and social issues may not be fully effective whereas if it becomes part of overall communication system for the project it is likely to be quite effective. UPBSN has come out with a communication strategy for the overall project in which environmental and social communication needs to be built in. The communication strategy outlined by UPBSN is elaborated in following paragraphs. For effective information and communication with all the associated departments and institutions, monthly review meetings would be held at the UPBSN headquarters for providing staff with new information necessary for effective implementation of social and environmental aspects of the project. All Project Managers and NGO Coordinators, representatives of associated departments as well as of other institutions namely RSAC and External M&E agency would participate in these review meetings. For effective communication and implementation, weekly review meeting with all the zonal officers would be held at the UPBSN headquarters. Separate monthly meeting for better communication will also be held with RSAC and external M&E agency to review the progress of mapping work, monitoring of soil and water in the project area, and concurrent monitoring & evaluation activities. Quarterly meeting would also be held in the office of the Engineer-in-Chief, Irrigation Departments, in which all Assistant Engineers and Executive Engineers of the concerned divisions of the project districts would participate to know the new instruction, rules framed by World Bank, government, UPBSN and review the progress of the drainage works. Quarterly meeting would also be held at UPBSN office in which state level Nodal Officers of Animal Husbandry Department, Agriculture, Ground Water and all nodal officers of project districts would participate for better understanding of the updated information and review of the progress of the line department components. Regularly quarterly information, communications, and education (ICE) workshop would also be held with Zonal Managers of the Banks and other linked institutions and individually with Lead Bank Managers of project districts and District Development Officers of NABARD to educate, inform new developments and discuss the problems and progress regarding formation of Self Help Groups and their linkages with Banks, cluster level organizations and farmers field schools. Page 127 UPBSN IESA Report for UPSLRP-III 127 7..4 Strategic Communication The policymakers and government officials would be a primary audience for the purpose of building support for the project, especially in terms of continued financing after implementation is complete. To fulfill above objectives, the strategy would include regular briefing and updating them through meetings, a newsletter (Bhumitra), Brochures, Fact Files and communication materials which they can distribute to the visitors at their respective offices. Beyond policy makers, academia, scientist, technocrats, NGOs and opinion leaders will also be informed, educated and communicated through various tools. Which will be clear and concise and most able to convey messages that can be understood by a largely non-specialist audience. Some important modes and tools are as follows: · Face to Face meetings . State Steering Committee meetings and Board of Directors meetings will be periodically organized to maintain ties with policymakers to build a positive sense of ownership. In addition, regular meetings of Zonal Officers, Project Managers, and line department officials will also be held for strategic communication and effective implementation and review of the project. · Brochures . Concise, understandable and attractive brochures will be prepared to provide an overview of the project, summarize project progress, tell the success stories of the project beneficiaries and explain various issues relevant to sodic lands. · Fact File . A glossy fact file containing data of sodic projects will be prepared and circulated to politicians, policymakers and visitors to the project area. · Documentaries, TV/Radio interviews . As the UPSLRIIIP starts yielding results, documentaries on project impacts showing how government funds are changing the lives of poor farmer’s family will be filmed and shown to all concerned. · Newspaper Articles and Editorials . A wide spread newspaper coverage of project can raise public awareness of sodic land issue and plight of poor farmers. Editorials, explaining to the urban population the plight of those who grow food for them, will also be published. · Case Studies . The case study based on MIS data will be incredibly powerful ways to communicate non-specialist audience. · Technical manuals . All technical guidelines and procedures will be prepared for UPSLR III P in form of technical manuals for the benefits of NGOs, universities scholars, developmental staff etc. The summary of communication tools planned by UPBSN for use in the project is given below in Table-7.7. TABLE-7.7 Summary of communication tools planned by UPBSN Stakeholder Group Primary Communication Need Primary Messages Preferred Tools Beneficiaries Operational · Project rules, roles, responsibilities · Benefits of participation · Right to information · Traditional theater · Posters · Village meetings · Radio ads/shows · TV ads Page 128 UPBSN IESA Report for UPSLRP-III 128 Stakeholder Group Primary Communication Need Primary Messages Preferred Tools · Technical knowledge on land management (agriculture) · Opportunities for income generation (livelihoods) · Other programs that can meet their needs (dovetailing) · SMS technology (for extension messages) Policymakers Strategic · Project progress · To maintain Tie and build ownership · To show project impacts · Meetings · Brochures · Fact File · Documentaries · TV/radio · Case studies · Technical manuals Opinion Leaders, Academia Strategic · Project progress · To maintain Tie and build opinion · To show project impacts · Meetings · Brochures · Fact File · Documentaries · TV/radio · Case studies Government officials (practitioners) Operational · Project rules, roles, responsibilities · Benefits of participation · Right to information · Technical knowledge on land management related issues · Meetings · Circulars · Brochures NGOs Operational · Project rules, roles, responsibilities · Benefits of participation · Right to information · Technical knowledge on land management related issues · Awareness’ campaign · Meeting · Extension Literature · Audio/Video · Folk/Cultural media · Wall paintings The IEC strategy of UPBSN is quite comprehensive and is likely to prove effective in achieving its goal. As mentioned earlier, the same communication system should be used for environmental and social aspects because it will be efficient (in terms of lower cost) and effective (in terms of Page 129 UPBSN IESA Report for UPSLRP-III 129 fulfillment of objectives). Environmental and social aspects are integral to the project implementation as well as its output, outcome and impact. Some specific suggestions for improving communication on environmental and social aspects are given below: · Each communication material (mainly printed) should have a separate section on environmental and social aspects. · Field staff and NGO workers should be particularly oriented on environmental and social issues and they should be provided adequate literature for further distribution among the general farmers as well as beneficiaries · As the experience of Water conservation campaign (Amrit Jaldhara) in Aurangabad district of Maharashtra under the National Agriculture Technology Project shows wall paintings can prove quite effective in sensitizing farmers on environmental aspects. · Involvement of Gram Panchayat and other local institutions in creating awareness on environmental and social issues will be very effective because people tend to listen to them more carefully. · Project should also promote Mitra Kisan and Mahila Mitra Kisan as environmental and social messengers. They should be adequately trained and sensitized on these issues so that could further communicate with other farmers. · Special-purpose cultural troupe should be mobilized to organize cultural programs on environmental and social aspects. This media is likely to be more effective in sensitizing people. · The communication system for the project including environmental and social aspects should be dynamic in nature. It should be continuously improved and updated with additional knowledge resources and tools and techniques on the basis of implementation experience and feedback from implementation partners. 7.8 CONFLICT RESOLUTIONS As part of IESA, an attempt was made on assessing the type of risks and the existing resolution systems and the findings are presented below in Table-7.8 TABLE-7.8 Conflicts and existing resolution system S. No. Conflict areas/risks Existing resolution system 1. In absence of irrigation channel network attached to private boring, sometimes farmers whose field is located away from boring face problem in irrigating their crop because other farmers do not allow conveyance of boring water through fields. Such objections are attributed to personal reasons or anticipated loss of crop or indifferent attitude of concerned farmer. ƒ Conflict/objection due to personal reasons (between two farmers) is sorted out through mutual discussion or through intervention from influential people of the village or through peer pressure. Sometimes, it is never resolved. ƒ Conflict/objection due to anticipated loss of crop is addressed through synchronization of sowing and irrigation schedule by the concerned farmers. ƒ Conflict/objection due to indifferent attitude is resolved through peer/social pressure. 2. Pond water is better accessible to those farmers whose field is located adjacent/closer to the pond. Such farmers develop a sense of first right to use pond water. When owner of distantly- located plot uses pond water, conflict arises. ƒ Final resolution of conflict depends on relative socio-economic power of the concerned parties. Sometime, decision is taken in favor of stronger party. ƒ In majority cases, adjacent farmer is convinced Page 130 UPBSN IESA Report for UPSLRP-III 130 S. No. Conflict areas/risks Existing resolution system Many a time, this leads to intense conflicts. about equal rights of all farmers of the village to use pond water. ƒ Members of Gram Panchayat, not the Gram Panchayat as an institution, play crucial role in resolution of such conflicts. 3. Conflict arises also in use of canal water for crop irrigation. When quantum of water in canal is low and some intermittent farmer puts on bunds in order to ensure higher quantity of water for his field tail users have smaller quantity of water, conflict among farmers arises. ƒ Such conflicts are resolved generally through mutually negotiation. In many cases, the problem is referred to the Irrigation Department which intervenes to resolve the issue. 4. Though farm roads (chuck roads) have been installed in most villages, such network is found to be inadequate due to increasing fragmentation of holdings. As a result, many farmers are not able to bring tractor to their respective fields due to objection from the en route farmers. Thus, farmers are compelled to use bullocks for ploughing or leave the field uncultivated. ƒ This problem is resolved through mutual discussion or through intervention from influential people of the village or members of Gram Panchayat. ƒ Sometimes, such conflicts remain unresolved and the concerned farmers resort to alternatives. 5. Community grazing land/pasture should be theoretically accessible to all farmers of the village. However, influential people have better access to such lands/pastures. Many a time, animals belonging to powerful people get privilege. Thus, poor and weaker farmers have lower access. ƒ Such conflicts, when arise, are never resolved. Poor farmers adjust their timing. 6. Conflict arises in usage of Panchayat Bhawan for the purpose of marriage or other such occasions. Influential and powerful people get priority over poor people. Sometimes, people of weaker section do not get an opportunity to use these facilities. ƒ Such issues are discussed in Gram Panchayat and resolutions are generally based on first- come-first-served basis. Such solution is acceptable to all. ƒ However, in many cases, poor people remain deprived of these facilities. 7. Absence of proper field/link drain network connecting agricultural fields also leads to conflict among farmers, especially during heavy rains. When a farmer wishes to drain out excess water, due to heavy rains, from his field the fields of other farmers may be flooded. The affected farmer will object leading to conflict. ƒ Generally, such conflicts are not resolved. ƒ However, sometimes, farmers will arrive at mutual consensus to drain out the entire area. 8. Sowing and harvesting time is generally the same for all farmers. Hence, their labor requirement is also simultaneous. Many a time, a group of labor engaged by a farmer is hired by another farmer through allurement of little higher wages or other mechanisms. Thus, conflict of interest arises between the two parties. ƒ Such conflicts are resolved through mutual discussions. ƒ When conflict becomes intense other people and even members of Gram Panchayat intervene. 9. Illegal possession on land ƒ Local resolution systems such as social pressure, intervention of Gram Panchayat or other influential people of the village become virtually ineffective. The affected party approaches formal court for legal remedy. 10. Some general conflict of interest arises in the villages. These conflicts may relate to property, division of assets between brothers, etc. ƒ These conflicts are generally resolved through informal Panchayat under which elderly and influential people are invited to decide the case. Such elderly people provide an opportunity of hearing to both the parties and take decision on the basis of merit. If the parties are not satisfied with the decision, they approach the court for legal remedy. 11. Community hand pumps have been installed under different government schemes. These hand ƒ In majority cases, Gram Panchayat intervenes and resolves the conflict. Page 131 UPBSN IESA Report for UPSLRP-III 131 S. No. Conflict areas/risks Existing resolution system pumps are supposed to at a location easily accessible to all those who wish to use those. However, such hand pumps are located at private places/premises of individuals who tend to prohibit others from these hand pumps. Such situation leads to quarrel between two parties. 12. Community toilets have also been constructed in many villages which are meant for the use of all those who wish to do so. But neighboring families have better physical access to such toilets. When distantly-located families use these toilets, conflict arises because neighboring families raise objections. ƒ In such cases, Gram Panchayat intervenes and resolves the conflict. 13. Field bunds are prepared by two adjacent farmers. Both of them are required to contribute equal area towards field bund. If an individual farmer tends to reduce the area bund area from his side, conflict arises. ƒ Such types of conflicts are resolved through social pressure or mutual understanding. 14. Since residential area in the village is unplanned there are no systematic pathways for commuting of people from one place to other. People use each other’s space for day to day movement. Residential premises of some people are located at critical places which are used by many households for mobility within the village. If such farmers block the pathway big conflict arises in the village. ƒ Such blocking of pathway by an individual person is considered as major fault by the community. This conflict is resolved by strong community pressure. In most cases, the concerned persons are compelled to clear the blockade of pathway. ƒ However, if the person is quite influential he may succeed in blockade. Others find themselves and search for alternative pathways. 15. Absence of common drain outlets in residential area also leads to conflicts among people, especially during rains. Downstream households object to flow of water from up-land through their premises. ƒ Community pressure resolves the issue. ƒ Sometimes, Gram Panchayat also intervenes to resolve the issue. 7.8.1 Effectiveness of existing resolution system for new assets and opportunities to be created under the project It is clear from the analysis presented in the previous section that most of the conflicts are resolved through mutual discussions/negotiations, community pressure, intervention of Gram Panchayat or other influential people of the village. In a few cases, the affected parties also resort to legal remedies. It is needed to examine the effectiveness of these existing resolution systems for the assets and opportunities to be created by the project. It is anticipated that the existing resolution system will prove equally effective for the assets and opportunities to be created under the project. However, it is necessary to explore additional resolution mechanisms in order to manage the probable conflicts and/or risks. The project is likely to create/rehabilitate various assets during its course of implementation. Such assets include bore wells, field drain, link drain, main drain, Haat, assets of SHG federation, asset for Cluster Organization including capital assets/goods for value addition and/or agribusiness activities. Findings are discussed in Table-7.9. Page 132 UPBSN IESA Report for UPSLRP-III 132 TABLE-7.9 Findings of conflicts and their resolution for various assets S. No. Asset/ opportunity Probable conflict/risk Proposed resolution system 1. WUG boring ƒ Though the boring is meant for entire group, the farmer in whose plot boring is located may not supply water to member ƒ The plot for WUG boring will be identified and selected by the group trough consensus on the basis of willingness and commitment of the plot owner to supply water to group members. ƒ WUG will prepare water roster with consensus. Farthest field will be given the first priority and the nearest field the last. ƒ The concerned farmer will formally agree to supply water to group members at least during the course of project implementation. ƒ After completion of project implementation WUG boring normally becomes individual property of the concerned farmer and general social dynamics comes into play. 2. Field drain ƒ The concerned farmers may not be ready to spare land for field drain, hence field drain between two adjacent plots can not be dug. ƒ Even after digging of field drain, an individual farmer may dismantle its portion and join the area with his field. In such case, field drain will cease to exist. ƒ Since field drain will be dug on private lands, farmers’ willingness to retain it will be the key factor in its sustainability. ƒ Farmers should be adequately sensitized about essentiality of field drain not only for draining out leached water from their fields but also for draining out of excess rainwater in long run. Once, they realize this fact they are likely to retain field drain as it will not acquire much area. 3. Link drain ƒ If link drain is dug on private lands, the same problem, as in case of field drain, may arise. ƒ Link drain may not be maintained periodically ƒ Ideally, link drain should be dug on community land. ƒ If it is dug on private land, area under link drain can be declared as the property of Gram Sabha. But, it is difficult proposition. ƒ Gram Panchayat should be involved since very beginning so that it takes the responsibility of maintenance of link drain after project withdrawal. ƒ Farmers should be sensitized and motivated to make monetary and/or labor contribution for maintenance of link drain. 4. Main drain ƒ Post-rehabilitation maintenance of main drains may not be taken up by the Irrigation Department. It may result into deterioration in the quality of main drains rehabilitated during the project. ƒ Irrigation Department should formally agree to provide adequate fund and undertake periodical maintenance of main drains. 5. Sodic Haat ƒ Though management of Sodic Haat is proposed to be entrusted to respective Gram Panchayat, it may not take desired interest in management of the Sodic ƒ A tripartite agreement between UPBSN, Department of Panchayati Raj and Gram Panchayat should be signed before establishing a Sodic Haat. Page 133 UPBSN IESA Report for UPSLRP-III 133 S. No. Asset/ opportunity Probable conflict/risk Proposed resolution system Haat. 6. Productive assets for SHG ƒ Though productive assets will be provided to the group, some members be deprived from the benefits ƒ Provision of productive asset should be decided on the basis of consensus. ƒ Moreover, the group should formally agree to share the use of such assets among all its members. MoU between the concerned group and UPBSN will prove helpful. 7. Assets (Storage, collection center, etc) to CO ƒ Some members of the Cluster level Organization may be neglected by the influential members and may not derive the benefits from these assets. ƒ Cluster level Organization (CO) should be established as a registered entity and appropriate institutional provisions should be made for hearing of voice of all. ƒ The executive body/organ of the CO should be formed through democratic process so that each and every member has a say. Page 134 UPBSN IESA Report for UPSLRP-III 134 CHAPTER - 8 INSTITUTIONAL ARRANGEMENT AND CAPACITY BUILDING PLAN 8.1 INSTITUTIONAL ARRANGEMENT The proposed project is multi-disciplinary in nature due to which multiple agencies are involved in its implementation. In addition to UPBSN, which is the lead implementing agency, Department of Agriculture, Animal Husbandry department, Panchayati Raj department and Irrigation Department are also involved. The terms of reference of the IESA study included an assessment of the institutional set-up both at the project (state) and field (district) levels, identification of the deficiencies (both in term of the number and skills required), if any, and suggesting improvements to ensure that social and environmental aspects are adequately addressed. The study also intended to identify where the required skills are available within the government agencies and skills that would be available in the open market. Agency/department wise assessment is discussed hereunder. 8.1.1 Uttar Pradesh Bhumi Sudhar Nigam The UPBSN would have overall responsibility of implementation. It would function under the overall guidance of Board of Directors, chaired by the Agriculture Production Commissioner (APC), Government of UP. The Board would comprise representatives from the Government of Uttar Pradesh, line Departments, State Agricultural Universities, and NGOs. Day-to-day operation would be the responsibility of Managing Director, assisted by Joint Managing Directors and heads of Project Reclamation, Finance, Procurement, Technical Services, Management Services, Drainage and Minor Irrigation divisions in the UPBSN. Institutional arrangement envisaged for overall review and guidance consists of different committees at state and district levels. The State Steering Committee (SSC), to be constituted at the state level, would be headed by the Chief Secretary, Government of Uttar Pradesh. Its other members would be: Agriculture Production Commissioner, Secretaries of Parti Bhumi Vikas, Finance, Planning, Irrigation, Externally Aided Scheme, Public Enterprises, Animal Husbandry, Horticulture, Forest, Environment, Rural Development, Science and Technology, Institutional Finance, Member (Land Records), Board of Revenue; Managing Director, UPBSN, Joint Secretary, Agriculture (GoI), Director General, UP Council of Agricultural Research and Director, Agriculture, Animal Husbandry, Ground water, Horticulture, Environment, (RSAC) and Chief Conservator, Forest. The functions of this committee would include: review and approval of policies for the State's reclamation programs and approval of a detailed annual investment plan under the project for Government's forthcoming fiscal year prepared by UPBSN and approved by its Board. At the state level, there shall also be a Board of Directors of Uttar Pradesh Bhumi Sudhar Nigam which would act as a Project Management Committee. It would meet at least once in every quarter and would review the project progress of each component on quarterly basis. For smooth coordination among the line departments at district level, District Implementation and Coordination Committee (DICC) in each project district. This committee would be chaired by the concerned District Magistrate and the Senior Project Manager/Project Manager, UPBSN of the concerned district would be its convener. The other members of the committee would be the Page 135 UPBSN IESA Report for UPSLRP-III 135 district level officials including: Chief Development Officer, Sub-Divisional Magistrates, Member of Zila Parishad, Deputy Director (Agriculture), District Agricultural Officer, District Livestock Officer, Assistant Engineer (Minor Irrigation), Plant Protection Officer, Executive Engineer (Drainage), Divisional Forest Officer, Executive Engineer (Public Works Department), representative of UP Agro, District Panchayati Raj Officer, Additional District Development Officer, Social/Harijan Welfare Officer, District Project Coordinator (UPDASP), Chairman, Regional Rural Bank, District Manager (UP Agriculture and Rural Development Bank), District Manager (NABARD), District Soil Conservation Officer, and representatives of NGO working in the district and farmer's organization. The Senior Project Manager/Project Manager, UPBSN would be the member secretary of this committee. The responsibility of the committee would be to coordinate the functioning of various departments and to oversee the progress of the project implementation. It would also review the progress of land allotment to beneficiaries; resolve inter-departmental problems and conflicts; and fix dates for credit camps and approve annual plan. As the office of the District Magistrate plays the key role in all development activities at the district level, support of this office is critical for facilitating timely implementation of field activities. Deficiencies, if any, in terms of number and skills required UPBSN has prepared a detailed plan for recruitment and deployment of adequate number of project officers/staff for the proposed project. In total, there will be 1023 officers/staff involved in the project. The proposed staff strength is assessed to be adequate. As far as quality of staff and skill sets are concerned, UPBSN has prepared a systematic plan for hiring of competent staff. Thus, it can be safely assumed that the new staff on the project will have the necessary qualification and competence for the job. However, there will be need for appropriate training and capacity building of the new staff in various areas related to environment and socio-economic dimensions. Separate capacity building plan has been prepared for this purpose. 8.1.2 Department of Agriculture The Department of Agriculture will be involved in the project for various activities such as Integrated Pest Management programme. undertaking crop cutting experiments, issuance of license for seed-cum-fertilizer outlets, seed certification, and overall extension support. Department of Agriculture operates under overall administrative control of the Principal Secretary (Agriculture), Uttar Pradesh. At the the department level, there are 5 Directors/director level officers, Director (Agriculture), Director (U.P. Seed Corporation), Director (U.P. Seed Certification Agency), Director (State Institute of Agriculture Management), and Director General (U.P. Council for Agricultural Research). At the headquarters level, there are 10 Additional Directors (General, Soil Conservation, Extension, Projects, ISOPOM, Externally- aided Projects, Seed & Farm, Plant Protection, Training, Chief General Manager, U.P. Agro, and Agricultural Statistics). There are 39 Joint Directors of Agriculture, out of which 11 are posted at the headquarters and the remaining 18 are deployed at the Division level. The eleven JDAs at headquarters include JDA (Fertilizers), JDA (Flood Prone Areas), JDA (National Watershed Management), JDA (Planning), JDA (Bureau and Media), JDA (Cereals), JDA (Pulses), JDA (Quality Control), JDA (Research and Soil Survey), JDA (Principal, Agriculture College, Bulandshahar), and Superintendent (Agronomy). At the district/field level, there are Deputy Directors of Agriculture, District Agriculture Officer, Bhumi Sanrakshan Adhikari, Sub- Divisional Agricultural Extension Officers, Assistant Agronomists, Botanists, Regional Assistant Directors, out of which the first three officers are posted in each district whereas other officers are Page 136 UPBSN IESA Report for UPSLRP-III 136 posted depending upon the local situations. At the block level, there are Assistant Development Officer (Agriculture) and Assistant Development Officer (Plant Protection). No perceptible deficiencies are observed in the department in terms of the number of officers/staff in place against the sanctioned number. As far as skills are concerned, officers and functionaries at operational level are selected through open competitive examination. Thus, it can be safely assumed that they are skilled and competent. However, they may require some orientation and training on environmental and social aspects. 8.1.3 Department of Animal Husbandry Animal Husbandry Department will be responsible for implementation of livestock sub- component of the major component of Agricultural Support Services. The department will undertake following activities under the project: · Improvement in Animal Nutrition o Fodder seed demonstration o Mineral Mixture Demonstration · Animal Health o Vaccination Campaign o Organization of Animal Health Camps and Pashupalak Gosthi · Breed Improvement o Comprehensive Cattle Development Centers/programme o Breed improvement through Natural Service o Castration of Scrub Bulls The department is headed by the Director who is assisted by 3 Additional Directors and 9 Joint Directors. In addition, there are 51 posts of Deputy Directors. Field/district level officers of the department include Chief Veterinary Officer (at district level), Veterinary Officer (at veterinary hospital level), and Livestock Extension Officer and Veterinary Pharmacist (at Nyaya Panchayat level). Status of sanctioned and filled posts in the department is summarized in Table-8.1. TABLE-8.1 Status of sanctioned and filled posts in Animal Husbandry Department S. No. Post Sanctioned number Filled number 1. Director 1 1 2. Additional Director 3 0 3. Joint Director 9 1 4. Deputy Director 51 29 5. Chief Veterinary Officer 112 84 6. Veterinary Officer# 760 592 7. Livestock Extension Officer# 1284 662 8. Veterinary Pharmacist# 699 577 # In project districts It is clear from above that some posts of Veterinary Officers, Livestock Extension Officers and Veterinary Pharmacists are vacant. The department will have to fill up the vacant posts, at least in the project districts so that project implementation does not suffer. As far as quality of manpower and competence are concerned there is standard and robust procedure to fill up different post through competitive examinations. There seems no scope of apprehension about the skills and competence of the officers and staff. Page 137 UPBSN IESA Report for UPSLRP-III 137 8.1.4 Panchayati Raj Department Some of the project interventions such as establishment of Sodic Haat and Ruminant markets will be implemented with the cooperation of Panchayati Raj department. Moreover, Gram Panchayat will be responsible for management of these markets in their respective jurisdictions. The department is headed by the Director, Panchayati Raj who is assisted by a Joint Director, Panchayati Raj. In addition, there are Deputy Directors at the Division level (in selected divisions). Other officers/functionaries of the department include District Panchayati Raj Officer and Assistant District Panchayati Raj Officer (in select districts) at district level, Assistant Development Officer (Panchayat) at block level, and Gram Panchayat Adhikari at Gram Panchayat level. The status of sanctioned and filled posts in Panchayati Raj Department is given in Table-8.2. TABLE-8.2 Status of sanctioned and filled posts in Panchayati Raj Department S. No. Post Sanctioned number Filled number 1. Director 1 1 2. Joint Director 1 1 3. Deputy Director 11 11 4. District Panchayati Raj Officer 70 70 5. Assistant District Panchayati Raj Officer 38 38 6. Assistant Development Officer (Panchayat) 809 809 7. Gram Panchayat Adhikari 8135 8135 It is clear from above information that all the sanctioned posts are filled in the department. Thus, there is no deficiency in terms of number of officers/functionaries. As far as skills and competence of the officers and staff are concerned, there seems no scope of apprehension because all of them are selected and recruited through competitive examination. 8.1.5 Irrigation Department Irrigation Department will be responsible for rehabilitation and maintenance of main drains. The department is headed by the Engineer General who is assisted by Engineer-in-Chief, Zonal Chief Engineers and Chief Engineers. Superintending Engineers are posted at Drainage Circles/Divisions. District/field level staff includes Executive Engineers, Assistant Engineers and Junior Engineers. Current staff position in the project area is summarized in Table-8.3. TABLE-8.3 Status of sanctioned and filled posts in Irrigation Department S. No. Post Sanctioned number Filled number 1. Superintending Engineer 3 1 2. Executive Engineer 16 14 3. Assistant Engineer 40 27 4. Junior Engineer 105 56 Page 138 UPBSN IESA Report for UPSLRP-III 138 In the proposed project areas, many posts are vacant in the Irrigation Department. These posts should be filled at an early date so that work under the project could take off simultaneously with the project. The process of selection of engineers is open and competitive. Thus, technical skills and competence of the staff are reasonable. However, they may need some orientation and training on environmental and social aspects of the project. Analysis of staff strength of different line departments indicate that some posts are vacant which requires to be filled up before the start of the project, especially in project districts. As far as skills and competence is concerned there is little scope of doubt because the mostly the staff members are selected and deployed through open and competitive examination. However, they will need training and capacity building on environmental and social aspects. 8.1.6 Water Management Committees As per the Terms of Reference, IESA study also envisaged assessment of the functioning of Water Management Committees (a sub-committee under Gram Panchayat) where Site Implementation Committees have been merged with Gram Panchayat under previous phases of the project. Assessment was undertaken through interaction with Gram Pradhan, Upa Pradhan and other members of Gram Panchayat, general villagers. Such interactions were undertaken with the help of a checklist. Findings are discussed below: Water Management Committee is one of the 6 committees constituted by Gram Panchayat for carrying out different roles/functions expected from the Gram Panchayat. Assessment revealed following points: ƒ Respective Gram Panchayats have constituted the 6 Panchayat Committees in accordance with extant norms including adherence to the reservation norms. ƒ Various committees are in place. ƒ Though Panchayat Committees have been entrusted separate roles, entire Gram Panchayat gets involved in execution of various activities at Gram Panchayat level, thus the identity of the Panchayat Committees including Water Management Committee gets mixed up with that of Gram Panchayat. ƒ The concerned Government Order had merged the Site Implementation Committee into Water Management Committee of the Gram Panchayat. As result, the size of this committee became very large, many times larger than the Gram Panchayat itself. Consequently, the constituent character of the Water Management Committee gets lost. ƒ Effectiveness of Water Management Committee, or any committee for that matter, is dependent on the dynamism of the Gram Pradhan. ƒ Thus, effectiveness of Water Management Committee or any other committee is directly related to vibrancy of Gram Panchayat as a whole and it’s Gram Pradhan. ƒ Awareness among general people about the roles and functions of Panchayat Committee is low. ƒ Meetings of Panchayat Committees do not take place regularly; rather are held as per need. Suggestions for further improvement Findings clearly reveal that functioning and effectiveness of Water Management Committee and other committees depend on overall effectiveness and vibrancy of Gram Panchayat as a whole. Some suggestions are forwarded hereunder to improve functioning of Gram Panchayat and its committees. Page 139 UPBSN IESA Report for UPSLRP-III 139 (i) Since formal meetings are the only mechanism of functioning of Gram Panchayat and Gram Sabha they must meet regularly to discharge their functions. But it has been observed that Gram Panchayat and Gram Sabha do not meet as per the decided frequency in spite of strict guidelines issued in this regard. It is attributed to lack of follow up, crosscheck, and enforcement mechanisms. To install such mechanism one way could be to make it mandatory for Gram Panchayats to submit detailed proceedings of the meetings (certified by all the members) to the competent authority on yearly basis. The Government will have to make some penal provisions for non- adherence to the meeting frequency and non-compliance to the issued instructions. (ii) As per standing guidelines, the Gram Panchayat should perform its activities through 6 Panchayat committees. But it has been observed that these committees get mixed up with Gram Panchayat. Such situation is attributed to lack of suitable provisions to ensure the adherence to guidelines. A statutory/executive provision can be made under which committees have the sole authority to plan the activity and receive and expend the funds related to their respective jurisdiction. However, such plans and proposals should be placed in Gram Panchayat and Gram Sabha meetings in order to obtain acceptance of Panchayat members and villagers. (iii) Awareness about roles and responsibilities of Gram Panchayat, especially Panchayat Committees, is low among general villagers. Their knowledge empowerment is not less important if local self-governance is the objective because it is the general villagers who are members of Gram Sabha. Print and electronic media can be utilized in order to raise the awareness level of people. 8.1.7 Non-Government Organizations (in earlier project areas) Field assessment indicated that farmers/beneficiaries were fully satisfied with the functioning of NGO workers posted at village level. People’s feedback about NGO workers is summarized below: ƒ They (NGO workers) used to devote considerable time with farmers. ƒ They always behaved like farmers’ friends. ƒ They played crucial role in awareness generation among people about the project. ƒ NGO workers were able to convince the farmers that project support in cash or kind would not be recovered from farmers later. ƒ The critical guidance required by water users’ groups and self-help groups in group conduct and record keeping including preparation of agenda, proceedings, etc was ably provided by these workers. ƒ Success SHG-bank linkage program is attributed mainly to these workers. ƒ At many occasions, they were instrumental in resolving intra-group conflicts. ƒ NGO workers were the key link between UPBSN and farmers for two-way flow of information. On one hand, they forwarded the complaints and grievances of farmers to UPBSN and on the other, circulated the instructions and schedules to farmers. ƒ They acted a facilitator in implementation of different project activities including OFD, boring, field and link drain and crop production through guiding the farmers about the schedule, quality of work as well as technology. ƒ They were key players in functioning of various institutions like SIC, WUG and SHG. Thus, beneficiaries and other farmers expressed their satisfaction with the NGO workers. 8.2 CAPACITY BUILDING PLAN The project is anticipated to leave various environmental and social impacts which may be positive (desirable) or negative (undesirable). There will be need for combination of maximin and Page 140 UPBSN IESA Report for UPSLRP-III 140 minimax strategies to address such impacts. While maximin strategy should aim at maximization of minimum possible positive outcomes from each activity, the minimax strategy should target to minimize the maximum probable undesirable outcomes. A separate chapter of this report has outlined various positive and negative environmental and social impacts of the project intervention. The aim is to enhance the positive impacts and reduce the negative impacts of the project intervention. Suggestions have also been forwarded for this purpose. Willingness and capacity of different stakeholders will be the most important determinant of the success. Thus, capacity-building of farmers and functionaries of UPBSN and line departments will be necessary to improve environmental and social performance of the project. The IESA study has attempted to cover these issues as per the Terms of Reference. Findings are discussed in following paragraphs. 8.2.1 Ways & means to improve environmental and social performance of project Environmental and social performance of the project will depend, as the performance of any other domain will, on clarity of objectives and goals, meticulous planning, sincere implementation, and rigorous monitoring and evaluation along with compliance review and action mechanism. As far as the objectives are concerned there is not ambiguity in this respect. The aim is to reduce adverse environmental and social impacts and to enhance the positive outcomes. Chapters 8 and 9 have elaborated in detail the impacts and Environmental and Social Management Framework, respectively. Environmental issues are mainly technical in nature and need to be handled technically. However, adequate sensitization of various stakeholders, especially implementation partners such as UPBSN (the agency mainly responsible for implementation of OFD and Land Treatment), Irrigation Department (responsible for rehabilitation and maintenance of main drains), Agriculture Department (responsible for organization of demonstrations, crop cutting experiments and seed certification) and Animal Husbandry department (responsible for livestock development through breed improvement, animal health care, etc). Though these departments are aware of both positive and negative impacts of their activities they need additional sensitization so that all possible precautions are taken to avoid negative outcomes and enhance the positive outcomes. Farmers need to be sensitized and cautioned against negative environmental impacts and the steps which they could adopt for the same. Social issues such as probable conflicts, caste and other socio-economic dynamics should be kept in mind while planning and implementing the project activities. Project functionaries including the line department staff should be apprised of these inherent conflicts and socio-economic dynamics which exist in the rural areas so that they take preemptive measures against these negative forces. In a nutshell, sensitization and orientation of stakeholders is the key way to improve the environmental and social performance of the project. i. Skill and capacity-building requirements Skill and capacity-building requirements may be different for different levels of stakeholders. Summary of these requirements at various stakeholder levels is given inTable-8.4. TABLE-8.4 Summary of capacity-building requirements at various stakeholder levels Stakeholder level Skill and capacity-building requirement Individual ƒ Individual level measures to avoid adverse environmental impacts ƒ Sensitization to covariate factors affecting the environment ƒ Trade - off between short term and long term gains from Page 141 UPBSN IESA Report for UPSLRP-III 141 Stakeholder level Skill and capacity-building requirement various activities ƒ Socio-economic heterogeneity existing the villages and measures to overcome for common cause Farm/household ƒ Individual level measures to avoid adverse environmental impacts ƒ Sensitization to covariate factors affecting the environment ƒ Trade-off between short term and long term gains from various activities ƒ Socio-economic heterogeneity existing the villages and measures to overcome for common cause ƒ ƒ Orientation and sensitization of women and if possible children about all the above issues Water Users Groups ƒ Necessity of group approach in planning and execution of irrigation system development including irrigation channel network, field drain network, construction and maintenance of link drains through watershed approach ƒ Water sharing among group members ƒ Preparation of water roster on consensus basis to enhance transparency and to avoid disputes and conflicts in water sharing ƒ Planning of crop rotation and crop mix ƒ Collective management of agricultural inputs ƒ Ways to overcome socio-economic heterogeneity for the common cause Community ƒ Mass awareness in order to develop a community for environmental and social aspects ƒ Sensitization of community towards environmental and social issues so that individual efforts of farmers het support from the community ƒ Developing community ownership of various concerns affecting the entire community Institutional ƒ UPBSN and other line departments need to prepare separate action plan to address environmental and social issues concerned with their respective activities as detailed in chapter 8 of this report ƒ Awareness among all the functionaries of implementing agencies ƒ Officers and functionaries of UPBSN and line departments are technically sound. However, they are generally driven by targets set by the project or higher authorities. As a result, they neglect environmental and social aspects of their activities. They need to be alerted against negative outcomes of their activities and probable measures to reduce the same. District ƒ Since district level officers and functionaries of the project and line departments will be entrusted with the direct responsibility of implementation, they need adequate orientation to environmental and social issues. ƒ They need to be trained on environmental and social settings in which they will function for which location-specific knowledge base should be created and communicated to these officers and functionaries. State ƒ State level officers should be oriented about the environmental and social settings of all the project districts Page 142 UPBSN IESA Report for UPSLRP-III 142 Stakeholder level Skill and capacity-building requirement and the state as a whole. ƒ Sense of ownership needs to be developed at the top management level 8.2.3 Convergence with overall capacity-building plan UPBSN has already prepared a plan (refer Project Implementation Plans prepared by UPBSN) for capacity building of project functionaries and farmers. Environmental and social aspects could be built into this plan in order to ensure efficiency and effectiveness of these programmes. Various training material planned to be developed for overall training and awareness generation should include a separate section on environmental and social aspects. New sets of pamphlets, flip charts, booklets should be designed, printed and distributed to the concerned stakeholders. At farmers’ field school, some specific-purpose Master Trainers should be identified and trained. These master trainers would impart training to farmers on environmental and social issues. SIC training should include sessions on environmental and social issues. When these issues are integrated into the overall training and capacity building plan of the project it will be more effective. Moreover, farmers and other trainees will realize the real importance of these issues; otherwise they tend to adopt indifferent approach towards these issues as they are soft skills. Similarly, environmental and social issues should be included in the training programmes for officers and functionaries of UPBSN and line departments. Institutional arrangement There should/will be a separate Training Cell at UPBSN headquarters which will plan, coordinate and implement the training and capacity building activities. The Training Cell at UPBSN headquarters will coordinate with the identified institutes/agencies for sending batches of trainees there. The Cell will function in close coordination with the Environment Cell and Participatory Management Cell so that environmental and social issues are adequately addressed in training programmes. At the district level, a dedicated staff should/would be posted who will coordinate all training activities in the district. At sub-district level, field staff including NGO workers will/should be entrusted the responsibility of coordinating the training and capacity building activities. Farmers’ Field School can play an important role in capacity building on environmental and social aspects of the project intervention. These schools should be adequately strengthened through literature, infrastructure and financial support to organize training programmes at the local level. This arrangement will also improve attendance in training sessions. Timeline Schedule of capacity building should be drawn in such a manner that it caters to both orientation and refresher requirement of a given audience. Thus, training programmes should be organized for different project functionaries immediately after their induction and at regular intervals for reminder/refresher purposes. The capacity-building initiative needs to be a continuous process for farmers because the reclamation programme is slated to be implemented for 4 cohorts. The suggested timelines of the capacity building of project officers/functionaries and farmers are described in table 8.5 below: TABLE 8.5 Page 143 UPBSN IESA Report for UPSLRP-III 143 Timeline of capacity-building initiatives for functionaries and farmers Target group Year-1 Year-2 Year-3 Year-4 Year-5 Individual Farm/household WUG Community Institutional District State Notes: Continuous Orientation Refresher Page 144 UPBSN IESA Report for UPSLRP-III 144 CHAPTER-9 ENVIRONMENTAL MONITORING PROGRAMME 9.1 THE NEED Environmental monitoring is an essential component for sustainability of any developmental project. It is an integral part of any environmental assessment process. A land reclamation project introduces complex inter-relationships in the project area between people, various natural resources, biota and the many developing forces. Thus, a new environment is created. It is very difficult to predict with complete certainty the exact post-reclamation environmental scenario. Hence, monitoring of critical parameters is essential in the post-reclamation phase. An Environmental Monitoring Programme has been designed with the following objectives: · Assess the changes in environmental conditions, if any, during reclamation and post- reclamation phases of the project. · Monitor the effective implementation of mitigatory measures. · Warning of any significant deterioration in environmental quality so that additional mitigatory measures may be planned in advance. From the monitoring point of view, the important parameters are water quality, soil quality, agriculture related issues, socio-economic aspects and project implementation monitoring aspects. Suggested monitoring details are outlined in the following sections. 9.2 GROUND WATER LEVEL AND QUALITY MONITORING As a part of groundwater monitoring, open wells, tube wells and peizometers need to be monitored. It is envisaged that open wells, tube wells, and peizometers (to be installed) as a part of the project within the sodic land shall be monitored for ground water levels. The monitoring is to be done in both pre (May-June) and post monsoon (October-November) seasons. In addition to above, tube wells and open wells will also be monitored for ground water quality. The water quality too is proposed to be monitored twice in a year i.e. pre monsoon (May-June) and post monsoon (October-November). The parameters to be analyzed are listed as below: · pH · Electrical Conductivity · Carbonates · Bicarbonates · Chlorides · Calcium · Magnesium · Sodium Page 145 UPBSN IESA Report for UPSLRP-III 145 · Potassium · Total Dissolved Solids · Residual Sodium Carbonate · Sodium Adsorption Ratio · Percent Sodium 9.3 DRAIN WATER QUALITY MONITORING The surface water monitoring is essential to study the impact of soil reclamation on the quality of water flowing out of the reclaimed area through the field and link drains into the natural drains system. It is also ensure that downstream users of drainage waters are not being adversely affected by this water. In view of the above, water samples from various link and main drains including out fall locations is proposed to be collected once every year during monsoon period (August-September). The parameters to be monitored are listed as below: · pH · Electrical Conductivity · Carbonates · Bicarbonates · Chlorides · Calcium · Magnesium · Sodium · Potassium · Total Dissolved Solids · Residual Sodium Carbonate · Sodium Adsorption Ratio · Percent Sodium 9.4 DRAIN BED The soil samples from bed of the drains rehabilitated as a part of the project be collected and anlaysed prior to rehabilitation. The monitoring is to be done once for each drain. The parameters to be analysed are given as below: · pH · Electrical Conductivity · Total Dissolved Solids · Total Kjeldahl Nitrogen · Phosphates · Chlorides · Nitrates · Phosphates 9.5 SOIL QUALITY Page 146 UPBSN IESA Report for UPSLRP-III 146 One representative site in each district is proposed to be selected for annual soil monitoring. Thus a total of 25 soil monitoring sites need to be monitored. At each site, 12 plots can be selected, from reclaimed land with four plots each from class B+, B and C categories of sodic land use classes. Another nine plots can be selected from non-reclaimed land with three each from land use class B+, B, and C. The location of non-reclaimed plots can be close to drains but not more than 50 m from an improved drain. Soil samples shall be taken each year after rabi crop from three locations within each plot at depth intervals of 0-15 cm, 15-30 cm, and 30-60 cm. From one location in each plot, soil samples will be taken at a depth of 160 cm. The soil sampling can also include the collection and analysis of soil samples from sites where piezometers shall be installed. Three set of soil samples can be collected to a depth of 160 cm in increments of 0-15, 15-30, 30-45, 45-60, 60-75, 75-90, 90-120, and 120-160 cm. These samples will be collected within the plots where gypsum is proposed to be applied for reclamation. A set of soil samples shall also be collected before the beginning of reclamation activity on these plots. The parameters to be monitored are listed as below: · pH · Electrical Conductivity · Calcium · Magnesium · Sodium · Potassium · Sodium Adsorption Ratio 9.6 PROJECT DURABILITY STUDY The project durability study envisages monitoring the effect of reclamation programme on a long- term basis. Monitoring can be done at one location per district through digital analysis of satellite data of a period prior to reclamation (zero year) and subsequently after a period of 3-5 years. The area under cropping can be monitored using IRS-1C/1D satellite imageries. The post-reclamation status of these plots can be compared with plan map and beneficiary list provided by UPBSN and percentage of plots under crops can be ascertained. 9.7 WETLANDS The wetland study can be conducted in Etawah and Mainpuri districts,which are home to approximately 3000 Saurus Cranes. The studies on changes in water spread and water quality of wetlands is recommended to be conducted. The IRS LISS-III satellite data of rabi, pre and post monsoon periods can be analyzed for a period of five years from 2009 to 2013 for 5 wetlands i.e. Sarsai Nawar jhil, Sauj Tal, Cheonri Tal, Hasil Tal & Amberpur Tal to assess the spread of water during different seasons and extent of aquatic vegetation in the wetlands area. In addition, water quality of wetland can be monitored twice a year, i.e. summer and winter seasons. The parameters to be monitored are listed as below: · pH · Electrical Conductivity · Turbidity Page 147 UPBSN IESA Report for UPSLRP-III 147 · Phosphates · Total Kjeldahl Nitrogen · Dissolved Oxygen · Biochemical Oxygen Demand · Chemical Oxygen Demand · Total Coliform · Fecal Coliform · Escherichia coli 9.8 AGRICULTUE AND SOCIO-ECONOMIC ASPECTS It is recommended that concurrent evaluation approach be adopted for the project. It consists of analytical comparison of agricultural and socio-economic status of project beneficiaries in pre and post-project (with project) scenarios. This is proposed to be done through pre-reclamation benchmark assessment and monitoring the selected beneficiary-households for three consecutive years after leaching in each reclamation phase area. Paddy (grown during Kharif season) and wheat (grown during Rabi season) being major agricultural outputs, post-reclamation assessments can be conducted immediately after harvest of paddy and wheat crops respectively. Such assessments can be conducted on the same selected beneficiary-farmers who were covered in pre- reclamation benchmark assessment in order to make pre-project and post-reclamation findings fully comparable. Each reclamation phase can then be revisited at the project-end. Hence, in every reclamation phase, assessment is proposed to be carried out at eight stages. These stages of assessment were: i. Pre-reclamation benchmark assessment (immediately before leaching); ii. Post-Kharif-1 assessment (immediately after harvest of post-reclamation first Kharif crop); iii. Post-Rabi-1 assessment (immediately after harvest of post-reclamation first Rabi crop); iv. Post-Kharif-2 assessment (immediately after harvest of post-reclamation second Kharif crop); v. Post-Rabi-2 assessment (immediately after harvest of post-reclamation second Rabi crop); vi. Post-Kharif-3 assessment (immediately after harvest of post-reclamation third Kharif crop); vii. Post-Rabi-3 assessment (immediately after harvest of post-reclamation third Rabi crop) viii. Project-End assessment For properly capturing the improvements and impacts of reclamation on various socio-economic aspects the ‘Agricultural and Socio-economic Impact Assessment Study’ two-fold data collection methods, viz., Survey and PRA approaches is proposed to be adopted. Survey approach For household survey during the benchmark assessment, a 10 percent beneficiary sample can be drawn in accordance with stratified-random sampling method on the basis of such factors as caste category, landholding size and land class. The same selected beneficiary-households will be surveyed during the post-Kharif-1 and Post-Rabi-1 assessments. Sample size can be reduced to 4 percent for the post-reclamation assessments during the second and third years. Household surveys is proposed to be conducted with pre-tested interview schedules that were designed on Page 148 UPBSN IESA Report for UPSLRP-III 148 the basis of agreed agricultural and socio-economic indicators. Separate schedules can be designed for pre-reclamation benchmark, post-kharif, and post-rabi assessment surveys. PRA approach PRA method of data collection is proposed to be adopted at three stages of assessment in each of the reclamation phase areas: (a) Pre-reclamation benchmark assessment, (b) Post Rabi-1 assessment, and (c) Project-end assessment. The PRA will be carried out in 3 villages per district. PRA studies will be conducted with help of various tools and techniques including Focus Group Discussion, Trend Analysis, Seasonal Analysis, Pie Charting, Transect Walk, Resource Mapping, Social aping, Paired Ranking, Problem Analysis, etc. The information on following aspects is proposed to be collected as a part of the household survey. a. Beneficiary Profile · Caste composition of beneficiaries · Family profile · Composition of beneficiaries w.r.t. land holdings · Landholding · Land undertaken for project intervention b. Agricultural aspects · KHARIF CROP COVERAGE · RABI CROP COVERAGE · ZAID CROP COVERAGE · GREEN MANURE COVERAGE · ANNUAL CROPPING INTENSITY · Input use in crop (seed rate, use of improved seed, irrigation frequency, farmyard manure application, nitrogen application, phosphorus application, potash application) · Crop yield · Net income from cultivation of sodic land c. Socio-economic aspects · Value of land · Employment from sodic land · Wage employment to labourers · Wage rate · Labour migration · Annual Income · Incidence Of Poverty Page 149 UPBSN IESA Report for UPSLRP-III 149 · Access to amenities (House accommodation, Drinking water source, Farm implements/equipments, Electric/electronic goods, Conveyance goods/vehicles, Health and hygiene) · livestock holding · Access to land · Women empowerment (Educational empowerment, Financial empowerment, Economic empowerment, Social empowerment) · Capacity building & human resource development · Farmer-led Extension Mechanism – Kisan Vidyalaya · Social capital building d. Livestock · Total livestock · No. of livestock with improved breed · No. of desi livestock breed · Incidence of diseases in livestock · Productivity of various livestock 9.9 PROJECT IMPLEMENTATION MONITORING Based on successful experience in the phase-I and phase-II of the UPSLRP, it is proposed to that concurrent monitoring & evaluation of project implementation be made in the UPSLR-IIIP as well Concurrent monitoring will be an on-going process of tracking the execution of the project activities at different levels in order to provide timely feedback to the project management for necessary mid-course corrections. To achieve its objectives, the monitoring system for the project shall have both internal and external mechanism. Internal monitoring mechanism shall focus on administrative and financial review and control and follow up whereas the external monitoring shall concentrate on generating an un-biased third-eye-view of the project performance in terms of achievement of established milestones with adherence to the recommended process and quality parameters within the purview of overall objectives of the project. The following steps are proposed for the conduct of concurrent monitoring: · Designing of activity schedules for each and every project activity along with execution responsibility and time schedule. · Development of performance indicators (qualitative and quantitative) on the basis of activity schedule. · Review of monthly, quarterly and annual reports prepared by the UPBSN and participating agencies to understand the reported project progress before visiting project sites · Regular visits to project villages as per the agreed methodology. In such visits, monitoring team shall emphasise on time and quality adherence in the execution of project activities and identification of gaps and constraints faced by the field staff in carrying out their task. · Monthly reports (written in Hindi) to be submitted to top management, district project managers, concerned deputy manager (the person responsible for project implementation at the sub unit level), and concerned assistant manager (the field staff responsible for project implementation at the village level). Page 150 UPBSN IESA Report for UPSLRP-III 150 · A system of Compliance Review Mechanism (on monthly basis) to be instituted and operationalized by the UPBSN to monitor whether or not the required actions were being taken in time bound manner. · Visit to field offices and interview of field officers/functionaries (on quarterly basis) to develop an objective view of the progress being made and whether or not proposed project goals are being achieved. A list of indicators to be finalized after which suitable formats can be prepared. The list of indicators is given as below: Borings · Total borings planned for the project in visited villages (Existing, New) · New borings drilled · Development of newly-drilled borings · MB of newly-drilled & developed borings · Final payment of new borings · Delivery Tank Constructed · Delivery Tank incentive paid · Dedicated pumpset available · Boring failed Link Drains · Number of link drains - Target · Number of link drains - Achievement · Length (meters) of link drains - Target · Length (meters) of link drains - Achievement · MB of constructed LD (Number) · MB of constructed LD (Meter) · Final payment of LD (Number) · Final payment of LD (Meter) Number of link drains physically visited · Planned length of the LD (Meter) · Actual length constructed (Meter) · Length of LD physically visited by monitoring staff (Meters) · Pucca profile at every 500 mtr: no. of LD · Pucca Bedbar at every 100 meters: no. of LD · Berm (1 fit) left: no. of LD · Cross-section intact: no. of LD · Blocking bunds found: no. of LD · Siltage observed: no. of LD · Weeds & grasses found: no. of LD Finalization of payment (No.) · Link drain · Boring · Delivery tank · Field drain · Leveling Page 151 UPBSN IESA Report for UPSLRP-III 151 · Gypsum mixing · Water charges (Leaching) Finalization of payment · Link drain · Boring · Delivery tank · Field drain · Leveling · Gypsum mixing · Water charges (Leaching) SIC · Has SIC account been opened? · Kharif-1 deposit in SIC account (Rs) · Rabi-1 deposit in SIC account (Rs) · Kharif-2 deposit in SIC account (Rs) · Rabi-2 deposit in SIC account (Rs) · Current balance in SIC account (Rs) · SIC reviewed (no. of villages) · SIC meetings expected during last 6 months (No) · SIC meetings actually held during the last 6 months (No) Gross number of reviewed meetings (latest 5 meetings) · No. of meetings in which AM was present · No. of meetings in which NGO was present · No. of meetings for which agenda was prepared · No. of meetings of which agenda-wise minutes were prepared · No. of meetings in which decisions of last meetings were reviewed · No. of meetings in which Core Team Review was done Water User Groups · Number of groups · WUG account opened · Caste category of Group leader (GC, BC, SC) · Landholding category of Group leader (Marginal, Small, Big) · Boring for the Group [Existing] · Boring for the Group [New] · Boring in the plot of [Group leader] · Boring in the plot of [Other farmer] · Fixation of water charges on cost basis [Done] · Preparation of roster [done] · Following roster [Yes] · Logbook acquired/purchased? [Yes] · Logbook being maintained regularly · Delivery tank constructed · Payment for DT received · Entitlement list pasted in WUG register Page 152 UPBSN IESA Report for UPSLRP-III 152 · Group map drawn · Soil testing results recorded · Recording of payments & receipts No of WUG visited · No of plots visited · Bunding done · Bunds intact · Is plot leveled · IC exists · Field drain exists · Rabi sowing done · Paddy transplanting done Women Self Help Groups · Number of WSHG reviewed · Number of members in the group (GC, BC, SC, total , Averagae) · Number of literate group members (At the time of group formation, at present) · Regular meeting: no. of groups · Regular meeting: % of groups · Regular saving: no. of groups · Regular saving: % of groups · Cumulative saving till date (Rs.) · Average cumulative saving (Rs/group) · Bank linkage: no. of groups · Bank linkage: % of groups · Gross CCL (Rs.) · Average CCL (Rs./linked group) · Number distribution of Internal Loans by purpose (Agriculture, IGA, other purposes) · Gross amount of internal loaning (Rs.) · Average amount of internal loaning (Rs./group) Page 153 UPBSN IESA Report for UPSLRP-III 153 ANNEX-I SCOPE OF WORK FOR INTEGRATED ENVIRONMENTAL AND SOCIAL ASSESSMENT STUDY 1. SCOPE OF WORK With respect to the Social Assessment (SA), the Consultants(s)- should adopt a `four pillar' strategy. This involves (i) identifying key social development and participation issues; (ii) evaluate institutional and social organizational issues; (iii) defining the participation framework; and (iv) establishing social-based indicators for monitoring and evaluation. As regards the Environmental Assessment (EA), the Consultants should adopt the approach outlined in World Bank Operational Policy on EA (4.01). The EA will be conducted to develop a framework to ensure that the environmental issues are fully considered and addressed in the project design, preparation and implementation. The EA strategy would include, but not limited to, (i) identification of key environmental issues related to land degradation and reclamation; (ii) identifying and analysing the adverse impacts of proposed investments under the project; (iii) assessing the legal/policy/and institutional arrangements to tackle adverse environmental issues; and (iv) develop appropriate M&E plan including relevant indicators. The scope of ISEA includes the following specific aspects. 1.1 Main Elements of the IESA (a) Stakeholder assessment and social analysis: Initiate participation process by identification of stakeholders (including the project beneficiaries, those who can influence the project outcome like NGOs, village committees, Gram Panchayats (GP), project implementers, affected persons etc.) their concerns, roles and responsibilities in planning, implementing and monitoring project activities and develop a strategy for continuing this process; (b) Establishing indicators and baselines for key environmental and social parameters including, but not limited to, socio-economic conditions, land use and tenure, agricultural practices and use of fertilizers/pesticides, drainage water quality, existing market practices etc. This would be used for monitoring and evaluation (M&E) as part of project Page 154 UPBSN IESA Report for UPSLRP-III 154 implementation. The consultants shall clearly define the environmental and social development outcomes of the project and develop indicators and criteria for the same for M&E at regular intervals and at completion. (c) Identifying the detailed positive and negative social and environmental impacts of the proposed project activities and measures to enhance the positive social and environmental impacts. The Consultants would need to establish a framework for identification, mitigation response and monitoring of the adverse impacts as part of the IESA. On the social side there is a risk that the project could benefit certain (more elite) sections of a community disproportionately. On the environmental side the project could drain certain natural/man-made wetlands and threaten biodiversity. (d) Identifying vulnerable groups and their role in the proposed project, taking care to ensure their proactive participation in the decision making process for the location, development and management of markets, as well as other opportunities for income generating activities related to agriculture marketing. Vulnerable groups (e.g. women, tribal, landless and other such groups) within a community are traditionally marginalized from local decision making (including market management decisions) for a variety of complex reasons (e.g. caste dynamics, local perspectives on gender-based division of labour etc.). The Consultants will examine and identify initiatives in which decision making could be made more transparent and vulnerable groups can have greater voice in planning, implementation and monitoring of various project activities in all the identified sites. (e) Assessment of physical and/or economic displacement caused by the project and the development of Resettlement Action Plan (RAP) including participation of potentially affected groups. The project envisages land development, drainage improvement and infrastructure development, which may result in new land acquisition and/or appropriation, physical and/or economic displacement. The issue of encroachments in the project sites is an important issue that needs focussed attention. The Consultants will identify the type and extent of these losses and the segments of population that are affected. The Consultants will focus on two aspects: (i) identification of adverse impacts by type and extent, (ii) development of a policy and procedural framework (including R&R entitlement framework) to mitigate specific adverse impacts identified and to address any negative impacts due to the project. On the first aspect, the SA will necessarily include users of land irrespective of their ownership. Encroachment in the project sites and loss of livelihood opportunities may be the major issues that the SA would focus on to define mitigation measures. The Consultants will, therefore, as part of social policy framework and, prepare detailed guidelines to identify adverse impacts and suggest mitigation measures. Based on the impacts identified and measures to mitigate these adverse impacts, a Social Mitigation Plan (SMP) including RAP, where ever required, would be prepared. Generic principles will include compensating losses for the project activities and the institutional arrangement to identify adverse impacts; plan, implement and monitor SMP/RAP. (f) Assessing impacts on vulnerable groups (including women): The vulnerable groups including scheduled castes, women, landless families, marginal and small framers constitute significant proportion of the project beneficiaries and. therefore. it is important that their issues, in relation to the proposed project interventions are addressed up-front mainly to enhance their participation in the project and to ensure that they have access to project benefits. The Consultants would therefore define principles and develop a framework on how to address issues related to vulnerable groups; and promote transparent consultations and informed choices in decision making. The consultants will prepare Gender Development strategy and strategies for the development of other vulnerable groups. Page 155 UPBSN IESA Report for UPSLRP-III 155 (g) WiIlingness of the community to contribute: The project envisages contribution from the community to take up land development and infrastructure works. As part of the assessment, the Consultants will assess the wiIIingness of the project beneficiaries to contribute to the infrastructure development under the project. At the same time, it is expected that the Consultants would ascertain the extent and type of contribution; and the terms and conditions for the same. In this regard, the IESA consultant will assess the success in ensuring community contribution for the O&M of assets created under previous phases of the project. (h) Environmental impacts: The project envisages financing a range of activities including improvement of existing and new infrastructure, productivity enhancement measures, improving marketing etc (see Section 2 of TORs on project components). The negative impacts may arise from diverse activities under the project, for example, the earthwork and construction related activities and post land development agriculture. There could be both direct and indirect impacts. The direct impacts could be alteration/modification of the natural drainage pattern of the land, damage to surrounding natural wetlands either through draining them or inflow of untreated wastewater, farm runoff and effluents, impact on biodiversity, for example, on Sarus Crane that is know to colonize project areas etc. The indirect impacts may arise due to increased water use through extraction of groundwater, increased use of fertilizers and pesticides, soil and groundwater quality deterioration, pollution of surface waters, etc. The consultants would identify and prepare an inventory of possible direct and indirect negative impacts and develop appropriate mitigation measures for them. Wherever possible they may suggest cost effective alternate approaches, such as use of environment friendly materials, to prevent negative impacts. (i) Identifying possibilities to enhance positive impacts: The direct positive environmental impacts of these investments are expected to be improved drainage, increased soil productivity etc. Besides these, the project presents opportunity to positively impact environmental performance of proposed investments and current practices through awareness building, demonstration, extension on improvising farm practices to conserve natural resources and use of organic inputs. Consultants would provide recommendations to enhance farm productivity by use of environment friendly natural by-products, including assessing their availability etc. They would prepare an Integrated Nutrient and Pest Management (INPM) Plan to positively impact farm practices. It is essential that Consultants undertake field visits to observe, understand and document current Farm practices and this data/information would also constitute baseline data. (i) Assessing institutional issues: The Consultants well assess the institutional set up both at the project (state) and field (district) levels, identify the deficiencies (both in term of the number and skills required), if any and suggest improvements to ensure that social and environmental aspects are adequately addressed. Consultants will also identify where the required skills are available within the government agencies and skills that would be available in the open market. (k) Capacity building for mitigating adverse environmental and social Impacts and enhancing and replicating positive impacts: While the consultants would examine ways and means to improve environmental and social performance of existing, practices, they would assess what skills, training and capacity building needs would be required for achieving this at individual, farm, user group, community, institutional, district and state level. They would prepare a capacity building plan and also suggest an institutional mechanism/arrangement for implementing the plan. This plan would also include capacity building needs for the UPBSN for dealing with both environmental and social issues after careful assessment of its present capacity. (l) Analysis of induced impacts: The assessment will also include an analysis of the nature Page 156 UPBSN IESA Report for UPSLRP-III 156 and extent of induced impacts associated with the proposed project. This also includes issues such as any expected increase in pesticide use that may trigger the Bank Operation Policy on pest management that may require Integrated Pest Management and other mitigation measures to be included in the project. (m) Assessment of the existing policies and regulations that determine the social and environmental aspects of the proposed project activities and outline key enabling policy reforms that would be required in the short, medium and long-term to address these issues. The policy reforms could be at technology development and extension, institutional capacity and/or regulatory level that deals with issues/causes/reasons of land degradation and its reclamation and management The consultants should also look into the issue of convergence of other GOUP/GOI programmes and schemes that benefit project development objectives. (n) Development of an Environmental and Social Management Framework (ESMF): All the project activities (including sites for infrastructure strengthening and development) have not yet been identified and these will be identified as project implementation progresses. Further, there may be a number of other issues that might emerge during the course of the study and project preparation, which will need to also be examined under the IESA. Appropriate management plans to adequately address safeguard issues would have to be developed during the project implementation. For this purpose, an ESMF will have to be developed that would provide detailed procedures, adequate guidance and management framework during the project implementation for sub-projects triggering social and environmental issues. (O) Awareness-building, Information Management and Knowledge Base Development: There is a need to improve and share knowledge and skills both for the implementing agencies as well as the project communities and beneficiaries in many areas including environmental awareness, social conflict resolution mechanisms, participatory decision- making, monitoring and evaluation, etc. The consultants would prepare an Information, Education and Communication (IEC) strategy with clear timelines and roles and responsibilities of concerned stakeholders for managing information and knowledge base that empowers UPBSN for addressing environmental and social issues while undertaking similar activities elsewhere in the state with or without external support. (p) Assess functioning of community institutions: As part of the study the Consultant will assess the functioning of Water Management Committees (a sub committee under Gram Panchayat) where Site Implementation Committees have been merged with GP under previous phases of the project. Similarly, the Consultants will get feedback of the project beneficiaries on the functioning of NGOs in the implementation of the project activities. (q) Conflict resolution: The Consultants need to study and assess the social, economic, institutional and other conflict/risks and the existing resolution systems surrounding the use and management of natural and physical resources in consultation with the community and other stakeholders and apply the findings to see whether such systems \\iould also work for the new assets and opportunities to be created under the project. They would also assess State Government's willingness to support and implement risk mitigation measures to protect interest of these groups and recommend interventions to ensure communities access and benefits to common resources and well being and management of environmental resources through stakeholder participation in a transparent manner (r) Further Studies: During the course of carrying out the IESA, Consultants may discover certain important environmental and/or social issues that may not be covered adequately under the TORs of IESA. In such an event, Consultants may identify and recommend any other studies that need to be done for project implementation or post project Page 157 UPBSN IESA Report for UPSLRP-III 157 sustainability. 6. CONSULTATION 6.1 The Consultants will undertake substantial consultations with the key stakeholders all through the process of conducting the proposed IESA based on which a consultation framework will have to be developed to reflect local concerns in preparing and implementing individual project activities and sub-projects. The views of affected groups, project communities, NGOs, project functionaries, relevant government agencies and others should be fully taken into account in the preparation of the ESMF and mitigation measures. It is important to understand the nature and extent of any environmental and social impacts and the acceptability of the proposed mitigation measures, particularly to vulnerable and affected groups. Consultations should occur, at a minimum, during the screening/scoping of project activities and sub-projects, at the preparation of IESA report and ESMF. The Consultants will, therefore, prepare relevant information in a form/format that is meaningful and acceptable to the groups to be consulted (e.g. using local language). Such information should normally include a brief description of the project objectives and components and a summary of the key social and environmental issues, approaches and draft conclusions (e.g. framework and action plan). These have to be disclosed in accordance with the Bank's Disclosure Policy. The Consultants will prepare tools of observations (including questionnaires, guidelines for focus group discussions, consultations) and field test them before using them to collect required data/information. The Consultants should carefully document all stakeholder consultations including photographic records. 8. PUBLIC DISCLOSURE 7.1 The consultants will provide support and assistance to the client in meeting the disclosure requirements, which at the minimum shall meet the World Bank’s Policy on public disclosure and requirements under Right to Information Act of the government. The consultants will prepare a plan for in-country disclosure, specifying the timing and locations; translate the key documents, such as the IESA report, ESMF, R&R policy framework, Vulnerable Groups Development strategy: key mitigation measures for individual sub-projects both in English and in the local language; draft for the newspaper announcements for disclosure and placing them at the client's website, project office. district offices etc. Page 158 UPBSN IESA Report for UPSLRP-III 158 ANNEX-II WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) HOUSEHOLD QUESTIONNAIRE A01 Interviewer’s name A02 Interviewer’s code (2 digit) A03 Date of survey [dd/mm/yyyy] 1. IDENTIFICATION INFORMATION: VILLAGE A04 Name of Region (Eastern, Central, Western) A05 Name of District (Sultanpur, Kanpur Dehat, Etah) A06 Name of Block A07 Name of Nyaya Panchayat A08 Name of Gram Panchayat A09 Name of Revenue Village A10 Village code (To be assigned at the Central Office) 2. IDENTIFICATION INFORMATION: HOUSEHOLD & RESPONDENT A11 Name of household head (write full name) A12 Sex of household head (Male, Female) A13 Sex code of household head (Male=1, Female=2) A14 Name of father/husband of household head A15 Sub-caste (write description of sub-caste) A16 Caste category (General caste, Backward caste, Scheduled caste, Scheduled tribe) A17 Caste category code (GC=1, BC=2, SC=3, ST=4) A18 Name of respondent A19 Relation of respondent with the household head Page 159 UPBSN IESA Report for UPSLRP-III 159 3 . LANDHOLDING STATUS OF HOUSEHOLD A20 Total land owned by the household (bigha) A21 Inherited land (bigha) A22 Land purchased during last 5 years (bigha) A23 Land allotted (bigha) A24 Irrigated land out of total land owned by household (bigha) A25 Irrigated by canal (bigha) A26 Irrigated by tube well (bigha) A27 Irrigated by other sources (bigha) A28 Cultivated land (bigha) A29 Cultivated land – multiple cropped (bigha) A30 Cultivated land – mono cropped (bigha) A31 Reasons for mono-cropping [sodic=1, waterlogged=2, other (specify)=3 A32 Uncultivated land (bigha) A33 Reason for land remaining uncultivated [sodic=1, waterlogged=2, other (specify)=3 A34 Leased-in land (bigha) A35 Leased-out land (bigha) A36 Landholding category of household [Landless, Marginal (<1 ha), Small (1-2 ha), Large (>2 ha)] 4. FAMILY PROFILE (Total members in household: _____________) Particulars Male Female A37 Number of members Age distribution of members A38 Less than 7 years A39 7 to 14 years A40 15-60 years A41 More than 60 years Literacy & educational status of members aged 7 years and above A42 Total number of members aged 7 years and above A43 Number of literate members A44 Out of literate members how many are less than high school? A45 How many are high school? A46 How many are higher than high school? Page 160 UPBSN IESA Report for UPSLRP-III 160 A47 How many members are currently studying? Working status of family members A48 A49 Number of non-working members A50 Number of working members 5A. Occupation of working MALEs of household (Please refer to A50 above) Primary occupation Secondary occupation Particulars Occupation code Days of involvement (no) Occupation code Days of involvement (no) A51 First male worker A52 Second male worker A53 Third male worker A54 Fourth male worker A55 Fifth male worker 5B. Occupation of working FEMALEs of household (Please refer to A50 above) Primary occupation Secondary occupation Particulars Occupation code Days of involvement (no) Occupation code Days of involvement (no) A56 First female worker A57 Second female worker A58 Third female worker A59 Fourth female worker A60 Fifth female worker Page 161 UPBSN IESA Report for UPSLRP-III 161 Occupation codes: Salaried=1, Family farm=2, laborer=3, trade-business=4, profession/technical work (Doctor, Advocate, Driver, Mechanic etc.) =5, caste-based activities=6, other (Specify) 6A. Profile of MALE laborers from family/household (Please refer to 5A above) Particulars Male 1 Male 2 Male 3 Male 4 A61 Identification of member A62 Total number of wage earning days in year A63 Local A64 Outside A65 Wage rate (Rs/day) A66 Local A67 Outside A68 Nature of work performed# A69 Local A70 Outside 6B. Profile of FEMALE laborers from family/household (Please refer to 5B above) Particulars Female 1 Female 2 Female 3 Female 4 A71 Identification of member A72 Total number of wage earning days in year A73 Local A74 Outside A75 Wage rate (Rs/day) Page 162 UPBSN IESA Report for UPSLRP-III 162 Particulars Female 1 Female 2 Female 3 Female 4 A76 Local A77 Outside A78 Nature of work performed # A79 Local A80 Outside # Farm work=1, Civil work (Road & canal) =2, Brick field=3, Construction=4, Trades=5, Factory=6, Transport=7, Other (Specify) 7. NON-FARM & NON-LABOR INCOME OF HOUSEHOLD Particulars Amount (Rs) B01 Salary/service B02 Pension B03 Trade/business (Rs) B04 Profession/technical work (Rs) B05 Caste-based occupation (Rs) B06 Remittances from members living outside (Rs) B07 Any other cash income (Rs) Please specify the source in case of others 8. ACCESS TO CREDIT SN Particulars Status Source 1 Source 2 Source 3 B08 Sources of loan taken during last one year Source 1 Source 2 Source 3 B09 Purpose of loan taken during last one year Source 1 Source 2 Source 3 B10 Amount of loan taken during last one year Source 1 Source 2 Source 3 B11 Rate of interest on loan taken during last one year Source 1 Source 2 Source 3 B12 Outstanding amount on loan taken during last one year B13 Do you have Kisan Credit Card? [yes=1, no=2] B14 Cumulative amount withdrawn (Rs) B15 Outstanding amount as on today [Rs] 9. CROP HUSBANDRY Page 163 UPBSN IESA Report for UPSLRP-III 163 [Crop Codes: Paddy=1, Wheat=2, Barley=3, Jwor=4, Bajra=5, Maize=6, Arhar=7, Moong=8, Mustard=9, G arlic=10, Vegetables (specify) =11, Potato=12, Peas=13, Sugarcane=14, Gram=15, Dhaincha=16, Urd=17, Other (Specify) =18 S N Particulars 1 2 3 4 5 6 C01 Name of the crop C02 Code of the crop C03 Area sown under the crop (bigha) C04 Seed quantity used (kg) C05 Seed quality (certified=1, Others=2) C06 Preparatory irrigation given (yes=1, no=2) C07 Number of irrigation given after sowing (nos.) C08 Source of irrigation (canal=1, own tube well=2, other’s tube well=3, water lifted from river/pond=4, water lifted from drain=5, other source (specify)=6) C09 Did you use farmyard manure/cow dung before sowing? (yes=1, no=2) C10 If yes, quantity of FYM/cow dung used (qt) C11 Quantity of urea used (kg) C12 Quantity of DAP used (kg) C13 Quantity of MOP used (kg) C14 Quantity of Zinc sulphate used (kg) C15 Quantity of pesticides used (kg) C16 Name of crop disease which attacked the crop (if any) C17 Labor deployment: male laborers (mandays) C18 Labor deployment: female laborers (mandays) C19 Labor deployment: male family-labor (mandays) C20 Labor deployment: female family-labor (mandays) C21 Wage rate paid to male laborers (Rs/day) C22 Wage rate paid to female laborers (Rs/day) C23 Quantity of main product (quintal) C24 Value of main product (Rs.) C25 Quantity of byproduct (Quintal) C26 Value of byproduct (Rs) C27 Cost of cultivation (Rs) Page 164 UPBSN IESA Report for UPSLRP-III 164 1 0. ANIMAL HUSBANDRY / LIVESTOCK SN Particulars Status C28 Number of milking buffaloes with the household C29 Breed of buffaloes C 30 Average milk yield of buffaloes (liters/buffalo/day) C31 Number of milking cows with the household C32 Breed of cows C33 Average milk yield of cows (liters/cow/day) C34 Number of goats with the household C35 Breed of goats C36 Number of goats sold out (nos./year) C37 Number of sheep with the household C38 Breed of sheep C39 Quantity of wool obtained (Kg/year) C40 Number of sheep sold out (nos./year) C41 Number of poultry birds with the household C42 Breed of poultry birds C43 Egg yield (nos./bird/day) C44 Number of poultry birds sold out (nos./year) C45 Number and types of other animals with the household C46 Type of feeding practice [free grazing / stall feeding] C47 Types of fodder used [crop residue / fodder grass / others (specify)] C48 Source of fodder grass [purchased from market / forest] C49 Do you use any livestock feed? [yes/no] C50 If yes, please give details C51 Did any of the animals suffered from animal disease during last one year? [yes/no] C52 If yes, please give details of diseases and affected animals C53 Did you avail the services of professional veterinarians? [yes/no] C54 If yes, please give details of including charges paid C55 Did any animal died during last one year due to animal disease? [yes/no] C56 If yes, please give details of animal, disease Page 165 UPBSN IESA Report for UPSLRP-III 165 11. MARKETING/SELLING OF FARM & ALLIED PRODUCTS C57 Item sold (Code) C58 Quantity sold (Qt) C59 Rate (Rs/Qt) C60 Selling mode# # Itinerary trader=1, fellow farmer=2, Haat Painth=3, Town market=4, Mandi=5, Other (Specify) 12. HOUSING ACCOMMODATION AND AMENITIES SN Particulars Status D01 Type of house [Pucca=1/whollyKkuchha=2, Chhappar=3] If combination, indicate respective codes. D02 Does the household have independent cattle yard [Yes=1, No=2] D03 Type of cattle yard [Pucca=1/whollyKuchha=2,Chhappar=3] If combination, indicate respective codes. D04 Drinking water source – Type [Tap=1, Handpump=2, tubewell=3, well=4, tank/pond/lake=5, river/canal=6, spring=7, other=99] D05 Drinking water source – Availability [Within the premises=1, near the premises=2, away=3] D06 Drinking water source – ownership [Exclusively owned by household=1, ownership shared with other households=2, privately owned=3, public owned=4, common property=5] D07 Source of lighting in house [Electricity=1, Kerosene=2, solar=3, other oil=4, any other=5, no lighting=6] D08 Latrine within the house premises [No latrine=1, Service latrine=2, Pit latrine=3, Water closet=4] D09 Waste water outlet connected to [Closed drainage=1, open drainage=2, No drainage=3] D10 Bathroom within the house? [Yes=1, No=2] D11 Separate kitchen space in the house? [Yes=1, No=2] D12 Predominant fuel used for cooking [Firewood=1, Crop residue=2, Cow dung cake=3, Coal/lignite/charcoal=4, Kerosene=5, LPG=6, Electricity=7, Gobar/Bio Gas=8, any other=9, No cooking=99] D13 If cooking fuel is firewood, what is source of firewood? [purchased from market=1, sourced locally=2, sourced from forests=3, others (specify)=4 Page 166 UPBSN IESA Report for UPSLRP-III 166 1 3. AWARENESS ABOUT THE UPSLRP – III (FOR POTENTIAL BENEFICIARIES) E01. Are you aware of the proposed land reclamation UPSLR III project ( ) Yes/ ( ) No E02. If Yes, what is/was your source of information (1) Heard about the proposed project through Media ( 2) Read in the local News Paper (3) Heard from fellow villagers (4) Heard from UPBSN officials E03. Have you seen/ visited previous reclamation project intervention villages ( ) Yes/ ( ) No E04. What are your observations/ perceptions/ feedback? Please Specify: E05. Do you think this land reclamation project will benefit you? ( ) Yes/ ( ) No E06. If Yes, In what way/ manner do you think it will benefit you? Please Specify: E07. Are you aware of the activities involved in the land reclamation project? ( ) Yes/ ( ) No If Yes, Please Specify: E08. In what way/ manner would you and your family contribute/ get involved in the land reclamation project Please Specify: Page 167 UPBSN IESA Report for UPSLRP-III 167 ANNEX-III WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) VILLAGE PROFILE FORMAT Investigator’s name Investigator’s code (2 digit) Date of survey [dd/mm/yyyy] 1. VILLAGE IDENTIFICATION (Investigators should prepare an Approach Map for the village) Name of Region (Eastern, Central, Western) Name of District (Sultanpur, Kanpur Dehat, Etah) Name of Block Name of Nyaya Panchayat/Gram Panchayat Name of Revenue Village Number and names of hamlets in the village Distance of the Village from the Highway (km) Distance of Village from Block Headquarters (km) Distance of Village from District Headquarters (km) Reclamation Year (if included in earlier projects) 2. DEMOGRAPHIC PROFILE OF THE VILLAGE Particular General Caste Backward Caste Scheduled Caste/Tribe All Castes Number of households Total population Male population Female population Land holding size / category Caste-wise number households General Caste Backward Caste Scheduled Caste/Tribe All Castes Landless Marginal farmers (<1 ha) Page 168 UPBSN IESA Report for UPSLRP-III 168 Small farmers (1-2 ha) Big farmers (> 2 ha) All households Distribution of households across hamlets in the village Name of hamlet GC BC SC Name of hamlet GC BC SC 3. DETAILS OF BENEFICIARIES FROM THE VILLAGE [AS PER BENEFICIARY LIST OF UPBSN] Particulars GC BC SC/ST Marginal Farmer (< 1 ha) Small Farmer (1-2 ha) Big Farmer (> 2 ha) Total number of beneficiaries from the village: (No.) Total number of plots (Khasra no.) under the project (No.) 4. LAND AND WATER RESOURCES OF THE VILLAGE Page 169 UPBSN IESA Report for UPSLRP-III 169 5. IRRIGATION AND DRAINAGE FACILITY IN THE VILLAGE Particulars Current status Number of borings/tube wells Number of ponds Area under ponds (bigha) Access to canal irrigation Availability & adequacy of canal water Does canal overflow? Particulars Area (ha) Total Geographical area of the village Total uncultivable land Inhabited area Area under orchard Area under forest Area under Reserved Forest Area under Protected Forest Designated Protected Area Area under ponds Area under wetlands, other than ponds Area under pond lost in the past 5 years due to: dried up / encroached / land use changed / other reasons Area under wetlands lost in the past 5 years due to dried up / encroached / land use changed / other reasons Area under Common Grazing land/pastures Area under road, canal and other permanent uses Total cultivable land Uncultivated area (pure sodic land) Cultivated area Mono-cropped area Multiple cropped area Total sodic land in the village Barren sodic land (C class) Mono-cropped sodic land (B class) Double-cropped sodic land (B+ class) Total sodic land owned by the Gram Sabha (yet to be allotted) Out of above, encroached area Total sodic land allotted by the Gram Sabha (on which possession is awaited) Out of above, encroached area General soil quality of the village (including any special features, etc) please give details Page 170 UPBSN IESA Report for UPSLRP-III 170 Is there leakage from the canal? Name and distance (km) of the nearest Main Drain Is the main drain smooth-flowing? 6. CROPPING PATTERN Name of crops cultivated Area sown (bigha) Number of farmers who grew the crop during last season Average yield per bigha NORMAL LAND SODIC LAND 8. SEED QUALITY AND VARIETY Particulars Details/ Description Seed varieties presently used for cultivation of paddy crops The common method of making seeds for next cultivation of paddy Seed varieties presently used for cultivation of wheat crops The common method of making seeds for next cultivation of wheat Seed varieties presently used for cultivation of Other crops. (Name the crop and seed variety) Page 171 UPBSN IESA Report for UPSLRP-III 171 The common method of making seeds for next cultivation of other crops 8. FERTILIZER/FARMYARD MANURE/PESTICIDE USE IN THE VILLAGE Name of crop Urea DAP Potash Zinc Sulphate % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Name of crop Farmyard manure NADEP Vermicompost Pesticides % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) % of farmers who used Avg. quantity (kg/bigha) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 9. ACCESS TO CREDIT FACILITIES Particulars Tick relevant option(s) Percentage of credit requirement contributed by relevant option(s) Relatives ( ) Friends ( ) Neighbors ( ) Page 172 UPBSN IESA Report for UPSLRP-III 172 Commercial banks ( ) Nationalized Banks ( ) Co-operative Banks ( ) Self Help Groups (SHG) ( ) Male SHGs ( ) Female SHGs ( ) How many defunct SHGs Kisan Credit Cards ( ) Number of Kisan Credit Cards issued in the village 11. ON-GOING PROGRAMMES IN THE VILLAGE What are on-going programmes in the village? Please give details of the programmes and benefited families. Page 173 UPBSN IESA Report for UPSLRP-III 173 11. ACCESS TO BASIC FACILITIES 11A. Livelihood support amenities Particulars Location (Within the Village vicinity/ Out of the village with distance) Primary Health Centre Community Health Centre Veterinary Hospital Bank Post Office PCO Seed Supply centre Fertilizer supply centre Krishi Raksha Ekai Kisan Vidyalaya Go-down facility Cold storage Access roads (Metal) Village roads ™ Metal ™ Cemented ™ Khadanja ™ Kutcha Village shops/ market (Nos./ week days) 11B. Schooling facility Schooling level Location & Distance from Village (Km) Balwadi/ Anganwadi Primary School Middle School High School Intermediate Graduation Post Graduation Page 174 UPBSN IESA Report for UPSLRP-III 174 12. SOME SOCIO-ECONOMIC ASPECTS Particulars Details Total Number of Graduates and/or Professionals in the village Males Females Total Number of Employed persons in Government/ Private Service Males Females Total Number of people of the village engaged in migratory labor for sustenance, i.e., those people who go to nearby villages/ or far flung areas to work Average numbers of days/year men-folk is engaged in migratory wage earnings Average numbers of days/year women-folk are engaged in migratory wage earnings Average daily wages/day received by men-folk is engaged in migratory wage earnings Average daily wages/day received by women-folk are engaged in migratory wage earnings Total Livestock in the village [Mention livestock names cows, buffalo) and numbers, including local breeds and hybrid] How the villagers make use of the cow dung (Scribe No. of families in % age against the options) 1 = No use 2 = As Only Fuel 3 = As Only Farmyard manure 4 = For Fuel & Manure Whether milk is sold? If Yes, what is the rate at which it is sold and where it is sold? How many livestock heads are insured in the village Give details of Agricultural implements in the village Wooden Ploughs = Metal Ploughs = Seed Drill = Cultivator = Harvester = Tractor = Bullock Cart = Chaff cutter = Page 175 UPBSN IESA Report for UPSLRP-III 175 Particulars Details Pump sets (electric) = Pump sets (diesel) = Is the village electrified? If Yes, mention details on number of connections for the following: Domestic Connections (metered) = Domestic Connections (un- metered) = Agricultural use = Commercial use = Street Lighting = Sources of Drinking Water in the village (Mention the number families using/ accessing these sources) (1) Supply water (2) Hand pumps a. Private b.Government (3) Well (4) Pond (5) Bore-well Does the village have any private/ community initiated income generating activities in the village? Give details on type and nature of activity How many women are involved in these/this activity No. of females who operate the activity How many men are involved in these/this activity No. of males who operate the activity 13. SOCIAL CAPITAL IN THE VILLAGE Composition of Gram Panchayat (nos.) Gram Pradhan: Male/Female, GC/BC/SC/ST, Educational status of Gram Pradhan= Male= Female= GC= BC= SC= ST= Illiterate= High school Status of SIC (if formed earlier) Water Users’ Groups (if formed earlier) Number of functional WUG: Number of members associated with functional WUG: Men Self-Help Groups Number of functional MSHG: Number of members associated with functional MSHG: Women Self-Help Groups Number of functional WSHG: Number of members associated with functional WSHG: Any other social capital (please give details) Page 176 UPBSN IESA Report for UPSLRP-III 176 14. ENVIRONMENTAL ASPECTS What is the average Ground Water Level in the Village Investigators are directed to measure at least two Wells/ Borings for depth Nos. of Ponds in the village Specify and mention No. of ponds that have been renovated in the last two years No. of ponds that have dried in the village in last 5 years, if any. If yes, reasons for the same Prevalence of agriculture weeds in the forms and methods of their removal What are the Main Vector borne diseases in the village (1) Japanese Sephalytis (2) Malaria (3) Filaria (4) Dengu No. of persons who died in the last 10 year due to a fatal illness/ disease (Name the disease) Is the village affected by Water Logging (1) Yes (2) No If Yes, For how many days does the water logged area take to dry completely Area (ha) of water logged area No. of Fruit bearing Trees and tress of commercial value (Timber) Name of Tree Numbers 15. PARTICIPATORY VILLAGE RESOURCES MAPPING This map needs to be prepared by the villagers. Such map should indicate the physical location and occupied area by the features listed below. After completion of Village Resource Map, investigators should conduct a transect walk along with the villagers in order to visually capture the natural resource base and related aspects of the village. ƒ Village boundary ƒ Settlements ƒ Cultivated area ƒ Uncultivated area ƒ Sodic land ƒ Ravine land ƒ Drainage network including outfall of link and main drains ƒ Road network (especially intra-village) Page 177 UPBSN IESA Report for UPSLRP-III 177 ƒ Common grazing land/pastures ƒ Forest (reserved, protected, designated protected area, etc); both within the village area and within 2 km of the village ƒ Ponds/wetlands including seasonal wetlands, streams ƒ Bio-diversity, especially Sarus cranes or other migratory birds ƒ Irrigation facility ƒ Community places/building such as school, panchayat bhawan, etc ƒ Any other features mentioned by the villagers Page 178 UPBSN IESA Report for UPSLRP-III 178 ANNEX-IV WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) FOCUS GROUP DISCUSSION 1. Characteristics of Focus Group Interview/Discussion ƒ\03 Carefully recruited participants o Characteristics, experience & knowledge on topic o Reasonable size (neither too less nor too many) o 2 to 3 separate FG for each type of participants o Avoid power differentials among participants ƒ\03 Interacting in a comfortable environment o Hold FG in familiar or neutral settings/places o Seat people in circle or semi-circle o Interview people in their language (do not use an interpreter, if required train an insider for FG) o Record the discussion for analysis (field notes, audio tape, laptop computer) ƒ\03 Choose skillful moderator o Moderator should be good at listening o Use predetermined questions o Establish an open environment (create a feeling among the participants that it will be safe to talk in FG) ƒ\03 Record & analyze data systematically o Develop a systematic approach to recording & analyzing data o Use a verifiable process (i.e., analysis process should be documented) A Focus Group is working well when participants begin to talk to one another and build on one other’s comments rather than continually responding directly to the Moderator. Ideally, participants become engaged, and the FG becomes a forum for their own discussion. The Moderator should begin to play a less central role as participants share experiences, debate ideas, and offer their opinions. Some groups arrive at this point quickly; others never reach it. 2. Roles in conducting Focus Group ƒ\03 Organizer (leads planning & developing questions) ƒ\03 Recruiter (invites participants) ƒ\03 Moderator (leads the group) ƒ\03 Assistant Moderator (handles logistics & captures data) ƒ\03 Analyst / Reporter (summarizes the data and prepares the report) One person can fill all the roles. However, roles should be divided among members of 2 to 4 persons. Team members work together to complete the study, but individuals may take primary responsibility for certain tasks. 3. Planning A. First steps with Focus Group studies ƒ\03 Decide whether FG is appropriate [FG work particularly well for following tasks] o Understanding how people see needs & assets o Understanding how people think or feel about an issue, idea, behavior, product, or service Page 179 UPBSN IESA Report for UPSLRP-III 179 o Pilot testing ideas, reforms, or projects o Evaluating how well projects/projects are working ƒ\03 Clarify the purpose of the study ƒ\03 Decide what types of people to listen to (target audience) ƒ\03 Get advice from the target audience ƒ\03 Put thoughts in writing B. Sampling & number of groups ƒ\03 2 to 3 focus groups for each type of audience category that is of interest ƒ\03 Do not use statistical formula to determine sample size Ö Use concepts of Redundancy or Theoretical Saturation in which the researcher continues interviewing until no new insights are presented 4. Questions A good set of questions focuses on getting information that directly relates to the study’s objectives. ƒ\03 Developing a set of questions (i.e., Questioning Route) o Hold a brainstorming session (adjourn when ideas dry up) o Use brainstorming questions to draft a questioning route (list of questions & sequencing the questions in a logical flow from general to specific) o Send the draft questioning route to the team for feedback 5. Phrasing & sequencing questions ƒ\03 Use open-ended or non-directive questions (for providing maximum possible latitude to participants for their responses) ƒ\03 Avoid questions that can be answered with one-word, e.g., a ‘yes’ or ‘no’ ƒ\03 Avoid why questions ƒ\03 Use ‘think back’ questions ƒ\03 Use different types of questions o Opening questions (answered by everyone) o Introductory questions o Transition questions (move participants to key questions) o Key questions (address fundamental issues of the study) o Ending questions (get a final viewpoint from participants on key topics) ƒ\03 Use questions that get participants involved ƒ\03 Focus the questions, sequencing them from general to specific 6. Recruiting Participants are selected and invited because they have certain experiences or qualities in common, not simply because they are interested in attending. One of the challenges of FG research is getting people who are not interested in the study to participate. To be successful, the researcher will need to do 3 things. ƒ\03 Finding a pool of participants o Find a pool of people who meet the selection requirements, and then randomly select and invite individuals from that pool. ƒ\03 Developing a recruiting procedure [a typical recruiting process is given below] o Set meetings date, time, and location for the FG o Recruit potential participants by message or in-person contact o Brief the potential participants about FG objectives o Preferably invite through an insider ƒ\03 Getting people to attend: Incentives o Money (we will pay you) Page 180 UPBSN IESA Report for UPSLRP-III 180 o Food (there will be something to eat) o Gifts (we have a gift for you) o Compliments (others value your insights) o Honor (we value your opinion) o Enjoyment (you will have a nice time) o Community feeling (your participation will help the community) 7. Moderating ƒ\03 The challenge of moderating is making people feel comfortable enough to share in a group what they think and how they feel. ƒ\03 Participants must trust the moderator, the process, and the sponsoring organization, and they must believe that the results will be used in a positive way. ƒ\03 The moderator must know when to wait for more information and when to move on. ƒ\03 He/she must be able to control dominant speakers and encourage hesitant participants. ƒ\03 He/she must respect the participants, listen to what they have to say, and thank them for their views even when the moderator may personally disagree with their views. ƒ\03 Other things that the Moderator should do include following: o Be mentally prepared (alert and free from distraction) o Have the discipline to listen o Be familiar to questioning route o Work with an Assistant Moderator o Record the discussion o Use purposeful small talk before group begins o Give a short and smooth introduction o Use pauses and probes to draw out more responses o Control one’ reactions to participants [Avoid showing signs of approval or disapproval; avoid head nodding and verbal cues; do not correct participants during the discussion; do not become defensive about the program/project/system] o Use subtle group control [control dominant speakers; encourage everyone by calling on quiet participants] o Conclude with a summary and final questions 8. Capturing the data Various methods of data capturing include memory, field notes, audio tape recording, video camera, and laptop computer. 9. Focus group analysis ƒ\03 Words used by participants & meaning thereof ƒ\03 Quotes of participants ƒ\03 Context ƒ\03 Internal consistency ƒ\03 Frequency ƒ\03 Extensiveness ƒ\03 Intensity ƒ\03 Specificity Page 181 UPBSN IESA Report for UPSLRP-III 181 ANNEX-V WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) Focused Group Discussion (For Resettlement & Rehabilitation Aspects) 1. Is any person(s) land and/or homestead being/ has been acquired under the UPSLRP- III for any of the following project activities: a. Main Drain ( ) b. Link Drains ( ) c. Borings ( ) d. Dumping of muck ( ) e. Irrigation channels ( ) f. Road ( ) g. Office infrastructure ( ) h. None of the above ( ) 2. If Yes, mention names of the Person(s)/ Tiller(s)/ Farmer(s), whose land is being/ has been acquired Name Husband/ Father’s Name Khasra No. Area Acquired (bigha) Type of land 3. Have the tillers/ farmers received any form of compensation? 4. If Yes, at what rate was compensation decided and received? 5. Have all the affected persons/ tillers/ farmers received compensation? 6. How many persons/ tillers/ farmers not receive compensation and WHY? Page 182 UPBSN IESA Report for UPSLRP-III 182 ANNEX-VI WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR DISCUSSION TO ADDRESS GENDER DEVELOPMENT ISSUES Recognition of the need to improve the status of women and to promote their potential roles in development is no longer seen only as an issue of human rights or social justice. While the pursuit of gender equity remains strongly embedded within the framework of fundamental human rights and gender justice, investments in women now also are recognized as crucial to achieving sustainable development. Economic analyses recognize that low levels of education and training, poor health and nutritional status, and limited access to resources not only depress women’s quality of life, but also limit productivity and hinder economic efficiency and growth. Hence, promoting and improving the status of women need to be pursued, for reasons of equity and social justice and also because it makes economic sense and is good development practice. It is proposed under to identify the gender development issues and suggest possible project interventions to address them on the basis of feedback from and discussion from women and others familiar with these issues. The framework for Focus Group Discussion on these issues is given below. Moreover, the field team would follow the procedures set in the attached ‘ Note of Focus Group Discussion ’. Guidelines for FGD on gender development issues Location: Date, time and venue: Number and categories of participants: Any experience of working on women development: Domain Issues Possible interventions to address these issues Child rearing and education Homemaking (along with males) Homemaking (without males) Household decision making Education, training and skills Job opportunities While on family farm Primary processing of farm produces Cooking (including arrangement of cooking fuel) Access to toilet/bath facilities Access to and control over household resources While working as laborer While undertaking petty business While working as salaried person Nutrition and health Any other domain Page 183 UPBSN IESA Report for UPSLRP-III 183 ANNEX-VII WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR DISCUSSION WITH PRIs A. Guidelines for discussion with District Panchayati Raj Officer (DPRO) Such discussion will be held in the office of the DPRO on a date and at a time convenient to him/her. It will also be ensured that other officers, deployed at the district office, must be present at the time of the discussion. Moreover, other officers will be encouraged to participate in the discussion and give their inputs. Discussion will center on the following aspects: (i) Awareness about the earlier sodic land reclamation project, especially UPSLR II P under which the Panchayati Raj department was involved for implementation of a sub- component on construction of Panchayat Bhawan and establishment of libraries at district and village level (ii) Awareness about the proposed UPSLR III P under which the department will be involved with respect to Sodic Haat and Ruminant markets (iii) Perceived prospects and constraints in coordination with UPBSN and other line departments for implementation of the project activities (iv) Suggested measures to improve/strengthen the inter-departmental coordination at the district level (v) Perception about the capability of Gram Panchayat to take part in planning and implementation of the project activities at village level (vi) Suggested mechanism to strengthen such capability (vii) Probable role of the department, especially district office, in strengthening the capacity of Gram Panchayat to take up the roles and responsibilities under the project (viii) Possibilities of institutional linkage of the proposed Site Implementation Committee and Water Users’ Group with the Gram Panchayat and its committees (ix) Possibilities of installing suitable mechanism to take up the task of maintenance of village level assets (such as link drains, field drains) created during the course of project implementation (x) Identification of main hurdles in development of social capital in the district and suggested measures to overcome such hurdles (xi) Prospects for handholding of social capital, such as SIC, WUG, SHG, generated during project implementation (xii) Perceived socio-economic dynamics, specific to the district, which needs to be kept in mind while finalizing the project design Deliberations will be appropriately recorded. A dedicated member of the consultant’s team will assigned this task. Page 184 UPBSN IESA Report for UPSLRP-III 184 B. Guidelines for discussion with Gram Panchayat (Gram Pradhan and Members) The discussion will be held at Panchayat Bhawan or any other common place on a date and at a time convenient to Gram Pradhan and members of the Gram Panchayat. Preferably, Gram Pradhan will be requested to call a special meeting of the Gram Panchayat for the purpose. The team will attempt to capture the perception of the Gram Panchayat on the following aspects: (i) Awareness about the earlier sodic land reclamation project, especially UPSLR II P under which the Gram Panchayat was involved for implementation of a sub-component on construction of Panchayat Bhawan and establishment of libraries at the Panchayat Bhawan (ii) Awareness about the proposed UPSLR III P under which the department will be involved with respect to Sodic Haat and Ruminant markets (iii) Probable roles which the Gram Panchayat could play in planning and implementation of the project (Gram Panchayat will be briefed about the project components before asking this question) (iv) Perception about the capability of Gram Panchayat to take part in planning and implementation of the project activities at village level (v) Suggested mechanism to strengthen such capability (vi) Expectations from UPBSN and state government to strengthen the capacity of Gram Panchayat to take up the roles and responsibilities under the project (vii) Possibilities of institutional linkage of the proposed Site Implementation Committee and Water Users’ Group with the Gram Panchayat and its committees (viii) Possibilities and willingness on part of Gram Panchayat to take up the task of maintenance of village level assets (such as link drains, field drains) created during the course of project implementation (ix) Identification of main hurdles in development of social capital in the village and suggested measures to overcome such hurdles (x) Prospects and willingness for post-project handholding of social capital, such as SIC, WUG, SHG, generated during project implementation (xi) Perceived socio-economic dynamics of village, which needs to be kept in mind while finalizing the project design (xii) Possible role of different Panchayat Committees, especially Water and Land Management Committee in project implementation (xiii) Status of community land, sodic and non-sodic, owned by the Gram Sabha and prospects, plan and problems in its allotment to eligible farmers (xiv) Status of possession on already-allotted Gram Sabha land and prospects, plan and problems in providing possession on allotted land Deliberations will be appropriately recorded. A dedicated member of the consultant’s team will assigned this task. Page 185 UPBSN IESA Report for UPSLRP-III 185 ANNEX-VIII WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) INTERVIEW FORMAT/GUIDELINES FOR PROJECT STAFF SN Particulars Response 1. Name of Staff 2. Current age 3. Designation 4. Qualification and area of expertise 5. Major trainings obtained (please give details) 6. Current posting (HQ/ name of district) 7. If on deputation, name of parent department 8. Tenure at current designation (years) 9. Tenure at current department (years) 10. Tenure at current location (months) 11. Current responsibilities 12. Were you involved in earlier projects? 13. If yes, please mention the period and designation 14. If yes, what were your roles and responsibilities? Give details 15. What was perceived level of your commitment and involvement in the earlier projects? 16. To what extent are you satisfied with your performance in earlier projects? 17. If reasonably satisfied, please list your major achievements 18. What can be done to boost further your performance and satisfaction during UPSLR P-III 19. If not satisfied, please elaborate on the reasons 20. What were the main hurdles in performance of your duties in earlier projects? 21. Do you think that the design of earlier project was fault-free? Page 186 UPBSN IESA Report for UPSLRP-III 186 SN Particulars Response 22. If no, please list major shortcomings of the design of earlier projects which should be removed from the proposed UPSLRP-III 23. If you are new to sodic land reclamation project, what are your perceived roles and responsibilities in the proposed project? 24. In your view, what are main environmental risks associated with the proposed project? 25. What can be done to address such environmental risks? 26. In your view, what are main social risks associated with the proposed project? 27. What can be done to address such social risks? 28. Why do you think that you will be able to perform your roles effectively? 29. Any suggestion for the project Page 187 UPBSN IESA Report for UPSLRP-III 187 ANNEX-IX WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: Farmers A semi-structured interview schedule has been developed for soliciting both quantitative and qualitative information from the sample households. The schedule covers various agricultural, environmental and socio-economic aspects of life of individual rural households. In addition, Participatory Group Exercise will be undertaken in order to supplement the data/information collected through interview schedules. METHOD : Participatory Group Exercise ISSUES TO BE COVERED : ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizers and pesticides (trends and current level and impact on soil quality) ƒ Use of Irrigation; effect on groundwater (awareness about conjunctive water use) ƒ Small farmers’ opportunity to participate in the project ƒ Weed invasion on agricultural fields ƒ Cattle productivity; unproductive cattle/fodder shortages ƒ Animal diseases (frequency and spread) ƒ Dependence on natural resource base (wetlands/pastures / forests, etc) ƒ Ownership/occupancy issues and the extent of encroachment ƒ Perceived hesitation, if any, to join socio-economically neutral water users’ groups which are to be formed on the basis of proximity of sodic land ƒ Participation in proposed site implementation committee meetings ƒ Willingness to allow for field drain between two adjoining plots ƒ Willingness to allow for common irrigation channels within the area of a water users’ group SUGGESTIONS FOR FIELD TEAM: ƒ Conduct the exercise in an environment comfortable to the participants ƒ Select the participants according to their knowledge about the village and willingness to contribute. However, late comer should be welcomed even after the exercise had started ƒ The team should act only as facilitator ƒ Deliberations should be properly recorded ƒ At the end of the consultation, findings should be summarized in presence of the participants ƒ A copy of the findings may be handed over to the participants if asked for Page 188 UPBSN IESA Report for UPSLRP-III 188 ANNEX-X WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: Women’s Groups Focus Group Discussion will be conducted with women’s groups in order to capture the concerns and issues related to women. METHOD : Focus Group Discussion ISSUES TO BE COVERED : ƒ An assessment of number of women (de facto) cultivators ƒ Impact of migration of male workers on the role of women in agricultural productivity ƒ Impact on household consumption / nutrition ƒ Adequacy of skills to manage farming (on improved land) and skills to take up improved agriculture ƒ Wage payment at par with male members for equal work ƒ Involvement of child labor in the construction activities ƒ Cooking media/indoor; impact on health ƒ Gender impact on environment: grass/fodder/ firewood collection ƒ Incidence of HIV/AIDS in the area SUGGESTIONS FOR FIELD TEAM: ƒ The team should follow the procedures set in the attached note on Focus Group Discussion ƒ Conduct the exercise in an environment comfortable to the participants ƒ The team should act only as facilitator ƒ Deliberations should be properly recorded ƒ At the end of the consultation, findings should be summarized in presence of the participants ƒ A copy of the findings may be handed over to the participants if asked for Page 189 UPBSN IESA Report for UPSLRP-III 189 ANNEX-XI WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: ATMA Officials Focus Group Discussion will be conducted wit h women’s groups in order to capture the concerns and issues related to women. METHOD : Interviews with field staff ISSUES TO BE COVERED : ƒ Readiness to take up improved farming ƒ Accessibility to farm inputs (seeds, fertilizers, plant protection chemicals) ƒ Feedback on the working of ATMA in terms of their effectiveness in the area SUGGESTIONS FOR FIELD TEAM: ƒ Interview should be conducted at the office of the respective field staff at a time convenient to him/her ƒ Before starting the interview, team should brief him/her about the purpose of the interview ƒ Staff should be encouraged to frankly provide the solicited information. INTERVIEW FORMAT FOR ATMA OFFICIALS: Format for interview with field staff of ATMA is attached below. Page 190 UPBSN IESA Report for UPSLRP-III 190 WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) FORMAT FOR INTERVIEW WITH ATMA FIELD STAFF SN Particulars Response 30. Name of Staff 31. Current age 32. Designation 33. Qualification and area of expertise 34. Major trainings obtained (please give details) 35. Current posting (name of district/block) 36. Current work jurisdiction (area) 37. Current responsibilities 38. Were you somehow involved in earlier projects? 39. If yes, please mention the period, designation, department 40. If yes, what were your roles and responsibilities? Give details 41. Do you think that the design of earlier project was fault-free? 42. If no, please list major shortcomings of the design of earlier projects which should be removed from the proposed UPSLR III P 43. If you are new to sodic land reclamation project, what are your perceived roles and responsibilities in the proposed project? 44. In your view, what are main environmental risks associated with the Page 191 UPBSN IESA Report for UPSLRP-III 191 SN Particulars Response proposed project? 45. What can be done to address such environmental risks? 46. In your view, what are main social risks associated with the proposed project? 47. What can be done to address such social risks? 48. Why do you think that you will be able to perform your roles effectively? 49. Do you think that you are ready take the responsibilities associated with improved farming in reclaimed land? 50. What are your views about farmers’ access to farm inputs (seed, fertilizers, plant protection chemicals) in your working area? Please focus on the constraints faced by the farmers 51. Do you think that ATMA is effective in its working in your working area? 52. If yes, what are key drivers of such effectiveness? 53. If no, what are key reasons for ineffectiveness? Page 192 UPBSN IESA Report for UPSLRP-III 192 ANNEX-XII WAPCOS (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: Institutional Stakeholders (UPBSN, Department of Agriculture, Animal Husbandry Department, Irrigation Department) METHOD : Structured Interview ISSUES TO BE COVERED : ƒ Encroachment on natural habitats (wetlands) as sodicity increases ƒ Construction related issues (drain rehabilitation / field drains, etc) ƒ Water conservation approaches ƒ Drainage and sanitation ƒ Cattle productivity; unproductive cattle/ fodder shortages ƒ Strategies to deal with livestock sector issues ƒ Perception about design and working of earlier sodic land reclamation projects ƒ Perceived roles and responsibilities under the proposed UPSLR III P SUGGESTIONS FOR INTERVIEWER: ƒ Interview should be conducted at the office of the respective official at a time convenient to him/her ƒ Before starting the interview, the interviewer should brief him/her about the purpose of the interview ƒ The official should be encouraged to frankly provide the solicited information. FORMAT FOR INTERVIEW WITH LINE DEPARTMENT OFFICIALS: A format for interview with officials of the line departments is given below. Page 193 UPBSN IESA Report for UPSLRP-III 193 WAPCOS (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) FORMAT FOR INTERVIEW WITH UPBSN/LINE DEPARTMENT OFFICIALS SN Particulars Response 1. Name of department 2. Name of official 3. Designation 4. Qualification and area of expertise 5. Major trainings obtained (please give details) 6. Current roles and responsibilities in the department 7. Were you somehow involved in earlier projects? 8. If yes, please mention the period, designation 9. If yes, what were your roles and responsibilities? Give details 10. Do you think that the design of earlier project was fault-free? 11. If no, please list major shortcomings of the design of earlier projects which should be removed from the proposed UPSLR III P 12. If you are new to sodic land reclamation project, what are your perceived roles and responsibilities in the proposed project? 13. In your view, what are main environmental risks associated with the proposed project? 14. What can be done to address such environmental risks? 15. In your view, what are main social Page 194 UPBSN IESA Report for UPSLRP-III 194 SN Particulars Response risks associated with the proposed project? 16. What can be done to address such social risks? 17. Do you think that encroachment on natural habitats (wetlands) increases as sodicity increases? 18. If yes, how? Please elaborate. 19. If no, why? Please elaborate. 20. In your views, what are construction- related issues associated with main drain rehabilitation? 21. What are your suggestions to address these (drain rehabilitation) issues? 22. In your views, what are construction- related issues associated with link drains? 23. What are your suggestions to address these (link drain) issues? 24. In your views, what are construction- related issues associated with field drains? 25. What are your suggestions to address these (field drain) issues? 26. What are water conservation approaches? Do you think these approaches are being adopted? If yes, to what extent? 27. What are key issues related to drainage and sanitation? In your views, how can these issues be addressed? 28. What are your perception about cattle productivity and unproductive cattle in the state/district? 29. Do you think there is fodder shortage in the state/district? Does it hamper livestock enterprise? If yes, how? 30. What are other livestock sector issues? 31. What strategies would you suggest to deal with livestock sector issues? Page 195 UPBSN IESA Report for UPSLRP-III 195 ANNEX-XIII WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: Office- bearers of local farmers’ cooperatives METHOD : Semi-structured interview ISSUES TO BE COVERED : ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizer and pesticides ƒ Use of irrigation; effect on groundwater ƒ Small farmers’ opportunity to participate ƒ Extent of encroachment in the drains ƒ Alternatives on the mode of use of drain water for irrigation purposes SUGGESTIONS FOR INTERVIEWER: ƒ Interview should be conducted at the office of the respective staff at a time convenient to him/her ƒ Before starting the interview, team should brief him/her about the purpose of the interview ƒ Staff should be encouraged to frankly provide the solicited information. INTERVIEW FORMAT FOR OFFICE-BEARERS OF COOPERATIVES: Format for interview with office-bearers of farmers’ cooperatives is given below. Page 196 UPBSN IESA Report for UPSLRP-III 196 WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) FORMAT FOR INTERVIEW WITH OFFICE-BEARERS OF COOPERATIVES SN Particulars Response 1. Name of Cooperative 2. Name of the Officer-bearer 3. Designation 4. Qualification and area of expertise 5. Major trainings obtained (please give details) 6. Current roles and responsibilities 7. What are your observations about changing agricultural bio-diversity over the period (in your operational area)? 8. Do you think that sodic land reclamation will improve agricultural bio-diversity in the area? 9. What is the current level of use of chemical fertilizers and pesticides and what is the trend over recent past? 10. Do you think that use of irrigation has some positive/negative effect on groundwater? If yes, what are the effects in your area? 11. Will small and poor farmers be able to actively participate in the project? 12. If yes, why? 13. If no, why? 14. As per your knowledge, is there any encroachment in the drains? If yes, please give the details in terms of name of drain, extent of encroachment, etc. 15. As per your knowledge, do farmers lift water from drains for irrigation? 16. If yes, please give details of drains and number farmers involved 17. If yes, what will be the alternative in case farmers are stopped using drain water for irrigation purposes? Page 197 UPBSN IESA Report for UPSLRP-III 197 ANNEX-XIV WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) GUIDELINES FOR STAKEHOLDER CONSULTATION STAKEHOLDER: Local NGO working on farming issues METHOD : Semi-structured interview ISSUES TO BE COVERED : ƒ Impact on agricultural bio-diversity ƒ Use of chemical fertilizer and pesticides ƒ Use of irrigation; effect on groundwater ƒ Cattle productivity; unproductive cattle, fodder shortages ƒ Impact on household consumption / nutrition ƒ Impact on health ƒ Relationship between various project institutions at village level (like SIC, WUG, Farmers Cooperatives, etc) with PRIs ƒ Gender impacts ƒ HIV/AIDS among the construction workers and migrant labor SUGGESTIONS FOR INTERVIEWER: ƒ Interview should be conducted at the office of the NGO functionary at a time convenient to him/her ƒ Before starting the interview, team should brief him/her about the purpose of the interview ƒ Staff should be encouraged to frankly provide the solicited information. INTERVIEW FORMAT FOR OFFICE-BEARERS OF COOPERATIVES: Format for interview with NGO functionaries is given below. Page 198 UPBSN IESA Report for UPSLRP-III 198 WAPCOS LTD. (A Government of India Undertaking) Integrated Environmental and Social Assessment (IESA) FORMAT FOR INTERVIEW WITH NGO FUNCTIONARIES SN Particulars Response 1. Name of NGO 2. Name of the Officer-bearer 3. Designation 4. Qualification and area of expertise 5. Major trainings obtained (please give details) 6. Current roles and responsibilities 7. What are your observations about changing agricultural bio-diversity over the period (in your operational area)? 8. Do you think that sodic land reclamation will improve agricultural bio-diversity in the area? 9. What is the current level of use of chemical fertilizers and pesticides and what is the trend over recent past? 10. Do you think that use of irrigation has some positive/negative effect on groundwater? If yes, what are the effects in your area? 11. What are your perception about cattle productivity and unproductive cattle in the state/district? 12. Do you think there is fodder shortage in the state/district? Does it hamper livestock enterprise? If yes, how? 13. What will impact of the project on household consumption/nutrition? 14. What will be the impact of the project on health? 15. What are your observations about relationship between various institutions at village level (like SIC, WUG, Farmers’ Cooperatives, etc) with PRIs? 16. How will the project impact the women and their position vis-à-vis men? 17. Are you aware of incidence of HIV/AIDS among th e construction Page 199 UPBSN IESA Report for UPSLRP-III 199 SN Particulars Response workers and migration labor? 18. If yes, please give the details without disclosing the names of affected people. Page 200 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 1 9 9 A N N E X - X V G r o u n d w a t e r l e v e l D a t a f o r S t u d y A r e a D i s t r i c t s A . G r o u n d w a t e r l e v e l D a t a f o r D i s t r i c t E t a h H Y D _ N A M E P R M _ 0 2 P T M _ 0 2 P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 B l o c k G a n j u n d w a r a B a h o r a D R Y 5 . 7 5 4 . 7 0 5 . 9 0 4 . 0 0 G a n j d u n d w a r a D R Y 5 . 7 6 4 . 0 6 4 . 9 6 5 . 6 6 5 . 4 6 4 . 8 6 N a w a d a - 2 7 . 5 3 6 . 8 8 3 . 8 6 4 . 8 6 4 . 6 5 5 . 7 7 S a h a w a j p u r 3 . 5 8 3 . 4 4 - - B l o c k N i d h o l i k a l a n B a s u n d h a r a D R Y 9 . 1 7 8 . 9 7 8 . 4 9 8 . 8 8 9 . 6 3 9 . 1 0 G a d a n p u r D R Y 7 . 4 1 7 . 7 1 3 . 1 9 5 . 6 7 - - J i t o l i p i e z o 5 . 7 0 4 . 1 0 4 . 4 3 4 . 3 0 - - N i d h o l i k a l a n p z 5 . 8 0 6 . 1 8 6 . 7 8 3 . 5 3 5 . 3 8 6 . 2 0 6 . 8 8 6 . 4 3 B l o c k P a t i y a l i D a r i y a b g a n j 5 . 4 4 5 . 6 6 6 . 7 6 4 . 7 1 5 . 2 1 5 . 4 0 6 . 5 1 5 . 4 8 6 . 8 5 5 . 8 6 P a t i y a l i - 1 3 . 7 0 3 . 1 4 P a t i y a l i - 2 3 . 9 6 2 . 1 4 2 . 9 9 3 . 3 3 4 . 0 4 3 . 2 9 B l o c k S a k e e t M a l w a n D R Y 4 . 2 2 2 . 4 3 4 . 2 3 2 . 4 2 2 . 6 4 8 . 1 5 5 . 0 4 P h a p h o o t o o - 1 6 . 9 8 7 . 1 2 5 . 2 3 S a k e e t - p z 6 . 2 1 3 . 6 1 5 . 4 6 5 . 0 3 5 . 8 6 - - B l o c k S h e e t a l p u r C h a c h e n a 4 . 1 7 1 . 5 5 4 . 6 0 2 . 9 5 1 . 7 8 4 . 4 0 4 . 6 5 3 . 6 0 C h a m k a r i D R Y D R Y D R Y 4 . 6 1 - - G o l a k u a n - 1 D R Y D R Y - - G o l a k u a n - 2 6 . 4 3 5 . 6 9 6 . 3 6 6 . 8 9 J e e s a k p u r 6 . 1 4 4 . 1 2 6 . 2 1 2 . 6 7 5 . 4 2 4 . 1 2 5 . 9 2 - - K a k r a u l i p i e z o 5 . 9 0 3 . 8 5 5 . 1 0 5 . 0 0 4 . 9 5 6 . 1 5 5 . 8 0 Page 201 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 0 H Y D _ N A M E P R M _ 0 2 P T M _ 0 2 P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 K a t h o l e e 9 . 1 2 7 . 2 0 7 . 6 0 3 . 4 0 6 . 1 0 5 . 7 3 7 . 6 0 5 . 9 7 9 . 0 7 6 . 3 2 L a l g a r h i p i e z o 1 0 . 1 8 9 . 8 0 1 0 . 1 3 8 . 4 5 8 . 9 0 8 . 8 2 9 . 6 0 9 . 9 8 9 . 1 5 N a g l a j a g r o o p 1 0 . 2 1 9 . 7 4 1 0 . 4 9 8 . 0 4 9 . 1 4 8 . 9 5 1 0 . 1 5 - - O n g h a t 3 . 9 2 2 . 8 0 4 . 0 0 3 . 5 0 3 . 9 0 2 . 4 8 4 . 0 0 3 . 8 0 4 . 0 0 3 . 7 0 P a h a r a - 1 5 . 3 7 D R Y 6 . 4 8 2 . 3 5 4 . 0 0 5 . 7 6 - - N o t e : P R M : P r e - m o n s o o n , P T M : P o s t M o n s o o n B . G r o u n d w a t e r l e v e l D a t a f o r D i s t r i c t K a n p u r D e h a t H Y D _ N A M E P R M _ 0 2 P T M _ 0 2 P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 B l o c k M a i t h a A s a i a n u p u r 7 . 0 1 6 . 6 0 4 . 1 5 5 . 4 5 4 . 7 0 5 . 9 0 4 . 8 5 5 . 8 0 4 . 3 0 A u r a n g a b a g h 3 . 2 5 2 . 6 2 3 . 5 8 1 . 9 1 2 . 2 8 2 . 1 3 3 . 3 3 2 . 6 3 3 . 6 3 1 . 9 3 B e r i B a g h p u r 5 . 5 6 4 . 6 7 5 . 7 0 2 . 0 0 3 . 6 5 2 . 2 5 4 . 4 5 3 . 7 0 4 . 4 5 4 . 7 5 B e r i D a r i y a b 4 . 8 0 1 . 7 5 3 . 9 0 2 . 5 5 4 . 1 0 3 . 5 5 3 . 7 5 3 . 3 0 D e b i n p u r 8 . 5 4 8 . 2 2 8 . 9 5 6 . 6 0 7 . 6 5 7 . 3 5 8 . 4 0 7 . 5 5 8 . 6 1 8 . 1 5 D e v i p u r 5 . 8 0 5 . 9 2 6 . 4 2 4 . 7 5 6 . 0 0 5 . 1 0 6 . 6 0 6 . 3 0 6 . 5 5 6 . 4 0 H a t h i k a 6 . 4 1 6 . 5 4 6 . 3 5 5 . 3 2 6 . 7 0 5 . 9 5 7 . 5 0 4 . 0 5 7 . 8 5 7 . 4 0 M a i t h a 5 . 1 3 4 . 6 1 5 . 2 7 2 . 7 7 3 . 4 2 3 . 0 2 4 . 7 7 4 . 0 2 4 . 0 7 3 . 9 7 P r a t a p P u r 5 . 9 6 5 . 8 7 6 . 8 8 4 . 1 5 5 . 5 0 4 . 6 0 5 . 8 5 6 . 3 5 5 . 4 5 3 . 7 5 S a i t w a n p u r 3 . 3 4 1 . 5 5 4 . 1 2 1 . 6 1 3 . 4 0 1 . 5 0 3 . 7 0 3 . 5 3 3 . 9 0 1 . 8 8 S h i v l i 5 . 7 9 3 . 9 9 4 . 5 0 3 . 3 0 5 . 4 5 3 . 7 0 5 . 8 0 3 . 8 0 5 . 8 0 3 . 7 0 S h u b h a n 6 . 2 0 5 . 7 0 6 . 8 0 5 . 1 4 5 . 7 0 5 . 0 0 6 . 1 0 5 . 1 0 6 . 3 0 6 . 1 5 B l o c k M a l a s a D e e n d h 1 2 . 1 0 9 . 6 5 1 1 . 7 8 1 0 . 7 0 1 1 . 5 0 1 0 . 7 0 1 1 . 7 0 1 1 . 0 5 1 2 . 7 0 1 2 . 1 0 M a l a s a 1 7 . 4 0 1 6 . 6 5 1 6 . 7 5 1 5 . 8 7 1 7 . 7 0 1 6 . 6 0 1 8 . 3 5 1 7 . 2 0 1 9 . 7 5 1 7 . 9 5 S a i d a l i p u r 1 0 . 7 7 8 . 4 8 1 1 . 8 5 1 0 . 7 2 1 2 . 0 0 1 0 . 8 0 1 3 . 6 0 1 2 . 0 0 1 3 . 7 5 1 0 . 1 5 B l o c k R a s o o l a b a d B h i k d e o 8 . 5 7 7 . 3 4 8 . 5 4 6 . 3 5 8 . 5 4 6 . 4 4 7 . 8 6 5 . 0 9 7 . 9 6 6 . 9 0 B i l h a 4 . 6 8 2 . 4 1 3 . 0 0 1 . 9 7 2 . 9 8 0 . 6 8 3 . 3 5 0 . 7 8 4 . 5 7 1 . 4 3 R a s o o l a b a d 5 . 7 1 3 . 5 0 4 . 7 8 2 . 6 1 4 . 5 8 2 . 5 3 4 . 7 5 2 . 4 0 4 . 9 0 3 . 1 7 B l o c k S a r w a n p u r a Page 202 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 1 H Y D _ N A M E P R M _ 0 2 P T M _ 0 2 P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 A r y a n a g a r 4 . 8 0 5 . 2 5 4 . 6 5 4 . 5 1 2 . 1 5 2 . 4 7 2 . 3 6 4 . 6 5 4 . 6 2 D u a r i 6 . 8 0 6 . 1 0 5 . 2 5 4 . 6 3 3 . 8 3 3 . 6 7 3 . 2 4 2 . 9 0 K a m a l p u r 4 . 1 0 3 . 9 0 4 . 3 0 2 . 8 5 3 . 6 0 3 . 5 0 1 . 7 9 1 . 7 5 4 . 2 5 4 . 0 0 K a s m a 4 . 3 7 4 . 5 2 4 . 1 7 3 . 9 7 3 . 0 2 3 . 4 2 3 . 3 7 K u n d a n p u r 4 . 5 5 4 . 2 0 4 . 7 5 1 . 7 5 2 . 2 0 2 . 1 1 3 . 5 5 3 . 3 2 M a i n a t h 5 . 8 0 5 . 0 0 5 . 4 2 0 . 6 7 5 . 0 1 2 . 8 8 3 . 5 0 3 . 3 0 M o h a n a 5 . 3 0 5 . 7 0 4 . 8 0 3 . 5 5 2 . 4 0 3 . 6 5 3 . 5 1 2 . 7 0 2 . 0 5 N o t e : P R M : P r e - m o n s o o n , P T M : P o s t M o n s o o n C . G r o u n d w a t e r l e v e l D a t a f o r D i s t r i c t S u l t a n p u r H Y D _ N A M E P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 P R M _ 0 7 P T M _ 0 7 B l o c k B h a d a r B i s h u n d a s p u r 6 . 5 0 1 . 6 5 5 . 3 8 3 . 4 8 6 . 3 5 4 . 0 0 6 . 7 5 5 . 5 0 4 . 6 0 4 . 5 7 C h a i n t i w a r i k a p u r w a 6 . 6 0 4 . 7 1 6 . 0 0 7 . 2 5 6 . 1 0 7 . 4 3 5 . 6 0 5 . 3 5 6 . 8 0 C h e e r a 4 . 3 6 1 . 2 0 3 . 8 3 1 . 3 5 4 . 2 5 1 . 9 5 4 . 7 0 3 . 9 5 6 . 7 0 3 . 6 5 K u r a n g 5 . 9 2 1 . 6 0 5 . 0 5 2 . 7 5 5 . 8 0 3 . 8 5 6 . 1 6 3 . 8 0 4 . 1 5 4 . 7 5 R a m g a n j 7 . 0 7 2 . 8 6 6 . 1 2 4 . 3 2 6 . 8 8 5 . 1 7 7 . 2 2 4 . 8 0 4 . 7 7 5 . 8 7 T i e k a r m a f i 1 0 . 4 5 6 . 4 5 8 . 9 5 9 . 9 7 7 . 1 0 8 . 7 7 6 . 8 0 5 . 3 5 6 . 8 0 B l o c k B h a d i y a n B h a d a 6 . 6 0 2 . 7 5 6 . 0 0 4 . 8 0 6 . 7 0 5 . 9 0 7 . 7 5 7 . 1 2 7 . 2 5 6 . 0 2 I s l a m g a n j 1 3 . 6 0 1 1 . 9 2 1 3 . 3 0 1 3 . 0 5 1 4 . 4 0 1 4 . 2 5 1 5 . 1 0 1 4 . 1 5 1 7 . 0 5 1 5 . 6 0 K a m a t a g a n j 1 0 . 0 5 8 . 8 0 9 . 4 5 1 0 . 5 5 1 0 . 6 0 1 1 . 6 0 1 1 . 6 0 M a h a n p u r p i e z o 1 0 . 9 0 9 . 5 0 1 0 . 5 0 1 0 . 9 0 N a r a i n p u r 7 . 0 0 2 . 4 0 5 . 8 5 3 . 9 5 6 . 9 3 6 . 2 5 7 . 2 0 6 . 8 2 6 . 6 2 8 . 3 0 R u d u a l l y 5 . 8 5 1 . 8 2 5 . 2 0 4 . 4 0 5 . 9 5 4 . 3 3 5 . 7 0 4 . 4 0 6 . 3 0 5 . 3 0 B l o c k G a u r i g a n j D a r p i p u r 5 . 9 3 1 . 4 2 2 . 5 2 3 . 4 5 2 . 7 5 3 . 6 5 3 . 0 8 2 . 5 0 3 . 7 5 G a u r i g a n j 4 . 7 1 2 . 0 0 4 . 0 5 1 . 9 5 2 . 9 0 2 . 0 5 3 . 2 5 1 . 7 5 2 . 2 5 4 . 2 5 K a t h i 2 . 7 6 1 . 2 0 1 . 9 5 1 . 1 5 1 . 7 4 1 . 3 5 2 . 0 5 1 . 9 0 1 . 5 5 4 . 4 5 M a d a e e k a p u r w a 2 . 3 8 0 . 2 0 0 . 7 7 0 . 7 3 1 . 2 0 0 . 6 8 1 . 6 0 1 . 2 6 4 . 4 0 4 . 1 0 Page 203 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 2 H Y D _ N A M E P R M _ 0 3 P T M _ 0 3 P R M _ 0 4 P T M _ 0 4 P R M _ 0 5 P T M _ 0 5 P R M _ 0 6 P T M _ 0 6 P R M _ 0 7 P T M _ 0 7 B l o c k J a m o C h a u d h i p u r G o g a m a u 3 . 1 8 1 . 6 5 2 . 5 0 2 . 0 4 2 . 5 5 2 . 0 0 2 . 8 0 2 . 0 5 1 . 9 0 3 . 4 0 J a m o 4 . 7 2 1 . 3 5 3 . 6 0 1 . 9 0 2 . 7 0 1 . 9 5 2 . 8 5 1 . 7 3 7 . 1 0 2 . 7 0 B l o c k K u r e b h a r A y a n p u r 6 . 3 0 2 . 3 7 5 . 8 0 3 . 0 0 5 . 3 3 3 . 5 2 5 . 3 5 4 . 9 8 F e e h u k h a n p u r w a 8 . 9 5 8 . 3 7 8 . 0 5 8 . 3 3 K n i t p i e z o 9 . 1 5 6 . 0 7 9 . 3 5 8 . 0 0 9 . 3 0 8 . 4 2 9 . 3 0 8 . 7 2 7 . 8 0 8 . 5 2 K u r e b h a r 4 . 0 0 C H O K E 4 . 7 0 2 . 2 5 4 . 5 0 2 . 3 8 4 . 5 2 2 . 5 8 2 . 9 0 2 . 6 1 K u t a k a k h a n p u r 8 . 9 2 8 . 1 5 8 . 2 9 9 . 5 0 8 . 9 3 8 . 1 5 S a f u l l a g a n j 1 4 . 1 0 1 2 . 7 0 1 4 . 2 5 1 4 . 2 5 1 4 . 9 3 1 4 . 4 4 1 4 . 9 5 1 4 . 4 5 1 3 . 5 3 1 4 . 5 2 W a j h a n a 3 . 2 5 1 . 3 0 3 . 0 0 1 . 4 0 3 . 0 0 1 . 5 5 3 . 3 0 2 . 1 5 3 . 3 5 1 . 8 5 B l o c k S h a h g a r h B a r g a d e h a n k a p u r w a 5 . 6 4 1 . 9 5 5 . 1 1 2 . 1 7 5 . 3 3 2 . 4 5 5 . 4 8 4 . 3 2 2 . 2 7 4 . 8 7 P r a n i y a r p i e z o D R Y P u r w a g a o n 5 . 9 4 1 . 7 3 4 . 8 0 3 . 1 0 5 . 5 2 4 . 0 0 5 . 9 0 4 . 1 8 4 . 7 0 5 . 1 0 R a g u n a t h p u r 6 . 3 7 2 . 4 0 4 . 7 9 3 . 5 0 6 . 1 5 5 . 0 2 7 . 0 0 4 . 5 8 6 . 5 0 6 . 5 0 S h a g a r h p i e z o 5 . 6 5 1 . 1 5 4 . 2 2 3 . 3 0 5 . 3 2 3 . 7 0 N o t e : P R M : P r e - m o n s o o n , P T M : P o s t M o n s o o n Page 204 UPBSN IESA Report for UPSLRP-III 203 ANNEX-XVI SUMARY OF FINDINGS OF VILLAGE LEVEL SURVEY A. Identification and location of villages S. No. Name of Village Distance from Block HQ (km) Distance from District HQ (km) Distance from Main road (km) A. SODIC VILLAGES i. District Sultanpur 1 Ismailpur 5 20 8 2 Baithoo 16 33 15 3 Sarme 5 60 3 4 Bhoye 3 62 0 5 Sukhi 3 45 12 6 Kohar 6 46 10 7 Ramshah pur 1 38 7 8 Guddoor 8 50 3 9 Deeh Dhaggupur 12 20 10 10 Sakarsi 12 23 12 ii. District Kanpur Dehat 1 Jugrajpur 8 40 4 2 Aliyapur 12 27 8 3 Newada Devrai 20 50 5 4 Khalak pur 10 60 10 5 Nahi junia 5 11 4 6 Patra sadva 8 10 8 7 Chataini 8 30 17 8 Behta 10 25 8 9 Maujam pur 13 65 4 10 Dhakpurwa 13 36 7 iii. District Etah 1 Rajpura 10 25 10 2 Mubarikpur Nibarua 4 18 9 3 Bijauri 15 7 2.5 4 Dastam pur 5 21 13 5 Sena Kala 9 28 9 6 Chaprai 10 12 1.5 7 Bagwala 15 15 0 8 Raja rijola 9 45 9 9 Ranethi 8 40 3 10 Jari 21 50 3 B. RAVINE VILLAGES i. District Kanpur Dehat 1 Sanya salvahan 4 13 1 2 Jarsain 10 25 7 3 Paronkh 8 35 15 4 Khalla 6 40 1.5 Page 205 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 4 B . C a s t e c o m p o s i t i o n o f h o u s e h o l d s a n d p o p u l a t i o n N u m b e r o f h o u s e h o l d s N u m b e r o f h o u s e h o l d s M a l e p o p u l a t i o n F e m a l e p o p u l a t i o n S N N a m e o f V i l l a g e G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l 1 I s m i l e p u r [ D i s t t . S u l t a n p u r ] 2 5 1 1 5 6 0 2 0 0 1 5 0 7 0 0 3 7 5 1 2 2 5 9 0 4 0 0 2 7 5 7 6 5 6 0 3 0 0 1 0 0 4 6 0 2 B a i t h o o [ D i s t t . S u l t a n p u r ] 3 8 5 5 8 4 1 7 7 3 2 0 4 2 5 6 1 0 1 3 5 5 1 7 5 2 4 0 3 4 0 7 5 5 1 4 5 1 8 5 2 7 0 6 0 0 3 S a r m e [ D i s t t . S u l t a n p u r ] 4 2 1 2 0 2 0 0 3 6 2 3 4 0 9 0 0 1 4 1 0 2 6 5 0 1 9 0 4 8 5 7 5 0 1 4 2 5 1 5 0 4 1 5 6 6 0 1 2 2 5 4 B h o y e [ D i s t t . S u l t a n p u r ] 3 0 4 0 1 3 0 2 0 0 2 5 0 3 5 0 9 7 5 1 5 7 5 1 3 5 1 9 0 5 2 0 8 4 5 1 1 5 1 6 0 4 5 5 7 3 0 5 S u k h i [ D i s t t . S u l t a n p u r ] 6 0 3 5 2 0 5 3 0 0 4 5 0 2 1 0 9 9 0 1 6 5 0 2 5 0 1 1 0 5 0 0 8 6 0 2 0 0 1 0 0 4 9 0 7 9 0 6 K o h a r [ D i s t t . S u l t a n p u r ] 6 0 1 5 5 0 1 2 5 3 3 0 9 0 2 8 0 7 0 0 1 8 0 5 4 1 6 8 4 0 2 1 5 0 3 6 1 1 2 2 9 8 7 R a m s h a h p u r [ D i s t t . S u l t a n p u r ] 5 0 1 0 0 1 5 0 3 0 0 2 0 0 4 0 0 4 0 0 1 0 0 0 1 2 5 2 0 0 1 5 0 4 7 5 7 5 2 0 0 2 5 0 5 2 5 8 G u d d o o r [ D i s t t . S u l t a n p u r ] 5 0 2 5 0 1 2 5 4 2 5 3 0 0 1 3 5 0 7 8 0 2 4 3 0 1 6 0 7 0 0 4 3 0 1 2 9 0 1 4 0 6 5 0 3 5 0 1 1 4 0 9 D e e h d h a g g u p u r [ D i s t t . S u l t a n p u r ] 3 0 4 0 6 5 1 3 5 2 3 0 3 0 0 4 8 0 1 0 1 0 1 3 0 1 7 5 2 7 0 5 7 5 1 0 0 1 2 5 2 1 0 4 3 5 1 0 S a k a r s i [ D i s t t . S u l t a n p u r ] 4 0 2 6 0 1 0 0 4 0 0 4 0 0 2 0 0 0 6 0 0 3 0 0 0 2 0 0 1 1 0 0 3 2 5 1 6 2 5 2 0 0 9 0 0 2 7 5 1 3 7 5 1 1 J u g r a j p u r [ D i s t t . K a n p u r ] 5 0 5 4 3 0 1 3 4 4 3 0 4 5 0 2 6 0 1 1 4 0 2 3 0 2 4 0 1 4 0 6 1 0 2 0 0 2 1 0 1 2 0 5 3 0 1 2 A l i y a p u r [ D i s t t . K a n p u r ] 1 1 0 1 0 0 6 0 2 7 0 8 3 0 7 3 0 4 9 0 2 0 5 0 4 5 0 3 9 5 2 6 5 1 1 1 0 3 8 0 3 3 5 2 2 5 9 4 0 1 3 N e w a d a D e v r a i [ D i s t t . K a n p u r ] 1 0 0 1 3 5 8 2 3 1 7 6 0 0 9 6 5 5 9 0 2 1 5 5 3 3 0 5 1 5 3 2 5 1 1 7 0 2 7 0 4 5 0 2 6 5 9 8 5 1 4 K h a l a k p u r [ D i s t t . K a n p u r ] 0 1 8 3 6 2 2 4 5 0 1 2 5 0 3 9 0 1 6 4 0 0 6 5 0 2 1 0 8 6 0 0 6 0 0 1 8 0 7 8 0 1 5 N a h i j u n i a [ D i s t t . K a n p u r ] 1 3 5 5 8 4 9 2 4 2 8 1 0 3 8 0 3 4 0 1 5 3 0 4 2 5 2 0 0 1 8 0 8 0 5 3 8 5 1 8 0 1 6 0 7 2 5 1 6 P a t r a s a d v a [ D i s t t . K a n p u r ] 3 2 3 4 9 1 7 6 5 4 8 2 0 0 0 3 4 3 1 2 3 2 3 5 7 5 1 0 3 0 1 8 0 6 4 2 1 8 5 2 9 7 0 1 6 3 5 9 0 1 7 2 3 1 7 C h a t a i n i [ D i s t t . K a n p u r ] 7 1 8 2 1 7 2 0 6 5 0 1 4 3 0 1 2 0 1 6 0 0 2 7 7 7 0 6 5 8 6 2 2 3 6 6 0 5 5 7 3 8 1 8 B e h t a [ D i s t t . K a n p u r ] 2 8 1 0 1 1 4 5 2 7 4 1 8 5 7 1 0 1 1 4 0 2 0 3 5 9 5 3 7 0 6 0 0 1 0 6 5 9 0 3 4 0 5 4 0 9 7 0 1 9 M a u j a m p u r [ D i s t t . K a n p u r ] 2 2 2 9 4 6 1 3 7 7 1 3 5 2 0 0 0 1 6 0 2 2 9 5 7 0 1 0 4 0 8 5 1 1 9 5 6 5 9 6 0 7 5 1 1 0 0 2 0 D h a k p u r w a [ D i s t t . K a n p u r ] 2 5 5 0 5 5 1 3 0 1 5 0 3 0 0 4 1 0 8 6 0 8 0 1 6 0 2 2 0 4 6 0 7 0 1 4 0 1 9 0 4 0 0 2 1 R a j p u r a [ D i s t t . E t a h ] 2 4 2 4 1 2 0 5 4 6 1 5 2 9 0 0 7 8 0 3 6 9 5 8 1 5 0 0 4 1 0 1 9 1 8 7 1 4 0 0 3 7 0 1 7 7 7 2 2 M u b a r i k p u r N i b a r u a [ D i s t t . E t a h ] 1 2 3 4 0 2 0 3 7 2 8 0 2 0 9 0 1 3 0 2 3 0 0 4 5 1 1 3 0 7 0 1 2 4 5 3 5 9 6 0 6 0 1 0 5 5 2 3 B i j a u r i [ D i s t t . E t a h ] 7 4 1 3 4 1 2 6 3 3 4 4 4 5 9 0 0 8 5 0 2 1 9 5 2 3 0 4 6 6 4 4 5 1 1 4 1 2 1 5 4 3 4 4 0 5 1 0 5 4 2 4 D a s t a m p u r [ D i s t t . E t a h ] 3 1 2 5 5 1 6 3 0 2 1 5 0 9 7 0 1 2 0 1 2 4 0 1 1 5 2 0 5 6 5 3 8 5 3 5 7 6 5 5 5 8 5 5 2 5 S e n a K a l a [ D i s t t . E t a h ] 9 3 2 1 2 9 7 4 0 2 6 7 0 1 4 8 5 8 4 5 3 0 0 0 3 7 0 8 0 5 4 5 5 1 6 3 0 3 0 0 6 8 0 3 9 0 1 3 7 0 Page 206 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 5 N u m b e r o f h o u s e h o l d s N u m b e r o f h o u s e h o l d s M a l e p o p u l a t i o n F e m a l e p o p u l a t i o n S N N a m e o f V i l l a g e G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l 2 6 C h a p r a i [ D i s t t . E t a h ] 3 4 1 4 6 5 5 2 3 5 3 0 0 1 2 3 0 4 7 0 2 0 0 0 1 6 5 6 7 5 2 6 0 1 1 0 0 1 3 5 5 5 5 2 1 0 9 0 0 2 7 B a g w a l a [ D i s t t . E t a h ] 6 5 1 9 4 2 3 1 4 9 0 4 3 0 1 2 6 0 1 6 0 0 3 2 9 0 2 2 0 6 5 0 8 4 0 1 7 1 0 2 1 0 6 1 0 7 6 0 1 5 8 0 2 8 R a j a r i j o l a [ D i s t t . E t a h ] 1 8 2 3 6 2 8 6 6 3 0 1 3 6 0 2 7 4 0 6 5 0 4 7 5 0 7 4 5 1 4 8 0 3 5 0 2 5 7 5 6 1 5 1 2 6 0 3 0 0 2 1 7 5 2 9 R a n e t h i [ D i s t t . E t a h ] 1 2 8 5 0 3 9 2 1 7 1 1 9 0 4 5 5 3 5 5 2 0 0 0 6 4 0 2 4 5 2 0 5 1 0 9 0 5 5 0 2 1 0 1 5 0 9 1 0 3 0 J a r i [ D i s t t . E t a h ] 1 4 2 0 0 3 2 1 7 9 0 1 2 7 0 2 1 1 3 8 1 4 6 6 6 0 1 1 7 1 7 4 4 6 1 0 1 0 6 6 4 3 1 S a n y a s a l v a h a n [ D i s t t . K a n p u r ( R a v i n e ) ] 1 7 6 1 2 2 1 0 0 1 2 0 4 4 5 1 6 0 7 2 5 6 5 2 4 5 8 5 3 9 5 5 5 2 0 0 7 5 3 3 0 3 2 J a r s a i n [ D i s t t . K a n p u r ( R a v i n e ) ] 1 5 0 1 0 0 1 0 0 3 5 0 9 0 0 4 0 0 5 0 0 1 8 0 0 6 7 5 2 4 0 2 7 5 1 1 9 0 2 2 5 1 6 0 2 2 5 6 1 0 3 3 P a r o n k h [ D i s t t . K a n p u r ( R a v i n e ) ] 2 3 7 2 4 8 1 0 2 5 8 7 1 4 8 1 1 5 4 0 6 3 7 3 6 5 8 8 1 5 8 7 3 3 5 0 2 0 3 8 6 6 6 6 6 7 2 8 7 1 6 2 0 3 4 K h a l l a [ D i s t t . K a n p u r ( R a v i n e ) ] 2 5 2 8 7 3 6 3 4 8 1 7 5 2 2 0 0 2 8 0 2 6 5 5 9 5 1 1 6 0 1 5 0 1 4 0 5 8 0 1 0 4 0 1 3 0 1 2 5 0 Page 207 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 6 C . C a s t e c o m p o s i t i o n o f h o u s e h o l d s a n d p o p u l a t i o n N u m b e r o f h o u s e h o l d s T o t a l p o p u l a t i o n M a l e p o p u l a t i o n F e m a l e p o p u l a S . N o . N a m e o f V i l l a g e G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T 1 I s m i l e p u r [ D i s t t . S u l t a n p u r ] 2 5 1 1 5 6 0 2 0 0 1 5 0 7 0 0 3 7 5 1 2 2 5 9 0 4 0 0 2 7 5 7 6 5 6 0 3 0 0 1 0 0 2 B a i t h o o [ D i s t t . S u l t a n p u r ] 3 8 5 5 8 4 1 7 7 3 2 0 4 2 5 6 1 0 1 3 5 5 1 7 5 2 4 0 3 4 0 7 5 5 1 4 5 1 8 5 2 7 0 3 S a r m e [ D i s t t . S u l t a n p u r ] 4 2 1 2 0 2 0 0 3 6 2 3 4 0 9 0 0 1 4 1 0 2 6 5 0 1 9 0 4 8 5 7 5 0 1 4 2 5 1 5 0 4 1 5 6 6 0 4 B h o y e [ D i s t t . S u l t a n p u r ] 3 0 4 0 1 3 0 2 0 0 2 5 0 3 5 0 9 7 5 1 5 7 5 1 3 5 1 9 0 5 2 0 8 4 5 1 1 5 1 6 0 4 5 5 5 S u k h i [ D i s t t . S u l t a n p u r ] 6 0 3 5 2 0 5 3 0 0 4 5 0 2 1 0 9 9 0 1 6 5 0 2 5 0 1 1 0 5 0 0 8 6 0 2 0 0 1 0 0 4 9 0 6 K o h a r [ D i s t t . S u l t a n p u r ] 6 0 1 5 5 0 1 2 5 3 3 0 9 0 2 8 0 7 0 0 1 8 0 5 4 1 6 8 4 0 2 1 5 0 3 6 1 1 2 7 R a m s h a h p u r [ D i s t t . S u l t a n p u r ] 5 0 1 0 0 1 5 0 3 0 0 2 0 0 4 0 0 4 0 0 1 0 0 0 1 2 5 2 0 0 1 5 0 4 7 5 7 5 2 0 0 2 5 0 8 G u d d o o r [ D i s t t . S u l t a n p u r ] 5 0 2 5 0 1 2 5 4 2 5 3 0 0 1 3 5 0 7 8 0 2 4 3 0 1 6 0 7 0 0 4 3 0 1 2 9 0 1 4 0 6 5 0 3 5 0 9 D e e h d h a g g u p u r [ D i s t t . S u l t a n p u r ] 3 0 4 0 6 5 1 3 5 2 3 0 3 0 0 4 8 0 1 0 1 0 1 3 0 1 7 5 2 7 0 5 7 5 1 0 0 1 2 5 2 1 0 1 0 S a k a r s i [ D i s t t . S u l t a n p u r ] 4 0 2 6 0 1 0 0 4 0 0 4 0 0 2 0 0 0 6 0 0 3 0 0 0 2 0 0 1 1 0 0 3 2 5 1 6 2 5 2 0 0 9 0 0 2 7 5 1 1 J u g r a j p u r [ D i s t t . K a n p u r ] 5 0 5 4 3 0 1 3 4 4 3 0 4 5 0 2 6 0 1 1 4 0 2 3 0 2 4 0 1 4 0 6 1 0 2 0 0 2 1 0 1 2 0 1 2 A l i y a p u r [ D i s t t . K a n p u r ] 1 1 0 1 0 0 6 0 2 7 0 8 3 0 7 3 0 4 9 0 2 0 5 0 4 5 0 3 9 5 2 6 5 1 1 1 0 3 8 0 3 3 5 2 2 5 1 3 N e w a d a D e v r a i [ D i s t t . K a n p u r ] 1 0 0 1 3 5 8 2 3 1 7 6 0 0 9 6 5 5 9 0 2 1 5 5 3 3 0 5 1 5 3 2 5 1 1 7 0 2 7 0 4 5 0 2 6 5 1 4 K h a l a k p u r [ D i s t t . K a n p u r ] 0 1 8 3 6 2 2 4 5 0 1 2 5 0 3 9 0 1 6 4 0 0 6 5 0 2 1 0 8 6 0 0 6 0 0 1 8 0 1 5 N a h i j u n i a [ D i s t t . K a n p u r ] 1 3 5 5 8 4 9 2 4 2 8 1 0 3 8 0 3 4 0 1 5 3 0 4 2 5 2 0 0 1 8 0 8 0 5 3 8 5 1 8 0 1 6 0 1 6 P a t r a s a d v a [ D i s t t . K a n p u r ] 3 2 3 4 9 1 7 6 5 4 8 2 0 0 0 3 4 3 1 2 3 2 3 5 7 5 1 0 3 0 1 8 0 6 4 2 1 8 5 2 9 7 0 1 6 3 5 9 0 1 7 C h a t a i n i [ D i s t t . K a n p u r ] 7 1 8 2 1 7 2 0 6 5 0 1 4 3 0 1 2 0 1 6 0 0 2 7 7 7 0 6 5 8 6 2 2 3 6 6 0 5 5 1 8 B e h t a [ D i s t t . K a n p u r ] 2 8 1 0 1 1 4 5 2 7 4 1 8 5 7 1 0 1 1 4 0 2 0 3 5 9 5 3 7 0 6 0 0 1 0 6 5 9 0 3 4 0 5 4 0 1 9 M a u j a m p u r [ D i s t t . K a n p u r ] 2 2 2 9 4 6 1 3 7 7 1 3 5 2 0 0 0 1 6 0 2 2 9 5 7 0 1 0 4 0 8 5 1 1 9 5 6 5 9 6 0 7 5 2 0 D h a k p u r w a [ D i s t t . K a n p u r ] 2 5 5 0 5 5 1 3 0 1 5 0 3 0 0 4 1 0 8 6 0 8 0 1 6 0 2 2 0 4 6 0 7 0 1 4 0 1 9 0 2 1 R a j p u r a [ D i s t t . E t a h ] 2 4 2 4 1 2 0 5 4 6 1 5 2 9 0 0 7 8 0 3 6 9 5 8 1 5 0 0 4 1 0 1 9 1 8 7 1 4 0 0 3 7 0 2 2 M u b a r i k p u r N i b a r u a [ D i s t t . E t a h ] 1 2 3 4 0 2 0 3 7 2 8 0 2 0 9 0 1 3 0 2 3 0 0 4 5 1 1 3 0 7 0 1 2 4 5 3 5 9 6 0 6 0 2 3 B i j a u r i [ D i s t t . E t a h ] 7 4 1 3 4 1 2 6 3 3 4 4 4 5 9 0 0 8 5 0 2 1 9 5 2 3 0 4 6 6 4 4 5 1 1 4 1 2 1 5 4 3 4 4 0 5 2 4 D a s t a m p u r [ D i s t t . E t a h ] 3 1 2 5 5 1 6 3 0 2 1 5 0 9 7 0 1 2 0 1 2 4 0 1 1 5 2 0 5 6 5 3 8 5 3 5 7 6 5 5 5 2 5 S e n a K a l a [ D i s t t . E t a h ] 9 3 2 1 2 9 7 4 0 2 6 7 0 1 4 8 5 8 4 5 3 0 0 0 3 7 0 8 0 5 4 5 5 1 6 3 0 3 0 0 6 8 0 3 9 0 Page 208 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 0 7 N u m b e r o f h o u s e h o l d s T o t a l p o p u l a t i o n M a l e p o p u l a t i o n F e m a l e p o p u l a S . N o . N a m e o f V i l l a g e G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T T o t a l G C B C S C / S T 2 6 C h a p r a i [ D i s t t . E t a h ] 3 4 1 4 6 5 5 2 3 5 3 0 0 1 2 3 0 4 7 0 2 0 0 0 1 6 5 6 7 5 2 6 0 1 1 0 0 1 3 5 5 5 5 2 1 0 2 7 B a g w a l a [ D i s t t . E t a h ] 6 5 1 9 4 2 3 1 4 9 0 4 3 0 1 2 6 0 1 6 0 0 3 2 9 0 2 2 0 6 5 0 8 4 0 1 7 1 0 2 1 0 6 1 0 7 6 0 2 8 R a j a r i j o l a [ D i s t t . E t a h ] 1 8 2 3 6 2 8 6 6 3 0 1 3 6 0 2 7 4 0 6 5 0 4 7 5 0 7 4 5 1 4 8 0 3 5 0 2 5 7 5 6 1 5 1 2 6 0 3 0 0 2 9 R a n e t h i [ D i s t t . E t a h ] 1 2 8 5 0 3 9 2 1 7 1 1 9 0 4 5 5 3 5 5 2 0 0 0 6 4 0 2 4 5 2 0 5 1 0 9 0 5 5 0 2 1 0 1 5 0 3 0 J a r i [ D i s t t . E t a h ] 1 4 2 0 0 3 2 1 7 9 0 1 2 7 0 2 1 1 3 8 1 4 6 6 6 0 1 1 7 1 7 4 4 6 1 0 1 0 3 1 S a n y a s a l v a h a n [ D i s t t . K a n p u r ( R a v i n e ) ] 1 7 6 1 2 2 1 0 0 1 2 0 4 4 5 1 6 0 7 2 5 6 5 2 4 5 8 5 3 9 5 5 5 2 0 0 7 5 3 2 J a r s a i n [ D i s t t . K a n p u r ( R a v i n e ) ] 1 5 0 1 0 0 1 0 0 3 5 0 9 0 0 4 0 0 5 0 0 1 8 0 0 6 7 5 2 4 0 2 7 5 1 1 9 0 2 2 5 1 6 0 2 2 5 3 3 P a r o n k h [ D i s t t . K a n p u r ( R a v i n e ) ] 2 3 7 2 4 8 1 0 2 5 8 7 1 4 8 1 1 5 4 0 6 3 7 3 6 5 8 8 1 5 8 7 3 3 5 0 2 0 3 8 6 6 6 6 6 7 2 8 7 3 4 K h a l l a [ D i s t t . K a n p u r ( R a v i n e ) ] 2 5 2 8 7 3 6 3 4 8 1 7 5 2 2 0 0 2 8 0 2 6 5 5 9 5 1 1 6 0 1 5 0 1 4 0 5 8 0 1 0 4 0 1 3 0 A v e r a g e 6 7 1 5 4 8 7 3 0 9 4 5 8 1 0 3 4 5 7 1 2 0 6 4 2 5 3 5 4 4 3 0 7 1 1 0 4 2 0 5 4 9 0 2 6 5 Page 209 UPBSN IESA Report for UPSLRP-III 208 D. Access to irrigation facilities in study Area Villages S No. District Village Number of borings/ tube wells Number of ponds Access to canal irrigation 1 Ismile pur 70 3 Yes 2 Baithoo 25 15 Yes 3 Sarme 40 10 Yes 4 Bhoye 75 8 Yes 5 Sukhi 50 6 Yes 6 Kohar 59 20 Yes 7 Ramshah pur 50 10 Yes 8 Guddoor 20 5 Yes 9 Deeh dhaggupur 60 6 No 10 Sultanpur Sakarsi 70 6 Yes 11 Jugrajpur 20 3 No 12 Aliyapur 80 4 No 13 Newada Devrai 10 5 Yes 14 Khalak pur 40 5 Yes 15 Nahi junia 60 14 Yes 16 Patra sadva 100 6 Yes 17 Chataini 85 2 No 18 Behta 40 3 Yes 19 Maujam pur 65 4 Yes 20 Kanpur Dehat Dhakpurwa 25 3 Yes 21 Rajpura 65 3 No 22 Mubarikpur Nibarua 70 4 No 23 Bijauri 80 3 Yes 24 Dastam pur 100 3 Yes 25 Sena Kala 150 2 Yes 26 Chaprai 200 3 No 27 Bagwala 40 6 Yes 28 Raja rijola 200 7 No 29 Ranethi 250 4 No 30 Etah Jari 40 4 No 31 Sanya salvahan 5 4 Yes 32 Jarsain 16 8 No 33 Paronkh 100 5 No 34 Kanpur Dehat (Ravines) Khalla 25 5 Yes Page 210 UPBSN IESA Report for UPSLRP-III 209 E. Access to drainage facilities in Study Area Villages S. No. District Village Name & distance (km) of nearest main drain Is the main drain smooth flowing? (yes/no) 1 Ismile pur sarme drain-3 Yes 2 Baithoo Bhoeydrain-3 Yes 3 Sarme Sukhi drain-3 Yes 4 Bhoye Kohar drain-5 No 5 Sukhi Ramsahpur drain-6 Yes 6 Kohar Guddur drain-5 Yes 7 Ramshah pur Dhaggupur drain-4 Yes 8 Guddoor Guddur drain-5 Yes 9 Deeh dhaggupur Dhaggupur drain-4 Yes 10 Sultanpur Sakarsi Sakarsi drain-3 Yes 11 Jugrajpur Jugrajpur drain-2 No 12 Aliyapur Alliyapur drain-3 No 13 Newada Devrai Nevada drain-1 Yes 14 Khalak pur Khalakpur drain-2 No 15 Nahi junia Jhunia drain-2 No 16 Patra sadva Sarva drain=3 No 17 Chataini Chatoni drain-2 No 18 Behta Behta drain-1 No 19 Maujam pur Moujam drain-2 Yes 20 Kanpur Dehat Dhakpurwa Dhakwa drain-3 No 21 Rajpura Rajpura drain-0.5 No 22 Mubarikpur Nibarua Kak nadi-0.6 No 23 Bijauri Bijori Nala-0 Yes 24 Dastam pur Arind Nadi-0.1 Yes 25 Sena Kala Isan nadi-0.5 Yes 26 Chaprai Isan nadi-0.6 No 27 Bagwala Bagvala drain-0.5 No 28 Raja rijola Raja Rijola-1 No 29 Ranethi Jari Drain-2 Yes 30 Etah Jari Jari nala-0 No 31 Sanya salvahan Sengur Nadi-3 Yes 32 Jarsain Sengur Nadi-3 Yes 33 Paronkh Paronkh nala-0 Yes 34 Kanpur Dehat (Ravines) Khalla Kuti nala-1 No Page 211 UPBSN IESA Report for UPSLRP-III 210 F. Distance of educational facilities from the villages covered under the survey S No. District Village BA PS MS HS IM GR PG 1 Ismile pur 0 0 0 5 5 20 20 2 Baithoo 0 0 6 6 6 36 36 3 Sarme 0 0 0 5 5 5 25 4 Bhoye 0 0 3 3 3 3 62 5 Sukhi 0 0 3 3 3 3 3 6 Kohar 1 1 1 1 1 7 7 7 Ramshah pur 0 0 2 8 8 8 8 8 Guddoor 0 0 0 6 6 15 15 9 Deeh dhaggupur 0 0 0 3 3 120 10 Sultanpur Sakarsi 0 0 0 2 2 2 2 11 Jugrajpur 0 0 2 2 10 18 35 12 Aliyapur 0 0 0 12 12 35 35 13 Newada Devrai 0 0 0 5 5 7 55 14 Khalak pur 0 0 4 4 12 24 24 15 Nahi junia 0 0 0 3 3 16 16 16 Patra sadva 0 0 3 12 12 40 17 Chataini 0 0 3 3 15 45 45 18 Behta 0 0 0 1.5 1.5 33 33 19 Maujam pur 0 0 0 4 4 4 45 20 Kanpur Dehat Dhakpurwa 0 0 4 2 6 6 85 21 Rajpura 0 0 0 10 10 25 25 22 Mubarikpur Nibarua 0 0 0.7 0.5 0.5 3 3 23 Bijauri 0 0 0 7 7 7 7 24 Dastam pur 0 0 0 4 4 4 4 25 Sena Kala 0 0 0 3 3 28 28 26 Chaprai 1.5 1.5 1.5 1.5 1.5 12 12 27 Bagwala 0 0 0 12 12 12 15 28 Raja rijola 0 1 0 2 9 15 15 29 Ranethi 0 0 0 8 8 18 18 30 Etah Jari 0 0 2 14 14 21 21 31 Sanya salvahan 0 0 2 7 7 12 12 32 Jarsain 0 0 5 5 30 30 30 33 Paronkh 0 0 0 8 10 80 34 Kanpur Dehat (Ravines) Khalla 0 0 0 4 4 7 10 Note: BA: Balwadi/Anganwadi; PS: Primary School; MS: Middle school; HS. High School; IM: Intermediate; GR: Graduation; PG: Post-Graduation Page 212 UPBSN IESA Report for UPSLRP-III 211 G. List of villages where National Rural Employment Guarantee Scheme is being implemented S No. Name of Village Status (Yes/No) A. Sodic Villages District Sultanpur 1 Ismile pur Yes 2 Baithoo Yes 3 Sarme Yes 4 Bhoye Yes 5 Sukhi Yes 6 Kohar Yes 7 Ramshah pur Yes 8 Guddoor Yes 9 Deeh dhaggupur Yes 10 Sakarsi Yes District Kanpur Dehat 1 Jugrajpur Yes 2 Aliyapur Yes 3 Newada Devrai Yes 4 Khalak pur Yes 5 Nahi junia Yes 6 Patra sadva Yes 7 Chataini Yes 8 Behta Yes 9 Maujam pur Yes 10 Dhakpurwa Yes District Etah 1 Rajpura Yes 2 Mubarikpur Nibarua No 3 Bijauri Yes 4 Dastam pur No 5 Sena Kala Yes 6 Chaprai No 7 Bagwala Yes 8 Raja rijola Yes 9 Ranethi No 10 Jari Yes B. Ravine Villages District Kanpur Dehat 1 Sanya salvahan Yes 2 Jarsain Yes 3 Paronkh Yes 4 Khalla Yes Page 213 UPBSN IESA Report for UPSLRP-III 212 H. Details of ponds in the villages covered under IESA survey S No. Name of Village No. of ponds No. of ponds renovated in last 2 years A. Sodic Villages District Sultanpur 1 Ismile pur 3 3 2 Baithoo 10 2 3 Sarme 10 0 4 Bhoye 8 1 5 Sukhi 6 0 6 Kohar 10 1 7 Ramshah pur 10 1 8 Guddoor 4 1 9 Deeh dhaggupur 6 0 10 Sakarsi 6 0 Total 83 9 District Kanpur Dehat 1 Jugrajpur 3 0 2 Aliyapur 4 0 3 Newada Devrai 1 1 4 Khalak pur 5 1 5 Nahi junia 14 1 6 Patra sadva 6 1 7 Chataini 2 0 8 Behta 3 1 9 Maujam pur 8 2 10 Dhakpurwa 3 0 Total 47 9 District Etah 1 Rajpura 3 1 2 Mubarikpur Nibarua 2 2 3 Bijauri 3 1 4 Dastam pur 3 1 5 Sena Kala 2 1 6 Chaprai 3 2 7 Bagwala 6 3 8 Raja rijola 7 4 9 Ranethi 4 0 10 Jari 4 2 Total 37 17 B. Ravine Villages District Kanpur Dehat 1 Sanya salvahan 4 3 Page 214 UPBSN IESA Report for UPSLRP-III 213 S No. Name of Village No. of ponds No. of ponds renovated in last 2 years 2 Jarsain 8 2 3 Paronkh 5 3 4 Khalla 6 1 Total 23 9 I. Details of villages affected due to waterlogging S No. District Village Affected by waterlogging (yes/no) No. of days Area affected (ha) 1 Ismile pur No - - 2 Baithoo Yes 4 90 3 Sarme Yes 100 180 4 Bhoye No - - 5 Sukhi Yes 25 30 6 Kohar Yes 15 120 7 Ramshah pur Yes 50 7 8 Guddoor No - - 9 Deeh dhaggupur Yes 50 180 10 Sultanpur Sakarsi Yes 3 30 11 Jugrajpur No - - 12 Aliyapur No - - 13 Newada Devrai Yes 60 100 14 Khalak pur Yes 45 10 15 Nahi junia No - - 16 Patra sadva Yes 90 8 17 Chataini No - - 18 Behta No - - 19 Maujam pur Yes 90 40 20 Kanpur Dehat Dhakpurwa No - - 21 Rajpura No - - 22 Mubarikpur Nibarua Yes 10 3 23 Bijauri Yes 120 1 24 Dastam pur Yes 90 14 25 Sena Kala Yes 60 5 26 Chaprai Yes 30 8 27 Bagwala Yes 90 4 28 Raja rijola No - - 29 Ranethi Yes 15 2 30 Etah Jari Yes 120 15 31 Kanpur Sanya salvahan No - - Page 215 UPBSN IESA Report for UPSLRP-III 214 S No. District Village Affected by waterlogging (yes/no) No. of days Area affected (ha) 32 Jarsain No - - 33 Paronkh No - - 34 Dehat (Ravines) Khalla No - - Page 216 UPBSN IESA Report for UPSLRP-III 215 ANNEX-XVII SUMARY OF FINDINGS OF HOUSEHOLD SURVEY A. Occupational profile of respondent households covered as a part of Survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Sodic Villages Males - Primary Occupation Salaried % 7% 10% 24% 9% Family farm % 72% 78% 64% 73% Labor % 15% 7% 4% 12% Trade/business % 4% 4% 6% 4% Profession/technical % 2% 1% 3% 2% Caste-based % 1% 0% 0% 1% Males - Secondary Occupation Salaried % 18% 7% 9% 15% Family farm % 13% 9% 18% 12% Labor % 55% 65% 9% 57% Trade/business % 7% 12% 55% 9% Profession/technical % 4% 6% 9% 4% Caste-based % 3% 1% 0% 3% Females - Primary Occupation Salaried % 8% 4% 69% 14% Family farm % 68% 88% 27% 70% Labor % 20% 4% 4% 11% Trade/business % 4% 3% 0% 3% Profession/technical % 0% 1% 0% 0% Caste-based % 0% 1% 0% 0% Females - Secondary Occupation Salaried % 0% 0% 0% 0% Family farm % 5% 0% 0% 3% Labor % 82% 60% 0% 77% Trade/business % 11% 40% 0% 17% Profession/technical % 2% 0% 0% 1% Caste-based % 2% 0% 0% 1% Ravine Villages Males - Primary Occupation Salaried % 9% 19% 26% 15% Family farm % 57% 69% 68% 63% Labor % 32% 6% 3% 18% Trade/business % 2% 0% 3% 1% Profession/technical % 0% 6% 0% 2% Page 217 UPBSN IESA Report for UPSLRP-III 216 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Caste-based % 0% 0% 0% 0% Males - Secondary Occupation Salaried % 0% 9% 0% 3% Family farm % 18% 5% 0% 11% Labor % 76% 27% 0% 50% Trade/business % 3% 45% 100% 29% Profession/technical % 3% 14% 0% 6% Caste-based % 0% 0% 0% 0% Females - Primary Occupation Salaried % 0% 0% 0% 0% Family farm % 64% 88% 80% 74% Labor % 21% 0% 0% 11% Trade/business % 14% 0% 20% 11% Profession/technical % 0% 13% 0% 4% Caste-based % 0% 0% 0% 0% Females - Secondary Occupation Salaried % 0% 0% 0% 0% Family farm % 0% 0% 0% 0% Labor % 100% 40% 0% 40% Trade/business % 0% 60% 100% 60% Profession/technical % 0% 0% 0% 0% Caste-based % 0% 0% 0% 0% B. Laborer profile of respondent households covered as a part of Survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES MALE LABORERS Average wage earning days Local Days/laborer 134 137 40 134 Outside Days/laborer 112 116 142 114 Total Days/laborer 246 253 182 247 Average wage rate Local Rs./day 65.58 69.58 70.00 66.43 Outside Rs./day 84.41 86.54 100.00 85.39 Type of work - Local Farm work % 50% 65% 100% 53% Civil work % 8% 5% 0% 7% Brick field % 19% 13% 0% 18% Construction % 16% 13% 0% 15% Page 218 UPBSN IESA Report for UPSLRP-III 217 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Trade % 1% 1% 0% 1% Factory % 2% 0% 0% 2% Transport % 1% 0% 0% 1% Type of work - Outside Farm work % 7% 20% 0% 11% Civil work % 13% 3% 0% 10% Brick field % 6% 6% 0% 6% Construction % 68% 52% 100% 64% Trade % 1% 9% 0% 3% Factory % 3% 10% 0% 5% Transport % 2% 0% 0% 1% Wage Income Local Rs./laborer 8776 9557 2800 8869 Outside Rs./laborer 9467 10022 14167 9731 Total Rs./laborer 18243 19579 16967 18600 FEMALE LABORERS Average wage earning days Local days/laborer 85 52 79 Outside days/laborer 120 5 51 Total days/laborer 205 57 129 Average wage rate Local Rs./day 51.96 56.74 52.89 Outside Rs./day 100 27 63.5 Type of work - Local Farm work % 56% 68% 58% Civil work % 1% 0% 1% Brick field % 41% 21% 37% Construction % 3% 11% 4% Trade % 0% 0% 0% Factory % 0% 0% 0% Transport % 0% 0% 0% Type of work - Outside Farm work % 0% 33% 17% Civil work % 0% 0% 0% Brick field % 0% 0% 0% Construction % 67% 0% 33% Trade % 0% 33% 17% Factory % 33% 33% 33% Transport % 0% 0% 0% Wage Income Local Rs./laborer 4419 2953 0 4160 Outside Rs./laborer 12000 126 0 3226 Page 219 UPBSN IESA Report for UPSLRP-III 218 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Total Rs./laborer 16419 3079 0 7386 RAVINE VILLAGES MALE LABORERS Average wage earning days Local days/laborer 83 160 100 96 Outside days/laborer 113 130 114 Total days/laborer 196 290 210 Average wage rate Local Rs./day 74.00 86.11 60.00 76 Outside Rs./day 100.00 105.00 100 Type of work – Local Farm work % 63% 8% 100% 54% Civil work % 4% 25% 0% 7% Brick field % 2% 42% 0% 9% Construction % 13% 0% 0% 10% Trade % 0% 0% 0% 0% Factory % 0% 0% 0% 0% Transport % 0% 0% 0% 0% Type of work – Outside Farm work % 3% 33% 5% Civil work % 0% 0% 0% Brick field % 0% 0% 0% Construction % 76% 0% 70% Trade % 0% 0% 0% Factory % 15% 33% 16% Transport % 6% 33% 8% Wage Income Local Rs./laborer 6117 13778 6000 7242 Outside Rs./laborer 11303 13650 0 11432 Total Rs./laborer 17420 27428 6000 18674 FEMALE LABORERS Average wage earning days Local days/laborer 54 135 79 Outside days/laborer 80 80 Total days/laborer 134 159 Average wage rate Local Rs./day 66.00 115.00 80.00 Outside Rs./day 0 0 Type of work – Local Farm work % 100% 50% 83% Civil work % 0% 0% 0% Page 220 UPBSN IESA Report for UPSLRP-III 219 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Brick field % 0% 50% 17% Construction % 0% 0% 0% Trade % 0% 0% 0% Factory % 0% 0% 0% Transport % 0% 0% 0% Type of work – Outside Farm work % 100% 100% Civil work % 0% 0% Brick field % 0% 0% Construction % 0% 0% Trade % 0% 0% Factory % 0% 0% Transport % 0% 0% Wage Income Local Rs./laborer 3564 15525 0 6343 Outside Rs./laborer 0 0 0 0 Total Rs./laborer 3564 15525 0 6343 C. Quality of seed used by respondent households covered as a part of survey Particulars Marginal farmers Small farmers Large farmers Overall Paddy Sodic villages Certified 28% 29% 32% 29% Others 72% 71% 68% 71% Ravine villages Certified 25% 33% 25% 29% Others 75% 67% 75% 71% Wheat Sodic villages Certified 24% 37% 44% 29% Others 76% 63% 56% 71% Ravine villages Certified 33% 29% 30% 31% Others 67% 71% 70% 69% Mustard Sodic villages Certified 33% 33% 44% 39% Others 67% 67% 56% 61% Ravine villages Certified 29% 25% 17% 25% Page 221 UPBSN IESA Report for UPSLRP-III 220 Particulars Marginal farmers Small farmers Large farmers Overall Others 71% 75% 83% 75% Potato Sodic villages Certified 0% 0% 0% 0% Others 100% 100% 100% 100% Ravine villages Certified 0% 0% 0% 0% Others 100% 100% 100% 100% Gram Sodic villages Certified 0% 0% 0% 0% Others 100% 100% 100% 100% Ravine villages Certified 0% 0% 0% 0% Others 100% 100% 100% 100% Bajra Sodic villages Certified 31% 29% 100% 32% Others 69% 71% 0% 68% Ravine villages Certified 33% 41% 43% 38% Others 67% 59% 57% 62% D. Marketing of agricultural produce by respondent households covered as part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Sodic Areas Sellers of different commodities [Percentage of farmers] Paddy % 28% 49% 59% 36% Wheat % 29% 55% 70% 38% Bajra % 0.0% 1.3% 0.0% 0.3% Mustard % 0.2% 0.0% 1.8% 0.2% Potato % 0.2% 0.0% 0.0% 0.1% Gram % 0.0% 0.4% 0.0% 0.1% Average sold quantity Paddy qt/seller 5.57 13.46 28.94 10.90 Wheat qt/seller 4.74 10.87 18.18 8.64 Bajra qt/seller - 5.33 - 5.33 Page 222 UPBSN IESA Report for UPSLRP-III 221 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Mustard qt/seller 12.00 - 4.00 8.00 Potato qt/seller 3.00 - - 3.00 Gram qt/seller - 2.00 - 2.00 Selling mode Itinerary trader % 17% 20% 15% 18% Fellow farmer % 28% 20% 16% 24% Haat Painth % 11% 6% 4% 9% Town market % 24% 15% 21% 20% Mandi % 21% 38% 44% 30% Ravine villages Sellers of different commodities [Percentage of farmers] Paddy % 0% 13% 20% 7% Wheat % 20% 42% 47% 30% Bajra % 3.6% 0.0% 0.0% 2.0% Mustard % 7.1% 3.2% 6.7% 5.9% Potato % 0.0% 0.0% 0.0% 0.0% Gram % 0.0% 0.0% 0.0% 0.0% Average sold quantity Paddy qt/seller - 7.00 7.67 7.29 Wheat qt/seller 3.18 8.08 15.57 8.03 Bajra qt/seller 1.50 - - 1.50 Mustard qt/seller 2.00 2.00 6.00 2.67 Potato qt/seller - - - - Gram qt/seller - - - - Selling mode Itinerary trader % 14% 0% 11% 8% Fellow farmer % 61% 48% 33% 49% Haat Painth % 11% 0% 11% 7% Town market % 0% 30% 0% 11% Mandi % 14% 22% 44% 25% E. Income details of respondent households covered as part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Page 223 UPBSN IESA Report for UPSLRP-III 222 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Access to non-farm income sources Salary % HH 11% 19% 36% 15% Pension % HH 2% 4% 7% 3% Trade/business % HH 14% 14% 13% 14% Profession % HH 5% 3% 9% 5% Caste-based occupation % HH 2% 0% 0% 2% Remittances % HH 1% 0% 0% 1% Others % HH 1% 1% 2% 1% Non-farm income Rs./HH 14559 26483 110371 23805 Salary Rs./HH 6241 16915 68025 13002 Pension Rs./HH 469 2308 25500 2543 Trade/business Rs./HH 5243 6221 7911 5673 Profession Rs./HH 1601 743 8507 1808 Caste-based occupation Rs./HH 596 21 0 405 Remittances Rs./HH 127 0 0 85 Others Rs./HH 282 274 429 289 Wage income 9404 5858 1718 7978 Farm income Rs./HH 6598 18927 31301 11458 Paddy Rs./HH 2235 5979 9265 3681 Wheat Rs./HH 3990 10940 18943 6794 Bajra Rs./HH 102 128 66 107 Mustard Rs./HH 115 162 2551 282 Potato Rs./HH 156 1719 476 594 Gram Rs./HH 0 0 0 0 Total household income Rs./HH 30,561 51,268 143,390 43,241 RAVINE VILLAGES Access to non-farm income sources Salary % HH 13% 42% 47% 26% Pension % HH 2% 3% 13% 4% Trade/business % HH 14% 45% 40% 27% Profession % HH 0% 6% 7% 3% Caste-based occupation % HH 0% 0% 0% 0% Remittances % HH 0% 0% 0% 0% Others % HH 0% 0% 0% 0% Non-farm income Rs./HH 11768 45950 72813 31134 Salary Rs./HH 7696 28690 56667 21278 Pension Rs./HH 64 2258 6040 1610 Trade/business Rs./HH 4007 12872 6747 7104 Page 224 UPBSN IESA Report for UPSLRP-III 223 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Profession Rs./HH 0 2129 3360 1141 Caste-based occupation Rs./HH 0 0 0 0 Remittances Rs./HH 0 0 0 0 Others Rs./HH 0 0 0 0 Wage income 11895 5882 400 8263 Farm income Rs./HH 3331 14872 12473 8183 Paddy Rs./HH 258 578 683 418 Wheat Rs./HH 1169 7074 4678 3479 Bajra Rs./HH 121 696 928 415 Mustard Rs./HH 1051 4826 3877 2614 Potato Rs./HH 0 44 0 13 Gram Rs./HH 732 1655 2307 1244 Total household income Rs./HH 26,993 66,704 85,686 47,580 F. Housing details of respondent households covered as part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Type of house Pucca %HH 21% 33% 55% 26% Kuchha %HH 43% 32% 20% 39% Chhappar %HH 7% 2% 2% 5% Pucca + Kuchha %HH 7% 10% 9% 8% Pucca + Chhappar %HH 1% 1% 2% 1% Kuchha + Chhappar %HH 12% 8% 4% 11% Pucca + Kuchha + Chhappar %HH 10% 13% 9% 11% Independent cattle yard Yes %HH 40% 57% 68% 46% No %HH 62% 43% 30% 55% Type of cattle yard Pucca %HH 4% 3% 7% 4% Kuchha %HH 19% 12% 16% 16% Chhappar %HH 66% 72% 53% 66% Kuchha + Chhappar %HH 9% 11% 23% 11% Pucca + Kuchha + Chhappar %HH 2% 1% 0% 2% RAVINE VILLAGES Page 225 UPBSN IESA Report for UPSLRP-III 224 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Type of house Pucca %HH 20% 26% 44% 25% Kuchha %HH 45% 6% 19% 29% Chhappar %HH 2% 0% 0% 1% Pucca + Kuchha %HH 14% 29% 31% 21% Pucca + Chhappar %HH 0% 0% 0% 0% Kuchha + Chhappar %HH 18% 19% 6% 17% Pucca + Kuchha + Chhappar %HH 2% 19% 0% 7% Independent cattle yard Yes %HH 39% 39% 38% 39% No %HH 59% 61% 56% 59% Type of cattle yard Pucca %HH 0% 0% 0% 0% Kuchha %HH 3% 0% 38% 7% Chhappar %HH 90% 77% 50% 80% Kuchha + Chhappar %HH 7% 23% 13% 13% Pucca + Kuchha + Chhappar %HH 0% 0% 0% 0% G. Basic amenities of respondent households covered as part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Source of light in house Electricity %HH 4% 9% 21% 7% Kerosene %HH 97% 90% 77% 93% Latrine within house premises No latrine %HH 92% 90% 68% 90% Service latrine %HH 6% 8% 20% 8% Pit latrine %HH 2% 2% 12% 2% Waste water outlet connected to Closed drainage %HH 24% 4% 5% 18% Open drainage %HH 44% 74% 75% 54% No drainage %HH 33% 22% 20% 29% Bathroom within house Yes %HH 6% 14% 45% 14% No %HH 94% 86% 55% 90% Page 226 UPBSN IESA Report for UPSLRP-III 225 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Separate kitchen space in house Yes %HH 4% 19% 43% 11% No %HH 96% 81% 57% 89% RAVINE VILLAGES Source of light in house Electricity %HH 4% 6% 0% 5% Kerosene %HH 96% 94% 94% 95% Latrine within house premises No latrine %HH 93% 97% 91% 93% Service latrine %HH 2% 3% 3% 2% Pit latrine %HH 5% 0% 6% 5% Waste water outlet connected to Closed drainage %HH 0% 3% 0% 1% Open drainage %HH 93% 81% 88% 88% No drainage %HH 7% 16% 6% 10% Bathroom within house Yes %HH 2% 6% 25% 7% No %HH 98% 94% 69% 92% Separate kitchen space in house Yes %HH 2% 3% 13% 4% No %HH 98% 97% 87% 95% H. Drinking water source for respondent households covered as part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Drinking water source – type Hand pump %HH 90% 90% 93% 90% Dug well %HH 9% 8% 3% 8% Hand pump + dug well %HH 1% 2% 4% 2% Drinking water source - availability Within the premises %HH 30% 41% 70% 36% Near the premises %HH 60% 53% 27% 56% Page 227 UPBSN IESA Report for UPSLRP-III 226 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Away %HH 10% 6% 3% 8% Drinking water source - ownership Exclusively owned by household %HH 24% 32% 41% 27% Shared ownership %HH 7% 3% 5% 6% Privately owned %HH 12% 15% 36% 14% Publicly owned %HH 4% 4% 0% 4% Common property %HH 55% 46% 18% 50% Ravine Villages Drinking water source - type Hand pump %HH 82% 84% 78% 83% Dug well %HH 18% 16% 22% 17% Hand pump + dug well %HH 0% 0% 0% 0% Drinking water source – availability Within the premises %HH 2% 16% 6% 7% Near the premises %HH 79% 58% 75% 72% Away %HH 19% 26% 19% 21% Drinking water source - ownership Exclusively owned by household %HH 2% 13% 25% 9% Shared ownership %HH 0% 0% 0% 0% Privately owned %HH 9% 6% 6% 8% Publicly owned %HH 0% 0% 0% 0% Common property %HH 89% 81% 69% 83% I. Livestock owned by respondent households covered as a part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Buffalo Households having buffalo % 43% 52% 78% 49% Average number of buffalo No./H H 1.3 1.3 1.4 1.3 Average milk yield Ltr/da 5.23 5.04 6.76 5.39 Page 228 UPBSN IESA Report for UPSLRP-III 227 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall y Breed of buffalo Anni % 4% 0% 10% 3% Deshi % 92% 100% 86% 94% Murrah % 4% 0% 5% 3% Cow Households having cow % 4% 13% 22% 8% Average number of cow No./H H 1.0 1.1 1.3 1.1 Average milk yield Ltr/da y 2.86 2.18 3.17 2.63 Breed of cow Deshi % 100% 82% 100% 92% Jarsi % 0% 18% 0% 8% Goat Households having goat % 17% 13% 7% 15% Average number of goats No./H H 2.0 1.6 2.5 1.9 Breed of goat Ajmeri % 3% 0% 0% 2% Burbury % 13% 0% 0% 9% Deshi % 84% 100% 100% 89% RAVINE VILLAGES Buffalo Households having buffalo % 38% 74% 67% 53% Average number of buffalo No./H H 1.2 1.4 2.0 1.4 Average milk yield Ltr/da y 5.57 5.83 10.20 6.54 Breed of buffalo Anni % 0% 0% 0% 0% Deshi % 100% 96% 100% 98% Murrah % 0% 4% 0% 2% Cow Households having cow % 13% 23% 20% 17% Average number of cow No./H H 1.4 1.6 1.0 1.4 Average milk yield Ltr/da y 3.71 4.86 5.67 4.53 Breed of cow Page 229 UPBSN IESA Report for UPSLRP-III 228 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Deshi % 100% 100% 100% 100% Jarsi % 0% 0% 0% 0% Goat Households having goat % 27% 42% 33% 32% Average number of goats No./H H 2.1 2.2 9.2 3.2 Breed of goat Ajmeri % 0% 0% 0% 0% Burbury % 0% 0% 0% 0% Deshi % 100% 100% 100% 100% J. Source of fodder for livestock for respondent households covered as a part of survey Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall SODIC VILLAGES Feeding practice Free grazing % 14% 12% 4% 12% Stall feeding % 86% 88% 96% 88% Fodder usage Crop residue % 84% 84% 67% 82% Fodder grass % 16% 16% 33% 18% Source of fodder grass Purchased from market % 31% 43% 33% 35% Forest/wild % 69% 57% 67% 65% Usage of livestock feed Yes % 4% 9% 0% 5% No % 96% 91% 100% 95% Did any animal suffer from any disease? Yes % 13% 8% 7% 11% No % 87% 92% 93% 89% Was veterinary care services availed? Yes % 78% 100% 100% 84% No % 22% 0% 0% 16% RAVINE VILLAGES Feeding practice Page 230 UPBSN IESA Report for UPSLRP-III 229 Household categories Particulars Unit Marginal farmers Small farmers Large farmers Overall Free grazing % 11% 13% 7% 11% Stall feeding % 89% 87% 93% 89% Fodder usage Crop residue % 79% 58% 67% 71% Fodder grass % 21% 42% 33% 29% Source of fodder grass Purchased from market % 33% 8% 20% 20% Forest/wild % 67% 92% 80% 80% Usage of livestock feed Yes % 7% 10% 27% 11% No % 93% 90% 73% 89% Did any animal suffer from any disease? Yes % 13% 29% 40% 22% No % 88% 71% 60% 78% Was veterinary care services availed? Yes % 100% 100% 100% 100% No % 0% 0% 0% 0% K. Access to credit for respondent households covered as a part of survey Parameter Unit Margin al farmers Small farme rs Large farmer s Overall SODIC VILLAGES Source of credit Bank % HH 45% 77% 100% 54% Moneylender % HH 50% 23% 0% 42% Fellow villager/relatives % HH 5% 0% 0% 4% Total borrowers Nos. 38 13 1 52 Purpose of loan Purchasing buffalo % borrowers 11% 15% 0% 12% Purchasing bullock % borrowers 3% 0% 0% 2% Dairy % borrowers 5% 23% 0% 10% Agriculture % borrowers 47% 54% 0% 48% Purchasing goat % borrowers 3% 0% 0% 2% House improvement % borrowers 5% 0% 0% 4% Marriage % borrowers 16% 0% 0% 12% Medical care % borrowers 8% 8% 0% 8% Page 231 UPBSN IESA Report for UPSLRP-III 230 Parameter Unit Margin al farmers Small farme rs Large farmer s Overall Pumpset installation % borrowers 3% 0% 100% 4% Average amount of loan Rs/borrower 21855 24923 14000 22471 Average outstanding amount Rs/borrower 1747 18692 8000 6104 Households with KCC % HH 9% 18% 21% 12% Average cumulative withdrawal Rs/KCC holder 16387 19625 45650 21512 Average outstanding amount Rs/KCC holder 8179 9208 37660 12417 RAVINE VILLAGES Source of credit Bank % HH 40% 0 0 40% Moneylender % HH 40% 0 0 40% Fellow villager/relatives % HH 20% 0 0 20% Total borrowers % HH 5 0 0 5 Purpose of loan Purchasing buffalo % borrowers 0% - - 0% Purchasing bullock % borrowers 0% - - 0% Dairy % borrowers 20% - - 20% Agriculture % borrowers 20% - - 20% Purchasing goat % borrowers 0% - - 0% House improvement % borrowers 40% - - 40% Marriage % borrowers 20% - - 20% Medical care % borrowers 0% - - 0% Pumpset installation % borrowers 0% - - 0% Average amount of loan Rs/borrower 15900 - - 15900 Average outstanding amount Rs/borrower 8400 - - 8400 Households with KCC % HH 17% 19% 10% 12% Average cumulative withdrawal Rs/KCC holder 20154 49992 20056 22681 Average outstanding amount Rs/KCC holder 9731 42392 11035 13404 Page 232 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 1 A n n e x - X V I I I : S t a k e h o l d e r s ’ F e e d b a c k , C o n c e r n s a n d S u g g e s t i o n s 1 8 . 1 : S T A K E H O L D E R : F a r m e r s I S S U E S F E E D B A C K I m p a c t o n a g r i c u l t u r a l b i o - d i v e r s i t y · R e c l a m a t i o n o f s o d i c l a n d s w i l l f a c i l i t a t e g r o w t h o f n e w g r a s s e s a n d c r o p s w h i c h w i l l i m p r o v e t h e d i v e r s i t y · F a r m e r s a r e n o t m u c h a w a r e o f a g r i c u l t u r a l b i o d i v e r s i t y a n d i t s i m p o r t a n c e · R e c l a m a t i o n o f s o d i c l a n d w i l l i m p r o v e s o i l q u a l i t y a n d p r o d u c t i v i t y . I t w i l l c e r t a i n l y e n h a n c e a g r i c u l t u r a l b i o d i v e r s i t y i n t h e v i l l a g e · I f r a v i n e s a r e r e c l a i m e d i t w i l l f a c i l i t a t e g r o w t h o f n e w g r a s s e s a n d c r o p s . U s e o f c h e m i c a l f e r t i l i z e r s a n d p e s t i c i d e s ( t r e n d s a n d c u r r e n t l e v e l a n d i m p a c t o n s o i l q u a l i t y ) · C o n s u m p t i o n o f c h e m i c a l f e r t i l i z e r s i n c r o p s i s h i g h d u e t o i n a d e q u a t e q u a n t i t y o f c o w d u n g a n d f a r m y a r d m a n u r e w i t h f a r m e r s . S u c h t e n d e n c y h a s i n c r e a s e d o v e r t h e p e r i o d m a i n l y d u e t o d e c l i n i n g n u m b e r o f a n i m a l s w i t h h o u s e h o l d s a n d i n c r e a s i n g p r e s s u r e t o e n h a n c e a v a i l a b i l i t y o f f o o d p r o d u c t s f o r f a m i l y c o n s u m p t i o n . D e c l i n i n g s i z e o f h o l d i n g n e c e s s i t a t e s h i g h e r p e r u n i t p r o d u c t i o n i n a v a i l a b l e l a n d . I t i s i n c r e a s i n g o v e r t h e p e r i o d a l s o d u e t o a f f o r d i n g c a p a c i t y o f f a r m e r s . · C h e m i c a l f e r t i l i z e r s h a v e a d v e r s e i m p a c t o n s o i l f e r t i l i t y . S o i l q u a l i t y h a s d e t e r i o r a t e d o v e r t h e p e r i o d . N o w s o i l i s i n c a p a b l e o f g i v i n g g o o d y i e l d w i t h o u t h i g h d o z e o f c h e m i c a l f e r t i l i z e r s . · F a r m e r s a r e w e l l a w a r e a b o u t t h e n e g a t i v e e f f e c t s o f c h e m i c a l f e r t i l i z e r s o n s o i l q u a l i t y . T h e y w i s h t o u s e f a r m y a r d m a n u r e m o r e a n d m o r e b u t i t s l a c k w i t h f a r m e r s c o m p e l t h e m t o u s e c h e m i c a l f e r t i l i z e r s · U s e o f p e s t i c i d e s i s n o t m u c h , h o w e v e r , i t i s d i s c r i m i n a t e , · S c i e n t i s t s s h o u l d i n v e n t n e w v a r i e t i e s w h i c h s h o u l d n o t r e q u i r e u s e o f a n y f e r t i l i z e r . F a r m e r s w i l l p l e a s a n t l y p u r c h a s e t h e s e e d e v e n a t h i g h c o s t . U s e o f I r r i g a t i o n ; e f f e c t o n g r o u n d w a t e r ( a w a r e n e s s a b o u t c o n j u n c t i v e w a t e r u s e ) · T h o u g h s o m e f i e l d s h a v e a c c e s s t o c a n a l w a t e r , b o r e w e l l i s t h e p r i m a r y s o u r c e o f i r r i g a t i o n d u e t o i n a d e q u a c y a n d i r r e g u l a r i t y o f c a n a l w a t e r . M o r e o v e r , n u m b e r o f b o r e w e l l s h a s i n c r e a s e d w h i c h h a s r e s u l t e d i n t o m o r e a n d m o r e e x t r a c t i o n o f g r o u n d w a t e r . E x c e s s i v e e x t r a c t i o n o f g r o u n d w a t e r t h r o u g h p u m p s e t i s c a u s i n g d e p l e t i o n o f g r o u n d w a t e r i n t h e a r e a . I t i s r e f l e c t e d f r o m d r y i n g d u g w e l l s a n d h a n d p u m p s . · F a r m e r s a r e n o t m u c h a w a r e a b o u t c o n j u n c t i v e u s e o f w a t e r . M o r e o v e r , t h e y w i l l p r e f e r t o u s e c a n a l w a t e r i f a v a i l a b l e b e c a u s e i t i s c h e a p e r t h a n b o r e w e l l w a t e r · F a r m e r s f e e l t h a t g r o u n d w a t e r h a s , n o d o u b t , d e p l e t e d o v e r t h e p e r i o d . B u t t h e y a t t r i b u t e i t t o d e c r e a s i n g q u a n t u m o f r a i n f a l l . R a i n f a l l h a s d e c l i n e d o v e r t h e p e r i o d . M o r e o v e r , i t i s c h a r a c t e r i z e d b y l o n g d r y s p e l l w h i c h c o m p e l s f a r m e r s t o u s e a r t i f i c i a l i r r i g a t i o n . · P r o j e c t s h o u l d d o s o m e t h i n g t o r e c h a r g e g r o u n d w a t e r Page 233 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 2 I S S U E S F E E D B A C K · C r o p p i n g p a t t e r n h a s a l s o c h a n g e d o v e r t h e p e r i o d . M o r e w a t e r - d e m a n d i n g c r o p s a r e b e i n g g r o w n b y t h e f a r m e r s . A s a r e s u l t , i r r i g a t i o n i n t e n s i t y h a s i n c r e a s e d . H e n c e , g r o u n d w a t e r i s d e p l e t i n g a t f a s t r a t e . S m a l l f a r m e r s ’ o p p o r t u n i t y t o p a r t i c i p a t e i n t h e p r o j e c t · I f t h e s e l e c t i o n o f f a r m e r a s b e n e f i c i a r y i s d o n e p u r e l y o n o b j e c t i v e c r i t e r i o n , n o f a r m e r w i l l h a v e a n y p r o b l e m i n p a r t i c i p a t i n g i n t h e p r o j e c t . U n l e s s p r o j e c t i s i m p l e m e n t e d i n s t r i c t a d h e r e n c e t o i t s s l a t e d d e s i g n , f a r m e r s o f p o o r s o c i o - e c o n o m i c s t a t u s m a y n o t g e t a p p r o p r i a t e o p p o r t u n i t y t o b e n e f i t f r o m t h e p r o j e c t . F i e l d s t a f f m a y f a v o r s o m e f a r m e r s . · T h e r e i s n e e d f o r c l o s e m o n i t o r i n g o f b e n e f i c i a r y s e l e c t i o n p r o c e s s . P r e f e r a b l y , i t s h o u l d b e d o n e i n o p e n m e e t i n g o f S I C . · I f t h e p r o j e c t e x p e c t s m o n e t a r y c o n t r i b u t i o n , p o o r f a r m e r s m a y n o t b e i n a p o s i t i o n t o p a r t i c i p a t e i n t h e p r o j e c t . · T i n y l a n d - h o l d e r s , w h o a r e d e p e n d e n t o n w a g e e a r n i n g f o r t h e i r l i v e l i h o o d , m a y a l s o h e s i t a t e t o a c t i v a t e p a r t i c i p a t e i n t h e p r o j e c t i f i t i s d e m a n d i n g o n t h e i r t i m e . · P r o j e c t o f f i c e r s , s o m e t i m e s , s h o w s p e c i a l p r e f e r e n c e t o r i c h a n d i n f l u e n t i a l p e r s o n s o f t h e v i l l a g e . T h e i r s u c h p r e f e r e n c e t e n d s t o h a m p e r s m a l l a n d p o o r f a r m e r s ’ o p p o r t u n i t y t o p a r t i c i p a t e i n t h e p r o j e c t · T o p m a n a g e m e n t s h o u l d d e v e l o p t r a n s p a r e n t a n d o b j e c t i v e c r i t e r i a f o r b e n e f i c i a r y s e l e c t i o n s o t h a t a l l f a r m e r s g e t e q u a l o p p o r t u n i t i e s t o t a k e p r o j e c t b e n e f i t s . W e e d i n v a s i o n o n a g r i c u l t u r a l f i e l d s · W e e d s i n a g r i c u l t u r a l f i e l d s a r e i m p o r t a n t i s s u e . E s p e c i a l l y p a d d y a n d w h e a t c r o p s s u f f e r f r o m e x c e s s i v e g r o w t h o f w e e d s i n f i e l d . S o m e f a r m e r s u s e c h e m i c a l m e a s u r e s w h i l e o t h e r s r e s o r t t o m a n u a l w e e d i n g w h i c h i n v o l v e s h u g e l a b o r c o s t . F a r m e r s a r e a w a r e a b o u t t h e u s e f u l n e s s o f s u m m e r p l o u g h i n g t o c o n t r o l w e e d s , b u t d u e t o h i g h c o s t i n v o l v e d i n s u m m e r p l o u g h i n g v e r y f e w f a r m e r s g o f o r i t . · P r o j e c t s h o u l d g u i d e t h e f a r m e r s t o a d o p t c h e a p e r m e t h o d s o f w e e d c o n t r o l . C a t t l e p r o d u c t i v i t y ; u n p r o d u c t i v e c a t t l e / f o d d e r s h o r t a g e s · M i l k p r o d u c t i v i t y i s a d v e r s e l y a f f e c t e d b y i n f e r i o r b r e e d a n d l o w n u t r i t i o n o f a n i m a l . F a r m e r s g e n e r a l l y r e a r a n i m a l s o f i n d i s c r i m i n a t e b r e e d w h i c h g i v e l o w e r m i l k y i e l d . I f p o s s i b l e , t h e p r o j e c t s h o u l d p r o v i d e s u p p o r t f o r b r e e d i m p r o v e m e n t , e s p e c i a l l y t h a t o f b u f f a l o a n d c o w . · I n a d e q u a t e f o d d e r a v a i l a b i l i t y i s a n i s s u e . D u e t o s m a l l h o l d i n g s i z e f a r m e r s h a v e n o l a n d t o g r o w f o d d e r c r o p s . A s a c o n s e q u e n c e , t h e y a r e d e p e n d e n t o n c r o p r e s i d u e w h i c h i s p o o r i n n u t r i t i o n v a l u e . F e e d i n g o f d r y c r o p r e s i d u e t o a n i m a l s a d v e r s e l y a f f e c t s m i l k p r o d u c t i v i t y o f b u f f a l o a n d c o w . · U n p r o d u c t i v e c a t t l e p o p u l a t i o n i s q u i t e l a r g e i n t h e v i l l a g e , w h i c h a r e a d d i t i o n a l b u r d e n o n t h e l i m i t e d f o d d e r r e s o u r c e s . E v e n i f s o m e b u f f a l o a n d c o w b e c o m e d r y f a r m e r s d o n o t s e l l t h e s e a n i m a l s t o b u t c h e r s a n d a n y b o d y e l s e d u e t o e m o t i o n a l r e a s o n s A n i m a l d i s e a s e s ( f r e q u e n c y a n d s p r e a d ) · K h u r p a k a , M u h p a k a a n d G a l a g h o n t u a r e c o m m o n a n i m a l d i s e a s e s . I n r a i n y s e a s o n , m a j o r i t y o f Page 234 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 3 I S S U E S F E E D B A C K a n i m a l s s u f f e r f r o m t h e s e d i s e a s e s . · F a r m e r s u s e t r a d i t i o n a l t r e a t m e n t m e t h o d s . S o m e f a r m e r s a l s o r e s o r t t o p r o f e s s i o n a l v e t e r i n a r i a n s . · E a s i l y a c c e s s i b l e a n d c o s t e f f e c t i v e s e r v i c e s o f a n i m a l d o c t o r s a r e t h e k e y i s s u e s . T h e p r o j e c t s h o u l d d o s o m e t h i n g t o i m p r o v e t h e s i t u a t i o n · V e t e r i n a r y c a r e f a c i l i t i e s a r e n o t a d e q u a t e D e p e n d e n c e o n n a t u r a l r e s o u r c e b a s e ( w e t l a n d s / p a s t u r e s / f o r e s t s , e t c ) · V i l l a g e l a c k i n w e t l a n d s , p a s t u r e s a n d f o r e s t , o t h e r w i s e m a n y f a m i l i e s c o u l d h a v e b e n e f i t e d . · P o o r f a r m e r s a r e d e p e n d e n t o n c o m m o n p a s t u r e s f o r o p e n g r a z i n g o f t h e i r a n i m a l s b u t l a c k o f s u c h p a s t u r e s i s a n i s s u e f o r t h e m · P o o r f a r m e r s ( w h o d o n o t h a v e t h e i r o w n o r c h a r d s ) a r e d e p e n d e n t o n f o r e s t f o r c o o k i n g f u e l · P o o r f a r m e r s / h o u s e h o l d s a r e d e p e n d e n t o n p a s t u r e s a n d f o r e s t f o r o p e n g r a z i n g o f a n i m a l s a n d f i r e w o o d r e s p e c t i v e l y . B u t , d e c l i n i n g p a s t u r e s a n d f o r e s t s h a v e g r a b b e d t h i s o p p o r t u n i t y f r o m s u c h f a r m e r s · I f p o s s i b l e , t h e p r o j e c t s h o u l d p r o m o t e s o c i a l f o r e s t r y i n t h e v i l l a g e v i c i n i t y w i t h t h e r i g h t t o l o c a l i n h a b i t a n t s t o u s e t h e s e r e s o u r c e s · E a r l i e r p a s t u r e s w e r e u n d e r t h e p o s s e s s i o n o f G r a m S a b h a . S u c h l a n d s w e r e a l l o t t e d t o e l i g i b l e v i l l a g e r s u n d e r t h e g o v e r n m e n t p o l i c y . A f t e r a l l o t m e n t , t h e s e l a n d s w e r e c o n v e r t e d i n t o a g r i c u l t u r a l f i e l d s . O w n e r s h i p / o c c u p a n c y i s s u e s a n d t h e e x t e n t o f e n c r o a c h m e n t · T h e r e i s g e n e r a l l y n o i s s u e r e l a t e d t o e n c r o a c h m e n t . O w n e r s a n d o c c u p a n t s o f l a n d r e s o u r c e s a r e t h e s a m e i n t h e v i l l a g e . · I n c a s e o f a l l o t t e d c o m m u n i t y l a n d , s o m e o w n e r s ( a l l o t t e s ) a r e y e t t o b e c o m e o c c u p a n t s d u e t o t h e f a c t t h a t t h e y h a v e n o t b e e n g i v e n p o s s e s s i o n . H o w e v e r , s u c h l a n d s a r e s t i l l i n t h e p o s s e s s i o n o f t h e G r a m S a b h a . H e n c e , t h e r e i s n o p r o b l e m o f e n c r o a c h m e n t . P e r c e i v e d h e s i t a t i o n , i f a n y , t o j o i n s o c i o - e c o n o m i c a l l y n e u t r a l w a t e r u s e r s ’ g r o u p s w h i c h a r e t o b e f o r m e d o n t h e b a s i s o f p r o x i m i t y o f s o d i c l a n d · U n d o u b t e d l y , f a r m e r s w i l l p r e f e r t o j o i n h a n d s w i t h f a r m e r s o f s a m e s o c i o - e c o n o m i c p r o f i l e a n d s a m e t h i n k i n g . B u t , t h e y d o n o t h a v e a n y h e s i t a t i o n t o j o i n w a t e r u s e r s ’ g r o u p s w h i c h w i l l b e s o c i o - e c o n o m i c a l l y n e u t r a l b e c a u s e t h e r e w i l l b e n o o p t i o n . H o w e v e r , t h e i r h e a r t s m a y n o t j o i n i f g r o u p i s m a j o r l y h e t e r o g e n e o u s . · M o r e o v e r , t h e s e w a t e r u s e r s ’ g r o u p s a r e l i k e l y t o r e m a i n h e t e r o g e n e o u s g r o u p s w h i c h m a y b e a k i n d o f h i n d r a n c e i n d e v e l o p m e n t o f g r o u p f e e l i n g · T h e p r o j e c t s h o u l d c r e a t e s o m e c o m m o n s o c i o - e c o n o m i c b i n d i n g f o r c e f o r t h e m e m b e r s o f W U G · A c c o r d i n g t o s o m e p a r t i c i p a n t s , t h e p r o j e c t s h o u l d f o r m g r o u p o f f a r m e r s / b e n e f i c i a r i e s o n t h e b a s i s o f s o c i o - e c o n o m i c h o m o g e n e i t y a n d m u t u a l l i k e n e s s r a t h e r t h a n o n s o m e s o c i a l l y - i n s e n s i t i v e c r i t e r i a . O t h e r w i s e , g r o u p f u n c t i o n i n g w i l l b e a d v e r s e l y a f f e c t e d b e c a u s e t h e r e q u i r e d a f f i n i t y w i l l n o t b e d e v e l o p e d . P a r t i c i p a t i o n i n p r o p o s e d s i t e i m p l e m e n t a t i o n · F a r m e r s w i l l w i l l i n g l y p a r t i c i p a t e i n S I C m e e t i n g p r o v i d e d S I C b e c o m e s a n e f f e c t i v e f o r u m f o r Page 235 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 4 I S S U E S F E E D B A C K c o m m i t t e e m e e t i n g s p l a n n i n g a n d d e c i s i o n m a k i n g . F a r m e r s w i l l p a r t i c i p a t e i n S I C m e e t i n g i f t h e y f i n e i t u s e f u l a n d e s s e n t i a l . T h u s , t h e f o r u m o f S I C s h o u l d b e m a d e u s e f u l a n d e s s e n t i a l t o t h e f a r m e r s . · S I C s h o u l d b e m a d e f o c a l p o i n t f o r v i l l a g e l e v e l p l a n n i n g a n d i m p l e m e n t a t i o n o f p r o j e c t a c t i v i t i e s · S I C m e e t i n g s s h o u l d b e s c h e d u l e d a t s u c h t i m e a n d d a y w h i c h i s c o n v e n i e n t t o a l l c a t e g o r i e s o f f a r m e r s t o a t t e n d . F o r e x a m p l e , l a b o r e r f a r m e r s m a y n o t b e a b l e t o S I C m e e t i n g i f i t i s s c h e d u l e d a t a t i m e w h i c h i s w o r k i n g h o u r f o r t h e m . · I f a l l t h e d e c i s i o n s a r e n e c e s s a r i l y t a k e n i n t h e S I C m e e t i n g , f a r m e r s w i l l c e r t a i n l y a t t e n d s u c h m e e t i n g s . H o w e v e r , S I C d e c i s i o n s s h o u l d n o t b e d i c t a t e d u n i l a t e r a l l y b y i t s c h a i r p e r s o n o r a n y o t h e r i n d i v i d u a l . · I t c a n b e m a d e u s e f u l b y p r o v i d i n g o p p o r t u n i t y t o t h e f a r m e r s t o p u t f o r w a r d t h e i r p r o b l e m s a n d i t c a n b e m a d e e s s e n t i a l b y e n s u r i n g a l l d e c i s i o n s i n S I C W i l l i n g n e s s t o a l l o w f o r f i e l d d r a i n b e t w e e n t w o a d j o i n i n g p l o t s · F a r m e r s w i l l n o t g e n e r a l l y s p a r e l a n d f o r f i e l d d r a i n . H o w e v e r , t h e y w i l l s o m e h o w m a n a g e d r a i n i n g o u t o f t h e i r p l o t s w i t h m u t u a l c o o p e r a t i o n o f o t h e r f a r m e r s . · I f t h e a i m i s t o i n s t a l l f i e l d d r a i n n e t w o r k , f i e l d d r a i n s s h o u l d b e p l a n n e d w e l l i n a d v a n c e a n d t h e p l a n s h o u l d b e i n t i m a t e d t o t h e e n t i r e v i l l a g e , p a r t i c u l a r l y t h e c o n c e r n e d f a r m e r s . · F a r m e r s s h o u l d a l s o b e s e n s i t i z e d t o w a r d s e s s e n t i a l i t y o f f i e l d d r a i n f o r r e c l a m a t i o n o f s o d i c l a n d s . I t w i l l m o t i v a t e f a r m e r s t o s p a r e l a n d f o r f i e l d d r a i n s · I n s p i t e o f t h e a b o v e m e a s u r e s , s o m e f a r m e r s w i l l n o t b e r e a d y t o s p a r e l a n d f o r f i e l d d r a i n . T h e s e f a r m e r s w i l l n e e d t o b e m o t i v a t e d a n d g u i d e d · I n d i v i d u a l f a r m e r s m a y w i l l i n g l y s p a r e l a n d f o r f i e l d d r a i n i f a l l t h e f a r m e r s j o i n t l y t a k e t h e d e c i s i o n . S I C c a n p l a y c r u c i a l r o l e i n f a c i l i t a t i n g s u c h c o m m o n d e c i s i o n · T h e p r o j e c t c a n a l s o m a k e i t m a n d a t o r y f o r a l l t h e p o t e n t i a l b e n e f i c i a r i e s t o s p a r e s o m e l a n d f o r f i e l d d r a i n s . B u t , s u c h s t r i c t p r o v i s i o n m a y d i s c o u r a g e s o m e f a r m e r s t o j o i n t h e l a n d r e c l a m a t i o n p r o g r a m . T h u s , t h e p r o j e c t h a s t o d e v i s e s o m e o t h e r m e c h a n i s m f o r t h e s a m e . W i l l i n g n e s s t o a l l o w f o r c o m m o n i r r i g a t i o n c h a n n e l s w i t h i n t h e a r e a o f a w a t e r u s e r s ’ g r o u p · I n d i v i d u a l f a r m e r s w i l l n o t s p a r e t h e i r l a n d f o r i r r i g a t i o n c h a n n e l n e t w o r k b e c a u s e i t w i l l p r i m a r i l y s e r v e t h e i n t e r e s t o f b o r i n g o w n e r . S i n c e t h e g r o u p b o r i n g w i l l b e v i r t u a l l y t h e p r o p e r t y o f o n e f a r m e r ( i n w h o s e p l o t b o r i n g e x i s t s ) , o t h e r f a r m e r s w i l l n o t w i l l i n g l y s p a r e l a n d f o r c o m m o n i r r i g a t i o n c h a n n e l . · T h e p r o j e c t s h o u l d n o t i n s i s t o n c o m m o n i r r i g a t i o n c h a n n e l n e t w o r k f o r e n t i r e W U G . W U G m e m b e r s w i l l s o m e h o w m a n a g e i r r i g a t i o n w a t e r t o t h e i r p l o t s . P r o j e c t n e e d n o t w o r r y . 1 8 . 2 : S T A K E H O L D E R : W O M E N ’ S G R O U P S I S S U E S F E E D B A C K Page 236 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 5 I S S U E S F E E D B A C K N u m b e r o f w o m e n ( d e f a c t o ) c u l t i v a t o r s · T h e r e a r e v e r y f e w w o m a n - h e a d e d h o u s e h o l d s . · V e r y f e w h o u s e h o l d s h a v e a c t i v e w o m a n c u l t i v a t o r s a m o n g g e n e r a l c a s e h o u s e h o l d s . · A b o u t 4 0 t o 6 0 p e r c e n t o f b a c k w a r d c a s t e h o u s e h o l d s h a v e w o m a n c u l t i v a t o r s . · A b o u t 6 0 t o 8 0 p e r c e n t s c h e d u l e d c a s t e h o u s e h o l d s h a v e w o m a n c u l t i v a t o r s . · T h o u g h w o m e n a r e a c t i v e l y e n g a g e d i n c u l t i v a t i o n , m a j o r d e c i s i o n s a r e t a k e n b y t h e i r m a l e c o u n t e r p a r t s . I m p a c t o f m i g r a t i o n o f m a l e w o r k e r s o n t h e r o l e o f w o m e n i n a g r i c u l t u r a l p r o d u c t i o n · R o l e s a n d r e s p o n s i b i l i t i e s i n c r e a s e t r e m e n d o u s l y i n a b s e n c e o f m a l e m e m b e r s . A c t u a l e x e c u t i o n o f f i e l d a c t i v i t i e s i s m a n a g e d b y w o m a n m e m b e r s o f t h e f a m i l y t h e y a r e d i c t a t e d i n m o s t c a s e s b y t h e i r m a l e c o u n t e r p a r t s . · I t b e c o m e s s t r e s s f u l f o r w o m e n b e c a u s e t h e y h a v e t o m a n a g e a g r i c u l t u r a l a c t i v i t i e s i n a d d i t i o n t o h o u s e h o l d c h o r e ( w h i c h i s t h e i r p r i m a r y r e s p o n s i b i l i t y ) . · S o m e t i m e s , w o m e n a r e a l s o r e s p o n s i b l e f o r m o b i l i z a t i o n o f m o n e y r e q u i r e d f o r f i e l d o p e r a t i o n . · I n c a s e o f s o m e f a m i l i e s , i t d o e s n o t m a k e m u c h d i f f e r e n c e w h e t h e r m a l e m e m b e r s l i v e w i t h f a m i l y o r m i g r a t e o u t o f v i l l a g e b e c a u s e w o m e n a r e g e n e r a l l y i n v o l v e d i n f a r m a c t i v i t i e s . H o w e v e r , t h e r e s p o n s i b i l i t i e s o f w o m e n i n c r e a s e w h e n m a l e s a r e n o t t h e r e . · W o m e n f a c e d i f f i c u l t y i n p r o c u r e m e n t o f i n p u t s f r o m t h e m a r k e t i n a b s e n c e o f m a l e m e m b e r s . · W o m e n m a n a g e f a r m o p e r a t i o n s i n c o n s u l t a t i o n w i t h t h e i r m a l e c o u n t e r p a r t s l i v i n g o u t s i d e . A s a c o n s e q u e n c e , t h e y a r e l e s s r e c e p t i v e t o a g r i c u l t u r a l e x t e n s i o n . I m p a c t o n h o u s e h o l d c o n s u m p t i o n / n u t r i t i o n · A b s e n c e o f m a l e m e m b e r s d o e s n o t h a v e a n y e x c l u s i v e i m p a c t o n h o u s e h o l d c o n s u m p t i o n / n u t r i t i o n . A v e r a g e c o n s u m p t i o n o f t h e h o u s e h o l d s r e m a i n s t h e s a m e . B u t , d i s t r i b u t i o n o f c o n s u m p t i o n i t e m s a m o n g f a m i l y m e m b e r s b e c o m e s m o r e e q u a l i n a b s e n c e o f m a l e m e m b e r s b e c a u s e s p e c i a l a t t e n t i o n t o w o r k i n g m a l e s i s n o t r e q u i r e d . · I n c a s e o f v e r y p o o r h o u s e h o l d s c o n s u m p t i o n l e v e l g o e s d o w n b e c a u s e w o m e n f i n d t h e m s e l v e s i n c a p a b l e o f m o b i l i z i n g r e s o u r c e s i n t h e s i t u a t i o n o f f o o d s h o r t a g e s . A d e q u a c y o f s k i l l s t o m a n a g e f a r m i n g ( o n i m p r o v e d l a n d ) a n d s k i l l s t o t a k e u p i m p r o v e d a g r i c u l t u r e · W o m e n p o s s e s s o n l y g e n e r a l s k i l l s t o m a n a g e f a r m i n g . T h e y l a c k s k i l l s t o t a k e u p i m p r o v e d a g r i c u l t u r e . S o m e w o m e n a r e e q u a l l y c o m p e t e n t a s t h e i r m a l e c o u n t e r p a r t s i n m a n a g i n g f a r m i n g a c t i v i t y . · W o m e n a r e l e s s m o b i l e p h y s i c a l l y w h i c h h i n d e r s t h e p r o c u r e m e n t o f i n p u t s f r o m t o w n m a r k e t . A s a r e s u l t , s o m e t i m e s t h e y c o m p r o m i s e w i t h q u a l i t y a n d q u a n t i t y o f a g r i c u l t u r a l i n p u t s . · W o m e n a r e g e n e r a l l y u n a w a r e o f t h e l a t e s t f a r m i n g t e c h n o l o g y b e c a u s e t h e y a r e g e n e r a l l y d e v o i d o f t r a i n i n g a n d c a p a c i t y b u i l d i n g . · W o m e n h a v e t h e i r o w n c o n s t r a i n t s t o a t t e n d t r a i n i n g p r o g r a m s o r g a n i z e d o u t s i d e t h e v i l l a g e i n a d d i t i o n t o s o c i a l p r e j u d i c e s a t t a c h e d w i t h w o m e n ’ s n i g h t o u t s . Page 237 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 6 I S S U E S F E E D B A C K · W o m e n ’ s t r a i n i n g s h o u l d b e o r g a n i z e d a t l o c a l l e v e l s o t h a t t h e y c o u l d a t t e n d w i t h o u t a n y d i f f i c u l t y . W a g e p a y m e n t a t p a r w i t h m a l e m e m b e r s f o r e q u a l w o r k · W o m e n l a b o r e r s r e c e i v e l o w e r w a g e a s c o m p a r e d t o m a l e l a b o r e r s e v e n f o r s a m e t y p e o f w o r k . · W o m e n d o n o t k n o w t h e r e a s o n o f g e n d e r - b a s e d d i s c r i m i n a t i o n i n w a g e r a t e s . H o w e v e r , s o m e o f t h e m a t t r i b u t e s u c h d i s c r i m i n a t i o n t o t r a d i t i o n a l d i f f e r e n c e i n p r o d u c t i v i t y o f m a l e s a n d f e m a l e s w h i l e s o m e o t h e r s f e e l t h a t w a g e d i f f e r e n t i a l i s n o t h i n g b u t s o c i a l p r e j u d i c e a g a i n s t w o m e n . · S o m e w o m e n a r e a w a r e t h a t g o v e r n m e n t p r e s c r i b e s t h e s a m e m i n i m u m w a g e r a t e f o r m a l e a n d f e m a l e l a b o r e r s . · W o m a n l a b o r e r s a r e h i r e d f o r s i m p l e r w o r k s w h i c h d o n o t r e q u i r e a n y s p e c i f i c s k i l l s e t . I n v o l v e m e n t o f c h i l d l a b o r i n t h e c o n s t r u c t i o n a c t i v i t i e s · I n v o l v e m e n t o f c h i l d l a b o r i n c o n s t r u c t i o n a c t i v i t i e s i s n o t f o u n d . · C h i l d r e n a r e g e n e r a l l y i n v o l v e d i n f a r m a c t i v i t i e s a l o n g w i t h t h e i r p a r e n t s . · T h e y a r e a l s o e n g a g e d i n o t h e r h o u s e h o l d l e v e l a c t i v i t i e s i n c l u d i n g c o n s t r u c t i o n w o r k s b u t t h e y d o n o t w o r k i n c o n s t r u c t i o n a c t i v i t i e s f o r w a g e s . · S o m e l a b o r e r s t a k e t h e i r w a r d s a l o n g w i t h t h e m w h i l e g o i n g f o r w o r k w h i c h m a y i n c l u d e c o n s t r u c t i o n w o r k . B u t s i m p l y a c c o m p a n y t h e i r p a r e n t s . C o o k i n g m e d i a / m e d i a ; i m p a c t o n h e a l t h · B a r r i n g a f e w f a m i l i e s , f i r e w o o d , c o w d u n g c a k e a n d c r o p r e s i d u e a r e t h e c h i e f c o o k i n g m e d i a . · U s e o f c o w d u n g c a k e c a u s e s r e s p i r a t o r y p r o b l e m s a m o n g w o m e n · A b s e n c e o f s e p a r a t e a n d p r o p e r k i t c h e n a c c e n t u a t e s t h e p r o b l e m · C o o k i n g b e c o m e s d r u d g e r y f o r w o m e n w h e n t h e y u s e c o w d u n g c a k e t h a t t o o i n c o n g e s t e d k i t c h e n s p a c e . · S i n c e c o o k i n g i s t h e s o l e r e s p o n s i b i l i t y o f w o m e n t h e y a r e t h e a c t u a l s u f f e r e r s o f i l l e f f e c t s o f s m o k e w h i l e c o o k i n g . · C o o k i n g i s t e d i o u s j o b f o r w o m e n . B u t , t h e y h a v e i n t e r n a l i z e d t h i s a c t i v i t y a n d h e n c e d o n o t s e e i t a s h a r d w o r k . · C o o k i n g i s t i m e c o n s u m i n g a c t i v i t y . I t t a k e s m a j o r p o r t i o n o f t h e i r t i m e . G e n d e r i m p a c t o n e n v i r o n m e n t : g r a s s / f o d d e r / f i r e w o o d c o l l e c t i o n · W o m e n f r o m o n l y s c h e d u l e d c a s t e h o u s e h o l d s c o l l e c t f i r e w o o d f r o m f o r e s t / o r c h a r d s . H o w e v e r , s o m e b a c k w a r d c a s t e w o m e n a r e a l s o e n g a g e d i n t h i s a c t i v i t y · W o m e n o f v e r y f e w g e n e r a l c a s t e h o u s e h o l d s a r e a l s o i n v o l v e d i n c o l l e c t i o n o f g r a s s f r o m w i l d . · I t a d d s t o t h e w o r k l o a d o f w o m e n . I t i s d r u d g e r y f o r t h o s e w o m e n w h o a r e i n v o l v e d i n t h i s a c t i v i t y . · S o m e t i m e s , t h e y o v e r e x p l o i t t h e a v a i l a b l e r e s o u r c e s i n a b s e n c e o f a l t e r n a t i v e . Page 238 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 7 I S S U E S F E E D B A C K I n c i d e n c e o f H I V / A I D S i n t h e a r e a · N o i n c i d e n c e o f H I V / A I D S i s k n o w n 1 8 . 3 : I D E N T I F I C A T I O N O F G E N D E R I S S U E S D o m a i n I s s u e s P o s s i b l e i n t e r v e n t i o n s t o a d d r e s s t h e s e i s s u e s C h i l d r e a r i n g a n d e d u c a t i o n · T o t a l r e s p o n s i b i l i t y o f p h y s i c a l c h i l d c a r e / r e a r i n g · D e c i s i o n o n s c h o o l i n g o f c h i l d r e n ( s t a r t i n g y e a r , s e l e c t i o n o f s c h o o l , c o n t i n u a t i o n o f s c h o o l i n g , e t c ) t a k e n m a i n l y b y m a l e s ; w o m e n h a v e n e g l i g i b l e r o l e · M a l e - d o m i n a n t s o c i a l f a b r i c i s t h e m a i n r e a s o n · P s y c h o l o g i c a l e m p o w e r m e n t o f w o m e n t h r o u g h m o t i v a t i o n , t r a i n i n g a n d a w a r e n e s s g e n e r a t i o n · S e n s i t i z a t i o n o f m e n o n g e n d e r e q u i t y t h r o u g h w o r k s h o p s , p o s t e r s , e t c H o m e m a k i n g ( a l o n g w i t h m a l e s ) · E x t e r n a l m a t t e r s ( s h o p p i n g & p u r c h a s e d e c i s i o n s , r e l a t i o n s h i p w i t h o u t s i d e w o r l d , e t c ) m a n a g e d b y m a l e s · I n t e r n a l m a t t e r s ( h o u s e h o l d c h o r e , c o o k i n g , h o u s e u p k e e p , a t t e n d i n g g u e s t s , e t c ) h a n d l e d b y f e m a l e s · M a l e s h a v e d o m i n a n t p o s i t i o n i n b o t h e x t e r n a l a n d i n t e r n a l m a t t e r s . · S e n s i t i z a t i o n o f m e n o n g e n d e r e q u i t y / i s s u e s t h r o u g h w o r k s h o p s , p o s t e r s , f o l k m e d i a , e t c H o m e m a k i n g ( w i t h o u t m a l e s ) · W h e n m a l e s a r e a w a y f r o m h o m e , b o t h i n t e r n a l a n d e x t e r n a l m a t t e r s a r e h a n d l e d b y f e m a l e s . I t b e c o m e s t o o h e a v y f o r w o m e n t o m a n a g e . · S e n s i t i z a t i o n o f m e n o n g e n d e r e q u i t y / i s s u e s t h r o u g h w o r k s h o p s , p o s t e r s , f o l k m e d i a , e t c H o u s e h o l d d e c i s i o n m a k i n g · F e m a l e s h a v e n e g l i g i b l e i n f l u e n c e o n h o u s e h o l d d e c i s i o n m a k i n g · T h e y g e n e r a l l y f u n c t i o n a s w o r k e r s u n d e r t h e d i r e c t i o n o f m a l e s · H o w e v e r , i n s o m e f a m i l i e s , w o m e n h a v e r e s p e c t a b l e p l a c e i n d e c i s i o n m a k i n g · E c o n o m i c e m p o w e r m e n t o f w o m e n t h r o u g h p r o v i d i n g i n c o m e g e n e r a t i n g o p p o r t u n i t i e s a t l o c a l l e v e l · I n t e r v e n t i o n s m a y i n c l u d e m i c r o e n t e r p r i s e s , i m p r o v e d a c c e s s t o s a v i n g a n d c r e d i t s e r v i c e s t h r o u g h s e l f - h e l p g r o u p s · I n f o r m a l e d u c a t i o n t o w o m e n a t a t i m e c o n v e n i e n t t o t h e m E d u c a t i o n , t r a i n i n g a n d s k i l l s · E d u c a t i o n o f g i r l i s t r a d i t i o n a l l y t h e l a s t p r i o r i t y l e a d i n g t o l o w e r l i t e r a c y a m o n g c u r r e n t l y - a d u l t w o m e n · T h e t r e n d c o n t i n u e s a m o n g s o c i a l l y a n d e d u c a t i o n a l l y b a c k w a r d f a m i l i e s · H o w e v e r , c h a n g e i s t a k i n g p l a c e a r e s u l t o f m e d i a e f f e c t , a w a r e n e s s , d i f f e r e n t g o v e r n m e n t s c h e m e s f o r g i r l e d u c a t i o n · W o m e n h a v e w e a k e r a c c e s s t o t r a i n i n g a n d c a p a c i t y b u i l d i n g b e c a u s e m o s t o f t r a i n i n g p r o g r a m s a r e o r g a n i z e d · M a s s a w a r e n e s s o n i m p o r t a n c e a n d e s s e n t i a l i t y o f e d u c a t i o n i n m o d e r n a g e · A w a r e n e s s o n e d u c a t i o n o f g i r l c h i l d · O r g a n i z a t i o n o f t r a i n i n g p r o g r a m s f o r w o m e n a t l o c a l l e v e l s o t h a t m o r e a n d m o r e w o m e n c o u l d a t t e n d · D e v e l o p m e n t o f d i v e r s e s k i l l s e t s a m o n g w o m e n a c c o r d i n g t o t h e i r i n t e r e s t a n d c h o i c e · P r o v i d i n g s a f e t y a n d s e c u r i t y t o t r a i n e e w o m e n a n d Page 239 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 8 D o m a i n I s s u e s P o s s i b l e i n t e r v e n t i o n s t o a d d r e s s t h e s e i s s u e s o u t s i d e v i l l a g e . W o m e n a r e n o t a l l o w e d t o m o v e o u t o f v i l l a g e . M o r e o v e r , w o m e n c a n n o t a t t e n d l o n g - d u r a t i o n ( m o r e t h a n a d a y ) t r a i n i n g p r o g r a m s b e c a u s e n i g h t o u t i s i m p o s s i b l e p r o p o s i t i o n f o r w o m e n . · P o o r e d u c a t i o n a n d l o w a c c e s s t o t r a i n i n g l e a d s t o l a c k o f t e c h n i c a l s k i l l s · W o m e n ’ s e m p l o y a b i l i t y g e t s a d v e r s e l y a f f e c t e d d u e t o g a p s i n e d u c a t i o n , t r a i n i n g a n d s k i l l s c o n v e y i n g t h e s a m e t o t h e i r m a l e c o u n t e r p a r t s · A r r a n g i n g p r o p e r t r a n s p o r t f a c i l i t y f o r p o t e n t i a l t r a i n e e w o m e n · T o p o s s i b l e e x t e n t , t r a i n i n g p r o g r a m s f o r m e n a n d w o m e n s h o u l d b e a r r a n g e d a t t h e s a m e i n s t i t u t e / p l a c e a n d a t t h e s a m e t i m e . M e n a n d w o m e n o f a f a m i l y m a y b e s e l e c t e d f o r t h e t r a i n i n g p r o g r a m s o t h a t t h e y c o u l d a t t e n d t h e t r a i n i n g p r o g r a m s t o g e t h e r . J o b o p p o r t u n i t i e s · W o m e n h a v e l i m i t e d j o b o p p o r t u n i t i e s d u e t o p o o r e d u c a t i o n a l a c h i e v e m e n t s a n d s k i l l s s e t s · T h e y a r e a t d i s a d v a n t a g e a s c o m p a r e d t o m a l e s i n t h i s r e g a r d s · T h e y g e n e r a l l y w o r k a s u n s k i l l e d l a b o r e r s · H o w e v e r , s o m e w o m e n w h o h a v e r e c e i v e d s o m e f o r m a l e d u c a t i o n g e t s a l a r i e d j o b · S o c i a l p r e j u d i c e a g a i n s t o u t s i d e w o r k i n g o f w o m e n i s a n o t h e r h u r d l e i n t h e w a y o f w o m e n e m p l o y m e n t · G e n e r a t i n g a w a r e n e s s a m o n g p e o p l e i n o r d e r t o r e m o v e s o c i a l p r e j u d i c e s a g a i n s t w o r k i n g w o m e n · C o n f i d e n c e b u i l d i n g a m o n g w o m e n t h r o u g h s e n s i t i z i n g t h e m a b o u t t h e i r r i g h t s a n d p r i v i l e g e s a t w o r k p l a c e a n d l e g a l r e m e d i e s a v a i l a b l e a t w o r k p l a c e · P r o v i d i n g s u i t a b l e t r a i n i n g t o w o m e n W h i l e o n f a m i l y f a r m · W o m e n a r e a l l o t t e d t i m e - c o n s u m i n g a n d l a b o r i o u s t a s k s o n f a m i l y f a r m · T h e y w o r k u n d e r t h e i n s t r u c t i o n f r o m t h e i r m a l e c o u n t e r p a r t s · T h e y a r e p r e f e r r e d f o r t h o s e t a s k s w h i c h r e q u i r e l e s s e r p h y s i c a l s t r e n g t h · E v e n w h i l e o n f a r m , t h e y r e m a i n r e s p o n s i b l e f o r m a n a g i n g f o o d a n d h o u s e h o l d c h o r e f o r t h e f a m i l y . C o n s e q u e n t l y , t h e i r o w n n u t r i t i o n a n d h e a l t h g e t s c o m p r o m i s e d . · S e n s i t i z a t i o n o f p e o p l e a b o u t g e n d e r e q u i t y · M o t i v a t i n g w o m e n t o t a k e c a r e o f t h e i r h e a l t h P r i m a r y p r o c e s s i n g o f f a r m p r o d u c e s · P r i m a r y p r o c e s s i n g o f f a r m p r o d u c e s i s t h e s o l e r e s p o n s i b i l i t y o f w o m e n , m e n d o n o t h e l p i n t h i s a c t i v i t y · T h i s a c t i v i t y i s q u i t e a b u r d e n o n w o m e n · A v a i l a b i l i t y o f r i c e m i l l i n g a n d f l o o r m i l l i n g o n c u s t o m h i r i n g b a s i s h a s r e d u c e d t h e b u r d e n o n w o m e n t o s o m e e x t e n t . B u t , t h i s r e l i e f i s a v a i l a b l e t o w o m e n o f o n l y t h o s e h o u s e h o l d s w h o c a n a f f o r d t h e c u s t o m h i r i n g c h a r g e s . · E c o n o m i c e m p o w e r m e n t o f w o m e n t h r o u g h i n c o m e g e n e r a t i n g a c t i v i t i e s s o t h a t t h e y h a v e c o n t r o l o v e r m o n e t a r y r e s o u r c e s t o u s e c u s t o m h i r i n g s e r v i c e s f o r p r i m a r y f o o d p r o c e s s i n g C o o k i n g ( i n c l u d i n g a r r a n g e m e n t o f c o o k i n g · C o o k i n g i s t h e e x c l u s i v e r e s p o n s i b i l i t y o f w o m e n · W o m e n o f p o o r h o u s e h o l d s ( e s p e c i a l l y s c h e d u l e d c a s t e a n d · D o v e t a i l i n g w i t h g o v e r n m e n t s c h e m e s t o p r o v i d e s u b s i d y o n s o l a r c o o k e r , e t c Page 240 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 3 9 D o m a i n I s s u e s P o s s i b l e i n t e r v e n t i o n s t o a d d r e s s t h e s e i s s u e s f u e l ) w a g e - d e p e n d e n t o n e s ) a r e a l s o r e s p o n s i b l e f o r a r r a n g i n g c o o k i n g f u e l · I n c a s e o f w e l l - t o - d o a n d f o r w a r d c a s t e h o u s e h o l d s , c o o k i n g f u e l i s a r r a n g e d a t h o u s e h o l d l e v e l b y m e n f o l k · T r a i n i n g a n d g u i d a n c e o f n e e d y w o m e n t o a d o p t ‘ I m p r o v e d C h o o l h a ’ w h i c h i s m o r e f u e l e f f i c i e n t a n d r e l a t i v e l y s m o k e l e s s A c c e s s t o t o i l e t / b a t h f a c i l i t i e s · I f t h e h o u s e p r e m i s e d o e s n o t h a v e t o i l e t ( a s i s t h e s i t u a t i o n i n c a s e o f m o s t o f f a m i l i e s ) w o m e n r e s o r t t o o p e n f i e l d t o r e l i e v e t h e m s e l v e s a s m e n w i l l d o . B u t w o m e n n e e d t o g o o u t v e r y e a r l y i n t h e m o r n i n g ( b e f o r e d a w n o f d a y ) o r a f t e r d a r k n e s s s p r e a d s . A s a c o n s e q u e n c e , w o m e n h a v e t o w a k e u p e a r l y i n t h e m o r n i n g e v e n t h o u g h t h e y g o t o b e d l a t e i n n i g h t . A s a r e s u l t , s l e e p i n g h o u r s a r e r e d u c e d f o r w o m e n . M o r e o v e r , i f t h e y n e e d t o a t t e n d n a t u r e ’ s c a l l d u r i n g d a y t i m e i t i s a c h a l l e n g e f o r t h e m · C o m m u n i t y t o i l e t s a r e a v a i l a b l e i n s o m e p o c k e t s b u t t h e y a r e i n a d e q u a t e · M o s t o f t h e h o u s e h o l d s d o n o t h a v e p r o p e r b a t h r o o m f a c i l i t i e s . W o m e n a r e c o m p e l l e d t o c o m p r i s e w i t h q u a l i t y o f b a t h a s b a t h i n g t i m e i s c u r t a i l e d . · D o v e t a i l i n g w i t h t h e c o n c e r n e d d e p a r t m e n t s o f t h e G o v e r n m e n t t o p r o v i d e s u b s i d y o n c o n s t r u c t i o n o f t o i l e t s · C o n s t r u c t i n g c o m m u n i t y t o i l e t s i n t h e c o n c e r n e d v i l l a g e s w i t h s u p p o r t f r o m d i f f e r e n t s c h e m e s A c c e s s t o a n d c o n t r o l o v e r h o u s e h o l d r e s o u r c e s · W o m e n g e n e r a l l y h a v e r e a s o n a b l e a c c e s s t o ( r i g h t t o u s e ) h o u s e h o l d r e s o u r c e s b u t t h e y d o n o t h a v e c o n t r o l ( p o w e r t o d e f i n e t h e i r u s e ) t h e m · M e n h a v e b o t h a c c e s s t o a s w e l l a s c o n t r o l o v e r a l l h o u s e h o l d r e s o u r c e s · T h i s s i t u a t i o n i s t r u e r i n c a s e o f t h o s e w o m e n w h o a r e n o t e a r n i n g . E a r n i n g w o m e n h a v e b e t t e r a c c e s s t o a s w e l l a s c o n t r o l o v e r h o u s e h o l d r e s o u r c e s . · E c o n o m i c e m p o w e r m e n t o f w o m e n b y i n c r e a s i n g t h e i r i n c o m e t h r o u g h v a r i o u s m i c r o - e n t e r p r i s e s · F i n a n c i a l e m p o w e r m e n t o f w o m e n t h r o u g h a s s o c i a t i n g t h e m w i t h s a v i n g & c r e d i t g r o u p s W h i l e w o r k i n g a s l a b o r e r · W o m e n r e c e i v e l o w e r w a g e s t h a n m a l e l a b o r e r s r e c e i v e . · W o m e n a r e h i r e d o n l y f o r m a n u a l / u n s k i l l e d w o r k e v e n i f s o m e o f t h e m p o s s e s s c o m p e t e n c e t o d o s o m e s k i l l e d w o r k · W o m e n a r e g i v e n s e c o n d a r y t r e a t m e n t w h i l e w o r k i n g a s l a b o r e r s · W h i l e w o r k i n g a s l a b o r e r s , w a r d s o f w o m e n a r e t h e w o r s t s u f f e r e r s a s t h e y g e t n e g l e c t e d . · G e n e r a t i o n o f a w a r e n e s s a m o n g g e n e r a l p u b l i c a n d l a b o r e r s a b o u t t h e l e g a l p r o v i s i o n s o f t h e M i n i m u m W a g e s A c t W h i l e u n d e r t a k i n g p e t t y b u s i n e s s · W o m e n a r e d e p e n d e n t o n m e n f o r c a p i t a l · M e n d i s t u r b f l o w o f f u n d s w h e n c o m p e l e n t e r p r i s i n g · P r o m o t i n g b a n k i n g h a b i t s a n d i m p r o v e d f i n a n c i a l m a n a g e m e n t a m o n g w o m e n s o t h a t t h e y c o u l d m a n a g e t h e i r Page 241 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 0 D o m a i n I s s u e s P o s s i b l e i n t e r v e n t i o n s t o a d d r e s s t h e s e i s s u e s w o m e n t o e x c e s s i v e a m o u n t f r o m t h e c a s h b o x · D e p e n d e n c y o n m a l e c o u n t e r p a r t s f o r s a f e t y & s e c u r i t y o f t h e b u s i n e s s p r e m i s e s , p r o c u r e m e n t o f s u p p l i e s , e t c b u s i n e s s w e l l W h i l e w o r k i n g a s s a l a r i e d p e r s o n · D i f f i c u l t i e s i n p h y s i c a l m o b i l i t y · S o c i a l p r e j u d i c e s a g a i n s t w o r k i n g w o m e n · H i g h e r e x p o s u r e t o r i s k s · A w a r e n e s s g e n e r a t i o n t o r e m o v e s o c i a l p r e j u d i c e s · S e n s i t i z a t i o n o f w o m e n a b o u t l e g a l r e m e d i e s a v a i l a b l e a g a i n s t d i f f e r e n t t y p e s a b u s e s a t w o r k p l a c e N u t r i t i o n a n d h e a l t h · P r e f e r e n c e t o m a l e m e m b e r s o f t h e f a m i l y i n c o n s u m p t i o n · F e m a l e s a d v e r s e l y a f f e c t e d i n t e r m s o f l o w e r n u t r i t i o n · A s a c o n s e q u e n c e , t h e i r h e a l t h i s a d v e r s e l y a f f e c t e d · I n c r e a s i n g h e a l t h c o n s c i o u s n e s s a m o n g w o m e n a s w e l l a s m e n 1 8 . 4 : S T A K E H O L D E R : G R A M P A N C H A Y A T P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S A w a r e n e s s a b o u t t h e e a r l i e r s o d i c l a n d r e c l a m a t i o n p r o j e c t , e s p e c i a l l y U P S L R I I P u n d e r w h i c h t h e G r a m P a n c h a y a t w a s i n v o l v e d f o r i m p l e m e n t a t i o n o f a s u b - c o m p o n e n t o n c o n s t r u c t i o n o f P a n c h a y a t B h a w a n a n d e s t a b l i s h m e n t o f l i b r a r i e s a t t h e P a n c h a y a t B h a w a n · F u l l y a w a r e a b o u t t h e p r o j e c t a n d i t s c o m p o n e n t s · G r a m P a n c h a y a t p l a y e d a c t i v e r o l e i n c o n s t r u c t i o n o f P a n c h a y a t B h a w a n a n d e s t a b l i s h m e n t o f l i b r a r y a t t h e P a n c h a y a t B h a w a n · G o v e r n m e n t s h o u l d p r o v i d e m o r e f u n d s f o r f u r n i t u r e a n d c o m m u n i t y p u r p o s e i t e m s s u c h a s d u r r y , m a s s c o o k i n g u t e n s i l s , e t c · M o r e l i t e r a t u r e i n c l u d i n g b o o k s s h o u l d b e p r o v i d e d · I f p o s s i b l e P a n c h a y a t B h a w a n s h o u l d b e e x t e n d e d t o i n c l u d e a t l e a s t t w o - b e d r o o m g u e s t h o u s e f o r v i s i t o r s A w a r e n e s s a b o u t t h e p r o p o s e d U P S L R I I I P u n d e r w h i c h t h e d e p a r t m e n t w i l l b e i n v o l v e d w i t h r e s p e c t t o S o d i c H a a t a n d R u m i n a n t m a r k e t s · M a n y P a n c h a y a t m e m b e r s a r e a w a r e a b o u t t h e p r o p o s e d U P S L R I I I P b u t n o t a w a r e a b o u t i t s d e t a i l e d c o m p o n e n t s · S o m e P a n c h a y a t m e m b e r s b e c a m e a w a r e o n l y a f t e r I E S A t e a m c o n t a c t e d t h e m f o r i n t e r a c t i o n . T h e s e m e m b e r s a r e n o w a b o u t t h e d e t a i l e d p r o j e c t c o m p o n e n t s a l s o . · M a n a g e m e n t o f S o d i c H a a t a n d R u m i n a n t m a r k e t s h o u l d b e u n d e r c o m p l e t e c o n t r o l o f G r a m P a n c h a y a t w i t h t e c h n i c a l s u p p o r t f r o m t h e P a n c h a y a t i R a j D e p a r t m e n t · M e m b e r s o f G r a m P a n c h a y a t s h o u l d h a v e e q u a l v o i c e i n t h e d e c i s i o n s . I t s h o u l d n o t b e u n d e r e x c l u s i v e l y c o n t r o l o f G r a m P r a d h a n · G r a m P a n c h a y a t a s a w h o l e s h o u l d t a k e d e c i s i o n s · P a n c h a y a t s e c r e t a r y s h o u l d m a i n t a i n p r o p e r r e c o r d s o f S o d i c H a a t a n d Page 242 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 1 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S R u m i n a n t m a r k e t s a n d p u t b e f o r e t h e G r a m P a n c h a y a t f r o m t i m e t o t i m e · R e g u l a r m e e t i n g o f G r a m P a n c h a y a t s h o u l d b e h e l d i n o r d e r t o r e v i e w t h e f i n a n c i a l r e c o r d s a n d p r o g r e s s o f t h e s e m a r k e t s P r o b a b l e r o l e s w h i c h t h e G r a m P a n c h a y a t c o u l d p l a y i n p l a n n i n g a n d i m p l e m e n t a t i o n o f t h e p r o j e c t ( G r a m P a n c h a y a t w e r e b r i e f e d a b o u t t h e p r o j e c t c o m p o n e n t s b e f o r e a s k i n g t h i s q u e s t i o n ) · G r a m P a n c h a y a t c a n d e v e l o p S i t e I m p l e m e n t a t i o n P l a n b e c a u s e i t i s a w a r e a b o u t t h e r e s o u r c e s , l o c a t i o n o f s o d i c p a t c h e s a n d t o p o g r a p h y i n t h e v i l l a g e . · I t c a n h e l p i n a w a r e n e s s g e n e r a t i o n i n t h e v i l l a g e · I t c a n h e l p i n m o t i v a t i n g f a r m e r s t o p a r t i c i p a t e i n t h e p r o j e c t · I t c a n h e l p p r o j e c t a u t h o r i t i e s i n f i n a l i z i n g t h e s c h e d u l e f o r v a r i o u s p r o j e c t a c t i v i t i e s i n c l u d i n g i n p u t d i s t r i b u t i o n · I t c a n t r y t o c o n v i n c e b e n e f i c i a r y f a r m e r s t o s p a r e p a r t o f t h e i r l a n d f o r i n s t a l l a t i o n o f f i e l d d r a i n n e t w o r k · I t c a n m o t i v a t e f a r m e r s t o c o n t r i b u t e i n c a s h o r k i n d f o r m a i n t e n a n c e o f c o m m u n i t y a s s e t s t o b e c r e a t e d d u r i n g t h e c o u r s e o f t h e p r o j e c t · I t c a n h e l p i n g i n r e s o l v i n g i n t e r - g r o u p c o n f l i c t s · I t c a n h e l p i n r e v i e w i n g t h e p r o j e c t p r o g r e s s a n d m o n i t o r i n g o f f i e l d a c t i v i t i e s f r o m t i m e t o t i m e · G r a m P a n c h a y a t s h o u l d b e i n v o l v e d i n t h e p r o j e c t f r o m t h e v e r y b e g i n n i n g · N o t o n l y G r a m P r a d h a n b u t e n t i r e G r a m P a n c h a y a t s h o u l d b e t a k e n i n t o c o n f i d e n c e w h i l e l a u n c h i n g t h e p r o j e c t i n t h e v i l l a g e · E n t i r e G r a m P a n c h a y a t , n o t o n l y G r a m P r a d h a n , s h o u l d b e i n v o l v e d i n t h e s i t e i m p l e m e n t a t i o n c o m m i t t e e · G r a m P a n c h a y a t s h o u l d b e e n t r u s t e d w i t h t h e t a s k o f m a i n t e n a n c e o f c o m m u n i t y a n d g e n e r a l p u r p o s e a s s e t s t o b e c r e a t e d u n d e r t h e p r o j e c t P e r c e p t i o n a b o u t t h e c a p a b i l i t y o f G r a m P a n c h a y a t t o t a k e p a r t i n p l a n n i n g a n d i m p l e m e n t a t i o n o f t h e p r o j e c t a c t i v i t i e s a t v i l l a g e l e v e l · G r a m P a n c h a y a t i s f u l l y c o m p e t e n t t o p a r t i c i p a t e i n p l a n n i n g a n d i m p l e m e n t a t i o n o f t h e p r o j e c t a c t i v i t i e s a t v i l l a g e l e v e l a s i t i s a l r e a d y i m p l e m e n t i n g m a n y g o v e r n m e n t s c h e m e s · H o w e v e r , i t w i l l n e e d t e c h n i c a l s u p p o r t f r o m p r o j e c t s t a f f a n d o t h e r g o v e r n m e n t d e p a r t m e n t s t o s u c c e s s f u l l y i m p l e m e n t t h e a c t i v i t i e s · G r a m P a n c h a y a t s h o u l d b e i n v o l v e d f r o m t h e v e r y b e g i n n i n g a n d i t s h o u l d b e t a k e n i n t o c o n f i d e n c e b e f o r e l a u n c h i n g o f t h e p r o j e c t i n t h e v i l l a g e S u g g e s t e d m e c h a n i s m t o s t r e n g t h e n s u c h c a p a b i l i t y · · M e m b e r s o f G r a m P a n c h a y a t s h o u l d b e i m p a r t e d s u i t a b l e t r a i n i n g o n v a r i o u s i s s u e s r e l a t e d t o s o d i c l a n d r e c l a m a t i o n a n d i t s s u s t a i n a b i l i t y · M e m b e r s E x p e c t a t i o n s f r o m U P B S N a n d s t a t e g o v e r n m e n t t o s t r e n g t h e n t h e c a p a c i t y o f G r a m P a n c h a y a t t o t a k e · A p p r o p r i a t e t r a i n i n g a n d c a p a c i t y b u i l d i n g o f m e m b e r s o f t h e G r a m P a n c h a y a t · L i n k a g e o f p r o j e c t i n s t i t u t i o n s w i t h G r a m P a n c h a y a t t o t h e · G r a m P a n c h a y a t s h o u l d b e t h e f i r s t c o n t a c t p o i n t w h i l e e n t e r i n g t h e v i l l a g e · U P B S N s h o u l d e x p l o r e a n d e x e c u t e t h e Page 243 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 2 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S u p t h e r o l e s a n d r e s p o n s i b i l i t i e s u n d e r t h e p r o j e c t p o s s i b l e e x t e n t · S h a r i n g o f i n f o r m a t i o n · S e n s i t i v i t y t o l o c a l s o c i o - e c o n o m i c d y n a m i c s b u t r e m a i n i n g n e u t r a l t o t h e g r e a t e x t e n t · H o l i s t i c i n v o l v e m e n t o f G r a m P a n c h a y a t i n p r o j e c t m a n a g e m e n t a t v i l l a g e l e v e l p o s s i b i l i t y o f i n s t i t u t i o n a l l i n k a g e w i t h G r a m P a n c h a y a t · P r o j e c t f i e l d t e a m s h o u l d h o l d d e t a i l e d d i s c u s s i o n w i t h G r a m P a n c h a y a t a b o u t t h e p r o b l e m s a n d p r o s p e c t s o f t h e v i l l a g e b e f o r e s t a r t i n g l a n d r e c l a m a t i o n a c t i v i t i e s · P r o j e c t s h o u l d a l s o c o n t r i b u t e i n a c t i v a t i n g t h e G r a m P a n c h a y a t i t s e l f t h r o u g h p r e s s i n g f o r i t s r e g u l a r m e e t i n g P o s s i b i l i t i e s o f i n s t i t u t i o n a l l i n k a g e o f t h e p r o p o s e d S i t e I m p l e m e n t a t i o n C o m m i t t e e a n d W a t e r U s e r s ’ G r o u p w i t h t h e G r a m P a n c h a y a t a n d i t s c o m m i t t e e s · A n y i n s t i t u t i o n s h o u l d h a v e p e r e n n i a l r e l e v a n c e . S i t e I m p l e m e n t a t i o n C o m m i t t e e a n d W a t e r U s e r s ’ G r o u p a r e r e l e v a n t o n l y f o r t h o s e f a r m e r s w h o p o s s e s s s o d i c l a n d w h i c h h a s b e e n i n c l u d e d i n t h e l a n d r e c l a m a t i o n p r o g r a m . P r i n c i p a l l y , w e s h o u l d n o t c o n s i d e r s o d i c l a n d a s p e r m a n e n t s o d i c l a n d . T h e r e i s e v e r y p o s s i b i l i t y o f i t s r e c l a m a t i o n , e v e n w i t h o u t p r o j e c t i n t e r v e n t i o n . M o r e o v e r , S I C a n d W U G a r e p r o j e c t - s p e c i f i c i n s t i t u t i o n s m e a n t o n l y f o r p r o j e c t p e r i o d . · I t i s g e n e r a l t e n d e n c y a m o n g e x t e r n a l a g e n c i e s t o c r e a t e t h e n e w i n s t i t u t i o n s a n d a r r a n g e m e n t s f o r e x e c u t i o n o f t h e i r p l a n n e d a c t i v i t i e s . · P a n c h a y a t i R a j I n s t i t u t i o n i s o n e o f m a j o r a c h i e v e m e n t s o f o u r c o u n t r y . U n d o u b t e d l y , t h e r e a r e m a n y i s s u e s r e l a t e d t o t h e f u n c t i o n i n g o f s u c h i n s t i t u t i o n s e s p e c i a l l y a t v i l l a g e l e v e l . A n y e x t e r n a l a g e n c y / g o v e r n m e n t d e p a r t m e n t s h o u l d e x p l o r e t h e p o s s i b i l i t i e s t o u t i l i z e e x i s t i n g i n s t i t u t i o n a l s e t u p a n d t r y t o i m p r o v e i t s f u n c t i o n i n g , r a t h e r t h a n c r e a t i n g n e w s e t o f i n s t i t u t i o n s e v e r y t i m e . · M o r e o v e r , n e w i n s t i t u t i o n s d o n o t g u a r a n t e e s m o o t h i m p l e m e n t a t i o n o f a c t i v i t i e s a c c o r d i n g t o t h e i r m a n d a t e . · U n l e s s y o u i n v o l v e G r a m P a n c h a y a t s i n c e b e g i n n i n g i n t h e d e c i s i o n s h o w c a n e x p e c t i t t a k e t h e r e s p o n s i b i l i t i e s i n p o s t p r o j e c t p e r i o d ( e s p e c i a l l y m a i n t e n a n c e o f p r o j e c t a s s e t s ) · P r o j e c t n e e d s t o e x p l o r e p r o a c t i v e r o l e o f G r a m P a n c h a y a t r a t h e r t h a n a p a s s i v e r o l e i n f o r m o f a p p r o v i n g a u t h o r i t y · L i n k a g e w i t h G r a m P a n c h a y a t s h o u l d b e s t a r t i n g p o i n t · G r a m P a n c h a y a t s h o u l d a l s o b e i n v o l v e d i n p l a n n i n g a n d e x e c u t i o n o f f i e l d a c t i v i t i e s i n c l u d i n g f i e l d a n d l i n k d r a i n c o n s t r u c t i o n P o s s i b i l i t i e s a n d w i l l i n g n e s s o n p a r t o f G r a m P a n c h a y a t t o t a k e u p t h e t a s k o f m a i n t e n a n c e o f v i l l a g e l e v e l · I f t h e G r a m P a n c h a y a t i s i n v o l v e d i n h o l i s t i c m a n n e r f r o m t h e v e r y b e g i n n i n g , i t w i l l n o t h a v e a n y h e s i t a t i o n i n a c c e p t i n g t h e s e r e s p o n s i b i l i t i e s . B u t i f y o u i m p l e m e n t v a r i o u s a c t i v i t i e s a t y o u r · G r a m P a n c h a y a t s h o u l d b e i n v o l v e d f r o m t h e v e r y b e g i n n i n g i n p l a n n i n g a n d e x e c u t i o n o f f i e l d d r a i n a n d l i n k d r a i n Page 244 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 3 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S a s s e t s ( s u c h a s l i n k d r a i n s , f i e l d d r a i n s ) c r e a t e d d u r i n g t h e c o u r s e o f p r o j e c t i m p l e m e n t a t i o n o w n w i t h o u t a n y r o l e f o r G r a m P a n c h a y a t p l e a s e d o n o t e x p e c t u s t o t a k e t h e s e r e s p o n s i b i l i t i e s i n p o s t p r o j e c t p e r i o d n e t w o r k i n s t a l l a t i o n a n d c r e a t i o n o f o t h e r a s s e t s · I t s h o u l d b e a t t e m p t e d t o d e v e l o p a s e n s e o f o w n e r s h i p i n G r a m P a n c h a y a t t o w a r d s t h e s e a s s e t s s i n c e b e g i n n i n g . I d e n t i f i c a t i o n o f m a i n h u r d l e s i n d e v e l o p m e n t o f s o c i a l c a p i t a l i n t h e v i l l a g e a n d s u g g e s t e d m e a s u r e s t o o v e r c o m e s u c h h u r d l e s · M a i n h u r d l e s i n d e v e l o p m e n t o f s o c i a l c a p i t a l i n c l u d e s o c i o - e c o n o m i c h e t e r o g e n e i t y i n t h e v i l l a g e , l o c a l p o l i t i c s , i n t e r - f a m i l y r e l a t i o n s , p h y s i c a l p r o x i m i t y o f h o u s e h o l d s , p a s t r e c o r d s o f m u t u a l h e l p , d i f f e r e n c e s i n e d u c a t i o n a l a c h i e v e m e n t s , c a s t e d y n a m i c s , e t c · T h e o n l y w a y t o o v e r c o m e s u c h h u r d l e s i s t o e v o l v e s o m e c o m m o n b i n d i n g f o r c e s t r o n g e n o u g h b r i n g a n d r e t a i n h o u s e h o l d s t o g e t h e r f o r t h e c o m m o n c a u s e · M a k i n g c o n s e n s u s - b a s e d a p p r o v a l s a n d d e c i s i o n s i n S I C a n d W U G m e e t i n g s m a y b e o n e w a y o f p r o m o t i n g s u c h b i n d i n g . H o w e v e r , s u c h a r r a n g e m e n t m a y h a l t o r d e l a y t h e p r o j e c t a c t i v i t i e s b u t g r a d u a l l y f a r m e r s w i l l r e a l i z e t h e i m p o r t a n c e o f c o n s e n s u s . M o r e o v e r , s o c i a l a n d p e e r p r e s s u r e w i l l f a c i l i t a t e i n a r r i v a l o f c o n s e n s u s . P r o s p e c t s a n d w i l l i n g n e s s f o r p o s t - p r o j e c t h a n d h o l d i n g o f s o c i a l c a p i t a l , s u c h a s S I C , W U G , S H G , g e n e r a t e d d u r i n g p r o j e c t i m p l e m e n t a t i o n · O n l y g e n e r a l p u r p o s e i n s t i t u t i o n s a r e s u s t a i n a b l e f o r l o n g t i m e · S p e c i f i c p u r p o s e i n s t i t u t i o n s w i l l d o d i e t h e i r o w n d e a t h a f t e r c o m p l e t i o n o f t h e p u r p o s e o r e n d o f p l a n n e d t i m e s c h e d u l e o f t h e p r o j e c t · G r a m P a n c h a y a t w i l l h a v e n o h e s i t a t i o n i n h a n d h o l d i n g o f t h e s e i n s t i t u t i o n s a f t e r t h e p r o j e c t w i t h d r a w a l i f t h e s e i n s t i t u t i o n s c o n t i n u e t o e x i s t a n d r e m a i n f u n c t i o n a l . · T h e p r o j e c t a u t h o r i t i e s s h o u l d n o t i m p r e s s u p o n s u s t a i n a b i l i t y o f s p e c i f i c - p u r p o s e i n s t i t u t i o n s t o s u s t a i n e v e n a f t e r p r o j e c t w i t h d r a w a l . · I f t h e y w a n t t h e s e i n s t i t u t i o n s t o b e c o m e p e r m a n e n t i n s t i t u t i o n s i n t h e v i l l a g e , t h e i r m a n d a t e s h o u l d b e d e s i g n e d i n s u c h a w a y t h a t i t r e m a i n s r e l e v a n t e v e n a f t e r c o m p l e t i o n o f t h e p r o j e c t a c t i v i t i e s . P e r c e i v e d s o c i o - e c o n o m i c d y n a m i c s o f v i l l a g e , w h i c h n e e d s t o b e k e p t i n m i n d w h i l e f i n a l i z i n g t h e p r o j e c t d e s i g n · T h e r e i s m i x o f g e n e r a l , b a c k w a r d a n d s c h e d u l e d c a s t e h o u s e h o l d s . T h e s e h o u s e h o l d s h a v e d i f f e r e n t s o c i a l h e r i t a g e · I n t r a - c a s t e c o n g r u e n c e i s s t r o n g e r t h a n i n t e r - c a s t e c o n g r u e n c e · S o m e f a m i l i e s h a v e a c c e s s t o s a l a r y i n c o m e . Q u a l i t y o f l i f e a s w e l l a s s o c i a l s t a t u s o f t h e s e h o u s e h o l d s i s b e t t e r t h a n o t h e r h o u s e h o l d s . M o r e o v e r , t h e y a r e l e s s e r r e s p o n s i v e t o e x t e r n a l p r o j e c t s r e l a t e d t o a g r i c u l t u r a l a n d r u r a l d e v e l o p m e n t · P r o j e c t s h o u l d k e e p t h e s e s i t u a t i o n s i n m i n d w h i l e d e s i g n i n g t h e p r o j e c t · T h o u g h p r o j e c t s u p p o r t s h o u l d b e a s o b j e c t i v e a s p o s s i b l e , s o m e s p e c i a l p r e f e r e n c e t o p o o r a n d n e e d y f a r m e r s s h o u l d b e c o n s i d e r e d · C o m m i t m e n t o f t h e c o n c e r n e d f a r m e r s Page 245 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 4 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S · A f f o r d i n g c a p a c i t y o f h o u s e h o l d s v a r y a c r o s s t h e c a s t e a n d l a n d h o l d i n g c a t e g o r i e s · W a g e - d e p e n d e n t h o u s e h o l d s h a v e l e s s e r t i m e t o p a r t i c i p a t e i n l o n g - d u r a t i o n m e e t i n g s · S o m e f a m i l i e s a c r o s s t h e c a s t e c a t e g o r i e s a r e c l o s e r t o G r a m P r a d h a n a n d e x p e c t s p e c i a l f a v o r · T i n y l a n d h o l d e r s a r e g e n e r a l l y d e p e n d e n t o n w a g e e a r n i n g f o r t h e i r l i v e l i h o o d . T h e y t e n d t o t a k e l e s s e r i n t e r e s t i n r e c l a m a t i o n o f t h e i r s o d i c l a n d s d u e t o o p p o r t u n i t y c o s t · L a r g e f a r m e r s a r e n o t m u c h b o t h e r e d t o r e c l a i m t h e i r s o d i c l a n d · A b s e n t e e l a n d h o l d e r s w i l l a l s o n o t t a k e m u c h i n t e r e s t i n p r o j e c t a c t i v i t i e s b e c a u s e t h e y w i l l r e q u i r e v i s i t i n g t h e v i l l a g e f r e q u e n t l y . s h o u l d b e e n s u r e d b e f o r e a s s o c i a t i n g t h e m w i t h t h e p r o j e c t ; o t h e r w i s e t h e i r p o o r p e r f o r m a n c e l e a v e s s p i l l - o v e r e f f e c t · A l l t h e f a r m e r s m a y n o t b e m o t i v a t e d p u r e l y o n t h e g r o u n d o f e c o n o m i c s o f s o d i c l a n d r e c l a m a t i o n ( f o r e x a m p l e , w a g e - d e p e n d e n t f a m i l i e s ) . S u c h f a r m e r s s h o u l d b e m o t i v a t e d o n o t h e r g r o u n d s . P r o j e c t a u t h o r i t i e s n e e d t o e x p l o r e s u c h o t h e r g r o u n d s . P o s s i b l e r o l e o f d i f f e r e n t P a n c h a y a t C o m m i t t e e s , e s p e c i a l l y W a t e r a n d L a n d M a n a g e m e n t C o m m i t t e e i n p r o j e c t i m p l e m e n t a t i o n · P a n c h a y a t c o m m i t t e e s a r e n o t v e r y e f f e c t i v e i n t h e v i l l a g e . T h e i r e f f i c i e n c y a n d e f f e c t i v e n e s s a c t u a l l y d e p e n d s o n t h e v i b r a n c y o f G r a m P a n c h a y a t a s a w h o l e · O n c e t h e G r a m P a n c h a y a t g e t s i n v o l v e d i n t h e p r o j e c t i m p l e m e n t a t i o n , a l l t h e r e l e v a n t c o m m i t t e e s w i l l a u t o m a t i c a l l y b e a c t i v a t e d b e c a u s e G r a m P a n c h a y a t i s e x p e c t e d t o p e r f o r m i t s f u n c t i o n s t h r o u g h t h e s e c o m m i t t e e s . · G r a m P a n c h a y a t s h o u l d b e a c t i v a t e d t o p l a y a p r o a c t i v e r o l e i n p r o j e c t p l a n n i n g a n d i m p l e m e n t a t i o n · C o m m i t t e e s w i l l a u t o m a t i c a l l y b e a c t i v a t e d . S t a t u s o f c o m m u n i t y l a n d , s o d i c a n d n o n - s o d i c , o w n e d b y t h e G r a m S a b h a a n d p r o s p e c t s , p l a n a n d p r o b l e m s i n i t s a l l o t m e n t t o e l i g i b l e f a r m e r s · M a j o r p a r t o f c o m m u n i t y l a n d h a s a l r e a d y b e e n a l l o t t e d t o t h e e l i g i b l e b e n e f i c i a r i e s ; o n l y s m a l l p o r t i o n r e m a i n s t o b e a l l o t t e d · T h e r e i s n o p r o b l e m i n l a n d a l l o t m e n t · S o d i c p l o t s , i f i d e n t i f i e d f o r t h e r e c l a m a t i o n p r o g r a m , w i l l b e a l l o t t e d o n p r i o r i t y b a s i s · P r o j e c t a u t h o r i t i e s s h o u l d i n d e n t i f y t h e s o d i c p l o t s t o b e i n c l u d e d i n t h e l a n d r e c l a m a t i o n p r o g r a m a n d f o r w a r d t h e l i s t t o t h e G r a m P a n c h a y a t w e l l i n a d v a n c e . S u c h p l o t s w i l l b e a l l o t t e d t o t h e e l i g i b l e v i l l a g e r s i n a c c o r d a n c e w i t h t h e e x t a n t g o v e r n m e n t p o l i c y . S t a t u s o f p o s s e s s i o n o n a l r e a d y - a l l o t t e d G r a m S a b h a l a n d a n d p r o s p e c t s , p l a n a n d p r o b l e m s i n p r o v i d i n g p o s s e s s i o n o n a l l o t t e d l a n d · P o s s e s s i o n o n a l r e a d y - a l l o t t e d l a n d i s p e n d i n g i n a f e w c a s e s · P o s s e s s i o n c a n b e p r o v i d e d i f c o o r d i n a t i o n w i t h t h e R e v e n u e D e p a r t m e n t i m p r o v e s · P r o j e c t s h o u l d f a c i l i t a t e c o o r d i n a t i o n w i t h t h e R e v e n u e D e p a r t m e n t Page 246 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 5 1 8 . 5 : S T A K E H O L D E R : N G O s w o r k i n g w i t h f a r m e r s P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y L i k e l y i m p a c t o f t h e p r o j e c t o n a g r i c u l t u r a l b i o - d i v e r s i t y · R e c l a m a t i o n o f s o d i c l a n d a n d r a v i n e s w i l l c e r t a i n l y e n h a n c e a g r i c u l t u r a l b i o d i v e r s i t y · O n c e a v i l l a g e i s s e l e c t e d u n d e r t h e l a n d r e c l a m a t i o n p r o g r a m , i t s h o u l d b e m a d e f r e e f r o m s o d i c l a n d · S i m i l a r l y , r a v i n e r e c l a m a t i o n p r o g r a m s h o u l d b e i m p l e m e n t e d i n t h e e n t i r e v i l l a g e ; p a t c h e s s h o u l d n o t b e l e f t . U s e o f c h e m i c a l f e r t i l i z e r a n d p e s t i c i d e s · F a r m e r s a r e u s i n g h i g h d o z e s o f c h e m i c a l f e r t i l i z e r s m a i n l y d u e t o i n a d e q u a t e a v a i l a b i l i t y o f f a r m y a r d m a n u r e w i t h t h e m · M o r e o v e r , u s e o f c h e m i c a l f e r t i l i z e r s i s h i g h l y i m b a l a n c e d i n f a v o r o f n i t r o g e n o u s f e r t i l i z e r s · P e s t i c i d e s a r e u s e d i n t h e c r o p s e l e c t i v e l y · F a r m e r s s h o u l d b e s e n s i t i z e d o n b a l a n c e d u s e o f f e r t i l i z e r s · T h e y s h o u l d b e m o t i v a t e d a n d g u i d e d t o i n c r e a s e t h e u s e o f f a r m y a r d m a n u r e t o t h e p o s s i b l e e x t e n t · T h e y s h o u l d b e e n c o u r a g e d t o a l s o u s e o t h e r t y p e s o f o r g a n i c m a n u r e s · F a r m e r s s h o u l d b e m o t i v a t e d a n d t r a i n e d t o a d o p t I P M a n d I P N M p r a c t i c e s U s e o f i r r i g a t i o n : e f f e c t o n g r o u n d w a t e r · I n c r e a s e d i r r i g a t i o n h a s c e r t a i n l y l e f t a d v e r s e e f f e c t o n t h e g r o u n d w a t e r l e v e l · F a r m e r s h a v e n o o p t i o n b u t u s e b o r e w e l l s f o r c r o p i r r i g a t i o n d u e t o i n a d e q u a c y a n d i r r e g u l a r i t y o f c a n a l w a t e r . · D e p l e t i n g g r o u n d w a t e r i s a t t r i b u t e d m a i n l y t o d e c l i n i n g r a i n f a l l d u e t o w h i c h a d e q u a t e r e c h a r g i n g d o e s n o t t a k e p l a c e . · G o v e r n m e n t s h o u l d e n s u r e r e g u l a r s u p p l y o f c a n a l w a t e r i n a d e q u a t e q u a n t i t y s o t h a t f a r m e r s o f a t l e a s t c o m m a n d a r e a c o u l d u s e i t p r o p e r l y . · F a r m e r s s h o u l d a l s o b e t r a i n e d o n w a t e r c o n s e r v a t i o n t e c h n i q u e s · T h e y s h o u l d b e s e n s i t i z e d a g a i n s t t h e i l l e f f e c t s o f e x c e s s i v e i r r i g a t i o n i n t h e f i e l d . C a t t l e p r o d u c t i v i t y ; u n p r o d u c t i v e c a t t l e ; f o d d e r s h o r t a g e s · C a t t l e p r o d u c t i v i t y i s q u i t e l o w m a i n l y d u e t o i n f e r i o r b r e e d a n d l o w n u t r i t i o n s u p p l i e d t o t h e m · F a r m e r s f a c e a c u t e f o d d e r s h o r t a g e , e s p e c i a l l y d u r i n g s u m m e r · D u e t o i n c r e a s i n g p r e s s u r e f o r p r o d u c t i o n o f f o o d i t e m s f a r m e r s a r e n o t i n a p o s i t i o n t o g r o w f o d d e r c r o p s i n a d e q u a t e q u a n t i t y · F a r m e r s a l s o p o s s e s s s o m e u n p r o d u c t i v e c a t t l e b u t d o n o t s e l l o f f t h e m d u e t o e m o t i o n a l r e a s o n s · U n p r o d u c t i v e c a t t l e b e c o m e s a d d i t i o n a l b u r d e n o n l i m i t e d · F a r m e r s s h o u l d b e e n c o u r a g e d t o g r o w f o d d e r c r o p s · F a r m e r s s h o u l d b e s e n s i t i z e d a b o u t t h e i m p o r t a n c e o f a d e q u a t e n u t r i t i o n t o a n i m a l s · G r a s s l a n d s a n d p a s t u r e s s h o u l d b e d e v e l o p e d i n r a v i n e s · V a c a n t c o m m u n i t y l a n d i n o t h e r a r e a s s h o u l d b e d e v e l o p e d i n t o g r a s s l a n d a n d p a s t u r e Page 247 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 6 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y f o d d e r r e s o u r c e s l e a d i n g t o l o w f e e d i n g o f e v e n p r o d u c t i v e c a t t l e · G r a z i n g o p p o r t u n i t i e s a r e a l s o l i m i t e d d u e t o s h r i n k i n g p a s t u r e a r e a ; h o w e v e r , i n r a v i n e s s o m e g r a z i n g a r e a i s a v a i l a b l e I m p a c t o n h o u s e h o l d c o n s u m p t i o n / n u t r i t i o n · P r o j e c t i n t e r v e n t i o n w i l l l e a d t o i n c r e a s e d c r o p a n d m i l k p r o d u c t i o n . C o n s e q u e n t l y , i n t e r n a l a v a i l a b i l i t y o f a g r i c u l t u r a l p r o d u c e s a n d m i l k w i l l i n c r e a s e w h i c h w i l l c e r t a i n l y i m p r o v e h o u s e h o l d c o n s u m p t i o n a n d n u t r i t i o n · P r o j e c t i n t e r v e n t i o n w i l l e n h a n c e i n c o m e o f t h e p a r t i c i p a t i n g h o u s e h o l d s w h i c h w i l l i n c r e a s e t h e i r a f f o r d i n g c a p a c i t y t o b u y m o r e f o o d f r o m t h e m a r k e t · R a v i n e r e c l a m a t i o n w i l l i m p r o v e f o d d e r a v a i l a b i l i t y l e a d i n g t o b e t t e r c a t t l e p r o d u c t i v i t y e n h a n c i n g t h e q u a n t i t y o f m i l k a v a i l a b l e w i t h h o u s e h o l d s · T h e p r o j e c t s h o u l d b e i m p l e m e n t e d w i t h f u l l h o n e s t y a n d a l l t h e b e n e f i t s s h o u l d a c t u a l l y r e a c h t h e f a r m e r s I m p a c t o n h e a l t h · I n c r e a s e d a v a i l a b i l i t y o f a g r i c u l t u r a l a n d l i v e s t o c k p r o d u c e s w i l l e n h a n c e c o n s u m p t i o n a n d n u t r i t i o n o f t h e b e n e f i c i a r y - f a m i l i e s . A s a r e s u l t , t h e i r h e a l t h w i l l i m p r o v e . · P r o j e c t i n t e r v e n t i o n w i l l l e a d t o i m p r o v e m e n t i n o v e r a l l g r e e n e r y i n t h e a r e a w h i c h w i l l h a v e m a n y p o s i t i v e i m p a c t s o n t h e g e n e r a l h e a l t h o f v i l l a g e r s . · R e h a b i l i t a t i o n o f m a i n d r a i n s i s l i k e l y t o r e d u c e w a t e r l o g g i n g f r o m t h e v i l l a g e s . T h u s , p r o n e n e s s t o w a t e r b o r n e d i s e a s e s w i l l d e c l i n e . · D r a i n a g e i m p r o v e m e n t s h o u l d b e t a k e n u p i n h o l i s t i c m a n n e r c o n s i s t i n g o f r e h a b i l i t a t i o n o f m a i n d r a i n s , c o n s t r u c t i o n o f l i n k a n d f i e l d d r a i n s R e l a t i o n s h i p b e t w e e n v a r i o u s p r o j e c t i n s t i t u t i o n s a t v i l l a g e l e v e l ( l i k e S I C , W U G , F a r m e r s ’ C o o p e r a t i v e s , e t c ) w i t h P a n c h a y a t i R a j I n s t i t u t i o n s · S u c h l i n k a g e i s q u i t e w e e k a t p r e s e n t · I t n e e d s t o b e i m p r o v e d t h r o u g h i n s t i t u t i o n a l i z a t i o n o f t h e s e l i n k a g e s a n d a p p r o p r i a t e a m e n d m e n t i n t h e P a n c h a y a t i R a j A c t . G e n d e r i m p a c t s · R e c l a m a t i o n o f s o d i c l a n d s a n d r a v i n e w i l l i n c r e a s e c u l t i v a t e d a r e a a n d h e n c e l a b o r r e q u i r e m e n t . I t w i l l l e a d t o i n c r e a s e i n w o r k l o a d o n m e n a s w e l l a s w o m e n . · A n i m a l h u s b a n d r y i n t e r v e n t i o n s w i l l a l s o i n c r e a s e t h e w o r k l o a d o f w o m e n . H o w e v e r , i t w i l l a l s o i m p r o v e t h e i r h e a l t h s t a t u s t h r o u g h i n c r e a s e d a v a i l a b i l i t y o f m i l k a n d m i l k p r o d u c t s f o r s e l f - c o n s u m p t i o n . · T h e p r o j e c t s h o u l d s h a r p e n t h e f o c u s o n d e v e l o p m e n t o f w o m e n t h r o u g h l i t e r a c y , h e a l t h i m p r o v e m e n t a n d i n c o m e g e n e r a t i n g a c t i v i t i e s . Page 248 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 7 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y · I n c a s e o f t h o s e f a m i l i e s w h o s e m a l e w o r k e r s m i g r a t e o u t f o r w a g e w o r k , t h e e n t i r e a d d i t i o n a l w o r k l o a d w i l l f a l l u p o n w o m e n · I n c a s e o f s o m e f a m i l i e s , m a l e l a b o r e r s m a y s t o p g o i n g o u t i n s e a r c h o f w o r k b e c a u s e w o r k a v a i l a b i l i t y w i l l i n c r e a s e a t l o c a l l e v e l . I n s u c h f a m i l i e s , m a l e s w i l l s h a r e s o m e o f t h e a d d i t i o n a l w o r k l o a d w h i c h w i l l b e a r e l i e f t o w o m e n . · A f e w l a b o r e r s g o o u t o f v i l l a g e i n s e a r c h o f w a g e w o r k . S u c h w o m e n w i l l s t o p g o i n g o u t a s a r e s u l t o f i n c r e a s e d w o r k a v a i l a b i l i t y a t l o c a l l e v e l . · P r o p o s e d s e l f - h e l p g r o u p s w i l l i m p r o v e w o m e n ’ s a c c e s s t o s a v i n g a n d c r e d i t s e r v i c e s . C o n s e q u e n t l y , t h e y w i l l h a v e b e t t e r c a p a c i t y t o f u l f i l l c r e d i t n e e d s o f t h e f a m i l y . I t w i l l a l s o i m p r o v e t h e i r r e s p e c t i v e l y w i t h i n t h e f a m i l y b e c a u s e t h e f a m i l y w i l l r e a l i z e t h a t t h e y a r e t h e c h i e f v e h i c l e t o g r o u p c r e d i t . · I n c o m e g e n e r a t i n g a c t i v i t i e s w i l l l e a d t o e c o n o m i c e m p o w e r m e n t o f w o m e n . T h u s , t h e i r q u a l i t y o f l i f e w i l l i m p r o v e . M o r e o v e r , t h e i r s t a t u s a n d r e s p e c t i v e l y i n t h e c o m m u n i t y a s w e l l a s w i t h i n t h e f a m i l y w i l l i m p r o v e . · W o m e n ’ s o v e r a l l p e r s o n a l i t y i s l i k e l y t o i m p r o v e a s a r e s u l t o f t h e i r p a r t i c i p a t i o n i n t h e p r o j e c t a c t i v i t i e s a n d i n t e r a c t i o n w i t h o u t s i d e p e o p l e . H I V / A I D S a m o n g t h e c o n s t r u c t i o n w o r k e r s a n d m i g r a n t l a b o r · N o c a s e o f H I V / A I D S i s k n o w n i n t h e a r e a · S o m e a w a r e n e s s p r o g r a m s h o u l d b e i m p l e m e n t e d i n t h e a r e a i n o r d e r t o e d u c a t e a g a i n s t t h i s d i s e a s e . 1 8 . 6 : S T A K E H O L D E R : F A R M E R S ’ C O O P E R A T I V E S P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y O b s e r v a t i o n s a b o u t c h a n g i n g a g r i c u l t u r a l b i o - d i v e r s i t y o v e r t h e p e r i o d ( i n t h e c o n c e r n e d o p e r a t i o n a l a r e a ) · A g r i c u l t u r a l b i o - d i v e r s i t y i s d e c l i n i n g o v e r t h e p e r i o d ; m a n y g r a s s e s a n d s h r u b s a r e a l m o s t e x t i n c t n o w · N o s u g g e s t i o n s W i l l s o d i c l a n d r e c l a m a t i o n i m p r o v e a g r i c u l t u r a l b i o - d i v e r s i t y i n t h e a r e a ? · P r o b a b l y , s o d i c l a n d r e c l a m a t i o n w i l l i m p r o v e a g r i c u l t u r a l b i o d i v e r s i t y · T h e p r o j e c t s h o u l d r e c l a i m e n t i r e s o d i c a r e a o f t h e r e g i o n ; o t h e r w i s e , l e f t o v e r a r e a w i l l Page 249 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 8 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y a d v e r s e l y a f f e c t t h e f e r t i l e t r a c t s · T h e p r o j e c t s h o u l d n o t f o r c e u p o n f o r m a t i o n o f w a t e r u s e r s ’ g r o u p s o n t h e b a s i s o f c o n t i g u o u s p a t c h o f 4 h e c t a r e s . S o m e m e c h a n i s m s h o u l d b e e v o l v e d t o i n v o l v e e v e n i n d i v i d u a l f a r m e r s i f t h e y c o u l d m a n a g e d r a i n i n g o u t o f l e a c h e d w a t e r a t t h e i r o w n l e v e l C u r r e n t l e v e l o f u s e o f c h e m i c a l f e r t i l i z e r s a n d p e s t i c i d e s a n d t h e t r e n d o v e r r e c e n t p a s t · F a r m e r s a r e u s i n g q u i t e h i g h d o z e s o f c h e m i c a l f e r t i l i z e r s , e s p e c i a l l y n i t r o g e n o u s f e r t i l i z e r , i n a g r i c u l t u r a l f i e l d . · U s e o f c h e m i c a l f e r t i l i z e r s i s i n c r e a s i n g o v e r t h e p e r i o d . · D e c l i n i n g s o i l f e r t i l i t y i s b o t h c a u s e a n d e f f e c t o f i n c r e a s e d u s e o f c h e m i c a l f e r t i l i z e r s . · L a c k o f a d e q u a t e q u a n t i t y o f o r g a n i c m a n u r e s u c h a s f a r m y a r d m a n u r e a n d c o w d u n g c o m p e l s t h e f a r m e r s u s e c h e m i c a l f e r t i l i z e r s · I n c r e a s i n g a f f o r d i n g c a p a c i t y o f f a r m e r s a n d e a s i e r a v a i l a b i l i t y o f t h e s e f e r t i l i z e r s ( a s c o m p a r e d t o p a s t ) a r e a l s o t h e r e a s o n s f o r i n c r e a s e d u s e . · I m b a l a n c e d d o z e s o f c h e m i c a l f e r t i l i z e r s i s t h e m a i n c o n c e r n · C h e a p e r p r i c e o f U r e a e n c o u r a g e s t h e f a r m e r s t o u s e i t i n h i g h e r q u a n t i t y · E v e n t h o u g h c o o p e r a t i v e s a n d o t h e r i n s t i t u t i o n s a t t e m p t t o g u i d e t h e f a r m e r s o n b a l a n c e d d o z e s o f f e r t i l i z e r s , t h e y t a k e t h e i r o w n d e c i s i o n s d e p e n d i n g u p o n t h e i r e c o n o m i c c o n d i t i o n . · F a r m e r s s h o u l d b e t r a i n e d o n b a l a n c e d u s e o f f e r t i l i z e r s · T h e y s h o u l d b e s e n s i t i z e d t o u s e f e r t i l i z e r s a c c o r d i n g t o s o i l ’ s n e e d f o r w h i c h t h e y s h o u l d g o f o r s o i l t e s t i n g b e f o r e a p p l y i n g f e r t i l i z e r s , e s p e c i a l l y c h e m i c a l f e r t i l i z e r s · F a r m e r s s h o u l d b e s e n s i t i z e d a b o u t h i g h e r i m p o r t a n c e o f l o n g - t e r m c r o p p r o d u c t i v i t y o v e r s h o r t - t e r m c r o p p r o d u c t i v i t y . P o s i t i v e / n e g a t i v e i m p a c t o f i n c r e a s e d i r r i g a t i o n o n g r o u n d w a t e r i n t h e a r e a · I n c r e a s e d i r r i g a t i o n h a s c e r t a i n l y l e f t a d v e r s e e f f e c t o n t h e g r o u n d w a t e r l e v e l · F a r m e r s h a v e n o o p t i o n b u t u s e b o r e w e l l s f o r c r o p i r r i g a t i o n d u e t o i n a d e q u a c y a n d i r r e g u l a r i t y o f c a n a l w a t e r . · G r o u n d w a t e r h a s b e e n d e p l e t i n g o v e r t h e p e r i o d w h i c h i s a t t r i b u t e d n o t o n l y t o i n c r e a s e d i r r i g a t i o n · G o v e r n m e n t s h o u l d e n s u r e r e g u l a r s u p p l y o f c a n a l w a t e r i n a d e q u a t e q u a n t i t y s o t h a t f a r m e r s o f a t l e a s t c o m m a n d a r e a c o u l d u s e i t p r o p e r l y . · V i l l a g e r s s h o u l d b e e n c o u r a g e d t o i n c r e a s e g r e e n c o v e r i n t h e i r r e s p e c t i v e a r e a s w h i c h w o u l d h e l p i n i n c r e a s i n g p r e c i p i t a t i o n · F a r m e r s s h o u l d a l s o b e t r a i n e d o n w a t e r Page 250 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 4 9 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y b u t a l s o t o d e c l i n i n g p r e c i p i t a t i o n · T h u s , t h e p r i m a r y r e a s o n f o r d e p l e t i n g g r o u n d w a t e r i s d e c l i n i n g r a i n f a l l d u e t o w h i c h a d e q u a t e r e c h a r g i n g d o e s n o t t a k e p l a c e . c o n s e r v a t i o n t e c h n i q u e s · T h e y s h o u l d b e s e n s i t i z e d a g a i n s t t h e i l l e f f e c t s o f e x c e s s i v e i r r i g a t i o n i n t h e f i e l d . W i l l s m a l l a n d p o o r f a r m e r s b e a b l e t o a c t i v e l y p a r t i c i p a t e i n t h e p r o j e c t ? · A s p e r t h e p a s t e x p e r i e n c e , t h e p r o j e c t i s f a m o u s f o r i t s o b j e c t i v e a n d t r a n s p a r e n t s e l e c t i o n c r i t e r i a . S i n c e s e l e c t i o n o f b e n e f i c i a r y - f a r m e r s i s b a s e d o n t h e t y p e l a n d o w n e d a n d t h e i r w i l l i n g n e s s t o p a r t i c i p a t e i n t h e p r o j e c t a c t i v i t i e s , n o f a r m e r s w i l l h a v e a n y t y p e o f d i f f i c u l t y i n p a r t i c i p a t i n g i n t h e p r o j e c t . · T h e s a m e o b j e c t i v e a n d t r a n s p a r e n t c r i t e r i a o f s e l e c t i o n o f b e n e f i c i a r i e s s h o u l d c o n t i n u e i n t h e U P S L R I I I P . O b s e r v a t i o n a n d e x p e r i e n c e o n e n c r o a c h m e n t i n t h e d r a i n s · N o e n c r o a c h m e n t i n t h e d r a i n s i s o b s e r v e d · N o s u g g e s t i o n D o f a r m e r s l i f t w a t e r f r o m d r a i n s f o r i r r i g a t i o n p u r p o s e ? · S o m e f a r m e r s w h o s e f i e l d s a r e a d j a c e n t t o d r a i n s l i f t w a t e r f r o m d r a i n s f o r i r r i g a t i o n p r o v i d e d w a t e r i s a v a i l a b l e · P e r c e n t a g e o f s u c h f a r m e r s i s q u i t e l o w b e c a u s e o n l y f e w p l o t s c a n b e a d j a c e n t t o t h e d r a i n s . M o r e o v e r , d r a i n s a r e g e n e r a l l y d r y i n n o n - m o n s o o n s e a s o n a n d i n m o n s o o n s e a s o n ; t h e r e i s n o n e e d t o l i f t w a t e r f r o m d r a i n s . · N o s u g g e s t i o n I f y e s , w h a t w i l l b e t h e a l t e r n a t i v e i n c a s e f a r m e r s a r e s t o p p e d f r o m u s i n g d r a i n w a t e r f o r i r r i g a t i o n p u r p o s e s ? · W a t e r l i f t e d f r o m d r a i n s s e r v e s o n l y n e g l i g i b l e a r e a ; t h u s i t i s n o t a n i s s u e . · P r o j e c t s h o u l d n o t w o r r y a b o u t t h i s i s s u e a s i t i s n o n - i s s u e . 1 8 . 7 : S T A K E H O L D E R : P r o j e c t S t a f f P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y S h o r t c o m i n g s o f t h e d e s i g n o f e a r l i e r p r o j e c t s w h i c h s h o u l d b e r e m o v e d f r o m t h e p r o p o s e d U P S L R I I I P · E a r l i e r p r o j e c t d i d n o t h a v e a n y p r o v i s i o n f o r s u p p o r t i n g l i v e s t o c k · W a t e r c h a r g e s f o r l e a c h i n g a n d g r e e n m a n u r i n g w a s i n a d e q u a t e · C r o p d i v e r s i f i c a t i o n w a s n o t p r o p e r l y e m p h a s i z e d u p o n · T h e r e w a s n o s u p p o r t f o r I P M a n d I P N M a c t i v i t i e s · A n i m a l h u s b a n d r y s h o u l d b e i n c l u d e d a s a s e p a r a t e c o m p o n e n t i n t h e p r o j e c t d e s i g n . T h i s c o m p o n e n t s h o u l d a d d r e s s v a r i o u s i s s u e s r e l a t e d t o b r e e d i m p r o v e m e n t , h e a l t h a n d n u t r i t i o n o f a n i m a l s a n d v e t e r i n a r y s e r v i c e s . · P r e f e r a b l y , t h e p r o j e c t s h o u l d p r o v i d e w a t e r c h a r g e s a t t h e m a r k e t r a t e f o r l e a c h i n g a n d g r e e n m a n u r i n g . Page 251 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 0 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y w h i c h a r e n e c e s s a r y f o r s u s t a i n a b i l i t y o f r e c l a m a t i o n · S o m e t i m e s , l a c k o f t i m e l y s u p p l y o f i n p u t s t o t h e p r o j e c t d i s t r i c t s d i s t u r b e d e n t i r e s c h e d u l e · T h o u g h f i e l d s t a f f w a s q u i t e o p e n t o r e c e i v e c o m p l a i n t s f r o m t h e f a r m e r s , t h e r e w a s n o i n s t i t u t i o n a l i z e d a r r a n g e m e n t f o r l o d g i n g o f c o m p l a i n t a n d i t s r e d r e s s . · I n s p i t e o f b e i n g p a r t i c i p a t o r y a n d t r a n s p a r e n t i n i t s a p p r o a c h , t h e p r o j e c t w a s s t i l l t a r g e t d r i v e n d u e t o w h i c h f i e l d c o n c e n t r a t e d m o r e o n t h e t a r g e t t h a n t h e i m p l e m e n t a t i o n p r o c e s s / m e t h o d o l o g y . · H o r t i c u l t u r e w a s m a j o r c h a l l e n g e f o r t h e f i e l d s t a f f b e c a u s e f a r m e r s w a n t e d i m m e d i a t e r e s u l t s f r o m t h e i r i n v e s t m e n t o f t i m e a n d m o n e y w h e r e a s f r u i t c r o p s n e e d e d s o m e t i m e t o g i v e r e t u r n s o n i n v e s t m e n t . O t h e r w i s e , f a r m e r s s h o u l d b e c l e a r l y t o l d t h a t t h e y h a v e t o s h a r e t h e c o s t o f w a t e r f o r l e a c h i n g a n d D h a i n c h a i r r i g a t i o n i n c e r t a i n r a t i o . I n e a r l i e r p r o j e c t , a t y p e o f c o m m u n i c a t i o n g a p w a s c r e a t e d b e c a u s e w h e n t h e f i e l d s t a f f i n t i m a t e d t h a t t h e p r o j e c t w o u l d p r o v i d e w a t e r c h a r g e s f o r l e a c h i n g a n d D h a i n c h a i r r i g a t i o n f a r m e r s p r e s u m e d t h a t t h e t o t a l c o s t o f w a t e r w o u l d b e b o r n e b y t h e p r o j e c t , w h e r e a s i t d i d n o t h a p p e n . · W h a t e v e r c r o p d i v e r s i f i c a t i o n t o o k p l a c e i n t h e r e c l a i m e d a n d o t h e r l a n d i t w a s t h e r e s u l t o f f a r m e r s ’ o w n i n i t i a t i v e s ; t h e p r o j e c t d i d n o t a c t p r o a c t i v e l y . N o w i n t h e p r o p o s e d p r o j e c t t h e r e s h o u l d b e s o m e p r o v i s i o n o f o r g a n i z i n g c r o p d e m o n s t r a t i o n s o n n o n - c e r e a l c r o p s s o t h a t f a r m e r s c o u l d b e m o t i v a t e d t o a d o p t n e w c r o p s . · T h e p r o p o s e d p r o j e c t s h o u l d h a v e p r o v i s i o n f o r o r g a n i z i n g d e m o n s t r a t i o n s a n d f a r m e r s ’ t r a i n i n g o n I P M a n d I P N M . F i e l d d a y s s h o u l d a l s o b e o r g a n i z e d o n t h e s i t e o f I P M a n d I P N M d e m o n s t r a t i o n s s o t h a t g e n e r a l f a r m e r s c o u l d b e b e n e f i t e d . · T h e r e s h o u l d b e i n s t i t u t i o n a l a r r a n g e m e n t f o r l o d g i n g o f c o m p l a i n t s a n d t h e i r r e d r e s s . P r e f e r a b l y , s u c h a r r a n g e m e n t s h o u l d n o t a s k f o r t h e i d e n t i t y o f t h e c o m p l a i n a n t s o t h a t h e d o e s n o t h e s i t a t e i n l o d g i n g c o m p l a i n t . · T h e r e i s n e e d f o r p r o p e r b a l a n c e b e t w e e n t h e a c h i e v e m e n t o f t a r g e t a n d a d h e r e n c e t o t h e s l a t e d i m p l e m e n t a t i o n p r o c e s s . · T h e i n t e r - h o r t i c u l t u r e c o m p o n e n t s h o u l d b e e x c l u d e d f r o m t h e p r o p o s e d p r o j e c t . E n v i r o n m e n t a l i s s u e s / r i s k s a s s o c i a t e d w i t h t h e p r o p o s e d p r o j e c t · I n c r e a s e d b o r e w e l l i n t e n s i t y i n t h e p r o j e c t v i l l a g e w i l l h a v e f u r t h e r p r e s s u r e o n d e p l e t i n g g r o u n d w a t e r r e s o u r c e s · L e a c h e d w a t e r f r o m s o d i c p l o t s d r a i n e d o u t i n m a i n · N o s u g g e s t i o n s ; o n l y e n v i r o n m e n t a l e x p e r t c a n g i v e s u g g e s t i o n s . · E v e r y i n t e r v e n t i o n h a s p o s i t i v e a s w e l l a s n e g a t i v e d i m e n s i o n . T h e i n t e r v e n t i o n s h o u l d b e e v a l u a t e d i n Page 252 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 1 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y d r a i n m a y a d v e r s e l y a f f e c t d o w n s t r e a m a r e a / f i e l d u n l e s s m a i n d r a i n i s p r o p e r l y c o n n e c t e d t o n a t u r a l d r a i n a g e s y s t e m · S o d i c l a n d r e c l a m a t i o n w i l l i n c r e a s e c r o p p e d a r e a a n d c r o p p i n g i n t e n s i t y . I t w i l l a l s o l e a d t o i n c r e a s e d u s e o f c h e m i c a l f e r t i l i z e r s w h i c h m a y a d v e r s e l y a f f e c t s o i l a n d g r o u n d w a t e r q u a l i t y . · R e h a b i l i t a t i o n o f d r a i n s m a y i n v o l v e d i g g i n g a n d c l e a n i n g w h i c h i s l i k e l y t o i m p a c t f l o r a a n d f a u n a o f t h e d r a i n a r e a · R e c l a m a t i o n o f s o d i c l a n d a n d r a v i n e w i l l u n d o u b t e d l y i n c r e a s e p r o d u c t i v e l a n d i n t h e v i l l a g e s b u t i t w i l l r e d u c e t h e w i l d a r e a w h i c h i s q u i t e u s e f u l f o r a n i m a l s a n d s o m e c o m m u n i t y e v e n t s . S i n c e b e n e f i t o f t h e i n t e r v e n t i o n w o u l d b e m o r e t h a n t h e c o s t s i n t h i s s e n s e t h i s i s n o t a r e a l i s s u e . t o t a l i t y . I n t h i s l i g h t , p r o j e c t i n t e r v e n t i o n s a r e b e n e f i c i a l f o r t h e f a r m e r s s o i t s h o u l d b e c o n t i n u e d . · W h i l e r e h a b i l i t a t i n g m a i n d r a i n s a n d c o n s t r u c t i n g l i n k a n d f i e l d d r a i n s t h e p r o j e c t s h o u l d a d o p t n e t w o r k a p p r o a c h s o t h a t s a l t e d w a t e r l e a v e s t h e a g r i c u l t u r a l z o n e s a n d r e a c h e s t h e r i v e r s a n d f i n a l l y t o t h e s e a . S o c i a l i s s u e s / r i s k s a s s o c i a t e d w i t h t h e p r o p o s e d p r o j e c t · S o d i c / r a v i n e l a n d i s o w n e d m o s t l y b y r e s o u r c e - p o o r f a r m e r s . T h e y m a y n o t t a k e t h e c r i t i c a l i n t e r e s t i n t h e p r o j e c t b e c a u s e t h e y w i l l h a v e t o d e v o t e t i m e a n d s o m e m o n e y f o r r e c l a m a t i o n o f t h e i r s o d i c / r a v i n e l a n d . S u c h f a r m e r s a r e v i r t u a l l y s e t t l e d w i t h t h e i r a l t e r n a t i v e l i v e l i h o o d s o u r c e s s u c h a s w a g e e a r n i n g a n d p e t t y b u s i n e s s e s . · M o r e o v e r , w a g e - d e p e n d e n t h o u s e h o l d s m a y n o t t a k e a d e q u a t e i n t e r e s t i n t h e p r o j e c t b e c a u s e t h e i r h o l d i n g i s t i n y a n d m a y n o t c o m p e n s a t e t h e i r w a g e e a r n i n g . T h u s , t h e y m i g h t n o t p r e f e r t o l e a v e w a g e e a r n i n g i n o r d e r t o g e t i n v o l v e d i n f a r m i n g o n t h e i r s m a l l s i z e d f a r m s . · F a r m e r s h a v e s o m e h o w d e v e l o p e d a f e e l i n g t h a t s o d i c l a n d i s s o d i c l a n d a n d c a n n o t b e i m p r o v e d . S u c h f a r m e r s m a y n o t a c c e p t t h e p r o j e c t m e s s a g e t h a t s o d i c l a n d c a n b e r e c l a i m e d o n s u s t a i n a b l e b a s i s . · P r e v a l e n t l o c a l s o c i o - e c o n o m i c d y n a m i c s m a y a d v e r s e l y a f f e c t t h e p a r t i c i p a t o r y m o d e l o f p r o j e c t · R e s o u r c e - p o o r f a r m e r s s h o u l d b e m o t i v a t e d t o t a k e u p s o d i c / r a v i n e l a n d r e c l a m a t i o n p r o g r a m b y c o n v i n c i n g a b o u t t h e f a c t t h a t o n c e r e c l a i m e d s u c h l a n d s w i l l b e c o m e t h e i r p e r m a n e n t s o u r c e o f l i v e l i h o o d . · W a g e - d e p e n d e n t h o u s e h o l d s s h o u l d a l s o b e m o t i v a t e d t h a t r e c l a i m e d s o d i c / r a v i n e l a n d w i l l b e c o m e t h e i r p e r m a n e n t s o u r c e o f l i v e l i h o o d . T h u s , s a c r i f i c e o f s o m e w a g e e a r n i n g d a y s w i l l b e w o r t h o f d o i n g s o . · I n a d d i t i o n t o c o n v i n c i n g t h e f a r m e r s a b o u t t h e p o s s i b i l i t y o f r e c l a m a t i o n o f s o d i c l a n d t h r o u g h a w a r e n e s s c a m p a i g n t h e y s h o u l d a l s o b e e x p o s e d t o v i l l a g e r s c o v e r e d i n e a r l i e r p r o j e c t s , e s p e c i a l l y s u c c e s s s t o r i e s . · E f f o r t s h o u l d b e m a d e t o b r i n g t h e f a r m e r s t o g e t h e r o n t h e i s s u e o f s o d i c / r a v i n e l a n d . R e s o l v e t o r e c l a i m s o d i c / r a v i n e l a n d s h o u l d b e d e v e l o p e d a s c o m m o n o b j e c t i v e a n d t h e k e y b i n d i n g f o r c e a m o n g f a r m e r s . Page 253 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 2 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y i m p l e m e n t a t i o n . · W a t e r u s e r s ’ g r o u p s a r e f o r m e d o n t h e b a s i s p h y s i c a l p r o x i m i t y o f s o d i c p l o t s . T h u s , t h e W U G m a y b e s o c i o - e c o n o m i c a l l y h e t e r o g e n e o u s w h i c h m a y b e t h e m a i n r e a s o n f o r p o o r p e r f o r m a n c e o f t h e s e g r o u p s . · T h e r e a r e s o m e i n f l u e n t i a l p e r s o n s i n t h e v i l l a g e w h o e x p e c t s p e c i a l f a v o r f r o m t h e f i e l d s t a f f . B u t p r o j e c t d e s i g n d o e s n o t p e r m i t s u c h f a v o r i t i s m . U n h a p p i n e s s o f s u c h i n f l u e n t i a l p e o p l e m a y a d v e r s e l y a f f e c t p a r t i c i p a t i o n o f g e n e r a l f a r m e r s i n t h e p r o j e c t . · W o m e n a r e i m p o r t a n t p l a y e r s i n f a r m i n g s y s t e m , e s p e c i a l l y a n i m a l h u s b a n d r y . B u t w e g e n e r a l l y n e g l e c t t h e m i n o u r t r a i n i n g p r o g r a m s . · M a n y a t i m e , c o n t i g u o u s p a t c h o f 4 h a d o e s n o t b e c o m e a v a i l a b l e . I n s u c h c a s e s s m a l l p a t c h e s a r e l e f t u n - r e c l a i m e d . · I n a b s e n c e o f a l t e r n a t i v e , f a r m e r s s h o u l d b e m o t i v a t e d t o j o i n t h e w a t e r u s e r s ’ g r o u p f o r c o m m o n c a u s e . · F r o m t h e v e r y b e g i n n i n g , t h e f o c u s s h o u l d b e s h a r p e n e d o n t h e o b j e c t i v i t y a n d t r a n s p a r e n c y i n t h e s e l e c t i o n o f s o d i c / r a v i n e p l o t s a n d b e n e f i c i a r i e s . T h e s e l e c t i o n c r i t e r i a s h o u l d b e d i s c l o s e d t o t h e p u b l i c i n c l e a r m a n n e r . T h e s e l e c t i o n c r i t e r i a s h o u l d , i n n o c o n d i t i o n , b e c o m p r o m i s e d . H o w e v e r , t h e s e l e c t i o n c r i t e r i a s h o u l d b e p r a c t i c a l t o t h e p o s s i b l e e x t e n t . · P r o j e c t s h o u l d i d e n t i f y w o m e n c u l t i v a t o r s i n t h e v i l l a g e s . T h e y s h o u l d b e i m p a r t e d s u i t a b l e t r a i n i n g a l o n g w i t h m e n . F o r w o m e n , t r a i n i n g p r o g r a m s s h o u l d b e p r e f e r a b l y o r g a n i z e d a t l o c a l l e v e l s o t h a t t h e y c o u l d a t t e n d w i t h o u t f a i l . · A u t h o r i t i e s s h o u l d c o n s i d e r s e l e c t i n g e v e n i n d i v i d u a l p l o t s ( w h i c h c a n n o t b e a p a r t o f a c o n t i g u o u s w a t e r u s e r s ’ g r o u p ) f o r t h e r e c l a m a t i o n p r o g r a m , p r o v i d e d i r r i g a t i o n w a t e r i s a v a i l a b l e a n d t h e c o n c e r n e d f a r m e r i s r e a d y t o d i g t h e f i e l d d r a i n u p t o t h e l i n k d r a i n p o i n t . Page 254 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 3 1 8 . 8 : S T A K E H O L D E R : A T M A f u n c t i o n a r i e s P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y R e a d i n e s s t o t a k e u p i m p r o v e d f a r m i n g · F a r m e r s w i l l h a v e n o i s s u e s r e g a r d i n g f a r m i n g i n r e c l a i m e d l a n d a s t h e y a r e a l r e a d y g r o w i n g v a r i o u s c r o p s i n t h e i r n o r m a l l a n d · T h e y w i l l e a s i l y t a k e u p a n i m a l h u s b a n d r y w i t h i m p r o v e d b r e e d · F a r m e r s s h o u l d b e p r o v i d e d a d d i t i o n a l o r i e n t a t i o n a n d t r a i n i n g o n t h e l a t e s t f a r m i n g t e c h n o l o g y · T h e y s h o u l d a l s o b e t r a i n e d o n l i v e s t o c k a c t i v i t i e s , e s p e c i a l l y a n i m a l n u t r i t i o n a n d h e a l t h m a n a g e m e n t a s p e c t s A c c e s s i b i l i t y t o f a r m i n p u t s ( s e e d s , f e r t i l i z e r s , p l a n t p r o t e c t i o n c h e m i c a l s ) · R e s o u r c e - r i c h f a r m e r s h a v e n o p r o b l e m i n p r o c u r i n g v a r i o u s f a r m i n p u t s a s t h e y m o n e y t o b u y a n d t r a n s p o r t f a c i l i t y t o r e a c h t h e t o w n m a r k e t o r a n y o t h e r p l a c e s w h e r e t h e s e i n p u t s b e c o m e a v a i l a b l e · R e s o u r c e - p o o r f a r m e r s h a v e w e a k e r a c c e s s , b o t h e c o n o m i c a n d p h y s i c a l , t o f a r m i n p u t s . T h e y l a c k m o n e y t o b u y t h e s e i n p u t s . A t t h e s a m e t i m e , t h e y a l s o f a c e d i f f i c u l t y i n p r o c u r e m e n t o f t h e s e i n p u t s f r o m t h e t o w n m a r k e t d u e t o l a c k o f t r a n s p o r t f a c i l i t y o r t h e c o s t i n v o l v e d i n c o m m u t i n g . A s a r e s u l t , t h e y o f t e n c o m p r o m i s e w i t h q u a l i t y a s w e l l a s q u a n t i t y o f i n p u t s . · P r o j e c t s h o u l d h e l p i n e s t a b l i s h i n g s e e d - c u m - f e r t i l i z e r s h o p s i n t h e v i l l a g e v i c i n i t y . I t s h o u l d f a c i l i t a t e i n i s s u a n c e o f a p p r o p r i a t e l i c e n s e t o w i l l i n g p e r s o n s . · P r o j e c t s h o u l d a l s o h e l p t h e p o o r f a r m e r s i n a c c e s s i n g i n s t i t u t i o n a l c r e d i t t h r o u g h e s t a b l i s h i n g i m p r o v e d l i n k a g e w i t h b a n k s . · S e l f - h e l p g r o u p s s h o u l d b e p r o m o t e d o n l a r g e s c a l e s o t h a t f a r m f a m i l i e s h a v e b e t t e r a c c e s s t o c r e d i t . F e e d b a c k o n t h e w o r k i n g o f A T M A i n t e r m s o f t h e i r e f f e c t i v e n e s s i n t h e a r e a · A T M A a s a n i n s t i t u t i o n i s y e t t o b e f u l l y f u n c t i o n a l . H o w e v e r , i t s m a n d a t e i n t e r m s o f p r o v i d i n g e x t e n s i o n s e r v i c e s i s b e i n g f u l f i l l e d t h r o u g h a s s o c i a t e d l i n e d e p a r t m e n t s . · N o s u g g e s t i o n 1 8 . 9 : S T A K E H O L D E R : D i s t r i c t - l e v e l A g r i c u l t u r e O f f i c e r s P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y I m p a c t o f t h e p r o j e c t o n a g r i c u l t u r a l b i o - d i v e r s i t y · A f t e r r e c l a m a t i o n o f s o d i c l a n d / r a v i n e i t i s e x p e c t e d t h a t n e w c r o p s , s h r u b s a n d h e r b s w i l l c o m e u p i n t h e a r e a b e c a u s e t h e s o i l w i l l b e c o m e f e r t i l e . T h u s , a g r i c u l t u r a l b i o - d i v e r s i t y i s l i k e l y t o i n c r e a s e . · P r o p e r m o n i t o r i n g o f t h e t r e a t e d a r e a s h o u l d b e u n d e r t a k e n t o o b s e r v e t h e c h a n g e i n a g r i c u l t u r a l b i o d i v e r s i t y · T h e r e i s n e e d f o r p r o p e r d o c u m e n t a t i o n o f t h e s e c h a n g e s a n d p r e p a r a t i o n o f a n i n v e n t o r y . U s e o f c h e m i c a l f e r t i l i z e r a n d p e s t i c i d e s · F a r m e r s a r e e x t e n s i v e l y u s i n g c h e m i c a l f e r t i l i z e r s , e s p e c i a l l y n i t r o g e n o u s f e r t i l i z e r s . P o p u l a r i t y o f n i t r o g e n o u s o v e r o t h e r f e r t i l i z e r s i s d u e t o c o n s i d e r a b l e · F a r m e r s s h o u l d b e s e n s i t i z e d , t r a i n e d a n d m o t i v a t e d t o u s e o r g a n i c m a n u r e i n c l u d i n g f a r m y a r d m a n u r e , c o w d u n g a n d c r o p r e s i d u e s i n Page 255 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 4 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y p r i c e d i f f e r e n c e s . F a r m e r s h a v e n o c h o i c e b e c a u s e t h e y d o n o t h a v e a d e q u a t e q u a n t i t y o f o r g a n i c m a n u r e t o a p p l y i n t h e f i e l d . O t h e r w i s e , t h e y a r e a w a r e o f t h e h a r m s o f c h e m i c a l f e r t i l i z e r s . · F a r m e r s r e s o r t t o c h e m i c a l m e a s u r e s ( p e s t i c i d e s ) t o c o n t r o l p e s t s a n d d i s e a s e s i n t h e c r o p b e c a u s e t h e y a r e n o t a d e q u a t e l y f a m i l i a r w i t h I P M a n d I P N M m e t h o d s . · F a r m e r s r e a l i z e t h a t i n c r e a s e d u s e o f c h e m i c a l f e r t i l i z e r s a n d p e s t i c i d e s i s a d v e r s e l y a f f e c t i n g n o t o n l y s o i l a n d g r o u n d w a t e r q u a l i t y b u t a l s o t h e t a s t e o f f a r m p r o d u c t s . · F a r m e r s a l s o f e e l t h a t q u a l i t y a n d t a s t e o f m i l k h a s a l s o d e t e r i o r a t e d d u e t o f e e d i n g o f c r o p r e s i d u e s a n d f o d d e r a f f e c t e d b y t h e s e c h e m i c a l f e r t i l i z e r s . · I m p r o v e d v a r i e t i e s o f c r o p s n e e d h i g h e r q u a n t i t y o f i r r i g a t i o n a n d f e r t i l i z e r s . T h u s , f a r m e r s a r e l e f t w i t h n o o p t i o n b u t t o u s e c h e m i c a l f e r t i l i z e r s . f i e l d t o t h e e x t e n t p o s s i b l e . · T h e y s h o u l d a l s o b e g u i d e d t o p r o d u c e o t h e r o r g a n i c m a n u r e s s u c h a s N A D E P a n d v e r m i c o m p o s t , e t c . P r o j e c t s h o u l d p r o v i d e t r a i n i n g a n d f i n a n c i a l s u p p o r t t o t h e f a r m e r s f o r t h e s e a l t e r n a t i v e s . · F a r m e r s s h o u l d b e g u i d e d o n t h e m e t h o d s o f p r o d u c i n g i n c r e a s e d q u a n t i t y o f f a r m y a r d m a n u r e w i t h t h e l i m i t e d n u m b e r o f a n i m a l s t h e y h a v e . · T h e y s h o u l d a l s o b e t r a i n e d t o m a k e a p p r o p r i a t e u s e o f c a t t l e u r i n e i n t h e f i e l d . · I f t h e u s e o f c h e m i c a l f e r t i l i z e s i s n e c e s s a r y f a r m e r s s h o u l d b e a l e r t e d a g a i n s t t h e u s e o f i m b a l a n c e d d o z e s . · T h e y s h o u l d b e t o l d t h a t s m a l l e r b u t b a l a n c e d d o z e o f c h e m i c a l f e r t i l i z e r s i s b e t t e r t h a n h i g h e r b u t i m b a l a n c e d d o z e f o r t h e i r f i e l d a n d l o n g t e r m s u s t a i n a b i l i t y . U s e o f i r r i g a t i o n : e f f e c t o n g r o u n d w a t e r · I r r i g a t i o n i n t e n s i t y h a s i n c r e a s e d o v e r t h e p e r i o d d u e t o i m p r o v e d a v a i l a b i l i t y o f i r r i g a t i o n s o u r c e s . I t i s a d v e r s e l y a f f e c t i n g t h e g r o u n d w a t e r l e v e l i n e v e r y a r e a m a i n l y b e c a u s e r a i n f a l l h a s d e c r e a s e d a t t h e s a m e t i m e . · I n c e r t a i n p o c k e t s , b o t h c a n a l a n d b o r e w e l l i r r i g a t i o n a r e a v a i l a b l e b u t f a r m e r s d o n o t m a k e c o n j u n c t i v e u s e o f w a t e r . · I n c a s e o f c a n a l a s a s o u r c e , f a r m e r s g e n e r a l l y o v e r - i r r i g a t e t h e i r f i e l d b e c a u s e t h e r e i s n o m o n i t o r i n g a n d c o n t r o l o f t h e q u a n t u m o f w a t e r t a k e n f r o m c a n a l . I r r i g a t i o n f r o m c a n a l i s c h a r g e d o n t h e b a s i s o f t h e a r e a i r r i g a t e d . · F a r m e r s s h o u l d b e t r a i n e d a b o u t r e a s o n a b l e q u a n t u m o f i r r i g a t i o n i n t h e f i e l d , e s p e c i a l l y i n t h e c o m m a n d a r e a . · F a r m e r s s h o u l d b e t r a i n e d o n c o n j u n c t i v e u s e o f w a t e r w h e r e b o t h c a n a l a n d b o r e w e l l i s a v a i l a b l e f o r i r r i g a t i o n . · F a r m e r s s h o u l d b e a l e r t e d a g a i n s t i l l e f f e c t s o f o v e r - i r r i g a t i o n . C a t t l e p r o d u c t i v i t y ; u n p r o d u c t i v e c a t t l e ; f o d d e r s h o r t a g e s ; c o m m o n c a t t l e d i s e a s e s · C a t t l e p r o d u c t i v i t y i s q u i t e l o w m a i n l y d u e t o i n f e r i o r b r e e d a n d l o w n u t r i t i o n s u p p l i e d t o t h e m b e c a u s e f a r m e r s f a c e a c u t e f o d d e r s h o r t a g e , e s p e c i a l l y d u r i n g s u m m e r · M a n y f a m i l i e s h a v e u n p r o d u c t i v e c a t t l e w i t h t h e m . · C o m m o n a n i m a l d i s e a s e s i n c l u d e F o o t & M o u t h D i s e a s e , · F a r m e r s s h o u l d b e e n c o u r a g e d t o g r o w f o d d e r c r o p s · G r a s s l a n d s a n d p a s t u r e s s h o u l d b e d e v e l o p e d i n r a v i n e s · V a c a n t c o m m u n i t y l a n d i n o t h e r a r e a s s h o u l d b e Page 256 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 5 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y G a l a g h o n t u , e t c . d e v e l o p e d i n t o g r a s s l a n d a n d p a s t u r e Page 257 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 6 1 8 . 1 0 : S T A K E H O L D E R : D I S T R I C T P A N C H A Y A T I R A J O F F I C E R P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S A w a r e n e s s a b o u t t h e e a r l i e r s o d i c l a n d r e c l a m a t i o n p r o j e c t , e s p e c i a l l y U P S L R I I P u n d e r w h i c h t h e P a n c h a y a t i R a j d e p a r t m e n t w a s i n v o l v e d f o r i m p l e m e n t a t i o n o f a s u b - c o m p o n e n t o n c o n s t r u c t i o n o f P a n c h a y a t B h a w a n a n d e s t a b l i s h m e n t o f l i b r a r i e s a t d i s t r i c t a n d v i l l a g e l e v e l · F u l l y a w a r e a b o u t t h e p r o j e c t a n d i t s c o m p o n e n t s · P a n c h a y a t i R a j D e p a r t m e n t s u c c e s s f u l l y i m p l e m e n t e d t h e p r o j e c t c o m p o n e n t r e l a t e d t o · N o s u g g e s t i o n A w a r e n e s s a b o u t t h e p r o p o s e d U P S L R I I I P u n d e r w h i c h t h e d e p a r t m e n t w i l l b e i n v o l v e d w i t h r e s p e c t t o S o d i c H a a t a n d R u m i n a n t m a r k e t s · R e a s o n a b l y a w a r e a b o u t t h e p r o p o s e d p r o j e c t a n d i t s c o m p o n e n t s s u c h a s S o d i c H a a t a n d R u m i n a n t M a r k e t s · D e t a i l e d m e t h o d o l o g y o f i m p l e m e n t a t i o n o f t h e c o m p o n e n t i s y e t t o b e k n o w n s i n c e i t i s s t i l l e v o l v i n g · D e p a r t m e n t s h o u l d b e g i v e n c o m p l e t e a u t o n o m y i n i m p l e m e n t a t i o n o f t h e c o m p o n e n t a c t i v i t i e s · U P B S N s h o u l d p r o v i d e a d e q u a t e f u n d s u p p o r t · F u n d s s h o u l d b e d i s b u r s e d i n t i m e b o u n d m a n n e r · D e p a r t m e n t s h o u l d b e i n v o l v e d a l s o i n i d e n t i f i c a t i o n o f t h e d i s t r i c t , b l o c k a n d v i l l a g e f o r c o m p o n e n t a c t i v i t i e s P e r c e i v e d p r o s p e c t s a n d c o n s t r a i n t s i n c o o r d i n a t i o n w i t h U P B S N a n d o t h e r l i n e d e p a r t m e n t s f o r i m p l e m e n t a t i o n o f t h e p r o j e c t a c t i v i t i e s · C o o r d i n a t i o n w i t h U P B S N w i l l n o t b e a p r o b l e m a t d i s t r i c t l e v e l i f p r o p e r i n f o r m a t i o n s h a r i n g i s e n s u r e d · C o o r d i n a t i o n w i l l a l s o d e p e n d o n t h e s p e e d o f d o w n w a r d f l o w o f i n f o r m a t i o n a n d i n s t r u c t i o n f r o m t h e s t a t e h e a d q u a r t e r s · T h e r e s h o u l d b e r e g u l a r m e e t i n g b e t w e e n D P R O a n d D i s t r i c t P r o j e c t M a n a g e r o f U P B S N · T h e i n s t i t u t i o n a l m e c h a n i s m i n f o r m o f D i s t r i c t I m p l e m e n t a t i o n C o o r d i n a t i o n C o m m i t t e e s h o u l d b e u s e d f u l l y i n o r d e r t o e n s u r e i n t e r - d e p a r t m e n t a l c o o r d i n a t i o n . · S t a t e h e a d q u a r t e r s o f t h e P a n c h a y a t i R a j d e p a r t m e n t s h o u l d e n s u r e t i m e l y f l o w i n f o r m a t i o n a n d i n s t r u c t i o n s t o t h e d i s t r i c t o f f i c e · A c t i v i t y s c h e d u l e o f t h e p r o j e c t s h o u l d b e f o r w a r d e d t o t h e P a n c h a y a t i R a j d e p a r t m e n t i n a d v a n c e · T h e r e s h o u l d b e r e g u l a r m e e t i n g b e t w e e n Page 258 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 7 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S U P B S N h e a d q u a r t e r s a n d P a n c h a y a t i R a j h e a d q u a r t e r s P e r c e p t i o n a b o u t t h e c a p a b i l i t y o f G r a m P a n c h a y a t t o t a k e p a r t i n p l a n n i n g a n d i m p l e m e n t a t i o n o f t h e p r o j e c t a c t i v i t i e s a t v i l l a g e l e v e l · G r a m P a n c h a y a t i s f u l l y c o m p e t e n t t o p a r t i c i p a t e i n p l a n n i n g a n d i m p l e m e n t a t i o n o f t h e p r o j e c t a c t i v i t i e s a t v i l l a g e l e v e l a s i t i s a l r e a d y i m p l e m e n t i n g m a n y g o v e r n m e n t s c h e m e s · H o w e v e r , i t w i l l n e e d t e c h n i c a l s u p p o r t f r o m p r o j e c t s t a f f a n d o t h e r g o v e r n m e n t d e p a r t m e n t s t o s u c c e s s f u l l y i m p l e m e n t t h e a c t i v i t i e s · G r a m P a n c h a y a t s h o u l d b e i n v o l v e d f r o m t h e v e r y b e g i n n i n g a n d i t s h o u l d b e t a k e n i n t o c o n f i d e n c e b e f o r e l a u n c h i n g o f t h e p r o j e c t i n t h e v i l l a g e S u g g e s t e d m e c h a n i s m t o s t r e n g t h e n s u c h c a p a b i l i t y · · M e m b e r s o f G r a m P a n c h a y a t s h o u l d b e i m p a r t e d s u i t a b l e t r a i n i n g o n v a r i o u s i s s u e s r e l a t e d t o s o d i c l a n d r e c l a m a t i o n a n d i t s s u s t a i n a b i l i t y · M e m b e r s o f G r a m P a n c h a y a t s h o u l d b e a l s o b e t r a i n e d i n m a n a g e m e n t o f r u r a l m a r k e t s · D i s t r i c t o f f i c e o f t h e P a n c h a y a t R a j d e p a r t m e n t s h o u l d b e p r o v i d e d f i n a n c i a l a n d m o b i l i t y s u p p o r t s o t h a t d i s t r i c t o f f i c e r s c o u l d v i s i t t h e c o n c e r n e d p r o j e c t v i l l a g e s t o p r o v i d e o r i e n t a t i o n t o t h e G r a m P a n c h a y a t m e m b e r s P r o b a b l e r o l e o f t h e d e p a r t m e n t , e s p e c i a l l y d i s t r i c t o f f i c e , i n s t r e n g t h e n i n g t h e c a p a c i t y o f G r a m P a n c h a y a t t o t a k e u p t h e r o l e s a n d r e s p o n s i b i l i t i e s u n d e r t h e p r o j e c t · D i s t r i c t o f f i c e c a n p r o v i d e o r i e n t a t i o n a n d e n c o u r a g e m e n t t o G r a m P a n c h a y a t m e m b e r s · D i s t r i c t o f f i c e o f P a n c h a y a t i R a j d e p a r t m e n t s h o u l d b e p r o v i d e d f i n a n c i a l a n d m o b i l i t y s u p p o r t f o r o r g a n i z i n g s u c h o r i e n t a t i o n p r o g r a m s P o s s i b i l i t i e s o f i n s t i t u t i o n a l l i n k a g e o f t h e p r o p o s e d S i t e I m p l e m e n t a t i o n C o m m i t t e e a n d W a t e r U s e r s ’ G r o u p w i t h t h e G r a m P a n c h a y a t a n d i t s c o m m i t t e e s · A n y i n s t i t u t i o n s h o u l d h a v e p e r e n n i a l r e l e v a n c e . S i t e I m p l e m e n t a t i o n C o m m i t t e e a n d W a t e r U s e r s ’ G r o u p a r e r e l e v a n t o n l y f o r t h o s e f a r m e r s w h o p o s s e s s s o d i c l a n d w h i c h h a s b e e n i n c l u d e d i n t h e l a n d r e c l a m a t i o n p r o g r a m . P r i n c i p a l l y , w e s h o u l d n o t c o n s i d e r s o d i c l a n d a s p e r m a n e n t s o d i c l a n d . T h e r e i s e v e r y p o s s i b i l i t y o f i t s r e c l a m a t i o n , e v e n w i t h o u t p r o j e c t i n t e r v e n t i o n . M o r e o v e r , S I C a n d W U G a r e p r o j e c t - s p e c i f i c i n s t i t u t i o n s m e a n t o n l y f o r p r o j e c t p e r i o d . · P r o j e c t n e e d s t o e x p l o r e p r o a c t i v e r o l e o f G r a m P a n c h a y a t r a t h e r t h a n a p a s s i v e r o l e i n f o r m o f a p p r o v i n g a u t h o r i t y · L i n k a g e w i t h G r a m P a n c h a y a t s h o u l d b e s t a r t i n g p o i n t · G r a m P a n c h a y a t s h o u l d a l s o b e i n v o l v e d i n p l a n n i n g a n d e x e c u t i o n o f f i e l d a c t i v i t i e s i n c l u d i n g f i e l d a n d l i n k d r a i n c o n s t r u c t i o n Page 259 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 8 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S · I t i s g e n e r a l t e n d e n c y a m o n g e x t e r n a l a g e n c i e s t o c r e a t e t h e n e w i n s t i t u t i o n s a n d a r r a n g e m e n t s f o r e x e c u t i o n o f t h e i r p l a n n e d a c t i v i t i e s . · P a n c h a y a t i R a j I n s t i t u t i o n i s o n e o f m a j o r a c h i e v e m e n t s o f o u r c o u n t r y . U n d o u b t e d l y , t h e r e a r e m a n y i s s u e s r e l a t e d t o t h e f u n c t i o n i n g o f s u c h i n s t i t u t i o n s e s p e c i a l l y a t v i l l a g e l e v e l . A n y e x t e r n a l a g e n c y / g o v e r n m e n t d e p a r t m e n t s h o u l d e x p l o r e t h e p o s s i b i l i t i e s t o u t i l i z e e x i s t i n g i n s t i t u t i o n a l s e t u p a n d t r y t o i m p r o v e i t s f u n c t i o n i n g , r a t h e r t h a n c r e a t i n g n e w s e t o f i n s t i t u t i o n s e v e r y t i m e . · M o r e o v e r , n e w i n s t i t u t i o n s d o n o t g u a r a n t e e s m o o t h i m p l e m e n t a t i o n o f a c t i v i t i e s a c c o r d i n g t o t h e i r m a n d a t e . · U n l e s s y o u i n v o l v e G r a m P a n c h a y a t s i n c e b e g i n n i n g i n t h e d e c i s i o n s h o w c a n e x p e c t i t t a k e t h e r e s p o n s i b i l i t i e s i n p o s t p r o j e c t p e r i o d ( e s p e c i a l l y m a i n t e n a n c e o f p r o j e c t a s s e t s ) P o s s i b i l i t i e s o f i n s t a l l i n g s u i t a b l e m e c h a n i s m t o t a k e u p t h e t a s k o f m a i n t e n a n c e o f v i l l a g e l e v e l a s s e t s ( s u c h a s l i n k d r a i n s , f i e l d d r a i n s ) c r e a t e d d u r i n g t h e c o u r s e o f p r o j e c t i m p l e m e n t a t i o n · G r a m P a n c h a y a t c a n b e m a d e l e g a l l y a c c o u n t a b l e f o r m a i n t e n a n c e o f v i l l a g e l e v e l a s s e t s c r e a t e d d u r i n g t h e c o u r s e o f t h e p r o j e c t o n l y w h e n t h e s e a s s e t s a r e o f f i c i a l l y r e c o r d e d a s c o m m u n i t y p r o p e r t y . O n c e t h e s e a s s e t s b e c o m e c o m m u n i t y p r o p e r t y o f t h e v i l l a g e t h e y w i l l b e o w n e d b y t h e G r a m S a b h a a n d p r i v a t e o w n e r s h i p , i f a n y , w i l l c e a s e t o e x i s t . · I t i s i m p r a c t i c a l t o d e c l a r e f i e l d d r a i n s a s c o m m u n i t y p r o p e r t y . B u t i t i s p o s s i b l e t o d e c l a r e l i n k d r a i n s a s c o m m u n i t y p r o p e r t y . L i n k d r a i n s h o u l d b e r e c o r d e d a n d m a r k e d a s G r a m S a b h a p r o p e r t y i n S a z r a m a p . · I f i t c o u l d b e d o n e , l i n k d r a i n w i l l b e c o m e p e r m a n e n t a s s e t o f t h e v i l l a g e a n d G r a m P a n c h a y a t w i l l b e c o m e d i r e c t l y r e s p o n s i b l e f o r i t s m a i n t e n a n c e . I d e n t i f i c a t i o n o f m a i n h u r d l e s i n d e v e l o p m e n t o f s o c i a l c a p i t a l i n t h e d i s t r i c t a n d s u g g e s t e d m e a s u r e s t o o v e r c o m e s u c h h u r d l e s · M a i n h u r d l e s i n d e v e l o p m e n t o f s o c i a l c a p i t a l i n c l u d e s o c i o - e c o n o m i c h e t e r o g e n e i t y i n t h e v i l l a g e , l o c a l p o l i t i c s , i n t e r - f a m i l y r e l a t i o n s , p h y s i c a l p r o x i m i t y o f h o u s e h o l d s , p a s t r e c o r d s o f m u t u a l h e l p , d i f f e r e n c e s i n e d u c a t i o n a l a c h i e v e m e n t s , c a s t e d y n a m i c s , e t c · T h e o n l y w a y t o o v e r c o m e s u c h h u r d l e s i s t o e v o l v e s o m e c o m m o n b i n d i n g f o r c e s t r o n g e n o u g h b r i n g a n d r e t a i n h o u s e h o l d s t o g e t h e r f o r t h e c o m m o n c a u s e · M a k i n g c o n s e n s u s - b a s e d a p p r o v a l s a n d d e c i s i o n s i n S I C a n d W U G m e e t i n g s m a y b e o n e w a y o f p r o m o t i n g s u c h b i n d i n g . Page 260 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 5 9 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S H o w e v e r , s u c h a r r a n g e m e n t m a y h a l t o r d e l a y t h e p r o j e c t a c t i v i t i e s b u t g r a d u a l l y f a r m e r s w i l l r e a l i z e t h e i m p o r t a n c e o f c o n s e n s u s . M o r e o v e r , s o c i a l a n d p e e r p r e s s u r e w i l l f a c i l i t a t e i n a r r i v a l o f c o n s e n s u s . P r o s p e c t s f o r h a n d h o l d i n g o f s o c i a l c a p i t a l , s u c h a s S I C , W U G , S H G , g e n e r a t e d d u r i n g p r o j e c t i m p l e m e n t a t i o n · O n l y g e n e r a l p u r p o s e i n s t i t u t i o n s a r e s u s t a i n a b l e f o r l o n g t i m e · S p e c i f i c p u r p o s e i n s t i t u t i o n s w i l l d o d i e t h e i r o w n d e a t h a f t e r c o m p l e t i o n o f t h e p u r p o s e o r e n d o f p l a n n e d t i m e s c h e d u l e o f t h e p r o j e c t · G r a m P a n c h a y a t w i l l h a v e n o h e s i t a t i o n i n h a n d h o l d i n g o f t h e s e i n s t i t u t i o n s a f t e r t h e p r o j e c t w i t h d r a w a l i f t h e s e i n s t i t u t i o n s c o n t i n u e t o e x i s t a n d r e m a i n f u n c t i o n a l . · T h e p r o j e c t a u t h o r i t i e s s h o u l d n o t i m p r e s s u p o n s u s t a i n a b i l i t y o f s p e c i f i c - p u r p o s e i n s t i t u t i o n s t o s u s t a i n e v e n a f t e r p r o j e c t w i t h d r a w a l . · I f t h e y w a n t t h e s e i n s t i t u t i o n s t o b e c o m e p e r m a n e n t i n s t i t u t i o n s i n t h e v i l l a g e , t h e i r m a n d a t e s h o u l d b e d e s i g n e d i n s u c h a w a y t h a t i t r e m a i n s r e l e v a n t e v e n a f t e r c o m p l e t i o n o f t h e p r o j e c t a c t i v i t i e s . P e r c e i v e d s o c i o - e c o n o m i c d y n a m i c s , s p e c i f i c t o t h e d i s t r i c t , w h i c h n e e d s t o b e k e p t i n m i n d w h i l e f i n a l i z i n g t h e p r o j e c t d e s i g n · T h e r e i s m i x o f g e n e r a l , b a c k w a r d a n d s c h e d u l e d c a s t e h o u s e h o l d s . T h e s e h o u s e h o l d s h a v e d i f f e r e n t s o c i a l h e r i t a g e · I n t r a - c a s t e c o n g r u e n c e i s s t r o n g e r t h a n i n t e r - c a s t e c o n g r u e n c e · S o m e f a m i l i e s h a v e a c c e s s t o s a l a r y i n c o m e . Q u a l i t y o f l i f e a s w e l l a s s o c i a l s t a t u s o f t h e s e h o u s e h o l d s i s b e t t e r t h a n o t h e r h o u s e h o l d s . M o r e o v e r , t h e y a r e l e s s e r r e s p o n s i v e t o e x t e r n a l p r o j e c t s r e l a t e d t o a g r i c u l t u r a l a n d r u r a l d e v e l o p m e n t · A f f o r d i n g c a p a c i t y o f h o u s e h o l d s v a r y a c r o s s t h e c a s t e a n d l a n d h o l d i n g c a t e g o r i e s · W a g e - d e p e n d e n t h o u s e h o l d s h a v e l e s s e r t i m e t o p a r t i c i p a t e i n l o n g - d u r a t i o n m e e t i n g s · S o m e f a m i l i e s a c r o s s t h e c a s t e c a t e g o r i e s a r e c l o s e r t o G r a m P r a d h a n a n d e x p e c t s p e c i a l f a v o r · T i n y l a n d h o l d e r s a r e g e n e r a l l y d e p e n d e n t o n w a g e e a r n i n g f o r t h e i r l i v e l i h o o d . T h e y t e n d t o t a k e l e s s e r i n t e r e s t i n r e c l a m a t i o n o f t h e i r s o d i c l a n d s d u e t o o p p o r t u n i t y c o s t · P r o j e c t s h o u l d k e e p t h e s e s i t u a t i o n s i n m i n d w h i l e d e s i g n i n g t h e p r o j e c t · T h o u g h p r o j e c t s u p p o r t s h o u l d b e a s o b j e c t i v e a s p o s s i b l e , s o m e s p e c i a l p r e f e r e n c e t o p o o r a n d n e e d y f a r m e r s s h o u l d b e c o n s i d e r e d · C o m m i t m e n t o f t h e c o n c e r n e d f a r m e r s s h o u l d b e e n s u r e d b e f o r e a s s o c i a t i n g t h e m w i t h t h e p r o j e c t ; o t h e r w i s e t h e i r p o o r p e r f o r m a n c e l e a v e s s p i l l - o v e r e f f e c t · A l l t h e f a r m e r s m a y n o t b e m o t i v a t e d p u r e l y o n t h e g r o u n d o f e c o n o m i c s o f s o d i c l a n d r e c l a m a t i o n ( f o r e x a m p l e , w a g e - d e p e n d e n t f a m i l i e s ) . S u c h f a r m e r s s h o u l d b e m o t i v a t e d o n o t h e r g r o u n d s . P r o j e c t a u t h o r i t i e s n e e d t o e x p l o r e s u c h o t h e r g r o u n d s . Page 261 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 6 0 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S · L a r g e f a r m e r s a r e n o t m u c h b o t h e r e d t o r e c l a i m t h e i r s o d i c l a n d · A b s e n t e e l a n d h o l d e r s w i l l a l s o n o t t a k e m u c h i n t e r e s t i n p r o j e c t a c t i v i t i e s b e c a u s e t h e y w i l l r e q u i r e v i s i t i n g t h e v i l l a g e f r e q u e n t l y . Page 262 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 6 1 1 8 . 1 1 : S T A K E H O L D E R : O f f i c i a l s o f L i n e D e p a r t m e n t ( A g r i c u l t u r e , A n i m a l H u s b a n d r y , P a n c h a y a t i R a j , I r r i g a t i o n ) P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y S h o r t c o m i n g s o f t h e d e s i g n o f e a r l i e r p r o j e c t s w h i c h s h o u l d b e r e m o v e d f r o m t h e p r o p o s e d U P S L R I I I P · I n a d e q u a t e a t t e n t i o n t o f a r m i n g s y s t e m a p p r o a c h b e c a u s e t h e r e w a s d i r e c t c o m p o n e n t f o r a n i m a l h u s b a n d r y · C r o p d i v e r s i f i c a t i o n w a s n o t p r o p e r l y e m p h a s i z e d u p o n · T h e r e w a s n o s u p p o r t f o r I P M a n d I P N M a c t i v i t i e s · H o r t i c u l t u r e w a s f a i l u r e a r e a b e c a u s e f a r m e r s w a n t e d i m m e d i a t e r e t u r n s f r o m t h e i r t i m e a n d m o n e y i n v e s t m e n t · T h o u g h s e l f - h e l p g r o u p s w e r e p r o m o t e d a t l a r g e s c a l e , i n a d e q u a t e i n t e r v e n t i o n s w e r e m a d e f o r i n c o m e g e n e r a t i n g a c t i v i t i e s · N o i n t e r v e n t i o n w a s p l a n n e d f o r d e v e l o p m e n t o f f o o d p r o c e s s i n g u n i t s i n t h e p r o j e c t a r e a · T h e p r o p o s e d p r o j e c t m u s t h a v e a n e x c l u s i v e c o m p o n e n t f o r d e v e l o p m e n t o f l i v e s t o c k s e c t o r i n t h e p r o j e c t v i l l a g e s t h r o u g h s u p p o r t i n g f o r b r e e d i m p r o v e m e n t , a n i m a l h e a l t h c a r e a n d f o d d e r p r o d u c t i o n · D e m o n s t r a t i o n s s h o u l d b e o r g a n i z e d o n c r o p d i v e r s i f i c a t i o n . N e w c r o p s s h o u l d b e i n t r o d u c e d i n t h e c r o p p i n g s y s t e m . F a r m e r s s h o u l d a l s o b e p r o v i d e d s o m e f i n a n c i a l s u p p o r t f o r a d o p t i o n o f n e w c r o p s i n t h e i r f i e l d s · P r o j e c t s h o u l d o r g a n i z e o n - f i e l d d e m o n s t r a t i o n s o n I P M a n d I P N M a n d f a r m e r s s h o u l d a l s o b e p r o v i d e d s o m e f i n a n c i a l s u p p o r t · T h e p r o p o s e d p r o j e c t s h o u l d e v o l v e s u i t a b l e s t r a t e g y f o r p r o m o t i o n o f i n c o m e g e n e r a t i n g a c t i v i t i e s f o r w o m e n d e p e n d i n g u p o n t h e i r s k i l l a n d i n t e r e s t . · P r o j e c t s h o u l d p r o v i d e s u p p o r t t o w i l l i n g f a r m e r s / e n t r e p r e n e u r s t o e s t a b l i s h f o o d p r o c e s s i n g u n i t s t h r o u g h d o v e t a i l i n g w i t h e x i s t i n g s c h e m e s o f g o v e r n m e n t o f U t t a r P r a d e s h a n d I n d i a . · S o m e o f t h e s c h e m e s s h o u l d b e o p e n t o g e n e r a l f a r m e r s o f t h e v i l l a g e a l s o . E n v i r o n m e n t a l i s s u e s / r i s k s a s s o c i a t e d w i t h t h e p r o p o s e d p r o j e c t · I f n o t p r o p e r l y d r a i n e d o u t i n t o t h e n a t u r a l d r a i n a g e s y s t e m , s a l t e d w a t e r f r o m t h e t r e a t e d f i e l d s m a y d a m a g e t h e s o i l q u a l i t y i n t h e a d j o i n i n g a r e a s · F e r t i l i z e r u s a g e i s l i k e l y t o i n c r e a s e a s a r e s u l t o f s o d i c l a n d / r a v i n e r e c l a m a t i o n w h i c h m a y a d v e r s e l y i m p a c t s o i l a n d g r o u n d w a t e r q u a l i t y · C l e a n i n g a n d e a r t h w o r k a s s o c i a t e d w i t h m a i n d r a i n r e h a b i l i t a t i o n m a y b e a d v e r s e l y i m p a c t n a t u r a l v e g e t a t i o n i n a n d a r o u n d m a i n d r a i n s · R e c l a m a t i o n o f s o d i c l a n d w i l l r e d u c e f r e e g r a z i n g a r e a f o r t h e a n i m a l s · I t m u s t b e e n s u r e d t h a t l e a c h e d w a t e r i s d r a i n e d o u t i n t o t h e n a t u r a l d r a i n a g e s y s t e m f o r w h i c h p r o p e r d r a i n a g e n e t w o r k s h o u l d b e i n s t a l l e d a n d m a i n t a i n e d . · F a r m e r s s h o u l d b e s e n s i t i z e d t o u s e b a l a n c e d d o z e s o f c h e m i c a l f e r t i l i z e r s . I n a d d i t i o n t h e y s h o u l d b e e n c o u r a g e d t o o r g a n i c m a n u r e t o t h e p o s s i b l e e x t e n t . · W h i l e e x e c u t i n g e a r t h w o r k i n t h e m a i n d r a i n s m i n i m u m d a m a g e s h o u l d b e m a d e t o t h e s u r r o u n d i n g a r e a s . · F o d d e r p r o d u c t i o n s h o u l d b e p r o m o t e d i n l i e u o f l o s t g r a z i n g l a n d s . Page 263 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 6 2 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y S o c i a l i s s u e s / r i s k s a s s o c i a t e d w i t h t h e p r o p o s e d p r o j e c t · O w n e r s o f s o d i c l a n d / r a v i n e a r e m o s t l y p o o r f a r m e r s w h o a r e d e p e n d e n t o n a l t e r n a t e s o u r c e s o f l i v e l i h o o d . M o s t o f t h e m a r e d e p e n d e n t o n w a g e s o r p e t t y t r a d e / b u s i n e s s . T h e s e f a r m e r s m a y n o t b e r e a d y t o i n v e s t t i m e a n d m o n e y i n n e w a c t i v i t y , i . e . O F D w o r k a n d r e c l a m a t i o n o f s o d i c l a n d / r a v i n e . · C a s t e d y n a m i c s p a y s a n i m p o r t a n t r o l e i n c o m m u n i t y l i f e i n t h e v i l l a g e . M o b i l i z a t i o n o f f a r m e r s o f d i f f e r e n t c a s t e g r o u p s u n d e r a n i n s t i t u t i o n m a y b e d i f f i c u l t t a s k f o r t h e f i e l d s t a f f . · W a t e r u s e r s ’ g r o u p s a r e f o r m e d o n t h e b a s i s p h y s i c a l p r o x i m i t y o f s o d i c p l o t s . T h u s , t h e W U G m a y b e s o c i o - e c o n o m i c a l l y h e t e r o g e n e o u s w h i c h m a y b e t h e m a i n r e a s o n f o r p o o r p e r f o r m a n c e o f t h e s e g r o u p s . · I n f l u e n t i a l p e r s o n s o f t h e v i l l a g e m a y e x p e c t s p e c i a l f a v o r f r o m t h e p r o j e c t . I n c a s e t h e y d o n o t g e t t h e s a m e ( w h i c h t h e y w i l l n o t a s p e r t h e p r o j e c t d e s i g n ) t h e y m a y m i s g u i d e o t h e r f a r m e r s a g a i n s t t h e p r o j e c t a c t i v i t i e s . M a n y f a r m e r s , e s p e c i a l l y p o o r o n e s , a r e i n f l u e n c e d b y t h e s e i n f l u e n t i a l p e o p l e t h a t t h e y d o n o t a k e a n y d e c i s i o n a t t h e i r o w n . · W o m e n p l a y a n i m p o r t a n t r o l e i n t h e p r o d u c t i o n s y s t e m i n c l u d i n g a n i m a l h u s b a n d r y . I f t h e y a r e n e g l e c t e d i n t h e p r o j e c t ’ s t r a i n i n g a n d c a p a c i t y b u i l d i n g p l a n i t m a y d a m a g e t h e p r o j e c t o b j e c t i v e s . · P r o b l e m a t i c s o i l i s n o t a l w a y s f o u n d i n c o n t i g u o u s p a t c h e s . T h u s , i f t h e p r e c o n d i t i o n o f a c o n t i g u o u s p a t c h o f 4 h a i s s t r i c t l y i m p o s e d f o r p r o j e c t i n t e r v e n t i o n s o m e p l o t s m a y b e l e f t o u t o f r e c l a m a t i o n p r o g r a m . · R e s o u r c e - p o o r a n d w a g e - d e p e n d e n t h o u s e h o l d s s h o u l d b e m o t i v a t e d t o t a k e u p s o d i c / r a v i n e l a n d r e c l a m a t i o n p r o g r a m b y c o n v i n c i n g a b o u t t h e f a c t t h a t o n c e r e c l a i m e d s u c h l a n d s w i l l b e c o m e t h e i r p e r m a n e n t s o u r c e o f l i v e l i h o o d . · E f f o r t s h o u l d b e m a d e t o b r i n g t h e f a r m e r s t o g e t h e r o n t h e i s s u e o f s o d i c / r a v i n e l a n d . R e s o l v e t o r e c l a i m s o d i c / r a v i n e l a n d s h o u l d b e d e v e l o p e d a s c o m m o n o b j e c t i v e a n d t h e k e y b i n d i n g f o r c e a m o n g f a r m e r s . · I f p r o p e r l y g u i d e d a n d m o t i v a t e d , f a r m e r s w i l l j o i n t h e p r o j e c t i n s t i t u t i o n s . · P r o j e c t n o r m s s h o u l d b e w i d e l y p u b l i c i z e d a m o n g p e o p l e s o t h a t e x p e c t a t i o n o f s p e c i a l t r e a t m e n t i s r e m o v e d f r o m t h e i r m i n d . T h e s e n o r m s s h o u l d b e s t r i c t l y f o l l o w e d . · T r a i n i n g a n d c a p a c i t y b u i l d i n g p l a n s h o u l d i n v a r i a b l e i n c l u d e a l l t h o s e , m e n o r w o m e n , w h o a r e e n g a g e d i n p r o d u c t i o n s y s t e m . · S o m e c r i t e r i a s h o u l d b e e v o l v e d f o r p r o v i d i n g s u p p o r t t o e v e n i n d i v i d u a l p l o t s f o r t h e i r r e c l a m a t i o n . D o e s e n c r o a c h m e n t o n n a t u r a l h a b i t a t s ( w e t l a n d s ) i n c r e a s e a s s o d i c i t y i n c r e a s e s ? ƒ W h e n s o d i c i t y i n c r e a s e s , a g r i c u l t u r a l a r e a g e t s r e d u c e d . A s a r e s u l t , p e o p l e m a y t u r n t o w e t l a n d s f o r l i v e l i h o o d a l t e r n a t i v e s s u c h a s e x c e s s i v e f i s h i n g , c u l t i v a t i o n o f a p p r o p r i a t e c r o p s i n w e t l a n d s , e t c · S o d i c l a n d s h o u l d b e r e c l a i m e d a t t h e e a r l i e s t C o n s t r u c t i o n - r e l a t e d i s s u e s a s s o c i a t e d w i t h m a i n d r a i n ƒ I t m a y l e a d t o s o i l e r o s i o n ƒ S o m e f i e l d s a d j a c e n t t o m a i n d r a i n s c o u l d b e a d v e r s e l y · E f f o r t s h o u l d b e m a d e t o m i n i m i z e t h e s o i l e r o s i o n d u r i n g t h e c o u r s e o f m a i n d r a i n r e h a b i l i t a t i o n . Page 264 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 6 3 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y r e h a b i l i t a t i o n a f f e c t e d d u e t o e a r t h s p i l l ƒ O u t f a l l p o i n t s o f e x i s t i n g l i n k d r a i n s m a y b e c l o s e d w h i c h w i l l d i s t u r b d r a i n a g e ƒ I f d r a i n s a r e p r o p e r l y r e h a b i l i t a t e d , w a t e r w i l l n o t s t a n d i n i t . T h e d r a i n w a t e r s o m e t i m e s q u e n c h e s t h e t h i r s t o f a n i m a l s , e s p e c i a l l y w i l d a n i m a l s . A f t e r r e h a b i l i t a t i o n , s u c h w a t e r w i l l n o t b e a v a i l a b l e . ƒ S t a n d i n g w a t e r o f d r a i n s i s a l s o u s e d b y p e o p l e a f t e r a t t e n d i n g n a t u r e ’ s c a l l . S m o o t h - f l o w i n g d r a i n s w i l l r u l e o u t s u c h o p p o r t u n i t y . · O u t f a l l p o i n t s o f e x i s t i n g l i n k d r a i n s s h o u l d b e k e p t o p e n . · B e d o f t h e r e h a b i l i t a t e d m a i n d r a i n s s h o u l d b e l o w e r e d a t r e g u l a r d i s t a n c e s C o n s t r u c t i o n - r e l a t e d i s s u e s a s s o c i a t e d w i t h l i n k d r a i n s · C o m m u n i t y l a n d m a y n o t b e a v a i l a b l e f o r c o n s t r u c t i o n o f l i n k d r a i n s . L i n k d r a i n c o n s t r u c t e d o n p r i v a t e l a n d m a y b e d i s m a n t l e d l a t e r · T o t h e p o s s i b l e e x t e n t , l i n k d r a i n s h o u l d b e c o n s t r u c t e d o n c o m m u n i t y l a n d . I n c a s e i t i s c o n s t r u c t e d o n p r i v a t e l a n d t h e c o n c e r n e d f a r m e r s s h o u l d b e c o n v i n c e d a n d m o t i v a t e d t o r e t a i n t h e l i n k d r a i n C o n s t r u c t i o n - r e l a t e d i s s u e s a s s o c i a t e d w i t h f i e l d d r a i n s · F a r m e r s m a y n o t b e r e a d y t o s p a r e a p a r t o f t h e i r l a n d f o r f i e l d d r a i n c o n s t r u c t i o n · G r o u p a p p r o a c h s h o u l d b e a d o p t e d f o r i n s t a l l a t i o n o f f i e l d d r a i n n e t w o r k . W a t e r c o n s e r v a t i o n a p p r o a c h e s : A w a r e n e s s a n d a d o p t i o n · A w a r e n e s s a b o u t w a t e r c o n s e r v a t i o n a p p r o a c h e s i s a l m o s t m i s s i n g ; h e n c e a d o p t i o n i s o u t o f q u e s t i o n . · V i l l a g e r s s h o u l d b e o r i e n t e d a n d s e n s i t i z e d a b o u t d i f f e r e n t w a y s t h r o u g h w h i c h t h e y c o u l d c o n s e r v e w a t e r , e s p e c i a l l y i r r i g a t i o n w a t e r a n d w a t e r f o r h o u s e h o l d p u r p o s e s K e y i s s u e s r e l a t e d t o d r a i n a g e a n d s a n i t a t i o n · D e a r t h o f d r a i n a g e n e t w o r k i n t h e a g r i c u l t u r a l f i e l d s · L a c k o f p r o p e r d r a i n a g e f a c i l i t y i n t h e r e s i d e n t i a l a r e a s · T h e p r o j e c t s h o u l d d e v e l o p a n d i m p l e m e n t a n i n t e g r a t e d d r a i n a g e p l a n t h r o u g h c a t c h m e n t s a p p r o a c h . · E x t a n t g o v e r n m e n t s c h e m e s s h o u l d b e d o v e t a i l e d w i t h t h e p r o j e c t f o r p r o v i s i o n o f m i c r o d r a i n s i n t h e r e s i d e n t i a l a r e a s . P e r c e p t i o n a b o u t c a t t l e p r o d u c t i v i t y a n d u n p r o d u c t i v e c a t t l e · A v e r a g e m i l k p r o d u c t i v i t y o f b u f f a l o a n d c o w i s q u i t e l o w d u e t o i n f e r i o r b r e e d o f a n i m a l s , l o w n u t r i t i o n a n d h e a l t h o f a n i m a l s d u e t o l a c k o f n u t r i t i o u s f o d d e r & f e e d · M a n y f a r m e r s o w n u n p r o d u c t i v e c a t t l e d u e t o e m o t i o n a l r e a s o n s · T h e r e s h o u l d b e s o m e i n t e r v e n t i o n f o r b r e e d i m p r o v e m e n t o f b u f f a l o , c o w a n d g o a t · F a r m e r s s h o u l d b e t r a i n e d o n t h e n e c e s s i t y o f p r o v i d i n g a d e q u a t e n u t r i t i o n t o a n i m a l s · F o d d e r a v a i l a b i l i t y / s h o r t a g e a n d i t s i m p a c t o n l i v e s t o c k s e c t o r · F o d d e r s h o r t a g e l e a d s t o l o w c a t t l e p r o d u c t i v i t y a n d a l s o i n d e c l i n i n g n u m b e r o f a n i m a l s w i t h h o u s e h o l d s · C u l t i v a t i o n o f f o d d e r c u l t i v a t i o n s h o u l d b e p r o m o t e d t h r o u g h d e m o n s t r a t i o n s , t r a i n i n g a n d s o m e f i n a n c i a l s u p p o r t Page 265 U P B S N I E S A R e p o r t f o r U P S L R P - I I I 2 6 4 P A R T I C U L A R S F E E D B A C K S U G G E S T I O N S , I F A N Y O t h e r l i v e s t o c k s e c t o r i s s u e s · V e t e r i n a r y s e r v i c e s a r e i n a d e q u a t e s i n c e p u b l i c s e c t o r i s n o t a b l e t o r e a c h o u t a l l t h e n e e d y a n i m a l s · I n a d d i t i o n t o s t r e n g t h e n i n g o f a n i m a l h u s b a n d r y d e p a r t m e n t o f t h e s t a t e p r i v a t e s e c t o r s h o u l d a l s o b e i n v o l v e d t o i m p r o v e v e t e r i n a r y s e r v i c e s Page 266 UPBSN IESA Report for UPSLRP-III 265 ANNEX-XIX Proceedings of 1 st Village-level Stakeholders Workshop Date: 01-02-2009 Venue: Kohar village (Sultanpur district) Time: 1200 – 1530 hours Participants: S. No. Category of participants Number of participants 1 UPBSN Officers 4 2 Experts of WAPCOS (IESA Consultants) 16 3 Members of Gram Panchayat 7 (including Gram Pradhan) 4 Male Farmers 351 (212 marginal farmers, 112 small farmers, 16 large farmers, 11 landless) 5 Women 46 6 School-going children 32 7 Total 456 1. The workshop started off with traditional welcome of the visitors by the villagers. 2. After introduction of each official present at the workshop, farmers and others present at the venue were briefed about the purpose of the workshop and were invited to share their knowledge and perception about the resources, issues and concerns of the village. 3. First of all, the Gram Pradhan shared his knowledge and experience about the village. Subsequently, other farmers and women participated in the interaction. Feedback received from the farmers and other stakeholders at village level is summarized below: (i) The village has huge sodic area which is lying uncultivated for long. The proposed project should help farmers in reclaiming entire sodic patch. Page 267 UPBSN IESA Report for UPSLRP-III 266 (ii) Sodic area is located in 3-4 contiguous patches which will facilitate implementation of field activities. (iii) The sodic area of the village has no source of irrigation. Thus, the first task would be to develop irrigation facility for this area. (iv) The village has quite large number of animals, especially milch animals. Almost every family has animals. But, animal health care facility is lacking in the village. (v) Common animal diseases of the village include Khurpaka & Muhpaka (Foot and Mouth disease), Sarra, etc. (vi) The project should provide animal health care facility in the village. (vii) Large quantity of milk is produced every day. But there is no milk collection center in the vicinity. As a consequence, many a time, milk is spoiled before reaching the market. (viii) The project should make a provision of milk collection and storage center in the village. (ix) Substantial part of the village area faces waterlogging which needs to be addressed urgently. If done, it will ensure sowing of second crop (during the Rabi season). (x) Intra-village road network (road connectivity between the hamlets) is quite poor. It needs improvement. (xi) Availability of quality seed must be ensured. (xii) Timely availability of standard quality fertilizers, especially DAP, must be ensured. (xiii) Project information should be disseminated in advance to farmers so that they become aware about the project subsidies and supports. (xiv) Criteria of selection of farmers for the project support should be based on their socio-economic condition. Poor farmers should be given priority while distributing project inputs in kind or cash. (xv) Project authorities should use their power to influence various departments of the State government so that farmers get adequate benefit from different government programmes. Page 268 UPBSN IESA Report for UPSLRP-III 267 (xvi) Project should implement some schemes for development of women, especially their income enhancement. (xvii) Project should provide full subsidy on seed, fertilizers, and irrigation for sodic land. (xviii) Self-help groups should be formed for men as well as women. These groups should be provided some no-refundable fund to start income generating activities. (xix) There is difference in wage rate for male and female laborers. Such difference should be removed. (xx) Farmers receive low prices for their agricultural produces. Something needs to be done to increase the prices received by the farmers. (xxi) Whatever support is provided by the World Bank should be received by the beneficiaries. (xxii) Since farmers are poor, they would not be able to contribute much in terms of cash. However, they are ready to contribute their labor services in project implementation. 4. After the farmers shared their perception and suggestions, UPBSN officers elaborated in detail various project activities, support in kind and cash, and expectation from the farmers. They all emphasized upon the participatory and transparent nature of the project. 5. Experts of WAPCOS concentrated on need for participating proactively in the project activities as the project was for their own benefit. 6. The workshop concluded with the vote of thanks proposed by the Project Manager of Sultanpur district. Page 269 UPBSN IESA Report for UPSLRP-III 268 Proceedings of 2 nd Village-level Stakeholders Workshop Date: 07-02-2009 Venue: Jugraj Pur (Kanpur Dehat district) Time: 1300 – 1500 hours Participants: S. No. Category of participants Number of participants 1. World Bank representative 1 2. UPBSN Officers 5 3. Experts of WAPCOS (IESA Consultants) 14 4. Members of Gram Panchayat 10 (including Gram Pradhan) 5. Male Farmers 205 (116 marginal farmers, 72 small farmers, 9 large farmers, 8 landless) 6. Women 45 7. School-going children 35 8. Total 315 7. The workshop started off with traditional welcome of the visitors by the villagers. 8. After introduction of each official present at the workshop, farmers and others present at the venue were briefed about the purpose of the workshop and were invited to share their knowledge and perception about the resources, issues and concerns of the village. 9. The process started with narration of the situation of the village by the eldest person (also ex-Gram Pradhan) of the village. Subsequently, Gram Pradhan and other farmers and women participated in the interaction. Feedback received from the farmers and other stakeholders at village level is listed below: (i) The authorities should make the village free from sodic land. Farmers are ready to take the task as per the advice of the officers and project staff. Page 270 UPBSN IESA Report for UPSLRP-III 269 (ii) The village lacks adequate irrigation facility in some pockets, especially sodic patches. Even if farmers wish to try cultivate the sodic land, lack of irrigation facility stops them doing so. (iii) The road connecting the inhabited area with the motorable road is in extremely bad condition. The project should try to improve its condition. Entire socio-economic life of the villagers is adversely affected by the poor road connectivity. Once road is improved many of our day-to-day problems will automatically be solved. (iv) Farmers face difficulties in getting quality seed and fertilizers in timely manner. (v) Breed of animals in the village is of poor quality resulting into low milk productivity. If something could be done, it would be great. (vi) Veterinary hospital is located far away from the village. Poor road condition adds to the problems of farmers. (vii) Common animal diseases of the village include Khurpaka & Muhpaka (Foot and Mouth disease), Sarra. (viii) Crops are destroyed by Blue Horse. (ix) Verification of Ration Cards has not been done properly. As a result, issuance of APL and BPL ration Cards is fallacious. (x) There is no community toilet in the village. Women of poor families face lots of problem. (xi) Dai is not deployed at the Primary Health Center due to which maternity care is adversely affected. (xii) Inhabited area of the village face water logging due to lack of drainage facility. Water logging is also experienced in some part of agricultural land. (xiii) Project should make efforts to ensure timely availability of quality seed, fertilizers to the farmers. (xiv) Project information should be disseminated in advance to farmers so that they become aware about the project subsidies and supports. Page 271 UPBSN IESA Report for UPSLRP-III 270 (xv) Criteria of selection of farmers for the project support should be based on their economic condition. Resource-poor farmers should be given priority while distributing project inputs. (xvi) Project should dovetail with various on-going schemes of the government so that villagers could be benefited from these schemes. (xvii) Project should provide full subsidy on seed, fertilizers, and irrigation for sodic land to be selected for reclamation programme. (xviii) Self-help groups should be formed for men as well as women. These groups should be supported with financial and technical inputs in starting income generating activities. (xix) Farmers face problems in marketing of their farm produces. This problem is accentuated due to poor road condition. If the project could establish some kind of organized market in the village vicinity it would help farmers getting remunerative prices for their products. It will also reduce the cost of transporting the products to the town market. (xx) There should be some mechanism to lodge complaints against the erring project officers and staff. Such arrangement should not require disclosure of the identity of the complainant. (xxi) Farmers are ready to contribute their share in terms of labor. 10. After the farmers shared their issues, perception and suggestions, UPBSN officers elaborated in detail various project activities, support in kind and cash, and expectation from the farmers. They all emphasized upon the participatory and transparent nature of the project. 11. Experts of WAPCOS concentrated on need for participating proactively in the project activities as the project was for their own benefit. 12. The workshop concluded with the vote of thanks proposed by the Project Manager of Kanopur Dehat district. Page 272 UPBSN IESA Report for UPSLRP-III 271 Proceedings of 3 rd Village-level Stakeholders Workshop Date: 22-02-2009 Venue: Dustampur (Etah district) Time: 1200 – 1500 hours Participants: S. No. Category of participants Number of participants 9. UPBSN Officers 4 10. Representatives of WAPCOS (IESA Consultants) 14 11. Members of Gram Panchayat 8 (including Gram Pradhan) 12. Male Farmers 154 (95 marginal farmers, 36 small farmers, 16 large farmers, 7 landless) 13. Women 23 14. School-going children 7 15. Total 210 13. To start with, villagers under the leadership of the Gram Pradhan welcomed the officers of UPBSN, representatives of WAPCOS. 14. After introduction of each official present at the workshop, farmers and others present at the venue were briefed about the purpose of the workshop and were invited to share their knowledge and perception about the resources, issues and concerns of the village. 15. Gram Pradhan and other farmers and women shared various issues facing them and provided some suggestions for project implementation. Feedback received from the farmers and other stakeholders at village level is listed below: (i) Timely payment to water users’ groups should be ensured. Interaction with the beneficiaries of other villages where the project was Page 273 UPBSN IESA Report for UPSLRP-III 272 implemented during the second phase revealed that there was some problem in payments. (ii) Arind Nadi (a natural drain) needs proper cleaning in order to address water logging problem of the village vicinity. (iii) Village does not have adequate irrigation facility. The project should provide/develop more irrigation facility. (iv) One boring will not be able to supply adequate irrigation water to the command area of 4 hectares as proposed in the project. Command area of the boring should be reduced to 3 hectares. (v) Animals in the village suffer from various foot and mouth diseases. For last 5 years, no programme has been implemented to fight these diseases. (vi) Farmers should be trained to take care of health and hygiene of their animals. (vii) Possession on community land allotted to different farmers is an issue. Project authorities should help the allottees in getting the possession so that they could start crop cultivation on these lands. (viii) In view of high cost of diesel, there is need for electric tube well in the village. Project should try to establish a government tube well (electric) in the village. It will reduce the cost of cultivation. (ix) There should be perfect transparency on payments under the project. It will improve confidence of the beneficiaries. (x) The project should arrange/provide leveling machine in stead of providing some money for the purpose. (xi) There is need for community toilets in the village. 16. After the farmers shared their issues, perception and suggestions, UPBSN officers elaborated in detail various project activities, support in kind and cash, and expectation from the farmers. They all emphasized upon the participatory and transparent nature of the project. 17. Experts of WAPCOS concentrated on need for participating proactively in the project activities as the project was for their own benefit. Page 274 UPBSN IESA Report for UPSLRP-III 273 18. The workshop concluded with the vote of thanks proposed by the Project Manager of Etah district. Page 275 UPBSN IESA Report for UPSLRP-III 274 ANNEX-XX Potential Environment and Social Impacts and Suggested Mitigation Measures Issues Potential Impact Suggested Mitigation (i) Land Related Selection of Sodic Land villages · Possibility of non-coverage of villages with high concentration of vulnerable groups · Make the process transparent · Give wide publicity on the village selection process · Allow local communities to make representation for the inclusion of village satisfying the selection criteria Site Identification · Possibility of poor and marginalized farmers being left out from reclamation coverage · Ensure that poor, marginalized and vulnerable groups, including minorities are covered as beneficiaries · Make the process transparent · Give wide publicity of the selection process · Allow local communities to make representation for the inclusion of their sodic lands- satisfying the selection criteria Collection of cadastral maps · Old maps collected that may result in conflicts regarding land titles · Collect latest maps and cross- check with revenue records prior to physical demarcation of titled sodic patches of land Map classification & ground verification · Inordinate delay may affect reclamation timing and one season lost · Inadequate field staff may verify without visiting fields resulting in anomalies and possible conflicts later on · Develop sufficient and flexible timelines to avoid heat waves and excessive monsoon for ground verification · Deploy sufficient staff for field work and monitor actual field visit – digital photographic record of field visits to be documented Household survey · Inadequate staff may not cover all stakeholder households · Possibility of inclusion of absentee farmers and/or identification of elite/large farmers due to pervasive corruption · Deploy sufficient staff and provide enough and flexible timelines to avoid heat waves and excessive monsoon for household surveys · Monitor corrupt practices by random sample check by senior managers of the survey results Land allotment and possession · Acquisition of private land for OFD works without consent or with force · Loss of forest land if any · Loss of fodder resources due to acquisition of pastures and plantation land · Impacts on wildlife habitats · Ensure that forceful and without consent acquisition/appropriation of land does not takes place. UPBSN should issue a circular to this effect · If in doubt, seek confirmation from forest department that lands are not forestlands. · Avoid reclaiming community lands that may be used as pastures by landless families who earn from livestock Page 276 UPBSN IESA Report for UPSLRP-III 275 Issues Potential Impact Suggested Mitigation · Monitor corrupt practices by random sample check by senior managers of the land allotment · Ensure that reclamation process does not harm fodder resources on common pasture lands, i.e. native grasses that grow under sodic conditions · Do not acquire seasonal and/or permanent wetlands (small to large) near villages Identifying eligible persons · Inclusion of non-eligible persons due to corruption · Some needy and eligible persons may be missed if away on account of migrant labor, illness etc · Display the list of beneficiaries in the selected villages · Allow local people to representation for their inclusion- satisfying eligibility criteria · Monitor corrupt practices by random sample check by senior managers of the survey results · Ensure a follow on confirmation survey to cover genuine eligible absentees Community mobilization Motivation & awareness campaigns · False promises to motivate people · Non-use of publication material, brochures in local language · Few and ill timed awareness campaigns resulting in inadequate coverage of potential beneficiaries · Non-involvement of PRIs · Ensure that local NOGs, field level officers who are engaged for motivation and awareness building are properly oriented about the scope of the project · Use local language publication material · Involve innovative approaches like street plays, awareness camps with health camps etc · Do not undertake programs during sowing and harvesting times and avoid extreme weather events to ensure larger participation · Inform the communities, including PRIs well in advance through public announcements and posters regarding date, time and place for such events Beneficiary selection · Poor farmers with smaller sodic farms left out under influence of bigger farmers · Political influence in selecting beneficiaries · Ensure transparency in beneficiary selection – disclose methodology used and list of selected beneficiaries · Provide copies of beneficiary list to PRIs, ZPs and at local administration office · Adhere to beneficiary selection criteria to avoid political interference · Allow local people to Page 277 UPBSN IESA Report for UPSLRP-III 276 Issues Potential Impact Suggested Mitigation representation for their inclusion- satisfying eligibility criteria · Monitor corrupt practices by random sample check by senior managers of the survey results Forming the SIC · Dominance of bigger farmers, political influence in constituting resulting in non- inclusive SIC · Non-transparent process for constituting SIC leading to dissatisfied beneficiaries · Ensure inclusiveness and representation of all communities/castes and vulnerable groups, including women · Inform communities about SIC selection criteria and involve them in processes · Allow local grassroots worker to play facilitation role in SIC formation Mitra Kisan (MK)and Mahila Mitra Kisan (MMK) selection · Impacts on role of women in social setup and possible conflicts with MK · Less time for traditional household chores inviting family ire · Allow grassroots worker and local NGOs to educate and form a cooperative relationship between MK and MMK · Undertake regular dialogue with MMK to understand their family dynamics; field officers to also educate families and make them see as an achievement rather than conflict with traditional roles Forming Water User Groups and electing presidents · Infiltration of influential farmers for taking benefits from assured irrigation · Non-transparent selection of WUG presidents resulting in early disassociation of WUGs · Review WUGs one week after constitution and take appropriate remedial action if discrepancy found · Make public the finding of the WUG process of formation and review · Select presidents in an open forum · Ensure that vulnerable have opportunities to be members of WUGs Assessment of the benefiting community and lands to be reclaimed · Inclusion of higher class B and B+ lands due to interference by influential farmers · Inaccurate assessment of communities and gaps in farmer extension services · Follow the land selection criteria to ensure that C class lands are covered more than B and B+ · Cross check community assessment results with baseline study and IESA data · Monitor corrupt practices by random sample check by senior managers of the survey results Detail land reclamation plan · Over budgeting for resources, soil amendments and under budgeting for time · Balance time and resources – double check all calculations before placing orders and Deputy Manager at the field level to certify quantities · Strictly follow sequence for land treatment Page 278 UPBSN IESA Report for UPSLRP-III 277 Issues Potential Impact Suggested Mitigation Developing a time bound activity schedule · Selecting fields not in a sequence but due to influence of bigger farmers · Not following sequence and indulging in land leveling and applying soil amends before developing drainage · Impatience by excited farmers resulting in inadequate time for flooding and flushing before planting paddy · Ensure that field selection for reclamation is complete and plots are adjacent to achieve a size of approximately 40 hectares or more · Ensure that without developing proper drainage – field and link drains and rehabilitation of main drains, actual reclamation process is not started · Develop proper social monitoring system to ensure that land reclamation is preceded by a proper drainage network · Work with farmers to educate them about the importance of flooding and flushing Classifying and fixing the responsibility of different role players in different stages of project · Confusion regarding roles and responsibilities between beneficiaries and project staff · Inadequate staff, as a result some staff getting overburdened · Conflict of interest, as some staff does both implementation and supervision of the same work · Define and describe roles clearly and provide a printout of these in local language to beneficiaries communities · Carefully delegate responsibilities so as not to overburden staff · Frame clear rules of reporting and avoid conflict of interest Making the beneficiaries accountable for implementation and impact of the project · Inactive beneficiaries · NGOs are working closely with the beneficairies · Ensure that NGOs work with beneficiaries · Monitor NGOs working through sample checks and their regular reporting · Ensure participatory monitoring is udneratken Topographical Survey · Inaccurate survey may impact choice in designing drainage · Inaccurate survey could result in miscalculation of materials extraction and other requirements · Topographical survey to be verified by technical experts and cross-checked with respect to materials requirement Survey planning and approval in SIC Soil and Water sampling Determination of gypsum requirement value Gypsum Arrangement · Procurement of phosphor- gypsum · Do not procure phosphor-gypsum Bunding Scrapping of salt crust · Disposal of scrapped salt · Social conflict in disposal of salt Land leveling and shaping · Impacts due to extraction of soil material and its disposal Page 279 UPBSN IESA Report for UPSLRP-III 278 Issues Potential Impact Suggested Mitigation · Creation of low lying areas resulting in water logging Making of small size plots and micro-leveling · Soil erosion · Ensure feasible plot size Construction of field drains · Increase in turbidity of nearby water bodies, as a result of outflow · · Ensure that beneficiaries maintain field drains Construction of link drains · Draining of seasonal and small wetlands due to drainage channels passing through · Loss of aquatic flora and fauna · Eutrophication risks due to increased use of agro- chemicals that will flow to nearby water bodies · Threat to the habitat of Sarus crane due to draining of wetlands · Ensure that the link drains do not pass through natural wetlands · Prepare digital maps of project districts and land reclamation sites to superimpose with a wetlands map prepared through remotely sensed data of last five years · Document aquatic flora and fauna of significant wetlands that are known habitats of Sarus crane and monitor its population during project period · Monitor and regulate use of excess fertilizers through farmer education, awareness and training · Promote IPM and INPM to reduce use of various agro-chemicals Assured Irrigation · Conflicts in the operation of the pump · Conflicts in distribution of water · NGOs to ensure community actions · Enthuse community belongingness Selection of boring sites · Chances of polluted groundwater being extracted, especially fluoride · Test water quality, especially for presence of fluoride; do not install tube well if tested positive for fluoride Installing tube well · Impacts on ground water level · Excess use of diesel generators for running tube wells in absence of regular electricity supply · Conflicts among WUG members on priority and first use of tube wells · Undertake regular monitoring of water table with help from the concerned department and maintain records · Work with electricity board to provide timely power for tube wells · Develop and document resource sharing models with WUG members Gypsum addition · Addition of excess gypsum due to perception problems that more gypsum will result in faster and better land reclamation · Add gypsum as per calculated amount and do not procure extra and provide at reclamation site to avoid extra addition · Allot responsibility to beneficiaries for adding appropriate amounts Supply and use of soil amendments · Use of extra soil amendments for perceived faster and better reclamation · Use appropriate amounts of soil amendments and educate farmers regarding this Page 280 UPBSN IESA Report for UPSLRP-III 279 Issues Potential Impact Suggested Mitigation · Increased use of chemical fertilizers and pesticides · Impact on groundwater quality due to infiltration of water with high TDS level · Promote IPM and INPM · Undertake regular monitoring of groundwater quality Flushing the fields · Disposal of runoff from reclaimed areas may enter natural wetlands and water bodies · Optimize irrigation practices including provision of proper leveling and bunding, to check water run-off and soil erosion Crop production and crop diversification · Increased use of pesticides/ fertilizers · Soil and ground water pollution · Pollution due to run-off from agriculture fields containing pesticides and fertilizers resulting in pollution of receiving surface water · Increased eutrophication risks · Impacts on aquatic ecology · Increase in pesticide residues in food chain · Disposal of used or empty cans of pesticides/fertilizers · Depletion of nutrients in soil due to regular cropping and by not adding amendments after one/two years · Prior assessment of pests and weeds existing in the project area · Greater use of integrated pest management techniques and practices · Optimal dosage and composition of agro chemicals as per the requirement of crops · Use of personal protective equipment while handling, using and storage of fertilizers and pesticides · Proper OFD to check surface run-off of fertilizers and pesticides · Proper disposal of hazardous waste like pesticides with containers · Grazing cattle on fallow land between two crops to increase fertility. · Use of organic manure and bio fertilizers (mulching, vermin- compost etc.) · Optimal dosage of agro- chemicals after soil quality analysis Improving Animal Nutrition · Increase in livestock population · Increased water demand for Livestock · Increase in solid waste generation and problems associated with its disposal. · Increased generation of liquid wastes · Improvement in local breeds due to cross- breeding with better breed · Increased risks of diseases in live stock. · Increased pressure on agriculture and forests land · Assessment of fodder and water availability for livestock in the village. · Possible use of local varieties of grasses for fodder and pasture land development. · Selection of local resilient varieties of grass suited to local conditions for pasture development · Identification and development of alternate grazing areas and improvement of existing ones. · Fodder and fuel wood cultivation as a part of social forestry Page 281 UPBSN IESA Report for UPSLRP-III 280 Issues Potential Impact Suggested Mitigation for fodder due to higher fodder demand. · Encourage stall feeding. · Composting of organic waste or generation of biogas plants. · Regular vaccination of Livestock as per standard norms. · Biomedical wastes generated at various insemination centres to be handled and managed according to the Biomedical Hazardous Waste (Management and Handling)Rules, 1989 and amendments. · Develop capacities among local villagers for basic health care support of livestock. · Encouragement of and adopt best management practices in animal husbandry Fodder seed demonstration · Lack of common lands or poor response for growing fodder on private lands · Select hardy and native fodder species, which could be easily grown on drain slopes, farm bunds and wastelands Vaccination campaign · Handling and disposal of biomedical wastes, like syringes etc · Low response from cattle owners for vaccination · Arrange for proper biomedical waste disposal; seek guidance from UPHSDP · Educate owners regarding benefits of vaccination to increase coverage Animal health camps · Lack of cleanliness and upkeep of hygiene at camp site · Problem of odor and disposal of biomedical wastes · Ensure proper cleanliness at animal health camps with proper shade, ventilation and land sloping to avoid water accumulation and stagnation · Install bins for biomedical waste disposal · Provide proper water troughs for animals Breed Improvement · Increase in number of total cattle due to non-reduction of scrub cattle · Impact on surrounding forests and natural vegetation due to over-grazing · Encourage livestock owners to reduce scrub cattle and provide better breed only in exchange · Castration of scrub bulls · Encourage stall-feeding practices Promotion of Small Ruminants Goat/sheep rearing · Increased pressure on fodder resources and threat to natural forests · Degradation of pastures and grasslands · Ensure that fodder is available before planning for goat rearing · Work with communities for fodder crop cultivation in small patches · Explore the use of common land for fodder trees plantation Page 282 UPBSN IESA Report for UPSLRP-III 281 Issues Potential Impact Suggested Mitigation Backyard poultry · Pig rearing Improved Access to Credit Seed-Fertilizer Shop · Chances of increased use of fertilizers due to easy availability and access · Health hazard during storage, transport and application Convergence of government schemes · Delays in convergence · Lack of coordination · Beneficiaries not eligible · NGOs should work intensively with related agencies to ensure convergence · UPBSN/DPU should take up the issues with relevant agencies · Organize ‘credit melas’ involving financial institutions Training of Line Department Staff · Training needs assessment not done · Staff not spared for training · Project to undertake a need assessment of all the staff/functionaries of the project · Make it mandatory that staff attend some of the important training programs Improvement of Drainage Systems Rehabilitation of main drains · Drains occupied by local population for farming & other uses · Drains blocked with check dams to facilitate irrigation · Participatory processes and stakeholder consultation not done · Pollution by construction spoils · Excavation of large quantities of earth and its disposal · Impacts due to disposal of effluents from main drains into receiving water bodies · Impacts on wetlands due to improvement in natural drainage (chances of draining and subsequent conversion of land to agriculture) · Assess adverse impacts and prepare mitigation measures · Involve local communities in finding out acceptable measures · Overflow of link and main drains · Improvement in drainage Maintenance of main drains · Draining of small to medium sized wetlands in surrounding lands · Disposal of sedimentation/bed material due to cleaning of main drains · Avoid draining of natural wetlands by not linking them with the drainage line · Allow farmers to take away earth excavated from drains, as it may be rich in organic matter (this was also seen in the previous project) · Involve local communities to check further use of drains for agril. and other purposes Monitoring by WUGs · Inadequate monitoring by · Build capacity of WUGs in Page 283 UPBSN IESA Report for UPSLRP-III 282 Issues Potential Impact Suggested Mitigation WUGs of physical works · WUGs not active on resolving conflicts on water use monitoring of physical works and its progress · Train WUG members in account keeping and record checking · Ensure WUGs take full responsibility of distribution of irrigation from tube wells Page 284 UPBSN IESA Report for UPSLRP-III 283 ANNEX-XXI Measures for IPM for various crops I. CHICK PEA Preparation · Chick pea requires a well aerated well drained, properly clean and rough seed bed. · So that the root growth is facilitated and higher nodulation is promoted. · If kharif crop is not taken then prepare the field by applying two harrowing and then leveling the field by leveler or patta after cessation of rains for soil moisture conservation. · One deep ploughing followed by one to two harrowing should be done, deep ploughing should be done once in every two to three years. · If required planking should be done. · If the field is having weed problem then stale seed bed technique can be used. · Let a heavy flush of weeds emerge and be destroyed with herbicide before sowing. · Most of the weeds seeds germinate from the top 5cm of soil surface in about a weeks time, these weed seedlings can be destroyed either with a contact herbicide or by shallow type tillage implement like a spike tooth harrow. · In stale seed bed technique depending upon the availability of time and resources one or two flushes of weeds can be destroyed before planting of the crop. Seed & Sowing · Seed treatment is very essential to prevent the crop from soil borne diseases. · The seed treatment is done by treating 1.0 kilogram of seed with 3 gm of Captan, or Thiram or Agrosan GN plus 1.5 gm of Bavistin. · The treatment of gram seeds should be done before seed inoculation so that the coating of the fungicide first adheres to the seed. Harvest · The harvesting of the crop is done when the whole plant or a majority of plant parts begin to turn reddish to brown in colour. · The grains also turn reddish brown and the pod colour is turned into light brown to golden brown in colour. · The plants are harvested by plucking the plants or by cutting them with the help of sickle, in some places the plants are directly uprooted in the field. · After harvesting the the plants are sun dried so that the excess moisture is drained out from the grain. · The moisture in the grains should not exceed above 12 - 14 percent II. MUSTARD Agronomic Practices Page 285 UPBSN IESA Report for UPSLRP-III 284 Field Preparation · Mustard generally gives optimum production in well fertilized sandy to sandy loam soils with adequate drainage and requires fine, firm and moist seed bed. · The land can be prepared by giving one ploughing followed by discing or planking. · Deep ploughing should be done to expose the soil borne pathogen and the hibernating stage of the defoliators. · Destruction of plant debris and earlier crop residues. · If the field is having weed problem, then stale seed bed technique can be used. · Heavy flush of weeds is allowed to be emerged and then destroy it with herbicide before sowing the crop, without any tillage on it. · Most of the weeds seed germinate from the top 5cm of soil surface in about a week's time. These weed seedlings can be destroyed either with a contact herbicide or by shallow type tillage implements like spike tooth harrow. · In stale seed bed technique depending upon the availability of time and resources one or two flushes of weeds can be destroyed before planting of the crop. Seed and Sowing · Care to be taken to purchase the seeds only from the authorized seed sale counter like the State Seed Corporation, National Seed Corporation etc. and only registred and certified seeds should be purchased. · The pre-treated seeds need not be treated again. · Seed treatment using Thiram or carbendazim @2.5 g/kg seed protects the crop by Root rot and Sclerotinia. · Seed treatment with Apron 35 SD @ 6 g/kg seed controls the initial infection of White rust and Downy mildew and thus saves the use of costly chemicals. Harvest · Harvesting of the crop is done when the pods turn yellow in colour, and the stem turns slightly brown in colour and is changing colour. · The seeds turn dark in colour and also they become dry and give a rattling sound when it is shaken. · Harvesting is done manually with the help of sickle by cutting down the stem at a lower portion, · Harvesting to be done preferably in the morning to reduce the shattering losses. · After harvesting, the heaps are layered on the field for drying so that the moisture percentage is reduced. III. MOONG Agronomic Practices Field Preparation · 1 ploughing and 1 harrowing, level the field with patta or leveller and remove weeds. · Care should be taken to do ploughing once in every two to three years. Page 286 UPBSN IESA Report for UPSLRP-III 285 · In termite endemic areas, apply lindane 1.5% kg/ha before last harrowing. · If the field is having weed problem then stale seed bed technique can be used. · Let a heavy flush of weeds emerge and be destroyed with herbicide before sowing the crop, without any tillage on it. · Most of the weeds seeds germinate from the top 5cm of soil surface in about a weeks time, these weed seedlings can be destroyed either with a contact herbicide or by shallow type tillage implement like a spike tooth harrow. · In stale seed bed technique depending upon the availability of time and resources one or two flushes of weeds can be destroyed before planting of the crop. Seed & Sowing · Treat seed with 1 g Carbendazim + 2g of Thiram or 3 gms of thiram fungicide per kilogram of seed. · Treat the seed with 5 g Rhizobium culture per kg seed. · After treatment, keep it in shadow and sow thereafter immediately. Harvest · When pods turn black and are matured then harvesting should be done. · To avoid shattering losses it is advised to harvest the crop in early hours. · Over maturity of the crop will lead to shattering losses at the time of harvest. D. URAD Agronomic Practices Field Preparation · Light soils are suitable for Urd cultivation. · Immediately after first rains, one ploughing and two harrowing are recommended. · Destroy weeds and other foreign materials from the field and adjoining areas. · Soils having 7-8 pH are suitable. · Acidic and alkaline soils are not suitable for this crop · Drainage canals should be made to remove excess water from the field. · If the field is having weed problem then stale seed bed technique can be used. · Let a heavy flush of weeds emerge and be destroyed with herbicide before sowing the crop, without any tillage on it. · Most of the weeds seeds germinate from the top 5cm of soil surface in about a weeks time, these weed seedlings can be destroyed either with a contact herbicide or by shallow type tillage implement like a spike tooth harrow. · In stale seed bed technique depending upon the availability of time and resources one or two flushes of weeds can be destroyed before planting of the crop. Seed and Sowing · Treat the seed with 3 gm thiram + 1 gm carbendazim per kg of seed. · For the above use old earthen pot or tripal. Page 287 UPBSN IESA Report for UPSLRP-III 286 Harvest · Harvesting should be done after crop is matured and most of the pods turn black. · Harvesting should be done in the early hours to minimize shattering losses. · Over maturity may result in shattering losses